1 abcd LLOYD S REGISTER TYPE APPROVAL SYSTEM Test Specification GT04 GAS TURBINES 2004 Performance and test specifications for GasTurbines to be used in Marine, Offshore and Industrial Applications.

2 ABCD Lloyd s Register 71 Fenchurch Street London EC3M 4BS Telephone +44 (0) Fax +44 (0) tad@lr.org Web site: LLOYD S REGISTER 2004 ALL RIGHTS RESERVED. Except as permitted under current legislation no part of this work may be photocopied, stored in a retrieval system, published, performed in public, adapted, broadcast, transmitted, recorded or reproduced in any form or by any means, without prior permission of the copyright owner. Enquiries should be directed to the above address. TERMS AND CONDITIONS Refer to LLOYD S REGISTER TYPE APPROVAL SYSTEM Procedure TA (Sample of form 2502 Annex B - `Request for Marine Services`)

3 Lloyd's Register Type Approval System Test Specification GT04 FOREWORD This Specification details the documentation, performance and tests required for the Lloyd's Register (LR) Approval of gas turbines for Marine, Offshore and Industrial applications. This test specification should be read in conjunction with the LR Type Approval System - Procedure TA02. Failure to comply with this requirement may render the test results unacceptable for the purposes of LR Type Approval. CONTENTS No. Section Page 1. INTRODUCTION 2 2. GENERAL 2 3. DETAILS OF REQUIRED DOCUMENTATION 4. TESTING PROCEDURES VISUAL INSPECTION AND CERTIFICATION 6. PRODUCTION INSPECTION AND CERTIFICATION 4 4 Lloyd s Register GT04 Page 1

4 Lloyd's Register Type Approval System Test Specification GT04 Sections INTRODUCTION 1.1. This specification is intended as an aid to assist a Producer seeking LR Type Approval of gas turbines for use in Marine, Offshore and Industrial applications and should be read in conjunction with the LR Type Approval System - Procedure TA02.` 1.2. Type Approval of gas turbines containing electrical and control components will be based on agreed performance and environmental tests. Assessment of Safety Systems fitted to such units will be carried out Electrical and control components may be required to meet the requirements of the LR Type Approval System - Test Specification No Separate Type Approval certificates are not issued for individual components on the basis of tests carried out on a composite product. 2. GENERAL 2.1. The Type Approval will be considered in three phases. During the Phase 1 review of the documentation and an appraisal of the design will be completed. The Type Testing and the issue of the appropriate certification will be carried out in the Phase 2. Phase 3 consists of the production inspection and certification Phase The submitted information will be forwarded by the Local LR office to the Type Approval Centre for consideratiion Phase Type Tests shall be carried out in accordance with the agreed test programme on a representative machine, to confirm that the performance provisions of the specified standard(s) are fulfilled. Type Tests are to be witnessed by the local LR representative, unless otherwise agreed in writing All test and measuring equipment shall be of proven accuracy, where appropriate traceable to a National or International standard of measurement Test area ambient conditions are to be monitored throughout testing Type Tests may be carried out at the manufacturer s works or at any establishment having suitable facilities acceptable to LR On completion of tests, a report shall be issued, identified by number and date, which accurately, clearly and unambiguously presents the test results and all other relevant information. The English language should be used Test reports shall be signed by the test personnel and countersigned, as verification of the results, by the LR or agreed independent representative witnessing the tests When the machine has been deemed to satisfy the procedures for LR Type Approval, a Type Approval Certificate will be authorised A document review will be conducted to determine such facts as product acceptability, compliance with relevant standards and LR s Rules, design appraisal, adequacy of proposed Type Test programme and relevance of previous certification and reports. Lloyd s Register GT04 Page 2

5 Lloyd's Register Type Approval System Test Specification GT04 Sections 3 to 4 3. DETAILS OF REQUIRED DOCUMENTATION 3.1. Submission in triplicate of the following: Request for LR Type Approval via the Local office, Detailed product specification, Relevant design drawings with materials specified, catalogues, data sheets, calculations and functional descriptions, Full details of: Sectional assembly drawing, Combustion chambers and heat exchangers, Rotors, bearings and couplings, Blades and blade attachments, Inlet and exhaust ducting, Securing arrangements, including details of resilient mounts where applicable, Control systems schematics, Fuel oil schematic, including controls and safety devices, Lubricating oil system schematic, Starting system schematic, Cooling water system schematic, where applicable Calculations of the critical speeds of blade and rotor vibration, giving full details of the basic assumptions Calculations concerning the amplitude and frequency of vibration associated with any resilient type mountings Proposed field of application and operational limitations Proposed Type Test programme, sufficiently detailed in order to demonstrate that the performance provisions of the specified standards may be fulfilled for acceptance, Certificates and reports for relevant tests previously obtained for the machine, Copies of the relevant standards where necessary. 4. TESTING PROCEDURES 4.1. Generally, the requirements of BS 3135:1989 (ISO 2314:1989) will be used for the basis of the Test programme. The primary objective of the tests is to determine: Power output under specified operating conditions against ambient temperature (gas power, if only a gas generator is supplied), Thermal efficiency, heat rate or specific fuel consumption under specified operating conditions and, The adequacy of essential protective devices (i.e. emergency overspeed trip and flame failure trip, if installed) Additional tests to those detailed in 4.1 above, are: Performance of the following governing and protective systems; Constant speed regulation, Variable speed regulation, The gas turbine temperature control, gas turbine exhaust, turbine inlet or other limiting temperatures as applicable Low lubricating oil pressure, High lubricating oil temperature, High bearing temperature, Fuel supply pressure and, Lloyd s Register GT04 Page 3

