1 IMTH Wey Weirs Refurbishment Project Options Appraisal Stage Fish Pass Scoping Note 1.0 Introduction This note has been prepared as an Appendix to the Preliminary Environmental Information Report (PEI) to document the development, scoping and selection of fish and eel pass designs that meet legislation and are appropriate for the scale of works to be included within the project or in the complementary Wey Weirs Structures project. Twelve weirs were identified in the Wey Flood Risk Management Strategy and initially included in the Wey Weirs Refurbishment Project. Further detail is contained in the PEI report. They were: High Mill Weir (NGR: SU8647) Elstead Mill Bypass (SU9044) Millmead Bypass, Guildford (SU9948) Stoke Mill Bypass (SU9951) Bowers Mill Bypass (TQ0152) Broadmead Weir, Old Woking (TQ0156) Newark Mill Bypass (TQ0357) Abbey Overfall (TQ0357) Ockham Mill Sluice (TQ0357) Walsham Weir (TQ0557) Bluegates Hole (TQ0761) Hamm Oil Mills, Weybridge (adjacent to Thames Lock - TQ0765) 2.0 Options Appraisal Stage The screening and scoping was carried out for three milestones: Project Planning Phase Options Workshop Preferred Option Development and PEI Report The initial outline design and options screening and scoping developed in a Planning Phase of the project, culminating in a Site Visit and Outline Options Report (Jan 2013). An Appraisal Summary Table was completed identifying a range of options for weir management and fish/eel pass works at each site. It also considered the rationale for which of these should be included in the options appraisal stage of the project. This is reproduced in Appendix G to the PEI.

2 After investigation, it was found that the Agency do own part of Bluegates Hole Sluices, aand there are liabilities laid out in the Title Deeds A fish pass outline design sketch was developed. The Byfleet Weir close to this site was installed as part of the River Wey Improvement Scheme so we also have similar responsibilities for this structure. However, it would appear to be relatively simple to convert Bluegates Hole Sluice gate structure and apron to a fish pass as noted in the Appraisal Summary Table. The design and sketch will be transferred to the Wey Structures Project for potential implementation. In preparation for an Options Workshop held on 19 September 2013, outline designs for the remaining sites and options were developed and costed and then discussed in a webconference on 11 September 2013 with input from the Environment Agency Fisheries team (Steve Sheridan) and Jacobs fish pass specialists (Gillian McCoy and Guy Russell). The presentation on which these discussions were based is included as Appendix 1. It was concluded during the discussions that the preferred option could be identified without the need for explicitly scoring each option with respect to the number of species that could be passed. The presentation included: schematic overall layouts for each weir site sketches on which the fish pass options are based summary costs tables to help identify the most cost effective option at each site At the end of the Planning Stage it was recognised that, relative to the cost of weir works, the cost of making provision for fish passage could be disproportionate. The current FDGiA/Levy funded project does not incorporate fish passes at all of the six priority sites due to the relative costs compared to the scale refurbishment works being proposed. Following a workshop (see Minutes of the Options Workshop held on 19 th September ) further investigation of costs and options for fish passes and priority the most important weirs for fish pass installation were carried out. An extract from the prioritisation paper prepared following the meeting (see Appendix 3) follows: Restoring connectivity from the Thames through the main stem of the Wey (Shalford to Thames waterbody) is a fundamental stage in ensuring GES / GEP objectives can be met throughout this and the other WFD water bodies in the catchment. In terms of a simple prioritisation of the structures for fish passage i.e. focussing on upstream migration from the Thames, suggested priorities are as follows (weirs relevant to this project in bold): Priority 1 Hamm, Byfleet / Bluegates, Walsham, Abbey / Newark, Broadmead, Broadoak, Bowers, Stoke and Millmead - this connects the main stem of the Wey from the Thames to confluences of the significant tributaries Tillingbourne and Cranleigh Waters. Priority 2 St Catherine s, Unstead, Catteshall, Westbrook, Eashing, Somerset, Elstead, Tilford Gauging weir, Frensham Mill (fish pass installed). - This connects the main stem of the Wey to the North and South branches and to the Slea. Priority 3 Numerous but includes EA assets: High Mill and Farnham Gauging station 1 Information taken from Jacobs meeting notes for the Wey Weirs Refurbishment Options Workshop held on 19 th September 2013.

3 When the status of partnership funding, FDGiA funding limitations and scale of works were taken into account, it was agreed at a progress meeting that the priority sites to be included within the project would be Hamm Oil Mills and Walsham (see Appendix 2). Hamm Oil Mills site is the highest priority site in this project for inclusion of a fish pass as there is currently no provision for fish passage from the Thames at Weybridge to the entire Wey catchment. Walsham weir is the next fish passage priority site upstream as it has a large attractive flow and it is highly unlikely that fish passage is possible at this site through the main river past any of the structures at this site. The project cost estimates indicate that including any significant further fish pass works in the project would result in the cost of fish passage exceeding the 25% limit. An extract from the Project Cost Plan evaluating the percentage costs is in Appendix 4. After extensive further work on prioritisation, design development and cost investigation against national average figures, the cost for the 4 other priority sites remains disproportionate, however, eel passes are low cost and a higher statutory priority and are included. While this work will help make significant steps towards achieving WFD on the River Wey catchment, it leaves 3 of our weir structures (Millmead, Newark and Broadmead; Bowers weir is included in a separate bid detailed below) without any provision or commitment within the project or by the Environment Agency as a whole to providing fish passage and requiring this before 2027, i.e. within 13 years. It should be noted that there are other barriers to passage owned by others which in some cases are on parallel channels or shared at the actual weir site. Further significant maintenance on the sub-structure of these 6 weir structures is not expected within the WFD timetable. Under the WFD; it is the Owners responsibility to ensure that eel/fish passage is delivered. Due to the FDGiA funding constraint, additional funding has been investigated.sources of funding in addition to Flood Defence Grant in Aid (FDGiA) were explored such as Levy and potential WFD funding from within the Environment Agency and potential external partners Guildford and Woking Borough Councils and the National Trust. Discussions and meetings were held to explore each of these potential sources. However, only 20k of direct financial partner funding has so far been successfully secured from Guildford Borough Council for works at Millmead with other funds potentially available. These funds are known as S106 funds which need spending by 2017 which cannot be used on design fees or feasibility work. Further investigation continues. Other non-financial contributions have been agreed in principle, including from the National Trust. At this time no additional sources of funding have currently been identified. As such there is currently no certainty of significant monetary contributions becoming available within the expected timescale of the refurbishments works ( ), whilst repairs are needed now. The project has worked alongside the FCRM PSO team and Technical specialists and latterly with an emerging Fisheries and Biodiversity Integrated Environment Planning (IEP) project known as the Wey Forward Project. A funding application has been made including for other fish pass sites, namely Broadoak, St Catherine s, Unstead, the Hell Ditch, and Bowers weir fish pass is now included in this project. There remain 3 other priority sites which currently have no provision, so there remains a risk of failure on the WFD target to the Agency and loss of packaging efficiency. Further opportunities for funding will be explored alongside the Wey Forward Project with construction delivery a potential option through the refurbishment project s Contractor.

