1 Low Voltage Power Supplies in Electrified Areas Synopsis This document mandates requirements for control of return and stray currents and the management of earthing for low voltage power supplies in electrified areas. Copyright in the Railway Group documents is owned by Rail Safety and Standards Board Limited. All rights are hereby reserved. No Railway Group document (in whole or in part) may be reproduced, stored in a retrieval system, or transmitted, in any form or means, without the prior written permission of Rail Safety and Standards Board Limited, or as expressly permitted by law. RSSB Members are granted copyright licence in accordance with the Constitution Agreement relating to Rail Safety and Standards Board Limited. Content approved by: Plant Standards Committee on 16 October 2008 Authorised by RSSB on 20 November 2008 In circumstances where Rail Safety and Standards Board Limited has granted a particular person or organisation permission to copy extracts from Railway Group documents, Rail Safety and Standards Board Limited accepts no responsibility for, and excludes all liability in connection with, the use of such extracts, or any claims arising therefrom. This disclaimer applies to all forms of media in which extracts from Railway Group documents may be reproduced. Published by: Rail Safety and Standards Board Evergreen House 160 Euston Road London NW1 2DX Copyright 2009 Rail Safety and Standards Board Limited
2 Issue record Issue Date Comments One February 2009 Original document Supersedes GI/RT7007 The three new requirements have been marked by a vertical black line. Superseded documents The following Railway Group documents are superseded, either in whole or in part as indicated: Superseded documents Sections superseded Date when sections are superseded GI/RT7007, issue 1, June 2002 Low Voltage Electical Installations GI/GN7607, issue 1, June 2002 Guidance for Low Voltage Electrical Installations All 04 April 2009 All 04 April 2009 Supply Controlled and uncontrolled copies of this may be obtained from the Corporate Communications Department, Rail Safety and Standards Board, Evergreen House, 160 Euston Road, London NW1 2DX, telephone or enquiries@rssb.co.uk. s and associated documents can also be viewed at Page 2 of 18 RAIL SAFETY AND STANDARDS BOARD
3 Contents Section Description Page Part 1 Purpose and Introduction Purpose Introduction 4 Part 2 Earthing Requirements General earthing requirements Earthing requirements for LV electrical installations in ac electrified lines areas Earthing requirements for LV electrical installations in dc electrified lines areas Residual current devices providing additional protection against direct contact in dc electrified lines areas Guidance for Part 2 6 Part 3 Other Requirements Segregation Interlocking of power supplies Consultation with affected parties Guidance for Part 3 7 Part 4 Temporary LV Electrical Installations Temporary installations 8 Part 5 Application of this document Application infrastructure managers Application railway undertakings Health and safety responsibilities 9 Appendices 10 Appendix A Guidance for Part 2 of this standard 10 Appendix B Guidance for Part 3 of this standard 16 Definitions 17 References 18 RAIL SAFETY AND STANDARDS BOARD Page 3 of 18
4 Part 1 Purpose 1.1 Purpose This document mandates requirements for the management of earthing to avoid hazardous potentials, and for the management of segregation to control stray currents and minimise current transfer between different electrical power supply systems These requirements are additional to those normally required for low voltage (LV) power supplies (for example. compliance with BS 7671) and are needed to avoid hazardous touch potentials arising from differences in two independent power supply systems (LV power supplies and traction power supplies) while ensuring fault and stray currents are effectively controlled This document excludes power supplies to signalling and telecommunications (S&T) equipment, for which specific earthing arrangements are made This document excludes installations which do not form part of the main line railway, such as traction substations and depots. 1.2 Introduction Infrastructure managers need to co-operate to design, install and maintain LV electrical installations such that the earthing and segregation arrangements are not compromised. Page 4 of 18 RAIL SAFETY AND STANDARDS BOARD
5 Part 2 Earthing Requirements 2.1 General earthing requirements Touch potentials Where it is possible for a person to simultaneously touch exposed conductive parts that are connected to the equipotential bonding system of a LV electrical installation and the exposed conductive parts of the equipotential bonding system of another electrical system or rail mounted vehicle, the LV electrical installation shall be designed to ensure the touch voltage values do not exceed those specified in BS EN Circuit protective conductor Metallic conduit, trunking and cable trays shall not be used as a circuit protective conductor where high currents associated with other electrical systems could affect the integrity of the circuit protective conductor. 2.2 Earthing requirements for LV electrical installations in ac electrified lines areas LV electrical equipment directly bonded to the traction return circuit Where LV electrical equipment is either a) in contact with a conductive structure directly bonded to the traction return circuit, or b) is directly bonded to the traction return circuit, then the LV electrical equipment circuit protective conductor and any other earthed metallic conductor (for example screen wire or armouring) shall not be connected to the LV electrical equipment Guidance for is set out in A.1.2 and Figure A LV electrical equipment indirectly bonded to the traction return circuit Where LV electrical equipment is not directly bonded to traction return circuit as set out in 2.2.1, then the LV electrical equipment circuit protective conductor shall be connected to the LV electrical equipment The LV electrical equipment and circuit protective conductor shall be rated to carry the prospective traction fault current, unless the equipment is not at risk of carrying this current under fault conditions Where indirect bonding is used, a bond between the LV electrical installation supply main earth and the traction return circuit shall be provided Guidance for is set out in A.1.3 and Figure A Utility services and LV electrical installation bonding Where the LV electrical installation is bonded to another electrical system, the bonding and segregation arrangement of the utility services (for example gas, water etc) shall avoid hazards arising from touch voltages and the transfer of current between the systems and the utility services under operating and fault conditions. 2.3 Earthing requirements for LV electrical installations in dc electrified lines areas Protection against dc leakage Where a socket outlet is located such that an electrical appliance could be used on or near an object in contact with the running rail or other exposed conductive parts of the traction return circuit, then the design of the LV electrical installation shall prevent the adverse effects of dc leakage in the earth wire. RAIL SAFETY AND STANDARDS BOARD Page 5 of 18
6 The design of the LV electrical installation shall prevent adverse effects from dc leakage entering the neutral conductor of any other equipment or electrical distribution system because of earth faults between the earth conductor and neutral conductor The detection system of earth monitoring or earth proving devices shall be protected against the effects of dc leakage Guidance for is set out in A Residual current devices providing additional protection against direct contact in dc electrified lines areas In dc electrified lines areas dc leakage can affect the operation of the residual current devices (RCD) used to provide additional protection against direct contact. Therefore, Network Rail shall produce and maintain a list of approved RCDs that are immune up to declared levels of dc leakage and shall make this list available to others on request. 2.5 Guidance for Part Guidance for Part 2 is set out in Appendix A. Page 6 of 18 RAIL SAFETY AND STANDARDS BOARD
