1 Version 1.6 PROJECT MANAGEMENT OFFICE (PMO) WORKBOOK Date: 6/1/16 Workbook Contents: PMO Charter University Strategic Plan PMO Process Descriptions PMO High Level Procedure 2.1 Procedure 2.2 Work Instruction Work Instruction Document List The Office of Information Technology at Winston-Salem State University 0 P a g e

2 TABLE OF CONTENTS PMO CHARTER... 2 UNIVERSITY STRATEGIC PLAN PMO PROCESS DESCRIPTIONS... 3 PMO HIGH LEVEL... 4 PROCEDURE 2.1: PROJECT INTAKE... 6 PROCEDURE 2.2: PROJECT MANAGEMENT WORK INSTRUCTION 2.1.1: PROJECT INTAKE INSTRUCTION WORK INSTRUCTION 2.2.1: PROJECT INTEGRATION MANAGEMENT DOCUMENT LIST P a g e

3 Project Management Office (PMO) Charter Purpose: The Project Management Office (PMO) is a centralized entity responsible for organizing and coordinating projects. The PMO responsibilities can range from providing project management support and training functions, such as, sharing of resources, methodologies, tools, techniques; to actually being responsible for the direct management and leadership of a project. Vision: To implement successful project management leadership principles within the Office of Information Technology (OIT) in support of the University s strategic plan. Mission: The PMO will ensure the effective execution of the University s strategic objectives by providing project management leadership and governance structure to all portfolios, programs, and projects in support of business decisions. The PMO will facilitate and monitor project management documentation; provide timely and accurate decision support information to all levels of management across the University; and provide consultation, mentoring, tools, training, support, and planning to all projects, project managers, and project leads. Goal: To provide support to our University s strategic plan, the PMO will: Develop and Maintain Standards: Develop and maintain a standard set of project management protocols Establish portfolio and project governance policies Establish and implement portfolio and project assessments and metrics Develop and maintain guidelines for process improvements Provide Products and Services: Provide project management protocols, processes, and tools Provide project management training and development support Provide a communication and tracking structure for project managers Provide a central tool for managing process improvements across the University Training/Coaching/Mentoring: Provide project management training to project leadership Coach and mentor project managers and teams on tools, processes, and methodology Provide a project management leadership and development program Keep abreast on the leadership practices in the field of project management Values: The PMO will adhere to the values defined by the Project Management Institute (PMI) Code of Ethics and Professional Conduct: 1) Responsibility, 2) Respect, 3) Fairness, and 4) Honesty 2 P a g e

4 University Strategic Plan Goal 5: Enhance the Quality of Physical and Operational Infrastructure Objective 5.2: Technology will be used to manage transactional processes efficiently, free staff to focus on customer service with an equity-minded approach. - Strategy: Implement strategy for using technology to increase customer service. Objective 5.5: Staff will be highly trained and committed to excellence. - Strategy: Develop a process to promote staff accountability through performance management. - Strategy: Ensure that consistent assessment tools are utilized to gather actionable data on interaction and satisfaction with service across the institution. - Strategy: Insist upon a customer-centered approach as an essential quality when hiring, training, and evaluating staff. Objective 5.6: Operational excellence will be evidenced by results-oriented goals, policies, procedures, and assessments. - Strategy: Review and revise all policies and procedures to ensure that they reflect an equity-minded approach that is both effective and efficient. Project Management Office (PMO) Process Descriptions Level I: Process: High level processes are a series of actions or steps taken in order to achieve a particular result. Typically there are no details. Primary use is to receive an overview of a function. High level processes are typically illustrated using a mapping format or process flow charts. Level II: Procedures: Procedures are an established or an official way of conducting a function, or a course of action or series of steps or techniques to achieve a particular result. Procedures are typically illustrated using procedure flow charts and procedure narratives. Level III: Work Instructions: Work instructions describes how to specially perform a task, which is a more detailed portion of the procedure. Employees may need more detail than described in the procedures to complete a task. Work instructions are typically illustrated using narratives. 3 P a g e

5 Procedure: 2.0 PMO High Level Process Project Intake High Level I Process Definition: Project Intake is an iterative process designed to review and evaluate project proposals that are submitted. 1. Business Sponsor submits project concept via Project Management System (PMS). 2. Project Management Office (PMO) reviews concept. 3. PMO shall complete and submit IT Proposal Review (Form 1.2) to IT Leadership. 4. If approved IT Leadership will notify PMO and Project Manager (PM) or Project Lead (TL) is assigned. 5. PM or PL collaborates with Business Sponsor to complete and submit IT Project Charter (Form 1.3) to University Technology Advisory Committee (UTAC). 6. If approved UTAC will notify PMO to activate project. 4 P a g e

6 Project Management High Level I Process Definition: Project Management is the application of processes, methods, knowledge, skill-sets, and experience to achieve project objectives or outcomes. 1. Project Management Office (PMO) shall create Initiating Process Group to authorize project phase and/or project charter. 2. Project Manager (PM) or Project Lead (PL) shall lead Planning Process Group to establish scope, refine objectives, and define course of action for project phase and/or project. 3. PM or PL shall lead Executing Process Group to complete the work defined in the project management plan to satisfy the project specifications. 4. PM or PL shall lead Monitoring and Controlling Process Group to track, review, and regulate progress and performance of the project. 5. PM or PL shall lead Closing Process Group to finalize all activities across all process groups to formally close project or phase. - End of Process P a g e

7 Procedure: 2.1 Project Intake Project Intake Level II Procedure Purpose: To review and evaluate a proposed project during the initiation phase to make a decision on whether to approve or reject project. Scope: Project Intake is an iterative process that Begins with receiving project concept and Ends with Project Charter approval. Definitions: - Discovery Session: A focus group meeting designed to gather and/or clarify data about the project. - Project Intake: Managed by the Project Management Office (PMO), it is the process of matriculating projects through the project management system. - Project Charter: A document created by project sponsor that formulizes the existence of a project; whereas the project manager and team are assigned. - Project Management: The application of knowledge, skills, tools, and techniques to project activities to meet project requirements. - Project Management Team (PMT): The members of the project team who are directly involved in the project activities. - Project Manager (PM): May also be referred as Project Lead (PL), the person assigned by the performing organization to achieve the project objectives. - Report Out: A method to present project information and/or data. - Sponsor: Person(s) that is actively involved in the project, or whose interests may be positively or negatively affected by project execution or completion. - Stakeholder: Person(s) or organizations that may exert influence or may be impacted by the project and its deliverables. References: - Gygi, C.,DeCarlo, N., & Williams, B. (2005). Six Sigma for Dummies. Wiley Publishing, Inc. Hoboken, NJ. - Jacka, M. J. & Keller, P. J. (2009). Business Process Mapping. Wiley Publishing, Inc. Hoboken, NJ. - Madison, D. (2005). Process Mapping, Process Improvement, and Process Management. Paton Press, LLC. Chico, CA. - Project Management Institute. (2013). A Guide to the Project Management Body of Knowledge-5 th Edition. Project Management Institute, Inc. Newton Square, PA. 6 P a g e

8 Process Begins: Receiving project concept Process Ends: Project Charter approval Procedure 2.1: Project Intake Flowchart Procedure 2.1: Project Intake Version 1.4: Last Revised Feb 16 - Prepared by Dr. Bulls Project Mgt. Office (PMO) Project Manager (PM) or Project Lead (PL) IT Leadership & UTAC Business Sponsor & Stakeholders Receive project concept via PMS Submit project concept to Project Management System (PMS) No Approved? Yes Receives and fills out IT Project Proposal (Form 1.1) Reject concept contact Business Sponsor A Time: - Notify Business Sponsor within 5-7 business days Submit IT Project Proposal (Form 1.1) PMO assigns PM-PL Conduct Discovery Session(s) B If Service or Incident Request, then assign as needed contact Business Sponsor Report-Out Items: - Project Proposal Form Meeting Updates Form Other documentation as needed No Project Request? Yes Submit IT Report-Out (Form 1.5) Submit IT Proposal Review (Form 1.2) to IT Leadership Type Project Type: - Project Request - Service Request - Incident Request IT Leadership reviews IT Proposal Review (Form 1.2) Yes -Needs revisions Go to B No Captured requirements? -Needs revisions Go to B No Approved? No Go to A -Not project C Conduct Discovery Session(s) for project clarity Yes PM-PL & Business Sponsor form PMT Generate IT Project Charter (Form 1.3) UTAC receives IT Project Charter (Form 1.3) Procedure: -See Procedure: 2.2 Project Management PMO receives approval status -Needs revisions Go to C No Yes Approved? No Go to A -Not project 7 P a g e

9 Procedure 2.1: Project Intake Narrative 1-1. Business Sponsor submits project concept via Project Management System (PMS) Project Management Office (PMO) will review project concept. Notify Business Sponsor of status within 5-7 business days Upon approval of concept PMO shall forward IT Project Proposal (Form 1.1) to Business Sponsor Business Sponsor shall complete IT Project Proposal (Form 1.1); submit to PMO Upon receiving project proposal from Business Sponsor, the PMO shall assign Project Manager (PM) or Project Lead (PL) to conduct Discovery Session(s). *Note: Discovery Session is a focus group-style meeting designed to gather information, to narrow focus, and to refine the problem and opportunity of the project proposal IF Project Request, then go to step IF other request type (see list below), then assign IT request as needed to complete and contact Business Sponsor. Service Request (purchasing or upgrade request) Incident Request (repair request) 1-6. PM-PL shall conduct business process assessment, business system, and relationship analysis and submit on IT-PMO: Report-Out (Form 1.5) Send to Business Sponsor for review to see if requirements were captured. IT-PMO: Project Proposal (Form 1.1) IT-PMO: Meeting Updates (Form 1.4) Any other documents or diagrams 1-7. IF captured PM-PL shall submit IT-PMO: Proposal Review (Form 1.2) to IT Leadership Upon receiving project approval from IT Leadership, the PM-PL shall conduct Discovery Session(s) with Business Sponsor and Stakeholders (as needed) to clarify IT-PMO: Proposal Review (Form 1.2) PM-PL and Business Sponsor shall form Project Management Team (PMT) PM-PL will generate IT-PMO: Project Charter (Form 1.3) with Business Sponsor PM-PL shall submit completed IT-PMO: Project Charter (Form 1.3) to University Technology Advisory Committee (UTAC). 8 P a g e

