1 Penticton Creek May 4, 2015 Council Meeting

2 Penticton Creek Council Meeting May 4, 2015 Penticton Creek in the Early Years

3 Penticton Creek Council Meeting May 4, 2015 Penticton Creek Today

4 Penticton Creek Council Meeting May 4, 2015 Agenda: Agenda Project Location Objectives Project Background Design Flow Flood Protection Considerations The M178 Plan and Bylaws The Showcase Project details Schedule Staff Recommendation Alternatives

5 Penticton Creek Council Meeting May 4, 2015 Project Location:

6 Objectives Return Penticton Creek to a more healthy stream state with a focus on habitat features that benefit Kokanee, Rainbow Trout and Riparian wildlife; Address existing failing flood protection infrastructure; Meet or exceed existing flood protection measures; Improve aesthetic and social values; Increase economic contributions to the local community; Be consistent with the Downtown Plan, Penticton Creek is an important natural amenity; Be consistent with the OCP, promotion of critical species habit and the restoration of fish stocks in Okanagan Lake.

7 Project Background Council identified the enhancement of the Downtown as a strategic priority; Key component of the plan was recognition of the importance of Penticton Creek; 2012 Q3 Proposal received to request funding from the Habitat Conservation Trust Foundation (HCTF) to develop a restoration plan for Penticton Creek; 2013 Q1 Four years of grant funding obtained to cover the cost of designing a restored creek channel; 2013 Q2 City Council established the Penticton Creek Restoration Committee to work with staff to make the restoration of the Creek a priority; and 2014 Q1 a consultant was hired through an RFP process to work on preliminary and detail design.

8 Milestones and achievements Design flow finalized; Showcase Project Area defined; Project Background Funding of $333,000 has been secured for construction of the showcase project for this year; and Preliminary Design underway for Showcase Project.

9 Design Flow: Design Flow Mould Engineering determined a Design Flow consistent with Provincial flood requirements; The Design Flow will be used for hydraulic analysis and detailed design: Historical information = 40 m3/s + 25% for peaking factor = 10 m3/s + 20% for climate change (recommended by APEG) = 10 m3/s Recommended Design Flow = 60 m3/s

10 Design Flow STAFF RECOMMENDATION That an Instantaneous 1 in 200 year design flow of 60 cubic meters per second be used for detail design purposes.

11 Flood Protection Considerations Considerations: Flood protection considered as part of the project; Vitally important to protect adjacent property owners & the community at large from flooding; Real and perceived risks of flooding have to be addressed; Any decrease in freeboard (rise in water levels) could be seen as an increased flood risk;

12 Flood Protection Considerations Considerations: A more conservative and defensible position would be to ensure that the new design does not present any less freeboard than the original design; This is called a No-rise approach; Since March 5, 2015 Mould Engineering has established that the showcase project could be designed and constructed to achieve a no-rise situation; However private land with in the M178 Plan area would be required (Discussed in detail later).

13 Flood Protection Considerations The balance: Tolerance for the risk of flooding attributed to any proposed works vs; Fish habitat improvements; Lowering the risk of flooding also lowers the fish habitat improvement value and vice versa; There are locations where the creek could rise with no impact on flood risk.

14 Flood Protection Considerations Key considerations: The original concrete flood protection works, particularly upstream of Ellis Street, are gradually failing; How will a lesser freeboard be viewed by adjacent landowners; How will a reduction in fish habitat values impact funding.

15 Flood Protection Considerations STAFF RECOMMENDATION That the showcase area be designed utilizing a No-Rise philosophy adjusted where possible to enhance fish habitat while not significantly increasing the risk of flooding.

16 M178 Plan and Bylaws Between Five bylaws were enacted related to the channelization of Penticton Creek; The purpose of the bylaws was to establish a corridor of land on which the City could construct, maintain, repair and replace creek flood protection works; These bylaws fall under section 34 of the Community Charter which allows for appropriation of land without compensation.

17 M178 Plan and Bylaws The City is obliged to provide clear notification to property owners of intended work on their land; Existing creek flood control works include the concrete channel and the berms; Today s legislation, under Section 34 of the Community Charter would also permit the City to appropriate land for flood control works.

18 M178 Plan and Bylaws

19 M178 Plan and Bylaws Moving forward It is proposed to work on private property reserved for that purpose by the aforementioned bylaws and the M-178 plan; Work is restricted to the limits of the actual construction undertaken previously; The showcase project could be constructed without impact to private land, using new concrete, however other sections of the creek upstream cannot be restored without reutilizing private property reserved for that purpose in the M-178 plan; Staff recommends that this precedent should not be set.

20 M178 Plan and Bylaws STAFF RECOMMENDATION That privately owned lands contained within the M-178 Plan be utilized in the construction of the Flood Control / Habitat restoration of Penticton Creek.

21 Showcase Project

22 Showcase Project Location

23 Showcase Project Selection was based on: Can be constructed within available budget ($333,000); Area is highly visible, providing excellent showcase opportunity; Potential to improve fish habitat; Addresses section of creek with severe short term channel maintenance requirements; City has control over the lands on which the works are proposed to be constructed via the M178 Plan.

24 Current Channel = LOW - Species Life Stage Migration Rearing Spawning Potential to improve fish habitat Habitat Quality Rating; Current Channel vs. Showcase Project under No-Rise Scenario Kokanee Spawners Low NA Nil Fry Low Nil NA Rainbow Trout Parr Low Nil NA Adult Low Low Nil Showcase Project Potential No-rise = LOW + Species Life Stage Migration Rearing Spawning Kokanee Spawners Moderate NA Low Fry Low Low NA Rainbow Trout Parr Low Low NA Adult Moderate Low Low

25 Showcase Project - Habitat The no-rise design represents a decline in fish habitat quality compared to allowing the creek level to rise; However there will be a substantial improvement over the current channel; Biggest benefit of the project will be generated from the showcase component; Demonstrating values and building support for long term larger scale/higher quality restoration; It is anticipated the current funders will continue to support this project on the basis of the long term benefits.

