1 Ministry of Environment WEEE/E-WASTE BUSINESS MODEL Prepared by the Ministry of Environment (MoE) Supported by UNEP-DTIE OCTOBER 2009

2 Table of Contents Executive Summary... 2 CHAPTER 1: INTRODUCTION & BACKGROUND Introduction Project on Waste Electronic and Electric Equipment/ E-waste Management in Phnom Penh City Project Objectives Approach and Methodology Outcome Format of Report CHAPTER 2: BUSINESS MODEL AND STRATEGIC ANALYSIS Introduction Basis for Development of Business Model Business Model SWOT Analysis PPP based E-waste business model in Combodia CHAPTER 3: RECOMMENDATIONS AND TIME LINE Recommendations General Recommendations Steps involved in Implementation of Business Model List of Tables Table 2.1: Project Risk Profile Table 2.2: Established European WEEE Schemes (EU/EEA): Flexibility of Cost Models Table 2.3: SWOT Analysis Table 2.4: Summary Mapping of model versus instruments/incentives List of Figures Figure 2.1: Financial Model of Netherlands NVMP A Collective EU Collective Compliance System Figure 2.2: Financial Flow Model of Japanese E-waste Take back System A Consumer/Retailer based system Figure 2.3: Financial Flow Model of Swiss E-waste

3 Executive Summary E-waste inventory ranges from 6792 metric tons in 2008 to 22,443 metric tons in It is expected to grow exponentially with a significant correlation during the next decade both in terms of numbers and weight. In terms of numbers E-waste from mobile phones is expected to grow at a higher rate followed by TVs, PCs, refrigerator, air conditioners and washing machine. This will form the basis of planning for product wise intervention. In terms of weight, E-waste from TV is expected to grow at a higher rate followed by PCs, refrigerator, air conditioners, washing machine and mobile phones. The E-waste inventory projections both in numbers and weight show significant growth starting from the year 2012 onward. It gives policy planners, implementers and other stakeholders three years to plan and implement future interventions starting from the year 2009.From the regulatory perspective, definition of electrical and electronic equipment is not covered under the existing regulations. One of the major gaps, which have been identified, is the lack of clear definition of E-waste under existing regulations. There is a need to cover E-waste either under existing regulations or a separate regulation depending on the time frame and capacity of regulatory agencies to implement it. Since draft 3R strategy is being formulated in the country, E-waste can also be brought under its purview so that necessary regulatory interventions can be planned and implemented. The E-waste trade value chain consisting of stakeholders implementing twelve processes indicates that future interventions are required at level 1 and level 2 consisting of primary E-waste generators and secondary E-waste generator. Considering the 1 st and 2 nd level E-waste treatment, plant specifications have been defined and financial viability has been assessed. The volume of E-waste item to be collected and transported till 2020 based on E-waste inventory estimates in Phnom Penh ranges from 4490 m 3 to m 3 for washing machine, 5140 m 3 to 6925 m 3 for personal computers, 9m 3 to 46m 3 for mobile phones, 2918 m 3 to 9573 m 3 for refrigerator, 1458 m 3 to 5976 m 3 for Air Conditioners and 1557 m 3 to 2618 m 3 for washing machine. This is based on 50% availability of E-waste for recycling. Depending upon the type of E-waste, different types of bins/ cages have been identified and recommended. The collected E- waste in container will be lifted manually, through fork lifts, placed into small trucks/ container carriers and transported from the collection facility to E-waste treatment facility. Depending on the collection efficiency and availability of the input raw material, the facility can start with one shredder of half the capacity followed by the second. There is huge variation in the prices of the treatment system starting from US$ to US$ 3.1 million depending on type of technology. The output from the E-waste recycling system will be sold/ exported to metal recyclers outside Cambodia. E-waste export market is expected to follow the same trend as that of global market for precious metals. The analysis of the price graphs indicates that metal market peaks and bottoms out in a ten year period. E-waste purchase price in PPM has ranged from US$ 1/kg to US$ 4/kg during the last ten year period. A financial analysis for the 7500 tons per annum E-waste recycling facility in PPM has been carried out based on capital and operating cost estimates, local land prices, labor costs, customs duty, equipment costs, electricity costs and current interest rates. It has been proposed that the capital costs will be in the form of debt and equity in a ratio of 70:30. The financial viability indicators e.g. IRR shows viability of the project. NPV is positive and decreases with high cost of capital. But the financial indicators are not strong enough to attract private investment because IRR value is much lower than 25% and payback period is 5 years. The project is most sensitive to land prices followed by interest rates, and customs duty. This analysis also indicates that if lower quantities of PC are dismantled then financial viability goes down 2

4 significantly. It shows that for waste white goods treatment and disposal, the combination of incentives should be higher. Financial viability is also sensitive to price fluctuations i.e. prices with respect to both input raw material as well as output. A comparative analysis of financial analysis indicators shows that viability improves with the improved capacity utilization. Capacity utilization depends upon the availability of the raw material. In order to make the project more viable an efficient E-waste collection and transportation system and a set of incentives like lower interest rate or duty exemption or subsidy on land may be planned. These measures need to be implemented in the form of a business model. The key elements, which form the basis of development of business model include risk profile of the project, financial viability of the project and consumer behavior. The major risks of medium to high intensities, which have been identified, are given below. 1. Risks due to lack of definition of E-waste in existing regulations 2. Risks due to part inclusion of E-waste in existing Waste Rules 3. Risks due to lack of harmonization of E-waste in Export/ Import rules 4. Risks of availability of raw material 5. Risk associated with collection 6. Risk associated with competition 7. Type of raw material/ input to E-waste recycling system 8. Scale of operation 9. Expected yield/ output 10. Price Risks Risks 1 to 3 are related to policy and regulatory level interventions. Risks 4 to 6, 10 are related to market and logistics interventions. Risks 7 to 9 are related to technology level interventions. Consumer behavior reflects the attitude of the consumer for E-waste management. It has been well established that consumers want value of their E-waste and may prefer exchange schemes where retailers offer them discounted price of the brand new item in exchange of their old electrical and electronic equipment. The three different types of E-waste business models, which can be implemented, are described below. 1. Conventional E-waste Recycling Model 2. Public Private Partnership (PPP) based E-waste Business Model 3. Extended Producer Responsibility Based Business Model The analysis of the above three models indicates that there are three mechanisms for E- waste management out of which two mechanisms are at extreme levels i.e. conventional E-waste recycling model and EPR based business model. Strength, Weakness, Opportunities and Threat (SWOT) analysis of these two extreme mechanisms has been carried out to understand the applicability under the current business environment. The common points, which can be inferred from this analysis, are given below. 1. Regulatory intervention is required in implementation of both the models. 2. Government participation will boost the implementation of both the models. 3. Potential of leakage exists in both the systems i.e. they are not foolproof system. Though EPR system offers the potential of reduction of leakage of waste to informal sector, it is also not 100% foolproof. The recent EU report 3

5 on the implementation of WEEE directive in member countries clearly states the gap in WEEE collection efficiency. The major point of difference in the implementation of the two models is the money flow i.e. who pays whom. In Combodian context, the EPR system will lead to a complete shift in consumer behavior. The existing consumer, which is used to receive the best salvage value of their E-waste, will start giving it free of cost and start paying Recycling Fee at the same time. The major barriers, which are expected to implement this system, are given below. 1. Is the consumer ready at the moment to adopt the system or shift in attitude? 2. If yes, then what is the time line for implementation? 3. Does the regulatory monitoring system have capacity to monitor this system? 4. Who will be responsible for leakages and implementation of penal provisions? 5. Who will be responsible for ownership of imported E-waste seized at the point of entry in the country? 6. How many E-waste recycling facilities will be viable under this system and how the E-waste collection and transportation system will be organized considering intra province or province state issues? A summary mapping of the sensitivity analysis versus the three models shows that a clear trade off exists between the government participation in terms of land/ subsidy/ customs duty & octroi waiver/ income tax rebate/ interest rate rebate on one hand and input raw material cost, rights to sell recovered material and recycling fee on the other hand. The timing of this trade off can be linked to time taken to shift consumer behavior. This provides the basis for either supporting the recyclers for a particular period of time or lead to development of PPP model for E-waste management. Though Combodia has no experience of implementing PPP models in infrastructure sector, the proposed E-waste recycling project can be formulated and implemented along the PPP mechanism. The salient features of this proposed model is given below. 1. The project should fall under the category of urban infrastructure. In case, it is not included in this category then efforts should be made to included it under urban infrastructure category. 2. Any statutory/ government agency can become partner in the project both in terms of provision of land on concession basis and/ or equity partnership % to 40% of the project cost can be contributed by the government in order to make it viable. 4. User Fee or Service Fee can be in the form of annuity transferred from the government to the recycling project operators every year. This annuity can be transferred by the authorized government agency in proportion to the recycled E-waste by recycler every year. The mechanism for implementation includes recovery of the user fee at the point of sale can be transferred to a fund specially created for E-waste recycling. This fund can be managed by the government agency or an independent fund manager. Money from this fund can be transferred to the recycler as per approved annuity based on statement of accounts submitted by the recycler to statutory entity. PPP model can provide ideal solution at the time when the E-waste management is entering into implementation 4

