Energy Trigger (A Existing Building Upgrade Mechanism Model)

Size: px
Start display at page:

Download "Energy Trigger (A Existing Building Upgrade Mechanism Model)"

Transcription

1 Trigger (A Existing Building Upgrade Mechanism Model) Applicability All Building Permit applications for projects related to existing buildings are required to follow the energy upgrade trigger process with the following exceptions; i) Buildings categorized as; i. 1 and 2 Family Dwellings, or ii. Temporary Building/Use (< 1 year) ii) iii) Buildings designed and constructed to; i. ASHRAE , or ii. ASHRAE , or iii. NECB 2011 Projects categorized as; i. Interior Demolition: Scope of work is limited to interior alterations involving removal of non-load bearing walls, fixed millwork and related electrical/plumbing so that the space reverts back to a shell state that is not occupied. Future tenant improvement work and building permit will be required for occupancy of this space at which time Part 11 energy upgrades will be triggered. ii. Subdividing Existing Commercial Space: Scope of work of an existing office or retail space is being subdivided into small units. A new space is created as an empty (shell) space that is not occupied. Future tenant improvement work and building permit will be required for occupancy of this space at which time Part 11 energy upgrades will be triggered. iii. Repair (Fire, Flood, Leak): Scope of work is different from "Repair" under Part 11's Flow Chart No.1 which is based on normal operation's wear and tear. This Repair work can be due to fire, flood, water leak, etc. where additional work triggered by Part 11 may be onerous and not covered by insurance. iv. Re and Re Work (Remove and Replace): Scope of work is limited to the removal and replacement of existing appliance(s) or plumbing fixtures, typically within condominiums. Work comprises of replacing a tub, basin, kitchen sink, etc. but does not involve alterations to interior walls. However, renovations or overhauling of kitchen or washroom is not considered Re and Re Work. v. Minor Alterations: Scope of work is deemed as very minor, such as installing hand/mop sink to meet Health Department requirements. Acceptance of exemption under this category is at the discretion of the CBO, or the CBO's representative. vi. Site / External Alterations: Scope of work is outside the building envelope and independent of the building s operations. Examples include site work, canopy or awning installation, drainage, and surface parking lot work including parking lot/parkade kiosk upgrades.

2 Voluntary Upgrade ( Criteria) The Voluntary Upgrade option is applicable when the entire scope of work consists of the upgrading of energy related equipment and/or components as listed below. Any additional work not directly related to the upgrading of energy related equipment and/or components, negates the Voluntary Upgrade option. The intent of the Voluntary Upgrade exemption is to allow buildings to voluntarily upgrade energy related equipment or components without triggering additional upgrade requirements in any of the trigger categories. Certain conditions apply. i) All energy related equipment being replaced must be replaced with either; a) a more efficient model recognised in its class as high efficiency, or b) the most efficient model. ii) Equipment: All energy related components being replaced must be replaced with components that meet or exceed present Vancouver Building By-Law requirements. The addition or replacement of any of the following energy related equipment is eligible for the Voluntary Upgrade exemption; Boilers, Furnaces, Hot Water Tanks, Motors (including variable speed) Lighting Systems, Reduction Sensors (occupancy sensors, day-lighting sensors, etc.) Renewable Systems Photovoltaic system Solar Thermal system Biofuel-based system Geothermal Heating system Geothermal Electric system Wave & Tidal Power system High Performance Systems Ground Source Heat Pump system Air Source Heat Pump system Waste Heat Recovery system Components: The addition or replacement of any of the following energy related components are eligible for the Voluntary Upgrade exemption; Any component of a building s envelope

3 PROJECT TYPES AND THEIR RELATED CATEGORIES OF WORK REHABILITATION PROJECT TYPE (Flow Chart No. 1) REPAIR Repair pertains to a limited scope of interior or exterior renovation work to replace existing building components with functionally equivalent components. Repair work may not include work that increases the usable floor area of a building, creates an interconnected floor space, supports an addition or change of use, or the consolidation of more than one existing suite into a single tenant space. If the renovation includes other categories of work or project types such as a change of major occupancy classification or an addition, then the most restrictive upgrade levels from all project types would be applied. For Repairs, an E1 level of energy upgrade shall be applied. SMALL SUITE The upgrade trigger Small Suite pertains to limited renovation work within a small suite as defined in Division A, Article Small Suite work may include reconfiguration of the interior space of the suite, but may not include work on more than level (storey or mezzanine), interconnected floor spaces, exterior renovations, or the consolidation of more than one existing suite into a single new tenant space. If the renovation includes other categories of work or project types such as a change of major occupancy classification or an addition, then the most restrictive upgrade levels from all project types would be applied. For Small suite renovations, an E2 level of energy upgrade shall be applied. MINOR RENOVATION Minor renovations mean work within a single tenant space which may occupy multiple levels in a building. Minor renovations may include reconfiguration of the interior space of the suite as well as exterior renovations or the consolidation of more than one existing suite into a single new tenant space; however, a change of major occupancy classification is not considered to be a minor renovation type project. Where the renovation includes a new interconnected floor space or a new mezzanine, this work would not be considered to be a minor renovation. New mezzanines are considered to be additions. If the renovation includes other categories of work or project types such as a change of major occupancy classification or an addition (mezzanine), then the most restrictive upgrade levels from all project types would be applied. MAJOR RENOVATION Major renovations means work which may include (singly or in combination): Interior re-configuration of multiple tenant spaces, interconnected floor spaces, exterior alterations, or alterations that create more than one new tenant space. However, where such renovation includes a change of major occupancy classification or a new mezzanine, this work would not be considered as a major renovation. New mezzanines are considered to be additions. If the renovation includes other categories of work or project types such as a change of major occupancy classification or an addition (mezzanine) then the most restrictive upgrade levels from all project types would be applied. RECONSTRUCTION - Reconstruction means any project where: extensive renovations are being carried on throughout the entire building and the building is completely gutted; where all drywall and plaster has been removed from the interior walls; all drywall, plaster, insulation and exterior cladding has been removed from the exterior walls ; and all floor and roof membranes and coverings have been removed. Reconstruction also includes substantial reconfiguration of the interior floor space. Reconstruction means exposing the primary structure of the building on all interior and exterior walls, floors and roof with only the primary structural elements remaining in place (the building skeleton). Where work which might otherwise be considered as reconstruction, is undertaken solely to facilitate the repair of a building due to envelope damage, insect infestation, mould abatement or asbestos abatement, then the work would not be considered a reconstruction: it would be considered a repair, minor renovation or a major renovation as defined in this By-law.