10 1-10. UTAC reviews IT-PMO: Project Charter (Form 1.3) and determines if valid project IF revisions, then submit to PM-PL to revise (see step 1-8) IF not approved, then submit non-approval response to Business Sponsor IF approved, then submit approval status to PMO; then go to procedure 2.2 Project Management. - End of Procedure P a g e

11 Procedure: 2.2 Project Management Project Management Level II Procedure Purpose: To accomplish project objectives through the application and integration of project management processes. Scope: Project Management is an iterative process that Begins with receiving project approval and Ends with closing project. Definitions: - Discovery Session: A focus group meeting designed to gather and/or clarify data about the project. - Project Intake: Managed by the Project Management Office (PMO), it is the process of matriculating projects through the project management system. - Project Charter: A document created by project sponsor that formulizes the existence of a project; whereas the project manager and team are assigned. - Project Management: The application of knowledge, skills, tools, and techniques to project activities to meet project requirements. - Project Management Team (PMT): The members of the project team who are directly involved in the project activities. - Project Manager (PM): May also be referred as Project Lead (PL), the person assigned by the performing organization to achieve the project objectives. - Report Out: A method to present project information and/or data. - Sponsor: Person(s) that is actively involved in the project, or whose interests may be positively or negatively affected by project execution or completion. - Stakeholder: Person(s) or organizations that may exert influence or may be impacted by the project and its deliverables. References: - Gygi, C.,DeCarlo, N., & Williams, B. (2005). Six Sigma for Dummies. Wiley Publishing, Inc. Hoboken, NJ. - Jacka, M. J. & Keller, P. J. (2009). Business Process Mapping. Wiley Publishing, Inc. Hoboken, NJ. - Madison, D. (2005). Process Mapping, Process Improvement, and Process Management. Paton Press, LLC. Chico, CA. - Project Management Institute. (2013). A Guide to the Project Management Body of Knowledge-5 th Edition. Project Management Institute, Inc. Newton Square, PA. 10 P a g e

12 Process Begins: Receiving project approval Process Ends: Closing project Procedure 2.2: Project Management Procedure 2.2: Project Management Flowchart Project Mgt. Office (PMO) Project Manager (PM) or Project Lead (PL) Project Mgt. Team (PMT) Business Sponsor & Stakeholders PMO create Initiating Process Group Assigns to Initiating Process Group Time: - Conduct as many as needed Time: - Upon receiving approval from IT Leadership Go to A Review IT Project Charter (Form 1.3) Yes Update IT Project Charter (Form 1.3) No PM-PL & Business Sponsor form PMT PM-PL conduct Discovery Session(s) for project clarity A Coordinate Planning Process Group Coordinate Executing Process Group PMT develops IT Project Mgt. Plan (Form 1.6) - IT Software Requirements (Form 1.7) - IT Project Test Plan (Form 1.9) Items: - people - stakeholders - expectations - integrate processes - deliverables PM coordinates PMT coordinates Items: - activity duration - resource productivity - resource availability - risks - test case Note: - Provide project status reports to Sponsor on regular basis, especially when discussing budget calculations. Note Provide project IT Status Report (Temp 1.10) Coordinate Monitoring & Controlling Process Group Responsibility: - measure and analyze project performance - identify variance in plan - document and record 1) preventive action plan 2) compare activities with project baselines PM regulates PMT regulates Update project documentation (as needed) Responsibility: - identify change areas to plan - initiate changes to plan Implement corrective actions IT Change Request (Temp 1.11) Update project documentation (as needed) Coordinate Closing Process Group PMT verifies contractual and project obligations Project closed PM complete IT Project Close- Out (Form 1.7) Yes Approved? No 11 P a g e

13 Procedure 2.2: Project Management Narrative 1-1. Upon receiving project approval from University Technology Advisory Committee (UTAC), the Project Management Office (PMO) shall create Initiating Process Group; to define and authorize the project phase and/or project charter PMO shall assign Project Manager (PM) or Project Lead (PL) to Initiating Process Group PM-PL shall review IT-PMO: Project Charter (Form 1.3) PM-PL shall conduct Discovery Session(s) with Business Sponsor and Stakeholders (as needed) to clarify IT-PMO: Project Charter (Form 1.3) PM-PL and Business Sponsor shall form Project Management Team (PMT) PM-PL will update IT-PMO: Project Charter (Form 1.3) with Business Sponsor if necessary. *Note: Involve sponsors, customers, and other stakeholders (internal and external) as needed to create a shared understanding of Project Charter PM-PL shall coordinate Planning Process Group; to assist in gathering information, sources, Stakeholders, data, materials, etc.; needed for the continual development of the project management plan, software requirements, and test plan PM-PL shall use the Planning Process Group to delineate the strategy and the action items needed to complete the project or phases PMT shall research and develop the following items for the project: scope time cost quality communication human resources risks procurements (if applicable) stakeholder engagement (if applicable) PM-PL shall create IT-PMO: Project Mgt. Plan (Form 1.6) for project PM-PL shall create IT-PMO: Software Requirements (Form 1.7) for project PM-PL shall create IT-PMO: Project Test Plan (Form 1.9) for project and use IT-PMO: Test Case (Template 1.13) to design test case PM-PL shall coordinate Executing Process Group; to assist in integrating people and resources to effectively carry out all the project requirements. 12 P a g e

14 1-3.1 PMT shall coordinate these efforts for the project management plan: people resources deliverables managing stakeholder expectations (internal and external) integrating processes and procedures (if applicable) PM-PL shall analyze the project management plan during this phase and anticipate any variation which may include, but not limited to: activity durations changes in resource productivity changes in resource availability unanticipated risks *Note: Variance(s) may affect the project management plan or any project document and may require a detailed analysis and development of appropriate project management responses IF required after analysis, PM-PL may modify project management plan or other project documents as required IF required after analysis, PM-PL may establish new project baselines. *Note: Due to the majority of project s budget being either calculated and/or expended during this phase, collaborate with sponsor PM-PL shall execute the IT-PMO: Test Case (Template 1.13) PM-PL will update project documentation as required PM-PL shall provide project progress reports to Sponsor on IT-PMO: Status Report (Template 1.10). *Note: Involve sponsors, customers, and other stakeholders (internal and external) as needed to create a shared understanding of Project Charter PM-PL shall coordinate Monitoring and Controlling Process Group; to track, review, and regulate the progress and performance of the project PMT shall identify any areas of changes to the plan PMT shall initiate corresponding changes to the plan PM-PL shall measure & analyze project performance at regular intervals PM-PL shall identify variances from the project management plan PM-PL shall document and/or record the following recommend corrective or preventive action plan measure project activities and compare project baselines influence factors that can circumvent change mechanisms implement approved changes *Note: Involve sponsors, customers, and other stakeholders (internal and external) as needed to create a shared understanding of Project Charter. 13 P a g e

15 1-4.6 PMT is responsible for implementing corrective and preventive actions to keep the project management plan in compliance PM-PL shall update project on IT-PMO: Change Request (Template 1.11) PM-PL shall provide project progress reports to Sponsor on IT-PMO: Status Report (Template 1.10) PM-PL shall coordinate Closing Process Group; to conclude the project PMT shall verify that the project, phase, or contractual obligations have been met PM-PL shall document and/or record premature closed projects, such as: aborted projects cancelled projects critical situation projects IF project cannot be formally closed, then PM-PL may: obtain Sponsor acceptance to formally close project or phase conduct post-project or phase-end review record impacts of tailoring to any process document lessons learned apply appropriate updates to organizational process keep project documents as historical data close out procurement activities and relevant agreements perform team assessments and release project resources PM-PL shall document and/or record the following: recommend corrective or preventive action plan measure project activities and compare project baselines influence factors that can circumvent change mechanisms implement approved changes 1-6. PM-PL shall complete IT-PMO: Project Close-Out (Form 1.7). *Note: Obtain all sponsor signatures as needed to create a shared understanding of Project Close-Out and completed requirements. - End of Procedure P a g e

16 Work Instruction: Project Intake Instruction Project Intake Instruction Level III Work Instruction Purpose: To review and evaluate a proposed project during the initiation phase to make a decision on whether to approve or reject project. Scope: Project Intake is an iterative process that Begins with receiving project concept and Ends with Project Charter approval. Definitions: - Discovery Session: A focus group-style meeting designed to gather and/or clarify information about the project. - Project Charter: A document created by project sponsor that formulizes the existence of a project; whereas the project manager and team are assigned. - Project Management: The application of knowledge, skills, tools, and techniques to project activities to meet project requirements. - Project Management Office (PMO): A centralized office assigned the responsibility to lead, organize, and coordinate for the organization. - Project Management Team (PMT): The members of the project team who are directly stakeholders of the project initiative. - Project Manager (PM): May also be referred as Project Lead (PL), the person assigned by the performing organization to achieve the project objectives. - Report Out: A method to present project information and/or data. - Sponsor: Person(s) that is actively involved in the project, or whose interests may be positively or negatively affected by project execution or completion. - Stakeholder: Person(s) or organizations that may exert influence or may be impacted by the project and its deliverables. References: - Cobb, C. G. (2005). Enterprise Process Mapping. American Society for Quality. Quality Press, MI. - Gygi, C.,DeCarlo, N., & Williams, B. (2005). Six Sigma for Dummies. Wiley Publishing, Inc. Hoboken, NJ. - Jacka, M. J. & Keller, P. J. (2009). Business Process Mapping. Wiley Publishing, Inc. Hoboken, NJ. - Madison, D. (2005). Process Mapping, Process Improvement, and Process Management. Paton Press, LLC. Chico, CA. - Project Management Institute. (2013). A Guide to the Project Management Body of Knowledge-5 th Edition. Project Management Institute, Inc. Newton Square, PA. 15 P a g e