6 stage where the situation appears to be in transition. One of the major advantage of this mechanism could be that this user fee can be levied at the time of sale of brand new electrical and electronic equipment and transferred to the same fund in case of EPR regime. The management of the fund can also be transferred to an independent fund manager under EPR regime. The timing of this transfer will be in line with PPP contract conditions, when government wants to exit out of the model and transfer all its roles and responsibilities to an entity in EPR regime. A rough estimate of this exit could be after eight to ten years depending upon the financial indicators, when the E-waste recycling facility becomes profit generating entity. 5

7 CHAPTER 1: INTRODUCTION & BACKGROUND 1.0 Introduction Basel Convention s, Report on the Survey of the Import and the Environmentally Sound Management of Electronic Wastes in the Asia-Pacific Region, stated that E-waste release per annum is roughly 276 units of computer, 2,760 units of TV sets, 5,520 units of mobile phones and 690 units of fixed phones. This report also indicates that there is a rapid increase in the import of electronic equipment in the country. Moreover, with rapid increase in internet and information technology penetration and decrease in the retail prices of EEE, their end of life is getting reduced. Therefore, a need was identified to carry out due diligence as part of preparatory work for developing E-waste action plan for Cambodia. As a next step, the MoE of KoC got support from SBC and MoE of Japan, to implement the project Environmentally Sound Management of Electrical and Electronic Waste in Cambodia in A technical field study was conducted by local NGO, namely, Cambodia Environment Association (CEA) in a selected sample of provinces and cities that have different socio-economic conditions of high, medium and low income families in order to prepare a detailed E-waste inventory in the country. This study was carried out under supervision of the MOE of Cambodia, MoE of Japan and EX Corporation. The study items included E-waste from TV, computer, air-conditioners, mobile phone, refrigerator and washing machines. The major findings of this study included E-waste estimation as of 2007, which consisted 40, kg from TV, 13, kg from airconditioners, 2, kg from mobile phones and 1, kg from personal computers. It was also found that major quantities of E-waste are generated in Phnom Penh City. Further, the study indicated usage of low repairing/dismantling technology with inappropriate facilities in study areas, which threaten the environment and public health. In Phnom Penh, many small family workshops, within houses, have been established to recover reusable and recyclable materials from E-waste without proper precautions. The residual E-waste is disposed off as municipal solid waste in bins and landfill sites. Since EEE contain hazardous materials, these family level operations create a direct risk to workers and their families, to the community and to the environment, especially due to release of hazardous substances in soil, water and air. In order to achieve improved environmental conditions and high economic values from E-waste prior to its disposal, a pilot project is being planned in Phnom Penh since this city is considered to largely generate E-waste than other provinces and cities in Cambodia. 1.1 Project on Waste Electronic and Electric Equipment/ E-waste Management in Phnom Penh City Based on the current situation of E-waste handling in Phnom Penh, a comprehensive pilot project is designed to build the local capacity for proper E-waste management, including recovery of valuable materials. The local capacity building effort is aimed at national and local government level including small businesses and private sector. In this regard, MoE, Government of Cambodia has received a support from UNEP-DTIE-IETC to implement the project, E-waste Management in the Phnom Penh Municipality. The project has started in earlier 2009, after the official signing by the representatives of MoE and UNEP-DTIE-IETC. 6

8 1.2 Project Objectives The objective of the proposed project is to formulate, design and implement an integrated WEEE/E-waste management pilot project in PPM. After augmentation of local capacity, the level of effort could be scaled up to the national level and replicated in other countries. Specific objectives of the proposed pilot project are given below. Build the national and local capacity in Cambodia on inventorization and management of E-waste by undertaking various activities, including the inventory of E-waste and a pilot project to process E-waste in and environmentally sound manner with optimum level of recovery for recycling. Bring out the guidelines and training materials for dissemination for other developing countries to replicate similar projects and capacity building process. 1.3 Approach and Methodology The capacity building is designed for government institutions, private sector and local NGO. The current capacity building effort is being targeted in two major areas i.e. E- waste inventorization and E-waste management. UNEP has already produced two volumes of E-waste Manual. The first volume provides guidelines for E-waste inventorization, while second volume provides guidelines for E-waste Management. This project will utilize these manuals as part of their comprehensive approach and methodology as described below: Activity 1: Inventory of E-waste Assessment of the Phnom Penh City with respect to generation of E-waste from various sources (residential, commercial, industrial, inter-city, etc.) Establishment of Material flow with respect to E-waste generation in Phnom Penh City and identification of stakeholders Quantification and characterization of E-waste in Phnom Penh City, including quantity of various types as well as characterization of each type of E-waste Technical assistance to institutionalize E-waste inventory and its updating with Phnom Penh City Government Output: Activity 2: Report on current inventory and future projections of WEEE/ E-waste and mechanism for its update. Study of E-waste recycling structure Study of E-waste recycling/ other recycling infrastructure (formal/informal) and its capacity Study of E-waste toxic footprint by inventorizing E-waste recycling sites in case recycling occurs in informal sector in Phnom Penh City Study of the feasibility of the level of treatment of E-waste in formal sector in Phnom Penh City Output: Status report on existing recycling system and its capacity. 7

9 Activity 3: Design of pilot project for E-waste storage, collection and transportation system Study of consumer behavior for E-waste storage, collection, transportation and disposal in Phnom Penh City Study of existing infrastructure for storage, collection and transportation system in Phnom Penh City Pilot testing of E-waste storage, collection and transportation system using existing infrastructure Output: Activity 4: Output: Activity 5: Output: Feasibility report on E-waste collection and transportation system. Identification of best practices and enabling policy/ regulatory requirement to ensure E-waste management including collection, transportation, and treatment and disposal system includes possibilities of public private partnership Feasibility report on a model E-waste management. Identification of stakeholders (manufacturing industry) and initiating a dialogue with them to involve them in future work related to EPR/e-design of key electronic components (e.g. computers keyboard manufacturers) Stakeholders Workshop and Report Activity 6: Dissemination of the project experiences, including guidelines and E- waste Plan for Phnom Penh City, at national level. This will help other cities to develop their own plans based on local data Output: National Workshop and Report 1.4 Outcome The outcome of activities 1, 2 and 3 has lead to development of E-waste inventory, collection, transportation, treatment and viability of an E-waste management system in PPM. E-waste inventory ranges from 6792 metric tons in 2008 to 22,443 metric tons in It is expected to grow exponentially with a significant correlation during the next decade both in terms of numbers and weight. In terms of numbers E-waste from mobile phones is expected to grow at a higher rate followed by TVs, PCs, refrigerator, air conditioners and washing machine. This will form the basis of planning for product wise intervention. In terms of weight, E-waste from TV is expected to grow at a higher rate followed by PCs, refrigerator, air conditioners, washing machine and mobile phones. This will form the basis of planning for any collection, transportation and recycling facility in future. In terms of E-waste fractions, the availability of iron ranges from 3079 tons to 7249 tons followed by glass, which ranges from 1344 tons to 7277 tons. Plastic availability ranges from 1190 tons to 4091 tons while non-iron metal, which constitute precious metals and other metals like copper, lead etc. ranges from 607 tons to 1991 tons. The availability of electronic component ranges from 618 tons to 1690 tons while others range from 536 tons to 1558 tons. The E-waste inventory projections both in numbers and weight show significant growth starting from the year 2012 onward. It gives policy planners, implementers and other stakeholders three years to plan and implement future interventions starting from the year