4 FLOW CHART NO. 1 Rehabilitation Project (Flow Chart #1) Voluntary Upgrade Repair/ Small Suite Minor Renovation Major Renovation Reconstruction NA NA Non- NA NA NA F1 S1 Non- N1 A1 E1/E2 F1 S2 Non- N1 A2 E2 F2 S2 Non- N3 A3 E4 F4 S4 Non- N4 A4 E6

5 CHANGE OF MAJOR OCCUPANCY CLASSIFICATION PROJECTS (Flow Chart No. 2) Change of Major Occupancy Classification Change of major occupancy classification means a change of use within a building, a suite, or its constituent floor areas where the proposed use is outside of the defined uses of the existing major occupancy classification permitted for the building, the suite, or its constituent floor areas. Small Suite Change of Major Occupancy Classification Small suite change of major occupancy classification means a change of use within a small suite, or its constituent floor areas where the occupant load for the entire suite does not exceed 60 persons and the small suite is limited to a Group A, Division 2, Group D, Group E, Group F, Division 2 (wholesale showroom), or Group F, Division 3 major occupancy. FLOW CHART NO. 2 Change of Major Occupancy Project (Flow Chart #2) Cumulative 5 Year Limit Exceeded? Small Suite? Did Hazard Index Increase? Yes No Yes No No Yes F4 S4 Non- N4 A4 E3 F1 S1 Non- N1 A1 E1 F2 OL increase<50% = S3 OL increase>50% = S4 Non- N3 OL increase<50% = A3 OL increase>50% = A4 E3 F4 OL increase<50% = S3 OL increase>50% = S4 Non- N4 OL increase<50% = A3 OL increase>50% = A4 E4

6 ADDITION PROJECTS (Flow Chart No. 3) Horizontal Horizontal additions include both minor and major horizontal additions. A minor horizontal addition is any expansion of a floor area beyond the extents of the existing floor area in which it is located by not more than 25 per cent of the existing building area, or by not more than 500 m 2 in aggregate floor area. A major horizontal is any expansion of a floor area beyond the extents of the existing floor area in which it is located by more than 25 per cent of the existing building area, or by more than 500 m 2 in aggregate floor area. Any construction creates new floor area that in-fills existing roof or deck areas, or is superimposed over existing building structure or floor area is not considered a horizontal addition. Vertical Vertical additions include both minor and major vertical additions. A minor vertical addition is the addition of new floor area (storey or mezzanine) that in-fills existing roof or deck areas, or is superimposed over existing building structure or floor area, with an aggregate floor area increase of not more than 25 per cent of the building area, or by not more than 500 m 2 in aggregate building area. A major vertical addition is an addition that increases the aggregate floor areas or mezzanine area increase of not more than 25 per cent of the existing building area or increases the total aggregate floor area by more than 500 m 2. FLOW CHART NO. 3 Project (Flow Chart #3) Horizontal Vertical Minor Horizontal Major Horizontal Minor Vertical Major Vertical F2 S1 Non- N2 A1 E2 F3 S2 Non- N4 A2 E4 F2 S2 Non- N3 A2 E2 F4 S4 Non- N4 A4 E5

7 Efficiency Table E1 E2 E3 BOMA BESt (Path 1) BOMA BESt (Path 2) MENU - Choose and complete all of the following; OR MENU - Choose and complete all of the following; OR MENU - Choose and complete all of the following; L1 Requirements L2 Requirements L3 Requirements E4 E5 E6 BOMA BESt (Path 2) BOMA BESt (Path 2) OR MENU - Choose and complete all of the following; OR MENU - Choose and complete all of the following; L7 L4 Requirements L6 Requirements

8 Trigger Acceptable Solutions BOMA BESt The intent of the inclusion of the BOMA BESt rating system is to recognise the efforts made towards improved building performance. Certain conditions apply: i) BOMA BESt certification is to be administered by BOMA. ii) As per all other E paths, the BOMA BESt path needs to show advancement over time using the following criteria for; BOMA BESt Path 1 - BOMA BESt (Level 1, 2, 3, 4) o Requires proof of; valid Certification, and ongoing commissioning per BOMA s BESt Practice Q.3 (Preventative Maintenance Program) BOMA BESt Path 2 - BOMA BESt (Level 1-AL2, 2, 3, 4) o Requires proof of; first-time Certification (to at least Level 1 with ASHRAE Level 2 audit) within the previous 18 months, or valid Certification, and an increase in BOMA BESt s Performance Benchmark Scale by at least one level within the previous 18 months, or advancing Certification (from one level to another) within previous 24 months. Proof may be accepted in the form of; - official Certification documentation produced by BOMA, - a single Commissioning/ Report developed and provided by a qualified consultant, contractor, or other subject-matter expert

9 TABLE A D Alternative Acceptable Solutions for Efficiency L Level Sections Alternative Acceptable Solution Options Envelope 1) Reduce air leakage of all Vestibules (per of ASHRAE ) Upgrade all Opaque Doors performance (per of ASHRAE ) Upgrade Dead Band settings (per of L1 HVAC 2) Upgrade Set-point Overlap Restrictions (per of ASHRAE ) Upgrade Off-Hour Controls (per of 4) Upgrade Ventilation System Controls (per of ASHRAE ) Upgrade Heat Pump Auxiliary Heat Controls (per of ASHRAE ) Upgrade Freeze Protection and Snow/Ice Melting Systems (per of 7) Upgrade Ventilation Controls For High-Occupancy Areas (per of 8) Upgrade Single Zone VAV Controls (per of 9) Upgrade Heat and Cool Limitation (per of 10) Inspect and remediate HVAC Insulation (per of ASHRAE ) Inspect and remediate Duct and Plenum Leakage (per of SWH 1) Upgrade all SWH Piping Insulation (per of L2 Lighting Envelope HVAC SWH 1) Upgrade internal Exit Signs to not exceed 5W per face (per of 2) Functional Testing (per of 1) Reduce air leakage of all Loading Dock Doors (per of ASHRAE ) Upgrade all Floor Insulation (per of 3) Reduce total Skylight Fenestration/Glazing Area to 5% of gross roof area (per of 1) Clean and Balance all Air Systems (per of 2) Balance all Hydronic Systems (per of 1) Upgrade SWH system Temperature Controls (per of ASHRAE ) Upgrade SWH system Temperature Maintenance Controls (per of

10 3) Upgrade SWH system Outlet Temperature Controls (per of 4) Upgrade SWH system Circulating Pump Controls (per of ASHRAE ) Upgrade Pool systems (per of 6) Upgrade pipe risers to incorporate Heat Traps (per of ASHRAE ) Upgrade to incorporate Automatic Lighting Shutoff (per of 2) Upgrade to incorporate Space Control systems (per of ASHRAE ) Upgrade to control Parking Garage Lighting (per of ASHRAE Lighting 4) Upgrade all Automatic Daylighting Controls for Primary Sidelighted Areas (per of 5) Upgrade all Automatic Daylighting Controls for Toplighting (per of 6) Upgrade to incorporate al Controls for specialized lighting (per of 7) Exterior Lighting Control (per of 8) Reduce total Skylight Fenestration/Glazing Area to 5% of gross roof area (per of 1) Provide a Building Envelope Assessment Report, to be signed and sealed by a design professional, report to include: effective R-value, blower test, list of upgrades to achieve a compliance rating using the latest COMcheck software version. 2) Reduce air leakage of all Fenestration & Doors (per of ASHRAE Envelope 3) Upgrade all Below-Grade Wall Insulation (per of ASHRAE L3 4) Inspect and remediate all ceiling/attic space equipment and services including ductwork, plumbing, insulation, penetrations, dampers, valves, coils, pans and drains. HVAC 5) Inspect and remediate all floor/crawl space equipment and services including ductwork, plumbing, insulation, penetrations, dampers, valves, coils, pans and drains. 1) Provide an HVAC System Assessment Report, to be signed and sealed by a design professional. Report to include: systems reviews, upgrade and recommissioning options, with estimates for energy savings and cost paybacks. 2) Upgrade all ducts, plenums, and insulation (per of ASHRAE ; inspect and remediate HVAC Insulation (per of ASHRAE ; and inspect and remediate Duct and Plenum Leakage (per of