26 Showcase Project Mtce. Issues

27 Showcase Project Details Profile through creek bed

28 Rip-Rap Showcase Project Details

29 Showcase Project Details Rip-Rap

30 River rock embedded in concrete Showcase Project Details Details

31 River rock embedded in concrete Showcase Project Details

32 High Flow Showcase Project Details

33 High Flow Showcase Project Details

34 Low Flow Showcase Project Details

35 Showcase Project Details

36 Showcase Project - Details Before Construction concrete. After Construction Creek bed of river rock with riffles & pools. Creek banks are Rip-Rap except where constrained by width or need for smoother finish = River Rock Embedded in Concrete.

37 Showcase Project STAFF RECOMMENDATION That the City proceed with permit applications for the showcase project and with public consultation and following permit approvals proceed with construction of an 80m showcase project directly upstream of the Ellis Street Bridge in STAFF RECOMMENDATION That the 2016 Budget process include a Master Plan for the Penticton Creek Restoration project and that staff actively pursue funding for this project.

38 Schedule Schedule: Meeting with Landowners: April 14 May 4, 2015 Application Submission: As early as possible after April 14, 2015 Present to PIB Council: April 21, 2015 Open Council Meeting: May 4, 2015 Public Consultation: Market 8 a.m. - 1:30 p.m May 9, 2015 Penticton High School May 10, 2015 DPA 4-6 p.m. May 13, 2015 Library/Museum 4-7 p.m May 14, 2015 Confirm funding and tender: July 13, 2015 Construction : Summer 2015 subject to permits & approvals

39 Staff Recommendation THAT Council endorse moving forward with Penticton Creek Restoration project in accordance with the following Plan of Action: 1. Use an Instantaneous 1 in 200 year design flow of 60 cubic meters per second for detail design purposes; 2. That the showcase project be designed with a No-Rise philosophy adjusted where possible to enhance fish habitat while not significantly increasing the risk of flooding; 3. Utilize privately owned lands contained within the M-178 Plan in the construction of the Flood Control / Habitat restoration measures;

40 Staff Recommendation Cont d 4. Proceed with permit applications for the showcase project and with public consultation; 5. Following permit approvals, proceed with construction of an 80m showcase project directly upstream of the Ellis Street Bridge in 2015; 6. Include in the 2016 Budget a Master Plan for Flood Protection and Aquatic Habitat Restoration for the length of Penticton Creek from Okanagan Lake to the Penticton Creek II Dam by the Water Treatment Plant; and 7. Actively seek out funding sources for the Master Plan work.

41 Alternatives 1. THAT Council direct staff to cease work on the Showcase Project until such time as a Penticton Creek Flood Protection and Aquatic Habitat Restoration Master Plan for the length of Penticton Creek from Okanagan Lake to the Penticton Creek II Dam is completed; AND THAT Council direct staff to bring forward to the 2016 Budget the above noted Master Plan project; AND THAT staff pursue funding sources for the Master Plan work.

42 2. That Council provide other such direction to staff as they wish. Alternatives

43 Public can learn more:

The Teton Creek Restoration Project Summary:

The Teton Creek Restoration Project Summary: The Teton Creek Restoration Project Summary: The Teton Creek Restoration Project area extends for approximately one mile upstream from the Cemetery Road Bridge and includes the Aspen Pointe, The Aspens

More information

Mission Creek Flood Control & Restoration Project. City of Fremont, Alameda County

Mission Creek Flood Control & Restoration Project. City of Fremont, Alameda County Mission Creek Flood Control & Restoration Project City of Fremont, Alameda County Agenda Background Why are proposed improvements necessary? Proposed project components Challenges Construction schedule/phasing

More information

Stream Rehabilitation Concepts, Guidelines and Examples. Objectives. Pierre Y. Julien. Three Laws of Stream Restoration

Stream Rehabilitation Concepts, Guidelines and Examples. Objectives. Pierre Y. Julien. Three Laws of Stream Restoration Stream Rehabilitation Concepts, Guidelines and Examples Pierre Y. Julien Wuhan 2005 Objectives Part I - Stream restoration and rehabilitation: 1. Present and discuss important concepts, laws, criteria

More information

Prepared By: Eric Chamberlain

Prepared By: Eric Chamberlain Prepared By: Eric Chamberlain Drainage 101 So, What s a Municipal Drain??? It is a Drainage System either open ditch or enclosed pipe system or any other water control structure Petitioned for by landowners

More information

HERE COMES THE RAIN AGAIN Stormwater Management in a Changing Climate at the City of Toronto

HERE COMES THE RAIN AGAIN Stormwater Management in a Changing Climate at the City of Toronto HERE COMES THE RAIN AGAIN Stormwater Management in a Changing Climate at the City of Toronto Evergreen s Urban Watershed Forum 20 March 2015 Presented by Kurtis Elton Policy & Program Advisor, Toronto

More information

Valhalla Wilderness Society

Valhalla Wilderness Society Valhalla Wilderness Society Box 329, New Denver, British Columbia, Canada V0G 1S0 Phone: (250) 358-2333, Fax: (250) 358-7950, E-mail: vws@vws.org, Web: http://www.vws.org Robyn Roome Regional Director,

More information

The Effects of a Riparian Forest on Water Temperatures in the Restoration Area

The Effects of a Riparian Forest on Water Temperatures in the Restoration Area Study 31 The Effects of a Riparian Forest on Water Temperatures in the Restoration Area Final 2015 Monitoring and Analysis Plan January 2015 1.0 The Effects of a Riparian Forest on Water Temperatures

