1 National Directorate for Fire and Emergency Management Guide to Works and Development Consents for Repairing Infrastructure Damaged in Storms or other Emergency Events Document Title Guide to Works and Development Consents for Repairing Infrastructure Damaged in Storms or other Emergency Events Document Version: 1.4 Date 28/02/14 Prepared By: Document Status NC/ CO R Final Draft Approved for Issue: SH Date 4/3/2014 1

2 GUIDE TO WORKS AND DEVELOPMENT CONSENTS FOR REPAIRING INFRASTRUCTURE DAMAGED IN STORMS OR OTHER EMERGENCY EVENTS FEBRUARY 2013 Introduction The storms over the winter of 2013/14 had a seriously damaging effect on a range of infrastructure including: Roads and bridges; Piers and harbours; Seaside amenity areas; and Coastal defences and embankments. The Government has committed substantial aid in funds to enable local authorities and other public bodies in moving swiftly to repair the damage and enable local areas and communities to get back to normal. This Guide has been prepared with the inputs of relevant Government Departments and Offices to provide information on how necessary repair works can proceed in a way that takes account of legal requirements in relation to planning, watercourse management and biodiversity protection. This Guide has been prepared as a general overview and not as detailed legal advice. It is issued as a working draft and may be updated through feedback to the National Directorate for Fire and Emergency Management. Through the National Co-ordination Group on Severe Weather, the relevant Departments including the Department of the Environment, Community and Local Government, the Department of Arts, Heritage and the Gaeltacht, the Department of Transport, Tourism and Sport, the Department of Agriculture, Food and the Marine and the Office of Public Works have come together to provide advice in relation to the co-ordination of repair works and to ensure that people, property and nature are all protected in those repair efforts and in compliance with all legal requirements. The Department of Environment, Community and Local Government wishes to acknowledge the contribution of the relevant Departments and Offices to the production of this Guide. Emergency Works In broad terms, any emergency repair to damaged public infrastructure such as roads and bridges, car parks, piers and harbours and coastal defences on a like for like basis can and should proceed in line with legislative provisions that have been made for such situations. Emergency works are time-critical works that are necessary for dealing urgently with a situation which the relevant county/city Manager considers is an emergency situation calling for immediate action. Local authorities will be aware that under Section 179(6) of the Planning and Development Act 2000 as amended, the requirements under Part XI relating to development by local authorities do not 2

3 apply in respect of proposed development which is necessary for dealing urgently with any situation which the Manager considers is an emergency situation calling for immediate action. At the same time, the critical nature of these works should not prevent public authorities from keeping a documentary record of the relevant legislative provisions that they understand authorise the works. Having such a documentary record is considered important should any query or legal challenge arise afterwards regarding actions taken and the vires (legal powers) of a local authority to undertake them. Relevant provisions from the Planning and Development Act 2000 that authorise an array of statutory and non-statutory undertakers as amended are summarised in Appendix 1 to this Guide. Public authorities proposing to undertake or authorise emergency repair works need to form a view as to whether such works are likely to have significant effects on the environment. The nature of the works decided upon and the manner in which they are undertaken will often permit such effects to be avoided or mitigated. In some cases, expert advice may be required. The Department of Arts, Heritage and the Gaeltacht s National Parks and Wildlife Service will endeavour, within its resources, to provide appropriate ecological advice to local authorities in this situation. General Repair Where general repairs to infrastructure damaged in the storms are necessary, these are permitted where the repairs seek to restore the infrastructure to the condition it was in, before it was damaged. However, it is important to remember that if such repairs significantly alter the nature and/or extent of the infrastructure that was there in the first place, then relevant consents may require to be obtained. This is particularly important in those instances where it is proposed to put in place more extensive hard engineering coastal defences to protect the infrastructure to be repaired, and where significant in-stream works are proposed in repairing a bridge or other infrastructure in or adjoining a river. Within the overall and necessary repair efforts, it is vitally important that works achieve the desired outcome and avoid creating new problems for land and property owners elsewhere, or contaminating or causing siltation of sensitive waters and the aquatic habitats of sensitive species, notably salmon and the freshwater pearl mussel. In the marine context, shorelines absorb wave energy through a variety of means including the redistribution of sediment. Interference with these natural dynamic processes (by attempting to slow down or stop them) can sometimes exacerbate erosion elsewhere in subsequent storm events. Therefore, while the natural inclination is to immediately repair any damage that may be caused by storm events, this may not be necessarily the most effective option, and so careful analysis leading to the selection of the best option is essential in responding to erosional events. New coastal defence works are not considered to be part of repair or emergency works as they will require detailed study and assessment to determine that they will achieve the intended goal and that any potential negative outcomes will be identified and mitigated. 3

4 The photograph above shows an instance of ad-hoc works that go beyond the nature and scope of the pre-existing, but now damaged, coastal protection infrastructure. Works of this nature are liable to result in further damage, including the acceleration of coastal erosion elsewhere. Issues of illegal dumping may also arise. To avoid well-intentioned but ultimately counter-productive interventions where homes and other private structures are under genuine threat, local authorities should monitor areas where such interventions might be likely and to work proactively with property owners giving advice on the most appropriate steps and relevant consent requirements. New Works Unfortunately, in some cases the storm damage to infrastructure such as coastal roads and footpaths, car parks, amenity areas and burial grounds has been so severe that they and the lands on which they stood were completely obliterated, damaged beyond repair or buried under significant amounts of shingle and sediment. In these cases, it may be some time before works can be undertaken to replace the lost infrastructure. Replacement of lost infrastructure requires careful evaluation with regard to the feasibility of its restoration, including the feasibility of re-locating the relevant facilities to a safer location in view of the possible recurrence of, and susceptibility of alternative sites to, future similarly severe storm events. In these cases, specific development consents will be required because they will probably involve land acquisition and also require new infrastructure projects such as in the case of relocation of a road further inland. Their potential impact on the environment, including on European sites, will require to be assessed as necessary. Biodiversity and European law Some of our coastal areas, rivers and streams are particularly sensitive and are within or near sites that have been selected for designation as Special Areas of Conservation (SACs) or Special Protection Areas (SPAs). Details of these areas can be found at 4

