Table of Contents. Purpose. Eldorado Intertie and System (Eldorado- Four Corners) Scheduling. Operating Procedure

Size: px
Start display at page:

Download "Table of Contents. Purpose. Eldorado Intertie and System (Eldorado- Four Corners) Scheduling. Operating Procedure"

Transcription

1 Table of Contents Purpose Limits, Ratings, & Effectiveness Factors Contingency Operations Transmission Lines Outages APS Terminal Equipment Outages SCE Terminal Equipment Outages Eldorado to Four Corners Path Outages & ENTA Eldorado- Moenkopi 500 kv Line Outage Moenkopi- Four Corners 500 kv Line Outage Crystal-Navajo 500 kv Line Outages Crystal-McCullough 500 kv Line Outages Manual Calculation ETCC Update for Fcorner 5 Tie Normal Operations Pre-Scheduled Energy Interchange HASP or Real-Time Energy Exchange Scheduling Eldorado Losses Back to APS Supporting Information Background Operationally Affected Parties References Definitions Version History Technical Review Approval Appendix Attachment Purpose Addresses specific requirements associated with operating and Scheduling the Eldorado Intertie and the Four Corners- Moenkopi - Eldorado 500 kv path, external to the CAISO Balancing Authority Area (BAA), as a result of SCE s preexisting rights across the Arizona Public Service Company s (APS) BAA out to Four Corners. Page 1 of 33

2 1. Limits, Ratings, & Effectiveness Factors Table 1 - Normal and Emergency Operating Limits Not applicable to this procedure Table 2 - Ratings Not applicable to this procedure Table 3 - Generation Effectiveness Factors Not applicable to this procedure 2. Contingency Operations 2.1 Transmission Lines Outages To schedule Outages on the various transmission equipment which comprise the Eldorado Intertie and the external Eldorado Moenkopi Four Corners 500 kv path, take the following actions: CAISO Operations Planning & APS Actions 1 Coordinate all transmission Outages for Four Corners Moenkopi and the Eldorado Moenkopi 500 kv transmission lines. 2.2 APS Terminal Equipment Outages APS Actions 1 Coordinate Outages on terminal equipment at Four Corners and Moenkopi, as well as Outages that effect the East-of-River (EOR) rating, with the CAISO Operations Planning group in Folsom. 2.3 SCE Terminal Equipment Outages SCE Actions 1 Coordinate any Outages associated with the terminal equipment at Eldorado with the CAISO Operations Planning group. Page 2 of 33

3 CAISO Operations Planning Actions 2 Coordinate these Outages with APS and other transmission operators with responsibility for the EOR transmission path Interconnections. 2.4 Eldorado to Four Corners Path Outages & ENTA For purposes of network modeling and Congestion Management, the Eldorado Four Corners System to and from the Eldorado Intertie with APS is modeled as a single, external CAISO transmission path, when in fact the transmission path consists of two distinct transmission segments, which can be independently scheduled in the CAISO markets, as Interchange Schedules. Therefore, during Outages to sections or components of this external transmission path, a manual work-around is necessary to accurately reflect, the acceptable tagged paths and Hourly TTCs, under various Outage scenarios in the CAISO s Interchange transaction scheduler. This procedure section clarifies: The workarounds required to accurately determine Hourly TTC for the Eldorado Intertie and the associated Eldorado_ITC limits The correct application of the Eldorado Intertie Hourly TTC to properly calculate the Available Transfer Capability (ATC) published in the Day-Ahead and HASP markets and The correct Interchange Scheduling process. Note: The Eldorado-Moenkopi 500 kv line is fully located within the APS BAA and the parallel McCullough-Crystal-Navajo 500 kv line operates within the LDWP BAA, with interconnection to NEVP at Crystal. During scheduled or Forced Outages of either line, the CAISO may use SCE s preexisting entitlement in the Edison Navajo Transmission Agreement (ENTA), in accordance with the calculations documented within the Arizona Security Monitoring Manual. Page 3 of 33

4 During an Outage of any component of the Eldorado-Moenkopi or McCullough-Crystal-Navajo 500 kv transmission lines, this exchange agreement specifies alternate transmission rights for use, (i.e. available for use on the other parties parallel 500 kv system) Eldorado- Moenkopi 500 kv Line Outage Take the following steps for a Eldorado-Moenkopi 500 kv line Outage: APS is the transmission operator for the Eldorado-Moenkopi 500 kv transmission segment. In the event of a line Outage, SCE (only) may use the parallel LDWP/ NEVP/WALC transmission (via the ENTA agreement) from Moenkopi to Navajo to Crystal to McCullough and back into the CAISO BAA, at the Eldorado500 Scheduling Point. The SCE rights to use this parallel system are determined from the Arizona Security Monitoring Manual. Note: Per the ENTA, only SCE has the rights to use of the ENTA parties transmission during a Moenkopi Eldorado 500 kv Outage. Other CAISO SCs do not, and thus their Schedules should be curtailed to zero, during such Outage conditions. It is important to be aware that other configuration changes in the EOR system can result in modifications to the ENTA party allocations. Note: For an Eldorado-Moenkopi 500kV line outage, the ENTA calculator will not be used. The ENTA calculator is only used for a Navajo-Crystal or Crystal-McCullough 500kV line outage. Page 4 of 33

5 CAISO Operations Planning or Transmission Dispatcher Actions 1 Determine CAISO s (SCE s) transmission allocations on the Eldorado Intertie from the Arizona Security Monitoring Manual, identified by the SCE North Sys Column in Table I, II & III of the Arizona-California EHV Transmission Capacity Allocation Tables. Prior to Determine Then Checking the Arizona- California EHV Transmission Capacity Allocation Tables, The correct system configuration changes in the EOR system, which can result in modifications to the allocations, Determine the correct amount of the CAISO s (SCE) ENTA transmission allocations across the LDWP system (Navajo to McCullough 500). 2 Prior to Publishing 0 MW Hourly TTC on Eldorado Intertie, Then Verify the CAISO s transmission allocations with the APS system dispatcher. CAISO Operations Planning or Transmission Operator Actions 3 Set the Eldorado Intertie Hourly TTC to 0 MW to reflect the open Intertie with APS, for the duration of the Moenkopi Eldorado 500 kv line Outage. Page 5 of 33

6 4 CAISO Interchange Scheduler Actions If The CAISO Day-Ahead Market (DAM) or HASP has already run with the new 0 MW Hourly TTC value for the Eldorado Intertie, OR If The CAISO DAM or RTPD has run with the current (non-zero) Hourly TTC value for the Eldorado Intertie, Then Perform no manual curtailments Then Initiate Interchange Schedule curtailments to reduce the Schedules on the Eldorado Intertie to 0 MW to be within the new Hourly TTC limits. CAISO Interchange Scheduler Actions 5 Check out the ELDORADO500 (McCullough) end of the e- Tagged Interchange Schedule with LDWP. 6 Notify the involved SCs that their Interchange Schedules will be curtailed for the duration of the Moenkopi Eldorado line Outage and inform them to adjust their bids and Self-Schedules, as necessary, through the Scheduling Infrastructure and Bidding Rules (SIBR). Page 6 of 33

7 Figure 1 Page 7 of 33

8 2.4.2 Moenkopi- Four Corners 500 kv Line Outage When determining the Eldorado Intertie Hourly TTC/ATC, the loss of the Moenkopi-Four Corners 500 kv line does not directly affect the EOR rating. The full Hourly TTC at the CAISO physical Eldorado Intertie remains 1,555 MW, as the Moenkopi to Eldorado line segment and the Eldorado Intertie with APS, remains in service. Take the following steps for a Moenkopi-Four Corners 500 kv line Outage: 1 If The Moenkopi- Four Corners 500 kv line Outage is scheduled for a future date, CAISO Operations Planning or Transmission Dispatcher Actions Then Place the following note into the ETCC (with no de-rate): The Moenkopi-Four Corners 500 kv transmission segment of the Eldorado Intertie is out of service. During this Outage, no Interchange Schedules will be allowed which use this transmission path segment. However, the Eldorado_ITC will not be de-rated, as the Moenkopi-Eldorado 500 line segment remains in service. 2 Set the FCORNER5_ITC to 0 MW bidirectional 3 Notify the CAISO Day Ahead Market Operator, Interchange Scheduler, and Market Operations groups via . CAISO Transmission Dispatcher Actions 4 When The Moenkopi- Four Corners 500 kv line is out of service, Then Issue a Market Notice through MNS that states the following: The Moenkopi-Four Corners 500kV transmission segment of the Eldorado Intertie is out of service. Until further notice no Interchange Schedules will be allowed which use this segment of the Four Corners-Moenkopi- Eldorado transmission path. Page 8 of 33

