1 Baseline Reliability Project Exercises 1. The date is August During your annual reliability analysis, you find low voltage at the 138kV substation SUB1 when the 230kV line from SUB2 to SUB3 is removed from service in the summer of You plan for capacitor bank at SUB1 to meet the voltage guidelines of your Planning Criteria. Does this qualify as a BRP? A. Yes B. No 2. The date is June 2015 and a customer approaches your company with a request for service January 1, The load size is 100MW, and you identify Bulk Electric System upgrades required to meet the needs of customer and maintain system reliability. The project construction lead time for this project is 1.5 years. Does this project meet the requirements for an Out-of-Cycle review? A. Yes B. No April 21,

2 Generation Interconnection Project Exercises 1. MISO posts a contour map to gives people a rough idea about where transmission capacity is potentially available on the MISO network. It is updated periodically based on summer off-peak system condition. By looking at this map, please identify where the transmission capacity may be most available. A. A B. B C. C D. D 2. If you want to build a new generator and connect it to transmission system under MISO functional control, what all do you need to submit to MISO? A. A signed, hard copy of Appendix 1: Application for Generator Interconnection and Attachments B. All M1 technical milestones C. A non-refundable application/feasibility study fee of $5,000 made out to MISO. D. A deposit to fund a D2 system impact study. E. Demonstration of site control OR an additional $100,000 deposit made out to MISO F. All of the Above 3. If you want to be up-to-date about queue process and study results, which stakeholder forum would you need to attend? Select all that apply. A. Market Congestion Planning Study Meeting B. Loss of Load Expectation Working Group C. Interconnection Process Task Force D. Individual Study Ad hoc group meeting E. Queue workshops F. Planning Advisory Committee April 21,

3 4. If you are part of the Generation Interconnection DPP study ad hoc group, what types of input would MISO need from you? Select all that apply. A. Model review B. Identify valid constraints C. Provide input on estimated cost and schedule D. Set study criteria 5. In one of the stakeholder meetings, MISO shared preliminary overloads identified in a DPP study: Overloaded Rating Contingency Distribution Factor A 100 N-1 Outage 10% 5 B 100 System Intact 10% 10 C 300 N-1 Outage 30% 25 D 300 System Intact 3% 60 Which one(s) are Injection constraints that will require Network Upgrades? MW Impact 6. In the subsequent stakeholder meetings, MISO shared additional overloads identified in the deliverability analysis (summer peak condition) in the study: Overloaded Rating Contingency Distribution Factor A 200 N-1 Outage 10% 10 B 200 System Intact 10% 5 C 300 N-1 Outage 30% 15 D 300 System Intact 3% 50 Which one(s) are deliverability constraints? MW Impact April 21,

4 7. In the subsequent stakeholder meetings, MISO shared additional overloads identified in the deliverability analysis (summer peak condition) in the study: Overloaded Rating Contingency Distribution Factor A 200 N-1 Outage 10% 10 B 200 System Intact 10% 5 C 300 N-1 Outage 30% 15 D 300 System Intact 3% 50 Which one(s) are deliverability constraints? MW Impact 8. In the final DPP System Impact Study report, the following Network Upgrades were listed as required by the generator. Which one of these will be primarily paid by the generators, and which ones are postage stamped to the load: A. An upgrade on an existing 230 kv facility B. Replacement of a 230/138 kv transformer C. A 345 kv new section of a transmission line D. A new wavetrap on a 161 kv line April 21,

5 Market Efficiency Project Exercise MISO identifies the following short and long-term opportunities. Draw lines that you think may be good opportunities. Congested Element Export Limited Import Limited April 21,

6 Here are some examples that we drew Which one do you think will provide the most benefits? Congested Element Export Limited Import Limited A. Line A B. Line B C. Line C D. Line D April 21,

7 At the next Economic Planning Users Group (EPUG) meeting MISO comes back with the following results: Project Voltage Cost (NPV) BAU - Production Cost Benefits (NPV) Benefit to Cost Ratio Notes A 230 $100 $ Completely Mitigated Congestion on Flowgate R B 230 $300 $ Minimal change in congestion patters C 500 $400 $ Completed Mitigated Congestion on Flowgate A, B, N, L, and W D 230 $150 $ Completed mitigated congestion on Flowgate A, N, and L Increased congestion on Flowgate B *Note: Costs put into 20 year Net Present Value (NPV) considers time value of money and annual revenue requirements What s the next iteration looking at these results? April 21,

8 Let s iterate: MISO goes back to the workshop and at the next meeting comes back with. Project Voltage Cost BAU - Production Benefit to Notes (NPV) Cost Benefits (NPV) Cost Ratio A 230 $100 $ Completely Mitigated Congestion of Flowgate R A2 230 $60 $ Partially Mitigated Congestion of Flowgate R C 500 $400 $ Completed Mitigated Congestion on Flowgate A, B, N, L, and W C2 500 $225 $ Partially mitigated congestion on W and A, completely mitigated B, N, and L D 230 $150 $ Completed mitigated congestion on Flowgate A, N, and L Increased congestion on Flowgate B D2 230 $175 $ Completely mitigated congestion on A, N, L, B Which is the most cost effective option? - Is it an MEP? o Voltage? Cost? B/C? April 21,

9 Option C2 looks good, but we need to make sure it doesn t harm the reliability of the system No Harm Reliability Testing Testing comes back and says we need to add $10 M worth of additional upgrades to this project in order to meet reliability criteria. Recalculate B/C Project Voltage Cost B/C (Nominal) C C D D Is the C2 project still the best option? Does it meet MEP criteria? April 21,

