1 Section 1 Aerial Bundled Conductor (ABC) Low Voltage Mains and Services Asset Management THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE
2 Section 1 LV ABC v1.2 Page 2
3 Table of Contents 1 Scope References Definitions Introduction Design Information General Practice Risk assessment Earthing Design Data Construction Information General Practice Supports Clearances General Tree Clearances Low Voltage Supports Augering Foundations Stays General back filling and Compaction In Line Connections Connections to the Bundle General Limit on Number of Connections to the Bundle Disconnections from the bundle Open points General Appendix A GA Drawings and Materials Mains Appendix B GA Drawings and Materials Services Appendix C GA Drawings and Materials Pole Mounted Equipment Appendix D GA Drawings and Materials Earthing...57 August 2012 OHL Design Manual - Section 1 - Aerial Bundled Conductor (ABC) Low Voltage Mains And Services LS BH PW Page 3
4 6.15 Appendix E Reference List of all Materials for this specification Appendix F Design Data for Conductor ABC, 4 x 120mm Appendix G Design Data for Conductor, ABC, 4 x 95mm Appendix H Design Data for Conductor, ABC, 2 x 95mm Appendix I Design Data for Conductor, ABC, 4 x 35mm Appendix J Design Data for Conductor, ABC, 2 x 35mm Appendix K Service Spans Appendix L Un stayed Supports Appendix M Stay base and angle conversion table Full list of tables Full list of figures...98 Revision Record Issue Date Prepared by Details /08/2010 Andy Horstead New document /03/2011 John Lowe Document rebranded /08/2012 Lee Strachan Reviewed for Publication on G81 Website Overhead Line Design Manual Section 1 LV ABC v1.2 Page 4
5 1 Scope This specification details the design and construction requirements for all new types of Low Voltage (LV) Aerial Bundled Conductor (ABC) lines and services, operating in the range up to and including 1kV. LV ABC structures can be considered as one of three distinct types for design and construction purposes: 1. LV ABC distribution networks supported on wood poles. 2. LV ABC service connections (excludes terminations within property). 3. LV ABC pole-mounted equipment. ABC conductors comprising the following number of cores and cross-sectional areas are used in the above lines: 4. Conductor, ABC, 2x35mm Conductor, ABC, 2x95mm Conductor, ABC, 4x35mm Conductor, ABC, 4x95mm Conductor, ABC, 4x120mm 2. These conductors are specified in more detail in EAS and BS August 2012 OHL Design Manual - Section 1 - Aerial Bundled Conductor (ABC) Low Voltage Mains And Services LS BH PW Page 5
6 2 References The following referenced documents are indispensable for the application of this document. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies. Standard Number BS 1990 BS EN ISO 9001 BS EN ISO UKPN EDS ENA TS ENA TS ENA TS BS Standard Description Wood pole for overhead lines (power and telecommunications lines) Quality Management Systems Requirements Environmental Management Systems Specification with guidance for use LV Networks Earthing Design Insulated Aerial Bundled Conductors erection requirements of low voltage overhead distribution systems Aerial Bundled Conductors (ABC) insulated with cross-linked polyethylene for low voltage overhead distribution systems Conductor fittings and associated apparatus for use with LV aerial bundled conductors Low Voltage Aerial Bundled Conductors UKPN EM 01 Overhead line Construction Manual 2010 UKPN EDS UKPN EAS Safety signs and labelling of equipment UK Power Networks' Materials List (Overhead Lines) March 2011 Overhead Line Design Manual Section 1 LV ABC v1.2 Page 6
7 3 Definitions ABC CNE UKPN UK Power Networks DMS EDS ENA TS FoS GA JC,s IPC Manufacturer NI PME SJI XLPE Aerial Bundled Conductor Combined Neutral Earth UK Power Networks UK Power Networks Document Management System Engineering Design Standard Energy Networks Association Technical Specification Factor of Safety General Arrangement Job Cards Insulation Piercing Connector An organisation supplying equipment for use on networks owned by UK Power Networks Not Illustrated (i.e. item numbers on Figures). Protective Multiple Earthing Specific Job Instructions Cross-linked Polyethylene August 2012 OHL Design Manual - Section 1 - Aerial Bundled Conductor (ABC) Low Voltage Mains And Services LS BH PW Page 7
8 March 2011 Overhead Line Design Manual Section 1 LV ABC v1.2 Page 8
9 4 Introduction The body of this specification covers general design and construction requirements. How to construct and maintain ABC is detailed in a separate manual known as the Overhead Line Construction Manual. Appendix A to Appendix C of this document comprises General Arrangement (GA) drawings with associated lists of materials for LV ABC structures as follows: 1. Appendix A comprises GAs for LV ABC distribution networks supported on wood poles. (Note that inside and outside angles are not as defined in ENA TS ) 2. Appendix B comprises GAs for LV ABC service connections, followed by a GA summarising ABC and CNE service spans 3. Appendix C comprises GAs for LV ABC pole-mounted equipment. Each list of materials identifies the components included in the associated GA and which supplementary items are needed to complete that structure. Variations within each GA for different conductors are covered by different columns in the associated list of materials. Note that the lists of materials for the connections and plant shown in Appendix B and Appendix C do not include the materials for the associated GA structure; many combinations are possible and it is not practical to cover every possible structure/connection variation here. (Refer to Appendix A for approved GA structures and materials.) Appendix E Reference List of all Materials for this specification comprises a reference list of all materials used within this specification. Appendixes F to M are tables of design data for this specification: one Appendix for each ABC type. This specification fits into the overall design and construction process as outlined by the following process summary: (a) Carry out a risk assessment. (b) Generate a proposal taking into account the risk assessment. (c) Generate a proposal for a new line. (d) Choose a proposed route and a line survey carried out. (e) Plot pole positions, heights, clearances, and develop a line profile. (Note that the development of a line profile will require some data and parameters from Appendix F and subsequent Appendices.) (f) Compile a list of materials using the GAs and supplementary items identified in this specification (Appendix A, Appendix B, Appendix C and appropriate ES and/or ENA TS). The GAs and supplementary items shall be selected and used in accordance with the design and construction information given below and the data given in subsequent Appendices. August 2012 OHL Design Manual - Section 1 - Aerial Bundled Conductor (ABC) Low Voltage Mains And Services LS BH PW Page 9
10 Appendix M provides a table to give distances in metres from pole base to stay base dependant on pole size. This has been provided to support the minimum angle of stay column provided in Appendix F to J. 5 Design Information 5.1 General Practice Lines shall be designed using the GAs and supplementary items from Appendix A, Appendix B, Appendix C and the data from Appendix F to M, etc. The following information shall be taken into account during the design process. 5.2 Risk assessment A risk assessment shall be carried out at the commencement of the design work to identify the site specific safety hazards. The design shall incorporate mitigation measures to control the risks, identified in the risk assessment, associated with the construction, operation and maintenance of the proposed overhead line and its suitability compared with an underground cable solution. 5.3 Earthing System earthing shall meet the requirements of the current UK Power Networks LV Network Earthing Design Manual EDS To provide a PME network the connection from the neutral of the bundle to the earth electrode(s) shall be installed and connected in accordance with the drawings given in Appendix D. (The PME connections are split across two drawings, because all pole mounted equipment GAs incorporate connections from bundle neutral to neutral/earth as mandatory requirements.) 5.4 Design Data Each set of design data (Appendix F to M) contains all the information necessary for the conductor bundle specified, with the exception of poles supporting electrical plant. Design parameters used to construct the tables of design data are given for reference. Note that the basic span for this design is 50m. If ABC is to be installed onto an existing pole it is then assumed that the pole depth will be 1500 mm. The maximum wind loading span shall then be limited to the figures supplied in Table 6 and Table 12 (Appendix F and G). If an existing pole has to be changed due to decay or clearance problems then refer to tables for planting depth for new build. March 2011 For poles supporting electrical plant, strut loadings need to be re-calculated as necessary. (Note that 1000kg additional weight can be approximated to 1000kgf additional loading for this purpose.) Data in Appendix F to J, etc, are based on the minimum pole diameters included in BS In practice, if it is found that strut loadings exceed the values given in Appendix F to J, etc, the minimum pole top diameter needs to be re-calculated. Maximum service spans shall be in accordance with Figure 15: Concentric Service Spans and Figure 16: ABC Service Spans. Overhead Line Design Manual Section 1 LV ABC v1.2 Page 10
11 August 2012 OHL Design Manual - Section 1 - Aerial Bundled Conductor (ABC) Low Voltage Mains And Services LS BH PW Page 11
