1 Baseline Reliability Project Exercises 1. The date is August During your annual reliability analysis, you find low voltage at the 138kV substation SUB1 when the 230kV line from SUB2 to SUB3 is removed from service in the summer of You plan for capacitor bank at SUB1 to meet the voltage guidelines of your Planning Criteria. Does this qualify as a BRP? A. Yes B. No 2. The date is June 2015 and a customer approaches your company with a request for service January 1, The load size is 100MW, and you identify Bulk Electric System upgrades required to meet the needs of customer and maintain system reliability. The project construction lead time for this project is 1.5 years. Does this project meet the requirements for an Out-of-Cycle review? A. Yes B. No April 21,
2 Generation Interconnection Project Exercises 1. MISO posts a contour map to gives people a rough idea about where transmission capacity is potentially available on the MISO network. It is updated periodically based on summer off-peak system condition. By looking at this map, please identify where the transmission capacity may be most available. A. A B. B C. C D. D 2. If you want to build a new generator and connect it to transmission system under MISO functional control, what all do you need to submit to MISO? A. A signed, hard copy of Appendix 1: Application for Generator Interconnection and Attachments B. All M1 technical milestones C. A non-refundable application/feasibility study fee of $5,000 made out to MISO. D. A deposit to fund a D2 system impact study. E. Demonstration of site control OR an additional $100,000 deposit made out to MISO F. All of the Above 3. If you want to be up-to-date about queue process and study results, which stakeholder forum would you need to attend? Select all that apply. A. Market Congestion Planning Study Meeting B. Loss of Load Expectation Working Group C. Interconnection Process Task Force D. Individual Study Ad hoc group meeting E. Queue workshops F. Planning Advisory Committee April 21,
3 4. If you are part of the Generation Interconnection DPP study ad hoc group, what types of input would MISO need from you? Select all that apply. A. Model review B. Identify valid constraints C. Provide input on estimated cost and schedule D. Set study criteria 5. In one of the stakeholder meetings, MISO shared preliminary overloads identified in a DPP study: Overloaded Rating Contingency Distribution Factor A 100 N-1 Outage 10% 5 B 100 System Intact 10% 10 C 300 N-1 Outage 30% 25 D 300 System Intact 3% 60 Which one(s) are Injection constraints that will require Network Upgrades? MW Impact 6. In the subsequent stakeholder meetings, MISO shared additional overloads identified in the deliverability analysis (summer peak condition) in the study: Overloaded Rating Contingency Distribution Factor A 200 N-1 Outage 10% 10 B 200 System Intact 10% 5 C 300 N-1 Outage 30% 15 D 300 System Intact 3% 50 Which one(s) are deliverability constraints? MW Impact April 21,
4 7. In the subsequent stakeholder meetings, MISO shared additional overloads identified in the deliverability analysis (summer peak condition) in the study: Overloaded Rating Contingency Distribution Factor A 200 N-1 Outage 10% 10 B 200 System Intact 10% 5 C 300 N-1 Outage 30% 15 D 300 System Intact 3% 50 Which one(s) are deliverability constraints? MW Impact 8. In the final DPP System Impact Study report, the following Network Upgrades were listed as required by the generator. Which one of these will be primarily paid by the generators, and which ones are postage stamped to the load: A. An upgrade on an existing 230 kv facility B. Replacement of a 230/138 kv transformer C. A 345 kv new section of a transmission line D. A new wavetrap on a 161 kv line April 21,
5 Market Efficiency Project Exercise MISO identifies the following short and long-term opportunities. Draw lines that you think may be good opportunities. Congested Element Export Limited Import Limited April 21,
6 Here are some examples that we drew Which one do you think will provide the most benefits? Congested Element Export Limited Import Limited A. Line A B. Line B C. Line C D. Line D April 21,
