1 LAKE BASIN DEVELOPMENT AUTHORITY PROPOASL FOR IMPLEMENTATION OF TEREMI HYDRO-POWER PROECT MAY

2 PROPOSAL FOR IMPLEMENTATION OF TEREMI HYDRO-POWER PROJECT 1.0 INTRODUCTION The Lake Basin Development Authority was established in 1979 by an Act of Parliament. It undertakes overall planning, coordination and implementation of development projects and programmes in the region. 1.1 Problem Statement The Lake Basin region suffers from inadequate power supply, especially in rural areas, which would otherwise spur industrial development. Electricity demand has been growing at an average rate of 8% per annum with demand sometimes exceeding supply during peak periods. The rural electrification programme is an important element of the regional development policy as it stimulates industrial and agricultural development as well as promotion of general welfare of the people in the rural area. 1.2 Background IMATRAN VOIMA OY-IVO and FINNCOSULT OY Consulting Engineers conducted the feasibility study for Teremi Hydropower project in The results of the study showed that the project was feasible. The study recommended a concrete overflow weir with a crest elevation of m and length of 35m. The headrace canal and penstock would take water to the powerhouse situated at a net head of 200m downstream. The powerhouse would be fitted with 2 units of power generation with a total installed capacity of 1700 kw. The total cost for construction is estimated at Ksh 133,609,300/= (US$ 2,155,000). This does not include improvement and expansion of the water supply system. 2.0 PROJECT AREA 2.1 Location The site is in Western Province, Bungoma District. The main consumption area consists of Kapkateny, Mukuyuni and Chwele. The areas to be electrified will include Chwele, Lukhome, Mukuyuni, Kapsambo, Teremi, Mpakani, Nakoyonjo, Chebukaka, Kibichori and Makhange. 2.2 Topography The project area lies on the southern slopes of Mt. Elgon on an altitude of 1500m-2000m. Teremi Falls in the river Kuywa has a head of 300m per 1 Km due to the steep cliffs abruptly rising. At the edge of the cliffs the attitude is about 1950m while at the junction of river Kuywa and river Nzoia, the altitudes is 1300m. 2

3 2.3 Land Use In the region, deep wall drained reddish brown friable clays are encountered often with a topsoil darkened by organic matter. Soil erosion is experienced on the mountain slopes and is caused by poor farming methods and overgrazing. Most people are engaged in subsistence farming and diary cattle, goat, sheep and poultry. The pressure on the existing farmland is increasing and people have invaded Mt. Elgon Forest. 2.4 Hydrology Kuywa River originates near the top of Mt. Elgon at elevation 3950m. At the foot of the mountain, the river falls down to the plain through Teremi Falls. Throughout the main part of the area, the mean annual rainfall is mm. Station 1DB1 B in the Kuywa river recorded a mean annual flow of 4.95 m³/s between Discharges between should be analyzed to determine the current scenario. 3.0 OBJECTIVES Under the Rural Electrification Programme, the main objectives of the Government is to provide electricity to as many parts of the country as possible and reduce demand on woodfuel and kerosene for lighting. This will achieve the objectives of the Economic Recovery Strategy as well as contribute to the Governments Vision Specific Objectives are: 1. Increase supply of energy in the region 2. Lessen country s dependency on imported energy 3. Harness energy resources of the region 4. Create employment opportunities 5. Stimulate industrial development in the region 6. Alleviate poverty in the region 4.0 SCOPE OF WORK The Teremi Falls have a potential of generating 2MW and supplying domestic water to the surrounding locality. The scope of work entails validation of the feasibility study report, conducting additional hydrological measurements, detailed designs and optimization of power generation. In addition, an environmental impact assessment will be conducted and an environmental management plan proposed. The consultant shall also prepare tender documents for all the works with final estimates and financing requirements. A proposed implementation programme of 48 months is shown in annex 1. 3

4 5.0 ESTIMATED INVESTMENT COSTS Kshs. 5.1 Preliminary and General Establishment on site 2,500, Compensation and resettlement costs 1,000, Sub-Total 3,500, Civil Works Access road 4,500, Diversion works 4,000, Dam and Intake Excavation 100, Concrete Weir 2,625, Concrete Walls 1,800, Concrete Intakes 525, Trash racks 25, Earth fill dam 1,155, Power Conduct Headrace canal 6,660, Fore bay 325, Power House and Tailrace Canal Excavation 315, Power House 960, Sub-Total 22,990, Mechanical and Hydraulic Equipment Turbine (2 No.) 36,000, Penstock 9,720, Outlet valves 350, Sub-total 46,070, Electrical Equipment Generator (2No.) 9,840, Transformer (2 No.) 6,192, Other equipment 23,328, Sub-Total 33,060, Transmissions and Distribution 11 kv line 7,980, V line 20,676, kva transformer (3 No.) 3,042, kva transformer (1 No.) 1,362, Sub-Total 33,060, Engineering and Supervision 15% x ( ) 15,843, Contingencies 10% x ( ) 12,146, GRAND TOTAL 133,609,

5 Annex 1 IMPLEMENTATION PROGRAMME FOR TEREMI FALLS HYDROPOWER PROJECT 1 Activities 1 st Year 2 nd Year 3 rd Year 4 th Year Site Investigations 2 Detailed Design 3 Contract Documents 4 Tendering 5 Construction 6. Trial Run 7 Follow-up 5

Micro-Hydro. Module 4.1. 4.1.1 Introduction. Tokyo Electric Power Co. (TEPCO)