12 6 Construction Information 6.1 General Practice Construction practices shall be in accordance with the UK Power Networks Overhead Line Construction Manual. For reference, ABC phases and neutral shall be identified by the number of ribs on the insulation as follows: Phase L1: 1 rib. Phase L2: 2 ribs. Phase L3: 3 ribs. Neutral: fully ribbed. (Note that this applies whenever ABC is used; e.g. when neutral is run down the pole for connection to the neutral/earth connection.) Supports All fittings supporting the ABC system shall provide an insulating barrier rated at 1000V between the core insulation and the mechanical attachment. The ABC shall be attached in such a manner that it cannot make contact with any metalwork or stays. The maximum pole height for a service or service line shall be 9 metres. Weak links will be used on all poles except for the following: 1. Terminal poles 2. Section poles or 3. Either side of a road crossing. 6.2 Clearances General Clearances from external objects and structures (e.g. buildings, trees and roads) shall comply with ENA TS In-line construction clearances shall comply with those specified in the specific job instructions detailed in the Overhead Line Construction Manual. In addition to the above, the following rules shall be followed: March Wherever possible, ABC conductors shall not pass directly over buildings and roofs. 2. Wherever it is necessary to over sail a building or roof, the relevant span shall not contain any in-line connections. 3. Where ABC is attached to a building which has a thatched roof, the attachment shall be a minimum of 0.5m from the thatched roof. 4. Once terminated, ABC shall be converted to concentric cable or insulated and sheathed (mechanically protected) cable within 0.5m of the point of attachment to a Overhead Line Design Manual Section 1 LV ABC v1.2 Page 12
13 building. Service cable lead-ins into the building shall be installed in accordance with the Overhead Line Construction Manual Tree Clearances Where an ABC system is erected through trees, the following points shall be considered: 1. For additional information regarding overhead line clearances, refer to ENA TS Risks of the ABC being abraded by trees. 3. Sag variations and conductor swing due to the effects of the wind. 4. The effect of wind and snow loading on trees or branches bearing onto the ABC. 5. The danger of trees providing climbing access. 6. The amount of tree cutting required for ABC compared with conventional open wire systems can be significantly reduced. However, the XLPE insulation is susceptible to abrasion and shall not be allowed to come into contact with tree trunks, mature branches or heavy outer growth, under any circumstances. 7. Clearances through trees shall take account of maximum and minimum conductor sags, conductor swing and the anticipated tree growth rate and cutting periods. 6.3 Low Voltage Supports All supports shall be fitted with a Safety Sign (Danger of Death) in accordance with UK Power Networks EDS Augering Augering the pole hole is the preferred method when the ground is suitable. After pole erection, the remaining hole shall be backfilled with suitable material based on soil condition. If there is a risk of movement due to poor soil conditions then a suitable cement mixture shall be used. 6.5 Foundations Un-stayed angle poles shall be installed 0.5m deeper than the planting depth given in the Appendices to this specification. (Care shall be taken when planning un-stayed angle poles, particularly near walls.) August 2012 OHL Design Manual - Section 1 - Aerial Bundled Conductor (ABC) Low Voltage Mains And Services LS BH PW Page 13
14 6.6 Stays Only the following types of stay are suitable for lines designed to this specification: Load-lock anchors (Light) Screw-in (Heavy) Concrete blocks: Light 500 x 300 x 90mm Heavy 640 x 430 x 140mm Refer to tables for staying arrangements. Heavy duty stay plates are useful for structures of restricted height: the overall distance between the fixing at the top of the pole and the stay insulator is less than that of an equivalent pole-top make-off. March 2011 The distance of the stay-base from the pole-base are given in Appendix F J using angles in degrees from 0 o to 45 o measured between the pole and stay. This information is then supported by a further table 42 provided in Appendix M which gives the spread in metres between the stay and the pole at ground level. 6.7 General back-filling and Compaction All holes shall be backfilled with the excavated material but consideration should be given to soil condition. It may be necessary to import suitable material which can be mixed with a cement based compound for reinstatement around the pole. Overhead Line Design Manual Section 1 LV ABC v1.2 Page 14
15 Any poles erected in the highway (excluding grass verges) shall be backfilled with suitable material with reference to NRSWA requirements. 6.8 In-Line Connections Compression fittings shall be used for all tension and in line non-tension connections. (Under no circumstances shall IPC s) be used to make in-line connections.) 6.9 Connections to the Bundle General Only ABC to ABC connections to the conductor bundle are permitted. Table 1 Number of IPC s required for Mains and service connections Scenario Phase Neutral 120mm² Mains or Service 1 double bolt IPC 2 double bolt IPCs 95mm² Mains or Service 1 single bolt IPC 2 single bolt IPCs 35mm² Mains or Service 1 single bolt IPC 2 single bolt IPCs Service Connections For single phase and three phase connections to 95mm 2 ABC and below, one single-bolt IPC shall be used on each phase conductor and two single-bolt IPC s shall be used on the neutral/earth conductor. For single phase and three phase connections to 120mm 2 ABC, one double-bolt IPC shall be used on each phase conductor and two double-bolt IPC s shall be used on the neutral/earth conductor (as illustrated in the appropriate GAs) Mains Connections For all mains connections to 95mm 2 and below, one single-bolt IPC shall be used on each phase conductor and two single-bolt IPC s shall be used on the neutral/earth conductor For all mains connections to 120mm 2, one, double-bolt IPC shall be used on each phase conductor and two, double-bolt IPCs shall be used on the neutral/earth conductor (as illustrated in the appropriate GAs) Limit on Number of Connections to the Bundle Only two single phase or two three phase connection to the bundle is permitted at any pole position. If this number of connections is to be exceeded then a distribution box is to be provided Disconnections from the bundle IPC s shall not be removed from the bundle. Disconnections shall be made on the ABC tail. Refer to the appropriate SJI in the Overhead Lines Construction Manual for method of disconnection Open points General The following method is adopted when creating or replacing an open point. August Fuse Links see Figure 18 OHL Design Manual - Section 1 - Aerial Bundled Conductor (ABC) Low Voltage Mains And Services LS BH PW Page 15
16 6.11 Appendix A GA Drawings and Materials - Mains Table 2: List of GA Drawings and Materials - Mains Figure Drawing Title Figure 1: Figure 2: Equipment) ABC General Drawing Arrangement ABC Stay Arrangement, Make-Off (No Auxiliary Pole-Mounted Figure 3: ABC Stay Arrangement, Make-Off (Restricted Height or Auxiliary Pole-Mounted Equipment) Figure 4: ABC Stay Arrangement, Stay Plate (Restricted Height, Auxiliary Pole-Mounted Equipment or Live Line Working) Figure 5: Figure 6: Figure 7: Figure 8: Figure 9: Figure 10: ABC Intermediate GA (Inside Angle up to 60o Line Deviation) ABC Intermediate GA (Outside Angle up to 30o Line Deviation) ABC Angle Section GA (up to 20o Line Deviation) ABC Angle Section GA (20o to 90o Line Deviation) ABC Terminal GA ABC Tee-off Intermediate GA March 2011 Overhead Line Design Manual Section 1 LV ABC v1.2 Page 16
17 August 2012 OHL Design Manual - Section 1 - Aerial Bundled Conductor (ABC) Low Voltage Mains And Services LS BH PW Page 17
18 Figure 1: ABC General Drawing Arrangement March 2011 Overhead Line Design Manual Section 1 LV ABC v1.2 Page 18
19 Figure 2: ABC Stay Arrangement, Make-Off (No Auxiliary Pole-Mounted Equipment) August 2012 OHL Design Manual - Section 1 - Aerial Bundled Conductor (ABC) Low Voltage Mains And Services LS BH PW Page 19
20 Ref No Component (Manufacturer s references are available in UKPN EAS ) Stores No 1 Pole-top make-off, 7/3.25mm 08237U or 08244Y 2 Guy grip dead-end, 7/3.25mm 09532A or 08233F or 08245J 3 Insulator, stay, LV, ENA TS type 1, 110kN MFL 08911W 4 Stay wire, 7/3.25mm, 1150 grade 08316A or 13816S 5 Steelwork, thimble, stay, type P 6 & 7 Anchor, stay, load lock 0944D and/or 0944T - Staples, wire [NI] ** TBA - Stay marker [NI] *** 13818M 1 Pole-top make-off, 7/4.00mm 08237U or 08244Y 2 Guy grip dead-end, 7/4.00mm 09354U, 09532A, 08233F or 08245J 3 Insulator, stay, LV, ENA TS type 1, 110kN MFL 08911W 4 Stay wire, 7/4.00mm, 1150 grade 08315Q or 13817C 5 Steelwork, thimble, stay, type P 6 & 7* Anchor, stay rod, type 2 Concrete stay block, 640 x 430 x S 09447X 6 & 7* Anchor, stay, screw-in, 8", single helix 08719K 6 & 7* Anchor, stay, screw-in, 10", single helix 08720F 6 & 7* Anchor, stay, screw-in, 10", twin helix 08725E 6 & 7* Anchor, stay, screw-in, 12", single helix 08721Q 6 & 7* Anchor, stay, screw-in, 14", single helix 08730P - Staples, wire [NI] ** TBA - Stay marker [NI] *** 13818M March 2011 Overhead Line Design Manual Section 1 LV ABC v1.2 Page 20
21 Figure 3: ABC Stay Arrangement, Make-Off (Restricted Height or Auxiliary Pole-Mounted Equipment) August 2012 OHL Design Manual - Section 1 - Aerial Bundled Conductor (ABC) Low Voltage Mains And Services LS BH PW Page 21