17 Project Proposal Submittal: Work Instruction: Project Intake Instruction Project Management System: is the aggregation of the processes, tools, techniques, methodologies, resources, and procedures to manage a project (PMI, 2013, p. 555) Business Sponsor submits project concept via Project Management System (PMS) Business Sponsor shall gather basic requirements from their unit Business Sponsor shall identify other Stakeholders impacted by their unit Project Management Office (PMO) will receive project concept PMO will forward IT-PMO: Project Proposal (Form 1.1) to Business Sponsor Business Sponsor will complete IT-PMO: Project Proposal (Form 1.1) Business Sponsor will develop the project Business Problem section. Business Sponsor shall consider these questions (if applicable): What is currently wrong or what is the issue with product/service? Is current product/service meeting our customer/stakeholder s needs? What is the product/service s impact on customer/stakeholder s product if issue is not corrected? How will this project drive business initiatives and goals? Why is it important to do now? Why is it a priority? Business Sponsor will develop the project Proposed Solution section. Business Sponsor shall consider these questions (if applicable): What is a possible solution(s) to correct current product/service? How can the issue of the product/service be resolved? Business Sponsor will develop the project Business Justification section. Business Sponsor shall consider these questions (if applicable): What are the benefits of doing project now? 16 P a g e

18 How does the project align with WSSU s Strategic Plan? What are the consequences of not doing project now? Business Sponsor will develop Departments Impacted section. Business Sponsor shall consider these questions (if applicable): What is the product/service s impact on customer/stakeholder s product if issue is not corrected? How will this project impact the customer and/or stakeholders? What stakeholders will need to participate? PM-PL will complete the project Budget section (if applicable). Review & Confirm: 2-1. Business Sponsor will submit IT-PMO: Project Proposal (Form 1.1) to PMO PMO will assign Project Manager (PM) or Project Lead (PL) PM-PL will conduct Discovery Session(s) (if applicable). *Note: Discovery Session is a focus group-style meeting designed to gather information, to narrow focus, and to refine the problem and opportunity of the project proposal PM-PL shall consider these start-up questions (if applicable). What is the focus? i.e. to improve cycle time, accuracy, process What is the target? i.e. reduce cycle time by 50% What is the deadline? i.e. complete by 1 Jan 20xx What are the expected benefits (i.e. revenue and/or cost reduction)? Are the Objectives S-M-A-R-T (Specific, Measurable, Attainable, Relevant, Time-bound)? How will this project impact the customer and/or stakeholders? 2-3. PM-PL will input Discover Session(s) info on IT-PMO: Meeting Updates (Form 1.4) PMO will determine request type (see list below), then assign IT request as needed to complete and contact Business Sponsor. Project Request (sanctioned by PMO) Incident Request (repair request) Service Request (purchasing or upgrade request) 17 P a g e

19 2-5. IF Incident or Service Request, then PM-PL will assign IT request as needed to complete request then contact Business Sponsor to update status IF Project Request, then PM-PL will send IT-PMO: Project Report-Out (Form 1.5) to Business Sponsor for review to see if project requirements were captured IT-PMO: Project Report-Out (Form 1.5) contents: IT-PMO: Project Proposal (Form 1.1) IT-PMO: Meeting Updates (Form 1.4) Any other documents or diagrams Business Sponsor will verify IT-PMO: Project Report-Out (Form 1.5). Project Proposal Review: 3-1. PM-PL shall develop IT-PMO: Project Proposal Review (Form 1.2) with Business Sponsor and/or Stakeholders PM-PL will develop Overview section. PM-PL may reference IT-PMO: Project Proposal (Form 1.1) to complete this section (if applicable) PM-PL will develop Background section. PM-PL may reference IT-PMO: Project Proposal (Form 1.1) to complete this section (if applicable). PM-PL may use start-up questions to complete this section (if applicable): What is the focus? i.e. to improve cycle time, accuracy, process What is the target? i.e. reduce cycle time by 50% What is the deadline? i.e. complete by 1 Jan 20xx PM-PL will develop Business Justification section. PM-PL may reference IT-PMO: Project Proposal (Form 1.1) to complete this section (if applicable). PM-PL may use start-up questions to complete this section (if applicable): What are the expected benefits (i.e. revenue and/or cost reduction)? 18 P a g e

20 Are the Objectives S-M-A-R-T (Specific, Measurable, Attainable, Relevant, Time-bound)? How will this project impact the customer and/or stakeholders? PM-PL will develop Vendor Profile section. PM-PL will research information about the vendor. PM-PL will provide and include any information about the vendor PM-PL will develop Software Overview section (if applicable). PM-PL will research information about the software. PM-PL will provide and include any information about the software PM-PL will develop Project Cost Analysis section (if applicable). PM-PL will research cost estimates about the software/hardware PM-PL will develop Resource Analysis/Timeline section. PM-PL will develop high-level project plan and resources PM-PL will research and complete Technical Assessment section. PM-PL will provide technical requirements and technical details. PM-PL will provide application configuration, data integration, interfaces and any other technical information PM-PL will complete SLA (Service Licensing Agreement) section. PM-PL will provide and include: Number of users Hours of use Resources PM-PL will complete Recommendation section PM-PL shall submit IT-PMO: Project Proposal Review (Form 1.2) to IT Leadership. 19 P a g e

21 Project Approval: 4-1. IT Leadership or IT Department Head shall review IT-PMO: Project Proposal Review (Form 1.2) IT Leadership or IT Department Head will notify PMO on decision PMO will submit request type (see list below), then assign IT request as needed to complete and contact Business Sponsor. Project Request (sanctioned by PMO) Incident Request (repair request) Service Request (purchasing or upgrade request) 4-4. IF Incident or Service Request, then PMO will assign IT request as needed to complete request then contact Business Sponsor to update status IF Project Request, then PMO will assign PM-PL to implement IT-PMO: Project Charter (Form 1.3) process. Project Review: 5-1. PM-PL shall develop IT-PMO: Project Charter (Form 1.3) with Business Sponsor and/or Stakeholders. PM-PL shall discuss the Project Charter inputs with Business Sponsor and/or Stakeholders and Project Management Team (PMT). PM-PL shall discuss the Project Management Process with Business Sponsor and/or Stakeholders and PMT PM-PL will develop the project Background section. PM-PL may reference IT-PMO: Project Proposal (Form 1.1) to complete this section (if applicable). PM-PL may use start-up questions to complete this section (if applicable): What is currently wrong or what is the issue with product/service? Is current product/service meeting our customer/stakeholder s needs? What is the product/service s impact on customer/stakeholder s product if issue is not corrected? How will this project drive business initiatives and goals? Why is it important to do now? Why is it a priority? 20 P a g e

22 5.1-2 PM-PL will develop the project Scope section. PM-PL may reference IT-PMO: Project Proposal (Form 1.1) to complete this section (if applicable). PM-PL may use start-up questions to complete this section (if applicable): What is the focus? i.e. to improve cycle time, accuracy, process What is the target? i.e. reduce cycle time by 50% What is the deadline? i.e. complete by 1 Jan 20xx What are the expected benefits (i.e. revenue and/or cost reduction)? Are the Objectives S-M-A-R-T (Specific, Measurable, Attainable, Relevant, Time-bound)? How will this project impact the customer and/or stakeholders? PM-PL will complete the project Roles & Responsibilities section PM-PL will develop Assumptions-Constraints-Risks sections. PM-PL may reference templates to complete this section (if applicable): IT-PMO: RAMMP Matrix (Template 1.3) IT-PMO: Benefit-Effort Matrix (Template 1.4) IT-PMO: Risk Matrix (Template 1.5) IT-PMO: Issue Log (Template 1.6) PM-PL may use start-up questions to complete this section (if applicable): What are the consequences of not doing project now? When and where does the problem occur? How big is the problem? What resources are available to the team? (i.e. personnel) What is the product/service s impact on customer/stakeholder s product if issue is not corrected? What (if any) constraints must the team work under? (i.e. budget) What (if anything) is out of bounds for the team? (i.e. database access) What is the time commitment expected of the team? (i.e. meetings) What will happen to our regular jobs while we are doing the project? PM-PL will develop Milestones & Deliverables section. PM-PL may reference templates to complete this section (if applicable): 21 P a g e

23 IT-PMO: Schedule (Template 1.1) IT-PMO: SIPOC-Diagram (Template 1.2) PM-PL may use start-up questions to complete this section (if applicable): What specific phase and/or process will the team focus on? What are the boundaries of the phase and/or process the team is trying to improve? Begin and End point? What (if anything) is out of bounds for the team? i.e. database access PM-PL will complete the project Budget section (if applicable) PM-PL will obtain signatures for the Acceptance section. Charter Approval: 6-1. UTAC shall review IT-PMO: Project Charter (Form 1.3) UTAC will notify PMO on decision IF revisions, then submit to PM-PL to revise IF not approved, then submit non-approval response to Business Sponsor IF approved, then go to procedure 2.2. Project Management and work instruction Project Integration Management. - End of Work Instruction P a g e