5 Many of these sites have experienced extensive changes as a consequence of the recent storm and flooding events. Because these changes are the result of natural, if extreme, processes, ecological evaluation over time of the resultant changes is necessary. Even where there has been apparent loss of habitats (such as mobile dunes) or species, that evaluation will be necessary to inform the management and regulation of interventions affecting sites so as not to jeopardise natural processes of succession and recovery, in the light of the sites conservation objectives. In some such areas, flooding of farmland or amenity lands has occurred as a result of exceptionally high groundwater levels and inundation from the sea; this is expected to resolve itself as water tables return to their normal levels, and it is unlikely that any immediate works would be necessary or appropriate. In some sites, removal of soil, mud, gravel, sand or minerals on a site may be an activity that requires NPWS consent. Local authorities should advise landowners and farmers that they should discuss proposed works with their local NPWS representatives before engaging in any significant works in, or that may affect, European sites, including notifiable actions such as in-stream works. Generally, the removal of debris such as recently-fallen trees that are impeding flow and causing localised flooding should not be a problem but it is recommended to check with NPWS for advice before works commence. Proposals for in-stream works such as dredging or channel modification that alter the flow of water permanently will normally require more detailed assessments from an environmental and or biodiversity/habitat perspective because of the potential impact of such works on protected habitats or species. Where EIA or AA is required, planning consent will be necessary. Landowners in European sites have been notified of the requirement to obtain the consent of the Minister for Arts, Heritage and the Gaeltacht before undertaking certain works. This is generally achieved through contacting their local NPWS official. NPWS will endeavour to deal with such requests promptly. Arterial Drainage Works The OPW will be liaising closely with local authorities in relation to the performance of various rivers and watercourses in the recent floods. Local authorities have drawn up existing river basin catchment management plans. The OPW has developed a Catchment Flood Risk Assessment and Management (CFRAM) Programme, which is being delivered through the CFRAM Studies. The CFRAM Studies are comprehensive catchmentbased studies through which detailed flood maps are produced and flood risk management measures are assessed and taken to outline design. These measures will be prioritised and set out in a Flood Risk Management Plan (FRMP). The Local Authorities and the OPW are working together on the preparation of these flood risk management plans. In line with the National Flood Policy Review, the OPW is the lead authority in relation to the national programme for flood defences and also operates the Minor Works Scheme, whereby the OPW can provide funds to Local Authorities to undertake flood relief works (including channel clearance, where appropriate) to reduce flood risk. The national flood protection works programme, and the minor works scheme are focused on 5

6 reducing flood risk and are subject to the normal planning and environmental consents requirements. Further Information Any further queries in relation to this note should be directed, as appropriate, to: Planning Section, Department of the Environment Community and Local Government Custom House Dublin 1, Tel (01) ; National Parks and Wildlife Service, Department of Arts Heritage and the Gaeltacht, Ely Place Dublin 2, Tel (01) Office of Public Works Areterial Drainage Section, Hatch Street Dublin 2, Tel (046) Feedback on the Guide should be addressed to the National Directorate for Fire and Emergency Management, Department of the Environment Community and Local Government Custom House Dublin 1, Tel (01) ; 6

7 Appendix 1: Relevant Provisions of the Planning and Development Act 2000, as amended and Relevant Regulations made thereunder. (subject to corrections and update) Planning Legislation Relevant to Storm/Flood Damage Repair Measures and Reconstruction Exempted Developments General Planning legislation provides exemption from the requirement to apply for planning permission for local authorities, statutory bodies, statutory undertakers and private citizens and landowners in some measure across a broad spectrum of types of development. Section 4 of the Planning and Development Act provides general exemption for certain developers with regard to particular types and classes of development set out in Regulations. Exempted Developments Local Authorities Section 4 of the Planning and Development Act provides general exemption for works carried out by local authorities with one notable caveat: where a development requires environmental impact assessment (in accordance with the EIA Directive) or appropriate assessment (in accordance with the Habitats Directive). Section 4 provides exemptions for construction, maintenance or improvement of roads; sewers, mains, pipes, cables, overhead wires or other apparatus and including the excavation of street or other land for that purpose subject to conditions and limitations set out in Regulations, and subject to restrictions that may be imposed by a planning authority under article 9 of Regulations. Section 179 of the Act provides that a local authority may carry out development in accordance with the relevant Regulations (contained in Part 8), either on its own behalf or by an undertaker acting on behalf of, or in partnership with the local authority in accordance with procedures set out for public consultation and approval by the elected members by resolution; however, 179(6)(b) provides that the procedures may not apply where development is necessary for dealing urgently with any situation which the manager considers is an emergency situation calling for immediate action. Local Authority Developments: EIA and AA Section 175 of the Act provides that works carried out by the local authorities or an undertaker acting on its behalf of a type, scale or intensity that exceed the thresholds set out in Schedule 5 of the Regulations require the preparation of an EIS. The authority or undertaker is required to make an application for approval to the Board. Prior to this, the authority or undertaker is required to advertise the fact that an EIS has been prepared, that it intends to seek approval from the Board, will notify a transboundary State where there is any likelihood of significant effects on that State, and will invite submissions to the Board regarding the proposed development. Similarly, section 177AE provides that where local authority works require Appropriate Assessment the authority or undertaker is required to make an application for consent to the Board. It should be noted that the agreed text of the draft recasting of the codified EIA Directive provides that: 7

8 Member States may decide, on a case-by-case basis and if so provided under national law, not to apply this Directive to projects, or parts of projects, having as their sole purpose defence or projects having as their sole purposes, the response to civil emergencies, if they deem that such application would have an adverse effect on these purposes. Exempted Developments Statutory Bodies/Undertakers While section 4 of the Act provides generally for exemptions for statutory bodies and undertakers acting on their behalf, the Regulations set out particular classes of development with conditions and limitations imposed. These include: Office of Public Works; The ESB or other electricity undertakers; Bord Gais; Telecoms undertakers under Class 31 of Part 1, Schedule 2 of Regulations; Waterways Ireland; and Harbour Authorities. Exempted Developments Landowners Exemptions exist for landowners for general agricultural works under section 4. Landowners may also be subject to conditions and limitations provided for by articles: 8 (works specified in a drainage scheme), 8A (initial afforestation), 8B (field drainage for agriculture), 8C (land reclamation works), 8D (removal of field boundaries), 8E (works in Special Amenity Areas), 8F (replanting of forests or woodlands), and 8G (forest roads). Exempted developments in a European nature site may require the consent of the Minister for Arts, Heritage and the Gaeltacht under Regulation 30 of the European Communities (Birds and Natural Habitats) Regulations Where the Minister determines that Appropriate Assessment is required in relation to an exempted development, the matter will be referred to the planning system and planning permission will be required. Protected Structures Under section 59, where protected structures are endangered the planning authority may issue notice for specified works to be carried out to restore the structure within a period of not less than 8 weeks of the issue of the notice. Such a notice may be appealed to the District Court. 8

