Asphalt compaction: a race against time
|
|
- Baldwin Owen
- 7 years ago
- Views:
Transcription
1 Asphalt compaction: a race against time BOMAG asphalt rollers proved their outstanding performance capabilities during the full reconstruction of the 16/34 runway at Zurich International Airport. There were barely six hours available during the overnight cessations of flights to completely remove sections up to 70 metres long and 23 metres wide, to lay pipes for the runway lighting, to install a new asphalt surface and to hand over sections "swept clean" and ready for work to the airport company. A race for time - night after night. Ueli Stalder, construction engineer from the Swiss Walo Group, hardly remembers the warm summer days of 2008 as he was predominantly working nights over the summer period. Ueli Stalder was managing one of the most spectacular construction sites in Switzerland , engines are warming up. The aim was to completely remove a 23 metre wide, 3,700 metre long central concrete strip during night-time work, taking it in sections of up to 70 metres at a time. At the same time the runway lighting including power supply was renewed, new asphalt laid and the renovated sections handed back each morning to Unique, the airport's operating company, on time and in a condition to start work immediately. On time meant 5.30 as airport operations could not be interrupted. "Sometimes the plane that was scheduled to land at 6.00 was already in the air when we started to remove the concrete surface at " Any overrun would incur contract penalties: 25,000 Swiss Franks for each quarter hour started. The clock began ticking after each start. Every night on weekdays the machine convoy, including ten pivot steered BOMAG asphalt rollers - types BW 174 and BW 184 equipped with BOMAG ASPHALT MANAGER started up. And while part of the crew was still working on cordoning off the site, excavators with special grab buckets were already removing a concrete layer up to 35 centimetres thick. On some nights up to 1,000 tonnes were shifted in 1.5 hours.
2 1.00, 4.5 hours to go. The concrete had only just been removed, the subbase meticulously cleaned and the empty pipes laid for the beacon's power supply when the contractor began laying the asphalt. "Specifications were very high," remembers Ueli Stalder. The reason lay not only with his experienced and well-drilled team but in his confidence in the technology, which made it possible to reduce the original three layers of asphalt base layer to one layer (25 cm), all of which was achieved while maintaining the specified compaction of 98 percent. To achieve this, tonnes of the low temperature asphalt that had been in temporary storage at the airport were trucked in. The material was spread by dozer and compacted in about eight passes, followed by a 10 centimetre asphalt binder layer. In addition to the exceptional compaction performance from the BOMAG rollers, the BOMAG ASPHALT MANAGER automatic measuring and control system played an indispensable role in meeting the strict quality and placing specifications in spite of the time constraints. The system works with directed oscillation which progressively adjusts the applied direction of force between vertical and horizontal. The dynamic stiffness value E VIB is calculated in terms of MN/m² as a reference and comparative value. The acceleration transducer mounted on the front drum detects the interaction between asphalt and oscillating mass with increasing compaction. This interaction is then regulated by a rapid control circuit. The compaction force automatically adjusts to the stiffness of the material to be compacted. A central display summarises all of this in a simple colour schematic and keeps the roller driver, Michele Greco, and his colleagues continually aware of the results. This not only gives high compaction performance but also valuable time and cost benefits. Ueli Stalder: "BOMAG ASPHALT MANAGER has completely won us over under these tough conditions." And by the way, Michele Greco is also a long-term employee at Walo. "Thanks to the early training we all received from Probst Maveg, it was easy for us to work with the roller and the BOMAG ASPHALT MANAGER even at night and under such time pressure; we were able to exploit the full potential of the machine." With growing experience, the crew around Ueli Stalder was able to increase the section lengths from an initial 30 metres to over Seite 2 von 6
3 70 metres after just a few days - due to the lack of downtime and the high steering precision of the BOMAG rollers. At peak times they were able to place up to 1,500 tonnes of asphalt in three hours. 