10 Multi-Value Project Exercises 1. A proposed transmission project starts off as a Multi-Value Project? A. True B. False 2. Select the criteria below that a Multi-Value Project must satisfy: A. Shown to enable the transmission system to deliver such energy in a manner that is more reliable and/or more economic than it otherwise would be without the transmission upgrade in order to reliably meet documented energy policy state or federal legislation or regulatory requirement B. Provides multiple types economic value across multiple pricing zones with a Total MVP benefit to cost ratio 1.0 or higher. C. Addresses projected violation of NERC or Regional Entity standard and must provide economic value across multiple pricing zones with Total MVP benefit to cost ratio 1.0 or higher. D. One or more above E. All of the above 3. Which criteria below is not a Multi-Value Projects cost allocation criteria: A. Must be evaluated as part of a portfolio of projects, whose benefits are spread broadly across the footprint B. The total capital cost for the transmission project must be greater than or equal to $20.0 million C. A Network Upgrades driven solely by an Interconnection Request in the MISO Generation Interconnection Procedures or Transmission Service Request D. None of the above April 21,

MISO Transmission Cost Allocation Overview. October 21, 2013

MISO Transmission Cost Allocation Overview. October 21, 2013 MISO Transmission Cost Allocation Overview October 21, 2013 The MISO transmission cost allocation approach seeks to match the business case with the allocation method * Allocation Category Driver(s) Allocation

More information

Potential Attachment FF-6 Tariff Gap Options. Regional Expansion Criteria & Benefits Working Group (RECBWG)

Potential Attachment FF-6 Tariff Gap Options. Regional Expansion Criteria & Benefits Working Group (RECBWG) Potential Attachment FF-6 Tariff Gap Options Regional Expansion Criteria & Benefits Working Group (RECBWG) April 19, 2016 Overview Objective Review original intent of Attachment FF-6 Highlight tariff gap

More information

Attachment FF-6 and Potential Tariff Gap

Attachment FF-6 and Potential Tariff Gap Attachment FF-6 and Potential Tariff Gap Regional Expansion Criteria & Benefits Working Group Workshop (RECBWG) May 26, 2016 Revised 5/31/2016 Overview Objective Review original intent of Attachment FF-6

More information

Generation Interconnection Feasibility Study Report-Web Version. PJM Generation Interconnection Request Queue Position Z1-055

Generation Interconnection Feasibility Study Report-Web Version. PJM Generation Interconnection Request Queue Position Z1-055 Generation Interconnection Feasibility Study Report-Web Version For PJM Generation Interconnection Request Queue Position Z1-055 South Bend Generation Project March 2014 PJM Interconnection 2014. All rights

More information

CONNECTING. Energy Infrastructure. Postage Stamp Cost Allocation for MEP projects 345 kv and above

CONNECTING. Energy Infrastructure. Postage Stamp Cost Allocation for MEP projects 345 kv and above CONNECTING Energy Infrastructure Postage Stamp Cost Allocation for MEP projects 345 kv and above Dave Grover ITC Holdings Corp. September 20, 2016 1 Overview of Presentation Review of Postage Stamp Pricing

More information

Cost Allocation Issues Whitepaper. September 14, 2015

Cost Allocation Issues Whitepaper. September 14, 2015 Cost Allocation Issues Whitepaper September 14, 2015 Revised November 9, 2015 Table of Contents Executive Summary... 2 Introduction... 2 Summary of Issues... 2 Path Forward... 3 Background... 3 Importance

More information

Generation and Transmission Interconnection Process

Generation and Transmission Interconnection Process PJM Manual 14A Generation and Transmission Interconnection Process Revision: 18 Effective Date: January 28, 2016 Prepared by Planning Division Generation Interconnection Department PJM 2016 Table of Contents

More information

Generator Interconnection and Deliverability Study Methodology Technical Paper

Generator Interconnection and Deliverability Study Methodology Technical Paper Generator Interconnection and Deliverability Study Methodology Technical Paper July 2, 2013 Generator Interconnection and Deliverability Study Methodology Table of Contents Introduction... 1 Section One:

More information

Cost Allocation Developments for Network Upgrades in RTOs/ISOs

Cost Allocation Developments for Network Upgrades in RTOs/ISOs 30th ANNUAL NATIONAL CONFERENCE OF REGULATORY ATTORNEYS Cost Allocation Developments for Network Upgrades in RTOs/ISOs June 4, 2007 Rick Drom Discussion Topics: Network Upgrade Background Varying RTO Approaches:

More information

Interconnection Process Queue Reform BPM Evaluation and Discussion IPTF 1/14/16

Interconnection Process Queue Reform BPM Evaluation and Discussion IPTF 1/14/16 Interconnection Process Queue Reform BPM Evaluation and Discussion IPTF 1/14/16 Recap of the Action Items (BPM) from 2015 Develop a study calendar for the future DPP cycles Revise Business Practice manual

More information

PJM Merchant Transmission Request. Queue #R75. Mitchell Shepler Hill 138 Kv Feasibility / System Impact Study

PJM Merchant Transmission Request. Queue #R75. Mitchell Shepler Hill 138 Kv Feasibility / System Impact Study PJM Merchant Transmission Request Queue #R75 Mitchell Shepler Hill 138 Kv Feasibility / System Impact Study 413038v1a March 2007 PJM Interconnection 2007. All rights reserved. Preface The intent of the