10 From the regulatory perspective, definition of electrical and electronic equipment is not covered under the existing regulations. One of the major gaps, which have been identified, is the lack of clear definition of E-waste under existing regulations. There is very little difference between definition of used EEE and E-waste. Role of collector/ transporter is defined only in the context of hazardous waste and solid waste. There is no specific definition of generator or producer of E-waste. However, definition of importer of Used EEE is mentioned in the existing regulation. There is a need to cover E-waste either under existing regulations or a separate regulation depending on the time frame and capacity of regulatory agencies to implement it. Since draft 3R strategy is being formulated in the country, E-waste can also be brought under its purview so that necessary regulatory interventions can be planned and implemented. EEE market in PPM is organized in three different types of market segments i.e. shops selling brand new EEE, shops selling brand new as well as second hand EEE and shops selling second hand EEE. The majority of EEE market in PPM is organized in mixed market conditions with shops selling a combination of new and second hand items and shops selling second hand items. The market share of second hand EEE is increasing every year, although, some of brand-new items are cheaper. Consumers prefer branded EEE even when it is second hand. Shops selling second hand EEE have multiple functions of selling, repairing, refurbishing and dismantling. Geographically, it is organized in different hubs catering to ICT and white goods sector. It is observed that the major hubs of AC refurbishing / dismantling also serve as major hubs for refrigerator refurbishing/ repair and dismantling. Major hubs for TV and PC are located at different places. However, hubs at Chamkamorn and Toul Kok serve as two major hubs for TV and PCs. Chamkamorn, Toulkok and Meanchay also serve as major repairing/ refurbishing centre for washing machine. Therefore, four functions can be geographically addressed at one place while considering future interventions. There are twelve processes, which need to be considered for environmentally sound management while planning for future interventions since no chemical processing is occurring within municipal boundary of PPM. The E-waste trade value chain consisting of stakeholders implementing twelve processes indicates that future interventions are required at level 1 and level 2 consisting of primary E-waste generators and secondary E-waste generator. Considering the 1 st and 2 nd level E-waste treatment, plant specifications have been defined and financial viability has been assessed. The volume of E-waste item to be collected and transported till 2020 based on E-waste inventory estimates in Phnom Penh ranges from 4490 m 3 to m 3 for washing machine, 5140 m 3 to 6925 m 3 for personal computers, 9m 3 to 46m 3 for mobile phones, 2918 m 3 to 9573 m 3 for refrigerator, 1458 m 3 to 5976 m 3 for Air Conditioners and 1557 m 3 to 2618 m 3 for washing machine. This is based on 50% availability of E-waste for recycling. Depending upon the type of E-waste, different types of bins/ cages have been identified and recommended. The collected E- waste in container will be lifted manually, through fork lifts, placed into small trucks/ container carriers and transported from the collection facility to E-waste treatment facility. Depending on the collection efficiency and availability of the input raw material, the facility can start with one shredder of half the capacity followed by the second. There is huge variation in the prices of the treatment system starting from US$ to US$ 3.1 million depending on type of technology. The output from the E-waste recycling system will be sold/ exported to metal recyclers outside Cambodia. E-waste export market is expected to follow the same trend as that of global market for precious metals. The analysis of the price graphs indicates that metal market peaks and bottoms out in a ten year period. E-waste purchase price in PPM has ranged from US$ 1/kg to US$ 4/kg 9

11 during the last ten year period. A financial analysis for the 7500 tons per annum E-waste recycling facility in PPM has been carried out based on capital and operating cost estimates, local land prices, labor costs, customs duty, equipment costs, electricity costs and current interest rates. It has been proposed that the capital costs will be in the form of debt and equity in a ratio of 70:30. The financial viability indicators e.g. IRR shows viability of the project. NPV is positive and decreases with high cost of capital. But the financial indicators are not strong enough to attract private investment because IRR value is much lower than 25% and payback period is 5 years. The project is most sensitive to land prices followed by interest rates, and customs duty. This analysis also indicates that if lower quantities of PC are dismantled then financial viability goes down significantly. It shows that for waste white goods treatment and disposal, the combination of incentives should be higher. Financial viability is also sensitive to price fluctuations i.e. prices with respect to both input raw material as well as output. A comparative analysis of financial analysis indicators shows that viability improves with the improved capacity utilization. Capacity utilization depends upon the availability of the raw material. In order to make the project more viable an efficient E-waste collection and transportation system and a set of incentives like lower interest rate or duty exemption or subsidy on land may be planned. These measures need to be implemented in the form of a business model. 1.5 Format of Report This report describes the E-waste business model after completion of activity 4. The report consists of three chapters. Chapter 1 gives background information, approach and methodology used, training and its outcome and format of the report. Chapter 2 describes business model and strategic analysis. Chapter 3 describes recommendations and timeline. 10

12 CHAPTER 2: BUSINESS MODEL AND STRATEGIC ANALYSIS 2.0 Introduction This chapter describes the basis of business model, description of business model followed by strategic analysis on the application of the model. Further, recommendations have been formulated including time line for implementation of the recommendations. 2.1 Basis for Development of Business Model The key elements, which form the basis of development of business model, are given below. a. Risk profile of the project b. Financial Viability of the project c. Consumer Behavior Risk Profile The cumulative risk profile of the entire project is summarized in table 2.1. Table 2.1: Project Risk Profile Factors/ Intensity High Medium Low Regulatory Risks Risks due to lack of definition of E-waste in existing regulations Risks due to part inclusion of E-waste in existing Waste Rules Risks due to lack of harmonization of E- waste in Export/ Import rules Market Risks Risks of availability Short term of raw material Long term Risk associated with Short term collection Long term Risk associated with Short term transportation Long term Risk associated with Short term competition Long term Technology Risks Type of raw material/ input to E-waste recycling system Scale of operation Expected yield/ output Experience of technology supplier Environmental Issues Price Risks 11

13 The major risks of medium to high intensities, which have been identified, are given below. 11. Risks due to lack of definition of E-waste in existing regulations 12. Risks due to part inclusion of E-waste in existing Waste Rules 13. Risks due to lack of harmonization of E-waste in Export/ Import rules 14. Risks of availability of raw material 15. Risk associated with collection 16. Risk associated with competition 17. Type of raw material/ input to E-waste recycling system 18. Scale of operation 19. Expected yield/ output 20. Price Risks Risks 1 to 3 are related to policy and regulatory level interventions. Risks 4 to 6, 10 are related to market and logistics interventions. Risks 7 to 9 are related to technology level interventions. Financial Viability Under the existing policy and regulatory regime, financial analysis has been carried out by factoring in risks 4 to 10. Financial viability has been assessed in terms of internal rate of return (IRR), net present value (NPV), payback period and their sensitivity with respect to different interventions. The salient features of this analysis are given below. 1. Project IRR indicates that the project is capital intensive. Though IRR, NPV are positive, they are not high enough to attract financial investment from private sector. 2. If the land is allocated at subsidized rate or comes free then maximum increase in project IRR is deserved. 3. In case interest rates decrease then project IRR increases. 4. If customs duty on equipment is not levied then project IRR increases. Consumer Behavior Consumer behavior reflects the attitude of the consumer for E-waste management. It has been well established that consumers want value of their E-waste and may prefer exchange schemes where retailers offer them discounted price of the brand new item in exchange of their old electrical and electronic equipment. 2.2 Business Model The three different types of E-waste business models, which can be implemented, are described below. 4. Conventional E-waste Recycling Model 5. Public Private Partnership (PPP) based E-waste Business Model 6. Extended Producer Responsibility Based Business Model 12

14 Conventional E-waste Recycling Model Conventional recycling model is based on recycling of E-waste purchased by recycler from generator. The entire model is based on conventional business model, where recycler recovers money by selling by selling the products. The salient features of existing model are given below. 1. Recycler establishes E-waste recycling facility. 2. Recycler purchases input raw material from the E-waste generators. 3. Recycler recovers money by selling the E-waste fractions/ final product to smelters. 4. Recycler has its own collection and transportation system for input raw material. 5. Recycler finances the entire cost of collection, transportation and recycling through its own resources or through loans. Recycler can avail of existing incentives available for industrial promotion offered by different government agencies. However, the application of these schemes is dependent on classification of this type of business activity. Public Private Partnership Business Model Project on Public Private Partnership (PPP) Project model is based on a contract or concession agreement, between a Government or statutory entity on the one side and a private sector company on the other side, for delivering an infrastructure service on payment of user charges. Therefore, government participates to mitigate risks in order to promote infrastructure services. The features of this model are described in terms of definitions, eligibility criteria and government support as given below. Definitions 1. Private Sector Company means a company in which 51% or more of the subscribed and paid up equity is owned and controlled by a private entity. 2. Lead Financial Institution means the financial institution (FI) that is funding the PPP project, and in case there is a consortium of FIs, the FI designated as such by the consortium. 3. Total Project Cost means the lower of the total capital cost of the PPP Project: (a) as estimated by the statutory entity that owns the project, (b) as sanctioned by the Lead Financial Institution, and (c) as actually expended; but does not in any case include the cost of land incurred by the government/statutory entity; 4. Viability Gap Funding or Grant under this model means a grant one-time or deferred, provided under this Scheme with the objective of making a project commercially viable. Eligibility (a) The project shall be implemented i.e. developed, financed, constructed, maintained and operated for the Project Term by a Private Sector Company to be selected by 13

15 a statutory entity through a process of open competitive bidding;. (c) The project should provide a service against payment of a predetermined tariff or user charge. (d) The concerned statutory entity should certify, with reasons; (i) (ii) (iii) that the tariff/user charge cannot be increased to eliminate or reduce the viability gap of the PPP; The Project Term cannot be increased for reducing the viability gap; and The capital costs are reasonable and based on the standards and specifications normally applicable to such projects and that the capital costs cannot be further restricted for reducing the viability gap. Statutory Support (1) The total Viability Gap Funding under this scheme shall not exceed a certain percent of the total project cost. (2) Viability Gap Funding under this scheme will normally be in the form of a capital grant at the stage of project construction. In this model, the recovery of the revenue for the services rendered is dependent on the user fee, which in case of E-waste management could be recycling fee, which may be recovered from the consumer. Extended Product Responsibility Based Business Model The entire business model in Europe is based on Extended Producer Responsibility, where the producing organizations are responsible for E-waste take back and treatment. The business model is an integrated model consisting of E-waste collection, transportation and treatment. The conceptual guidance for financing each of these schemes has been provided by EU directive. These guidance features as per EU directive are given below. 1. Producers are responsible for the costs of picking up E-waste from collection facilities and for refurbishing waste products for reuse or for recycling and recovery. 2. When producers put a new product on the market, they must provide a financial guarantee that waste management of the product will be paid for. Producers can get waiver on this guarantee by participating in a producer responsibility organization (PRO), paying recycling insurance, or setting up a special bank account for this purpose. ICT sector and brown and white goods sector have different preferred business models with regard to E-waste management. In Europe, brown and white goods producers are comfortable with the schemes set up to address brown and white goods, while the IT producers are comfortable with those schemes set up to address IT goods. The major difference in business model lies in the method of charging fee/ money for E-waste management. The fee structure consists of different options. These options include actual costs of recycling, projected costs of recycling per category and cross subsidization. Cross subsidization occurs if the fee charged on one category of E-waste 14