7 Part 3 Other Requirements 3.1 Segregation High voltage (HV) and traction systems shall be segregated from LV earth systems in order to avoid extraneous connections. 3.2 Interlocking of power supplies Interlocking of power supplies shall be provided where it is necessary to prevent paralleling of independent LV electrical power sources. 3.3 Consultation with affected parties Before making any change to a LV electrical installation the infrastructure manager shall consult with any other infrastructure manager that could be affected to ensure that the design, installation, testing and maintenance of the LV electrical installation maintains the separation and ensure the values of touch voltages specified in BS EN are not exceeded. 3.4 Guidance for Part Guidance for Part 3 is set out in Appendix B. RAIL SAFETY AND STANDARDS BOARD Page 7 of 18
8 Part 4 Temporary LV Electrical Installations 4.1 Temporary installations Temporary LV electrical installations shall comply with the arrangements set out in Part Temporary LV electrical installations shall not affect existing permanent earthing arrangements or segregation arrangements. Page 8 of 18 RAIL SAFETY AND STANDARDS BOARD
9 Part 5 Application of this document 5.1 Application infrastructure managers Scope The requirements of this document apply to all new and existing LV electrical installations, including all cabling and equipment from the main incoming power supply, through distribution and sub-distribution boards to ring mains, and discrete power supplies to fixed and portable equipment Where it is known, or becomes known, that existing LV power supplies do not comply with the requirements of this document, action to bring them into compliance is required as follows: a) When a LV power supply is modified b) When a LV power supply is renewed as a whole c) When any major component of a LV power supply is replaced The requirements of this document apply to all work that affects LV power supplies, whether new or altered Exclusions from scope There are no exclusions from the scope specified in for infrastructure managers General compliance date for infrastructure managers This comes into force and is to be complied with from 04 April After the compliance dates or the date by which compliance is achieved if earlier, infrastructure managers are to maintain compliance with the requirements set out in this. Where it is considered not reasonably practicable to comply with the requirements, authorisation not to comply should be sought in accordance with the s Code. 5.2 Application railway undertakings There are no requirements applicable to railway undertakings. 5.3 Health and safety responsibilities Users of documents published by Rail Safety and Standards Board (RSSB) are reminded of the need to consider their own responsibilities to ensure health and safety at work and their own duties under health and safety legislation. RSSB does not warrant that compliance with all or any documents published by RSSB is sufficient in itself to ensure safe systems of work or operation or to satisfy such responsibilities or duties. RAIL SAFETY AND STANDARDS BOARD Page 9 of 18
10 Appendix A Guidance for Part 2 of this standard The content of this appendix is not mandatory and is provided for guidance only. In addition to the guidance below reference can also be made to BS EN :1997. Clause 6.2 of BS EN :1997 gives some information relating to protective provisions for electrical equipment in ac and dc electrified areas, and illustrates some techniques which may be employed in addressing voltage and current transfer. It should be noted that BS EN :1997 is being updated and the corresponding provisions are set out in clause 7 of pren :2008. Consideration of these proposed provisions may also be helpful pending publication of the final version. When considering the guidance below it is necessary to consider the distribution network operator (DNO) supply earthing arrangements (existing or proposed), and if direct connection of the DNO and railway systems is to be undertaken or avoided. The transfer of potentials and currents between the DNO and railway systems is influenced by the arrangements employed by both parties. The arrangements employed on the railway should not result in a risk to the DNO installation. Early dialogue with the DNO is strongly recommended. A.1 Earthing requirements for LV electrical installations in ac electrified lines areas (2.2 of this standard) A.1.1 General A The overhead contact wire is energised at a nominal voltage of 25 kv. Electric trains draw power from the overhead wire with current returning to the feeder station via the running rails, return conductors or aerial earth wire depending upon the specific location design. Each overhead line equipment (OLE) support mast is bonded to the traction return circuit and provides an earth path through the mast foundation. A A A Where there is a risk of an exposed conductive part (for example trackside LV equipment enclosure, station platform awning, etc) becoming electrically connected to live OLE (by flashover, breakage of conductors, etc) exposed conductive parts and services are bonded to the traction return circuit to ensure rapid disconnection of the traction power supply in the event of a fault on the traction supply system. Additionally, equipotential bonding is required where it is possible simultaneously to touch exposed conductive parts and the running rails, trains or other conductive objects connected to the traction return circuit. This is necessary to limit touch voltage to values not exceeding those specified in BS EN The final choice of whether to bond directly or indirectly depends on several factors, including the cost of providing a reinforced circuit protective conductor for indirect bond compared to the cost of direct bonding and the practicality of segregating the systems at the LV electrical equipment or elsewhere. A.1.2 LV electrical equipment within the LV electrical installations directly bonded to the traction return circuit A Parallel paths for traction current can be avoided by not connecting the LV electrical installation supply circuit protective conductor, cable armouring and other earthed metallic conductors to the LV electrical equipment (see Figure A.1 for a typical arrangement) when the LV electrical equipment is either directly bonded to the traction return circuit, or is in contact with a conductive structure having a direct bond to the traction return circuit. Page 10 of 18 RAIL SAFETY AND STANDARDS BOARD
11 Conductive structure connected to traction return circuit LV electrical installation LV electrical equipment LV supply in contact with traction return circuit L N L N L N E E (cpc) Armour / metallic screen E (cpc) return circuit directly bonded to traction return circuit A and A cpc and where applicable cable armour / metallic screen etc not to be connected A possible bond by agreement with DNO Supply LV supply main earth return circuit return circuit distributed earthing return current bus-bar supply main earth (Feeder Stations only) Figure A.1 LV electrical equipment within the LV electrical installations directly bonded to the ac traction return circuit A Separation is achieved by gapping the supply cable armouring, by either: a) The use of an insulated gland Or b) Cutting back the cable armouring to a maximum distance of 300 mm from the equipment entry point RAIL SAFETY AND STANDARDS BOARD Page 11 of 18