7 At the next Economic Planning Users Group (EPUG) meeting MISO comes back with the following results: Project Voltage Cost (NPV) BAU - Production Cost Benefits (NPV) Benefit to Cost Ratio Notes A 230 $100 $ Completely Mitigated Congestion on Flowgate R B 230 $300 $ Minimal change in congestion patters C 500 $400 $ Completed Mitigated Congestion on Flowgate A, B, N, L, and W D 230 $150 $ Completed mitigated congestion on Flowgate A, N, and L Increased congestion on Flowgate B *Note: Costs put into 20 year Net Present Value (NPV) considers time value of money and annual revenue requirements What s the next iteration looking at these results? April 21,
8 Let s iterate: MISO goes back to the workshop and at the next meeting comes back with. Project Voltage Cost BAU - Production Benefit to Notes (NPV) Cost Benefits (NPV) Cost Ratio A 230 $100 $ Completely Mitigated Congestion of Flowgate R A2 230 $60 $ Partially Mitigated Congestion of Flowgate R C 500 $400 $ Completed Mitigated Congestion on Flowgate A, B, N, L, and W C2 500 $225 $ Partially mitigated congestion on W and A, completely mitigated B, N, and L D 230 $150 $ Completed mitigated congestion on Flowgate A, N, and L Increased congestion on Flowgate B D2 230 $175 $ Completely mitigated congestion on A, N, L, B Which is the most cost effective option? - Is it an MEP? o Voltage? Cost? B/C? April 21,
9 Option C2 looks good, but we need to make sure it doesn t harm the reliability of the system No Harm Reliability Testing Testing comes back and says we need to add $10 M worth of additional upgrades to this project in order to meet reliability criteria. Recalculate B/C Project Voltage Cost B/C (Nominal) C C D D Is the C2 project still the best option? Does it meet MEP criteria? April 21,
10 Multi-Value Project Exercises 1. A proposed transmission project starts off as a Multi-Value Project? A. True B. False 2. Select the criteria below that a Multi-Value Project must satisfy: A. Shown to enable the transmission system to deliver such energy in a manner that is more reliable and/or more economic than it otherwise would be without the transmission upgrade in order to reliably meet documented energy policy state or federal legislation or regulatory requirement B. Provides multiple types economic value across multiple pricing zones with a Total MVP benefit to cost ratio 1.0 or higher. C. Addresses projected violation of NERC or Regional Entity standard and must provide economic value across multiple pricing zones with Total MVP benefit to cost ratio 1.0 or higher. D. One or more above E. All of the above 3. Which criteria below is not a Multi-Value Projects cost allocation criteria: A. Must be evaluated as part of a portfolio of projects, whose benefits are spread broadly across the footprint B. The total capital cost for the transmission project must be greater than or equal to $20.0 million C. A Network Upgrades driven solely by an Interconnection Request in the MISO Generation Interconnection Procedures or Transmission Service Request D. None of the above April 21,
Generation Interconnection Feasibility Study Report-Web Version. PJM Generation Interconnection Request Queue Position Z1-055
Generation Interconnection Feasibility Study Report-Web Version For PJM Generation Interconnection Request Queue Position Z1-055 South Bend Generation Project March 2014 PJM Interconnection 2014. All rights
More informationGenerator Interconnection and Deliverability Study Methodology Technical Paper
Generator Interconnection and Deliverability Study Methodology Technical Paper July 2, 2013 Generator Interconnection and Deliverability Study Methodology Table of Contents Introduction... 1 Section One:
More informationGeneration and Transmission Interconnection Process
PJM Manual 14A Generation and Transmission Interconnection Process Revision: 18 Effective Date: January 28, 2016 Prepared by Planning Division Generation Interconnection Department PJM 2016 Table of Contents
More informationPJM Merchant Transmission Request. Queue #R75. Mitchell Shepler Hill 138 Kv Feasibility / System Impact Study
PJM Merchant Transmission Request Queue #R75 Mitchell Shepler Hill 138 Kv Feasibility / System Impact Study 413038v1a March 2007 PJM Interconnection 2007. All rights reserved. Preface The intent of the
More informationNTTG Study Plan for the 2014-2015 Public Policy Consideration Scenario
NTTG Study Plan for the 2014-2015 Public Policy Consideration Scenario Table of Contents NTTG Study Plan for the 2014-2015 Public Policy Consideration Scenario Table of Contents... 2 1. Executive Summary...