Micro-Hydro. Module 4.1. 4.1.1 Introduction. Tokyo Electric Power Co. (TEPCO) Module 4.1 Micro-Hydro 4.1.1 Introduction Tokyo Electric Power Co. (TEPCO) Workshop on Renewable Energies November 14-25, 2005 Nadi, Republic of the Fiji Islands Subjects to be Covered in Workshop Potential

More information

APPENDIX F. Baker County. Mason Dam Hydroelectric Project FERC No. P-12686. Turbidity Monitoring Plan

APPENDIX F. Baker County. Mason Dam Hydroelectric Project FERC No. P-12686. Turbidity Monitoring Plan APPENDIX F Baker County Mason Dam Hydroelectric Project FERC No. P-12686 Turbidity Monitoring Plan April 2011 857 Table of Contents 1.0 Introduction 1 2.0 Purpose and Scope 2 3.0 Turbidity Monitoring and

More information

Technology Fact Sheet for Mitigation B. Small Hydropower Technology i 1. Introduction 1.1. Historical - All over the World, hydropower sector is

Technology Fact Sheet for Mitigation B. Small Hydropower Technology i 1. Introduction 1.1. Historical - All over the World, hydropower sector is Technology Fact Sheet for Mitigation B. Small Hydropower Technology i 1. Introduction 1.1. Historical - All over the World, hydropower sector is playing a great role in economic development since the last

More information

Búrfell. hydropower station

Búrfell. hydropower station Búrfell hydropower station Búrfell station The river Thjórsá is harnessed at Búrfell by a dam on the river which previously flowed south above Mt. Búrfell, diverting it northwards through the Sámsstadamúli

More information

Hydropower in Rwanda: Ongoing Initiatives & New Investment Opportunities. Yves Muyange Director General Energy Water & Sanitation Authority

Hydropower in Rwanda: Ongoing Initiatives & New Investment Opportunities. Yves Muyange Director General Energy Water & Sanitation Authority Hydropower in Rwanda: Ongoing Initiatives & New Investment Opportunities Yves Muyange Director General Energy Water & Sanitation Authority Rwanda: A Thousand hills between the two Major Drainage Basins

More information

Clean Development Mechanism Project Opportunities in Indonesia

Clean Development Mechanism Project Opportunities in Indonesia Clean Development Mechanism Project Opportunities in Indonesia Pre-feasibility Report on a Micro Hydro Power CDM Project Center for Research on Material and Energy Institut Teknologi Bandung October 2002

More information

MICRO-HYDROPOWER NEED FOR ENERGY FOR RURAL DEVELOPMENT. By: Payman Hassan Rashed

MICRO-HYDROPOWER NEED FOR ENERGY FOR RURAL DEVELOPMENT. By: Payman Hassan Rashed MICRO-HYDROPOWER NEED FOR ENERGY FOR RURAL DEVELOPMENT Significant water resources are found in many developing countries. In areas where adequate water resources are present, harnessing the power of falling

More information

Jackson Gulch Outlet Canal Rehabilitation Project

Jackson Gulch Outlet Canal Rehabilitation Project Jackson Gulch Outlet Canal Rehabilitation Project Preliminary Budgetary Estimate for Rehabilitation February 2004 Prepared for the Mancos Water Conservancy District Jackson Gulch Reservoir 42888 County

More information

Abaya-Chamo Lakes Physical and Water Resources Characteristics, including Scenarios and Impacts

Abaya-Chamo Lakes Physical and Water Resources Characteristics, including Scenarios and Impacts LARS 2007 Catchment and Lake Research Abaya-Chamo Lakes Physical and Water Resources Characteristics, including Scenarios and Impacts Seleshi Bekele Awulachew International Water Management Institute Introduction

More information

US Army Corps of Engineers BUILDING STRONG

US Army Corps of Engineers BUILDING STRONG Fort Worth District Public Meeting 20 August 2013 US Army Corps of Engineers Lewisville Dam - Authorization Authorized by the River and Harbor Act, approved 2 March 1945 (Public Law 14, 79th Congress,

More information

Re: Preliminary Permit Application for the Rose Creek Pumped Storage Project

Re: Preliminary Permit Application for the Rose Creek Pumped Storage Project September 12, 2013 Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Re: Preliminary Permit Application for the Dear Ms. Bose, Please find attached

More information

Frequently Asked Questions (FAQs) on Hydropower

Frequently Asked Questions (FAQs) on Hydropower Frequently Asked Questions (FAQs) on Hydropower What are the advantages of Hydropower? A renewable source of energy - saves scarce fuel reserves. Non-polluting and hence environment friendly. Long life

More information

Small Hydropower in Jaén, Spain

Small Hydropower in Jaén, Spain Small hydropower in the province of Jaén (Spain): base of local sustainable development Blas Ogayar Fernández Universidad de Jaén. IDEA José A. La Cal Herrera Agener Index: 1. Introduction 2. Study. Methodology

More information

RENEWABLE ENERGY TECHNOLOGY: MICRO HYDRO POWER GENERATION FOR ELECTRIFICATION

RENEWABLE ENERGY TECHNOLOGY: MICRO HYDRO POWER GENERATION FOR ELECTRIFICATION RENEWABLE ENERGY TECHNOLOGY: MICRO HYDRO POWER GENERATION FOR ELECTRIFICATION Dr. S. K. Dave 1, Ashokkumar A. Parmar 2, Nikhil M. Vyas 3, P. S.Chadhari 4 Lecturer & I/C Head Civil Eng, Applied Mechanics.,

More information

MICRO-GRIDS FOR RURAL ELECTRIFICATION Case Study from Zambia on the Zengamina Micro-Hydro Power Grid