9 Legislation Potentially Relevant to Various Repair Works Affected Body/Agent Roads Bridges Piers/Harbours Coastal/River Defences Dredging/clearance of waterways Buildings/Houses Works on Land Local Authority S.4 (1) Note s.4(4) re EIA S.179 Regs Part 8 Note s.4(4) S.179 Regs Part 8 S.175 S.176 Part XAB S.53 Act Fifth Sch Regs a.8 Note s.4(4) S.179 Regs Part 8 S.53 S.175 S.176 Part XAB Act Fifth Sch Note s.4(4) S.179 Regs Part 8 S.175 S.176 Part XAB Act Fifth Sch Sch2/P3/Class3 Note s.4(4) S.179 Regs Part 8 S.175 S.176 Part XAB Act Fifth Sch Note s.4(4) S.58 S.59 S.79 S.252 Sch2/P1/Class50 Note s.4(4) S.252 Sch2/P1/Class36 /40/41/46/47/4 8 Sch2/P3/Class3 OPW Regs Part 9 Sch2/P1/Class51 Regs Part 9 Sch2/P1/Class5 1 Regs Part 9 Sch2/P1/Class5 1 Regs Part 9 Sch2/P1/Classes35/5 1 Regs Part 9 Sch2/P1/Classes35/5 1 Regs Part 9 Regs Part 9 Sch2/P1/Classes 36/51 9

10 Landowner S.58 S.59 S.79 S.7 S.4 Regs a.8/8a/8b/ 8C/8D/8E/8F/8G /9 Sch 2/P1/Class34 Sch2/P3/Classes 3/11/17/20 ESB Sch2/P1/Class26/ 27/28/29 Sch2/P1/Class 26/27/28/29 Sch2/P1/Class 26/27/28/29 Sch2/P1/Class 26/27/28/29 Sch2/P1/Class 26/27/28/29 Bord Gais Sch2/P1/Class25 Sch2/P2/Class 25 Sch2/P1/Class25 Sch2/P1/Class25 10

11 Telecoms undertaker Sch2/P1/Class31 Sch2/P1/Class31 Waterways Ireland Sch2/P2/Class35 Sch2/P2/Class35 Education Regs Part 9 S.4 (ref. Regs Sch 2/P1/Classes 20B/20C/57) Railway undertaker Sch2/P1/Class 23 Harbour Authorities Sch2/P1/Class 24 EPA S.7 Sch2/P1/Class46 /47 11

12 Dept. of Arts, Heritage and the Gaeltacht (NPWS) S.I. No. 477 of 2011, Reg. 27, 28, 29, 30, 42, 43 and 44. S.I. No. 477 of 2011, Reg. 27, 28, 29, 30, 42, 43 and 44. S.I. No. 477 of 2011, Reg. 27, 28, 29, 30, 42, 43 and 44 (where it is an exempted category of development and likely to require only a Notifiable Action consent or consent to an Activity Requiring Consent under the Regulations). 1 S.I. No. 477 of 2011, Reg. 27, 28, 29, 30, 42, 43 and 44. S.I. No. 477 of 2011, Reg. 27, 28, 29, 30, 42, 43 and An exempted development or an on-farm development that requires ARCs or Notifiable Activities consent is considered by D/AHG (NPWS) staff, and if it is determined that either EIA or Appropriate Assessment is required, then planning permission or the consent of the Minister for Agriculture, Food and the Marine must be sought if it is proposed to proceed with the works. Otherwise NPWS will provide consent for the proposed works. 12

13 13

An Irish Strategy for River Restoration: How it works on the ground. Karen Delanty

An Irish Strategy for River Restoration: How it works on the ground. Karen Delanty An Irish Strategy for River Restoration: How it works on the ground Karen Delanty River Restoration and EU Directives River Restoration in Ireland to-date; TAM (Tourism Angling Measure) Local small scale

More information

The future of flood risk management in Scotland

The future of flood risk management in Scotland Scottish Environment LINK is the forum for Scotland's voluntary environment organisations representing a broad spectrum of environmental interests with the common goal of contributing to a more environmentally

More information

1. Purpose and scope. 2. SEPA's role in hydropower and planning

1. Purpose and scope. 2. SEPA's role in hydropower and planning Page no: 1 of 10 1. Purpose and scope 1.1 The purpose of this note is to provide guidance on the approach that we will take when dealing with hydropower development management consultations. We welcome

More information

Improving the physical condition of Scotland s water environment. A supplementary plan for the river basin management plans

Improving the physical condition of Scotland s water environment. A supplementary plan for the river basin management plans Improving the physical condition of Scotland s water environment A supplementary plan for the river basin management plans Contents Executive summary... 2 1. Introduction... 3 2. Vision... 4 3. Taking

More information

approval of matters specified in conditions; and The Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013

approval of matters specified in conditions; and The Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013 Application for: planning permission; planning permission in principle; further applications; approval of matters specified in conditions; and mineral workings (if the planning authority do not have a

More information

Agricultural & Farm Development - The Planning Issues

Agricultural & Farm Development - The Planning Issues Agricultural & Farm Development - The Planning Issues Generally, smaller developments of an agricultural or forestry nature are exempt, however, larger developments do require planning permission. In addition,

More information

INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION. Infrastructure Flood Protection Remediation Policies

INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION. Infrastructure Flood Protection Remediation Policies INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION Infrastructure Flood Protection Remediation Policies DRAFT POOLBEG PLANNING SCHEME 196 FIGURE 9.1: UTILITIES WAYLEAVES Electricity Cables 8m Wayleave for

More information

London Borough of Merton Local Flood Risk Management Strategy

London Borough of Merton Local Flood Risk Management Strategy Local Flood Risk Management Strategy Summary 2014-2020 Introduction In response to the severe flooding across large parts of England and Wales in summer 2007, the Government has recently enacted the Flood

More information

Aiding the Hydro-scheme development process. Web-links to useful information sources

Aiding the Hydro-scheme development process. Web-links to useful information sources Aiding the Hydro-scheme development process. Web-links to useful information sources Web-pages are in bold. These pages aim at providing developers, land-owners, decision makers and advisors with a collation

More information

1 Introduction. 1.1 Key objective. 1.2 Why the South Esk

1 Introduction. 1.1 Key objective. 1.2 Why the South Esk 1 Introduction 1.1 Key objective The aim of this study is to identify and assess possible options for improving the quality of the river channel and habitats in the River South Esk catchment whilst helping

More information

2011 No. 1824 TOWN AND COUNTRY PLANNING. The Town and Country Planning (Environmental Impact Assessment) Regulations 2011