24 Work Instruction: Project Integration Management Project Integration Management Level III Work Instruction Purpose: To accomplish project objectives through the application and integration of project management processes. Scope: Project Management is an iterative process that Begins with receiving project approval and Ends with closing project. Definitions: - Discovery Session: A focus group-style meeting designed to gather and/or clarify information about the project. - Project Charter: A document created by project sponsor that formulizes the existence of a project; whereas the project manager and team are assigned. - Project Management: The application of knowledge, skills, tools, and techniques to project activities to meet project requirements. - Project Management Office (PMO): A centralized office assigned the responsibility to lead, organize, and coordinate for the organization. - Project Management Team (PMT): The members of the project team who are directly stakeholders of the project initiative. - Project Manager (PM): May also be referred as Project Lead (PL), the person assigned by the performing organization to achieve the project objectives. - Report Out: A method to present project information and/or data. - Sponsor: Person(s) that is actively involved in the project, or whose interests may be positively or negatively affected by project execution or completion. - Stakeholder: Person(s) or organizations that may exert influence or may be impacted by the project and its deliverables. References: - Cobb, C. G. (2005). Enterprise Process Mapping. American Society for Quality. Quality Press, MI. - Gygi, C.,DeCarlo, N., & Williams, B. (2005). Six Sigma for Dummies. Wiley Publishing, Inc. Hoboken, NJ. - Jacka, M. J. & Keller, P. J. (2009). Business Process Mapping. Wiley Publishing, Inc. Hoboken, NJ. - Madison, D. (2005). Process Mapping, Process Improvement, and Process Management. Paton Press, LLC. Chico, CA. - Project Management Institute. (2013). A Guide to the Project Management Body of Knowledge-5 th Edition. Project Management Institute, Inc. Newton Square, PA. 23 P a g e

25 Work Instruction: Project Integration Management Initiating Process Group: Develop Project Charter: is the process of developing a document that formally authorizes the existence of project and provides project manager the authority to apply organizational resources to project activities (PMI, 2013) Project Manager (PM) or Project Lead (PL) shall develop IT-PMO: Project Charter (Form 1.3) with Business Sponsor and/or Stakeholders. PM-PL shall discuss the Project Charter inputs with Business Sponsor and/or Stakeholders and Project Management Team (PMT). PM-PL shall discuss the Project Management Process with Business Sponsor and/or Stakeholders and PMT PM-PL will develop the project Background section. PM-PL may reference IT-PMO: Project Proposal (Form 1.1) to complete this section (if applicable). PM-PL may use start-up questions to complete this section (if applicable): What is currently wrong or what is the issue with product/service? Is current product/service meeting our customer/stakeholder s needs? What is the product/service s impact on customer/stakeholder s product if issue is not corrected? How will this project drive business initiatives and goals? Why is it important to do now? Why is it a priority? PM-PL will develop the project Scope section. PM-PL may reference IT-PMO: Project Proposal (Form 1.1) to complete this section (if applicable). PM-PL may use start-up questions to complete this section (if applicable): What is the focus? i.e. to improve cycle time, accuracy, process What is the target? i.e. reduce cycle time by 50% What is the deadline? i.e. complete by 1 Jan 20xx What are the expected benefits (i.e. revenue and/or cost reduction)? Are the Objectives S-M-A-R-T (Specific, Measurable, Attainable, Relevant, Time-bound)? 24 P a g e

26 How will this project impact the customer and/or stakeholders? PM-PL will complete the project Roles & Responsibilities section PM-PL will develop Assumptions-Constraints-Risks sections. PM-PL may reference templates to complete this section (if applicable): IT-PMO: RAMMP Matrix (Template 1.3) IT-PMO: Benefit-Effort Matrix (Template 1.4) IT-PMO: Risk Matrix (Template 1.5) IT-PMO: Issue Log (Template 1.6) PM-PL may use start-up questions to complete this section (if applicable): What are the consequences of not doing project now? When and where does the problem occur? How big is the problem? What resources are available to the team? (i.e. personnel) What is the product/service s impact on customer/stakeholder s product if issue is not corrected? What (if any) constraints must the team work under? (i.e. budget) What (if anything) is out of bounds for the team? (i.e. database access) What is the time commitment expected of the team? (i.e. meetings) What will happen to our regular jobs while we are doing the project? PM-PL will develop Milestones & Deliverables section. PM-PL may use start-up questions to complete this section (if applicable): IT-PMO: Schedule (Template 1.1) IT-PMO: SIPOC-Diagram (Template 1.2) PM-PL may reference templates to complete this section (if applicable): What specific phase and/or process will the team focus on? What are the boundaries of the phase and/or process the team is trying to improve? Begin and End point? What (if anything) is out of bounds for the team? i.e. database access PM-PL will complete the project Budget section (if applicable). 25 P a g e

27 1-1.7 PM-PL will obtain signatures for the Acceptance section. Planning Process Group: Develop Project Management Plan: is the process of defining, preparing, and coordinating all subsidiary plans and integrating them into a comprehensive project management plan (PMI, 2013). Develop Software Requirements: is process of defining the needed requirements to produce the end result for the hardware/software product (PMI, 2013). Develop Test Plan: is the strategy that will used to verifying and ensuring that a product or system meets its design specifications (PMI, 2013) Project Manager (PM) or Project Lead (PL) shall develop IT-PMO: Project Management Plan (Form 1.6) with Business Sponsor and/or Stakeholders PM-PL will develop the project Introduction section. PM-PL may reference IT-PMO: Project Charter (Form 1.3) to complete this section (if applicable) PM-PL will develop the Project Management Approach section. PM-PL will develop plan and setup to work on project. PM-PL will develop work and tracking strategies for project. PM-PL will develop project outputs to close project PM-PL will develop the Project Scope section. PM-PL may reference IT-PMO: Project Charter (Form 1.3) to complete this section (if applicable). PM-PL may use start-up questions to complete this section (if applicable): What is the focus? i.e. to improve cycle time, accuracy, process What is the target? i.e. reduce cycle time by 50% What is the deadline? i.e. complete by 1 Jan 20xx What are the expected benefits (i.e. revenue and/or cost reduction)? Are the Objectives S-M-A-R-T (Specific, Measurable, Attainable, Relevant, Time-bound)? How will this project impact the customer and/or stakeholders? PM-PL will develop Milestones List section. 26 P a g e

28 PM-PL may reference IT-PMO: Project Charter (Form 1.3) to complete this section (if applicable). PM-PL may reference templates to complete this section (if applicable): IT-PMO: Schedule (Template 1.1) IT-PMO: SIPOC-Diagram (Template 1.2) PM-PL will develop Schedule Baseline & WBS section. PM-PL may reference templates to complete this section (if applicable): IT-PMO: WBS: Event Scheduling System Project (Template 1.9) IT-PMO: WBS: Event Chart (Template 1.9) IT-PMO: WBS: Schedule (Template 1.9) PM-PL will develop the Change Management Plan section PM-PL will develop the Communication Management Plan section. PM-PL may use start-up questions to complete this section (if applicable): What are the roles and communication requirements? What information will be communicated? How will the information be communicated? When will information be distributed? Who does the communication? Who receives the communication? What is the communication conduct? PM-PL will develop Cost Management Plan section (if applicable). PM-PL may reference IT-PMO: Project Charter (Form 1.3) to complete this section (if applicable) PM-PL will develop Requirement Management Plan section. PM-PL may reference templates to complete this section (if applicable): IT-PMO: SIPOC-Diagram (Template 1.2) PM-PL will develop the Quality Management Plan section (if applicable). 27 P a g e

29 PM-PL will develop Risks Management Plan section. PM-PL may reference templates to complete this section (if applicable): IT-PMO: RAMMP Matrix (Template 1.3) IT-PMO: Benefit-Effort Matrix (Template 1.4) IT-PMO: Risk Matrix (Template 1.5) IT-PMO: Issue Log (Template 1.6) PM-PL may use start-up questions to complete this section (if applicable): What are the consequences of not doing project now? When and where does the problem occur? How big is the problem? What resources are available to the team? (i.e. personnel) What is the product/service s impact on customer/stakeholder s product if issue is not corrected? What (if any) constraints must the team work under? (i.e. budget) What (if anything) is out of bounds for the team? (i.e. database access) What is the time commitment expected of the team? (i.e. meetings) What will happen to our regular jobs while we are doing the project? PM-PL will develop the Staff Management Plan section PM-PL will develop the Cost Baseline section PM-PL will develop the Quality Baseline section (if applicable) PM-PL will obtain signatures for the Acceptance section Project Manager (PM) or Project Lead (PL) shall develop IT-PMO: Software Requirements (Form 1.7) with Stakeholders. PM-PL may reference relevant documents to complete (if applicable): PM-PL will develop the project Introduction section PM-PL will develop the Project Scope section PM-PL will develop the Assumptions section PM-PL will develop the Constraints section. 28 P a g e

30 2-2.5 PM-PL will develop the Business Process Model section PM-PL will develop the Requirements section PM-PL will obtain signatures for the Acceptance section Project Manager (PM) or Project Lead (PL) shall develop IT-PMO: Project Test Plan (Form 1.9) with Stakeholders. PM-PL may reference relevant documents to complete (if applicable): PM-PL will develop the project Introduction section PM-PL will develop the Test Objectives section PM-PL will develop the Test Approach section PM-PL will develop the Test Case section PM-PL will develop the Resources section PM-PL will obtain signatures for the Acceptance section. Executing Process Group: Direct and Manage Project Work: is the process of leading and performing the work defined in the project management plan and implementing approved changes to achieve the project s objective (PMI, 2013) 3-1. Project Manager (PM) or Project Lead (PL) shall direct and Manage Project Work PM-PL may reference: IT-PMO: Project Management Plan (Form 1.6) IT-PMO: Software Requirements (Form 1.7) IT-PMO: Project Test Plan (Form 1.9) PM-PL will manage work performance data and change requests PM-PL will manage project risks and performing activities PM-PL shall direct and perform Quality Assurance PM-PL will audit the quality project requirements. 29 P a g e

