Short-term Forecasting of Nodal Electricity Demand in New Zealand

Size: px
Start display at page:

Download "Short-term Forecasting of Nodal Electricity Demand in New Zealand"

Transcription

1 Short-term Forecasting of Nodal Electricity Demand in New Zealand Erwann Sbaï and Michael Simpson 1 December University of Auckland. This work is part of a Honours dissertation written by Michael Simpson under the supervision of Erwann Sbaï.

2 Abstract This paper compares the accuracy of several models for short-term electricity load forecasting for nodes in New Zealand. The literature on short-term electricity load forecasting is reviewed, resulting in the selection of the seasonal ARIMA model and the double seasonal Holt-Winters exponential smoothing model for empirical testing. We also estimate a one season ARIMA model with some double seasonal aspects. A multivariate regression model is also developed for comparison, utilising aspects of several multivariate models used in other short-term electricity load forecasting papers. A time series of half-hourly electricity demand in the Hayward node in New Zealand is used for estimation and forecasting. The data clearly indicates a daily and a weekly seasonal pattern. The seasonal ARIMA model outperforms the Holt- Winters and multivariate regression models in forecasting electricity demand from half an hour to three hours ahead. The superiority of the seasonal ARIMA model increases as the forecasting length increases. Significant autocorrelation of residuals in the Holt-Winters and multivariate regression models leads to an error adjustment term being included, which improves the forecasting accuracy of the Holt-Winters models but not the multivariate regression model.

3 1. Introduction Accurate forecasting of short-term electricity load is important for all participants in the New Zealand electricity spot market. Generators require accurate forecasts in order to determine the most efficient method of producing the load needed in the forthcoming periods, and to submit supply schedules to the spot market for each half-hour period of the day, in order to maximise profits with respect to the other generators bids. Transpower, the systems operator, utilises forecasts of demand in forthcoming periods to determine the lowest cost method of providing the required quantity of electricity for each node in New Zealand, given the supply bids submitted by each generator. Overestimation of the quantity required results in financial losses from generators being on standby that are not needed, while underestimation can result in the costly startup of cold generators or, in the worst case scenario, the frequency dropping from the required 50Hz, with the potential tripping of generators resulting in a blackout (Bunn, 1982). The New Zealand electricity transmission grid is divided into 244 nodes, where generated electricity exits the high-voltage network and is distributed to customers. Electricity generators in New Zealand submit a supply function at least two hours ahead for each node they are willing to supply electricity to for each half hour period of the day. The system allows each generator to submit five price bands, and the quantity they are willing to supply at each price. Transpower forecasts the quantity required in each node for the approaching half hour, and calculates the quantities each generator should supply to each node in order to achieve the lowest cost. Each generator is paid the price of the last quantity required to meet the demand

4 forecast in each node. This mechanism is illustrated in Figure 1, in which Generators 1, 2 and 3 submit their supply schedules to the systems operator. Transpower determines that 540MW are needed for the approaching half hour. Adding the quantities provided at the lowest cost from the three generators to cover the required quantity results in a price of $75.02 per megawatt generated. Figure 1: Price Determination in Electricity Spot Market Source: Genesis Energy The importance of accurate forecasting and the power of computer algorithms in estimating complex models have encouraged extensive research into forecasting models for short-term electricity demand. Seasonal ARIMA and Holt-Winters exponential smoothing have been widely used as they require only the quantity demanded variable, and are relatively simple and robust in forecasting. A variety of multivariate models have also been empirically tested in other papers. In this paper the forecasting ability of seasonal ARIMA, Holt-Winters exponential smoothing and multivariate regression models will be empirically tested on data from the

5 Hayward node in New Zealand which, due to its relatively small size, is far more unpredictable than aggregate country demand data used for empirical testing in other papers. The following section discusses the relevant literature on the three short-term forecasting models. We then introduce the data used for estimation and forecasting, and outline the structure of the models to be estimated. Section 4 discusses the estimation of the models and empirical testing, followed by a summary and a conclusion.

6 2. Literature Review The Holt-Winters exponential smoothing model was pioneered by Winters (1960) in a comparison of forecasting methods for sales, as a modification of existing exponential smoothing models. The basic exponential smoothing model forecast the value of a time series variable in the next period to be a weighted average of the actual value in the current period, and the previous period s forecast for the current period. The Holt-Winters model added a seasonal ratio and linear trend to this model, to allow for seasonal variations and changes in the underlying mean over time. Additional modifications have been suggested in order to improve forecasting accuracy. Chatfield (1978) noted significant autocorrelation of residuals in comparing Holt-Winters models to Box-Jenkins ARIMA models for forecasting ability, and used a method suggested by Reid (1975) for improving the forecasting ability of exponential smoothing. The adjustment involves fitting a linear relationship λe t to the one-step-ahead forecast. The parameter lambda can be estimated after the estimation of the other parameters in the model, or simultaneously, which Chatfield suggests may be more efficient. A second major modification to the Holt-Winters exponential smoothing model is the addition of a second seasonal index, introduced by Taylor (2003) when comparing univariate methods for short-term electricity demand forecasting in England and Wales. The double seasonal model achieves more accurate forecasts than the traditional Holt-Winters model, since electricity demand clearly has both a daily and a weekly seasonal pattern. Taylor found that by combining the double seasonal Holt-Winters model with an adjustment for error autocorrelation, forecasting accuracy was improved. In this paper, one and two season Holt-Winters models will

7 be estimated with and without the error adjustment term, and a new estimation method will be discussed in order for the model to be estimated with relatively little knowledge of programming. The multiplicative seasonal ARIMA model is well established in short-term load forecasting literature, and is often used as a benchmark to compare alternative methods to. Box, Jenkins, & Reinsel (1994) noted that the model can be extended to include multiple seasons. Darbellay and Slama (2000) found that the double seasonal ARIMA model outperformed the nonlinear artificial neural network model in forecasting hourly electricity demand in the Czech Republic. The suggested reason for the superiority of the linear ARIMA model was the linearity of the autocorrelation in the data. Taylor (2003) compared double seasonal ARIMA with the double seasonal Holt-Winters model and found ARIMA to be less accurate. However, Taylor (2006) used an ARIMA model once again to compare against a variety of nonlinear models, and found ARIMA to be more accurate than all but one. Despite the success of the double seasonal ARIMA model, the lack of an available estimation method will limit this paper to a one season ARIMA model, which will contain certain aspects of a double seasonal model, though not in the orthodox format. 2 Multivariate models for short-term load forecasting are less common than univariate models, due in part to their impracticality for real-time forecasting. Weather variables are the major factors affecting electricity demand, and gathering data for predictions in the short-term would be very demanding (Bunn, 1982). Also, weather variables tend to change in a smooth fashion, which may already be reflected in lagged demand values in univariate models (Taylor, 2003). 2 We restrict our self to the use of one econometric software: Eviews 6.0.

8 Some models have been developed that achieve accurate results, particularly in longer-term forecasts. Hyde and Hodnett (1997) developed a regression model to predict daily load demand in Ireland, to replace the Electricity Supply Board s method of forecasting based on observed loads from a similar day and adjusting based on weather variables. The proposed model consisted of a normal level for the day type, weather effects, and special events such as power outages or industrial strikes, estimated using regression analysis. An error adjustment term was also included, allowing the model to adjust its forecast based on short-term deviations from previous days forecasts. Favourable results were reported for most times of the year, and it was proposed that periods of significant deviation from the forecast be dealt with using rule-based procedures for handling special days. Cottet and Smith (2003) developed a vector autoregressive model using temperature and humidity variables, and dummy variables for day of the week and public holidays, to estimate separate regressions for each of the 48 half-hour periods of the day. The model is able to predict not only distribution of the daily load, but also the time and quantity of the daily peak load. The resulting accuracy is difficult to judge, as other models were not used for comparison. Our work will combine aspects of these papers to develop a simple multivariate regression model which includes temperature measurements and dummy variables for half-hour of the day instead of separate regressions for each half-hour, to allow for the inclusion of lagged quantity variables.

9 3. Data and Econometric Models Data The data consists of a time series of half-hourly observations of electricity demand from the Hayward node in New Zealand for the one year and four week period from July to August This period was chosen because the univariate models will only use the last twelve weeks from May to August , which contain only one public holiday and no changes in daylight savings, thus preventing unnecessary challenges to the models. The last four weeks of the sample will be used to test the forecasting accuracy of all of the models, and the previous eight weeks will be used to estimate the seasonal ARIMA and exponential smoothing models. The first year, from July to July , will be used to estimate the regression model, since the model requires at least one year of data to estimate all of the parameters. Figure 1 shows demand in the Hayward node for each half-hour on July The variation in demand across time is apparent, with peaks in demand at 8am and 6pm, a trough in the middle of the day, and a deeper trough around 2am.