MICRO-GRIDS FOR RURAL ELECTRIFICATION Case Study from Zambia on the Zengamina Micro-Hydro Power Grid MICRO-GRIDS FOR RURAL ELECTRIFICATION Case Study from Zambia on the Zengamina Micro-Hydro Power Grid Presentation by Energy Regulation Board, Zambia 79 th IEC General Assembly Workshop for Industrialising

More information

Mpeketoni Electricity Project

Mpeketoni Electricity Project Session 4.1 Mpeketoni Electricity Project Mr Danson Mwangi Kinyanjui & Mr Paul Mutinda Kituku Rural Electrification Workshop March 1-3, 2006 Nairobi Mpeketoni Electricity Project Community Based Electricity

More information

Analytical Approach for Cost Estimation of Low Head Small Hydro Power Schemes

Analytical Approach for Cost Estimation of Low Head Small Hydro Power Schemes Analytical Approach for Cost Estimation of Low Head Small Hydro Power Schemes S.K. Singal and R.P. Saini Alternate Hydro Energy Centre, Indian Institute of Technology, Roorkee, India Email : sunilfah@iitr.ernet.in

More information

What are the Benefits?

What are the Benefits? Micro hydro power system introduction Not everyone is lucky enough to have a source of running water near their homes. But for those with river-side homes or live-on boats, small water generators (micro-hydro

More information

National Electric Power Regulatory Authority

National Electric Power Regulatory Authority National Electric Power Regulatory Authority MECHANISM FOR DETERMINATION OF TARIFF FOR HYDROPOWER PROJECTS Preamble Conservative estimates show total hydroelectric potential in the country to be 45000

More information

Mini & Micro Hydro Power Generation. EBARA Hatakeyama Memorial Fund Tokyo, Japan

Mini & Micro Hydro Power Generation. EBARA Hatakeyama Memorial Fund Tokyo, Japan Mini & Micro Hydro Power Generation EBARA Hatakeyama Memorial Fund Tokyo, Japan Definitions Large Scale hydro power generation : Capacity 100(MW) Most of them involve major construction of dams. Small

More information

Presentation from the 2013 World Water Week in Stockholm

Presentation from the 2013 World Water Week in Stockholm Presentation from the 2013 World Water Week in Stockholm www.worldwaterweek.org The Author(s), all rights reserved www.siwi.org Restoration of ecosystem by reallocation of water resources in Shiyanghe

More information

Assessment of hydropower resources

Assessment of hydropower resources Assessment of hydropower resources Oliver Froend Assessment of hydropower resources Relevance of surveys, data assessment and analyses to the success of the project. Required data and field survey. Key

More information

A CASE-STUDY OF CUA_DAT CFRD IN VIETNAM

A CASE-STUDY OF CUA_DAT CFRD IN VIETNAM A CASE-STUDY OF CUA_DAT CFRD IN VIETNAM Giang Pham Hong, Michel Hotakhanh, Nga Pham Hong, Hoai Nam Nguyen, Abstract:Dams have been taken an important role in time and surface redistribution of water for

More information

NOTE. Note on the pumped storage potential of the Onslow-Manorburn depression, New Zealand

NOTE. Note on the pumped storage potential of the Onslow-Manorburn depression, New Zealand Journal of Hydrology (NZ) 44 (2): 131-135, 2005 New Zealand Hydrological Society (2005) NOTE Note on the pumped storage potential of the Onslow-Manorburn depression, New Zealand W. E. Bardsley Department

More information

How To Build A Road Into A Lake In The North Of The Korean Island Of Hongkoon

How To Build A Road Into A Lake In The North Of The Korean Island Of Hongkoon 3D view of intake - looking upstream from the west bank New intake access track forming upstream bund The intake is located at grid ref 204791,888654. The intake screen arrangement is a drop bar type screen

More information

Micro-hydro Power. Introduction. What is hydropower? System types. Power the entire farm Generate power to sell back to the national grid

Micro-hydro Power. Introduction. What is hydropower? System types. Power the entire farm Generate power to sell back to the national grid Cronfa Amaethyddol Ewrop ar gyfer Datblygu Gwledig: Ewrop yn Buddsoddi mewn Ardaloedd Gwledig The European Agricultural Fund for Rural Development: Europe Investing in Rural Areas Micro-hydro Power Introduction

More information

Chattichai WAISURASINGHA 1*, Prinya CHINDAPRASIRT 1, Winai SRI-AMPORN 1 and Sinee CHUANGCHAM 2

Chattichai WAISURASINGHA 1*, Prinya CHINDAPRASIRT 1, Winai SRI-AMPORN 1 and Sinee CHUANGCHAM 2 The Utilization of Geographic Information Systems and Multi-Criteria Decision Making with Local Community Participation for Selection of Site for Micro Hydropower Project: A Case Study of Chi River Basin,

More information

China s Small Hydropower in Rural Energy Development

China s Small Hydropower in Rural Energy Development China s Small Hydropower in Rural Energy Development Li Zhiwu National Research Institute for Rural Electrification, China Hangzhou regional (Asia & Pacific) Center for Small Hydropower 2012.8.1 As one

More information

Techno - socio - economic Assessment of Pico Hydropower Installations in the Northern Region of Thailand

Techno - socio - economic Assessment of Pico Hydropower Installations in the Northern Region of Thailand 2012 International Conference on Environment Science and Engieering IPCBEE vol.3 2(2012) (2012)IACSIT Press, Singapoore Techno - socio - economic Assessment of Pico Hydropower Installations in the Northern