2011 No. 1824 TOWN AND COUNTRY PLANNING. The Town and Country Planning (Environmental Impact Assessment) Regulations 2011 STATUTORY INSTRUMENTS 2011 No. 1824 TOWN AND COUNTRY PLANNING The Town and Country Planning (Environmental Impact Assessment) Regulations 2011 Made - - - - 19th July 2011 Laid before Parliament 26th July

More information

River Wensum Restoration Strategy Swanton Morley Restoration Scheme Reach 14a

River Wensum Restoration Strategy Swanton Morley Restoration Scheme Reach 14a River Wensum Restoration Strategy Swanton Morley Restoration Scheme Reach 14a At a glance River restoration benefits: Improved planform, channel cross-section, flow variation and sediment process. Improved

More information

London Borough of Waltham Forest LOCAL FLOOD RISK MANAGEMENT STRATEGY. Summary Document

London Borough of Waltham Forest LOCAL FLOOD RISK MANAGEMENT STRATEGY. Summary Document LOCAL FLOOD RISK MANAGEMENT STRATEGY Summary Document October 2013 Local Flood Risk Management Strategy Summary 1 Introduction 2 Partner responsibilities 3 What do we know about flooding in the borough?

More information

SECTION 1.0 STATUTORY AUTHORIZATION AND PURPOSE

SECTION 1.0 STATUTORY AUTHORIZATION AND PURPOSE A local law for Flood Damage Prevention as authorized by the New York State Constitution, Article IX, Section 2, and Environmental Conservation Law, Article 36 1.1 FINDINGS SECTION 1.0 STATUTORY AUTHORIZATION

More information

6.11.2007 Official Journal of the European Union L 288/27 DIRECTIVES

6.11.2007 Official Journal of the European Union L 288/27 DIRECTIVES 6.11.2007 Official Journal of the European Union L 288/27 DIRECTIVES DIRECTIVE 2007/60/EC OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 23 October 2007 on the assessment and management of flood risks

More information

Environmental Impact Assessment of Forestry Projects

Environmental Impact Assessment of Forestry Projects Environmental Impact Assessment of Forestry Projects Flow chart of EIA process Developer submits grant application FC screens when sufficient info received, normally at "Proposal Submit stage Developer

More information

Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers

Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers Development and Regeneration Services Glasgow City Council 229 George Street Glasgow G1 1QU May 2011 1. Introduction...-

More information

PLANNING APPLICATION: 12/00056/APP

PLANNING APPLICATION: 12/00056/APP PLANNING APPLICATION: 12/00056/APP In the event that a recommendation on this planning application is overturned the Committee is reminded of the advice contained on the front page of the agenda for Reports

More information

Local Area Plans. Planning Guidelines. Guidelines for Planning Authorities. Department of the Environment, Community and Local Government June 2013

Local Area Plans. Planning Guidelines. Guidelines for Planning Authorities. Department of the Environment, Community and Local Government June 2013 23 Local Area Plans Planning Guidelines Guidelines for Planning Authorities Department of the Environment, Community and Local Government June 2013 Government of Ireland 2013 Table of Contents Page 1.

More information

Planning, Health and Environment Division

Planning, Health and Environment Division 18 Planning, Health and Environment Division A Planning Guide to Sustainable Drainage Systems Introduction Working in co-operation with the Environment Agency, Severn Trent Water Ltd., the Highway Authority

More information

RESTORING streams to reduce flood loss

RESTORING streams to reduce flood loss RESTORING streams to reduce flood loss Flood Loss Reduction the Natural Way Flood disasters have become a regular Floods can devastate local occurrence. One in your community may have communities. threatened

More information

SCOTTISH EXECUTIVE Development Department PLANNING. Removal of Legal Impediments to E-Planning. Consultation Paper

SCOTTISH EXECUTIVE Development Department PLANNING. Removal of Legal Impediments to E-Planning. Consultation Paper SCOTTISH EXECUTIVE Development Department PLANNING Removal of Legal Impediments to E-Planning Consultation Paper August 2003 abcdefghijkl Victoria Quay Edinburgh EH6 6QQ Development Department Planning

More information

CHAPTER 24: ENVIRONMENTAL MANAGEMENT

CHAPTER 24: ENVIRONMENTAL MANAGEMENT Central Eyre Iron Project Environmental Impact Statement CHAPTER 24: ENVIRONMENTAL MANAGEMENT CHAPTER 24 ENVIRONMENTAL MANAGEMENT COPYRIGHT Copyright Iron Road Limited, 2015 All rights reserved This document

More information

Flood Protection & control works

Flood Protection & control works Flood Protection & control works Whakamarumaru i ngā waipuke Environment Canterbury is the joint lead agency with territorial authorities for flood risk reduction. Under changes to the Local Government

More information

Number 27 of 2006 ARRANGEMENT OF SECTIONS. PART 1 Preliminary and General

Number 27 of 2006 ARRANGEMENT OF SECTIONS. PART 1 Preliminary and General Number 27 of 2006 PLANNING AND DEVELOPMENT (STRATEGIC INFRASTRUCTURE) ACT 2006 ARRANGEMENT OF SECTIONS PART 1 Preliminary and General Section 1. Short title, collective citation and commencement. 2. Definitions.

More information

Designed and produced by geo-graphicsdesign.com DP 300 3/02

Designed and produced by geo-graphicsdesign.com DP 300 3/02 Designed and produced by geo-graphicsdesign.com DP 300 3/02 Guidance for Developers and Regulators Purpose This booklet is produced on behalf of the North East Scotland Flooding Advisory Group and is intended

More information

Flood damaged road infrastructure: Can a rapid response be effected within the parameters of South Africa s environmental legislation?

