1 For Walls

2 1 Cover: Houghton Estate, luxury residential estate This page: Protea Hotel, Umhlanga Ridge

3 Mass per m 2 CTN BPN Overview Description Gyproc RhinoBoard is manufactured according to the ISO 9001 Quality Management System and the ISO Environmental Management System. RhinoBoard is a plasterboard and consists of an aerated or foamed gypsum core encased in, and firmly bonded to, special paper liners. RhinoBoard is used as lining/cladding for ceilings, drywalls and drylining. RhinoBoard is non combustible and it is used as a lining in fire rated drywall and ceiling systems. The face (unprinted) surface should receive all decoration (i.e. gypsum based plaster, paint, vinyl, etc.). Do not decorate the printed surface. Do not expose standard RhinoBoard to contact with water. It is not recommended for use in industrial kitchens and industrial bathrooms or exterior applications. Types of board 1. Gyproc RhinoBoard This is a standard grade board with no special additives in the gypsum core, but with specially treated paper liners. 2. Gyproc FireStop This gypsum plasterboard has added fibreglass strands and unexfoliated vermiculite impregnated into the gypsum core to provide increased fire resistance. It is lined with pink paper. 3. Gyproc MoistureResistant This gypsum plasterboard is moisture resistant and is lined on both sides with a distinctive green paper. The core of the board is impregnated with water repellant additives and is lined with a distinctive waxy green paper. RhinoBoard MoistureResistant is suitable for use in showers, bathrooms and kitchens and where ceramic wall tiling is required. It is not suitable for protection against continuous dampness or a base for cementitious rendering. Weber preparation compounds must be used as per Weber manufacturers instructions. 4. Gyproc SoundBloc Effective sound insulation is necessity as peace and quiet are essential to relaxation healing and concentration. Long-term noise disturbance may even lead to significant health problems. GypWall SoundBloc systems, with blue paper liners, have been designed and developed with sound insulating properties in mind. Gyproc RhinoBoard 12.5mm (standard widths) 8.9kg/m kg/m 2 Gyproc FireStop 12.5mm 11.3kg/m kg/m 2 Gyproc FireStop 15mm 13.7kg/m kg/m 2 Gyproc MoistureResistant 12.5mm 11.3kg/m kg/m 2 Gyproc MoistureResistant 15mm 13.7kg/m kg/m 2 Properties Fire resistance Gypsum plasters and plasterboard provide good fire protection in buildings due to the unique behaviour of their gypsum content when exposed to fire. Pure gypsum (CaSO 4 2H 2 0) contains nearly 21% chemically bonded water in crystallised form and about 79% calcium sulphate (CaSO 4 ) which is inert below a temperature of C. When gypsum protected elements of a structure are exposed to fire, the chemically combined water is gradually released in the form of moisture vapour. If a sufficiently high temperature is maintained, eventually all of the crystallised water will be expelled. 2

4 Overview The process of dehydrating gypsum by exposure to heat, known as calcination, commences at the surface exposed to the fire and proceeds gradually through the gypsum layer (i.e. the thickness of the gypsum plaster covering or the core of the plasterboard). The covering of calcinated gypsum formed on the exposed face adheres tenaciously to the uncalcinated material and serves to retard the process, which becomes progressively slower as the thickness of calcinated gypsum increases. While this process continues, the temperature directly behind the plane of calcination is only slightly higher than that of boiling water (100 0 C) and therefore, until all the crystallised water has been liberated, the temperature of materials adjacent to, or in contact with, the unexposed side cannot exceed C. This temperature is well below that at which materials stored in buildings will ignite. Once the gypsum layer is completely calcinated, the residue (calcium sulphate) continues to act as an insulating barrier for as long as it remains intact. Non-combustibility RhinoBoard is listed as a non-combustible material in the National Building Regulations SANS 10400, part T. Thermal insulation Thermal conductivity (k) is the measure of a material s ability to transmit heat, and is expressed as heat flow in watts per square metre of surface area for a temperature difference of 1 0 C per metre thickness and is expressed as W/m 0 k. Generally, denser materials have high thermal conductivity and are inefficient thermal insulants. Lightweight materials have low conductivity and are efficient thermal insulants. The lower the (k) value of the material, the better is its insulation efficiency. RhinoBoard has a (k) value of 0.21W/m 0 k. The thermal resistance (R) of a material is obtained by the following calculation where: t = the thickness of the material in metres. R = t / k RhinoBoard 12.5mm R value = 0.059m 2 K/W RhinoBoard 15mm R value = 0.071m 2 K/W respectively Sound insulation The Sound Reduction Index quoted on the individual system datasheets are those of actual tests performed by the SABS over a range of frequencies and are based on an imperforate solid RhinoBoard. Copies of test certificates are available if required. Site installation will differ from stated figures due to air leakage paths between junctions with ceiling, floor and other walls, optimum performance requires that these junctions be sealed with suitable acoustic sealants. Performance Effects of temperature The boards are not suitable for use in temperatures above 49 o C, but can be subjected to freezing temperatures without risk of damage. When subjected to tests in accordance with SABS 266 : 1982, the Gyproc MoistureResistant absorbed less than 5% of water by weight in the total immersion test. Thermal properties K = 0.25 W/m o C R = 0.05m 2 K/W Gyproc MoistureResistant will give similar performance to a standard board when tested for fire rating or sound insulation. Technical specification The Gyproc RhinoBoard range is manufactured according to SABS The SABS specification incorporates ISO gypsum plasterboard specification with modifications. Profile Gyproc RhinoBoard 15mm is manufactured with tapered edge only. 12.5mm is manufactured with both tapered edge and square edge and are special orders. The tapered edge board is usually used for jointing to achieve a monolithic finish as in the Gyproc Drywall System. 3

5 Gyproc RhinoBoard storage RhinoBoard should be stacked on a level surface in a dry place, preferably inside a building and properly protected from damp and inclement weather. If boards are to be stacked on a concrete floor inside a building, a damp proof membrane should first be laid down, or a timber platform should be provided. The wooden platform provided can be in the form of Bangalalas. The Bangalalas should be spaced at intervals of 400mm across the width of the boards, to prevent sagging of the boards. The ends and edges of the boards should be neatly aligned. Boards stored outside should be stacked on a level platform of timber bearers as described above, away from the ground. The stack should then be completely covered with a securely anchored polythene sheet or tarpaulin. Product Edge Standard sizes Widths (mm) Gyproc RhinoBoard 12.5mm Square and taper-edged 1200 Gyproc Firestop 12.5mm Square and taper-edged 1200 Gyproc FireStop 15mm Taper edged 1200 Gyproc MoistureResistant 12.5mm Square and taper-edged 1200 Gyproc MoistureResistant 15mm Taper edged 1200 Gyproc SoundBloc 12.5/15mm Taper edged 1200 Gyproc DuraLine Tolerances Lengths (mm) Thickness Width Length (300mm increments) (300mm increments) (300mm increments) (300mm increments) (300mm increments) (300mm increments) *To be launched ± 0.6mm +0 to -5mm +0 to -6mm ± 0.6mm +0 to -5mm +0 to -6mm ± 0.6mm +0 to -5mm +0 to -6mm ± 0.6mm +0 to -5mm +0 to -6mm ± 0.6mm +0 to -5mm +0 to -6mm ± 0.6mm +0 to -5mm +0 to -6mm Notes: 1. Gyproc FireStop 12.5mm and 15mm are available in square edge, but minimum quantities and lead times apply. Please refer to Gyproc Service Charter. 2. Gyproc non-standard stock products require a lead time. 3. Taper edge board is used where drywall jointing is required. 4. Not all standard sizes are stocked at all Gyproc sales outlets. Please contact your nearest Saint-Gobain Service Centre or builders merchant outlet for stock sizes, or see the current price list. Gyproc RhinoBoard handling When RhinoBoard is manually off-loaded or stacked it should be carried, two men to a pair of boards. Boards should not be carried with the surfaces horizontal, since this imposes an undesirable strain on the core. When a board is stacked or removed from a stack, the long edge should be placed down before it is turned horizontal. Boards should not be slid over each other as this can scuff the surface. RhinoBoard is particularly suited to mechanical handling, but this should be done with care. Forklifts should be equipped with multipronged forks to handle boards exceeding 3000mm in length. 4

