TRITON KNOLL ELECTRICAL SYSTEM CONSULTATION: QUESTIONNAIRE

Size: px
Start display at page:

Download "TRITON KNOLL ELECTRICAL SYSTEM CONSULTATION: QUESTIONNAIRE"

Transcription

1 RWE Innogy UK TRITON KNOLL ELECTRICAL SYSTEM CONSULTATION: QUESTIONNAIRE The Planning Act 2008 requires developers to undertake pre-application consultation before submitting an application for a Development Consent Order (DCO). This questionnaire is part of our community consultation under s47 of the Planning Act We have described how we will consult with the public and other consultees in our Statement of Community Consultation, which was consulted on with Lincolnshire County Council, East Lindsey District Council, Boston Borough Council and the Marine Management Organisation. Please use the Consultation Signpost Document to understand the different documents that are available to help you respond to the consultation. The responses we receive to this consultation will help shape our proposals before we apply for a Development Consent Order to the Secretary of State. How to participate Please answer as many of the questions in this questionnaire as you feel able to. You can also complete a questionnaire online by downloading the editable version available from How to respond Any responses made must include contact information including a name and an address to which any correspondence relating to the consultation can be sent. Your comments will be made public in a consultation report. The report will record comments received and explain how the views of consultees have been considered in finalising the application. This report will form part of our application for development consent. Please respond by returning the completed questionnaire using this freepost address: FREE POST RTBK-ABSH-TGLU Triton Knoll Offshore Wind Farm RWE Innogy UK, Auckland House, Lydiard Fields, Great Western Way, Swindon SN5 8ZT The consultation runs from 15 October until 19 November Please note that consultation responses must be received by 5pm on 19 November If you would like this questionnaire in larger print or in another format, please contact us on:

2 QUESTIONNAIRE SECTION 1 THE LANDFALL The landfall at Anderby Creek is where the offshore and onshore electricity cables are joined in the transition joint bays. Construction activities are likely to have the following impacts: temporary visual and noise impacts from vehicles and machinery temporary beach closures temporary increases in construction traffic. Further detail can be found in the Non-Technical Summary (NTS) of the Preliminary Environmental Information (PEI). Chapter 5 (Onshore Project Description) and Chapter 13 (Traffic and Access) of the Environmental Statement (ES) set out principles that could be applied to the management and the Outline Traffic Management Plan of construction activities. The following measures have been identified for the landfall works. These include: traffic management of construction vehicles to minimise congestion and impacts on local roads alternative pedestrian access for beach users set working hours that minimise impacts on the local community by limiting evening and weekend working. A. To what extent do you agree that the construction principles set out above will reduce the potential impacts? Please tick box B. Would you suggest any additional measures to reduce construction impacts? SECTION 2 ONSHORE CABLE INSTALLATION The onshore electrical cables will be buried underground, avoiding the need for overhead pylons. The cable route has been defined considering environmental and technical factors and also by consulting with landowners and the public as part of our Cable Route Consultation held during February and March The following measures have been proposed: where possible, locating the cable route a minimum distance of 70m from residential dwellings a burial depth below existing identified land drains to reduce impacts on farming activities avoiding environmental and archaeological constraints where possible. Further detail can be found in the NTS.

3 The Onshore Project Description Chapter and the outline Code of Construction Practice Document (CoCP) set out the following principles for how we propose to manage the construction activities when building the cable route. These include: Horizontal Directional Drilling (HDD) under roads, railways and larger watercourses a dedicated temporary haul road along the cable route to reduce traffic on local roads restoration after completion and the land returned to its former use. A. To what extent do you agree that the construction principles set out above will reduce the impacts of cable installation? B. Would you suggest any additional measures to reduce disruption? SECTION 3 THE INTERMEDIATE ELECTRICAL COMPOUND (IEC) AND THE ONSHORE ELECTRICITY SUBSTATION (SUBSTATION) The IEC and Substation contain electrical equipment that is necessary for the transmission of electricity from the offshore array and connection of the Triton Knoll Offshore Wind Farm to the national grid. The photomontages and other designs displayed at the public exhibitions and in the ES show what the infrastructure could look like from certain viewpoints. We have identified a set of principles that will be applied to the final design of the IEC and the Substation in the Design Considerations Document. Our landscaping principles include the following: a 50m area available for landscaping around the IEC and the Substation planting would begin during construction to allow screening to become established a mixture of slow and fast growing native species are proposed. A. Which do you think is the most appropriate screening for the Substation and IEC? Please tick box Substation A mixture of slow and fast growing native species Fast growing non-native species No screening IEC A mixture of slow and fast growing native species Fast growing non-native species No screening B. Do you have any other comments about our landscaping and screening principles?

4 C. Design options for the buildings and noise barriers at the IEC and Substation can be seen in the Design Considerations Document. What do you think is the most appropriate design for the IEC and Substation? Please tick box Substation Local vernacular (brick or stone) Modern design (wood cladding) Modern design (metal cladding) Modern design Noise barriers Pale grey Khaki Gradated green No preference IEC Local vernacular (brick or stone) Modern design (wood cladding) Modern design (metal cladding) Modern design Noise barriers Pale grey Khaki Gradated green No preference Do you have any other suggestions? SECTION 4 MANAGING CONSTRUCTION TRAFFIC Following comments about our access proposals during our Alternatives Consultation held during February and April 2013, and during the Parish Council update meetings in March and April 2014, we have modified our access proposals at the IEC to avoid the village of Orby and at the Substation to avoid the village of Bicker. A. Do you think that our alternative access proposals will reduce the impacts of construction traffic when compared to the original routes planned through the villages of Bicker and Orby? Please tick box The outline Traffic Management Plan sets out the main principles of managing traffic during construction of the project. These include: Horizontal Directional Drilling to avoid road closures notifications of roads to be used and when safety and traffic management measures to be put in place roads we will avoid. B. To assist us in developing a final Traffic Management Plan to minimise disruption, are there any specific additional measures you would suggest to reduce traffic impacts during construction, and why?