11 3) Incorporate Exhaust Air Recovery systems (per of ASHRAE ) Incorporate a Service Water Heating Recovery system (per of 5) Upgrade all Kitchen Exhaust and Replacement Air systems (per of 6) Upgrade all Laboratory Exhaust and Replacement Air systems (per of 7) Balance all systems (per of ; clean and balance all air systems (per of ; balance all hydronic systems (per of 1) Provide an SWH System Assessment Report, to be signed and sealed by a design professional Report to include: systems reviews, upgrade and re-commissioning options, with estimates for energy savings and cost paybacks. SWH Lighting 2) Upgrade SWH system Controls (per of Upgrade SWH system temperature controls (per of ASHRAE Upgrade SWH system Temperature Maintenance Controls (per of Upgrade SWH system Outlet Temperature Controls (per of Upgrade SWH system Circulating Pump Controls (per of 1) Provide a comprehensive Lighting System Assessment Report to be signed and sealed by a design professional Report to include: systems reviews, upgrade options, with estimates for energy savings and cost paybacks. 2) Upgrade total Exterior Lighting Power of the building (per of 3) Meet the interior lighting power allowance by the Building Area Method of the suite (per 9.5 of 4) Meet the interior lighting power allowance by the Space-by-Space Method of the suite (per 9.6 of

12 1) Reduce air leakage of entire Building Envelope (per of ASHRAE ; reduce air leakage of all Fenestration & Doors (per of Reduce air leakage of all Loading Dock Doors (per of ASHRAE Reduce air leakage of all Vestibules (per of ASHRAE ) For single retail/tenant spaces < 500 sq.m.) Perform an Air Leakage / Blower test and remediate 3) Upgrade all Roof Insulation (per of Envelope 4) Upgrade all Above-Grade Wall Insulation (per of ASHRAE L4 HVAC 5) For single retail/tenant spaces < 500 sq.m.) Replace storefront window(s) to meet the By-law. 6) Reduce total vertical Fenestration/Glazing Area to 40% of gross wall area (per of 7) Upgrade all Fenestration/Glazing Performance (per and of 8) Inspect and remediate roof systems including membrane, parapets, scuppers, drains, gutters, downspouts and drains. 1) Upgrade all Zone Thermostatic Controls (per & of ASHRAE Upgrade Dead Band settings (per of Upgrade Set-point Overlap Restrictions (per of ASHRAE Upgrade Off-Hour Controls (per of Upgrade Ventilation System Controls (per of ASHRAE Upgrade Heat Pump Auxiliary Heat Controls (per of ASHRAE Upgrade Freeze Protection and Snow/Ice Melting Systems (per of Upgrade Ventilation Controls For High-Occupancy Areas (per of Upgrade Single Zone VAV Controls (per of ASHRAE Upgrade Heat and Cool Limitation (per of ASHRAE ) Upgrade HVAC to incorporate Economizers (per of ASHRAE ) Upgrade Heat Rejection Equipment (per of 4) Upgrade to Air and Service Water Heating Heat Recovery systems (per of Incorporate Exhaust Air Recovery systems (per of ASHRAE Incorporate a Service Water Heating Recovery system (per of 5) Upgrade entire Radiant Heating system (per of ASHRAE

13 L5 L6 SWH Lighting Envelope HVAC SWH Lighting Envelope 6) (Re-)Commission all systems (per of 1) Upgrade all Service Water Heating Equipment Efficiency (per of 1) Lighting Control (per of Upgrade to incorporate Automatic Lighting Shutoff (per of Upgrade to incorporate Space Control systems (per of Upgrade to control Parking Garage Lighting (per of ASHRAE Upgrade all Automatic Daylighting Controls for Primary Sidelighted Areas (per of Upgrade all Automatic Daylighting Controls for Toplighting (per of Upgrade to incorporate al Controls for specialized lighting (per of Exterior Lighting Control (per of 1) Upgrade insulation levels of entire Building Envelope (Opaque Areas) (per of Upgrade all Roof Insulation (per of Upgrade all Above-Grade Wall Insulation (per of ASHRAE Upgrade all Below-Grade Wall Insulation (per of ASHRAE Upgrade all Floor Insulation (per of Upgrade all Opaque Doors performance (per of ASHRAE ) Upgrade all Fenestration/Glazing (per of (For single retail/tenant spaces 500 m 2 ) Replace storefront window(s) to meet Table of ASHRAE Reduce total vertical Fenestration/Glazing Area to 40% of gross wall area (per of Reduce total Skylight Fenestration/Glazing Area to 5% of gross roof area (per of Increase total Skylight Fenestration/Glazing Area (per of Upgrade all Fenestration/Glazing Performance (per and of 1) Upgrade all HVAC Controls, Insulation and Leakage (per 6.4 of ASHRAE ) Upgrade Service Water Heating system to meet the Mandatory Provisions (per 7.4 of ; Upgrade all Service Water Heating Equipment Efficiency (per of 1) Upgrade Lighting system to meet the Mandatory Provisions (per 9.4 of 1) Upgrade all aspects of Building Envelope (per Section 5 of ASHRAE HVAC 1) Upgrade all aspects of HVAC (per Section 6 of SWH 1) Upgrade all aspects of SWH (per Section 7 of Lighting 1) Upgrade all aspects of Lighting (per Section 9 of L7 1) Upgrade existing building (per Part 10)

2 STEPS TO CONDUCTING YOUR HVAC ASSESSMENT

2 STEPS TO CONDUCTING YOUR HVAC ASSESSMENT Presentation Synopsis Heating, Ventilating and Air Conditioning Building Condition Assessment Vancouver, B.C. Prepared for: EPIC Prepared by: Douglas Spratt, P.Eng Douglas Spratt & Associates Ltd. www.dspratt-associates.com

More information

Red River College MECB 101 School of Construction and Engineering Technologies Manitoba Energy Code for Buildings 101 (MECB 101)

Red River College MECB 101 School of Construction and Engineering Technologies Manitoba Energy Code for Buildings 101 (MECB 101) Manitoba Energy Code for Buildings 101 (MECB 101) The National Research Council of Canada (NRC) has issued the National Energy Code for Buildings (NECB) in 2011. The main objective of NECB 2011 was to

More information

2012 Ontario Building Code Requirements for New Construction. Bradford West Gwillimbury Building Division March 5, 2012

2012 Ontario Building Code Requirements for New Construction. Bradford West Gwillimbury Building Division March 5, 2012 2012 Ontario Building Code Requirements for New Construction Bradford West Gwillimbury Building Division March 5, 2012 1 Ontario Building Code changes Applicable to permits applied for after December 31,

More information

PLAN REVIEW SERVICES CONSTRUCTION DOCUMENTS NECESSARY FOR A THOROUGH PLAN REVIEW

PLAN REVIEW SERVICES CONSTRUCTION DOCUMENTS NECESSARY FOR A THOROUGH PLAN REVIEW CONSTRUCTION DOCUMENTS NECESSARY FOR A THOROUGH PLAN REVIEW PRELIMINARY BUILDING REVIEW two sets of the following: Architectural/engineering design development drawings indicating size of the building,

More information

Does Wall Township require an inspection by the building department on resale of a home?