4 3.0 Options Development Stage At the Options Workshop held on 19 September 2013 (see Minutes in Appendix 2 the Thames West Area Flood Risk Manager provided a clear direction to the project team that at some of the weirs fish passes will not be possible due to funding constraints unless alternative funding sources rather other than Flood Defence Grant-in Aid (FDGiA) were obtained (e.g. Levy Funding, third-party or riparian owner funding). An appropriate level of FDGiA funding was set at 25% of the capital cost was set as noted above. The Environment Agency Fisheries team were asked to provide justification and prioritisation for the sites (this is contained in Appendix 3). This list was considered in option development. Efforts were made to identify reduced cost options and establish reasonable ratios to allow inclusion of fish passage improvements at all (or at least most) sites. The Fisheries team provided details of costs and alternative designs fish passes installed at other locations. This was examined and showed that, where the extent of fish pass works was comparable, the basic construction cost was similar to the estimates for the Wey Weir sites. The main differences in the apparent total costs for fish pass works arose because of the inclusion of a comprehensive range of on-costs in the estimates for the Wey Weirs project which are necessary to derive a total Project Cost. The costs were also of similar magnitude to a national review of 237 implemented fish pass average costs provided by Daryl Clifton Dey Fisheries Technical Specialist (see dated ). The comparison did allow for additional risk, fees and overheads. Confirmation of earlier verbal advice was received in January 2014 that a fish pass at Hamm Oil Mills has the highest priority, not only for the Wey, but also for the Lower Thames and an agreement that Hamm and Walsham should be progressed first. The options for these sites have therefore been developed and are now included as part of the Wey Weirs Refurbishment Project for which a PAR has been prepared to gain approval for FDGiA/Levy funding. Eel passes using either simple bristle or top-hat panels will be incorporated in the vicinity of all priority weirs being refurbished under the project where there is a fixed crest section (i.e. Broadmead, Newark and Hamm and potentially at Bowers on the National Trust Weir and Millmead possibly on the GBC weir) as well as being integrated into the fish passes on Coleson s Channel (Hamm) and Walsham. Provisional sums are included within the cost plan for the Project Appraisal Report (PAR). 4.0 Water Framework Directive Context The project team have considered the Water Framework Directive (WFD) status and actions for the Wey water-bodies. These are summarised below. The proposed works fall within WFD water-bodies GB Wey (Shalford to River Thames confluence at Weybridge) and GB Thames (Egham to Teddington). They are Heavily Modified Water-bodies (HMWB) classified at Moderate and Poor Ecological Potential respectively. They have water-body objectives to reach Good Ecological Potential (GEP) by Reasons for failure include, for the Wey, Fish (Barriers to Fish Migration being one of the confirmed reasons) and for both the Thames and Wey, Mitigation Measures that are not yet in place. Relevant to this project is Mitigation measure 16, which is currently Not In Place. This refers to: Structures or other mechanisms in place and managed to enable fish to access waters upstream and downstream of the impounding works.

5 As part of a National WFD project, HMWB Mitigation Measures Investigation and Options Appraisal have identified fish pass installation as required at all of these sites for attainment of GEP. However, the WFD project has completed a Cost Benefit Analysis and the targeted package of works for the Wey has been found to be cost beneficial which means the all the actions will go into the updated River Basin Management Plan (RBMP) for consultation (and delivery). In the first cycle RBMP the objective was GEP by 2027, however following the options appraisal and CBA work, the new objective that is being put forward is Good Status for mitigation measures by The current WFD assessment goes on to conclude that a range of resources and partnerships will be required to restore adequate connectivity to the Wey catchment for it to reach Good Ecological Potential / Status. Refurbishment works can offer cost effective opportunities for installing fish passes. It will be important to find fish passage solutions at all sites, where weir works are proposed, that align in terms of design and affordability within the scheme. Inclusion of fish passes at weir sites would help restore connectivity within this water-body for fish (and other wildlife) with benefits for BAP species: eel, brown / sea trout, salmon and lamprey. In addition, this would create new and valuable flow dependent riverine habitats for a variety BAP species and importantly contribute to WFD mitigation measures 5, 6, 16, 19, 20 and 26. The fragmentation of the catchment by these structures not only impacts the ecological potential / status of this water-body but also of those water-bodies upstream, and of the Lower Thames downstream. It is acknowledged that the starting point for improvement is to restore connectivity within the main stem of the Wey. This includes all the structures in this report and, in addition, others both Agency and Non Agency owned. This is reflected in the prioritisation list in Appendix 3 and proposals contained in this note. The project has also been developed and reported through the Wey WFD Catchment Co-ordinator and Catchment Co-ordination Meetings. 5.0 Wey Fish Passage Studies Two reference studies have been used to inform the selection process. 5.1 University of Southampton Wey Barrier Assessment In 2012 a barrier assessment was carried for the River Wey catchment, in partnership with the University of Southampton 2. A geospatial of river infrastructure developed using various databases - National Flood and Coastal Defence database (NFCDD), EA channel section surveys and National River Obstruction Database. This identified 835 structures of which a sample (283) were assessed for passability using field appraisal and through desk study of channel survey information. The information collected during the survey was used to calculate a passability score for different species, families or life stages of fish depending on their swimming and leaping ability, depth requirements and susceptibility to turbulence conditions. Target fish identified by the Environment Agency for the Wey catchment were brown and sea trout (Salmo trutta), cyprinids and the European eel (Anguilla anguilla). Barriers were scored between 0 and 1 for each target species, family or life stage as follows: Value = 0: Complete barrier to passage 2 Eakins, L., Parks, K. and Kemp, P River Wey Barrier Assessment, Phase 1 Final report. Southampton University / Environment Agency

