1 Small Dam Repair The Stone Lake Dam Story Joe Barron, P.E. SynTerra formerly the Fletcher Group, Inc. 148 River St. Suite 220 Greenville, S.C

2 Historical background of Stone Lake A series of three lakes built by the Stone family in the 1960 s Development of subdivision in City of Greenville, SC Built roads over dams dam belongs to Home Owners Association, roads to City 2

3 Middle and upper Stone Lake Dams Lower Stone Lake Dam the project site 3

4 Experience with State Park dams Table Rock State Park Dam Old CCC dam for mountain lake 60 feet high with internal spillway gate leaking. Couldn t lower lake because of Legislative conference. Santee State Park Dam: lowcountry farm pond size dam with leaking gate. Couldn t drain because of backwater from hydro reservoir. Put on Scuba to remove old gate. 4

5 Notification of Problem Inspection by South Carolina Department of Health and Environmental Control (DHEC) noted problems in the spillway 5

6 Dam Classification High Hazard by DHEC Significant property damage with downstream flooding 6

7 Terms Spillway refers to the 48 inch concrete pipe primary spillway Drain refers to the 12 inch steel pipe drain for the lake 7

8 Spillway A brick and concrete spillway controlled the water level of the lake and then drained to the spillway pipe 8

9 Cracking was noted in the spillway apron 9

10 Condition of pipe interior Note the water coming through the pipe disappears about 3 joints up the pipe and comes out under the pipe A catch basin in the street above appeared to be bearing on the pipe 10

11 11

12 12

13 Additional concerns A street culvert that used to discharge into the spillway pipe and was later diverted to discharge below the dam 13

14 Additional problems Steep slopes, hard to walk on, much less maintain Tree growth and root system weakens dam 14

15 Down stream erosion 15

16 Lake drain pipe Concern over the 12 inch diameter pipe under the dam used to drain the lake Could not find the end Water spilling out around some tree roots 16

17 Options Just seal the joints on the main overflow drain and dig out the end of the drain and keep watching the dam Take the opportunity to remove the trees, reslope the dam, rebuild the overflow spillway, and study the hidden drain for possible repairs 17

18 The plan The City and Homeowners Association opted for the more expensive route believing that a band aid was not adequate and that more extensive problems might be uncovered during the work 18

19 Hydrology and Hydraulics Suburban watershed with two lakes upstream Recently studied by City consultant Concluded that spillway pipe was correctly sized 19

20 Characteristics of dam Height Width at top Width at bottom Length at top Length of Primary Spillway Size of Primary Spillway Size of Drain 30 feet 45 feet 125 feet 250 feet 85 feet 48 inch diameter 12 inch diameter. 20

21 21

22 22

23 The battle plan Add a new junction box at the location of the disjointed spillway pipe The spillway will turn at this point and discharge at a lower point to allow the most serious area of downstream erosion to be filled and grassed 23

24 24

25 25

26 The battle plan Cut all trees, remove stumps and reslope the back of dam Clear end of drain and inspect with video Place toe drain of stone wrapped in filter fabric to catch seepage under dam 26

27 27

28 28

29 Construction Begins 29

30 Clearing and Grubbing 30

31 Changes to recommendations on drains & filters Prior to the 1980 s seepage collars were recommended and in some cases required around the piped drains through dams Starting then a number of studies indicated that seepage collars were not working due to the difficulty of compaction around them Pipe filters of sand and stone are now recommended 31

32 32

33 Challenges and solutions 1 More seepage than anticipated, but all under the dam, not through it Revise Toe filter to utilize a sand and stone filter Add a monitoring point 33

34 Challenges & Solutions 2 Significant root systems Anticipated Encouraged that no seepage was noted around the roots 34

35 Challenges and solutions 3 Spillway pipe crumbled when removed, not reinforced, raised concern for pipe left in place. Dig and replace or slipline? Dig up and replace would mean redoing the road and replacing pipe that did not appear to have seepage problems around it. 35

36 Sliplining options Smooth core aluminum pipe to slide inside 48 problem concrete pipe is not completely round and joints are not even Use resin impregnated fabric to seal the pipe would not provide any structure or strength but would eliminate seepage City had Insituform company under contract to slipline sanitary sewer 36

37 What would you do? 37

38 Challenges and solutions 4 Drain under dam was uncovered, inspected with video, proved to be in bad shape Decided to plug with flowable fill Add siphon drain over dam, under road instead of through dam 38

39 Challenges and solutions 4 Drain under dam was uncovered, inspected with video, proved to be in bad shape Decided to plug with flowable fill Add siphon drain over dam, under road instead of through dam 39

40 Be prepared constant diligence 40

41 Come see us in Greenville 41

Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1

Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1 6 Index inlet protection excavated drop inlet protection (Temporary) 6.50.1 HARDWARE CLOTH AND GRAVEL INLET PROTECTION Block and gravel inlet Protection (Temporary) sod drop inlet protection ROCK DOUGHNUT