9 CAISO Interchange Scheduler Actions 5 Immediately curtail all existing and future DAM/RTPD Interchange Schedules awarded at FOURCORNE500 to zero and maintain zero for the duration of the Outage. Note: As an alternative, the SC may re-schedule through APS if they can secure alternative transmission from APS, back to Moenkopi500. SC Actions 6 If Then The SC acquires alternative non- CAISO transmission through APS with delivery to the Moenkopi 500kV bus, by the responsible SCs, Transfer DAM/HASP Interchange Schedules at FOURCORNE500 to MOENKOPI500. CAISO Generation Dispatcher Actions 7 Manually skip any HASP or RTM Bids at FOURCORNE500. CAISO Interchange Scheduler Actions 8 Curtail all Interchange Schedules (including losses) on FOURCORNE500 to zero; and any RTPD or RTM. 9 Leave intact any existing DAM/RTPD Schedules that are Scheduled on MOENKOPI500 since this Scheduling Point is not affected by a Moenkopi-Four Corners 500 kv line Outage Crystal-Navajo 500 kv Line Outages LDWP and NEVP are the transmission operators for this external, parallel non-caiso transmission segment. In the event of a line Outage, the ENTA Agreement allows LDWP, NEVP, and WALC to exercise their rights to reroute their Navajo Schedules onto the CAISO/SCE transmission rights between Moenkopi and Eldorado, then back to LDWP at McCullough. In this situation, the LDWP, NEVP, and WALC rights to CAISO capacity on Moenkopi Eldorado 500 kv line are reserved by use of TORs and CRNs, which are normally set to 0 MW. These CRNs must be reset to the external parties ENTA right, to allow each party access to CAISO transmission capacity as an import at Moenkopi to Eldorado, through the CAISO BAA, to an export at McCullough. Page 9 of 33

10 The CAISO s remaining transmission rights on the Eldorado 500 Intertie (Eldorado_ITC) with APS are determined from the Arizona Security Monitoring Manual Take the following steps (on the next pages) to calculate each ENTA parties rights in the event of an adjacent BAA McCullough-Crystal-Navajo 500 kv line Outage. Prior to using the Arizona-California EHV Transmission Capacity Allocation tables it is important to be aware that other configuration changes in the EOR system can result in modifications to the Northern System allocations. CAISO Operations Planning or Transmission Dispatcher Actions 1 First Determine the actual capacity for Energy flow into the CISO from APS at Eldorado. This is the Hourly TTC MW value for the Eldorado 500 Intertie with APS, utilize 1555 MW. Do not use 1555 MW if there is a de-rate on the line or EOR Northern System Allocation MW less the Liberty Peacock Allocation is less than 1555 MW. Note: This total Eldorado 500 Hourly TTC capacity must be shared by the ENTA parties (SCE, LDWP, NEVP and WALC) for the duration of the Navajo-Crystal-McCullough line Outage. LDWP, NEVP, and WALC may use their ENTA rights to wheel power using LDWP/NEVP transmission from Navajo to Moenkopi and CISO transmission from Moenkopi to Eldorado back to LDWP at McCullough. These adjacent BAA ENTA rights are essentially a TOR-like right for LDWP, NEVP, or WALC when invoked under the ENTA. 2 Find the following Arizona California EHV Transmission Capacity Northern System Allocations: SCE North System LDWP (DWP reference in Arizona Security Manual) NEVP (CPC reference in Arizona Security Manual) WALC From Table I and III of the Arizona-California EHV Transmission Capacity Allocation Tables in the Arizona Security Monitoring Manual for the specific line Outage scenario. Note: Table I addresses: Path 49 line configurations and Table III addresses: Southern system compensation configurations. Page 10 of 33

11 Open the ENTA calculator located in the Pi ProcessBook (in the Transmission section) and select the S-320ENTAcalc.xlsx spreadsheet. User Instructions tab in tools If Then The calculator is Use the manual method of calculating unavailable, or to the respective ENTA party rights in verify the values it section 2.5 of this Operating provides, titled Manual Calculation Page 11 of 33

12 3 Calculate each of the ENTA parties rights to use this Eldorado Hourly TTC, under the ENTA agreement, when any segment of Navajo-Crystal-McCullough is out of service. Include the actual Eldorado Intertie Hourly TTC value in the comments section of the Total Transfer Capability (TTC) sheet: Actual Hourly TTC value = SCE + LDWP + NEVP + WALC 4 Document the individual shares in the Outage card for the line Outage. CAISO Day Ahead Market Operator Actions Prior to Implementing LDWP, NVE or WALC ENTA rights through the CAISO BAA, Then Verify ENTA Party shares of the Eldorado Hourly TTC with the parties. Set the ENTA parties CRN MW values to the respective ENTA party Eldorado Hourly TTC share calculations. Change the LDWP/ NEVP/WALC ENTA CRN MW values from 0 MW to the calculated (see 2) ENTA parties Eldorado Hourly TTC shares, using the ETCC. Enter the sum of LDWP/ NEVP/WALC shares into the ETCC for the ELDORADO_ITC (import side) CRN ENTA_1101 and the MCCULLGH_ITC (export side) CRN ENTA_2101 Note: When the market runs it will run with the Eldorado 500 Hourly TTC established by operating conditions (normal Hourly TTC is 1,555 MW) and with the LDWP, NEVP, and WALC ENTA CRNs set to reserve back their respective shares or Eldorado 500 capacity allocations, as determined in 2. Page 12 of 33

13 5 CAISO Interchange Scheduler Actions If The DAM or RTPD was run without the ENTA parties TOR capacity rights, OR The CAISO SCs Interchange Schedules in Interchange transaction scheduler exceed the Eldorado Intertie ATC limits, Then Calculate and initiate prorata curtailments to reduce the CAISO Interchange Schedules on the Eldorado Intertie to within the new CAISO ATC limits, to create capacity for the ENTA parties rights on the path. 6 Contact LDWP, NEVP and WALC schedulers and determine the amount they wish to Schedule on their ENTA rights. Page 13 of 33

14 CAISO Interchange Scheduler Actions 7 Create six market reservations (three sets of wheels) in Interchange transaction scheduler to reflect the change of Energy flow for the effective hours. Enter the market reservations in Interchange transaction scheduler equal to the maximum ETCC ENTA CRN value. Note: This will allow Interchange Schedulers to determine if ENTA rights are over-tagged via the Interchange transaction scheduler Market Entitlement (ME) limits screen when the screen is filtered to include dynamics. Refer to the following pre-established Master File market wheel Schedules: Intertie Point (Import) MOENKOPI500 (Import) MOENKOPI500 (Import) MOENKOPI500 SC ID Energy ITIE/ETIE Resource ID Type ZISO F CISO_ MOENKOPI500_I_WHL_ENTALA ZISO F CISO_ MOENKOPI500_I_WHL_ENTANV ZISO F CISO_ MOENKOPI500 I_WHL ENTWLC (Export) ELDORADO500 (Export) ELDORADO500 (Export) ELDORADO500 ZISO F CISO_ ELDORDO500 E_WHL ENTALA ZISO F CISO_ ELDORDO500 E_WHL ENTANV ZISO F CISO_ ELDORDO500 E_WHL ENTWLC Note: ENTA Interchange schedules may be either dynamic or static. LDWP, NEVP, & WALC may adjust their Dynamically Scheduled Interchange tags after-the-fact because these Schedules include Navajo Power Plant Dynamics. Page 14 of 33

15 Note: The Eldorado 500 Hourly TTC remains un-changed and the ENTA parties wheeled Energy is accommodated by implementation of a TOR CRN capacity right between Moenkopi and McCullough, via the CAISO Eldorado 500 kv system. The pre-assigned CRNs for the parties ENTA rights are: ENTA_1101, ENTA_2101 and ENTA_5101 Note: The CRN that the parties will need to show on their E-Tag is ENTA_5101. All parties share the same TOR CRN s. The CAISO implements these TORs during ENTA events, as CISO Interchange Schedules, to prevent any CAISO settlements charges being applied to the ENTA parties, per the ENTA. Page 15 of 33

16 Figure 2 Page 16 of 33

17 2.4.4 Crystal-McCullough 500 kv Line Outages LDWP is the transmission operator for this external, parallel non-caiso transmission segment. In the event of a line Outage, the ENTA Agreement allows LDWP and WALC to exercise their rights to reroute their Navajo Schedules onto the CAISO/SCE transmission rights between Moenkopi and Eldorado, then back to LDWP at McCullough. In this situation, the LDWP and WALC rights to CAISO capacity on Moenkopi Eldorado 500 kv line are reserved by use of Transmission Ownership Rights (TORs) CRNs, which are normally set to 0 MW. These CRNs must be reset to the external parties ENTA right, to allow each party access to CAISO transmission capacity as an import at Moenkopi to Eldorado, through the CAISO BAA, to an export at McCullough. The CAISO s remaining transmission rights on the Eldorado 500 Intertie (Eldorado_ITC) with APS are determined from the Arizona Security Monitoring Manual. Take the following steps (on the next pages) to calculate each ENTA parties rights in the event of an adjacent BAA McCullough-Crystal 500 kv line Outage. Prior to using the Arizona-California EHV Transmission Capacity Allocation tables it is important to be aware that other configuration changes in the EOR system can result in modifications to the Northern System allocations. Page 17 of 33