6 Value = 0.3: A partial high impact barrier. Some of the population will pass at some times. For example less than one third of the population will be able to pass, or the barrier is only passable for a third of the time. Value = 0.6: A partial low impact barrier. Most of the population will be able to pass at some point. For example more than two thirds of the population will be able to pass or the barrier is impassable less than one third of the time. Value = 1: The barrier is passable for all individuals at all times An estimate of passability during high flows was also completed. For example if depth is the limiting factor and large species such as trout are impeded at the measured depth, high flow conditions may enable passage. Following the field visit the data was summarised into a database of final passability scores for each fish species, family, or life stage, along with barrier type, location and watercourse name. Summary values for hydraulic head, velocity and depth were recorded where available and the use of the structure if known. Hamm Oil Mills / Coleson s Overfall and Walsham are impassable to all species, scoring zero for each. These large barriers are the first that any migratory species moving from the Thames into the Wey would meet and passage is blocked immediately. Due to the high number of bypasses and side channels there is the potential for some fish species to pass by alternative routes at some barriers. For example at Newark / Abbey there is a pool and traverse fish pass on the Abbey overfall which is passable to adult salmonid fish, though not for juveniles, cyprinids or eel. Newark Weir is impassable to all species. The impoundment upstream of Broadmead is also controlled by structures on a separate channel at Gresham Mill where fish passes are being installed as part of a hydropower development. However a separate channel leads to Broadmead weir which is over 2.5km in length, attracting upstream migrating fish to a structure completely impassable to all species. Bowers Mill, Bowers weir and Millmead Weir also have zero values for upstream passage for all species. 1.2 Lower Thames Fish Passage Study A Lower Thames Fish Passage Study was carried out for the Agency by Babtie, Brown and Root in which ranked priorities for fish pass improvement projects in the Lower Thames catchment. The Hamm Oil Mills site was ranked as top priority of the 19 sites. This study focussed on structures directly impacting the main river Thames fish populations and simply support the importance of this site in the wider catchment context. 6.0 Preferred Fish Passage Options Where preferred options have not been shown for progression within the project, it is understood that the Wey Forward Project will use outline designs and data produced to date will be used to progress these fish passes subject to funding. 6.1 Hamm Oil Mills The preferred fish pass option for Hamm Oil Mills is Hamm_F01 Convert Coleson s Channel, which runs alongside the River Wey Navigation. This would include a pre-barrage at the upstream end of Coleson s Channel at the confluence with the River Wey Navigation, and 3 Lower Thames Fish Passage Study, Babtie, Brown and Root (ref ), Environment Agency Project (ref.1/0776/228/ )

7 modifications to the weir structure at the downstream end of Coleson s Channel at the confluence with the River Thames. The inclusion of a fish passage solution at this site will restore longitudinal connectivity between the rivers Wey and Thames water bodies. From this site downstream, to the Sea, there are existing fish passes installed at all obstructions. 6.2 Walsham At the time of the tele-conference on 11 September 2013, the preferred fish pass option for the Walsham site (principally on cost grounds) was conversion of the existing drain to the south of the main navigation channel. However, subsequent advice from our Estates team was that the natural channel option closer to the weir was likely to be more acceptable to the riparian owners and that contributions may be easier to obtain therefore it is option Walsh_F03 which has been progressed to option development. It was also preferred as an option that would allow the channel profile to be optimised for habitat and passage. 6.3 Abbey / Newark / Ockham There is an existing fish pass adjacent to Abbey weir. The preferred fish pass option (subject to available funding) is Abb_F02 Fish Pass Upgrade Existing. No fish pass options were considered for Newark weir as it was thought to be cheaper and easier to upgrade the fish pass at Abbey as part of the project. Improvements to the fish pass at Abbey weir would help restore connectivity within this water body. Inclusion of an eel pass facility at Newark weir would improve upstream migration and colonisation of eel into the catchment and this has been included in the project. At the start of the options appraisal stage conversion of the Ockham Mill Channel to a potential route for fish passage was considered which would bypass both Walsham and Newark Weirs. Ockham Mill Sluice upstream of Newark Weir allows water to flow into this channel which extends almost 3km downstream, past Ockham Mill to rejoin the Wey. On further examination it was concluded that this option should not be pursued for the following reasons: Additional fish pass structures would be required around the obstruction presented by the Ockham Mill private residential properties The very low flow capacity of the channel compared to that of the main River Wey would be unlikely to provide sufficient attraction for fish at the downstream confluence with the Wey. The option would not facilitate fish passage in the main Wey channel past Walsham Weir and up to the existing fish pass on the Abbey Stream 6.4 Broadmead No fish pass options were considered as part of this project for Broadmead weir. However, to fully meet WFD objectives at this location a natural channel fish pass could be constructed on the right bank of the navigation channel which has a suitable land profile to bypass the weir which would connect with the 2.5km length of the Broadmead Cut below the weir. The layout would be similar to that proposed for Bowers. Alternatively, a Larinier solution similar to Millmead might also be possible. 6.5 Bowers Mill The preferred fish pass option for Bowers Mill is Bow_F03 Naturalised bypass channel on the left bank around the National Trust weir at the upstream end of the navigation channel from the main River Wey channel. This would be the most effective and sustainable solution and would not reduce the National Trust weir discharge capacity. Bowers Mill weir is off the

8 navigation some distance downstream of the National Trust weir. Construction work for a fish pass at this location would be essentially independent of the proposed weir works as land access can readily be obtained via the Slyfield Regeneration Site. The National Trust has indicated that there are no current plans to undertake works on their weir, although the longer term requirement to provide fish passage is recognised. It is therefore recommended that a potential fish pass at this location should be considered as part of a subsequent project, possibly in partnership with Guildford Borough Council as part of the Slyfield Regeneration. 6.6 Millmead The preferred fish pass option for our Millmead Weir is Mill_F01 Larinier, which is the least cost option. Downstream of our weir two other structures (the GBC weir and the Town Mill hydropower plant) owned by Guildford Borough Council also provide obstructions to fish passage However, Millmead Weir is the most upstream obstruction at this site and presents the optimum location for a fish pass facility. GBC has indicated that there are no current plans to undertake works on their weir or the Town Mill, although the longer term requirement to provide fish passage is recognised. The possibility of contributions to construction of a fish pass at Millmead Weir as part of the Wey Weirs Refurbishment Project has been discussed with GBC. GBC has indicated that while contributions in kind (e.g. making land available for access and permanent works) could be considered in a partnership arrangement, but so far only a 20k direct Section 106 financial contribution to fund construction only has been allocated, although more is possible. This means that third-party funding is uncertain within the timescale of the project ( ). 6.7 Elstead and High Mill Outline layouts of options for fish passes at these locations have been developed and will be passed to the Wey Structures project team. However, unlike on the navigable section of the River Wey, there is no requirement to prevent impact to navigation or heritage conservation designation. The benefits of the retained water levels are essentially for amenity reasons relating to local properties. However, as noted in the Site Visit and Outline Options Report, the control of the weirs at Elstead (which is carried out by the managers of the Elstead Mill pub/restaurant owned by Fuller Smith & Turner plc) is important for implementation of the Water Level Management Plan for Charleshill SSSI located upstream. The WLMP states that The river levels are controlled at Elstead Mill and In 1998 a new management regime had been agreed, that the head level will be maintained at 43.60m plus or minus 100mm. This is a more stable regime than that previously operated. Despite this agreement, in 2007 the Surrey Wildlife Trust noted that the river levels fluctuated considerably and that there was increasing erosion of the river banks due to changes in levels. The preferred option for our weirs at both Elstead and High Mill is to enter into negotiation with the local land owners with a view to transferring ownership as part of the Wey Weirs Refurbishment Project. The requirements for fish passage at all structures under WFD will be included as part of these negotiations alongside potential development of the outline designs provided to the parallel Wey Forward Project if funding is received.