More information

Feasibility Study Mzimvubu Water Project

Feasibility Study Mzimvubu Water Project Feasibility Study Mzimvubu Water Project Newsletter 2/September 2013 Activities and Achievements to Date A Detailed Feasibility Study is underway in the Eastern Cape to investigate a potential site for

More information

Small-Micro Hydro Facilitation & Innovative Technologies in Japan

Small-Micro Hydro Facilitation & Innovative Technologies in Japan 1 HYDROVISION2006 Oregon Convention Center, Portland, Oregon USA July 31 August 5, 2006 Innovative Small and Medium Hydro Technologies Workshop By IEA Small Hydro Annex-2 2 & NRCan - CETC Small-Micro Hydro

More information

Moving Small Mountains Vesuvius Dam Rehab

Moving Small Mountains Vesuvius Dam Rehab Moving Small Mountains Vesuvius Dam Rehab Susan L. Peterson, P.E., regional dams engineer, Eastern Region, Bedford, IN Note: The following article, Moving Small Mountains Vesuvius Dam Rehab, by Sue Peterson,

More information

Environmental and Social Review Summary

Environmental and Social Review Summary Environmental and Social Review Summary Rajamandala Hydropower Project This Environmental and Social Review Summary (ESRS) is prepared by MIGA staff and disclosed prior to the date on which MIGA s Board

More information

Sample Micro Hydro Initial Report

Sample Micro Hydro Initial Report Sample Micro Hydro Initial Report Sample Micro Hydro Initial Report Introduction The Hydro Burn at Glen Water was visited by Richard Haworth of Glen Hydro to assess its suitability for a micro hydro installation.

More information

IUCN Guidelines to Avoid Impacts of Water Resources Projects on Dams and Other Water Infrastructure

IUCN Guidelines to Avoid Impacts of Water Resources Projects on Dams and Other Water Infrastructure IUCN Guidelines to Avoid Impacts of Water Resources Projects on Dams and Other Water Infrastructure (December 2013) IUCN does not engage in projects which involve the design, construction or rehabilitation

More information

Project Layout & Design Features of the Project

Project Layout & Design Features of the Project Project Layout & Design Features of the Project 1 PROJECT LAYOUT DRI DAM DRI DAM TOE P/H U/G POWER HOUSE COMPLEX DRI DAM TOE POWER HOUSE TANGON DAM TOE POWER HOUSE TOTAL 3070 MW 19.60 MW 7.40 MW 3097 MW

More information

CHAPTER 3 RESEARCH DESIGN

CHAPTER 3 RESEARCH DESIGN CHAPTER 3 RESEARCH DESIGN 3.1 Introduction In general, micro-hydropower systems operate as Run-of-River type which means that neither a large dam or water storage reservoir is built nor is land flooded.

More information

Financing hydropower Introduction to the Specifics of Small Hydro Power Plants

Financing hydropower Introduction to the Specifics of Small Hydro Power Plants EFSE Annual Meeting 2012, Tiblisi GGF Technical Workshop on Small Hydro Power Financing hydropower Introduction to the Specifics of Small Hydro Power Plants May 2012 01 June 2012 Arnsburger Str. 64, 60385

More information

MICRO-HYDRO POWER. Technical

MICRO-HYDRO POWER. Technical MICRO-HYDRO POWER Introduction Water power can be harnessed in many ways; tidal flows can be utilised to produce power by building a barrage across an estuary and releasing water in a controlled manner

More information

Tanzania Traditional Energy Development and Environment Organisation (TaTEDO) Business plan

Tanzania Traditional Energy Development and Environment Organisation (TaTEDO) Business plan Tanzania Traditional Energy Development and Environment Organisation (TaTEDO) 70 kw Micro hydroelectric Plant in Zege village Business plan TaTEDO P.O. Box 32794 Dar es Salaam Tanzania Tel: 22 2700438/2700771

More information

Lockport Pool Chicago Sanitary & Ship Canal Illinois Waterway

Lockport Pool Chicago Sanitary & Ship Canal Illinois Waterway Presentation to the Inland Waterways Users Board Lockport Pool Chicago Sanitary & Ship Canal Illinois Waterway by Gary Loss, P.E. Rock Island District July 13, 2006 Chicago Sanitary and Ship Canal A

More information

Flood Mitigation and Management in Bangkok Metropolitan Area

Flood Mitigation and Management in Bangkok Metropolitan Area กร งเทพมหานคร Flood Mitigation and Management in Bangkok Metropolitan Area Present By Mr. Kriangkrai Phamornpol Department of Drainage and Sewerage Bangkok Metropolitan Administration 1 Flood Mitigation

More information

Strategic Directions for Integrated Water Resources Management in the Lower Mekong Basin

Strategic Directions for Integrated Water Resources Management in the Lower Mekong Basin Strategic Directions for Integrated Water Resources Management in the Lower Mekong Basin Prepared by the Mekong River Commission under the Basin Development Plan 1 Basin Development Plan 1. Regional planning

More information

An Introduction to. Micro- Hydropower. Systems. Natural Resources Canada. Ressources naturelles Canada

An Introduction to. Micro- Hydropower. Systems. Natural Resources Canada. Ressources naturelles Canada An Introduction to Micro- Hydropower Systems Natural Resources Canada Ressources naturelles Canada Introduction Hydropower technology has been around for more than a century. Hydropower comes from converting

More information

Flood mitigation program for Gatun lake. Programa de mitigación de inundaciones del lago Gatún