10 Figure 1: Electricity Demand in the Hayward Node on 18 July Demand (kw) Half-hour Figure 2 shows demand in the Hayward node across a two week period in July The strong daily pattern is reflected in almost all of the twenty-four hour periods shown, with some variations in the magnitude of the peaks in demand. The two weeks have a similar overall pattern, with lower than average demand on Monday, Saturday and Sunday, although even this is variable, with demand on the Saturday of the first week as high as the Wednesday, Thursday and Friday of that week. These variations in the overall pattern will make forecasting more difficult, especially over a longer timeframe than one period ahead. Despite variations in the seasonal pattern, our data clearly has two seasonal patterns, one over 48 periods and one over 336 periods.

11 Figure 2: Electricity Demand in the Hayward Node 16 July 2006 to 29 July Demand (kw) Half-hour Hourly temperature observations for Wellington City were retrieved from the National Institute of Water and Atmospheric Research. Half-hourly observations were not available, resulting in the same temperature observation being used for both periods in each hour. Some smoothing of the data - so that periods between the recorded hourly observations took the average of the two recorded observations may be more accurate, but the sheer scale of observations in the one year and four month period made this approach impractical. Figure 3 shows temperature observations over the same two week period as Figure 2. The variation and lack of a consistent seasonal pattern may explain some of the variation in demand that is not attributed to the time of day or the day of the week, hence allowing for more accurate forecasting.

12 Figure 3: Temperature in Wellington 16 July 2006 to 29 July Temperature (degrees Celcius) Half-hours Stationarity In order for a reliable econometric model to be estimated, some knowledge of the trends in the data is needed. An important consideration in time series models is whether the data is stationaryif a data series is nonstationary, with the mean or the variance changing over time, then the model may be mis-specified and lead to a spurious regression. The stationarity of the quantity series must be tested, both for the twelve week period for the ARIMA and Holt- Winters models, and for the longer period for the multivariate regression model. If the longer period is found to be nonstationary, and the temperature variable is also nonstationary, the two variables should be tested for cointegration before differencing is initiated.

13 Multiplicative or Additive Model Selection Both the Holt-Winters exponential smoothing model and the seasonal ARIMA model can be specified in either multiplicative or additive form. The multiplicative form is appropriate in cases where the magnitude of the seasonal variation of the data increases as the mean of the data increases (Taylor, 2003). In other short-term load forecasting papers, multiplicative models have been used, suggesting it is the correct choice. Testing for this condition in our data ensures the correct model is used. A seven-day moving mean is calculated for each observation for a six month period. This is subtracted from each observation to find the deviation from the moving mean. For each week in the six month period, the average of the moving mean and the average of the absolute deviation from the moving mean are determined. The correlation between these averages is over 0.95, which indicates that for our data, seasonal variation is positively related to the mean level, suggesting multiplicative models should be used. One Season Holt-Winters Exponential Smoothing The one season Holt-Winters model is a modification of the exponential smoothing model. It consists of a local level S t which is equivalent to a deseasonalised local mean, a local trend T t which is the difference between local levels (S t S t-1 ), and a seasonal index I t, estimated by dividing the actual observation X t by the local level. The specification of the variables is outlined below. Level S t = α (X t / I t-s ) + (1-α) (S t-1 + T t-1 )

14 Trend T t = β (S t S t-1 ) + (1-β) T t-1 Index I t = ω(x t / S t ) + (1- ω) I t-s Forecast X t+k = (S t + kt t ) I t+k-s where α, β and ω are smoothing parameters between zero and one, s is the number of periods in the seasonal cycle, and X t+k is the k-step ahead forecast. Since the data on electricity demand has two seasonal components, the most prominent seasonal cycle must be chosen for the one season exponential smoothing model. Choosing a season of 336 periods will incorporate both the effect of the day of the week and the half-hour of the day into the model, since the seasonal index will be taken from the same half-hour and the same day of the week from the previous week, while choosing a season of 48 periods ignores the effect the day of the week has on demand. Therefore, choosing a season of 336 periods is more sensible. Double Seasonal Holt-Winters Exponential Smoothing As described in section 2, the Holt-Winters exponential smoothing method has been adapted for data containing two seasons by Taylor (2003). The major addition is a second seasonal index, resulting in a daily index D t and a weekly index W t. There are also changes in the formulation of the level and the forecast to include the effect of the second season. Level S t = α (X t / (D t-s1 W t-s2 )) + (1-α) (S t-1 + T t-1 ) Trend T t = β (S t S t-1 ) + (1- β) T t-1

15 Daily Index D t = δ (X t / (S t W t-s2 )) + (1-δ) D t-s1 Weekly Index W t = ω (X t / (S t D t-s1 )) + (1-ω) W t-s2 Forecast X t+k = (S t + kt t ) D t+k-s1 W t+k-s2 where s1 is the number of periods in the first season (48), and s2 the number of periods in the second season (336). Error Adjustment for Holt-Winters Models Holt-Winters estimation may be improved using a simple AR(1) error correction term, of the form e t = λe t-1 +ε t. For forecasting, the forecast equation above will be expanded to as follows: X t+k = (S t + kt t ) D t+k-s1 W t+k-s2 λ k e t Forecasts for more than one period ahead will not have knowledge of the previous period s error term, since the observed demand will not be known. However, the relationship between error terms of k lag is: E[e t ] = E[λe t-1 + ε t ] =E[ λ(λe t-2 + ε t-1 )]= = λ k e t-k Therefore, a forecast for k-periods ahead will subtract λ k times the current period s error term. The Holt-Winters parameters and the error adjustment parameter lambda will be estimated simultaneously to improve efficiency. Seasonal ARIMA

16 An autoregressive integrated moving average (ARIMA) model explains one variable with respect to its past and the history of its residuals. ARIMA models can be written as ARIMA(p,d,q), where p is the number of autoregressive terms, d is the order of integration, and q is the number of moving average terms in the model. The autoregressive terms explain the variable with respect to previous observations of the variable. For example, an AR(2) model appears as follows: Y t = φ 1 Y t-1 + φ 2 Y t-2 + u t. The moving average terms explain the variable with respect to previous residuals, as the following MA(2) model demonstrates: Y t = u t + φ 1 u t-1 + φ 2 u t-2. The order of integration indicates the number of times the data must be differenced before it becomes stationary. An ARIMA(1,1,1) model is written as (1-φL)(ΔY t c) = (1-θL)ε t, where L is the lag operator, with LY t = Y t-1, and Lε t = ε t-1. This process can also be written linearly as ΔY t = (1-φ)c + φδy t-1 - θε t-1 + ε t. In the case where the data contains not only a relationship between the variable and past observations of the variable and residuals but also a seasonal component, the basic ARIMA

17 model outlined above can be extended to a seasonal ARIMA model, containing seasonal autoregressive and moving average terms, as well as seasonal differencing. The seasonal ARIMA model can be classified as ARIMA(p,d,q)х(P,D,Q,s), where P is the number of seasonal autoregressive terms, D is the order of seasonal differencing, Q the number of seasonal moving average terms included in the model and s the number of periods in the season. For example, ARIMA(1,0,1) х(1,0,1,336) is written as (1-φL)(1-φL 336 )(Y t -c) = (1-θL)(1-ωL 336 )ε t. The requirement for seasonal AR and MA terms can be found by analysing the correllelogram of residuals after the basic ARIMA model has been estimated. Seasonal ARIMA models with more than one seasonal period can be developed. Darbellay and Slama (2000), and also Taylor (2003), used seasonal periods of one day and one week for their double seasonal ARIMA models. An example that would be a natural starting-point for the data in this paper would be an ARIMA(1,0,1)х(1,0,1,48)х(1,0,1,336) model. This can be written as (1- φl)( 1-φ 1 L 48 )(1-φ 2 L 336 )(Y t -c) = (1-θL)(1-ω 1 L 48 )(1-ω 2 L 336 )ε t. A season of 336 periods will be used in the estimation of a seasonal ARIMA model for this data. Some seasonal autoregressive or moving average terms may be added for the 48-period season, though not in the form outlined in the double seasonal model above. The estimation techniques used prevent a second season being added in a separate bracket as written above, but lags of 48 periods may be included in the 336-period bracket; i.e. (1-φL)(1-φ 1 L 48 -φ 2 L 336 )(Y t - c) = (1-θL)(1-ω 1 L 48 -ω 2 L 336 )ε t.

18 Multivariate Regression A simple multivariate regression model can be used to compare the univariate ARIMA and exponential smoothing models against. Although there are few time series variables to regress electricity demand against, with the one obvious choice being temperature, dummy variables can be used for the half-hour period of the day, the day of the week, the month of the year and also the year itself. Other dummy variables can be tested, and adding lagged dependent variables is another way to improve the accuracy of the regression model. Bunn (1982) discussed some special effects that may be taken into account when forecasting short-term demand in electricity. These include weather variables, television audience behaviour, holidays, on-set of darkness and daylight-savings time. Limitations in the availability of data prevent some of these variables being tested. The general formula for such a model is as follows: X t = c + Σ i=2 48 φ i h t + Σ j=2 7 θ j d t +Σ k=2 12 ρ k m t + ωy t + α*temp t + {other dummy variables} + {lagged dependent variables} + e t, where h is the half-hourly dummy variable, d is the day of the week dummy variable, m the month dummy variable, and y the year dummy variable, and φ i, θ j, ρ k, and ω are the parameters for the 47 half-hours, 6 days, 11 months and the one year requiring dummy variables. Dummy variables need to be estimated for all but one of the half-hours, days, months and years, with the half-hour, day month and year not allocated a dummy variable used as a base. Hyde and Hodnett (1997) found that adding an error adjustment term improved forecasting accuracy. A simple error adjustment term will be added, as for Holt-Winters, in the form of e t = λe t-1 + ε t.