9 Appendix 1 Fish Pass Option Presentation

10 Page left blank

11 Appendix 2 Minutes of Project Team Meeting

12 Page left blank

13 Appendix 3 Fish Pass Prioritisation Paper

14 Appendix 4 Fish Pass Percentage Comparison

Preliminary Environmental Information Report

Preliminary Environmental Information Report Wey Weirs Refurbishment - Project Appraisal Preliminary Environmental Information Report Version: Final October 2014 Wey Weirs Refurbishment, Preliminary Environmental Information Report i We are the Environment

More information

An Irish Strategy for River Restoration: How it works on the ground. Karen Delanty

An Irish Strategy for River Restoration: How it works on the ground. Karen Delanty An Irish Strategy for River Restoration: How it works on the ground Karen Delanty River Restoration and EU Directives River Restoration in Ireland to-date; TAM (Tourism Angling Measure) Local small scale

More information

Howsham fish passage Consultation document

Howsham fish passage Consultation document Howsham fish passage Consultation document Report ENVIMNE000903 Final version 30 June 2016 We are the Environment Agency. We protect and improve the environment. Acting to reduce the impacts of a changing

More information

Improving the physical condition of Scotland s water environment. A supplementary plan for the river basin management plans

Improving the physical condition of Scotland s water environment. A supplementary plan for the river basin management plans Improving the physical condition of Scotland s water environment A supplementary plan for the river basin management plans Contents Executive summary... 2 1. Introduction... 3 2. Vision... 4 3. Taking

More information

Advice note. Linking River and Floodplain Management

Advice note. Linking River and Floodplain Management Advice note Linking River and Floodplain Management Advice note Linking River and Floodplain Management Demonstrating STrategic REstoration And Management (STREAM) is a 1 million four-year conservation

More information

1. Purpose and scope. 2. SEPA's role in hydropower and planning

1. Purpose and scope. 2. SEPA's role in hydropower and planning Page no: 1 of 10 1. Purpose and scope 1.1 The purpose of this note is to provide guidance on the approach that we will take when dealing with hydropower development management consultations. We welcome

More information

Engineering in the water environment: good practice guide. River crossings

Engineering in the water environment: good practice guide. River crossings Engineering in the water environment: good practice guide River crossings Second edition, November 2010 Contents 1 Introduction 3 2 Impacts of crossings 5 2.1 Construction phase impacts 5 2.2 Barrier to

More information

London Borough of Waltham Forest LOCAL FLOOD RISK MANAGEMENT STRATEGY. Summary Document

London Borough of Waltham Forest LOCAL FLOOD RISK MANAGEMENT STRATEGY. Summary Document LOCAL FLOOD RISK MANAGEMENT STRATEGY Summary Document October 2013 Local Flood Risk Management Strategy Summary 1 Introduction 2 Partner responsibilities 3 What do we know about flooding in the borough?

More information

River Wensum Restoration Strategy Swanton Morley Restoration Scheme Reach 14a

River Wensum Restoration Strategy Swanton Morley Restoration Scheme Reach 14a River Wensum Restoration Strategy Swanton Morley Restoration Scheme Reach 14a At a glance River restoration benefits: Improved planform, channel cross-section, flow variation and sediment process. Improved

More information

Delivering multiple benefits through effective river restoration UK & EU

Delivering multiple benefits through effective river restoration UK & EU Martin Janes Managing Director The River Restoration Centre Delivering multiple benefits through effective river restoration UK & EU CIEEM Annual Conference Southampton 2013 rrc@therrc.co.uk 01234 752979

More information

ArcGIS Model Build. ArcGIS Geodatabase. Brian Beckett (Inland Fisheries Ireland) and Dr. Sally Cook (Supervisor, University of Ulster, Coleraine)

ArcGIS Model Build. ArcGIS Geodatabase. Brian Beckett (Inland Fisheries Ireland) and Dr. Sally Cook (Supervisor, University of Ulster, Coleraine) An evaluation of GIS for the predictive modelling and mapping of specific stream power, substratum particle size and potential juvenile lamprey habitat Brian Beckett (Inland Fisheries Ireland) and Dr.

More information

Places Directorate Environment Infrastructure PO Box 100 Wigan Council WN1 3DS. Culvert Advice Note

Places Directorate Environment Infrastructure PO Box 100 Wigan Council WN1 3DS. Culvert Advice Note Places Directorate Environment Infrastructure PO Box 100 Wigan Council WN1 3DS Culvert Advice Note Culverts Advice Note Revisions Rev Date Details Prepared by Reviewed by Approved by 1 19/07/2013 AC MAJ

More information

How To Write A New Bill On Flood Management In Scotland

How To Write A New Bill On Flood Management In Scotland Scottish Environment LINK is the forum for Scotland's voluntary environment organisations representing a broad spectrum of environmental interests with the common goal of contributing to a more environmentally

More information

Rural Flooding: The Potential Role of Forestry

Rural Flooding: The Potential Role of Forestry Rural Flooding: The Potential Role of Forestry Nadeem Shah, Tom Nisbet, & Huw Thomas Centre for Forestry and Climate Change Structure Background Woodland and Flood Alleviation The Theory. Studies on Woodland

More information

1 Introduction. 1.1 Key objective. 1.2 Why the South Esk

1 Introduction. 1.1 Key objective. 1.2 Why the South Esk 1 Introduction 1.1 Key objective The aim of this study is to identify and assess possible options for improving the quality of the river channel and habitats in the River South Esk catchment whilst helping

More information

Action plans for hotspot locations - Ash Study

Action plans for hotspot locations - Ash Study Appendix 9 Action plans for hotspot locations - Ash Study Ash Vale North 1. Local evidence indicates the culvert could not discharge during December 2013 because the outlet was blocked on the western side

More information

King County, Washington Policies and Practice for the Use of Eminent Domain For Flood Risk Reduction

King County, Washington Policies and Practice for the Use of Eminent Domain For Flood Risk Reduction King County, Washington Policies and Practice for the Use of Eminent Domain For Flood Risk Reduction Introduction Eminent domain refers to the power possessed by the state over all property within the

More information

Macro water sharing plans the approach for unregulated rivers

Macro water sharing plans the approach for unregulated rivers Macro water sharing plans the approach for unregulated rivers Access and trading rules for pools Leading policy and reform in sustainable water management Publisher NSW Office of Water Level 18, 227 Elizabeth

More information

Essex County Council Flood Investigation Report

Essex County Council Flood Investigation Report Essex County Council Stock City of Chelmsford Rev Date Details Author Checked and Approved By 01 February 2015 Draft report for stakeholder consultation Ed Clarke Flood Investigation Engineer Lucy Shepherd

More information

The River Ribble is one of the longest rivers in the North West of England

The River Ribble is one of the longest rivers in the North West of England River Ribble The River Ribble is one of the longest rivers in the North West of England Did you know? The tidal limit of the Ribble is 11 miles inland (above Preston); The River Ribble is home to a variety

More information

11.4 Voluntary Purchase. 11.5 House Raising and Flood Proofing

11.4 Voluntary Purchase. 11.5 House Raising and Flood Proofing 11.4 Voluntary Purchase As mentioned in Section 10 in certain high hazard areas of the floodplain, it may be impractical or uneconomic to mitigate flood hazard to existing properties at risk, or flood

More information

Aiding the Hydro-scheme development process. Web-links to useful information sources