31 3-2.2 PM-PL will manage the quality control measurements PM-PL shall manage Project Team PM-PL will acquire and develop project team PM-PL will manage project team PM-PL shall manage Communications PM-PL will manage communication needs with PMT, Business Sponsor and/or Stakeholders PM-PL will manage meetings and update project outputs as needed PM-PL may reference form to complete meeting updates and outputs PM-PL shall conduct Procurements PM-PL will coordinate contracts, agreements, and contracted work PM-PL shall manage Stakeholder Engagement PM-PL shall provide status on IT-PMO: Status Report (Template 1.10) PM-PL shall provide testing status on IT-PMO: Test Case (Template 1.13) PM-PL will manage stakeholder expectation and needs PM-PL will address issues during the project. Monitoring and Controlling Process Group: Monitor and Control Project Work: is the process of tracking, reviewing, and reporting the progress to meet the performance objectives defined in the project management plan (PMI, 2013). Perform Integrated Change Control: is the process of reviewing all change requests; approving changes and managing changes to deliverables, organizational process assets, project documents, and the project management plan; and communicating their disposition (PMI, 2013, p. 94). 30 P a g e

32 4-1. Project Manager (PM) or Project Lead (PL) shall direct and Validate Scope and Control Scope PM-PL will formally accept updated deliverables and change requests PM-PL will monitor scope, change request, and work performance info PM-PL may need to update IT-PMO: Project Management Plan (Form 1.6) PM-PL shall control Schedule PM-PL will coordinate and monitor schedule and project timelines PM-PL may need to update IT-PMO: Project Management Plan (Form 1.6) PM-PL shall control Costs (if applicable) PM-PL may monitor cost forecasts and change requests PM-PL may need to update IT-PMO: Project Management Plan (Form 1.6) PM-PL shall control Quality (if applicable) PM-PL may monitor quality control measures using appropriate methods PM-PL may validate changes and verify quality deliverables PM-PL may monitor work performance and change requests PM-PL may need to update IT-PMO: Project Management Plan (Form 1.6) PM-PL shall control Communications PM-PL will manage communication needs with PMT, Business Sponsor and/or Stakeholders PM-PL will manage meetings and update project outputs as needed PM-PL shall control Risks PM-PL will identify and track project risks PM-PL will coordinate corrective and preventive actions (if applicable). 31 P a g e

33 4-6.3 PM-PL may use templates as documentation. IT-PMO: RAMMP Matrix (Template 1.3) IT-PMO: Benefit-Effort Matrix (Template 1.4) IT-PMO: Risk Matrix (Template 1.5) IT-PMO: Issue Log (Template 1.6) IT-PMO: Change Request (Template 1.11) IT-PMO: Test Case (Template 1.13) 4-7. PM-PL shall control Procurements PM-PL will manage contracts, agreements, and contracted work PM-PL will coordinate project audits or inspections (if applicable) PM-PL will coordinate corrective and preventive actions (if applicable) PM-PL shall control Stakeholder Engagement PM-PL will manage engagement with Business Sponsor and/or Stakeholders PM-PL will coordinate status update meetings as needed. Closing Process Group: Develop Close Project or Phase: is the process of finalizing all activities across all of the Project Management Process Groups to formally complete the project or phase; key benefit is that it provides lessons learned, the formal ending of project work, and the release of organization resources (PMI, 2013) Project Manager (PM) or Project Lead (PL) shall develop IT-PMO: Project Close-Out (Form 1.7) for Business Sponsor and/or Stakeholders PM-PL will complete the Project Summary section. PM may reference relevant documents to complete this form (if applicable): PM-PL will complete the Project Team and Staffing section PM-PL will complete the Project Deliverables section. 32 P a g e

34 5-1.4 PM-PL will complete Transition to Operations section PM-PL will complete Project Costs section PM-PL will complete the Recommendations section PM-PL will obtain signatures for the Acceptance section PM-PL is responsible for reviewing and verifying project completion of all abovementioned information from the previous phase closures to ensure that all project work is completed and objectives are met IF project is terminated before official closure, PM-PL will establish the procedures to investigate and document the reasons for actions taken IF project is terminated before official closure, PM-PL shall communicate with all Stakeholders in the process PMT, Business Sponsor and/or Stakeholders will Monitor the Phase/Process and approve product specifications, delivery receipts, and work performance documents PMT will Standardize the Process, which is to incorporate the best known current method into everyday routine of appropriate Stakeholders of the organization PMT will Document the Process, which is a necessary step to ensure that the learning gained via improvement is shared and institutionalized PMT will develop a Response Plan, which is a documented method for how a process owner/team should respond to any out-of-control conditions that may occur in a process PM-PL will Close the Project, document results and design plan using the IT-PMO: Project Close-Out (Form 1.7) document to communicate output success and knowledge business wide Output refers to the transition of the final product, service, or result that the project was authorized to produce The organizational process assets that are updated as a result of the close project or phase include, but not limited to: 33 P a g e

35 Project Files: Documentation from project activities i.e. project management plan, scope, cost, schedule, risks, change management, response plan, etc. Project or Phase Closure Documents: Document consisting of formal documentation that indicates completion of the project or phase. Historical Information: Lessons learned information that are transferred to the lessons learned knowledge base for use by future projects or phases. - End of Work Instruction P a g e

36 Procedure: 2.0 Document List Project Management Forms and Templates 35 P a g e

Project Management for Everyone

Project Management for Everyone Project Management for Everyone Contact Information Adam Donaldson, PMP Business Management & Analysis Group Phone: (202) 994-6867 Cell: (240) 472-2171 Email: adonald@gwu.edu Objectives Basic understanding

More information

Project Management for Everyone

Project Management for Everyone Project Management for Everyone Contact Information Adam Donaldson, PMP Business Management & Analysis Group System, Analytics & Insights Group Phone: (202) 994-6867 Email: adonald@gwu.edu Objectives Basic

More information

5.2. 5.2 Template for IT Project Plan. Template for IT Project Plan. [Project Acronym and Name]

5.2. 5.2 Template for IT Project Plan. Template for IT Project Plan. [Project Acronym and Name] 231 5.2 Template for IT Project Plan Name of the Tool: Source: Usage: Description: Template for IT Project Plan GIZ This template has been designed as a tool to support the planning of IT projects for

More information

Sound Transit Internal Audit Report - No. 2014-3

Sound Transit Internal Audit Report - No. 2014-3 Sound Transit Internal Audit Report - No. 2014-3 IT Project Management Report Date: Dec. 26, 2014 Table of Contents Page Background 2 Audit Approach and Methodology 2 Summary of Results 4 Findings & Management

More information

THE PROJECT MANAGEMENT KNOWLEDGE AREAS

THE PROJECT MANAGEMENT KNOWLEDGE AREAS THE PROJECT MANAGEMENT KNOWLEDGE AREAS 4. Project Integration Management 5. Project Scope Management 6. Project Time Management 7. Project Cost Management 8. Project Quality Management 9. Project Human

More information

Best Practices Statement Project Management. Best Practices for Managing State Information Technology Projects

Best Practices Statement Project Management. Best Practices for Managing State Information Technology Projects State of Arkansas Office of Information Technology 124 W. Capitol Ave. Suite 990 Little Rock, AR 72201 501.682.4300 Voice 501.682.4020 Fax http://www.cio.arkansas.gov/techarch Best Practices Statement

More information

MNLARS Project Audit Checklist

MNLARS Project Audit Checklist Audit Checklist The following provides a detailed checklist to assist the audit team in reviewing the health of a project. Relevance (at this time) How relevant is this attribute to this project or audit?

More information

Organization. Project Name. Project Overview Plan Version # Date

Organization. Project Name. Project Overview Plan Version # Date Project Overview Plan Template Organization Project Name Project Overview Plan Version # Date REVISION HISTORY VERSION # REVISION DATE COMMENT 1 APPROVALS: Authorized Signature DATE 2 Table of Contents

More information

Project Management Professional (PMP)

Project Management Professional (PMP) Project Management Professional (PMP) Duration: 5 days Course Objectives: PMI s Project Management Professional (PMP) credential is the most important industry-recognized certification for project managers.

More information

Input, Output and Tools of all Processes

Input, Output and Tools of all Processes 1 CIS12-3 IT Project Management Input, Output and Tools of all Processes Marc Conrad D104 (Park Square Building) Marc.Conrad@luton.ac.uk 26/02/2013 18:22:06 Marc Conrad - University of Luton 1 2 Mgmt /

More information

PROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME >

PROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME > PROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME > Date of Issue: < date > Document Revision #: < version # > Project Manager: < name > Project Management Plan < Insert Project Name > Revision History Name

More information

Minnesota Health Insurance Exchange (MNHIX)

Minnesota Health Insurance Exchange (MNHIX) Minnesota Health Insurance Exchange (MNHIX) 1.2 Plan September 21st, 2012 Version: FINAL v.1.0 11/9/2012 2:58 PM Page 1 of 87 T A B L E O F C O N T E N T S 1 Introduction to the Plan... 12 2 Integration

More information

Why are PMO s are Needed on Large Projects?