12 A A In both cases apply heavy-duty heat-shrink sleeving, or equivalent, to cover the gland or the cut back section and 150 mm of the cable outer sheath, and terminate any other earthed metallic conductor and additional circuit protective conductor before it reaches the equipment. A suitable permanent warning label should be installed (securely attached to the cable at the gapping location) which identifies that the cable has been gapped and should not be bridged. The preferred warning label wording (black text on yellow background) is as follows: Caution cable gapped (see Railway Group Standard ). Do not bridge this gap A A A bond may be required between the traction return circuit and the LV electrical installation supply main earth to provide earth fault protection for the equipment and / or minimise touch voltages. This bond between the traction return circuit and the LV electrical installation should not be fitted at feeder stations because of the high level of traction currents which could flow via the bond into the LV supply network. The type and rating of this bond should be agreed with the infrastructure manager responsible for the traction system and the DNO formerly known as the regional electricity company. The LV protection arrangement for gapped circuits needs to be carefully considered because of the discontinuity of the circuit protective conductor. The characteristics of the traction system return circuit and its earthing arrangements can allow conduction of the LV fault current via the traction return system. In some cases use of this path is adequate for protection even if a bond in accordance with A is not fitted (subject to the requisite earth loop impedance being achieved). Consideration should be given to provision of appropriate RCD protection. A.1.3 LV electrical equipment within the LV electrical installations indirectly bonded to the traction return circuit A When the LV electrical equipment requires to be bonded to ensure safety during traction fault conditions (for example flashover or conductor breakage) or to control touch potentials, but is not in contact with any metalwork which itself is connected to the traction return circuit, an alternative to direct bonding of the equipment is required (see Figure 2 for a typical arrangement). Page 12 of 18 RAIL SAFETY AND STANDARDS BOARD
13 Conductive structure connected to traction return circuit LV electrical installation LV electrical equipment A armour / metallic screen connected subject to consideration of traction fault current conduction LV supply L N E Armour / metallic screen L N E (cpc) and cpc connected and where applicable rated for traction fault current L N E (cpc) return circuit electrical equipment indirectly bonded to traction return circuit and A bond between LV main earth and traction return return circuit Supply LV supply main earth return circuit return circuit distributed earthing return current bus-bar supply main earth (Feeder Stations only) Figure A.2 LV electrical equipment within the LV electrical installations indirectly bonded to the ac traction return circuit A Where the LV electrical equipment is at risk from traction system faults (for example flashover) the LV circuit protective conductor provides a fault path which is completed by a bond between the LV electrical installation supply main earth and the traction return circuit. When assessing the risk to LV electrical equipment resulting from OLE conductor breakage or current collector failure, the LV RAIL SAFETY AND STANDARDS BOARD Page 13 of 18
14 equipment s location in relation to the overhead line zone and pantograph zone as set out in BS EN should be considered. Where the LV equipment is not directly at risk from traction system faults, the bond is used to control touch potentials between the LV equipment and exposed conductive parts connected to the traction return system. The type and rating of this bond should be agreed with the infrastructure manager responsible for the traction system. Care should also be taken when considering cable termination arrangements on LV equipment at risk from traction system faults where armour / metallic screens are present. A A suitable permanent warning label should be securely attached to the bond identifying that the traction return circuit is connected to the LV supply main earth and that care needs to be taken when disconnection is required. A.1.4 Non-electrified sidings in an electrified area A Non-electrified sidings in an electrified area should be treated as electrified lines unless fitted with insulated rail joints. A.2 Earthing requirements for LV electrical installations in dc electrified lines areas (see 2.3 of this standard) A.2.1 General A The conductor rail is energised at a nominal voltage of 750 V dc. Electric trains draw power from the conductor rail with current returning to the substation via the running rails. The running rails are not deliberately earthed but allowed to float electrically about true earth. A As a result of the high-traction current levels and corresponding volt-drop, the running rails may rise to some tens of volts above true earth. Also, because the running rails are not electrically insulated from the ground, the track ballast, surrounding area and the conductive framework of buildings nearby takes up a dc voltage between true earth and the running rail potential. A.2.2 Protection against dc leakage supplies from socket outlets A When an earthed electrical appliance makes contact with a running rail or conductive object at running rail potential dc current may flow dependent upon the actual voltage and circuit parameters. In the case of an earthed electrical appliance, this current flows in the earth lead. An arc may be produced when contact between the electrical appliance and the running rail, or conductive object at running rail potential occurs. Overheating is possible in the earth lead and possibly the circuit protective conductor of the electrical distribution system. Also, uncontrolled dc can cause corrosion in adjacent metalwork. A Special precautions are required where any socket outlet, within 30 m of a running rail at traction potential, may provide power to an electrical appliance to be used on or about an object in contact with the running rail. Because earthed portable appliances can come into contact with the running rail or conductive object in connection at running rail potential, precautions are required to ensure the current flow is prevented, or reduced so as not to impair the effectiveness of the appliance conductors or supply conductors. Techniques to achieve this depends upon the specifics of the application, but might include one or more of the following: a) Ensure the earthing path has a sufficiently high value (for example provide additional resistance but without prejudicing disconnection times) to ensure the dc current flow is not significant Page 14 of 18 RAIL SAFETY AND STANDARDS BOARD