19 4. Results and Interpretation Empirical analysis is performed to compare the forecasting accuracy of the models. Demand is forecast for one to six periods ahead since the generators and the Systems Operator for the spot market require different lengths of foresight in demand for their different roles. The possibility exists that some models that accurately forecast one period ahead may be less accurate in forecasting six periods ahead. As mentioned previously, the univariate models have estimation periods of eight weeks, the multivariate regression model have an estimation period of one year, and the same four week period is used as a forecast sample for all models. Stationarity The twelve-week period of quantity demanded observations used for univariate estimation and forecasting is tested for nonstationarity. There is very strong evidence against quantity containing a unit root. Therefore, quantity does not need to be differenced before estimating Holt-Winters and ARMA models. Testing the one year and four week period of quantity data provides no evidence against nonstationarity in the data. In the absence of other time series variables in the data, this would require quantity to be differenced to remove the nonstationarity. However, since temperature is a time series variable, there may exist cointegration between quantity and temperature. A linear regression with an intercept is run on quantity and temperature, and the residuals are tested for nonstationarity. There is very strong evidence against nonstationarity, so Engle-

20 Granger cointegration exists between quantity and temperature, which means the data is not required to be differenced before the regression is run. One Season Holt-Winters Exponential Smoothing The initial trend value is calculated by taking the average of: (i) the difference between the mean of the first and the second 336 observations divided by 336; and (ii) the mean of the first differences from the first two weeks of the sample. The initial level value is calculated by taking the mean of the first 672 observations, and adding times the initial trend. The model also requires initial seasonal indices for each of the 336 periods in the season. These are calculated as the average of the ratio of observation to 336-point moving means for each corresponding half-hour period, taken from the first two weeks of the sample. The parameters are estimated in Excel to minimise the mean absolute percentage error (MAPE) of one-step-ahead forecasts. MAPE is the most commonly used forecasting error summary in short-term electricity demand forecasting (Taylor, 2003). Random numbers between zero and one are generated for the parameter values, and the combinations of parameters that resulted in the lowest MAPEs over time are selected and used to narrow the range of random number generation for each parameter. This process is followed until the specific parameters that minimised the MAPE for the estimation sample were identified. Double Seasonal Holt-Winters Exponential Smoothing

21 Initial values for the level and the trend are calculated in the same manner as for Holt-Winters with one season. The initial values for the 48 day indices are estimated by taking the average of the ratios of observations to 48-point moving mean for the corresponding periods from the first week of the sample. The initial values for the 336 week indices are estimated by taking the average of the ratios of observations to 336-point moving mean from the first two weeks of the sample, divided by the corresponding day indices. The same process for estimation of the parameters is used for double seasonal Holt-Winters as is used for one season Holt-Winters. Error Adjustment for Holt-Winters Models After estimating the Holt-Winters model for one and two seasons, significant positive autocorrelation of residuals was found. This is unsurprising, given the prevalence of autocorrelation in other literature on Holt-Winters forecasting. Our estimation of both the one season and double seasonal Holt-Winters models with error correction estimates the error correction parameter lambda in conjunction with estimating the other parameters, and using the same method as the estimation of the other parameters. Random numbers between 0 and 1 are generated for lambda since the autocorrelation coefficient is significantly positive, and the range is narrowed down to find the value of lambda that minimises the MAPE of the estimation sample. The estimated coefficients for the Holt-Winters exponential smoothing models without and with error adjustment terms are reported in Tables 1 and 2 respectively. Table 1: Estimated Coefficients of Holt-Winters Exponential Smoothing Models

22 Level α Trend β Within-day seasonality δ Within-week seasonality ω One Season Holt-Winters Double Seasonal Holt-Winters Table 2: Estimated Coefficients of Holt-Winters Exponential Smoothing Models with Error Adjustment Level α Trend β Within-day seasonality δ Within-week seasonality ω Error adjustment λ One Season Holt-Winters Double Seasonal Holt-Winters Seasonal ARIMA Several statistics are considered important for identifying the correct specification of the ARIMA model. In keeping with the estimation of the Holt-Winters model, the MAPE of onestep-ahead forecasts is one of the statistics considered. Other criteria used to select the specification of the model include the Akaike Information Criterion, the adjusted R-squared, and the Box-Jenkins methodology to minimise or eliminate the autocorrelation of residuals. Due to the difficulty in estimating a true double seasonal ARIMA model, the hybrid model which performed the best overall with regards to the criteria above is difficult to write in compact form. In expanded form, the model is written as: (1-1.36L L 2 )(1-0.32L L L L L 1344 )(Y t ) = ( L 48 )( L L 672 )ε t This specification has two autoregressive terms, seasonal autoregressive terms of lags 48, 336, 672, 1008 and 1344, a moving-average term with a lag of 48, and seasonal moving-average terms of lags 336 and 672. Of the many combinations of autoregressive and moving-average terms tested, this was the only specification that did not have statistically significant

23 autocorrelation of residuals. It also has the second-lowest Akaike Information Criterion and MAPE, and the highest adjusted R-squared, which all indicate a well-specified model. Multivariate Regression Initially, a model with only dummy variables for the half-hour, day, month and year is estimated, with an MAPE for the period of estimation of Adding temperature to the model decreases the MAPE to 15.9, though of the other variables added, only a dummy variable for public holidays that fall on weekdays was significant. Variables found to be insignificant include dummy variables for daylight savings and school holidays, and a time variable that increases by one for each subsequent period. Adding lagged dependent variables has a significant effect on decreasing the MAPE of the forecasts. For example, adding a dependent variable of one lag decreases the MAPE from 15.8 to Adding lags from 1 to 5 periods behind, 46 to 49 periods behind, and 329 and 334 to 339 periods behind all added to the forecasting accuracy of the model. The Breusch-Godfrey serial correlation test provides extremely strong evidence against no autocorrelation of residuals. Autocorrelation is particularly severe with residuals from 48 periods behind. However, autocorrelation only affects the standard errors of the coefficients, not the estimates of the coefficients themselves. In testing the significance of variables this would be a considerable problem. Since we are only interested in estimating a model to provide accurate forecasts, autocorrelation is far less important. Forecasting accuracy may be improved by including a lagged error term as was used in the Holt-Winters models. In this case, the results when including a lagged error term for one period behind and for 48 periods behind did

24 not improve the forecasting accuracy of the model. The White Test provided extremely strong evidence against no heteroskedasticity in the model. This implies that the magnitude of the residuals in the model vary as at least one of the variables in the model varies. Once again, heteroskedasticity affects the standard errors of the coefficients and not the estimation of the coefficients themselves, so for building a forecasting model this will not have an impact. The estimated coefficients and standard errors for the multivariate regression model are reported in Table 7 of Appendix 1. Discussion Figures 6 and 7 compare the accuracy of the models for forecasting one to six periods ahead. The seasonal ARIMA model performed best in forecasting for all time periods except one period ahead, where it was second best with an MAPE of 2.02, slightly behind the double seasonal Holt-Winters exponential smoothing model s MAPE of The one season Holt-Winters, double seasonal Holt-Winters and seasonal ARIMA were very similar in accuracy for one period ahead, and even the multivariate regression model was not far behind. From two to six periods ahead, the errors for the Holt-Winters and multivariate regression models were fairly similar in accuracy, highlighting the relative supremacy of the seasonal ARIMA. Seasonal ARIMA forecasting errors for six periods ahead were 6.21, well below the other models MAPEs of between 6.93 and One reason for this could be the superior error adjustment structure of the seasonal ARIMA model. Three moving average terms including two seasonal moving average terms with one and two-week lags were included, and each had the same power for any number of forecasting periods ahead. However, for the Holt-Winters models with error

25 adjustment terms, the coefficient for the error adjustment decreases greatly in magnitude as the forecasting period ahead is extended, so that when forecasting six periods ahead, the error adjustment would have had very little impact on the actual forecast. The multivariate regression model had no error adjustment term as it did not improve forecasting ability in estimation. The inaccuracy in forecasting from two to six periods ahead for the multivariate model is not surprising given the relative inaccuracy in forecasting one period ahead. It must be noted that there are many multivariate models in literature for short-term electricity load forecasting, so we cannot conclude from these results that univariate models are superior. These results are surprising given that Taylor found the double seasonal Holt-Winters model with an error adjustment to be clearly more accurate than the seasonal ARIMA model. Equally surprising is that Taylor s paper estimated a true double seasonal ARIMA model, while our seasonal ARIMA model was effectively a one season model with a crude adjustment. A properly formatted double seasonal ARIMA model would be expected to yield even more accurate results. Figure 6: MAPE s of forecasts from one to six periods ahead for data from July 21 to August Forecast Periods Ahead Forecasting Method One Season Holt-Winters One Season Error Adjusted Holt-Winters Double Seasonal Holt-Winters Double Seasonal Error Adjusted Holt-Winters Multivariate Regression Seasonal ARIMA

26 Figure 7: MAPE s of forecasts from one to six periods ahead for data from July 21 to August One Season Holt-Winters One Season Error Adjusted Holt-Winters MAPE Double Seasonal Holt-Winters Double Seasonal Error Adjusted Holt- Winters Multivariate Regression Seasonal ARIMA Forecast Periods Ahead The results when comparing the four Holt-Winters models are unsurprising, with the double seasonal Holt-Winters performing better than the one season version. The data clearly contained two seasonal trends, so the one season Holt-Winters would not have adjusted for the seasonal variation as successfully as the double seasonal model. The error adjustment versions also performed better than the models without them, especially for very short-term forecasting, for reasons explained above.