Does Wall Township require an inspection by the building department on resale of a home? Selling your home Does Wall Township require an inspection by the building department on resale of a home? No. We do not require a Certificate of Continued Occupancy on the resale of home. A Smoke Detector,

More information

SUMMARY REPORT THE BOTTOM LINE. Electrical. Report Number: 1860. Inspection Date: Saturday, February XX, XXXX

SUMMARY REPORT THE BOTTOM LINE. Electrical. Report Number: 1860. Inspection Date: Saturday, February XX, XXXX SUMMARY REPORT Report Number: 1860 Inspection Date: Saturday, February XX, XXXX Property Address: XX XXXXX XXX Toronto, ON XXX XZX Client Name: Xxxx Xxxxxxxxxxxxx Prepared by: Andrew Marioselva BSc,CHI

More information

ENERGY AUDITS AND RETRO- COMMISSIONING Local Law 87

ENERGY AUDITS AND RETRO- COMMISSIONING Local Law 87 ENERGY AUDITS AND RETRO- COMMISSIONING Local Law 87 Overview Although energy-efficiency retrofits generally result in major cost and energy savings, many buildings are not participating in the audits that

More information

Schedule B to By-law 33-2009

Schedule B to By-law 33-2009 Amended by By-law 8-2016 Note: This consolidation is prepared for convenience only. For accurate reference the original by-laws should be reviewed. Floor Area Calculation Floor area shall: Schedule B to

More information

Plumbing Installations. A homeowner guide to the City of Winnipeg plumbing requirements for a single-family dwelling

Plumbing Installations. A homeowner guide to the City of Winnipeg plumbing requirements for a single-family dwelling Plumbing Installations A homeowner guide to the City of Winnipeg plumbing requirements for a single-family dwelling February 2001 contents General Information 3 Inspection 4 New Drain and Vent Installations

More information

Plumbing Installations A homeowner guide to the City of Winnipeg plumbing requirements for a single-family dwelling

Plumbing Installations A homeowner guide to the City of Winnipeg plumbing requirements for a single-family dwelling PLANNING, PROPERTY AND DEVELOPMENT DEPARTMENT Plumbing Installations A homeowner guide to the City of Winnipeg plumbing requirements for a single-family dwelling October 2014 contents General Information

More information

BUILDING DEPARTMENT 8748 W. 82 nd Place - Justice, IL 60458 Phone: (708) 458-2130 Fax: (708) 458-3207

BUILDING DEPARTMENT 8748 W. 82 nd Place - Justice, IL 60458 Phone: (708) 458-2130 Fax: (708) 458-3207 BUILDING DEPARTMENT 8748 W. 82 nd Place - Justice, IL 60458 Phone: (708) 458-2130 Fax: (708) 458-3207 SELF EVALUATION CHECKLIST FOR RESIDENTIAL AND MULTI-FAMILY DWELLING INSPECTIONS The attached checklist

More information

2014 British Columbia Building Code Changes

2014 British Columbia Building Code Changes District of Houston 250-845-2238 2014 British Columbia Building Code Changes A District of Houston interpretation of the 2014 Building Code Changes for 9.36 & 9.32 The following changes reflect the most

More information

2013 BUILDING ENERGY EFFICIENCY STANDARDS

2013 BUILDING ENERGY EFFICIENCY STANDARDS 2013 BUILDING ENERGY EFFICIENCY STANDARDS Title 24, Part 6, and Associated Administrative Regulations in Part 1 CALIFORNIA ENERGY COMMISSION Edmund G. Brown Jr., Governor MAY 2012 CEC 400 2012 004 CMF

More information

Condensing Boiler Efficiency

Condensing Boiler Efficiency Condensing Boiler Efficiency Date: July 17, 2012 PRES E NT ED BY DO N L E O NA RDI LE O N A RD I I NC. HV AC T RAI N I N G & C ON SU LT IN G Concepts 1 The current state of evolution in boiler design 2

More information

Building Condition Assessment Report

Building Condition Assessment Report C2 - Nurses Resident (aka Administration) Building Condition Assessment Report Asset Address Address Construction Year Size (Gross Floor Area) Asset Type Floors Above Ground Inspection Date C2 - Nurses

More information

Sustainable Strategies for Rehabilitation Projects: 9th Street Office Building Adaptive Reuse Case Study

Sustainable Strategies for Rehabilitation Projects: 9th Street Office Building Adaptive Reuse Case Study Sustainable Strategies for Rehabilitation Projects: 9th Street Office Building Adaptive Reuse Case Study Robert C. Burns, AIA, LEED AP Principal Director of Historic Architecture 804. 648. 5040, ext. 1107

More information

Building Energy Codes 101 October 23, 2013. Matthew Giudice Building Policy Associate Midwest Energy Efficiency Alliance

Building Energy Codes 101 October 23, 2013. Matthew Giudice Building Policy Associate Midwest Energy Efficiency Alliance Building Energy Codes 101 October 23, 2013 Matthew Giudice Building Policy Associate Midwest Energy Efficiency Alliance OVERVIEW 1. Introduction 2. Energy Code Development 3. Adoption Process 4. Elements

More information

Center for Energy Education Laboratory

Center for Energy Education Laboratory Paper ID #7072 Center for Energy Education Laboratory Dr. Robert Gilbert, Sinclair Community College Robert B. Gilbert, Ph.D., LEED AP, BA, is an Associate Professor of Energy Management Technology, and

More information

Building Condition Assessment Report

Building Condition Assessment Report Building Condition Assessment Report Asset C3c - Oak Terrace Cottage 121 Address Riverview Lands, 2601 Lougheed Highway, Coquitlam, BC. V5C 4J2 Construction Year Size (Gross Floor Area) 1920. 2,553 Sq.Ft.