4.15, 1.25 hours still to go. At 4.15 the finishing bell sounded for the asphalt specialists from Walo and Implenia. This was the latest time to start installation of the so-called centre-line lamps (the beacons) in order to guarantee punctual handover of the section. In addition to this, the airport company required that the asphalt surface temperature should not exceed 80 degrees Celsius. To save time, cleaning and runway marking were carried out at the same time. By 5.30 there had to be no sign of the night work; this was when construction safety experts from Zurich Airport carried out the quality inspection, not a minute earlier or later. The final placement of the approx. four centimetre thick chip mastic cover layer would have been impossible under the time constraints, so this was carried out after complete placement of the first two asphalt layers. For this, the newly laid asphalt binder layer was milled by four centimetres. Subsequently the surface was cleaned and binder was applied. "Even here we had to work with great precision, in spite of the time pressure," says Stalder. After all, even the layer specifications were exceptional: "The layers had to be double the strength of those on motorway projects, specifically 28 kn per square metre." This was achieved. "It's only possible," says Ueli Stalder, "When everything is planned in minute detail and everyone knows what they're doing." Quality requirements and time constraints don't allow errors. This is why Implenia and Walo (who worked alongside a total of four other companies in the "Midnight Run" joint working project) wanted to play it safe; the preparations alone for this construction site took months. Consequently, the coordination of multiple, closely interlinked work phases was tried out on a test site before the first day of actual construction (as specified by the client). 5.28, 2 minutes still to go. Seite 3 von 6
4 Thanks to the precision units from BOMAG, Ueli Stalder was able to watch the approval process as well as the landing of the first plane. It was not just that the crew had once again finished on time, Stalder also knew already, thanks to the BOMAG ASPHALT MANAGER, what the strict checks by the construction safety department at the airport would confirm: compaction target, quality and evenness achieved. Six months and 56 million Swiss Franks later, over 52,000 cubic metres of concrete had been removed, over 81,000 tonnes of asphalt had been placed, 100,000 metres of cable conduits were laid and 13,000 metres of trenches for industrial lines were excavated. In the end, Ueli Stalder and Michele Greco were certain they had found the right partner in BOMAG, particularly for extreme challenges such as this. This text contains characters (with spaces). Seite 4 von 6
5 The company: BOMAG is a global market leader in the field of compaction technology. The company, which is situated in Boppard and has belonged to the FAYAT Group since 2005, produces machines for soil, asphalt and refuse compaction as well as stabilisers/recyclers, milling machines and pavers. In 2007, around 1,900 employees throughout the world achieved a turnover amounting to 600 million Euros. The company owns six branches within Germany and 10 independent subsidiaries. More than 500 dealers in over 120 countries guarantee global distribution of BOMAG machines and their service. CONTACT: BOMAG GmbH Hellerwald D Boppard Germany Dr Iris v. Kirschbaum Head of Communications Tel: / Fax: / iris.kirschbaum@bomag.com Reproduction of this text is free of charge; reference to the source is requested. Seite 5 von 6
6 Bild Unterschriften: Bild 1/Image Nr B Precise: Perfect teamwork under cramped conditions..aspx?file= b Bild 2/Image Nr B Ready to go: BOMAG asphalt rollers with engines running, ready to start work. Download :.aspx?file= b Bild 3/Image Nr B Impressive: Michele Greco and his colleagues compacting asphalt layers. Download :.aspx?file= b Bild 4/Image Nr B Intelligent: Even the strictest specifications were met on time thanks to the BOMAG ASPHALT MANAGER. Download :.aspx?file= b Seite 6 von 6
15m Pave Width: New Runway for Braunschweig-Wolfsburg Airport, Germany
VÖGELE SUPER 3000-2 rehabilitates runway in Braunschweig-Wolfsburg. 15m Pave Width: New Runway for Braunschweig-Wolfsburg Airport, Germany VÖGELE SUPER 3000-2 rehabilitates runway in Braunschweig-Wolfsburg.
More informationSnoTrace KSR Surface Snow and Ice Melting INSTALLATION PROCEDURES
SnoTrace Surface Snow and Ice Melting INSTALLATION PROCEDURES SnoTrace INSTALLATION PROCEDURES Refer to the SnoTrace Cable Testing Report for required recording of test data and circuit information. Upon
More informationHigh performance, non-stop. Wirtgen slipform pavers build Berlin Brandenburg International Airport
High performance, non-stop Wirtgen slipform pavers build Berlin Brandenburg International Airport 1.5 million square metres of concrete paved to perfection Berlin is Germany s largest city and home to
More informationReinforcement HUESKER. HaTelit. Engineering with geosynthetics
HUESKER Engineering with geosynthetics rhuesker HUESKER HUESKER HUESKER HUESKER HUESKERr SKER HUESKER HUESKER Asphalt HUESKER HUESKER HUESKERHUES Reinforcement - the answer to reflective cracking in asphalt
More informationvision meets philosophy
worth worth worthy worth the effort vision meets philosophy Visionaries set the course, realize opportunities, and remain focused on goals. That is the basis of the Lobbe operational philosophy. With the
More informationSPECIFICATION FOR CONSTRUCTION OF UNBOUND GRANULAR PAVEMENT LAYERS
TNZ B/02:2005 SPECIFICATION FOR CONSTRUCTION OF UNBOUND 1. SCOPE This specification shall apply to the construction of unbound granular pavement layers. The term pavement layer shall apply to any layer
More informationAdvancements in Permeable Pavements
Advancements in Permeable Pavements Engineers Workshop Saint Vincent College March 14 & 15 2013 Permeable Pavements There are several different words that are used to describe a pavement that water drains
More informationCW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS
December 2014 CW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS 1. DESCRIPTION... 1 1.1 General... 1 1.2 Definitions... 1 1.3 Referenced Standard Construction Specifications...
