Georgia Underground Marking Standards PSC RULE
|
|
|
- Katrina Stokes
- 9 years ago
- Views:
Transcription
1 Georgia Underground Marking Standards PSC RULE
2 AGENDA GUFPA PSC Rules Marking Standards Sufficient Particularity Educational Materials
3 GUFPA Law and PSC Rule GUFPA- Dig Law Passed by the State Legislature Enforced by the PSC Maximum $10,000 fine per violation Fines can be mitigated by PSC Certified GUFPA training classes PSC Rules Rules created by PSC Enforced by PSC Maximum $15,000 fine per violation
4 Facility Owner/Operator Responsibilities
5 Utility Markings Indicate utility facilities by placing UPC alpha code (AGL) Type of material the facility consists of, if known, at the beginning & end of locates. Arrows should be placed at the ends of markings to indicate that the underground facility continues. AGL PL AGL AGL PL
6 Utility Markings Cont. The marks shall indicate the approximate center-line of the underground lines. For example, the middle of the cable, line or pipe shall be at the center of the dashed marks.
7 AGL plastic AGL AGL plastic Locating Nonconductive Lines When locating lines that are nonconductive a tracer wire is located NOT the facility Tracer Wire 12 Plastic GAS Main
8 Understanding Tolerance Zone Tolerance Zone = 5 feet Tracer Wire 24 AGL GAS Main 24 AGL 12+
9 Utility Markings cont. Location marks shall be 4 to 12 inches in length & at intervals of 5 to 10 feet. 5 ft. to 10 ft. intervals 4 inch to 12 inch marks
10 Marking Duct Structures Ducts structures shall be marked by using a dot with parallel boundary on each side of the dot. ATT ATT
11 Joint Trenching Facilities that share the same trench CCAST AGL CCAST AGL CCAST AGL This would apply to lines that use the same color code. ATT ATT ATT
12 Other Marks Dead ends, stub-outs, termination points, etc., shall be marked as follows AGL ATT
13 Connecting Lines & Lines that Change Direction Lines that have connections (e.g., T's or Y s) or changes in directions shall be clearly indicated. Line Connections MWA MWA ATT MWA ATT MWA Lines Cross but do not connect
14 Splice Pits In areas where cables are spliced, the facilities should be located individually as far as possible on both sides of the splice. When the signal is distorted due to the near proximity to the splice, use a circle with SP. ATT ATT SP ATT
15 Offsets In areas of high construction traffic, offsets shall be placed on a permanent surface, spaced every third or fourth mark. Use only in conjunction with marks placed above a facility. CTV 16 CTV 16 CTV CTV
16 Manholes and Valves Manholes and valves shall be identified by using a circle and letters if they are not visible (dirt covering valve boxes or pavement covering manhole cover). V M
17 Unlocatable Sewer Laterals Unlocateable sewer laterals shall be marked by placing a green triangle, on the sewer main, toward the address(es) in question. MWA MWA These locate marks represent ONE unlocatable sewer lateral. If there are 3 unlocatable laterals there should be 3 green triangles.
18 Known Diameters Greater than 12 If the facility to be marked has a diameter greater than 12, the size of the facility shall be indicated if known. AGL 12 AGL 12
19 Unknown Diameters Greater than 12 If the size of the facility is not known, then the mark shall indicate greater than 12 inches. AGL +12 AGL +12
20 Sufficient Particularity
21 PSC Marking Standards Rule (d) Directive to UPC. Pursuant to O.C.G.A (a) (1), (a) (1) and (b), (a) (2), and (f) and pursuant to Commission Utility Rule , the Utilities Protection Center, Inc. ( UPC or One-Call Center ) is hereby directed to establish policies and procedures which identify when white lining is required.