Aiding the Hydro-scheme development process. Web-links to useful information sources Aiding the Hydro-scheme development process. Web-links to useful information sources Web-pages are in bold. These pages aim at providing developers, land-owners, decision makers and advisors with a collation

More information

SECTION 10.0 MANAGEMENT UNIT 5: HORNSEA

SECTION 10.0 MANAGEMENT UNIT 5: HORNSEA 10.1 Summary Information 10.1.1 Location SECTION 10.0 MANAGEMENT UNIT 5: HORNSEA The limits of Management Unit 5, a 2.9km stretch of shoreline fronting the town of Hornsea on the Holderness coast, are

More information

Gold Ray Dam Interagency Technical Team Meeting

Gold Ray Dam Interagency Technical Team Meeting Gold Ray Dam Interagency Technical Team Meeting Agenda Public Outreach, Funding, Monitoring EA/BA/Permit Updates Deconstruction Plans Fish Passage & Salvage Plan Hydraulic Modeling Next Steps Public Outreach,

More information

Background Information: The Mamquam River Floodplain Restoration Project

Background Information: The Mamquam River Floodplain Restoration Project Background Information: The Mamquam River Floodplain Restoration Project The Mamquam River Floodplain Restoration project is being undertaken in partnership with the Squamish River Watershed Society, Fisheries

More information

BRIDGE SCOUR INVESTIGATION: DEVELOPING A SCREENING AND HYDRAULIC VULNERABILITY RATING SYSTEM FOR BRIDGES B.HERON 1 & C.BOWE 2

BRIDGE SCOUR INVESTIGATION: DEVELOPING A SCREENING AND HYDRAULIC VULNERABILITY RATING SYSTEM FOR BRIDGES B.HERON 1 & C.BOWE 2 BRIDGE SCOUR INVESTIGATION: DEVELOPING A SCREENING AND HYDRAULIC VULNERABILITY RATING SYSTEM FOR BRIDGES B.HERON 1 & C.BOWE 2 1 O Connor Sutton Cronin Consulting Engineers, Dublin, Ireland 2 Iarnród Éireann,

More information

1.1 At its meeting on 11 December 2014, Council resolved to (9.3): 1.3 This report also seeks the Council s approval to:

1.1 At its meeting on 11 December 2014, Council resolved to (9.3): 1.3 This report also seeks the Council s approval to: DUDLEY CREEK FLOOD REMEDIATION UPDATE Executive Leadership Team Member responsible: Officer responsible: Author: Director, Council Facilities and Infrastructure Unit Manager, Stormwater and Land Drainage

More information

Draft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT

Draft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT Draft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT MAY 2015 1 Contents 1 INTRODUCTION 3 2 DRAFT NEW MUSEUMS SITE SPD 4 3 STRATEGIC ENVIRONMENTAL

More information

Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers

Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers Development and Regeneration Services Glasgow City Council 229 George Street Glasgow G1 1QU May 2011 1. Introduction...-

More information

Rhode Island NRCS received approximately $2.4 million in ARRA funds to implement four floodplain easement projects.

Rhode Island NRCS received approximately $2.4 million in ARRA funds to implement four floodplain easement projects. American Recovery and Reinvestment Act (ARRA) Emergency Watershed Protection Program Floodplain Easements Rhode Island Natural Resources Conservation Service Rhode Island NRCS received approximately $2.4

More information

Designed and produced by geo-graphicsdesign.com DP 300 3/02

Designed and produced by geo-graphicsdesign.com DP 300 3/02 Designed and produced by geo-graphicsdesign.com DP 300 3/02 Guidance for Developers and Regulators Purpose This booklet is produced on behalf of the North East Scotland Flooding Advisory Group and is intended

More information

PROJECT STATUS REPORT. Development of microhabitat suitability criteria for fry and juvenile salmonids of the Trinity River

PROJECT STATUS REPORT. Development of microhabitat suitability criteria for fry and juvenile salmonids of the Trinity River PROJECT STATUS REPORT Development of microhabitat suitability criteria for fry and juvenile salmonids of the Trinity River Prepared for: Trinity River Restoration Program P.O. Box 13 1313 South Main St.

More information

Regulatory Features of All Coastal and Inland Ecological Restoration Limited Projects

Regulatory Features of All Coastal and Inland Ecological Restoration Limited Projects Eligibility Checklist This Ecological Restoration Limited Project Eligibility Checklist guides the applicant in determining if their project is eligible to file as an Inland or Coastal Ecological Restoration

More information

London Borough of Merton Local Flood Risk Management Strategy

London Borough of Merton Local Flood Risk Management Strategy Local Flood Risk Management Strategy Summary 2014-2020 Introduction In response to the severe flooding across large parts of England and Wales in summer 2007, the Government has recently enacted the Flood

More information

Site Assessment for Neighbourhood Plans: A toolkit for neighbourhood planners

Site Assessment for Neighbourhood Plans: A toolkit for neighbourhood planners Site Assessment for Neighbourhood Plans: A toolkit for neighbourhood planners Action the COI Table Of Contents Introduction... 3 Benefit of carrying out a site assessment... 4 How to carry out a site assessment

More information

A guide to your rights and responsibilities of riverside ownership in Wales

A guide to your rights and responsibilities of riverside ownership in Wales A guide to your rights and responsibilities of riverside ownership in Wales Natural Resources Wales is a Welsh Government Sponsored Body. Our purpose is to ensure that the natural resources of Wales are

More information

Environment Agency 2014 All rights reserved. This document may be reproduced with prior permission of the Environment Agency.

Environment Agency 2014 All rights reserved. This document may be reproduced with prior permission of the Environment Agency. Flood and coastal erosion risk management Long-term investment scenarios (LTIS) 2014 We are the Environment Agency. We protect and improve the environment and make it a better place for people and wildlife.

More information

Newbiggin House Farm,

Newbiggin House Farm, Newbiggin House Farm, Near Waberthwaite Flood Investigation Report 32 Flood Event 30/8/2012 Cumbria County Council Version Undertaken by Reviewed by Approved by Date Preliminary Colin Parkes Anthony Lane

More information

EPR Exempt Flood Risk Activities: descriptions and conditions

EPR Exempt Flood Risk Activities: descriptions and conditions EPR Exempt Flood Risk Activities: descriptions and conditions Version 1 April 2016 We are the Environment Agency. We protect and improve the environment. Acting to reduce the impacts of a changing climate

More information

ENVIRONMENTAL STATEMENT: VOLUME 2 APPENDICES 11.1 TO 11.3

ENVIRONMENTAL STATEMENT: VOLUME 2 APPENDICES 11.1 TO 11.3 NORTH LONDON WASTE AUTHORITY NORTH LONDON HEAT AND POWER PROJECT ENVIRONMENTAL STATEMENT: VOLUME 2 APPENDICES 11.1 TO 11.3 AD06.02 NORTH LONDON WASTE AUTHORITY NORTH LONDON HEAT AND POWER PROJECT ENVIRONMENTAL

More information

SUSTAINABLE URBAN DRAINAGE SYSTEMS

SUSTAINABLE URBAN DRAINAGE SYSTEMS overflow can lead into a permeable conveyance system to increase further the benefit and reduce the need for pipe systems. Pollutant removal rates have been shown to be high, with some pollutants being

More information

1.2 This technical note provides a preliminary investigation into the Flood Risk and provides outline drainage strategies.