More information

Schedule B to By-law 33-2009 Part A Fees Payable for Permits

Schedule B to By-law 33-2009 Part A Fees Payable for Permits Floor Area Calculation Floor area shall: Part A Fees Payable for Permits (Effective January 1, 2015) a) be calculated by measuring to the outer face of exterior walls and to the centre of party walls or

More information

ELIGIBLE REPAIR PROJECT PARAMETERS

ELIGIBLE REPAIR PROJECT PARAMETERS THE DISTRICT MUNICIPALITY OF MUSKOKA ONTARIO RENOVATES PROGRAM FOR HOMEOWNERS ELIGIBLE REPAIR PROJECT PARAMETERS 1. To have your project considered and payment processed, all projects requiring a Building

More information

Inspection Report. Dream Home Inspections. www.timinspects.com. 415 Second Ave. Frisco CO 80443-1789 (970) 368-2668

Inspection Report. Dream Home Inspections. www.timinspects.com. 415 Second Ave. Frisco CO 80443-1789 (970) 368-2668 Inspection Report Property Address: 123 Dream Home Way Frisco, CO 80443 Prepared for: Inspector: Tim Nixon Tim Nixon Inspection date: 3/28/2014 1 of 9 General Information Property Information Address:

More information

HVAC Simplified Approach Option

HVAC Simplified Approach Option HVAC Simplified Approach Option Part I Project Address: City: HVAC System Designer of Record: Date: Zip: Qualification The building is 2 stories or less in height and has a gross floor area is less than

More information

2011 Energy Efficiency Expo!

2011 Energy Efficiency Expo! Welcome to the 2011 Energy Efficiency Expo! Thank you to our session sponsors! Comparison Between the 2009 and 2012 International Energy Conservation Code What s coming when the new commercial energy code

More information

PLAN SUBMITTAL INFORMATION

PLAN SUBMITTAL INFORMATION PLAN SUBMITTAL INFORMATION APPLICATION FOR A BUILDING PERMIT Prior to drafting construction drawings, please check with the North Miami Beach Community Development Department concerning the following:

More information

SCHEDULE A BY-LAW B-6 CLASSES OF PERMITS AND FEES

SCHEDULE A BY-LAW B-6 CLASSES OF PERMITS AND FEES 1. CALCULATION OF PERMIT FEES SCHEDULE A BY-LAW B-6 CLASSES OF PERMITS AND FEES Permit fees shall be calculated based on the formula given below, unless otherwise specified in this schedule: Permit Fee

More information

IECC Compliance Guide for Homes in Virginia

IECC Compliance Guide for Homes in Virginia IECC Compliance Guide for Homes in Virginia Amended Version of 2012 International Energy Conservation Code July 14, 2014 Climate Zone Since the entire state of Virginia falls in the IECC Climate Zone 4,

More information

The fees listed below are stand-alone fees. Additional Developemnt Review or Stormwater fees may apply. 1.0. Fee Activity

The fees listed below are stand-alone fees. Additional Developemnt Review or Stormwater fees may apply. 1.0. Fee Activity MINOR & MISCELLANEOUS PERMITS The fees listed below are stand-alone fees. Additional Developemnt Review or Stormwater fees may apply. 1.0 Fee Activity Fee Description Fee 50% REDUCED FEES FOR SINGLE FAMILY

More information

DEPARTMENT OF CODES AND BUILDING SAFETY FLOOD RECOVERY INFORMATION

DEPARTMENT OF CODES AND BUILDING SAFETY FLOOD RECOVERY INFORMATION May 2010 DEPARTMENT OF CODES AND BUILDING SAFETY FLOOD RECOVERY INFORMATION GUIDELINES FOR PERMITS ASSOCIATED WITH THE REPAIR OF FLOOD DAMAGED HOMES AND BUILDINGS The Department of Codes and Building Safety

More information

2009 Seattle Energy Code Impacts: See below for a recap of Changes in Envelope performance from 2006 to 2009

2009 Seattle Energy Code Impacts: See below for a recap of Changes in Envelope performance from 2006 to 2009 2009 Seattle Energy Code Impacts: Building Envelope Impacts: Below is a Summary of Changes that impact building envelope construction planned for 624 Yale. There are several modifications are required

More information

Gramercy Place Condo Association, Inc.

Gramercy Place Condo Association, Inc. Gramercy Place Condo Association, Inc. UNIT MODIFICATION REQUEST Date of Application: Name of Owner (s): Telephone: (Home) (Cell) E-Mail: Anticipated start date: Anticipated ending date: Permission is

More information

Report for. Dick and Jane Homeowner. 1234 Lovers Lane, Houston, Texas 77000

Report for. Dick and Jane Homeowner. 1234 Lovers Lane, Houston, Texas 77000 Report for Dick and Jane Homeowner 1234 Lovers Lane, Houston, Texas 77000 March 17, 2004 I NI NP R Inspection Item I. STRUCTURAL SYSTEMS o o o A. Foundations (If all crawl space areas are not inspected,

More information

South Carolina Home Inspector Standards of Practice

South Carolina Home Inspector Standards of Practice South Carolina Home Inspector Standards of Practice The following Standards provide guidelines for the Residential Home Inspector and outline what the Residential Home Inspector should observe, identify,

More information

EarthCents (DSM) Program Summary

EarthCents (DSM) Program Summary EarthCents (DSM) Program Summary Renewable Energy EarthCents Programs Solar Water Heating This program is available to residential customers for the installation of a qualifying solar thermal water heater.

More information

CITY PLAN REVIEW AND INSPECTION. Lisa Fleming Brown, CPM

CITY PLAN REVIEW AND INSPECTION. Lisa Fleming Brown, CPM CITY PLAN REVIEW AND INSPECTION Lisa Fleming Brown, CPM Houston Commercial Energy Conservation Code (2011) A choice of 2009 IECC or ASHRAE 90.1-2007 with amendments. Effective September 2, 2011. Complete

More information

Key energy-efficient features of your new home

Key energy-efficient features of your new home Key energy-efficient features of your new home Your thermal envelope The thermal envelope, or shell, of your home (walls, roof and floor) is designed to keep you dry and comfortable. It protects you from

More information

Inspecting to a higher standard.

Inspecting to a higher standard. Inspecting to a higher standard. Rob Hopkin Silver Spring, MD 20902 Monday, June 2, 2014 ProTec Inspection Services Inc. 19736 Selby Ave Poolesville, MD 20837 301-972-8531 www.protec-inspections.com rob@protec-inspections.com

More information

STATE OF SOUTH CAROLINA RESIDENTIAL PROPERTY CONDITION DISCLOSURE STATEMENT

STATE OF SOUTH CAROLINA RESIDENTIAL PROPERTY CONDITION DISCLOSURE STATEMENT STATE OF SOUTH CAROLINA RESIDENTIAL PROPERTY CONDITION DISCLOSURE STATEMENT The South Carolina Code of Laws (Title 27, Chapter 50, Article 1) requires that an owner of residential real property (single

More information

Attachment #23 Health Safety Table. Client Education Inform issue and document. How to clean & maintain gutters. How to adjust sprinklers

Attachment #23 Health Safety Table. Client Education Inform issue and document. How to clean & maintain gutters. How to adjust sprinklers Exterior Visual Health & Safety Issue Allowable Action Site Drainage Exterior grade does not slope 2% within the first 10' Site drainage causing bulk moisture in crawl space or basement Repairs to existing

More information

Instructions for Form 5695

Instructions for Form 5695 2014 Instructions for Form 5695 Residential Energy Credits Department of the Treasury Internal Revenue Service Section references are to the Internal Revenue Code unless otherwise noted. General Instructions