15 b) Block dc current flow by inserting a suitable device such as a capacitor (with a discharge resistor in parallel) within the earth path of the supply but ensuring that the protection for ac faults remains effective c) Use of RCDs and multi-pole protection to detect and disconnect the appliance (phase and neutral circuits) if inadmissible currents flow. A A A Special precautions are required as the neutral conductor is earthed at the supply point, and neutral to earth faults can remain undetected and if unchecked, cause unacceptably high stray traction current to flow through the neutral conductor system. Techniques to achieve this will be dependent upon the specifics of the application, but might include the use of RCDs and multi-pole protection to detect and disconnect the appliance (phase and neutral circuits) if inadmissible currents flow. For a supply with a nominal voltage of 400 V 3 phase there should be no neutral connection at the socket outlet. Any neutral necessary for control circuits should be derived from an isolating transformer mounted on the appliance. For a supply with a nominal voltage of 110 V or 230 V, the supply should be derived from an isolating transformer, centre tapped to earth. A.3 Earth monitoring or earth proving device A.3.1 An earth monitoring system provides a pilot conductor to the device, usually in the form of a cable braid, which forms a loop with the circuit protective conductor. The continuity of the earth path is proven by passing a small electrical current through the loop. If the earth path is not continuous, or if it has a resistance higher or lower than set values, the power supply is not energised. A.3.2 A.3.3 Currents flowing through the body under fault conditions produces a momentary electric shock. Where appliances are used in hazardous situations, for example, where there is an increased risk of falling as a result of an electric shock or where there is an increased risk due to using water, then the use of an earth monitoring device, in addition to an RCD, should be considered. Guidance on methods of protection for areas where high pressure water jets are used is set out in HSE Guidance Note PM29 Electrical hazards from steam / water pressure cleaners etc. A.4 LV electrical equipment attached to a running rail A.4.1 All electrical equipment powered from a LV power supply and attached to a running rail should be energised from an earth-free, isolated power supply, operated at a nominal voltage not exceeding 110 V. RAIL SAFETY AND STANDARDS BOARD Page 15 of 18
16 Appendix B Guidance for Part 3 of this standard The content of this appendix is not mandatory and is provided for guidance only. B.1 Fuses B.1.1 B.1.2 Cartridge fuses should be used for short circuit and / or overcurrent protection. Rewirable fuses should not be used. B.2 Miniature circuit breakers B.2.1 Miniature circuit breakers (MCB), complying with BS EN series, may be used to protect final circuits. The selection of the correct type and rating of MCB to match the circuit duty depends on the methods used by manufacturers to determine device ratings. B.2.2 B.2.3 MCBs have a relatively low maximum fault current rating, and back-up fuse protection may be necessary. Miniature circuit breakers should not be installed where they may be used as a switch, for example as a light switch. The careful selection of location of MCBs during the installation design process can inhibit the use of the MCBs as switches. Page 16 of 18 RAIL SAFETY AND STANDARDS BOARD
17 Definitions Circuit protective conductor (cpc) (BS 7671) A circuit protective conductor is a protective conductor connecting exposed-conductiveparts of equipment to the main earth terminal. Electrical installation (BS 7671) An assembly of associated electrical equipment supplied from a common origin to fulfil a specific purpose and having certain co-ordinated characteristics. High voltage High voltage (HV) is normally exceeding low voltage. Low voltage Normally not exceeding 1000 V ac or 1500 V dc between conductors, or 600 V ac or 900 V dc between conductors and earth. Nominal voltage (BS EN ) Voltage by which an installation or part of an installation is designated. Temporary installation An installation that is not intended to become a fixed installation, regardless of the length of time. Touch voltage (BS EN ) Voltage between parts when touched simultaneously 1. equipment The term traction equipment is used to mean the electrical equipment and conductors necessary to power the trains on an electrified railway. It includes the incoming supply feeders, switchgear and transformers which control and provide the electrical current at the traction system s line voltage, the distribution network and overhead contact wire or conductor rail system including the traction return circuit. return circuit The path by which the traction current returns from the traction unit to the feeder station, or substation, incorporating the traction return rails, bonding connections, return conductors and booster transformers as appropriate. 1 The definition of touch voltage used in BS EN :1997 differs from those proposed in pren :2008. RAIL SAFETY AND STANDARDS BOARD Page 17 of 18
18 References The Catalogue of s and the s CD-ROM give the current issue number and status of documents published by RSSB. This information is also available from Documents referenced in the text RGSC 01 The s Code Other references BS 7671 BS EN BS EN PM29 Requirements for electrical installations. IEE Wiring Regulations. Seventeenth edition Railway applications. Fixed installations. Protective provisions relating to electrical safety and earthing Electrical accessories. Circuit-breakers for overcurrent protection for household and similar installations. HSE Guidance Note Electrical hazards from steam / water pressure cleaners etc Other relevant documents Other references SI 1999/3242 Management of Health and Safety at Work Regulations: 1999 Page 18 of 18 RAIL SAFETY AND STANDARDS BOARD
PROTECTION AGAINST ELECTRIC SHOCK by John Ware
16 become live under fault conditions. The potential of the metal enclosure is higher than that of the main earthing terminal of the installation (and that of Earth) because of a potential difference created
More informationDOMESTIC ELECTRICAL INSTALLATION CERTIFICATE (Requirements for Electrical Installations BS 7671 IEE Wiring Regulations)
DOMESTIC ELECTRICAL INSTALLATION CERTIFICATE (Requirements for Electrical Installations BS 7671 IEE Wiring Regulations) DETAILS OF THE CLEINT Client and address ADDRESS OF THE INSTALLATION Installation
More informationInterfacing electrification and system reliability. Earthing of AC and DC railways 4,10,13
Interfacing electrification and system reliability Roger White Professional Head of Electrification and Plant Rail Abstract Integration is the term given to ensuring that the different elements of an electrified
More informationCircuit Electrical Testing
Safe Isolation Procedure Circuit Electrical Testing Site Safety Management It is essential from the outset that effective management and control of the system, apparatus and equipment used on site is achieved
More informationEARTHING AND BONDING AT SECONDARY SUBSTATIONS
DISTRIBUTION CONSTRUCTION MANUAL SECTION 4 - SUBSTATIONS ISSUE B SEPT 1996 4.4.4 EARTHING AND BONDING AT SECONDARY SUBSTATIONS 1 SCOPE This section of the Distribution Construction Manual lays down the
More informationELECTRICAL INSULATION TESTING OF HV EQUIPMENT UP TO 33kV
1. SCOPE This document details PowerSystems requirements for electrical testing of HV Equipment up to and including 33kV. 2. ISSUE RECORD This is a Reference document. The current version of Controlled
More information12 SOLAR PHOTOVOLTAIC POWER SUPPLY SYSTEMS by John Ware. PV modules are current-limiting
12 SOLAR PHOTOVOLTAIC POWER by John Ware IT IS PLANNED for BS 7671:2008 to include a new Section 712 providing additional requirements for safety applicable to solar photovoltaic (pv) power supply systems.
More informationCHECKING AND TESTING ELECTRICAL INSTALLING WORK
CHECKING AND TESTING ELECTRICAL INSTALLING WORK Department of Consumer and Employment Protection Energy Safety Preface It is a requirement of the Electricity (Licensing) Regulations 1991 that all electrical
More informationchapter8 Testing and commissioning Unit 2 outcome 2
Testing and commissioning chapter8 Unit 2 outcome 2 It is important that electricians are not just able to construct; they should also be able to recognise faults and take action to help prevent them.