1.2 This technical note provides a preliminary investigation into the Flood Risk and provides outline drainage strategies. ODYSSEY MARKIDES TECHNICAL NOTE PROJECT : CHAILEY HOUSE, BLEWBURY JOB NO. : 14-216 NOTE TITLE : PRELIMINARY FLOODING AND DRAIANGE AUTHOR : STEVEN ROOTH APPROVED : ANDREAS MARKIDES DATE : 02/09/2014 1.0

More information

Northern Territory Fisheries Resource Sharing Framework

Northern Territory Fisheries Resource Sharing Framework Northern Territory Fisheries Resource Sharing Framework Page 1 of 11 Introduction Fishing is important in the Northern Territory (Territory). Coastal Aboriginal people recognise sea country out to the

More information

Acting on your responses to the draft update to the river basin management plan and flood risk management plan consultations 2015 LIT 10345

Acting on your responses to the draft update to the river basin management plan and flood risk management plan consultations 2015 LIT 10345 LIT 10345 Acting on your responses to the draft update to the river basin management plan and flood risk management plan consultations 2015 We are the Environment Agency. We protect and improve the environment

More information

Final. Contact person: Colin Whittemore Aurecon Centre 1 Century City Drive Waterford Precinct, Century City Cape Town, South Africa

Final. Contact person: Colin Whittemore Aurecon Centre 1 Century City Drive Waterford Precinct, Century City Cape Town, South Africa Review Report and Recommendations for the Remediation of Flood Damage at the Berg River Causeway and the Dam Bypass Channel on Portion of Farms 1646 and 1014, Franschhoek Contact person: Colin Whittemore

More information

Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013.

Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013. Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013 Rationale Underground infrastructure may be at risk from valley, streambank

More information

LONDON BOROUGH OF HAVERING

LONDON BOROUGH OF HAVERING LONDON BOROUGH OF HAVERING CORPORATE ASSET MANAGEMENT PLAN 2015-2019 Sections LONDON BOROUGH OF HAVERING CORPORATE ASSET MANAGEMENT PLAN CONTENTS 1 Introduction and Context 2 Corporate Vision 3 Policy

More information

Penticton Creek May 4, 2015 Council Meeting

Penticton Creek May 4, 2015 Council Meeting Penticton Creek May 4, 2015 Council Meeting Penticton Creek Council Meeting May 4, 2015 Penticton Creek in the Early Years Penticton Creek Council Meeting May 4, 2015 Penticton Creek Today Penticton Creek

More information

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile Chapter 3 CULVERTS Description A culvert is a closed conduit used to convey water from one area to another, usually from one side of a road to the other side. Importance to Maintenance & Water Quality

More information

WHAT IS WORLD FISH MIGRATION DAY (WFMD)?

WHAT IS WORLD FISH MIGRATION DAY (WFMD)? WHAT IS WORLD FISH MIGRATION DAY (WFMD)? WFMD 2016 is a one day event to create worldwide awareness of the importance of freshwater migratory fish and open rivers for the general public, especially students

More information

London Borough of Croydon Local Flood Risk Management Strategy

London Borough of Croydon Local Flood Risk Management Strategy London Borough of Croydon Local Flood Risk Management Strategy Summary 2014-2020 Introduction In response to the severe flooding across large parts of England and Wales in summer 2007, the Government has

More information

INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION. Infrastructure Flood Protection Remediation Policies

INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION. Infrastructure Flood Protection Remediation Policies INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION Infrastructure Flood Protection Remediation Policies DRAFT POOLBEG PLANNING SCHEME 196 FIGURE 9.1: UTILITIES WAYLEAVES Electricity Cables 8m Wayleave for

More information

Flood Risk & Surface Water Management. Page 1 of 20

Flood Risk & Surface Water Management. Page 1 of 20 Page 1 of 20 Flood Risk & Surface Water Management Flood Risk & Surface Water Management and the Planning Process Introduction The purpose of this document is to increase awareness of the potential of

More information

Sites of Importance for Nature Conservation (SINCs). Guidelines for their Identification, Selection and Designation

Sites of Importance for Nature Conservation (SINCs). Guidelines for their Identification, Selection and Designation Sites of Importance for Nature Conservation (SINCs). Guidelines for their Identification, Selection and Designation Isle of Wight Biodiversity Partnership August 2010 1. Introduction 1.1 This document

More information

Planning Application Non Technical Summary. Planning Application Document A May 2013. Defence College of Technical Training Lyneham

Planning Application Non Technical Summary. Planning Application Document A May 2013. Defence College of Technical Training Lyneham Planning Application Non Technical Summary Planning Application Document A May 2013 Defence College of Technical Training Lyneham 2 Defence College of Technical Training, Lyneham Integrating Technical

More information

Flood and Coastal Erosion Risk Management Service Delivery Plan

Flood and Coastal Erosion Risk Management Service Delivery Plan Flood and Coastal Erosion Risk Management Service Delivery Plan Document Information Title Flood and coastal erosion risk management Service Delivery Plan Owner Sefton Council Version 1.2 Status Draft

More information

Chapter 2 Spatial Portrait

Chapter 2 Spatial Portrait 15 November 2013 Dear Julie Fylde Local Plan to 2030 Part 1 Preferred Options Thank you for the opportunity to meet with you on 9 October in respect of the above mentioned document. As discussed at the

More information

Black Canyon Hydroelectric Project FERC Project No. P-14110 Proposed Fish Passage Study Plan September 2012

Black Canyon Hydroelectric Project FERC Project No. P-14110 Proposed Fish Passage Study Plan September 2012 Black Canyon Hydroelectric Project FERC Project No. P-14110 Proposed Fish Passage Study Plan September 2012 Prepared for Black Canyon Hydro, LLC 3633 Alderwood Avenue Bellingham, WA 98225 Table of Contents

More information

ENVIRONMENT AGENCY POLICY REGARDING CULVERTS

ENVIRONMENT AGENCY POLICY REGARDING CULVERTS ENVIRONMENT AGENCY POLICY REGARDING CULVERTS T E C H N I C A L G U I D A N C E O N C U L V E R T I N G P R O P O S A L S M A R C H 1 9 9 9 E N V I R O N M E N T 1.0 Purpose This leaflet provides technical

More information

Outlet stabilization structure

Outlet stabilization structure Overview of Sedimentation and Erosion Control Practices Practice no. 6.41 Outlet stabilization structure Erosion at the outlet of channels, culverts, and other structures is common, and can cause structural

More information

National Directorate for Fire and Emergency Management

National Directorate for Fire and Emergency Management National Directorate for Fire and Emergency Management Guide to Works and Development Consents for Repairing Infrastructure Damaged in Storms or other Emergency Events Document Title Guide to Works and