More informationMCS 020. MCS Planning Standards. For permitted development installations of wind turbines and air source heat pumps on domestic premises
MCS 020 MCS Planning Standards For permitted development installations of wind turbines and air source heat pumps on domestic premises This Standard is the property of Department of Energy and Climate
More informationA strong team for economical concrete paving. Slipform Paver SP 1500
A strong team for economical concrete paving Slipform Paver SP 1500 Where concrete paving is concerned, this work train is a fast train Two layers, one machine Rarely does the technical and economical
More informationRehabilitation by cracking and seating of concrete pavement optimized by FWD analysis
Rehabilitation by cracking and seating of concrete pavement optimized by FWD analysis H. C. Korsgaard & J. P. Pedersen Carl Bro Pavement Consultants, Kokbjerg 5, DK6000 Kolding M. Rasmussen Copenhagen
More informationSKER HUESKER HUESKER HUESKER HUESKER HUESKERHUES
rhuesker HUESKER HaTelit HUESKER HUESKER HUESKER HUESKERr SKER HUESKER HUESKER Asphalt HUESKER HUESKER HUESKERHUES SKER HUESKERHUES HUESKERr SKER HUESKERHUES rhueskerreinforcement HUESKERr Long-term retardation
More informationS a f e G u i d a n c e. Single Lamp Control and Monitoring
Single Lamp Control and Monitoring S a f e G u i d a n c e Separation brings Benefits Traditionally designed power supplies for airfield lighting systems require separate series circuits when switching.
More information8.70 m. Loading and cleaning machine. Technical innovation
Class Leaders Loading and cleaning machine Technical innovation Effective cleaning Careful handling of beets Tremendous load-carrying capacity Very high user-safety The euro MAUS has been greatly improved
More information301.7D. Mini Hydraulic Excavator
301.7D Mini Hydraulic Excavator Engine Weights Gross Power (ISO 14396) 17.9 kw 24.3 hp Operating Weight with Canopy 1610 kg 3,550 lb Net Power 13.2 kw 17.7 hp Operating Weight with Cab 1720 kg 3,792 lb
More informationBuilding Pit Roche Building 1 Basel, Switzerland
Building Pit Roche Building 1 Basel, Switzerland Implenia Spezialtiefbau GmbH Infrastructure - Central Branch Mannheim Office Diffenéstraße 14 D-68169 Mannheim GERMANY T +49 621 70014-250 F +49 621 70014-260
More informationEQUIPEMENTS DE MAINTENANCE. Road maintenance
EQUIPEMENTS DE MAINTENANCE Road maintenance There are many road maintenance techniques. The treatment of cracks and potholes, the creation of joints are all different works needing specific equipment.