More information

Chehalis River Basin Flood Damage Reduction 2013-2015 Capital Budget Approved by Legislature in June 2013

Chehalis River Basin Flood Damage Reduction 2013-2015 Capital Budget Approved by Legislature in June 2013 Chehalis River Basin Flood Damage Reduction 2013-2015 Capital Budget Approved by Legislature in June 2013 1. Design alternatives for large capital flood projects (basinlevel water retention and Interstate

More information

Background Information: The Mamquam River Floodplain Restoration Project

Background Information: The Mamquam River Floodplain Restoration Project Background Information: The Mamquam River Floodplain Restoration Project The Mamquam River Floodplain Restoration project is being undertaken in partnership with the Squamish River Watershed Society, Fisheries

More information

Advice note. Linking River and Floodplain Management

Advice note. Linking River and Floodplain Management Advice note Linking River and Floodplain Management Advice note Linking River and Floodplain Management Demonstrating STrategic REstoration And Management (STREAM) is a 1 million four-year conservation

More information

Assessing Rivers for Restoration Purposes. Ann L. Riley Waterways Restoration Institute

Assessing Rivers for Restoration Purposes. Ann L. Riley Waterways Restoration Institute Assessing Rivers for Restoration Purposes Ann L. Riley Waterways Restoration Institute Assessing Rivers for Restoration Purposes Ann L. Riley Waterways Restoration Institute Assessing Rivers for Restoration

More information

Miquon Creek STREAM RESTORATION PROJECT WHO WE ARE

Miquon Creek STREAM RESTORATION PROJECT WHO WE ARE Miquon Creek STREAM RESTORATION PROJECT WHO WE ARE Introductions Brett Long, PE Project Permitting & Construction Oversight Chris Streb, PE Project Designer & Construction Oversight Assistance WHO WE ARE

More information

ROGUE RIVER SPRING CHINOOK SALMON CONSERVATION PLAN. Evaluation of spring Chinook salmon spawning in Big Butte Creek, 2008

ROGUE RIVER SPRING CHINOOK SALMON CONSERVATION PLAN. Evaluation of spring Chinook salmon spawning in Big Butte Creek, 2008 ROGUE RIVER SPRING CHINOOK SALMON CONSERVATION PLAN Evaluation of spring Chinook salmon spawning in Big Butte Creek, 28 Rogue Watershed District Oregon Department of Fish and Wildlife March 29 Introduction

More information

Urban Stream Restoration Defining the Full Benefits of a Project. Warren C. High MACTEC Engineering and Consulting

Urban Stream Restoration Defining the Full Benefits of a Project. Warren C. High MACTEC Engineering and Consulting Urban Stream Restoration Defining the Full Benefits of a Project Warren C. High MACTEC Engineering and Consulting Economics in the Decision Process Return on Investment Willingness to Pay Municipal Growth

More information

Session A3: Think Big: Adding Large Structures To Improve Ecosystem Health

Session A3: Think Big: Adding Large Structures To Improve Ecosystem Health University of Massachusetts - Amherst ScholarWorks@UMass Amherst International Conference on Engineering and Ecohydrology for Fish Passage International Conference on Engineering and Ecohydrology for Fish

More information

Get to Know Your Watershed. McMillan Creek

Get to Know Your Watershed. McMillan Creek Get to Know Your Watershed McMillan Creek Where is McMillan Creek? McMillan Creek is found in the northeastern portion of the City of Prince George, know as the Hart and Shady Valley. It is located entirely

More information

Arkansas River Corridor Vision & Master Plan

Arkansas River Corridor Vision & Master Plan A r k a n s a s R I v e r C o r r I d o r P l a n Arkansas River Corridor Vision & Master Plan July 2005 Indian Nations Council of Governments A r k a n s a s R I v e r C o r r I d o r P l a n Partnership

More information

Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013.

Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013. Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013 Rationale Underground infrastructure may be at risk from valley, streambank

More information

Skaguay Reservoir. FISH SURVEY AND MANAGEMENT DATA Greg A. Policky - Aquatic Biologist (Salida) greg.policky@state.co.

Skaguay Reservoir. FISH SURVEY AND MANAGEMENT DATA Greg A. Policky - Aquatic Biologist (Salida) greg.policky@state.co. FISH SURVEY AND MANAGEMENT DATA (Salida) greg.policky@state.co.us / 719-530-5525 General Information: Skaguay Reservoir, a 114 acre impoundment, offers good fishing for rainbow and brown trout with an

More information

Bowmanville Marsh Habitat Restoration and Public Access Project

Bowmanville Marsh Habitat Restoration and Public Access Project Bowmanville Marsh Habitat Restoration and Public Access Project Terms of Reference for Detailed and Conceptual Design Works December 2015 1.0 Background and Purpose The Bowmanville Marsh Habitat Restoration

More information

HUDSON RIVER-BLACK RIVER REGULATING DISTRICT BOARD MEETING JUNE 10, 2014

HUDSON RIVER-BLACK RIVER REGULATING DISTRICT BOARD MEETING JUNE 10, 2014 HUDSON RIVER-BLACK RIVER REGULATING DISTRICT BOARD MEETING JUNE 10, 2014 PRESENTATION TOPICS Analysis Objectives Analysis Dam Removal Plan Dam Remediation Plan Effects Analysis Permit Requirements Decision

More information

Sand and Silt Removal from Salmonid Streams

Sand and Silt Removal from Salmonid Streams Sand and Silt Removal from Salmonid Streams Stream bank erosion Poor land use practices Sources of Sand and Silt Impacts of Sand and Silt Interstitial spaces infilled Little or no flow through the streambed

More information

Thin Air and Thick Ice Unusual Challenges at a High Elevation Hydro Plant

Thin Air and Thick Ice Unusual Challenges at a High Elevation Hydro Plant Thin Air and Thick Ice Unusual Challenges at a High Elevation Hydro Plant By Ginger Gillin, John Pizzimenti, and Doug Foss, GEI Consultants, Inc., USA, and Jon Jourdonnais, PPL Montana, USA. Abstract The

More information

Rhode Island NRCS received approximately $2.4 million in ARRA funds to implement four floodplain easement projects.

