Fundamentals for EHR Success
|
|
- Conrad Wilkerson
- 8 years ago
- Views:
Transcription
1 Fundamentals for EHR Success Angie Chew Monksfield Principal of Portfolio Lim Shih Hsien Deputy Director, Information Security
2 Knowing the Pain Points This material contains information that is confidential to MOH Holdings Pte Ltd (MOHH) and should not be circulated beyond MOHH without permission. 2
3 The Key Challenges Shared Goals, Buy-in & Cooperation Scope Timeline Complexity System Availability & SLAs Technology Obsolescence and Updates Information Security and Privacy This material contains information that is confidential to MOH Holdings Pte Ltd (MOHH) and should not be circulated beyond MOHH without permission. 3
4 We have to nurture it together This material contains information that is confidential to MOH Holdings Pte Ltd (MOHH) and should not be circulated beyond MOHH without permission. 4
5 Governance & Frameworks Project Steering Committee Steer & approve: scope, budget and timeline Decide on issues & risk mitigation steps. Approves variations Risk Board Review and Approve Risk Strategies, Processes and KPIs Approve Risk Acceptance & Compliance Waivers Track and Ensure Compliance Architecture & Standards Board Review and Approve Technology and Standards Roadmap Approve Compliance Waiver Review and Track Obsolescence Quality Board (QMB) Review and Approve Quality Processes & Project Methodology Review Quality Gaps & KPIs Promote Improvement Initiatives This material contains information that is confidential to MOH Holdings Pte Ltd (MOHH) and should not be circulated beyond MOHH without permission. 5
6 Delivery Processes Project Risk Quality Procurement Change Measurement Analysis Process Configuration Service This material contains information that is confidential to MOH Holdings Pte Ltd (MOHH) and should not be circulated beyond MOHH without permission. 6
7 Project Initiation Requirements Acquisition Design Construction Testing Deployment App Support Conceptualization Inception Elaboration Construction Transition Project Process (Project Plan, Project Monitoring & Control, Integrated Project ) Risk (Identify, Analyze, Mitigate, Monitor and Close Risks) Requirements Engineering (Establish Requirements Baseline, Manage Requirements Changes) Decision Analysis & Resolution (Plan, Analyze, Review and Approve Decisions) Vendor (Plan, RFI/RFQ/RFP, Establish Supplier Agreement, Award) Quality (Plan, Perform Quality Audits, Track, Closure) Solution Engineering (Develop the Design, Build, Review & Unit Test) Configuration (Plan, Control Changes, Create and Release Baselines) Verification and Validation (Test Plan, Test Scripts, Test Execution, Reviews, Closure) Organization Training (Determine, Plan, Execute, Evaluate) Measurement & Analysis (Plan, Collect, Analyze & Store Project Metrics) This material contains information that is confidential to MOH Holdings Pte Ltd (MOHH) and should not be circulated beyond MOHH without permission. 7
8 Aligning People - Process & Culture People Development of Competencies & Skills Matching with Needs Personal Goals Process Developed bottom up Tools Compliance Culture Culture Consultative decision making Risk Sharing & Mitigation Information Sharing Sharing of Success & Failure Integrity & Trust This material contains information that is confidential to MOH Holdings Pte Ltd (MOHH) and should not be circulated beyond MOHH without permission. 8
9 MOH Hol d i ng s P t e Lt d This material contains information that is confidential to MOH Holdings Pte Ltd (MOHH) and should not be circulated beyond MOHH without permission. 9
10 Service Levels Measurable Targets and KPIs Incident Reporting Matrix Tracking of Incidents Resolution Reports Quarterly Review of Service KPIs Pre-defined Outcomes Well defined scope of work Agreed delivery milestones & deliverables Clear acceptance criteria for phase exits Compliance to security & technical standards Fixed cost & payment milestones Vendor Service Credit Units Step in Rights Termination Rights Indemnity Penalties This material contains information that is confidential to MOH Holdings Pte Ltd (MOHH) and should not be circulated beyond MOHH without permission. 10