More information

PJM Generator Interconnection X2-060 & Y1-068 East Mill 115 kv 0 MW Capacity / 50 MW Energy Combined Feasibility & System Impact Study Report

PJM Generator Interconnection X2-060 & Y1-068 East Mill 115 kv 0 MW Capacity / 50 MW Energy Combined Feasibility & System Impact Study Report PJM Generator Interconnection X2-060 & Y1-068 East Mill 115 kv 0 MW Capacity / 50 MW Energy Combined Feasibility & System Impact Study Report July 2012 DMS #708833v1 Introduction This Feasibility Study

More information

AEP Local Plans 2016 RTEP Planning Process

AEP Local Plans 2016 RTEP Planning Process AEP Local Plans 2016 RTEP Planning Process PJM Sub-Regional RTEP Committee Western Sub-Regional Meeting January 28, 2016 01/28/2016 AEP Local Plans Western Sub-Regional RTEP Committee Meeting January 2016

More information

California Independent System Operator Corporation Fifth Replacement FERC Electric Tariff

California Independent System Operator Corporation Fifth Replacement FERC Electric Tariff Table of Contents 24. Comprehensive Transmission Planning Process... 3 24.1 Overview... 3 24.1.1 [NOT USED]... 3 24.1.2 [NOT USED]... 3 24.1.3 [NOT USED]... 3 24.1.4 [NOT USED]... 3 24.2 Nature of the

More information

NTTG Study Plan for the 2014-2015 Public Policy Consideration Scenario

NTTG Study Plan for the 2014-2015 Public Policy Consideration Scenario NTTG Study Plan for the 2014-2015 Public Policy Consideration Scenario Table of Contents NTTG Study Plan for the 2014-2015 Public Policy Consideration Scenario Table of Contents... 2 1. Executive Summary...

More information

Job Descriptions. Job Title Reports To Job Description TRANSMISSION SERVICES Manager, Transmission Services. VP Compliance & Standards

Job Descriptions. Job Title Reports To Job Description TRANSMISSION SERVICES Manager, Transmission Services. VP Compliance & Standards Updated July 11, 2013 Job Descriptions Job Title Reports To Job Description TRANSMISSION SERVICES VP Compliance & Standards Develops strategy and business plans for efficient, safe, reliable, regulatorycompliant

More information

2016 Short-Term Incentive Plan. 1 of 14

2016 Short-Term Incentive Plan. 1 of 14 2016 Short-Term Incentive Plan 1 of 14 2016 Annual Incentive Goals & Metrics Summary: The table below provides an overall summary of incentive plan metrics and weights. Detailed information including performance

More information

New Brunswick Electricity Business Rules

New Brunswick Electricity Business Rules New Brunswick Electricity Business Rules Table of Contents Chapter 1 Chapter 2 Chapter 3 Chapter 4 Administration and Participation Transmission Planning and Connections Reliable Operations Billing and

More information

AAPG 2011 Annual Convention & Exhibition April 10, 2011

AAPG 2011 Annual Convention & Exhibition April 10, 2011 Generator Transmission Grid Interconnection Guidelines AAPG 2011 Annual Convention & Exhibition April 10, 2011 Hala Ballouz, B.Sc., M.Sc. TAMU, P.E. President, Electric Power Engineers, Inc. Partner &

More information

Southwest Power Pool METRIC TASK FORCE MEETING March 19, 2012 Web Conference MINUTES

Southwest Power Pool METRIC TASK FORCE MEETING March 19, 2012 Web Conference MINUTES Southwest Power Pool METRIC TASK FORCE MEETING March 19, 2012 Web Conference MINUTES Agenda Item 1 Administrative Items Chair Kip Fox (AEP) called the meeting to order at 11:07 a.m. The following members

More information

Comments of Louisiana Energy Users Group and Texas Industrial Energy Consumers. MISO South Market Congestion Planning Study. September 18, 2015

Comments of Louisiana Energy Users Group and Texas Industrial Energy Consumers. MISO South Market Congestion Planning Study. September 18, 2015 Comments of Louisiana Energy Users Group and Texas Industrial Energy Consumers On MISO South Market Congestion Planning Study September 18, 2015 In response to the MISO Staff s September 11, 2015 request

More information

PJM LMP Market Overview

PJM LMP Market Overview PJM LMP Market Overview Andrew Ott Senior Vice President, Markets June 10, 2010 PJM as Part of the Eastern Interconnection 6,038 substations KEY STATISTICS PJM member companies 600+ millions of people

More information

2. How does this assessment relate to MISO s resource adequacy construct?

2. How does this assessment relate to MISO s resource adequacy construct? DRAFT Applied Energy Group DR, EE, DG Assessment FAQs 1. What is the Applied Energy Group Assessment of Demand Response, Energy Efficiency and Distributed Generation for Midcontinent ISO, and how will

More information

Energy Storage as a Transmission Asset

Energy Storage as a Transmission Asset Energy Storage as a Transmission Asset PJM Interconnection Muhsin Abdurrahman Scott Baker Bhavana Keshavamurthy Xtreme Power Mike Jacobs (Formerly) Director, Market Policy and Regulatory Affairs PJM 2012

More information

TDI's NYC Merchant CHPE Transmission Project with POI at Astoria (NYISO Queue #305) Deliverability Analysis

TDI's NYC Merchant CHPE Transmission Project with POI at Astoria (NYISO Queue #305) Deliverability Analysis R103-11 TDI's NYC Merchant CHPE Transmission Project with POI at Astoria (NYISO Queue #305) Deliverability Analysis Prepared for Transmission Developers, Inc. Submitted by: Larry Eng, Staff Consultant