More informationEDS 06-0017 CUSTOMER LV INSTALLATION EARTHING DESIGN
THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE Document Number: EDS 06-0017 ENGINEERING DESIGN STANDARD EDS 06-0017 CUSTOMER LV INSTALLATION EARTHING DESIGN Network(s):
More informationHigh Visibility Clothing
GORT3279 Iss 7 on 07/12/2013 Railway Group Standard Date December 2013 High Visibility Clothing Synopsis This document sets out the minimum specification for high visibility clothing. Copyright in the
More informationEarthing Guidance Notes
Central Networks Earthing Manual Section E2 Earthing Guidance Notes Version: 2 Date of Issue: September 2007 Author: Nigel Johnson Job Title: Earthing Specialist Approver: John Simpson Job Title: Head
More informationELECTRICAL INSTALLATION CONDITION REPORT (Requirements for Electrical Installations BS 7671 IEE Wiring Regulations)
Original Certificate DETAILS OF THE CLIENT Certificate reference: ELECTRICAL INSTALLATION CONDITION REPORT (Requirements for Electrical Installations BS 7671 IEE Wiring Regulations) Name: Address: PURPOSE
More informationHigh Voltage (HV) Electricity System Safety Rules and Associated Safety Guidance
Annex I To Loughborough University (LU) Facilities Management (FM) Health and Safety Policy High Voltage (HV) Electricity System Safety Rules and Associated Safety Guidance 1. Introduction a. These Safety
More informationRegulation IO-6.0: Electrical Safety Regulations
Regulation IO-6.0: Electrical Safety Regulations 6.1 Workmanship & Material 6.2 Electrical Conductors 6.3 Overcurrent Protective Devices 6.4 Precautions against Earth Leakage and Earthfault Currents 6.5
More informationBy Mark Coles. This article looks at the temporary use of portable generators in floating, earthed and reference-earthing scenarios.
16 Operation of portable generators Operation of portable generators By Mark Coles This article looks at the temporary use of portable generators in floating, earthed and reference-earthing scenarios.
More informationWork in Substations - General
Work in Substations - General Summary: This document supports the Power System Safety Rules and its requirements assembled under Work in Substations General Category 3 and apply to all persons working
More informationGO/GN3677. Guidance on Operational Criteria for the Provision of Lineside Telephony. Following GSM-R Introduction. Rail Industry Guidance Note
GN Published by: Block 2 Angel Square 1 Torrens Street London EC1V 1NY Copyright 2010 Rail Safety and Standards Board Limited GO/GN3677 Guidance on Operational Criteria for the Provision of Lineside Telephony
More informationHandbook 16. Handbook 16. AC electrified lines. GE/RT8000/HB16 Rule Book
GE/RT8000/HB16 Rule Book Uncontrolled When Printed Handbook 16 AC electrified lines Handbook 16 Issue 3 September 2015 Comes into force 05 December 2015 This handbook is for those personnel who need to
More informationTrade of Electrician. Three-phase Distribution Boards And Socket Circuits
Trade of Electrician Standards Based Apprenticeship Three-phase Distribution Boards And Socket Circuits Phase 2 Module No. 2.3 Unit No. 2.3.2 COURSE NOTES Created by Charlie Walsh - Athlone TC Revision
More informationESP 120 M1, ESP 208 M1, ESP 240 M1, ESP 415 M1, ESP 277 M1, ESP 480 M1 and M1R variants. Installation instructions ESP M1/M1R mains protectors
ESP 120 M1, ESP 208 M1, ESP 240 M1, ESP 415 M1, ESP 277 M1, ESP 480 M1 and M1R variants Installation instructions Contents Key points of installation Before installation Installation Installation check
More informationTrial Exams C. Standards and Regulations. Examination No: GH-08-C- 1 hour and 5 minutes plus 10 minutes reading time
Trial Exams C Standards and Regulations Examination No: GH-08-C- This test is intended to gauge your knowledge of essential information contained within AS/CA S009:2013. To qualify for an allpication to
More informationSafety in electrical testing at work
Safety in electrical testing at work Introduction This leaflet is aimed at people who manage or carry out electrical testing, and gives guidance on controlling risks and preventing or reducing danger arising
More informationElectrical safety and you
Electrical safety and you A brief guide Introduction Electricity can kill or severely injure people and cause damage to property. Every year many accidents at work involving electric shock or burns are
More informationEDS 06-0016 LV NETWORK EARTHING DESIGN
THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE Document Number: EDS 06-0016 ENGINEERING DESIGN STANDARD EDS 06-0016 LV NETWORK EARTHING DESIGN Network(s): EPN, LPN, SPN
More informationUnified requirements for systems with voltages above 1 kv up to 15 kv
(1991) (Rev.1 May 2001) (Rev.2 July 2003) (Rev.3 Feb 2015) Unified requirements for systems with voltages above 1 kv up to 15 kv 1. General 1.1 Field of application The following requirements apply to
More informationFORMS for the 17th Edition
FORMS for the 17th Edition Usage and Reproduction of IEE Forms Subject to your agreement to the following conditions, you are permitted to, free of charge, photocopy and/or electronically manipulate the
More information1 Introduction. 2 Hazards From Electricity
Risk Assessment Application to Electrical Rigs A guide to assist the Competent Named person who will verify the safety of rigs consisting mainly of electrical equipment. 1 Introduction Every employer shall
More informationBuilding Regulations P.4. Socket Outlets P.6. Other Considerations P.10. Training Seminars P.24
1 Introduction For well over one hundred years the Wiring Regulations have provided the rules which must be followed to make sure that electrical installations are safe. The introduction of the 17 th Edition
More informationGUIDE TO THE MAINTENANCE, INSPECTION AND TESTING OF PORTABLE EQUIPMENT (ELECTRICAL APPLIANCES AND TOOLS) IN THE WORKPLACE
GUIDE TO THE MAINTENANCE, INSPECTION AND TESTING OF PORTABLE EQUIPMENT (ELECTRICAL APPLIANCES AND TOOLS) IN THE WORKPLACE ET 215:2008 ELECTRO-TECHNICAL COUNCIL OF IRELAND 2008 Page 1 of 6 Published by