More information

Outlet stabilization structure

Outlet stabilization structure Overview of Sedimentation and Erosion Control Practices Practice no. 6.41 Outlet stabilization structure Erosion at the outlet of channels, culverts, and other structures is common, and can cause structural

More information

Emergency Spillways (Sediment basins)

Emergency Spillways (Sediment basins) Emergency Spillways (Sediment basins) DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short-Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1]

More information

ENERGY DISSIPATION CHAPTER 7

ENERGY DISSIPATION CHAPTER 7 CHAPTER 7 ENERGY DISSIPATION 7.1 Overview... 7-1 7.2 Design Criteria... 7-1 7.2.1 General Criteria... 7-1 7.2.2 Erosion Hazards... 7-1 7.2.3 Recommended Dissipators... 7-1 7.3 Riprap Aprons... 7-2 7.3.1

More information

SECTION 5. Sediment Control Measures

SECTION 5. Sediment Control Measures SECTION 5 Sediment Control Measures 60. STORM DRAIN INLET PROTECTION When Runoff from earth change activities will discharge to a catch basin or storm drain inlet. A newly constructed catch basin or storm

More information

Section 402. STORM SEWERS

Section 402. STORM SEWERS 402.02 Section 402. STORM SEWERS 402.01. Description. This work consists of constructing storm sewers of the size and class required, including excavation, bedding, and backfill. 402.02. Materials. Provide

More information

Section 2100-Trenching and Tunneling

Section 2100-Trenching and Tunneling SECTION 5200 - STORM SEWER PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of storm sewer mains and culverts. Topics include permits and fees, trench widths, pipe laying, bedding, initial

More information

SEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER

SEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER Village of Shorewood, Wisconsin SEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER Prepared By: Thomas A. Zoulek, P.E., LEED A.P. Vice President Mid City Plumbing & Heating

More information

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile Chapter 3 CULVERTS Description A culvert is a closed conduit used to convey water from one area to another, usually from one side of a road to the other side. Importance to Maintenance & Water Quality

More information

SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS

SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS SECTION 08000 STORM DRAINAGE 08010 DESIGN A. Location B. Sizing TABLE OF CONTENTS 08020 MATERIALS A. Pipe Materials B. Structure Materials C. Installation D. Inlets and Outlets 08030 INSPECTIONS AND TESTING

More information

City of Shelbyville Site Inspection Checklist

City of Shelbyville Site Inspection Checklist City of Shelbyville Site Inspection Checklist General Information Project Name: KYR10 Permit Number: Date: Project Location: Contractor: Conractor Representative: Inspector's Name: Title: Signature : Weather

More information

APPENDIX F. Baker County. Mason Dam Hydroelectric Project FERC No. P-12686. Turbidity Monitoring Plan

APPENDIX F. Baker County. Mason Dam Hydroelectric Project FERC No. P-12686. Turbidity Monitoring Plan APPENDIX F Baker County Mason Dam Hydroelectric Project FERC No. P-12686 Turbidity Monitoring Plan April 2011 857 Table of Contents 1.0 Introduction 1 2.0 Purpose and Scope 2 3.0 Turbidity Monitoring and

More information

RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.mass.gov/dep/water/laws/policies.

RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.mass.gov/dep/water/laws/policies. RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.mass.gov/dep/water/laws/policies.htm#storm Definition: A permanent, erosion-resistant ground cover

More information

US Army Corps of Engineers BUILDING STRONG

US Army Corps of Engineers BUILDING STRONG Fort Worth District Public Meeting 20 August 2013 US Army Corps of Engineers Lewisville Dam - Authorization Authorized by the River and Harbor Act, approved 2 March 1945 (Public Law 14, 79th Congress,

More information

Storm Sewer Trenchless Upgrade Alternatives and Recommendations

Storm Sewer Trenchless Upgrade Alternatives and Recommendations Storm Sewer Trenchless Upgrade Alternatives and Recommendations Background Approximately 1,930 feet of the 40-inch and 42-inch CMP storm sewer pipe from manhole M22 to manhole M12 will be evaluated for

More information

CLIFTY CREEK PLANT MADISON, INDIANA

CLIFTY CREEK PLANT MADISON, INDIANA 2015 DAM AND DIKE INSPECTION REPORT GERS-15-018 CLIFTY CREEK PLANT MADISON, INDIANA PREPARED BY GEOTECHNICAL ENGINEERING AEP SERVICE CORPORATION 1 RIVERSIDE PLAZA COLUMBUS, OHIO Annual Dam and Dike Inspection

More information

Minimizes sediment and debris from entering storm drains that lead to waterways and watercourses.