16 is higher than its recycling costs. The differential is used to pay for the recycling of another category of E-waste, whose recycling costs are higher than the fee charged. Table 2.2 gives an example of fee structure. Table 2.2: Established European WEEE Schemes (EU/EEA): Flexibility of Cost Models Scheme Recupel (Belgium) NVMP (The Netherlands) ICT Milieu (The Netherlands) EI Retur (Norway) EI Kretsen (Sweden) SWICO (Switzerland) Number Type of Cost Allocation of Cost Models 1 Fixed Fee Model All categories. 1 Fixed Fee Model Certain categories excluded 1 Debiting Model ICT products. Real costs are calculated on a month-by-month basis and divided amongst members on a market share basis, calculated monthly. 3 Fixed Fee Model (EE Bransjen) According to type and volume of product placed on market (Brown Goods). ICT Model (IKT Retur/IT Retur) Actual Costs are calculated month by month and divided amongst members on a current market share basis. Fixed Fee Customer Model White Goods (Hvitevareretur). A fee is levied by customs on import and passed to PRO Spell out what it means! 3 Debitting Model Preliminary Cost. A preliminary cost (per unit, per kg or % of sales values) is fixed for the year. These fees are compared against actual costs at year-end and difference settled.. Debitting Model ICT products. Real costs are calculated on a month-by-month basis and divided amongst members on a market share basis, calculated on the preceeding year. Costs per unit will therefore vary on a month-by-month basis. Other Debitting Model. Special fixed fee debiting models have been developed for specific product groups e.g. light bulbs (2500 SEK per year). 2 Fixed Fee Models: ICT Products. Fixed fee tariff banded according to sales price. 12 fee bands with no fee for products under 50CHF. Fixed Fee Model: Consumer Electronics/Photographic. Fixed tariff according to product category. 5 fee levels with no fee for price below 50 CHF. Funding for supply chain The fee charged catalyses financial flow along the E-waste supply chain. This financial flow meets the costs of E-waste collection, transportation and treatment. Examples of funding of E-waste stakeholders along the supply chain in Netherlands, Japan and Switzerland are shown in figure 2.1, figure 2.2 and figure 2.3. The salient features of Netherlands NVMP (PRO) supply chain model are given below: 15

17 1. Producers/ Importers pay NVMP to manage their E-waste responsibilities under Dutch legislation. A fixed fee is paid to NVMP for each product placed on the market. This fee is passed on to the consumer with no mark up. The scheme covers household E-waste. 2. Households pay a visible fee on the purchase of new EE products. Households also pay a local municipal waste tax to fund general waste collection and operation of municipal sites. Households may return E-waste free of charge to municipal collection sites. Municipalities provide some kerbside collection. Households may also return E-waste to a retailer/distributor free of charge on the basis of 1:1 new for old purchase. Retailers may charge for collection of the old product from household. 3. Retailers are obliged to take back E-waste on a new for old basis from consumers. They may then transfer the E-waste to a municipal waste site, direct to the regional sorting stations (RTS) or pay for collection by NVMP. 4. Municipal collection sites receive E-waste and take responsibility for delivery to regional sorting stations operated by the municipalities and NVMP. Municipalities are not reimbursed. 5. Regional sorting stations receive E-waste free of charge and sort for collection and treatment. NVMP makes a financial contribution to the operation of RTS. 6. Transport contractors are responsible for the collection of E-waste from the RTS and delivery to treatment plants and recycling firms. Contractor invoices on the basis of weight. Logistics are organized in house by NVMP. 7. Treatment and recycling contractors take receipt of E-waste and process. Contractors invoice NVMP on the basis of actual treatment costs. The salient features of Japanese supply chain model are given below: 1. Consumers pay an end-of-life fee for product disposal and treatment as opposed to the producer responsibility concept in the E-waste Directive. This fee is paid to the retailer, and passed on to one of two industry consortia who are responsible for the collective management of E-waste in the specified categories. 2. Retailers are obliged to take back goods on a new for old basis. This applies both to replacement products, but also to products from non-identical product categories. It is estimated that 80% of waste is currently collected through the retail stream. 3. The Association for Electric Home Appliances (AEHA) is a trade group responsible for orphan products. Some collection services are also subcontracted to AEHA, who operate in isolated or rural areas not served by retailers. 4. Each Industry Consortium manages approximately 200 consolidation and bulking centres across Japan. These are privately owned and managed, although 16

18 retailers, local government or another designated organisation is obliged to deliver goods from the retailer. 5. Each consortium operates approximately 12 treatment centres for different project types and groups. Transport from the consolidation to treatment centres is outsourced. The Swiss system is based on EPR, both legally and operationally i.e. producers and importers are both physically as well as the financially responsible for an environmentally sound disposal of E-waste. The salient features of Swiss E-waste supply chain model are given below: 1. The entire operative responsibility is shared with the two PROs SWICO and S.EN.S, who manage and operate the system on behalf of their member producers. 2. Secured financing of the collection and recycling is ensured by way of the Advance Recycling Fee (ARF) charged on all new appliances. The ARF is used to pay for the collection, the transport and the recycling of the disposed appliances. The ARF can range from a minimum CHF (Swiss franc) 1 on small items, such as hair dryers and electric shavers, to up to CHF 20 for TVs or CHF 40 for refrigerators. Both SWICO and S.EN.S have distinct categories of products according to the approximate cost of recycling them. It is seen that the largest portion of the ARF goes to the recyclers. 3. The Swiss ARF is an intergenerational contract between appliances purchased in the past and those that will be purchased in the future, similar to a pension system. Therefore, it requires accurate estimations of how much waste will be generated and how many new products will be sold. 4. SWICO and S.EN.S have official collection points around Switzerland in addition to the thousands of retail locations which have to take back old equipment free of charge, irrespective of the brand or year of manufacture. It becomes easier for consumers to dispose their E-waste at appropriate locations. 5. By having common collection points, the PROs are better able to manage logistics, benefit from economies of scale and provide a consumer friendly, allinclusive solution instead of a prohibitively expensive brand specific one. 6. Both material and financial flows are controlled at every stage, as shown in figure 2.3. The independent controls not only deter free riders, but also give credibility to the entire system. It also ensures participation of retailers and consumers. Financial guarantee Producers have to provide a financial guarantee for fulfillment of their take back obligation for electrical and electronic products placed on the national market after the effective date of the local legislation (so called New waste ) by giving evidence of a guarantee (e.g. blocked bank account/insurance) for future E-waste management costs. In most European countries an additional financial guarantee is not needed if the producer is member of a collective scheme. 17

19 Retailers (3) Household (2) Producers/Importers (1) Municipal Collection Sites (4) Regional Collection Stations (5) Transport Partner (6) Treatment Partner (7) NVMP In house logistics (7) Financial Flow WEEE/ E-waste Flow Source: Chapter 5, Financing Mechanism for WEEE/E-waste management, Volume 2, E-waste Manual, United Nations Environmental Programme, Division of Technology, Industry and Economics, International Environmental Technology Centre, Osaka/Shiga. Figure 2.1: Financial Model of Netherlands NVMP A Collective EU Collective Compliance System 18

20 Retailers (2) Household (1) AEHA (3) Consortium Collection Sites (4) Consortium Treatment Centre (5) In house logistics Manufacturer Consortium Financial Flow WEEE/ E-waste Flow Source: Chapter 5, Financing Mechanism for WEEE/E-waste management, Volume 2, E-waste Manual, United Nations Environmental Programme, Division of Technology, Industry and Economics, International Environmental Technology Centre, Osaka/Shiga. Figure 2.2: Financial Flow Model of Japanese E-waste Take back System A Consumer/Retailer based system 19

Environmentally Sound Management of E- waste: Emerging Issues, Challenges and Opportunities for Material Recovery and Recycling

Environmentally Sound Management of E- waste: Emerging Issues, Challenges and Opportunities for Material Recovery and Recycling Environmentally Sound Management of E- waste: Emerging Issues, Challenges and Opportunities for Material Recovery and Recycling Dr Sunil Herat Senior Lecturer in Waste Management & Project Leader Griffith