Why are PMO s are Needed on Large Projects? Why are PMO s are Needed on Large Projects? Keeps Project Manager focused on: Priority risks Priority issues Stakeholder alignment Technical challenges Ensures administrative tasks are completed: Projects

More information

PMP Examination Tasks Puzzle game

PMP Examination Tasks Puzzle game PMP Examination Tasks Puzzle game Here is a great game to play to test your knowledge of the tasks you will be tested on in the actual examination. What we have done is take each of the domain tasks in

More information

Module 2: The Project Initiation Stage

Module 2: The Project Initiation Stage Overview Initiation stage is highly instrumental in the life cycle of a project as it defines the boundaries of the project gives clarity to all participants about the objectives, scope, cost timescale

More information

PROJECT MANAGEMENT PLAN CHECKLIST

PROJECT MANAGEMENT PLAN CHECKLIST PROJECT MANAGEMENT PLAN CHECKLIST The project management plan is a comprehensive document that defines each area of your project. The final document will contain all the required plans you need to manage,

More information

Department of Administration Portfolio Management System 1.3 June 30, 2010

Department of Administration Portfolio Management System 1.3 June 30, 2010 E 06/ 30/ 2010 EX AM PL 1. 3 06/ 28/ 2010 06/ 24/ 2010 06/ 23/ 2010 06/ 15/ 2010 06/ 18/ 2010 Portfolio System 1.3 June 30, 2010 Contents Section 1. Project Overview... 1 1.1 Project Description... 1 1.2

More information

<name of project> Software Project Management Plan

<name of project> Software Project Management Plan The document in this file is adapted from the IEEE standards for Software Project Management Plans, 1058-1998, which conforms to the requirements of ISO standard 12207 Software Life Cycle Processes. Tailor

More information

IS&T Project Management: Project Management 101. June, 2006

IS&T Project Management: Project Management 101. June, 2006 IS&T Project Management: Project Management 101 June, 2006 Session Objectives Review basics management Discuss obstacles to effective management Share practices that work for you Empower you to try some

More information

Develop Project Charter. Develop Project Management Plan

Develop Project Charter. Develop Project Management Plan Develop Charter Develop Charter is the process of developing documentation that formally authorizes a project or a phase. The documentation includes initial requirements that satisfy stakeholder needs

More information

Overview of: A Guide to the Project Management Body of Knowledge (PMBOK Guide) Fourth Edition

Overview of: A Guide to the Project Management Body of Knowledge (PMBOK Guide) Fourth Edition Overview of A Guide to the Project Management Body of Knowledge (PMBOK Guide) Fourth Edition Overview of: A Guide to the Project Management Body of Knowledge (PMBOK Guide) Fourth Edition 1 Topics for Discussion

More information

Computing Services Network Project Methodology

Computing Services Network Project Methodology Computing Services Network Project Prepared By: Todd Brindley, CSN Project Version # 1.0 Updated on 09/15/2008 Version 1.0 Page 1 MANAGEMENT PLANNING Project : Version Control Version Date Author Change

More information

Knowledge Area Inputs, Tools, and Outputs. Knowledge area Process group/process Inputs Tools Outputs

Knowledge Area Inputs, Tools, and Outputs. Knowledge area Process group/process Inputs Tools Outputs HUMAN RESOURCE MANAGEMENT Organizational planning Staff Acquisition Project interfaces such as organizational interfaces, technical interfaces and interpersonal interfaces. Staffing requirements Staffing

More information

Program Lifecycle Methodology Version 1.7

Program Lifecycle Methodology Version 1.7 Version 1.7 March 30, 2011 REVISION HISTORY VERSION NO. DATE DESCRIPTION AUTHOR 1.0 Initial Draft Hkelley 1.2 10/22/08 Updated with feedback Hkelley 1.3 1/7/2009 Copy edited Kevans 1.4 4/22/2010 Updated

More information

Application of Standard Project Management Processes in Fiber Optic Cable Plant Project Management. Introduction. Alfred Sankara, DigiBridge TelCo

Application of Standard Project Management Processes in Fiber Optic Cable Plant Project Management. Introduction. Alfred Sankara, DigiBridge TelCo Application of Standard Project Management Processes in Fiber Optic Cable Plant Project Management Alfred Sankara, DigiBridge TelCo Introduction The Project Management Institute (PMI) is the world's leading

More information

OE PROJECT CHARTER TEMPLATE

OE PROJECT CHARTER TEMPLATE PROJECT : PREPARED BY: DATE (MM/DD/YYYY): Project Name Typically the Project Manager Project Charter Last Modified Date PROJECT CHARTER VERSION HISTORY VERSION DATE (MM/DD/YYYY) COMMENTS (DRAFT, SIGNED,

More information

44-76 mix 2. Exam Code:MB5-705. Exam Name: Managing Microsoft Dynamics Implementations Exam

44-76 mix 2. Exam Code:MB5-705. Exam Name: Managing Microsoft Dynamics Implementations Exam 44-76 mix 2 Number: MB5-705 Passing Score: 800 Time Limit: 120 min File Version: 22.5 http://www.gratisexam.com/ Exam Code:MB5-705 Exam Name: Managing Microsoft Dynamics Implementations Exam Exam A QUESTION

More information

Project Management Body of Knowledge (PMBOK) (An Overview of the Knowledge Areas)

Project Management Body of Knowledge (PMBOK) (An Overview of the Knowledge Areas) Project Management Body of Knowledge (PMBOK) (An Overview of the Knowledge Areas) Nutek, Inc. 3829 Quarton Road, Suite 102 Bloomfield Hills, Michigan 48302, USA. Phone: 248-540-4827, Email: Support@Nutek-us.com

More information

Project Management Office Charter

Project Management Office Charter Old Dominion University Office of Computing and Communication Services Project Management Office Charter Version: 1.0 Last Update: February 18, 2010 Created By: Anthony Fox, PMP OCCS Project Management

More information

THE COMPLETE PROJECT MANAGEMENT METHODOLOGY AND TOOLKIT

THE COMPLETE PROJECT MANAGEMENT METHODOLOGY AND TOOLKIT THE COMPLETE PROJECT MANAGEMENT METHODOLOGY AND TOOLKIT GERARD M. HILL CRC Press Taylor & Francis Group Boca Raton London New York CRC Press is an imprint of the Taylor & Francis Croup, an informa business

More information

Central Agency for Information Technology

Central Agency for Information Technology Central Agency for Information Technology Development of a National IT Governance Framework Project Management Agenda 1 What is project management? Why it is important? 2 Leading practices 3 Project management

More information

State of California. Contents. California Project Management Office Project Management Framework. Project Management. Framework.

State of California. Contents. California Project Management Office Project Management Framework. Project Management. Framework. Contents State of California Project Management Framework Page i Contents Overview 1 Introduction 3 8 15 Overview of the CA-PMF Document Structure and Convention Guide Discussion of Lifecycles Templates

More information

The 10 Knowledge Areas & ITTOs

The 10 Knowledge Areas & ITTOs This document is part of a series that explain the newly released PMBOK 5th edition. These documents provide simple explanation and summary of the book. However they do not replace the necessity of reading

More information

Project Management Professional (PMP) Examination Content Outline

Project Management Professional (PMP) Examination Content Outline Project Management Professional (PMP) Examination Content Outline Project Management Institute Project Management Professional (PMP) Examination Content Outline June 2015 Published by: Project Management

More information

Project Management for Implementing the Smart Grid By Power System Engineering, Inc. Abstract PM Methodology Using a Repeatable Project Management

Project Management for Implementing the Smart Grid By Power System Engineering, Inc. Abstract PM Methodology Using a Repeatable Project Management Project Management for Implementing the Smart Grid By Power System Engineering, Inc. Abstract PM Methodology Using a Repeatable Project Management Approach Project management solutions for the Smart Grid

More information

Program Management Professional (PgMP) Examination Content Outline

Program Management Professional (PgMP) Examination Content Outline Program Management Professional (PgMP) Examination Content Outline Project Management Institute Program Management Professional (PgMP ) Examination Content Outline April 2011 Published by: Project Management

More information

Project Scope Management in PMBOK made easy

Project Scope Management in PMBOK made easy By Dr. TD Jainendrakumar The main objective of any project is to fulfill the scope of the project on time and within the budget. What is Project Scope? Scope refers to all the work involved in creating

More information

PROJECT PLAN TEMPLATE

PROJECT PLAN TEMPLATE Treasury Board of Canada Secretariat Secrétariat du Conseil du Trésor du Canada Enhanced Management Framework for Information Management/Information Technology PROJECT PLAN TEMPLATE Document Revision Draft

More information

Crosswalk Between Current and New PMP Task Classifications

Crosswalk Between Current and New PMP Task Classifications Crosswalk Between Current and New PMP Task Classifications Domain 01 Initiating the Project Conduct project selection methods (e.g., cost benefit analysis, selection criteria) through meetings with the

More information

Initiating Forms COPYRIGHTED MATERIAL 1.0 INITIATING PROCESS GROUP

Initiating Forms COPYRIGHTED MATERIAL 1.0 INITIATING PROCESS GROUP 1 Initiating Forms 1.0 INITIATING PROCESS GROUP The purpose of the initiating process group is to authorize a project, provide a high-level definition of the project, and identify stakeholders. There are

More information

PROJECT MANAGEMENT PLAN <PROJECT NAME>

PROJECT MANAGEMENT PLAN <PROJECT NAME> PROJECT MANAGEMENT PLAN TEMPLATE This Project Management Plan Template is free for you to copy and use on your project and within your organization. We hope that you find this template useful and welcome

More information

PHASE 3: PLANNING PHASE

PHASE 3: PLANNING PHASE PHASE 3: PLANNING PHASE The ning Phase focuses principally on required project planning work. Proper comprehensive project planning is essential to a successful IT project, and incomplete project planning

More information

PHASE 3: PLANNING PHASE

PHASE 3: PLANNING PHASE PHASE 3: PLANNING PHASE The Planning Phase focuses principally on required project planning work. Proper comprehensive project planning is essential to a successful IT project, and incomplete project planning

More information

Project Management Fundamentals. Office of the Senior Associate Vice President for Finance

Project Management Fundamentals. Office of the Senior Associate Vice President for Finance Project Management Fundamentals Project Management Institute PMI is an aggregation of best practices from thousands of professional project managers Principles in this training are based on PMI methodologies,

More information

21. Earned Value deals with: a. EV Scope b. PV Time c. AC Cost 22. Portfolios are organized around business goals. 23. Take stern action against

21. Earned Value deals with: a. EV Scope b. PV Time c. AC Cost 22. Portfolios are organized around business goals. 23. Take stern action against PMP Short Notes Based on PMBOK Guide fifth edition By Dilip Chaturvedi,PMP Email id: info@justpmp.com To know about our training schedule, please visit www.justpmp.com 1. Communication is more complex

More information

Frank P.Saladis PMP, PMI Fellow

Frank P.Saladis PMP, PMI Fellow Frank P.Saladis PMP, PMI Fellow Success factors for Project Portfolio Management The Purpose of Portfolio Management Organizational Assessment Planning a Portfolio Management Strategy The Portfolio Management

