Special interventions Status of production and QC

Size: px
Start display at page:

Download "Special interventions Status of production and QC"

Transcription

1 Fourth LHC Splice Review November 2013 Special interventions Status of production and QC Nicolas Bourcey TE-MSC-MDT

2 Outline I. Work organisation II. III. Sector 5-6: lessons and improvements Status of special activities IV. Status of magnets replacement V. QC VI. Traceability VII. Still to do and conclusion

3 Work Organisation Interventions prior to the train: PIM consolidations Special opening (ELQA, leaks, RQ busbars segment shortening, early opening for splice analysis, Q7-DFBA M sleeves opening ) Magnets exchange Interventions in parallel of the train: Fixed urgent NCR raised during train consolidations

4 Team (16 persons) 3 month of training in surface before LS1 on mock-ups in building 180.

5 Sector interventions planned before start of LS1 (PIM consolidations, 3 leaks, ELQA). More than 40 interventions done! Flange replacements for too short lip (12) Corrective action: partial cutting Cut of flanges for busbars machining (18) Corrective action: tooling re-design Cutting mark on flange weld Corrective action: modify tooling PIM damaged (5) Corrective action: add protections Q7-DFBA M sleeves opening (train machine doesn t fit) SIT intervene in 23% of the IC of the sector.

6 Sector 5-6: lessons and improvements PIM damaged Mark during cutting M flange cutting Q9 M-N pipes cutting Only 7 interventions in sector 6-7 up to now! Corrective actions applied in sector 5-6 improve the quality.

7 Status of special interventions PIM Sector Total Magnets 0/0 0/0 8/8 0/0 24/24 8/12 0/16 0/8 40/68 NCR + preventive 10/10 2/2 6/12 5/7 2/2 0/4 0/2 6/6 31/45 Only 2 PIM found broken during ball test (1-2 and 8-1) instead of 14 expected. 5 PIM damaged during SMACC (5-6). Leaks 3 old leaks repaired in 5-6 (2 M flange and 1 M2N flexible) 1 old leak repaired in 7-8 (M2N flexible)

8 Status of special interventions Early opening of M line sleeves and removal of insulation Sector Total ELQA tests 3/3 3/3 3/3 3/3 3/3 3/3 3/3 3/3 24/24 Splice analysis Electrical NC Opening for ELQA instrumentation 0/0 0/0 5/5 4/4 8/8 22/22 0/11 5/5 44/55 0/0 0/0 4/4 4/4 1/1 0/0 0/0 0/0 9/9 77/88 M sleeves opened prior to the train

9 Courtesy of S. Le Naour Status of special interventions RQ busbars segment shortening at point 1 and 5 4 IC s opened, desoldering and cutting of busbars done. QEQI.11R5: soldering of the shortcircuit. M1 ok but NCR on M2 (cable initially too long and external copper wedge too soft). (D.Etiembre / G.Bachmann) Before repairing After repairing

10 Secteur Slot Disconnection Transport old magnet (night) Refurbishment Transoprt new magnet (night) Alignment Welding activity Spools US welding ELQA Line N US welding ELQA Final welding (line N) Status of magnet exchange 14/18 magnets removed (last transport foreseen 09/08) 12 installed (last transport foreseen 15/08) Reconnection of all magnets foreseen before end of the year Q5L8 B30R7 31/05 07/06 B21L8 03/06 06/06 C15R1 17/06 19/06 A22R1 20/06 25/06 C30R1 24/06 01/07 C33R1 28/06 03/07 B33L2 02/07 08/07 A29L2 04/07 10/07 A23R2 05/07 11/07 B25R2 09/07 15/07 C15L3 11/07 18/07 Q23R3 17/07 23/07 A26R3 22/07 01/08 Q27R3 26/07 12/08 B32R3 01/08 13/08 C17R4 06/08 14/08 B31R4 09/08 15/08

11 Some pictures of cryomagnets transport Thanks to EN-HE colleagues

12 QC: Welding Welders qualification (automatic and manual welding) Internal QC Visual inspection Endoscopy Parameters recording for automatic welding External QC Visual inspection 100% (WQC) Radio on butt weld 100% (WQC) Leak tests (VSC) Systematic change of M line flanges 1 NCR detected by radio: crack due to copper particles (leak test ok). Corrective action: modification of the shielding tooling from copper to stainless steel (see EDMS report of A.Gerardin). Courtesy of A.Gerardin

13 QC: Desoldering and stabilisation Internal QC Same procedure than train Visual inspection Gauges Process data recording Traceability of data in MTF External QC Visual inspection (ELQC) SIT never do soldering of 13KA busbars.

14 QC: US welding US welding of line N US welding of spools

15 QC: US welding Qualification of welding machines before LS1 and after each transport. Production of standard samples for cold Rc measurements (cryolab) and tensile test (EN-MME). Same welding program than 2009 production. Same criteria than during the installation.