6 Overview Gyproc RhinoBoard cutting The following methods should be used when cutting RhinoBoard: 1. Place the board flat on a level surface, with the writing facing upwards. 2. Mark the cut on the face side of the board, using a chalk line of pencil. 3. Cut along this line with a utility knife. 4. Lift the board on its side and snap it back along the cut. 5. Cut the paper on the back of the board with the utility knife. Blade Runner Reduces risks of accidents No exposed blades - blades never in contact with fingers or hands. Cut in a forward motion - trip hazards are visible. Tool is pushed away from the body - reduced risk of injury. Less dust on site - reduced chance of slips. Saves time on site Cutting time is halved (no need to turn board around). Approximately 1000 linear metres per blade. Quick release blades at the touch of a button. Cuts shapes, corners and circles on RhinoBoard 12.5/15mm with a neat professional finish. Accessories Replacement Blades Holster Gyproc RhinoBoard decoration Before decoration check the entire surface to see that nail holes, taped joints, etc. have been filled and sanded satisfactorily. Ensure that the boards are free from powder/dust. For improved paint finishes, it is suggested that a good quality plaster primer be used on the entire surface. 5

7 Docklands Hotel, Durban 6

8 Gyproc DryWall design guidelines Preparation Additional support to drywall top track Provisions to be made for top track to be fixed accurately to a securely fixed framing member. Top track to be fixed at 600mm centres. Additional support for fixtures and fittings Provide or ensure provision of accurately positioned and securely fixed noggins to support fixtures, fittings and services. Service penetration Penetrations for services should be given careful consideration to ensure that the fire and sound performance of the wall is not compromised and also that services themselves do not act as pathways for the transmission of fire and sound. General Gyproc standards/design criteria The drywall should be built in accordance with Saint-Gobain Gyproc specifications. The specifications should be read in conjunction with the project specifications. The erection of the drywall should comply with SABISA guidelines for dry walls. Quality The installer should have experience and knowledge of the installation of drywall systems or be an approved Gyproc GypWall installer. Recommended quality control on site Donn UltraSTEEL TM metal framing should be inspected by a recognised site authority. All cavity services ducts and conduits should be installed before boarding. Plan the position of all service penetrations/fittings and provide the necessary framing. RhinoBoard should be inspected after each installation and before finishing. Manufacturer s specification should be properly interpreted and adhered to. It is the drywall contractor s responsibility to ensure that the specifications are properly adhered to. Inspection prior to installation Verify that site conditions are suitable for the commencement of work and that all labelled materials are as indicated in the Saint-Gobain Gyproc specification document or as instructed by the manufacturer. Ensure that there are no damaged materials. The building should be weather proof before the installation of the Gyproc drywall lining. Good Practice Detailing Acoustics Consider the layout and structure of buildings at the design stage in order to separate quiet and noisy areas. Plan properly to avoid retro-fitting of services and/or noggins. Control sound paths around walls and floors to reduce flanking sound transmission. Seal the base and top of the wall using non-hardening silicone sealant. It is general practice to lay the sound seal before fixing the bottom/top tracks and abutting studs. Tape and fill, or skim plaster plasterboard joints to increase air tightness. Keep penetrations to a minimum and as small as possible. Use an acoustic sealant for optimum sound insulation. Seal joints, junctions, penetrations, etc. to avoid transmission of sound through leakage. It is good practice to seal all service holes/ penetrations. Air conditioning ducts should be fitted with the appropriate proprietary dampers. Avoid back-to-back sockets. Gaps on either side of the socket box should be sealed with an appropriate fire or acoustic sealant. The gap between the socket box and opposite side lining should be filled. Closely follow manufacturers fixing details as deviations may negate any acoustic benefit. Insulation deflection heads, by definition, must be able to move and therefore achieving an airtight seal is very difficult without incorporating sophisticated components and techniques. Air leakage at the drywall heads will have a detrimental effect on the acoustic performance of any drywall. 7

9 Where the party wall meets the external wall/gyproc drywall lining, appropriate detailing should be adopted to reduce leakage of sound and vibration transfer. Fire resistance Closely follow Saint-Gobain Gyproc specifications as deviations may negate fire resistance performance. Cut boards to a neat fit, avoiding any gaps If small gaps do occur, they must be backed by a framing member and filled with appropriate jointing material, or be skim plastered Tape and fill joints, or skim plaster plasterboard to achieve fire performance Fire-stop joints, junctions, penetrations, etc. to maintain integrity Keep penetrations to a minimum Avoid back-to-back sockets Thermal performance Seal lining perimeters and penetrations, etc. to avoid air leakage. Use insulation in the cavity to improve the thermal performance of the wall. Door detail Where heavy semi-solid and solid core doors are fixed onto aluminium door frames, additional bracing and reinforcement of the frame will be required, otherwise the door opening will undergo too much deflection and damage if the door slams. To reinforce Donn UltraSTEEL Studs use timber inserts. Load bearing studs can be used in place of the Donn UltraSTEEL Studs - no reinforcing is required. Maximum drywall heights Saint-Gobain Gyproc has adopted an internationally accepted methodology to determine maximum allowable wall heights, which is based on the level of lateral deflection under a given uniformly distributed load (UDL). The criterion is that the maximum lateral deflection of the drywall should not exceed L/240 (where L is the drywall height) when the drywall is uniformly loaded to 200Pa. Services installation Services can be incorporated in all Saint-Gobain Gyproc drywalls and ceilings. Donn UltraSTEEL Studs either have service holes or service holes have to be made on site to accommodate routing of electrical services When forming service holes on site, these need to be cut in-situ, paying attention to Health and Safety issues Grommets or isolating strip should be installed in the service holes to prevent abrasion of the cables Switch boxes and socket outlets can be supported on brackets formed from Donn UltraSTEEL Tracks 102mm x 25mm. Pipes or conduits should be fixed in position before lining work commences To maintain an airtight construction, the perimeter of any penetration through the lining should be sealed as necessary at the time the services are being installed Where heating pipes, particularly micro-bore systems, are to be located within the Gyproc drywalling system, it is recommended that only one pipe is passed through each aperture in the metal framework. If this cannot be accommodated for whatever reason, it may be necessary to incorporate proprietary pipe restraining clips, or other means of keeping the pipes apart, to prevent vibration noise Where a large number of electrical cables or pipes have to be accommodated when the framing is at 600mm centres, a service duct can be created by narrowing the stud centres to 300mm and boxing the opening Fixing electrical socket boxes into Gyproc drywalling systems can impair both fire and acoustic performance, but with careful detailing this can be minimised, particularly the avoidance of back-to-back services The Gyproc RhinoBoard should always be neatly cut and a proprietary sealant should be applied where optimum acoustic performance is required The fire resistant properties of the drywall are indicated by it's fire rating. A proprietary fire resistant sealant should be used For high acoustic performance, an acoustic expert should be consulted Access to services can be achieved by installing access panels. The access panels should be designed not to compromise the sound and fire rating of the drywall system By designing service zones through which all services pass, the number of individual service penetrations can be minimised Services and fittings can be fixed to the face of Gyproc drywalling systems, using plywood/fixing strap noggins within the cavity of the drywall. A minimum stud spacing of 400mm is recommended. An alternative to this would be to install a metal or timber support framework within the cavity of the drywall 8