Flood damaged road infrastructure: Can a rapid response be effected within the parameters of South Africa s environmental legislation? Claire Blanché Kim White Flood damaged road infrastructure: Can a rapid response be effected within the parameters of South Africa s environmental legislation? 1 WESTERN CAPE WEATHER Cabo das Tormentas

More information

Development proposals will require to demonstrate, according to scale, type and location, that they:-

Development proposals will require to demonstrate, according to scale, type and location, that they:- Appendix 2 : Relevant Development Plan Policies Angus Local Plan Review 2009 Policy S1 : Development Boundaries (a) Within development boundaries proposals for new development on sites not allocated on

More information

MassDEP Natural Disaster Guidance for Coastal and Inland Wetland Resource Area Impacts: Hurricane or Tropical Storm Sandy

MassDEP Natural Disaster Guidance for Coastal and Inland Wetland Resource Area Impacts: Hurricane or Tropical Storm Sandy MassDEP Natural Disaster Guidance for Coastal and Inland Wetland Resource Area Impacts: Hurricane or Tropical Storm Sandy Tropical Storm Sandy may cause severe flooding, erosion and other impacts to wetland

More information

Explanatory Memorandum to the Conservation of Habitats and Species (Amendment) Regulations 2012

Explanatory Memorandum to the Conservation of Habitats and Species (Amendment) Regulations 2012 Explanatory Memorandum to the Conservation of Habitats and Species (Amendment) Regulations 2012 This Explanatory Memorandum has been prepared by the Environment and Sustainable Development Department and

More information

THE NATIONAL PRELIMINARY FLOOD RISK ASSESSMENT (PFRA) OVERVIEW REPORT

THE NATIONAL PRELIMINARY FLOOD RISK ASSESSMENT (PFRA) OVERVIEW REPORT THE NATIONAL PRELIMINARY FLOOD RISK ASSESSMENT (PFRA) OVERVIEW REPORT DRAFT FOR PUBLIC CONSULTATION AUGUST 2011 2019/RP/001/B FLOOD RELIEF & RISK MANAGEMENT DIVISION ENGINEERING SERVICES OFFICE OF PUBLIC

More information

MINERALS AND ASSOCIATED WASTE APPLICATIONS APPLICATION FORM

MINERALS AND ASSOCIATED WASTE APPLICATIONS APPLICATION FORM MINERALS AND ASSOCIATED WASTE APPLICATIONS APPLICATION FORM 1. Applicant Details (See guidance note 1) 2. Agent Details Please complete if the applicant has an agent (See guidance note 2) * Title: * Forename:

More information

Places Directorate Environment Infrastructure PO Box 100 Wigan Council WN1 3DS. Culvert Advice Note

Places Directorate Environment Infrastructure PO Box 100 Wigan Council WN1 3DS. Culvert Advice Note Places Directorate Environment Infrastructure PO Box 100 Wigan Council WN1 3DS Culvert Advice Note Culverts Advice Note Revisions Rev Date Details Prepared by Reviewed by Approved by 1 19/07/2013 AC MAJ

More information

Restoration Planning and Development of a Restoration Bank

Restoration Planning and Development of a Restoration Bank Restoration Planning and Development of a Restoration Bank Black Creek Pioneer Village, South Theatre 8:30 a.m. to 3:30 p.m. Habitat Restoration and Environmental Monitoring Projects Section Restoration

More information

Sec. 22a-1a page 1 (4-97)

Sec. 22a-1a page 1 (4-97) Department of Environmental Protection Sec. 22a-1a page 1 (4-97) TABLE OF CONTENTS Connecticut Environmental Policy Act Definitions... 22a-1a- 1 Determination of sponsoring agency.... 22a-1a- 2 Determination

More information

Plumbing and Drainage Regulation 2012

Plumbing and Drainage Regulation 2012 Regulatory Impact Statement Subordinate Legislation Act 1989 Plumbing and Drainage Regulation 2012 A regulation under the Plumbing and Drainage Act 2011 April 2012 Enquiries to: NSW Fair Trading Policy

More information

GROWER ADVISORY Agriculture Regulations of the Wetlands Protection Act

GROWER ADVISORY Agriculture Regulations of the Wetlands Protection Act Cape Cod Cranberry Growers Association GROWER ADVISORY Agriculture Regulations of the Wetlands Protection Act Cranberry Bogs and the Agricultural Exemption The Massachusetts Wetlands Protection Act (WPA)

More information

ArcGIS Model Build. ArcGIS Geodatabase. Brian Beckett (Inland Fisheries Ireland) and Dr. Sally Cook (Supervisor, University of Ulster, Coleraine)

ArcGIS Model Build. ArcGIS Geodatabase. Brian Beckett (Inland Fisheries Ireland) and Dr. Sally Cook (Supervisor, University of Ulster, Coleraine) An evaluation of GIS for the predictive modelling and mapping of specific stream power, substratum particle size and potential juvenile lamprey habitat Brian Beckett (Inland Fisheries Ireland) and Dr.

More information

Statement of Community Involvement (SCI) March 2016

Statement of Community Involvement (SCI) March 2016 Statement of Community Involvement (SCI) Contents Section Page No. 1.0 What is a Statement of Community Involvement?... 1 2.0 Who can get involved in the planning process?... 3 3.0 Empowering disadvantaged

More information

The Basics of Chapter 105 Waterways and Wetlands Permitting in PA

The Basics of Chapter 105 Waterways and Wetlands Permitting in PA The Basics of Chapter 105 Waterways and Wetlands Permitting in PA April 17, 2013 Goal To develop a basic understanding of PA Department of Environmental Protection (DEP) and US Army Corps of Engineers

More information

Stormwater harvesting

Stormwater harvesting Stormwater harvesting How to collect and re-use stormwater from Sydney Water s stormwater system Most of the stormwater pipes and channels in the Sydney metropolitan area are the responsibility of local

More information

Newbiggin House Farm,

Newbiggin House Farm, Newbiggin House Farm, Near Waberthwaite Flood Investigation Report 32 Flood Event 30/8/2012 Cumbria County Council Version Undertaken by Reviewed by Approved by Date Preliminary Colin Parkes Anthony Lane

More information

SUFFOLK COASTAL DISTRICT COUNCIL DOMESTIC FLOOD PROTECTION POLICY

SUFFOLK COASTAL DISTRICT COUNCIL DOMESTIC FLOOD PROTECTION POLICY SUFFOLK COASTAL DISTRICT COUNCIL DOMESTIC FLOOD PROTECTION POLICY 1. Introduction 1.1 The Council recognises the threat to local communities from flooding following severe weather events and as a result

More information

201[X] No. INFRASTRUCTURE PLANNING. The Network Rail (Ipswich Chord) Order

201[X] No. INFRASTRUCTURE PLANNING. The Network Rail (Ipswich Chord) Order Regulation number: Regulation 5(2)(b) Document Ref: 5.1 Author Winckworth Sherwood LLP Date: 21 June 2011 Date of revision & version number: 1.0 21 June 2011 STATUTORY INSTRUMENTS 201[X] No. INFRASTRUCTURE

More information

Engineering Policy 146. Severe Weather Management Plans

Engineering Policy 146. Severe Weather Management Plans Engineering Policy 146 Severe Weather Management Plans January 2014 Contents Engineering Policy... 1 1 Policy statement... 1 2 Applicability... 1 3 Context... 1 4 Objectives and benefits... 1 5 Consultation...

