PARAPETS + PROJECTIONS

Size: px
Start display at page:

Download "PARAPETS + PROJECTIONS"

Transcription

1 Key Junctures DESIGN INVESTIGATE REHABILITATE Key Junctures and Interfaces for Air Barriers Presented by: Vince Cammalleri, AIA Senior Principal Simpson Gumpertz & Heger Inc. CONTINUITY of air barrier installations fail most frequently at the following transitions: Parapets and projections. Roof/wall intersection. + Window/wall interface. 12 April Parapets PARAPETS + PROJECTIONS Other Common Building Projections Wall Fins Where to put C.I.? SASM Insulation Vapor Permeable WRB ROOF/WALL INTERFACE NREL, Golden, CO Plan Section Sheathing very cold even if c.i. provided. 5 1

2 Qualitative Testing Infrared Thermography Preventing Condensation Within Walls and Roofs 2

3 Preventing Condensation Within Walls and Roofs 3

4 Qualitative Testing Infrared Thermography Perforated Metal Deck Standing Seam Metal Roof Batt Insulation Rigid Insulation Gypsum Wallboard Bulkhead EAVE DETAIL Structural Steel Metal Soffit Construction Geometries 22 Construction Geometries Preventing Condensation Within Walls and Roofs 23 4

5 AIR BARRIER CONTINUITY VAPOR RETARDER CONTINUITY THERMAL BARRIER CONTINUITY 5

6 Art Museum in a Cold Climate Overall Survey Primary issue: Roof-to-Wall Polyethylene sheet used as roof air barrier not ideal, but relatively effective in this application No transition from wall to roof barrier Repairs Simple but complex WINDOW/WALL INTERFACE 6

7 The Four Barriers Key Design Considerations BARRIER 1: Waterproofing BARRIER 2: Insulation BARRIER 3: Vapor Retarder BARRIER 4: Air Barrier Rainwater/Groundwater Control Condensation Control & Energy Consumption Wall system design performance capabilities, four barrier planes. Window system design configuration, accessories and limitations. Interior operating conditions and air pressures humidified buildings. Appropriateness/relevance of laboratory and field tests mock-up design and testing. Continuity of Thermal Barrier Short-circuits at thermal break material. Effect of window accessories starter sills. Alignment of thermal barrier plane of window system with wall insulation. Window Sill - Baseboard Sill Flashing Waterproofing The most important single element in waterproofing performance: Provide slope to drain horizontal portions of flashing. Do not penetrate horizontal leg of flashing. Turn flashing up at interior edges and at ends to prevent over-topping or bypassing. Provide weatherproofed expansion/contraction joints at laps in finishing recommend adhered rubber sheet with metal cover plate. Work out sequencing and coordination of multiple trades involved in flashing and veneer installation shop drawings are generally not comprehensive in scope. 7

8 Continuity of Air Barrier/Vapor Retarder (AVB) and Waterproofing Air barrier/wp plane of window system. Configuration of extrusion/frame at sill, jamb, and head. Material bonding, forming, compatibility. Transition seal sealant, foam, membrane, compression (mechanical), Engineered Transition Assembly Perimeter Seals Sealant to Side of Frame AVB Seal/backup WP AVB/Waterproofing WP first line of defense Relies on sealant joint bond to polyethylene; surface preparation. Difficult transition to sill flashing. Potential air flow through side of frame. Interior frame accessible/visible. Perimeter Seals Spray Foam to Side of Frame DESIGN INVESTIGATE AVB Seal/backup WP AVB/Waterproofing REHABILITATE WP first line of defense Relies on foam bond to polyethylene, surface preparation, shrinkage. Difficult transition to sill flashing. Air flow through side of frame can be mitigated. Continuity of thermal barrier facilitated. 8

9 Perimeter Seals Membrane to Side of Frame Perimeter Seals Membrane to Glazing Pocket AVB/Waterproofing adhered to side AVB/Waterproofing adhered to pocket. WP first line of defense Works better with flush, smooth frame edges; good for ETA products. Difficult transition to sill flashing. Sequencing of cladding installation. WP first line of defense Consistent through full perimeter; mechanically supported. Requires screw spline modification at verticals. Limited depth of WP protection. Sequencing of cladding installation. REHABILITATE INVESTIGATE DESIGN REHABILITATE INVESTIGATE REHABILITATE INVESTIGATE DESIGN DESIGN 9

10 Perimeter Seals Membrane to Nailing Flange Clad Wood Windows Nailing Flanges Nailing Flange AVB/Waterproofing adhered to nailing flange Sealing the air barrier to the nailing flange might not provide an air-tight envelope if the cladding material is not fused or welded continuously at the corners. WP first line of defense Sealing the air barrier to the nailing flange at the window sill will impede drainage. Performance relies on window/flange assembly. Needs special attention at sill flashing. REHABILITATE INVESTIGATE DESIGN 10

11 Flanged window Provide notches or weeps in sill flange Self-adhered membrane flashing Sealant Metal angle Weather resistant barrier Cladding (stucco shown) Typical Window Sill at Flanged Window 11

12 Perimeter Seals Membrane to Back of Frame AVB Seal/backup WP AVB/Waterproofing Perimeter Seals Membrane to Back of Frame Alternate (Two-Piece) AVB Seal/backup WP AVB/Waterproofing WP first line of defense Works reliably with mechanical attachment. Provides best WP protection at sill, jamb, and head. Easy transition to sill flashing. Air flow through side of frame. Interior frame obstructed; needs coordination w/ finishes. WP first line of defense Provides WP protection at sill, jamb and head. Difficult transition to sill flashing. Air flow through side of frame. Interior frame obstructed; needs coordination w/ finishes. Continuous Attachment to Interior of Frame: Sill Condition AVB Seals (sealant or butyl tape) Metal Flashing AVB/backup WP Continuous angle at sill, jamb and head. Sealant joint w/ weeps FRAME FASTENED FROM THE INTERIOR THROUGH THE ANGLE; FASTENERS TO NOT PENETRATE FLASHING ELEMENTS. 12