5 SECTION 5 MANAGING IMPACTS ON ECOLOGY The Landscape and Ecological Mitigation Strategy, which forms part of Chapter 6 (Landscape and Visual), sets out how we will manage impacts on ecology during construction, including: avoiding hedgerows and other sensitive habitats undertaking pre-construction surveys to avoid protected species ensuring best practice construction management techniques are used to reduce the risk of contamination of watercourses Project Ecologists overseeing environmentally-sensitive activities. A. To what extent do you agree that the principles set out will reduce ecological impacts? Please tick box B. Would you suggest any additional measures to reduce impacts? SECTION 6 THE OFFSHORE CABLE ROUTE The NTS and Offshore Project Description Chapter of the ES describe the key design principles which have shaped the offshore cable route, including: avoiding sensitive ecological areas minimising the amount of rock or concrete mattressing that will be required to protect the cable by routing the cable through areas of the seabed where the required burial depth can be achieved avoiding dredging areas reducing impacts on fishermen and other sea users. A. To what extent do you agree that we have captured the important issues for the offshore elements of the proposed electrical system? Please tick box B. Is there any other information about the offshore cable route you think we should consider?

6 SECTION 7 THE CONSULTATION A. How were you informed about the Triton Knoll Electrical System Consultation? Please tick box Newsletter Newspaper advert Local media other B. Have you found the public exhibitions helpful in answering questions or concerns you may have had? Please tick box Yes No C. Was the information available in the consultation documents and at the exhibitions helpful in answering questions or concerns you may have had? Please tick box Yes No D. If you would like to be kept up to date with the project, how would you like us to contact you? Please tick box Newsletter E. Do you have any other comments on the consultation or our proposals? (You can continue on a separate sheet for any of the questions)

7 YOUR DETAILS Any responses made must include contact information including a name and an address to which any correspondence relating to the consultation can be sent. Please provide details below: Name Address Telephone All personal details provided will be held in accordance with the Data Protection Act and will not be passed on to any third parties. Your comments will be made public in a consultation report. The report will record comments received and explain how the views of consultees have been considered in finalising the application. This report will form part of our development consent application. Thank you very much for taking the time to complete this questionnaire. Please give it to a member of staff or send by freepost to the address below. Contact us Tritonknoll@rwe.com Telephone: Web: Post: FREE POST RTBK-ABSH-TGLU Triton Knoll Offshore Wind Farm RWE Innogy UK Auckland House Lydiard Fields Great Western Way Swindon SN5 8ZT

Triton Knoll Offshore Wind Farm Limited Electrical System. Outline Traffic Management Plan

Triton Knoll Offshore Wind Farm Limited Electrical System. Outline Traffic Management Plan Triton Knoll Offshore Wind Farm Limited Electrical System Outline Traffic Management Plan October 2014 RWE Innogy UK Triton Knoll TMP Copyright 2014 RWE Innogy UK Ltd All pre-existing rights reserved.

More information

Who is National Grid?

Who is National Grid? Who is National Grid? National Grid is a leading international energy infrastructure business In the UK, our business includes electricity and gas transmission networks and gas distribution networks. We

More information

Viking Link Interconnector

Viking Link Interconnector Viking Link Interconnector Public information event for Bicker Parish Why we re here today We re here today to introduce the Viking Link project, to explain what we want to build and to answer any questions

More information

Wind turbines on your land. Renewable energy development for landowners

Wind turbines on your land. Renewable energy development for landowners Wind turbines on your land Renewable energy development for landowners Diversification By diversifying into wind energy, landowners have an opportunity to receive a regular, guaranteed income for up to

More information

1 Welcome. The exhibition comprises a series of boards which provide some background information to show you our initial ideas for the site.

1 Welcome. The exhibition comprises a series of boards which provide some background information to show you our initial ideas for the site. 1 Welcome Thank you for taking the time to attend this public exhibition of our proposals for residential development on Land at Daws Farm, Back Road, Writtle (site shown opposite). The exhibition comprises

More information

Our approach to the design and routeing of new electricity transmission lines

Our approach to the design and routeing of new electricity transmission lines Our approach to the design and routeing of new electricity transmission lines We own and manage the grid to which many different energy sources are connected. In Britain we run systems that deliver gas

More information

environment briefing02

environment briefing02 PRODUCED BY THE SAFETY, HEALTH & ENVIRONMENT GROUP OF THE ENERGY NETWORKS ASSOCIATION - JULY 2006 environment briefing02 transporting electricity Overhead Lines or Underground Cables? Introduction The

More information

Experience from the first large scale tidal turbine EIA in Europe. How do we work towards effective and proportionate EIA?

Experience from the first large scale tidal turbine EIA in Europe. How do we work towards effective and proportionate EIA? Independent, integrated thinking Experience from the first large scale tidal turbine EIA in Europe How do we work towards effective and proportionate EIA? Liz Foubister IEMA Webinar 30 th July 2014 What

More information

Firth of Forth Offshore Wind Farm Zone. Offshore and Onshore Project Information

Firth of Forth Offshore Wind Farm Zone. Offshore and Onshore Project Information Firth of Forth Offshore Wind Farm Zone Offshore and Onshore Project Information May 2012 Introduction Seagreen Wind Energy Limited (Seagreen) is a 50/50 joint venture between SSE and Fluor (UK) Limited.