Flood mitigation program for Gatun lake. Programa de mitigación de inundaciones del lago Gatún Flood mitigation program for Gatun lake Programa de mitigación de inundaciones del lago Gatún Moffatt & Nichol Engineers 10 de febrero de 2005 Contrato No. 126161 Introducción y Recomendaciones 1 INTRODUCTION

More information

4 Water supply description

4 Water supply description 4 Water supply description A description of the drinking-water system is equally applicable to large utilities with piped distribution systems, piped and non-piped community supplies, including handpumps

More information

Pico Power: A Boon for Rural Electrification

Pico Power: A Boon for Rural Electrification Advance in Electronic and Electric Engineering. ISSN 2231-1297, Volume 3, Number 7 (2013), pp. 865-872 Research India Publications http://www.ripublication.com/aeee.htm Pico Power: A Boon for Rural Electrification

More information

Project Proposal and Feasibility Study

Project Proposal and Feasibility Study Team 15: Monsoon Platoon Ben Giudice Kevin Gritters Dan VanderHeide INTRODUCTION...3 PURPOSE...3 GEOGRAPHY...3 BACKGROUND...4 PROBLEM...5 MONSOON CLIMATE...5 EXTREME LAKE LEVEL CHANGES...6 WATER LEVEL

More information

Emergency Spillways (Sediment basins)

Emergency Spillways (Sediment basins) Emergency Spillways (Sediment basins) DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short-Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1]

More information

Impact of water harvesting dam on the Wadi s morphology using digital elevation model Study case: Wadi Al-kanger, Sudan

Impact of water harvesting dam on the Wadi s morphology using digital elevation model Study case: Wadi Al-kanger, Sudan Impact of water harvesting dam on the Wadi s morphology using digital elevation model Study case: Wadi Al-kanger, Sudan H. S. M. Hilmi 1, M.Y. Mohamed 2, E. S. Ganawa 3 1 Faculty of agriculture, Alzaiem

More information

HCP Team Meeting. November 18, 2015. icfi.com

HCP Team Meeting. November 18, 2015. icfi.com HCP Team Meeting November 18, 2015 icfi.com 1 Welcome and Introductions Where are we in the HCP process Hydrology modeling update Native fish survey Fish translocation Finalize covered activities Next

More information

1. Purpose and scope. 2. SEPA's role in hydropower and planning

1. Purpose and scope. 2. SEPA's role in hydropower and planning Page no: 1 of 10 1. Purpose and scope 1.1 The purpose of this note is to provide guidance on the approach that we will take when dealing with hydropower development management consultations. We welcome

More information

Module 3. Irrigation Engineering Principles. Version 2 CE IIT, Kharagpur

Module 3. Irrigation Engineering Principles. Version 2 CE IIT, Kharagpur Module 3 Irrigation Engineering Principles Lesson 9 Regulating Structures for Canal Flows Instructional objectives On completion of this lesson, the student shall be able to learn: 1. The necessity of

More information

USAID ENERGY POLICY PROGRAM SITE VISIT REPORT STATUS OF 4 RUN OF RIVER HYDROPOWER PROJECTS. October 2013

USAID ENERGY POLICY PROGRAM SITE VISIT REPORT STATUS OF 4 RUN OF RIVER HYDROPOWER PROJECTS. October 2013 USAID ENERGY POLICY PROGRAM SITE VISIT REPORT STATUS OF 4 RUN OF RIVER HYDROPOWER PROJECTS October 2013 This program is made possible by the support of the American people through the United States Agency

More information

Tunnelling and underground works in PPC hydro projects: Contracting practices & construction management Ioannis Thanopoulos Dr.

Tunnelling and underground works in PPC hydro projects: Contracting practices & construction management Ioannis Thanopoulos Dr. Tunnelling and underground works in PPC hydro projects: Contracting practices & construction management Ioannis Thanopoulos Dr. Civil Engineer Public Power Corporation, Greece Public Power Corporation

More information

< SUBSURFACE DAMS TO AUGMENT GROUNDWATER STORAGE IN BASEMENT TERRAIN FOR HUMAN SUBSISTENCE BRAZILIAN EXPERIENCE >

< SUBSURFACE DAMS TO AUGMENT GROUNDWATER STORAGE IN BASEMENT TERRAIN FOR HUMAN SUBSISTENCE BRAZILIAN EXPERIENCE > CASE PROFILE COLLECTION No 5 < SUBSURFACE DAMS TO AUGMENT GROUNDWATER STORAGE IN BASEMENT TERRAIN FOR HUMAN SUBSISTENCE BRAZILIAN EXPERIENCE > Stephen Foster September 2002 TASK MANAGERS: Gabriel Azevedo

More information

INTRODUCING PUMPED STORAGE IN LEBANON: TOWARDS A PROSPECTIVE NATIONAL MASTER PLAN

INTRODUCING PUMPED STORAGE IN LEBANON: TOWARDS A PROSPECTIVE NATIONAL MASTER PLAN INTRODUCING PUMPED STORAGE IN LEBANON: TOWARDS A PROSPECTIVE NATIONAL MASTER PLAN by Adib Geadah Senior Hydraulic Engineer and Consultant, P.O.Box 13-6195, Beirut, 1102-2801, Lebanon International Seminar

More information

Ponds- Planning, Design, Construction

Ponds- Planning, Design, Construction United States Department of Agriculture Soil Conservation Service Agriculture Handbook Number 590 Ponds- Planning, Design, Construction This handbook describes the requirements for building a pond. It

More information

CITY UTILITIES DESIGN STANDARDS MANUAL

CITY UTILITIES DESIGN STANDARDS MANUAL CITY UTILITIES DESIGN STANDARDS MANUAL Book 2 (SW) SW9 June 2015 SW9.01 Purpose This Chapter provides information for the design of open channels for the conveyance of stormwater in the City of Fort Wayne.