11 Delivering on the Promise This material contains information that is confidential to MOH Holdings Pte Ltd (MOHH) and should not be circulated beyond MOHH without permission. 11
12 Lets dance to its success! This material contains information that is confidential to MOH Holdings Pte Ltd (MOHH) and should not be circulated beyond MOHH without permission. 12
13 Thank You
Dallas IIA Chapter / ISACA N. Texas Chapter. January 7, 2010
Dallas IIA Chapter / ISACA N. Texas Chapter Auditing Tuesday, October Project 20, 2009 Management Controls January 7, 2010 Table of Contents Contents Page # Project Management Office Overview 3 Aligning
More informationSkatteudvalget 2014-15 (2. samling) SAU Alm.del Bilag 48 Offentligt. Programme, Project & Service Management Analysis
Skatteudvalget 2014-15 (2. samling) SAU Alm.del Bilag 48 Offentligt Programme, Project & Service Management Analysis Table of Content 1 Executive Summary... 3 1.1 Scope of Work... 3 1.2 Methodology for
More informationKMS Implementation Roadmap
KMS Implementation Roadmap Sample Excerpt Prepared by: The Knowledge Compass, Inc. TABLE OF CONTENTS 1. EXECUTIVE SUMMARY 5 1.1 Overview 5 1.2 Project Goals & Objectives 5 1.3 Implementation Approach 5
More informationSingapore s National Electronic Health Record
Singapore s National Electronic Health Record The Roadmap to 2010 Dr Sarah Christine Muttitt Chief Information Officer Information Systems Division 17 th July, 2009 Taking the Next Step (MSM April 2008)
More informationBlend Approach of IT Service Management and PMBOK for Application Support Project
Blend Approach of IT Service and PMBOK for Application Support Project Introduction: This paper addresses the process area, phases and documentation to be done for Support Project using Project and ITSM
More informationIT Project Management Methodology. Project Execution Support Guide. Version 0.3
NATIONAL INFORMATION TECHNOLOGY AUTHORITY - UGANDA IT Project Management Methodology Project Execution Support Guide Version 0.3 Table of Contents 1 INTRODUCTION... 4 1.1 When should Project Execution
More informationMNLARS Project Audit Checklist
Audit Checklist The following provides a detailed checklist to assist the audit team in reviewing the health of a project. Relevance (at this time) How relevant is this attribute to this project or audit?
More informationProgram Management Professional (PgMP) Examination Content Outline
Program Management Professional (PgMP) Examination Content Outline Project Management Institute Program Management Professional (PgMP ) Examination Content Outline April 2011 Published by: Project Management
More informationProject Management Life Cycle (PMLC)
Project Management Life Cycle (PMLC) Page 2 Project Management Life Cycle (PMLC) Introduction PMLC Working Group IT Business Process Management(BPM) IT Project Management Office (PMO) Finance System Support
More informationENOVIA Aerospace and Defense Accelerator for Program Management
ENOVIA Aerospace and Defense Accelerator for Program Management Through project pipeline dashboards, ENOVIA Aerospace and Defense Accelerator for Program Management provides real-time visibility into a
More informationTemplate K Implementation Requirements Instructions for RFP Response RFP #
Template K Implementation Requirements Instructions for RFP Response Table of Contents 1.0 Project Management Approach... 3 1.1 Program and Project Management... 3 1.2 Change Management Plan... 3 1.3 Relationship
More informationSACM and CMDB Strategy and Roadmap. David Lowe ActionableITSM.com March 20, 2012
SACM and CMDB Strategy and Roadmap David Lowe ActionableITSM.com March 20, 2012 Disclaimer The strategy and roadmap information presented here is generic by nature and based on a highly hypothetical use
More informationProgram Lifecycle Methodology Version 1.7
Version 1.7 March 30, 2011 REVISION HISTORY VERSION NO. DATE DESCRIPTION AUTHOR 1.0 Initial Draft Hkelley 1.2 10/22/08 Updated with feedback Hkelley 1.3 1/7/2009 Copy edited Kevans 1.4 4/22/2010 Updated
More informationProject Management Guidelines
Project Management Guidelines 1. INTRODUCTION. This Appendix (Project Management Guidelines) sets forth the detailed Project Management Guidelines. 2. PROJECT MANAGEMENT PLAN POLICY AND GUIDELINES OVERVIEW.