27 5. Conclusion The importance of short-term electricity load forecasting and the significant financial gains for players in the spot market that can be achieved through increased accuracy has encouraged a substantial amount of research into various univariate and multivariate models. Seasonal ARIMA, Holt-Winters exponential smoothing and variations on weather-related multivariate models have proven most popular in recent years. In this study, one season and two season Holt-Winters exponential smoothing models with and without error adjustment terms, a hybrid of a single and double seasonal ARIMA model, and a dummy variable model with temperature and lagged dependent variables were compared for forecasting electricity load in the Hayward node of New Zealand for one to six periods ahead. The seasonal ARIMA model performed the best in minimising the mean absolute percentage errors, especially for longer-term forecasting. The error adjustment term in the Holt-Winters model significantly improved very short-term forecasting, but the improvements were reduced for longer-term forecasts. Given the relative superiority of the seasonal ARIMA model in forecasting for the Hayward node, the estimation and performance of a pure double seasonal ARIMA model for nodal electricity demand should be investigated. Also, other multivariate models should be empirically tested before it can be concluded that univariate models are superior for short-term load forecasting, as the multivariate model used in this study is only one of a variety of multivariate models introduced in other literature. Another extension would be to use the models to forecast demand for other nodes in New Zealand. The distribution of demand for electricity over a day varies greatly across nodes, given the characteristics of

28 electricity consumers, especially non-residential consumers, also varies greatly across nodes. A combination of models may be a sensible way to deal with the relative strengths and weaknesses of models, with weights varying for different periods of time (Smith, 1989) or different forecast periods ahead.

29 6. Acknowledgements I would like to sincerely thank Dr Erwann Sbai for his constant guidance and assistance on all aspects of this paper. I would also like to thank Dr James W. Taylor for his helpful response to queries about estimation of the Holt-Winters exponential smoothing model.

30 Appendix 1 Table 1 Dickey-Fuller Unit Root Test for Quantity for One Year and Four Week Period Null Hypothesis: QUANTITY has a unit root Exogenous: Constant Lag Length: 44 (Automatic based on SIC, MAXLAG=44) t-statistic Prob.* Augmented Dickey-Fuller test statistic Test critical values: 1% level % level % level *MacKinnon (1996) one-sided p-values. Augmented Dickey-Fuller Test Equation Dependent Variable: D(QUANTITY) Method: Least Squares Date: 11/16/08 Time: 13:53 Sample (adjusted): Included observations: after adjustments Table 2 Dickey-Fuller Unit Root Test for Temperature for One Year and Four Week Period Null Hypothesis: TEMPHH has a unit root Exogenous: Constant

31 Lag Length: 40 (Automatic based on SIC, MAXLAG=44) t-statistic Prob.* Augmented Dickey-Fuller test statistic Test critical values: 1% level % level % level *MacKinnon (1996) one-sided p-values. Augmented Dickey-Fuller Test Equation Dependent Variable: D(TEMPHH) Method: Least Squares Date: 11/16/08 Time: 13:57 Sample (adjusted): Included observations: after adjustments Table 3 Dickey-Fuller Unit Root Test for Residuals of Regression for One Year and Four Week Period Null Hypothesis: RESID01 has a unit root Exogenous: Constant Lag Length: 44 (Automatic based on SIC, MAXLAG=44)

32 t-statistic Prob.* Augmented Dickey-Fuller test statistic Test critical values: 1% level % level % level *MacKinnon (1996) one-sided p-values. Augmented Dickey-Fuller Test Equation Dependent Variable: D(RESID01) Method: Least Squares Date: 11/16/08 Time: 13:59 Sample (adjusted): Included observations: after adjustments Table 4 Dickey-Fuller Unit Root Test for Quantity for Twelve Week Period Null Hypothesis: Q has a unit root Exogenous: Constant Lag Length: 30 (Automatic based on SIC, MAXLAG=31)

33 t-statistic Prob.* Augmented Dickey-Fuller test statistic Test critical values: 1% level % level % level *MacKinnon (1996) one-sided p-values. Augmented Dickey-Fuller Test Equation Dependent Variable: D(Q) Method: Least Squares Date: 11/11/08 Time: 14:16 Sample (adjusted): Included observations: 4673 after adjustments Table 5 Estimated Coefficients and Standard Errors from ARIMA Estimation Dependent Variable: Q Method: Least Squares Date: 10/28/08 Time: 18:35 Sample (adjusted):

34 Included observations: 1342 after adjustments Convergence achieved after 11 iterations Backcast: OFF (Roots of MA process too large) Variable Coefficient Std. Error t-statistic Prob. C AR(1) AR(2) SAR(48) SAR(336) SAR(672) SAR(1008) SAR(1344) MA(48) SMA(336) SMA(672) R-squared Mean dependent var Adjusted R-squared S.D. dependent var S.E. of regression Akaike info criterion Sum squared resid Schwarz criterion Log likelihood F-statistic Durbin-Watson stat Prob(F-statistic) Table 6 Autocorrelation Test for Preferred ARIMA Model Breusch-Godfrey Serial Correlation LM Test: F-statistic Probability Obs*R-squared Probability

35 Test Equation: Dependent Variable: RESID Method: Least Squares Date: 11/11/08 Time: 14:25 Presample missing value lagged residuals set to zero. Table 7 Estimated Coefficients and Standard Errors of Multivariate Regression Model Dependent Variable: QUANTITY Method: Least Squares Date: 10/30/08 Time: 15:26 Sample (adjusted): Included observations: after adjustments

36 Variable Coefficient Std. Error t-statistic Prob. C QUANTITY(-1) QUANTITY(-2) QUANTITY(-3) QUANTITY(-4) QUANTITY(-5) QUANTITY(-46) QUANTITY(-47) QUANTITY(-48) QUANTITY(-49) QUANTITY(-329) QUANTITY(-334) QUANTITY(-335) QUANTITY(-336) QUANTITY(-337) QUANTITY(-338) QUANTITY(-339) NUM FEBRUARY MARCH APRIL MAY JUNE JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY SUNDAY H H H H H H H H H H

37 H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H HOLIDAYWKD TEMPHH R-squared Mean dependent var Adjusted R-squared S.D. dependent var S.E. of regression Akaike info criterion Sum squared resid 9.54E+08 Schwarz criterion Log likelihood F-statistic Durbin-Watson stat Prob(F-statistic)

38 Appendix 2 References Box, G. E. P., Jenkins, G. M. and Reinsel, G. C. (1994). Time Series Analysis: Forecasting and Control, 3 rd edn, Prentice-Hall: Englewood Cliffs. NJ, p333. Bunn, D. W. (1982). A Review of Procedures in the Electricity Supply Industry. The Journal of the Operational Research Society, Vol 33(6), Chatfield, C. (1978). The Holt-Winters Forecasting Procedure. Applied Statistics, Vol 27(3), Cottet, R. and Smith, M. (2003). Bayesian Modeling and Forecasting if Intraday Electricity Load. Journal of the American Statistical Association, Vol 98, Darbellay, G. A. and Slama, M. (2000). Forecasting the Short-term Demand for Electricity Do Neural Networks Stand a Better Chance? International Journal of Forecasting, Vol 16, Genesis Energy. Electricity Trading in the New Zealand Electricity Market. Retrieved from D748-07D0-4721F0FC48B7&siteName=genesis on 13 March Hyde, O. and Hodnett, P. F. (1997). Modeling the Effects of Weather in Short-term Electricity Load Forecasting. Mathematical Engineering in Industry, Vol 6, Reid, D. J. (1975). A Review of Short-term Projection Techniques. Practical Aspects of Forecasting. Operational Reserch Society: London, pp8-25. Smith, D. G. C. (1989). Combination of Forecasts in Electricity Demand Prediction. Journal of Forecasting, Vol 8, Taylor, J. W. (2003). Short-term Electricity Demand Forecasting using Double Seasonal Exponential Smoothing. Journal of the Operational Research Society, Vol 54, Taylor, J. W. (2006). A Comparison of Univariate Methods for Forecasting Electricity Demand up to a Day Ahead. International Journal of Forecasting, Vol 22, Vogelvang, B. (2005). Econometrics: Theory and Applications with EViews. Pearson Education Limited, Essex, England.