Rhode Island NRCS received approximately $2.4 million in ARRA funds to implement four floodplain easement projects. American Recovery and Reinvestment Act (ARRA) Emergency Watershed Protection Program Floodplain Easements Rhode Island Natural Resources Conservation Service Rhode Island NRCS received approximately $2.4

More information

An Irish Strategy for River Restoration: How it works on the ground. Karen Delanty

An Irish Strategy for River Restoration: How it works on the ground. Karen Delanty An Irish Strategy for River Restoration: How it works on the ground Karen Delanty River Restoration and EU Directives River Restoration in Ireland to-date; TAM (Tourism Angling Measure) Local small scale

More information

Monitoring the Benefits of Instream Habitat Diversity. Entiat River, Chelan County, Washington

Monitoring the Benefits of Instream Habitat Diversity. Entiat River, Chelan County, Washington Monitoring the Benefits of Instream Habitat Diversity Entiat River, Chelan County, Washington Bureau of Reclamation Bonneville Power Administration May 2013 This is an update of the report that first occurred

More information

Gold Ray Dam Interagency Technical Team Meeting

Gold Ray Dam Interagency Technical Team Meeting Gold Ray Dam Interagency Technical Team Meeting Agenda Public Outreach, Funding, Monitoring EA/BA/Permit Updates Deconstruction Plans Fish Passage & Salvage Plan Hydraulic Modeling Next Steps Public Outreach,

More information

US Army Corps of Engineers BUILDING STRONG

US Army Corps of Engineers BUILDING STRONG Fort Worth District Public Meeting 20 August 2013 US Army Corps of Engineers Lewisville Dam - Authorization Authorized by the River and Harbor Act, approved 2 March 1945 (Public Law 14, 79th Congress,

More information

Clean Water Services. Ecosystems Services Case Study: Tualatin River, Washington

Clean Water Services. Ecosystems Services Case Study: Tualatin River, Washington Viewed broadly, the concept of ecosystem services describes the many resources and services provided by nature. Typically, traditional planning and development practices do not adequately represent the

More information

Howsham fish passage Consultation document

Howsham fish passage Consultation document Howsham fish passage Consultation document Report ENVIMNE000903 Final version 30 June 2016 We are the Environment Agency. We protect and improve the environment. Acting to reduce the impacts of a changing

More information

HCP Team Meeting. November 18, 2015. icfi.com

HCP Team Meeting. November 18, 2015. icfi.com HCP Team Meeting November 18, 2015 icfi.com 1 Welcome and Introductions Where are we in the HCP process Hydrology modeling update Native fish survey Fish translocation Finalize covered activities Next

More information

King County, Washington Policies and Practice for the Use of Eminent Domain For Flood Risk Reduction

King County, Washington Policies and Practice for the Use of Eminent Domain For Flood Risk Reduction King County, Washington Policies and Practice for the Use of Eminent Domain For Flood Risk Reduction Introduction Eminent domain refers to the power possessed by the state over all property within the

More information

Napa River Restoration Projects

Napa River Restoration Projects Napa River Restoration Projects Shaun Horne, Napa County, shaun.horne@countyofnapa.org Jeremy Sarrow, Napa County, jermy.sarrow@countyofnapa.org The Napa River flows though one of the most scenic landscapes

More information

7.0 Stream Restoration

7.0 Stream Restoration 7.0 Stream Restoration 7.1 Issue Statements One of the primary concerns of residents in the Bassett Creek watershed is the maintenance of the natural beauty of the creek in residential and recreational

More information

Final Report. Dixie Creek Restoration Project. Funded by Plumas Watershed Forum

Final Report. Dixie Creek Restoration Project. Funded by Plumas Watershed Forum Final Report Dixie Creek Restoration Project Funded by Plumas Watershed Forum Plumas Corporation January 2009 1 Background FR-CRM staff presented this project to the Dixie Valley Landowners Association

More information

COMPLIANCE REPORT MUDDY HOLLOW CULVERT REMOVAL FILE NUMBER 25358N

COMPLIANCE REPORT MUDDY HOLLOW CULVERT REMOVAL FILE NUMBER 25358N COMPLIANCE REPORT MUDDY HOLLOW CULVERT REMOVAL FILE NUMBER 25358N Submitted by the National Park Service Point Reyes National Seashore Point Reyes Station, California, 94956 Project Description: Muddy

More information

Water Security Agency. Plan for 2015-16. saskatchewan.ca

Water Security Agency. Plan for 2015-16. saskatchewan.ca Water Security Agency Plan for 2015-16 saskatchewan.ca Statement from the Minister I am pleased to present the Water Security Agency s Plan for 2015-16. The Honourable Scott Moe Minister Responsible for

More information

Accretion Sediments carried by a stream and deposited along banks or surrounding areas.