More informationBosch Rexroth The Drive and Control Company. Telehandlers Mobile concrete mixers Cranes Drilling equipment Surface repair machinery Pavers
CASE STUDY Bosch Rexroth AG Hydraulics for the Automotive Industry Sound and Vibration R&D Germany Automotive PULSE, customised software, transducers Bosch Rexroth AG is a 100% subsidiary of Robert Bosch
More informationWATERPROOFING FOR CONCRETE STRUCTURES
MANUAL OF CONTRACT DOCUMENTS FOR ROAD WORKS VOLUME 1 SPECIFICATION FOR ROAD WORKS SERIES 2000 WATERPROOFING FOR CONCRETE STRUCTURES Contents Clause Title Page 2001 General 2 2002 Protection of Bridge Deck
More informationINSTALLATION RECOMMENDATIONS. Outdoor Rubber Tiles
INSTALLATION RECOMMENDATIONS Outdoor Rubber Tiles Prior to Installation: The Outdoor Rubber Tiles and accessory transition pieces intended for this installation have been shipped to you via a freight carrier
More informationMachine Foundation Design
Machine Foundation Design As the structural engineer who recently designed the machine foundation for one of the largest vertical turning and milling centers in the country, in addition to over 250 other
More informationSeven. Easy Steps. Your Own Walkway, Without Mortar. or Concrete. to Installing. Driveway and Patio
Seven Easy Steps to Installing Your Own Walkway, Driveway and Patio Without Mortar or Concrete Brick is one of the world s oldest and most enduring building materials. Those same qualities also make it
More informationSECTION 4Aggegate Subbase
The contractor shall moist-cure the completed Lime Treated Subbase for a minimum of days before allowing any traffic on the compacted surface. The contractor shall be responsible for repairing any damages
More informationTS 813 GROUNDING AND BONDING TTD 813.001 TRAFFIC SIGNAL INSTALLATION AND CONTROLLER CABINET GROUNDING SYSTEM TTD 813.005 CONTROLLER CABINET GROUNDING
TORONTO TRANSPORTATION January 2012 TS 813 GROUNDING AND BONDING TABLE OF CONTENTS 1. DRAWINGS TTD 813.001 TRAFFIC SIGNAL INSTALLATION AND CONTROLLER CABINET GROUNDING SYSTEM TTD 813.005 CONTROLLER CABINET
More informationLeica MC200 Digger The guidance solution for excavators. >Fast >Accurate >Flexible
Leica MC200 Digger The guidance solution for excavators >Fast >Accurate >Flexible MC200 Digger Solution MC200 Digger provides excavator operators with real-time depth, slope and reach information, in relation
More informationShuibuya rockfill dam BOMAG compaction technology in use on world s highest rockfill dam
Shuibuya rockfill dam BOMAG compaction technology in use on world s highest rockfill dam Job report by H.-J. Kloubert Shuibuya rockfill dam Using the latest compaction technology on the world s highest
More informationASPHALT. Advance Galileo Navigation System for Asphalt s Fleet Machines. Galileo Application Days www.application-days.eu 3-5 March 2010, Brussels
ASPHALT Advance Galileo Navigation System for Asphalt s Fleet Machines Galileo Application Days www.application-days.eu 3-5 March 2010, Brussels Content ASPHALT Team Road Construction Key Data Project
More informationUnit 5 Length. Year 4. Five daily lessons. Autumn term Unit Objectives. Link Objectives
Unit 5 Length Five daily lessons Year 4 Autumn term Unit Objectives Year 4 Suggest suitable units and measuring equipment to Page 92 estimate or measure length. Use read and write standard metric units
More informationUnit 4 Measures time, mass and area
Unit 4 Measures time, mass and area Five daily lessons Year 4 Spring term (Key objectives in bold) Unit Objectives Year 4 Estimate/check times using seconds, minutes, hours. Page 98 Know and use the relationships
More informationSquash Court Design general points
Squash Court Design general points Contents: Contents:... 1 1. Squash Court Dimensions... 2 2. CourtTech Walls... 3 3. Dimensional requirements for courts with CourtTech Walls... 3 4. Loading of CT System
More informationOtta Seal BACKGROUND GENERAL DESCRIPTION DESIGN ASPECTS. Category : Technical Information/On-carriageway/
Otta Seal Category : Technical Information/On-carriageway/ BACKGROUND An Otta seal is a thin bituminous seal comprising graded gravel or crushed aggregate containing all sizes and either a cut-back or
More informationEmbedding components within PCB substrates
Embedding components within PCB substrates Max Clemons, Altium - March 19, 2014 Continued pressure for electronic devices that provide greater functionality in ever-smaller formfactors is not only providing
More informationNevada DOT Cold In-Place Recycling Federal Highway Administration National Review Close out meeting, August 25, 2005
Nevada DOT Cold In-Place Recycling Federal Highway Administration National Review Close out meeting, August 25, 2005 Purpose The purpose of this review is to capture for technical deployment the most advanced
More informationInterlocking Concrete Pavement as an Alternative to Asphalt Concrete for Howard Road, Westley, California