More informationCrosswalk Between Current and New PMP Task Classifications
Crosswalk Between Current and New PMP Task Classifications Domain 01 Initiating the Project Conduct project selection methods (e.g., cost benefit analysis, selection criteria) through meetings with the
More informationID Task Name Time Pred
0 UC Modernization Project Plan 1115 d 1 1 Phase I - Business Case Development and Competitive Procurement 205 d 2 1.1 Complete Initial Feasibility Study 55 d 3 1.2 Prepare and Issue LBR 30 d 2 4 1.3 Competitive
More informationProject Management Plan for
Project Management Plan for [Project ID] Prepared by: Date: [Name], Project Manager Approved by: Date: [Name], Project Sponsor Approved by: Date: [Name], Executive Manager Table of Contents Project Summary...
More informationBIG DATA KICK START. Troy Christensen December 2013
BIG DATA KICK START Troy Christensen December 2013 Big Data Roadmap 1 Define the Target Operating Model 2 Develop Implementation Scope and Approach 3 Progress Key Data Management Capabilities 4 Transition
More informationCloud Development Manager Like Tweet 0
1 of 9 Contact Info. Feedback. Sitemap Advanced Search Home Job Roles Competencies Courses Readiness Kit FAQ Partners NICF Overview Events News Sign In HOME > JOB ROLES > SEARCH JOB ROLE > JOB DETAIL Cloud
More informationProject Type Guide. Project Planning and Management (PPM) V2.0. Custom Development Version 1.1 January 2014. PPM Project Type Custom Development
Project Planning and Management (PPM) V2.0 Project Type Guide Custom Development Version 1.1 January 2014 Last Revision: 1/22/2014 Page 1 Project Type Guide Summary: Custom Development Custom software
More informationPHASE 3: PLANNING PHASE
PHASE 3: PLANNING PHASE The ning Phase focuses principally on required project planning work. Proper comprehensive project planning is essential to a successful IT project, and incomplete project planning
More informationPHASE 3: PLANNING PHASE
PHASE 3: PLANNING PHASE The Planning Phase focuses principally on required project planning work. Proper comprehensive project planning is essential to a successful IT project, and incomplete project planning
More informationThe ITIL Foundation Examination
The ITIL Foundation Examination Sample Paper B, version 5.0 Multiple Choice Instructions 1. All 40 questions should be attempted. 2. All answers are to be marked on the answer grid provided. 3. You have
More informationIntroductory Certificate. The APM Project Fundamentals Qualification
The syllabus provides a summary of the coverage of the qualification, the details are then found in the learning outcomes and assessment criteria. Both the syllabus and the learning outcomes and assessment
More informationEllucian Implementation Methodology. Summary of Project Management and Solution Delivery Phases
Ellucian Implementation Methodology Summary of Project Management and Solution Delivery Phases Rev. 5/10/2013 Table of Contents Overview 3 Project Management Initiation 4 Planning 5 Execution 6 Monitor
More informationDomain 1 The Process of Auditing Information Systems
Certified Information Systems Auditor (CISA ) Certification Course Description Our 5-day ISACA Certified Information Systems Auditor (CISA) training course equips information professionals with the knowledge
More informationLINKING STRATEGY TO EXECUTION Program Performance Management: Increasing Focus and Velocity
l Program Performance Management: Increasing Focus and Velocity ACCELERATING HIGH PERFORMANCE: TACTICS TOOLS TECHNOLOGY JANUARY 29-31, 2012 NEW YORK MIKE GABALY LOCKHEED MARTIN CORPORATION INFORMATION
More informationThe ITIL v.3. Foundation Examination
The ITIL v.3. Foundation Examination ITIL v. 3 Foundation Examination: Sample Paper 4, version 3.0 Multiple Choice Instructions 1. All 40 questions should be attempted. 2. There are no trick questions.