More informationNZECP 14: 1995 ISSN 0114-0663 COVER PAGE
NZECP 14: 1995 ISSN 0114-0663 COVER PAGE NZECP 14:1995 NEW ZEALAND ELECTRICAL CODE OF PRACTICE FOR CONTROL PROTECTION AND SWITCHBOARDS Issued by the Office of The Chief Electrical Engineer, Energy and
More informationEstimation of electrical losses in Network Rail Electrification Systems
Estimation of electrical losses in Network Rail Electrification Systems Page 1 of 16 Contents 1. BACKGROUND...3 2. PURPOSE...3 3. SCOPE...3 4. DEFINITIONS & ABBREVIATIONS...4 5. NETWORK RAIL INFRASTRUCTURE
More informationCode of Practice Electricity transmission and distribution asset management. February 2009
Code of Practice Electricity transmission and distribution asset management February 2009 CONTENTS 1 PREFACE...4 2 APPLICATION AND OBJECTIVES...5 3 SCOPE...6 4 DEFINITIONS...7 5 DESIGN AND CONSTRUCTION...11
More informationPhase Attribute Identification using GPS Technology
Phase Attribute Identification using GPS Technology Date 11 June 2009 John Sinclair Power Quality Manager Slide 1 Topics of Discussion Remote Phase Identification How it works Principals of operation Benefits
More informationElectrical Practices for Construction Work
1. Purpose Electrical Practices for Construction Work The purpose of this Code is to provide practical guidance and set minimum safety requirements for electrical practices on all construction sites in
More informationAWS and TPWS Interface Requirements
Railway Group Standard AWS and TPWS Interface Synopsis This document defines the track / train and driver / machine interface requirements for the Automatic Warning System (AWS) and the Train Protection
More informationHeading FACT SHEET. Overview. www.safeworkaustralia.gov.au
ELECTRICAL RISKS AT THE WORKPLACE Heading FACT SHEET Overview This fact sheet provides general guidance for persons conducting a business or undertaking (PCBUs) and workers on managing electrical risks
More informationElectrical Resistance Resistance (R)
Electrical Resistance Resistance (R) Any device in a circuit which converts electrical energy into some other form impedes the current. The device which converts electrical energy to heat energy is termed
More information4 IX D N E P P A Installation methods Current-carrying capacity and voltage drop for cables Reference method IET Wiring Matters
8 Appendix 4 of BS 7671 by Mark Coles Appendix 4, Current-carrying capacity and voltage drop for cables and flexible cords, has seen significant changes with the publishing of BS 7671:2008. This article
More informationELECTRICAL PRACTICES FOR CONSTRUCTION WORK
CONTRACTOR S CHECKLIST ELECTRICAL PRACTICES FOR CONSTRUCTION WORK 2007 WorkCover. Watching out for you. New South Wales Government Disclaimer This publication contains information regarding occupational
More information6.0 Electrical Installations
6.0 An electrical installation is a combination of electrical equipment installed to fulfill a specific purpose and having coordinated characteristics. In dealing with the electrical installation, it is
More informationGuide to the Safety, Health and Welfare at Work (General Application) Regulations 2007. Part 3: Electricity
Guide to the Safety, Health and Welfare at Work (General Application) Regulations 2007 Part 3: Electricity 9 Guide to the Safety, Health and Welfare at Work (General Application) Regulations 2007 Part
More informationCAPACITOR BANK TESTING SWP
1. PURPOSE AND SCOPE The purpose of this Standard Work Practice (SWP) is to standardise and prescribe the method for testing Capacitor Banks including capacitors, tuning reactors and inrush limiting reactors.
More informationElectrical safety rules
Electrical safety rules 2015 DISCLAIMER The material contained in this publication has been developed for the use of ActewAGL, its contractors and all others working on or near ActewAGL s electricity
More informationGuide to the electrical parameter classifications of IEC 60950 and IEC 62368 safety standards
Guide to the electrical parameter classifications of IEC 60950 and IEC 62368 safety standards Abstract This Guide is an informative listing of selected terms and definitions found in IEC Glossary entry
More informationElectrical Grounding. Appendix C
Appendix C Electrical Grounding Low-Voltage Equipment Grounding The most frequently cited Office of Safety and Health Administration (OSHA) electrical violation is improper occupational grounding of equipment
More informationThe Electricity Wiring Regulations 2007
The Electricity Wiring Regulations 2007 Issued by: the Regulation and Supervision Bureau for the Water, Wastewater and Electricity Sector in the Emirate of Abu Dhabi www.rsb.gov.ae Revision 1 January 2009
More information1. Electrical Equipment A) Transformer
Standards and Basic Equipment Date : 15 November 2010 1. Electrical Equipment 2. Terminology 3. Code & Standard 1. Electrical Equipment A) Transformer A1) One Transformer and 11kV Switchgear in High Rise
More informationSELECTION OF FINAL CIRCUIT PROTECTION
SELECTION OF FINAL CIRCUIT PROTECTION By Phil Williams, Product Marketing Manager, Power Distribution Components, Eaton Executive summary The selection of devices for final circuit protection in electrical
More informationLV MCC LOW VOLTAGE SWITCHGEAR MOTOR CONTROL CENTRE PRODUCT GUIDE
LV MCC LOW VOLTAGE SWITCHGEAR MOTOR CONTROL CENTRE PRODUCT GUIDE 380/415/690 Volt AC 50/65/80/100 ka 1. Product Guide Low Voltage Motor Control Centre CONTSTRUCTION Continuous "poured in place" gasket
More informationELECTRICAL INSPECTION BULLETIN (Effective 2000-03-01)
ELECTRICAL INSPECTION BULLETIN (Effective 2000-03-01) Rule 28-900 Standby Generator Installations Due to the increasing number of standby generator installations being established to maintain continuity
More informationWhat are the basic electrical safety issues and remedies in solar photovoltaic installations?