22 Ref No Component (Manufacturer s references are available in UKPN EAS ) Stores No 1 Pole-top make-off, 7/3.25mm 08237U or 08244Y 2 Stay wire splice, 7/3.25mm 09356P 3 Stay wire, 7/3.25mm, 1150 grade 08316A or 13816S 4 Guy grip dead-end, 7/3.25mm 09532A or 08233F or 08245J 5 Insulator, stay, LV, ENA TS type 1, 110kN MFL 08910M 6 Steelwork, thimble, stay, type P 7 & 8 Anchor, stay, load lock 0944D and/or 0944T - Staples, wire [NI] ** TBA - Stay marker [NI] *** 13818M 1 Pole-top make-off, 7/4.00mm 08237U or 08244Y 2 Stay wire splice, 7/4.00mm 09357Y 3 Stay wire, 7/4.00mm, 1150 grade 08315Q or 13817C 4 Guy grip dead-end, 7/4.00mm 09354U, 09532A, 08233F or 08245J 5 Insulator, stay, LV, ENA TS type 1, 110kN MFL 08911W 6 Steelwork, thimble, stay, type P 7 & 8* Anchor, stay rod, type 2 Concrete stay block, 640 x 430 x S 09447X 7 & 8* Anchor, stay, screw-in, 8", single helix 08719K 7 & 8* Anchor, stay, screw-in, 10", single helix 08720F 7 & 8* Anchor, stay, screw-in, 10", twin helix 08725E 7 & 8* Anchor, stay, screw-in, 12", single helix 08721Q 7 & 8* Anchor, stay, screw-in, 14", single helix 08730P - Staples, wire [NI] ** TBA - Stay marker [NI] *** 13818M March 2011 Overhead Line Design Manual Section 1 LV ABC v1.2 Page 22
23 Figure 4: ABC Stay Arrangement, Stay Plate (Restricted Height, Auxiliary Pole-Mounted Equipment or Live Line Working) August 2012 OHL Design Manual - Section 1 - Aerial Bundled Conductor (ABC) Low Voltage Mains And Services LS BH PW Page 23
24 Ref No Component (Manufacturer s references are available in UKPN EAS ) Stores No 1 Steelwork, stay plate, heavy duty TBA - Bolt, M20, length 260mm, c/w hex full nut [NI] 13370X - Washer, square curved, M20 [NI] 13803U 2 Guy grip dead-end, 7/3.25mm 09532A or 08233F or 08245J 3 Steelwork, thimble, stay, type P 4 Stay wire, 7/3.25mm, 1150 grade 08316A or 13816S 5 Insulator, stay, LV, ENA TS type 1, 110kN MFL 08910M 6 & 7 Anchor, stay, load lock 0944D and/or 0944T - Stay marker [NI] ** 13818M 1 Steelwork, stay plate, heavy duty TBA - Bolt, M20, length 260mm, c/w hex full nut [NI] 13370X - Washer, square curved, M20 [NI] 13803U 2 Guy grip dead-end, 7/4.00mm 09354U, 09532A, 08233F or 08245J 3 Steelwork, thimble, stay, type P 4 Stay wire, 7/4.00mm, 1150 grade 08315Q or 13817C 5 Insulator, stay, LV, ENA TS type 1, 110kN MFL 08911W 6 & 7* Anchor, stay rod, type 2 Concrete stay block, 640 x 430 x S 09447X 6 & 7* Anchor, stay, screw-in, 8", single helix 08719K 6 & 7* Anchor, stay, screw-in, 10", single helix 08720F 6 & 7* Anchor, stay, screw-in, 10", twin helix 08725E 6 & 7* Anchor, stay, screw-in, 12", single helix 08721Q 6 & 7* Anchor, stay, screw-in, 14", single helix 08730P - Stay marker [NI] ** 13818M March 2011 Overhead Line Design Manual Section 1 LV ABC v1.2 Page 24
25 Figure 5: ABC Intermediate GA (Inside Angle up to 60 o Line Deviation) Alternative arrangement showing weak link August 2012 OHL Design Manual - Section 1 - Aerial Bundled Conductor (ABC) Low Voltage Mains And Services LS BH PW Page 25
26 Materials for Figure 5: ABC Intermediate GA (Inside Angle up to 60o Line Deviation) Conductor ABC, 2x35mm 2 ABC, 2x95mm ABC, 4x35mm 2 ABC, 4x95mm 2 ABC, 4x120mm 2 Ref no Component (Manufacturer s references are available in UKPN EAS ) Stores No 1 Nut, M20, open-ended hook, ABC 09375W or 08365J Conductor fitting, clamp, suspension, ABC, 2/4x35mm N Conductor fitting, clamp, suspension, ABC, 2x95mm X Conductor fitting, clamp, suspension, ABC, 4x95mm H Conductor fitting, clamp, suspension, ABC, 4x120mm D Washer, square curved, M C Bolt, M20 * Wood pole * Notice, danger of death [NI] 20010P Supplementary components needed to complete the structure 6 Stay * As required ACD [NI] 08136C As required 7 Conductor fitting, clamp, weak link suspension, ABC [NI] 09385F ** As required Notices [NI] * As required * Select from specification identified in previous column. 7 ** The adjacent drawing is for Illustration purposes to show position for the weak link if required as per 6.1.1Supports March 2011 Overhead Line Design Manual Section 1 LV ABC v1.2 Page 26
27 Figure 6: ABC Intermediate GA (Outside Angle up to 30 o Line Deviation) Alternative arrangement showing weak link August 2012 OHL Design Manual - Section 1 - Aerial Bundled Conductor (ABC) Low Voltage Mains And Services LS BH PW Page 27
28 Materials for Figure 6: ABC Intermediate GA (Outside Angle up to 30o Line Deviation) Conductor ABC, 2x35mm 2 ABC, 2x95mm 2 ABC, 4x35mm 2 ABC, 4x95mm 2 ABC, 4x120mm 2 Ref No Component (Manufacturer s references are available in UKPN EAS ) Stores No 1 Steelwork, hook outrigger, pole, ABC 09376G Conductor fitting, clamp, suspension, ABC, 2/4x35mm W Conductor fitting, clamp, suspension, ABC, 2x95mm G Conductor fitting, clamp, suspension, ABC, 4x95mm R Conductor fitting, clamp, suspension, ABC, 4x120mm B Washer, square curved, M C Bolt, M20, 320mm 09372S Wood pole * Notice, danger of death [NI] 20010P Supplementary components needed to complete the structure 6 Stay * As required ACD [NI] 08136C As required 7 Conductor fitting, clamp, weak link suspension, ABC [NI] 09385F ** As required Notices [NI] e.g pole number * As required * Select from specification identified in previous column. 7 ** The adjacent drawing is for Illustration purposes to show position for the weak link if required as per 6.1.1Supports March 2011 Overhead Line Design Manual Section 1 LV ABC v1.2 Page 28
29 Figure 7: ABC Angle Section GA (up to 20 o Line Deviation) August 2012 OHL Design Manual - Section 1 - Aerial Bundled Conductor (ABC) Low Voltage Mains And Services LS BH PW Page 29
30 Materials for Figure 7: ABC Angle Section GA (up to 20o Line Deviation) Conductor ABC, 2x35mm 2 ABC, 2x95mm 2 ABC, 4x35mm 2 ABC, 4x95mm 2 ABC, 4x120mm 2 Ref No Component (Manufacturer s references are available in UKPN EAS ) Stores No 1 Conductor fitting, clamp, anchor, 2x35mm H Conductor fitting, clamp, anchor, 2x95mm S Conductor fitting, clamp, anchor, 4x35mm C Conductor fitting, clamp, anchor, 4x95mm X Conductor fitting, clamp, anchor, 4x120mm H Bolt, eye, M20, 300mm 08052X Conductor fitting, compression non tension, ABC, 08740X mm 2 3 Conductor fitting, compression non tension, ABC, 08743C mm 2 3 Conductor fitting, compression non tension, ABC, 120mm M Washer, square curved, M C Nut, eye, M W Wood pole * Notice, danger of death (wood poles) [NI] 20010P Supplementary components needed to complete the structure 7 Stay * As required 8 Cleat, stand-off, plastic, ABC TBA As required ACD [NI] * As required Notices [NI] e.g pole number * As required * Select from specification identified in previous column. March 2011 Overhead Line Design Manual Section 1 LV ABC v1.2 Page 30
31 Figure 8: ABC Angle Section GA (20 o to 90 o Line Deviation) August 2012 OHL Design Manual - Section 1 - Aerial Bundled Conductor (ABC) Low Voltage Mains And Services LS BH PW Page 31
32 Materials for Figure 8: ABC Angle Section GA (20o to 90o Line Deviation) Conductor ABC, 2x35mm 2 ABC, 2x95mm 2 ABC, 4x35mm 2 ABC, 4x95mm 2 ABC, 4x120mm 2 Ref No Component (Manufacturer s references are available in UKPN EAS ) Stores No 1 Conductor fitting, clamp, anchor, 2x35mm H Conductor fitting, clamp, anchor, 2x95mm S Conductor fitting, clamp, anchor, 4x35mm C Conductor fitting, clamp, anchor, 4x95mm X Conductor fitting, clamp, anchor, 4x120mm H Bolt, eye, M20, 300mm 08052X Washer, square curved, M C Wood pole * Notice, danger of death (wood poles) [NI] 20010P Supplementary components needed to complete the structure 5 Stay * As required ACD [NI] * As required Notices [NI] e.g pole number * As required * Select from specification identified in previous column. March 2011 Overhead Line Design Manual Section 1 LV ABC v1.2 Page 32
33 Figure 9: ABC Terminal GA August 2012 OHL Design Manual - Section 1 - Aerial Bundled Conductor (ABC) Low Voltage Mains And Services LS BH PW Page 33
34 Materials for Figure 9: ABC Terminal GA Conductor ABC, 2x35mm 2 ABC, 2x95mm 2 ABC, 4x35mm 2 ABC, 4x95mm 2 ABC, 4x120mm 2 Ref No Component (Manufacturer s references are available in UKPN EAS ) Stores No 1 Conductor fitting, clamp, anchor, 2x35mm H Conductor fitting, clamp, anchor, 2x95mm S Conductor fitting, clamp, anchor, 4x35mm C Conductor fitting, clamp, anchor, 4x95mm X Conductor fitting, clamp, anchor, 4x120mm H Bolt, eye, M20, 300mm 08052X Conductor fitting, cap, end, ABC 08881A Washer, square curved, M C Wood pole * Notice, danger of death (wood poles) [NI] 20010P Supplementary components needed to complete the structure 6 Stay * As required ACD [NI] * As required Notices [NI] e.g pole number * As required * Select from specification identified in previous column. March 2011 Overhead Line Design Manual Section 1 LV ABC v1.2 Page 34
35 Figure 10: ABC Tee-off Intermediate GA Note This drawing illustrates connections for a 120mm 2 ABC. For connections of 95mm 2 and below refer to the material lists. August 2012 OHL Design Manual - Section 1 - Aerial Bundled Conductor (ABC) Low Voltage Mains And Services LS BH PW Page 35
36 Materials for Figure 10: ABC Tee-off Intermediate GA Conductor ABC, 2x35mm 2 ABC, 2x95mm 2 ABC, 4x35mm 2 ABC, 4x95mm 2 ABC, 4x120mm 2 Ref No Component (Manufacturer s references are available in UKPN EAS ) Stores No 1 Conductor fitting, clamp, suspension, ABC, 2/4x35mm W Conductor fitting, clamp, suspension, ABC, 2x95mm G Conductor fitting, clamp, suspension, ABC, 4x95mm R Conductor fitting, clamp, suspension, ABC, 4x120mm B Nut, M20, open-ended hook, ABC 09375W Conductor fitting, insulating piercing connector, ABC, 35mm E ABC, 35mm 2, single bolt 3 Conductor fitting, insulating piercing connector, ABC, 95mm P ABC, 95mm 2, single bolt 3 Conductor fitting, insulating piercing connector, ABC, 120mm J ABC, 120mm 2,double bolt 4 Conductor fitting, clamp, anchor, 2x35mm H Conductor fitting, clamp, anchor, 2x95mm S Conductor fitting, clamp, anchor, 4x35mm C Conductor fitting, clamp, anchor, 4x95mm X Conductor fitting, clamp, anchor, 4x120mm H Bolt, eye, M20, 300mm 08052X Washer, square curved, M C Wood pole * Notice, danger of death (wood poles) [NI] 20010P Supplementary components needed to complete the structure 8 Stay * As required ACD [NI] * As required Cable tie [NI] TBA As required Cleat, stand-off, plastic, ABC [NI] TBA As required Notices [NI] e.g pole number * As required * Select from specification identified in previous column. March 2011 Overhead Line Design Manual Section 1 LV ABC v1.2 Page 36