More information

East Midlands Intermodal Park, South Derbyshire Proposals for a Strategic Rail Freight Interchange

East Midlands Intermodal Park, South Derbyshire Proposals for a Strategic Rail Freight Interchange Newsletter: Issue 1 (May 2014) Welcome + This newsletter announces the start of Goodman Shepherd s consultation on its proposals for the East Midlands Intermodal Park (EMIP) in South Derbyshire. Goodman

More information

Galloper Wind Farm Project. Traffic Management Plan May 2013 Draft v1 Document Reference GWF/TMP/100513. Galloper Wind Farm Limited

Galloper Wind Farm Project. Traffic Management Plan May 2013 Draft v1 Document Reference GWF/TMP/100513. Galloper Wind Farm Limited Galloper Wind Farm Project Traffic Management Plan May 2013 Draft v1 Document Reference GWF/TMP/100513 Galloper Wind Farm Limited Document title Galloper Wind Farm Project Traffic Management Plan Status

More information

Who are we? *Based on an average annual domestic household electricity consumption of 4,700KWh (DECC).

Who are we? *Based on an average annual domestic household electricity consumption of 4,700KWh (DECC). Who are we? We re one of the world s leading power and gas companies. Here in the UK, we supply energy to more than 5 million customers, generate enough electricity for around 8 million homes and employ

More information

1.0 THE PROPOSAL...2. Introduction 2 Project Description 2 2.0 THE APPLICANT...2 3.0 OUR APPROACH TO COMMUNITY CONSULTATION...2

1.0 THE PROPOSAL...2. Introduction 2 Project Description 2 2.0 THE APPLICANT...2 3.0 OUR APPROACH TO COMMUNITY CONSULTATION...2 CONTENTS 1.0 THE PROPOSAL...2 Introduction 2 Project Description 2 2.0 THE APPLICANT...2 3.0 OUR APPROACH TO COMMUNITY CONSULTATION...2 4.0 LEGISLATIVE REQUIREMENTS...3 5.0 THE CONSULTATION PROCESS...4

More information

Developing Ocean Energy in Ireland. Belmullet Wave Energy Test Site

Developing Ocean Energy in Ireland. Belmullet Wave Energy Test Site Developing Ocean Energy in Ireland Belmullet Wave Energy Test Site Where does our energy come from? Most of the energy we use in Ireland comes from fossil fuels such as oil, coal, peat and gas. We burn

More information

Development proposals will require to demonstrate, according to scale, type and location, that they:-

Development proposals will require to demonstrate, according to scale, type and location, that they:- Appendix 2 : Relevant Development Plan Policies Angus Local Plan Review 2009 Policy S1 : Development Boundaries (a) Within development boundaries proposals for new development on sites not allocated on

More information

AGENCY COORDINATION AND PUBLIC INVOLVEMENT

AGENCY COORDINATION AND PUBLIC INVOLVEMENT 5 AGENCY COORDINATION AND PUBLIC INVOLVEMENT 5.1 AGENCY COORDINATION As part of the planning process for the Oregon Avenue Final EA, DDOT conducted an agency coordination program. This coordination included

More information

4 Alternatives and Design Evolution

4 Alternatives and Design Evolution 4 Introduction 4.1 This Chapter describes the considerations and constraints influencing the siting, layout and massing of the Development. It also describes the main alternatives to the Development that

More information

Planning Act 2008: Guidance on Changes to Development Consent Orders. December 2015 Department for Communities and Local Government

Planning Act 2008: Guidance on Changes to Development Consent Orders. December 2015 Department for Communities and Local Government Planning Act 2008: Guidance on Changes to Development Consent Orders December 2015 Department for Communities and Local Government Crown copyright, 2015 Copyright in the typographical arrangement rests

More information

COPCUT RISE COPCUT RISE DROITWICH SPA CONSULTATION STATEMENT. November 2010. Prepared by Capita Lovejoy on behalf of William Davis Limited

COPCUT RISE COPCUT RISE DROITWICH SPA CONSULTATION STATEMENT. November 2010. Prepared by Capita Lovejoy on behalf of William Davis Limited COPCUT RISE DROITWICH SPA CONSULTATION STATEMENT COPCUT RISE November 2010 Prepared by Capita Lovejoy on behalf of William Davis Limited Copcut Rise Land north of Copcut Lane, Droitwich Spa: Consultation

More information

Alphington sewer replacement

Alphington sewer replacement Alphington sewer replacement Frequently asked questions We understand you might have some questions for us so here are a few to provide you with more information. You are also welcome to call us on 1800

More information

WELCOME TO THE BAD Á CHEÒ WIND FARM EXHIBITION

WELCOME TO THE BAD Á CHEÒ WIND FARM EXHIBITION WELCOME TO THE BAD Á CHEÒ WIND FARM EXHIBITION Thank you for taking the time to attend The purpose of this exhibition is to explain why we have identified this site for a potential wind farm development

More information

APPLICATION FOR PLANNING PERMISSION FOR A SOIL TREATMENT FACILITY AT KINGS CLIFFE LANDFILL SITE, STAMFORD, NORTHAMPTONSHIRE

APPLICATION FOR PLANNING PERMISSION FOR A SOIL TREATMENT FACILITY AT KINGS CLIFFE LANDFILL SITE, STAMFORD, NORTHAMPTONSHIRE APPLICATION FOR PLANNING PERMISSION FOR A SOIL TREATMENT FACILITY AT KINGS CLIFFE LANDFILL SITE, STAMFORD, NORTHAMPTONSHIRE DESIGN AND ACCESS STATEMENT Report Reference: AU/KC/SPH/1449/01/D&A/FIN Baddesley

More information

5 ALTERNATIVE SOLUTIONS AND EVALUATION

5 ALTERNATIVE SOLUTIONS AND EVALUATION Page 23 5 ALTERNATIVE SOLUTIONS AND EVALUATION The process used for the assessment and evaluation of the alternatives follows the procedures of the Municipal Class EA, as described below: Identify a reasonable

More information

There are access points readily available into the site.