16 QC: US welding Example of reports for machine qualification

17 QC: US welding Internal QC production of samples just before soldering to warm-up the machine Visual inspection, gauges External QC Visual inspection by ELQC team N line EDMS # M line EDMS # Electrical tests by ELQA team after completion of a sector > 0.5 mm non-conform Alignment Excess length 1 mm ± 0.5 Gauge

18 Traceability New step created in MTF to register process data. REMPLACEMENT DIPOLE 2438 (A26R3) 2438 / 1242 QBQI.24R3 QQBI.25R3 QBBI.A25R3 QBBI.B25R3 QBQI.25R3 QQBI.25R3 QBBI.A26R3 QBBI.B26R3 QBQI.26R3 QQBI.26R3 QBBI.A27R3 QBBI.B27R3 QBQI.27R3 Ouverture manchettes W et écrans thermiques Retrait instrumentation cryogénique QC (ouverture) Découpe manchettes M1, M2, M3 Découpe manchettes N Découpe PIM Découpe soufflet E Découpe C' Découpe X, Y Découpe K Ouverture boitier ligne N Deconnection boitier ligne N Retrait cable ligne N Dépose isolation Déconnection spools QC (elect) Débrasage busbars 13KA QBQI.24R3 QBQI.25R3 QQBI.25R3 QBBI.A25R3 QBBI.B26R3 QBQI.26R3 QBQI.27R3 Date Operateurs Date Operateurs Date Operateurs Date Operateurs Date Operateurs Date Operateurs Date Operateurs TRANSPORT Stabilisation busbars 13KA QC (elect) Découpe brides lignes M Soudures brides lignes M QC (soudures) QC (soudures) / radio Tests de fuites TRANSPORT QC (SIT) Alignement Installation PIM Soudure PIM QC (soudures) Soudure manchette C' Test de fuite manchette C' Soudure soufflet E Test de fuite soufflet E Brasage ligne Y Soudure manchette X Test de fuite manchette X Soudure flexible K Test de fuite soudure flexible K QC (soudures) Soudure US spools QC (elect) Insertion ligne N Montage boitier ligne N QC (elect) MPAQ AIV1 Soudure US ligne N QC (elect) AIV2 Fermeture boitier ligne N Soudure manchettes ligne N Test de fuites manchettes N Cablage instrumentation cryogénique QC (SIT) All activities done by SIT are registered in excel files

19 Still to do and conclusion Still to do: Magnets replacement will finish before end of weeks of delay on the planning. Connection cryostat: 6/16 inspected ok. Still 2 to repair. Line Y repair Triplets copper braid SAM level gauges Follow train NCR SIT is able to follow the needs and we expect to free resources for major NCR last quarter of 2013.

20 Thank you for your attention.

Large Systems Commissioning

Large Systems Commissioning Large Systems Commissioning, DESY CAS Vacuum in Accelerators Platja D`Aro, May 21, 2006 Special thanks to O. Gröbner 1 Outline Introduction Pump Down and Leak Check Components Check Bake Out Interlocks/Safety

More information

Guidelines for Securing by Welding of Chain Cable Studs in Service Guidance for Anchoring Equipment in Service

Guidelines for Securing by Welding of Chain Cable Studs in Service Guidance for Anchoring Equipment in Service (July 2003) (Rev.1 July 2014) Guidelines for Securing by Welding of Chain Cable Studs in Service Guidance for Anchoring Equipment in Service 1. General 1.1 This document gives the guidelines for maximum

More information

www.klmtechgroup.com TABLE OF CONTENT

www.klmtechgroup.com TABLE OF CONTENT Page : 1 of 45 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia TABLE OF CONTENT 1.0 SCOPE 2 2.0 CONFLICTS

More information

The commissioning of the LHC: first the technical systems, then the commissioning with beam

The commissioning of the LHC: first the technical systems, then the commissioning with beam The commissioning of the LHC: first the technical systems, then the commissioning with beam Roberto Saban 4. Ulusal Parçacık Hızlandırıcıları ve Uygulamaları Kongresi 30 Ağustos 1 Eylül 2010, Bodrum -

More information

Minimum requirements for the 13 ka splices for 7 TeV operation

Minimum requirements for the 13 ka splices for 7 TeV operation Minimum requirements for the 13 ka splices for 7 TeV operation - type of defects - FRESCA tests and validation of the code QP3 - a few words on the RRR - I safe vs R addit plots - conclusion Arjan Verweij

More information

building engineering services association specification for: Domestic Heating www.thebesa.com

building engineering services association specification for: Domestic Heating www.thebesa.com building engineering services association specification for: Domestic central Heating installation www.thebesa.com building engineering services association acknowledgments Guide to good practice: Domestic

More information

SERIES NG 1800 STRUCTURAL STEELWORK

SERIES NG 1800 STRUCTURAL STEELWORK MANUAL OF CONTRACT DOCUMENTS FOR HIGHWAY WORKS VOLUME 2 NOTES FOR GUIDANCE ON THE SPECIFICATION FOR HIGHWAY WORKS SERIES NG 1800 STRUCTURAL STEELWORK Contents Clause Title Page NG 1800 (08/14) General

More information

SAMPLE TEST QUESTIONS STEAMFITTER/PIPEFITTER - ITA WEBSITE

SAMPLE TEST QUESTIONS STEAMFITTER/PIPEFITTER - ITA WEBSITE 1 Which tool is used to correct internal hi-low when preparing a 4-in. steel pipe for welding? A. 4-in. grinder with cutting disc. B. Mini-grinder with flapper disc. C. Pencil grinder with cone stone.