10 Gyproc DryWall design guidelines Dampers Fire and smoke resistant dampers may be installed in Saint-Gobain Gyproc s range of drywall systems. Because the performance of the complete assembly will depend on a number of elements, the precise details of the opening need to be determined in consultation with the damper manufacturers. Penetrations for dampers need careful scrutiny to ensure that the integrity of the element is not impaired, and also to ensure that the dampers do not act as a mechanism for the spread of fire. It is important to use only those dampers and installation methods which have been rigourisly fire tested and proven to be able to maintain the integrity of the construction. Service zones may be sealed after installation of the services using a tested and certified fire stopping system. In most situations, the services will be installed by drywall contractors. It is therefore important that all relevant contractors should be instructed as to where and how their service penetrations should be made and maintained. The necessity for independent structural support to dampers will depend on their size and weight Consult Saint-Gobain Gyproc Technical and Specifications Solutions Centre on for further detailed information. Access to services Access panels should be designed to offer practical, cost effective solutions. Care should be taken that the acoustic and fire performance of the wall is not compromised by the access panels. Health and Safety The details and guidance contained in this document have been written for the benefit of experienced trade professionals, to assist them in the use and installation of Saint-Gobain Gyproc s products. This document assumes a level of expertise which makes it unsuitable for use by a novice without the benefit of other guidance and instruction as to the use and installation of Saint-Gobain Gyproc s products. Saint-Gobain Gyproc provides training on the use and installation of all its products at the company s Academy Training Centres. The advice and guidance referred to does not seek to replace Health and Safety regulations, or the in-house systems of employers in relation to the use and installation of the Company s products, but should be considered supplementary to these. All users of such products and installation techniques should at all times ensure that they are familiar with, and adhere to, their employer s own Health and Safety procedures. While the advice and guidance given in the Specification Document meets relevant legislative and regulatory requirements and standards current at the date of publication, it is the responsibility of the user to ensure that these remain current prior to use. The Saint-Gobain Gyproc products and systems included in the Specification Document have been developed for use in domestic, commercial and industrial buildings. Guidance as to the correct application and installation of these products and systems is included in the installation sections. It is important to follow good site practice at all times and to ensure that appropriate safety precautions are taken (including the wearing of appropriate personal protection equipment and clothing) when working with Saint-Gobain Gyproc products. The following general notes are offered for guidance: Saint-Gobain Gyproc systems are non-load bearing and are not designed to support body weight Installers must work off an independantly supported platform Manual off-loading of boards, panels and bagged materials should be carried out with care to avoid unnecessary strain Keep sanding and other dust generation to a minimum. Maintain adequate ventilation and/or wear suitable protection When cutting boards or metal sections, hand and power tools should be used with care, keeping hands clear of blades and saw teeth, etc. Power tools should be used in accordance with manufacturers recommendations, and only be used by people who have been instructed and trained to use them safely and correctly When using plaster, mix with water in well ventilated conditions. Avoid contact with eyes and skin wear suitable eye and skin protection. In the event of contact with the eyes, irrigate with plenty of clean water immediately. (MSDS is available upon request) When handling insulation or cutting board products containing glass fibre, wear suitable face and skin protection. Wear eye protection when working overhead (MSDS is available upon request from Saint-Gobain Gyproc Technical Solutions Centre). Customers are also reminded that all the guidelines of the Occupational Health and Safety Act: 1993 should be adhered to. Donn UltraSTEEL TM metal stud framing Use components, accessories and methods recommended by Saint-Gobain Gyproc Set out floor/head tracks and perimeter studs to give a framework which is accurately aligned with a true vertical plane. Fix securely at all perimeters at not more than 600mm centres Position studs at equal centres to suit specified linings, maintaining sequence across openings. Provide additional studs as necessary to ensure support to all vertical edges of boards Accurately form openings to receive door sets using Donn UltraSTEEL Studs. Load bearing studs and suitable timber insert should be used to achieve the strength requirements of the framing assembly and adequately support the weight of the door 9

11 Insulation Fit securely with closely butted joints, leaving no gaps. Unless the insulation is of a self supporting batt type fitted between studs, fix at head of frame using galvanised steel angle 25mm x 25mm Acoustics Saint-Gobain Gyproc reference: SoundSeal Location: At junctions between drywall(s) and adjoining structure Apply as a continuous band to clean, dry, dust-free surfaces, leaving no gaps Seal any gaps and service penetrations Fire stopping Seal any gaps and service penetrations, etc. using tightly packed Ultimate insulation or fire resisting/intumescent sealant, to prevent penetration of flame Vertical joints Lightly butt boards together Centre joints on studs. Ensure that joints on opposite sides of studs are staggered. For double layer boarding, stagger joints between layers Horizontal joints RhinoBoards: Lightly butt boards together Horizontal joints will not be permitted in walls up to a height of 3600mm Walls over 3600mm (exceeding the maximum available length of board): Agree positions of joints where not specified. Provide horizontal framing to support the horizontal edges of the boards. Ensure that horizontal joints on opposite sides of studs are staggered For two layer lining, stagger joints between layers by at least 600mm. Provide horizontal framing to support the horizontal edges of the first layer lining Houghton Estate: luxury residential estate 10

12 Gyproc DryWall design guidelines Fixing lining to Donn UltraSTEEL TM metal supports Single layer drywall face layer: Fix securely to all supports at maximum 220mm centres using Gyproc RhinoBoard Sharp Point Screws 3.5mm diameter x 25mm. Double layer drywall first layer: Fix securely to all supports at maximum 220mm centres using Gyproc RhinoBoard Sharp Point Screws 3.5mm diameter x 25mm. Double layer drywall face layer: Fix securely to all supports at maximum 220mm centres using Gyproc RhinoBoard Sharp Point screws 3.5mm diameter x 42mm. Stagger the screws along RhinoBoard butt joints. Fix working from the centre of each board. Position screws not less than 13mm from cut edges and 10mm from bound edges of boards. Set heads in a depression; do not break paper or gypsum core. Deflection heads To be specified by the project structural engineer. For details contact Saint-Gobain Technical and Specification on Jointed finish to plasterboard Joint compound: RhinoGlide. Joints/gaps/internal corners: RhinoTape. External corners: Donn Corner Bead. Primer/sealer: Oil based Plaster Primer. Lightly sand cut edges of boards to remove paper burrs. Cover all joints, gaps and internal angles with RhinoTape. Cover with RhinoGlide feathered out to give a flush, smooth finish. Sand if required. Reinforce external angles, stop ends, etc. with the Donn Corner Bead embedded in RhinoGlide. Spot nail/screw depressions with joint compound to give a flush surface. After joint, angle and spotting treatments have dried, lightly sand to remove any minor imperfections. Plaster finish Thickness: 3mm to 6mm. Reinforcement: Joints/gaps/internal corners: RhinoTape. External corners: Donn Corner Bead embedded in skim coat plaster. Fill and tape all joints. Trowel/float to a tight, matt, smooth surface with no hollows, abrupt changes of level or trowel marks as per skim coat plaster specification. Painting: plaster finish/jointed finish Primer: As per manufacturer s specification. Do not apply epoxy paints. Wallpaper: plaster finish/jointed finish Primer: As per manufacturer s specification. Apply wallpaper as per manufacturer s specifications. 11

13 Holiday Inn, Sandton 12

14 Gyproc DryWall installation guide 1 2 Apply SoundSeal as a continuous application to the perimeter of the framework. Determine and mark wall position and make allowance for openings. Fix Donn UltraSTEEL Track at 600mm centres using suitable fixings. 3 4 Measure the wall height and cut stud to size. Install the stud into Donn UltraSTEEL Floor Track. Twist Donn UltraSTEEL Stud into place. 5 6 Ensure the stud is plumb and mark stud position. Fix the UltraSTEEL Stud to the abutting wall at 600mm centres using suitable fixings. 7 8 Insert top UltraSTEEL Track into position. Fasten the top UltraSTEEL Track at 600mm centres. 13