Interlocking Concrete Pavement as an Alternative to Asphalt Concrete for Howard Road, Westley, California By Matt Machado, PE, LS, MBA Public Works Director for Stanislaus County and Ron Illium, PE Regional
More informationQuality Assurance Concepts. Outline
Quality Assurance Concepts Peter C. Taylor Outline What is quality? Who cares? How do we get it? What is the important stuff? 1 Defining Quality Simple Definition (Philip Crosby) Quality: Conformance to
More informationasphalt applications Construction and surfacing of parking areas including private drives mpa asphalt Asphalt Information Service
asphalt applications 1 Construction and surfacing of parking areas including private drives Asphalt Information Service mpa asphalt November 2009 Mineral Products Association Introduction Nearly all roads
More informationasphalt applications Choosing a surfacing contractor mpa asphalt Asphalt Information Service Mineral Products Association
asphalt applications 5 Choosing a surfacing contractor Service mpa asphalt November 2009 Mineral Products Association Introduction Property owners with existing asphalt* or as more commonly known macadam
More informationLight compaction LT rammer
Light compaction LT rammer Quality is easy Customers put their trust in you for great compaction. Our job is to provide the tools that help you deliver. Together we create quality. We are all about making
More informationAPPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE
APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE JURISDICTION OF ALBERTA TRANSPORTATION 1.0 Application Procedures 2.0
More informationASPHALT CORE DAMS An embankment dam with asphaltic concrete core is an appropriate dam type for the very highest future dams ICOLD Bulletin 84 (1992)
ASPHALT CORE DAMS An embankment dam with asphaltic concrete core is an appropriate dam type for the very highest future dams ICOLD Bulletin 84 (1992) Asphalt Concrete Core for Embankment Dams (ACC) For
More informationModel based quality assurance process in a infra construction. Case Riippa-Eskola RU2 double rail project
Model based quality assurance process in a infra construction project Case Riippa-Eskola RU2 double rail project M. Jaakkola a and P. Toppi a a Destia Ltd, Development of Infra construction, Finland E-mail:
More informationSECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.
02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily
More informationMaking the most of Work Experience
Making the most of Work Experience This guide is part of the Getting Started series. For more guides in the series please visit the website below. www.twitter.com/mmu_careers www.facebook.com/careersmmu
More informationPICP Construction. Why PICPs The Big Picture. Key things to know about PICPs
PICP Construction Permeable Interlocking Concrete Pavement Presenter: Frank Gandora, President Creative Hardscape Why PICPs The Big Picture Germany was first to develop PICPs 2005 Clean Water Act Federal
More informationRoad Construction. Production Study. AccuGrade GPS & ATS Systems. MALAGA Demonstration & Learning Center
AccuGrade GPS & ATS Systems Road Construction Production Study MALAGA Demonstration & Learning Center December 2006 2 TABLE OF CONTENTS ABSTRACT... 4 1 INTRODUCTION... 5 PERSONNEL... 6 EQUIPMENT... 6 2
More informationAtlet Balance Electric Counterbalance trucks ET EF EH 1.25 3 tons
Atlet Balance Electric Counterbalance trucks ET EF EH 1.25 3 tons 3 models. Man and machine as one. Secure your operations from order to delivery with Atlet Balance electric counterbalance trucks The Atlet
More informationProposed Minimum Subterranean Termite Treatment Standards
Proposed Minimum Subterranean Termite Treatment Standards Introduction This document is intended to serve as a model for states considering the adoption of standards for soil application of termiticides.
More informationTOWN OF FARMINGTON, CT REQUEST FOR PROPOSALS FOR CONSTRUCTION EQUIPMENT RENTALS AND ON CALL CONSTRUCTION SERVICES
TOWN OF FARMINGTON, CT REQUEST FOR PROPOSALS FOR CONSTRUCTION EQUIPMENT RENTALS AND ON CALL CONSTRUCTION SERVICES The Town of Farmington Department of Public Works is seeking proposals for the purpose
More informationAB 500-2 and AB 600-2
AB 500-2 and AB 600-2 VÖGELE Extending Screeds AB 500-2 /AB 600-2 Maximum Pave Width - AB 500-2: 8.5m - AB 600-2: 9.5m Basic Width - AB 500-2: 2.55m - AB 600-2: Screed Versions TV, TP1, TP2 VÖGELE AB 500-2
More informationwww.the Floor Heating Warehouse.co.uk
www.the Floor Heating Warehouse.co.uk Underfloor Heating Installation Guide (Grundfoss Pump System) General Overview: Our water based underfloor heating system can be installed by your own plumber or heating
More informationLeadership Skills, Project Management and Backbone
Seven core competencies that any project manager should master Leadership Skills, and Backbone Summary: For a long time this was the understanding among engineers: Whoever has the technical skills, may