Minimizes sediment and debris from entering storm drains that lead to waterways and watercourses. 4.5-p DRAIN INLET PROTECTION Alternative Names: DI protection, Drop Inlet Protection DESCRIPTION Storm drain inlet (DI) protection slows and ponds stormwater, and filters sediment and debris before it

More information

Lansdowne Stormwater UPDATE

Lansdowne Stormwater UPDATE Lansdowne Stormwater UPDATE August 22, 2012 Ann Arbor Footing Drain Disconnection Stormwater Review Presentation Agenda Welcome and introductions Background on stormwater and sanitary sewer issues Footing

More information

Stormwater/Wetland Pond Construction Inspection Checklist

Stormwater/Wetland Pond Construction Inspection Checklist : Construction Inspection ChecklistsTools Stormwater/Wetland Pond Construction Inspection Checklist Project: Location: Site Status: Date: Time: Inspector: SATISFACTORY/ UNSATISFACTORY COMMENTS Pre-Construction/Materials

More information

LS 2540 SEWER LATERALS AND INSPECTION TEES

LS 2540 SEWER LATERALS AND INSPECTION TEES LS 2540 SEWER LATERALS AND INSPECTION TEES A. Summary B. Submittals C. Site Information D. Sewer Pipe and Fittings E. Lateral Locations F. Lateral Installation G. Inspection Tee Installation H. Removal

More information

Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control

Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control Project Name: Tax Map Parcel: Acreage: Plat: ADC Map & Grid Engineering

More information

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth

More information

SECTION 02400 - STORM DRAIN SYSTEM

SECTION 02400 - STORM DRAIN SYSTEM SECTION 02400 - STORM DRAIN SYSTEM CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And

More information

NRCS Overview. National Dam Safety Program Technical Workshop #19 February 22-23, 2012

NRCS Overview. National Dam Safety Program Technical Workshop #19 February 22-23, 2012 NRCS Overview National Dam Safety Program Technical Workshop #19 February 22-23, 2012 Thomas Brown National Design, Construction, and Soil Mechanics Center (NDCSMC) Fort Worth, Texas NRCS Dam Inventory

More information

CHAPTER 5 ON SITE STORMWATER MANAGEMENT

CHAPTER 5 ON SITE STORMWATER MANAGEMENT CHAPTER 5 ON SITE STORMWATER MANAGEMENT Contents 5.0 INTRODUCTION 5-1 A. Objective 5-1 B. Impervious Surface Mitigation Requirements 5-1 C. Pollution Generating Pervious Surface Mitigation Requirements

More information

Flood mitigation program for Gatun lake. Programa de mitigación de inundaciones del lago Gatún

Flood mitigation program for Gatun lake. Programa de mitigación de inundaciones del lago Gatún Flood mitigation program for Gatun lake Programa de mitigación de inundaciones del lago Gatún Moffatt & Nichol Engineers 10 de febrero de 2005 Contrato No. 126161 Introducción y Recomendaciones 1 INTRODUCTION

More information

Homeowner s Guide to Drainage

Homeowner s Guide to Drainage Homeowner s Guide to Drainage a scottsdale homeowner s guide to drainage produced by the city of scottsdale s stormwater management division Transportation Department TABLE OF CONTENTS Introduction 2 Drainage

More information

Storm Drain Inlet Protection for Construction Sites (1060)

Storm Drain Inlet Protection for Construction Sites (1060) Storm Drain Inlet Protection for Construction Sites (1060) Wisconsin Department of Natural Resources Conservation Practice Standard I. Definition A temporary device installed in or around a storm drain

More information

Local Road Assessment and Improvement Drainage Manual

Local Road Assessment and Improvement Drainage Manual Local Road Assessment and Improvement Drainage Manual Donald Walker, T.I.C. Director, author Lynn Entine, Entine & Associates, editor Susan Kummer, Artifax, design Transportation Information Center University

More information

SECTION 300 STORM SEWER AND SUMP PUMP DRAIN SYSTEMS

SECTION 300 STORM SEWER AND SUMP PUMP DRAIN SYSTEMS SECTION 300 STORM SEWER AND SUMP PUMP DRAIN SYSTEMS Section Title Page 301 General................................... 18 302 Materials.................................. 18 303 Design Requirements........................

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 1100 SLIP-LINING SANITARY SEWERS

San Antonio Water System Standard Specifications for Construction ITEM NO. 1100 SLIP-LINING SANITARY SEWERS ITEM NO. 1100 SLIP-LINING SANITARY SEWERS 1100.1 DESCRIPTION: This item shall consist of slip-lining sanitary sewer pipe, which is accomplished by pulling or pushing liner pipe into existing sewers by

More information

Construction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can

Construction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can Construction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can do his or her share to protect Ohio's water resources

More information

STORMWATER MANAGEMENT CHECKLIST

STORMWATER MANAGEMENT CHECKLIST STORMWATER MANAGEMENT CHECKLIST *This checklist must be completed and part of the Land Disturbing Permit submittal for review if the acreage disturbed is one (1) acre or more: I. SUPPORTING DATA Narrative

More information

Tookany Creek Flood Damage Reduction Feasibility Study Section 205 Continuing Authorities Program

Tookany Creek Flood Damage Reduction Feasibility Study Section 205 Continuing Authorities Program Tookany Creek Flood Damage Reduction Feasibility Study Section 205 Continuing Authorities Program Field Inspection Notes 27 29 September 2012 Introduction The U.S. Army Corps of Engineers (Corps), in

