Stilling Basins. CIVE 401 Hydraulic Engineering Term Paper 11/18/2014. Sam Plaza Alex Potvin Ahmed Sahab

Size: px
Start display at page:

Download "Stilling Basins. CIVE 401 Hydraulic Engineering Term Paper 11/18/2014. Sam Plaza Alex Potvin Ahmed Sahab"

Transcription

1 Stilling Basins CIVE 401 Hydraulic Engineering Term Paper 11/18/2014 Sam Plaza Alex Potvin Ahmed Sahab

2 Plaza, Potvin, and Sahab 2 Introduction Stilling Basins are used to dissipate energy from high velocity water to minimize the scouring effects which can occur downstream of the flow. This can be due to water falling from the upper portion of a dam or in the vicinity of a hydraulic jump. Local Scouring occurs immediately downstream of stilling basins and is unavoidable because local water velocity exceeds the incipient motion velocity of the sediment. This leads to a difference between the level of the concrete floor of the basin and the riverbed. In such cases, different basin designs can be used to protect against the development of a scouring hole that could destabilize the structure and cause widespread damage to the region. Stilling basins are designed with special appurtenances that help to direct flow and maximize the efficiency of the structure. Depending on the properties of the incoming flow, chute blocks, sills, and baffle piers can be designed trigger a hydraulic jump for the required tailwater condition. Chute Blocks are used to form a serrated device at the entrance of the stilling basin. They function to furrow the incoming jet, thus lifting a portion from the floor of the spillway to create a shorter length of hydraulic jump. The sill is located at the end of the basin and acts to reduce the length of the hydraulic jump and minimize scour. Baffle Piers are blocks placed in the midway across the floor of the basin and function to dissipate energy through the impact action from the flow. They are useful in small structures with low incoming velocities but are unsuitable where high velocity flows could induce cavitation. For a properly designed stilling basin, the velocity leaving the basin is equal to the velocity of the inlet channel. A schematic for a stilling basin has been shown in Figure 1. Figure 1: Stilling Basin design for USBR type 3 (USDOT FHA)

3 Plaza, Potvin, and Sahab 3 The higher the Froude number at the entrance to a basin, the more efficient the hydraulic jump thus requiring a shorter necessary basin. To increase the Froude number as the water travels from the culvert to the basin, an expansion and depression section can be implemented. This geometric modification converts the depth or potential energy into kinetic energy by allowing the flow to expand or drop. The result of these changes is that the depth decreases and the velocity and Froude number increases as shown in Figure 2. Depending on the specific design, stilling basins can operate over a wide range of approach flow Froude Figure 1: Cross section schematic of a USBR stilling basin (USDOT FHA) numbers typically from 1.7 to 17. The selection of a stilling basin is dependent on several considerations including hydraulic limitations, feasibility of construction, basin size, and cost. Stilling Basin Classifications Stilling Basins are divided into two types: basins with Froude Number greater than 4.5 and basins with Froude number less than 4.5. The stilling basins with the lower Froude numbers are usually encountered with weirs and barrages, while those with higher Froude number are used in medium to high dams. The higher the Froude number is, the shorter the basin is, and the more economical design it is. Several typical designs are set for each category. For Froude number < 4.5, there are four type of design can be simply listed as: i. R.S. Varshney ii. Indian Standard Stilling Basin iii. iv. U.S.B.R. Stilling Basin IV S.A.F. (Saint Anthony Falls) Stilling Basin. What is the Froude Number? The Froude Number describes the nature of the flow and is equal to the ratio of the flow velocity to the square root of the acceleration of gravity times the flow depth. Open channel flow can be described as either a subcritical flow,, or supercritical flow,. For subcritical flow, the fluid has a greater depth and lower velocity whereas a supercritical flow is characterized by the fact that it hugs the channel bed with a high velocity. The boundary between these two flow types is defined by,, and is where a hydraulic jump will occur.

4 Plaza, Potvin, and Sahab 4 The U.S.B.R. stilling basin IV is recommended for Froude number ranges from 2-4.5, which usually occurs in canal structures and diversion dams. For this low range of Froude numbers, an oscillating jump will be produced generating a wave that is hard to dampen. Basin IV solves this problem by narrowing D1 (preferably 0.75*D1) and by setting the tailwater (Tw) equal to ( )*D2 (see Figure 3). This design seems to be the perfect solution; however, it is only applicable for rectangular cross section. For Froude number > 4.5, there are three main types of design, which are: i. S.A.F. Stilling Basin. ii. Indian Standard Stilling Basin II. iii. U.S.B.R Stilling Basin II. These designs are recommended for high Froude numbers. They are often used in large and medium Figure 2: Proportions of Froude numbers 2.5 to 4.5 (Basin IV) spillways and large canal (Beichley) structures. These types of stilling basins are very economical, as the length of the basin is reduced by 33% with the use of appurtenances (including chute blocks and/or a dentated sill.) However, baffle piers are not used because high velocities might cause cavitation that damages the piers. Based on United State Department of Interior Bureau of Reclamation, Basin VI has certain standards to be followed. The basin s dimensions have been standardized based on the basin width. The limits are shown in Figure 4. The basin size is determined by the width Figure 3: General design of the type VI stilling basin (Beichley)

5 Plaza, Potvin, and Sahab 5 of the basin and the quantity and velocity of flow. Figure 5 below will explain the limit of the basin size. C is the coefficient that varies for maximum, minimum, and intermediate flow. Figure 4: Flow Capacity and Velocity for Various C Values

6 Plaza, Potvin, and Sahab 6 Case Study I Deadman s Basin Failure, October 2010, Shawmut, Montana Deadman s Basin, located near Shawmut, Montana, diverts water from the nearby Mud Creek for the purposes of irrigation. The basin supplies 110 irrigators and also provides a popular fishing site (Montana Fish, Wildlife & Parks). Deadman s Basin has a total capacity of 72,220 acre-feet, and operates at an average capacity of 40,500 acre-feet (Deadman s Basin Water Association). The basin was originally connected to an 8 x 8 box culvert conduit (with a capacity of 970 cfs) and to an outlet canal system (with a capacity of 560 cfs); the normal operating flow was between 200 and 300 cfs (Grabinski et al.). Due to damage in the outlet structure, a replacement box Figure 5: Articulated Concrete Blocks (Grabinski et al.) culvert extension was designed and constructed between 2009 and 2010, with a design flow rate of 560 cfs (Grabinski et al.). A distinctive feature in this structure was a hydraulic jump stilling basin which culminated in an end sill that flowed onto Articulated Concrete Blocks (ACBs) before entering the outlet canal system (see Figures 6 and 7.) The ACBs were used at the outflow of the stilling basin to prevent scouring of the canal bed as an alternative to riprap. However, while the use of ACBs proved effective at the similarly designed Nilan reservoir (Grabinski et al.), they were unable to sufficiently dissipate the energy in the flow, leading to scouring underneath the sheet Figure 7: Implementation of ACBs in Deadman's Basin outflow structure (Grabinski et al.)