There are access points readily available into the site. Site Name Reference Number Settlement Land at Broughton Atterbury U4 Size (Ha) 4. Broughton Planning history/context This section provides a brief overview of any significant planning history on the site

More information

Site Deliverability Statement Development at: Beech Lane, Kislingbury. Persimmon Homes Midlands March 2015

Site Deliverability Statement Development at: Beech Lane, Kislingbury. Persimmon Homes Midlands March 2015 Site Deliverability Statement Development at: Beech Lane, Kislingbury Persimmon Homes Midlands March 2015 Contents Site Deliverability Statement Development at: Beech Lane, Kislingbury 1.INTRODUCTION 1.1

More information

Offshore Work Packages

Offshore Work Packages Rampion Offshore Wind Farm Offshore Work Packages Meet The Buyer Naren Mistry, Engineering Manager 26 th Feb 2014 Rampion Offshore Project Scope Design, manufacture, transportation and Installation: Up

More information

Charging for Pre-application Advice. WSCC Guidance Note

Charging for Pre-application Advice. WSCC Guidance Note Charging for Pre-application Advice WSCC Guidance Note Content 1. Introduction 1.1 Our Objectives 1.2 Development Team Approach 1.3 Areas of Advice 1.4 What We Expect of You 1.5 Benefits of Pre-application

More information

Undergrounding high voltage electricity transmission. The technical issues

Undergrounding high voltage electricity transmission. The technical issues Undergrounding high voltage electricity transmission The technical issues This is an interactive PDF document with clickable links from the contents to all sections and back and also to URL and email links.

More information

Overhead lines in Ireland

Overhead lines in Ireland Overhead lines in Ireland The value in Cigré Jarlath Doyle Abstract The main theme of my presentation is to give a brief overview of the valuable information and influence Cigré has and is having on the

More information

PLANNING SERVICES UNIT

PLANNING SERVICES UNIT SUPPLEMENTARY PLANNING GUIDANCE DEVELOPMENT INVOLVING HORSES PLANNING SERVICES UNIT 1. INTRODUCTION 1.1 This document provides supplementary planning guidance on development involving horses, which is

More information

2015 No. 595 TOWN AND COUNTRY PLANNING, ENGLAND. The Town and Country Planning (Development Management Procedure) (England) Order 2015

2015 No. 595 TOWN AND COUNTRY PLANNING, ENGLAND. The Town and Country Planning (Development Management Procedure) (England) Order 2015 S T A T U T O R Y I N S T R U M E N T S 2015 No. 595 TOWN AND COUNTRY PLANNING, ENGLAND The Town and Country Planning (Development Management Procedure) (England) Order 2015 Made - - - - 18th March 2015

More information

A new Garden Neighbourhood for West Guildford An opportunity for Smart Growth. university of surrey November 2013

A new Garden Neighbourhood for West Guildford An opportunity for Smart Growth. university of surrey November 2013 A new Garden Neighbourhood for West Guildford An opportunity for Smart Growth university of surrey November 2013 A new Garden Neighbourhood for West Guildford Preface Since the County and Borough Councils

More information

Development Management Report

Development Management Report Committee and Date Central Planning Committee 5 th April 2012 Item 13 Public Development Management Report Responsible Officer: Stuart Thomas email: stuart.thomas@shropshire.gov.uk Tel: 01743 252665 Fax:

More information

PB POWER ISLAND OF IRELAND CAVAN-TYRONE AND MEATH-CAVAN 400KV PROJECTS PRELIMINARY BRIEFING NOTE OVERHEAD AND UNDERGROUND ENERGY TRANSMISSION OPTIONS

PB POWER ISLAND OF IRELAND CAVAN-TYRONE AND MEATH-CAVAN 400KV PROJECTS PRELIMINARY BRIEFING NOTE OVERHEAD AND UNDERGROUND ENERGY TRANSMISSION OPTIONS ISLAND OF IRELAND CAVAN-TYRONE AND MEATH-CAVAN 400KV PROJECTS PRELIMINARY BRIEFING NOTE OVERHEAD AND UNDERGROUND ENERGY TRANSMISSION OPTIONS FEBRUARY 2008 PB POWER PB Power Page i EXECUTIVE SUMMARY General

More information

I refer to the application made by Aquamarine Power Ltd. ( the Company ), dated 17 th June 2011 for:

I refer to the application made by Aquamarine Power Ltd. ( the Company ), dated 17 th June 2011 for: Ms Megan Richardson Aquamarine Power Ltd. Elder House 24 Elder Street Edinburgh EH1 3DX 14 February 2012 Dear Ms. Richardson, CONSENT FOR THE CONSTRUCTION AND OPERATION OF AN OFFSHORE DEMONSTRATOR WAVE

More information

23.1 RENEWABLE ENERGY

23.1 RENEWABLE ENERGY Proposed Hastings District Plan as Amended 23.1 Renewable Energy 23.1 RENEWABLE ENERGY 23.1.1 INTRODUCTION The use of energy is of fundamental importance to the function and development of our society.

More information

Advice can also be sought from specific specialist officers in the Council.

Advice can also be sought from specific specialist officers in the Council. Canterbury City Council Validation of Planning Applications Guidance note 2010: Introduction Up to date advice on the validation of planning applications is contained in the CLG Guidance on information

More information

November 2013 PLANNING PRE- APPLICATION ADVICE AND PLANNING PERFORMANCE AGREEMENT SERVICE

November 2013 PLANNING PRE- APPLICATION ADVICE AND PLANNING PERFORMANCE AGREEMENT SERVICE November 2013 PLANNING PRE- APPLICATION ADVICE AND PLANNING PERFORMANCE AGREEMENT SERVICE PRE-APPLICATION ADVICE AND PLANNING PERFORMANCE AGREEMENT SERVICE PRE-APPLICATION The Council welcomes and encourages