More information

TABLE OF CONTENTS SECTION 300 STORM SEWER

TABLE OF CONTENTS SECTION 300 STORM SEWER TABLE OF CONTENTS SECTION 300 STORM SEWER Starts on Page 300 GENERAL... 2 301 MATERIALS... 2 302 CONSTRUCTION PROCEDURES... 5 303 TESTING... 5 304 ABANDONMENT OF EXISTING STORM SEWER FACILITIES... 6 305

More information

Storm Drain Inlet Protection

Storm Drain Inlet Protection Objectives EC Erosion Control SE Sediment Control TR Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Objective

More information

Small Dam Hazard Assessment Inventory

Small Dam Hazard Assessment Inventory Small Dam Hazard Assessment Inventory What would happen if your dam were to fail? This is a question that most dam owners hope they will never have to answer. However it is a question you, as a responsible

More information

Stock Pond (Highgate No. 6) FINAL ANNUAL STATEMENT BY SUPERVISING ENGINEER RESERVOIR NOT SUBJECT TO THE RESERVOIRS ACT 1975.

Stock Pond (Highgate No. 6) FINAL ANNUAL STATEMENT BY SUPERVISING ENGINEER RESERVOIR NOT SUBJECT TO THE RESERVOIRS ACT 1975. Stock Pond (Highgate No. 6) ANNUAL STATEMENT BY SUPERVISING ENGINEER RESERVOIR NOT SUBJECT TO THE RESERVOIRS ACT 1975 FINAL October 2011 Supervising Engineer Dr A K Hughes Atkins Water Woodcote Grove Ashley

More information

ITD Pipe Materials Selection & Specification Procedures. July 2011

ITD Pipe Materials Selection & Specification Procedures. July 2011 ITD Pipe Materials Selection & Specification Procedures July 2011 INTRODUCTION: This technical memorandum is written as a guide to the selection of compliant pipe materials and the elimination of non-compliant

More information

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation 644-10-569 Page 1 of 9 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING

More information

Memorandum. PROJECT: Postmark Emergency Storm Repair Alternative Analysis

Memorandum. PROJECT: Postmark Emergency Storm Repair Alternative Analysis Memorandum CRW Engineering Group, LLC 3940 Arctic Blvd. Suite 300 Anchorage, AK 99503 (907) 562-3252 FAX 561-2273 TO: Mike Lee, P.E., Chief Engineer, ADOT/ANC FROM: Shane Blanchard, P.E. THRU: Mike Rabe,

More information

First in Service First in Safety

First in Service First in Safety 7840 Nagle Avenue Morton Grove, Illinois 60053 847-470-5235 Fax - 847-965-9511 Wind Damage; Frequently Asked Questions: What can I do with branches that fall in my yard? Bring them out to the parkway;

More information

FY08 SEWER POINT REPAIRS BID TABULATION

FY08 SEWER POINT REPAIRS BID TABULATION 6-07-831 Page 1 of 12 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING "

More information

Storm Drain Inlet Protection for Construction Sites (1060)

Storm Drain Inlet Protection for Construction Sites (1060) Storm Drain Inlet Protection for Construction Sites (1060) Wisconsin Department of Natural Resources Conservation Practice Standard I. Definition A temporary device installed in or around a storm drain

More information

CLARK COUNTY REGIONAL FLOOD CONTROL DISTRICT HYDROLOGIC CRITERIA AND DRAINAGE DESIGN MANUAL SECTION 1100 ADDITIONAL HYDRAULIC STRUCTURES

CLARK COUNTY REGIONAL FLOOD CONTROL DISTRICT HYDROLOGIC CRITERIA AND DRAINAGE DESIGN MANUAL SECTION 1100 ADDITIONAL HYDRAULIC STRUCTURES CLARK COUNTY REGIONAL FLOOD CONTROL DISTRICT HYDROLOGIC CRITERIA AND DRAINAGE DESIGN MANUAL SECTION 1100 ADDITIONAL HYDRAULIC STRUCTURES TABLE OF CONTENTS Page 1101 INTRODUCTION 1102 1102 CHANNEL DROPS

More information

EMERGENCY ACTION PLAN UPDATE OF LAKE GENEVA DAM ID #617. Prepared for: LAKE GENEVA ASSOCIATION 1114 E. Geneva Drive City of DeWitt, MI

EMERGENCY ACTION PLAN UPDATE OF LAKE GENEVA DAM ID #617. Prepared for: LAKE GENEVA ASSOCIATION 1114 E. Geneva Drive City of DeWitt, MI EMERGENCY ACTION PLAN UPDATE OF LAKE GENEVA DAM ID #617 Prepared for: LAKE GENEVA ASSOCIATION 1114 E. Geneva Drive City of DeWitt, MI Modified by: WILCOX PROFESSIONAL SERVICES, LLC 111 W. Edgewood Blvd.,

More information

FIRST RESPONSE: STORM DAMAGE MITIGATION OF A BMP FAILURE

FIRST RESPONSE: STORM DAMAGE MITIGATION OF A BMP FAILURE FIRST RESPONSE: STORM DAMAGE MITIGATION OF A BMP FAILURE Author: Audrey G. Beaulac, P.E., CPSWQ Company: (Hoyle, Tanner), Manchester, New Hampshire INTRODUCTION In early July 2013, 2 inches of rain fell

More information

Orifices may be constructed on a pipe, tee riser, baffle, or other structure intended for conveyance.