6 Lloyds Register Type Approval System Test Specification GT04 Sections 4 to Handling characteristics, for example; Starting sequence, Starting reliability, Special starting characteristics, such as - black start, remote start, emergency start, dead load pick-up, alternative fuel start on dual fuel machines, starting power requirements, minimum self-sustaining speed determination and starting fuel consumption, Normal load pick-up, Time period for start-up and loading Amplitude and frequency of rotor vibration Amplitude and frequency of vibration associated with any resilient type mountings, (see above) Stack emissions, in accordance with a recognised test method, Exhaust mass flow and temperature (for waste heat recovery evaluation), Noise levels (generally in accordance with ISO 10494:1993), Dependent upon the field of application of the gas turbine, additional special testing may be required. This may include operating in excess of the maximum continuous rating and inclination tests. 6. PRODUCTION INSPECTION AND CERTIFICATION - Phase General Type Approved gas turbines intended to be fitted into LR classed ships are to be surveyed at the manufacturer s works during their production The manufacturer has a choice of two production inspection and testing procedures Construction under Survey Individual gas turbine units are to be surveyed at the manufacturer s works. The Surveyors are to examine and test the materials and workmanship from the commencement of work until the final test of the gas turbine under full power working conditions in accordance with the rules Alternative Quality Scheme of Inspection Where gas turbines are manufactured as individual or series produced units a survey procedure based on quality assurance concepts utilising regular and systematic audits of the approved manufacturing and quality control processes and procedures as an alternative to the direct survey of individual items The procedure is detailed in LR Rules for Classification of Ships, Part 5, Chapter 1, Quality Assurance Scheme for Machinery. 5. VISUAL INSPECTION AND CERTIFICATION 5.1. Following successful completion of Design Appraisal and Type Testing, the manufacturing facilities will be inspected to ensure that the appropriate procedures are in place in order to maintain conformity of manufacture for the five year life of the Type Approval Certificate Only when all outstanding points have been mutually resolved will the Type Approval Certificate be authorised and issued. Lloyd s Register GT04 Page 4

TYPE APPROVAL CERTIFICATION SCHEME MASS PRODUCED DIESEL ENGINES

TYPE APPROVAL CERTIFICATION SCHEME MASS PRODUCED DIESEL ENGINES 1. Introduction TYPE APPROVAL CERTIFICATION SCHEME MASS PRODUCED DIESEL ENGINES 1.1 This scheme details the tests and inspection of diesel engines manufactured by mass production system for use in marine

More information

ShipRight ABCD. Machinery Planned Maintenance and Condition Monitoring. Linked Supporting Service. March 2013. Design and construction

ShipRight ABCD. Machinery Planned Maintenance and Condition Monitoring. Linked Supporting Service. March 2013. Design and construction ShipRight Design and construction Machinery Planned Maintenance and Condition Monitoring Linked Supporting Service March 2013 ABCD ShipRight Design and construction Machinery Planned Maintenance and Condition

More information

TYPE CERTIFICATION OF WIND TURBINES

TYPE CERTIFICATION OF WIND TURBINES TYPE CERTIFICATION OF WIND TURBINES March 2003, rev. 9 DET NORSKE VERITAS, DANMARK A/S Building 114 Frederiksborgvej 399 P. O. Box 49 DK-4000 Roskilde Denmark Email: Wind.Turbine.Certification@dnv.com

More information

1.3 Turbochargers are categorised in three groups depending on served power by cylinder groups with:

1.3 Turbochargers are categorised in three groups depending on served power by cylinder groups with: (Feb 2015) Turbochargers 1. Scope 1.1 These requirements are applicable for s with regard to design approval, type testing and certification and their matching on engines. Turbochargers are to be type

More information

Australian Transport Council. National Standard for the Administration of Marine Safety SECTION 4 SURVEYS OF VESSELS

Australian Transport Council. National Standard for the Administration of Marine Safety SECTION 4 SURVEYS OF VESSELS Australian Transport Council National Standard for the Administration of Marine Safety SECTION 4 SURVEYS OF VESSELS Edition 1 Draft for comment issued 20 December 2005 Endorsed by the Australian Transport

More information

Quality Manual. This manual is proprietary and no part thereof shall be copied without written authorisation from the company. Ref: Quality Manual.

Quality Manual. This manual is proprietary and no part thereof shall be copied without written authorisation from the company. Ref: Quality Manual. This manual is proprietary and no part thereof shall be copied without written authorisation from the company Ref: Quality Manual.ind Issue: June 2009 INDEX 1 Amendment Status 2 Controlled Distribution

More information

DNVGL-CP-0393 Edition December 2015

DNVGL-CP-0393 Edition December 2015 CLASS PROGRAMME Type approval DNVGL-CP-0393 Edition December 2015 The electronic pdf version of this document, available free of charge from http://www.dnvgl.com, is the officially binding version. FOREWORD

More information

01 2015 CIMAC Guideline

01 2015 CIMAC Guideline 01 2015 CIMAC Guideline Cold flow properties of marine fuel oils By CIMAC WG7 Fuels This publication is for guidance and gives an overview regarding the assessment of risks associated with operating on

More information

Gas Detector System, Portable/Fixed Oxygen Analysis and Gas Detection Equipment

Gas Detector System, Portable/Fixed Oxygen Analysis and Gas Detection Equipment STANDARD FOR CERTIFICATION No. 2.9 TYPE APPROVAL PROGRAMME NO. 7-473.30/31 / MED A.1/3.30/54 Gas Detector System, Portable/Fixed Oxygen Analysis and Gas Detection Equipment SEPTEMBER 2011 The content of

More information

Top Technology for Industry, Agriculture, Business and Communities

Top Technology for Industry, Agriculture, Business and Communities Top Technology for Industry, Agriculture, Business and Communities CHP The Technology with a Potential for Saving Energy Combined Heat and Power (CHP) is a highly efficient technology for the conversion