15 9 10 Insert UltraSTEEL studs at 600mm centres to a friction fit within the channel sections this allows for adjustment during boarding. Position the UltraSTEEL Studs so all face the same way. Fasten Gyproc RhinoBoard 12.5mm to the framework using Gyproc RhinoBoard Sharp Point Screws 25mm spaced at 220mm centres After the boarding is complete, apply Gyproc RhinoTape to all joints. Apply Gyproc RhinoGlide to the joints using a 150mm taping knife Fill all screw heads using Rhinoglide. Apply a second coat off Rhinoglide using a 300mm steel trowel. 14

16 Saint-Gobain s SpecSure system warranty Unique to Saint-Gobain Construction Products South Africa, the 10 year system warranty is designed to give you total confidence that the systems you have chosen will meet the most rigorous of building requirements. All of our systems are developed using the highest quality components designed to work together, and are specifically developed to give you a lifetime of confidence. SpecSure is more than just a performance warranty. It means that the Saint-Gobain Construction Products SA systems you specify: Have a guaranteed 10 year performance. Have the technical expertise and experience of the SA s leading construction products specialist behind it. Have been tested in accredited fire, acoustic and structural test laboratories. Have been site tested to demonstrate installation integrity and simplicity. Will be supported at every stage of the project by SA s leading on and off-site technical support personnel. Will perform to published parameters if installed in accordance to our specifications. Will be repaired or replaced by Saint-Gobain Construction Products South Africa in the unlikely event of system failure attributed to unsatisfactory product/system performance. Project Packs offer technical guidance and compliance to the building methodology prescribed which will ensure optimal system performance. Customer contact centre:

Manual lifting and handling

Manual lifting and handling Manual lifting and handling When installing British Gypsum products and systems care should be taken to ensure that appropriate methods of handling and lifting are adopted. The following guidance details

More information

Schlüter -KERDI-BOARD Substrate, structural panel, bonded waterproofing

Schlüter -KERDI-BOARD Substrate, structural panel, bonded waterproofing Substrate, structural panel, bonded waterproofing The universal substrate for tiles Perfect covering No matter whether you work with mosaics or large format tiles, an absolutely level substrate with straight

More information

Knauf Aquapanel Interior. Tile Backing. Cement board for wet areas. Will not deteriorate in water. Easy to score and snap

Knauf Aquapanel Interior. Tile Backing. Cement board for wet areas. Will not deteriorate in water. Easy to score and snap Tile Backing Will not deteriorate in water Easy to score and snap Resistant to mould and mildew Knauf Aquapanel Interior Cement board for wet areas Knauf Aquapanel Interior Cement Board Drywall for Wet

More information

GYPSUM AREA SEPARATION FIREWALLS GA-620-2011

GYPSUM AREA SEPARATION FIREWALLS GA-620-2011 GYPSUM AREA SEPARATION FIREWALLS GA-620-2011 GA-620-2011 Copyright 2011 Gypsum Association All rights reserved. Printed in U.S.A. Characteristics, properties, or performance of materials or systems herein

More information

Fiberglas, Exterior Wall Thermal Insulation

Fiberglas, Exterior Wall Thermal Insulation PROJECT ENGINEER RESPONSIBILITY: This is a general specification guide, intended to be used by experienced construction professionals, in conjunction with good construction practice and professional judgment.

More information

C05. S03. P02 P08 FireWall. Including C05. S01. P02 Specialist partitions introduction

C05. S03. P02 P08 FireWall. Including C05. S01. P02 Specialist partitions introduction C05. S03. P02 P08 Including C05. S01. P02 Specialist partitions introduction C05 Specialist partitions Introduction Specialist partitions This section details specialist lightweight systems where high-security,

More information

plumbing products guide

plumbing products guide plumbing products guide radiator pipe guide & seals A significant development in the drive to reduce air leakage and heat loss. Installations such as that shown are all too common. The detail is poorly

More information

IMPACT DAMAGE RESISTANT WALL SYSTEMS

IMPACT DAMAGE RESISTANT WALL SYSTEMS IMPACT DAMAGE RESISTANT WALL SYSTEMS CONTENTS Introduction 2 Advantages 2 2 Material Specifications 2 Design Considerations 3 Framing 5 Plasterboard Installation 5 Health, Safety & Warranty 6 Contact Details

More information

first look at GigaCrete s revolutionary new New Construction GigaHouse GigaHouse Utilizing GigaPanel

first look at GigaCrete s revolutionary new New Construction GigaHouse GigaHouse Utilizing GigaPanel first look at GigaCrete s revolutionary new New Construction GigaHouse GigaHouse Utilizing GigaPanel What is GigaCrete GigaCrete is a family of products based on low carbon footprint Green ceramic binders

More information

FireWall. High performance fireresistant. FireWall. www.british-gypsum.com

FireWall. High performance fireresistant. FireWall. www.british-gypsum.com FireWall FireWall High performance fireresistant wall system FireWall is a non-loadbearing wall which provides up to 240 minutes fire resistance. It is used in certain ground floor basement situations

More information

PART 1 GENERAL 1.1 SECTION INCLUDES

PART 1 GENERAL 1.1 SECTION INCLUDES J-1 Section 09110 Long Form Specification INTERIOR METAL STUD FRAMING This section includes lightweight, usually 0.036 inch (0.9 mm) thick or lighter, non-axial load bearing metal stud framing including

More information

H-Stud Area Separation Wall System

H-Stud Area Separation Wall System 12 TH EDITION 09 21 16.33/NGC H-Stud Area Separation Wall System 09 21 16.33 139 H-STUD AREA SEPARATION WALL SYSTEM The fire-protection of gypsum-based Area Separation Walls is demonstrated in dramatic

More information

Replacement Window Installation Guide Non-Impact & Impact Resistant Windows without Nailing Fin

Replacement Window Installation Guide Non-Impact & Impact Resistant Windows without Nailing Fin Replacement Window Installation Guide Non-Impact & Impact Resistant Windows without Nailing Fin americancraftsmanwindows.com Project Requirements: Failure to follow these instructions may void product

More information

CERTIFICATE NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE. No VTT C-6044-10 Date of issue 11.10.2010, Updated July 1, 2011

CERTIFICATE NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE. No VTT C-6044-10 Date of issue 11.10.2010, Updated July 1, 2011 CERTIFICATE NAME OF PRODUCT No VTT C-6044-10 Date of issue 11.10.2010, Updated July 1, 2011 H-CONTROL REFLEX+ reflective insulating vapour control layer for roof and wall applications MANUFACTURER ACTIS

More information

Rockwool Flexi Insulation Application Guide

Rockwool Flexi Insulation Application Guide Pitched roof Rafters InterMediate floors INTERNAL partitions external Framed walls separating floors Separating Walls Rockwool Flexi Insulation Application Guide Ground floor The perfect fit for any framed

More information

Sun Windows General Information Sun New Construction Window Installation Instructions

Sun Windows General Information Sun New Construction Window Installation Instructions Sun Windows General Information Section 1 G F H H H A. Apply Weather Resistive Barrier B. Apply Sill Flashing Tape C. Place Waterproof Sill Shims D. Caulk Back of Nail Fin Sides & Top, Set Window, Fasten

More information

Window Installation Instructions

Window Installation Instructions Caution The correct installation methods of windows in full frame or insert applications is critical towards achieving the tested performance of the window and longterm enjoyment and energy savings for

More information

Mark Cramer Inspection Services, Inc.