Orifices may be constructed on a pipe, tee riser, baffle, or other structure intended for conveyance. APPENDIX F CONTROL STRUCTURES FOR DETENTION SYSTEMS This appendix presents the methods and equations for the design of flow control structures. It includes illustrations and equations for the design of

More information

Wastewater Collection System Supplemental Design Standards for Capital Improvement Program Projects

Wastewater Collection System Supplemental Design Standards for Capital Improvement Program Projects Wastewater Collection System Supplemental Design Standards for Capital Improvement Program Projects March 2013 i Metropolitan Sewer District of Greater Cincinnati Wastewater Collection System Supplemental

More information

URBAN DRAINAGE CRITERIA

URBAN DRAINAGE CRITERIA URBAN DRAINAGE CRITERIA I. Introduction This division contains guidelines for drainage system design and establishes a policy for recognized and established engineering design of storm drain facilities

More information

STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION

STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION Design Criteria Drainage Area The drainage area for storm drain inlets shall not exceed one acre. The crest elevations of these practices shall

More information

5.0 OVERVIEW OF FLOOD DAMAGE REDUCTION MEASURES

5.0 OVERVIEW OF FLOOD DAMAGE REDUCTION MEASURES 5.0 OVERVIEW OF FLOOD DAMAGE REDUCTION MEASURES Flood damage reduction consists of two basic techniques structural and non-structural. Structural methods modify the flood and take the flood away from people

More information

A CASE-STUDY OF CUA_DAT CFRD IN VIETNAM

A CASE-STUDY OF CUA_DAT CFRD IN VIETNAM A CASE-STUDY OF CUA_DAT CFRD IN VIETNAM Giang Pham Hong, Michel Hotakhanh, Nga Pham Hong, Hoai Nam Nguyen, Abstract:Dams have been taken an important role in time and surface redistribution of water for

More information

Storm Drain Inlet Protection - IP

Storm Drain Inlet Protection - IP Storm Drain Inlet Protection - IP DEFINITION A temporary protective device formed around a storm drain drop inlet to trap sediment. PURPOSE To prevent sediment from entering storm drainage systems, prior

More information

SEPTIC SYSTEM CONSTRUCTION REQUIREMENTS ST. MARY S COUNTY HEALTH DEPARTMENT

SEPTIC SYSTEM CONSTRUCTION REQUIREMENTS ST. MARY S COUNTY HEALTH DEPARTMENT SEPTIC SYSTEM CONSTRUCTION REQUIREMENTS ST. MARY S COUNTY HEALTH DEPARTMENT The following are minimum requirements for installation of conventional trench sewage disposal systems in St. Mary s County,

More information

Watershed Works Manual

Watershed Works Manual National Rural Employment Guarantee Act Watershed Works Manual DRAINAGE LINE TREATMENT: GABION STRUCTURE Baba Amte Centre for People s Empowerment Samaj Pragati Sahayog September 2006 Drainage Line Treatment:

More information

Source Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows to Prevent Contamination of Drinking Water

Source Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows to Prevent Contamination of Drinking Water United States Office of Water EPA 916-F-01-032 Environmental Protection (4606) July 2001 Agency Source Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows

More information

Retaining Wall Stability and Maintenance

Retaining Wall Stability and Maintenance Retaining Wall Stability and Maintenance Heavy rains have contributed to landslides and other unfortunate occurrences in various jurisdictions. Although the SCRD has been spared any serious mishap, it

More information

SE-10 STORM DRAIN INLET PROTECTION. Objectives

SE-10 STORM DRAIN INLET PROTECTION. Objectives STORM DRAIN INLET PROTECTION SE-10 Objectives Erosion Control - EC Sediment Control - SE Tracking Control - TC Wind Erosion Control - WE Non-Storm Water Management - NS Waste and Materials Management -

More information

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary

More information

IMPROVING SOUTH FORK PEACHTREE CREEK WATERSHED USING THE TRIPLE BOTTOM LINE DEKALB COUNTY, GEORGIA

IMPROVING SOUTH FORK PEACHTREE CREEK WATERSHED USING THE TRIPLE BOTTOM LINE DEKALB COUNTY, GEORGIA IMPROVING SOUTH FORK PEACHTREE CREEK WATERSHED USING THE TRIPLE BOTTOM LINE DEKALB COUNTY, GEORGIA David Chastant AUTHORS:DeKalb County, 330 West Ponce De Leon Ave, Decatur, Georgia 30030 REFERENCE:Proceedings