More information

Energy Savings through Electric-assist Turbocharger for Marine Diesel Engines

Energy Savings through Electric-assist Turbocharger for Marine Diesel Engines 36 Energy Savings through Electric-assist Turbocharger for Marine Diesel Engines KEIICHI SHIRAISHI *1 YOSHIHISA ONO *2 YUKIO YAMASHITA *3 MUSASHI SAKAMOTO *3 The extremely slow steaming of ships has become

More information

Effect of Burr Grinding on the Fatigue Strength of Angled Welded Connections

Effect of Burr Grinding on the Fatigue Strength of Angled Welded Connections Lloyd s Register Technical Papers Effect of Burr Grinding on the Fatigue Strength of Angled Welded Connections by S. E. Rutherford and H. Polezhayeva The authors of this paper retain the right of subsequent

More information

Rules for Classification and Construction Additional Rules and Guidelines

Rules for Classification and Construction Additional Rules and Guidelines VI Rules for Classification and Construction Additional Rules and Guidelines 7 Guidelines for the Performance of Type Approvals 6 Test Requirements for Electrical Machinery Edition 1999 The following Guidelines

More information

ISO 9001:2000 Gap Analysis Checklist

ISO 9001:2000 Gap Analysis Checklist ISO 9001:2000 Gap Analysis Checklist Type: Assessor: ISO 9001 REQUIREMENTS STATUS ACTION/COMMENTS 4 Quality Management System 4.1 General Requirements Processes needed for the quality management system

More information

General Description of The CMC- Services

General Description of The CMC- Services STANDARD FOR CERTIFICATION No.1.1 General Description of The CMC- Services JANUARY 2013 The electronic pdf version of this document found through http://www.dnv.com is the officially binding version The

More information

ISO 9001:2008 Quality Management System Requirements (Third Revision)

ISO 9001:2008 Quality Management System Requirements (Third Revision) ISO 9001:2008 Quality Management System Requirements (Third Revision) Contents Page 1 Scope 1 1.1 General. 1 1.2 Application.. 1 2 Normative references.. 1 3 Terms and definitions. 1 4 Quality management

More information

This is Document Schedule 5 Part 1 referred to in this Contract SCOTTISH MINISTERS REQUIREMENTS SCHEDULE 5 PART 1 QUALITY MANAGEMENT SYSTEM

This is Document Schedule 5 Part 1 referred to in this Contract SCOTTISH MINISTERS REQUIREMENTS SCHEDULE 5 PART 1 QUALITY MANAGEMENT SYSTEM This is Document Schedule 5 Part 1 referred to in this Contract SCOTTISH MINISTERS REQUIREMENTS SCHEDULE 5 PART 1 QUALITY MANAGEMENT SYSTEM CONTENTS Page No 1 GENERAL REQUIREMENTS 1 1.1 Requirements 1

More information

Check-list for auditors. Audit visit at candidate registered laboratories

Check-list for auditors. Audit visit at candidate registered laboratories Check-list for auditors Audit visit at candidate registered laboratories 1 Contents Introduction Laboratory documentation required by the standard(s), available for inspection by the auditor Items to be

More information

Screw Compressors ESM 30 132 Fixed Speed & VS 30 132 Variable Speed

Screw Compressors ESM 30 132 Fixed Speed & VS 30 132 Variable Speed Screw Compressors ESM 30 132 Fixed Speed & VS 30 132 Variable Speed Rely on GD to provide the perfect fit The perfect fit to maximise productivity The growing industrial demand for compressed air requires

More information

Vigilant Security Services UK Ltd Quality Manual

Vigilant Security Services UK Ltd Quality Manual Quality Manual Date: 11 th March, 2014 Issue: 5 Review Date: 10 th March 2015 VSS-COM-PRO-001 SCOPE This Quality Manual specifies the requirements for the Quality Management System of Vigilant Security

More information

Quality Management System

Quality Management System LH Sleightholme Ltd, Westfield Works, Helperthorpe, Malton, North Yorkshire YO17 8TQ Quality Management System MANUAL ISO 9001:2008 This Quality Management System Manual has been issued on the authority

More information

ISO 9001:2000 AUDIT CHECKLIST

ISO 9001:2000 AUDIT CHECKLIST ISO 9001:2000 AUDIT CHECKLIST No. Question Proc. Ref. Comments 4 Quality Management System 4.1 General Requirements 1 Has the organization established, documented, implemented and maintained a quality

More information

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD INTERNATIONAL STANDARD IEC 61892-1 First edition 2001-12 Mobile and fixed offshore units Electrical installations Part 1: General requirements and conditions Unités fixes et mobiles en mer Installations

More information

AEROSPACE STANDARD. Quality Management Systems - Requirements for Aviation, Space and Defense Organizations RATIONALE

AEROSPACE STANDARD. Quality Management Systems - Requirements for Aviation, Space and Defense Organizations RATIONALE AEROSPACE STANDARD AS9100C Issued 1999-11 Revised 2009-01 Superseding AS9100B Quality Management Systems - Requirements for Aviation, Space and Defense Organizations RATIONALE This standard has been revised

More information

QUALITY MANAGEMENT SYSTEM REQUIREMENTS General Requirements. Documentation Requirements. General. Quality Manual. Control of Documents

QUALITY MANAGEMENT SYSTEM REQUIREMENTS General Requirements. Documentation Requirements. General. Quality Manual. Control of Documents Chapter j 38 Self Assessment 729 QUALITY MANAGEMENT SYSTEM REQUIREMENTS General Requirements 1. Establishing and implementing a documented quality management system 2. Implementing a documented quality