More information

Chapter 5 - Aircraft Welding

Chapter 5 - Aircraft Welding Chapter 5 - Aircraft Welding Chapter 5 Section A Study Aid Questions Fill in the Blanks 1. There are 3 types of welding:, and, welding. 2. The oxy acetylene flame, with a temperature of Fahrenheit is produced

More information

External Quality, Environment, Health & Safety Management Manual with Integrated Welding Engineering Manual

External Quality, Environment, Health & Safety Management Manual with Integrated Welding Engineering Manual conferdo GmbH & Co. KG External Quality, Environment, Health & Safety Management Manual with Integrated Welding Engineering Manual of the company conferdo GmbH & Co. KG STAHLBAU OHNE GRENZEN STEELWORK

More information

RMF Engineering 23 05 23

RMF Engineering 23 05 23 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

More information

STATEMENT OF WORK (SOW) On-Call Certified Welding Inspections and Nondestructive Testing

STATEMENT OF WORK (SOW) On-Call Certified Welding Inspections and Nondestructive Testing 1.0 INTRODUCTION Colorado Springs Utilities (UTILITIES) is seeking qualified firms to provide verification welding inspection services, nondestructive testing services, and technical reporting to Colorado

More information

Application of Welding Standards in Hong Kong. S. K. Babu Laboratory Manager - Foundation Techniques Ltd

Application of Welding Standards in Hong Kong. S. K. Babu Laboratory Manager - Foundation Techniques Ltd Application of Welding Standards in Hong Kong S. K. Babu Laboratory Manager - Foundation Techniques Ltd Introduction: This paper summarizes the current welding standards practiced in Hong Kong & also outlines

More information

Part B Repair Quality Standard for Existing Ships

Part B Repair Quality Standard for Existing Ships Part B Repair Quality Standard for Existing Ships PART B SHIPBUILDING AND REPAIR QUALITY STANDARD FOR EXISTING SHIPS CONTENTS: 1. Scope 2. General requirements to repairs and repairers 3. Qualification

More information

NORSOK Compact Flange Installation and Assembly Procedure

NORSOK Compact Flange Installation and Assembly Procedure NORSOK Compact Flange Installation and Assembly Procedure Hytorc Norway www.hytorc.no P.Nødland. Page 2 INTRODUCTION Scope The following main operations are covered in this section: Assembly/disassembly

More information

TUBE-TO-TUBESHEET JOINTS: THE MANY CHOICES ABSTRACT KEYWORDS. Seal welding, tube-to-tubesheet welds, heat exchanger, mock-up, tube expansion

TUBE-TO-TUBESHEET JOINTS: THE MANY CHOICES ABSTRACT KEYWORDS. Seal welding, tube-to-tubesheet welds, heat exchanger, mock-up, tube expansion B. J. Sanders Consultant 307 Meyer Street Alvin, Texas 77511 TUBE-TO-TUBESHEET JOINTS: THE MANY CHOICES ABSTRACT After a decision has been made to use zirconium as the material of construction for a shell

More information

NCCER 13614 Progress Blvd., Alachua, FL 32615 Tel: (888) 622-3720 E-mail: info@nccer.org. Task Number Item Date(s) Recorded By

NCCER 13614 Progress Blvd., Alachua, FL 32615 Tel: (888) 622-3720 E-mail: info@nccer.org. Task Number Item Date(s) Recorded By NCCER 13614 Progress Blvd., Alachua, FL 32615 Tel: (888) 622-3720 E-mail: info@nccer.org PIPELINE MAINTENANCE On-the-Job Training Level One MODULE 66101-02 INTRODUCTION TO THE PIPELINE INDUSTRY This is

More information

Heavy Duty Alternator Charging System Troubleshooting

Heavy Duty Alternator Charging System Troubleshooting Heavy Duty Alternator Charging System Troubleshooting Alternator Charging System Troubleshooting Squealing noises under the hood? Headlight bulbs blow out repeatedly or dim? Is the dash voltmeter gauge

More information

FPO. Meeting and Exceeding API Standards: How Much Testing Do Pumps Really Need? White Paper

FPO. Meeting and Exceeding API Standards: How Much Testing Do Pumps Really Need? White Paper White Paper Meeting and Exceeding API Standards: How Much Testing Do Pumps Really Need? John Bailey, API Global Product Manager Marc DeSilva, Global Product Director, Oil & Gas Plant Performance Services

More information

Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe

Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe 1. GENERAL The following supplemental sewer main specifications are intended to address the installation of high-density polyethylene

More information

SECTION 4: Cable Ladder Stainless Steel & Aluminium

SECTION 4: Cable Ladder Stainless Steel & Aluminium SECTION 4: Cable Ladder & Aluminium Type 3/50 (NEMA 6A) Type 4/70L Type 5/112 (NEMA 20C) > 4:3 > 4:4 > 4:5 Aluminium Type 4/70A (NEMA 16B) Ladder Splice Plates > 4:7 > 3:18 Page 4:1 Cable Ladder General

More information

11. NONDESTRUCTIVE TESTING

11. NONDESTRUCTIVE TESTING 11. NONDESTRUCTIVE TESTING Nondestructive testing includes magnetic particle testing (MT), Liquid Dye Penetrant testing (PT), Radiographic Testing (RT) and Ultrasonic Testing (UT). The purpose of nondestructive

More information

Pump Skid Fabrication for Magnetic Coupling. Rick Soltis Chief Mechanic City of Bedford

Pump Skid Fabrication for Magnetic Coupling. Rick Soltis Chief Mechanic City of Bedford Pump Skid Fabrication for Magnetic Coupling Rick Soltis Chief Mechanic City of Bedford Contents Magnetic Couplings What They Are, How They Work, Where They re Used Fabrication and Manufacturing of Pump

More information

NQF and the New Zealand Certificate in Electrical Engineering

NQF and the New Zealand Certificate in Electrical Engineering NQF Ref 0223 Version 6 Page 1 of 8 National Certificate in Electrical Engineering (Level 3) Level 3 Credits 149 This qualification has been reviewed. The last date to meet the requirements is 31 December

More information

9. QUALITY CONTROL/QUALITY ASSURANCE

9. QUALITY CONTROL/QUALITY ASSURANCE Interim Guidelines: Chapter 9 - Quality Control/Quality Assurance 9. QUALITY CONTROL/QUALITY ASSURANCE Quality control is principally the responsibility of the contractor, while Quality Assurance is performed

More information

Trouble shooting guide

Trouble shooting guide guide DPR/PSR Leak Insuffi ciently tightened, shallow bite Tighten the nut according to correct number of turns, direct assembly only for maintanance/repair, use of recommended pre-assembly machines Mark

More information

Reasons for reissue are provided in Section 6, REVISION SUMMARY.