More informationSection 300 Base Courses
Table of Contents 1. Importance of Base Courses... 300-1 2. Types of Bases... 300-3 A. Cement Treated Permeable Base Course... 300-3 B. Bituminous Concrete Base Courses... 300-6 C. Superpave Asphalt HMA
More informationMay 30 June 3, 2016. Present yourself at the global market for environmental technologies. www.ifat.de INFORMATION FOR EXHIBITORS MESSE MÜNCHEN
May 30 June 3, 2016 Present yourself at the global market for environmental technologies. MESSE MÜNCHEN World s Leading Trade Fair for Water, Sewage, Waste and Raw Materials Management www.ifat.de INFORMATION
More informationENGLISH. Lightphoria 10,000LUX Energy Light Lamp SP9982 version 2.4
ENGLISH Lightphoria 10,000LUX Energy Light Lamp SP9982 version 2.4 1 Light and your body Light means life. Many of the processes of life are influenced by light and its intensity. As many of you may experience
More informationSection 02702 SEWER PIPE INSTALLATION AND TESTING
PART 1 - GENERAL Section 02702 SEWER PIPE INSTALLATION AND TESTING 1-1. SCOPE. This section covers the installation and testing of all sewer pipe furnished under the following specification sections: Concrete
More informationCID STREET INFRASTRUCTURE ASSESSMENT
ABSTRACT An evaluation of the street infrastructure in Foxberry Estates Phase 1, including pavement condition, verification of construction techniques, and subgrade quality. Recommendations and costs for
More informationSection 2 Specification 2.18 Concrete and/or Corrugated Steel Storm Sewer TABLE OF CONTENTS
TABLE OF CONTENTS 2.18 CONCRETE AND/OR CORRUGATED STEEL STORM SEWER... 1 2.18.1 GENERAL... 1 2.18.2 MATERIALS... 1 2.18.2.1 Storm Sewer Pipe... 1 2.18.2.2 Cement Mortar... 1 2.18.2.3 Granular Materials...
More informationHow To Use Leica Dozernav Plus
Leica DozerNav Plus High precision GPS dozer guidance More than a guidance system Leica DozerNav Plus > helping you drive productivity with ease Leica DozerNav Plus the benefits at a glance Real-time feedback
More informationHow to monitor and evaluate your community project
How to monitor and evaluate your community project So you've set up your project. But how can you tell if it's going well? This guide tells you all you need to know about monitoring and evaluating what
More informationExcavation & Trenching Procedure
Excavation & Trenching 1. Overview The will ensure, as far as is reasonably practicable, that the conduct of work relating to excavation and trenching will not be harmful to the health and safety of employees
More informationGUIDE TO THE ARTIFICIAL LIGHTING OF HOCKEY PITCHES
GUIDE TO THE ARTIFICIAL LIGHTING OF HOCKEY PITCHES Sixth Edition Foreword There is an increasing desire to use an outdoor hockey facility over a long period of time each day. This will often entail the
More informationConstruction Specifications for Keyhole Pavement Coring and Reinstatement
F I N A L Construction Specifications for Keyhole Pavement Coring and Reinstatement Gas Technology Institute 1700 S. Mount Prospect Rd. Des Plaines, Illinois 60018 www.gastechnology.org Version 13 October
More informationWater Main Break During Normal Operating Hours
Emergency Guideline GU.FAC.018 - Version 1.0 For Project Supervisor, Team Leader, Caretakers, Trades Approved by FS Leadership Team, March 27, 2013 In addition to fixing water main breaks on its own property,
More informationState of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary
More informationBuilding Your Interlocking Concrete Pavement to Last a Lifetime
Building Your Interlocking Concrete Pavement to Last a Lifetime A Guide for Consumers Contents Building Your Interlocking Concrete Pavement to Last a Lifetime.... 3 What Does Installation Involve?....
More informationHow To Retaining Wall Guide
How To Retaining Wall Guide Before you start: Consents and Engineering Building Consent Retaining walls over 1.5m high will require a building consent from the Local Body Council. Walls that carry extra
More informationSPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION
SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION 1. SCOPE Pipe subsoil drains shall be constructed in accordance with this specification and in conformity with the lines, grades and cross-sections shown
More informationSteps to PCB design using Orcad.
Steps to PCB design using Orcad. 1. Design circuit using schematic entry package (Capture). 2. Generate netlist for PCB package. 3. Import netlist into PCB package (LayoutPlus). 4. Place components, route
More informationDetection of Pipe Leaks Connection of Pulse Monitoring System in Thermal Utilities
ZPU MIĘDZYRZECZ PREINSULATED PIPE Detection of Pipe Leaks in Thermal Utilities Assembly Manual Principles of Assembly and Servicing ZAKŁAD PRODUKCYJNO USŁUGOWY Międzyrzecz Polskie Rury Preizolowane Sp.
More informationServices for the dispersion and wet grinding technology. Efficient, reliable and available worldwide.