More information

R4R GUIDELINES FOR LOCAL AND REGIONAL AUTHORITIES

R4R GUIDELINES FOR LOCAL AND REGIONAL AUTHORITIES R4R GUIDELINES FOR LOCAL AND REGIONAL AUTHORITIES Helping cities and regions to improve their selective collection and recycling strategies November 2014 1. THE R4R PROJECT IN A NUTSHELL 1.1 The birth

More information

Designing Closed-loop Supply Chains: Implementation of the WEEE directive in the UK 1

Designing Closed-loop Supply Chains: Implementation of the WEEE directive in the UK 1 Issue 56 Feature Designing Closed-loop Supply Chains: Implementation of the WEEE directive in the UK 1 Dr Wojciech Piotrowicz, Oxford Institute of Retail Management, Saïd Business School, University of

More information

E-waste Challenges & Solutions

E-waste Challenges & Solutions E-waste Challenges & Solutions December 2013 SIMS at a glance Global 6 continents, 46 countries Over 500,000 tonnes processed annually #11 on the list of Global 100 Most Sustainable Companies Quality ISO

More information

Country Status of E-waste

Country Status of E-waste E-waste Management Scenario in Bangladesh Fazle Rabbi Sadeque Ahmed (frsa1962@yahoo.co.uk) Department of Environment www.doe-bd.org Government of Bangladesh July, 2011 Country Status of E-waste No inventory

More information

Policy measures for the prevention and minimization of hazardous wastes

Policy measures for the prevention and minimization of hazardous wastes WASTE AND WASTE MANAGEMENT PROGRESS AND ACHEIVEMENTS Policy measures for the prevention and minimization of hazardous wastes 1. At the international level, Mongolia joined The Basel Convention on the Control

More information

Practices in China. Outline

Practices in China. Outline Waste Management Policies and Practices in China Ministry of Environmental Protection Regional Workshop of the Greater Mekong Sub-region to share the lessons learnt from the Vietnam experience on the National

More information

Little Drops of Water The Decentralized Path to Urban Renewal. Shyamala Mani, Anil Kumar* Amit Sardana, Abhijit Ray**

Little Drops of Water The Decentralized Path to Urban Renewal. Shyamala Mani, Anil Kumar* Amit Sardana, Abhijit Ray** Little Drops of Water The Decentralized Path to Urban Renewal Shyamala Mani, Anil Kumar* Amit Sardana, Abhijit Ray** Most of today s cities produce enormous qualities of wastes that can pollute air, water

More information

Recycling of end-of-life building glass

Recycling of end-of-life building glass Recycling of end-of-life building glass Glass for Europe s contribution June 2013 The increased attention paid to resource efficiency, sustainable use of natural resources and sustainable buildings has

More information

Complying with Extended Producer Responsibility Requirements: Business Impacts, Tools and Strategies

Complying with Extended Producer Responsibility Requirements: Business Impacts, Tools and Strategies Complying with Extended Producer Responsibility Requirements: Business Impacts, Tools and Strategies Jennifer McCracken Environmental Policy Analyst Environmental Packaging International (EPI) Jamestown,

More information

Climate Change and Waste The Missing Link December 2010 Written by Jacob Gregory

Climate Change and Waste The Missing Link December 2010 Written by Jacob Gregory Climate Change and Waste The Missing Link December 2010 Written by Jacob Gregory Strategies being used to mitigate climate change in Canada are largely focused on curtailing emissions from energy production:

More information

Packaging Management Law 5771 2011

Packaging Management Law 5771 2011 1 This is an unofficial translation. The binding version is the official Hebrew text. Readers are consequently advised to consult qualified professional counsel before making any decision in connection

More information

Case study for the OECD Working Party on Resource Productivity and Waste: The Australian National Television and Computer Recycling Scheme

Case study for the OECD Working Party on Resource Productivity and Waste: The Australian National Television and Computer Recycling Scheme Case study for the OECD Working Party on Resource Productivity and Waste: The Australian National Television and Computer Recycling Scheme Contents Executive Summary... 3 Background... 4 The Australian

More information

WG1: Implementation of the 3Rs within each country From Result of Questionnaire (as of March 24th,2006)

WG1: Implementation of the 3Rs within each country From Result of Questionnaire (as of March 24th,2006) WG1: Implementation of the 3Rs within each country From Result of Questionnaire (as of March 24th,2006) Toru Hashi Senior Policy Researcher LTP, Institute of Global Environmental Strategy IGES and 3R Initiative

More information

European Recycling Platform. - Strategy, Business Model and Implementation Progress -

European Recycling Platform. - Strategy, Business Model and Implementation Progress - European Recycling Platform - Strategy, Business Model and Implementation Progress - Overview ERP Mission & Objective WEEE Producer Responsibility WEEE Take Back Process Competition Between Take Back Systems

More information

2010-9. Closed-Loop Supply Chains in the Electrical and Electronics Industry of Japan. Tomoaki Shimada Luk N. Van Wassenhove

2010-9. Closed-Loop Supply Chains in the Electrical and Electronics Industry of Japan. Tomoaki Shimada Luk N. Van Wassenhove 2010-9 Closed-Loop Supply Chains in the Electrical and Electronics Industry of Japan Tomoaki Shimada Luk N. Van Wassenhove Closed-Loop Supply Chains in the Electrical and Electronics Industry of Japan

More information

European waste policy:

European waste policy: Waste: the problem European waste policy: prevention a dream? EU Waste policy: general principles and summary of legislation Waste Framework Directive - 2008 Waste Electr(on)ical Equipment 2002 and review

More information

EPR in Promotion of Chinese Circular Economic Law

EPR in Promotion of Chinese Circular Economic Law THE SIXTH REGIONAL 3R FORUM IN ASIA AND THE PACIFIC 16-19 August 2015, Malé, Maldives EPR in Promotion of Chinese Circular Economic Law Jinhui Li Executive Director, Basel Convention Regional Center for

More information

The London Waste and Recycling Board business plan 2015-2020. November 2014. London Waste and Recycling Board 169 Union Street London SE1 0LL

The London Waste and Recycling Board business plan 2015-2020. November 2014. London Waste and Recycling Board 169 Union Street London SE1 0LL The London Waste and Recycling Board business plan 2015 2020 November 2014 London Waste and Recycling Board 169 Union Street London SE1 0LL info@lwarb.gov.uk www.lwarb.gov.uk 2015 2020 Business Plan Contents

More information

Post-Consumer Plastic Waste Management in European Countries 2012 - EU 27 + 2 Countries -

Post-Consumer Plastic Waste Management in European Countries 2012 - EU 27 + 2 Countries - Final Report (October 2013) Post-Consumer Plastic Waste Management in European Countries 2012 - EU 27 + 2 Countries - PlasticsEurope Av. E. Van Nieuwenhuyse 4/3 B-1160 Bruxelles CONSULTIC MARKETING & INDUSTRIEBERATUNG

More information

PERFORMANCE MEASURES

PERFORMANCE MEASURES RESEARCH AND RECOMMENDATIONS for PERFORMANCE MEASURES For Regulated, Industry-led, End-of-life Electronics Recycling Programs In Canada Commissioned By: Atlantic Canada Electronics Stewardship (ACES) Electronics

More information

Update on Electronics Product Management April 8, 2003

Update on Electronics Product Management April 8, 2003 Update on Electronics Product Management This paper provides a brief overview of electronics management in Europe and the United States. Due to the passage of legislation in Europe, demand has accelerated

More information

An Overview of Nigeria s Regulatory Approach

An Overview of Nigeria s Regulatory Approach An Overview of Nigeria s Regulatory Approach Presentation made at the 2 Day 1 st Eko E-Waste Summit on the Regulation and Management of E-Waste in Nigeria 24 th to 25 th February, 2011 By Professor Olanrewaju

More information

Where are WEEE now? Lessons from WEEE: Will EPR work for the US?

Where are WEEE now? Lessons from WEEE: Will EPR work for the US? Where are WEEE now? Lessons from WEEE: Will EPR work for the US? Jaco Huisman Design for Sustainability Research Group, Delft University of Technology, Delft, The Netherlands j.huisman@tudelft.nl Federico

More information

GLOBAL PARTNERSHIP SPONSORED FOCAL AREA/ BUSINESS PLAN: UNIDO E-WASTE WORKING PLAN

GLOBAL PARTNERSHIP SPONSORED FOCAL AREA/ BUSINESS PLAN: UNIDO E-WASTE WORKING PLAN GLOBAL PARTNERSHIP SPONSORED FOCAL AREA/ BUSINESS PLAN: UNIDO E-WASTE WORKING PLAN The Global Partnership on Waste Management (GPWM) was established to coordinate activities related to waste management.

More information

Energy efficiency improvement and environmental protection have ranked first priorities in utility policies, in developed and developing countries.