Reasons for reissue are provided in Section 6, REVISION SUMMARY. Reasons for reissue are provided in Section 6, REVISION SUMMARY. The FRONT OF TOOL has the AMP marking on the link. The BACK OF TOOL (Wire Side), into which the wire is inserted, has the wire size marked

More information

Engineered Solutions

Engineered Solutions Engineered Solutions Long established partnerships bring together the world s leading instrumentation companies within BKW. Our manufacturing facility enables us to quickly adapt standard instruments to

More information

STORAGE, INSTALLATION AND MAINTENANCE PROCEDURES

STORAGE, INSTALLATION AND MAINTENANCE PROCEDURES GATE VALVE O.S. & Y 1.0 Periodic Inspections 1.1 The valve stem packing should be inspected at least monthly. If the stem packing shows signs of leakage, simply tighten the adjusting nuts to compress the

More information

ASTM A860/A860M-09 Standard Specification for Wrought High Strength. Ferritic Steel Butt Welding Fittings. 1. Scope :- 2. Reference Documents :-

ASTM A860/A860M-09 Standard Specification for Wrought High Strength. Ferritic Steel Butt Welding Fittings. 1. Scope :- 2. Reference Documents :- Standard Specification for Wrought High Strength Ferritic Steel Butt Welding Fittings 1. Scope :- 1.1 This specification covers wrought high strength ferritic steel butt-welding fitting of seamless and

More information

Chapter. Restoration of Damaged Structures

Chapter. Restoration of Damaged Structures 5 Chapter Restoration of Damaged Structures Bringing back a damaged structure to its pre-earthquake state and original strength is called restoration. This is the first step of building rehabilitation.

More information

INSTALLATION PROCEDURES FOR PRINTED CIRCUIT BOARD TERMINATORS D-607-XX

INSTALLATION PROCEDURES FOR PRINTED CIRCUIT BOARD TERMINATORS D-607-XX Page: 1 of 9 INSTALLATION PROCEDURES FOR PRINTED CIRCUIT BOARD TERMINATORS D-607-XX 1. SCOPE This engineering standard contains the termination procedures and inspection requirements for the printed circuit

More information

DC MOTOR ANALYSIS & TROUBLESHOOTING

DC MOTOR ANALYSIS & TROUBLESHOOTING DC MOTOR ANALYSIS & TROUBLESHOOTING By Don Shaw Condition assessment of DC motors requires a basic understanding of the design and operating characteristics of the various types available: the series motor,

More information

MEDFORD FABRICATION CSC, INC. Quality System Manual. Date of issue: 03/25/2010 Revision : F

MEDFORD FABRICATION CSC, INC. Quality System Manual. Date of issue: 03/25/2010 Revision : F MEDFORD FABRICATION CSC, INC Quality System Manual Date of issue: 03/25/2010 Revision : F Table of Contents System Description 1.0 Introduction 2.0 Company Quality Policy 3.0 Organization Charts 4.0 Quality

More information

AMPSEAL* Automotive Plug Connector and Header Assembly

AMPSEAL* Automotive Plug Connector and Header Assembly AMPSEAL* Automotive Plug Connector and Header Assembly Application Specification 24 SEP 97 Rev E All dimensions are given in millimeters unless otherwise specified. All dimensional tolerances are +0.2

More information

S-Level and Hi-Rel Connectors... 94. Power Rating for Coaxial Connectors... 98. Mounting Guidelines For Flange Mount Connectors...

S-Level and Hi-Rel Connectors... 94. Power Rating for Coaxial Connectors... 98. Mounting Guidelines For Flange Mount Connectors... Index... Page S-Level and Hi-Rel... 94 Power Rating for Coaxial... 98 Mounting Guidelines For Flange Mount... 102 Mating Microwave... 105 RF Versus Microwave SMA... 106 EMI/RFI Shielding Standards... 108

More information

08003-1 WATER SERVICE 2

08003-1 WATER SERVICE 2 08003_Mar08_2011.pdf Page 1 of 7 INDEX Page 08003-1 WATER SERVICE 2 1.1 Pipe 2 1.1.1 Copper 2 1.1.2 Polyethylene 2 1.2 Valves and Fittings 2 1.2.1 Main Stops 3 1.2.2 Curb Stops 3 1.2.3 Curb Box 3 1.2.4

More information

Drawings for Pipe Installation

Drawings for Pipe Installation TRADE OF Pipefitting PHASE 2 Module 5 Technical Drawing UNIT: 4 Produced by In cooperation with subject matter expert: Finbar Smith SOLAS 2014 Table of Contents Unit Objective... 1 Learning Outcome...

More information

Specifications. Model Flow type Pressure type. Air Maximum operating pressure. 1.0 MPa Ambient and fluid temperature. 3% F.S.