More information

Half the cost Half the carbon

Half the cost Half the carbon Half the cost Half the carbon the world s most efficient micro-chp What is BlueGEN? The most efficient small-scale electricity generator BlueGEN uses natural gas from the grid to generate electricity within

More information

Rev: Issue 4 Rev 4 Quality Manual AOP0101 Date: 10/07/13. Quality Manual. CBT Technology, Inc. 358 North Street Randolph, MA 02368

Rev: Issue 4 Rev 4 Quality Manual AOP0101 Date: 10/07/13. Quality Manual. CBT Technology, Inc. 358 North Street Randolph, MA 02368 Quality Manual CBT Technology, Inc. 358 North Street Randolph, MA 02368 Issue 4 Revision 4 Note: updates are in italics Page 1 of 18 1.0 Scope and Exclusions Scope This Quality Manual contains policies

More information

QUALITY & TECHNICAL CERTIFICATIONS

QUALITY & TECHNICAL CERTIFICATIONS QUALITY & TECHNICAL CERTIFICATIONS October 2015 ODIN Underwater Inspection in Lieu of Drydocking I am writing in regard to the EM&I ODIN System for Underwater Inspection in Lieu of Drydocking. ABS has

More information

Implementing a Ship Energy Efficiency Management Plan (SEEMP) Guidance for shipowners and operators

Implementing a Ship Energy Efficiency Management Plan (SEEMP) Guidance for shipowners and operators Implementing a Ship Energy Efficiency Management Plan (SEEMP) Guidance for shipowners and operators Lloyd s Register, its affiliates and subsidiaries and their respective officers, employees or agents

More information

Rules for Classification and Construction Additional Rules and Guidelines

Rules for Classification and Construction Additional Rules and Guidelines VI Rules for Classification and Construction Additional Rules and Guidelines 5 Pumps 1 Guidelines for the Design, Construction and Testing of Pumps Edition 2007 The following Guidelines come into force

More information

9. GOVERNANCE. Policy 9.8 RECORDS MANAGEMENT POLICY. Version 4

9. GOVERNANCE. Policy 9.8 RECORDS MANAGEMENT POLICY. Version 4 9. GOVERNANCE Policy 9.8 RECORDS MANAGEMENT POLICY Version 4 9. GOVERNANCE 9.8 RECORDS MANAGEMENT POLICY OBJECTIVES: To establish the framework for, and accountabilities of, Lithgow City Council s Records

More information

Rules for Classification and Construction Ship Technology

Rules for Classification and Construction Ship Technology I Rules for Classification and Construction Ship Technology 1 Seagoing Ships 19 Guidelines for the Carriage of Refrigerated Containers on Board Ships Edition 2003 The following Guidelines come into force

More information

DOCUMENT CS/1: SCHEME DESCRIPTION AND BENEFITS

DOCUMENT CS/1: SCHEME DESCRIPTION AND BENEFITS WELDING FABRICATOR CERTIFICATION SCHEME DOCUMENT CS/1: SCHEME DESCRIPTION AND BENEFITS 6 th Edition July 2012 Issued under the authority of the Governing Board for Certification All correspondence should

More information

TECHNICAL SPECIFICATION

TECHNICAL SPECIFICATION TECHNICAL SPECIFICATION IEC TS 61400-14 First edition 2005-03 Wind turbines Part 14: Declaration of apparent sound power level and tonality values IEC 2005 Copyright - all rights reserved No part of this

More information

Exhaust Scrubbers. What you need to know. Move Forward with Confidence

Exhaust Scrubbers. What you need to know. Move Forward with Confidence Exhaust Scrubbers What you need to know Move Forward with Confidence Exhaust Scrubbers - What you need to know 1 What are the rules? From January 1, 2015 ships navigating in designated areas globally will

More information

ISO 9001:2015 Internal Audit Checklist

ISO 9001:2015 Internal Audit Checklist Page 1 of 14 Client: Date: Client ID: Auditor Audit Report Key - SAT: Satisfactory; OBS: Observation; NC: Nonconformance; N/A: Not Applicable at this time Clause Requirement Comply Auditor Notes / Evidence

More information

COMPANY NAME. Environmental Management System Manual

COMPANY NAME. Environmental Management System Manual Revision No. : 1 Date : DD MM YYYY Prepared by : Approved by : (EMR) (Top Management) Revision History Revision Date Description Sections Affected Revised By Approved By Table of Content 0.0 Terms and

More information

Quality Assurance QUALITY ASSURANCE PLAN

Quality Assurance QUALITY ASSURANCE PLAN Revision 2 Page 1 of 40 QUALITY ASSURANCE PLAN PLAN APPROVALS: Jeff Shouse Signature on File DIRECTOR OF QUALITY ASSURANCE DIRECTOR OF QUALITY ASSURANCE (signature) DATE Rodney Baltzer Signature on File

More information

BFRC ENERGY RATING THE REHAU ABC ENERGY EFFICIENT WINDOWS AND DOORS. www.rehau.co.uk. Building Solutions Automotive Industry

BFRC ENERGY RATING THE REHAU ABC ENERGY EFFICIENT WINDOWS AND DOORS. www.rehau.co.uk. Building Solutions Automotive Industry BFRC ENERGY RATING THE REHAU ABC ENERGY EFFICIENT WINDOWS AND DOORS www.rehau.co.uk Building Solutions Automotive Industry INTRODUCTION IMPROVING THE ENERGY EFFICIENCY OF WINDOWS AND DOORS This information

More information

4000 Series 4008TAG2A Diesel Engine ElectropaK 947 kwm @ 1500 rpm

4000 Series 4008TAG2A Diesel Engine ElectropaK 947 kwm @ 1500 rpm The Perkins 4000 Series family of 6, 8, 12 and 16 cylinder diesel engines was designed in advance of today s uncompromising demands within the power generation industry and includes superior performance