More information

REPORTS SUSTAINABILITY AND ENVIRONMENT 11 MAY 2015 ORDINARY COUNCIL MEETING OF COUNCIL

REPORTS SUSTAINABILITY AND ENVIRONMENT 11 MAY 2015 ORDINARY COUNCIL MEETING OF COUNCIL REPORT NO: 0.0 REPORT TITLE: SOURCE: DIVISION: FILE NO: POLICY: - STRATEGIC OBJECTIVE: Planning Scheme Amendment C202: 140-204 Western Avenue, Westmeadows Gareth Edgley, Senior Strategic Planner City Sustainability

More information

HS2 Phase One Planning Forum Highways Sub-group. Meeting #2 November 2014

HS2 Phase One Planning Forum Highways Sub-group. Meeting #2 November 2014 HS2 Phase One Planning Forum Highways Sub-group Meeting #2 November 2014 Agenda Schedules 4 part 1 Highways Accesses Schedule 16 Road traffic routes Schedule 16 Mud control measures Schedule 24 Lorry ban

More information

Eldorado-Ivanpah Transmission Project WELCOME To Southern California Edison Company s Eldorado-Ivanpah Transmission Project OPEN HOUSE

Eldorado-Ivanpah Transmission Project WELCOME To Southern California Edison Company s Eldorado-Ivanpah Transmission Project OPEN HOUSE WELCOME To Southern California Edison Company s Eldorado-Ivanpah Transmission Project OPEN HOUSE 1 1 Welcome to The Eldorado-Ivanpah Transmission Project Open House How is the open house organized? This

More information

Once an assessment has been made, the decision on whether the scheme will be put forward to the Panels will be reported to you.

Once an assessment has been made, the decision on whether the scheme will be put forward to the Panels will be reported to you. New TRO Requests Introduction and Application Form Essex Highways has delegated on-street parking, including lines, signs and restrictions, to the North Essex Parking Partnership (NEPP) in the North of

More information

SAN DIEGO GAS & ELECTRIC COMPANY SOUTH BAY SUBSTATION RELOCATION PROJECT TRAFFIC MANAGEMENT PLAN SEPTEMBER 2014

SAN DIEGO GAS & ELECTRIC COMPANY SOUTH BAY SUBSTATION RELOCATION PROJECT TRAFFIC MANAGEMENT PLAN SEPTEMBER 2014 SAN DIEGO GAS & ELECTRIC COMPANY SOUTH BAY SUBSTATION RELOCATION PROJECT TRAFFIC MANAGEMENT PLAN SEPTEMBER 2014 Traffic Management Plan TABLE OF CONTENTS 1 INTRODUCTION... 1 2 OBJECTIVES... 1 3 APPLICABLE

More information

Appendix C. Municipal Planning and Site Restoration Considerations

Appendix C. Municipal Planning and Site Restoration Considerations Appendix C Municipal Planning and Site Restoration Considerations 67 68 Appendix C - Municipal Planning and Site Restoration Considerations This appendix contains best practice standards for site planning

More information

Position Statement regarding Offshore Wind Proposals on Lake Huron. Lake Huron Centre for Coastal Conservation

Position Statement regarding Offshore Wind Proposals on Lake Huron. Lake Huron Centre for Coastal Conservation Position Statement regarding Offshore Wind Proposals on Lake Huron Lake Huron Centre for Coastal Conservation June 2010 Lake Huron Centre for Coastal Conservation (LHCCC) Corporate Position related to:

More information

Sector Design Concepts

Sector Design Concepts Section C Sector Design Concepts C7 Sector 7 Great North Road Underpass 6 6 6 C7. Existing situation Sector 7 refers to the cut and cover section of the project linking the northern end of the deep tunnels

More information

Do you own or operate underground facilities?

Do you own or operate underground facilities? This document contains information on becoming a member of the MISS DIG System. Once completed and returned to MISS DIG along with the supporting documents, MISS DIG will be able to establish you as a

More information

London Array Off-Shore Wind Farm

London Array Off-Shore Wind Farm London Array Off-Shore Wind Farm 1 Jamie R Mathlin Construction Manager Off-Shore Sub-Stations Project Commissioning Manager 27 Years Experience in the Power Industry Grid Trained Electrical Engineer 10

More information

THIS PAGE INTENTIONALLY LEFT BLANK

THIS PAGE INTENTIONALLY LEFT BLANK THIS PAGE INTENTIONALLY LEFT BLANK Construction Traffic Management Plan 2 Contents 1. Introduction... 4 1.1 Conditions of Consent... 4 2. Goals of the CTMP... 6 2.1 Objectives... 6 2.2 Predicted Construction

More information

Site Alternative Deliverability Report. SALT 034 Ty Nant, Groesffordd Resubmission: Deliverable. Local Development Plan

Site Alternative Deliverability Report. SALT 034 Ty Nant, Groesffordd Resubmission: Deliverable. Local Development Plan Local Development Plan Site Alternative Deliverability Report Brecon Beacons National Park Authority SALT 034 Ty Nant, Groesffordd Resubmission: Deliverable SALT 034 Ty Nant Groesffordd (Llanfrynach) Existing

More information

Basics of Sustainability. Environmental Impact Assessments (EIA)

Basics of Sustainability. Environmental Impact Assessments (EIA) Basics of Sustainability 8 Environmental Impact Assessments (EIA) 1 Contents Page Aims... 2 Introduction... 3 The Objectives of EIAs... 3 Developments that Require an EIA... 4 Key Stages of an EIA... 6

More information

Overview of Atlantic Offshore Renewable Energy Studies Program. Brian Hooker Office of Renewable Energy Programs

Overview of Atlantic Offshore Renewable Energy Studies Program. Brian Hooker Office of Renewable Energy Programs Overview of Atlantic Offshore Renewable Energy Studies Program Brian Hooker Office of Renewable Energy Programs February 2012 Completed Studies of Interest Compendium of Avian Information and Comprehensive

More information

Prior Notification of Proposed Demolition Validation Checklist

Prior Notification of Proposed Demolition Validation Checklist Prior Notification of Proposed Demolition Validation Checklist Introduction Submitting your application can be made easier by ensuring you have submitted all of the necessary information. Should important