More informationTDI's NYC Merchant CHPE Transmission Project with POI at Astoria (NYISO Queue #305) Deliverability Analysis
R103-11 TDI's NYC Merchant CHPE Transmission Project with POI at Astoria (NYISO Queue #305) Deliverability Analysis Prepared for Transmission Developers, Inc. Submitted by: Larry Eng, Staff Consultant
More informationJob Descriptions. Job Title Reports To Job Description TRANSMISSION SERVICES Manager, Transmission Services. VP Compliance & Standards
Updated July 11, 2013 Job Descriptions Job Title Reports To Job Description TRANSMISSION SERVICES VP Compliance & Standards Develops strategy and business plans for efficient, safe, reliable, regulatorycompliant
More informationUpdated November 20, 2015. Director, System Planning
Updated November 20, 2015 Job Descriptions Job Title Reports To Job Description SYSTEM PLANNING & SERVICES VP Compliance Manages the system planning and services staff. The director is responsible for
More informationDeliverability Testing
Deliverability Testing Henry Chao Vice President System & Resource Planning New York Independent System Operator New York State Reliability Council Executive Committee Meeting September 12, 2008 Definition
More informationAAPG 2011 Annual Convention & Exhibition April 10, 2011
Generator Transmission Grid Interconnection Guidelines AAPG 2011 Annual Convention & Exhibition April 10, 2011 Hala Ballouz, B.Sc., M.Sc. TAMU, P.E. President, Electric Power Engineers, Inc. Partner &
More informationComments of Louisiana Energy Users Group and Texas Industrial Energy Consumers. MISO South Market Congestion Planning Study. September 18, 2015
Comments of Louisiana Energy Users Group and Texas Industrial Energy Consumers On MISO South Market Congestion Planning Study September 18, 2015 In response to the MISO Staff s September 11, 2015 request
More informationIESO Supply Deliverability Guidelines
PUBLIC IMO_GDL_0021 IESO Supply Deliverability Guidelines Issue 3.0 This document is to be used to evaluate long-term system adequacy and connection assessments Public Disclaimer The posting of documents
More informationNew Brunswick Electricity Business Rules
New Brunswick Electricity Business Rules Table of Contents Chapter 1 Chapter 2 Chapter 3 Chapter 4 Administration and Participation Transmission Planning and Connections Reliable Operations Billing and
More information16 West Coast Regional Plan
16 West Coast Regional Plan 16.1 Regional overview 16.2 West Coast transmission system 16.3 West Coast demand 16.4 West Coast generation 16.5 West Coast significant maintenance work 16.6 Future West Coast
More informationFRCC Coordination Procedure. Title: FRCC Reliability Coordinator Contingency Analysis Monitoring Criteria
A. Purpose: The FRCC Reliability Coordinator (RC) Contingency Analysis (CA) application is essential to maintaining the reliability of the FRCC Bulk Electric System. The application has the capability
More informationPJM LMP Market Overview
PJM LMP Market Overview Andrew Ott Senior Vice President, Markets June 10, 2010 PJM as Part of the Eastern Interconnection 6,038 substations KEY STATISTICS PJM member companies 600+ millions of people
More informationDUKE ENERGY INDIANA. Preparation for Summer 2007. Presentation to Indiana Utility Regulatory Commission
DUKE ENERGY INDIANA Preparation for Summer 2007 Presentation to Indiana Utility Regulatory Commission May 30, 2007 Overview of Presentation 2006 Duke Energy Indiana accomplishments/challenges Summer 2007
More informationGeneration Interconnection System Impact Study Report. For. PJM Generation Interconnection Request Queue Position X1-114.
Generation Interconnection System Impact Study Report For PJM Generation Interconnection Request Queue Position X1-114 Sandyston January 2012 Preface The intent of the System Impact Study is to determine
More informationElectricity from the Power Plant To the Consumer
Electric Transmission Lines Electricity from the Power Plant To the Consumer The Nature of Electricity Electricity must be used as it is generated. Unlike other commodities, there is very little ability
More informationSection 4: Integrating Public Policy Drivers
Public Policy Drivers Section : Integrating Public Policy Drivers PJM DE DC IL IN KY MD MI NJ NC OH PA TN VA WV Section.0: The Role of Public Policy in the RTEP Process Figure.1: Public Policy Drivers
More informationFirm Flow Entitlement on M2M Flowgates Readers' Guide. Last Updated: February 01, 2016 Version: 4.0
Firm Flow Entitlement on M2M Flowgates Readers' Guide Last Updated: February 01, 2016 Version: 4.0 1 Table of Contents 1 DISCLAIMER...3 2 INTRODUCTION...3 3 GLOSSARY OF TERMS...3 4 FFE FILE...3 4.1 DESCRIPTION...
More information5/27/2015. Overview of Energy Storage Value Propositions and Business Cases. Utility Cost-Function: Foundation of Energy Storage Economics.