Forecasting the US Dollar / Euro Exchange rate Using ARMA Models

Forecasting the US Dollar / Euro Exchange rate Using ARMA Models Forecasting the US Dollar / Euro Exchange rate Using ARMA Models LIUWEI (9906360) - 1 - ABSTRACT...3 1. INTRODUCTION...4 2. DATA ANALYSIS...5 2.1 Stationary estimation...5 2.2 Dickey-Fuller Test...6 3.

More information

Time Series Analysis

Time Series Analysis Time Series Analysis Identifying possible ARIMA models Andrés M. Alonso Carolina García-Martos Universidad Carlos III de Madrid Universidad Politécnica de Madrid June July, 2012 Alonso and García-Martos

More information

Advanced Forecasting Techniques and Models: ARIMA

Advanced Forecasting Techniques and Models: ARIMA Advanced Forecasting Techniques and Models: ARIMA Short Examples Series using Risk Simulator For more information please visit: www.realoptionsvaluation.com or contact us at: admin@realoptionsvaluation.com

More information

Forecasting of Paddy Production in Sri Lanka: A Time Series Analysis using ARIMA Model

Forecasting of Paddy Production in Sri Lanka: A Time Series Analysis using ARIMA Model Tropical Agricultural Research Vol. 24 (): 2-3 (22) Forecasting of Paddy Production in Sri Lanka: A Time Series Analysis using ARIMA Model V. Sivapathasundaram * and C. Bogahawatte Postgraduate Institute

More information

Promotional Forecast Demonstration

Promotional Forecast Demonstration Exhibit 2: Promotional Forecast Demonstration Consider the problem of forecasting for a proposed promotion that will start in December 1997 and continues beyond the forecast horizon. Assume that the promotion

More information

TIME SERIES ANALYSIS

TIME SERIES ANALYSIS TIME SERIES ANALYSIS Ramasubramanian V. I.A.S.R.I., Library Avenue, New Delhi- 110 012 ram_stat@yahoo.co.in 1. Introduction A Time Series (TS) is a sequence of observations ordered in time. Mostly these

More information

TIME SERIES ANALYSIS

TIME SERIES ANALYSIS TIME SERIES ANALYSIS L.M. BHAR AND V.K.SHARMA Indian Agricultural Statistics Research Institute Library Avenue, New Delhi-0 02 lmb@iasri.res.in. Introduction Time series (TS) data refers to observations

More information

16 : Demand Forecasting

16 : Demand Forecasting 16 : Demand Forecasting 1 Session Outline Demand Forecasting Subjective methods can be used only when past data is not available. When past data is available, it is advisable that firms should use statistical

More information

Time Series Analysis

Time Series Analysis Time Series Analysis Forecasting with ARIMA models Andrés M. Alonso Carolina García-Martos Universidad Carlos III de Madrid Universidad Politécnica de Madrid June July, 2012 Alonso and García-Martos (UC3M-UPM)

More information

The relationship between stock market parameters and interbank lending market: an empirical evidence

The relationship between stock market parameters and interbank lending market: an empirical evidence Magomet Yandiev Associate Professor, Department of Economics, Lomonosov Moscow State University mag2097@mail.ru Alexander Pakhalov, PG student, Department of Economics, Lomonosov Moscow State University

More information

Performing Unit Root Tests in EViews. Unit Root Testing

Performing Unit Root Tests in EViews. Unit Root Testing Página 1 de 12 Unit Root Testing The theory behind ARMA estimation is based on stationary time series. A series is said to be (weakly or covariance) stationary if the mean and autocovariances of the series

More information

Luciano Rispoli Department of Economics, Mathematics and Statistics Birkbeck College (University of London)

Luciano Rispoli Department of Economics, Mathematics and Statistics Birkbeck College (University of London) Luciano Rispoli Department of Economics, Mathematics and Statistics Birkbeck College (University of London) 1 Forecasting: definition Forecasting is the process of making statements about events whose

More information

Forecasting Using Eviews 2.0: An Overview

Forecasting Using Eviews 2.0: An Overview Forecasting Using Eviews 2.0: An Overview Some Preliminaries In what follows it will be useful to distinguish between ex post and ex ante forecasting. In terms of time series modeling, both predict values

More information

Forecasting areas and production of rice in India using ARIMA model

Forecasting areas and production of rice in India using ARIMA model International Journal of Farm Sciences 4(1) :99-106, 2014 Forecasting areas and production of rice in India using ARIMA model K PRABAKARAN and C SIVAPRAGASAM* Agricultural College and Research Institute,

More information

ADVANCED FORECASTING MODELS USING SAS SOFTWARE

ADVANCED FORECASTING MODELS USING SAS SOFTWARE ADVANCED FORECASTING MODELS USING SAS SOFTWARE Girish Kumar Jha IARI, Pusa, New Delhi 110 012 gjha_eco@iari.res.in 1. Transfer Function Model Univariate ARIMA models are useful for analysis and forecasting

More information

Air passenger departures forecast models A technical note

Air passenger departures forecast models A technical note Ministry of Transport Air passenger departures forecast models A technical note By Haobo Wang Financial, Economic and Statistical Analysis Page 1 of 15 1. Introduction Sine 1999, the Ministry of Business,

More information

2016 ERCOT System Planning Long-Term Hourly Peak Demand and Energy Forecast December 31, 2015

2016 ERCOT System Planning Long-Term Hourly Peak Demand and Energy Forecast December 31, 2015 2016 ERCOT System Planning Long-Term Hourly Peak Demand and Energy Forecast December 31, 2015 2015 Electric Reliability Council of Texas, Inc. All rights reserved. Long-Term Hourly Peak Demand and Energy

More information

Time Series - ARIMA Models. Instructor: G. William Schwert

Time Series - ARIMA Models. Instructor: G. William Schwert APS 425 Fall 25 Time Series : ARIMA Models Instructor: G. William Schwert 585-275-247 schwert@schwert.ssb.rochester.edu Topics Typical time series plot Pattern recognition in auto and partial autocorrelations

More information

The Combination Forecasting Model of Auto Sales Based on Seasonal Index and RBF Neural Network

The Combination Forecasting Model of Auto Sales Based on Seasonal Index and RBF Neural Network , pp.67-76 http://dx.doi.org/10.14257/ijdta.2016.9.1.06 The Combination Forecasting Model of Auto Sales Based on Seasonal Index and RBF Neural Network Lihua Yang and Baolin Li* School of Economics and

More information

A Trading Strategy Based on the Lead-Lag Relationship of Spot and Futures Prices of the S&P 500

A Trading Strategy Based on the Lead-Lag Relationship of Spot and Futures Prices of the S&P 500 A Trading Strategy Based on the Lead-Lag Relationship of Spot and Futures Prices of the S&P 500 FE8827 Quantitative Trading Strategies 2010/11 Mini-Term 5 Nanyang Technological University Submitted By:

More information

IBM SPSS Forecasting 22

IBM SPSS Forecasting 22 IBM SPSS Forecasting 22 Note Before using this information and the product it supports, read the information in Notices on page 33. Product Information This edition applies to version 22, release 0, modification

More information

Univariate and Multivariate Methods PEARSON. Addison Wesley

Univariate and Multivariate Methods PEARSON. Addison Wesley Time Series Analysis Univariate and Multivariate Methods SECOND EDITION William W. S. Wei Department of Statistics The Fox School of Business and Management Temple University PEARSON Addison Wesley Boston

More information

ITSM-R Reference Manual

ITSM-R Reference Manual ITSM-R Reference Manual George Weigt June 5, 2015 1 Contents 1 Introduction 3 1.1 Time series analysis in a nutshell............................... 3 1.2 White Noise Variance.....................................

More information

Price volatility in the silver spot market: An empirical study using Garch applications

Price volatility in the silver spot market: An empirical study using Garch applications Price volatility in the silver spot market: An empirical study using Garch applications ABSTRACT Alan Harper, South University Zhenhu Jin Valparaiso University Raufu Sokunle UBS Investment Bank Manish

More information

Testing for Granger causality between stock prices and economic growth

Testing for Granger causality between stock prices and economic growth MPRA Munich Personal RePEc Archive Testing for Granger causality between stock prices and economic growth Pasquale Foresti 2006 Online at http://mpra.ub.uni-muenchen.de/2962/ MPRA Paper No. 2962, posted

More information

Integrated Resource Plan

Integrated Resource Plan Integrated Resource Plan March 19, 2004 PREPARED FOR KAUA I ISLAND UTILITY COOPERATIVE LCG Consulting 4962 El Camino Real, Suite 112 Los Altos, CA 94022 650-962-9670 1 IRP 1 ELECTRIC LOAD FORECASTING 1.1

More information

Time Series and Forecasting

Time Series and Forecasting Chapter 22 Page 1 Time Series and Forecasting A time series is a sequence of observations of a random variable. Hence, it is a stochastic process. Examples include the monthly demand for a product, the

More information

MGT 267 PROJECT. Forecasting the United States Retail Sales of the Pharmacies and Drug Stores. Done by: Shunwei Wang & Mohammad Zainal