More informationSubject Area 1 Project Initiation and Management
DRII/BCI Professional Practice Narrative: Establish the need for a Business Continuity Plan (BCP), including obtaining management support and organizing and managing the BCP project to completion. (This
More informationPHASE 8: IMPLEMENTATION PHASE
PHASE 8: IMPLEMENTATION PHASE The Implementation Phase has one key activity: deploying the new system in its target environment. Supporting actions include training end-users and preparing to turn the
More informationThe ITIL v.3 Foundation Examination
The ITIL v.3 Foundation Examination ITIL v. 3 Foundation Examination: Sample Paper B, version 3.1 Multiple Choice Instructions 1. All 40 questions should be attempted. 2. There are no trick questions.
More informationServices Providers. Ivan Soto
SOP s for Managing Application Services Providers Ivan Soto Learning Objectives At the end of this session we will have covered: Types of Managed Services Outsourcing process Quality expectations for Managed
More informationCONTENTS. Preface. Acknowledgements. 1. Introduction and Overview 1 Introduction 1 Whatis the CMMI"? 2 What the CMMI* is Not 3 What are Standards?
Preface Acknowledgements xi xiii 1. Introduction and Overview 1 Introduction 1 Whatis the CMMI"? 2 What the CMMI* is Not 3 What are Standards? 3 2. Summaryof CMMI-SW 5 The CMM*-SW 5 CMMI--SW Continuous
More informationThe ITIL Foundation Examination
The ITIL Foundation Examination Sample Paper A, version 5.1 Multiple Choice Instructions 1. All 40 questions should be attempted. 2. All answers are to be marked on the answer grid provided. 3. You have
More informationRoles within ITIL V3. Contents
Roles within ITIL V3 Roles are employed in order to define responsibilities. In particular, they are used to assign Process Owners to the various ITIL V3 processes, and to illustrate responsibilities for
More informationCapability Maturity Model Integration (CMMI SM ) Fundamentals
Capability Maturity Model Integration (CMMI SM ) Fundamentals Capability Maturity Model Integration and CMMI are are service marks of Carnegie Mellon University 2008, GRafP Technologies inc. 1 What is
More informationThe ITIL Foundation Examination
The ITIL Foundation Examination Sample Paper B, version 4.0 Multiple Choice Instructions 1. All 40 questions should be attempted. 2. All answers are to be marked on the answer grid provided. 3. You have
More informationITIL Foundation for IT Service Management 2011 Edition
ITIL Foundation for IT Service Management 2011 Edition ITIL Rev 03.12 3 days Description ITIL (IT Infrastructure Library) provides a practical, no-nonsense framework for identifying, planning, delivering
More informationThe Danwood Group Professional Services Offering DANWOOD
The Danwood Group Professional Services Offering DANWOOD Our Professional Services Our Professional Services department can provide you with a variety of services from Audit and Assessment to Technical
More informationPharma CloudAdoption. and Qualification Trends
Pharma CloudAdoption and Qualification Trends OurCloudExperience Numerous implementations of EDMS systems with external hosting for smaller life science clients Development of qualification strategy for
More informationTREASURY INSPECTOR GENERAL FOR TAX ADMINISTRATION
TREASURY INSPECTOR GENERAL FOR TAX ADMINISTRATION The Customer Account Data Engine 2 Systems Development Guidelines; However, Process Improvements Are Needed to Address Inconsistencies September 30, Year
More informationCisco IT Technology Tutorial Overview of ITIL at Cisco
Cisco IT Technology Tutorial Overview of ITIL at Cisco Ian Reddy, IT Manager David Lietzell, IT Program Manager May 2009 Produced by the Cisco on Cisco team within Cisco IT 2007 Cisco Systems, Inc. All
More informationRoles & Grades Rate Cards and Applicable SFIA Skills