22 Sufficient Particularity Sufficient Particularity is achieved when the area of excavation is described in such a way that there is no question where the digging will take place. AKA: Verbal White Lining
23 Use Quadrants for Verbal White Lining Lots will be divided into four quadrants identified as if standing in the street at the curb in the middle of the property facing the lot. Back Left Front Left Back Right Structure/ house Front Right You
24 White Lining Physical White Lining is to be used when Sufficient Particularity is not descriptive enough to clearly lead a locator to the excavation area. The purpose of White Lining is to provide a physical outline of the dig site, illustrating the exact location of the proposed excavation site.
25 Locator Marks and White Lining The Locator shall extend marks outside the proposed work area by 20 to 30 feet if those facilities extend outside the proposed excavation area. MWA MWA
26 20 feet 20 feet White Lining Symbols White lining proposed dig sites that will follow a single path or trench shall be marked using white lines &/or arrows and located for twenty (20) feet on either side of the white line. It is important to identify the starting & ending points. ABC Excavator Start END 20 feet 20 feet
27 Identification of White Lining Excavator Each excavator, when white lining, shall be identified by labeling the white line area with the excavator s name or the applicable locate ticket number or both.
28 White Lining Examples Start Start ABC Excavator END END ABC ABC Excavating ABC Excavating ABC ABC ABC
29 White Lining on Roadways No white paint should be placed on any road way due to possible confusion with DOT road markings White paint can be placed up to the edge of the road and again on the opposite side of the road to indicate the path of excavation
30 White Lining near roadways ABC Excavator END Start ABC Excavator
31 Exceptions to White Lining Any large project so designated in accordance with GPSC Rule Any jobsite that can be described with Sufficient Particularity as defined by UPC and required by GUFPA Emergency Locate requests
32 Utility Owner Responsibilities What if an excavator fails to verbally or physically white line? Locate the area requested on the Locate Request Respond to PRIS using code 2D - Marked with exceptions: Ticket should have been white-lined but was not Report failure to white line as a probable violation to the PSC
33 REMEMBER!! Use water-based paint for white lining White lining does not guarantee your locate request will be marked prior to the 48 hours required by law You still must check PRIS and if all utilities have responded with marked or clear no facilities then excavation can begin prior to the 48 hours
34 Education Materials Can be found at PSC RULE UPC Sufficient Particularity Document Marking Standards Power Point Presentation
35 Contact your UPC Liaison for more info. Region 1 & 2 Becky Creech: Region 3 & 4 Holly Files: Region 2 & 5 Mike Joyner: Region 6 & 3 Terry McLaurin: Region 7 Fiona Bowen:
Appendix B: Uniform Color Code & Marking Guidelines
Appendix B: Uniform Color Code & Marking Guidelines The information contained in Appendix B is intended to be supplemental information for existing practices found within CGA Best Practices Version 2.0.
SECTION 5 DRAFTING STANDARDS
SECTION 5 DRAFTING STANDARDS 1 SECTION FIVE TABLE OF CONTENTS Description Page TABLE OF CONTENTS... 5-2 GENERAL... 5-3 DRAFTING STANDARDS... 5-5 DRAFTING MINIMUM REQUIREMENTS HANDOUT... 5-8 2 GENERAL 1.
Utility Marking Trace Wire Guide
Manufacture product options: Utility Marking Trace Wire Guide The information provided by Copperhead Industries gives you product options to help you choose the correct wire termination points connectors
DESCRIPTION OF WORK:
DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works
Gas Meter Clearances and Service Installation Requirements
March 2016 Gas Meter Clearances and Service Installation Requirements Builder/Owner/Developer Requirements Call PSE's Customer Construction Services 1 888 321 7779 or visit PSE.com/CustomerConstruction
San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS
San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS 854.1 DESCRIPTION: This item shall govern sanitary sewer laterals installed in accordance with these
Guidelines for Fiber Optic Cable Permits
Guidelines for Fiber Optic Cable Permits NOVA District (Fairfax/Arlington) Permits www.virginiadot.org/business/fairfax-permits-main.asp Email: [email protected] 14685 Avion Parkway
Gas Meter Clearances and Service Installation Requirements
March 2015 Gas Meter Clearances and Service Installation Requirements Builder/Owner/Developer Requirements Call PSE s Customer Construction Services 1-888-321-7779 or visit PSE.com/CustomerConstruction
FIBER-OPTIC CABLE PLAN CHECK
Engineering Division 201 North Broadway, Escondido, CA 92025 (760) 839-4651, FAX (760) 839-4597 FIBER-OPTIC CABLE PLAN CHECK To: Date: Project: Project No. Address: Check No. Attn: Via: The attached plans
3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.