Accretion Sediments carried by a stream and deposited along banks or surrounding areas. GLOSSARY Accretion Sediments carried by a stream and deposited along banks or surrounding areas. Acre-foot A quantity or volume of water covering one acre to a depth of one foot (43,560 cubic feet). Active

More information

RESTORING streams to reduce flood loss

RESTORING streams to reduce flood loss RESTORING streams to reduce flood loss Flood Loss Reduction the Natural Way Flood disasters have become a regular Floods can devastate local occurrence. One in your community may have communities. threatened

More information

Catchment Scale Processes and River Restoration. Dr Jenny Mant Jenny@therrc.co.uk. The River Restoration Centre therrc.co.uk

Catchment Scale Processes and River Restoration. Dr Jenny Mant Jenny@therrc.co.uk. The River Restoration Centre therrc.co.uk Catchment Scale Processes and River Restoration Dr Jenny Mant Jenny@therrc.co.uk The River Restoration Centre therrc.co.uk 3 Main Catchment Elements Hydrology Energy associated with the flow of water affects

More information

Backyard Buffers. Protecting Habitat and Water Quality

Backyard Buffers. Protecting Habitat and Water Quality Backyard Buffers Protecting Habitat and Water Quality What is a buffer? A buffer (also called a riparian buffer area or zone) is the strip of natural vegetation along the bank of a stream, lake or other

More information

Year 2 7-15-10 Post Restoration Monitoring Summary Rock Creek Project Monitoring and Analysis conducted by Bio-Surveys,LLC. Contact: strask@casco.

Year 2 7-15-10 Post Restoration Monitoring Summary Rock Creek Project Monitoring and Analysis conducted by Bio-Surveys,LLC. Contact: strask@casco. Year 2 7-15-10 Post Restoration Monitoring Summary Rock Creek Project Monitoring and Analysis conducted by Bio-Surveys,LLC. Contact: strask@casco.net Project Sponsors include: The City of Corvallis Oregon

More information

OLMSTED COUNTY SOIL AND WATER CONSERVATION DISTRICT 2016 OPERATIONAL PLAN

OLMSTED COUNTY SOIL AND WATER CONSERVATION DISTRICT 2016 OPERATIONAL PLAN OLMSTED COUNTY SOIL AND WATER CONSERVATION DISTRICT 2016 OPERATIONAL PLAN MISSION STATEMENT The mission of Olmsted Soil and Water Conservation District is to promote sustainable resource utilization and

More information

River Wensum Restoration Strategy Swanton Morley Restoration Scheme Reach 14a

River Wensum Restoration Strategy Swanton Morley Restoration Scheme Reach 14a River Wensum Restoration Strategy Swanton Morley Restoration Scheme Reach 14a At a glance River restoration benefits: Improved planform, channel cross-section, flow variation and sediment process. Improved

More information

Coldwater Heritage Partnership Implementation Grant Final Report Morrison Run Watershed Restoration Project Western Pennsylvania Conservancy Project Summary The goal of the Morrison Run Watershed Restoration

More information

Outlet stabilization structure

Outlet stabilization structure Overview of Sedimentation and Erosion Control Practices Practice no. 6.41 Outlet stabilization structure Erosion at the outlet of channels, culverts, and other structures is common, and can cause structural

More information

Presented by Dani Wise Johnson Vanasse Hangen Brustlin, Inc.

Presented by Dani Wise Johnson Vanasse Hangen Brustlin, Inc. Incorporating LID Stormwater Management Practices and Ecological Restoration on Redevelopment Properties Presented to LID Conference Philadelphia, Sept 2011 Presented by Dani Wise Johnson Vanasse Hangen

More information

Youghiogheny River From Confluence, Pa to Indian Creek Fayette and Somerset Counties

Youghiogheny River From Confluence, Pa to Indian Creek Fayette and Somerset Counties Pennsylvania Fish & Boat Commission Biologist Report Youghiogheny River From Confluence, Pa to Indian Creek Fayette and Somerset Counties August 2012 Electrofishing Survey Originating in the mountains

More information

Thunder Bay. Area of Concern Status of Beneficial Use Impairments September 2010

Thunder Bay. Area of Concern Status of Beneficial Use Impairments September 2010 Thunder Bay Area of Concern Status of Beneficial Use Impairments September 2010 The Thunder Bay Area of Concern extends approximately 28 km along the shoreline of Lake Superior from north of Bare Point

More information

St. Vrain Watershed Master Plan Thursday, January 23 10:00 a.m. 12:15 p.m.

St. Vrain Watershed Master Plan Thursday, January 23 10:00 a.m. 12:15 p.m. St. Vrain Watershed Master Plan Thursday, January 23 10:00 a.m. 12:15 p.m. City Council Study Session Room City of Longmont Civic Center, 350 Kimbark Street, Longmont Minutes 1. Introductions a. Jeff Crane

More information

Thank you to all of our 2015 sponsors: Media Partner

Thank you to all of our 2015 sponsors: Media Partner Thank you to all of our 2015 sponsors: Media Partner Channel Naturalization: Planning and Implementation in Peel Region TRIECA March 25 & 26, 2015 Peel Region Channel Remediation Strategy An Urban Context

More information

Places Directorate Environment Infrastructure PO Box 100 Wigan Council WN1 3DS. Culvert Advice Note

Places Directorate Environment Infrastructure PO Box 100 Wigan Council WN1 3DS. Culvert Advice Note Places Directorate Environment Infrastructure PO Box 100 Wigan Council WN1 3DS Culvert Advice Note Culverts Advice Note Revisions Rev Date Details Prepared by Reviewed by Approved by 1 19/07/2013 AC MAJ

More information

Yakima Basin Integrated Water Resource Management Plan

Yakima Basin Integrated Water Resource Management Plan Yakima Basin Integrated Water Resource Management Plan October 23, 2014 Presented by Derek Sandison, Director Office of Columbia River Photo Courtesy of Tom Ring Basin size: 6,155 sq. miles Population:

More information

Stream Restoration Post-Implementation Annual Monitoring Report Year 2: 2013 Covering the Period of July 2012 to July 2013