More information

Indiana State Department of Health Construction Guidelines for Gravity and Flood-Dose Trench Onsite Systems

Indiana State Department of Health Construction Guidelines for Gravity and Flood-Dose Trench Onsite Systems Indiana State Department of Health Construction Guidelines for Gravity and Flood-Dose Trench Onsite Systems The septic tank-absorption field sewage treatment system is composed of two major elements; the

More information

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix. Storm Drainage 13-C-1 APPENDIX C INLETS 1.0 Introduction The application and types of storm drainage inlets are presented in detail in this Appendix. 2.0 Inlet Locations Inlets are required at locations

More information

Downspout Disconnection Program FAQs

Downspout Disconnection Program FAQs Why is the Village making downspout disconnection mandatory? A mandatory downspout disconnection has been the law for several years in La Grange Park. All gutter downspouts must be disconnected from the

More information

Table 4.9 Storm Drain Inlet Protetion Applicable for

Table 4.9 Storm Drain Inlet Protetion Applicable for BMP C220: Storm Drain Inlet Protection Purpose To prevent coarse sediment from entering drainage systems prior to permanent stabilization of the disturbed area. Conditions of Use Type of Inlet Protection

More information

Guidelines for the Construction of Low Flow Bypass Devices

Guidelines for the Construction of Low Flow Bypass Devices TECHNICAL FACT SHEETS IN THIS SERIES Sheet 3a On-Stream Dams Sheet 3b Off-Stream Diversions Sheet 3c Off-Stream Diversion with a 50:50 Flow Split Small Weir to Divert Low Flows caption to go here Guidelines

More information

CITY UTILITIES DESIGN STANDARDS MANUAL

CITY UTILITIES DESIGN STANDARDS MANUAL CITY UTILITIES DESIGN STANDARDS MANUAL Book 2 (SW) SW9 June 2015 SW9.01 Purpose This Chapter provides information for the design of open channels for the conveyance of stormwater in the City of Fort Wayne.

More information

1. Water Line Maintenance 2. Sanitary Sewer Maintenance 3. Spill/Leak/Overflow Control, Response, and Containment

1. Water Line Maintenance 2. Sanitary Sewer Maintenance 3. Spill/Leak/Overflow Control, Response, and Containment WATER AND SEWER UTILITY OPERATION AND MAINTENANCE Although sewage systems the operation and maintenance of public utilities are not considered themselves are not a chronic sources of stormwater pollution,

More information

MEMORANDUM: RECOMMENDATIONS FOR PIPE MATERIAL SELECTION

MEMORANDUM: RECOMMENDATIONS FOR PIPE MATERIAL SELECTION MEMORANDUM: RECOMMENDATIONS FOR PIPE MATERIAL SELECTION Moser and Associates Engineering for CDOT Region 6 Date: 9/30/10 Memorandum to File: Recommendations for Pipe Material Selection for Construction

More information

Before H 2 Town of South Windsor, CT Evaluates Large Diameter Concrete Pipe

Before H 2 Town of South Windsor, CT Evaluates Large Diameter Concrete Pipe Before H 2 Town of South Windsor, CT Evaluates Large Diameter Concrete Pipe September 11, 2012 NEWEA Collection Systems Conference Presented by: Laurie L. Perkins, PE Dennis A. Dievert, PE C. Frederick

More information

Engineering Specifications February, 2004 Schedule H to Bylaw 7452, Subdivision Bylaw Page 18

Engineering Specifications February, 2004 Schedule H to Bylaw 7452, Subdivision Bylaw Page 18 Schedule H to Bylaw 7452, Subdivision Bylaw Page 18 3.4 Sanitary Sewers 3.4.1 Materials 3.4.1.1 The class and type of pipe and fittings, together with required class of bedding and trench widths, shall

More information

February 4, 2011. hoffman.stephen@epa.gov. Report Recommendations and NIPSCO Responses. 4.3 Maintaining and Controlling Vegetation Growth

February 4, 2011. hoffman.stephen@epa.gov. Report Recommendations and NIPSCO Responses. 4.3 Maintaining and Controlling Vegetation Growth February 4, 2011 VIA E-MAIL AND CERTIFIED MAIL #7010 0290 0002 0577 6226 Mr. Stephen Hoffman US Environmental Protection Agency (5304P) 1200 Pennsylvania Avenue, NW Washington, DC 20460 hoffman.stephen@epa.gov

More information

Amherst Dam. Michael Juris - Village President Joe Behlen, P.E. WDNR Dam Safety Engineer Gerald Krueger, P.E. AECOM

Amherst Dam. Michael Juris - Village President Joe Behlen, P.E. WDNR Dam Safety Engineer Gerald Krueger, P.E. AECOM Amherst Dam Public Informational Meeting Michael Juris - Village President Joe Behlen, P.E. WDNR Dam Safety Engineer Gerald Krueger, P.E. AECOM April 3, 2014 Welcome Michael Juris Village President Introduction