37 6.12 Appendix B GA Drawings and Materials Services Table 3: List of GA Drawings and Materials Services Figure Figure 11: Figure 12: Figure 13: Figure 14: Figure 15: Figure 16: Drawing Title ABC Service Connection (Three Phase) GA Concentric Service Connection GA Insulated Open Wire Service Connection GA Street Lighting Service Connection GA Concentric Service Spans ABC Service Spans August 2012 OHL Design Manual - Section 1 - Aerial Bundled Conductor (ABC) Low Voltage Mains And Services LS BH PW Page 37
38 March 2011 Overhead Line Design Manual Section 1 LV ABC v1.2 Page 38
39 Figure 11: ABC Service Connection (Three Phase) GA Note This drawing illustrates connections for 95mm 2 ABC and below. For connections of 120mm 2 and below refer to the material lists. August 2012 OHL Design Manual - Section 1 - Aerial Bundled Conductor (ABC) Low Voltage Mains And Services LS BH PW Page 39
40 Materials for Figure 11: ABC Service Connection (Three Phase) GA Conductor ABC, 4x35mm 2 ABC, 4x95mm 2 ABC, 4x120mm 2 Ref No Component (Manufacturer s references are available in UKPN EAS ) Stores No 1 Conductor fitting, cap, end, ABC 08881A Conductor fitting, insulating piercing connector, ABC, 35mm 2 ABC, 35mm 2, single bolt Conductor fitting, insulating piercing connector, ABC, 95mm 2 ABC, 35mm 2, single bolt Conductor fitting, insulating piercing connector, ABC, 120mm 2 ABC, 35mm 2, double bolt 08845E Y J Steelwork, hook bolt, pole, ABC 09372S Conductor fitting, clamp, anchor, 4x35mm C Conductor fitting, clamp, anchor, 4x95mm X Conductor fitting, clamp, anchor, 4x120mm H Supplementary components needed to complete the structure 5 Cleat, stand-off, plastic, ABC TBA As required 6 Cable tie TBA As required March 2011 Overhead Line Design Manual Section 1 LV ABC v1.2 Page 40
41 Figure 12: Concentric Service Connection GA (3ph service cable shown) Note This drawing illustrates connections for 95mm 2 ABC and below. For connections of 120mm 2 refer to the material lists. August 2012 OHL Design Manual - Section 1 - Aerial Bundled Conductor (ABC) Low Voltage Mains And Services LS BH PW Page 41
42 Materials for Figure 12: Concentric Service Connection GA single phase Conductor CNE, 1-phase, 35mm 2 Ref No Component (Manufacturer s references are available in UKPN EAS ) Stores No 1 Conductor fitting, cap, end, ABC 08885P Conductor fitting, insulating piercing connector, ABC, 35mm 2 ABC, 35mm 2, single bolt Conductor fitting, insulating piercing connector, ABC, 95mm 2 ABC, 35mm 2, single bolt Conductor fitting, insulating piercing connector, ABC, 120mm 2 ABC, 35mm 2, double bolt 08845E 3** 08847Y 3** 08848J 3** 3 Conductor fitting, non-tension, ABC tailed out fitting to match CNE * 2 4 Cable termination, break-out kit, 2-core 02805T 02806D 5 Cable, CNE, 1-phase * L* 6 Conductor fitting, helical dead end, CNE, 1-phase * 1 7 Insulator, coach screw, service 08927P 1 Conductor CNE, 3-phase, 35mm 2 1 Ref No Component Stores No 1 Conductor fitting, cap, end, ABC 08885P Conductor fitting, insulating piercing connector, ABC, 35mm 2 ABC, 35mm 2, single bolt Conductor fitting, insulating piercing connector, ABC, 95mm 2 ABC, 35mm 2, single bolt Conductor fitting, insulating piercing connector, ABC, 120mm 2 ABC, 35mm 2, double bolt 08845E 5** 08847Y 5** TBA 5** 3 Conductor fitting, non-tension, ABC tailed out fitting to match CNE * 4 4 Cable termination, break-out kit, 4-core 02805T 02806D 5 Cable, CNE, 3-phase 05177J L* 6 Conductor fitting, helical dead end, CNE, 3-phase 08243P 1 7 Insulator, coach screw, service 08927P 1 1 March 2011 Supplementary components needed to complete the structure for 3ph and single 1ph services 8 Cleat, stand-off, plastic, ABC TBA As req d 9 Cable tie TBA As req d L* Length as required. * Select from specification identified in previous column. ** Select to fit ABC. Overhead Line Design Manual Section 1 LV ABC v1.2 Page 42
43 Figure 13: Insulated Open Wire Service Connection GA Note This drawing illustrates connections for 95mm 2 ABC and below. For connections of 120mm 2 refer to the material lists. August 2012 OHL Design Manual - Section 1 - Aerial Bundled Conductor (ABC) Low Voltage Mains And Services LS BH PW Page 43
44 Materials for Figure 13: Insulated Open Wire Service Connection GA Conductor Insulated open-wire Ref No Component (Manufacturer s references are available in UKPN EAS ) Stores No 1 Conductor, ABC, 2x35mm R L* 1 Conductor, ABC, 2x95mm L L* 1 Conductor, ABC, 4x35mm Q L* 1 Conductor, ABC, 4x95mm K L* 1 Conductor, ABC, 4x120mm U L* Conductor fitting, insulating piercing connector, ABC, 35mm 2 ABC, 35mm 2, single bolt Conductor fitting, insulating piercing connector, ABC, 95mm 2 ABC, 35mm 2, single bolt Conductor fitting, insulating piercing connector, ABC, 95mm 2 ABC, 95mm 2, single bolt Conductor fitting, insulating piercing connector, ABC, 120mm 2 ABC, 35mm 2, double bolt Conductor fitting, insulating piercing connector, ABC, 120mm 2 ABC, 95mm 2, double bolt Conductor fitting, insulating piercing connector, ABC, 120mm 2 ABC, 120mm 2, double bolt 08845E ** 08847Y ** 08846P ** 08848J ** 08848J ** 08848J ** 3 Conductor fitting, cap, end, ABC 08881A Conductor fitting, non-tension, ABC, 35mm 2 tail 400mm long transformed insulated wire Conductor fitting, non-tension, ABC, 95mm 2 tail 400mm long transformed insulated wire Conductor fitting, non-tension, ABC, 120mm 2 tail 400mm long transformed insulated wire * *** * *** * *** 5 Insulator, coach screw, service 08927P 4 6 Conductor fitting, helical dead end * 4 Supplementary components needed to complete the structure 7 Cleat, stand-off, plastic, ABC TBA As req d 8 Cable tie TBA As req d March 2011 L* Length as required. * Select to fit insulated wire from specification identified in previous column. ** Select to fit ABC (5 required for three phase; 3 required for single phase). *** Select to fit ABC and insulated wire from specification identified in previous column (4 required for three phase; 2 required for single phase). Overhead Line Design Manual Section 1 LV ABC v1.2 Page 44
45 Figure 14: Street Lighting Service Connection GA Note This drawing illustrates connections for 95mm 2 ABC and below. For connections of 120mm 2 refer to the material lists. August 2012 Lamp, control gear and tails are the property of the local Street Lighting Authority OHL Design Manual - Section 1 - Aerial Bundled Conductor (ABC) Low Voltage Mains And Services LS BH PW Page 45
46 Materials for Figure 14: Street Lighting Service Connection GA Conductor ABC, all Ref No Component (Manufacturer s references are available in UKPN EAS ) Stores No 1 Conductor fitting, cap, end, ABC 08881A Conductor fitting, insulating piercing connector, ABC, 35mm 2 ABC, 35mm 2, single bolt Conductor fitting, insulating piercing connector, ABC, 95mm 2 ABC, 35mm 2, single bolt Conductor fitting, insulating piercing connector, ABC, 120mm 2 ABC, 35mm 2, double bolt 08845E * 08847Y * 08848J * 3 Conductor, ABC, 2x35mm R L* 4 Conductor fitting, compression non tension, ABC, 35mm 2 Al 16mm P 08757A 5 Cable termination, break-out kit, 2-core 02805T 1 6 Cable, Concentric, 1-phase, 4mm 2 or 16mm 2 TBA L* 7 Service box cut-out (diamond) 08361U 1 7 Cut-Out Street Lighting PME 25 Amp 12000K 1 Supplementary components needed to complete the structure 8 Cleat, stand-off, plastic, ABC TBA As req d 9 Local Authority Street Light Tails TBA As req d 2 L* Length as required. * Select to fit ABC. March 2011 Overhead Line Design Manual Section 1 LV ABC v1.2 Page 46
47 Figure 15: Concentric Service Spans Figure 16: ABC Service Spans Table 11.1 Service Clearances Location Along the line of hedgerows, fences and boundary walls 4.0 etc. Domestic driveways with an access width of 2.5 m or less 4.3 which is defined by gateposts, hedges or other fixed features. Between buildings where there is no vehicular access. 3.5 Minimum Clearance (m) August 2012 Normal Ground 3.5 OHL Design Manual - Section 1 - Aerial Bundled Conductor (ABC) Low Voltage Mains And Services LS BH PW Page 47
48 6.13 Appendix C GA Drawings and Materials Pole Mounted Equipment Table 4: List of GA Drawings and Materials Pole Mounted Equipment Figure Figure 17: Figure 18: Figure 19: Figure 20: Drawing Title ABC to Two Distribution Boxes ABC to ABC via Fuses GA ABC Intermediate with Cable Termination and LV Fuses GA ABC Terminal with Cable Termination and LV Fuses GA March 2011 Overhead Line Design Manual Section 1 LV ABC v1.2 Page 48
49 Figure 17: ABC to Two Distribution Boxes Note This drawing illustrates connections for 120mm 2 ABC. For connections of 95mm 2 and below refer to the material lists. August 2012 Please ensure that ABC droppers (Ref No 3) are adequately cleated to the pole as above drawing is for illustration purposes only. OHL Design Manual - Section 1 - Aerial Bundled Conductor (ABC) Low Voltage Mains And Services LS BH PW Page 49
50 Materials for Figure 17: ABC to Two Distribution Boxes Conductor ABC, 4x95mm 2 Ref No Component (Manufacturer s references are available in UKPN EAS ) Stores No 1 Conductor fitting, cap, end, ABC 08881A Conductor fitting, insulating piercing connector, ABC, 95mm 2 ABC, 95mm 2, single bolt Conductor fitting, insulating piercing connector, ABC, 120mm 2 ABC, 95mm 2, double bolt 08846P J 8 3 Conductor, ABC, 4x50mm 2 or 95mm 2 (line to distribution box) 06207K L* 4 Conductor, ABC, 4x50mm 2 or 95mm 2 (line to distribution box) 06207K L* 5 Distribution box, overhead, 3-phase 08360K 2 Supplementary components needed to complete the structure Cable tie [NI] TBA As req d Cleat, stand-off, plastic, ABC [NI] TBA As req d L* Length as required. March 2011 Overhead Line Design Manual Section 1 LV ABC v1.2 Page 50
51 Figure 18: ABC to ABC via Fuses GA Note This drawing illustrates connections for 120mm 2 ABC. For connections of 95mm 2 and below refer to the material lists. August 2012 Please ensure that ABC droppers (Ref No 3) are adequately cleated to the pole as above drawing is for illustration purposes only. OHL Design Manual - Section 1 - Aerial Bundled Conductor (ABC) Low Voltage Mains And Services LS BH PW Page 51