13 REHABILITATE INVESTIGATE DESIGN Inc Simpson Gumpertz & Heger 13

14 Windows in Precast The Right Curtain Wall in the Wrong Place Precast concrete panels are the acting air barrier in the wall system. Setting the window on the precast creates a thermal bridge which can lead to condensation. 49 ºF T ext = 0 F T 51 ºF int = 70 F 51 ºF The Right Curtain Wall in the Wrong Place 40 ºF T ext = 0 F T 41 ºF int = 70 F 42 ºF 14

15 Window Precast Interface

16

17 97 98 Paths of Air Leakage through Sides of Frame Improperly sealed corners, including thermal break material. Notched corners in mitered aluminum frames. Notched openings or other perforations in the window frames made to support insect screens, storm window sash, or accessories. Hardware penetrations, such as pivoting window mechanisms, sash balance (jamb) clips, hinge arms, etc. Penetrations at window anchors. Improperly capped or sealed ends at mullions or field-mulled units. 17

18 Laboratory Testing for Air Leakage Two approaches, depending on window type and location of air barrier seals at window perimeter: ASTM E-283 Standard Test Method for Determining Rate of Air Leakage Through Exterior Windows, Curtain Walls, and Doors Under Specified Pressure Differences Across the Specimen ASTM E Standard Test Method for Determining Air Flow Through the Face and Sides of Exterior Windows, Curtain Walls, and Doors Under Specified Pressure Differences Across the Specimen Perimeter Seal Options Laboratory Set-up E283 3: Specimen Air Leakage Q s = Specimen Air Leakage Face Side/Caulk Stop Air Barrier Tie-in Nailing/AB Flange Glazing Pocket/CW 18

19 Perimeter Seals AB/Waterproofing Sealed to Interior of Window Frame 19

20 E2319 Leakage through Face E2319 Leakage through Sides Q s(f) = Air Leakage through Face of Specimen Q s(s) = Air Leakage through Sides of Specimen Special Cases Air Flow in Humidified Buildings In humidified, pressurized buildings that contain multiple-glazed window units (usually with integrated blinds), interior air that leaks through the sides of the frame into the interstitial space can condense within the window. 20

21 Location of air seal Pressurized Interior What Passing the Test Really Means That the system at that point in time can meet a specific established set of design parameters. It is not an indicator of future performance. Tests are tools designed to verify that a design concept or idea can work under a specific set of controlled conditions. Tests are used to verify or validate the design concept. Tests can be misleading if used to replace the analytical part of the design process. With new reporting requirement for E283 and modified testing procedure for E2319, manufacturers may begin to address perimeter seal conditions by defining the intended air barrier plane. Ideally, extrusions will begin to include provisions for air barrier tie-ins. 21

22 Simpson Gumpertz & Heger Consulting Engineers Building Engineering Infrastructure and Special Structures Construction Engineering INVESTIGATE REHABILITATE DESIGN Thank You Vince Cammalleri, AIA

Window Installation Instructions

Window Installation Instructions Caution The correct installation methods of windows in full frame or insert applications is critical towards achieving the tested performance of the window and longterm enjoyment and energy savings for

More information

Clad Direct Glaze Window Installation Instructions

Clad Direct Glaze Window Installation Instructions Clad Direct Glaze Window Installation Instructions Sill flashing and sealing: 2. An overview of the proper flashing sequence is shown in figure 1. Please read entire installation instructions carefully

More information

Sun Windows General Information Sun New Construction Window Installation Instructions

Sun Windows General Information Sun New Construction Window Installation Instructions Sun Windows General Information Section 1 G F H H H A. Apply Weather Resistive Barrier B. Apply Sill Flashing Tape C. Place Waterproof Sill Shims D. Caulk Back of Nail Fin Sides & Top, Set Window, Fasten

More information

Window Sill Details for Effective Drainage of Water

Window Sill Details for Effective Drainage of Water Construction Technology Update No. 76 Window Sill Details for Effective Drainage of Water By M.A. Lacasse and M.M. Armstrong Satisfactory window performance demands a good product and proper installation.

More information

Avoiding Air Barrier Pitfalls

Avoiding Air Barrier Pitfalls Avoiding Air Barrier Pitfalls Design & Durability November 2013 Air barriers, when correctly installed, help buildings achieve high levels of energy efficiency by decreasing heat loss. For example, great

More information

We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit.

We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit. Important Information for New Construction Installations Attention Installer! We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden

More information

March 14, 2007. Installation of Bay, Bow and Garden Windows

March 14, 2007. Installation of Bay, Bow and Garden Windows March 14, 2007 Re: Installation of Bay, Bow and Garden Windows Attached are the Atrium Companies, Inc recommendation for the installation of bay, bow and garden windows. These instructions were developed

More information

ENERGY STAR Qualified New Homes Thermal Enclosure Checklist. Water Management Checklist. Eli Caudill

ENERGY STAR Qualified New Homes Thermal Enclosure Checklist. Water Management Checklist. Eli Caudill ENERGY STAR Qualified New Homes Thermal Enclosure Checklist & Water Management Checklist Eli Caudill ENERGY STAR Version 3 Tighter Standards Whole Home Approach Better, More Sustainable Construction Surpasses

More information

We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit.