Services for the dispersion and wet grinding technology. Efficient, reliable and available worldwide. Maximum economy through comprehensive and customer-oriented service. Worldwide employee training. On-site
More informationBuilding over or close to a public sewer
Building over or close to a public sewer thameswater.co.uk/developerservices thameswater.co.uk/developerservices 1 Questions and answers Did you know Thames Water is legally responsible for more than 100,000
More informationMeasurement with Reasoning
compare, describe and solve practical problems for: * lengths and heights [e.g. long/short, longer/shorter, tall/short, double/half] * mass/weight [e.g. heavy/light, heavier than, lighter than] * capacity
More informationElegant sculpture in flexible shoring
Elegant sculpture in flexible shoring Edificio Ágora, Valencia, Spain In his hometown of Valencia, the Spanish star architect Santiago Calatrava has realized the Ciudad de las Artes y de las Ciencias.
More information1.3.2 Method of construction and restoration of existing water service connections. This shall include:
1.0 GENERAL 1.1 DESCRIPTION: This specification shall cover the rehabilitation of existing water lines using the GRUNDOCRACK PIPE BURSTING SYSTEM. Pipe bursting is a system by which the pneumatic bursting
More information1.0 INDEX TO SHEETS URGENT STORM DAMAGE REPAIR AVON PARK AIR FORCE RANGE LOCATION MAP LEGEND LOCATION MAP
5 INDEX TO SHEETS. NOTES AND TYPICAL SECTIONS. H. R. SMITH RD.CULVERT.3 0/5 END BARRIER ACCESS ROAD REPAIR. KISSIMMEE RD. AT MORGAN HOLE CR. ROAD REPAIR.5 RANGE INFRASTRUCTURE REPAIR N 0 000' 3 0,000'
More informationTunnelling & Underground. Specialists
Tunnelling & Underground Specialists Mined Tunnels Excavation at Ayer Rajah Avenue, Singapore Introduction Amberg & TTI Engineering Pte Ltd (AETTI) was established in Singapore in 2002 by Amberg Engineering
More informationDIY Poly Digester. What is Supplied in the Kit. Sketch of Arrangement
DIY Poly Digester What is Supplied in the Kit 4 m of clear polyethylene layflat tube Inlet tube (100mm PVC pipe, 40 cm long) 0.4 m of 19mm dia PVC pipe 0.4 m of 13mm dia black poly tube 2 m of 12 mm dia
More informationGuidelines for Excavations
O c t o b e r 2 0 0 1 Guidelines for Excavations in the vicinity of gas lines Technical Standards & Safety Authority Putting Public Safety First Guidelines for Excavations in the Vicinity of Gas Lines
More informationProject II Using Body Temperature to Estimate Time Since Death
Project II Using Body Temperature to Estimate Time Since Death or A Solution to the Mystery Answer to questions in boldface must be in your final report 1 Part I. A Little History and One Method Though
More informationSECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE
SECTION 15076 CEMENT-MORTAR LINED AND COATED (CML&C) STEEL PIPE PART 1 GENERAL 1.01 DESCRIPTION This section designates the requirements for steel pipe fabrication, test in shop, installation of steel
More informationC. Section 014510 TESTING LABORATORY SERVICE.