7 Plaza, Potvin, and Sahab 7 of ACBs (see Figure 8). Figure 8: Progression of Failure in outflow ACBs (Grabinski et al.)

8 Plaza, Potvin, and Sahab 8 Several alternatives were considered to replace the ACBs, the foremost of these being riprap (grouted or ungrouted) or 48 A-Jacks. The riprap variations proved to be unacceptable alternatives, however, as each would require a large enough diameter so as to make procurement difficult; furthermore, for the riprap to effectively prevent scour, significant sandstone bedrock excavation would be required as well, increasing the costs of the repair even more (Grabinski et al.). Since the A-Jacks did not require nearly as much bedrock excavation, they were selected to replace the ACBs (see Figure 9). After installation of the A- Jacks, tests proved that they were sufficient to quell the scouring at the outflow structure s base. While the A-Jacks eventually proved effective at dissipating the energy in the outflow, another possibility that could have been implemented would be redesigning the stilling basin to dissipate the energy before it reached the canal. The design of the stilling basin appears Figure 9: A-Jack implementation (Grabinski et al.) to have been insufficient to reduce the energy entering the canal, as alternative measures were required to prevent scouring, which even then were inadequate, in the case of the ACBs. To increase the amount of energy dissipated in the stilling basin, the hydraulic jump effected by the basin would need to be augmented: this could be accomplished by deepening the drop in elevation at the stilling basin, or adding baffle blocks to the design. While each of the these selections would increase the Froude number sufficiently to supplement the energy dissipation of the stilling basin, the baffle blocks would seem to be a better approach given the difficulties in excavating the sandstone bedrock expressed above. Case Study II El Guapo Dam Spillway, December 1999, El Guapo, Venezuela The El Guapo Dam, constructed between 1975 and 1980 near El Guapo, Venezuela, was designed to provide safe drinking water, flood mitigation, and irrigation water to the surrounding area (United States Department of Reclamation). The dam was fashioned to hold a volume of 33,000 acre-ft., and originally included an uncontrolled ogee crest spillway ending in a concrete hydraulic jump stilling basin. The spillway had a width of 40 ft., a length of 925 ft., and a design discharge of 3600 ft. 3 /s; an additional tunnel spillway 820 ft. from the original was added after the spillway overtopped during construction. The design of the dam and primary spillway were based on a hydrologic study of a basin similar to the Rio Guapo, but not on the Rio Guapo basin itself. The overtopping of the initial spillway led to a new flood study, which resulted in the tunnel spillway s construction.

9 Plaza, Potvin, and Sahab 9 Figure 10: Sweepout of the El Guapo stilling basin (United States Department of Reclamation) During December, 1999, the water elevation of the reservoir rose considerably, peaking on December 15 th with a water elevation.66 ft. below the dam crest. The spillway chute walls began to overtop near spillway crest, and the cities in the perceived flood path were evacuated at this time (United States Department of Reclamation). Following inspection via helicopter the next morning, the danger due to flooding was determined to have ceased, with the dam s water elevation cresting at 2.5 ft. below the dam crest. However, by that afternoon, the water s had rose considerably and quickly. The spillway began to overtop, which led to a sweepout of the stilling basin (see text below). This sweepout, concurrent with overtopping in the spillway, eroded the soil foundation of the stilling basin, spillway chute, and crest structure, and within an hour headcutting had progressed to the reservoir itself, causing a breach and simultaneous failure of the El Guapo Dam (see Figures 10, 11, and 12). Though overtopping of the spillway chute was the main cause of the erosion and subsequent failure, this overtopping was primarily the result of the stilling basin being improperly designed. The stilling basin was not designed to withstand the capacity of flow it experienced during the rainfall event, which not only caused the sweepout of the stilling basin, but the backlogging of water in the spillway chute, Figure 11: Breach of the El Guapo Dam (United States Department of Reclamation)

10 Plaza, Potvin, and Sahab 10 which then overtopped and accelerated the failure of the dam. This could have been prevented by properly examining the El Guapo basin, and determining the maximum discharges the stilling basin may experience. The hydrologic study that accompanied the initial design was not of the El Guapo basin, but of a different basin, and while the El Guapo basin itself was studied during construction due to the spillway overtopping, the Figure 12: Overtopping of the El Guapo spillway (United States Department of Reclamation) study seems to have focused primarily on the spillway discharge capacity, rather than the stilling basin discharge capacity. This is evidenced in that the spillway was the structure to fail amidst construction, and in that the eventual result of the study was a supplemental tunnel spillway, which increased the discharge of the spillway with no apparent complementary addition to the stilling basin discharge. This resulted in a stilling basin with more water flowing into it than it was designed to discharge. Had a full and comprehensive hydrologic study of the El Guapo basin been conducted, the incommensurate discharge of the stilling basin may have been detected, and suitable alterations may have been made to prevent the catastrophic failure at the El Guapo Dam. What is a Stilling Basin Sweepout? A stilling basin sweepout is a phenomena in which the tailwater is insufficient to allow a hydraulic jump to develop or be maintained (United States Department of Reclamation, italics theirs). Since a hydraulic jump stilling basin s primary mode of energy dissipation is the creation and prolonging of a hydraulic jump, the failure to preserve a hydraulic jump can cause one of two failure modes. The first of these begins with downstream erosion that results in headcutting, which then can lead to failure in the stilling basin, spillway, or reservoir itself due to degradation of the foundation materials. The second failure mode occurs when the tailwater has overtopped the spillway and surrounded the stilling basin, in addition to preventing the formation of a hydraulic jump. In addition to the headcutting and erosion failures of the first failure mode, failure can also transpire due to flotation of the stilling basin due to uplift pressures (United States Department of Reclamation).