We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit. Important Information for New Construction Installations Attention Installer! We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden

More information

Fig. 2 WALL-TO-WALL PANEL CONNECTIONS CORNER WALL CONNECTION

Fig. 2 WALL-TO-WALL PANEL CONNECTIONS CORNER WALL CONNECTION SIPS SCREWS WITH MINIMUM 1" PENETRATION IN WOOD MEMBER IN SIP WALL PANEL CONNECTED TO @ 24" O.C. MAXIMUM OUTSIDE SKIN EACH SIDE OF FRAMING TYP. AS RECOMMENDED BY FOAM CORE AS EACH SIDE OF FRAMING TYP.

More information

September 3, 2009. Ric Boyd, Public Works Director Ketchikan Gateway Borough 344 Front St. Ketchikan, AK 99901

September 3, 2009. Ric Boyd, Public Works Director Ketchikan Gateway Borough 344 Front St. Ketchikan, AK 99901 September 3, 2009 Ric Boyd, Public Works Director Ketchikan Gateway Borough 344 Front St. Ketchikan, AK 99901 RE: Ketchikan Gateway Borough Gateway Recreation Center Roof Observations and Intrusive Inspections

More information

Envelope INSULATION BATT (2) Avoid Using Batt Insulation With Metal Framing. Pressure or Friction Fit

Envelope INSULATION BATT (2) Avoid Using Batt Insulation With Metal Framing. Pressure or Friction Fit R-H-DI1 INSULATION BATT NR-E-IB1 Avoid Using Batt Insulation With Metal Framing Batt insulation should not be used with metal framing systems. Although it is common to see fiberglass batt insulation installed

More information

Superform Products Ltd.

Superform Products Ltd. TYPICAL CORNER REINFORCING NOTE : SEE ENGINEERED REBAR SCHEDULES SUPPLIED BY THE MANUFACTURER STEEL REINFORCEMENT WALL CORNER 90 Copyright 2012 Sept. 2012 5.1.1 Rebar Spacing 6" 12" Max. Load LB./FT. 2000

More information

Comment Form on Proposed Gut Rehabilitation Alternatives

Comment Form on Proposed Gut Rehabilitation Alternatives Comment Form on Gut Rehabilitation Alternatives Name: Organization: Email: Instructions Submission: Please submit this form to energystarhomes@energystar.gov by October 10 th, 2012 with the subject line

More information

INSTALLATION OF A BAY WINDOW

INSTALLATION OF A BAY WINDOW INSTALLATION OF A BAY WINDOW Installation of a Bay Window These instructions relate to the replacement of an existing bay window or replacement of a straight window with a new bay window, in an opening

More information

How To Repair A Boat Landing Deck With A Boat Bed

How To Repair A Boat Landing Deck With A Boat Bed RESIDENTIAL INSULATED SHEATHING INSTALLATION GUIDE Residential Insulated Sheathing Installation Guide ROXUL COMFORTBOARD IS Table of Contents Slab-on-grade-to Above Grade Wall...1 Foundation Wall at Footing

More information

STANDARD PROCEDURES FOR INSTALLATION OF METAL ROOF SYSTEMS

STANDARD PROCEDURES FOR INSTALLATION OF METAL ROOF SYSTEMS ROOFING APPLICATION STANDARD (RAS) No. 133 STANDARD PROCEDURES FOR INSTALLATION OF METAL ROOF SYSTEMS 1. Scope 1.1 This application standard has been developed to provide consistent information for the

More information

WINDOW INSTALLATION GUIDE FOR NEW CONSTRUCTION - WOOD FRAMING

WINDOW INSTALLATION GUIDE FOR NEW CONSTRUCTION - WOOD FRAMING WINDOW INSTALLATION GUIDE FOR NEW CONSTRUCTION - WOOD FRAMING IMPORTANT NOTICES AND INFORMATION Read these instructions in their entirety prior to installing windows. Any local building code requirements

More information

WINDOW INSTALLATION GUIDE

WINDOW INSTALLATION GUIDE WINDOW INSTALLATION GUIDE is not responsible for or liable for any use or misuse of the information contained in this window installation guide. Window Installation Guide This guide provides basic information

More information

SECTION 08560 SERIES 1500 VINYL PATIO DOORS

SECTION 08560 SERIES 1500 VINYL PATIO DOORS SERIES 1500 VINYL PATIO DOORS PART 1 GENERAL 1.1 SECTION INCLUDES A. Patio Doors 1.2 RELATED SECTIONS A. Section 05450: Cold Formed Metal Framing. B. Section 06100: Rough Carpentry. C. Section 06200: Finish

More information

AAMA 2400-10. Standard Practice for Installation of Windows with a Mounting Flange in Open Stud Frame Construction for Low Wind/Water Exposure

AAMA 2400-10. Standard Practice for Installation of Windows with a Mounting Flange in Open Stud Frame Construction for Low Wind/Water Exposure A M E R I C A N A R C H I T E C T U R A L AAMA 2400-10 Standard Practice for Installation of Windows with a Mounting Flange in Open Stud Frame Construction for Low Wind/Water Exposure M A N U F A C T U

More information

foot skylight) is enough to knock a worker off their feet. A 10 mph wind gust on a 5 x 6 skylight develops a wind force of 270 lbs.

foot skylight) is enough to knock a worker off their feet. A 10 mph wind gust on a 5 x 6 skylight develops a wind force of 270 lbs. Skylight Installation Instructions This document provides instruction and guidelines for installation of both curb mount (CM) and self flashing (SF) unit skylights on flat, pitched (> or equal to 3/12

More information

Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows

Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows americancraftsmanwindows.com Project Requirements: Read

More information

INSTALLATION INSTRUCTIONS for Vinyl Windows without Nailing Fin (JII011) ImPOrTANT INFOrmATION & GlOssAry. rough OPeNINGs

INSTALLATION INSTRUCTIONS for Vinyl Windows without Nailing Fin (JII011) ImPOrTANT INFOrmATION & GlOssAry. rough OPeNINGs Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for vinyl windows without a nailing fin (including finless, flush fin and flange). Read these instructions