More information

ISO 9001 (2000) QUALITY MANAGEMENT SYSTEM ASSESSMENT REPORT SUPPLIER/ SUBCONTRACTOR

ISO 9001 (2000) QUALITY MANAGEMENT SYSTEM ASSESSMENT REPORT SUPPLIER/ SUBCONTRACTOR Page 1 of 20 ISO 9001 (2000) QUALITY MANAGEMENT SYSTEM ASSESSMENT REPORT SUPPLIER/ SUBCONTRACTOR SUPPLIER/ SUBCONTRACTOR NAME: ADDRESS: CITY AND STATE: ZIP CODE: SUPPLIER/MANUFACTURER NO PHONE: DIVISION:

More information

BLOOM AND WAKE (ELECTRICAL CONTRACTORS) LIMITED QUALITY ASSURANCE MANUAL

BLOOM AND WAKE (ELECTRICAL CONTRACTORS) LIMITED QUALITY ASSURANCE MANUAL 130 Wisbech Road Outwell Wisbech Cambridgeshire PE14 8PF Tel: (01945) 772578 Fax: (01945) 773135 Copyright 2003. This Manual and the information contained herein are the property Bloom & Wake (Electrical

More information

A.1 Obligations and reporting of the gaining Society. Plans to be Submitted by the Owner to the Gaining Society

A.1 Obligations and reporting of the gaining Society. Plans to be Submitted by the Owner to the Gaining Society (Rev.0 July 2009) (Rev.1 June 2012) (Rev.2 Oct 2013) (Rev.3 Jan 2015) (Rev.4 July 2015) (Rev.5 Jan 2016) Procedure for Transfer of Class TABLE OF CONTENTS Procedure for Transfer of Class Application Definitions

More information

26 3213.13 Diesel Engine Driven Generators Page 1 of 6

26 3213.13 Diesel Engine Driven Generators Page 1 of 6 Last Update: December 8, 2014 A. Description of System Consultant s Handbook Page 1 of 6 1. Provide a diesel engine driven electric generating unit, factory assembled, tested and certified to operate at

More information

Environmental Management Systems in Hotels. 15 Steps to the Successful Implementation of an Environmental Management System in a Hotel

Environmental Management Systems in Hotels. 15 Steps to the Successful Implementation of an Environmental Management System in a Hotel Environmental Management Systems in Hotels 15 Steps to the Successful Implementation of an Environmental Management System in a Hotel 2 15 STEPS 1. Assemble the team 2. Initial Review 3. Environmental

More information

Quality Management System Manual

Quality Management System Manual Effective Date: 03/08/2011 Page: 1 of 17 Quality Management System Manual Thomas C. West Eric Weagle Stephen Oliver President ISO Management General Manager Representative Effective Date: 03/08/2011 Page:

More information

Application of a Large Hybrid Turbocharger for Marine Electric-power Generation

Application of a Large Hybrid Turbocharger for Marine Electric-power Generation 29 Application of a Large Hybrid Turbocharger for Marine Electric-power Generation YOSHIHISA ONO *1 KEIICHI SHIRAISHI *2 YUKIO YAMASHITA *3 The function of our new marine hybrid turbocharger, which has

More information

Performance Monitoring For Gas Turbines

Performance Monitoring For Gas Turbines Performance Monitoring For Gas Turbines Introduction Managing an asset requires numerous technologies designed to assess health. While most gas turbines in the field are fitted with some type of mechanical

More information

MP Plumbing & Heating Ltd Quality Policy Manual THE QUALITY POLICY STATEMENT OF:

MP Plumbing & Heating Ltd Quality Policy Manual THE QUALITY POLICY STATEMENT OF: THE QUALITY POLICY STATEMENT OF: MP Plumbing & Heating Ltd Unit 8,The Metro Centre, Bridge Road, Orpington BR5 2BE Telephone: 01689 822188 Fax: 01689 897 733 E-Mail: info@mpplumbingheating.co.uk Web page:

More information

Case Study 5 Use of Wind Turbine Technology

Case Study 5 Use of Wind Turbine Technology Case Study 5 Use of Wind Turbine Technology 1. Context Hong Kong relies on an adequate and reliable electricity supply for its economic development. Our electricity needs are met by the two electricity

More information

How To Manage A Quality Management System

How To Manage A Quality Management System Quality Management System Requirements for the Suppliers Of Arçelik A.Ş. Rev : 0.1 Date of issue : September 2005-1/23- -2/23- 0. INTRODUCTION... 5 0.1. GENERAL... 5 1. SCOPE... 5 1.1. GENERAL... 5 1.2.

More information

West Midlands Police and Crime Commissioner Records Management Policy 1 Contents

West Midlands Police and Crime Commissioner Records Management Policy 1 Contents West Midlands Police and Crime Commissioner Records Management Policy 1 Contents 1 CONTENTS...2 2 INTRODUCTION...3 2.1 SCOPE...3 2.2 OVERVIEW & PURPOSE...3 2.3 ROLES AND RESPONSIBILITIES...5 COMMISSIONED

More information

Foreword 2 STO BR IBBS-1.1-2007

Foreword 2 STO BR IBBS-1.1-2007 BANK OF RUSSIA STANDARD STO BR IBBS-1.1-2007 INFORMATION SECURITY OF RUSSIAN BANKING INSTITUTIONS INFORMATION SECURITY AUDIT* Date enacted: 1 May 2007 Moscow 2007 2 STO BR IBBS-1.1-2007 Foreword 1. ADOPTED