More information

Guideline: Works that interfere with water in a watercourse watercourse diversions. September 2014

Guideline: Works that interfere with water in a watercourse watercourse diversions. September 2014 Guideline: Works that interfere with water in a watercourse watercourse diversions September 2014 This publication has been compiled by the Department of Natural Resources and Mines. State of Queensland,

More information

New environmental liabilities for EU companies

New environmental liabilities for EU companies New environmental liabilities for EU companies The ELD applies to all businesses that operate within the EU, even if the parent company is located outside of the EU. The ELD applies to all businesses,

More information

WHAT TO DO IN THE EVENT OF AN ESCAPE OF FISH FROM A FISH FARM

WHAT TO DO IN THE EVENT OF AN ESCAPE OF FISH FROM A FISH FARM WHAT TO DO IN THE EVENT OF AN ESCAPE OF FISH FROM A FISH FARM Guidance on reporting an escape or suspected escape under Part 4A of the Aquatic Animal Health (Scotland) Regulations 2009 GUIDANCE September

More information

ENVIRONMENTAL AND SOCIAL RISK ASSESSMENT IN LENDING

ENVIRONMENTAL AND SOCIAL RISK ASSESSMENT IN LENDING ENVIRONMENTAL AND SOCIAL RISK ASSESSMENT IN LENDING Barclays has a strong and longstanding commitment to managing the environmental and social risks associated with commercial lending. We recognise that

More information

Integrated Restoration Prioritization

Integrated Restoration Prioritization Integrated Restoration Prioritization Habitat Restoration and Environmental Monitoring Projects Section Restoration Services Division Definition Restoration Prioritization is a process of combining various

More information

1.1 At its meeting on 11 December 2014, Council resolved to (9.3): 1.3 This report also seeks the Council s approval to:

1.1 At its meeting on 11 December 2014, Council resolved to (9.3): 1.3 This report also seeks the Council s approval to: DUDLEY CREEK FLOOD REMEDIATION UPDATE Executive Leadership Team Member responsible: Officer responsible: Author: Director, Council Facilities and Infrastructure Unit Manager, Stormwater and Land Drainage

More information

Consultation on integrating flood defence consents into the Environmental Permitting regime in England and Wales

Consultation on integrating flood defence consents into the Environmental Permitting regime in England and Wales www.gov.uk/defra www.wales.gov.uk Consultation on integrating flood defence consents into the Environmental Permitting regime in England and Wales Annex 2; Proposed exclusions Emergencies and licensable

More information

COMMUNITY CERTIFICATIONS

COMMUNITY CERTIFICATIONS National Flood Insurance Program Community Rating System COMMUNITY CERTIFICATIONS Public reporting burden for this form is estimated to average 4 hours for annual recertification, per response. The burden

More information

January 2016. Kath Lawless Assistant Director of Planning Newcastle City Council, Civic Centre, Barras Bridge, Newcastle upon Tyne, NE1 8QH

January 2016. Kath Lawless Assistant Director of Planning Newcastle City Council, Civic Centre, Barras Bridge, Newcastle upon Tyne, NE1 8QH January 2016 Kath Lawless Assistant Director of Planning Newcastle City Council, Civic Centre, Barras Bridge, Newcastle upon Tyne, NE1 8QH Pre-planning application advice service The city council is committed

More information

Section 4 General Strategies and Tools

Section 4 General Strategies and Tools Section 4 General Strategies and Tools Key planning issues for WRIA 35 have been identified in Sections 5 and 6 in the areas of water supply, instream flow, water quality, and aquatic habitat. General

More information

Draft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT

Draft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT Draft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT MAY 2015 1 Contents 1 INTRODUCTION 3 2 DRAFT NEW MUSEUMS SITE SPD 4 3 STRATEGIC ENVIRONMENTAL

More information

Draft Catchment Flood Risk Management Plan

Draft Catchment Flood Risk Management Plan Draft Catchment Flood Risk Management Plan February 2010 Acknowledgements In early 2006, the Office of Public Works (OPW), Cork City Council and Cork County Council commenced work on a Catchment-based

More information

2006 No. 613 (N.I. 6) NORTHERN IRELAND. The Budget (Northern Ireland) Order 2006

2006 No. 613 (N.I. 6) NORTHERN IRELAND. The Budget (Northern Ireland) Order 2006 STATUTORY INSTRUMENTS 2006 No. 613 (N.I. 6) NORTHERN IRELAND The Budget (Northern Ireland) Order 2006 Made - - - - 8 th March 2006 Coming into operation in accordance with Article 1 ARRANGEMENT OF ORDER

More information

Position Statement regarding Offshore Wind Proposals on Lake Huron. Lake Huron Centre for Coastal Conservation

Position Statement regarding Offshore Wind Proposals on Lake Huron. Lake Huron Centre for Coastal Conservation Position Statement regarding Offshore Wind Proposals on Lake Huron Lake Huron Centre for Coastal Conservation June 2010 Lake Huron Centre for Coastal Conservation (LHCCC) Corporate Position related to:

More information

KAWERAU DISTRICT COUNCIL BUSINESS DISASTER RECOVERY PLAN 2011

KAWERAU DISTRICT COUNCIL BUSINESS DISASTER RECOVERY PLAN 2011 KAWERAU DISTRICT COUNCIL BUSINESS DISASTER RECOVERY PLAN 2011 Kawerau District Council Private Bag 1004 Ranfurly Court KAWERAU 3169 Tel (07) 306 9009 Fax (07) 323 8072 Email kaweraudc@kaweraudc.govt.nz

More information

Creating the environment for business

Creating the environment for business 1. Introduction 1.1 Introduction to Water Cycle Strategies (WCS) 1.1.1 Background The water cycle describes the pathways and processes through which water moves through the natural and built environment,

More information

Regulatory Features of All Coastal and Inland Ecological Restoration Limited Projects

Regulatory Features of All Coastal and Inland Ecological Restoration Limited Projects Eligibility Checklist This Ecological Restoration Limited Project Eligibility Checklist guides the applicant in determining if their project is eligible to file as an Inland or Coastal Ecological Restoration

More information

Co-creation progress update and an invitation to respond. Overview of ideas from co-creation activities towards a Climate Ready UK...