Roles & s Rate Cards and Applicable Consultant Day Rate Card Consultant Day Rate Lead 900.00 Senior 800.00 Junior 0.00 CLAS Consultant and Competencies Lead CLAS Consultant Lead CLAS Consultant IT Governance
More informationTREASURY INSPECTOR GENERAL FOR TAX ADMINISTRATION
TREASURY INSPECTOR GENERAL FOR TAX ADMINISTRATION Improvements Are Needed to the Information Security Program March 11, 2008 Reference Number: 2008-20-076 This report has cleared the Treasury Inspector
More informationHKITPC Competency Definition
HKITPC Competency Definition for the Certification copyright 2011 HKITPC HKITPC Competency Definition Document Number: HKCS-CD-L1L2 Version: 1.0 Date: June 2011 Prepared by Hong Kong IT Professional Certification
More informationTeam A SaaS Strategy
Team A SaaS Strategy What is a strategy? Strategy is the direction and scope of an organization over the long-term term: : which achieves advantages for the organization through its configuration of resources
More informationPMO Starter Kit. White Paper
PMO Starter Kit White Paper January 2011 TABLE OF CONTENTS 1. ABOUT THE PMO STARTER KIT...3 2. INTRODUCTION TO THE PMO STARTER KIT WHITE PAPER...3 3. PMO DEVELOPMENT ROADMAP...4 4. PLAN PHASE...5 4.1 CREATE
More informationCertified Information Security Manager (CISM)
Certified Information Security Manager (CISM) Course Introduction Course Introduction Domain 01 - Information Security Governance Lesson 1: Information Security Governance Overview Information Security
More informationService Support. 2005 Kasse Initiatives, LLC. ITIL Configuration Management - 1. version 2.0
Service Support Configuration Management ITIL Configuration Management - 1 Goals of Configuration Management The goals of Configuration Management are to: Account for all the IT assets and configurations
More informationSLCM Framework (Version 2003.1) Roles and Responsibilities As of January 21, 2005
SLCM Framework (Version 2003.1) Roles and Responsibilities As of January 21, 2005 ROLE RESPONSIBILITY REVIEW SIGN- OFF CTO Manage IT assets to meet corporate goals Establish and chair the Information Technology
More informationBenefits of Adopting Data Management Practices to strengthen Measurement Analysis
Benefits of Adopting Data Management Practices to strengthen Measurement Analysis Gurdarshan Singh Brar, Dilip Gore, Arun Guruswami Wipro Technologies 1 Contents 1 About Wipro 2 IT Services Organization
More informationRFP Attachment C Classifications
RFP 1. Applications IT Architect Analyzes and designs the architecture for software applications and enhancements, including the appropriate application of frameworks and design patterns and the interrelationships
More information7 Practical insights for IT Asset Management
7 Practical insights for IT Asset Management Tauneel McKay Director Swiss Reinsurance Company Ltd Subbarao Chaganty Principal Consultant Infosys Ltd RELATE MANAGE.. Context KNOW. Consolidate the IT Asset
More informationPM Services. Transition Program Management
PM Services Transition Program Management Transition Program Management The PM Services team brings strong PM knowledge, years of program management experience, and a proven PM tool set to assure successful
More informationThe Halifax Group is an IT solution provider, offering a single or all of the following professional services to satisfy client requirements.
The Halifax Group is a multi-service Information Technology (IT) Management consulting company. Since 1988 we have consistently delivered high quality solutions to our customers in government and several
More informationBenefits to the Quality Management System in implementing an IT Service Management Standard ISO/IEC 20000-1
Benefits to the Quality System in implementing an IT Standard ISO/IEC 20000-1 Presentation to: ASQ North Jersey September 15, 2010 Subrata Guha Director IT s UL DQS Inc. A New Global Alliance for Systems
More informationWhich statement about Emergency Change Advisory Board (ECAB) is CORRECT?