Energy efficiency improvement and environmental protection have ranked first priorities in utility policies, in developed and developing countries. Introduction Energy efficiency improvement and environmental protection have ranked first priorities in utility policies, in developed and developing countries. Over the past ten years, electrical energy

More information

Waste Management. Background

Waste Management. Background Waste Management Background Overview of current waste management In 1970, the main method of waste disposal in Iceland was open-pit burning. Over 50 burning pits were in operation, close to one pit per

More information

Annex 2: Rules and Procedures for the Swiss-Polish Cooperation Programme

Annex 2: Rules and Procedures for the Swiss-Polish Cooperation Programme Annex 2: Rules and Procedures for the Swiss-Polish Cooperation Programme Annex 2 is an integral part of the Framework Agreement between the Swiss Federal Council and the Government of the Republic of Poland

More information

6 STEP 6 - PREPARING THE ACTION PLAN 2

6 STEP 6 - PREPARING THE ACTION PLAN 2 CONTENTS 6 STEP 6 - PREPARING THE ACTION PLAN 2 6.1 USER GUIDE TO THIS STEP 2 6.2 KEY MESSAGES OF THIS STEP 4 6.3 PREPARING THE ACTION PLAN 5 6.4 PRE-FEASIBILITY STUDY 8 6.5 PREPARING AN INVESTMENT PLAN

More information

HUGO BOSS ENVIRONMENTAL COMMITMENT. Our claim. Our approach

HUGO BOSS ENVIRONMENTAL COMMITMENT. Our claim. Our approach HUGO BOSS ENVIRONMENTAL COMMITMENT HUGO BOSS assumes responsibility for future generations. This entails that we also pursue our high standards for quality and performance in environmental protection.

More information

Reuse and Recycling European Union Social Enterprises. www.rreuse.org

Reuse and Recycling European Union Social Enterprises. www.rreuse.org Reuse and Recycling European Union Social Enterprises www.rreuse.org Members: R.U.S.Z (A) RepaNet (A) ARGE Müllvermeidung (A) KVK (B) RESsources (B) BAG Arbeit BAG Arbeit & Werkstatt Frankfurt (D) AIRES

More information

Waste Management Policy

Waste Management Policy University of Sussex Waste Management Policy May 2007 1 University of Sussex Waste Management Policy Contents 1. Introduction 2. Policy Statement 3. Policy Objectives 4. Application 5. Organisation and

More information

Country specific notes on municipal waste data

Country specific notes on municipal waste data EUROPEAN COMMISSION EUROSTAT Directorate E: Sectoral and regional statistics Unit E-2: Environmental Statistics and Accounts; Sustainable Development Country specific notes on municipal waste data Last

More information

Waste management and disposal:

Waste management and disposal: Waste management and disposal: A best practice business guide An ebook produced by FCC Environment 01 Waste management and disposal: a strategy for success Introduction Your guide to waste management FCC

More information

Policy and Regulations Faridabad (India)

Policy and Regulations Faridabad (India) Policy and Regulations Faridabad (2009) Policy and Regulations Faridabad (India) 1.1 Policies No specific regulations have been framed for addressing the management of plastic waste, and it is thus governed

More information

SHARPS COLLECTION PROGRAM PLAN FOR THE PRINCE EDWARD ISLAND MEDICAL SHARP STEWARDSHIP PROGRAM

SHARPS COLLECTION PROGRAM PLAN FOR THE PRINCE EDWARD ISLAND MEDICAL SHARP STEWARDSHIP PROGRAM SHARPS COLLECTION PROGRAM PLAN FOR THE PRINCE EDWARD ISLAND MEDICAL SHARP STEWARDSHIP PROGRAM DECEMBER 2014 EXECUTIVE SUMMARY On June 10, 2014 Prince Edward Island approved the Environmental Protection

More information

Community and Renewable Energy Scheme Project Development Toolkit

Community and Renewable Energy Scheme Project Development Toolkit Community and Renewable Energy Scheme Project Development Toolkit Balance Sheet Equity Investment Community Bond Issues Community Vehicle Crowd Funding Debentures a form of bond Debt Debt Service Cover

More information

ESCO Financing. State of Israel Ministry of National Infrastructure. Pierre Baillargeon. March 2007 ECONOLER INTERNATIONAL

ESCO Financing. State of Israel Ministry of National Infrastructure. Pierre Baillargeon. March 2007 ECONOLER INTERNATIONAL ESCO Financing State of Israel Ministry of National Infrastructure Pierre Baillargeon March 2007 Agenda Evaluation of the EE market Introduction to the ESCO concept Introduction to performance contracts

More information

Low Carbon Emission Supply Network Design and a case in Chinese ICT industry

Low Carbon Emission Supply Network Design and a case in Chinese ICT industry Low Carbon Emission Supply Network Design and a case in Chinese ICT industry Jialun Hu Centre for International Manufacturing Institute for Manufacturing, University of Cambridge jh693@cam.ac.uk Outline

More information

IT Trading UK Ltd Computer & IT Equipment Disposal Specialists

IT Trading UK Ltd Computer & IT Equipment Disposal Specialists IT Trading UK Ltd Computer & IT Equipment Disposal Specialists Unit 4A Scott's Close, Downton Business Centre, Downton, Salisbury, Wiltshire, SP5 3RA Tel: 01725 513403 Fax: 01725 513714 Email: info@it-trading.co.uk

More information

Driving resource efficient, green growth in Europe

Driving resource efficient, green growth in Europe Call for Partners WEEE 2020 Driving resource efficient, green growth in Europe The vision To create a Partnership across the WEEE value chain focused on delivering advancements in the sector to improve

More information

Testimony of MICHAEL BIDDLE. President and Founder of MBA Polymers, Inc. of Richmond California. before the Subcommittee on

Testimony of MICHAEL BIDDLE. President and Founder of MBA Polymers, Inc. of Richmond California. before the Subcommittee on Testimony of MICHAEL BIDDLE President and Founder of MBA Polymers, Inc. of Richmond California before the Subcommittee on Government Management, Organization, and Procurement of the Oversight and Government

More information

Responsibly Retiring IT Assets, Medical or Laboratory Equipment

Responsibly Retiring IT Assets, Medical or Laboratory Equipment Responsibly Retiring IT Assets, Medical or Laboratory Equipment Agenda Introductions David Zimet, President, Hesstech, LLC Industry Overview Key Issues When Retiring Electronic Equipment Data Security

More information

13 th International Project Week Lecturer: Stoyan Gaydardzhiev Participants: Laura Bauer Christoph Deckert Michael Grohme Carolin Gutsche Maximilian Hoeflich Roni Jojo Norman Knabe Johannes Lemberger Robert

More information

PAS 141:2011 Reuse of WEEE & UEEE

PAS 141:2011 Reuse of WEEE & UEEE PAS 141:2011 Reuse of WEEE & UEEE 2 nd International SMM Conference Taipei December 2011 Peter Calliafas Past Chair WEEE Advisory Body 1 Areas to be covered Regulatory Context: EU and UK. Global E-waste

More information

CHAPTER 5 FINANCIAL BENEFIT-COST ANALYSIS

CHAPTER 5 FINANCIAL BENEFIT-COST ANALYSIS CHAPTER 5 FINANCIAL BENEFIT-COST ANALYSIS 122 HANDBOOK FOR THE ECONOMIC ANALYSIS OF WATER SUPPLY PROJECTS CONTENTS 5.1 Introduction...123 5.2 Financial Revenues...124 5.3 Project Costs...126 5.3.1 Investments...127

More information

A clean energy solution from cradle to grave

A clean energy solution from cradle to grave Environmental Product Declaration A clean energy solution from cradle to grave Offshore wind power plant employing SWT-6.0-154 siemens.com / wind 2 Assessing the performance of a wind power plant The environmental

More information

The WEEE directive and CENELEC standards. What can be expected? How can recycling in Europe benefit from the standards? Agenda

The WEEE directive and CENELEC standards. What can be expected? How can recycling in Europe benefit from the standards? Agenda 1 The WEEE directive and CENELEC standards What can be expected? How can recycling in Europe benefit from the standards? Lizzi Andersen, Senior Specialist, Waste and Resources, COWI A/S 1 Agenda Why standards?