Mark Cramer Inspection Services, Inc. Mark Cramer Inspection Services, Inc. 492 Twentieth Avenue, Indian Rocks Beach, FL 34635-2970 (727) 595-4211 Fax (727) 596-7583 Certified Member #12085 American Society of Home Inspectors Construction

More information

March 14, 2007. Installation of Bay, Bow and Garden Windows

March 14, 2007. Installation of Bay, Bow and Garden Windows March 14, 2007 Re: Installation of Bay, Bow and Garden Windows Attached are the Atrium Companies, Inc recommendation for the installation of bay, bow and garden windows. These instructions were developed

More information

Installation Details. D1 General D2 Walls D3 Ceilings D4 Reference. D Installation Details

Installation Details. D1 General D2 Walls D3 Ceilings D4 Reference. D Installation Details D Installation Details D1 General D2 Walls D3 Ceilings D4 Reference D Installation Details D Contents D1 General Installation and Fastening Sequence for Steel Studs D1.1 Fastener Selection D1.3 D2 Walls

More information

GreenGuard Housewrap Installation Guide

GreenGuard Housewrap Installation Guide 000768PACBPHW_Flashing Bro 5/23/03 2:52 PM Page 1 For the most current product information, go to www.green-guard.com. Pactiv Building Products believes the information and recommendations herein to be

More information

12.1 Schlüter -KERDI-BOARD

12.1 Schlüter -KERDI-BOARD I n n o v a t i v e p r o f i l e s 12.1 Schlüter -KERDI-BOARD S u b s t r a t e U N I V E R S A L S T R U C T U R A L P A N E L, B O N D E D W A T E R P R O O F I N G Application and Function Schlüter

More information

PANELIZED HOME INSTALLATION GUIDELINE

PANELIZED HOME INSTALLATION GUIDELINE PANELIZED HOME INSTALLATION GUIDELINE A typical home package will be constructed of Snap-N-Lock Insulated Panels clad with steel skins. 4" panels will be used for the walls, and 6" panels for the roof.

More information

CertainTeed. Shaftliner For A rea Separation Firewalls

CertainTeed. Shaftliner For A rea Separation Firewalls CertainTeed Shaftliner For A rea Separation Firewalls M2Tech Shaftliner Type X for Area Separation M2Tech Shaftliner is a specially formulated product for applications where enhanced mold resistance is

More information

!!!!!! !!! Decra Plus DPSW010 DPSTW011 DPSW012 DPSW013 DPSW014 DPSW015 DPSW016 DPSW020 DPSW021 DPSW024 DPSW030 DPSW031 DPSW035 DPSW030 DPSW031 DPSW035

!!!!!! !!! Decra Plus DPSW010 DPSTW011 DPSW012 DPSW013 DPSW014 DPSW015 DPSW016 DPSW020 DPSW021 DPSW024 DPSW030 DPSW031 DPSW035 DPSW030 DPSW031 DPSW035 Decra Plus Drawing no DPSW010 DPSTW011 DPSW012 DPSW013 DPSW014 DPSW015 Description Shown In Decra Brochure Most Commonly Used Detail t~êã=oççñ=b~îéë=aéí~áä=b~îéë=lîéêü~åö=táíü=fåëìä~íéç=c~ëåá~=~åç=pçññáí

More information

FIRE RATED GLAZING System Guide

FIRE RATED GLAZING System Guide SYSTEM GUIDE Issue date: 05-05-2015 Expiry date: 31-12-2016 System Guide Introduction Pyropanel Developments are specialists in fire rated glazing solutions, and our systems are designed for easy installation

More information

Fire 2This Technical Bulletin has been commissioned by the UK SIP Association in

Fire 2This Technical Bulletin has been commissioned by the UK SIP Association in REV 1-12.12.11/TB002 Technical Bulletin Fire 2This Technical Bulletin has been commissioned by the UK SIP Association in conjunction with TRADA Technology and is intended to provide the reader with introductory

More information

2.18 INTERIOR & EXTERIOR FINISHES 2.18.1 VAPOR & AIR BARRIERS

2.18 INTERIOR & EXTERIOR FINISHES 2.18.1 VAPOR & AIR BARRIERS 2.18 INTERIOR & EXTERIOR FINISHES 2.18.1 VAPOR & AIR BARRIERS The LOGIX wall assembly has no need for an additional vapor barrier, the solid concrete core covered with the low permeance EPS (Type II) foam

More information

Services Enclosures and Protected Shafts - Maintaining Compartmentation

Services Enclosures and Protected Shafts - Maintaining Compartmentation Introduction When a fire resisting element is used to provide fire compartmentation, every opening that allows services to pass through the element must be adequately protected by sealing, or fire stopping

More information

INSTALLATION OF A BAY WINDOW

INSTALLATION OF A BAY WINDOW INSTALLATION OF A BAY WINDOW Installation of a Bay Window These instructions relate to the replacement of an existing bay window or replacement of a straight window with a new bay window, in an opening

More information

Built to Last. Built for Beauty. Good. Solid. Logix. TM

Built to Last. Built for Beauty. Good. Solid. Logix. TM Built to Last. Built for Beauty. Good. Solid. Logix. TM Quality, Value and Service Introducing LOGIX Insulated Concrete Forms. Based on the simple concept of interlocking blocks, LOGIX ICF gives you a

More information

NEW ELECTRICAL SUBSTATION Building 300 SECTION 07 53 23 ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK

NEW ELECTRICAL SUBSTATION Building 300 SECTION 07 53 23 ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK PART 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to within

More information

Finishing guide. For Thistle plaster and Gyproc plasterboard. Telephone: 08705 456123 Fax: 08705 456356 Email: bgtechnical.enquiries@bpb.

Finishing guide. For Thistle plaster and Gyproc plasterboard. Telephone: 08705 456123 Fax: 08705 456356 Email: bgtechnical.enquiries@bpb. BUSINESS SUPERBRAND SINCE 008 Gyproc, Thistle, Gypframe and Glasroc are all registered trade names of BPB United Kingdom Limited. Isover is a registered trade name of Saint-Gobain. Proprietor: BPB United

More information

IMPORTANT INSTRUCTIONS & OPERATING MANUAL. Houston 50 Inch Electric Wall Mounted Fireplace Black / White

IMPORTANT INSTRUCTIONS & OPERATING MANUAL. Houston 50 Inch Electric Wall Mounted Fireplace Black / White IMPORTANT INSTRUCTIONS & OPERATING MANUAL Houston 50 Inch Electric Wall Mounted Fireplace Black / White Model Number:MFE5050BK Model Number:MFE5050WH Read these instructions carefully before attempting

More information

VA25014B0516 VA CINCINNATI PROJECT NO. 539-328 INPATIENT BED TOWER ADDITION (4 TH AND 5 TH FLOORS) SECTION 09 29 00 GYPSUM BOARD

VA25014B0516 VA CINCINNATI PROJECT NO. 539-328 INPATIENT BED TOWER ADDITION (4 TH AND 5 TH FLOORS) SECTION 09 29 00 GYPSUM BOARD SECTION 09 29 00 GYPSUM BOARD PART 1 - GENERAL 1.1 DESCRIPTION This section specifies installation and finishing of gypsum board, vapor retarder and air and moisture barrrier. 1.2 RELATED WORK A. Installation

More information

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE TECHNICAL SPECIFICATION PART 8000 - PRECAST CONCRETE TABLE OF CONTENTS Item Number Page 8100 PRECAST CONCRETE CONSTRUCTION - GENERAL 8-3 8101 General

More information

Standard from CSI Part Section Format. 06212 For Wood Framing 05160 For Metal Framing 09226 For Gypsum Sheathing

Standard from CSI Part Section Format. 06212 For Wood Framing 05160 For Metal Framing 09226 For Gypsum Sheathing Standard from CSI Part Section Format. 06212 For Wood Framing 05160 For Metal Framing 09226 For Gypsum Sheathing Specifications for SURE-BOARD Series 200 and 200W Panel for shear PART 1.0 GENERAL 1.01