The following shall serve as the minimum requirements for contractors performing work in relation to the Authority s potable water and sanitary sewer system(s), appurtenances and service connections. General:
For business. Wiring your business for broadband. What happens when copper is required?
For business Wiring your business for broadband Your cabling requirements are dependent on the size and complexity of your business. Smaller businesses should follow the wiring recommendations for residential
DAMAGE PREVENTION LEGISLATION ELEMENTS REQUIRED FOR CANADA
DAMAGE PREVENTION LEGISLATION ELEMENTS REQUIRED FOR CANADA Ensuring the Highest Level of Public, Worker and Community Safety with Effective Legislation for Damage Prevention / Protection of Buried Infrastructure
Trenching and Excavation Safety
1.0 ACTIVITY DESCRIPTION 1.1 This document provides basic safety guidelines related to excavation and trenching in pipeline construction activities. These guidelines are applicable to the locating, marking
The checklist utilized by the Authority will be similar to that which is shown below. Project Name: Location: Consulting Engineering Firm:
Page 1 of 6 Section 1. PURPOSE This policy is an Engineering checklist of the Local Review Program for sanitary sewer improvement projects by the Bedford Regional Water Authority ( Authority ). Section
APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE
APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE JURISDICTION OF ALBERTA TRANSPORTATION 1.0 Application Procedures 2.0
32-02.05 Precast Manhole Sections and Castings. These items shall conform to Section 31, "Storm Drain Installation," of these Standard Provisions.
SECTION 32: SANITARY SEWER INSTALLATION 32-01 SCOPE. The Work shall consist of furnishing and installing sewer mains, manholes, laterals, cleanout fittings and appurtenances; and testing, flushing and
WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, 2015 1512-SPP-24 & 1512-ODP-24
Petition Number: Subject Site Address: Petitioner: Request: East side of Oak Road, north of 151 st Street Langston Development Co. Primary Plat and Overall Development Plan amendment review for Mapleridge
LONGITUDINAL PROFILE COMPLETION
LONGITUDINAL PROFILE COMPLETION Course of the trench bottom determine using drawn cross-sections plot (refer to fig. 0630) according to the stationing direction: right-sided... dotted line left-sided...
One-Call Notification Screening
Purpose Reference The purpose of this document is to share learnings with pipeline operators related to the process of receiving, analyzing, and managing notifications from the State One-call Center to
APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND TELECOMMUNICATION CABLES IN THE VICINITY OF TRANSPORTATION FACILITIES
APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND TELECOMMUNICATION CABLES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE JURISDICTION OF ALBERTA TRANSPORTATION 1.0 Application Procedures 2.0
Chapter 7 Plumbing Connections
Chapter 7 Plumbing Connections 7-1 General All plumbing equipment and installations must be designed, constructed, and installed in accordance with this code and where not specific, to the applicable provisions
NEW HAMPSHIRE CODE OF ADMINISTRATIVE RULES. CHAPTER Puc 800 UNDERGROUND UTILITY DAMAGE PREVENTION PROGRAM
CHAPTER Puc 800 UNDERGROUND UTILITY DAMAGE PREVENTION PROGRAM Statutory Authority: RSA 374:50 PART Puc 801 APPLICATION OF RULES Puc 801.01 Purpose. (a) The purpose of Puc 800 is to protect the public,
GUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables
Engineering Department SEPTEMBER, 2007 GUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables General Requirements This section applies to all public and private utilities,
Fixed and Portable Ladders- A Guide to OSHA Rules
Fixed and Portable Ladders- A Guide to OSHA Rules Introduction Working on and around stairways and ladders is hazardous. Stairways and ladders are major sources of injuries and fatalities among construction
MOBILE HOME SERVICE REQUIREMENTS GAS
ELECTRIC AND GAS 1.0 INDEX 1.0 INDEX 2.0 PURPOSE 3.0 GENERAL 4.0 REFERENCE MATERIAL 5.0 TYPICAL UNDERGROUND UTILITY LAYOUT 6.0 METER PAD DETAILS 7.0 GENERAL INSTALLATION PROCEDURES 8.0 PEDESTAL SPECIFICATIONS
California Excavation Law
California Excavation Law 1 Table of Contents California Gov. Code 4216 - Page 3 CalOSHA Title 8, Section 1541 - Page 23 2 California Government Code 4216 3 4216. As used in this article the following
Pipeline Safety Division Investigation Report
Pipeline Safety Division Investigation Report Investigation regarding: Crosby Excavating Incorporated UPPAC Database Record ID: 4873 Report Date: 9/23/2013 Investigator: Mike Orr Damage Date: 5/29/2013
Operating Vehicle Control Devices
Module 2 Topic 3 Operating Vehicle Control Devices 1. Identify the vehicle controls in the pictures below: 1. 2. 3. 4. 7. 7. 5. 6. 1. accelerator 2. parking brake 3. foot brake 4. gear shift lever_ 5.
How To Safely Dig For Natural Gas
PNG DIAL B4-U-DIG book_final_nu 5/1/05 3:24 PM Page 2 Phoenix Natural Gas,197 Airport Road West, Belfast BT3 9ED. Tel. 08454 55 55 55. www.phoenix-natural-gas.com PNG DIAL B4-U-DIG book_final_nu 5/1/05
San Antonio Water System Standard Specifications for Construction ITEM 866 SEWER MAIN TELEVISION INSPECTION
ITEM 866 SEWER MAIN TELEVISION INSPECTION 866.1 DESCRIPTION: The Contractor shall furnish all labor, materials, equipment, and incidentals to provide the televising and a NASSCO-(PACP) standard video,
Enbridge Class Location Change Management Plan. 1.1 Additional Information for Identified Changed Class Locations
Information Request No. 1-1.1 Additional Information for Identified Changed Class Locations Reference: i. (A70936) Preamble: ii. Canadian Standards Association (CSA) Z662-15, Oil and Gas Pipeline Systems
CHAPTER 8 CIVIL DESIGN
CHAPTER 8 CIVIL DESIGN A. GENERAL This Chapter includes standards and design considerations for other civil engineering design in structural, drainage and utilities. Design considerations for electrical
Chapter 11 - Streets ARTICLE 1 COASTING AND SKATEBOARDING ARTICLE 11 SNOW REMOVAL ARTICLE 111 HORSES ARTICLE IV DISPLAYING GOODS AND WARES
Chapter 11 - Streets ARTICLE 1 COASTING AND SKATEBOARDING Section 11-101 Coasting or Sledding Regulated 11-102 Skateboarding Regulated ARTICLE 11 SNOW REMOVAL 11-201 Snow Removal on Sidewalks Required
HIGHWAY DEPARTMENT ACCESS AND RIGHT OF WAY WIDTH GUIDELINES
Approved 6/26/01 HIGHWAY DEPARTMENT ACCESS AND RIGHT OF WAY WIDTH GUIDELINES All new, modified and/or changed use access(es) onto county roads shall be subject to the access and corridor protection guidelines
Optical Cable Pre-Construction Survey. Keywords Stationary Reel Method, empty innerducts, sub-ducts, microducts, Intermediate-feed manholes
Optical Cable Pre-Construction Survey Author John Peters Issued December 2012 Abstract Pre-construction site survey is one of the most important steps in the engineering and placement of a new optical
1-800-DIG-RITE or 811. mo1call.com
Excavator Manual 1-800-DIG-RITE or 811 1 mo1call.com This manual is designed to serve as a guide to assist excavators with the process of placing a locate request. It does not take the place of the Missouri
Tallahassee Community College PERIMETER