More information

LORD CHANCELLOR S CODE OF PRACTICE ON THE MANAGEMENT OF RECORDS UNDER

LORD CHANCELLOR S CODE OF PRACTICE ON THE MANAGEMENT OF RECORDS UNDER LORD CHANCELLOR S CODE OF PRACTICE ON THE MANAGEMENT OF RECORDS UNDER SECTION 46 OF THE FREEDOM OF INFORMATION ACT 2000 NOVEMBER 2002 Presented to Parliament by the Lord Chancellor Pursuant to section

More information

For the Design, Installation, Commissioning & Maintenance of Fixed Gaseous Fire Suppression Systems

For the Design, Installation, Commissioning & Maintenance of Fixed Gaseous Fire Suppression Systems BAFE Scheme: SP203-3 Version 1: July 2008 Amendment No: 1 Fire Protection Industry Scheme, Reference SP203 Part 3 For the Design, Installation, Commissioning & Maintenance of Fixed Gaseous Fire Suppression

More information

Jonathan Wilson. Sector Manager (Health & Safety)

Jonathan Wilson. Sector Manager (Health & Safety) Jonathan Wilson Sector Manager (Health & Safety) OHSAS 18001:2007 Making Life Easier For Health & Safety Managers Workshop Agenda 1. Introduction 2. Why Manage Health & Safety 3. OHSAS 18001 and OHSMS

More information

Ambient Temperature Operation and Matching MAN B&W Two-stroke Engines

Ambient Temperature Operation and Matching MAN B&W Two-stroke Engines Ambient Temperature Operation and Matching MAN B&W Two-stroke Engines Content Introduction...5 Standard ambient matched engine...5 Operating at high seawater with standard matched engine...6 Non-standard

More information

ISO 9001 Quality Systems Manual

ISO 9001 Quality Systems Manual ISO 9001 Quality Systems Manual Revision: D Issue Date: March 10, 2004 Introduction Micro Memory Bank, Inc. developed and implemented a Quality Management System in order to document the company s best

More information

SGT5-8000H SCC5-8000H 1S. Experience of Commercial Operation at Irsching 4. ANIMP-ATI, Sesto San Giovanni 26 June 2012

SGT5-8000H SCC5-8000H 1S. Experience of Commercial Operation at Irsching 4. ANIMP-ATI, Sesto San Giovanni 26 June 2012 SGT5-8000H SCC5-8000H 1S Experience of Commercial Operation at Irsching 4 ANIMP-ATI, Sesto San Giovanni 26 June 2012 Massimo Gianfreda 8000H Overview Validation Status Summary Fig. 2 Siemens Large Scale

More information

Feasibility Study Proposal & Report Guide. Industrial Optimization Program

Feasibility Study Proposal & Report Guide. Industrial Optimization Program Feasibility Study Proposal & Report Guide Industrial Optimization Program Table of contents 1.0 Industrial Optimization Program overview 2 2.0 Feasibility Study offer eligibility 2 3.0 Purpose of the Feasibility

More information

Part 0 - Classification and Surveys Classification and Surveys I-0 2016-01

Part 0 - Classification and Surveys Classification and Surveys I-0 2016-01 Code Edition I - Ship Technology Part 0 - Classification and Surveys Classification and Surveys I-0 2016-01 Part 1 - Seagoing Ships Chapter 1 - Hull Structures I-1-1 2016-01 Chapter 1 - Hull Structures

More information

Ship Propulsion/Electric Power Hybrid System Recovering Waste Heat of Marine Diesel Engine

Ship Propulsion/Electric Power Hybrid System Recovering Waste Heat of Marine Diesel Engine 54 Ship Propulsion/Electric Power Hybrid System Recovering Waste Heat of Marine Diesel Engine SHINICHIRO EGASHIRA *1 TAKAHIRO MATSUO *2 YOSHIHIRO ICHIKI *3 To meet ship power demand, using a steam turbine-driven

More information

Certification criteria for. Food Safety Management Systems Auditor Conversion Training Course

Certification criteria for. Food Safety Management Systems Auditor Conversion Training Course Certification criteria for Food Safety Management Systems Auditor Conversion Training Course CONTENTS BACKGROUND TO THIS COURSE 1. INTRODUCTION 2. PRIOR KNOWLEDGE REQUIREMENT 3. LEARNING OBJECTIVES 4.

More information

QSS 0: Products and Services without Bespoke Contracts.

QSS 0: Products and Services without Bespoke Contracts. QSS 0: Products and Services without Bespoke Contracts. Amendment History Version Date Status v.1 Dec 2014 Updated For 2015 deployment Table of Contents 1. DEFINITIONS 3 2. INTRODUCTION 3 3. WORKING WITH

More information

Guiding Principles for the contents of Particular Materials Appraisals (Version approved at the WGP on 21 November 2006)

Guiding Principles for the contents of Particular Materials Appraisals (Version approved at the WGP on 21 November 2006) PE- 03-28 - rev 5 21 November 2006 Page 1 of 5 Guiding Principles for the contents of Particular Materials Appraisals (Version approved at the WGP on 21 November 2006) Introduction A Particular Material

More information

Control Device Requirements Charts For Oil and Gas Handling and Production Facilities

Control Device Requirements Charts For Oil and Gas Handling and Production Facilities Device Charts For Oil and Gas Handling and Production Facilities Purpose/Scope: The purpose of this document is to provide standardized guidance for use by the regulated community and air permit reviewers,

More information

Standard the the Raising

Standard the the Raising Raising the Standard Introduction to BS 5839-1:2013 An Overview of the BS 5839 1:2013 for professionals who are responsible for the provision of fire detection and alarm systems for buildings Agenda Introduction

More information

Uncontrolled Document

Uncontrolled Document SOUTHWEST RESEARCH INSTITUTE QUALITY SYSTEM MANUAL July 2015 Revision 5 Quality System Manual Page iii TABLE OF CONTENTS 1.0 PURPOSE... 1 2.0 SCOPE... 1 3.0 TERMS AND DEFINITIONS... 2 4.0 QUALITY MANAGEMENT