More information

Table of Contents. Western States RustWall Wall and Soffit Panels Installation, Flashings & Shop Drawing Detail Guide

Table of Contents. Western States RustWall Wall and Soffit Panels Installation, Flashings & Shop Drawing Detail Guide Western States RustWall Wall and Soffit Panels Installation, Flashings & Shop Drawing Detail Guide Table of Contents Section Page Section Page Notes to Designer /Installers.. 1 Fastener Placement and Selection.2-3

More information

VA25014B0516 VA CINCINNATI PROJECT NO. 539-328 INPATIENT BED TOWER ADDITION (4 TH AND 5 TH FLOORS) SECTION 09 29 00 GYPSUM BOARD

VA25014B0516 VA CINCINNATI PROJECT NO. 539-328 INPATIENT BED TOWER ADDITION (4 TH AND 5 TH FLOORS) SECTION 09 29 00 GYPSUM BOARD SECTION 09 29 00 GYPSUM BOARD PART 1 - GENERAL 1.1 DESCRIPTION This section specifies installation and finishing of gypsum board, vapor retarder and air and moisture barrrier. 1.2 RELATED WORK A. Installation

More information

CONSTRUCTION DETAILS & LOAD DESIGN CHARTS

CONSTRUCTION DETAILS & LOAD DESIGN CHARTS Office and Production 126 New Pace Rd., PO Box 279 Newcomerstown, OH 43832 1-800-446-2188, Fax: 740-498-4184 www.buildwithsips.com CONSTRUCTION DETAILS & LOAD DESIGN CHARTS Table of Contents Description

More information

Garden Window. Montecito Series Vinyl Garden Window Architectural Manual

Garden Window. Montecito Series Vinyl Garden Window Architectural Manual Montecito Series Vinyl The offers the outstanding insulating properties, low maintenance, and contemporary aesthetic appeal only vinyl can provide. Available in White and Tan homogenous window frames,

More information

PART 1 GENERAL 1.1 SECTION INCLUDES

PART 1 GENERAL 1.1 SECTION INCLUDES J-1 Section 09110 Long Form Specification INTERIOR METAL STUD FRAMING This section includes lightweight, usually 0.036 inch (0.9 mm) thick or lighter, non-axial load bearing metal stud framing including

More information

Tundra Series Windows January 2016

Tundra Series Windows January 2016 Tundra Series Windows January 2016 New Construction Installation Instructions Nail Fin, J-Fin and Brickmold Aplications product. ATTENTION! Read and understand all installation instructions before installing

More information

SECTION 08 41 1 ALUMINUM FRAMED ENTRANCES and STOREFRONTS. System 402 Flush-Glazed Screw Spline Storefront

SECTION 08 41 1 ALUMINUM FRAMED ENTRANCES and STOREFRONTS. System 402 Flush-Glazed Screw Spline Storefront PART 1 GENERAL 1.01 Work Included SECTION 08 41 1 ALUMINUM FRAMED ENTRANCES and STOREFRONTS System 402 Flush-Glazed Screw Spline Storefront A. Furnish and install aluminum architectural storefront system

More information

Replacement Window Installation Guide Non-Impact & Impact Resistant Windows without Nailing Fin

Replacement Window Installation Guide Non-Impact & Impact Resistant Windows without Nailing Fin Replacement Window Installation Guide Non-Impact & Impact Resistant Windows without Nailing Fin americancraftsmanwindows.com Project Requirements: Failure to follow these instructions may void product

More information

PETERSONS WATERFRONT CONDOMINIUMS

PETERSONS WATERFRONT CONDOMINIUMS CONSULT DESIGN CONSTRUCT PETERSONS WATERFRONT CONDOMINIUMS 103 Park Street Chelan, Washington Findings Summary Report Prepared for: Petersons Waterfront Condominium Association March 21, 2014 J2 Project

More information

The WANZ Guide to Window Installation

The WANZ Guide to Window Installation The WANZ Guide to Window Installation as described in E2/AS1 Amendment 5 Ver. 1.1 Page 2 of 74 Contents Overview Page 5 Objective Page 5 Scope Page 5 Opening Preparation Page 7 Step P1 Preliminary Check

More information

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 8 DOORS AND WINDOWS 08 50 00 WINDOWS

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 8 DOORS AND WINDOWS 08 50 00 WINDOWS SECTION INCLUDES Metal Windows Vinyl/Aluminum Clad Wood Windows Solid Fiberglass and Vinyl Windows Wood Windows (Historic Preservation only) RELATED SECTIONS 02 83 00 Lead Paint Remediation 06 10 00 Rough

More information

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003) NCMA TEK National Concrete Masonry Association an information series from the national authority on concrete masonry technology CONCRETE MASONRY FOUNDATION WALL DETAILS TEK 5-3A Details (2003) Keywords:

More information

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001)

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for Vinyl windows with an integral nailing fin. While the use of these installation instructions

More information

CHAPTER 7: Building Systems ROOFING SYSTEMS

CHAPTER 7: Building Systems ROOFING SYSTEMS ROOFING SYSTEMS Purpose Examples 1. Shingle roof system 2. Metal roof with blanket insulation 3. Metal roof with rigid insulation 4. Built-up asphalt roof system 5. Single-ply roof system 6. Modified Bitumen

More information

Foundation. Foundation

Foundation. Foundation Moisture Aside from structural concerns, the most important consideration for foundation design is moisture. No client wants a wet basement. No client wants a damp basement. No client wants mold in their

More information

ASTM E 1886 and ASTM E 1996 TEST REPORT. Rendered to: Atrium Companies, Inc. SERIES/MODEL: 50/305 HS PRODUCT TYPE: Vinyl Horizontal Slider

ASTM E 1886 and ASTM E 1996 TEST REPORT. Rendered to: Atrium Companies, Inc. SERIES/MODEL: 50/305 HS PRODUCT TYPE: Vinyl Horizontal Slider ASTM E 1886 and ASTM E 1996 TEST REPORT Rendered to: Atrium Companies, Inc. SERIES/MODEL: 50/305 HS PRODUCT TYPE: Vinyl Horizontal Slider Report No.: Test Date: 5/21/07 Through: 5/23/07 Report Date: 5/30/07

More information

Figures 1A and IB show schematics of head (1A) and jamb (1B) receptors.