More information

How To Design An Hvac Design For A Stick Built Home

How To Design An Hvac Design For A Stick Built Home LEGALETT HVAC DESIGN FEE SCHEDULE (revised April 17, 2012) Background In the past Legalett has simply supplied warm floors for comfortable living. However, 2012 Building Code changes in Ontario make it

More information

1 RCNY 5000-01 CHAPTER 5000. New York City Energy Conservation Code

1 RCNY 5000-01 CHAPTER 5000. New York City Energy Conservation Code 1 RCNY 5000-01 CHAPTER 5000 New York City Energy Conservation Code 5000-01 Construction document approval requirements for compliance with the New York City Energy Conservation Code. (a) Purpose. This

More information

Table 1: Prescriptive Envelope Requirements: Residential WOOD FRAME WALL R-VALUE MASS WALL R-VALUE CEILING R-VALUE

Table 1: Prescriptive Envelope Requirements: Residential WOOD FRAME WALL R-VALUE MASS WALL R-VALUE CEILING R-VALUE June 24, 2011 North Carolina Has a New Energy Conservation Code! By R. Christopher Mathis Executive Summary On Friday, June 24, 2011, Governor Beverly Perdue signed SB 708 into law and, with it, approved

More information

COMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES

COMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES COMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES These guidelines are to be used for ALL commercial cooking hoods, ventilation systems and related fire suppression

More information

Total Building Commissioning: Case Study of the U.S. District Courthouse in Salt Lake City, Utah, USA

Total Building Commissioning: Case Study of the U.S. District Courthouse in Salt Lake City, Utah, USA Total Building Commissioning: Case Study of the U.S. District Courthouse in Salt Lake City, Utah, USA Boggarm S. Setty, P.E., Fellow ASHRAE Setty & Associates, Ltd. 3040 Williams Drive, Suite 600, Fairfax,

More information

COMPREHENSIVE PROPERTY INSPECTIONS

COMPREHENSIVE PROPERTY INSPECTIONS COMPREHENSIVE PROPERTY INSPECTIONS Thank you for selecting CPI for your Deficiency Observation. A full home inspection was not performed on this property at the buyers request. This inspection is a limited

More information

Before You Start an Energy Efficiency Retrofit The Building Envelope

Before You Start an Energy Efficiency Retrofit The Building Envelope ABOUT YOUR HOUSE Before You Start an Energy Efficiency Retrofit The Building Envelope The building envelope is the outer layer of the building that separates the indoor living space from the outdoor environment,

More information

Industrial Green Building Retrofit 101 Opportunities and Challenges. Light Industrial Green Building Retrofits. Why Green Retrofit?

Industrial Green Building Retrofit 101 Opportunities and Challenges. Light Industrial Green Building Retrofits. Why Green Retrofit? Industrial Green Building 101 Opportunities and Challenges Joanne Sawatzky Senior Project Manager, Light House Sustainability at Work Re-visioning a Sustainable False Creek Flats Light Industrial Green

More information

Raising the Bar- Houston

Raising the Bar- Houston City of Houston Code Enforcement Raising the Bar- Houston CATEE Conference Galveston, TX October 10, 2012 Sheila Blake MBA, CBO, LEED AP Assistant Director, PWE Planning and Development Services 1 Houston

More information

Asbestos Procedures. Asbestos Products

Asbestos Procedures. Asbestos Products Asbestos Procedures Asbestos Products Where is asbestos known to be located on The Evergreen State College? Please see Appendix A for a list of known asbestos containing materials located on the Olympia

More information

Rehab Inspection Report Page 1

Rehab Inspection Report Page 1 Rehab Inspection Report Page 1 Home Address: Construction Style: Number of bedrooms Square footage: Value of offer: Estimated rehab cost: Value of resale: Orientation of house: N S E W Note: orientation

More information

Element D Services Plumbing

Element D Services Plumbing PART 1 - GENERAL 1.01 OVERVIEW A. This section addresses domestic cold, hot and hot water return distribution systems within and to five feet beyond building perimeter. PART 2 - DESIGN CRITERIA 2.01 GENERAL

More information

STATE OF FLORIDA HOME INSPECTION STANDARDS OF PRACTICE:

STATE OF FLORIDA HOME INSPECTION STANDARDS OF PRACTICE: STATE OF FLORIDA HOME INSPECTION STANDARDS OF PRACTICE: 61-30.801 Standards of Practice, General. (1) Home inspections performed to these Standards of Practice are intended to provide the client with information

More information

Home Management Checklist: Spring

Home Management Checklist: Spring Home Management Checklist: Spring HVAC System Attic Plumbing and Electrical Service air conditioning unit (Ventilation inspected as part of service call). Ensure gutters are discharging water away from

More information

29 Broadway- 14 th Fl Tel: 212.888.8334 New York NY 10006 Fax: 212.419.1939. Due Diligence Report. New York, New York

29 Broadway- 14 th Fl Tel: 212.888.8334 New York NY 10006 Fax: 212.419.1939. Due Diligence Report. New York, New York Due Diligence Report New York, New York Prepared for Mr. On February 8, 2010 P a g e 1 Table of Contents PAGE 3.. GENERAL INFORMATION PAGE 4 FILINGS PERMITS AND ENCUMBRANCES PAGE 6. CORE AND SHELL PAGE

More information

HVAC Checklist - Long Form

HVAC Checklist - Long Form HVAC Checklist - Long Form Page 1 of 14 Appendix B discusses HVAC system components in relation to indoor air quality. utside Air Intake Location pen during occupied hours? Unobstructed? Standing water,

More information

Exterior Elevated Elements Inspection Guidelines

Exterior Elevated Elements Inspection Guidelines Exterior Elevated Elements Inspection Guidelines Planning and Development 1. Guideline Purpose These guidelines are intended to assist practicing professionals in complying with Berkeley Municipal Code

More information

Preventing Ice Dams on Roofs

Preventing Ice Dams on Roofs Preventing Ice Dams on Roofs Facility Manager November/December 2005 When a roof leaks, facility managers inevitably receive complaints from building occupants. If it is winter, ice dams are often the

More information

Contract for Weatherization Management Address City & State

Contract for Weatherization Management Address City & State I. Parties Contract for Weatherization Management Address City & State This contract is made and entered into on and specifies the terms of the agreement between Client Name, homeowner, and Sherlock Homes

More information

PROPERTY INSPECTION REPORT

PROPERTY INSPECTION REPORT (850) 297-1998 1716 Monticello Dr Tallahassee, Florida 32303 PROPERTY INSPECTION REPORT THIS INSPECTION IS A DETAILED LISTING OF AREAS VISUALLY INSPECTED AT:, Tallahassee FL Client Tallahassee, FL 32304

More information

Botetourt County, Virginia. Frequently Asked Questions

Botetourt County, Virginia. Frequently Asked Questions Botetourt County, Virginia Development Services Construction Compliance Frequently Asked Questions Permits... 2 When is a permit required?... 2 When is a permit NOT required?... 2 Who may apply for a permit?...