11 Plaza, Potvin, and Sahab 11 Works Cited 1) Beichley, G. L. "Hydraulic Design of Stilling Basins for Pipes or Channel Outlets." January 1, Accessed November 12, ) Deadman's Basin Water Users Association. Accessed November 12, ) Grabinski, Kevin, and Clayton Fawcett. "Lessons Learned - Successes & Failures with Articulated Concrete Blocks in Stilling Basins." Montana Association of Dam and Canal Systems. Accessed November 12, ) Hydraulic Design of Energy Dissipators for Culverts and Channels,Hydraulic Engineering Circular Number 14, Third Edition 5) Montana Fish, Wildlife & Parks. "Deadman's Basin." Accessed November 12, ) United States Department of Reclamation. "Overtopping of Walls and Stilling Basin Failures." Accessed November 10, OvertoppingOfWallsAndStillingBasinFailure

Lecture 24 Flumes & Channel Transitions. I. General Characteristics of Flumes. Flumes are often used:

Lecture 24 Flumes & Channel Transitions. I. General Characteristics of Flumes. Flumes are often used: Lecture 24 Flumes & Channel Transitions I. General Characteristics of Flumes Flumes are often used: 1. Along contours of steep slopes where minimal excavation is desired 2. On flat terrain where it is

More information

Module 3. Irrigation Engineering Principles. Version 2 CE IIT, Kharagpur

Module 3. Irrigation Engineering Principles. Version 2 CE IIT, Kharagpur Module 3 Irrigation Engineering Principles Lesson 9 Regulating Structures for Canal Flows Instructional objectives On completion of this lesson, the student shall be able to learn: 1. The necessity of

More information

Lecture 6. Jump as energy dissipation Control of jump.

Lecture 6. Jump as energy dissipation Control of jump. Lecture 6 Jump as energy dissipation Control of jump. Jump as energy dissipation The high energy loss that occurs in a hydraulic jump has led to its adoption as a part of high energy dissipater system

More information

Outlet stabilization structure

Outlet stabilization structure Overview of Sedimentation and Erosion Control Practices Practice no. 6.41 Outlet stabilization structure Erosion at the outlet of channels, culverts, and other structures is common, and can cause structural

More information

Lecture 22 Example Culvert Design Much of the following is based on the USBR technical publication Design of Small Canal Structures (1978)

Lecture 22 Example Culvert Design Much of the following is based on the USBR technical publication Design of Small Canal Structures (1978) Lecture 22 Example Culvert Design Much of the following is based on the USBR technical publication Design of Small Canal Structures (1978) I. An Example Culvert Design Design a concrete culvert using the

More information

Appendix 4-C. Open Channel Theory

Appendix 4-C. Open Channel Theory 4-C-1 Appendix 4-C Open Channel Theory 4-C-2 Appendix 4.C - Table of Contents 4.C.1 Open Channel Flow Theory 4-C-3 4.C.2 Concepts 4-C-3 4.C.2.1 Specific Energy 4-C-3 4.C.2.2 Velocity Distribution Coefficient

More information

CHAPTER 9 CHANNELS APPENDIX A. Hydraulic Design Equations for Open Channel Flow

CHAPTER 9 CHANNELS APPENDIX A. Hydraulic Design Equations for Open Channel Flow CHAPTER 9 CHANNELS APPENDIX A Hydraulic Design Equations for Open Channel Flow SEPTEMBER 2009 CHAPTER 9 APPENDIX A Hydraulic Design Equations for Open Channel Flow Introduction The Equations presented

More information

1. Carry water under the canal 2. Carry water over the canal 3. Carry water into the canal

1. Carry water under the canal 2. Carry water over the canal 3. Carry water into the canal Lecture 21 Culvert Design & Analysis Much of the following is based on the USBR publication: Design of Small Canal Structures (1978) I. Cross-Drainage Structures Cross-drainage is required when a canal

More information

CITY UTILITIES DESIGN STANDARDS MANUAL

CITY UTILITIES DESIGN STANDARDS MANUAL CITY UTILITIES DESIGN STANDARDS MANUAL Book 2 (SW) SW9 June 2015 SW9.01 Purpose This Chapter provides information for the design of open channels for the conveyance of stormwater in the City of Fort Wayne.

More information

Flood mitigation program for Gatun lake. Programa de mitigación de inundaciones del lago Gatún

Flood mitigation program for Gatun lake. Programa de mitigación de inundaciones del lago Gatún Flood mitigation program for Gatun lake Programa de mitigación de inundaciones del lago Gatún Moffatt & Nichol Engineers 10 de febrero de 2005 Contrato No. 126161 Introducción y Recomendaciones 1 INTRODUCTION

More information

CHAPTER 11 ENERGY DISSIPATORS

CHAPTER 11 ENERGY DISSIPATORS CHAPTER 11 ENERGY DISSIPATORS TABLE OF CONTENTS 11.1 INTRODUCTION...2 11.2 DESIGN CRITERIA...2 11.2.1 Dissipator Type Selection...2 11.2.2 Design Limitations...5 11.2.3 Design Options...5 11.2.4 Related

More information

Topic 8: Open Channel Flow

Topic 8: Open Channel Flow 3.1 Course Number: CE 365K Course Title: Hydraulic Engineering Design Course Instructor: R.J. Charbeneau Subject: Open Channel Hydraulics Topics Covered: 8. Open Channel Flow and Manning Equation 9. Energy,

More information

Emergency Spillways (Sediment basins)

Emergency Spillways (Sediment basins) Emergency Spillways (Sediment basins) DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short-Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1]

More information

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile Chapter 3 CULVERTS Description A culvert is a closed conduit used to convey water from one area to another, usually from one side of a road to the other side. Importance to Maintenance & Water Quality

More information

Riprap-lined Swale (RS)

Riprap-lined Swale (RS) Riprap-lined Swale (RS) Practice Description A riprap-lined swale is a natural or constructed channel with an erosion-resistant rock lining designed to carry concentrated runoff to a stable outlet. This

More information

CHAPTER 3 STORM DRAINAGE SYSTEMS

CHAPTER 3 STORM DRAINAGE SYSTEMS CHAPTER 3 STORM DRAINAGE SYSTEMS 3.7 Storm Drains 3.7.1 Introduction After the tentative locations of inlets, drain pipes, and outfalls with tail-waters have been determined and the inlets sized, the next