18 CAISO Operations Planning or Transmission Dispatcher Actions 1 First Determine the actual capacity for Energy flow into the CISO from APS at Eldorado. This is the Hourly TTC MW value for the Eldorado 500 Intertie with APS, utilize 1555 MW. Do not use 1555 MW if there is a de-rate limit on the line or EOR Northern System Allocation MW Liberty Peacock Allocation is less than 1555 MW. Note: This total Eldorado 500 Hourly TTC capacity must be shared by the ENTA parties (SCE, LDWP and WALC for the duration of the Navajo-Crystal-McCullough line Outage. LDWP and WALC may use their ENTA rights to wheel power using LDWP transmission from Navajo to Moenkopi and CISO transmission from Moenkopi to Eldorado back to LDWP at McCullough. These adjacent BAA ENTA rights are essentially a TOR-like right for LDWP or WALC when invoked under the ENTA. 2 Find the following Arizona California EHV Transmission Capacity Northern System Allocations: SCE North System LDWP (DWP reference in Arizona Security Manual) WALC From Table I and III of the Arizona-California EHV Transmission Capacity Allocation Tables in the Arizona Security Monitoring Manual for the specific line Outage scenario. Note: Table I addresses: Path 49 line configurations and Table III addresses: Southern system compensation configurations. Page 18 of 33

19 Open the ENTA calculator located in the Pi ProcessBook (in the Transmission section) and select the S-320ENTAcalc.xlsx spreadsheet. User Instructions tab in tools If Then The calculator is Use the manual method of calculating unavailable, or to the respective ENTA party rights in verify the values it Section 2.5 of this Operating provides, titled Manual Calculation Page 19 of 33

20 3 Calculate each of the ENTA parties rights to use this Eldorado Hourly TTC, under the ENTA agreement, when any segment of Navajo-Crystal-McCullough is out of service. 4 Include the actual Eldorado Intertie Hourly TTC value in the comments section of the Total Transfer Capability (TTC) sheet: Actual Hourly TTC value = SCE + LDWP + WALC Document the individual shares in the outage management system Outage card for the line Outage. CAISO Day Ahead Market Operator Actions Prior to Implementing LDWP or WALC ENTA rights through the CAISO BAA, Then Verify ENTA Party shares of the Eldorado Hourly TTC with the parties. Set the ENTA parties CRN MW values to the respective ENTA party Eldorado Hourly TTC share calculations. Change the LDWP/WALC ENTA CRN MW values from 0 MW to the calculated (see 2) ENTA parties Eldorado Hourly TTC shares, using the ETCC. Enter the sum of LDWP/WALC shares into the ETCC for the ELDORADO_ITC (import side) CRN ENTA_1101 and the MCCULLGH_ITC (export side) CRN ENTA_2101 Note: When the market runs it will run with the Eldorado 500 Hourly TTC established by operating conditions (normal Hourly TTC is 1,555 MW) and with the LDWP and WALC ENTA CRNs set to reserve back their respective shares or Eldorado 500 capacity allocations, as determined in 2. Page 20 of 33

21 5 CAISO Interchange Scheduler Actions If The DAM or RTPD was run without the ENTA parties TOR capacity rights, OR The CAISO SCs Interchange Schedules in Interchange transaction scheduler exceed the Eldorado Intertie ATC limits, Then Calculate and initiate prorata curtailments to reduce the CAISO Interchange Schedules on the Eldorado Intertie to within the new CAISO ATC limits, to create capacity for the ENTA parties rights on the path. 6 Contact LDWP and WALC schedulers and determine the amount they wish to Schedule on their ENTA rights. CAISO Interchange Actions 7 Create six market reservations (three sets of wheels) in Interchange transaction scheduler to reflect the change of Energy flow for the effective hours. Enter the market reservations in Interchange transaction scheduler equal to the maximum ETCC ENTA CRN value. Note: This will allow Interchange Schedulers to determine if ENTA rights are over-tagged via the Interchange transaction scheduler Market Entitlement (ME) limits screen when the screen is filtered to include dynamics. Refer to the following pre-established Master File market wheel Schedules: Intertie Point (Import) MOENKOPI500 (Import) MOENKOPI500 SC ID Energy ITIE/ETIE Resource ID Type ZISO F CISO_ MOENKOPI500_I_WHL_ENTALA ZISO F CISO_ MOENKOPI500 I_WHL ENTWLC (Export) ELDORADO500 (Export) ELDORADO500 ZISO F CISO_ ELDORDO500 E_WHL ENTALA ZISO F CISO_ ELDORDO500 E_WHL ENTWLC Page 21 of 33

22 Note: ENTA Interchange schedules may be either dynamic or static. LDWP & WALC may adjust their Dynamically Scheduled Interchange tags after-the-fact because these Schedules include Navajo Power Plant Dynamics. Note: The Eldorado 500 Hourly TTC remains un-changed and the ENTA parties wheeled Energy is accommodated by implementation of a TOR CRN capacity right between Moenkopi and McCullough, via the CAISO Eldorado 500 kv system. The pre-assigned CRNs for the parties ENTA rights are: ENTA_1101, ENTA_2101 and ENTA_5101 Note: The CRN that the parties will need to show on their E-Tag is ENTA_5101. All parties share the same TOR CRN s. The CAISO implements these TORs during ENTA events, as CISO Interchange Schedules, to prevent any CAISO settlements charges being applied to the ENTA parties, per the ENTA. Page 22 of 33

23 2.5 Manual Calculation The following are instructions to determine the most limiting ENTA contract MW rights for LDWP, NEVP and WAPA s use of SCE s Eldorado 500 rights to follow when the ENTA calculator is unavailable; CAISO Operations Planning or Transmission Dispatcher Actions First, determine the most limiting ENTA contract MW rights for LDWP, NVE and WAPA s use of SCE s Eldorado 500 rights; a) Take the sum of LDWP share + NVE share + WALC share as determined by APS and/or Table 1 of the Arizona Security Monitoring Manual. b) Then contrast this sum with the Maximum ENTA parties rights of 1,125MW (maximum ENTA rights for LDWP+ NEVP+ WALC). c) Compare the two values to determine which value to use in determining the ENTA parties pro-rata shares of the Eldorado 500 Hourly TTC, using the lower total. Note: Under most conditions it will be the 1,125 MW value. d) If it is the 1,125MW value, then determine the relative proportions for each of the ENTA parties rights (see example in 3 below). Then calculate each ENTA party s percentage share of the Eldorado 500 Hourly TTC; e) Multiply the SCE North system allocation by 1,555 (the Eldorado Hourly TTC with all lines in service Hourly TTC of the Eldorado- Moenkopi 500 kv line) and divide by the sum of the SCE allocation and the value determined from c above. This calculation determines SCE s share of the ENTA Scheduling rights on the Eldorado-Moenkopi 500 kv line during a Navajo Crystal McCullough 500 Outage. f) Repeat the same process for LDWP, NEVP, and WALC. g) Check that total of all four shares add up to 1,555 MW, or the Eldorado 500 Hourly TTC. Page 23 of 33

24 1 Sample ENTA party rights calculation: Situation; All lines in service at full series compensation and the Crystal- McCullough 500 kv line is scheduled out. Consult Table 1 of the Arizona Security Monitoring Manual to find the following Arizona California EHV Transmission Capacity Northern System Allocations: SCE Northern System share = 1,416 MW LDWP Northern System share = 891 MW NEVP Northern System share = 476 MW WALC Northern System share = 455 MW Calculate the sum of LDWP, NEVP and WALC Table 1 allocations = 1,346 MW. Note: Since this example is for the Crystal-McCullough 500kV line, NEVP shares do not need to be added in because they can take delivery at Crystal Substation. Contrast this sum with the maximum ENTA party rights, 1125 MW. Since the maximum ENTA rights of 1,125 MW is less than 1,346 MW, use 1,125 MW value to calculate the relative LDWP and WALC shares. Determine each ENTA parties share of the maximum ENTA party rights, as follows: For LDWP, multiply LDWP s Table 1 capacity allocation 891/1,346 (Sum of LDWP, NEVP and WALC shares) = 66.2 %. Multiply.662*1125 = 745 MW Repeat for NEVP and WALC LDWP s share of the 1,125MW = 745 MW or 66.2% WALC share of the 1,125MW = 380 MW or 33.8% Finally, determine the pro-rata shares of the Hourly TTC on the Eldorado-Moenkopi line (usually 1,555MW) for each ENTA participant, including SCE. Result: SCE Hourly TTC share = 1,416 * 1,555/2,541 = 867 MW LDWP share = 745*1,555/2,541 = 456 MW WALC share = 380*1,555/2,541 = 232 MW Sum of the shares = 1,555MW ( ) Note: the ENTA parties CRN values (for 5 below) in this example are LDWP = 456MW and WALC share = 232MW. Page 24 of 33