Stream Restoration Post-Implementation Annual Monitoring Report Year 2: 2013 Covering the Period of July 2012 to July 2013 NCDA&CS - North Carolina Forest Service Stream Restoration Post-Implementation Annual Monitoring Report Year 2: 2013 Covering the Period of July 2012 to July 2013 For the N.C. Division of Water Quality

More information

Nipigon Bay. Area of Concern Status of Beneficial Use Impairments September 2010

Nipigon Bay. Area of Concern Status of Beneficial Use Impairments September 2010 Nipigon Bay Area of Concern Status of Beneficial Use Impairments September 2010 Nipigon Bay is in the most northerly area of Lake Superior. The Area of Concern takes in a large portion of Nipigon Bay and

More information

Integrated Restoration Prioritization

Integrated Restoration Prioritization Integrated Restoration Prioritization Habitat Restoration and Environmental Monitoring Projects Section Restoration Services Division Definition Restoration Prioritization is a process of combining various

More information

Protecting Floodplain. While Reducing Flood Losses

Protecting Floodplain. While Reducing Flood Losses Protecting Floodplain Natural and Beneficial i Functions While Reducing Flood Losses Jon Kusler Association of State Wetland Managers 518 872 1804; jon.kusler@aswm.org Report available at: http://aswm.org/pdf_lib/nbf.pdf

More information

San Diego Integrated Regional Water Management Implementation Grant Proposal Economic Analysis Flood Damage Reduction Costs and Benefits

San Diego Integrated Regional Water Management Implementation Grant Proposal Economic Analysis Flood Damage Reduction Costs and Benefits Attachment 9 San Diego Integrated Regional Water Management Economic Analysis Flood Damage Reduction Costs and Benefits Attachment 9 consists of the following items: Flood Damage Reduction Costs and Benefits.

More information

Habitat rehabilitation for inland fisheries

Habitat rehabilitation for inland fisheries Habitat rehabilitation for inland fisheries FAO FISHERIES TECHNICAL PAPER 484 Global review of effectiveness and guidance for rehabilitation of freshwater ecosystems Cover photos : Left: excavation of

More information

General Permit for Activities Promoting Waterway - Floodplain Connectivity [working title]

General Permit for Activities Promoting Waterway - Floodplain Connectivity [working title] General Permit for Activities Promoting Waterway - Floodplain Connectivity [working title] Purpose These rules set forth the conditions under which a person may, without an individual removal-fill permit

More information

SCHNEIDER CREEK REMEDIATION CLASS ENVIRONMENTAL ASSESSMENT ADDENDUM

SCHNEIDER CREEK REMEDIATION CLASS ENVIRONMENTAL ASSESSMENT ADDENDUM SCHNEIDER CREEK REMEDIATION CLASS ENVIRONMENTAL ASSESSMENT ADDENDUM PUBLIC MEETING FEBRUARY 8 TH, 2012 The City of Kitchener and Grand River Conservation Authority (GRCA) are undertaking an Environmental

More information

Estabrook Dam A Discussion of Alternatives. Public Scoping Meeting June 5, 2014

Estabrook Dam A Discussion of Alternatives. Public Scoping Meeting June 5, 2014 Estabrook Dam A Discussion of Alternatives Public Scoping Meeting June 5, 2014 Presenters Kevin Haley, PLA, Milwaukee County Don Pirrung, P.E., PH, AECOM Mike Hahn, P.E., PH, Southeastern Wisconsin Regional

More information

Regulatory Features of All Coastal and Inland Ecological Restoration Limited Projects

Regulatory Features of All Coastal and Inland Ecological Restoration Limited Projects Eligibility Checklist This Ecological Restoration Limited Project Eligibility Checklist guides the applicant in determining if their project is eligible to file as an Inland or Coastal Ecological Restoration

More information

Environmental Case Study Decatur, Georgia, DeKalb County A Suburban Creek Resists Channelization

Environmental Case Study Decatur, Georgia, DeKalb County A Suburban Creek Resists Channelization Introduction A visual examination of Doolittle Creek in a highly developed suburban county in Georgia yielded telltale signs of a creek whose original streambed had been altered. Examination of official

More information

REQUESTS FOR PROPOSALS

REQUESTS FOR PROPOSALS REQUESTS FOR PROPOSALS Chelsea Village Flood Study (VT Rt.110 Bridge 10, Maple Street Bridge 45, N. Court St Bridge 43) Two Rivers-Ottauquechee Regional Commission A. INTRODUCTION The Two Rivers-Ottauquechee

More information

Community Workshop 5. Overarching Goals for Machado Lake Ecosystem and Wilmington Drain Multi-Use Projects

Community Workshop 5. Overarching Goals for Machado Lake Ecosystem and Wilmington Drain Multi-Use Projects City of Los Angeles Department of Public Works Bureau of Engineering Machado Lake Ecosystem Rehabilitation Project & Wilmington Drain Multi-Use Project Community Workshop 5 February 24, 2009 In association

More information

3. The submittal shall include a proposed scope of work to confirm the provided project description;

3. The submittal shall include a proposed scope of work to confirm the provided project description; QIN Shoreline Master Program Project Summary The Shoreline Master Program (SMP) development process for the Quinault Indian Nation (QIN) includes the completion of inventory and analysis report with corresponding

More information

Return to the River: Baikie Island Backchannels Phase 2 Implementation Project # 05.Ca.03

Return to the River: Baikie Island Backchannels Phase 2 Implementation Project # 05.Ca.03 Return to the River: Baikie Island Backchannels Phase 2 Implementation Project # 05.Ca.03 Prepared by Greenways Land Trust P.O. Box 291 Campbell River, BC V9W 5B1 Prepared with financial support of: BC