More information

Process Improvement Program Project Process

Process Improvement Program Project Process Process Improvement Program Project Process 1 P a g e 12/3/2014 The Process Improvement Program is part of the City of Fort Lauderdale s FL 2 STAT Approach to Exponential Improvement. Its objective is

More information

Information Technology Project Oversight Framework

Information Technology Project Oversight Framework i This Page Intentionally Left Blank i Table of Contents SECTION 1: INTRODUCTION AND OVERVIEW...1 SECTION 2: PROJECT CLASSIFICATION FOR OVERSIGHT...7 SECTION 3: DEPARTMENT PROJECT MANAGEMENT REQUIREMENTS...11

More information

Appendix 3: Project Management Substation Guidelines (General Process Flow Template)

Appendix 3: Project Management Substation Guidelines (General Process Flow Template) 365 Appendix 3: Project Management Substation Guidelines (General Process Flow Template) Checkpoint Methodology The schedule is issued prior to the go decision. It covers the duration of the project. It

More information

Quick Reference Guide Interactive PDF Project Management Processes for a Project

Quick Reference Guide Interactive PDF Project Management Processes for a Project Project Processes for a Project Click the Knowledge Area title (below and left in blue underline) to view the details of each Process Group. Project Process Groups and Knowledge Areas Mapping Project Process

More information

ITRM Guideline CPM 110-01 Date: January 23, 2006 SECTION 4 - PROJECT EXECUTION AND CONTROL PHASE

ITRM Guideline CPM 110-01 Date: January 23, 2006 SECTION 4 - PROJECT EXECUTION AND CONTROL PHASE PROJECT MANAGEMENT GUIDELINE SECTION 4 - PROJECT EXECUTION AND CONTROL PHASE Table of Contents Introduction... 3 Project Execution and Control Phase Overview... 3 Activities and Documents in the Execution

More information

PRINCE2:2009 Glossary of Terms (English)

PRINCE2:2009 Glossary of Terms (English) accept (risk response) acceptance acceptance criteria activity agile methods approval approver assumption assurance A risk response to a threat where a conscious and deliberate decision is taken to retain

More information

Project Charter and Scope Statement

Project Charter and Scope Statement Prepared by: Mike Schmidt Version: 1.0 Last Revision Date: April 14, 2010 Create Date: May 6, 2010 EXECUTIVE SUMMARY... 3 1 INTRODUCTION... 4 2 PROJECT OBJECTIVES... 4 2.1 MISSION... 4 2.2 OBJECTIVES...

More information

Happily Ever After: Project Management Tips and Tricks for the SAMHSA Grantee

Happily Ever After: Project Management Tips and Tricks for the SAMHSA Grantee Happily Ever After: Project Management Tips and Tricks for the SAMHSA Grantee Lloyd Potter, PhD, MPH SPRC Tarsha M. Wilson, MSW SAMHSA/CMHS December 10-12, 2007 GLSMA Grantee Meeting Portland, OR Project

More information

Project Audit & Review Checklist. The following provides a detailed checklist to assist the PPO with reviewing the health of a project:

Project Audit & Review Checklist. The following provides a detailed checklist to assist the PPO with reviewing the health of a project: Project Audit & Review Checklist The following provides a detailed checklist to assist the PPO with reviewing the health of a project: Relevance (at this time) Theory & Practice (How relevant is this attribute

More information

Central Project Office: Charter

Central Project Office: Charter Central Project Office: Charter ITCS: Central Project Office EAST CAROLINA UNIVERSITY 209 COTANCHE STREET, GREENVILLE, NC 27858 1 Table of Contents INTRODUCTION... 3 PURPOSE... 3 EXPECTED BENEFITS... 3

More information

Positive Train Control (PTC) Program Management Plan

Positive Train Control (PTC) Program Management Plan Positive Train Control (PTC) Program Management Plan Proposed Framework This document is considered an uncontrolled copy unless it is viewed online in the organization s Program Management Information

More information

Project Management for Process Improvement Efforts. Jeanette M Lynch CLSSBB Missouri Quality Award Examiner Certified Facilitator

Project Management for Process Improvement Efforts. Jeanette M Lynch CLSSBB Missouri Quality Award Examiner Certified Facilitator Project Management for Process Improvement Efforts Jeanette M Lynch CLSSBB Missouri Quality Award Examiner Certified Facilitator 2 Project and Process Due to the nature of continuous improvement, improvement

More information

THE FUNDAMENTALS OF PROJECT MANAGEMENT

THE FUNDAMENTALS OF PROJECT MANAGEMENT THE FUNDAMENTALS OF PROJECT MANAGEMENT Learning the Essential Elements for Effective Management at UW-Stout WHAT IS A PROJECT? 1. Improve the efficiency of a specific production line. 2. Organize the annual

More information

OFFICE OF THE CIO. PROCEDURE Informational VERSION: 1.0

OFFICE OF THE CIO. PROCEDURE Informational VERSION: 1.0 OFFICE OF THE CIO PROCEDURE Informational VERSION: 1.0 Purpose Project Management of Major or Large NDUS Information Technology Projects Project Managers Guide/Checklist This procedural process will ensure

More information

Introduction to project management and concepts

Introduction to project management and concepts 37E01500 Project Management and Consulting Practice Introduction to project management and concepts Matti Rossi, Professor Dept. of Information and Service Economy Lecture 1, Mon 26.10.2015 Learning objectives

More information

AIPM PROFESSIONAL COMPETENCY STANDARDS FOR PROJECT MANAGEMENT PART C CERTIFIED PRACTISING PROJECT MANAGER (CPPM)

AIPM PROFESSIONAL COMPETENCY STANDARDS FOR PROJECT MANAGEMENT PART C CERTIFIED PRACTISING PROJECT MANAGER (CPPM) AIPM PROFESSIONAL COMPETENCY STANDARDS FOR PROJECT MANAGEMENT PART C CERTIFIED PRACTISING PROJECT MANAGER (CPPM) February 2010 Version 1.12 Copyright: Australian Institute of Project Management Document

More information

AIPM PROFESSIONAL COMPETENCY STANDARDS FOR PROJECT MANAGEMENT PART B CERTIFIED PRACTISING PROJECT PRACTITIONER (CPPP)

AIPM PROFESSIONAL COMPETENCY STANDARDS FOR PROJECT MANAGEMENT PART B CERTIFIED PRACTISING PROJECT PRACTITIONER (CPPP) AIPM PROFESSIONAL COMPETENCY STANDARDS FOR PROJECT MANAGEMENT PART B CERTIFIED PRACTISING PROJECT PRACTITIONER (CPPP) Copyright: Australian Institute of Project Management Document Information Document

More information

MGMT 4135 Project Management. Chapter-16. Project Oversight

MGMT 4135 Project Management. Chapter-16. Project Oversight MGMT 4135 Project Management Chapter-16 Project Oversight Project Oversight: defined as a set of principles and processes to guide and improve the management of projects. Ensures projects meet the needs

More information

Project Management Professional (PMP) Examination Content Outline

Project Management Professional (PMP) Examination Content Outline Project Management Professional (PMP) Examination Content Outline Project Management Institute Project Management Professional (PMP ) Examination Content Outline Revised August 2011 Published by: Project

More information

PORTFOLIO, PROGRAMME & PROJECT MANAGEMENT MATURITY MODEL (P3M3)

PORTFOLIO, PROGRAMME & PROJECT MANAGEMENT MATURITY MODEL (P3M3) PORTFOLIO, PROGRAMME & PROJECT MANAGEMENT MATURITY MODEL (P3M3) 1st February 2006 Version 1.0 1 P3M3 Version 1.0 The OGC logo is a Registered Trade Mark of the Office of Government Commerce This is a Value

More information

Project Management Plan for

Project Management Plan for Project Management Plan for [Project ID] Prepared by: Date: [Name], Project Manager Approved by: Date: [Name], Project Sponsor Approved by: Date: [Name], Executive Manager Table of Contents Project Summary...

More information

pm4dev, 2016 management for development series Project Scope Management PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS

pm4dev, 2016 management for development series Project Scope Management PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS pm4dev, 2016 management for development series Project Scope Management PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS A methodology to manage development

More information

Project Management Guidebook

Project Management Guidebook METHOD 12 3 empowering managers to succeed Project Management Guidebook ISBN 0-473-10445-8 A bout this e-book This e-book was created by Method123 (see www.method123.com) to help provide you with a simple

More information

Project Management Office (PMO)

Project Management Office (PMO) Contents I. Overview of Project Management...4 1. Project Management Guide (PMG)...4 1.1 Introduction...4 1.2 Scope...6 1.3 Project Types...6 2. Document Overview, Tailoring, and Guidance...7 3. The Project

More information

Integrating the Worldwide Project Management Method (WWPMM) into an IBM Global Services Method Project

Integrating the Worldwide Project Management Method (WWPMM) into an IBM Global Services Method Project IBM Global Services Integrating the Worldwide Project Management Method (WWPMM) into an IBM Global Services Method Project Technique Paper (TP) Copyright International Business Machines Corporation, 2000

More information

The Agile PMO. Contents. Kevin Thompson, Ph.D., PMP, CSP Agile Practice Lead cprime, Inc. 4100 E. Third Avenue, Suite 205 Foster City, CA 94404

The Agile PMO. Contents. Kevin Thompson, Ph.D., PMP, CSP Agile Practice Lead cprime, Inc. 4100 E. Third Avenue, Suite 205 Foster City, CA 94404 The Agile PMO Kevin Thompson, Ph.D., PMP, CSP Agile Practice Lead cprime, Inc. 4100 E. Third Avenue, Suite 205 Foster City, CA 94404 Kevin.thompson@cprime.com Abstract The development of Agile processes

More information

Partnering for Project Success: Project Manager and Business Analyst Collaboration

Partnering for Project Success: Project Manager and Business Analyst Collaboration Partnering for Project Success: Project Manager and Business Analyst Collaboration By Barbara Carkenord, CBAP, Chris Cartwright, PMP, Robin Grace, CBAP, Larry Goldsmith, PMP, Elizabeth Larson, PMP, CBAP,

More information

Do not open this paper until instructed by the invigilator. Please note: This question paper must not be removed from the examination room.