More information

Construction Management Plan Template

Construction Management Plan Template Plan Template Planning Permit Number:... Date Planning Permit Issued:... Approval Stamp (Office Use only): Standard Plan Template Project details Company Operational Details.. Directors Name Company Name

More information

Development Brief for New Lodge, Bank Mill Lane Berkhamsted. Adopted November 2007

Development Brief for New Lodge, Bank Mill Lane Berkhamsted. Adopted November 2007 Development Brief for New Lodge, Bank Mill Lane Berkhamsted Adopted November 2007 This publication seeks your opinions about the design, layout and requirements for new housing development at New Lodge,

More information

Rockhampton Office Brisbane Office Tarong Site. Barron Gorge Hydro PS Kareeya Hydro PS Mica Creek PS

Rockhampton Office Brisbane Office Tarong Site. Barron Gorge Hydro PS Kareeya Hydro PS Mica Creek PS Business Procedure Traffic Management Document Number OHS-PROC-130 This document applies to the following sites: All Sites Rockhampton Office Brisbane Office Tarong Site Barron Gorge Hydro PS Kareeya Hydro

More information

What do we already know about Bradford-on-Avon community area?

What do we already know about Bradford-on-Avon community area? What do we already know about Bradford-on-Avon community area? Bradford-on-Avon is one of the smaller market towns in Wiltshire. It has good public transport connectivity and functions as a popular tourist

More information

TRAFFIC MANAGEMENT PLAN

TRAFFIC MANAGEMENT PLAN TRAFFIC MANAGEMENT PLAN For: The construction and operation of a Photovoltaic (PV) Facility in Dabenoris, South Africa Prepared for: Alternative Energy Solutions (Pty) Ltd PO Box 4939 Tygervalley, South

More information

8.0 Construction Cost Estimates

8.0 Construction Cost Estimates 8.0 Construction Cost Estimates 8.1 Introduction This chapter summarizes the results of the Task 14, Cost Estimating work for the five overall restoration alternatives under evaluation by Reclamation.

More information

Construction Traffic Management Plan

Construction Traffic Management Plan Construction Traffic Management Plan Proposed Additional Classroom Accommodation for Woolacombe Primary School Produced for and on behalf of Built Environments Team Devon County Council NPS South West

More information

HUNTER WATER CORPORATION Review of Environmental Factors Guidance Notes EG0041

HUNTER WATER CORPORATION Review of Environmental Factors Guidance Notes EG0041 HUNTER WATER CORPORATION Review of Environmental Factors Guidance Notes EG0041 January 2014 Document control Document controller: Manager Environment & Sustainability Document number: EG0041 Rev Date Description

More information

Significant investment and improvement of infrastructure and transport networks, delivered at no cost and no risk

Significant investment and improvement of infrastructure and transport networks, delivered at no cost and no risk December 2014 FACT SHEET: TRANSPORT AND INFRASTRUCTURE Significant investment and improvement of infrastructure and transport networks, delivered at no cost and no risk The Gold Coast Integrated Resort

More information

Tidal Energy. Wind Energy. Transmission & Distribution Network. Offshore Substation. Onshore Substation. Tidal Stream Energy.

Tidal Energy. Wind Energy. Transmission & Distribution Network. Offshore Substation. Onshore Substation. Tidal Stream Energy. Offshore Renewables Tidal Energy Transmission & Distribution Network Offshore Substation Wind Energy Onshore Substation Tidal Stream Energy Consumer Atkins in Offshore Renewables The offshore wind journey

More information

IALN11006400 /05 01 19.06.13. FAO: The Planning Department The Royal Borough of Windsor and Maidenhead Town Hall, St. Ives Road Maidenhead SL6 1RF

IALN11006400 /05 01 19.06.13. FAO: The Planning Department The Royal Borough of Windsor and Maidenhead Town Hall, St. Ives Road Maidenhead SL6 1RF IALN11006400 /05 01 19.06.13 FAO: The Planning Department The Royal Borough of Windsor and Maidenhead Town Hall, St. Ives Road Maidenhead SL6 1RF Dear Sir / Madam Re: 12/02994 BCA Sports Hall Condition

More information

CONSTRUCTION TRAFFIC MANAGEMENT PLAN Issue 2, V5, 11/11/13

CONSTRUCTION TRAFFIC MANAGEMENT PLAN Issue 2, V5, 11/11/13 Note: Please refer to the end of this document for guidance notes about completing this form Q1. What is the full postal address of the site? Your response Q2. Planning reference and revision number (if

More information

Construction Management Statement. Residential development at Bywell House, St Mary s Hill, Ascot

Construction Management Statement. Residential development at Bywell House, St Mary s Hill, Ascot Construction Management Statement Residential development at Bywell House, St Mary s Hill, Ascot Parking of Vehicles of Site Personnel, Operatives and Visitors Site staff, visitors to the development and

More information

Development Management Officer Report Committee Application. Summary

Development Management Officer Report Committee Application. Summary Development Management Officer Report Committee Application Summary Committee Meeting Date: 15 Dec 2015 Item Number: Application ID: Z/2014/0978/F Target Date: 31 st October 2014 Proposal: Single storey

More information

APPLICATION FOR AN ELECTRICITY CONNECTION (PROJECTS)

APPLICATION FOR AN ELECTRICITY CONNECTION (PROJECTS) APPLICATION FOR AN ELECTRICITY CONNECTION (PROJECTS) Completing this form accurately will help us deal with your application as quickly as possible. Please complete all sections. You can complete this

More information

Application No.: 14.074 Steve Rush, representing Rocky Mountain Power Rocky Mountain Power Project Location: approximately 1600 N. 6800 E.