25 2.6 ETCC Update for Fcorner 5 Tie When any of the conditions below exist for Four Corners Then update the ETCC with the corresponding actions: CAISO Operations Planning or Transmission Dispatcher Condition Action Four Corners-Moenkopi De-rate Fcorner 5 Tie (FCORNER5_ITC) to 0 500kV Line Outage MW. No other changes. Eldorado-Moenkopi Eldorado BG - follow Arizona Security Manual. Line Outage 1 This outage won t affect Fcorner 5 Tie. 1 In the event of an Eldorado Moenkopi 500 kv line Outage, Interchange Schedulers implement the ENTA agreement using 6930 Eldorado Intertie and System (El-Dorado-. Page 25 of 33

26 3. Normal Operations 3.1 Pre-Scheduled Energy Interchange To process Pre-Scheduled Energy Interchange, take the following actions: Scheduling Coordinator Actions 1 Submit Bids or Self-Schedules in the market at MOENKOPI500 or FOURCORNE500 as the market Scheduling Point. 2 Ensure all of the required transmission arrangements are made with APS for delivery to/from Four Corners, Moenkopi, and Eldorado. Note: SCE Schedules its Four Corners Dynamic as an Intertie Generator in the CAISO market and uses the FOURCORNE500 Scheduling Point for its Interchange Schedule. CAISO Interchange Scheduler Actions 3 Schedule and verify with APS all Interchange Schedules on the Four Corners-Moenkopi and Eldorado-Moenkopi 500 kv transmission line path. 3.2 HASP or Real- Time Energy Exchange To process Hour-Ahead Scheduling process (HASP) or Real-Time Energy Interchange, take the following actions: Scheduling Coordinator Actions 1 Submit market Bids or Self-Schedules in the RTPD or Real-Time Market (RTM) at the MOENKOPI500 or FOURCORNE500 Scheduling Point. 2 Ensure all of the required transmission arrangements are made with APS for delivery to/from Four Corners, Moenkopi, and Eldorado. CAISO Interchange Scheduler Actions 3 Schedule and verify with APS all Interchange Schedules on the Four Corners-Moenkopi and Eldorado-Moenkopi 500 kv transmission line path. Page 26 of 33

27 3.3 Scheduling Eldorado Losses Back to APS APS and the CAISO, as representatives for SCE, perform the following actions in relation to scheduling back transmission losses, when CAISO Scheduling Coordinators (SCs) use this external CAISO transmission: APS and CAISO Actions 1 Estimate average losses for the Four Corners-Moenkopi line and the Eldorado-Moenkopi line (as a percentage of Scheduled quantities) based on historical data. 2 Calculate the difference between the estimated losses and the method for determining losses stipulated in the APS-SCE Operating Agreement. 3 Adjust the estimated loss percentages to minimize the net accumulation of losses as necessary. Note: The export Schedule to APS for losses on the Four Corners- Moenkopi 500 kv line and the Eldorado-Moenkopi 500 kv line can be delivered back to APS at three (3) market Scheduling Points: MOENKOPI500, FOURCORNE500, or NRTHGILA500. The Energy for the Four Corners-Moenkopi and Eldorado-Moenkopi 500 kv line losses is provided by the CAISO from the Real-Time Energy Market, on behalf of the responsible SCs, which are subsequently billed APS contract losses. CAISO Interchange Scheduler Actions 4 Create a schedule for losses in the Interchange transaction scheduler using the following data: Intertie Scheduling Point is MOENKOPI500 FOURCORNE500 or NRTHGILA500 SC is ZISO Resource ID is either: CISO_NRTHGILA500_E_F_APS CISO_FOURCORNE345_E_F_APS or CISO_MOENKOPI500_E_F_APS Page 27 of 33

28 CAISO Settlement Actions 5 Allocate APS contract losses to each responsible SC Scheduling on the Four Corners-Moenkopi 500 kv line and the Eldorado- Moenkopi 500 kv line as an operational adjustment; AND Base such calculation upon the SCs share of Schedules on Four Corners-Moenkopi 500 kv line and Eldorado-Moenkopi 500 kv line, in the predominant direction of the net Schedules to account for their pro-rata share of APS contract losses. 6 Settle the allocated APS transmission losses as uninstructed Real Time Energy. 4. Supporting Information Background The Four Corners - Moenkopi - Eldorado path consists of the 500 kv Four Corners - Moenkopi line and the 500 kv Moenkopi - Eldorado line. Both 500 kv transmission lines are located, external to the CAISO BAA, and comprise the Eldorado Four Corners System within APS BAA. The CAISO-APS BAA boundary is metered at the Eldorado Intertie, which constitutes the CAISO physical Intertie with APS. SCE s external entitlements on this line were turned over to CAISO operation for CAISO Market Participant use. The line is operated in accordance with the Arizona Security Monitoring Manual. This external CAISO transmission path is Scheduled in the CAISO market using the Eldorado Intertie Constraint (ITC), comprised of two external market Scheduling Points, FOURCORNE500 and MOENKOPI500. The physical Intertie is at the Eldorado 500 Substation. Interchange Schedules from/to FOURCORNE500 and MOENKOPI500 cannot exceed the contractually derived Hourly TTC at the physical Eldorado Intertie the CAISO Interchange checkout point with APS. The Moenkopi Eldorado line segment of this path is also subject to a preexisting operating agreement, the ENTA (Edison Navajo Transmission Agreement) a transmission exchange agreement between SCE, LDWP, NEVP, and WALC, known as the parties. Page 28 of 33

29 Operationally Affected Parties Public, Peak RC References Resources studied in the development of this procedure and that may have an effect upon some steps taken herein include but are not limited to: CAISO Tariff Arizona Security Monitoring Manual Section 34.3 Real-Time Dispatch Table 1, 2 & 3 Temp APS Four Corners ECC Path 23 FC 31AA Transformer #1AA Transformer Proc. CAISO Operating 3210, Outage Coordination Activities CAISO Operating 3630, Modeling Scheduling ETC and TOR Rights CAISO ENTA Calculator \\csifiapp612\netapps\pi\fqas\pi\content\ope rations\transmission\reports\eor_wor_e NTA_CALC_2011_Rev 1.0.xls \\csifiapp612\netapps\pi\fcl1\pi\content\oper ations\transmission\reports\eor_wor_e NTA_CALC_2012_Rev 1.1.xlsm Definitions Unless the context otherwise indicates, any word or expression defined in the Master Definitions Supplement to the CAISO Tariff shall have that meaning when capitalized in this Operating. The following additional terms are capitalized in this Operating when used as defined below: Page 29 of 33

30 Version History Version Change By Date 4.2 Increased SCE s Eldorado Intertie 11/18/09 ENTA maximum rights from 1,000 MW to 1,125 MW 4.3 Added Fourcorner3_MSL to Figures 1 5/14/10 and 2 on Pages 11 and Revised section 4.3 for clarity 6/10/ New ENTA rights calculation tool. 9/14/10 Moved the sample ENTA calculation to a new Attachment A. 5.1 Reformat to new prototype-merged T- 9/29/ & Attachment A per TRC request 5.2 Clarified 6, page 15 and removed 3/16/11 steps 8 & 9 on page Annual Review, changes highlighted except for Section 2.4.2: Deleted step 7 (SC), & step 11 (RT Scheduler) Section 2.4.3: split in two, Crystal- Navajo 500 kv Line Outages & New Section Crystal McCullough 500 kv Line Outages; step 2 (Outage/Trans) added note; deleted step 7 (Pre-Sched) Section & 2.4.4: step 4 changed to Pre-Scheduling actions. New Section 2.4.4: This section is a copy of section with some minor adjustments; NEVP has been removed, wheel schedules have been removed from step 7. Section 2.5: Updated numbers for manual calculation. Section 2.6: derate to Fcorner5 Tie changed to 1000MW. References: Added path to ENTA Calculator 8/6/12 Page 30 of 33

31 6.1 Section 2.6 CAISO Outage Coordinator or TD: updated Fcorner5 MSL OTC to 1490 MW. 6.2 Removed all references of SRP scheduling for WALC. 6.3 Replaced RT Scheduler(S) with Interchange Scheduler(s) on pages 6, 7, 10, 15, 22, 26, & 27. Page 9: Replaced ISO DAM, Pre- Scheduling, and Market Operations groups to CAISO Day Ahead Market Operator, Interchange Scheduler and Market Operations groups. Page 10: Replaced CAISO Pre-Scheduler or RT Scheduler Actions with Interchange Scheduler Actions. Page 14: Replaced CAISO Pre- Scheduling Actions with CAISO Day Ahead Market Operator Actions. Page 15: Replaced CAISO Pre-Scheduler or RT Scheduler Actions with Interchange Scheduler Actions. Page 21: Replace CAISO Pre-Scheduler Actions with CAISO Day Ahead Market Operator Actions. Page 22: Replace CAISO Pre-Scheduler or RT Scheduler Actions with Interchange Scheduler Actions. Page 27 & 28: Replace CAISO Pre- Scheduler Actions with Interchange Scheduler Actions. 6.4 Throughout procedure changed FOURCORNE345 to FOURCORNE500 due to Four Corners asset transfer Sections 2.4.1, 2.6 and Removed references to Four Corners units In figures 1 and 2, removed reference to FCORNER3 1/31/13 10/7/13 12/16/13 1/4/14 Page 31 of 33