What are the basic electrical safety issues and remedies in solar photovoltaic installations? Presented by: Behzad Eghtesady City of Los Angeles Department of Building and Safety Topics Covered Photovoltaic
More informationLineside Signal Spacing and Speed Signage
Document to be withdrawn as of 03/12/11 To be superseded by GKRT0075 Iss 2 published on 03/09/11 Date March 11 Lineside Signal Spacing and Speed Synopsis This document specifies the minimum distances that
More informationGuidance notes for the installation of electrical supply in mobile trailers for breast screening
NHS Breast Cancer Screening Programme Cancer Screening Programmes Guidance notes for the installation of electrical supply in mobile trailers for breast screening B Mansfield, CP Lawinski NHSBSP PUBLICATION
More informationPower transformers. Special transformers Railway
Power transformers Special transformers Railway A leader in railway systems Our compact and low-weight transformers fully comply with the customer s specifications. The products are developed together
More informationModel 1756 Test Lead Kit
Keithley Instruments 28775 Aurora Road Cleveland, Ohio 44139 1-888-KEITHLEY http://www.keithley.com Model 1756 Test Lead Kit Gerneral Purpose Test Lead Information Description These test leads allow you
More informationAdvantages of Fixed Circuit Breaker Switchgear
Advantages of Fixed Circuit Breaker Switchgear by Lionel Mackay, EDF Energy, and Mike Adams, Schneider Electric Ltd Introduction The purpose of this paper is to review the advantages of fixed circuit breaker
More informationCODE OF PRACTICE FOR THE ELECTRICITY (WIRING) REGULATIONS
CODE OF PRACTICE FOR THE ELECTRICITY (WIRING) REGULATIONS Electrical and Mechanical Services Department 2009 Contents Page Acknowledgements 9 Part I 1. Introduction 10 2. Interpretation 11 3. Application
More informationHyperlinks are Inactive
Prepared by: NIB/EOB PLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES 05503 Department: Electric T&D Section: T&D Engineering and Technical Support Approved by: G.O. Duru (GOD)
More informationRelease: 2. UEENEEJ194A Solve problems in low voltage refrigeration circuits
Release: 2 UEENEEJ194A Solve problems in low voltage refrigeration circuits UEENEEJ194A Solve problems in low voltage refrigeration circuits Modification History Not Applicable Unit Descriptor Unit Descriptor
More information2002 No. 2665 ELECTRICITY. The Electricity Safety, Quality and Continuity Regulations 2002
STATUTORY INSTRUMENTS 2002 No. 2665 ELECTRICITY The Electricity Safety, Quality and Continuity Regulations 2002 Made - - - - - 24th October 2002 Laid before Parliament 28th October 2002 Coming into force
More informationDESIGN STANDARDS STRAY CURRENT MANAGEMENT
DESIGN STANDARDS STRAY CURRENT MANAGEMENT Tramway Technical Guidance Note 3 Contents Introduction 3 1. Stray current management 4 2. The legal position 5 3. Overall stray current management policy 5 4.
More informationHIGH VOLTAGE SHORE CONNECTION
Guide for High Voltage Shore Connection GUIDE FOR HIGH VOLTAGE SHORE CONNECTION NOVEMBER 2011 American Bureau of Shipping Incorporated by Act of Legislature of the State of New York 1862 Copyright 2011
More informationHARMONISATION OF WIRING COLOUR CODES Practical Guidelines
HARMOISATIO OF WIRIG COLOUR CODES Practical Guidelines Acknowledgments: We are grateful to the IEE for their permission to reproduce sections of BS 7671 and The Electrician s Guide to the Building Regulations.
More informationchapter6 Basic electrical circuitry and applications Unit 2 Outcome 3
Basic electrical circuitry and applications chapter6 Unit 2 Outcome 3 The primary role of an electrician is the installation of electrical circuits and applications. In order to install any type of application,
More informationEvaluating Water-Damaged Electrical Equipment
Evaluating Water-Damaged Electrical Equipment 1 USE OF THIS PUBLICATION This publication provides information on how to evaluate electrical equipment that has been exposed to water through flooding, fire
More informationTips for connecting 24-volt power
Digital Designer s Guide Application NoteAN0604D Revision B Tips for connecting 24-volt power This application note covers choosing a transformer and connecting 24 volt AC power to a KMC Controls DDC controller.
More informationThe Electricity Wiring Regulations
The Electricity Wiring Regulations (Third Edition) March 2014 Issued by: The Regulation and Supervision Bureau for the water, wastewater and electricity sector in the Emirate of Abu Dhabi The Electricity
More informationA B Brown. This sheet forms part of *Inspection Report Number/*Certificate Number NA/ * EC/ * PIR *Delete as applicable DB1 60898
NAPIT Electrical Test Continuation Sheet Requirements for Electrical Installations BS 767 [IEE Wiring Regulations] and for Please complete all the unshaded areas. This sheet forms part of *Inspection Report
More informationTIG INVERTER INSTRUCTION MANUAL
TIG INVERTER INSTRUCTION MANUAL Contents Warning General Description Block Diagram Main Parameters Circuit Diagram Installation and Operation Caution Maintenance Spare Parts List Troubleshooting 3 4 4
More informationMEM10019 Select circuit protection devices by type and rating, fit to switchboards and install earthing
MEM10019 Select circuit protection devices by type and rating, fit to switchboards and install earthing Release: 1 MEM10019 Select circuit protection devices by type and rating, fit to switchboards and
More informationEngineering Recommendation G81 Issue: October 2004
Engineering Recommendation G81 Issue: Part 4 - Framework for design and planning of industrial and commercial underground connected loads up to and including 11kV 2004 Energy Networks Association All rights
More informationScreened cable and data cable segregation
December 2007 Screened cable and data cable segregation Can an armoured power cable be considered a screened cable and how does this relate to power and data cable segregation? The short answer is yes;
More informationA Guide to 17th Edition Testing
Seaward, Bracken Hill, South West Industrial Estate, Peterlee, County Durham, SR8 2SW United Kingdom Tel: +44 (0) 191 586 3511 Fax: +44 (0) 191 586 0227 Email: sales@seaward.co.uk Web: www.seaward.co.uk
More informationGUIDELINES FOR ELECTRICAL WIRING IN RESIDENTIAL BUILDINGS
GUIDELINES FOR ELECTRICAL WIRING IN RESIDENTIAL BUILDINGS 2008 EDITION www.st.gov.my CONTENTS Chapter Title Page 1. 1.1 1.2 1.3 Introduction Purpose References 4 4 5 2. Supply System 6 2.1 Electricity
More informationINSPECTION AND TESTING OF ELECTRICAL INSTALLATIONS RESIDUAL CURRENT DEVICES
1 By kind permission of MK INSPECTION AND TESTING OF ELECTRICAL INSTALLATIONS RESIDUAL CURRENT DEVICES By Mark Coles The IEE receives many enquiries relating to the inspection and testing of electrical