More information

Water Operation and Maintenance Bulletin

Water Operation and Maintenance Bulletin Water Operation and Maintenance Bulletin No. 218 In This Issue... Can Your Spillway Survive the Next Flood? Learning Opportunity Protective Coatings Hands-On Course/Training U.S. Department of the Interior

More information

Guo, James C.Y. (2004). Design of Urban Channel Drop Structure, J. of Flood Hazards News, December,

Guo, James C.Y. (2004). Design of Urban Channel Drop Structure, J. of Flood Hazards News, December, Guo, James C.. (004). esign of Urban Channel rop Structure, J. of Flood azards News, ecember, Guo, James C.., (009) Grade Control for Urban Channel esign, submitted to Elsevier Science, J. of ydro-environmental

More information

Open channel flow Basic principle

Open channel flow Basic principle Open channel flow Basic principle INTRODUCTION Flow in rivers, irrigation canals, drainage ditches and aqueducts are some examples for open channel flow. These flows occur with a free surface and the pressure

More information

STORM DRAINS CHAPTER 7

STORM DRAINS CHAPTER 7 CHAPTER 7 Chapter 7 - Storm Drains A storm drain is a drainage system that conveys water or stormwater, consisting of two or more pipes in a series connected by one or more structures. Storm drains collect

More information

Open Channel Flow 2F-2. A. Introduction. B. Definitions. Design Manual Chapter 2 - Stormwater 2F - Open Channel Flow

Open Channel Flow 2F-2. A. Introduction. B. Definitions. Design Manual Chapter 2 - Stormwater 2F - Open Channel Flow Design Manual Chapter 2 - Stormwater 2F - Open Channel Flow 2F-2 Open Channel Flow A. Introduction The beginning of any channel design or modification is to understand the hydraulics of the stream. The

More information

CEE 370 Fall 2015. Laboratory #3 Open Channel Flow

CEE 370 Fall 2015. Laboratory #3 Open Channel Flow CEE 70 Fall 015 Laboratory # Open Channel Flow Objective: The objective of this experiment is to measure the flow of fluid through open channels using a V-notch weir and a hydraulic jump. Introduction:

More information

City of Shelbyville Site Inspection Checklist

City of Shelbyville Site Inspection Checklist City of Shelbyville Site Inspection Checklist General Information Project Name: KYR10 Permit Number: Date: Project Location: Contractor: Conractor Representative: Inspector's Name: Title: Signature : Weather

More information

2.0 BASIC CONCEPTS OF OPEN CHANNEL FLOW MEASUREMENT

2.0 BASIC CONCEPTS OF OPEN CHANNEL FLOW MEASUREMENT 2.0 BASIC CONCEPTS OF OPEN CHANNEL FLOW MEASUREMENT Open channel flow is defined as flow in any channel where the liquid flows with a free surface. Open channel flow is not under pressure; gravity is the

More information

Open Channel Flow. M. Siavashi. School of Mechanical Engineering Iran University of Science and Technology

Open Channel Flow. M. Siavashi. School of Mechanical Engineering Iran University of Science and Technology M. Siavashi School of Mechanical Engineering Iran University of Science and Technology W ebpage: webpages.iust.ac.ir/msiavashi Email: msiavashi@iust.ac.ir Landline: +98 21 77240391 Fall 2013 Introduction

More information

Final. Contact person: Colin Whittemore Aurecon Centre 1 Century City Drive Waterford Precinct, Century City Cape Town, South Africa

Final. Contact person: Colin Whittemore Aurecon Centre 1 Century City Drive Waterford Precinct, Century City Cape Town, South Africa Review Report and Recommendations for the Remediation of Flood Damage at the Berg River Causeway and the Dam Bypass Channel on Portion of Farms 1646 and 1014, Franschhoek Contact person: Colin Whittemore

More information

Prattsville Berm Removal Project. 1.0 Project Location

Prattsville Berm Removal Project. 1.0 Project Location Prattsville Berm Removal Project 1.0 Project Location The project site is located between the New York State Route 23 Bridge over the Schoharie Creek and the Schoharie Reservoir. The restoration plan encompassed

More information

Scour and Scour Protection

Scour and Scour Protection Design of Maritime Structures Scour and Scour Protection Steven A. Hughes, PhD, PE Coastal and Hydraulics Laboratory US Army Engineer Research and Development Center Waterways Experiment Station 3909 Halls

More information

Small Dam Hazard Assessment Inventory

Small Dam Hazard Assessment Inventory Small Dam Hazard Assessment Inventory What would happen if your dam were to fail? This is a question that most dam owners hope they will never have to answer. However it is a question you, as a responsible

More information

STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION DRAINAGE HANDBOOK OPEN CHANNEL. OFFICE OF DESIGN, DRAINAGE SECTION November 2009 TALLAHASSEE, FLORIDA

STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION DRAINAGE HANDBOOK OPEN CHANNEL. OFFICE OF DESIGN, DRAINAGE SECTION November 2009 TALLAHASSEE, FLORIDA STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION DRAINAGE HANDBOOK OPEN CHANNEL OFFICE OF DESIGN, DRAINAGE SECTION TALLAHASSEE, FLORIDA Table of Contents Open Channel Handbook Chapter 1 Introduction... 1

More information

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth

More information

Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1

Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1 6 Index inlet protection excavated drop inlet protection (Temporary) 6.50.1 HARDWARE CLOTH AND GRAVEL INLET PROTECTION Block and gravel inlet Protection (Temporary) sod drop inlet protection ROCK DOUGHNUT

More information

How To Check For Scour At A Bridge

How To Check For Scour At A Bridge Case Studies Bridge Scour Inspection and Repair Edward P. Foltyn, P.E. Senior Hydraulic Engineer ODOT Bridge Unit 2013 PNW Bridge Inspectors Conference April 2013 REFERENCES Stream Stability at Highway

More information

...Eq(11.6) The energy loss in the jump is dependent on the two depths y 1 and y 2 3 = E =...Eq(11.7)

...Eq(11.6) The energy loss in the jump is dependent on the two depths y 1 and y 2 3 = E =...Eq(11.7) . Open Channel Flow Contd.5 Hydraulic Jump A hydraulic jump occurs when water in an open channel is flowing supercritical and is slowed by a deepening of the channel or obstruction in the channel. The

More information

Design Charts for Open-Channel Flow HDS 3 August 1961

Design Charts for Open-Channel Flow HDS 3 August 1961 Design Charts for Open-Channel Flow HDS 3 August 1961 Welcome to HDS 3-Design Charts for Open-Channel Flow Table of Contents Preface DISCLAIMER: During the editing of this manual for conversion to an electronic

More information

What is the most obvious difference between pipe flow and open channel flow????????????? (in terms of flow conditions and energy situation)

What is the most obvious difference between pipe flow and open channel flow????????????? (in terms of flow conditions and energy situation) OPEN CHANNEL FLOW 1 3 Question What is the most obvious difference between pipe flow and open channel flow????????????? (in terms of flow conditions and energy situation) Typical open channel shapes Figure

More information

This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library.