MGT 267 PROJECT. Forecasting the United States Retail Sales of the Pharmacies and Drug Stores. Done by: Shunwei Wang & Mohammad Zainal MGT 267 PROJECT Forecasting the United States Retail Sales of the Pharmacies and Drug Stores Done by: Shunwei Wang & Mohammad Zainal Dec. 2002 The retail sale (Million) ABSTRACT The present study aims

More information

Week TSX Index 1 8480 2 8470 3 8475 4 8510 5 8500 6 8480

Week TSX Index 1 8480 2 8470 3 8475 4 8510 5 8500 6 8480 1) The S & P/TSX Composite Index is based on common stock prices of a group of Canadian stocks. The weekly close level of the TSX for 6 weeks are shown: Week TSX Index 1 8480 2 8470 3 8475 4 8510 5 8500

More information

Chapter 9: Univariate Time Series Analysis

Chapter 9: Univariate Time Series Analysis Chapter 9: Univariate Time Series Analysis In the last chapter we discussed models with only lags of explanatory variables. These can be misleading if: 1. The dependent variable Y t depends on lags of

More information

Time Series Analysis and Forecasting Methods for Temporal Mining of Interlinked Documents

Time Series Analysis and Forecasting Methods for Temporal Mining of Interlinked Documents Time Series Analysis and Forecasting Methods for Temporal Mining of Interlinked Documents Prasanna Desikan and Jaideep Srivastava Department of Computer Science University of Minnesota. @cs.umn.edu

More information

Chapter 5: Bivariate Cointegration Analysis

Chapter 5: Bivariate Cointegration Analysis Chapter 5: Bivariate Cointegration Analysis 1 Contents: Lehrstuhl für Department Empirische of Wirtschaftsforschung Empirical Research and und Econometrics Ökonometrie V. Bivariate Cointegration Analysis...

More information

Time Series Analysis: Basic Forecasting.

Time Series Analysis: Basic Forecasting. Time Series Analysis: Basic Forecasting. As published in Benchmarks RSS Matters, April 2015 http://web3.unt.edu/benchmarks/issues/2015/04/rss-matters Jon Starkweather, PhD 1 Jon Starkweather, PhD jonathan.starkweather@unt.edu

More information

THE UNIVERSITY OF CHICAGO, Booth School of Business Business 41202, Spring Quarter 2014, Mr. Ruey S. Tsay. Solutions to Homework Assignment #2

THE UNIVERSITY OF CHICAGO, Booth School of Business Business 41202, Spring Quarter 2014, Mr. Ruey S. Tsay. Solutions to Homework Assignment #2 THE UNIVERSITY OF CHICAGO, Booth School of Business Business 41202, Spring Quarter 2014, Mr. Ruey S. Tsay Solutions to Homework Assignment #2 Assignment: 1. Consumer Sentiment of the University of Michigan.

More information

Is the Forward Exchange Rate a Useful Indicator of the Future Exchange Rate?

Is the Forward Exchange Rate a Useful Indicator of the Future Exchange Rate? Is the Forward Exchange Rate a Useful Indicator of the Future Exchange Rate? Emily Polito, Trinity College In the past two decades, there have been many empirical studies both in support of and opposing

More information

The SAS Time Series Forecasting System

The SAS Time Series Forecasting System The SAS Time Series Forecasting System An Overview for Public Health Researchers Charles DiMaggio, PhD College of Physicians and Surgeons Departments of Anesthesiology and Epidemiology Columbia University

More information

Testing The Quantity Theory of Money in Greece: A Note

Testing The Quantity Theory of Money in Greece: A Note ERC Working Paper in Economic 03/10 November 2003 Testing The Quantity Theory of Money in Greece: A Note Erdal Özmen Department of Economics Middle East Technical University Ankara 06531, Turkey ozmen@metu.edu.tr

More information

Turkey s Energy Demand

Turkey s Energy Demand Current Research Journal of Social Sciences 1(3): 123-128, 2009 ISSN: 2041-3246 Maxwell Scientific Organization, 2009 Submitted Date: September 28, 2009 Accepted Date: October 12, 2009 Published Date:

More information

Source engine marketing: A preliminary empirical analysis of web search data

Source engine marketing: A preliminary empirical analysis of web search data Source engine marketing: A preliminary empirical analysis of web search data ABSTRACT Bruce Q. Budd Alfaisal University The purpose of this paper is to empirically investigate a website performance and

More information

3.1 Stationary Processes and Mean Reversion

3.1 Stationary Processes and Mean Reversion 3. Univariate Time Series Models 3.1 Stationary Processes and Mean Reversion Definition 3.1: A time series y t, t = 1,..., T is called (covariance) stationary if (1) E[y t ] = µ, for all t Cov[y t, y t

More information

Working Papers. Cointegration Based Trading Strategy For Soft Commodities Market. Piotr Arendarski Łukasz Postek. No. 2/2012 (68)

Working Papers. Cointegration Based Trading Strategy For Soft Commodities Market. Piotr Arendarski Łukasz Postek. No. 2/2012 (68) Working Papers No. 2/2012 (68) Piotr Arendarski Łukasz Postek Cointegration Based Trading Strategy For Soft Commodities Market Warsaw 2012 Cointegration Based Trading Strategy For Soft Commodities Market

More information

Chapter 6: Multivariate Cointegration Analysis

Chapter 6: Multivariate Cointegration Analysis Chapter 6: Multivariate Cointegration Analysis 1 Contents: Lehrstuhl für Department Empirische of Wirtschaftsforschung Empirical Research and und Econometrics Ökonometrie VI. Multivariate Cointegration

More information

I. Introduction. II. Background. KEY WORDS: Time series forecasting, Structural Models, CPS

I. Introduction. II. Background. KEY WORDS: Time series forecasting, Structural Models, CPS Predicting the National Unemployment Rate that the "Old" CPS Would Have Produced Richard Tiller and Michael Welch, Bureau of Labor Statistics Richard Tiller, Bureau of Labor Statistics, Room 4985, 2 Mass.

More information

Time Series Analysis

Time Series Analysis JUNE 2012 Time Series Analysis CONTENT A time series is a chronological sequence of observations on a particular variable. Usually the observations are taken at regular intervals (days, months, years),

More information

Some useful concepts in univariate time series analysis

Some useful concepts in univariate time series analysis Some useful concepts in univariate time series analysis Autoregressive moving average models Autocorrelation functions Model Estimation Diagnostic measure Model selection Forecasting Assumptions: 1. Non-seasonal

More information

Modelling and Forecasting Packaged Food Product Sales Using Mathematical Programming

Modelling and Forecasting Packaged Food Product Sales Using Mathematical Programming Modelling and Forecasting Packaged Food Product Sales Using Mathematical Programming Saurabh Gupta 1, Nishant Kumar 2 saurabhgupta2dams@gmail.com Abstract Sales forecasting is one of the most common phenomena

More information

Forecasting methods applied to engineering management

Forecasting methods applied to engineering management Forecasting methods applied to engineering management Áron Szász-Gábor Abstract. This paper presents arguments for the usefulness of a simple forecasting application package for sustaining operational

More information

Threshold Autoregressive Models in Finance: A Comparative Approach

Threshold Autoregressive Models in Finance: A Comparative Approach University of Wollongong Research Online Applied Statistics Education and Research Collaboration (ASEARC) - Conference Papers Faculty of Informatics 2011 Threshold Autoregressive Models in Finance: A Comparative

More information

Unit root properties of natural gas spot and futures prices: The relevance of heteroskedasticity in high frequency data

Unit root properties of natural gas spot and futures prices: The relevance of heteroskedasticity in high frequency data DEPARTMENT OF ECONOMICS ISSN 1441-5429 DISCUSSION PAPER 20/14 Unit root properties of natural gas spot and futures prices: The relevance of heteroskedasticity in high frequency data Vinod Mishra and Russell

More information

PITFALLS IN TIME SERIES ANALYSIS. Cliff Hurvich Stern School, NYU

PITFALLS IN TIME SERIES ANALYSIS. Cliff Hurvich Stern School, NYU PITFALLS IN TIME SERIES ANALYSIS Cliff Hurvich Stern School, NYU The t -Test If x 1,..., x n are independent and identically distributed with mean 0, and n is not too small, then t = x 0 s n has a standard

More information

Vector Time Series Model Representations and Analysis with XploRe

Vector Time Series Model Representations and Analysis with XploRe 0-1 Vector Time Series Model Representations and Analysis with plore Julius Mungo CASE - Center for Applied Statistics and Economics Humboldt-Universität zu Berlin mungo@wiwi.hu-berlin.de plore MulTi Motivation

More information

Chapter 4: Vector Autoregressive Models

Chapter 4: Vector Autoregressive Models Chapter 4: Vector Autoregressive Models 1 Contents: Lehrstuhl für Department Empirische of Wirtschaftsforschung Empirical Research and und Econometrics Ökonometrie IV.1 Vector Autoregressive Models (VAR)...