ITIL Foundation mock exam 4 1. Which of the following is NOT a purpose of Service Transition? A) To ensure that a service can be managed, operated and supported B) To provide training and certification
More informationITIL: Foundation (Revision 1.6) Course Overview. Course Outline
ITIL: Foundation (Revision 1.6) Course Overview The ITIL Foundation Certification Course introduces the new student to the fundamentals of IT Service Management as described in the IT Infrastructure Library
More information1 Why should monitoring and measuring be used when trying to improve services?
1 Why should monitoring and measuring be used when trying to improve services? a) To validate, direct, justify and intervene b) To validate, measure, monitor and change c) To validate, plan, act and improve
More informationContract and Vendor Management Guide
Contents 1. Guidelines for managing contracts and vendors... 2 1.1. Purpose and scope... 2 1.2. Introduction... 2 2. Contract and Vendor Management 2.1. Levels of management/segmentation... 3 2.2. Supplier
More informationSERV SER ICE DE SIGN
SERVICE DESIGN Service Design Set of specialized organizational capabilities for providing value to customers in the form of services SOURCE: ITIL Service Design Publication, p. 11 Service Design Goals
More informationEnterprise Data Governance
DATA GOVERNANCE Enterprise Data Governance Strategies and Approaches for Implementing a Multi-Domain Data Governance Model Mark Allen Sr. Consultant, Enterprise Data Governance WellPoint, Inc. 1 Introduction:
More informationAn ITIL Perspective for Storage Resource Management
An ITIL Perspective for Storage Resource Management BJ Klingenberg, IBM Greg Van Hise, IBM Abstract Providing an ITIL perspective to storage resource management supports the consistent integration of storage
More informationService Level Management
Process Guide Service Level Management Company ABC Service Improvement Program (SIP) Process Guide Service Level Management Table of Contents Document Information... 3 Approval... 4 Section 1: Process
More informationWHITE PAPER IT SERVICE MANAGEMENT IT SERVICE DESIGN 101
WHITE PAPER IT SERVICE MANAGEMENT IT SERVICE DESIGN 101 Prepared by: Phillip Bailey, Service Management Consultant Steve Ingall, Head of Service Management Consultancy 60 Lombard Street London EC3V 9EA
More informationBetter Data is Everyone s Job! Using Data Governance to Accelerate the Data Driven Organization
Better Data is Everyone s Job! Using Data Governance to Accelerate the Data Driven Organization Intros - Name - Interest / Challenge - Role Data Governance is a Business Function Data governance should
More informationITSM Process Description
ITSM Process Description Office of Information Technology Incident Management 1 Table of Contents Table of Contents 1. Introduction 2. Incident Management Goals, Objectives, CSFs and KPIs 3. Incident Management
More informationBenchmark Against Best Practice Service Delivery Metrics
Benchmark Against Best Practice Service Delivery Metrics Featuring: Julie Giera, Forrester Pierre Champigneulle, BearingPoint Host: Jason Schroedl, newscale Internal Service Delivery The average company
More informationPHASE 5: DESIGN PHASE
PHASE 5: DESIGN PHASE During the Design Phase, the system is designed to satisfy the requirements identified in the previous phases. The requirements identified in the Requirements Analysis Phase are transformed
More information5.1 4.1 4.2 4.3 PROCESS GROUP: PLANNING PROCESS GROUP: INITIATION. Oracle Projects. PMBOK Oracle Mapping. Scope Planning. Develop Project Charter
Develop Project Charter Develop Preliminary Project Scope Statement Develop Project Management Plan Scope Planning PROCESS GROUP: INITIATION 4.1 The project charter serves as the input document for the
More informationAdvanced Topics for TOGAF Integrated Management Framework
Instructor: Robert Weisman MSc, PEng, PMP CD Robert.weisman@buildthevision.ca Advanced Topics for TOGAF Integrated Management Framework ROBERT WEISMAN CEO BUILD THE VISION, INC. WWW.BUILDTHEVISION.CA EMAIL:
More informationCisco Unified Computing. Optimization Service
Improve your unified compute so it remains a competitive resource with the Cisco Unified Computing Optimization Service. Cisco Unified Computing Optimization Service Increase Agility and Performance with
More informationITIL. Lifecycle. www.alctraining.com.my. ITIL Intermediate: Continual Service Improvement. Service Strategy. Service Design. Service Transition
Take your ITIL skills to the next level ITIL Lifecycle ITIL Intermediate: Part of the complete ITIL Education Program Advance your career Add value to your organisation Gain credits towards ITIL Expert
More informationService Management. 702 IT/Technology Service Help Desk and Incident Management
702 IT/Technology Service Help Desk and Incident Management This sub-discipline is about the competencies required to manage the contacts made by customers of IT/technology systems, services and assets,
More informationThe ITIL Foundation Examination
The ITIL Foundation Examination Sample Paper A, version 5.1 Multiple Choice Instructions 1. All 40 questions should be attempted. 2. All answers are to be marked on the answer grid provided. 3. You have
More informationIdentity & Access Management new complex so don t start?