Overview of Energy Storage Value Propositions and Business Cases Ben Kaun Senior Project Manager ESA Energy Storage 101 Workshop Agenda Utility Cost-Function: Foundation of Energy Storage Economics Utility
More informationCOMPLIANCE REVIEW OF 2006/07 ASSET MANAGEMENT PLAN. Top Energy Limited
PB ASSOCIATES COMPLIANCE REVIEW OF 2006/07 ASSET MANAGEMENT PLAN Prepared for PB Associates Quality System: Document Identifier : 153162 Top Energy Final Report Revision : 2 Report Status : Final Date
More informationLast revised: September 1, 2014 TRANSMISSION FUNCTION TITLES AND JOB DESCRIPTIONS
Last revised: September 1, 2014 TRANSMISSION FUNCTION TITLES AND JOB DESCRIPTIONS EVP, Chief Operations Officer, has primary responsibility for the overall planning, operations and control of the transmission
More informationFRCC Standards Handbook. FRCC Automatic Underfrequency Load Shedding Program. Revision Date: July 2003
F R C C FRCC Standards Handbook FRCC Automatic Underfrequency Load Shedding Program Revision Date: July 2003 FRCC Underfrequency Load Shedding Program Modification and Approval Process Requests to modify
More informationTehachapi Wind Energy Storage Project (TSP)
Tehachapi Wind Energy Storage Project (TSP) Peer Review Presented by Mr. Loïc Gaillac October 20, 2011 San Diego, CA 1 Outline Policy Challenges SCE s Position SCE Smart Grid Vision Project Description
More informationNETWORK OUTPUT MEASURES METHODOLOGY Authors: National Grid, SP Transmission Limited, Scottish Hydro Electric Transmission Limited
NETWORK OUTPUT MEASURES METHODOLOGY Authors: National Grid, SP Transmission Limited, Scottish Hydro Electric Transmission Limited TABLE OF CONTENTS 1.0 Purpose and Scope...2 1.1 Methodology Purpose...2
More informationIntentionally left blank
Intentionally left blank Table of Contents Executive Summary... 7 Introduction... 7 The Transmission Planning Process... 9 Collaborative Planning Efforts... 10 Reliability Assessment... 12 33 Percent RPS
More informationMINNESOTA POWER. Company Background: CapX2020 Transmission Plan
TRANSMISSION PROJECTS: AT A GLANCE MINNESOTA POWER MINNESOTA POWER Company Background: Minnesota Power, a division of ALLETE, provides electricity in a 26,000 square mile electric service area located
More informationAsset Management Business Update
Asset Management Business Update Improvements through Asset Management Mark Davis, Director, Asset Management & AW October 29, 2008 1 From Maintenance to Asset Management Maintain the System -Initial Focus
More informationNV Energy ISO Energy Imbalance Market Economic Assessment
March 25, 2014 NV Energy ISO Energy Imbalance Market Economic Assessment NV Energy ISO Energy Imbalance Market Economic Assessment 2014 Copyright. All Rights Reserved. Energy and Environmental Economics,
More informationJOHN H. STOUT PRESIDENT, MARINER CONSULTING SERVICES, INC. 1303 LAKEWAY DRIVE TAYLOR LAKE VILLAGE, TEXAS 77586 713-252-0535
JOHN H. STOUT PRESIDENT, MARINER CONSULTING SERVICES, INC. 1303 LAKEWAY DRIVE TAYLOR LAKE VILLAGE, TEXAS 77586 713-252-0535 JSTOUT@MARINERCONSULT.COM WWW.MARINERCONSULT.COM OVER 36 YEARS OF EXPERIENCE
More informationTransmission Planning in the ERCOT Interconnection
Transmission Planning in the ERCOT Interconnection Warren Lasher Manager, Long-Term Planning and Policy Department of Energy Electricity Advisory Committee The ERCOT Interconnection The ERCOT Region is
More informationIntegration Capacity Analysis Workshop 11/10/15 California IOU s Approach
Integration Capacity Analysis Workshop 11/10/15 California IOU s Approach READ AND DELETE For best results with this template, use PowerPoint 2003 10 November 2015 Background and Importance of ICA Definition:
More informationTreasure Valley Electric Plan - Community Advisory Committee
Treasure Valley Electric Plan - Community Advisory Committee What is a transmission line and why are they necessary? A transmission line is used to conduct electricity between two points. Without high
More informationPublic Utilities and Their Reliability in Florida - History
UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Remedying Undue Discrimination Through Open Access Transmission Service And Standard Electricity Market Design GridFlorida, LLC Docket No.