Do not open this paper until instructed by the invigilator. Please note: This question paper must not be removed from the examination room. APM Introductory Certificate in Project Management Exam paper Candidate Reference Number Date of Exam Location of the Exam General Notes Time allowed 1 hour Answer all 60 multiple choice questions Use

More information

Project Management Guidelines

Project Management Guidelines Project Management Guidelines Overview Section 86-1506 (5) directs the NITC to adopt guidelines regarding project planning and management. The goal of project management is to achieve the objectives of

More information

Prepared for: Prepared by:

Prepared for: Prepared by: Executive Project Review Prepared for: Prepared by: Table of contents Introduction... 3 WHY an Executive Project Review?... 3 WHO is Involved?... 4 WHAT is an Executive Project Review?... 5 WHEN? - Schedule

More information

Integration Mgmt / Initiating Process Group 4.1 Develop Project Charter

Integration Mgmt / Initiating Process Group 4.1 Develop Project Charter 1 Mgmt / Initiating Process Group 4.1 Develop Project Charter Project statement of work Business case Agreements Facilitation techniques Project charter 26/02/2013 18:23:36 1 2 Mgmt / Planning Process

More information

Prior to printing, you should delete all [...] prompt text (in italics and blue text).

Prior to printing, you should delete all [...] prompt text (in italics and blue text). HOW TO USE THIS TEMPLATE: Introduction The template reflects the recommended content for a Project Charter document, as described in the PMI Project Management Body of Knowledge (PMBOK Guide, Third Edition).

More information

A Project Manager's Book of Forms. A Companion to the PMBOK Guide. 2nd Edition

A Project Manager's Book of Forms. A Companion to the PMBOK Guide. 2nd Edition Brochure More information from http://www.researchandmarkets.com/reports/2326795/ A Project Manager's Book of Forms. A Companion to the PMBOK Guide. 2nd Edition Description: A compendium of ready made

More information

- ATTACHMENT - PROGRAM MANAGER DUTIES & RESPONSIBILITIES MARYLAND STATE POLICE W00B0400021

- ATTACHMENT - PROGRAM MANAGER DUTIES & RESPONSIBILITIES MARYLAND STATE POLICE W00B0400021 - ATTACHMENT - PROGRAM MANAGER DUTIES & RESPONSIBILITIES MARYLAND STATE POLICE W00B0400021 About this document this is a detailed description of typical Project Manager (PM) duties, responsibilities, and

More information

Project Management. On-Site Training and Facilitation Services. www.performanceweb.org. For more information, visit

Project Management. On-Site Training and Facilitation Services. www.performanceweb.org. For more information, visit Project Management On-Site Training and Facilitation Services For more information, visit www.performanceweb.org Benefits of On-Site Training The Performance Institute s proven consulting methodology is

More information

A COMPARISON OF PRINCE2 AGAINST PMBOK

A COMPARISON OF PRINCE2 AGAINST PMBOK Introduction This comparison takes each part of the PMBOK and gives an opinion on what match there is with elements of the PRINCE2 method. It can be used in any discussion of the respective merits of the

More information

Project Execution, Monitoring and Control (IS PM 8. Lecture; 2012 Spring)

Project Execution, Monitoring and Control (IS PM 8. Lecture; 2012 Spring) Project Execution, Monitoring and Control Topics of the lecture as follows: PDCA cycle Project execution processes by PMBOK Project monitoring and controlling processes by PMBOK Project monitoring and

More information

At the end of this chapter. Project Charter. What is a Project Charter? What is a Project Charter? Why is a Project Charter used?

At the end of this chapter. Project Charter. What is a Project Charter? What is a Project Charter? Why is a Project Charter used? At the end of this chapter Project Charter Describe what a project charter is and why it is critical to project success. Explain what a project scope statement is and why it is important. List the various

More information

Project Management Standards: A Review of Certifications/Certificates

Project Management Standards: A Review of Certifications/Certificates Project Standards: A Review of Certifications/Certificates Standards for Project Supporting Certification and Certificates Certificate Certification The Project Body of Knowledge PMBOK Guide Projects in

More information

Project Management Using Microsoft Project Plan - Basic

Project Management Using Microsoft Project Plan - Basic Project Management Using Microsoft Project Plan Basic V2.0 Project Management Using Microsoft Project Plan - Basic Version 2.0, February, 2011 Illume-Tech Solutions & Services COPYRIGHT 2011 ILLUME-TECH

More information

Strategic Plan for the Enterprise Portfolio Project Management Office Governors Office of Information Technology... Ron Huston Director

Strategic Plan for the Enterprise Portfolio Project Management Office Governors Office of Information Technology... Ron Huston Director Strategic Plan for the Enterprise Portfolio Project Management Office Governors Office of Information Technology.......... June 2010 Ron Huston Director Message from the State Enterprise Portfolio Project

More information

Description of Program Management Processes (Initiating, Planning) 2011 PROGstudy.com. All rights reserved

Description of Program Management Processes (Initiating, Planning) 2011 PROGstudy.com. All rights reserved Description of Program Management Processes (Initiating, Planning) Topics Covered Program Management Process Groups salient features Description of all processes in Initiating Process Group: Initiate Program

More information

ATTACHMENT 3 SPS PROJECT SENIOR PROGRAM MANAGER (SPM) DUTIES & RESPONSIBILITIES

ATTACHMENT 3 SPS PROJECT SENIOR PROGRAM MANAGER (SPM) DUTIES & RESPONSIBILITIES 1. ROLE DEFINITIONS ATTACHMENT 3 SPS PROJECT SENIOR PROGRAM MANAGER (SPM) DUTIES & RESPONSIBILITIES The purpose of this section is to distinguish among the roles interacting with the SPM obtained through

More information

MICHIGAN DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET UCC and CPC MDOS Letters to FileNet PROJECT MANAGER STATEMENT OF WORK (SOW)

MICHIGAN DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET UCC and CPC MDOS Letters to FileNet PROJECT MANAGER STATEMENT OF WORK (SOW) MICHIGAN DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET UCC and CPC MDOS Letters to FileNet PROJECT MANAGER STATEMENT OF WORK (SOW) A Pre-Qualification Program was developed to provide a mechanism for

More information

Selftestengine..PMI-SP.270 questions PMI-SP. PMI Scheduling Professional

Selftestengine..PMI-SP.270 questions PMI-SP. PMI Scheduling Professional Selftestengine..PMI-SP.270 questions Number: PMI-SP Passing Score: 800 Time Limit: 120 min File Version: 5.1 PMI-SP PMI Scheduling Professional This study guides are so comprehensible that anyone can understand

More information

Position Title: Management Info Chief. Working Title: Technical Project Management Section Chief

Position Title: Management Info Chief. Working Title: Technical Project Management Section Chief Position Title: Management Info Chief Working Title: Technical Project Management Section Chief This management position directs the operational activities of the Project Management Office whose mission

More information

2012 National BDPA Technology Conference. Defining Project and PMO Metrics

2012 National BDPA Technology Conference. Defining Project and PMO Metrics 2012 National BDPA Technology Conference Defining Project and PMO Metrics Betty Hutchins, MBA, PMP August 1 4, 2012 Baltimore, MD Presentation Objectives Project Performance Determine the Process Defining

More information

http://www.io4pm.org IO4PM - International Organization for Project Management

http://www.io4pm.org IO4PM - International Organization for Project Management THE ONLY BOOK CAN SIMPLY LEARN PROJECT MANAGEMENT! Page 1 Contents ABOUT THE AUTHOR... 3 WHAT IS PROJECT MANAGEMENT?... 5 ORGANIZATIONAL INFLUENCES AND PROJECT LIFECYCLE... 11 PROJECT MANAGEMENT PROCESSES...

More information

PMAP. Project Management At Penn PMAP

PMAP. Project Management At Penn PMAP Project Management At Penn 1 Fundamentals Course Objective To provide you with an overview of Topics Project Management at Penn () Project Governance Phases & Project Management Activities Project Management

More information

Overview of A Guide to the Project Management Body of Knowledge (PMBOK Guide) Fourth Edition

Overview of A Guide to the Project Management Body of Knowledge (PMBOK Guide) Fourth Edition Overview of A Guide to the Project Management Body of Knowledge (PMBOK Guide) Fourth Edition Topics for Discussion PMI Foundational Standards Harmonization of PMI s Foundational Standards Top 10 changes

More information

Project organisation and establishing a programme management office

Project organisation and establishing a programme management office PROJECT ADVISORY Project organisation and establishing a programme office Leadership Series 1 kpmg.com/nz About the Leadership Series KPMG s Leadership Series is targeted towards owners of major capital

More information

Using Project Management Best Practices to Manage Oracle Enterprise Resource Planning (ERP) Projects Session ID# 12048

Using Project Management Best Practices to Manage Oracle Enterprise Resource Planning (ERP) Projects Session ID# 12048 Using Project Management Best Practices to Manage Oracle Enterprise Resource Planning (ERP) Projects Session ID# 12048 Edward Charity, Jr., PMP Project Management Systems Consultants (PMSC) LLC Agenda

More information

The Job of the Project Manager. Robert Youker World Bank (retired) 5825 Rockmere Drive Bethesda, Md. USA 20816 bobyouker@worldnet.att.

The Job of the Project Manager. Robert Youker World Bank (retired) 5825 Rockmere Drive Bethesda, Md. USA 20816 bobyouker@worldnet.att. The Job of the Project Manager Robert Youker World Bank (retired) 5825 Rockmere Drive Bethesda, Md. USA 20816 bobyouker@worldnet.att.net For any organization and for any project manager it is vitally important

More information