Figures 1A and IB show schematics of head (1A) and jamb (1B) receptors. INTRODUCTION Designers often wrestle with the question of whether or not to include a receptor frame (or sub-frame) around aluminum window assemblies and how to specify these important components. In general

More information

Residential Roofing Guide

Residential Roofing Guide Residential Roofing Guide TABLE OF CONTENTS Building Detail and Accessories...... 1 Panel Introduction and Handling...... 2 Cutting and Trimming.... 3 Roof Preparation..... 3 Roof Slope..... 3 Re-roofing...

More information

10DBMC International Conference On Durability of Building Materials and Components LYON [France] 17 20 April 2005

10DBMC International Conference On Durability of Building Materials and Components LYON [France] 17 20 April 2005 10DBMC International Conference On Durability of Building Materials and Components Wall Cladding System Durability Lessons Learned from the Premature Deterioration of Wood-Framed Construction Clad with

More information

ROOFING APPLICATION STANDARD (RAS) No. 150 PRESCRIPTIVE BUR REQUIREMENTS

ROOFING APPLICATION STANDARD (RAS) No. 150 PRESCRIPTIVE BUR REQUIREMENTS ROOFING APPLICATION STANDARD (RAS) No. 150 PRESCRIPTIVE BUR REQUIREMENTS 1. 2. 3. 3.0 Scope 1.1 This application standard shall be used where the authority having jurisdiction has adopted its use, and

More information

Introduction...COMB-2 Design Considerations and Examples...COMB-3

Introduction...COMB-2 Design Considerations and Examples...COMB-3 SECTION DIRECTORY General Information Introduction...COMB-2 Design Considerations and Examples...COMB-3 Combination Assembly Recommendations and Limitations Composite Configurations...COMB-4 Typical Sealant

More information

Astragal: a vertical member placed at the meeting edges of a double door to provide a weather seal and may be used to anchor the fixed door.

Astragal: a vertical member placed at the meeting edges of a double door to provide a weather seal and may be used to anchor the fixed door. Window and Door Dictionary AAMA: American Architectural Manufacturers Association. A national trade association that establishes voluntary standards for the window, door, and skylight industry. Ambient

More information

PANELIZED HOME INSTALLATION GUIDELINE

PANELIZED HOME INSTALLATION GUIDELINE PANELIZED HOME INSTALLATION GUIDELINE A typical home package will be constructed of Snap-N-Lock Insulated Panels clad with steel skins. 4" panels will be used for the walls, and 6" panels for the roof.

More information

SECTION 07400 STANDING SEAM METAL ROOF

SECTION 07400 STANDING SEAM METAL ROOF SECTION 07400 STANDING SEAM METAL ROOF PART 1 - GENERAL 1.01 SECTION INCLUDES A. Work described in this section includes pre-formed standing seam metal roofing system complete with clips, perimeter and

More information

PERFORMANCE TEST REPORT. Rendered to: ARCHITECTURAL METAL SOLUTIONS, INC.

PERFORMANCE TEST REPORT. Rendered to: ARCHITECTURAL METAL SOLUTIONS, INC. PERFORMANCE TEST REPORT Rendered to: ARCHITECTURAL METAL SOLUTIONS, INC. SERIES/MODEL: AMS ARMOR-LOCK PRODUCT TYPE: STANDING SEAM METAL ROOF PANEL SYSTEM Report No: 97123.02-901-44 Test Date: 05/17/10

More information

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000 RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000 SECTION R905 REQUIREMENTS FOR ROOF COVERINGS R905.1 Roof covering application. Roof coverings

More information

Installation Guide for Andersen Architectural Clad Outswing Commercial Doors

Installation Guide for Andersen Architectural Clad Outswing Commercial Doors Installation Guide for Andersen Architectural Clad Outswing Commercial Doors Congratulations! You have just purchased one of the many fine Andersen products. Proper assembly, installation and maintenance

More information

GreenGuard Housewrap Installation Guide

GreenGuard Housewrap Installation Guide 000768PACBPHW_Flashing Bro 5/23/03 2:52 PM Page 1 For the most current product information, go to www.green-guard.com. Pactiv Building Products believes the information and recommendations herein to be

More information

Holiday Inn Express & Suites Covington (Newton County) 1. Standing-seam metal roofing, custom fabricated.