More information

Standard Operating Procedures Storm Drain System Maintenance

Standard Operating Procedures Storm Drain System Maintenance s Storm Drain System Maintenance SECTIONS 1. Storm Drain System Inspections 2. Storm Drain System Cleaning 3. Storm Drain System Repairs 4. Proper Disposal of Material Storm Sewer System Cleaning Directive

More information

Appendix B.1. NRCS-MD Code No. 378 Pond Standards/Specifications

Appendix B.1. NRCS-MD Code No. 378 Pond Standards/Specifications Appendix B.1 NRCS-MD Code No. 378 Pond Standards/Specifications Pond MD-378-1 USDA NATURAL RESOURCES CONSERVATION SERVICE MARYLAND CONSERVATION PRACTICE STANDARD POND CODE 378 (Reported in No.) DEFINITION

More information

THE CORPORATION OF THE CITY OF GUELPH. THEREFORE the council of the Corporation of the City of Guelph enacts as follows:

THE CORPORATION OF THE CITY OF GUELPH. THEREFORE the council of the Corporation of the City of Guelph enacts as follows: THE CORPORATION OF THE CITY OF GUELPH By-law (1993)-14515 A by-law respecting storm water disposal from private property in the City of Guelph, to amend By-law (1987)-12602 and to adopt Municipal Code

More information

SECTION 108 - INLETS 108.1 INLET LOCATIONS

SECTION 108 - INLETS 108.1 INLET LOCATIONS Greene County Design Standards -Adopted April 5, 1999 SECTION 108 - INLETS SECTION 108 - INLETS 108.1 INLET LOCATIONS 108.2 INLET INTERCEPTION CAPACITIES 108.2.1 Clogging Factors 108.3 INTERCEPTION AND

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS

San Antonio Water System Standard Specifications for Construction ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS 1103.1 DESCRIPTION: 1. Repair of sanitary sewer lines by replacing short lengths of failed pipe with new pipe. 2. Repair of service laterals located

More information

Management of flooding downstream of dams

Management of flooding downstream of dams Management of flooding downstream of dams Attachment to Victoria State Flood Emergency Plan Version 1.0 (6 February 2013) This plan is produced by the Victoria State Emergency Service and Department of

More information

The checklist utilized by the Authority will be similar to that which is shown below. Project Name: Location: Consulting Engineering Firm:

The checklist utilized by the Authority will be similar to that which is shown below. Project Name: Location: Consulting Engineering Firm: Page 1 of 6 Section 1. PURPOSE This policy is an Engineering checklist of the Local Review Program for sanitary sewer improvement projects by the Bedford Regional Water Authority ( Authority ). Section

More information

REHABILITATION OF FAILED CORRUGATED METAL PIPE SPILLWAYS PRESENTED AT JUNE 1996 REGIONAL CONFERENCE MID-ATLANTIC COUNCIL FOR SAFE DAMS

REHABILITATION OF FAILED CORRUGATED METAL PIPE SPILLWAYS PRESENTED AT JUNE 1996 REGIONAL CONFERENCE MID-ATLANTIC COUNCIL FOR SAFE DAMS REHABILITATION OF FAILED CORRUGATED METAL PIPE SPILLWAYS PRESENTED AT JUNE 1996 REGIONAL CONFERENCE MID-ATLANTIC COUNCIL FOR SAFE DAMS by Harald W. Van Aller, PE Geotechnical Engineer, Maryland Dam Safety

More information

Steve Amann, P.E., CFM Baxter & Woodman, Inc.

Steve Amann, P.E., CFM Baxter & Woodman, Inc. Steve Amann, P.E., CFM Baxter & Woodman, Inc. Introduction Basement flooding from groundwater seepage Out of the ordinary for floodplain managers Two good things that don t always go good together: Stormwater

More information

Premature Storm Drainage System Repairs and Replacement

Premature Storm Drainage System Repairs and Replacement Premature Storm Drainage System Repairs and Replacement Stewart Edwards Program Manager Design Management Team Charlotte-Mecklenburg Storm Water Services April 8, 2015 Date Agenda Storm Water Infrastructure

More information

5.14 Floodplains and Drainage/Hydrology

5.14 Floodplains and Drainage/Hydrology I-70 East Final EIS 5.14 Floodplains and Drainage/Hydrology 5.14 Floodplains and Drainage/Hydrology This section discusses floodplain and drainage/hydrology resources and explains why they are important

More information

Rehabilitation or Replacement? That Is The Question

Rehabilitation or Replacement? That Is The Question Rehabilitation or Replacement? That Is The Question Chris L. Windley PE Greg Anderson, PE 94th Annual Conference November 18, 2014 Overview Project Background Existing Sewer Condition Flow Projections

More information

DRAINAGE :: DRAINAGE CONCERN FREQUENTLY ASKED QUESTIONS

DRAINAGE :: DRAINAGE CONCERN FREQUENTLY ASKED QUESTIONS DRAINAGE :: DRAINAGE CONCERN FREQUENTLY ASKED QUESTIONS The City of DeSoto s Department of Development Services is the point of contact for storm drainage related issues. The following are some frequently

More information

TOWN OF HARRISBURG FIRE DEPARTMENT 6450 Morehead Road, Harrisburg North Carolina 28075 Phone: 704 455 3574 Fax 704 455 6391 www.harrisburgfd.