More information

COURSES: 1. Short Course in Econometrics for the Practitioner (P000500) 2. Short Course in Econometric Analysis of Cointegration (P000537)

COURSES: 1. Short Course in Econometrics for the Practitioner (P000500) 2. Short Course in Econometric Analysis of Cointegration (P000537) Get the latest knowledge from leading global experts. Financial Science Economics Economics Short Courses Presented by the Department of Economics, University of Pretoria WITH 2015 DATES www.ce.up.ac.za

More information

TEMPORAL CAUSAL RELATIONSHIP BETWEEN STOCK MARKET CAPITALIZATION, TRADE OPENNESS AND REAL GDP: EVIDENCE FROM THAILAND

TEMPORAL CAUSAL RELATIONSHIP BETWEEN STOCK MARKET CAPITALIZATION, TRADE OPENNESS AND REAL GDP: EVIDENCE FROM THAILAND I J A B E R, Vol. 13, No. 4, (2015): 1525-1534 TEMPORAL CAUSAL RELATIONSHIP BETWEEN STOCK MARKET CAPITALIZATION, TRADE OPENNESS AND REAL GDP: EVIDENCE FROM THAILAND Komain Jiranyakul * Abstract: This study

More information

IS THERE A LONG-RUN RELATIONSHIP

IS THERE A LONG-RUN RELATIONSHIP 7. IS THERE A LONG-RUN RELATIONSHIP BETWEEN TAXATION AND GROWTH: THE CASE OF TURKEY Salih Turan KATIRCIOGLU Abstract This paper empirically investigates long-run equilibrium relationship between economic

More information

JOHANNES TSHEPISO TSOKU NONOFO PHOKONTSI DANIEL METSILENG FORECASTING SOUTH AFRICAN GOLD SALES: THE BOX-JENKINS METHODOLOGY

JOHANNES TSHEPISO TSOKU NONOFO PHOKONTSI DANIEL METSILENG FORECASTING SOUTH AFRICAN GOLD SALES: THE BOX-JENKINS METHODOLOGY DOI: 0.20472/IAC.205.08.3 JOHANNES TSHEPISO TSOKU North West University, South Africa NONOFO PHOKONTSI North West University, South Africa DANIEL METSILENG Department of Health, South Africa FORECASTING

More information

Analysis and Computation for Finance Time Series - An Introduction

Analysis and Computation for Finance Time Series - An Introduction ECMM703 Analysis and Computation for Finance Time Series - An Introduction Alejandra González Harrison 161 Email: mag208@exeter.ac.uk Time Series - An Introduction A time series is a sequence of observations

More information

Analysis of algorithms of time series analysis for forecasting sales

Analysis of algorithms of time series analysis for forecasting sales SAINT-PETERSBURG STATE UNIVERSITY Mathematics & Mechanics Faculty Chair of Analytical Information Systems Garipov Emil Analysis of algorithms of time series analysis for forecasting sales Course Work Scientific

More information

NTC Project: S01-PH10 (formerly I01-P10) 1 Forecasting Women s Apparel Sales Using Mathematical Modeling

NTC Project: S01-PH10 (formerly I01-P10) 1 Forecasting Women s Apparel Sales Using Mathematical Modeling 1 Forecasting Women s Apparel Sales Using Mathematical Modeling Celia Frank* 1, Balaji Vemulapalli 1, Les M. Sztandera 2, Amar Raheja 3 1 School of Textiles and Materials Technology 2 Computer Information

More information

Studying Achievement

Studying Achievement Journal of Business and Economics, ISSN 2155-7950, USA November 2014, Volume 5, No. 11, pp. 2052-2056 DOI: 10.15341/jbe(2155-7950)/11.05.2014/009 Academic Star Publishing Company, 2014 http://www.academicstar.us

More information

Forecasting Geographic Data Michael Leonard and Renee Samy, SAS Institute Inc. Cary, NC, USA

Forecasting Geographic Data Michael Leonard and Renee Samy, SAS Institute Inc. Cary, NC, USA Forecasting Geographic Data Michael Leonard and Renee Samy, SAS Institute Inc. Cary, NC, USA Abstract Virtually all businesses collect and use data that are associated with geographic locations, whether

More information

Energy Load Mining Using Univariate Time Series Analysis

Energy Load Mining Using Univariate Time Series Analysis Energy Load Mining Using Univariate Time Series Analysis By: Taghreed Alghamdi & Ali Almadan 03/02/2015 Caruth Hall 0184 Energy Forecasting Energy Saving Energy consumption Introduction: Energy consumption.

More information

How To Model A Series With Sas

How To Model A Series With Sas Chapter 7 Chapter Table of Contents OVERVIEW...193 GETTING STARTED...194 TheThreeStagesofARIMAModeling...194 IdentificationStage...194 Estimation and Diagnostic Checking Stage...... 200 Forecasting Stage...205

More information

2. Linear regression with multiple regressors

2. Linear regression with multiple regressors 2. Linear regression with multiple regressors Aim of this section: Introduction of the multiple regression model OLS estimation in multiple regression Measures-of-fit in multiple regression Assumptions

More information

Energy consumption and GDP: causality relationship in G-7 countries and emerging markets

Energy consumption and GDP: causality relationship in G-7 countries and emerging markets Ž. Energy Economics 25 2003 33 37 Energy consumption and GDP: causality relationship in G-7 countries and emerging markets Ugur Soytas a,, Ramazan Sari b a Middle East Technical Uni ersity, Department

More information

Module 5: Multiple Regression Analysis

Module 5: Multiple Regression Analysis Using Statistical Data Using to Make Statistical Decisions: Data Multiple to Make Regression Decisions Analysis Page 1 Module 5: Multiple Regression Analysis Tom Ilvento, University of Delaware, College

More information

MULTIPLE REGRESSION AND ISSUES IN REGRESSION ANALYSIS

MULTIPLE REGRESSION AND ISSUES IN REGRESSION ANALYSIS MULTIPLE REGRESSION AND ISSUES IN REGRESSION ANALYSIS MSR = Mean Regression Sum of Squares MSE = Mean Squared Error RSS = Regression Sum of Squares SSE = Sum of Squared Errors/Residuals α = Level of Significance

More information

Forecasting Stock Market Series. with ARIMA Model

Forecasting Stock Market Series. with ARIMA Model Journal of Statistical and Econometric Methods, vol.3, no.3, 2014, 65-77 ISSN: 2241-0384 (print), 2241-0376 (online) Scienpress Ltd, 2014 Forecasting Stock Market Series with ARIMA Model Fatai Adewole

More information

Readers will be provided a link to download the software and Excel files that are used in the book after payment. Please visit http://www.xlpert.

Readers will be provided a link to download the software and Excel files that are used in the book after payment. Please visit http://www.xlpert. Readers will be provided a link to download the software and Excel files that are used in the book after payment. Please visit http://www.xlpert.com for more information on the book. The Excel files are

More information

UK GDP is the best predictor of UK GDP, literally.

UK GDP is the best predictor of UK GDP, literally. UK GDP IS THE BEST PREDICTOR OF UK GDP, LITERALLY ERIK BRITTON AND DANNY GABAY 6 NOVEMBER 2009 UK GDP is the best predictor of UK GDP, literally. The ONS s preliminary estimate of UK GDP for the third

More information

Big Data, Socio- Psychological Theory, Algorithmic Text Analysis, and Predicting the Michigan Consumer Sentiment Index

Big Data, Socio- Psychological Theory, Algorithmic Text Analysis, and Predicting the Michigan Consumer Sentiment Index Big Data, Socio- Psychological Theory, Algorithmic Text Analysis, and Predicting the Michigan Consumer Sentiment Index Rickard Nyman *, Paul Ormerod Centre for the Study of Decision Making Under Uncertainty,

More information

Practical. I conometrics. data collection, analysis, and application. Christiana E. Hilmer. Michael J. Hilmer San Diego State University

Practical. I conometrics. data collection, analysis, and application. Christiana E. Hilmer. Michael J. Hilmer San Diego State University Practical I conometrics data collection, analysis, and application Christiana E. Hilmer Michael J. Hilmer San Diego State University Mi Table of Contents PART ONE THE BASICS 1 Chapter 1 An Introduction

More information

Causes of Inflation in the Iranian Economy

Causes of Inflation in the Iranian Economy Causes of Inflation in the Iranian Economy Hamed Armesh* and Abas Alavi Rad** It is clear that in the nearly last four decades inflation is one of the important problems of Iranian economy. In this study,

More information

Promotional Analysis and Forecasting for Demand Planning: A Practical Time Series Approach Michael Leonard, SAS Institute Inc.