More information

1 Introduction. 1.1 Background. 1.2 Organization. 1.3 How to Use this Manual

1 Introduction. 1.1 Background. 1.2 Organization. 1.3 How to Use this Manual 1 Introduction 1.1 Background 1.1.1 Stormwater Ordinance and Regulations 1.1.2 The Changing Regulatory Environment 1.2 Organization 1.3 How to Use this Manual This Page Intentionally Left Blank 1.1 Background

More information

Resolving complex issues with large scale river restoration; a case study: the San Joaquin River in California

Resolving complex issues with large scale river restoration; a case study: the San Joaquin River in California IWA Publishing 2011 Water Practice & Technology Vol 6 No 4 doi:10.2166/wpt.2011.074 Resolving complex issues with large scale river restoration; a case study: the San Joaquin River in California William

More information

ANGORA FIRE RESTORATION PROJECT

ANGORA FIRE RESTORATION PROJECT ANGORA FIRE RESTORATION PROJECT U.S. Forest Service LAKE TAHOE BASIN MANAGEMENT UNIT Duncan Leao Vegetation Management Planner Richard Vacirca Forest Aquatics Biologist 3 PHASES OF FIRE REHAB Phase I Rehab:

More information

Proposal to the Trinity Adaptive Management Working Group (TAMWG)

Proposal to the Trinity Adaptive Management Working Group (TAMWG) Proposal to the Trinity Adaptive Management Working Group (TAMWG) Request that the TAMWG recommend that the Trinity River Restoration Program fund BLM to purchase the Weigel parcel at Gold Bar (river mile

More information

The 25 Year Saskatchewan Water Security Plan. February 2013

The 25 Year Saskatchewan Water Security Plan. February 2013 The 25 Year Saskatchewan Water Security Plan February 2013 OUTLINE Challenges The Plan The Agency Implications for Agriculture Water Security Plan Development Consultation in 2011 with 174 individuals

More information

The purpose of this meeting is to inform the public of the updates to the project, and to get input before the finalization of the project.

The purpose of this meeting is to inform the public of the updates to the project, and to get input before the finalization of the project. The purpose of this meeting is inform the public of the updates the project, and get input before the finalization of the project. The following panels describe the purpose and hisry of the project, along

More information

Earth Science. River Systems and Landforms GEOGRAPHY 1710. The Hydrologic Cycle. Introduction. Running Water. Chapter 14.

Earth Science. River Systems and Landforms GEOGRAPHY 1710. The Hydrologic Cycle. Introduction. Running Water. Chapter 14. Earth Science GEOGRAPHY 1710 River Systems and Landforms DAVID R. SALLEE Robert W. Christopherson Charlie Thomsen Chapter 14 Introduction Rivers and streams are dynamic systems that continually adjust

More information

DANIELS RUN STREAM RESTORATION, FAIRFAX, VIRGINIA: FLOODPLAIN ANALYSIS REPORT

DANIELS RUN STREAM RESTORATION, FAIRFAX, VIRGINIA: FLOODPLAIN ANALYSIS REPORT DANIELS RUN STREAM RESTORATION, FAIRFAX, VIRGINIA: FLOODPLAIN ANALYSIS REPORT By: Conor C. Shea Stream Habitat Assessment and Restoration Program U.S. Fish and Wildlife Service CBFO-S07-01 Prepared in

More information

PUBLIC NOTICE Application for Permit

PUBLIC NOTICE Application for Permit PUBLIC NOTICE Application for Permit 30-Day Notice Issue Date: June 20, 2016 Expiration Date: July 20, 2016 US Army Corps of Engineers No: NWP-2010-535 Oregon Department of State Lands No: 58311-RF Interested

More information

LEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN

LEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN 1 AUGUST 2011 LEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN KEY ELEMENTS OF THE PLAN: 1. Replace the existing unsafe Ragged Mountain dam with a new dam and raise the reservoir pool level initially

More information

Restoration Planning and Development of a Restoration Bank

Restoration Planning and Development of a Restoration Bank Restoration Planning and Development of a Restoration Bank Black Creek Pioneer Village, South Theatre 8:30 a.m. to 3:30 p.m. Habitat Restoration and Environmental Monitoring Projects Section Restoration

More information

Methodology for Merit Order Dispatch. Version 1.0

Methodology for Merit Order Dispatch. Version 1.0 Methodology for Merit Order Dispatch Version 1.0 25 th April 2011 TABLE OF CONTENTS 1. OBJECTIVES... 1 2. ROADMAP FOR IMPLEMENTATION... 1 3. DEFINITIONS... 3 4. OPERATIONS PLANNING... 3 4.1. General Considerations...

More information

Flood Recovery Stampede Pathway along Elbow River

Flood Recovery Stampede Pathway along Elbow River Submission for: Flood Recovery Stampede Pathway along Elbow River Project Overview Calgary, Alberta encompasses approximately 230 kilometres of stream bank along the Bow River, Elbow River, Nose Creek

More information

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile Chapter 3 CULVERTS Description A culvert is a closed conduit used to convey water from one area to another, usually from one side of a road to the other side. Importance to Maintenance & Water Quality

More information

Welcome to Our Information Session

Welcome to Our Information Session 1 Welcome to Our Information Session Please sign in, and help yourself to refreshments 2 What This Information Session is All About Our Information Session is your opportunity to: Meet the OTR Project

More information

STATE OF IDAHO FISH AND GAME DEPARTMENT John R. Woodworth, Director

STATE OF IDAHO FISH AND GAME DEPARTMENT John R. Woodworth, Director STATE OF IDAHO FISH AND GAME DEPARTMENT John R. Woodworth, Director COEUR D'ALENE LAKE FISHERIES INVESTIGATIONS By Jerry L. Mallet Regional Fishery Biologist Boise, Idaho September 4, 1968 TABLE OF CONTENTS