More information

Engineering Procedure

Engineering Procedure Engineering Procedure Design Owner: EPD 0014 MANAGING CONFIGURATION CHANGE Manager, Engineering Standards and Configuration Version 2.1 Issued February 2010 Approved Jagath Peiris Authorised Jim Modrouvanos

More information

www.opraturbines.com Gas Turbine Power COMPACT, EFFICIENT, RELIABLE

www.opraturbines.com Gas Turbine Power COMPACT, EFFICIENT, RELIABLE www.opraturbines.com Gas Turbine Power COMPACT, EFFICIENT, RELIABLE T U R B I N E S About OPRA Turbines King Olav V of Norway with Jan Mowill and the KG2 in 1969 Production of OP16 generating sets in Hengelo,

More information

Internal Quality Management System Audit Checklist (ISO9001:2015) Q# ISO 9001:2015 Clause Audit Question Audit Evidence 4 Context of the Organization

Internal Quality Management System Audit Checklist (ISO9001:2015) Q# ISO 9001:2015 Clause Audit Question Audit Evidence 4 Context of the Organization Internal Quality Management System Audit Checklist (ISO9001:2015) Q# ISO 9001:2015 Clause Audit Question Audit Evidence 4 Context of the Organization 4.1 Understanding the organization and its context

More information

TYPE APPROVAL CERTIFICATE

TYPE APPROVAL CERTIFICATE DET NORSKE VERITAS TYPE APPROVAL CERTIFICATE CERTIFICATE NO. P-14862 This is to certify that the Pipe System with Couplings with type designation(s) Megapress with SC-contour Issued to Viega GmbH & Co.

More information

HSE information sheet. Fire and explosion hazards in offshore gas turbines. Offshore Information Sheet No. 10/2008

HSE information sheet. Fire and explosion hazards in offshore gas turbines. Offshore Information Sheet No. 10/2008 HSE information sheet Fire and explosion hazards in offshore gas turbines Offshore Information Sheet No. 10/2008 Contents Introduction.. 2 Background of gas turbine incidents in the UK offshore sector...2

More information

SUPPLIER QUALITY MANAGEMENT SYSTEM QUESTIONNAIRE

SUPPLIER QUALITY MANAGEMENT SYSTEM QUESTIONNAIRE Company Name Street Address City, State, Zip code Phone Number Fax Company Website Email Address ORGANIZATION NAME PHONE NUMBER EMAIL ADDRESS President/CEO General Manager Engineering Manager Production

More information

THM Gas Turbines Heavy duty gas turbines for industrial applications

THM Gas Turbines Heavy duty gas turbines for industrial applications THM Gas Turbines THM Gas Turbines Heavy duty gas turbines for industrial applications Combined advantages The THM 1304 heavy duty gas turbine family consists of two members with ISO power outputs of 10,500

More information

DNV GL Assessment Checklist ISO 9001:2015

DNV GL Assessment Checklist ISO 9001:2015 DNV GL Assessment Checklist ISO 9001:2015 Rev 0 - December 2015 4 Context of the Organization No. Question Proc. Ref. Comments 4.1 Understanding the Organization and its context 1 Has the organization

More information

TfNSW Standard Requirements TSR T Technical Management

TfNSW Standard Requirements TSR T Technical Management Template Applicable to: Transport Projects Quality Management System Status: Division: Approved Transport Projects Version: 5.0 Desksite No.: 3455797_1 Date of issue: 1 July 2014 Effective date: 1 July

More information

QUALITY MANUAL ISO 9001:2015

QUALITY MANUAL ISO 9001:2015 Page 1 of 22 QUALITY MANUAL ISO 9001:2015 Quality Management System Page 1 of 22 Page 2 of 22 Sean Duclos Owner Revision History Date Change Notice Change Description 11/02/2015 1001 Original Release to

More information

General Rules for the certification of Management Systems

General Rules for the certification of Management Systems General Rules for the certification of Management Systems Effective from 19/11/2015 RINA Via Corsica 12 16128 Genova - Italy tel. +39 010 53851 fax +39 010 5351000 website : www.rina.org Technical rules

More information

EXPERIMENT NO. 3. Aim: To study the construction and working of 4- stroke petrol / diesel engine.

EXPERIMENT NO. 3. Aim: To study the construction and working of 4- stroke petrol / diesel engine. EXPERIMENT NO. 3 Aim: To study the construction and working of 4- stroke petrol / diesel engine. Theory: A machine or device which derives heat from the combustion of fuel and converts part of this energy

More information

Technical Specification. Generating Set with Waukesha engine burning natural gas

Technical Specification. Generating Set with Waukesha engine burning natural gas Technical Specification Generating Set with Waukesha engine burning natural gas The following presents the Gas Engine Generating Set (GEGS) APG1000 type, based on Waukesha gas engine 16V150LTD. Using the

More information

UNCONTROLLED COPY FOR REFERENCE ONLY

UNCONTROLLED COPY FOR REFERENCE ONLY CLOVER MACHINE AND MFG. 800 MATHEW ST. #101 SANTA CLARA, CA 95050 727-3380 727-7015 fax REVISION: DATE: PAGE 1 OF 45 QUALITY POLICY MANUAL DISTRIBUTION LIST: President Purchasing Manager Vice President

More information

EMISSIONS FROM MARINE ENGINES VERSUS IMO CERTIFICATION AND REQUIREMENTS OF TIER 3

EMISSIONS FROM MARINE ENGINES VERSUS IMO CERTIFICATION AND REQUIREMENTS OF TIER 3 Journal of KONES Powertrain and Transport, Vol. 18, No. 2 2011 EMISSIONS FROM MARINE ENGINES VERSUS IMO CERTIFICATION AND REQUIREMENTS OF TIER 3 Jerzy Herdzik Gdynia Maritime University Marine Power Plant