More information

Updated November 20, 2015. Director, System Planning

Updated November 20, 2015. Director, System Planning Updated November 20, 2015 Job Descriptions Job Title Reports To Job Description SYSTEM PLANNING & SERVICES VP Compliance Manages the system planning and services staff. The director is responsible for

More information

Firm Flow Entitlement on M2M Flowgates Readers' Guide. Last Updated: February 01, 2016 Version: 4.0

Firm Flow Entitlement on M2M Flowgates Readers' Guide. Last Updated: February 01, 2016 Version: 4.0 Firm Flow Entitlement on M2M Flowgates Readers' Guide Last Updated: February 01, 2016 Version: 4.0 1 Table of Contents 1 DISCLAIMER...3 2 INTRODUCTION...3 3 GLOSSARY OF TERMS...3 4 FFE FILE...3 4.1 DESCRIPTION...

More information

Deliverability Testing

Deliverability Testing Deliverability Testing Henry Chao Vice President System & Resource Planning New York Independent System Operator New York State Reliability Council Executive Committee Meeting September 12, 2008 Definition

More information

DUKE ENERGY INDIANA. Preparation for Summer 2007. Presentation to Indiana Utility Regulatory Commission

DUKE ENERGY INDIANA. Preparation for Summer 2007. Presentation to Indiana Utility Regulatory Commission DUKE ENERGY INDIANA Preparation for Summer 2007 Presentation to Indiana Utility Regulatory Commission May 30, 2007 Overview of Presentation 2006 Duke Energy Indiana accomplishments/challenges Summer 2007

More information

Transmission Issue Submissions Summary

Transmission Issue Submissions Summary Transmission Issue Submissions Summary Respondents Associated Electric Cooperative, Inc. (AECI) American Electric Power (AEP)/Transource Energy Southwestern Power Administration (SWPA) Public Service Commission

More information

Electricity from the Power Plant To the Consumer

Electricity from the Power Plant To the Consumer Electric Transmission Lines Electricity from the Power Plant To the Consumer The Nature of Electricity Electricity must be used as it is generated. Unlike other commodities, there is very little ability

More information

MAPP Generation Reserve Sharing Pool. Bill Head MAPPCOR Chief Operating Officer

MAPP Generation Reserve Sharing Pool. Bill Head MAPPCOR Chief Operating Officer MAPP Generation Reserve Sharing Pool Bill Head MAPPCOR Chief Operating Officer Each component is part of the MAPP Restated Agreement (1996) What happened to MAPP? MAPP s Evolution Reliability (1972) Generation

More information

FRCC Coordination Procedure. Title: FRCC Reliability Coordinator Contingency Analysis Monitoring Criteria

FRCC Coordination Procedure. Title: FRCC Reliability Coordinator Contingency Analysis Monitoring Criteria A. Purpose: The FRCC Reliability Coordinator (RC) Contingency Analysis (CA) application is essential to maintaining the reliability of the FRCC Bulk Electric System. The application has the capability

More information

5/27/2015. Overview of Energy Storage Value Propositions and Business Cases. Utility Cost-Function: Foundation of Energy Storage Economics.

5/27/2015. Overview of Energy Storage Value Propositions and Business Cases. Utility Cost-Function: Foundation of Energy Storage Economics. Overview of Energy Storage Value Propositions and Business Cases Ben Kaun Senior Project Manager ESA Energy Storage 101 Workshop Agenda Utility Cost-Function: Foundation of Energy Storage Economics Utility

More information

Transmission Basics. Facilities, Interconnection and Permitting Laurie A. Woodall Esq Office Mobile

Transmission Basics. Facilities, Interconnection and Permitting Laurie A. Woodall Esq Office Mobile Transmission Basics Facilities, Interconnection and Permitting Laurie A. Woodall Esq. Laurie.Woodall@URS.com 602 648 2385 Office 480 291 3522 Mobile 1 Overview Basics regarding electrical system Basics

More information

Central Region Projects. Central SPM 12/05/2011 Carmel, IN

Central Region Projects. Central SPM 12/05/2011 Carmel, IN Central Region Projects Central SPM 12/05/2011 Carmel, IN HOOSIER ENERGY (HE) Proposed Project Review Hoosier Energy (HE) HE has a total of 0 projects in the project database No project proposals recommended

More information

Generation Interconnection System Impact Study Report. For. PJM Generation Interconnection Request Queue Position X1-114.

Generation Interconnection System Impact Study Report. For. PJM Generation Interconnection Request Queue Position X1-114. Generation Interconnection System Impact Study Report For PJM Generation Interconnection Request Queue Position X1-114 Sandyston January 2012 Preface The intent of the System Impact Study is to determine

More information

IESO Supply Deliverability Guidelines

IESO Supply Deliverability Guidelines PUBLIC IMO_GDL_0021 IESO Supply Deliverability Guidelines Issue 3.0 This document is to be used to evaluate long-term system adequacy and connection assessments Public Disclaimer The posting of documents

More information

16 West Coast Regional Plan

16 West Coast Regional Plan 16 West Coast Regional Plan 16.1 Regional overview 16.2 West Coast transmission system 16.3 West Coast demand 16.4 West Coast generation 16.5 West Coast significant maintenance work 16.6 Future West Coast