This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library. This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library. For additional information about this document and the document conversion process, please contact

More information

BRIDGES ARE relatively expensive but often are

BRIDGES ARE relatively expensive but often are Chapter 10 Bridges Chapter 10 Bridges Bridg Bridges -- usually the best, but most expensive drainage crossing structure. Protect bridges against scour. BRIDGES ARE relatively expensive but often are the

More information

EXAMPLES (OPEN-CHANNEL FLOW) AUTUMN 2015

EXAMPLES (OPEN-CHANNEL FLOW) AUTUMN 2015 EXAMPLES (OPEN-CHANNEL FLOW) AUTUMN 2015 Normal and Critical Depths Q1. If the discharge in a channel of width 5 m is 20 m 3 s 1 and Manning s n is 0.02 m 1/3 s, find: (a) the normal depth and Froude number

More information

Open Channel Flow Measurement Weirs and Flumes

Open Channel Flow Measurement Weirs and Flumes Open Channel Flow Measurement Weirs and Flumes by Harlan H. Bengtson, PhD, P.E. 1. Introduction Your Course Title Here Measuring the flow rate of water in an open channel typically involves some type of

More information

Managing Our Water Retention Systems

Managing Our Water Retention Systems Managing Our Water Retention Systems 29th Annual USSD Conference Nashville, Tennessee, April 20-24, 2009 Hosted by Corps of Engineers On the Cover Wolf Creek Dam is on the Cumberland River in South Central

More information

3.4 DRAINAGE PLAN. 3.4.1 Characteristics of Existing Drainages. 3.4.2 Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN

3.4 DRAINAGE PLAN. 3.4.1 Characteristics of Existing Drainages. 3.4.2 Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN 3.4 DRAINAGE PLAN This section describes the existing onsite drainage characteristics and improvements proposed within this Specific Plan. Following this description, drainage plan development standards

More information

Department of Energy and Water Supply

Department of Energy and Water Supply Department of Energy and Water Supply Guidelines on Acceptable Flood Capacity for Water Dams January 2013 State of Queensland, Department of Energy and Water Supply, 2012. The Queensland Government supports

More information

Chapter 13 OPEN-CHANNEL FLOW

Chapter 13 OPEN-CHANNEL FLOW Fluid Mechanics: Fundamentals and Applications, 2nd Edition Yunus A. Cengel, John M. Cimbala McGraw-Hill, 2010 Lecture slides by Mehmet Kanoglu Copyright The McGraw-Hill Companies, Inc. Permission required

More information

2O-1 Channel Types and Structures

2O-1 Channel Types and Structures Iowa Stormwater Management Manual O-1 O-1 Channel Types and Structures A. Introduction The flow of water in an open channel is a common event in Iowa, whether in a natural channel or an artificial channel.

More information

ICOLD POSITION PAPER ON DAM SAFETY AND EARTHQUAKES

ICOLD POSITION PAPER ON DAM SAFETY AND EARTHQUAKES ICOLD POSITION PAPER ON DAM SAFETY AND EARTHQUAKES August 2012 Dam Safety and Earthquakes Position Paper of International Commission on Large Dams (ICOLD) Prepared by ICOLD Committee on Seismic Aspects

More information

CHAPTER 2 HYDRAULICS OF SEWERS

CHAPTER 2 HYDRAULICS OF SEWERS CHAPTER 2 HYDRAULICS OF SEWERS SANITARY SEWERS The hydraulic design procedure for sewers requires: 1. Determination of Sewer System Type 2. Determination of Design Flow 3. Selection of Pipe Size 4. Determination

More information

Moving Small Mountains Vesuvius Dam Rehab

Moving Small Mountains Vesuvius Dam Rehab Moving Small Mountains Vesuvius Dam Rehab Susan L. Peterson, P.E., regional dams engineer, Eastern Region, Bedford, IN Note: The following article, Moving Small Mountains Vesuvius Dam Rehab, by Sue Peterson,

More information

DRAINAGE CRITERIA MANUAL (V. 2) CULVERTS CONTENTS

DRAINAGE CRITERIA MANUAL (V. 2) CULVERTS CONTENTS DRAINAGE CRITERIA MANUAL (V. 2) CONTENTS Section Page CU 1.0 INTRODUCTION AND OVERVIEW... 1 1.1 Required Design Information... 3 1.1.1 Discharge... 4 1.1.2 Headwater... 4 1.1.3 Tailwater... 5 1.1.4 Outlet

More information

THE UNIVERSITY OF TRINIDAD & TOBAGO

THE UNIVERSITY OF TRINIDAD & TOBAGO THE UNIVERSITY OF TRINIDAD & TOBAGO FINAL ASSESSMENT/EXAMINATIONS APRIL 2014 Course Code and Title: Programme: Date and Time: Duration: HYDRAULICS FLUD2006 BASc. Civil Engineering Wednesday 16 th April,

More information

OPEN-CHANNEL FLOW. Free surface. P atm

OPEN-CHANNEL FLOW. Free surface. P atm OPEN-CHANNEL FLOW Open-channel flow is a flow of liquid (basically water) in a conduit with a free surface. That is a surface on which pressure is equal to local atmospheric pressure. P atm Free surface

More information

Ponds- Planning, Design, Construction

Ponds- Planning, Design, Construction United States Department of Agriculture Soil Conservation Service Agriculture Handbook Number 590 Ponds- Planning, Design, Construction This handbook describes the requirements for building a pond. It