More information

WINDOW INSTALLATION GUIDE FOR NEW CONSTRUCTION - WOOD FRAMING

WINDOW INSTALLATION GUIDE FOR NEW CONSTRUCTION - WOOD FRAMING WINDOW INSTALLATION GUIDE FOR NEW CONSTRUCTION - WOOD FRAMING IMPORTANT NOTICES AND INFORMATION Read these instructions in their entirety prior to installing windows. Any local building code requirements

More information

NRG 75 CRF NRG GREENBOARD WALL SYSTEM

NRG 75 CRF NRG GREENBOARD WALL SYSTEM NRG GREENBOARD WALL SYSTEM NRG Energy Efficient Building Systems is pleased to announce a revolution in lightweight cladding systems. NRG Building Systems is the first and only company to achieve CodeMark

More information

EcoTouch Insulation with PureFiber Technology

EcoTouch Insulation with PureFiber Technology PROJECT ENGINEER RESPONSIBILITY: This is a general specification guide, intended to be used by experienced construction professionals, in conjunction with good construction practice and professional judgment.

More information

ALKALI-RESISTANT WATERPROOFING AND DECOUPLING MEMBRANE UNDER CERAMIC TILES AND NATURAL STONE

ALKALI-RESISTANT WATERPROOFING AND DECOUPLING MEMBRANE UNDER CERAMIC TILES AND NATURAL STONE Mapeguard WP System ALKALI-RESISTANT WATERPROOFING AND DECOUPLING MEMBRANE UNDER CERAMIC TILES AND NATURAL STONE Products used: Mapeguard WP 200, Mapeguard ST, Mapeguard IC, Mapeguard EC, Mapeguard WP

More information

7. Installation. installation 7.1.1. CAST-IN WINDOW SYSTEM 7.1. INSTALLATION OF WINDOW MAIN FRAME

7. Installation. installation 7.1.1. CAST-IN WINDOW SYSTEM 7.1. INSTALLATION OF WINDOW MAIN FRAME 7. Installation Window involves the fixing of window frame at an earlier construction stage and subsequent of the window sashes. This is a highly workmanship dependent process. Only trained and approved

More information

Tested to BS 6375: Part 1: 1989 and achieved a weathertightness classification of 2000 Pa (Special)

Tested to BS 6375: Part 1: 1989 and achieved a weathertightness classification of 2000 Pa (Special) THE B6 GLAZING SYSTEM GLAZING SYSTEMS FOR SEPTEMBER 2013 THE B6 HEEL BEAD SEAL SECURITY GLAZING SYSTEM Page 1 DESCRIPTION The B6 Heel Bead Seal Security Glazing System is suitable for installing all types

More information

INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACION FOR DOUBLE-HUNG VENT REPLACEMENT WINDOW

INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACION FOR DOUBLE-HUNG VENT REPLACEMENT WINDOW Vinyl Windows and Doors Manufactured by Pella Corporation INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACION FOR DOUBLE-HUNG VENT REPLACEMENT WINDOW Lea las instrucciones en español en el reverso.

More information

Energy Company Obligation (ECO): Technical Monitoring Questions

Energy Company Obligation (ECO): Technical Monitoring Questions Energy Company Obligation (ECO) Technical Monitoring Questions v1 30/05/2013 Energy Company Obligation (ECO): Technical Monitoring Questions Under ECO suppliers are required to instruct suitably qualified

More information

Eucaboard / Eucaplac/ Eucatile paneling is intended for dry interior use only and requires care in handling.

Eucaboard / Eucaplac/ Eucatile paneling is intended for dry interior use only and requires care in handling. i This instruction sheet describes the proper methods for installing Eucatex decorative wall paneling. Eucaboard / Eucaplac/ Eucatile paneling is intended for dry interior use only and requires care in

More information

SECTION 08 41 1 ALUMINUM FRAMED ENTRANCES and STOREFRONTS. System 402 Flush-Glazed Screw Spline Storefront

SECTION 08 41 1 ALUMINUM FRAMED ENTRANCES and STOREFRONTS. System 402 Flush-Glazed Screw Spline Storefront PART 1 GENERAL 1.01 Work Included SECTION 08 41 1 ALUMINUM FRAMED ENTRANCES and STOREFRONTS System 402 Flush-Glazed Screw Spline Storefront A. Furnish and install aluminum architectural storefront system

More information

FIRESTOPPING & SMOKE SEALS

FIRESTOPPING & SMOKE SEALS SPECIFICATION SECTION 07 84 00 FIRESTOPPING & SMOKE SEALS 1 GENERAL 1.1 SECTION INCLUDES 1.1.1 Comply with Division 1, General Requirements and Documents referred to therein. 1.1.2 It is the intent of

More information

Steel-framed Walls. Insulation

Steel-framed Walls. Insulation Insulation A4/8 SF AW1192 Issue 4 Nov 2012 Steel-framed Walls Insulation guide Helps achieve a 6-star house energy rating Rigid and flexible Kingspan AIR-CELL solutions available Vapour barrier or vapourpermeable

More information

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003) NCMA TEK National Concrete Masonry Association an information series from the national authority on concrete masonry technology CONCRETE MASONRY FOUNDATION WALL DETAILS TEK 5-3A Details (2003) Keywords:

More information

CEILING SYSTEMS. CI/SfB (35) Xy April 2006. [Between us, ideas become reality.] ULTIMA CANOPY. Data sheet. Acoustic performance meets High Design

CEILING SYSTEMS. CI/SfB (35) Xy April 2006. [Between us, ideas become reality.] ULTIMA CANOPY. Data sheet. Acoustic performance meets High Design CEILING SYSTEMS [Between us, ideas become reality.] CI/SfB (35) Xy April 2006 ULTIMA CANOPY Data sheet Acoustic performance meets High Design ULTIMA CANOPY Installation Instructions I. GENERAL 1. Product

More information

Fire Barrier Duct Wrap 15A

Fire Barrier Duct Wrap 15A 3 Fire Barrier Duct Wrap 15A Commerical Kitchen Grease Duct Fire Protection System Product Data and Installation Instructions Compliance 1998 Edition Complies with International Mechanical Code Complies

More information

Section 5.0. Basements. Wall insulated externally. Wall insulated internally. Ba02. Product: Polyfoam ECO Floorboard Ba01.

Section 5.0. Basements. Wall insulated externally. Wall insulated internally. Ba02. Product: Polyfoam ECO Floorboard Ba01. Section 5.0 Basements Wall insulated externally Product: Polyfoam ECO Ba01 Wall insulated internally Product: Polyfoam ECO Ba02 Basements Basements Basement design Waterproofing BS 8102: 2009 Code of practice

More information

SOUND INSULATION FOR EXTERIOR WALLS AND FACADE SYSTEMS

SOUND INSULATION FOR EXTERIOR WALLS AND FACADE SYSTEMS NOISE TECHNICAL FACT SHEET FACT SHEET 5 SOUND INSULATION FOR EXTERIOR WALLS AND FACADE SYSTEMS The sound insulation of exterior walls and roof-ceiling systems refers to their ability to reduce external

More information

Gypsum Board Systems Manual

Gypsum Board Systems Manual CertainTeed Gypsum Board Systems Manual Fire Resistance and Sound Control Design Manual Division 09 GYPSUM BOARD SYSTEMS MANUAL TABLE OF CONTENTS Introduction General Fire Resistance...1 Sound Control...3

More information

Schluter -KERDI-BOARD Substrate, building panel, bonded waterproofing

Schluter -KERDI-BOARD Substrate, building panel, bonded waterproofing Schluter -KERDI-BOARD Substrate, building panel, bonded waterproofing Schluter -KERDI-BOARD The universal substrate for tiles Flat. Level. Plumb. Square. No matter the quality, cost, or extravagance of

More information

Guidelines for Earthquake Bracing of Residential Water Heaters

Guidelines for Earthquake Bracing of Residential Water Heaters Guidelines for Earthquake Bracing of Residential Water Heaters Department of General Services Division of the State Architect 1102 Q Street, Suite 5100 Sacramento, CA 95814 Phone: (916) 324-7099 Fax: (916)

More information

IMPORTANT INFORMATION

IMPORTANT INFORMATION Curved Quadrant Instruction Manual CQ IMPORTANT INFORMATION Toughened glass is completely safe for use in our shower enclosures and bath screens; providing our products are installed according to our guidelines.