More information

European policy approaches to waste management and infrastructure

European policy approaches to waste management and infrastructure European policy approaches to waste management and infrastructure A5.0 Overview Appendix 5 Of greatest interest in terms of understanding the policies best suited for Irish waste management, infrastructure

More information

Chain of Custody of Forest Based Products - Requirements

Chain of Custody of Forest Based Products - Requirements PEFC INTERNATIONAL STANDARD Requirements for PEFC scheme users PEFC ST 2002:2013 2012-12-04 Enquiry Draft Chain of Custody of Forest Based Products - Requirements PEFC Council World Trade Center 1, 10

More information

Feasibility Study Requirements. Qatar Development Bank

Feasibility Study Requirements. Qatar Development Bank Feasibility Study Requirements Qatar Development Bank i. Feasibility Study Requirements The Feasibility study should ideally encompass the following areas / sections A. Executive Summary. B. Project details

More information

Recycling of high-tech metals in the context of the circular economy

Recycling of high-tech metals in the context of the circular economy MILAN, 10.6.2015 Recycling of high-tech metals in the context of the circular economy wo stehen wir heute im Vergleich zu vor zehn Jahren? Dr. Christian Hagelüken Closing the loop of metal based materials

More information

Revenue and Financing Policy

Revenue and Financing Policy Revenue and Financing Policy The Revenue and Financing Policy explains how the Council funds each activity it is involved in and why. Council provides a number of distinct activities and services to its

More information

Costs related to health-care waste management

Costs related to health-care waste management 11 Costs related to health-care waste management 11.1 Principles According to the polluter pays principle, each health-care establishment should be financially liable for the safe management of any waste

More information

SUPPLEMENTARY GREEN BOOK GUIDANCE

SUPPLEMENTARY GREEN BOOK GUIDANCE SUPPLEMENTARY GREEN BOOK GUIDANCE ADJUSTING FOR TAXATION IN PFI vs PSC COMPARISONS 1 INTRODUCTION 1.1 This guidance looks at the differential tax receipts that arise from the use of the Private Finance

More information

RE: CONSULTATION ON THE DRAFT ELECTRICITY MARKET REFORM DELIVERY PLAN Dear Sir / Madam,

RE: CONSULTATION ON THE DRAFT ELECTRICITY MARKET REFORM DELIVERY PLAN Dear Sir / Madam, 25 September 2013 EMR Delivery Plan Team Department of Energy and Climate Change 3 Whitehall Place London SW1A 2AW By email to: emrdeliveryplan@decc.gsi.gov.uk RE: CONSULTATION ON THE DRAFT ELECTRICITY

More information

Greening Supply Chain for a Better Environmental Management

Greening Supply Chain for a Better Environmental Management Greening Supply Chain for a Better Environmental Management Shankar Murthy & Shirish Sangle National Institute of Industrial Engineering Vihar Lake, Powai, Mumbai-400087, INDIA. Flow of the presentation

More information

Municipal waste management in Austria

Municipal waste management in Austria Municipal waste management in Austria Prepared by Márton Herczeg ETC/SCP February 2013 EEA project manager Almut Reichel Author affiliation Márton Herczeg, Copenhagen Resource Institute, http://www.cri.dk/

More information

5 STEP 5 DEVELOPING THE STRATEGY 2

5 STEP 5 DEVELOPING THE STRATEGY 2 CONTENTS 5 STEP 5 DEVELOPING THE STRATEGY 2 5.1 USER GUIDE TO THIS STEP 2 5.2 KEY MESSAGES OF THIS STEP 4 5.3 NATURE OF THE STRATEGY 5 5.4 BUILDING CONSENSUS AND OWNERSHIP 5 5.5 DEFINING THE STRATEGY 6

More information

An Introduction to Product Takeback

An Introduction to Product Takeback An Introduction to Product Takeback Overview Driving forces behind product takeback Product takeback legislation Product end-of-life options Reverse logistics Case study Motivation for Product Takeback

More information

ACR+ position paper on the Circular Economy Package 2.0

ACR+ position paper on the Circular Economy Package 2.0 Brussels, March 2016 ACR+ position paper on the Circular Economy Package 2.0 ACR+ welcomes the European Commission s Circular Economy Package 2.0 and supports once more the efforts to make all actors of

More information

CONTENTS LEVY. (Prepared by Ian G. Heggie, revised March 1999) 1. Weight-Distance Charges...2. 2. Exempting Non-Road Users...3

CONTENTS LEVY. (Prepared by Ian G. Heggie, revised March 1999) 1. Weight-Distance Charges...2. 2. Exempting Non-Road Users...3 CONTENTS EXEMPTING NON-ROAD USERS FROM PAYING THE DIESEL LEVY (Prepared by Ian G. Heggie, revised March 1999) 1. Weight-Distance Charges...2 2. Exempting Non-Road Users...3 3. Coloring Un-Taxed Diesel...3

More information

SNV s value chain development approach

SNV s value chain development approach SNV s value chain development approach Introduction In order to identify the best entry points for capacity development, SNV has under the BOAM 1 program adopted the value chain approach. A value chain

More information

Smarter Resources Smarter Business Recycling

Smarter Resources Smarter Business Recycling Smarter Resources Smarter Business Recycling Best Practice Waste and Recycling Contracts for Business February 2014 Best Practice Waste and Recycling Contracts for Business A three step process There is

More information

Sustainability. report.

Sustainability. report. Sustainability report CONTENT AND BOUNDARY OF THE REPORT This sustainability report refers to the financial year 2006. Unless otherwise stated, the same accounting principles are applied in the sustainability

More information

RailCalc. Calculation of charges for the Use of Railway Infrastructure THE RAILCALC PROJECT OVERVIEW & RESULTS. Paulo Teixeira - CENIT

RailCalc. Calculation of charges for the Use of Railway Infrastructure THE RAILCALC PROJECT OVERVIEW & RESULTS. Paulo Teixeira - CENIT Calculation of charges for the Use of Railway Infrastructure THE RAILCALC PROJECT OVERVIEW & RESULTS Paulo Teixeira - RAILCALC WORKSHOP Brussels, February 15 th, 2008 Team European Commission: DG Energy

More information

A new electricity market for Northern Ireland and Ireland from 2016 - Integrated Single Electricity Market (I-SEM)

A new electricity market for Northern Ireland and Ireland from 2016 - Integrated Single Electricity Market (I-SEM) A new electricity market for Northern Ireland and Ireland from 2016 - Integrated Single Electricity Market (I-SEM) Non-technical summary High level design Draft Decision Paper SEM -14-047 June 2014 1 INTRODUCTION

More information

BES 6001 Issue 3 Guidance Document

BES 6001 Issue 3 Guidance Document BES 6001 Issue 3 Guidance Document This guide is intended to give an understanding of BES6001:2014 Framework Standard for Responsible Sourcing. It is not a controlled document. 3.2.1 Responsible Sourcing

More information

PPP Basics and Principles of a PPP Framework

PPP Basics and Principles of a PPP Framework Note 1 May 2012 PPP Basics and Principles of a PPP Framework This note is the first in a series of notes on developing a comprehensive policy, legal, and institution framework for public-private partnership

More information

World Tourism Organization RECOMMENDATIONS TO GOVERNMENTS FOR SUPPORTING AND/OR ESTABLISHING NATIONAL CERTIFICATION SYSTEMS FOR SUSTAINABLE TOURISM

World Tourism Organization RECOMMENDATIONS TO GOVERNMENTS FOR SUPPORTING AND/OR ESTABLISHING NATIONAL CERTIFICATION SYSTEMS FOR SUSTAINABLE TOURISM World Tourism Organization RECOMMENDATIONS TO GOVERNMENTS FOR SUPPORTING AND/OR ESTABLISHING NATIONAL CERTIFICATION SYSTEMS FOR SUSTAINABLE TOURISM Introduction Certification systems for sustainable tourism

More information

Waste Management Action Plan 2011-2015

Waste Management Action Plan 2011-2015 Waste Management Action Plan 2011-2015 Approved on: 7 June 2011 Owner: Program Manager, 8203 7723 Trim Reference: ACC2011/77875 Next Review Date: June 2014 Executive Summary This Waste Management Action

More information

Integrated Solid Waste Management Oran, Algeria. Program Overview by R20 Regions of Climate Action

Integrated Solid Waste Management Oran, Algeria. Program Overview by R20 Regions of Climate Action Integrated Solid Waste Management Oran, Algeria Program Overview by R20 Regions of Climate Action A PROGRAM BY Under the leadership of the Algerian Ministry of Environment and Land Planning, R20 Regions

More information

Collections, quality and customer engagement: The industry's role in making the Waste (Scotland) Regulations work

Collections, quality and customer engagement: The industry's role in making the Waste (Scotland) Regulations work RWM Birmingham Collections, quality and customer engagement: The industry's role in making the Waste (Scotland) Regulations work Charlie Devine Head of Resource Management What s coming up About Zero Waste

More information

Volkswagen Aktiengesellschaft strategy for compliance with recycling and recovery rates

Volkswagen Aktiengesellschaft strategy for compliance with recycling and recovery rates Volkswagen Aktiengesellschaft strategy for compliance with recycling and recovery rates Dr. Frank Welsch Head of Technical Development signature see German version Peter Maiwald Head of Sales Service signature

More information

Western Australian Waste Strategy: Creating the Right Environment

Western Australian Waste Strategy: Creating the Right Environment Waste Authority March 2012 Western Australian Waste Strategy: Creating the Right Environment Table of Contents Table of Contents Minister s Foreword 1 Introduction by Chairman 2 The Waste Authority 3 Executive

More information

Export Business Plan Guide

Export Business Plan Guide Export Business Plan Guide Table of Contents Introduction... 4 SECTION 01: CURRENT SITUATION ANALYSIS... 5 Company Overview... 5 Availability of Resources... 6 SWOT Analysis... 9 SECTION 02: MARKET ANALYSIS...