More information

Broad Crested Weirs. I. Introduction

Broad Crested Weirs. I. Introduction Lecture 9 Broad Crested Weirs I. Introduction The broad-crested weir is an open-channel flow measurement device which combines hydraulic characteristics of both weirs and flumes Sometimes the name ramp

More information

Backwater Rise and Drag Characteristics of Bridge Piers under Subcritical

Backwater Rise and Drag Characteristics of Bridge Piers under Subcritical European Water 36: 7-35, 11. 11 E.W. Publications Backwater Rise and Drag Characteristics of Bridge Piers under Subcritical Flow Conditions C.R. Suribabu *, R.M. Sabarish, R. Narasimhan and A.R. Chandhru

More information

CHAPTER 7 STORM WATER DESIGN

CHAPTER 7 STORM WATER DESIGN CITY OF BOULDER DESIGN AND CONSTRUCTION STANDARDS CHAPTER 7 STORM WATER DESIGN TABLE OF CONTENTS Section Page 7.01 GENERAL...4 (A) INTENT... 4 (B) STORM WATER AND GREENWAYS MASTER PLANS... 4 (C) REFERENCE

More information

RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.mass.gov/dep/water/laws/policies.

RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.mass.gov/dep/water/laws/policies. RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.mass.gov/dep/water/laws/policies.htm#storm Definition: A permanent, erosion-resistant ground cover

More information

SECTION 5 - STORM DRAINS

SECTION 5 - STORM DRAINS Drainage Criteria Manual SECTION 5 - STORM DRAINS 5.1.0 GENERAL This The purpose of this section discusses briefly is to consider the hydraulic aspects of storm drains and their appurtenances in a storm

More information

City of Denton. Drainage Design Criteria Manual

City of Denton. Drainage Design Criteria Manual City of Denton Drainage Design Criteria Manual July 26, 2013 Drainage Design Criteria Manual Table of Contents Section 1.0 Introduction... 1 1.1 Purpose... 1 1.2 Design Criteria... 1 1.3 Definitions...

More information

Sharp-Crested Weirs for Open Channel Flow Measurement, Course #506. Presented by:

Sharp-Crested Weirs for Open Channel Flow Measurement, Course #506. Presented by: Sharp-Crested Weirs for Open Channel Flow Measurement, Course #506 Presented by: PDH Enterprises, LLC PO Box 942 Morrisville, NC 27560 www.pdhsite.com A weir is basically an obstruction in an open channel

More information

Construction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can

Construction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can Construction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can do his or her share to protect Ohio's water resources

More information

Section 3. HYDRAULIC DESIGN A. Weirs and Orifices

Section 3. HYDRAULIC DESIGN A. Weirs and Orifices Section 3. HYDRAULIC DESIGN A. Weirs and Orifices NOTE: Some of the graphs contained in this section are copied from the Los Angeles Hydraulics Manual and we wish to give them credit for their efforts.

More information

Chapter 9. Steady Flow in Open channels

Chapter 9. Steady Flow in Open channels Chapter 9 Steady Flow in Open channels Objectives Be able to define uniform open channel flow Solve uniform open channel flow using the Manning Equation 9.1 Uniform Flow in Open Channel Open-channel flows

More information

STORMWATER MANAGEMENT CHECKLIST

STORMWATER MANAGEMENT CHECKLIST STORMWATER MANAGEMENT CHECKLIST *This checklist must be completed and part of the Land Disturbing Permit submittal for review if the acreage disturbed is one (1) acre or more: I. SUPPORTING DATA Narrative

More information

** Pressure represents energy when a. pressure difference is available.

** Pressure represents energy when a. pressure difference is available. 4 * ** Pressure represents energy when a pressure difference is available. Potential Energy Datum Potential Energy Datum Pressure Energy Pressure Energy Kinetic Energy Kinetic Energy Kinetic Energy Dividing

More information

Jackson Gulch Outlet Canal Rehabilitation Project

Jackson Gulch Outlet Canal Rehabilitation Project Jackson Gulch Outlet Canal Rehabilitation Project Preliminary Budgetary Estimate for Rehabilitation February 2004 Prepared for the Mancos Water Conservancy District Jackson Gulch Reservoir 42888 County

More information

SUSTAINABLE URBAN DRAINAGE SYSTEMS

SUSTAINABLE URBAN DRAINAGE SYSTEMS overflow can lead into a permeable conveyance system to increase further the benefit and reduce the need for pipe systems. Pollutant removal rates have been shown to be high, with some pollutants being

More information

CHAPTER 9 CULVERTS 2005

CHAPTER 9 CULVERTS 2005 CHAPTER 9 CULVERTS 2005 Culverts 9-1 Chapter Table of Contents 9.1 - Introduction 9-5 9.2 - Policy and Practice 9-5 9.3 - Large, Medium and Small Culverts 9-8 9.4 - Sources of Information 9-8 9.5 - Culvert

More information

Using HEC-RAS for Dam Break Studies

Using HEC-RAS for Dam Break Studies Using HEC-RAS for Dam Break Studies August 2014 Approved for Public Release. Distribution Unlimited. TD-39 REPORT DOCUMENTATION PAGE Form Approved OMB No. 0704-0188 The public reporting burden for this

More information

APPENDIX F. Baker County. Mason Dam Hydroelectric Project FERC No. P-12686. Turbidity Monitoring Plan

APPENDIX F. Baker County. Mason Dam Hydroelectric Project FERC No. P-12686. Turbidity Monitoring Plan APPENDIX F Baker County Mason Dam Hydroelectric Project FERC No. P-12686 Turbidity Monitoring Plan April 2011 857 Table of Contents 1.0 Introduction 1 2.0 Purpose and Scope 2 3.0 Turbidity Monitoring and

More information

Travel Time. Computation of travel time and time of concentration. Factors affecting time of concentration. Surface roughness

Travel Time. Computation of travel time and time of concentration. Factors affecting time of concentration. Surface roughness 3 Chapter 3 of Concentration and Travel Time Time of Concentration and Travel Time Travel time ( T t ) is the time it takes water to travel from one location to another in a watershed. T t is a component