Specifications. Model Flow type Pressure type. Air Maximum operating pressure. 1.0 MPa Ambient and fluid temperature. 3% F.S. Electro-Pneumatic Proportional Valve Series /VEP Electro-pneumatic proportional valve: Flow type () Controls the flow rate steplessly according to current. (It is a / port valve that has an electrical

More information

Installation instruction CASAFLEX - Connecting piece DN 100

Installation instruction CASAFLEX - Connecting piece DN 100 1 CASAFLEX - 11 10 114,3 x 4,5 3 5 2 4 1 7 6 8 12 9 Do not begin work until you have read the installation instruction carefully. 1 internal backing sleeve 2 graphite packing 3 connecting piece 4 thrust

More information

National Certificate in Electrical Engineering (Electrician for Registration) (Level 4)

National Certificate in Electrical Engineering (Electrician for Registration) (Level 4) NZQF NQ Ref 1195 Version 3 Page 1 of 11 National Certificate in Electrical Engineering (Electrician for Registration) (Level 4) Level 4 Credits 249 This qualification has been reviewed. The last date to

More information

Rubber Lining for Projects

Rubber Lining for Projects Rubber Lining for Projects Trelleborg Rubber Lining - the ONE safeguard for wear and corrosion protection Trelleborg Rubber Linings can be applied to many surfaces to significantly reduce abrasive wear,

More information

Specification of the cooling- water-piping for SESAME Storage Ring and the Radio-Frequency System

Specification of the cooling- water-piping for SESAME Storage Ring and the Radio-Frequency System Technical Sector: Mechanical Synchrotron-light for Experimental Science And Applications in the Middle East Cooling water piping Date: 02/02/2015 Total Number of Pages: 1 Document type: Specifications

More information

Detection of Pipe Leaks Connection of Pulse Monitoring System in Thermal Utilities

Detection of Pipe Leaks Connection of Pulse Monitoring System in Thermal Utilities ZPU MIĘDZYRZECZ PREINSULATED PIPE Detection of Pipe Leaks in Thermal Utilities Assembly Manual Principles of Assembly and Servicing ZAKŁAD PRODUKCYJNO USŁUGOWY Międzyrzecz Polskie Rury Preizolowane Sp.

More information

1.2 For piping systems that operate at hoop stress of 20% or more of the Specified Minimum Yield Strength the following shall apply.

1.2 For piping systems that operate at hoop stress of 20% or more of the Specified Minimum Yield Strength the following shall apply. 1.0 JOINT FIT-UP AND ALIGNMENT 1.1 For piping systems that operate at hoop stress of less than 20% and the internal adjoining ends do not vary more than 1 / 8 in. and adequate penetration and fusion can

More information

MARC5001A Employ tools, equipment and materials in a shipboard context

MARC5001A Employ tools, equipment and materials in a shipboard context MARC5001A Employ tools, equipment and materials in a shipboard context Release 1 MARC5001A Employ tools, equipment and materials in a shipboard context Modification History Release 1 This is the first

More information

FIELD ACCEPTANCE OF FIELD WELDING GUIDE

FIELD ACCEPTANCE OF FIELD WELDING GUIDE Page 1 of 17 Oklahoma DOT Materials & Testing January 14, 2004 Publication: GFA-FW (Updated to reference current Structural Materials Branch of the ODOT Materials Division URL 07/06/2016) FIELD ACCEPTANCE

More information

PIPING SYSTEM - ABRASIVE SLURRIES Engineering Standard Specification. 96 B. Riutta

PIPING SYSTEM - ABRASIVE SLURRIES Engineering Standard Specification. 96 B. Riutta PIPING SYSTEM - ABRASIVE SLURRIES Engineering Standard Specification Number: 3503-11.2.610 Rev. 2 Rubber Lined Steel Pipe and Fittings Mechanically Coupled Plain End Type System Issued Revised Approved

More information

CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES

CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES 1.0 SCOPE CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES This document establishes the minimum quality program requirements for a contractor providing equipment, material, and construction

More information

Chesapeake Section AWWA Symposium

Chesapeake Section AWWA Symposium PRESTRESSED CONCRETE CYLINDER PIPE (PCCP) Chesapeake Section AWWA Symposium HANSON PRESSURE PIPE Steve Smith January 16,2014 Interpace Projects with Problems INTERPACE 45 MILLION FEET 11,500 PROJECTS Slide

More information

DOCUMENTATION FOR QUALIFICATION SYSTEM

DOCUMENTATION FOR QUALIFICATION SYSTEM DOCUMENTATION FOR QUALIFICATION SYSTEM MATERIAL GROUP: PRESSURE EQUIPMENT MAINTENANCE, REPAIR INTERNAL CODE OF MATERIAL GROUP: MM10300 New code according the registration on myhome: MMGV03 CPV CODE: 45259000-7,

More information

1.3.2 Method of construction and restoration of existing water service connections. This shall include:

1.3.2 Method of construction and restoration of existing water service connections. This shall include: 1.0 GENERAL 1.1 DESCRIPTION: This specification shall cover the rehabilitation of existing water lines using the GRUNDOCRACK PIPE BURSTING SYSTEM. Pipe bursting is a system by which the pneumatic bursting

More information

Technical Specification for the Cryogenic Testing of HTS Current Leads

Technical Specification for the Cryogenic Testing of HTS Current Leads Group Ref.: AT-MEL-CF EDMS No.: 44036 The Large Hadron Collider Project IT-3303/AT/LHC Technical Specification for the Cryogenic Testing of HTS Current Leads Abstract This specification concerns the testing

More information

EUROPEAN OEM SERVICE STAUFF. STAUFF - Line - Local solutions for individual customers worldwide