More information

PROPERTY INSPECTION REPORT

PROPERTY INSPECTION REPORT Whisper Computer Solutions, Inc. P.O. Box 690502 San Antonio, TX 78269-0502 Phone: (210)681-6325 Fax: (210)681-6325 Email: support@whispersolutions.com PROPERTY INSPECTION REPORT Prepared For: Concerning:,

More information

PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES

PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES ADDRESS: 123 MAIN ST MIAMI, FL CLIENT: BUYER ID No: 2014193 DATE: 5/13/2014 INSPECTION OR ASSESSMENT BY: GAIA CONSTRUCTION INC. CGC 1516136 FLORIDA HI-2792

More information

RESIDENTIAL HEATING OIL SERVICE CONTRACT ANNUAL COST $276.00

RESIDENTIAL HEATING OIL SERVICE CONTRACT ANNUAL COST $276.00 RESIDENTIAL HEATING OIL SERVICE CONTRACT This service contract covers all routine service and maintenance of your residential oil fired furnace or boiler. In addition this contract covers all service calls

More information

Home Inspection Report

Home Inspection Report 4949 Brownsboro Rd Suite 293 Louisville, KY 40223 (502) 414-1440 tripleainspections@gmail.com Inspected By: William Carter, HI-1956 Home Inspection Report Prepared For: Edward Cullen Property Address:

More information

INVOICE. DATE: May 11, 2005. DESCRIPTION Inspection and report on a property located at OF SERVICES: Perfect Street, Sarasota, Fl.

INVOICE. DATE: May 11, 2005. DESCRIPTION Inspection and report on a property located at OF SERVICES: Perfect Street, Sarasota, Fl. INVOICE DATE: May 11, 2005 CLIENT: The Buyer DESCRIPTION Inspection and report on a property located at OF SERVICES: Perfect Street, Sarasota, Fl. TOTAL FEE: $ See Schedule Tom Villani Hallmark Inspection

More information

Home Energy Evaluation Report for Fritz Kreiss and Catherine McQueen

Home Energy Evaluation Report for Fritz Kreiss and Catherine McQueen Home Energy Evaluation Report for Fritz Kreiss and Catherine McQueen May 2008 Wisconsin Area PO BOX 115 Lake Geneva, WI 53147 CELL (414) 550-4765 Home Performance with ENERGY STAR Evaluation Report Customer

More information

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal. 2.02 DESIGN DEVELOPMENT PHASE GENERAL The Architect shall prepare the Design Development Documents from the approved Schematic Design. The Design Development Documents shall consist of drawings and other

More information

Replacement of Heating, Ventilation, Air Conditioning (HVAC) Units In Apartments Located at 641 Fifth Avenue. Photo Essay

Replacement of Heating, Ventilation, Air Conditioning (HVAC) Units In Apartments Located at 641 Fifth Avenue. Photo Essay Original HVAC Units: Replacement of Heating, Ventilation, Air Conditioning (HVAC) Units In Apartments Located at 641 Fifth Avenue Photo Essay One fan motor draws air from the lower section of the unit,

More information

Category Measure Minimum Efficiency / Certification Requirements

Category Measure Minimum Efficiency / Certification Requirements ENERGYSMART and DENVER ENERGY CHALLENGE RESIDENTIAL LOAN ELIGIBLE MEASURES s! Please check https://www.elevationscu.com/energyloans/home-loans to ensure you are using the most up to date version of the

More information

Plumbing Identification and Damage Assessment Guide

Plumbing Identification and Damage Assessment Guide Plumbing Identification and Damage Assessment Guide *Please note that not all systems will be represented exactly by these diagrams and photos. As a vendor, it is required that you familiar yourself with

More information

Exhibit B. Property Acquisition and Disposition Division Residential Design & Performance Standards

Exhibit B. Property Acquisition and Disposition Division Residential Design & Performance Standards Exhibit B Property Acquisition and Disposition Division Residential Design & Performance Standards I. Introduction The Property Acquisition and Disposition Division ( PADD ) has developed design standards

More information

Inspection Item COMMENTS

Inspection Item COMMENTS APPENDIX 9 AFFORDABLE HOUSING PROGRAM INSPECTION CHECKLIST Participating Jurisdiction: Homeowner Name: Assisted Property Address: Date of Physical Inspection of Property: Total Square Footage of Property:

More information

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are: When is a Permit Required? The most common types of projects that require permits are: -New Houses or buildings -Room Additions or Expansions -Structural repairs, remodeling and alterations -Accessory

More information

Hartsfield-Jackson Atlanta International Airport s

Hartsfield-Jackson Atlanta International Airport s Hartsfield-Jackson Atlanta International Airport s 2008-09 Closed Projects (Posted 1/6/2009) FC-3007000038C: MISCELLANEOUS BUILT-UP ROOF AND SINGLE PLY ROOF REPAIRS AT H-JAIA Furnish all labor, equipment,

More information

Energy Efficiency in Industrial HVAC Systems

Energy Efficiency in Industrial HVAC Systems Energy Efficiency in Industrial HVAC Systems Heating, ventilation and air conditioning (HVAC) constitutes up to 35 percent of energy used in manufacturing facilities. This fact sheet is geared towards

More information

PENNSYLVANIA HOUSING FINANCE AGENCY (2015 UNDERWRITING APPLICATION) Tab 34 Physical/Capital Needs Assessment & Energy Audit

PENNSYLVANIA HOUSING FINANCE AGENCY (2015 UNDERWRITING APPLICATION) Tab 34 Physical/Capital Needs Assessment & Energy Audit Tab 34 Physical/Capital Needs Assessment & Energy Audit All Preservation developments must submit both of the following: A. Physical/Capital Needs Assessment A Physical/Capital Needs Assessment must be

More information

NSP3 Rehabilitation Standards Certification

NSP3 Rehabilitation Standards Certification Initial Certification: Subrecipient confirms that it has included in the scope of work all items necessary for the project to meet the NSP1 Rehabilitation Standards upon project completions. Second and

More information

LOW-RISE RESIDENTIAL BUILDINGS ADDITIONS AND ALTERATIONS IN EXISTING LOW-RISE RESIDENTIAL BUILDINGS

LOW-RISE RESIDENTIAL BUILDINGS ADDITIONS AND ALTERATIONS IN EXISTING LOW-RISE RESIDENTIAL BUILDINGS SUBCHAPTER 9 LOW-RISE RESIDENTIAL BUILDINGS ADDITIONS AND ALTERATIONS IN EXISTING LOW-RISE RESIDENTIAL BUILDINGS SECTION 150.2 ENERGY EFFICIENCY STANDARDS FOR ADDITIONS AND ALTERATIONS IN EXISTING BUILDINGS

More information

later damage - Loss ControL

later damage - Loss ControL later damage - Loss ControL axisinsurance.ca Table of Contents EXECUTIVE SUMMARY... 1 FACILITY SYSTEMS WATER DAMAGE... 2 Frozen Pipes.....................................................................................

More information

PEPPER VINER HOMES WARRANTY GUIDELINES

PEPPER VINER HOMES WARRANTY GUIDELINES PEPPER VINER HOMES WARRANTY GUIDELINES All non-emergency warranty and customer service requests MUST be made in writing. This provides you with documentation and allows Pepper Viner to operate efficiently.