More information

CORUH RIVER DEVELOPMENT PLAN

CORUH RIVER DEVELOPMENT PLAN CORUH RIVER DEVELOPMENT PLAN International Workshop on Transboundary Water Resources Management Tbilisi, Georgia 8-10 December 2009 Ubeyd Sezer Geological Engineer U. Sezer GENERAL DIRECTORATE OF STATE

More information

1 Introduction. 1.1 Key objective. 1.2 Why the South Esk

1 Introduction. 1.1 Key objective. 1.2 Why the South Esk 1 Introduction 1.1 Key objective The aim of this study is to identify and assess possible options for improving the quality of the river channel and habitats in the River South Esk catchment whilst helping

More information

SUMP PUMP. City of Ann Arbor & C O L L E C T I O N S Y S T E M G L O S S A R Y

SUMP PUMP. City of Ann Arbor & C O L L E C T I O N S Y S T E M G L O S S A R Y Foundation A foundation is the bottom part of a building. It s the element that anchors the building to the ground and transmits the building s gravity load directly to the earth. Water damage weakens

More information

Flash Flood Science. Chapter 2. What Is in This Chapter? Flash Flood Processes

Flash Flood Science. Chapter 2. What Is in This Chapter? Flash Flood Processes Chapter 2 Flash Flood Science A flash flood is generally defined as a rapid onset flood of short duration with a relatively high peak discharge (World Meteorological Organization). The American Meteorological

More information

Tanzania: Lower Kihansi Hydropower Station. 23065 / Hydropower plants

Tanzania: Lower Kihansi Hydropower Station. 23065 / Hydropower plants Tanzania: Lower Kihansi Hydropower Station Ex post evaluation OECD sector BMZ project ID 1996 66 108 Project-executing agency Consultant - 23065 / Hydropower plants Tanzanian Electricity Supply Company

More information

Technical Specifications of Micro Hydropower System Design and its Implementation

Technical Specifications of Micro Hydropower System Design and its Implementation Technical Specifications of Micro Hydropower System Design and its Implementation Feasibility Analysis and Design of Lamaya Khola Micro Hydro Power Plant Anil Kunwor Bachelor s Degree Thesis Förnamn Efternamn

More information

Feasibility Study Report. India Muerta Small Hydro Power Plant. In Uruguay

Feasibility Study Report. India Muerta Small Hydro Power Plant. In Uruguay Feasibility Study Report of India Muerta Small Hydro Power Plant In Uruguay Prepared by International Center on Small Hydro Power (ICSHP) for United Nations Industrial Development Organization (UNIDO)

More information

CHAPTER VII CONSTRUCTION QUALITY CONTROL INSPECTION PROGRAM 1

CHAPTER VII CONSTRUCTION QUALITY CONTROL INSPECTION PROGRAM 1 CHAPTER VII CONSTRUCTION QUALITY CONTROL INSPECTION PROGRAM 1 1 This Chapter of the FERC Engineering Guidelines has been prepared under contract with R & H Thomas, Inc. JANUARY 1993 Chapter VII Construction

More information

Small Dam Repair The Stone Lake Dam Story. Joe Barron, P.E. SynTerra formerly the Fletcher Group, Inc. 148 River St. Suite 220 Greenville, S.C.

Small Dam Repair The Stone Lake Dam Story. Joe Barron, P.E. SynTerra formerly the Fletcher Group, Inc. 148 River St. Suite 220 Greenville, S.C. Small Dam Repair The Stone Lake Dam Story Joe Barron, P.E. SynTerra formerly the Fletcher Group, Inc. 148 River St. Suite 220 Greenville, S.C. 29601 1 Historical background of Stone Lake A series of three

More information

Basement Flood Risk Reduction City of Winnipeg. Charles Boulet

Basement Flood Risk Reduction City of Winnipeg. Charles Boulet Basement Flood Risk Reduction City of Winnipeg Charles Boulet Outline Background Winnipeg Floodway Rain Events Winnipeg Sewer System Basement Flooding Flood Reduction Measures ICLR - BFRR Strategy 2 Where

More information

Chapter 18 Introduction to. A f r i c a

Chapter 18 Introduction to. A f r i c a Chapter 18 Introduction to A f r i c a Ch. 18:1 Landforms & Resources 1. Africa s shape & landforms are the result of its location in the southern part of the ancient supercontinent of. Pangaea Over thousands

More information

ENVIRONMENTAL MITIGATION AT HYDROELECTRIC PROJECTS Volume 1. Current Practices for Instream Flow Needs, Dissolved Oxygen, and Fish Passage

ENVIRONMENTAL MITIGATION AT HYDROELECTRIC PROJECTS Volume 1. Current Practices for Instream Flow Needs, Dissolved Oxygen, and Fish Passage DOEIID-10360 Distribution Category: UC-22S ENVIRONMENTAL MITIGATION AT HYDROELECTRIC PROJECTS Volume 1. Current Practices for Instream Flow Needs, Dissolved Oxygen, and Fish Passage M. J. Sale G. F. Cada

More information

The Alternatives of Flood Mitigation in The Downstream Area of Mun River Basin

The Alternatives of Flood Mitigation in The Downstream Area of Mun River Basin The Alternatives of Flood Mitigation in The Downstream Area of Mun River Basin Dr.Phattaporn Mekpruksawong 1, Thana Suwattana 2 and Narong Meepayoong 3 1 Senior Civil Engineer, Office of Project Management,

More information

Amaila Hydropower ESIA Update Section 2. Contents

Amaila Hydropower ESIA Update Section 2. Contents Contents 2 Project Description... 2-1 2.1 Hydropower Facility... 2-6 2.1.1 Hydropower Facility Components... 2-6 2.1.1.1 Dam... 2-9 2.1.1.2 Dam Stability... 2-12 2.1.1.3 Reservoir... 2-13 2.1.1.4 Spillway...