More information

Guidelines for Earthquake Bracing Residential Water Heaters

Guidelines for Earthquake Bracing Residential Water Heaters Guidelines for Earthquake Bracing Residential Water Heaters Department of General Services Division of the State Architect In accordance with the Health and Safety Code Section 19215, the Division of the

More information

Important Information

Important Information Single Door Quadrant Instruction Manual ESQ Important Information Toughened glass is completely safe for use in our shower enclosures and bath screens; providing our products are installed according to

More information

HVAC Vents & Diffusers

HVAC Vents & Diffusers 2 HVAC Vents & Diffusers Drywall, Stone, & Wood Applications TRUFIG can be installed in a variety of finishes and surfaces. This guide will detail the install of HVAC vents and diffusers in drywall, stone,

More information

INSTALLATION RECOMMENDATIONS. Outdoor Rubber Tiles

INSTALLATION RECOMMENDATIONS. Outdoor Rubber Tiles INSTALLATION RECOMMENDATIONS Outdoor Rubber Tiles Prior to Installation: The Outdoor Rubber Tiles and accessory transition pieces intended for this installation have been shipped to you via a freight carrier

More information

FERMACELL Powerpanel H 2 O for Wet & Moisture affected areas

FERMACELL Powerpanel H 2 O for Wet & Moisture affected areas FERMACELL Powerpanel H 2 O for Wet & Moisture affected areas Powerpanel H 2 O is a cement based board from FERMACELL. Board Characteristics Board Thickness 12.5 mm Board Sizes 1000 x 1200 mm 50 sheets/pallet

More information

We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit.

We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit. Important Information for New Construction Installations Attention Installer! We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden

More information

T H A N K Y OU F O R Y OUR P U R C H A S E O F A N E S S E N T I A V A N I T Y, P L E A S E R E A D T H E S E V A N I T Y C A R E A N D I N S T A L L

T H A N K Y OU F O R Y OUR P U R C H A S E O F A N E S S E N T I A V A N I T Y, P L E A S E R E A D T H E S E V A N I T Y C A R E A N D I N S T A L L T H A N K Y OU F O R Y OUR P U R C H A S E O F A N E S S E N T I A V A N I T Y, P L E A S E R E A D T H E S E V A N I T Y C A R E A N D I N S T A L L AT I O N I N S T R U C T I O N S C A R E F U L LY CAR

More information

Section 4.3. Separating Floors. Timber frame floor with I-Beams. Upgrading existing timber floor with new ceiling. Timber frame floor with

Section 4.3. Separating Floors. Timber frame floor with I-Beams. Upgrading existing timber floor with new ceiling. Timber frame floor with Section Separating Floors Timber frame floor with I-Beams Product: Earthwool Acoustic Roll and Floorfoam Easy Edge Strip Timber frame floor with solid timber joists Product: Earthwool Acoustic Roll and

More information

Colonnade Security Pipe

Colonnade Security Pipe Description: Round & Square downpipe formed from extruded 6060 T4 aluminium in various sizes (Ø83mm, Ø108mm, 83x83 mm & 108x108mm*) & supplied with a complete range of accessories i.e. Offsets, bends,

More information

We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit.

We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit. Important Information for New Construction Installations Attention Installer! We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden

More information

Bathroom Installation Guide

Bathroom Installation Guide Bathroom Installation Guide Step-by-step installation of your cabinets We do a lot of groundwork to make it as simple as possible for you to assemble and install your new bathroom furniture yourself. We

More information

Release: 1. CPCCWP3004A Apply waterproofing remedial processes

Release: 1. CPCCWP3004A Apply waterproofing remedial processes Release: 1 CPCCWP3004A Apply waterproofing remedial processes CPCCWP3004A Apply waterproofing remedial processes Modification History Not Applicable Unit Descriptor Unit descriptor This unit of competency

More information

City of Tucson and Pima County Arizona Building Code Appendix Chapter 72 Straw-Bale Structures

City of Tucson and Pima County Arizona Building Code Appendix Chapter 72 Straw-Bale Structures City of Tucson and Pima County Arizona Building Code Appendix Chapter 72 Straw-Bale Structures SECTION 7201 - PURPOSE The purpose of this appendix chapter is to establish minimum prescriptive standards

More information

sound reduction systems for commercial, educational and industrial environments

sound reduction systems for commercial, educational and industrial environments sound reduction systems for commercial, educational and industrial environments Tel: +44 ()14 3874 Fax: +44 ()14 38957 E-mail: info@soundreduction.co.uk Web: www.soundreduction.co.uk soundblocker Acoustic

More information

Air-Conditioning, Heating, and Refrigeration Institute. Sheet Metal and Air-Conditioning Contractors National Association

Air-Conditioning, Heating, and Refrigeration Institute. Sheet Metal and Air-Conditioning Contractors National Association Air-Conditioning, Heating, and Refrigeration Institute Sheet Metal and Air-Conditioning Contractors National Association GUIDELINE B-1997 ACKNOWLEDGEMENT These guidelines for Roof Mounted Outdoor Air-

More information

PB301 July 2009. Lightweight Building Solutions. Bushfire Protection. www.boral.com.au/bushfireprotection

PB301 July 2009. Lightweight Building Solutions. Bushfire Protection. www.boral.com.au/bushfireprotection PB301 July 2009 Lightweight Building Solutions Bushfire Protection www.boral.com.au/bushfireprotection Attached or adjacent within 6m roofed structures such as garages, carports, verandas and the like,

More information

Active and Passive Sash Replacement

Active and Passive Sash Replacement for Andersen Gliding Windows Read all instructions carefully before attempting this procedure. If you have any questions about your ability to complete the procedure, call Andersen at 1-888-888-7020 for

More information

SECTION 08360 SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS

SECTION 08360 SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS SECTION 08360 SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS Display hidden notes to specifier by using Tools / Options / View / Hidden Text. On newer versions of Microsoft Word

More information

Basement Window Installation Guide Hopper and Sliding

Basement Window Installation Guide Hopper and Sliding Basement Window Installation Guide Hopper and Sliding americancraftsmanwindows.com Project Requirements: Installation must comply with all applicable building codes. Existing window frame, wall and weatherresistant

More information

Report Number BTC 17755F

Report Number BTC 17755F Leics. LE NP Tel () 4 Fax () 4 Email btc.testing@saintgobain.com Report Number BTC 77F A FIRE RESISTANCE TEST ON A LOADBEARING TIMBER JOIST FLOOR INCORPORATING 4mm x 7mm x 47mm SOLID JOISTS PROTECTED BY

More information

Please calculate with around 5% more square meters than needed because you will have material loss due to cutting and sorting.