SECTION 014500 QUALITY CONTROL PART 1 GENERAL 1.01 RELATED REQUIREMENTS A. Drawings and General Provisions of Contract, including General and Special Conditions and other Division 1 Specification Sections,
More informationCONSTRUCTION TECHNOLOGY FOR HEAVY AND HIGHWAY CONTRACTORS
CONSTRUCTION TECHNOLOGY FOR HEAVY AND HIGHWAY CONTRACTORS THE CONNECTED JOBSITE. YOUR PRODUCTIVITY MAXIMIZED. SITE POSITIONING SYSTEMS Developed specifically for the needs of heavy and highway contractors,
More informationStandard terms and conditions
Standard terms and conditions INTRODUCTION For the provision of a water service (Water Supply, Wastewater and Drainage) Under Section 73(2)(a) of the Water Services Act 2012, landowners may be entitled
More information4 SENSORS. Example. A force of 1 N is exerted on a PZT5A disc of diameter 10 mm and thickness 1 mm. The resulting mechanical stress is:
4 SENSORS The modern technical world demands the availability of sensors to measure and convert a variety of physical quantities into electrical signals. These signals can then be fed into data processing
More informationUnit Price Averages Reports
Unit Price Averages Reports 12/7/2015 UNIT PRICE AVERAGES REPORT Disclaimer The information provided in the following Unit Price Averages Report is only for the use of Alberta Infrastructure & Transportation
More informationPhysical Quantities and Units
Physical Quantities and Units 1 Revision Objectives This chapter will explain the SI system of units used for measuring physical quantities and will distinguish between vector and scalar quantities. You
More informationHS-Steel-Classic. Curing chambers for the concrete block industry in a proven steel version
ANLAGENTECHNIK HS-Steel-Classic Curing chambers for the concrete block industry in a proven steel version + special galvanising + simple assembly due to snap-in connections and building kit system We build
More informationHas difficulty with counting reliably in tens from a multiple of ten
Has difficulty with counting reliably in tens from a multiple of ten Opportunity for: looking for patterns 5 YR / 100-square Tens cards (Resource sheet 24) Multiples of ten (10 100) written on A5 pieces
More informationCONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT
Volkert Field Office 80 M Street SE, Suite 725 Washington, DC 20003 RIVERSMART WASHINGTON - CONSTRUCTION RIVERSMART MACFARLAND, RIVERSMART LAFAYETTE AND GREEN ALLEYS CHEVY CHASE D.C. Contract No.: DCKA-2013-C-0160
More informationWM Housing Group. Director of Development Operations. Recruitment Pack
WM Housing Group Director of Development Operations Recruitment Pack Contents Introduction from Kevin Willetts Executive Director of Development and Procurement 3 What we do 4 Group structure and boards
More informationCONSTRUCTION EQUIPMENT SOLUTIONS GOVERNMENT
CONSTRUCTION EQUIPMENT SOLUTIONS GOVERNMENT nacasegovsales@casece.com Contract # GS-30F-0006U 1-888-614-3202 and # GS-07F-170CA www.casece.com 1 GOVERNMENT SOLUTIONS FOR HEAVY EQUIPMENT GSA CONTRACT TERMS
More informationHow Tonneau Covers Affect The Coefficient of Drag. Megan McKernan Research & Information Specialist Specialty Equipment Market Association 2007
How Tonneau Covers Affect The Coefficient of Drag Megan McKernan Research & Information Specialist Specialty Equipment Market Association 2007 Conclusion The tests showed that all of the tonneaus improved
More informationDigital Systems Based on Principles and Applications of Electrical Engineering/Rizzoni (McGraw Hill
Digital Systems Based on Principles and Applications of Electrical Engineering/Rizzoni (McGraw Hill Objectives: Analyze the operation of sequential logic circuits. Understand the operation of digital counters.
More informationNATUS SOLUTIONS Turnkey Project Management Project Engineering and Industrial Installations. Electrotechnical Solutions at the Highest Level
NATUS SOLUTIONS Turnkey Project Management Project Engineering and Industrial Installations Electrotechnical Solutions at the Highest Level State-of-the-art production processes, innovative products and
More informationMinimum Safety Requirements for Helicopter Landing Areas used on Regular basis.
GOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP SAFDARJANG AIRPORT, NEW DELHI CIVIL AVIATION REQUIREMENTS SECTION 4 AERODROME STANDARDS & LICENSING SERIES 'B' PART
More informationDESCRIPTION OF WORK:
DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works
More informationLocal company growing through disaster cleanups, biomass needs
Local company growing through disaster cleanups, biomass needs By Morgan Watkins Staff writer Published: Friday, January 11, 2013 at 5:11 p.m. When Bill Gaston got into the tree trimming business as a
More informationROAD OPENING LICENCE APPLICATION FORM PLEASE READ ALL PARTS AND SECTIONS OF THIS FORM IN ADVANCE OF COMPLETING THE APPLICATION
ROAD OPENING LICENCE APPLICATION FORM PLEASE READ ALL PARTS AND SECTIONS OF THIS FORM IN ADVANCE OF COMPLETING THE APPLICATION N.B. WORK MUST NOT COMMENCE UNTIL LICENCE IS ISSUED June 2014 Roads Section
More informationCONCRETE SEGMENTAL RETAINING WALL SYSTEM
CONCRETE SEGMENTAL RETAINING WALL SYSTEM PART 1: GENERAL SPECIFICATIONS 1.01 Work Included A. Work shall consist of furnishing and constructing a Rockwood Vintage TM unit segmental retaining wall (SRW)
More informationDeveloper s/consultants Field Services Guidelines
Developer s/consultants Field Services Guidelines 2007 Engineering and Works Department DEVELOPER S/CONSULTANT S FIELD SERVICES GUIDELINES Fourth Electronic Edition February 2007 STATEMENT OF COMPLETION
More information