More information

Thin Air and Thick Ice Unusual Challenges at a High Elevation Hydro Plant

Thin Air and Thick Ice Unusual Challenges at a High Elevation Hydro Plant Thin Air and Thick Ice Unusual Challenges at a High Elevation Hydro Plant By Ginger Gillin, John Pizzimenti, and Doug Foss, GEI Consultants, Inc., USA, and Jon Jourdonnais, PPL Montana, USA. Abstract The

More information

Republic of Zambia OPPORTUNITIES IN THE ENERGY SECTOR IN ZAMBIA

Republic of Zambia OPPORTUNITIES IN THE ENERGY SECTOR IN ZAMBIA Republic of Zambia OPPORTUNITIES IN THE ENERGY SECTOR IN ZAMBIA Presentation Outline COUNTRY PROFILE KEY POWER SECTOR PLAYERS OVERVIEW OF THE ENERGY SECTOR IN ZAMBIA ZAMBIA ENERGY SITUATION PRESENTLY RESULT

More information

S.1 Introduction to the Case Study on Micro-Hydro Power Plants

S.1 Introduction to the Case Study on Micro-Hydro Power Plants S.1 Introduction to the Case Study on Micro-Hydro Power Plants Micro-Hydro power is an alternative technology for power generation. This section provides a case study on the design and development of a

More information

ARTICLE II STORM DRAINAGE. (From Ordinance No. 1987-17; August 4, 1987; Sections III through VIII)

ARTICLE II STORM DRAINAGE. (From Ordinance No. 1987-17; August 4, 1987; Sections III through VIII) ARTICLE II STORM DRAINAGE (From Ordinance No. 1987-17; August 4, 1987; Sections III through VIII) SECTION 2.1 Standard Provisions Standard Provisions All construction for storm drainage in the development

More information

Technical Consultant

Technical Consultant Terms of Reference Technical Consultant Providing services in the framework of a Study for Rehabilitation of Zemo Samgori Irrigation System, Georgie (ref. ORIO13/GE/01) Introduction The Ministry of Agriculture

More information

Design Considerations for Addressing Climate Change Vulnerabilities of Dams and Reservoirs

Design Considerations for Addressing Climate Change Vulnerabilities of Dams and Reservoirs Design Considerations for Addressing Climate Change Vulnerabilities of Dams and Reservoirs Agenda Introduction Dam and Reservoir Vulnerabilities Decision Process Risk Review Case Study Candidates Lesotho

More information

ICOLD POSITION PAPER ON DAM SAFETY AND EARTHQUAKES

ICOLD POSITION PAPER ON DAM SAFETY AND EARTHQUAKES ICOLD POSITION PAPER ON DAM SAFETY AND EARTHQUAKES August 2012 Dam Safety and Earthquakes Position Paper of International Commission on Large Dams (ICOLD) Prepared by ICOLD Committee on Seismic Aspects

More information

Basements and Deep Building Construction Policy 2014

Basements and Deep Building Construction Policy 2014 Basements and Deep Building Construction Policy 2014 APPROVAL Council / CEO 27 October 2014 VERSION NO: Version 1.0 TRIM REF: 14/67838 REVIEW 30/10/2019 RESPONSIBLE EXECUTIVE General Manager City Assets

More information

Renewable energies, Energy efficiency, Water collection and supply. Autonomous Region of Madeira, Portugal

Renewable energies, Energy efficiency, Water collection and supply. Autonomous Region of Madeira, Portugal Optimising the Multiple Purpose Function of the Socorridos Hydro Power Station for Use All Year Round to Produce Water for Public Supply, Irrigation and Electricity Key words: Renewable energies, Energy

More information

River Basin Management in Croatia

River Basin Management in Croatia River Basin Management in Croatia 2. INTERNATIONAL RIVER BASIN MANAGEMENT HIGH LEVEL SYMPOSIUM Cappadocia/NEVŞEHİR, Turkey 16-18 April 2013 2 Water sector responsibilities are shared among: Croatian Parliament

More information

ENGINEERING REPORT FOR PAIES WATER SUPPLY SYSTEM KlTTl MUNICIPALITY, SECTION I, POHNPEI FEDERATED STATES OF MICRONESIA

ENGINEERING REPORT FOR PAIES WATER SUPPLY SYSTEM KlTTl MUNICIPALITY, SECTION I, POHNPEI FEDERATED STATES OF MICRONESIA ENGINEERING REPORT FOR PAIES WATER SUPPLY SYSTEM KlTTl MUNICIPALITY, SECTION I, POHNPEI FEDERATED STATES OF MICRONESIA Ulla Mogensen SOPAC Secretariat May 1996 SOPAC Technical Report 230 Prepared for the

More information

A least-cost electrification proposal for Kisiizi, Uganda Sten Bergman Sr. Energy Specialist, The World Bank

A least-cost electrification proposal for Kisiizi, Uganda Sten Bergman Sr. Energy Specialist, The World Bank A least-cost electrification proposal for Kisiizi, Uganda Sten Bergman Sr. Energy Specialist, The World Bank 1. Introduction Kisiizi Hospital is a Church of Uganda "Private not-for-profit health care provider