More information

BUILDING SAFETY UNIT

BUILDING SAFETY UNIT POLICY Page 1 of 5 SUBMITTAL REQUIREMENTS FOR ONE AND TWO FAMILY DWELLINGS, ADDITIONS AND RENOVATIONS All submittals shall be site specific and designed to the provisions of the 2012 International Residential

More information

Air Conditioning. The opportunity for energy efficiency. Low cost actions to reduce energy usage now

Air Conditioning. The opportunity for energy efficiency. Low cost actions to reduce energy usage now Fact Sheet #6 Air Conditioning In this fact sheet you will discover: The opportunity for energy efficiency How air conditioning works Low cost actions to reduce energy usage now Investments to reduce costs

More information

Water Management & Damage Prevention:

Water Management & Damage Prevention: Water Management & Damage Prevention: A Guide for Homeowners This article provides homeowners with basic information to make these decisions and take the appropriate actions to keep their homes dry and

More information

NYC Department of Education Building Condition Assessment Survey 2014-2015 BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 10004

NYC Department of Education Building Condition Assessment Survey 2014-2015 BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 10004 School: InspectionId Asset Data Inspection Type Building Assessment Survey 204-205 BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 0004 Time In Last Edited 255 MECHANICAL 205-05-8 09:00AM

More information

The Uniform Building Inspection Report Condensed

The Uniform Building Inspection Report Condensed The Uniform Building Inspection Report Condensed Single Family Residence:, Scottsdale, AZ Condensed Report Version Prepared for: John Doe Inspection Date: 9/19/2005, 1:00:00 AM Report Number: 091805s Inspection

More information

COMMISSIONING OF HVAC SYSTEMS

COMMISSIONING OF HVAC SYSTEMS FORM CL-01 SYSTEMS / EQUIPMENT INCLUDED : SYSTEM STARTUP CHECKLIST I - PRE - STARTUP INSPECTION EQUIPMENT MOUNTING & SETTING CONTROL, INTERLOCK & POWER WIRING ALIGNMENT OF MOTORS & DRIVES PIPING, CONNECTIONS

More information

#1) BEFORE Purchasing Land Here Is A Checklist Of Things You Should Check

#1) BEFORE Purchasing Land Here Is A Checklist Of Things You Should Check #1) BEFORE Purchasing Land Here Is A Checklist Of Things You Should Check Zoning laws Deed restrictions on home size, foundation style, roof pitch, etc. Suitability (slope, wetland issues, etc.) Accessibility

More information

APPENDIX C FORMS 2010 FLORIDA BUILDING CODE ENERGY CONSERVATION C.1

APPENDIX C FORMS 2010 FLORIDA BUILDING CODE ENERGY CONSERVATION C.1 APPENDIX C FORMS 2010 FLORIDA BUILDING CODE ENERGY CONSERVATION C.1 ENERGY PERFORMANCE LEVEL (EPL) DISPLAY CARD ESTIMATED ENERGY PERFORMANCE INDEX* = The lower the Energy Performance Index, the more efficient

More information

PLP - TERMS AND CONDITIONS

PLP - TERMS AND CONDITIONS PLP - TERMS AND CONDITIONS 2014-2015 Philadelphia Gas Works Residential Parts & Labor Plan Contract This Residential Parts & Labor Plan Contract (this Plan ) is available to customers of the Philadelphia

More information

Guidelines for energy efficient heating, ventilation and air conditioning (HVAC) systems

Guidelines for energy efficient heating, ventilation and air conditioning (HVAC) systems Guidelines for energy efficient heating, ventilation and air conditioning (HVAC) systems If you're a designer or a BCA, this guidance on the energy efficiency of HVAC systems in commercial buildings may

More information

UNIVERSITY OF MISSOURI 23 0000 - Heating Ventilating and Air-Conditioning (HVAC) March 2015.01

UNIVERSITY OF MISSOURI 23 0000 - Heating Ventilating and Air-Conditioning (HVAC) March 2015.01 GENERAL: This section provides general standards for overall sizing and design of Heating, Ventilating, and Air Conditioning (HVAC) systems. Other sections contain specific standards for each system per

More information

24.301.161 INCORPORATION BY REFERENCE OF INTERNATIONAL. (1) The Department of Labor and Industry adopts and incorporates by

24.301.161 INCORPORATION BY REFERENCE OF INTERNATIONAL. (1) The Department of Labor and Industry adopts and incorporates by 24.301.161 INCORPORATION BY REFERENCE OF INTERNATIONAL ENERGY CONSERVATION CODE (1) The Department of Labor and Industry adopts and incorporates by reference the International Code Council's International

More information

Solicitation Items Report

Solicitation Items Report Solicitation Items Report Solicitation 91036-12295-208 Title: M/R of Air Conditioning Units & Split A/C Units Estimated Total Value: Description: Delivery Terms: Free On Board Destination Payment Terms:

More information

Mechanical, Plumbing, and Fire Protection Conditions

Mechanical, Plumbing, and Fire Protection Conditions Mechanical, Plumbing, and Fire Protection Conditions Mechanical Conditions The mechanical systems within the building consist of a combination of the original 1926 systems and renovations that occurred

More information

Financing Options to support Energy Efficiency & Contractors

Financing Options to support Energy Efficiency & Contractors Financing Options to support Energy Efficiency & Contractors Renovation Loan Overview Renovation Loans offer a buyer the opportunity to buy a property and close as-is, financing both the purchase and repair

More information

Inspection Report Atlanta Strip Mall Commercial Building Property Address:

Inspection Report Atlanta Strip Mall Commercial Building Property Address: Page 1 of 25 Inspection Report Atlanta Strip Mall Property Address: Smyrna GA 30082 Page 2 of 25 South East Building Consultants Ray Thoroman Serving the entire State of Georgia 6 678-410-3005 Page 3 of

More information

Exterior Condition Report

Exterior Condition Report Scope of Work for Property Located at: 3918-20 West Cherry Street Date: 3/10/2014 Property is: Single Family Duplex Below is the minimum requirement to meet health and safety issues. The City of Milwaukee,

More information

ALBUQUERQUE PUBLIC SCHOOLS Facility Design & Construction / Maintenance & Operations

ALBUQUERQUE PUBLIC SCHOOLS Facility Design & Construction / Maintenance & Operations ALBUQUERQUE PUBLIC SCHOOLS Facility Design & Construction / Maintenance & Operations MECHANICAL SYSTEMS DESIGN STANDARDS Appendix A RECOMMENDED HVAC SYSTEMS BY TYPE OF SPACE Matt Higgins Valentin Lucero

More information

MURCH ELEMENTARY SCHOOL

MURCH ELEMENTARY SCHOOL INITIAL YEAR BUILT 1929 BUILDING AREA 47,700 SF CURRENT PROGRAM CAPACITY 479 ENROLLMENT 2008 491 WARD 3 PROPOSED PROGRAM CAPACITY 500 Site Plan MURCH - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information