EUROPEAN OEM SERVICE STAUFF. STAUFF - Line - Local solutions for individual customers worldwide EUROPEAN OEM SERVICE STAUFF STAUFF - Line - Local solutions for individual customers worldwide STAUFF - Line - Experienced staff and precision machinery enable the manufacture of high-quality hydraulic

More information

National Certificate in Electricity Supply (Electrical Services Technician) (Level 4)

National Certificate in Electricity Supply (Electrical Services Technician) (Level 4) NQF Ref 1098 Version 2 Page 1 of 6 National Certificate in Electricity Supply (Electrical Services Technician) (Level 4) Level 4 Credits 109 Purpose This national certificate is awarded to people who have

More information

INTER PLANT STANDARD STEEL INDUSTRY

INTER PLANT STANDARD STEEL INDUSTRY INTER PLANT STANDARD STEEL INDUSTRY CODE OF PRACTICE FOR REVAMPING OF EOT CRANES IPSS:3-02-014-03 IPSS Corresponding IS does not exist 0. FOREWORD 0.1 This Inter Plant Standard has been prepared by the

More information

Trade of Electrician. Three-phase Distribution Boards And Socket Circuits

Trade of Electrician. Three-phase Distribution Boards And Socket Circuits Trade of Electrician Standards Based Apprenticeship Three-phase Distribution Boards And Socket Circuits Phase 2 Module No. 2.3 Unit No. 2.3.2 COURSE NOTES Created by Charlie Walsh - Athlone TC Revision

More information

Standards and projects under the direct responsibility of TC 44 Secretariat

Standards and projects under the direct responsibility of TC 44 Secretariat Standards and projects under the direct responsibility of TC 44 Secretariat ISO 3677:1992 Filler metal for soft soldering, brazing and braze welding -- Designation ISO 5187:1985 Welding and allied processes

More information

TROUBLESHOOTING FLOW CHART

TROUBLESHOOTING FLOW CHART TROUBLESHOOTING FLOW CHART Revised and updated on January 16, 2003, by Tony Leger and Automation Lab Technology. FACScan(FC)\FACSort(FST) FACScalibur (FCB) Fluidics/Pneumatics troubleshooting guide DCM

More information

BODY OF KNOWLEDGE API-570 AUTHORIZED PIPING INSPECTOR CERTIFICATION EXAMINATION

BODY OF KNOWLEDGE API-570 AUTHORIZED PIPING INSPECTOR CERTIFICATION EXAMINATION BODY OF KNOWLEDGE API-570 AUTHORIZED PIPING INSPECTOR CERTIFICATION EXAMINATION 2015 (Replaces July 2013) API Authorized Piping Inspectors must have a broad knowledge base relating to maintenance, inspection,

More information

NON-DESTRUCTIVE TESTING OF PIPELINES. L. Annila. Abstract

NON-DESTRUCTIVE TESTING OF PIPELINES. L. Annila. Abstract NON-DESTRUCTIVE TESTING OF PIPELINES L. Annila Abstract This paper shall present different, contemporarily available non-destructive testing (NDT) methods of pipelines and compare them to each other from

More information

Ultrasonic Reference Blocks

Ultrasonic Reference Blocks Ultrasonic Reference Blocks Custom and Standard Test Blocks for Nondestructive Testing Introduction 3 IIW Type 1 Calibration Block 4 Miniature Angle Beam (ROMPAS) Calibration Block 4 Distance Calibration

More information

for industrial plants & rolling mills

for industrial plants & rolling mills WiCHMANN - Gelenkwellen Ihr Spezialist für Gelenkwellen in Papiermaschinen WiCHMANN - Cardan für industrielle Anlagenshafts & Walzwerke for industrial plants & rolling mills Manufacture, repairs and service

More information

LS 2540 SEWER LATERALS AND INSPECTION TEES

LS 2540 SEWER LATERALS AND INSPECTION TEES LS 2540 SEWER LATERALS AND INSPECTION TEES A. Summary B. Submittals C. Site Information D. Sewer Pipe and Fittings E. Lateral Locations F. Lateral Installation G. Inspection Tee Installation H. Removal

More information

GRCC Manufacturing Technology

GRCC Manufacturing Technology Grand Rapids Community College GRCC Manufacturing Technology Plastics Manufacturing Quality Science Tooling and Manufacturing Welding 1 www.grcc.edu G r a n d R a p i d s C o m m u n i t y C o l l e g

More information

WATER & SEWER CORROSIVE RESISTANT PRODUCTS

WATER & SEWER CORROSIVE RESISTANT PRODUCTS WATER & SEWER CORROSIVE RESISTANT PRODUCTS The Standard of Excellence in the Industry CASING SPACERS COUPLINGS & FLANGE COUPLING ADAPTERS REPAIR CLAMPS DUCTILE IRON SADDLES STAINLESS STEEL SADDLES TAPPING

More information

Reasons for reissue of this instruction sheet are provided in Section 5, REVISION SUMMARY.