32 6.5 Clarified language in section to add a note stating that the ENTA calculator is not used for an Eldorado-Moenkopi 500kV line outage and clarified sections 2.4.1, and to reflect changes in the Arizona Security Manual. Changed all references of Control Area Scheduler (CAS) and CAS to Interchange transaction scheduler. Changed all references of OTC to Hourly TTC. Changed path operator to transmission operator throughout the document. Page 16: Changed SLIC to outage management system. Changed references of HASP to RTPD where applicable. Updated Operationally Affected Parties to include Peak RC. 6.6 Changed North Gila 69 to North Gila 500 due to APS boundary change, aka HANG2. Changed Outage Management tasks/actions to Operations Planning throughout. 6.7 Changed MSL to ITC throughout - Final identity change across systems (ETCC) from _MSL to _ITC resulted from removing need for MSLs from Spring 2014 Dynamic transfer market enhancement. Updated Figure 1 & 2 with MSL to ITC change. 10/15/14 7/24/15 11/04/15 Page 32 of 33

33 Technical Review Reviewed By Content Expert Signature Date Operating s 10/26/15 Real-Time Operations 10/28/15 Scheduling 11/03/15 Operations Planning 11/04/15 Approval Approved By Signature Date Director, Real-Time Operations * 9/18/14 Director, Operations Engineering Services 11/04/15 *Signed previous version only, changes to this version were minor and did not require full signature approval Appendix Attachment Page 33 of 33

PAC7 Customer Specific Procedure

PAC7 Customer Specific Procedure PAC7 Customer Specific Procedure Table of contents 1. Procedure... 3 Call Services... 3 Day-Ahead (DA) Scheduling Process Pre DAM... 3 Hour Ahead (HA) Scheduling Process... 5 Real-Time Scheduling... 5

More information

Table of Contents. Real-Time Reliability Must Run Unit Commitment and Dispatch (Formerly G-203) Operating Procedure

Table of Contents. Real-Time Reliability Must Run Unit Commitment and Dispatch (Formerly G-203) Operating Procedure No. 2310 Table of Contents Purpose... 2 1. Responsibilities... 2 2. Scope/Applicability... 2 2.1 Background... 2 2.2 Scope / Applicability... 2 3. Detail... 3 3.1 Energy Dispatching... 3 3.1.2 Real-Time

More information

NV Energy ISO Energy Imbalance Market Economic Assessment

NV Energy ISO Energy Imbalance Market Economic Assessment March 25, 2014 NV Energy ISO Energy Imbalance Market Economic Assessment NV Energy ISO Energy Imbalance Market Economic Assessment 2014 Copyright. All Rights Reserved. Energy and Environmental Economics,

More information

Energy Imbalance Market

Energy Imbalance Market Energy Imbalance Market Tariff Framework September 10, 2013 CAIS[Type text] [Type text] [Type text] Table of Contents 1. Introduction... 1 2. Guiding Objectives for the Tariff Framework... 2 3. Tariff

More information

Convergence Bidding Stakeholder Conference Call

Convergence Bidding Stakeholder Conference Call Convergence Bidding Stakeholder Conference Call Margaret Miller Senior Market Design & Policy Specialist Convergence Bidding Stakeholder Conference Call August 13, 2009 Agenda 1:00 1:15 - Plan for Stakeholder

More information

California ISO Straw Proposal. Ancillary Services Procurement in HASP and Dispatch Logic

California ISO Straw Proposal. Ancillary Services Procurement in HASP and Dispatch Logic California ISO Straw Proposal Ancillary Services Procurement in HASP and Dispatch Logic August 5, 2009 Ancillary Services Procurement in HASP and Dispatch Logic Prepared for Discussion on a Stakeholder

More information

Demand Response FAQs

Demand Response FAQs 1 Under the current CAISO tariff, assuming it would otherwise meet the requirements under the CAISO tariff and business practice manuals to do so, can the Load associated with a retail meter participate

More information

How To Settle Day Ahead Energy, Loss, And Loss For A Day Ahead Market

How To Settle Day Ahead Energy, Loss, And Loss For A Day Ahead Market Settling the Day-Ahead Market Charge Codes included in this training: 6011, 6800, 6700, 6301. EXTERNAL Customer Services Page 1 of 45 Disclaimer All information contained in this document is provided for

More information

Release User Group Agenda

Release User Group Agenda Release User Group Agenda September 20, 2011 10:00 a.m. 10:55 a.m. (Pacific Time) Web Conference Information URL: https://www.connectmeeting.att.com Meeting Number: 8665282256 Access Code: 4914267 Conference

More information

Rules on Southern Companies Energy Auction Participation

Rules on Southern Companies Energy Auction Participation Southern Company Services, Inc. First Revised Sheet No. 20B Superseding Original Sheet No. 20B Rules on Southern Companies Energy Auction Participation 1.0 Participation; Definitions 1.1 Southern Companies

More information

The remainder of this memo provides a summary of market performance and trends in 2014 through November.

The remainder of this memo provides a summary of market performance and trends in 2014 through November. California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Eric Hildebrandt, Director, Market Monitoring Date: December 10, 2014 Re: Market monitoring report This memorandum

More information

Technical Bulletin 2011-04-01. Bid Cost Recovery and Accounting for Delivered Minimum Load Energy Market Revenues. Market Issue

Technical Bulletin 2011-04-01. Bid Cost Recovery and Accounting for Delivered Minimum Load Energy Market Revenues. Market Issue Technical Bulletin 2011-04-01 Bid Cost Recovery and Accounting for Delivered Minimum Load Energy Market Revenues Market Issue April 5, 2011 Technical Bulletin 2011-04-01 Bid Cost Recovery and Accounting

More information

Business Requirements Specification

Business Requirements Specification Business s Specification Version.16 October 19, 211 Revision History Date Version Description Author 6/8/211.8 Created the external business

More information

Generator Interconnection and Deliverability Study Methodology Technical Paper

Generator Interconnection and Deliverability Study Methodology Technical Paper Generator Interconnection and Deliverability Study Methodology Technical Paper July 2, 2013 Generator Interconnection and Deliverability Study Methodology Table of Contents Introduction... 1 Section One:

More information

sink asset load power pool ISO pool participant bids operating constraints ancillary service declarations

sink asset load power pool ISO pool participant bids operating constraints ancillary service declarations G1 DEFINITIONS In the ISO rules: acceptable operational reason means with respect to a source asset, any one or more of the following: i) a circumstance related to the operation of the generating asset

More information

Overview of Reliability Demand Response Resource

Overview of Reliability Demand Response Resource Overview of Reliability Demand Response Resource Radha Madrigal Customer Service Department May 8, 2014 Agenda Product overview and purpose Define Reliability Demand Response Resource Agreements & registration

More information

Release User Group Agenda 10:00 a.m. 11:00 a.m. (Pacific Time)

Release User Group Agenda 10:00 a.m. 11:00 a.m. (Pacific Time) Release User Group Agenda March 18th, 2014 10:00 a.m. 11:00 a.m. (Pacific Time) Web Conference Information URL: https://www.connectmeeting.att.com Meeting Number: 8665282256 Access Code: 5251941 Conference

More information

Comments of Pacific Gas & Electric Company pertaining to ISO s Straw Proposal on Bid Cost Recovery Enhancements

Comments of Pacific Gas & Electric Company pertaining to ISO s Straw Proposal on Bid Cost Recovery Enhancements Comments of Pacific Gas & Electric Company pertaining to ISO s Straw Proposal on Bid Cost Recovery Enhancements Submitted by Company Date Submitted Josh Arnold J2A2@pge.com 415-973-1273 CB Hall cbh7@pge.com

More information

External Business Requirements Specification

External Business Requirements Specification External Business Requirements Specification Changes to Bidding and Mitigation of Commitment Cost Version 1.0 November 29, 2010 Table of Contents 1. INTRODUCTION... 4 1.1 PURPOSE... 4 1.2 REFERENCES...