Promotional Analysis and Forecasting for Demand Planning: A Practical Time Series Approach Michael Leonard, SAS Institute Inc. Promotional Analysis and Forecasting for Demand Planning: A Practical Time Series Approach Michael Leonard, SAS Institute Inc. Cary, NC, USA Abstract Many businesses use sales promotions to increase the

More information

Simple linear regression

Simple linear regression Simple linear regression Introduction Simple linear regression is a statistical method for obtaining a formula to predict values of one variable from another where there is a causal relationship between

More information

Introduction to Time Series Analysis and Forecasting. 2nd Edition. Wiley Series in Probability and Statistics

Introduction to Time Series Analysis and Forecasting. 2nd Edition. Wiley Series in Probability and Statistics Brochure More information from http://www.researchandmarkets.com/reports/3024948/ Introduction to Time Series Analysis and Forecasting. 2nd Edition. Wiley Series in Probability and Statistics Description:

More information

FORECAST MODEL USING ARIMA FOR STOCK PRICES OF AUTOMOBILE SECTOR. Aloysius Edward. 1, JyothiManoj. 2

FORECAST MODEL USING ARIMA FOR STOCK PRICES OF AUTOMOBILE SECTOR. Aloysius Edward. 1, JyothiManoj. 2 FORECAST MODEL USING ARIMA FOR STOCK PRICES OF AUTOMOBILE SECTOR Aloysius Edward. 1, JyothiManoj. 2 Faculty, Kristu Jayanti College, Autonomous, Bengaluru. Abstract There has been a growing interest in

More information

Overview of Violations of the Basic Assumptions in the Classical Normal Linear Regression Model

Overview of Violations of the Basic Assumptions in the Classical Normal Linear Regression Model Overview of Violations of the Basic Assumptions in the Classical Normal Linear Regression Model 1 September 004 A. Introduction and assumptions The classical normal linear regression model can be written

More information

Analysis of Financial Time Series

Analysis of Financial Time Series Analysis of Financial Time Series Analysis of Financial Time Series Financial Econometrics RUEY S. TSAY University of Chicago A Wiley-Interscience Publication JOHN WILEY & SONS, INC. This book is printed

More information

Monitoring web traffic source effectiveness with Google Analytics An experiment with time series

Monitoring web traffic source effectiveness with Google Analytics An experiment with time series The current issue and full text archive of this journal is available at wwwemeraldinsightcom/0001-253xhtm AP 474 Received 9 July 2008 Revised 21 January 2009 Accepted 6 February 2009 Monitoring web traffic

More information

Time Series Analysis

Time Series Analysis Time Series 1 April 9, 2013 Time Series Analysis This chapter presents an introduction to the branch of statistics known as time series analysis. Often the data we collect in environmental studies is collected

More information

Hedge ratio estimation and hedging effectiveness: the case of the S&P 500 stock index futures contract

Hedge ratio estimation and hedging effectiveness: the case of the S&P 500 stock index futures contract Int. J. Risk Assessment and Management, Vol. 9, Nos. 1/2, 2008 121 Hedge ratio estimation and hedging effectiveness: the case of the S&P 500 stock index futures contract Dimitris Kenourgios Department

More information

Adaptive Demand-Forecasting Approach based on Principal Components Time-series an application of data-mining technique to detection of market movement

Adaptive Demand-Forecasting Approach based on Principal Components Time-series an application of data-mining technique to detection of market movement Adaptive Demand-Forecasting Approach based on Principal Components Time-series an application of data-mining technique to detection of market movement Toshio Sugihara Abstract In this study, an adaptive

More information

Factor Analysis. Chapter 420. Introduction

Factor Analysis. Chapter 420. Introduction Chapter 420 Introduction (FA) is an exploratory technique applied to a set of observed variables that seeks to find underlying factors (subsets of variables) from which the observed variables were generated.

More information

Forecasting sales and intervention analysis of durable products in the Greek market. Empirical evidence from the new car retail sector.

Forecasting sales and intervention analysis of durable products in the Greek market. Empirical evidence from the new car retail sector. Forecasting sales and intervention analysis of durable products in the Greek market. Empirical evidence from the new car retail sector. Maria K. Voulgaraki Department of Economics, University of Crete,

More information

THE IMPACT OF COMPANY INCOME TAX AND VALUE-ADDED TAX ON ECONOMIC GROWTH: EVIDENCE FROM NIGERIA

THE IMPACT OF COMPANY INCOME TAX AND VALUE-ADDED TAX ON ECONOMIC GROWTH: EVIDENCE FROM NIGERIA THE IMPACT OF COMPANY INCOME TAX AND VALUE-ADDED TAX ON ECONOMIC GROWTH: EVIDENCE FROM NIGERIA Dr. Lyndon M. Etale and Dr. Paymaster F. Bingilar Department of Finance and Accountancy, Faculty of Management

More information

THE IMPACT OF EXCHANGE RATE VOLATILITY ON BRAZILIAN MANUFACTURED EXPORTS

THE IMPACT OF EXCHANGE RATE VOLATILITY ON BRAZILIAN MANUFACTURED EXPORTS THE IMPACT OF EXCHANGE RATE VOLATILITY ON BRAZILIAN MANUFACTURED EXPORTS ANTONIO AGUIRRE UFMG / Department of Economics CEPE (Centre for Research in International Economics) Rua Curitiba, 832 Belo Horizonte

More information

Implied volatility transmissions between Thai and selected advanced stock markets

Implied volatility transmissions between Thai and selected advanced stock markets MPRA Munich Personal RePEc Archive Implied volatility transmissions between Thai and selected advanced stock markets Supachok Thakolsri and Yuthana Sethapramote and Komain Jiranyakul Public Enterprise

More information

Examining the Relationship between ETFS and Their Underlying Assets in Indian Capital Market

Examining the Relationship between ETFS and Their Underlying Assets in Indian Capital Market 2012 2nd International Conference on Computer and Software Modeling (ICCSM 2012) IPCSIT vol. 54 (2012) (2012) IACSIT Press, Singapore DOI: 10.7763/IPCSIT.2012.V54.20 Examining the Relationship between

More information

Forecasting Time Series with Multiple Seasonal Patterns

Forecasting Time Series with Multiple Seasonal Patterns Forecasting Time Series with Multiple Seasonal Patterns Abstract: A new approach is proposed for forecasting a time series with multiple seasonal patterns. A state space model is developed for the series

More information

Time series Forecasting using Holt-Winters Exponential Smoothing

Time series Forecasting using Holt-Winters Exponential Smoothing Time series Forecasting using Holt-Winters Exponential Smoothing Prajakta S. Kalekar(04329008) Kanwal Rekhi School of Information Technology Under the guidance of Prof. Bernard December 6, 2004 Abstract

More information

Is the Basis of the Stock Index Futures Markets Nonlinear?

Is the Basis of the Stock Index Futures Markets Nonlinear? University of Wollongong Research Online Applied Statistics Education and Research Collaboration (ASEARC) - Conference Papers Faculty of Engineering and Information Sciences 2011 Is the Basis of the Stock

More information

11. Time series and dynamic linear models

11. Time series and dynamic linear models 11. Time series and dynamic linear models Objective To introduce the Bayesian approach to the modeling and forecasting of time series. Recommended reading West, M. and Harrison, J. (1997). models, (2 nd

More information

VARIABLES EXPLAINING THE PRICE OF GOLD MINING STOCKS

VARIABLES EXPLAINING THE PRICE OF GOLD MINING STOCKS VARIABLES EXPLAINING THE PRICE OF GOLD MINING STOCKS Jimmy D. Moss, Lamar University Donald I. Price, Lamar University ABSTRACT The purpose of this study is to examine the relationship between an index

More information

Moving averages. Rob J Hyndman. November 8, 2009

Moving averages. Rob J Hyndman. November 8, 2009 Moving averages Rob J Hyndman November 8, 009 A moving average is a time series constructed by taking averages of several sequential values of another time series. It is a type of mathematical convolution.

More information

FORECASTING DEPOSIT GROWTH: Forecasting BIF and SAIF Assessable and Insured Deposits

FORECASTING DEPOSIT GROWTH: Forecasting BIF and SAIF Assessable and Insured Deposits Technical Paper Series Congressional Budget Office Washington, DC FORECASTING DEPOSIT GROWTH: Forecasting BIF and SAIF Assessable and Insured Deposits Albert D. Metz Microeconomic and Financial Studies

More information

Direct test of Harville's multi-entry competitions model on race-track betting data

Direct test of Harville's multi-entry competitions model on race-track betting data I Journal of Applied Statistics, Vol. 13, No. 2, 1986 Direct test of Harville's multi-entry competitions model on race-track betting data BRIAN McCULLOCH, Consultant, Touche Ross & Co., Auckland TONY VAN

More information

A Study on the Comparison of Electricity Forecasting Models: Korea and China

A Study on the Comparison of Electricity Forecasting Models: Korea and China Communications for Statistical Applications and Methods 2015, Vol. 22, No. 6, 675 683 DOI: http://dx.doi.org/10.5351/csam.2015.22.6.675 Print ISSN 2287-7843 / Online ISSN 2383-4757 A Study on the Comparison

More information

Do Electricity Prices Reflect Economic Fundamentals?: Evidence from the California ISO

Do Electricity Prices Reflect Economic Fundamentals?: Evidence from the California ISO Do Electricity Prices Reflect Economic Fundamentals?: Evidence from the California ISO Kevin F. Forbes and Ernest M. Zampelli Department of Business and Economics The Center for the Study of Energy and

More information

9th Russian Summer School in Information Retrieval Big Data Analytics with R

9th Russian Summer School in Information Retrieval Big Data Analytics with R 9th Russian Summer School in Information Retrieval Big Data Analytics with R Introduction to Time Series with R A. Karakitsiou A. Migdalas Industrial Logistics, ETS Institute Luleå University of Technology

More information