52 Materials for Figure 18: ABC to ABC via Fuses GA Conductor ABC, 4x35mm 2 ABC, 4x95mm 2 ABC, 4x120mm 2 Ref No Component (Manufacturer s references are available in UKPN EAS ) Conductor fitting, insulating piercing connector, ABC, 35mm 2 ABC, 35mm 2, single bolt Conductor fitting, insulating piercing connector, ABC, 95mm 2 ABC, 95mm 2, single bolt Conductor fitting, insulating piercing connector, ABC, 120mm 2 ABC, 120mm 2, double bolt Stores No 08845E P J Conductor fitting, compression full tension, ABC, 35mm X Conductor fitting, compression full tension, ABC, 95mm C Conductor fitting, compression full tension, ABC, 120mm M Fuse unit, pole mounted, LV ABC 12050D Conductor fitting, compression non tension, ABC, 35mm 2 Cu, 16mm P Conductor fitting, compression non tension, ABC, 95mm 2 Cu, 16mm 2 TBA Conductor fitting, compression non tension, ABC, 120mm 2 Cu, 16mm 2 TBA Earthing components * * Supplementary components needed to complete the structure Cable tie [NI] TBA As required Cleat, stand-off, plastic, ABC [NI] TBA As required March 2011 Overhead Line Design Manual Section 1 LV ABC v1.2 Page 52
53 Figure 19: ABC Intermediate with Cable Termination and LV Fuses GA Note This drawing illustrates connections for 120mm 2 ABC. For connections of 95mm 2 and below refer to the material lists. August 2012 Please ensure that ABC droppers (Ref No 3) are adequately cleated to the pole as above drawing is for illustration purposes only. OHL Design Manual - Section 1 - Aerial Bundled Conductor (ABC) Low Voltage Mains And Services LS BH PW Page 53
54 Materials for Figure 19: ABC Intermediate with Cable Termination and LV Fuses GA Conductor ABC, 2x95mm 2 ABC, 4x95mm 2 ABC, 4x120mm 2 Ref No 1 1 Component (Manufacturer s references are available in UKPN EAS ) Conductor fitting, insulating piercing connector, ABC, 95mm 2 ABC, 95mm 2, single bolt Conductor fitting, insulating piercing connector, ABC, 120mm 2 ABC, 95mm 2, double bolt Stores No 08846P TBA Conductor fitting, cap, end, ABC 08881A Conductor, ABC, 2x95mm 2 (main to fuse) 06202L - - L* 3 Conductor, ABC, 4x95mm 2 (main to fuse) 06207K - L* - 3 Conductor, ABC, 4x120mm 2 (main to fuse) 06208U L* Cable guard, LV ABC 08172X Conductor fitting, compression non tension, ABC, 95mm 2 Cu, 16mm 2 TBA Conductor fitting, compression full tension, ABC, 95mm C Conductor fitting, compression full tension, ABC, 120mm 2 ABC, 95mm 2 TBA Fuse unit, pole mounted, LV ABC 12050D Earthing components ** ** Supplementary components needed to complete the structure Cable tie [NI] TBA TBA As required Cleat, stand-off, plastic, ABC [NI] TBA TBA As required L* Length as required. * Select from specification identified in previous column. ** Refer to Figure 22. March 2011 Overhead Line Design Manual Section 1 LV ABC v1.2 Page 54
55 Figure 20: ABC Terminal with Cable Termination and LV Fuses GA Note This drawing illustrates connections for 120mm 2 ABC. For connections of 95mm 2 and below refer to the material lists. Please ensure that ABC droppers are adequately cleated to the pole as above drawing is for illustration purposes only. August 2012 OHL Design Manual - Section 1 - Aerial Bundled Conductor (ABC) Low Voltage Mains And Services LS BH PW Page 55
56 Materials for Figure 20: ABC Terminal with Cable Termination and LV Fuses GA Conductor ABC, 2x95mm 2 ABC, 4x95mm 2 ABC, 4x120mm 2 Ref No Component (Manufacturer s references are available in UKPN EAS ) Stores No 1 Fuse unit, pole mounted, LV ABC 12050D Cable guard, LV ABC 08172X Conductor fitting, compression non tension, ABC, 95mm 2 Cu, 16mm 2 TBA Conductor fitting, compression full tension, ABC, 95mm C Conductor fitting, compression full tension, ABC, 120mm 2 ABC, 95mm 2 TBA Conductor fitting, insulating piercing connector, ABC, 95mm 2 ABC, 95mm 2 single bolt Conductor fitting, insulating piercing connector, ABC, 120mm 2 ABC, 95mm 2, double bolt 08846P Conductor fitting, cap, end, ABC 08881A Earthing components ** ** Supplementary components needed to complete the structure Cable tie [NI] TBA As required Cleat, stand-off, plastic, ABC [NI] TBA As required * Select from specification identified in previous column. ** Refer to Figure 22. March 2011 Overhead Line Design Manual Section 1 LV ABC v1.2 Page 56
57 6.14 Appendix D GA Drawings and Materials Earthing Table 5: List of GA Drawings and Materials Earthing Figure Figure 21: Figure 22: Drawing Title ABC Earthing ABC Bundle to Neutral/Earth Bracket ABC Earthing Neutral/Earth Bracket to Earth Electrodes August 2012 OHL Design Manual - Section 1 - Aerial Bundled Conductor (ABC) Low Voltage Mains And Services LS BH PW Page 57
58 Figure 21: ABC Earthing ABC Bundle to Neutral/Earth Bracket Materials for Figure 21: ABC Earthing ABC Bundle to Neutral/Earth Bracket March 2011 Conductor ABC, 2x35mm 2 ABC, 2x95mm 2 ABC, 4x35mm 2 ABC, 4x95mm 2 ABC, 4x120mm 2 Ref No Component (Manufacturer s references are available in UKPN EAS ) Stores No 1 Conductor fitting, cap, end, ABC 08881A Conductor fitting, insulating piercing connector, ABC, 35mm E ABC, 35mm 2, single bolt 2 Conductor fitting, insulating piercing connector, ABC, 95mm Y ABC, 35mm 2, single bolt 2 Conductor fitting, insulating piercing connector, ABC, 120mm J ABC, 35mm 2, double bolt 3 Conductor fitting, non-tension, ABC, 35mm 2 tail 400mm long 08765P transformed Cu, bare, 16mm 2 4 Cable, Cu, 16mm 2, green/yellow insulated earth wire 05280G L* L* L* L* L* Earthing components * * * Refer to Figure 22. Overhead Line Design Manual Section 1 LV ABC v1.2 Page 58
59 Figure 22: ABC Earthing Neutral/Earth Bracket to Earth Electrodes August 2012 OHL Design Manual - Section 1 - Aerial Bundled Conductor (ABC) Low Voltage Mains And Services LS BH PW Page 59
60 Materials for Figure 22: ABC Earthing Neutral/Earth Bracket to Earth Electrodes ABC, all Ref No Component (Manufacturer s references are available in UKPN EAS ) Stores No 1 Cable, Cu, 16mm 2, green/yellow insulated earth wire 05280G 6m 2 Cable guard 08172X 1 3 Earth electrode 02463T As req d 4 Cable, Cu, 16mm 2, bare earth wire TBA As req d Supplementary components needed to complete the structure Earth electrode, coupling ** 02467K As req d Earth electrode, clamp ** 02466A As req d Earth electrode, extension ** TBA As req d L* Length as required. * Select from specification identified in previous column. ** For use with earth electrode as required. March 2011 Overhead Line Design Manual Section 1 LV ABC v1.2 Page 60
61 6.15 Appendix E Reference List of all Materials for this specification Reference List of all Materials for this specification (supplementary components are included at the end of this list) Component (Manufacturer s references are available in UKPN EAS ) Stores No GA Figure Ref Bolt, eye, M20, 300mm 08052X Figure 7, Figure 8, Figure 9 & Figure 10 Bolt, M20, lengths as required TBA Figure 4, Figure 5, & Figure 6 Cable, CNE, 1-phase Various Figure 12 Cable, CNE, 3-phase Various Figure 12 Cable, Concentric, 1-phase, 4mm 2 or 16mm 2 TBA Figure 14 Cable, Cu, 16mm 2, bare earth wire TBA Figure 21 Cable, Cu, 16mm 2, green/yellow insulated earth wire 05280G Figure 21 & Figure 22 Cable guard 08172X Figure 19, Figure 20 & Figure 22 Cable termination, break-out kit, 2-core Cable termination, break-out kit, 4-core 02805T 02806D 02805T 02806D Figure 12 Figure 14 Figure 12 Conductor, ABC, 2x35mm R Figure 13 Figure 14 Conductor, ABC, 2x95mm L Figure 13 Figure 19 Conductor, ABC, 4x35mm Q Figure 13 Conductor, ABC, 4x95mm K Figure 13, Figure 17 & Figure 19 Conductor, ABC, 4x120mm U Figure 13 & Figure 19 Conductor fitting, cap, end, ABC 08881A Figure 9, Figure 11, Figure 13, Figure 14, Figure 17 Figure 19, Figure 20 & Figure 21 Conductor fitting, cap, end, ABC 08885P Figure 12 Conductor fitting, clamp, anchor, 2x35mm H Figure 7, Figure 8, Figure 9 & Figure 10 Conductor fitting, clamp, anchor, 2x95mm S Figure 7, Figure 8, Figure 9 & Figure 10 Conductor fitting, clamp, anchor, 4x35mm C Figure 7, Figure 8, Figure 9 & Figure 10 Conductor fitting, clamp, anchor, 4x95mm X Figure 7, Figure 8, Figure 9 & Figure 10 Conductor fitting, clamp, anchor, 4x120mm H Figure 7, Figure 8, Figure 9 & Figure 10 Conductor fitting, clamp, suspension, ABC, 2/4x35mm N Figure 4 August 2012 Conductor fitting, clamp, suspension, ABC, 2/4x35mm W Figure 6 & Figure 10 Conductor fitting, clamp, suspension, ABC, 2x95mm X Figure 5 Conductor fitting, clamp, suspension, ABC, 2x95mm G Figure 6 & Figure 10 OHL Design Manual - Section 1 - Aerial Bundled Conductor (ABC) Low Voltage Mains And Services LS BH PW Page 61
EARTHING AND BONDING AT SECONDARY SUBSTATIONS
DISTRIBUTION CONSTRUCTION MANUAL SECTION 4 - SUBSTATIONS ISSUE B SEPT 1996 4.4.4 EARTHING AND BONDING AT SECONDARY SUBSTATIONS 1 SCOPE This section of the Distribution Construction Manual lays down the
More informationECS 02-0019 INSTALLATION OF UNDERGROUND CABLES - LV TO 132KV
THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE Document Number: ECS 02-0019 ENGINEERING CONSTRUCTION STANDARD ECS 02-0019 INSTALLATION OF UNDERGROUND CABLES - LV TO 132KV
More informationRequirements for the Attachment of Communication Cable Facilities on PPL Poles
Page 99 of 137 Requirements for the Attachment of Communication Cable Facilities on Replaces: URS-3002 URS-3004 URS-101C-304 A-157649 Page 100 of 137 Reference Notes for Drawings: General 1. The term communication
More informationEDS 06-0016 LV NETWORK EARTHING DESIGN
THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE Document Number: EDS 06-0016 ENGINEERING DESIGN STANDARD EDS 06-0016 LV NETWORK EARTHING DESIGN Network(s): EPN, LPN, SPN
More informationEarthing Guidance Notes
Central Networks Earthing Manual Section E2 Earthing Guidance Notes Version: 2 Date of Issue: September 2007 Author: Nigel Johnson Job Title: Earthing Specialist Approver: John Simpson Job Title: Head
More informationPole Guying More Complicated Than Meets the Eye. NRECA TechAdvantage 2014 Presented by Jason Settle, P.E. jason.settle@gdsassociates.