Reasons for reissue of this instruction sheet are provided in Section 5, REVISION SUMMARY. Reasons for reissue of this instruction sheet are provided in Section 5, REVISION SUMMARY. Air Pressure 586.1 min 689.5 kpa max [85 min 100 psi max] Air Displacement 721,000 mm 3 [44 in. 3 ] Figure 1 Weight

More information

Nuclear Safety Council Instruction number IS- 23 on in-service inspection at nuclear power plants

Nuclear Safety Council Instruction number IS- 23 on in-service inspection at nuclear power plants Nuclear Safety Council Instruction number IS- 23 on in-service inspection at nuclear power plants Published in the Official State Gazette (BOE) No 283 of November 24 th 2009 Nuclear Safety Council Instruction

More information

Specification for Rotary Drill Stem Elements

Specification for Rotary Drill Stem Elements Addendum 1 March 2007 Effective Date: September 1, 2007 Specification for Rotary Drill Stem Elements ANSI/API SPECIFICATION 7-1 FIRST EDITION, MARCH 2006 EFFECTIVE DATE: SEPTEMBER 2006 ISO 10424-1:2004

More information

Module 5 Couplings. Version 2 ME, IIT Kharagpur

Module 5 Couplings. Version 2 ME, IIT Kharagpur Module 5 Couplings Lesson 1 Introduction, types and uses Instructional Objectives At the end of this lesson, the students should have the knowledge of The function of couplings in machinery. Different

More information

MECHANICAL AND THERMAL ANALYSES OF THE CABLE/ STRAND STRAIN TEST FIXTURE

MECHANICAL AND THERMAL ANALYSES OF THE CABLE/ STRAND STRAIN TEST FIXTURE TD-01-001 January 6, 2000 MECHANICAL AND THERMAL ANALYSES OF THE CABLE/ STRAND STRAIN TEST FIXTURE Michela Fratini, Emanuela Barzi Abstract: A fixture to assess the superconducting performance of a reacted

More information

Assured Joint Integrity

Assured Joint Integrity Assured Joint Integrity All leaks cost Loss of containment can have catastrophic results and negatively impact brand image, facilities, employees, and the environment. Unplanned shutdowns at hydrocarbon

More information

PCB Quality Inspection. Student Manual

PCB Quality Inspection. Student Manual PCB Quality Inspection Student Manual Unit 2: Inspection Overview Section 2.1: Purpose of Inspection What Is The Purpose of Inspection? There are 2 reasons why Inspection is performed: o To verify the

More information

JIS G3445 Carbon steel tubes for machine structural purposes

JIS G3445 Carbon steel tubes for machine structural purposes JIS G3445 arbon steel tubes for machine structural purposes 1. Scope This Japanese Industrial Standard specifies the carbon steel tubes, hereinafter referred to as the "tubes", used for machinery, automobiles,

More information

ACS.VESLP1.LIMITED SCOPE SAFETY ASSESSMENT CRITERIA INITIAL & RE-ASSESSMENT DOMESTIC.LPG GAS STORAGE VESSELS

ACS.VESLP1.LIMITED SCOPE SAFETY ASSESSMENT CRITERIA INITIAL & RE-ASSESSMENT DOMESTIC.LPG GAS STORAGE VESSELS ACS.VESLP1.LIMITED SCOPE SAFETY ASSESSMENT CRITERIA INITIAL & RE-ASSESSMENT DOMESTIC.LPG GAS STORAGE VESSELS Issue 4.1 ACS.SMB 1 VESLP1 INITIAL & RE-ASSESSMENT Introduction Tests gas safety competence

More information

Quick Connect Boxes Inside Gloveboxes

Quick Connect Boxes Inside Gloveboxes ULC Series Junction Boxes Quick Connect Boxes Inside Gloveboxes The ULC quick connect junction boxes are the essential elements to optimize the cabling inside gloveboxes. Large range Designed for nuclear

More information

DOE LHC Quarterly Review. Magnet Production Cable Testing Cost to Complete issues. Mike Harrison, BNL July 26, 2004

DOE LHC Quarterly Review. Magnet Production Cable Testing Cost to Complete issues. Mike Harrison, BNL July 26, 2004 DOE LHC Quarterly Review Magnet Production Cable Testing Cost to Complete issues Mike Harrison, BNL July 26, 2004 1 BNL Production Status Magnet production complete The last series of dipoles (D3 s) is

More information

Projects and R&D activities

Projects and R&D activities Projects and R&D activities J.M. Jimenez On behalf of the Vacuum, Surface and Coatings Group (VSC) Vacuum, Surface and Coatings group* Mandate Design, construction, operation, maintenance and upgrade of

More information

NEW CONNECTION INDUSTRIAL PRODUCTS NC.10V NC.20V NC.30V. NC. SD.10 NC. SD.20 NC. F.Clamp

NEW CONNECTION INDUSTRIAL PRODUCTS NC.10V NC.20V NC.30V. NC. SD.10 NC. SD.20 NC. F.Clamp Repair and Construction. Complete stainless steel pipe repair clamps to repair cracks, fractures, pin holes, torn sockets or welded tees, broken asbest-cement pipe coupling and more. Available for all

More information

Standard Hydraulic Piping Flushing Procedure

Standard Hydraulic Piping Flushing Procedure Page 1 of 6 1.0 Scope This procedure covers the minimum technical requirements for cleaning and flushing of Hydraulic and Piping, and related accessories. 2.0 Introduction In hydraulic fluid power systems,

More information

POLYURETHANE TIMING BELTS

POLYURETHANE TIMING BELTS B212 POLYURETHANE TIMING BELTS BRECOflex CO., L.L.C. translates the customers needs into new and expanded product lines. We are committed to partner with our customers in providing unique solutions and

More information

Jim Harris Continuous Improvement Leader

Jim Harris Continuous Improvement Leader Approved By: Jerry Longmire Global Quality Leader Jim Harris Continuous Improvement Leader Document Revision Chart The following chart lists the revisions made to this document tracked by version. Use