More informationItem 8: Houston Import RPG Project
: Houston Import RPG Project Jeff Billo Manager, Transmission Planning Board of Directors Meeting April 8, 2014 Study Overview ERCOT has determined that there will be a need for additional import capacity
More informationNERC Cyber Security Standards
SANS January, 2008 Stan Johnson Manager of Situation Awareness and Infrastructure Security Stan.johnson@NERC.net 609-452-8060 Agenda History and Status of Applicable Entities Definitions High Level of
More informationTERMS AND CONDITIONS
Virginia Electric and Power Company TERMS AND CONDITIONS XXIV. GENERATOR INTERCONNECTION STANDARD Electric generator interconnection service includes only the ability to interconnect an electric generator
More information2013 Ventyx, an ABB company
Co-optimization of Congestion Revenue Rights in ERCOT Day-Ahead Market Chien-Ning Yu, Vladimir Brandwajn, Show Chang ABB/Ventyx Sainath M. Moorty ERCOT FERC Conference on increasing real-time and day-ahead
More informationGRADUATE RELIABILITY TRAINING PROGRAM. Initiation Date: September 2012
GRADUATE RELIABILITY TRAINING PROGRAM Initiation Date: September 2012 Board Approved Date: May 2012 GRADUATE RELIABILITY TRAINING PROGRAM Program Description This program is intended for recent college
More informationTransmission Planning Study (Year 2022) for Cherokee 4 Replacement Alternatives. Final Report
Transmission Planning Study (Year 2022) for Cherokee 4 Replacement Alternatives (Required per CPUC Decision No. C10-1328) Final Report (Submitted with Public Service s 2011 ERP) Executive Summary The objective
More informationRenewable Energy Transmission Planning Process (RETPP) Second Draft Final Proposal
Renewable Energy Transmission Planning Process (RETPP) Second Draft Final Proposal April 2, 2010 Second Draft Final Proposal Introduction The central objective of the ISO s proposed renewable energy transmission
More informationDuke Energy Progress Standards of Conduct Transmission Function Employee Job Titles and Job Descriptions 9/1/13
Duke Energy Progress Standards of Conduct Transmission Function Employee Job Titles and Job Descriptions 9/1/13 Transmission Operations & Planning Carolinas Power System Operations Director Power System
More informationTransmission Function Employees Job Titles and Descriptions 18 C.F.R 358.7(f)(1)
Date of Last Change to the Provided Information August 27 th, 2015 Director, Transmission Operations The employee in this position is responsible for effectively managing the operation of FirstEnergy Utilities
More informationSection 1: Executive Summary
Section 1: Executive Summary SECTION 1: EXECUTIVE SUMMARY 1.1 SECTION PURPOSE This report has been prepared for the Nevada Energy Assistance Corporation (NEAC), a 501(c)(3) non-profit agency; in support
More informationControl Number : 37897. Item Number : 9. Addendum StartPage: 0
Control Number : 37897 Item Number : 9 Addendum StartPage: 0 PROJECT NO. 37897 PUC PROCEEDING RELATING TO PUBLIC UTILITy/^OI^IMISSIO^ RESOURCE AND RESERVE ^CL_^ ADEQUACY AND SHORTAGE OF TEXAS PRICING COMMENTS
More informationSecurity Policy Review: Credible Event Management. Scope and Methodology Draft for Industry 2014
Security Policy Review: Credible Event Management Scope and Methodology Draft for Industry 2014 Version Date Change 1 26/03/2014 Draft for industry Position Date Prepared By: Reviewed By: Ina Ilieva, Senior
More informationMemorandum. This memorandum requires Board action. Executive Summary
California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Keith Casey, Vice President, Market & Infrastructure Development Date: July 8, 2014 Re: Decision on the Delaney-Colorado
More information2016 Request For Proposals For Long-Term Renewable Generation Resources For Entergy Arkansas, Inc.
2016 Request For Proposals For Long-Term Renewable Generation Resources For Entergy Arkansas, Inc. Entergy Arkansas, Inc. May 26, 2016 TABLE OF CONTENTS 1. GENERAL INFORMATION... 1 1.1. Introduction...
More informationINDEPENDENT SYSTEM OPERATORS (VI + Access Rules vs. ISO vs. ITSO)
INDEPENDENT SYSTEM OPERATORS (VI + Access Rules vs. ISO vs. ITSO) Paul L. Joskow September 28, 2007 ALTERNATIVE SYSTEM OPERATOR MODELS System operator (SO) is vertically integrated utility (G+T) Functional
More informationUNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION
UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Reliability Technical Conference Docket No. AD16-15-000 Prepared Statement of Mark Rothleder on behalf of the California Independent System
More informationCOLORADO SPRINGS UTILITIES ATTACHMENT K TO OPEN ACCESS TRANSMISSION TARIFF
COLORADO SPRINGS UTILITIES ATTACHMENT K TO OPEN ACCESS TRANSMISSION TARIFF I. INTRODUCTION The City of Colorado Springs, Colorado ( City ) is a Colorado home-rule municipal corporation with a population
More informationNew York State of the Market System - NYISO Success Project
Auxiliary Market Products Additional Capacity Zones The NYISO and stakeholders are developing the rationale in 2010 for creating additional capacity zones, identified as a recommendation in the 2009 State
More informationOperations Reliability Coordination Agreement
Operations Reliability Coordination Agreement This Agreement regarding Operations Reliability Coordination ( Agreement ) is made and entered into as of the 19th day of June, 2013, by and between Midcontinent
More information4.1.1 Generator Owner 4.1.2 Transmission Owner that owns synchronous condenser(s)
A. Introduction 1. Title: Verification and Data Reporting of Generator Real and Reactive Power Capability and Synchronous Condenser Reactive Power Capability 2. Number: MOD-025-2 3. Purpose: To ensure
More informationMain variations of business models for Flexible Industrial Demand combined with Variable Renewable Energy
Innovative Business Models for Market Uptake of Renewable Electricity unlocking the potential for flexibility in the Industrial Electricity Use Main variations of business models for Flexible Industrial
More informationGas transport tariffs calculation
Ad Hoc Expert Facility under the INOGATE project Support to Energy Market Integration and Sustainable Energy in the NIS (SEMISE) Gas transport tariffs calculation 1 TABLE OF CONTENTS 1. INTRODUCTION...