More information

Dorrien and Nuriootpa 33/11kV Substations N-1 Capacity Constraint

Dorrien and Nuriootpa 33/11kV Substations N-1 Capacity Constraint SA Power Networks www.sapowernetworks.com.au Reasonableness Test RT 005/13 Dorrien and Nuriootpa 33/11kV Substations N-1 Capacity Constraint RT 005-13 Dorrien and Nuriootpa Page 1 of 11 DISCLAIMER The

More information

NV Energy ISO Energy Imbalance Market Economic Assessment

NV Energy ISO Energy Imbalance Market Economic Assessment March 25, 2014 NV Energy ISO Energy Imbalance Market Economic Assessment NV Energy ISO Energy Imbalance Market Economic Assessment 2014 Copyright. All Rights Reserved. Energy and Environmental Economics,

More information

Last revised: September 1, 2014 TRANSMISSION FUNCTION TITLES AND JOB DESCRIPTIONS

Last revised: September 1, 2014 TRANSMISSION FUNCTION TITLES AND JOB DESCRIPTIONS Last revised: September 1, 2014 TRANSMISSION FUNCTION TITLES AND JOB DESCRIPTIONS EVP, Chief Operations Officer, has primary responsibility for the overall planning, operations and control of the transmission

More information

2013 Ventyx, an ABB company

2013 Ventyx, an ABB company Co-optimization of Congestion Revenue Rights in ERCOT Day-Ahead Market Chien-Ning Yu, Vladimir Brandwajn, Show Chang ABB/Ventyx Sainath M. Moorty ERCOT FERC Conference on increasing real-time and day-ahead

More information

Southern California Edison s 2012 Request Window Proposals

Southern California Edison s 2012 Request Window Proposals Southern California Edison s 2012 Request Window Proposals Arevik Petrosyan Power Systems Planner 2012/2013 ISO Transmission Plan September 27, 2012 Folsom, CA 2012 SCE Area Reliability Projects 1. - 230

More information

Eastside Needs Assessment Report Transmission System King County Executive Summary December 2013

Eastside Needs Assessment Report Transmission System King County Executive Summary December 2013 Eastside Needs Assessment Report Transmission System King County Executive Summary December 2013 PO BOX 97034, EST06W Bellevue, WA 98004 1-800-548-2614 RESPONSIBILITY TO ACT, ACTING RESPONSIBLY Major growth

More information

NIA Project Registration and PEA Document

NIA Project Registration and PEA Document Date of Submission October 2015 NIA Project Registration and PEA Document Notes on Completion: Please refer to the appropriate NIA Governance Document to assist in the completion of this form. The full

More information

Transmission Access Charge Options for Integrating New Participating Transmission Owners

Transmission Access Charge Options for Integrating New Participating Transmission Owners Transmission Access Charge Options for Integrating New Participating Transmission Owners Issue Paper October 23, 2015 Market & Infrastructure Policy Table of Contents 1. Introduction and Scope of Effort...

More information

COMPLIANCE REVIEW OF 2006/07 ASSET MANAGEMENT PLAN. Top Energy Limited

COMPLIANCE REVIEW OF 2006/07 ASSET MANAGEMENT PLAN. Top Energy Limited PB ASSOCIATES COMPLIANCE REVIEW OF 2006/07 ASSET MANAGEMENT PLAN Prepared for PB Associates Quality System: Document Identifier : 153162 Top Energy Final Report Revision : 2 Report Status : Final Date

More information

Section 4: Integrating Public Policy Drivers

Section 4: Integrating Public Policy Drivers Public Policy Drivers Section : Integrating Public Policy Drivers PJM DE DC IL IN KY MD MI NJ NC OH PA TN VA WV Section.0: The Role of Public Policy in the RTEP Process Figure.1: Public Policy Drivers

More information

PJM Generator Interconnection Request Queue #V3-009 Desoto-Tanners Creek 345 kv Facilities Study

PJM Generator Interconnection Request Queue #V3-009 Desoto-Tanners Creek 345 kv Facilities Study PJM Generator Interconnection Request Queue #V3-009 Desoto-Tanners Creek 345 kv Facilities Study March 2016 V3-009 Desoto Tanners Creek 345 kv Facilities Study Report A. Facilities Study Summary 1. Project

More information

2005 All-Source Solicitation Preliminary Portfolio Summary Portfolio P6 2,385 MW of Generation for November 2005

2005 All-Source Solicitation Preliminary Portfolio Summary Portfolio P6 2,385 MW of Generation for November 2005 2005 All-Source Solicitation Preliminary Portfolio Summary Portfolio P6 2,385 MW of Generation for 2007-2013 November 2005 I. Summary This Study Report summarizes the feasibility analyses to accommodate

More information

ATTACHMENTS ATTACHMENT X GENERATOR INTERCONNECTION PROCEDURES (GIP)

ATTACHMENTS ATTACHMENT X GENERATOR INTERCONNECTION PROCEDURES (GIP) GENERATOR INTERCONNECTION PROCEDURES (GIP) SECTION 1. DEFINITIONS. 10 kw Inverter Process shall mean the procedure for evaluating an Interconnection Request for a certified inverter-based Small Generating

More information

INDEPENDENT SYSTEM OPERATORS (VI + Access Rules vs. ISO vs. ITSO)

INDEPENDENT SYSTEM OPERATORS (VI + Access Rules vs. ISO vs. ITSO) INDEPENDENT SYSTEM OPERATORS (VI + Access Rules vs. ISO vs. ITSO) Paul L. Joskow September 28, 2007 ALTERNATIVE SYSTEM OPERATOR MODELS System operator (SO) is vertically integrated utility (G+T) Functional