Application No.: 14.074 Steve Rush, representing Rocky Mountain Power Rocky Mountain Power Project Location: approximately 1600 N. 6800 E. Planning Commission Staff Report Planning and Development Services Croydon Substation Conditional Use Permit Public Meeting August 28, 2014 Application No.: 14.074 Applicant: Steve Rush, representing Rocky

More information

Submission. 2. PURPOSE OF THE SUBMISSION To inform the NCC Board of Directors on the approach to implement the 2013 Greenbelt Master Plan.

Submission. 2. PURPOSE OF THE SUBMISSION To inform the NCC Board of Directors on the approach to implement the 2013 Greenbelt Master Plan. Public Submission No.: 2014-I17e To: Board of Directors For: INFORMATION Date: 2014-11-19 1. TITLE Greenbelt Master Plan Implementation 2. PURPOSE OF THE SUBMISSION To inform the NCC Board of Directors

More information

Questions Regarding Proposed Utility Undergrounding in Kensington

Questions Regarding Proposed Utility Undergrounding in Kensington Questions Regarding Proposed Utility Undergrounding in Kensington The following list of questions is being submitted by a group of Kensington residents at the request of Bob Coffin, chairperson for the

More information

BASILDON BOROUGH COUNCIL

BASILDON BOROUGH COUNCIL BASILDON BOROUGH COUNCIL Report to: Planning Committee December 05 PLANNING APPLICATION NO. 5/00699/FULL DEMOLITION OF ALL EXISTING OUTBUILDINGS AND REMOVAL OF ASSOCIATED LAWFUL USES AND TWO NO. RESIDENTIAL

More information

Best practice guide for Councils when initially dealing with NBN Co. June 2011

Best practice guide for Councils when initially dealing with NBN Co. June 2011 Best practice guide for Councils when initially dealing with NBN Co June 2011 Table of contents Local Government Guide... 2 Introduction Preparation... 4 Consider the development of a local digital economy

More information

CHAPTER 24: ENVIRONMENTAL MANAGEMENT

CHAPTER 24: ENVIRONMENTAL MANAGEMENT Central Eyre Iron Project Environmental Impact Statement CHAPTER 24: ENVIRONMENTAL MANAGEMENT CHAPTER 24 ENVIRONMENTAL MANAGEMENT COPYRIGHT Copyright Iron Road Limited, 2015 All rights reserved This document

More information

Purpose of the Local Liaison Committee

Purpose of the Local Liaison Committee Agenda 1. Welcome, introductions and purpose of the Local Liaison Committee 2. Introduction to the scheme 3. Progress update 4. Elect a chair for future meetings 5. Agree agenda and terms of reference

More information

Pre-application service for Nationally Significant Infrastructure Projects

Pre-application service for Nationally Significant Infrastructure Projects Pre-application service for Nationally Significant Infrastructure Projects Prospectus for Applicants Version 1 (May 2014) In this prospectus... This is a clickable PDF Executive summary 3 1 2 3 Purpose

More information

Gas to the West INFORMATION LEAFLET. gastothewest.com. info@gastothewest.com. www

Gas to the West INFORMATION LEAFLET. gastothewest.com. info@gastothewest.com. www Gas to the West INFORMATION LEAFLET 0800 975 2322 gastothewest.com @ info@gastothewest.com Gas to the West 1. INTRODUCTION This Gas to the West Project is a major energy infrastructure project to extend

More information

8 Strait of Belle Isle Marine Cable Crossing

8 Strait of Belle Isle Marine Cable Crossing 8 Strait of Belle Isle Marine Cable Crossing Report by: E. Colombo, Ing. (CESI) A. Snyder, P. Eng. P. Wilson, P. Eng. 8.1 Introduction The Strait of Belle Isle (SOBI) cable crossing involves the placement

More information

How To Write A New Bill On Flood Management In Scotland

How To Write A New Bill On Flood Management In Scotland Scottish Environment LINK is the forum for Scotland's voluntary environment organisations representing a broad spectrum of environmental interests with the common goal of contributing to a more environmentally

More information

DEVELOPMENT MANAGEMENT

DEVELOPMENT MANAGEMENT DEVELOPMENT MANAGEMENT Sub Heading Sub Heading 2 march 2012 PRE APPLICATION ADVICE SERVICE FOR PLANNING APPLICATIONS Introduction CONTACT DETAILS Telephone 0191 433 3416 / 0191 433 3426 Fax 0191 477 8422

More information

Renewable Energies WIND

Renewable Energies WIND WIND International Master in Sustainable Development and CR 2011-2012 Marcos López-Brea Index 1. Technical description: technology options, learning curve and grid integration. 2. Regulatory framework:

More information

Recycling & Energy Recovery Facility

Recycling & Energy Recovery Facility Recycling & Energy Recovery Facility Cross Green Industrial Estate Leeds Environmental Statement Volume 1: Non-Technical Summary The Proposed Development Project Background Leeds City Council (LCC) intends

More information

DESCRIPTION OF WORK:

DESCRIPTION OF WORK: DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works

More information

Rampion Offshore Wind Farm proposal

Rampion Offshore Wind Farm proposal Rampion Offshore Wind Farm proposal Statement of Community Consultation (SOCC) Strategy In support of Section 47 of the Planning Act 2008 January 2012 Robin Rigg Offshore Wind Farm, Solway Firth. For illustrative

More information

River Wensum Restoration Strategy Swanton Morley Restoration Scheme Reach 14a

River Wensum Restoration Strategy Swanton Morley Restoration Scheme Reach 14a River Wensum Restoration Strategy Swanton Morley Restoration Scheme Reach 14a At a glance River restoration benefits: Improved planform, channel cross-section, flow variation and sediment process. Improved

More information

How To Conduct An Environmental Impact Assessment

How To Conduct An Environmental Impact Assessment Proposed Terms of Reference for EIA studies 1. Introduction The proposed expansion of Bulk Drugs & Intermediates manufacturing unit by M/s. Sri Krishna Pharmaceuticals Limited (Unit V). is located at Plot