Please calculate with around 5% more square meters than needed because you will have material loss due to cutting and sorting. 1. TEKA Soft Loc Installation Guide Thank you for having chosen TEKA Parquet. To guarantee a constant quality product TEKA engineered hardwood flooring is made out of selected wood species and runs only

More information

Interior Walls below and above ground OLDROYD THE ULTIMATE WATERPROOF MEMBRANE SYSTEM

Interior Walls below and above ground OLDROYD THE ULTIMATE WATERPROOF MEMBRANE SYSTEM P r o d u c t a p p l i c a t i o n s a n d t e c h n i c a l i n f o r m a t i o n 2 below and above ground V OLDROYD THE ULTIMATE WATERPROOF MEMBRANE SYSTEM V The flexible, fast and cost-effective answer

More information

Innovation #9/12. of all Formaldehyde for up to

Innovation #9/12. of all Formaldehyde for up to Innovation #9/12 of all Formaldehyde for up to Gyproc Activ Air Benefits of Activ Air Improves the indoor air quality, providing healthier interior environments Permanently reduces Formaldehyde and other

More information

DETAILED INSTALLATION GUIDE

DETAILED INSTALLATION GUIDE DETAILED INSTALLATION GUIDE Warning: Risk of Electrical Shock, Fire or Personal Injury Once Installed and your wiring is run through your SMARTWALL system there is risk of electrical shock, fire or personal

More information

Division 9. SignaFlor Pad and Pour Flooring System

Division 9. SignaFlor Pad and Pour Flooring System Division 9 SignaFlor Pad and Pour Flooring System SPECIFICATIONS Page 1. General... 2 1.1 Description 2 1.2 Quality Assurance 2 1.3 Submittals 2 1.4 Delivery and Storage 3 1.5 Warranty 3 1.6 Working Conditions

More information

Partitioning & Ceiling Product Information

Partitioning & Ceiling Product Information Partitioning & Ceiling Product Information tel + 44 (0) 1384 412448 fax + 44 (0) 1384 4494 email enquiries@drywallsteelsections.co.uk web www.drywallsteelsections.co.uk tel + 44 (0) 1384 412448 fax + 44

More information

CERTIFICATE OF APPROVAL No CF 5055 ARABIAN VERMICULITE INDUSTRIES

CERTIFICATE OF APPROVAL No CF 5055 ARABIAN VERMICULITE INDUSTRIES CERTIFICATE OF APPROVAL No CF 5055 This is to certify that, in accordance with TS00 General Requirements for Certification of Fire Protection Products The undermentioned products of 1 st Industrial Area,

More information

IMPORTANT INSTALLATION GUIDE VALENCIA SQUARE CORNER SHOWER READ ALL INSTRUCTIONS CAREFULLY BEFORE STARTING THE INSTALLATION

IMPORTANT INSTALLATION GUIDE VALENCIA SQUARE CORNER SHOWER READ ALL INSTRUCTIONS CAREFULLY BEFORE STARTING THE INSTALLATION INSTALLATION GUIDE VALENCIA SQUARE CORNER SHOWER SEALANT REQUIRED TO COMPLETE THIS INSTALLATION: (Not supplied) Sika Sikasil NG (Arctic White) To seal the WHITE shower door and returns to the shower tray.

More information

STANDARD SPECIFICATION. for. Plumbing, Heating, Hot Water, Cold Water & Electrical work. Sussex Lodge London W2 & 16 Stanhope Terrace London W2

STANDARD SPECIFICATION. for. Plumbing, Heating, Hot Water, Cold Water & Electrical work. Sussex Lodge London W2 & 16 Stanhope Terrace London W2 STANDARD for Plumbing, Heating, Hot Water, Cold Water & Electrical work undertaken by owners within the building known as Sussex Lodge London W2 & 16 Stanhope Terrace London W2 BPME Consulting Engineers

More information

This handout is a guide only and does not contain all of the requirements of the Minnesota State Building Code or city ordinances.

This handout is a guide only and does not contain all of the requirements of the Minnesota State Building Code or city ordinances. Basement Finishing Guide Community Development Department Building Inspections Division 5200 85 th Avenue North / Brooklyn Park, MN 55443 Phone: (763) 488-6379 / Fax: (763) 493-8171 6/15 www.brooklynpark.org

More information

Part 3 Ancillary technologies. Chapter 3.2. Mechanical ventilation with heat recovery

Part 3 Ancillary technologies. Chapter 3.2. Mechanical ventilation with heat recovery Part 3 Ancillary technologies Chapter CONTENTS SCOPE Clause Page DESIGN Design standards D1 1 Statutory requirements D2 1 System design D3 1 Building integration D4 2 Noise D5 2 Access and controls D6

More information

HOW-TO LAY HARDBOARD OR PLYWOOD FLOOR OVERLAY

HOW-TO LAY HARDBOARD OR PLYWOOD FLOOR OVERLAY HOW-TO HOW-TO LAY HARDBOARD OR PLYWOOD FLOOR OVERLAY Most floor coverings, if laid over uneven wooden floors, will wear unevenly and look unsightly. The answer is to cover the old boards with hardboard

More information

Insulated Roof & Wall Panels. Product Data Sheet. Trapezoidal Insulated Roof Panels KS1000 RW

Insulated Roof & Wall Panels. Product Data Sheet. Trapezoidal Insulated Roof Panels KS1000 RW Insulated Roof & Wall Panels Trapezoidal Insulated Roof Panels KS1000 RW Overview Kingspan roof panel systems present a superior system compared to conventional multi-part site assembled systems. They

More information

Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows

Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows americancraftsmanwindows.com Project Requirements: Read

More information

High Performance Building Materials SCREEDS REPAIR MORTARS LEVELLING & SMOOTHING WATERPROOFING TILE ADHESIVES & GROUTS PRIMERS & ADDITIVES

High Performance Building Materials SCREEDS REPAIR MORTARS LEVELLING & SMOOTHING WATERPROOFING TILE ADHESIVES & GROUTS PRIMERS & ADDITIVES High Performance Building Materials SCREEDS REPAIR MORTARS LEVELLING & SMOOTHING WATERPROOFING TILE ADHESIVES & GROUTS PRIMERS & ADDITIVES ARDEX manufacture a complete range of high performance building

More information

necessary for years of satisfactory service. SmartBlock insulating form concrete walls share the

necessary for years of satisfactory service. SmartBlock insulating form concrete walls share the Chapter 7 PLUMBING AND ELECTRICAL 7.1 Introduction to Plumbing and Electrical Consideration of support services such as plumbing and electrical systems from the preliminary schematics phase through final

More information

4 Installation Requirements

4 Installation Requirements 4 Installation Requirements 9 4.1 Code Reference The authority having jurisdiction should be referenced to determine what law, ordinance or code shall apply in the use of flexible duct. Ducts conforming

More information

Guide Specifications for Maple Flooring Systems

Guide Specifications for Maple Flooring Systems Guide Specifications for Maple Flooring Systems MFMA Guide Specification for Resilient Pre-Engineered Fixed Panel System Purpose This Guide Specification is designed to assist in the production of actual

More information

ENVIRONMENTAL INFORMATION APR 1200 products are made from glass mineral wool, one of the most environmentally friendly insulants available.

ENVIRONMENTAL INFORMATION APR 1200 products are made from glass mineral wool, one of the most environmentally friendly insulants available. APR 1200 Acoustic Partition Roll CI/Sfb Ref: APR002 Glass mineral wool roll designed to provide high levels of sound insulation in walls and floors to meet Part E (England & Wales) and Section 5 (Scotland)

More information

How to Install GoBoard:

How to Install GoBoard: How to Install GoBoard: A Step-by-Step Guide Durable, Ultra-Lightweight, Waterproof Tile Backer Board Introducing GoBoard Every tiling project requires a durable, waterproof surface under the tile, called

More information

Tremco Fire Protection Systems Group Technical Bulletin

Tremco Fire Protection Systems Group Technical Bulletin Compartmentalization products and design play a key role in protecting lives and property from fire. Understanding the tools and techniques available for firestopping is of utmost importance to designers,

More information

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001)

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for Vinyl windows with an integral nailing fin. While the use of these installation instructions

More information