More information

Interjurisdictional Energy Trading. IESO Training

Interjurisdictional Energy Trading. IESO Training Interjurisdictional Energy Trading IESO Training Revised: January, 2014 Introduction to Interjurisdictional Energy Trading AN IESO TRAINING PUBLICATION This document has been prepared to assist in the

More information

THE CONNECTICUT LIGHT AND POWER COMPANY TERMS AND CONDITIONS FOR ELECTRIC SUPPLIERS PAGE 1 OF 18

THE CONNECTICUT LIGHT AND POWER COMPANY TERMS AND CONDITIONS FOR ELECTRIC SUPPLIERS PAGE 1 OF 18 TERMS AND CONDITIONS FOR ELECTRIC SUPPLIERS PAGE 1 OF 18 1. Applicability 1A. The following Terms and Conditions shall apply to every registered Electric Supplier authorized to do business within Connecticut

More information

THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY TERMS AND CONDITIONS FOR ELECTRIC SUPPLIERS PAGE 1 OF 20

THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY TERMS AND CONDITIONS FOR ELECTRIC SUPPLIERS PAGE 1 OF 20 TERMS AND CONDITIONS FOR ELECTRIC SUPPLIERS PAGE 1 OF 20 1. Applicability 1A. The following Terms and Conditions shall apply to every registered Electric Supplier authorized to do business within Connecticut

More information

Network Upgrades andSIAs Under California Tariff Clarifications

Network Upgrades andSIAs Under California Tariff Clarifications California Independent System Operator Corporation The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 July 11, 2013 Re: California Independent

More information

Demand Response Frequently Asked Questions (Last Updated 02/23/16)

Demand Response Frequently Asked Questions (Last Updated 02/23/16) # Questions Answers 1 Under the current CAISO tariff, assuming it would otherwise meet the requirements under the CAISO tariff and business practice manuals to do so, can the Load associated with a retail

More information

September 29, 2014. Docket No. ER14- -000 Amendment to CAISO FERC Electric Tariff to Eliminate Annual External Operations Review

September 29, 2014. Docket No. ER14- -000 Amendment to CAISO FERC Electric Tariff to Eliminate Annual External Operations Review California Independent System Operator Corporation September 29, 2014 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: California

More information

131 FERC 61,148 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER ON COMPLIANCE FILING. (Issued May 20, 2010)

131 FERC 61,148 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER ON COMPLIANCE FILING. (Issued May 20, 2010) 131 FERC 61,148 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Jon Wellinghoff, Chairman; Marc Spitzer, Philip D. Moeller, and John R. Norris. California Independent

More information

Rules on Southern Companies Energy Auction Participation. 1.2.1 Available Capacity: See Section 1.3 of Appendix DA-1 and Section 1.3 of Appendix HA-1.

Rules on Southern Companies Energy Auction Participation. 1.2.1 Available Capacity: See Section 1.3 of Appendix DA-1 and Section 1.3 of Appendix HA-1. Rules on Southern Companies Energy Auction Participation 1.0 Participation; Definitions 1.1 Southern Companies shall participate in the Energy Auction in accordance with these Rules on Southern Companies

More information

Convergence Bidding Tutorial & Panel Discussion

Convergence Bidding Tutorial & Panel Discussion Convergence Bidding Tutorial & Panel Discussion CAISO June 13, 2006 Joe Bowring PJM Market Monitor www.pjm.com Convergence Basics Day-Ahead Market basics Day-Ahead and Real-Time Market interactions Increment

More information

Section 4: Scheduling Philosophy & Tools

Section 4: Scheduling Philosophy & Tools Welcome to the Scheduling Philosophy & Tools section of the PJM Manual for Scheduling Operations. In this section you will find the following information: A description of the PJM OI s scheduling philosophy

More information

ECCO International, Inc. 268 Bush Street, Suite 3633 San Francisco, CA 94104

ECCO International, Inc. 268 Bush Street, Suite 3633 San Francisco, CA 94104 PROMAX SHORT-TERM ENERGY & TRANSMISSION MARKET SIMULATION SOFTWARE PACKAGE ECCO International, Inc. 268 Bush Street, Suite 3633 San Francisco, CA 94104 ECCO International, Inc. Copyright 2009 EXECUTIVE

More information

Section 1: Executive Summary

Section 1: Executive Summary Section 1: Executive Summary SECTION 1: EXECUTIVE SUMMARY 1.1 SECTION PURPOSE This report has been prepared for the Nevada Energy Assistance Corporation (NEAC), a 501(c)(3) non-profit agency; in support

More information

Use of Common Information Model (CIM) In Electricity Market at California ISO

Use of Common Information Model (CIM) In Electricity Market at California ISO Use of Common Information Model In Electricity Market at California ISO Enamul Haq, Dagmar Haller, Khaled Abdul Rahman and Becky Iverson Abstract The California Independent System Operator Corporation

More information

CAISO Market Results Interface (CMRI) Interface Specification Fall 2013 Release

CAISO Market Results Interface (CMRI) Interface Specification Fall 2013 Release CAISO Market Results Interface (CMRI) Interface Specification Fall 2013 Release Version: 1.2 September 3, 2013 Revision History Date Version Description 07/10/2013 1.0 Initial document release related

More information

Chapter 9 Settlements and Billing

Chapter 9 Settlements and Billing MDP_RUL_0002_09 Market Rules Chapter 9 Settlements and Billing Public Issue Date: December 2, 2015 Library Record No. MDP_RUL_0002_09 Document Name Market Rules for the Ontario Electricity Market Issue

More information

RIG Acceptance Test (RAT) Procedures

RIG Acceptance Test (RAT) Procedures RIG Acceptance Test (RAT) Procedures RIG Acceptance Test (RAT) Procedure 0 Print Date 2 /20/2007 REVISION HISTORY REVISON NO. DATE DESCRIPTION 1.0 Initial Release 0 Update Logo and Links i RIG Acceptance

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION California Independent System Operator ) Corporation ) Docket No. ER10-500-000 MOTION OF THE CALIFORNIA INDEPENDENT SYSTEM OPERATOR

More information

Introduction to the Integrated Marketplace

Introduction to the Integrated Marketplace The information, practices, processes and procedures outlined and contained in this publication are the intellectual property of Southwest Power Pool, Inc. and are protected by law. This publication or

More information

CALIFORNIA ISO. Pre-dispatch and Scheduling of RMR Energy in the Day Ahead Market

CALIFORNIA ISO. Pre-dispatch and Scheduling of RMR Energy in the Day Ahead Market CALIFORNIA ISO Pre-dispatch and Scheduling of RMR Energy in the Day Ahead Market Prepared by the Department of Market Analysis California Independent System Operator September 1999 Table of Contents Executive

More information

Template for Submission of Comments on Convergence Bidding and Bid Cost Recovery

Template for Submission of Comments on Convergence Bidding and Bid Cost Recovery Template for Submission of Comments on Convergence Bidding and Bid Cost Recovery The CAISO is requesting written comments to presentations and documents discussed at the October 16 th Convergence Bidding

More information

ATTACHMENT G. Network Operating Agreement

ATTACHMENT G. Network Operating Agreement ATTACHMENT G Network Operating Agreement 1. PURPOSE OF NETWORK OPERATING AGREEMENT The purpose of this Agreement is to identify contractual requirements related to Network Integration Transmission Service

More information

Wind Power and Electricity Markets

Wind Power and Electricity Markets PO Box 2787 Reston, VA 20195 Phone: 703-860-5160 Fax: 703-860-3089 E-mail: info@uwig.org Web: www.uwig.org Wind Power and Electricity Markets A living summary of markets and market rules for wind energy

More information

Comments on ISO s Third Revised Straw Proposal for Settlement of Interties in Real-Time

Comments on ISO s Third Revised Straw Proposal for Settlement of Interties in Real-Time Comments on ISO s Third Revised Straw Proposal for Settlement of Interties in Real-Time Department of Market Monitoring July 26, 2012 Summary The Department of Market Monitoring (DMM) appreciates the opportunity

More information

Chapter 7 System Operations and Physical Markets

Chapter 7 System Operations and Physical Markets MDP_RUL_0002_07 Market Rules Chapter 7 System Operations and Physical Markets Public Issue Date: June 3, 2015 Library Record No. MDP_RUL_0002_07 Document Name Market Rules for the Ontario Electricity Market

More information

Schedule NEM Sheet 1 NET ENERGY METERING

Schedule NEM Sheet 1 NET ENERGY METERING Southern California Edison Revised Cal. PUC Sheet No. 50927-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 49175-E* Schedule NEM Sheet 1 APPLICABILITY Applicable to Eligible Customer-Generators

More information

California Independent System Operator Corporation - A Case Study

California Independent System Operator Corporation - A Case Study UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Joseph T. Kelliher, Chairman; Nora Mead Brownell, and Suedeen G. Kelly. California Independent System Operator Corporation

More information

Interchange Scheduling Reference Manual

Interchange Scheduling Reference Manual Interchange Scheduling Reference Manual Effective October 1, 2015 Version 3.0 Revision History Revision History Date or Version Number 9/12/2012 Version 1.0 10/09/2012 Version 1.0 10/18/2012 Version 1.0

More information

PROCEDURE. Part 4.3: Real-Time Scheduling of the Physical Markets PUBLIC. Market Manual 4: Market Operations. Issue 44.

PROCEDURE. Part 4.3: Real-Time Scheduling of the Physical Markets PUBLIC. Market Manual 4: Market Operations. Issue 44. PUBLIC IMP_PRO_0034 PROCEDURE Market Manual 4: Market Operations Part 4.3: Real-Time Scheduling of the Physical Markets Issue 44.0 This procedure provides guidance to Market Participants on the Real-time

More information

151 FERC 61,108 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER ACCEPTING PROPOSED TARIFF REVISIONS. (Issued May 11, 2015)

151 FERC 61,108 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER ACCEPTING PROPOSED TARIFF REVISIONS. (Issued May 11, 2015) 151 FERC 61,108 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Norman C. Bay, Chairman; Philip D. Moeller, Cheryl A. LaFleur, Tony Clark, and Colette D. Honorable.