Pole Guying More Complicated Than Meets the Eye NRECA TechAdvantage 2014 Presented by Jason Settle, P.E. jason.settle@gdsassociates.com Pole Guying Strength of components NESC vs. RUS Guy Factor Grounding
More informationGUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables
Engineering Department SEPTEMBER, 2007 GUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables General Requirements This section applies to all public and private utilities,
More informationScottishPower Distribution Cables & Equipment. Metal Theft
ScottishPower Distribution Cables & Equipment Metal Theft April 2012 As an aid to deterring to metal theft this booklet has been put together to help identify the types of utility power cables and associated
More informationenvironment briefing02
PRODUCED BY THE SAFETY, HEALTH & ENVIRONMENT GROUP OF THE ENERGY NETWORKS ASSOCIATION - JULY 2006 environment briefing02 transporting electricity Overhead Lines or Underground Cables? Introduction The
More informationGulf Cable & Electrical Ind. Co.
CONTENTS INTRODUCTION PRODUCT RANGE I PRODUCT DATA TABLES XLPE INSULATED 600/1000V CABLES Two Core Cables CU/XLPE/PVC/LC/PVC/SWA/PVC 1 Three Core Cables CU/XLPE/PVC/LC/PVC/SWA/PVC 2 Four Core Cables CU/XLPE/PVC/LC/PVC/SWA/PVC
More informationChapter 3 Pre-Installation, Foundations and Piers
Chapter 3 Pre-Installation, Foundations and Piers 3-1 Pre-Installation Establishes the minimum requirements for the siting, design, materials, access, and installation of manufactured dwellings, accessory
More informationNetwork Standard Advice No. 1420C 9/6/2011
Network Standard Advice No. 1420C 9/6/2011 TO: Customers, Service Providers and Ausgrid Staff. Advisory Note on Changes to the Use of 11kV Cable Types. Introduction This Network Standard Advice (NSA) provides
More informationIndicative costs for replacing SWER lines
WIT.3019.005.0002 Indicative costs for replacing SWER lines 28 th August 2009 Department of Primary Industries Parsons Brinckerhoff Australia Pty Limited ABN 80 078 004 798 SWER_Replacement_Options_Report_v1_0
More informationELECTRICAL INSULATION TESTING OF HV EQUIPMENT UP TO 33kV
1. SCOPE This document details PowerSystems requirements for electrical testing of HV Equipment up to and including 33kV. 2. ISSUE RECORD This is a Reference document. The current version of Controlled
More informationCode of Practice Electricity transmission and distribution asset management. February 2009
Code of Practice Electricity transmission and distribution asset management February 2009 CONTENTS 1 PREFACE...4 2 APPLICATION AND OBJECTIVES...5 3 SCOPE...6 4 DEFINITIONS...7 5 DESIGN AND CONSTRUCTION...11
More informationTS 813 GROUNDING AND BONDING TTD 813.001 TRAFFIC SIGNAL INSTALLATION AND CONTROLLER CABINET GROUNDING SYSTEM TTD 813.005 CONTROLLER CABINET GROUNDING
TORONTO TRANSPORTATION January 2012 TS 813 GROUNDING AND BONDING TABLE OF CONTENTS 1. DRAWINGS TTD 813.001 TRAFFIC SIGNAL INSTALLATION AND CONTROLLER CABINET GROUNDING SYSTEM TTD 813.005 CONTROLLER CABINET
More informationCONSTRUCTION STANDARD ELECTRIC OPERATIONS ORGANIZATION
Page 1 of 11 ****This Standard Supercedes BECo CS2.13-2.3 & ComElectric OH Construction Manual, System Grounding Section, drawings CGND, GRDSUM, and C2**** 1.0 Bill of Materials GROUNDING AND BONDING POLE-MOUNTED
More informationDEHN + SÖHNE. DEHNconductor System No Problems with Proximities
DEHN + SÖHNE DEHNconductor System No Problems with Proximities DEHNconductor System - New Possibilities for controling Proximities. For preventing dangerous flashovers among parts of external lightning
More informationContents. All Rights Reserved
Electricity Specification 400C8 Issue 6 October 2015 LV Service Cables Contents 1 Scope 2 Definitions 3 General Requirements for Approvals and Assurance 4 Conditions of Installation 5 Conditions of Operation
More informationDESCRIPTION UNIT QTY RATE TOTAL (KSHS) Supply and install the following: -
PROPOSED KISUMU HOUSING 3 BEDROOM-TYPE 1 ELECTRICAL INSTALLATION -SITE 01 DESCRIPTION UNIT QTY RATE TOTAL (KSHS) Supply and install the following: - 1.0 Final sub-circuit from Consumer Unit to lighting
More informationINTERNATIONAL STANDARD
INTERNATIONAL STANDARD IEC 62305-3 Edition 2.0 2010-12 colour inside Protection against lightning Part 3: Physical damage to structures and life hazard INTERNATIONAL ELECTROTECHNICAL COMMISSION PRICE CODE
More informationInstallation guide for the SafeLine type anchorage device. Tested in compliance with EN 795: 1996. No.: SE-...
Installation guide for the SafeLine type anchorage device Tested in compliance with EN 795: 1996 No.: SE-... Version: 09.10.2008 SE 67 Subject to technical alterations! Contents 1. General information
More informationOperating Instructions
Operating Instructions Series L 000 Cord Reels Model Numbers: L 000 L 0 0 L 0 B L 0 X L 00 L A X L 0 L 0 0 L 00 L 0 L 0 B L 0 0 X L 00 L 0 A L 0 X IMPORTANT Read this manual carefully before installing,
More informationPlease check with your local inspection authority for any additional requirements before installation.
Specifications for Residential Overhead Electric Service Installation This brochure addresses most typical residential overhead service installations. Variances for the following specifications must be
More informationTrial Exams C. Standards and Regulations. Examination No: GH-08-C- 1 hour and 5 minutes plus 10 minutes reading time
Trial Exams C Standards and Regulations Examination No: GH-08-C- This test is intended to gauge your knowledge of essential information contained within AS/CA S009:2013. To qualify for an allpication to
More informationAerial Fibre Optics. Complete One Stop Solution for Aerial Fibre Optics. OPGW Cable and Fittings for OPGW
Complete One Stop Solution for OPGW Cable and Fittings for OPGW 53, Justice Chandra Madhav Road, Kolkata - 700020. India. Phone: 91-33-24748575 / 7565 Fax: 91-33-2476-1955 Email: sales@supremeco.com Website:
More informationWhen power interruptions happen.