More information

XAYABURI HYDRO POWER PLANT, LAO PDR

XAYABURI HYDRO POWER PLANT, LAO PDR XAYABURI HYDRO POWER PLANT, LAO PDR BACKGROUND MATERIAL ON PÖYRY S ASSIGNMENT CONTENT About Pöyry Pöyry s hydropower competences, p. 4-6 Xayaburi hydropower plant project, p. 7-14 Pöyry s role in the project,

More information

121 FERC 62,167 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION. Public Utility District No. 1 of Project No. 637-044 Chelan County

121 FERC 62,167 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION. Public Utility District No. 1 of Project No. 637-044 Chelan County 121 FERC 62,167 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Public Utility District No. 1 of Project No. 637-044 Chelan County ORDER MODIFYING AND APPROVING LAKE CHELAN FISHERY PLAN,

More information

Guildford borough Local Plan Local Development Scheme 2015

Guildford borough Local Plan Local Development Scheme 2015 Guildford borough Local Plan Local Development Scheme 2015 Summary The Local Development Scheme (LDS) is the timetable and project plan for the new Guildford borough Local Plan. The LDS explains what documents

More information

Chehalis River Basin Flood Damage Reduction 2013-2015 Capital Budget Approved by Legislature in June 2013

Chehalis River Basin Flood Damage Reduction 2013-2015 Capital Budget Approved by Legislature in June 2013 Chehalis River Basin Flood Damage Reduction 2013-2015 Capital Budget Approved by Legislature in June 2013 1. Design alternatives for large capital flood projects (basinlevel water retention and Interstate

More information

The Role of the Lender Common Infrastructure Design and Scoping Issues ESIA: The Management Planning Process Case Study Cross Cutting Themes:

The Role of the Lender Common Infrastructure Design and Scoping Issues ESIA: The Management Planning Process Case Study Cross Cutting Themes: Infrastructure Development, Ecosystem Services and the need for Adaptive Management: An EPFI s Perspective Chris Pullen Export Development Canada IAIA Biodiversity Symposium February 7, 2013 Presentation

More information

Chapter 9: Water, Hydrology and Drainage Land West of Uttoxeter

Chapter 9: Water, Hydrology and Drainage Land West of Uttoxeter Chapter 9: Water, Hydrology and Drainage Land West of Uttoxeter ENVIRONMENTAL STATEMENT: VOLUME 1 9.1 INTRODUCTION 9.1.1 This Chapter considers the effects of the Project on surface water and groundwater

More information

Restoration Planning and Development of a Restoration Bank

Restoration Planning and Development of a Restoration Bank Restoration Planning and Development of a Restoration Bank Black Creek Pioneer Village, South Theatre 8:30 a.m. to 3:30 p.m. Habitat Restoration and Environmental Monitoring Projects Section Restoration

More information

Homes and Environment Scrutiny Committee. (Environment & Transport)

Homes and Environment Scrutiny Committee. (Environment & Transport) REPORT TO: REPORT NO: Homes and Environment Scrutiny Committee HHPPE/89/15S DATE: 9 September 2015 LEAD MEMBER: Councillor David A Bithell (Environment & Transport) CONTACT OFFICER: Neil Taunt (Tel: 729734)

More information

How To Preserve Wildlife

How To Preserve Wildlife Multiple benefits from catchment restoration Alastair Driver, National Biodiversity Manager Environment Agency, UK @AliDriverEA Biodiversity 2020 the challenge Outcome 1A at least 90% of priority habitats

More information

Hydropower: A closer look at Archimedes Screws. Dr Peter Walker APEM Senior Aquatic Scientist

Hydropower: A closer look at Archimedes Screws. Dr Peter Walker APEM Senior Aquatic Scientist Hydropower: A closer look at Archimedes Screws Dr Peter Walker APEM Senior Aquatic Scientist Why am I here? To talk about Archimedes screw hydropower Topics covered: A brief, general overview of hydropower

More information

Arkansas River Corridor Vision & Master Plan

Arkansas River Corridor Vision & Master Plan A r k a n s a s R I v e r C o r r I d o r P l a n Arkansas River Corridor Vision & Master Plan July 2005 Indian Nations Council of Governments A r k a n s a s R I v e r C o r r I d o r P l a n Partnership

More information

1.7.0 Floodplain Modification Criteria

1.7.0 Floodplain Modification Criteria 1.7.0 Floodplain Modification Criteria 1.7.1 Introduction These guidelines set out standards for evaluating and processing proposed modifications of the 100- year floodplain with the following objectives:

More information

4. Environmental Impacts Assessment and Remediation Targets

4. Environmental Impacts Assessment and Remediation Targets 4. Environmental Impacts Assessment and Remediation Targets 4.1 Environmental Impacts Significant additional development in the Alder Creek watershed is not anticipated at this time; however, there are

More information

Prepared By: Eric Chamberlain

Prepared By: Eric Chamberlain Prepared By: Eric Chamberlain Drainage 101 So, What s a Municipal Drain??? It is a Drainage System either open ditch or enclosed pipe system or any other water control structure Petitioned for by landowners

More information

Stream Restoration Making It Happen: The Restoring The Waters Project

Stream Restoration Making It Happen: The Restoring The Waters Project Stream Restoration Making It Happen: The Restoring The Waters Project STEPHEN FROST, Fairfield City Council ROD WIESE, Department of Land & Water Conservation BARBARA SCHAFFER, Schaffer Barnsley Landscape

More information

Monitoring the Benefits of Instream Habitat Diversity. Entiat River, Chelan County, Washington

Monitoring the Benefits of Instream Habitat Diversity. Entiat River, Chelan County, Washington Monitoring the Benefits of Instream Habitat Diversity Entiat River, Chelan County, Washington Bureau of Reclamation Bonneville Power Administration May 2013 This is an update of the report that first occurred

More information

Communications strategy refresh. January 2012. 1 c:\documents and settings\mhln.snh\objcache\objects\a654473.doc

Communications strategy refresh. January 2012. 1 c:\documents and settings\mhln.snh\objcache\objects\a654473.doc Communications strategy refresh January 2012 1 c:\documents and settings\mhln.snh\objcache\objects\a654473.doc Contents 1. Introduction p 3 a. SNH: corporate aims and objectives b. SNH and communications

More information

UTILITIZATION OF ECOHYDROLOGIC MODELS IN FLOODPLAIN FISH PASSAGE AND HABITAT RESTORATION EVALUATION

UTILITIZATION OF ECOHYDROLOGIC MODELS IN FLOODPLAIN FISH PASSAGE AND HABITAT RESTORATION EVALUATION UTILITIZATION OF ECOHYDROLOGIC MODELS IN FLOODPLAIN FISH PASSAGE AND HABITAT RESTORATION EVALUATION Joshua A. Israel, Fish Biologist, U.S Bureau of Reclamation, Sacramento, CA. jaisrael@usbr.gov; Paul

More information

Fluvial non-tidal Fluvial tidal Coastal

Fluvial non-tidal Fluvial tidal Coastal Location: Castleconnell, Co. Limerick Unique ID: 252889 (from PFRA database) Initial OPW Designation APSR AFRR IRR Co-ordinates Easting: 166,390 Northing: 162,679 River / Catchment / Sub-catchment River