More information

LANDSCAPE AND DEVELOPMENT CHECKLIST FOR MONMOUTHSHIRE COUNTY COUNCIL

LANDSCAPE AND DEVELOPMENT CHECKLIST FOR MONMOUTHSHIRE COUNTY COUNCIL LANDSCAPE AND DEVELOPMENT CHECKLIST FOR MONMOUTHSHIRE COUNTY COUNCIL 1 Introduction It is to the advantage of the developer to treat the environmental aspects of development proposals seriously and take

More information

Overview of the 500MW EirGrid East-West Interconnector, considering System Design and Execution-Phase Issues

Overview of the 500MW EirGrid East-West Interconnector, considering System Design and Execution-Phase Issues Overview of the 500MW EirGrid East-West Interconnector, considering System Design and Execution-Phase Issues J Egan, P O Rourke EirGrid Plc, Republic of Ireland john.egan@eirgrid.com paul.o rouke@eirgrid.com

More information

Electromagnetic Radiation

Electromagnetic Radiation Environmental Protection Technical Advice note 2 Electromagnetic Radiation EP(S) Guidance notes for developers and consultants July 2003 Produced by: Environmental Protection (Specialist) Team ADVICE GUIDE

More information

NAPA COUNTY WATERSHED SYMPOSIUM

NAPA COUNTY WATERSHED SYMPOSIUM Planning, Building, and Environmental Services NAPA VALLEY GROWTH NAPA COUNTY WATERSHED SYMPOSIUM Plunging Forward May 15, 2015 1 YOU CAN T CROSS THE SEA MERELY BY STANDING AND STARING AT THE WATER. Rabindranath

More information

Chapter 7 COMMUNITY FACILITIES and SERVICES PLAN

Chapter 7 COMMUNITY FACILITIES and SERVICES PLAN Chapter 7 COMMUNITY FACILITIES and SERVICES PLAN Introduction Community facilities play an important role in ensuring a quality standard of living for Township residents, as well as impacting the location

More information

Construction Management Plan (CMP) Application

Construction Management Plan (CMP) Application About this form Principal Contractor (Applicant) Applicant Details (Person lodging application and main contact for CMP) DA and Site Details Development Consent for Works you are carrying out Construction

More information

Key Facts. Passenger growth at the airport is projected to grow to approximately 3 million passengers per annum by 2030.

Key Facts. Passenger growth at the airport is projected to grow to approximately 3 million passengers per annum by 2030. Bournemouth Airport & Business Park 7 7 Bournemouth Airport & Business Park Introduction 7.1 Bournemouth Airport is a key asset for the region, one of the UK s fastest growing regional airports and is

More information

Environmental Compliance Questionnaire for National Oceanic and Atmospheric Administration Federal Financial Assistance Applicants

Environmental Compliance Questionnaire for National Oceanic and Atmospheric Administration Federal Financial Assistance Applicants OMB Approval No.: 0648-0538 Environmental Compliance Questionnaire for National Oceanic and Atmospheric Administration Federal Financial Assistance Applicants Instructions The National Environmental Policy

More information

PLANNING & REGULATION COMMITTEE 16 JANUARY 2012

PLANNING & REGULATION COMMITTEE 16 JANUARY 2012 Division(s): Sutton Courtenay & Harwell Contact Officer: John Duncalfe (john.duncalfe@oxfordshire.gov.uk) Tel: 01865 815356 PLANNING & REGULATION COMMITTEE 16 JANUARY 2012 TO CRUSH, SCREEN, BLEND AND STOCK

More information

Taylor Wimpey UK Ltd. December 2007

Taylor Wimpey UK Ltd. December 2007 Taylor Wimpey UK Ltd December 2007 QM Issue/revision Issue 1 Revision 1 Revision 2 Revision 3 Remarks Draft For Planning Date 3 August 2007 20 December 2007 Prepared by D Gooding P Barton Signature Checked

More information

A2 Pepperhill to Cobham Highway Widening project, UK

A2 Pepperhill to Cobham Highway Widening project, UK Further information Skanska AB www.skanska.com Contact Noel Morrin, Senior Vice President Sustainability noel.morrin@skanska.se A2 Pepperhill to Cobham Highway Widening project, UK Case Study 40 Aspects

More information

2015 AVAGO 2D SEISMIC SURVEY ENVIRONMENTAL MANAGEMENT PLAN SUMMARY

2015 AVAGO 2D SEISMIC SURVEY ENVIRONMENTAL MANAGEMENT PLAN SUMMARY ENVIRONMENTAL MANAGEMENT PLAN SUMMARY TABLE OF CONTENTS 1. INTRODUCTION... 3 2. DESCRIPTION OF ACTIVITY... 4 3. DESCRIPTION OF THE ENVIRONMENT... 4 4. DESCRIPTION OF THE ACTIVITY IN RELATION TO THE ENVIRONMENT...

More information

Submarine Power Cables. State-of-the-art production facility, more than 100 years of experience and reference installations around the world.

Submarine Power Cables. State-of-the-art production facility, more than 100 years of experience and reference installations around the world. Submarine Power Cables State-of-the-art production facility, more than 100 years of experience and reference installations around the world. Reliable submarine power cables ABB is one of the world s most

More information

NON-TECHNICAL SUMMARY OF ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT FOR THE BAHCE WINDFARM PROJECT (135 MW)

NON-TECHNICAL SUMMARY OF ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT FOR THE BAHCE WINDFARM PROJECT (135 MW) Zorlu Plaza, 34310 Avcılar ISTANBUL / TURKIYE Tel: + 90 (212) 456-2300 Fax: +90 (212) 422-0099 www.zorlu.com.tr NON-TECHNICAL SUMMARY OF ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT FOR THE BAHCE WINDFARM

More information