More information

Rocky EEP Preliminary Findings Report Summary February 2005

Rocky EEP Preliminary Findings Report Summary February 2005 This is a DRAFT summary of the NC Ecosystem Enhancement Upper Rocky River Local Watershed Plan Preliminary Findings Report. The original, 157 page document can be found here: www.ncsu.edu/weco/rocky. The

More information

Kali Tuntang. Map of River. Table of Basic Data. Indonesia 9. Serial No. : Indonesia-9

Kali Tuntang. Map of River. Table of Basic Data. Indonesia 9. Serial No. : Indonesia-9 Kali Tuntang Map of River Table of Basic Data Name(s): Tuntang River Location: Java Island, Indonesia Area: 798 km 2 Origin: Mt. Merbabu (3,142 m) Outlet: Java sea Main tributaries: Senjoyo River (120

More information

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE 1008 STORM DRAINAGE (3/24/05) 1008.01 PURPOSE To minimize the amount of stormwater runoff resulting from development utilizing nonstructural controls where possible, maintain and improve water quality,

More information

Risk and vulnerability assessment of the build environment in a dynamic changing society

Risk and vulnerability assessment of the build environment in a dynamic changing society Risk and vulnerability assessment of the build environment in a dynamic changing society Limnei Nie SINTEF Building and infrastructure, P.O.Box 124 Blindern, NO-0314 Oslo, Norway. linmei.nie@sintef.no

More information

CHAPTER - VI FLOOD DAMAGES

CHAPTER - VI FLOOD DAMAGES CHAPTER - VI FLOOD DAMAGES 6.1 General Generally flood is defined as an unusually high stage in a river normally the level at which the river overflows its banks and inundates the adjoining area. In other

More information

How To Understand The Impacts Of Climate Change On Transboundary River Basins In West Africa

How To Understand The Impacts Of Climate Change On Transboundary River Basins In West Africa CLIMATE CHANGE AND FRESHWATER RESOURCES IN WEST AFRICA: TRANSBOUNDARY RIVER BASINS Audra El Vilaly & Mohamed Abd salam El Vilaly, PhD Outline Objectives of study Research Questions Background & Context

More information

Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1

Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1 6 Index inlet protection excavated drop inlet protection (Temporary) 6.50.1 HARDWARE CLOTH AND GRAVEL INLET PROTECTION Block and gravel inlet Protection (Temporary) sod drop inlet protection ROCK DOUGHNUT

More information

Flood Emergency Response Planning: How to Protect Your Business from a Natural Disaster RIC005

Flood Emergency Response Planning: How to Protect Your Business from a Natural Disaster RIC005 Flood Emergency Response Planning: How to Protect Your Business from a Natural Disaster RIC005 Speakers: Tom Chan, CEO, Global Risk Miyamoto Greg Bates, Principal, Global Risk Consultants Learning Objectives

More information

Minihydro to boost local economic growth The case of Nepal

Minihydro to boost local economic growth The case of Nepal Minihydro to boost local economic growth The case of Nepal Clara Kayser-Bril for T.A.C.E.C. Workshop Milano July 9 th 2014 Nepal s hydropower potential Potential 40 GW Installed 1 GW 2 Photo : Clara KB

More information

Final. Contact person: Colin Whittemore Aurecon Centre 1 Century City Drive Waterford Precinct, Century City Cape Town, South Africa

Final. Contact person: Colin Whittemore Aurecon Centre 1 Century City Drive Waterford Precinct, Century City Cape Town, South Africa Review Report and Recommendations for the Remediation of Flood Damage at the Berg River Causeway and the Dam Bypass Channel on Portion of Farms 1646 and 1014, Franschhoek Contact person: Colin Whittemore

More information

BANGKOK FLOOD PROTECTION SYSTEM Bangkok Metropolitan Administration (BMA)

BANGKOK FLOOD PROTECTION SYSTEM Bangkok Metropolitan Administration (BMA) BANGKOK FLOOD PROTECTION SYSTEM Bangkok Metropolitan Administration (BMA) Catchment area of Chao Phraya River is 160,000 sq.km. or about 1/3 of the country The Chao Phraya River flows passing through Bangkok

More information

LDPCSD Water Supply Emergency Response Plan Status Update 2-4-15

LDPCSD Water Supply Emergency Response Plan Status Update 2-4-15 LDPCSD Water Supply Emergency Response Plan Status Update 2-4-15 1 EMERGENCY OVERVIEW The Lake Don Pedro Community Services District (LDPCSD) provides domestic potable water service to 1450 connections

More information

Sustainability of Micro-hydropower in Nepal: A case study of Rukum District

Sustainability of Micro-hydropower in Nepal: A case study of Rukum District Sustainability of Micro-hydropower in Nepal: A case study of Rukum District Shashiram Dahal, Rajendra Shrestha Department of Mechanical Engineering, Central Campus, Pulchowk, Institute of Engineering,

More information

Title of Case presentation

Title of Case presentation Rural Electrification- Rwanda Title of Case presentation Study Fatin Ali Mohamed Industrial Development Officer UNIDO, Vienna, Austria UNITED NATIONS INDUSTRIAL DEVELOPMENT ORGANIZATION Contents 1. Context

More information

URBAN DRAINAGE CRITERIA

URBAN DRAINAGE CRITERIA URBAN DRAINAGE CRITERIA I. Introduction This division contains guidelines for drainage system design and establishes a policy for recognized and established engineering design of storm drain facilities

More information