More informationSOUTHERN MARYLAND ELECTRIC COOPERATIVE, INC. HUGHESVILLE, MD
SOUTHERN MARYLAND ELECTRIC COOPERATIVE, INC. HUGHESVILLE, MD HOLLAND CLIFF HEWITT ROAD 230 KV TRANSMISSION LINE PROJECT ELECTRIC ALTERNATIVE EVALUATION STUDY BLACK & VEATCH CORPORATION B&V Project 146026(G)
More informationEnergy Storage Systems and Role for the US Grid
Energy Storage Systems and Role for the US Grid Dr. Michael Kintner-Meyer Pacific Northwest National Laboratory Richland, WA 99354 U.S.A. PNNL-SA-114280 Pacific Northwest Demonstration Project What: $178M,
More informationEnergy Storage Market Overview MADRI 3/3/2015 John Fernandes Policy & Market Development Manager
Energy Storage Market Overview MADRI 3/3/2015 John Fernandes Policy & Market Development Manager Storage Technologies 2 Over 100 Energy Storage Technologies Background to the Market Flywheels Thermal ES
More informationTehachapi Renewable Transmission Project (TRTP)
SM Tehachapi Renewable Transmission Project (TRTP) February 2009 Why We Are Here Today Provide background on SCE s commitment to renewable energy Discuss the operational and economic importance of the
More informationRELIABILITY PLANNING CRITERIA
RELIABILITY PLANNING CRITERIA Version 4.0 01/20/2016 Date Rev. No. Individual Making Edits REVISION HISTORY Reason / Comments 07/01/2013 1 J. Johnson Initial document 06/06/2014 2 R. Chapman Document review;
More informationPreliminary Feasibility Assessment For. The Rio Tinto Alcan to BCH Transfer Limit of 460 MW. With 50% Series Compensation on Both KMO KIT lines
Preliminary Feasibility Assessment For The Rio Tinto Alcan to BCH Transfer Limit of 460 MW With 50% Series Compensation on Both KMO KIT lines Report : ASP2010-T001 July 2010 Asset Strategy & Planning,
More informationKent Active System Management (KASM) Oct 2015 / Matthieu Michel
Kent Active System Management (KASM) Oct 2015 / Matthieu Michel Project Background (update): D Heat Map: SPN D Connection Offers Accepted (Cumulative) 1W D Heat map (June 2015) SPN D Connection Offers
More informationGreen Power Connection Net Energy Metering Engineering Review Process in Delaware and Speeding Up the Application Fee Process
Green Power Connection Net Energy Metering Engineering Review Process in Delaware and Speeding Up the Application Fee Process Presented by: Marianne Mannschreck Date: Welcome A Look at the Net Energy Metering
More informationNETWORK OUTPUT MEASURES METHODOLOGY Authors: National Grid, SP Transmission PLC, Scottish Hydro Electric Transmission Limited
NETWORK OUTPUT MEASURES METHODOLOGY Authors: National Grid, SP Transmission PLC, Scottish Hydro Electric Transmission Limited TABLE OF CONTENTS 1.0 Purpose and Scope...2 1.1 Methodology Purpose...2 2.0
More informationMaking Energy Storage Work for The Pacific Northwest
Making Energy Storage Work for The Pacific Northwest US DOE Peer Review Program 2015 Portland, OR September 23, 2015 Diane Broad, PE Energy Planning & Innovation Division Oregon Department of Energy Leading
More informationHTS Cables: Pitfalls and Potential LIPA Cable Project. J. Maguire American Superconductor. DOE Wire Workshop January, 2007 Panama City, FL
HTS Cables: Pitfalls and Potential LIPA Cable Project J. Maguire American Superconductor DOE Wire Workshop January, 2007 Panama City, FL LIPA Project Overview Long Island Power Authority Holbrook Substation
More informationUNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION WRITTEN STATEMENT OF JOHN HOUSTON OF CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC
UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Geomagnetic Disturbances ) Docket. No. AD12-13-000 to the Bulk Power System ) WRITTEN STATEMENT OF JOHN HOUSTON OF CENTERPOINT ENERGY
More informationOperational Security Network Code
Amstelveenseweg 998 1081 JS Amsterdam Phone: + 31 20 520 7970 Fax: + 31 346 283 258 Email: secretariat@efet.org Website: www.efet.org Operational Security Network Code Public consultation 3 November 2012
More informationEmera Maine Proposed Potential Transmission Projects. Line Identification Line 75 - KR Sub. Estimated Cost $201,464 $0 $3,200,000