Holiday Inn Express & Suites Covington (Newton County) 1. Standing-seam metal roofing, custom fabricated. PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Standing-seam metal roofing, custom fabricated. 1.2 SUBMITTALS A. Product Data: For each type of product indicated. B. Shop Drawings: Show installation

More information

The WANZ Guide to Window Installation

The WANZ Guide to Window Installation The WANZ Guide to Window Installation as described in E2/AS1 Amendment 5 2 of 60 Contents Overview 5 Objective 5 Scope 5 Opening Preparation 7 Step P1 Preliminary Check 8 Step P2 Cut the Underlay 9 Step

More information

H-Stud Area Separation Wall System

H-Stud Area Separation Wall System 12 TH EDITION 09 21 16.33/NGC H-Stud Area Separation Wall System 09 21 16.33 139 H-STUD AREA SEPARATION WALL SYSTEM The fire-protection of gypsum-based Area Separation Walls is demonstrated in dramatic

More information

Basement Window Installation Guide Hopper and Sliding

Basement Window Installation Guide Hopper and Sliding Basement Window Installation Guide Hopper and Sliding americancraftsmanwindows.com Project Requirements: Installation must comply with all applicable building codes. Existing window frame, wall and weatherresistant

More information

AC-3200 ALUMINUM PLATE SYSTEM (DRY JOINT)

AC-3200 ALUMINUM PLATE SYSTEM (DRY JOINT) ALUMINUM PLATE SYSTEM (DRY JOINT) C D E G P J L A H M B Q F A B C D E F G H J K L M N P Q R HORIZONTAL JOINT DETAIL VERTICAL JOINT DETAIL COPING DETAIL (1) COPING DETAIL (2) COPING DETAIL (3) OUTSIDE CORNER

More information

SECTION 07 61 13 STANDING SEAM METAL ROOFING

SECTION 07 61 13 STANDING SEAM METAL ROOFING SECTION 07 61 13 STANDING SEAM METAL ROOFING PART 1 GENERAL 1.01 SCOPE OF WORK A. The Work shall include all labor, materials, equipment and supervision required to complete the work of the above referenced

More information

FOUNDATION INSULATING SYSTEM, INCLUDING WATERPROOFING AND DAMP PROOFING

FOUNDATION INSULATING SYSTEM, INCLUDING WATERPROOFING AND DAMP PROOFING FOUNDATION INSULATING SYSTEM, INCLUDING WATERPROOFING AND DAMP PROOFING insulation installed on foundation walls must be separated from the building interior with a code approved thermal barrier. Foam

More information

Linea Weatherboard DIRECT FIX CONCRETE SLAB AND SOFFIT FIGURE 1

Linea Weatherboard DIRECT FIX CONCRETE SLAB AND SOFFIT FIGURE 1 Top plate Stud Soffit lining 45mm min nog Fix scotia bead Building underlay/james Hardie rigid air barrier Soffit Detail Building underlay/james Hardie rigid air barrier Bottom plate 25mm wide cant strip.

More information

ROOF FLASHING SPRINGLOK FLASHING SYSTEM FEATURES & BENEFITS PRODUCT DESCRIPTION

ROOF FLASHING SPRINGLOK FLASHING SYSTEM FEATURES & BENEFITS PRODUCT DESCRIPTION SPRINGLOK SYSTEM PRODUCT DESCRIPTION FEATURES & BENEFITS Fry Reglet offers five flashing systems, each tailored for a particular type of substrate so you can get exactly what you need. SM Surface mounted

More information

Water Damage & Repair

Water Damage & Repair Water Damage & Repair Chinatown Preservation Talks 2015 James Engler, P.A Glenn Mason, AIA Mason Architects Program Outline Terminology & Waterproofing Basics Discussion of why this is important Below

More information

City of San Diego, CWP Guidelines

City of San Diego, CWP Guidelines PART 1 -- GENERAL SECTION 08520-1.1 WORK OF THIS SECTION City of San Diego, CWP Guidelines A. The WORK of this Section includes providing aluminum windows with frames, bracing, glazing attachments, screens,

More information

Brick Veneer Construction

Brick Veneer Construction Brick Veneer Construction Check list of suggested tools & support items Claw hammer Tape measure 3/4" [19 or 20] Wood chisel Wood or plastic shims Pry bar Utility knife Caulking and caulking gun Power

More information

DuPont Tyvek Commercial Air Barrier Assemblies Exceed Air Barrier Association of America, ASHRAE 90.1

DuPont Tyvek Commercial Air Barrier Assemblies Exceed Air Barrier Association of America, ASHRAE 90.1 Building Science Bulletin DuPont Tyvek Commercial Air Barrier Assemblies Exceed Air Barrier Association of America, ASHRAE 90.1 and IECC Air Leakage Requirements When Tested in Accordance with ASTM E2357

More information

ROOFS, SNOW AND ICE DAMS

ROOFS, SNOW AND ICE DAMS ROOFS, SNOW AND ICE DAMS The Problem Ice dams are a common roof performance problem in cold climate buildings. Simply put, they are ridges of ice and icicles caused by melt water from further up the roof

More information

InsulView Window Installation Instructions

InsulView Window Installation Instructions InsulView Window Installation Instructions 1. The entire building is normally sheeted with the 2" 2 ½ OR 3 wall panel and the windows installed at a later time. A window retrofit of an existing building

More information

Schluter -KERDI-BOARD Substrate, building panel, bonded waterproofing

Schluter -KERDI-BOARD Substrate, building panel, bonded waterproofing Schluter -KERDI-BOARD Substrate, building panel, bonded waterproofing Schluter -KERDI-BOARD The universal substrate for tiles Flat. Level. Plumb. Square. No matter the quality, cost, or extravagance of

More information

Brick Veneer/Steel Stud Walls

Brick Veneer/Steel Stud Walls TECHNICAL NOTES on Brick Construction 28B 1850 Centennial Park Drive, Reston, Virginia 20191 www.gobrick.com 703 620 0010 Brick Veneer/Steel Stud Walls Abstract: This Technical Note addresses the considerations

More information

PERFORMANCE TEST REPORT. Rendered to: TREMCO INCORPORATED. SERIES/MODEL: Proglaze ETA PRODUCT TYPE: Engineered Transition Assembly

PERFORMANCE TEST REPORT. Rendered to: TREMCO INCORPORATED. SERIES/MODEL: Proglaze ETA PRODUCT TYPE: Engineered Transition Assembly PERFORMANCE TEST REPORT Rendered to: TREMCO INCORPORATED SERIES/MODEL: Proglaze ETA PRODUCT TYPE: Engineered Transition Assembly Title Summary of Results Air Infiltration

More information

Table of Contents PART 1 WINDOW SELECTION GUIDE. Window and Door Selection Guide

Table of Contents PART 1 WINDOW SELECTION GUIDE. Window and Door Selection Guide VOLUME 1 - WINDOWS AND DOORS Window and Door Selection Guide PART 1 WINDOW SELECTION GUIDE WSG-11 PART 2 - PERFORMANCE SPECIFICATIONS Voluntary Specifications for Aluminum, Vinyl (PVC) and Wood Windows

More information

Mark Cramer Inspection Services, Inc.