More information

ProSUM Prospecting Secondary raw materials in the Urban mine and Mining wastes

ProSUM Prospecting Secondary raw materials in the Urban mine and Mining wastes ProSUM Prospecting Secondary raw materials in the Urban mine and Mining wastes Background Project Summary The use of secondary raw materials and recycling was recommended to the European Commission as

More information

DEVELOPMENT OF NATIONAL WASTE MANAGEMENT STRATEGIES IN SRI LANKA

DEVELOPMENT OF NATIONAL WASTE MANAGEMENT STRATEGIES IN SRI LANKA DEVELOPMENT OF NATIONAL WASTE MANAGEMENT STRATEGIES IN SRI LANKA M J J Fernando Deputy Director General (Education and Awareness) Project Director Project for Construction of Sanitary Landfill Central

More information

The Health and Environmental Impacts of e-waste

The Health and Environmental Impacts of e-waste The Health and Environmental Impacts of e-waste Presenter: Susanne Dittke Chemical Engineer/Environmental Consultant Tel: 0027-21-7069829 Email:envirosense@xsinet.co.za Skype: envirosense www.envirosensecc.co.za

More information

Principles of municipal waste management in Finland and their applications in Helsinki ja Tampere Regions

Principles of municipal waste management in Finland and their applications in Helsinki ja Tampere Regions Principles of municipal waste management in Finland and their applications in Helsinki ja Tampere Regions FORUM OF MUNICIPALITIES November 28, 2014, Tallinn, Estonia Simo Isoaho Senior Advisor JLY Finnish

More information

SAMPLE QUESTIONS EXAM EXEMPLAR QUESTIONS. AD5 - Sustainability in supply chains. Level 5 Advanced Diploma in Procurement and Supply

SAMPLE QUESTIONS EXAM EXEMPLAR QUESTIONS. AD5 - Sustainability in supply chains. Level 5 Advanced Diploma in Procurement and Supply Level 5 Advanced Diploma in Procurement and Supply AD5 - Sustainability in supply chains EXAM EXEMPLAR QUESTIONS QUESTIONS AND INDICATIVE ANSWER CONTENT Page 1 of 8 QUALIFICATIONS 2013 QUESTIONS AND MARKING

More information

Accounting for Infrastructure Projects within Enterprise Zones (EZ) and Tax Increment Financing (TIF) Funded Programmes.

Accounting for Infrastructure Projects within Enterprise Zones (EZ) and Tax Increment Financing (TIF) Funded Programmes. Accounting for Infrastructure Projects within Enterprise Zones (EZ) and Tax Increment Financing (TIF) Funded Programmes. Background 1 A number of initiatives are under way that involve local authorities

More information

TRIPLE BOTTOM LINE ASSESSMENT OF UR-3R PROCESS

TRIPLE BOTTOM LINE ASSESSMENT OF UR-3R PROCESS TRIPLE BOTTOM LINE ASSESSMENT OF UR-3R PROCESS Q: What is the Triple Bottom Line Assessment of the UR- 3R Process? The Triple Bottom Line Assessment of the UR-3R Process is a study whose overall aim was

More information

CENTRALLY MANAGED PROCESS MINIMIZING RISK MAXIMIZING REMARKETING VALUE

CENTRALLY MANAGED PROCESS MINIMIZING RISK MAXIMIZING REMARKETING VALUE IT ASSET DISPOSITION Technology is introduced to business workflows to increase productivity and boost earnings. When the time comes to remove off-lease and end-oflife IT assets, shouldn t those goals

More information

Contributions to the Legislative Provisions Governing the Management of Waste Containing Asbestos in Romania and EU

Contributions to the Legislative Provisions Governing the Management of Waste Containing Asbestos in Romania and EU Theoretical and Applied Economics Volume XVIII (2011), No. 9(562), pp. 149-154 Contributions to the Legislative Provisions Governing the Management of Waste Containing Asbestos in Romania and EU Silvian

More information

IKEA case study SWOT analysis and sustainable business planning

IKEA case study SWOT analysis and sustainable business planning IKEA case study SWOT analysis and sustainable business planning Page 1: Introduction IKEA is an internationally known home furnishing retailer. It has grown rapidly since it was founded in 1943. Today

More information

Guidelines (Master Plan) for Disaster Waste Management after the Great East Japan Earthquake

Guidelines (Master Plan) for Disaster Waste Management after the Great East Japan Earthquake Guidelines (Master Plan) for Disaster Waste Management after the Great East Japan Earthquake May 16, 2011 Ministry of the Environment 1. Introduction To manage waste resulting from the Great East Japan

More information

PPP seminar. High Level Regional Workshop on PPPs in the Middle East Jordan. June 2010

PPP seminar. High Level Regional Workshop on PPPs in the Middle East Jordan. June 2010 PPP seminar High Level Regional Workshop on PPPs in the Middle East Jordan June 2010 Suez Environnement EMPLOYEES > 65,000 CONSOLIDATED REVENUES 2008 12,4 Billion SUEZ ENVIRONNEMENT IS THE SOLE PLAYER

More information

Water Charges Plan Decision Paper (Executive Summary)

Water Charges Plan Decision Paper (Executive Summary) Water Charges Plan Decision Paper (Executive Summary) DOCUMENT TYPE: REFERENCE: DATE PUBLISHED: QUERIES TO: Decision Paper CER/14/746 30 September 2014 waterchargesplan@cer.ie The Commission for Energy

More information

Use of economic instruments in the EU 27 and waste management performances Shailendra Mudgal

Use of economic instruments in the EU 27 and waste management performances Shailendra Mudgal Waste in a new economic scenario: Low Cost strategies, efficiency and valorization Use of economic instruments in the EU 27 and waste management performances Shailendra Mudgal ORGANIZADO POR: CON LA COLABORACIÓN

More information

Annex 1 Tool for the demonstration and assessment of additionality

Annex 1 Tool for the demonstration and assessment of additionality page 1 Tool for the demonstration and assessment of additionality 1. This document provides for a step-wise approach to demonstrate and assess additionality. These steps include: Identification of alternatives

More information

Western Australian Feed-In Tariff Discussion Paper

Western Australian Feed-In Tariff Discussion Paper Western Australian Feed-In Tariff Discussion Paper OVERVIEW In September 2008, the incoming State Government announced its intention to introduce a feed-in tariff as part of the Liberal Plan for Environmental

More information

Ministry Of Finance VAT Department. VAT Guidance for Financial Services Version 4: June 09, 2015

Ministry Of Finance VAT Department. VAT Guidance for Financial Services Version 4: June 09, 2015 Ministry Of Finance VAT Department VAT Guidance for Financial Services Version 4: June 09, 2015 Introduction This guide is intended to provide businesses offering financial services with information about

More information

Life Cycle Assessment of a Solid Ink MFP Compared with a Color Laser MFP Total Lifetime Energy Investment and Global Warming Impact

Life Cycle Assessment of a Solid Ink MFP Compared with a Color Laser MFP Total Lifetime Energy Investment and Global Warming Impact Xerox ColorQube 8900 Color MFP White Paper Life Cycle Assessment of a Solid Ink MFP Compared with a Color Laser MFP Total Lifetime Energy Investment and Global Warming Impact Table of Contents Executive

More information

Monitoring & Recording Hazardous & Non-Hazardous Waste

Monitoring & Recording Hazardous & Non-Hazardous Waste GIIRS Emerging Market Assessment Resource Guide: What s in this Guide? I. Definition: What is II. Methods for Disposal: Non-Hazardous Waste III. Methods for Storage and Disposal: Hazardous Waste IV. Additional

More information

How To Help The World Coffee Sector

How To Help The World Coffee Sector ICC 105 19 Rev. 1 16 October 2012 Original: English E International Coffee Council 109 th Session 24 28 September 2012 London, United Kingdom Strategic action plan for the International Coffee Organization

More information

Finnish Energy Industries draft answer to CEER public consultation The future role of DSOs

Finnish Energy Industries draft answer to CEER public consultation The future role of DSOs Finnish Energy Industries draft answer to CEER public consultation The future role of DSOs Respondents information Name Ina Lehto Name of organisation Finnish Energy Industries Type of organisation Other

More information

GUIDELINES ON THE COMPLETION OF THE STRUCTURAL BUSINESS STATISTICS 2014 QUESTIONNAIRE

GUIDELINES ON THE COMPLETION OF THE STRUCTURAL BUSINESS STATISTICS 2014 QUESTIONNAIRE SECTION 1 DETAILS GUIDELINES ON THE COMPLETION OF THE STRUCTURAL BUSINESS STATISTICS 2014 QUESTIONNAIRE I. Principal Activity: Please provide an explanation of the activity of the enterprise according

More information

Waste Electrical and Electronic Equipment. Information Document

Waste Electrical and Electronic Equipment. Information Document Waste Electrical and Electronic Equipment. Information Document 10 th November 2009 Table of Contents 1. Electrical Waste Management Ltd. Introduction... 3 2. Services... 3 3. Compliance... 4 4. What is

More information

The University of Georgia Service Center Policy

The University of Georgia Service Center Policy TABLE OF CONTENTS The University of Georgia Service Center Policy 1. INTRODUCTION... 4 2. SCOPE... 4 2.1. Recharge Activities... 4 2.2. Service Centers... 4 2.3. Specialized Service Centers... 4 3. INTENT....

More information