Co-creation progress update and an invitation to respond. Overview of ideas from co-creation activities towards a Climate Ready UK... Department for Environment, Food and Rural Affairs Climate Ready Co-creation progress update and an invitation to respond July 2012 Contents Overview of ideas from co-creation activities towards a Climate

More information

Welsh Government. Practice Guide. Realising the potential of pre-application discussions

Welsh Government. Practice Guide. Realising the potential of pre-application discussions Welsh Government Practice Guide Realising the potential of pre-application discussions May 2012 Digital ISBN 978 0 7504 7623 2 Crown Copyright 2012 WG 15424 (2) Table of contents 1 Introduction...3 Background...3

More information

Crown Land Management

Crown Land Management Crown Land Management An introduction to Crown Land Management Fact Sheet 12 Updated December 2010 Approximately 93% of Western Australia s land area is Crown land (that is, not private land). The majority

More information

U.S. Army Corps of Engineers. Regulatory Program

U.S. Army Corps of Engineers. Regulatory Program U.S. Army Corps of Engineers Regulatory Program Regulatory Authorities Section 10 of the Rivers & Harbors Act of 1899 Section 404 of the Clean Water Act Section 10 of the Rivers and Harbors Act of 1899

More information

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED PHASE 2 EXPANSION OF THE TRANSNET IRON ORE HANDLING FACILITY, SALDANHA

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED PHASE 2 EXPANSION OF THE TRANSNET IRON ORE HANDLING FACILITY, SALDANHA ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED PHASE 2 EXPANSION OF THE TRANSNET IRON ORE HANDLING FACILITY, SALDANHA BACKGROUND INFORMATION DOCUMENT 1 BACKGROUND Transnet Limited s (Transnet) existing

More information

The Planning System and Flood Risk Management

The Planning System and Flood Risk Management 20 The Planning System and Flood Risk Management Guidelines for Planning Authorities November 2009 The Planning System and Flood Risk Management Guidelines for Planning Authorities Contents PAGE Ministers

More information

CHAPTER II SURFACE WATER MANAGEMENT ELEMENT

CHAPTER II SURFACE WATER MANAGEMENT ELEMENT CHAPTER II TABLE OF CONTENTS Objective 1-Master Stormwater Management Plan Implementation... 1 Objective 2- Meeting Future Needs... 5 Objective 3- Concurrency Management... 6 Objective 4- Natural Drainage

More information

Community Emergency Planning Guide

Community Emergency Planning Guide Community Emergency Planning Guide Our district has experienced numerous events over past years. Evidence from previous emergencies has shown that communities that plan and manage their own needs before,

More information

2016 No. 000 ENVIRONMENTAL PROTECTION, ENGLAND AND WALES FLOOD RISK MANAGEMENT, ENGLAND AND WALES

2016 No. 000 ENVIRONMENTAL PROTECTION, ENGLAND AND WALES FLOOD RISK MANAGEMENT, ENGLAND AND WALES Draft Regulations laid before Parliament and the National Assembly for Wales under sections 62(7) and (8) and 90(3) of the Water Act 2014, for approval by resolution of each House of Parliament and the

More information

Northern Territory Fisheries Resource Sharing Framework

Northern Territory Fisheries Resource Sharing Framework Northern Territory Fisheries Resource Sharing Framework Page 1 of 11 Introduction Fishing is important in the Northern Territory (Territory). Coastal Aboriginal people recognise sea country out to the

More information

Bolton s Flood Risk Management Strategy

Bolton s Flood Risk Management Strategy Bolton s Flood Risk Management Strategy www.bolton.gov.uk Public Summary Bolton s Flood Risk Management Strategy Public Summary Introduction Over 5.5 million properties in England and Wales are at risk

More information

Draft Heads of Terms Option and Lease for [ ] Community Wind Scheme Page 1 of

Draft Heads of Terms Option and Lease for [ ] Community Wind Scheme Page 1 of Draft Heads of Terms Option and Lease for [ ] Community Wind Scheme Page 1 of These Heads of Terms are applicable only to Community Wind Schemes approved under the National Forest Land Scheme. These are

More information

OWNER BUILDER AS AN WHAT ARE MY RESPONSIBILITIES UNDER THE DEVELOPMENT ACT 1993

OWNER BUILDER AS AN WHAT ARE MY RESPONSIBILITIES UNDER THE DEVELOPMENT ACT 1993 AS AN OWNER BUILDER building work? What records should I keep? Is insurance required? W I need approval for? What do I need approval for? How do I obtain building work? How do I obtain approval? What records

More information

FLOOD RISK AND SURFACE WATER DRAINAGE ASSESSMENT HILLHOUSE RESTORATION SITE, OFF JAMESON ROAD, THORNTON CLEVELEYS ON BEHALF OF NPL ESTATES

FLOOD RISK AND SURFACE WATER DRAINAGE ASSESSMENT HILLHOUSE RESTORATION SITE, OFF JAMESON ROAD, THORNTON CLEVELEYS ON BEHALF OF NPL ESTATES FLOOD RISK AND SURFACE WATER DRAINAGE ASSESSMENT HILLHOUSE RESTORATION SITE, OFF JAMESON ROAD, THORNTON CLEVELEYS ON BEHALF OF NPL ESTATES Integra Consulting Engineers Limited NS / 2543 Fountain House

More information

Flood Risk Management

Flood Risk Management Flood Risk Management Value of Flood Risk Management Every year floods sweep through communities across the United States taking lives, destroying property, shutting down businesses, harming the environment

More information

Flood Risk Management

Flood Risk Management Flood Risk Management Value of Flood Risk Management Value to Individuals and Communities Every year floods sweep through communities across the United States taking lives, destroying property, shutting

More information

King County, Washington Policies and Practice for the Use of Eminent Domain For Flood Risk Reduction

King County, Washington Policies and Practice for the Use of Eminent Domain For Flood Risk Reduction King County, Washington Policies and Practice for the Use of Eminent Domain For Flood Risk Reduction Introduction Eminent domain refers to the power possessed by the state over all property within the

More information

Living & Working Managing Natural Resources and Waste

Living & Working Managing Natural Resources and Waste Living & Working Managing Natural Resources and Waste 5.13 Managing Natural Resources and Waste Background 5.13.1 This chapter focuses on how we manage resources within the AONB. It includes renewable

More information

Flood Risk Mitigation Plan

Flood Risk Mitigation Plan Environment Waikato Technical Report 1997/13 Flood Risk Mitigation Plan Prepared by: M Malcolm and D Parkin Natural Hazards Programme For: Environment Waikato PO Box 4010 HAMILTON EAST June 1997 Document

More information

3. Given the geographic extent of the area, amendments have been made to the following regional planning documents

3. Given the geographic extent of the area, amendments have been made to the following regional planning documents AMENDMENTS TO THE REGIONAL PLANS RELATING TO LAND REPAIR ON EARTHQUAKE DAMAGED RESIDENTIAL LAND UNDER s27 OF THE CANTERBURY EARTHQUAKE RECOVERY ACT 2011 1. This memorandum outlines the specific changes