More information

EXAMPLES (OPEN-CHANNEL FLOW) AUTUMN 2015

EXAMPLES (OPEN-CHANNEL FLOW) AUTUMN 2015 EXAMPLES (OPEN-CHANNEL FLOW) AUTUMN 2015 Normal and Critical Depths Q1. If the discharge in a channel of width 5 m is 20 m 3 s 1 and Manning s n is 0.02 m 1/3 s, find: (a) the normal depth and Froude number

More information

Sutton Harbour Holdings PLC. March 2007

Sutton Harbour Holdings PLC. March 2007 Sutton Harbour Holdings PLC March 2007 Contents!! " # # $ % % &'(&'' ) ) ( * + ', *!$ -,!'! #. / $$ #% 00& ' 00&1 $ Executive Summary!! " WSP Development and Transportation has been engaged by Sutton

More information

Highway Asset Management Strategy

Highway Asset Management Strategy 1. Introduction 1.1. Cheshire East Council (CEC) recognises the importance of its highway infrastructure and how an effectively maintained and managed network contributes to the achievement of its corporate

More information

5 ALTERNATIVE SOLUTIONS AND EVALUATION

5 ALTERNATIVE SOLUTIONS AND EVALUATION Page 23 5 ALTERNATIVE SOLUTIONS AND EVALUATION The process used for the assessment and evaluation of the alternatives follows the procedures of the Municipal Class EA, as described below: Identify a reasonable

More information

Thank you to all of our 2015 sponsors: Media Partner

Thank you to all of our 2015 sponsors: Media Partner Thank you to all of our 2015 sponsors: Media Partner Channel Naturalization: Planning and Implementation in Peel Region TRIECA March 25 & 26, 2015 Peel Region Channel Remediation Strategy An Urban Context

More information

Hampshire Avon WFD Management Area Abstraction Licensing Strategy

Hampshire Avon WFD Management Area Abstraction Licensing Strategy Hampshire Avon WFD Management Area Abstraction Licensing Strategy A licensing strategy to manage water resources sustainably 22 nd December 2012 We are the. It's our job to look after your environment

More information

SCHNEIDER CREEK REMEDIATION CLASS ENVIRONMENTAL ASSESSMENT ADDENDUM

SCHNEIDER CREEK REMEDIATION CLASS ENVIRONMENTAL ASSESSMENT ADDENDUM SCHNEIDER CREEK REMEDIATION CLASS ENVIRONMENTAL ASSESSMENT ADDENDUM PUBLIC MEETING FEBRUARY 8 TH, 2012 The City of Kitchener and Grand River Conservation Authority (GRCA) are undertaking an Environmental

More information

Community Infrastructure Levy

Community Infrastructure Levy Woking Borough Council Local Development Framework Community Infrastructure Levy Charging Schedule October 2014 Produced by the Planning Policy Team. For further information please contact: Planning Policy,

More information

Development Brief for New Lodge, Bank Mill Lane Berkhamsted. Adopted November 2007

Development Brief for New Lodge, Bank Mill Lane Berkhamsted. Adopted November 2007 Development Brief for New Lodge, Bank Mill Lane Berkhamsted Adopted November 2007 This publication seeks your opinions about the design, layout and requirements for new housing development at New Lodge,

More information

Coldwater Heritage Partnership Implementation Grant Final Report Morrison Run Watershed Restoration Project Western Pennsylvania Conservancy Project Summary The goal of the Morrison Run Watershed Restoration

More information

Rivers Group. Effect of Canterbury Earthquakes on Waimakariri, Kaiapoi, & Halswell Rivers. Flooding & Drainage Perspectives

Rivers Group. Effect of Canterbury Earthquakes on Waimakariri, Kaiapoi, & Halswell Rivers. Flooding & Drainage Perspectives Rivers Group Effect of Canterbury Earthquakes on Waimakariri, Kaiapoi, & Halswell Rivers Flooding & Drainage Perspectives Waimakariri River Catchment Waimakariri River Hydrology Catchment area - 3,990

More information

Plan Groundwater Procurement, Implementation and Costs, prepared for the Brazos River Authority, July 2005.

Plan Groundwater Procurement, Implementation and Costs, prepared for the Brazos River Authority, July 2005. 6 Conjunctive Use 6.1 Lake Granger Augmentation 6.1.1 Description of Option Rapid population growth and development in Williamson County require additional water supplies throughout the planning period.

More information

Integrated Restoration Prioritization

Integrated Restoration Prioritization Integrated Restoration Prioritization Habitat Restoration and Environmental Monitoring Projects Section Restoration Services Division Definition Restoration Prioritization is a process of combining various

More information

Climate Local Hampshire County Council Our progress on November 2013

Climate Local Hampshire County Council Our progress on November 2013 Climate Local Hampshire County Council Our progress on November 2013 Since signing up to Climate Local on in July 2013 we have made the following progress towards achieving the commitments and actions

More information

Sample Micro Hydro Initial Report

Sample Micro Hydro Initial Report Sample Micro Hydro Initial Report Sample Micro Hydro Initial Report Introduction The Hydro Burn at Glen Water was visited by Richard Haworth of Glen Hydro to assess its suitability for a micro hydro installation.

More information

Wye and Usk Catchment Flood Management Plan. Summary Report January 2010. managing flood risk

Wye and Usk Catchment Flood Management Plan. Summary Report January 2010. managing flood risk Wye and Usk Catchment Flood Management Plan Summary Report January 2010 managing flood risk We are Environment Agency Wales. It s our job to look after your environment and make it a better place for you,

More information

DRAFT V5. PFSC 16/05/2014 Appendix 1. Outline Plan to deliver the County Council s investment property Strategy

DRAFT V5. PFSC 16/05/2014 Appendix 1. Outline Plan to deliver the County Council s investment property Strategy PFSC 16/05/2014 Appendix 1 Outline Plan to deliver the County Council s investment property Strategy 1. Strategic Drivers 1.1 The County Council s property investment strategy sets out how its property

More information

Recommendations for future developments

Recommendations for future developments C Recommendations for future developments C.1 Reducing flood risk through site layout and design C.1.1 C.1.2 Flood risk should be considered at an early stage in deciding the layout and design of a site

More information

Needs Report. Application for Development Consent. Thames Tideway Tunnel Thames Water Utilities Limited. Application Reference Number: WWO10001

Needs Report. Application for Development Consent. Thames Tideway Tunnel Thames Water Utilities Limited. Application Reference Number: WWO10001 Thames Tideway Tunnel Thames Water Utilities Limited Application for Development Consent Application Reference Number: WWO10001 Needs Report Doc Ref: 8.3 Main Report APFP Regulations 2009: Regulation 5(2)(q)

More information

A Green Sector Overview

A Green Sector Overview A Green Sector Overview Micro Hydro Electric Power Ontario's Waterpower Resources: Past and Present The first hydroelectric generator in Canada was installed near Ottawa, which was the first city in North

More information