More information

QUALITY MANAGEMENT SYSTEM Corporate

QUALITY MANAGEMENT SYSTEM Corporate Page 1 of 12 4 Quality Management System 4.1 General Requirements The Peerless Pump Quality Management System shall include: Documented statements of a quality policy and of quality objectives; A quality

More information

ED FAGAN INC. QUALITY SYSTEM MANUAL

ED FAGAN INC. QUALITY SYSTEM MANUAL ED FAGAN INC. QUALITY SYSTEM MANUAL APPROVED BY: Ed Fagan President ED FAGAN INC. January 13, 2010 TABLE OF CONTENTS 1. PURPOSE AND SCOPE 2 2. PRODUCTS, SERVICES AND CAPABILITIES 2 3. REVISION HISTORY

More information

ISO 9001: 2008 Construction Quality Management System Sample - Selected pages (not a complete plan)

ISO 9001: 2008 Construction Quality Management System Sample - Selected pages (not a complete plan) ISO 9001: 2008 Construction Quality Management System Sample - Selected pages (not a complete plan) Part 1: Project-Specific Quality Plan Part 2: Company Quality Manual Part 3: Submittal Forms Part 4:

More information

Why and How we Use Capacity Control

Why and How we Use Capacity Control Why and How we Use Capacity Control On refrigeration and air conditioning applications where the load may vary over a wide range, due to lighting, occupancy, product loading, ambient weather variations,

More information

Schedule of Accreditation issued by United Kingdom Accreditation Service 21-47 High Street, Feltham, Middlesex, TW13 4UN, UK

Schedule of Accreditation issued by United Kingdom Accreditation Service 21-47 High Street, Feltham, Middlesex, TW13 4UN, UK 21-47 High Street, Feltham, Middlesex, TW13 4UN, UK Royal & SunAlliance Insurance PlcTrading as:- RSA Engineering and 17 York Street Manchester M2 3RS Contact: Mr Richard Green Tel: +44 (0)161 235 3069

More information

Assured Joint Integrity

Assured Joint Integrity Assured Joint Integrity All leaks cost Loss of containment can have catastrophic results and negatively impact brand image, facilities, employees, and the environment. Unplanned shutdowns at hydrocarbon

More information

This Business Management System Manual is based on ISO 9001:2008 requirements

This Business Management System Manual is based on ISO 9001:2008 requirements Page 1 of 19 (Formerly: Quality Management System Manual) When the ISO 9001:2008 standard is identifying the Quality Manual or Quality Management System, Turbonetics is representing this requirement with

More information

QUALITY ASSURANCE MANUAL JPM OF MISSISSIPPI, INC.

QUALITY ASSURANCE MANUAL JPM OF MISSISSIPPI, INC. QUALITY ASSURANCE MANUAL JPM OF MISSISSIPPI, INC. Hattiesburg, MS Revision E 01/19/11 Revised to ISO 9001:2008 on July 9, 2009 JPM OF MISSISSIPPI, INC. MANAGEMENT QUALITY POLICY It is the goal of JPM of

More information

Quality Management System Manual ISO9001:2008

Quality Management System Manual ISO9001:2008 Quality Management System Manual ISO9001:2008 Controlled Copy Rev. 3 Page 1 of 21 7/1/13 Table of Contents Company Profile...5 Past...5 Present...5 Mission...5 Vision...5 Locations...6 1 Scope...6 1.1

More information

CCD MARINE LTD QUALITY MANUAL PROCEDURE Q0.000. Date: Title. Revision: QUALITY MANUAL PROCEDURE Q0.000. 29 September 2014

CCD MARINE LTD QUALITY MANUAL PROCEDURE Q0.000. Date: Title. Revision: QUALITY MANUAL PROCEDURE Q0.000. 29 September 2014 Title: Quality Manual Uncontrolled if Hardcopy CCD MARINE LTD th Date: 29 September 2014 Doc Ref: Q0.000 Issued By: Sarah Leighton Rev No: 2 Title Revision: Date: QUALITY MANUAL PROCEDURE Q0.000 2 29 September

More information

Maximum Customer Satisfaction

Maximum Customer Satisfaction www.kaeser.com Maximum Customer Satisfaction Provide the best solution for the customer Offer prices in line with the market Produce the expected quality Deliver on the agreed date Use the most effective

More information

WÄRTSILÄ DYNAMIC MAINTENANCE PLANNING (DMP) AND CONDITION BASED MAINTENANCE (CBM) Wärtsilä

WÄRTSILÄ DYNAMIC MAINTENANCE PLANNING (DMP) AND CONDITION BASED MAINTENANCE (CBM) Wärtsilä WÄRTSILÄ DYNAMIC MAINTENANCE PLANNING (DMP) AND CONDITION BASED MAINTENANCE (CBM) / 18 Wärtsilä Doc.ID: Revision: Status: Condition monitoring, Dynamic Maintenance Planning and Condition Based Maintenance

More information

How To Write Software

How To Write Software 1 Medical Device Software - Software Life Cycle Processes IEC 62304 2 Credits John F. Murray Software Compliance Expert U.S. Food and Drug Administration Marcie R. Williams Medical Device Fellow Ph.D.

More information

ISO 9001:2008 Audit Checklist

ISO 9001:2008 Audit Checklist g GE Power & Water ISO 9001:2008 Audit Checklist Organization Auditor Date Page 1 Std. 4.1 General s a. Are processes identified b. Sequence & interaction of processes determined? c. Criteria for operation

More information