More information

Renewable Energy Transmission Planning Process (RETPP) Second Draft Final Proposal

Renewable Energy Transmission Planning Process (RETPP) Second Draft Final Proposal Renewable Energy Transmission Planning Process (RETPP) Second Draft Final Proposal April 2, 2010 Second Draft Final Proposal Introduction The central objective of the ISO s proposed renewable energy transmission

More information

FRCC Standards Handbook. FRCC Automatic Underfrequency Load Shedding Program. Revision Date: July 2003

FRCC Standards Handbook. FRCC Automatic Underfrequency Load Shedding Program. Revision Date: July 2003 F R C C FRCC Standards Handbook FRCC Automatic Underfrequency Load Shedding Program Revision Date: July 2003 FRCC Underfrequency Load Shedding Program Modification and Approval Process Requests to modify

More information

COLORADO SPRINGS UTILITIES ATTACHMENT K TO OPEN ACCESS TRANSMISSION TARIFF

COLORADO SPRINGS UTILITIES ATTACHMENT K TO OPEN ACCESS TRANSMISSION TARIFF COLORADO SPRINGS UTILITIES ATTACHMENT K TO OPEN ACCESS TRANSMISSION TARIFF I. INTRODUCTION The City of Colorado Springs, Colorado ( City ) is a Colorado home-rule municipal corporation with a population

More information

Asset Management Business Update

Asset Management Business Update Asset Management Business Update Improvements through Asset Management Mark Davis, Director, Asset Management & AW October 29, 2008 1 From Maintenance to Asset Management Maintain the System -Initial Focus

More information

NETWORK OUTPUT MEASURES METHODOLOGY Authors: National Grid, SP Transmission Limited, Scottish Hydro Electric Transmission Limited

NETWORK OUTPUT MEASURES METHODOLOGY Authors: National Grid, SP Transmission Limited, Scottish Hydro Electric Transmission Limited NETWORK OUTPUT MEASURES METHODOLOGY Authors: National Grid, SP Transmission Limited, Scottish Hydro Electric Transmission Limited TABLE OF CONTENTS 1.0 Purpose and Scope...2 1.1 Methodology Purpose...2

More information

Behind the Meter Generation Common Issues Meeting. September 27, 2016

Behind the Meter Generation Common Issues Meeting. September 27, 2016 Behind the Meter Generation Common Issues Meeting September 27, 2016 Purpose Purpose and Key Takeaways Educate stakeholders on behind the meter generation treatment in MISO processes Key Takeaways Processes

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. The New PJM Companies, et al. ) Docket Nos. ER , et al.

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. The New PJM Companies, et al. ) Docket Nos. ER , et al. UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION The New PJM Companies, et al. ) Docket Nos. ER03-262-001, et al. ) PJM MARKET MONITOR S ASSESSMENT OF AEP PROPOSAL FOR LIMITED INTEGRATION

More information

John Flynn Managing Director Transmission Strategy & Business Development American Electric Power DistribuTECH January 22, 2008

John Flynn Managing Director Transmission Strategy & Business Development American Electric Power DistribuTECH January 22, 2008 Transmission Vision for Wind Integration and Expansion John Flynn Managing Director Transmission Strategy & Business Development American Electric Power DistribuTECH January 22, 2008 1 Renewable Energy

More information

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Reliability Technical Conference Docket No. AD16-15-000 Prepared Statement of Mark Rothleder on behalf of the California Independent System

More information

Theme: Wind Energy Production ID Letter: EE

Theme: Wind Energy Production ID Letter: EE Theme: Wind Energy Production ID Letter: EE Questions: 1. Can electrical transmission lines be buried underground from the wind turbine to the substation? See response below. 2. Can the electrical transmission

More information

Intentionally left blank

Intentionally left blank Intentionally left blank Table of Contents Executive Summary... 7 Introduction... 7 The Transmission Planning Process... 9 Collaborative Planning Efforts... 10 Reliability Assessment... 12 33 Percent RPS

More information

4.1.1 Generator Owner 4.1.2 Transmission Owner that owns synchronous condenser(s)

4.1.1 Generator Owner 4.1.2 Transmission Owner that owns synchronous condenser(s) A. Introduction 1. Title: Verification and Data Reporting of Generator Real and Reactive Power Capability and Synchronous Condenser Reactive Power Capability 2. Number: MOD-025-2 3. Purpose: To ensure

More information

Operations Reliability Coordination Agreement

Operations Reliability Coordination Agreement Operations Reliability Coordination Agreement This Agreement regarding Operations Reliability Coordination ( Agreement ) is made and entered into as of the 19th day of June, 2013, by and between Midcontinent

More information

Appendix C-2. Entergy Services, Inc. June 8, 2016

Appendix C-2. Entergy Services, Inc. June 8, 2016 Appendix C-2 Preliminary Due Diligence List (Existing Resources) For 2016 Request For Proposals For Long-Term Renewable Generation Resources For Entergy Louisiana, LLC Entergy Services, Inc. June 8, 2016

More information

MODULE A Day-Ahead Revenue Sufficiency Guarantee Charge: Day-Ahead Revenue Sufficiency Guarantee Credit:

MODULE A Day-Ahead Revenue Sufficiency Guarantee Charge: Day-Ahead Revenue Sufficiency Guarantee Credit: MODULE A 1.121 Day-Ahead Revenue Sufficiency Guarantee Charge: The sum of the Day-Ahead Revenue Sufficiency Guarantee Credits in an Hour in the Day, excluding Day-Ahead Revenue Sufficiency Guarantee Credits