More information

ALTERNATIVES EVALUATION. SWEET POND DAM VT Dam #90.01 Town of Guilford, Vermont

ALTERNATIVES EVALUATION. SWEET POND DAM VT Dam #90.01 Town of Guilford, Vermont ALTERNATIVES EVALUATION SWEET POND DAM VT Dam #90.01 Town of Guilford, Vermont Prepared for: Vermont Department of Forests, Parks and Recreation Prepared by: January 27, 2012 D&K #221179 SWEET POND DAM

More information

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary

More information

1.7.0 Floodplain Modification Criteria

1.7.0 Floodplain Modification Criteria 1.7.0 Floodplain Modification Criteria 1.7.1 Introduction These guidelines set out standards for evaluating and processing proposed modifications of the 100- year floodplain with the following objectives:

More information

Exercise (4): Open Channel Flow - Gradually Varied Flow

Exercise (4): Open Channel Flow - Gradually Varied Flow Exercise 4: Open Channel Flow - Gradually Varied Flow 1 A wide channel consists of three long reaches and has two gates located midway of the first and last reaches. The bed slopes for the three reaches

More information

WATER STORAGE, TRANSPORT, AND DISTRIBUTION Multi-Dam Systems and their Operation - J.J. Cassidy MULTI-DAM SYSTEMS AND THEIR OPERATION

WATER STORAGE, TRANSPORT, AND DISTRIBUTION Multi-Dam Systems and their Operation - J.J. Cassidy MULTI-DAM SYSTEMS AND THEIR OPERATION MULTI-DAM SYSTEMS AND THEIR OPERATION J.J. Cassidy Consulting Hydraulic and Hydrologic Engineer, Concord, California, USA Keywords: Dams, reservoirs, rivers, water storage, dam safety, floods, environment,

More information

A Stream Restoration Case Study in the California Central Coast

A Stream Restoration Case Study in the California Central Coast International Erosion Control Association Annual Conference 2009, Reno, Nevada Case Study Technical Presentation A Stream Restoration Case Study in the California Central Coast Justin S. Rogers, P.E.,

More information

L r = L m /L p. L r = L p /L m

L r = L m /L p. L r = L p /L m NOTE: In the set of lectures 19/20 I defined the length ratio as L r = L m /L p The textbook by Finnermore & Franzini defines it as L r = L p /L m To avoid confusion let's keep the textbook definition,

More information

Stream Rehabilitation Concepts, Guidelines and Examples. Objectives. Pierre Y. Julien. Three Laws of Stream Restoration

Stream Rehabilitation Concepts, Guidelines and Examples. Objectives. Pierre Y. Julien. Three Laws of Stream Restoration Stream Rehabilitation Concepts, Guidelines and Examples Pierre Y. Julien Wuhan 2005 Objectives Part I - Stream restoration and rehabilitation: 1. Present and discuss important concepts, laws, criteria

More information

Engineering Geological Asset Management for Large Dams. Yasuhito SASAKI (1)

Engineering Geological Asset Management for Large Dams. Yasuhito SASAKI (1) Engineering Geological Asset Management for Large Dams Yasuhito SASAKI (1) (1) Geology Research Team, Public Works Research Institute, Japan E-mail:ya-sasa@pwri.go.jp Abstract Comprehensive inspection

More information

FLOOD PROTECTION BENEFITS

FLOOD PROTECTION BENEFITS IV. (340 points) Flood Protection Benefits A. Existing and potential urban development in the floodplain (50) 1. Describe the existing and potential urban development at the site and the nature of the

More information

STATE OF COLORADO DEPARTMENT OF NATURAL RESOURCES DIVISION OF WATER RESOURCES OFFICE OF THE STATE ENGINEER DAM SAFETY BRANCH

STATE OF COLORADO DEPARTMENT OF NATURAL RESOURCES DIVISION OF WATER RESOURCES OFFICE OF THE STATE ENGINEER DAM SAFETY BRANCH STATE OF COLORADO DEPARTMENT OF NATURAL RESOURCES DIVISION OF WATER RESOURCES OFFICE OF THE STATE ENGINEER DAM SAFETY BRANCH RULES AND REGULATIONS FOR DAM SAFETY AND DAM CONSTRUCTION EFFECTIVE DATE: JANUARY

More information

The Teton Creek Restoration Project Summary:

The Teton Creek Restoration Project Summary: The Teton Creek Restoration Project Summary: The Teton Creek Restoration Project area extends for approximately one mile upstream from the Cemetery Road Bridge and includes the Aspen Pointe, The Aspens

More information

Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans

Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans APPENDIX IV Version: February 2, 2015 Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans Please fill in all blanks and please reference the plan sheets/pages where the information may

More information

COST EFFECTIVE APPROACHES FOR PRESCRIBED DAM ASSET MANAGEMENT

COST EFFECTIVE APPROACHES FOR PRESCRIBED DAM ASSET MANAGEMENT COST EFFECTIVE APPROACHES FOR PRESCRIBED DAM ASSET MANAGEMENT Haris Pinidiya Sydney Water, NSW, Australia ABSTRACT Dams need to be dewatered in an emergency, typically by operating scour valves. Operating

More information

Chapter 4 Hydraulic Design of Open Channels, Culverts, Bridges, and Detention Structures

Chapter 4 Hydraulic Design of Open Channels, Culverts, Bridges, and Detention Structures Table of Contents CHAPTER 4 Chapter 4 Hydraulic Design of Open Channels, Culverts, Bridges, and Detention Structures 4.1 Storm Water Open Channels, Culverts, Bridges, and Detention Structure Design Overview

More information

TENNESSEE GAS PIPELINE COMPANY, L.L.C.

TENNESSEE GAS PIPELINE COMPANY, L.L.C. TENNESSEE GAS PIPELINE COMPANY, L.L.C. HYDROLOGIC & HYDRAULIC CALCULATIONS FOR WATERBODIES CROSSED BY CONNECTICUT PIPELINE EXPANSION PROJECT CONNECTICUT LOOP Submitted by: Tennessee Gas Pipeline Company,

More information

Hydraulics Prof. A. K. Sarma Department of Civil Engineering Indian Institute of Technology, Guwahati. Module No. # 02 Uniform Flow Lecture No.