More information

APPLICATION COMPETENCY FIELD

APPLICATION COMPETENCY FIELD UNIT CODE UNIT TITLE APPLICATION COMPETENCY FIELD ELEMENTS Elements describe the essential outcomes. 1 Follow safe work practices MARC018 Employ tools, equipment and materials in a shipboard context This

More information

Operating Instructions

Operating Instructions CS101 CarSense Vehicle Motion Detector Operating Instructions CAUTIONS AND WARNINGS Never use the CS101 as a safety reversing or presence detection system. The CS101 requires that a vehicle be moving for

More information

SMD Rework Station TABLE OF CONTENTS

SMD Rework Station TABLE OF CONTENTS SMD Rework Station Thank you for purchasing the Hakko 50B SMD Rework Station. The Hakko 50B is designed to solder and desolder surface mounted devices with hot air. Please read this manual before operating

More information

METHOD STATEMENT INSTALLATION OF INSULATING FLANGE KITS

METHOD STATEMENT INSTALLATION OF INSULATING FLANGE KITS METHOD STATEMENT INSTALLATION OF INSULATING FLANGE KITS Revision Date Prepared By Approved By Method Statement IF Kits BAC Corrosion Control Limited Stafford Park 11 Telford TF3 3AY Tel: 01952 290321 Fax:

More information

SECTION 02845 GUARDRAILS

SECTION 02845 GUARDRAILS SECTION 02845 GUARDRAILS PART 1 - GENERAL 1.01 SCOPE OF WORK A. Furnish all labor, materials, equipment and incidentals necessary and repair, replace or install all types of guardrails as specified herein

More information

Development of Radiation Resistant Quadrupoles Based on High Temperature Superconductors for the Fragment Separator

Development of Radiation Resistant Quadrupoles Based on High Temperature Superconductors for the Fragment Separator Development of Radiation Resistant Quadrupoles Based on High Temperature Superconductors for the Fragment Separator R. Gupta and M.Harrison, Brookhaven National Laboratory A. Zeller, Michigan State University

More information

CT-02 CABLE TRAY SYSTEMS

CT-02 CABLE TRAY SYSTEMS CT-02 CABLE TRAY SYSTEMS SYSTEMS THAT MAKE SENSE Introduction B-Line Systems was formed in 96 and has over 30 years experience manufacturing cable tray systems in which it has grown to become the industry

More information

HGS620 Shielded Outlet Termination Instructions

HGS620 Shielded Outlet Termination Instructions Instruction Sheet 860524180 Issue 5, January 2013 SYSTIMAX Solutions HGS620 Shielded Outlet Termination Instructions General These instructions provide the recommended termination procedure for SYSTIMAX

More information

FX Circuit Board Replacement Instructions

FX Circuit Board Replacement Instructions FX Circuit Board Replacement Instructions There are three circuit boards inside the FX inverter. Normally, only two of these boards are candidates for replacement; the FET board (large board that includes

More information

Quality Product Certification Scheme for Mechanical Couplers (QS/MC)

Quality Product Certification Scheme for Mechanical Couplers (QS/MC) Quality Product Certification Scheme for Mechanical Couplers (QS/MC) Kenneth Kau Castco Certification Services Limited 13 November 2015 Quality Assurance Manager & Product Certification Auditor Summary

More information

Toroidal Conductivity Sensor

Toroidal Conductivity Sensor Instruction Sheet PN 51A-/rev.C June 2012 Toroidal Conductivity Sensor For additional information, please visit our website at www.emersonprocess.com/rosemountanalytical.com SPECIFICATIONS Wetted Materials:

More information

PAJ GROUP DEVELOPMENT OF ADVANCED MECHATRONICS

PAJ GROUP DEVELOPMENT OF ADVANCED MECHATRONICS 111881-901 version 1.29 WTER IN OIL SENSOR (WIO) Product Overview The WIO-Sensor technology is a secure on-line system monitoring the water content in oil. Water or moisture is the second largest contamination

More information

Packaged Terminal Air Conditioner Wall Sleeve Installation

Packaged Terminal Air Conditioner Wall Sleeve Installation Installation & Maintenance Data IM 1196 Group: PTAC Part Number: 910141799 Date: October 2013 Packaged Terminal Air Conditioner Installation x 42" PGAN with Top-Mounted Hydronic Heat Note: Installation

More information

Installation Instructions DTS-HAZ DTS-HAZ-DC. for Use with Self-Regulating & Constant Wattage Heating Cables

Installation Instructions DTS-HAZ DTS-HAZ-DC. for Use with Self-Regulating & Constant Wattage Heating Cables Installation Instructions DTS-HAZ DTS-HAZ-DC for Use with Self-Regulating & Constant Wattage Heating Cables PJ944-9 5625-81049 May 2013 1 2 DTS-HAZ Self-Regulating & Constant Wattage Heating Cables Junction

More information

Butt Fusion Welding of HDPE Pipes Work Procedure

Butt Fusion Welding of HDPE Pipes Work Procedure Butt Fusion Welding of HDPE Pipes Work Procedure A pipeline is as good as its weakest point. Accordingly it is not only important that quality pipes and components are used in a piping system, but also

More information

Fluid Level Gauge Fluid Level Sensor Temperature Switch FSA / FSK / TS

Fluid Level Gauge Fluid Level Sensor Temperature Switch FSA / FSK / TS Fluid Level Gauge Fluid Level Sensor Temperature Switch FSA / FSK / TS up to size 381; to PN 0.5; to T = 80 C 1. Description 1.1. General FSA fluid level gauges, FSK fluid level sensors and TS temperature

More information