Mark Cramer Inspection Services, Inc. Mark Cramer Inspection Services, Inc. 492 Twentieth Avenue, Indian Rocks Beach, FL 34635-2970 (727) 595-4211 Fax (727) 596-7583 Certified Member #12085 American Society of Home Inspectors Construction

More information

Storage Store the siding in a dry and ventilated area. Do not place it directly on the ground. Always cover the siding after a day s work.

Storage Store the siding in a dry and ventilated area. Do not place it directly on the ground. Always cover the siding after a day s work. Installation Guide Before you begin, take the time to read this entire guide to clearly understand the requirements and steps to follow for proper installation. Warning Do not install defective material.

More information

WINDOW PANNING AND TRIMS

WINDOW PANNING AND TRIMS OCTOBER, 2010 PANNING AND TRIMS GENERAL INFORMATION 1 EXTERIOR PANNING Panning is primarily used to cover the perimeters of existing building openings prior to the installation of replacement windows.

More information

PERFORMANCE TEST REPORT. Rendered to: UNITED STATES ALUMINUM CORPORATION. SERIES/MODEL: 450 Center Glaze PRODUCT TYPE: Aluminum Curtain Wall

PERFORMANCE TEST REPORT. Rendered to: UNITED STATES ALUMINUM CORPORATION. SERIES/MODEL: 450 Center Glaze PRODUCT TYPE: Aluminum Curtain Wall Architectural Testing PERFORMANCE TEST REPORT Rendered to: UNITED STATES ALUMINUM CORPORATION SERIES/MODEL: 450 Center Glaze PRODUCT TYPE: Aluminum Curtain Wall Title Summary of Results Air Infiltration

More information

PERFORMANCE TEST REPORT. Rendered to: GLASSCRAFT DOOR COMPANY

PERFORMANCE TEST REPORT. Rendered to: GLASSCRAFT DOOR COMPANY PERFORMANCE TEST REPORT Rendered to: GLASSCRAFT DOOR COMPANY SERIES/MODEL: Buffalo Forge Steel Doors / Round Top Single PRODUCT TYPE: In-swing Round Top Single Door RH-4 Title Uniform Load Deflection Test

More information

JANUARY, 2016 TR-7100 Windows (Fixed) 1 EC 97909-071 085113 ALUMINUM WINDOWS Guide Specs

JANUARY, 2016 TR-7100 Windows (Fixed) 1 EC 97909-071 085113 ALUMINUM WINDOWS Guide Specs JANUARY, 2016 TR-7100 Windows (Fixed) 1 EC 97909-071 085113 ALUMINUM WINDOWS Guide Specs SECTION 085113 ALUMINUM WINDOWS This suggested guide specification has been developed using the current edition

More information

Assessing Curtain Walls

Assessing Curtain Walls Assessing Curtain Walls Considerations and Best Practices Paul E Beers GCI Consultants, LLC pbeers@gciconsultants.com What is a Curtain Wall System? A curtain wall system is an outer covering of a building

More information

Common Callbacks. Designers love intersecting roof. ~ CoastalContractor

Common Callbacks. Designers love intersecting roof. ~ CoastalContractor Common Callbacks In the face of wind-blown rain and short drying cycles, coastal exteriors are shown no mercy by Steve Easley Callbacks typically result from three things: poor design, faulty construction,

More information

Important Information for Installer & Homeowner

Important Information for Installer & Homeowner Important Information for Installer & Homeowner Homeowner: Please keep this information for your records, do not discard! Installation Instructions for Wood Frame Construction Replacement (See other side

More information

MOCK-UP TEST REPORT. Rendered to: TUBELITE, INC. PROJECT: 200 Series Curtain Wall Mock-Up

MOCK-UP TEST REPORT. Rendered to: TUBELITE, INC. PROJECT: 200 Series Curtain Wall Mock-Up MOCK-UP TEST REPORT Rendered to: TUBELITE, INC. PROJECT: 200 Series Curtain Wall Mock-Up Report No: 85616.01-120-32 Test Completion Date: 01/15/09 Report Date: 02/11/09 Record Retention End Date: 01/15/13

More information

Installation Instructions

Installation Instructions Installation Instructions One-Piece Deep Wall Sleeve For Use with Packaged Terminal Units Please read these instructions completely before attempting installation. NOTE: Ensure that the unit is only installed

More information

Quality Building Products for over 50 Years

Quality Building Products for over 50 Years Light Commercial Quality Building Products for over 50 Years Harvey Building Products is a leading manufacturer and distributor of high quality building products. We manufacture a complete line of superior

More information

Table of Contents. Western States Standing Seam SS675 Panel Installation, Flashings & Shop Drawing Detail Guide. Notes to Designer /Installers..