More information

Scarcity Pricing. Draft Compliance Filing Language. CAISO Fourth Replacement Tariff. November 10, 2009

Scarcity Pricing. Draft Compliance Filing Language. CAISO Fourth Replacement Tariff. November 10, 2009 CAISO Fourth Replacement Tariff November 10, 2009 * * * 27.1.2 Ancillary Service Prices. 27.1.2.1 Ancillary Service Marginal Prices. As provided in Section 8.3, Ancillary Services are procured and awarded

More information

Release User Group Agenda 10:00 a.m. 11:00 a.m. (Pacific Time)

Release User Group Agenda 10:00 a.m. 11:00 a.m. (Pacific Time) Release User Group Agenda March 3 rd, 2015 10:00 a.m. 11:00 a.m. (Pacific Time) Web Conference Information URL: https://www.connectmeeting.att.com Meeting Number: 8665282256 Access Code: 5251941 Conference

More information

Load Dispatcher (Class Code 5223) Task List

Load Dispatcher (Class Code 5223) Task List A. Load Dispatching, General Load Dispatcher (Class Code 5223) Task List 1. Prior to work shift speaks to Load Dispatcher(s), reviews hardcopy and computer logs, and looks at the dispatcher's diagram board

More information

TRANSMISSION SERVICES MANUAL

TRANSMISSION SERVICES MANUAL TRANSMISSION SERVICES MANUAL Transmission Services Manual Version: 2.0 Revision Date: January 20, 2005 Committee Approved: January 19, 2005 Effectivity Date: February 1, 2005 Disclaimer The information

More information

Two Settlement - Virtual Bidding and Transactions

Two Settlement - Virtual Bidding and Transactions Two Settlement - Virtual Bidding and Transactions (Fall 2009) PJM 2009 2009 PJM 1 Agenda Two-Settlement Overview Two-Settlement Features & System Two-Settlement Business Rules Two-Settlement Data Requirements

More information

154 FERC 61,020 FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, DC 20426. January 19, 2016

154 FERC 61,020 FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, DC 20426. January 19, 2016 154 FERC 61,020 FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, DC 20426 January 19, 2016 In Reply Refer To: California Independent System Operator Corporation Docket No. ER16-366-000 California Independent

More information

SETTLEMENT AND BILLING PROTOCOL (SABP) OBJECTIVES, DEFINITIONS AND SCOPE

SETTLEMENT AND BILLING PROTOCOL (SABP) OBJECTIVES, DEFINITIONS AND SCOPE SETTLEMENT AND BILLING PROTOCOL (SABP) SABP 1 OBJECTIVES, DEFINITIONS AND SCOPE SABP 1.1 Objectives The objective of this Protocol (and of Annex 1) is to inform Scheduling Coordinators, Participating TOs

More information

148 FERC 61,009 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

148 FERC 61,009 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION 148 FERC 61,009 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Cheryl A. LaFleur, Acting Chairman; Philip D. Moeller, John R. Norris, and Tony Clark. Arizona Public

More information

PJM LMP Market Overview

PJM LMP Market Overview PJM LMP Market Overview Andrew Ott Senior Vice President, Markets June 10, 2010 PJM as Part of the Eastern Interconnection 6,038 substations KEY STATISTICS PJM member companies 600+ millions of people

More information

How To Manage The Ercot Grid

How To Manage The Ercot Grid US MEXICO Cross-border trade Joel Mickey Director, Market Design & Development NARUC Summer Meeting Dallas, Texas North American ISOs and RTOs Independent System Operators and Regional Transmission Organizations

More information

PJM Overview of Markets. Georgian Delegation PUCO Office April 11, 2013

PJM Overview of Markets. Georgian Delegation PUCO Office April 11, 2013 PJM Overview of Markets Georgian Delegation PUCO Office April 11, 2013 1 Agenda Introduction Energy Markets Locational Marginal Pricing - LMP Two Settlement - Day Ahead / Real time Ancillary Services Capacity

More information

Specific amendments to the Capacity Allocation and Congestion Management Network Code

Specific amendments to the Capacity Allocation and Congestion Management Network Code Annex: Specific amendments to the Capacity Allocation and Congestion Management Network Code I. Amendments with respect to entry into force and application The Network Code defines deadlines for several

More information

ISO-NE Transmission Markets and Services Tariff Cross Sound Cable Business Practices. Version 10.0 April 17, 2013

ISO-NE Transmission Markets and Services Tariff Cross Sound Cable Business Practices. Version 10.0 April 17, 2013 ISO-NE Transmission Markets and Services Tariff Cross Sound Cable Business Practices Version 10.0 April 17, 2013 ISO-NE Transmission, Markets and Services Tariff Cross Sound Cable Business Practices Version

More information

PJM Seams Update: Day-Ahead M2M Revisions to MISO- PJM Joint Operating Agreement

PJM Seams Update: Day-Ahead M2M Revisions to MISO- PJM Joint Operating Agreement PJM Seams Update: Day-Ahead M2M Revisions to MISO- PJM Joint Operating Agreement Asanga Perera Market-to-Market Lead Market Implementation Committee August 12, 2015 Purpose Overview This presentation provides

More information

Qualifying Facility Maintenance Outage Scheduling Procedures

Qualifying Facility Maintenance Outage Scheduling Procedures I. Applicability The Qualifying Facility ( Maintenance Procedures ) apply to the scheduling of an outage on a QF generating unit as a result of planned maintenance to keep the generating facility in suitable

More information

SCHEDULE 1. Scheduling, System Control and Dispatch Service

SCHEDULE 1. Scheduling, System Control and Dispatch Service Seventh Revised Volume No. 5 (MT) Original Sheet No. 71 SCHEDULE 1 Scheduling, System Control and Dispatch Service This service is required to schedule the movement of power through, out of, within, or

More information

First Deliverer Approach to Regulating gelectricity Imports in Cap and Trade Programs. RGGI Learning Session October 11, 2011 New York, NY

First Deliverer Approach to Regulating gelectricity Imports in Cap and Trade Programs. RGGI Learning Session October 11, 2011 New York, NY First Deliverer Approach to Regulating gelectricity Imports in Cap and Trade Programs RGGI Learning Session October 11, 2011 New York, NY Scott Murtishaw, California i PUC 2 Background: AB 32 Requirements

More information

Stakeholder Process: Integrated Balancing Authority Area (IBAA)

Stakeholder Process: Integrated Balancing Authority Area (IBAA) Stakeholder Process: Integrated Balancing Authority Area (IBAA) Attachment B 1. Summary of Submitted Comments and Stakeholder Meetings Stakeholders submitted rounds of written comments to the CAISO on

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. California Independent System ) Docket No. ER13-69- Operator Corporation )

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. California Independent System ) Docket No. ER13-69- Operator Corporation ) UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION California Independent System ) Docket No. ER13-69- Operator Corporation ) MOTION FOR EXTENSION OF TIME OF THE CALIFORNIA INDEPENDENT

More information

The Locational Based Marginal Prices ( LBMPs or prices ) for Suppliers and Loads in

The Locational Based Marginal Prices ( LBMPs or prices ) for Suppliers and Loads in 17.1 LBMP Calculation Method The Locational Based Marginal Prices ( LBMPs or prices ) for Suppliers and Loads in the Real-Time Market will be based on the system marginal costs produced by either the Real-

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Coordination between Natural Gas and Electricity Markets Docket No. AD12-12-000 Prepared Statement of Brad Bouillon on behalf of

More information

Market Simulation Structured Scenarios. Many to Many Availability Calculations

Market Simulation Structured Scenarios. Many to Many Availability Calculations Market Simulation Structured Scenarios Many to Many Availability Calculations Version 1.3 October 13 th, 2014 Location of Document Many to Many Availability Calculations Revision History Date Version Description

More information

Demand Response Programs

Demand Response Programs Southern California Edison Demand Response Programs Join thousands of businesses that work with us to reduce peak electricity use when California needs it most. By participating in Demand Response programs,

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION California Independent System ) Docket Nos. ER00-2019-017 Operator Corporation ) ER01-819-009 ) ER03-608-006 MOTION FOR LEAVE TO

More information

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Reliability Technical Conference Docket No. AD16-15-000 Prepared Statement of Mark Rothleder on behalf of the California Independent System

More information

August 27, 2007 Advice Letter 2146-E. Advice Letter 2146-E is effective August 31, 2007. Thank you for your time.