More information

Paragraph 9 Exemption The reclamation or improvement of land

Paragraph 9 Exemption The reclamation or improvement of land The reclamation or improvement of land 1 INTRODUCTION This document provides guidance, definitions, operational policy and strategy with regard registering a paragraph 9 exemption under Schedule 1 of the

More information

Flood Risk & Surface Water Management. Page 1 of 20

Flood Risk & Surface Water Management. Page 1 of 20 Page 1 of 20 Flood Risk & Surface Water Management Flood Risk & Surface Water Management and the Planning Process Introduction The purpose of this document is to increase awareness of the potential of

More information

Summary: Introduction

Summary: Introduction Summary: Melbourne Water has a range of responsibilities in the Port Phillip and Westernport region, including responsibilities for the protection and restoration of waterways and, in collaboration with

More information

COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES. April 20, 2010 EXHIBIT 1

COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES. April 20, 2010 EXHIBIT 1 COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES April 20, 2010 EXHIBIT 1 ELEMENT 4 WATER RESOURCES TABLE OF CONTENTS 4.1 INTRODUCTION 4.2 GOALS AND POLICIES 4.2.A General Goals and Policies 1 4.2.B

More information

183/2006 Coll. ACT of 14 th March 2006. on town and country planning and building code (Building Act)

183/2006 Coll. ACT of 14 th March 2006. on town and country planning and building code (Building Act) Contents and text 183/2006 Coll. latest wording of the text 183/2006 Coll. ACT of 14 th March 2006 on town and country planning and building code (Building Act) The Parliament passed this Act of the Czech

More information

Flood and Coastal Erosion Risk Management Service Delivery Plan

Flood and Coastal Erosion Risk Management Service Delivery Plan Flood and Coastal Erosion Risk Management Service Delivery Plan Document Information Title Flood and coastal erosion risk management Service Delivery Plan Owner Sefton Council Version 1.2 Status Draft

More information

THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.)

THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.) THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.) THE NATURAL RESOURCES AND ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER, 1994 (Made under section 11A(1)) (Incorporating

More information

Table of Contents. Introduction Guidance Permit fact sheet Completeness checklist. Introduction

Table of Contents. Introduction Guidance Permit fact sheet Completeness checklist. Introduction Instructions and Supporting Materials Table of Contents Introduction Permit fact sheet Completeness checklist Introduction MassDEP Permit Applications, as well as Instructions & Support Materials, are

More information

Central Government funding reductions. Lead Finance Officer summary paper May 2015. Background

Central Government funding reductions. Lead Finance Officer summary paper May 2015. Background Central Government funding reductions Lead Finance Officer summary paper May 2015 Background Council acknowledges the significant budget challenges being faced by Central Government as a result of the

More information

Environmental Liability Regulations. Kevin Motherway Environmental Liability Unit EPA Waste Workshop, Athlone 23 rd of October 2009

Environmental Liability Regulations. Kevin Motherway Environmental Liability Unit EPA Waste Workshop, Athlone 23 rd of October 2009 Environmental Liability Regulations Kevin Motherway Environmental Liability Unit EPA Waste Workshop, Athlone 23 rd of October 2009 The Environmental Liability Regulations (ELR)* S.I. No. 547 of 2008 in

More information

STATUTORY INSTRUMENTS. S.I. No. 102 of 2016 EUROPEAN UNION HABITATS (KERRY HEAD SHOAL SPECIAL AREA OF CONSERVATION 002263) REGULATIONS 2016

STATUTORY INSTRUMENTS. S.I. No. 102 of 2016 EUROPEAN UNION HABITATS (KERRY HEAD SHOAL SPECIAL AREA OF CONSERVATION 002263) REGULATIONS 2016 STATUTORY INSTRUMENTS. S.I. No. 102 of 2016 EUROPEAN UNION HABITATS (KERRY HEA SHOAL SPECIAL AREA OF CONSERVATION 002263) REGULATIONS 2016 2 [102] S.I. No. 102 of 2016 EUROPEAN UNION HABITATS (KERRY HEA

More information

PREVENTION. City of Orem FLOOD DAMAGE PREVENTION 10-1-1

PREVENTION. City of Orem FLOOD DAMAGE PREVENTION 10-1-1 City of Orem FLOOD DAMAGE PREVENTION 10-1-1 CHAPTER 10. Article 10-1. Article 10-2. Article 10-3. Article 10-4. Article 10-5. FLOOD DAMAGE PREVENTION Purposes Definitions General Provisions Administration

More information

[Sections 158 and 159 and all references in this Act to "specified premises" shall be treated as having ceased to have effect].

[Sections 158 and 159 and all references in this Act to specified premises shall be treated as having ceased to have effect]. The words omitted from sub-s (1) and the whole of sub-s (2) were repealed by the Port of London Act 1982, s 7, Sch2. Constable. See the note to s 119 ante. Note also, as to the appointment of constables

More information

Environmental Assessment Approval. Approval Date: Liverpool Wind Farm Liverpool Wind Energy Storage Project Inc.

Environmental Assessment Approval. Approval Date: Liverpool Wind Farm Liverpool Wind Energy Storage Project Inc. Environmental Assessment Approval Approval Date: ocr 2 8 zols Liverpool Wind Farm Liverpool Wind Energy Storage Project Inc. Queens County, Nova Scotia The Liverpool Wind Farm (the Undertaking ), proposed

More information

Flood Defence Asset Management

Flood Defence Asset Management May 2015 Flood Defence Asset Management The London Borough of Harrow is located in North West London and covers an area of 55km². There is approximately 80kms of rivers and watercourses, 2 reservoirs,

More information

CORPORATE POLICY STATEMENT NO. 12 MANAGEMENT OF PEST ANIMALS

CORPORATE POLICY STATEMENT NO. 12 MANAGEMENT OF PEST ANIMALS 1. OBJECTIVE CORPORATE POLICY STATEMENT NO. 12 MANAGEMENT OF PEST ANIMALS August 2015 To provide direction and guidance for the management of pest animals on lands and waters managed by the Department

More information

1.7.0 Floodplain Modification Criteria

1.7.0 Floodplain Modification Criteria 1.7.0 Floodplain Modification Criteria 1.7.1 Introduction These guidelines set out standards for evaluating and processing proposed modifications of the 100- year floodplain with the following objectives:

More information