More information

NERC Cyber Security Standards

NERC Cyber Security Standards SANS January, 2008 Stan Johnson Manager of Situation Awareness and Infrastructure Security Stan.johnson@NERC.net 609-452-8060 Agenda History and Status of Applicable Entities Definitions High Level of

More information

Chapter 7 Project Cost Management (1) Dr. Feng-Jen Yang

Chapter 7 Project Cost Management (1) Dr. Feng-Jen Yang Chapter 7 Project Cost Management (1) Dr. Feng-Jen Yang Objectives Understand the importance of project cost management Explain basic project cost management principles, concepts, and terms Discuss different

More information

Generator Contingency & RAS Modeling Issue Paper

Generator Contingency & RAS Modeling Issue Paper April 19, 2016 Table of Contents 1. Introduction... 4 2. Stakeholder Engagement... 4 3. Background & Issues... 5 Discussion... 5 3.1.1. N-1 security including loss of generation... 5 3.1.2. Current contingency

More information

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION. TECHNICAL CONFERENCE September 15, 2003

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION. TECHNICAL CONFERENCE September 15, 2003 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Remedying Undue Discrimination Through Open Access Transmission Service And Standard Electricity Market Design GridFlorida, LLC Docket No.

More information

Enabling Renewables with Energy Storage

Enabling Renewables with Energy Storage Enabling Renewables with Energy Storage EPRI Renewable Energy Council Mark Stoering VP, Portfolio Strategy & Business Development April 5, 2011 Energy Storage at Xcel Energy Storage is a means to provide

More information

Main variations of business models for Flexible Industrial Demand combined with Variable Renewable Energy

Main variations of business models for Flexible Industrial Demand combined with Variable Renewable Energy Innovative Business Models for Market Uptake of Renewable Electricity unlocking the potential for flexibility in the Industrial Electricity Use Main variations of business models for Flexible Industrial

More information

Tehachapi Wind Energy Storage Project (TSP)

Tehachapi Wind Energy Storage Project (TSP) Tehachapi Wind Energy Storage Project (TSP) Peer Review Presented by Mr. Loïc Gaillac October 20, 2011 San Diego, CA 1 Outline Policy Challenges SCE s Position SCE Smart Grid Vision Project Description

More information

2015 Project Schedule Milestone Update

2015 Project Schedule Milestone Update 2015 Schedule Milestone Update Robb Pike Director, & Product Management New York Independent System Operator Ryan Smith Senior Manager, Enterprise Product & Management New York Independent System Operator

More information

TERMS AND CONDITIONS

TERMS AND CONDITIONS Virginia Electric and Power Company TERMS AND CONDITIONS XXIV. GENERATOR INTERCONNECTION STANDARD Electric generator interconnection service includes only the ability to interconnect an electric generator

More information

GRADUATE RELIABILITY TRAINING PROGRAM. Initiation Date: September 2012

GRADUATE RELIABILITY TRAINING PROGRAM. Initiation Date: September 2012 GRADUATE RELIABILITY TRAINING PROGRAM Initiation Date: September 2012 Board Approved Date: May 2012 GRADUATE RELIABILITY TRAINING PROGRAM Program Description This program is intended for recent college

More information

System Operator Sample Transmission Certification Examination

System Operator Sample Transmission Certification Examination System Operator Sample Transmission Certification Examination 1. What is the minimum notice PJM requires for a nonemergency transmission outage work request? A. 48 hours B. 3 working days C. 5 working

More information

Gas transport tariffs calculation

Gas transport tariffs calculation Ad Hoc Expert Facility under the INOGATE project Support to Energy Market Integration and Sustainable Energy in the NIS (SEMISE) Gas transport tariffs calculation 1 TABLE OF CONTENTS 1. INTRODUCTION...

More information

5.9: Ohio RTEP Overview

5.9: Ohio RTEP Overview State RTEP Overviews Section PJM DE DC IL IN KY MD MI NJ NC OH PA TN VA WV.9: Ohio RTEP Overview MAP.3: PJM Service Area in Ohio PJM operates the electric transmission system shown on MAP.3 for American

More information

Tucson Electric Power and UNS Electric

Tucson Electric Power and UNS Electric Tucson Electric Power and UNS Electric 2016 Summer Preparedness Sam Rugel Director, System Control & Reliability April 28, 2016 Utility Service Areas 2 Service Statistics TEP UNSE Service Area (Sq Miles)

More information

1 Scope. 2 References and Resource Documents

1 Scope. 2 References and Resource Documents Engineering Handbook Volume 1 General 1 Scope The design of PacifiCorp s electrical system is intended to meet the reliability performance requirements of all North American Electric Reliability Corporation

More information

MINNESOTA POWER. Company Background: CapX2020 Transmission Plan

MINNESOTA POWER. Company Background: CapX2020 Transmission Plan TRANSMISSION PROJECTS: AT A GLANCE MINNESOTA POWER MINNESOTA POWER Company Background: Minnesota Power, a division of ALLETE, provides electricity in a 26,000 square mile electric service area located

More information

Southwest Power Pool (SPP)

Southwest Power Pool (SPP) Southwest Power Pool (SPP) 2010 ISO/RTO Metrics Report 315 Section 7 SPP Performance Metrics and Other Information Southwest Power Pool, Inc. (SPP) is a regional transmission organization (RTO) that coordinates

More information

Transmission Planning in the ERCOT Interconnection

Transmission Planning in the ERCOT Interconnection Transmission Planning in the ERCOT Interconnection Warren Lasher Manager, Long-Term Planning and Policy Department of Energy Electricity Advisory Committee The ERCOT Interconnection The ERCOT Region is

More information

2016 Request For Proposals For Long-Term Renewable Generation Resources For Entergy Arkansas, Inc.

2016 Request For Proposals For Long-Term Renewable Generation Resources For Entergy Arkansas, Inc. 2016 Request For Proposals For Long-Term Renewable Generation Resources For Entergy Arkansas, Inc. Entergy Arkansas, Inc. May 26, 2016 TABLE OF CONTENTS 1. GENERAL INFORMATION... 1 1.1. Introduction...