August 27, 2007 Advice Letter 2146-E. Advice Letter 2146-E is effective August 31, 2007. Thank you for your time. STATE OF CALIFORNIA ARNOLD SCHWARZENEGGER, Governor PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE Tel. No. (415) 703-2626 SAN FRANCISCO, CA 94102-3298 August 27, 2007 Advice Letter 2146-E Akbar Jazayeri

More information

Outage Scheduling Manual

Outage Scheduling Manual MANUAL 29 Outage Scheduling Manual July 2015 Version: 4.3.1 Effective Date: 07/29/2015 Committee Acceptance: 6/11/2015 OC This document was prepared by: NYISO Energy Market Operations New York Independent

More information

Update on Northeast Seams Issues. January 9, 2008 NYISO Management Committee Meeting

Update on Northeast Seams Issues. January 9, 2008 NYISO Management Committee Meeting Update on Northeast Seams Issues January 9, 2008 NYISO Management Committee Meeting Status of Seams Projects Current Deliverables Project 1. Intra-Hour Transaction Scheduling NYISO and ISO-NE have documented

More information

TRANSMISSION CONTROL AGREEMENT APPENDIX A. Facilities and Entitlements

TRANSMISSION CONTROL AGREEMENT APPENDIX A. Facilities and Entitlements TRANSMISSION CONTROL AGREEMENT APPENDIX A Facilities and Entitlements (The Diagrams of Transmission Lines and Associated Facilities Placed Under the Control of the ISO were submitted by the ISO on behalf

More information

urning A Bank Of California (EFCE)

urning A Bank Of California (EFCE) Akbar Jazayeri Director of Revenue and Tariffs May 3, 2005 ADVICE 1891-E (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION SUBJECT: Revisions to Clarify the Controlled Rotating

More information

Resource Monitoring and Deliverability Tool Paper

Resource Monitoring and Deliverability Tool Paper Resource Monitoring and Deliverability Tool Paper NWPP MC Phase 3 Operations Integration Work Group 11/30/2014 Page 1 of 16 Table of Contents Executive Summary... 3 1. Purpose... 5 2. Existent Methods

More information

Cross-Tie Transmission Line. Ravikanth Varanasi Principal Transmission Planner

Cross-Tie Transmission Line. Ravikanth Varanasi Principal Transmission Planner Cross-Tie Transmission Line Ravikanth Varanasi Principal Transmission Planner Overview ~213 mile 500-kV transmission line between PacifiCorp s proposed Clover 500 kv substation with NV Energy s Robinson

More information

CAISO Information Security Requirements for the Energy Communication Network (ECN)

CAISO Information Security Requirements for the Energy Communication Network (ECN) Page 1 of 11 REVISION HISTORY VERSION DATE DESCRIPTION DRAFT 0.1 11/27/2002 Initial Draft 1.0 10/13/2003 Initially Released Version 1.1 11/15/2005 Minor clean-up. 1.2 05/30/2006 New logo and appendix change

More information

Business Practice Manual for Definitions & Acronyms. Version 67

Business Practice Manual for Definitions & Acronyms. Version 67 Business Practice Manual for s & Acronyms Version 67 Last Revised: December 8, 2010Janaury 21, 2011 Approval History Approval Date: March 14, 2009 Effective Date: March 31, 2009 BPM Owner: Mike Dozier

More information

SOP-RTMKTS.0060.0005 - Test and Approve Operations Software Applications. Contents

SOP-RTMKTS.0060.0005 - Test and Approve Operations Software Applications. Contents SOP-RTMKTS.0060.0005 - Test and Approve Operations Software Applications Contents 1. Objective... 2 2. Background... 2 3. Responsibilities... 3 4. Controls... 4 5. Instructions... 5 5.1 Document Operations

More information

145 FERC 61,237 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

145 FERC 61,237 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION 145 FERC 61,237 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Cheryl A. LaFleur, Acting Chairman; Philip D. Moeller, John R. Norris, and Tony Clark. Nevada Power Company

More information

Aliso Canyon Gas-Electric Coordination. Straw Proposal

Aliso Canyon Gas-Electric Coordination. Straw Proposal Aliso Canyon Gas-Electric Coordination Straw Proposal April 15, 2016 Table of Contents 1. Executive Summary... 3 2. Plan for Stakeholder Engagement... 4 3. Background... 5 3.1. Aliso Canyon Impact... 5

More information

2013 Ventyx, an ABB company

2013 Ventyx, an ABB company Co-optimization of Congestion Revenue Rights in ERCOT Day-Ahead Market Chien-Ning Yu, Vladimir Brandwajn, Show Chang ABB/Ventyx Sainath M. Moorty ERCOT FERC Conference on increasing real-time and day-ahead

More information

Conference Call: BPA s Request for Offers Seeks Non-Wire Measures for Summer Peak Congestion Relief on the South of Allston Flowgate

Conference Call: BPA s Request for Offers Seeks Non-Wire Measures for Summer Peak Congestion Relief on the South of Allston Flowgate Conference Call: BPA s Request for Offers Seeks Non-Wire Measures for Summer Peak Congestion Relief on the South of Allston Flowgate May 23, 2016 (10:00am Noon) The BPA Administrator stated in the Final

More information

MRTU Readiness Criteria Dashboard

MRTU Readiness Criteria Dashboard MRTU Criteria Dashboard MRTU Criteria Dashboard June 30, 2008 This Dashboard is designed to display the status of each MRTU Criteria. Criteria status is indicated by the following color codes: Clear: A

More information

Southern California Edison Revised Cal. PUC Sheet No. 59134-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No. 59134-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 59134-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 58300-E Schedule TOU-8-RBU Sheet 1 APPLICABILITY Applicable to the additional

More information

104 FERC 61,128 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

104 FERC 61,128 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION 104 FERC 61,128 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Pat Wood, III, Chairman; William L. Massey, and Nora Mead Brownell. California Independent System Operator

More information

Pre-Scheduling Operations

Pre-Scheduling Operations PJM Manual 10: Pre-Scheduling Operations Revision: 33 Effective Date: December 22, 2015 Prepared by Operations Support Division Generation Department PJM 2015 i Table of Contents PJM Manual 10: Pre-Scheduling

More information

Applicability and Eligibility

Applicability and Eligibility Application for Resource Adequacy Deliverability Status for a Distributed Generation Resource Interconnected or Seeking Interconnection to the Distribution Facilities of an Investor-Owned Utility Participating

More information

STATEMENT OF CHARGING METHODOLOGY FOR USE OF ELECTRICITY NORTH WEST LIMITED S ELECTRICITY DISTRIBUTION NETWORK

STATEMENT OF CHARGING METHODOLOGY FOR USE OF ELECTRICITY NORTH WEST LIMITED S ELECTRICITY DISTRIBUTION NETWORK STATEMENT OF CHARGING METHODOLOGY FOR USE OF ELECTRICITY NORTH WEST LIMITED S ELECTRICITY DISTRIBUTION NETWORK This statement is effective from 1 April 2010 This statement is approved by the Gas and Electricity

More information

GLOSSARY. Glossary of Terms for Capacity Based Demand Response PUBLIC. Issue 3.0 GOT-1

GLOSSARY. Glossary of Terms for Capacity Based Demand Response PUBLIC. Issue 3.0 GOT-1 PUBLIC GOT-1 GLOSSARY Glossary of Terms for Capacity Based Demand Response Issue 3.0 This document provides a glossary of terms with definitions used in the Capacity Based Demand Response program. Public

More information

Schedule TOU-GS-1-RTP Sheet 1 GENERAL SERVICE - SMALL REAL TIME PRICING

Schedule TOU-GS-1-RTP Sheet 1 GENERAL SERVICE - SMALL REAL TIME PRICING Southern California Edison Revised Cal. PUC Sheet No. 58261-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 57813-E APPLICABILITY Schedule TOU-GS-1-RTP Sheet 1 Applicable to Bundled

More information

San Diego Gas & Electric Company FERC Order 717 Transmission Function Employee Job Descriptions. Electric Grid Operations

San Diego Gas & Electric Company FERC Order 717 Transmission Function Employee Job Descriptions. Electric Grid Operations San Diego Gas & Electric Company FERC Order 717 Transmission Function Employee Job Descriptions Electric Grid Operations Director Electric Grid Operations: Responsible for overall transmission system operations

More information

Presentation for The National Commission for Energy State Regulation of Ukraine

Presentation for The National Commission for Energy State Regulation of Ukraine Presentation for The National Commission for Energy State Regulation of Ukraine Todd Keech Laura Walter PJM Interconnection June 17, 2014 What is PJM? 1 What is PJM? ISO RTO Map Part of Eastern Interconnection

More information

2014 EIA Energy Conference. Edward Randolph Director, Energy Division California Public Utilities Commission

2014 EIA Energy Conference. Edward Randolph Director, Energy Division California Public Utilities Commission 2014 EIA Energy Conference Edward Randolph Director, Energy Division California Public Utilities Commission July 14, 2014 Clean Electricity Policy Initiatives In California (Partial) Wholesale Renewables

More information

Recitals. WHEREAS, the Amps Line connects to Bonneville s Hot Springs Switching Station;

Recitals. WHEREAS, the Amps Line connects to Bonneville s Hot Springs Switching Station; THIS CAPACITY MANAGEMENT PROCEDURES AGREEMENT ( Agreement ) is entered into as of the Effective Date, as defined herein, between AVISTA CORPORATION, a Washington corporation ( Avista ); the BONNEVILLE

More information

PJM Overview and Wholesale Power Markets. John Gdowik PJM Member Relations

PJM Overview and Wholesale Power Markets. John Gdowik PJM Member Relations PJM Overview and Wholesale Power Markets John Gdowik PJM Member Relations PJM s Role Ensures the reliability of the high-voltage electric power system Coordinates and directs the operation of the region

More information