TOWN OF HARRISBURG FIRE DEPARTMENT 6450 Morehead Road, Harrisburg North Carolina 28075 Phone: 704 455 3574 Fax 704 455 6391 www.harrisburgfd. FLOOD FACTS AND SAFETY TIPS Floods are one of the most common hazards in the United States. Flood effects can be local, impacting a neighborhood or community, or very large, affecting entire river basins

More information

The Evolution of Watertight Storm Drainage Systems John M. Kurdziel, P.E. (Member)

The Evolution of Watertight Storm Drainage Systems John M. Kurdziel, P.E. (Member) The Evolution of Watertight Storm Drainage Systems John M. Kurdziel, P.E. (Member) A-LOK Products, Inc. INTRODUCTION Watertight pipe and structures have historically only been considered with sanitary

More information

foundation designed to keep water out of the basement.

foundation designed to keep water out of the basement. Preventing Sewer Backups To safeguard your home against flooding from sewer backups, you should understand your home's basic plumbing and the preventative techniques discussed in this brochure. Basement

More information

SECTION 724 PIPE CULVERTS

SECTION 724 PIPE CULVERTS SECTION 724 PIPE CULVERTS 724.1 Description. This work shall consist of providing pipe or pipe arch of the diameter or shape designated, laid upon a firm bed and backfilled as specified. Where appropriate

More information

At the end of today s seminar you should be better. Recognize the causes of Sewer Lateral backup. Identify techniques to protect your home from

At the end of today s seminar you should be better. Recognize the causes of Sewer Lateral backup. Identify techniques to protect your home from Preventing Sewer Backups Presented by IAPMO Today s Objectives At the end of today s seminar you should be better able to: Recognize the causes of Sewer Lateral backup Identify techniques to protect tyour

More information

Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing

Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing 1 Most basements show some signs of leaking and cracking. Through the years, problems with water, poor soils, grading, drainage and possible settling affect the integrity of a basement. Being able to recognize

More information

Moving Small Mountains Vesuvius Dam Rehab

Moving Small Mountains Vesuvius Dam Rehab Moving Small Mountains Vesuvius Dam Rehab Susan L. Peterson, P.E., regional dams engineer, Eastern Region, Bedford, IN Note: The following article, Moving Small Mountains Vesuvius Dam Rehab, by Sue Peterson,

More information

Protect Your Home From Flooding. A guide for Lethbridge Residents

Protect Your Home From Flooding. A guide for Lethbridge Residents Protect Your Home From Flooding A guide for Lethbridge Residents Every year, millions of litres of water flow into the City of Lethbridge s stormwater and wastewater collection systems from residential

More information

ANTERO DAM REHABILITATION PHASE III

ANTERO DAM REHABILITATION PHASE III Introduction and Background ANTERO DAM REHABILITATION PHASE III Denver Water s Antero Dam is a high hazard dam located near the headwaters of the South Fork of the South Platte River near Hartsel, Park

More information

4.4.4 Alum Treatment System

4.4.4 Alum Treatment System 4.4.4 Alum Treatment System Limited Application Water Quality BMP Description: Alum treatment systems provide chemical treatment of stormwater runoff by means of adding liquid aluminum sulfate (alum) to

More information

Lighthouse Engineering, L.L.C.

Lighthouse Engineering, L.L.C. Registered Engineering Firm (F: 9334) Phone: 214-577-1077 Fax: 214-224-0549 Website: www.lighthouseeng.com Email: Office@LighthouseEng.com Thursday, September 04, 2014 TO: Our Client RE: Initial Engineering

More information

Vermont Economic Resiliency Initiative (VERI) Community Forum Barre City & Barre Town

Vermont Economic Resiliency Initiative (VERI) Community Forum Barre City & Barre Town Vermont Economic Resiliency Initiative (VERI) Community Forum Barre City & Barre Town MEETING NOTES April 16, 2015 6:00 8:00 PM VERI Project Overview With funding from the US Economic Development Administration

More information

DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY. a guide to PREVENTING SEWER BACKUPS AND FLOODING

DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY. a guide to PREVENTING SEWER BACKUPS AND FLOODING DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY a guide to PREVENTING SEWER BACKUPS AND FLOODING Sewer backups and flooding can damage District homes and businesses. Sewer blockages are most commonly found

More information

SECTION 33 41 13 PUBLIC STORM UTILITY DRAINAGE PIPING

SECTION 33 41 13 PUBLIC STORM UTILITY DRAINAGE PIPING SECTION 33 41 13 PUBLIC STORM PART 1 - GENERAL 1.01 SECTION INCLUDES A. Storm drainage piping, fittings, and accessories at proposed station areas and locations other than under and immediately adjacent

More information