Table of Contents. Western States Standing Seam SS675 Panel Installation, Flashings & Shop Drawing Detail Guide. Notes to Designer /Installers.. Western States Standing Seam SS675 Panel Installation, Flashings & Shop Drawing Detail Guide Table of Contents Section Page Section Page Notes to Designer /Installers.. 1 Fastener Placement and Selection.2-3

More information

DE Frame with C Series Sidelight

DE Frame with C Series Sidelight TOOLS REQUIRED Tape measure 6' magnetic level 3' magnetic level Screw gun with clutch adjusted #2 phillips tip #3 phillips tip Screwdriver (used to adjust frame on will using oval slots) Pry Bar Powder

More information

Installer Training and Certification Overview

Installer Training and Certification Overview Installer Training and Certification Overview Outline of This Presentation The Need for a Training Program The History of the Program Details of the Training Program The Certification Process The Need

More information

Low-slope reroofing guidelines

Low-slope reroofing guidelines Low-slope reroofing guidelines by Thomas Bollnow and Joan P. Crowe, AIA The NRCA Roofing and Waterproofing Manual, Fifth Edition, contains reroofing guidelines for steep- and low-slope roofing. The August

More information

TEST REPORT. Rendered to: TFC A DIVISION OF CENTURION INDUSTRIES, INC. Garrett, Indiana

TEST REPORT. Rendered to: TFC A DIVISION OF CENTURION INDUSTRIES, INC. Garrett, Indiana Architectural Testing TEST REPORT Report No.: D0162.02-201-44 Rendered to: TFC A DIVISION OF CENTURION INDUSTRIES, INC. Garrett, Indiana PRODUCT TYPE: Pressure Equalized Rainscreen SERIES/MODEL: 4 mm Composite

More information

Drexel Metals Inc. DMC 100SS 16oz min. Copper Mechanical Seam Metal Roof System over Plywood

Drexel Metals Inc. DMC 100SS 16oz min. Copper Mechanical Seam Metal Roof System over Plywood Drexel Metals Inc. DMC 100SS 16oz min. Copper Mechanical Seam Metal Roof System over Plywood Section 07411 Metal Roof Panels Part 1 General 1.1 Summary A. This section includes the following: a. Factory-formed

More information

3.1 Water Intrusion Problems Related to Unsealed Stucco Penetrations

3.1 Water Intrusion Problems Related to Unsealed Stucco Penetrations 3.1 Water Intrusion Problems Related to Unsealed Stucco Penetrations Any penetration through the stucco that is left unsealed will allow entry of moisture. Even an average size home can have an extreme

More information

DuPont Tyvek ThermaWrap R5.0 Installation Guidelines for New Construction Using Vinyl, Brick and Stone Claddings

DuPont Tyvek ThermaWrap R5.0 Installation Guidelines for New Construction Using Vinyl, Brick and Stone Claddings Tyvek ThermaWrap R5.0 Installation Guidelines for New Construction Using Vinyl, Brick and Stone Claddings VERSION 1/16 FOR SINGLE FAMILY HOMES AND LOW RISE MULTI-FAMILY BUILDINGS LESS THAN 4 STORIES Tyvek

More information

GYPSUM AREA SEPARATION FIREWALLS GA-620-2011

GYPSUM AREA SEPARATION FIREWALLS GA-620-2011 GYPSUM AREA SEPARATION FIREWALLS GA-620-2011 GA-620-2011 Copyright 2011 Gypsum Association All rights reserved. Printed in U.S.A. Characteristics, properties, or performance of materials or systems herein

More information

FIELD TESTING SERVICES

FIELD TESTING SERVICES FIELD TESTING SERVICES Chris Leach Director of Testing Baton Rouge, Louisiana Destin, Florida Scott Leach David Nichols Field Testing Representative Field Testing Representative 17485 Opportunity Avenue

More information

1. Adhered KEE membrane roofing system. 2. Mechanically fastened KEE membrane roofing system.

1. Adhered KEE membrane roofing system. 2. Mechanically fastened KEE membrane roofing system. SECTION 075416 - PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Adhered KEE membrane roofing system. 2. Mechanically fastened KEE membrane roofing system. 1.2 PERFORMANCE REQUIREMENTS A. Solar Reflectance

More information

DEFAULT HEAT LOSS COEFFICIENTS

DEFAULT HEAT LOSS COEFFICIENTS DEFAULT HEAT LOSS COEFFICIENTS SECTION A101 GENERAL REQUIREMENTS A101.1 Scope. The following defaults shall apply to Chapter 4 of both the (RE) and (CE) sections of the IECC. This chapter includes tables

More information

PERFORMANCE TEST REPORT

PERFORMANCE TEST REPORT PERFORMANCE TEST REPORT CCLW JOB #08-5152-1 DATES OF FORMAL TESTING SEPTEMBER 19 & 23, 2008 TEST LOCATION CONSTRUCTION CONSULTING LABORATORY WEST 4751 WEST STATE STREET, SUITE B ONTARIO, CA 91762 PH: 909-591-1789

More information

INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACION FOR DOUBLE-HUNG VENT REPLACEMENT WINDOW

INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACION FOR DOUBLE-HUNG VENT REPLACEMENT WINDOW Vinyl Windows and Doors Manufactured by Pella Corporation INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACION FOR DOUBLE-HUNG VENT REPLACEMENT WINDOW Lea las instrucciones en español en el reverso.

More information

NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS

NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS The (NRDCA) has prepared this document to provide customers and installers information that the industry

More information

EASY$ TIP SHEETS. Energy Advice Saving Yukoners Money

EASY$ TIP SHEETS. Energy Advice Saving Yukoners Money EASY$ TIP SHEETS Energy Advice Saving Yukoners Money Quick Links How to check for leaks Draftproofing products Sealants Draft proofing your home Draftproofing can be a cost-effective measure you take to

More information

Renovating Your Basement

Renovating Your Basement building science.com 2006 Building Science Press All rights of reproduction in any form reserved. Renovating Your Building America Report - 0309 2003 (revised 2007) Building Science Corporation Abstract:

More information