When power interruptions happen. We know it s never a good time to have your power go out, so we work all year pruning trees and investing in our system to cut down on problems before they start. Outage
More informationAVOIDANCE OF ELECTRICAL HAZARDS WHEN WORKING NEAR OVERHEAD ELECTRIC LINES
overhead 23/11/04 2:28 PM Page 1 AVOIDANCE OF ELECTRICAL HAZARDS WHEN WORKING NEAR OVERHEAD ELECTRIC LINES ESB Code 9803203 overhead 23/11/04 2:28 PM Page 2 overhead 23/11/04 2:28 PM Page 3 Page 1 of 20
More informationOUTDOOR DISCONNECTORS A division of ACTOM (Pty) Ltd
OUTDOOR DISCONNECTORS A division of ACTOM (Pty) Ltd ACTOM OUTDOOR DISCONNECTORS Single Side Break (SSB) Disconnector 22-132 kv, 800-1 A, 25 ka - 3s Typical bearing assembly. Voltage range 11 kv to 132
More information8' W x 8' H or 10' H Peak Style Shelter Assembly Instructions
' W x ' H or ' H Peak Style Shelter Assembly Instructions Description ' x ' x ' Peak Style Shelter - Gray ' x ' x ' Peak Style Shelter - Gray Recommended Tools Please read instructions COMPLETELY before
More information4 IX D N E P P A Installation methods Current-carrying capacity and voltage drop for cables Reference method IET Wiring Matters
8 Appendix 4 of BS 7671 by Mark Coles Appendix 4, Current-carrying capacity and voltage drop for cables and flexible cords, has seen significant changes with the publishing of BS 7671:2008. This article
More informationResidential Deck Safety, Construction, and Repair
Juneau Permit Center, 4 th Floor Marine View Center, (907)586-0770 This handout is designed to help you build your deck to comply with the 2006 International Residential Building code as modified by the
More informationCircuit Electrical Testing
Safe Isolation Procedure Circuit Electrical Testing Site Safety Management It is essential from the outset that effective management and control of the system, apparatus and equipment used on site is achieved
More informationElectrical Practices for Construction Work
1. Purpose Electrical Practices for Construction Work The purpose of this Code is to provide practical guidance and set minimum safety requirements for electrical practices on all construction sites in
More informationPost and Beam Construction
Post and Beam Construction A Presentation By the Canadian Wood Council Canadian Conseil Wood canadien Council du bois Early settlers introduced the concept of post and beam construction in North America
More informationSAFETY FENCES, SAFETY BARRIERS AND PEDESTRIAN GUARDRAILS
SERIES NG 400 SAFETY FENCES, SAFETY BARRIERS AND PEDESTRIAN GUARDRAILS Contents Clause Title Page NG 401 Performance Criteria for Safety Fences and Safety Barriers 2 NG 402 Components for Safety Fences
More informationTransmission Foundations. helical piles and guy anchors for transmission structures. www.hubbellpowersystems.com
Transmission Foundations helical piles and guy anchors for transmission structures www.hubbellpowersystems.com Grid locked on your transmission job? Instant Foundation helical piles go places concrete
More informationSTANDARD OPEN PATIO COVER
STANDARD OPEN PATIO COVER BUILDING & SAFETY DIVISION 201 E. LA HABRA BLVD. LA HABRA, CA 90631 62-90-9710 Call Before You Dig 1-800-227-2600 PLEASE NOTE: This information Bulletin is made available to assist
More informationThis unit is a pump that will clear the waste from a domestic shower and washbasin, bath, washing machine, glass washer and a sink.
1. Description This unit is a pump that will clear the waste from a domestic shower and washbasin, bath, washing machine, glass washer and a sink. The unit will start automatically. Please pay particular
More informationSKT-SP Tangent Terminal
Assembly Instructions for SKT-SP Tangent Terminal & FLEAT-SP Flared Terminal SP Standard Post System Guardrail Terminals ROAD SYSTEMS, INC. P. O. Box 2163 Big Spring, Texas 79721 Phone: (432) 263-2435
More informationSection M POWER LIFTS
Section M POWER LIFTS December 2009 1M Index 1. 53-520244-000 Poly V Idler Assembly 2. 53-520205-000 N.A. Mounting Bracket 3. 53-520212-000 Cable Assembly 4. 53-600149-000 Wire Harness Assembly 5. 53-860322-010
More informationMarch 14, 2007. Installation of Bay, Bow and Garden Windows
March 14, 2007 Re: Installation of Bay, Bow and Garden Windows Attached are the Atrium Companies, Inc recommendation for the installation of bay, bow and garden windows. These instructions were developed
More informationDOMESTIC ELECTRICAL INSTALLATION CERTIFICATE (Requirements for Electrical Installations BS 7671 IEE Wiring Regulations)
DOMESTIC ELECTRICAL INSTALLATION CERTIFICATE (Requirements for Electrical Installations BS 7671 IEE Wiring Regulations) DETAILS OF THE CLEINT Client and address ADDRESS OF THE INSTALLATION Installation
More informationPowerFlex 700S and 700H Frame 12 DC Bus Connector Kit
PowerFlex 700S and 700H Frame 12 DC Bus Connector Kit Installation Instructions This document provides instructions for the installation of a DC bus connector kit for PowerFlex 700S and 700H frame 12 drives
More informationMANUFACTURED HOUSING USED AS DWELLINGS
MANUFACTURED HOUSING USED AS DWELLINGS SECTION AE101 SCOPE AE101.1 General. These provisions shall be applicable only to a manufactured home used as a single dwelling unit and shall apply to the following:
More informationPOLE MOUNT SYSTEM EX-3 INSTALLATION
May 2014 POLE MOUNT SYSTEM EX-3 INSTALLATION The Pole Mount System EX-3 is an easy to install and flexible system designed to allow ONE SYSTEMS loudspeaker systems to be mounted to pole structures. The
More informationNORTH ORANGE COUNTY COMMUNITY COLLEGE DISTRICT SECTION 27 05 26 GROUNDING AND BONDING FOR COMMUNICATION SYSTEMS
SECTION GROUNDING AND BONDING FOR COMMUNICATION SYSTEMS RELATED SECTIONS: Section 27 00 00 General Requirements Section 27 02 00 Communication General Requirements Section 27 05 28 Pathways for Communications
More information1. Description. 2. List of Accessories included A B C F G H
1. Description This unit is a pump that will clear the waste from a domestic shower and washbasin. The unit will start automatically. Please pay particular attention to the following: Possible danger to
More informationAPPROVED EQUIPMENT REGISTER OVERHEAD LINES
1. SCOPE This document lists the categories of overhead line equipment that are Approved for use on the Company networks. 2. ISSUE RECORD This is a Controlled document. The current version of Controlled
More informationAERIAL FIBER OPTIC CABLE PLACEMENT
Installation Practice IP003 Aerial Fiber Optic Cable Placement Rev.-June 2000 Page 1 of 6 AERIAL FIBER OPTIC CABLE PLACEMENT CONTENTS PARAGRAPH SCOPE...1 GENERAL PRECAUTIONS...2 GENERAL DESCRIPTION OF
More informationUnderground Commercial Electric Service
Underground Commercial Electric Service SCANA Corporation 2013 Revised: June 2013 Table of Contents SECTION PAGE I. Specification and Requirements 2 A. General B. Definition of Terms C. Company and Developer
More informationStep 1. Item 6. Item 1
Voltage Regulators QD3/T350 Motor Replacement Kit Kit Number 57A63675100B Service Information S225-50-35 Contents General..................................... 1 Parts Supplied...............................
More information0095.05 June 30. 2011 July 18, 2014 1 of 7
Standard Number: Superseding: Effective Date: Page: 0095.05 June 30. 2011 July 18, 2014 1 of 7 Pole Attachments, Automated Meter Reading and Cellular Phone Antennas 1. Scope 2. Application This standard
More information2014 NEC Guide Lines for Home Owner Doing Electrical Work on their Property
2014 NEC Guide Lines for Home Owner Doing Electrical Work on their Property A brief summary of the most used code references for residential wiring State of Idaho Division of Building Safety Electrical
More informationMini USB and USB 2.0-IP67 Connector System
Mini USB and USB 2.0-IP67 Connector System Section 12 Mini USB and USB 2.0-IP67 Connector System CONEC has added the Mini-USB connector. This Mini-USB IP67 receptacle and plug family, feature a bayonet
More informationCP2 Buried Cable Pedestal Initial & Rehab Installation Instructions
Printing 3 March 2008 CP2 Buried Cable Pedestal Initial & Rehab Installation Instructions This instruction is intended for CP2 cable pedestal installations and replacements. The following tools will be
More informationEZ-Steer Assisted Steering System
EZ-Steer Assisted Steering System Installation Instructions Platform Kit P/N 53059-54 Case IH CVX 1135 CVX 1145 CVX 1155 CVX 1170 CVX 1190 CVX 1195 CVX 135 CVX 145 CVX 155 CVX 175 CVX 195 New Holland TVT
More informationELECTRICAL SERVICE REQUIREMENTS FOR MOBILE HOME DEVELOPMENTS
Prepared by: ABB1 ELECTRICAL SERVICE REQUIREMENTS FOR MOBILE HOME DEVELOPMENTS 052521 Asset Type: Electric Metering Function: Construction Issued by: Quoc Hoang (QxH1) Date: 07-01-16 Rev. #06: This document
More informationIRRIGATION PUMPING Table of Contents - Section 900
IRRIGATION PUMPING Table of Contents - Section 900 PARAGRAPH 900.1 GENERAL 1 900.2 METERING REQUIREMENTS 1 900.3 CUSTOMER S CONTROL EQUIPMENT 2 900.4 SERVICE CONDUCTOR REQUIREMENTS 2 900.5 RECOMMENDATIONS
More informationCables, Cable Laying & Accessories Manual
Distribution Business Cables, Cable Laying & Accessories Manual Database ref: File Ref: Title Page & Revision Log For Cables & Access v4 - Nov 2003.doc Manual Name: Cables & Accessories Manual Version
More informationDEPARTMENT OF LICENSING AND REGULATORY AFFAIRS DIRECTOR S OFFICE CONSTRUCTION SAFETY STANDARDS
MIOSHA-STD-1313 (10/15) 6 Pages For further information Ph: 517-284-7740 www.michigan.gov/mioshastandards DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS DIRECTOR S OFFICE CONSTRUCTION SAFETY STANDARDS
More informationOperating Instructions
Operating Instructions Series L 4000 Spring Driven Cord Reels 63 3 3 3 7A 63 0 63 3 3-RP 3 7B 63 X 6 3 3A 63 8 3 X 6 3 3A-RP 63 8 L 4000 63 3 3 3B 63 9 L 400 63 3-RP A 63 5 3 9 L 4500 63 3 A 63 5 3 9G
More informationOperating Instructions Drill rig DRU160
Operating Instructions Drill rig DRU160 Index 000 / 001 Original operating instructions 10988825 en / 20.10.2009 Congratulations! With a Hydrostress unit from TYROLIT you have chosen a tried and tested
More informationMAST ARMS & POLES. Ornamental Pole Top & Bases