IT Advisory Identity & Access Management new complex so don t start? Ing. John A.M. Hermans RE Associate Partner March 2009 ADVISORY Agenda 1 KPMG s view on IAM 2 KPMG s IAM Survey 2008 3 Best approach
More informationORIGINAL PLAN DATE: MARCH 1, 2012 REVISION DATE: REVISION:
WATER RIGHTS BUSINESS PROCESS MANAGEMENT SYSTEM PROJECT CHARTER FOR CERTIFICATION EXECUTIVE SPONSORS: RENEE MARTINEZ, CHIEF INFORMATION OFFICE JOHN ROMERO, WATER RIGHTS DIVISION CHIEF BUSINESS OWNER WRAP
More informationICTEC. IT Services Issues 3.4.2008. HELSINKI UNIVERSITY OF TECHNOLOGY 2007 Kari Hiekkanen
ICTEC IT Services Issues 3.4.2008 IT Services? IT Services include (for example) Consulting, IT Strategy, IT Architecture, Process, Software Software development, deployment, maintenance, operation, Custom
More informationD6.1: Service management tools implementation and maturity baseline assessment framework
D6.1: Service management tools implementation and maturity baseline assessment framework Deliverable Document ID Status Version Author(s) Due FedSM- D6.1 Final 1.1 Tomasz Szepieniec, All M10 (31 June 2013)
More informationInformation Technology Handbook
Information Technology Handbook IT Handbook Version Control Date Name Version Description of Change 04/18/2016 Revised cost estimate In section 4.1 added a statement in IT Procurement Policies. 05/02/2016
More informationProject Management Plan Template
Abstract: This is the project management plan document for . This is a controlled document and should be maintained in a configuration environment. Project Management Plan Template Contents REVISION
More informationDigital Asset Manager, Digital Curator. Cultural Informatics, Cultural/ Art ICT Manager
Role title Digital Cultural Asset Manager Also known as Relevant professions Summary statement Mission Digital Asset Manager, Digital Curator Cultural Informatics, Cultural/ Art ICT Manager Deals with
More informationManage Third Party Information Technology Services
Manage Third Party Information Technology Services City of Tulsa Internal Auditing June 2013 MANAGE THIRD PARTY INFORMATION TECHNOLOGY SERVICES City of Tulsa Internal Auditing Ron Maxwell, CIA, CFE Chief
More informationUNITED STATES DEPARTMENT OF EDUCATION OFFICE OF INSPECTOR GENERAL. September 24, 2010
UNITED STATES DEPARTMENT OF EDUCATION OFFICE OF INSPECTOR GENERAL September 24, 2010 AUDIT SERVICES FINAL ALERT MEMORANDUM TO: Danny Harris Chief Information Officer Office of the Chief Information Officer
More informationProblem Management Overview HDI Capital Area Chapter September 16, 2009 Hugo Mendoza, Column Technologies
Problem Management Overview HDI Capital Area Chapter September 16, 2009 Hugo Mendoza, Column Technologies Problem Management Overview Agenda Overview of the ITIL framework Overview of Problem Management
More informationIntegrating Project Management and Service Management
Integrating Project and Integrating Project and By Reg Lo with contributions from Michael Robinson. 1 Introduction Project has become a well recognized management discipline within IT. is also becoming
More informationPROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME >
PROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME > Date of Issue: < date > Document Revision #: < version # > Project Manager: < name > Project Management Plan < Insert Project Name > Revision History Name