More information

Treasure Valley Electric Plan - Community Advisory Committee

Treasure Valley Electric Plan - Community Advisory Committee Treasure Valley Electric Plan - Community Advisory Committee What is a transmission line and why are they necessary? A transmission line is used to conduct electricity between two points. Without high

More information

CANADA S GREEN ENERGY JOBS START HERE

CANADA S GREEN ENERGY JOBS START HERE CANADA S GREEN ENERGY JOBS START HERE Alternative Energy Vision for Vancouver Island North Regional District of Mount Waddington Port McNeill, B.C. Canada www.rdmw.bc.ca Background The Regional District

More information

Integration Capacity Analysis Workshop 11/10/15 California IOU s Approach

Integration Capacity Analysis Workshop 11/10/15 California IOU s Approach Integration Capacity Analysis Workshop 11/10/15 California IOU s Approach READ AND DELETE For best results with this template, use PowerPoint 2003 10 November 2015 Background and Importance of ICA Definition:

More information

Transmission Planning Study (Year 2022) for Cherokee 4 Replacement Alternatives. Final Report

Transmission Planning Study (Year 2022) for Cherokee 4 Replacement Alternatives. Final Report Transmission Planning Study (Year 2022) for Cherokee 4 Replacement Alternatives (Required per CPUC Decision No. C10-1328) Final Report (Submitted with Public Service s 2011 ERP) Executive Summary The objective

More information

Operational Security Network Code

Operational Security Network Code Amstelveenseweg 998 1081 JS Amsterdam Phone: + 31 20 520 7970 Fax: + 31 346 283 258 Email: secretariat@efet.org Website: www.efet.org Operational Security Network Code Public consultation 3 November 2012

More information

Marginal Cost of Service

Marginal Cost of Service UE 294 / PGE / 1300 Macfarlane Werner BEFORE THE PUBLIC UTILITY COMMISSION OF THE STATE OF OREGON UE 294 Marginal Cost of Service PORTLAND GENERAL ELECTRIC COMPANY Direct Testimony and Exhibits of Robert

More information

Clean Energy and Pollution Reduction Act Senate Bill 350 Study: Summary of Preliminary Results. May 23, 2016

Clean Energy and Pollution Reduction Act Senate Bill 350 Study: Summary of Preliminary Results. May 23, 2016 Clean Energy and Pollution Reduction Act Senate Bill 350 Study: Summary of Preliminary Results May 23, 2016 Scope of the SB 350 Study Legislative Requirement: 359.5. (a) It is the intent of the Legislature

More information

Load Growth in West Texas Infrastructure and Reliability

Load Growth in West Texas Infrastructure and Reliability Load Growth in West Texas Infrastructure and Reliability September 12, 2013 UTA TSDOS Dallas, TX Kenneth A. Donohoo Director, System Planning Distribution and Transmission Oncor Electric Delivery Co LLC

More information

Modeling the Financial and System Benefits of Energy Storage Applications in Distribution Systems

Modeling the Financial and System Benefits of Energy Storage Applications in Distribution Systems Modeling the Financial and System Benefits of Energy Storage Applications in Distribution Systems Patrick Balducci, Senior Economist, Pacific NW National Laboratory Hydrogen Energy Storage for Grid and

More information

JOHN H. STOUT PRESIDENT, MARINER CONSULTING SERVICES, INC. 1303 LAKEWAY DRIVE TAYLOR LAKE VILLAGE, TEXAS 77586 713-252-0535

JOHN H. STOUT PRESIDENT, MARINER CONSULTING SERVICES, INC. 1303 LAKEWAY DRIVE TAYLOR LAKE VILLAGE, TEXAS 77586 713-252-0535 JOHN H. STOUT PRESIDENT, MARINER CONSULTING SERVICES, INC. 1303 LAKEWAY DRIVE TAYLOR LAKE VILLAGE, TEXAS 77586 713-252-0535 JSTOUT@MARINERCONSULT.COM WWW.MARINERCONSULT.COM OVER 36 YEARS OF EXPERIENCE

More information

Construction, Management and Engineering Practices that Lead to Low Losses

Construction, Management and Engineering Practices that Lead to Low Losses Indiana Utility Regulatory Commission Construction, Management and Engineering Practices that Lead to Low Losses George Stevens Utility Analyst September 17, 2007 Note This presentation is based on the

More information

E N G I N E E R I N G

E N G I N E E R I N G Purpose If the customer s proposed project proceeds to Gate 1 of the Integrated Customer Solutions (ICS) process (see the ICS Process and Proposal Submission Guide), the customer must prepare a Load Displacement

More information

Item 8: Houston Import RPG Project

Item 8: Houston Import RPG Project : Houston Import RPG Project Jeff Billo Manager, Transmission Planning Board of Directors Meeting April 8, 2014 Study Overview ERCOT has determined that there will be a need for additional import capacity