Ornamental Pole Top & Bases Pelco s decorative pole top and bases help make the traffic signal aesthetically pleasing to the eye. Available for various pole diameters and multiple finish options. Ornamental
More information3M Mobile SkyWalk Series Horizontal Lifeline Product Return Form
3M Mobile SkyWalk Series Horizontal Lifeline Product Return Form THIS FULLY COMPLETED DOCUMENT MUST BE INCLUDED WITH EACH RETURN SHIPMENT IN ORDER FOR CREDIT TO BE ISSUED. ALL CREDITS WILL BE ISSUED TO
More informationInstallation information. METTLER TOLEDO MultiRange DW150 / DW150T wall scale
Installation information METTLER TOLEDO MultiRange DW150 / DW150T wall scale DW150 / DW150T wall scale Contents Contents Page 1. Installation... 2 1.1 Preparatory work... 2 1.2 Installing the wall plates
More informationHigh Voltage. Hazards
High Voltage Hazards HV Hazards Substations, Overhead Lines, Cables Safety Incidents Requirements for Designers, Constructors Construction Regs 2013 and other Legislation Codes of Practice Other Guidance
More informationEZ-Steer Assisted Steering System
EZ-Steer Assisted Steering System Installation Instructions Platform Kit P/N 53059-21 Case IH Puma 165 Puma 180 Puma 195 Puma 210 New Holland T7030 T7040 T7050 T7060 Revision A June 2007 Part Number 53345-21-EU2
More informationCable Installation Accessories. Cable Hoisting and Attachment. Snap-In Hangers. SnapStak Hangers
SnapStak Hangers New design increases stack height SnapStak hangers have become the industry standard for maximizing space utilization on crowded towers and now that utility is further expanded with the
More informationCeiling Mounted Folding Attic Ladders Installation Instructions
Ceiling Mounted Folding Attic Ladders Installation Instructions WARNING Before you start installing your new Louisville Ceiling Mounted Folding Attic Ladder, you must read and understand the following:
More informationPOLE MOUNT SYSTEM-3 INSTALLATION
1 May 2014 POLE MOUNT SYSTEM-3 INSTALLATION The Pole Mount System-3 is an easy to install and flexible system designed to allow ONE SYSTEMS loudspeaker products to be mounted to pole structures. The only
More informationHendrix Spacer Cable
Hendrix Spacer Cable What is Spacer Cable? Covered Conductor Withstands temporary branch contact Eliminates temporary faults Protects wildlife Less clearance issues Compact Configuration Multiple Circuits
More informationHURRICANE MITIGATION RETROFITS FOR EXISTING SITE-BUILT SINGLE FAMILY RESIDENTIAL STRUCTURES
HURRICANE MITIGATION RETROFITS FOR EXISTING SITE-BUILT SINGLE FAMILY RESIDENTIAL STRUCTURES 101 Retrofits Required. Pursuant to Section 553.844 553.884, Florida Statutes, strengthening of existing site-built,
More informationI-Line. Accessories. Essential cable installation products for corrugated, smooth wall, and braided cables
I-Line TM Essential cable installation products for corrugated, smooth wall, and braided cables Installation Coaxial cable installation components for corrugated, smooth wall and braided cables Proven
More informationInstallation Instructions Hustler 6-BTV Trap Vertical
Installation Instructions Hustler 6-BTV Trap Vertical ASSEMBLY 1. Check the package contents against the parts list on page 2. 2. WARNING. Installation of this product near power lines is dangerous. For
More informationSCAFFOLDING RUNWAY SYSTEM
SCAFFOLDING RUNWAY SYSTEM HANDBOOK 10/2009.2 i) Further information and detailed component information can be found in the C1 Conveyor Systems Brochure: http://www.nikoltd.co.uk/downloads/brochures/c1_overhead_conveyors_monorails.pdf
More informationCatalog May 2015. Cable Accessories < 1 kv
Catalog May 2015 Cable Accessories < 1 kv Table of content Cable Accessories 1 Cable Accessories 1 kv Product range 2 Universal cleats 3 List of content 4 Notes 5 We reserve the right to make technical
More informationTrees and powerlines. Office of the Technical Regulator. sa.gov.au/energysafe
Trees and powerlines Office of the Technical Regulator sa.gov.au/energysafe owerlines are an important part of our everyday lives, bringing electricity to our homes and businesses. egetation needs to be
More informationTECHNICAL SPECIFICATION FOR HIGH TENSION LINE HARDWARE AND ACCESSORIES FOR ACSR PANTHER & WOLF CONDUCTOR
TECHNICAL SPECIFICATION FOR HIGH TENSION LINE HARDWARE AND ACCESSORIES FOR ACSR PANTHER & WOLF CONDUCTOR 1.1.0 SCOPE : This specification covers design, manufacture, testing at manufacture s works before
More information3.1.1 Full Type Tests & Routine Tests according to Clause 8 2 & 8 3. 4.0 Instructions For Installation, Operation & Maintenance
SPECIFICATION FOR LOW VOLTAGE SWITCHBOARD SEN I N D E X Description 10 STANDARD TECHNICAL REQUIREMENTS 11 Standards 12 General Operating Conditions 13 General Description Of Switchboard 131 Structure 132
More informationWOLFFKRAN. 1 Schedule drawing. 1.1 Schedule drawing, WOLFF 6023.6clear. max. hook height above ground. Data WOLFF 6023.6clear
1 Schedule drawing 1.1 Schedule drawing, WOLFF 6023.6clear [X] max. hook height above ground Data WOLFF 6023.6clear Item Crane type Design Type of setup Basis of calculation Payload torque Hoist winch
More informationPLEASE NOTE. For more information concerning the history of these regulations, please see the Table of Regulations.
PLEASE NOTE This document, prepared by the Legislative Counsel Office, is an office consolidation of this regulation, current to August 1, 2013. It is intended for information and reference purposes only.
More informationTECHNICAL INFORMATION
TECHNICAL INFORMATION Models No. 2012NB Description 304mm (12") Automatic Thickness Planer CONCEPTION AND MAIN APPLICATIONS * Compact and light weight (27 Kg./59 lbs) automatic thickness planer for easier
More informationTrees and powerlines. Office of the Technical Regulator. Web: sa.gov.au/energysafe Phone: 8226 5500 Email: dmitre.otr@sa.gov.au
Trees and powerlines Office of the Technical Regulator For more energy information: Web: sa.gov.au/energysafe hone: 8226 5500 Email: dmitre.otr@sa.gov.au owerlines are an important part of our everyday
More informationwww.klmtechgroup.com TABLE OF CONTENT
Page : 1 of 13 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia ELECTIRAL GROUNDING TABLE OF CONTENT
More informationELECTRIC METERING COMMERCIAL & INDUSTRIAL
ELECTRIC METERING COMMERCIAL & 1.0 INDEX 1.0 INDEX 2.0 SCOPE 3.0 GENERAL REQUIREMENTS 4.0 METER LOCATIONS 5.0 UNDERGROUND TERMINATIONS 6.0 METERING TRANSFORMER ENCLOSURES 7.0 SINGLE CUSTOMER METER INSTALLATIONS
More informationRZ Guardrail System Installation Manual
TM RZ Guardrail System Installation Manual RZ Guardrail System Compliance is based on OSHA standards: (Standards - 29 CFR) 1910.23 (e) and (Standards - 29 CFR) 1926.502 (b) Failure to read, understand
More informationAPPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE
APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE JURISDICTION OF ALBERTA TRANSPORTATION 1.0 Application Procedures 2.0
More informationMEASUREMENTS OF THRUST LOAD IN CABLE SYSTEMS SEMI-RIGIDLY INSTALLED IN DUCT / MANHOLE STRUCTURES
MEASUREMENTS OF THRUST LOAD IN CABLE SYSTEMS SEMI-RIGIDLY INSTALLED IN DUCT / MANHOLE STRUCTURES Riccardo BODEGA, Prysmian Cables and Systems, The Netherlands, riccardo.bodega@prysmian.com Henk GEENE,
More informationX-Tension TM Guardrail End Terminal
Installation and Maintenance Manual X-Tension TM Guardrail End Terminal Step by Step Instructions for the Tangent, Flared and Median Applications Barrier Systems Sales and Service 3333 Vaca Valley Pkwy,
More informationDesign Manual. Copy #
Copy # Version: 5.1 Location of Master Copy: G:Proceedures\Design Manual Date Issued: 2 December 2011 Approved By: Lee Goddard Signature: Design Manual Distribution: Copies of this document are distributed
More information3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.
The following shall serve as the minimum requirements for contractors performing work in relation to the Authority s potable water and sanitary sewer system(s), appurtenances and service connections. General:
More informationBUILDERS AND CONTRACTORS GUIDE FOR ELECTRIC SERVICE
BUILDERS AND CONTRACTORS GUIDE FOR ELECTRIC SERVICE Toll Free Telephone Numbers Residential Services 800.454.3853 Commercial Services 800.653.5307 Utility Locating Company N.C. 800.632.4949 S.C. 888.721.7877
More informationChapter 3: Fall Protection/ Scaffolding Safety
Chapter 3: Fall Protection/ Scaffolding Safety Learning Objectives In this chapter you will learn to: recognize the hazards commonly associated with work on or around scaffolds; be aware of common scaffold-related
More informationFront axle components, overview
just a test. Front axle components, overview 40-1 General Information Load bearing components and parts of the suspension must not be welded or straightened. Vehicles without drive axle must not be moved,
More informationI BEAM TRACK INSTALLATION
PDQ 0/700 FESTOON SYSTEM INSTALLATION AND MAINTENANCE INSTRUCTIONS INTRODUCTION The PDQ Festoon System was designed to run on one of three sizes of I-beams: S x., S8 x 8. and S x.. System trolleys must
More informationES281 COMPANY-SPECIFIC APPENDICES TO ENA ENGINEERING RECOMMENDATION G81 PART 1
ES281 COMPANY-SPECIFIC APPENDICES TO ENA ENGINEERING RECOMMENDATION G81 PART 1 Design and Planning Specification for New Low Voltage Installations for Housing Developments 1. SCOPE This appendix to ENA
More informationEC DECLARATION OF CONFORMITY FOR MACHINES
EC DECLARATION OF CONFORMITY FOR MACHINES (DIRECTIVE 98/37/EC) Manufacturer: Address: Declares that: FAAC S.p.A. Via Benini, 1-40069 Zola Predosa BOLOGNA - ITALY 770 mod. operator is built to be integrated
More informationINSTALLATION INSTRUCTIONS HUSTLER 4-BTV, 5-BTV TRAP VERTICAL WARNING INSTALLATION OF THIS PRODUCT NEAR POWER LINES IS DANGEROUS
INSTALLATION INSTRUCTIONS HUSTLER 4-BTV, 5-BTV TRAP VERTICAL WARNING INSTALLATION OF THIS PRODUCT NEAR POWER LINES IS DANGEROUS FOR YOUR SAFETY, FOLLOW THE INSTALLATION DIRECTIONS GENERAL DESCRIPTION:
More informationLSA-PLUS Series 2 Connection and Disconnection Modules and Accessories
LSA-PLUS Series 2 Connection and Disconnection Modules and Accessories 2015 PRODUCT CATALOG 2ND EDITION LSA-PLUS Series 2 Connection and Disconnection Modules and Accessories A technically and commercially
More information