L75 & BW3 Rebuild ROW Phase I Keene Rd. Expansion for Oakfield Wind KR Transformer Addition Line Identification Line 75 - KR Sub Location Bangor Chester Chester Estimated Cost $201,464 $0 $3,200,000 Voltage
More informationConstruction, Management and Engineering Practices that Lead to Low Losses
Indiana Utility Regulatory Commission Construction, Management and Engineering Practices that Lead to Low Losses George Stevens Utility Analyst September 17, 2007 Note This presentation is based on the
More informationSTATEMENT OF PATRICIA HOFFMAN ACTING ASSISTANT SECRETARY FOR ELECTRICITY DELIVERY AND ENERGY RELIABILITY U.S. DEPARTMENT OF ENERGY BEFORE THE
STATEMENT OF PATRICIA HOFFMAN ACTING ASSISTANT SECRETARY FOR ELECTRICITY DELIVERY AND ENERGY RELIABILITY U.S. DEPARTMENT OF ENERGY BEFORE THE COMMITTEE ON ENERGY AND NATURAL RESOURCES UNITED STATES SENATE
More informationAPPLICATION NOTE. Increasing PV Hosting Capacity on LV Secondary Circuits with the Gridco System empower TM Solution
APPLICATION NOTE Increasing PV Hosting Capacity on LV Secondary Circuits with the Gridco System empower TM Solution INCREASING PV HOSTING WITH EMPOWER TM SOLUTION Executive Summary Distributed solar photovoltaic
More informationEntity Name ( Acronym) NCRnnnnn Risk Assessment Questionnaire
Entity Name ( Acronym) NCRnnnnn Risk Assessment Questionnaire Upcoming Audit Date: March 16, 2015 Upcoming Audit Type: O&P Audit Start of Audit Period: March 16, 2012 Date Submitted: Table of Contents
More informationSTRATEGIC ISSUES OF THE ELECTRICITY COMPANY OF GHANA PRESENTATION BY MR. WILLIAM HUTTON-MENSAH (AG. MANAGING DIRECTOR) ELECTRICITY COMPANY OF GHANA
STRATEGIC ISSUES OF THE ELECTRICITY COMPANY OF GHANA PRESENTATION BY MR. WILLIAM HUTTON-MENSAH (AG. MANAGING DIRECTOR) OUTLINE OF PRESENTATION (ECG) 2 Introduction Map of Operational Area Company Mandate,
More informationSouthwest Power Pool (SPP)
Southwest Power Pool (SPP) 2010 ISO/RTO Metrics Report 315 Section 7 SPP Performance Metrics and Other Information Southwest Power Pool, Inc. (SPP) is a regional transmission organization (RTO) that coordinates
More informationNorthport - Norwalk Harbor Cable (NNC) Tie line
September 9, 008 Northport - Norwalk Harbor Cable (NNC) Tie line Technical Assessment of Operating up to NNC Inter Tie STE Ratings Executive Summary Three (3) 38kV submarine cable circuits (Lines 60, 60,
More informationEIS. International Infrastructure Security Roadmap ELECTRIC INFRASTRUCTURE SECURITY SUMMIT
EIS S U M M I T International Infrastructure Security Roadmap Edition: April 11, 2011 ELECTRIC INFRASTRUCTURE SECURITY SUMMIT Monday, April 11, 2011 The Capitol Building US Congress, Washington D.C. Securing
More informationResource Monitoring and Deliverability Tool Paper
Resource Monitoring and Deliverability Tool Paper NWPP MC Phase 3 Operations Integration Work Group 11/30/2014 Page 1 of 16 Table of Contents Executive Summary... 3 1. Purpose... 5 2. Existent Methods
More informationGuideline - Business Continuity Plan
Guideline - Business Continuity Plan 1. Introduction: The Business Continuity Plan is a component of the Risk and Business Management suite. This suite includes: Risk Management including risk registers
More informationE N G I N E E R I N G
Purpose If the customer s proposed project proceeds to Gate 1 of the Integrated Customer Solutions (ICS) process (see the ICS Process and Proposal Submission Guide), the customer must prepare a Load Displacement
More informationState Of California's Energy Bill
2750 Monroe Boulevard Valley Forge Corporate Center Audubon, PA 19403 James M. Burlew Counsel Telephone: (610) 666-4345 Fax (610) 666-8211 Email Address: james.burlew@pjm.com December 15, 2015 The Honorable
More information2015 Project Schedule Milestone Update
2015 Schedule Milestone Update Robb Pike Director, & Product Management New York Independent System Operator Ryan Smith Senior Manager, Enterprise Product & Management New York Independent System Operator
More informationHigh Penetration of Distributed Solar PV Generation