Hydraulics Prof. A. K. Sarma Department of Civil Engineering Indian Institute of Technology, Guwahati. Module No. # 02 Uniform Flow Lecture No. Hydraulics Prof. A. K. Sarma Department of Civil Engineering Indian Institute of Technology, Guwahati Module No. # 02 Uniform Flow Lecture No. # 04 Computation of Uniform Flow (Part 02) Welcome to this

More information

FLOW CONDITIONER DESIGN FOR IMPROVING OPEN CHANNEL FLOW MEASUREMENT ACCURACY FROM A SONTEK ARGONAUT-SW

FLOW CONDITIONER DESIGN FOR IMPROVING OPEN CHANNEL FLOW MEASUREMENT ACCURACY FROM A SONTEK ARGONAUT-SW FLOW CONDITIONER DESIGN FOR IMPROVING OPEN CHANNEL FLOW MEASUREMENT ACCURACY FROM A SONTEK ARGONAUT-SW Daniel J. Howes, P.E. 1 Charles M. Burt, Ph.D., P.E. 2 Brett F. Sanders, Ph.D. 3 ABSTRACT Acoustic

More information

City of La Quinta Public Works Department - Storm Drain Plan Review Checklist

City of La Quinta Public Works Department - Storm Drain Plan Review Checklist Tract or Parcel Project Name PCN Checked By Date City of La Quinta Public Works Department - Storm Drain Plan Review Checklist SUBMITTAL REQUIREMENTS Approved Tentative Tract Map Conditions of Approval

More information

OHIO ENGINEERING JOB APPROVAL AUTHORITY ETHICS STATEMENT

OHIO ENGINEERING JOB APPROVAL AUTHORITY ETHICS STATEMENT Sheet 1 of 9 NAME TITLE GRADE LOCATION DELEGATED BY (Responsible Engineer) TITLE DATE 210-NEM-501-A, Third Ed., Amend. OH1, February 2015 CONCURRED BY (Line Supervisor) (non-nrcs) TITLE DATE TITLE ETHICS

More information

OPTIMISE TANK DESIGN USING CFD. Lisa Brown. Parsons Brinckerhoff

OPTIMISE TANK DESIGN USING CFD. Lisa Brown. Parsons Brinckerhoff OPTIMISE TANK DESIGN USING CFD Paper Presented by: Lisa Brown Authors: Lisa Brown, General Manager, Franz Jacobsen, Senior Water Engineer, Parsons Brinckerhoff 72 nd Annual Water Industry Engineers and

More information

Re: Preliminary Permit Application for the Rose Creek Pumped Storage Project

Re: Preliminary Permit Application for the Rose Creek Pumped Storage Project September 12, 2013 Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Re: Preliminary Permit Application for the Dear Ms. Bose, Please find attached

More information

2011 HYDRAULICS MANUAL

2011 HYDRAULICS MANUAL STATE OF LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT P.O. Box 94245 Baton Rouge, Louisiana 70804-9245 http://www.dotd.la.gov/ HYDRAULICS MANUAL Hydraulics (225) 379-1306 PREFACE The following

More information

Objectives and Purpose...Page 1 Open Bottom Arch - Flow Model...Page 1 The Pros and Cons of Metal Arch Culverts...Page 2 Positive Features of Arch

Objectives and Purpose...Page 1 Open Bottom Arch - Flow Model...Page 1 The Pros and Cons of Metal Arch Culverts...Page 2 Positive Features of Arch Objectives and Purpose...Page 1 Open Bottom Arch - Flow Model...Page 1 The Pros and Cons of Metal Arch Culverts...Page 2 Positive Features of Arch Culverts....Page 2 Negative features of Arch Culverts...Page

More information

Modeling of Morphou (Güzelyurt) Flood and Remedial Measures 1

Modeling of Morphou (Güzelyurt) Flood and Remedial Measures 1 Digest 2013, December 2013, 1659-1673 Modeling of Morphou (Güzelyurt) Flood and Remedial Measures 1 Erdal ŞAHİN* Bertuğ AKINTUĞ** A. Melih YANMAZ*** ABSTRACT Flash floods are known to result in excessive

More information

CHAPTER 9 CULVERTS TABLE OF CONTENTS. CDOT Drainage Design Manual

CHAPTER 9 CULVERTS TABLE OF CONTENTS. CDOT Drainage Design Manual CHAPTER 9 CULVERTS TABLE OF CONTENTS 9.1 INTRODUCTION...4 9.1.1 Definition...4 9.1.2 Purpose of Use...5 9.1.3 Concepts and Definitions...5 9.1.4 Symbols...8 9.1.5 Classification...10 9.1.6 Geometry...10

More information

SECTION 6A STORM DRAIN DESIGN Mar. 2002 S E C T I O N 6A STORM DRAIN - DESIGN

SECTION 6A STORM DRAIN DESIGN Mar. 2002 S E C T I O N 6A STORM DRAIN - DESIGN S E C T I O N 6A STORM DRAIN - DESIGN 6A.l Scope 6A.2 Storm Water Quantity 6A.3 Storm Drain Hydraulics 6A.4 Depths 6A.5 Locations 6A.6 Curved Storm Drains 6A.7 Manholes 6A.8 Catch basins 6A.9 Storm Drain

More information

DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS

DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS Phase I MS4 permits require continuous updating of the stormwater system inventory owned and operated by the MS4. They also include inspection

More information

STATE OF COLORADO DEPARTMENT OF NATURAL RESOURCES DIVISION OF WATER RESOURCES GUIDELINES FOR DAM BREACH ANALYSIS

STATE OF COLORADO DEPARTMENT OF NATURAL RESOURCES DIVISION OF WATER RESOURCES GUIDELINES FOR DAM BREACH ANALYSIS STATE OF COLORADO DEPARTMENT OF NATURAL RESOURCES DIVISION OF WATER RESOURCES OFFICE OF THE STATE ENGINEER DAM SAFETY BRANCH GUIDELINES FOR DAM BREACH ANALYSIS February 10, 2010 Telephone (303) 866-3581

More information

Fort Dodge Stormwater Master Planning. Prepared By: Ralph C. Stark, Jr., P.E., C.F.M. Joel N. Krause, P.E., C.F.M.

Fort Dodge Stormwater Master Planning. Prepared By: Ralph C. Stark, Jr., P.E., C.F.M. Joel N. Krause, P.E., C.F.M. Fort Dodge Stormwater Master Planning Prepared By: Ralph C. Stark, Jr., P.E., C.F.M. Joel N. Krause, P.E., C.F.M. Project Location Project Background Flooding History Localized flooding and storm sewer

More information