More information

Puhinui Stream Restoration- Concept Plan

Puhinui Stream Restoration- Concept Plan Puhinui Stream Restoration- Concept Plan Project Background The Manukau City Council Draft Parks Strategy states as one of its key goals coastal and riparian access and protection - the completion of a

More information

City of Quinte West Storm Flow Management Section 7.0 Engineering Design Page 7-1 Standards January 2012

City of Quinte West Storm Flow Management Section 7.0 Engineering Design Page 7-1 Standards January 2012 Engineering Design Page 7-1 1.0 Storm Flow Management The objective of Storm Flow Management is to provide: The safe conveyance of stormwater to legal and adequate outlets Water quality control Flooding

More information

ENVIRONMENTAL MITIGATION AT HYDROELECTRIC PROJECTS Volume 1. Current Practices for Instream Flow Needs, Dissolved Oxygen, and Fish Passage

ENVIRONMENTAL MITIGATION AT HYDROELECTRIC PROJECTS Volume 1. Current Practices for Instream Flow Needs, Dissolved Oxygen, and Fish Passage DOEIID-10360 Distribution Category: UC-22S ENVIRONMENTAL MITIGATION AT HYDROELECTRIC PROJECTS Volume 1. Current Practices for Instream Flow Needs, Dissolved Oxygen, and Fish Passage M. J. Sale G. F. Cada

More information

LYNDE CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT

LYNDE CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT Whitby CLOCA Whitby CLOCA LYNDE CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT June 2008 TABLE OF CONTENTS 1.0 INTRODUCTION... 3 2.0 STUDY AREA AND SCOPE... 4 3.0 METHODOLOGY...

More information

1.7.0 Floodplain Modification Criteria

1.7.0 Floodplain Modification Criteria 1.7.0 Floodplain Modification Criteria 1.7.1 Introduction These guidelines set out standards for evaluating and processing proposed modifications of the 100- year floodplain with the following objectives:

More information

Improving the physical condition of Scotland s water environment. A supplementary plan for the river basin management plans

Improving the physical condition of Scotland s water environment. A supplementary plan for the river basin management plans Improving the physical condition of Scotland s water environment A supplementary plan for the river basin management plans Contents Executive summary... 2 1. Introduction... 3 2. Vision... 4 3. Taking

More information

Innovative Approaches in Flood Damage Reduction

Innovative Approaches in Flood Damage Reduction Innovative Approaches in Flood Damage Reduction Solutions for the Stormwater Management High Level Results 3D geospatial model of storm water management pond (GRCA, 2013) Enhanced understanding of storm

More information

Upper Columbia Natural Production Restoration Project. Lucius Caldwell Kristen Kirkby John Jorgensen Daniel Russell Teresa Fish

Upper Columbia Natural Production Restoration Project. Lucius Caldwell Kristen Kirkby John Jorgensen Daniel Russell Teresa Fish Upper Columbia Natural Production Restoration Project Lucius Caldwell Kristen Kirkby John Jorgensen Daniel Russell Teresa Fish Who Funded by BPA YN: John Jorgensen Lucius Caldwell (Former) Kristen Kirkby

More information

Revising the Nantahala and Pisgah Land Management Plan Preliminary Need to Change the Existing Land Management Plan

Revising the Nantahala and Pisgah Land Management Plan Preliminary Need to Change the Existing Land Management Plan Revising the Nantahala and Pisgah Land Management Plan Preliminary Need to Change the Existing Land Management Plan Throughout the Plan 1. There is a fundamental need for the revised plan to address how

More information

Summary of Known Canadian Perspectives

Summary of Known Canadian Perspectives Summary of Known Canadian Perspectives Purpose The purpose of this document is to provide a high level overview of various Canadian perspectives on the Columbia River Treaty (CRT) based on publicly available

More information

BRIDGES ARE relatively expensive but often are

BRIDGES ARE relatively expensive but often are Chapter 10 Bridges Chapter 10 Bridges Bridg Bridges -- usually the best, but most expensive drainage crossing structure. Protect bridges against scour. BRIDGES ARE relatively expensive but often are the

More information

CHAD R. GOURLEY SPECIALTY EMPLOYMENT

CHAD R. GOURLEY SPECIALTY EMPLOYMENT CHAD R. GOURLEY P.O. Box 919 Verdi, Nevada 89439 phone 775.345.9960 cell 775.250.8140 chad_gourley at att.net SPECIALTY Restoration of riverine, spring, and wetland ecosystems, specializing in a process

More information

Flood Risk Management

Flood Risk Management Flood Risk Management Value of Flood Risk Management Every year floods sweep through communities across the United States taking lives, destroying property, shutting down businesses, harming the environment

More information

Flood Risk Management

Flood Risk Management Flood Risk Management Value of Flood Risk Management Value to Individuals and Communities Every year floods sweep through communities across the United States taking lives, destroying property, shutting

More information

FLOOD PROTECTION AND ECOSYSTEM SERVICES IN THE CHEHALIS RIVER BASIN. May 2010. Prepared by. for the. 2010 by Earth Economics

FLOOD PROTECTION AND ECOSYSTEM SERVICES IN THE CHEHALIS RIVER BASIN. May 2010. Prepared by. for the. 2010 by Earth Economics FLOOD PROTECTION AND ECOSYSTEM SERVICES IN THE CHEHALIS RIVER BASIN May 2010 Prepared by for the Execubve Summary The Chehalis Basin experienced catastrophic flooding in 2007 and 2009. In response, the

More information

Stream Restoration Account of Flood and Drought Response Fund Grant Program Guidance May 2014

Stream Restoration Account of Flood and Drought Response Fund Grant Program Guidance May 2014 Background Stream Restoration Account of Flood and Drought Response Fund Grant Program Guidance May 2014 Senate Bill 14-179, proposed to the 2014 Colorado General Assembly, establishes funding for stream

More information