High Penetration of Distributed Solar PV Generation Lessons Learned from Hawaii September 30, 2014 Discussion Overview Solar PV penetrations trends in Hawaii Lessons learned from Hawaii s high penetration
More informationCOMPETITIVE ELECTRIC ENERGY MARKET IN GREECE
NATIONAL TECHNICAL UNIVERSITY OF ATHENS (NTUA) GREECE COMPETITIVE ELECTRIC ENERGY MARKET IN GREECE EVANGELOS DIALYNAS Professor NTUA Director of Electric Power Division 1 Competitive Electric European
More informationModeling the Financial and System Benefits of Energy Storage Applications in Distribution Systems
Modeling the Financial and System Benefits of Energy Storage Applications in Distribution Systems Patrick Balducci, Senior Economist, Pacific NW National Laboratory Hydrogen Energy Storage for Grid and
More informationEnergy Management System (EMS) 3.0 Implementation Overview for BRP Consultation. July 2015
Energy Management System (EMS) 3.0 Implementation Overview for BRP Consultation July 2015 Background Energy Management System EMS - Used by System Controllers to monitor, control and optimize the performance
More informationContouring and Advanced Visualization
Contouring and Advanced Visualization Contouring Underlay your oneline with an image Geographic Data Views Auto-created geographic data visualization Emphasis of Display Objects Make specific objects standout
More informationCURTAILABLE RATE PROGRAM FOR INDIVIDUAL CUSTOMER LOADS
Page 1 of 16 CURTAILABLE RATE PROGRAM FOR INDIVIDUAL CUSTOMER LOADS PROPOSED TERMS AND CONDITIONS January 2015 Page 2 of 16 TABLE OF CONTENTS 1. Definitions... 3 2. Curtailable Load Options... 6 3. Nomination
More informationOperating Security Standards
Version 1.1 Prishtina December 2009 TABLE OF CONTENTS 1 Introduction... 1 2 Definitions... 1 2.1 General...1 2.1.2 Kosovo Transmission System...1 2.1.3 Circuit...2 2.1.4 The N-1 Criterion...2 2.1.5 Normal
More informationApplicability and Eligibility
Application for Resource Adequacy Deliverability Status for a Distributed Generation Resource Interconnected or Seeking Interconnection to the Distribution Facilities of an Investor-Owned Utility Participating
More informationAppendix C-2. Entergy Services, Inc. June 8, 2016
Appendix C-2 Preliminary Due Diligence List (Existing Resources) For 2016 Request For Proposals For Long-Term Renewable Generation Resources For Entergy Louisiana, LLC Entergy Services, Inc. June 8, 2016
More informationPowerlink has provided this document to the AER in support of its Revenue Proposal
Powerlink has provided this document to the AER in support of its Revenue Proposal Copyright Powerlink Queensland All rights reserved Powerlink Queensland owns the copyright contained in this document.
More informationRecent Developments in US-Mexico Electricity Trade: A Tale of Two Borders
Recent Developments in US-Mexico Electricity Trade: A Tale of Two Borders Nicolas Puga, Principal San Diego, California October 18-19, 2007 Historical trends of US-Mexico electricity trade may soon change
More informationProgram Guide for Risk-based Compliance Monitoring and Enforcement Program. ERA-01 Rev. 1. NPCC Manager, Entity Risk Assessment
NPCC Entity Risk Assessment Program Guide for Risk-based Compliance Monitoring and Enforcement Program ERA-01 Rev. 1 Process Owner: NPCC Manager, Entity Risk Assessment Effective Date: 03/02/2015 Table
More informationCross-Tie Transmission Line. Ravikanth Varanasi Principal Transmission Planner
Cross-Tie Transmission Line Ravikanth Varanasi Principal Transmission Planner Overview ~213 mile 500-kV transmission line between PacifiCorp s proposed Clover 500 kv substation with NV Energy s Robinson
More informationHow To Operate The Williston Uvls
WND Winter Operating Guide 2012/2013 1 WND Operating Study Using EQ-890-2012WIN- FINAL.sav developed through the 890 process Got load updates from MDU, Central Power, UM G&T Made several topology updates
More informationWind and Energy Markets: A Case Study of Texas.
Wind and Energy Markets: A Case Study of Texas. Ross Baldick Department of Electrical and Computer Engineering baldick@ece.utexas.edu The University of Texas at Austin May 21, 2010 1 Abstract Many jurisdictions
More information