More information3.1.1 Full Type Tests & Routine Tests according to Clause 8 2 & 8 3. 4.0 Instructions For Installation, Operation & Maintenance
SPECIFICATION FOR LOW VOLTAGE SWITCHBOARD SEN I N D E X Description 10 STANDARD TECHNICAL REQUIREMENTS 11 Standards 12 General Operating Conditions 13 General Description Of Switchboard 131 Structure 132
More informationElectrical Safety Tips. Help us keep you safe
Electrical Safety Tips Help us keep you safe To help you stay safe when using electricity, ActewAGL has compiled these electrical safety tips. For natural gas safety tips please see ActewAGL s natural
More informationGuidance for upgrading to GB4943.1-2011 (IEC 60950-1: 2005, MOD)
Guidance for upgrading to GB4943.1-2011 (IEC 60950-1: 2005, MOD) Note: This guidance document is a translation of official Chinese document which is issued by CQC (China Quality Certification Center) on
More informationTrouble-shoot and repair faults in low voltage electrical apparatus and circuits
UEENEEG108A Trouble-shoot and repair faults in low voltage electrical apparatus and circuits AS3000:2007 & AS3017:2007 Summary MANUFACTURING AND ENGINEERING DIVISI M & E UEENEEG108A TESTING Before any
More informationES281 COMPANY-SPECIFIC APPENDICES TO ENA ENGINEERING RECOMMENDATION G81 PART 1
ES281 COMPANY-SPECIFIC APPENDICES TO ENA ENGINEERING RECOMMENDATION G81 PART 1 Design and Planning Specification for New Low Voltage Installations for Housing Developments 1. SCOPE This appendix to ENA
More informationWORKING IN THE ELECTRIFIED AREA
Network Safety Management System SPECIFICATION SAF/SPC/5178/ELE/NET WORKING IN THE ELECTRIFIED AREA Version 1.0 Effective Date: 12 October 2014 AURIZON COMMERCIAL-IN-CONFIDENCE SAF/SPC/5178/ELE/NET Working
More informationRegulations for the Installation of Electrical Wiring, Electrical Equipment and Air Conditioning Equipment
Regulations for the Installation of Electrical Wiring, Electrical Equipment and Air Conditioning Equipment Qatar General Electricity & Water Corporation KAHRAMAA Customer Services Department State of Qatar
More informationGUIDE TO THE AM2 EXAM
AM2 GUIDE TO THE AM2 EXAM What is AM2? AM2 or the Achievement Measurement 2 is a practical performance skill test administered by the National Electrotechnical Training (NET). You must take the AM2 test
More informationElectrical safety code of practice 2013. Managing electrical risks in the workplace
Electrical safety code of practice 2013 Managing electrical risks in the workplace This Queensland code of practice has been approved by the Attorney-General and Minister for Justice and commences on 1
More informationFREQUENTLY ASKED QUESTIONS
September 2011 FREQUENTLY ASKED QUESTIONS Wiring Rules The new edition of the Australian/New Zealand Standard for Wiring Rules (AS/NZS 3000:2007) was released in November 2007 and revised by Amendment
More informationSOLAR PV STANDARD ELECTRICAL PLAN Microinverter Systems for Single Family Dwellings
*** Provide this document to the inspector along with ALL system installation instructions *** Project Address: Scope: Standard plan for the installation of grounded microinverter solar PV systems, not
More informationThe Electrical Safety Regulation (pre and post 1 January 2014)
The Electrical Safety Regulation (pre and post 1 January 2014) The following table provides an overview comparison between the Electrical Safety Regulation 2002 (the ESR 2002) current as at 1 July 2013
More informationGroundRod AC Substation Earthing Tutorial
1 GroundRod AC Substation Earthing Tutorial 1. Functions of an earthing system The two primary functions of a safe earthing system are: To ensure that a person who is in the vicinity of earthed facilities
More informationListed are common requirements that apply to existing solar installations when altered, added to or reconfigured.
SOLAR ALTERATIONS REQUIREMENTS August 2015 These requirements address typical alterations to solar installations; they cannot address every scenario. In Victoria, an alteration to a solar installation
More informationFAQs-Main switchboard design criteria
FAQs-Main switchboard design criteria Q: What is the Australian standard for main switchboards? Current Australian standard is AS/NZS 3439.1: 2002 originating from IEC 60439. The new series of standard
More informationEvaluating Water-Damaged Electrical Equipment
Evaluating Water-Damaged Electrical Equipment 1 USE OF THIS PUBLICATION This publication provides information on how to evaluate electrical equipment that has been exposed to water through flooding, fire
More informationLineside Signal Spacing and Speed Signage
Document comes into force on 05/12/15 Supersedes GKRT0075 Iss 3 on 05/12/15 Date September 15 Lineside Signal Spacing and Speed Synopsis This document specifies the minimum distances that must be provided
More informationPerformance Specification for Pedestrian Facilities at Temporary Standalone Traffic Signals
traffic systems and signing TR 2503 Issue B February 2006 Performance Specification for Pedestrian Facilities at Temporary Standalone Traffic Signals Crown Copyright 2005 First published 2005 Printed and
More informationISL Insulation monitoring devices Continuous monitoring of IT systems from photovoltaic to industrial applications.
ISL Insulation monitoring devices Continuous monitoring of IT systems from photovoltaic to industrial applications. Ensuring operational continuity To ensure the operational continuity of an electrical
More informationElectrical test equipment for use on low voltage electrical systems
Electrical test equipment for use on low voltage electrical systems Guidance Note GS38 (Fourth edition) This general series guidance note is aimed at people (including electricians, electrical contractors,
More informationFault location on power cables. Fault location on power cables
Fault location on power cables Fault location on power cables Contents: 1. Introduction 2. Construction of power cables 3. Cable faults 01. Introduction Fault location on communication and power cables
More informationSURGE PROTECTIVE DEVICES
SURGE PROTECTIVE DEVICES 1. INTRODUCTION In order to ensure safety of people, protection of equipment and, to a certain extent, continuity of supply, insulation co-ordination aims at reducing the likelihood
More informationINFRARED QUARTZ WALL HEATER
INFRARED QUARTZ WALL HEATER MODEL NO: IQ2000 PART NO: 6939004 MOUNTING & OPERATION INSTRUCTIONS GC0715 INTRODUCTION Thank you for purchasing this CLARKE Infrared Wall Heater. Before attempting to use this
More informationElectrical Contractors Association
Electrical Contractors Association Presents BS 7671 2008: Amendment No 1 BS 7671: 2008 Amendment No 1, 2011 IEE Wiring Regulations Now called IET Wiring Regulations History 1882 first edition of the Wiring
More information