More informationMicrosoft Active Directory Project
Microsoft Active Directory Project Simcoe County District School Board Project Kick-off Meeting Rami Wehbe (Solution Architect) January 18, 2012 Agenda Introductions Project objectives and drivers Approach
More informationOutsourcing: Maintaining the Business Case. IEEE Technology Management Council, Bonn Peter Snowdon April 11, 2008
Outsourcing: Maintaining the Business Case IEEE Technology Management Council, Bonn An Introduction... Electrical Engineer, 1993 Full time MBA (HEC Paris), 2005 2006 : Vodafone Management & advisory functions
More informationTECHNOLOGY SOLUTIONS FOR THE INTERNAL AUDITOR
TECHNOLOGY SOLUTIONS FOR THE INTERNAL AUDITOR (BUY VS BUILD) APRIL 17, 2015 LEVERAGING TECHNOLOGY FOR AUDIT Utilizing Software to Administrate Audit Process 40% 35% 30% 37% Tools Leveraged 32% 36% Yes
More informationITIL by Test-king. Exam code: ITIL-F. Exam name: ITIL Foundation. Version 15.0
ITIL by Test-king Number: ITIL-F Passing Score: 800 Time Limit: 120 min File Version: 15.0 Sections 1. Service Management as a practice 2. The Service Lifecycle 3. Generic concepts and definitions 4. Key
More informationThe ITIL Foundation Examination Sample Paper A, version 5.1
The ITIL Foundation Examination Sample Paper A, version 51 Multiple Choice Instructions 1 All 40 questions should be attempted 2 All answers are to be marked on the answer grid provided 3 You have 60 minutes
More informationPOSITION INFORMATION DOCUMENT
POSITION INFORMATION DOCUMENT Position Title: Senior Manager, ICT Contracts Classification Code: ASO8 Division: ICT Services Directorate: ICT Contracts & Performance Management Type of Appointment: Branch:
More informationMKS Integrity & CMMI. July, 2007
& CMMI July, 2007 Why the drive for CMMI? Missed commitments Spiralling costs Late delivery to the market Last minute crunches Inadequate management visibility Too many surprises Quality problems Customer
More informationDr. Gad J. Selig, PMP, COP
The Critical Role of the Project Manager in Executing Successful Strategic Sourcing and Outsourcing Initiatives: Major Trends, Critical Success Factors and Lessons Learned Abstract: Dr. Gad J. Selig, PMP,
More informationPHASE 9: OPERATIONS AND MAINTENANCE PHASE
PHASE 9: OPERATIONS AND MAINTENANCE PHASE During the Operations and Maintenance Phase, the information system s availability and performance in executing the work for which it was designed is maintained.
More informationBENEFITS REALIZATION: THE COMPETITIVE ADVANTAGE
BENEFITS REALIZATION: THE COMPETITIVE ADVANTAGE PRASHANTH NAIDU AUGUST 1, 2012 1 2011 Hitachi Data Systems. All rights reserved. INTRODUCING HITACHI DATA SYSTEMS Ranked # 140 for Innovation in 2010 Formed
More informationITIL Roles Descriptions
ITIL Roles s Role Process Liaison Incident Analyst Operations Assurance Analyst Infrastructure Solution Architect Problem Manager Problem Owner Change Manager Change Owner CAB Member Release Analyst Test
More informationPlanning for a Successful Information Governance Program. Kathy Downing, MA, RHIA CHPS,PMP AHIMA Senior Director IG
Planning for a Successful Information Governance Program Kathy Downing, MA, RHIA CHPS,PMP AHIMA Senior Director IG Objectives Overview of Project Management Applying Project Management techniques to Information
More information