Tallahassee Community College 47 PERIMETER The perimeter of a plane figure is the distance around it. Perimeter is measured in linear units because we are finding the total of the lengths of the sides
Summary of Bicycle Ordinances Tulsa Metropolitan Region. Passing requirement. Use of permanent seat
May 2009 Updated 10/2011 Summary of Bicycle Ordinances Tulsa Metropolitan Region Mandatory Sidepath Two Abreast Bicycles considered vehicles Passing requirement Use of permanent seat Ride as far to the
Before H 2 Town of South Windsor, CT Evaluates Large Diameter Concrete Pipe
Before H 2 Town of South Windsor, CT Evaluates Large Diameter Concrete Pipe September 11, 2012 NEWEA Collection Systems Conference Presented by: Laurie L. Perkins, PE Dennis A. Dievert, PE C. Frederick
Tour of the Pantograph Planner
(714) 989-6891 Instructions for PANTOGRAPH PLANNER The Pantograph Planner helps to free the quilter from the frustrations of positioning the rows for edge to edge quilting. This document provides step
SANITARY SEWER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix D
SANITARY SEWER PROJECT COST ESTIMATES & LOCATION MAPS Appendix D RIVERDALE CITY CAPITAL FACILITIES PLAN SANITARY SEWER Engineer's Cost Estimate January 2009 Project Name: Riverdale Road - Rumbi Grill -
Recommendations for Marking Communication Facilities with Use of 3M EMS Electronic Markers
Recommendations for Marking Communication Facilities with Use of 3M EMS Electronic Markers Near-Surface Marker A small marker which is well-suited for bore holes in concrete or asphalt for marking flush-mount
SMALL GAS OPERATOR OPERATION AND MAINTENANCE PLAN
SMALL GAS OPERATOR OPERATION AND MAINTENANCE PLAN Facility Name: Address: QUALIFIED PERSONNEL All tasks shall be completed by a person that is qualified to that task (see operators qualification of individuals
in Marina Del Rey Prepared by: County of Los Angeles Department of Public Works
Planned Public Works Projects in Marina Del Rey Prepared by: County of Los Angeles Department of Public Works Planned Projects in Marina Del Rey Waterline Projects Phase II Phase III Roadway Projects Admiralty
ROAD SIGNS IN JAPAN PARKING SIGNS. No Parking or Stopping Anytime SIZE & WEIGHT LIMIT SIGNS SPEED LIMIT SIGNS
ROAD SIGNS IN JAPAN Stop Slow & all Do Not Enter & Motorcycles Road Large Sized Trucks & Special Duty Road All Except Two Wheeled Light Except Bicycles Large Passenger No Right Turn No Passing No U-Turn
AN INTRODUCTION TO MAGNETIC AND UTILITY LOCATING BASICS
AN INTRODUCTION TO MAGNETIC AND UTILITY LOCATING BASICS TABLE OF CONTENTS AN INTRODUCTION TO PIPE AND CABLE LOCATING BASICS how to apply signal.................1 power levels.......................1 conductive
4. REQUEST FOR ELECTRIC SERVICE. 4.1 General Service Information
4. REQUEST FOR ELECTRIC SERVICE To establish an electric service, temporary or permanent, contact UI s Customer Care Center by calling: 1-800-722-5584 (7:00 a.m. 7:00 p.m., Monday Friday and 7:00 AM to
Fall protection systems and practices Duty to have fall protection Protection at or above 6' level.
Duty to have fall protection Protection at or above 6' level. Walking/working surfaces inspected before work begins. Employees can only work on surfaces strong enough to support them. Page 1 Protection
Perimeter. 14ft. 5ft. 11ft.
Perimeter The perimeter of a geometric figure is the distance around the figure. The perimeter could be thought of as walking around the figure while keeping track of the distance traveled. To determine
STANDARD SPECIFICATIONS SECTION 02956 CLOSED CIRCUIT TELEVISION INSPECTION OF SEWER MAINS, MANHOLES AND LATERALS
STANDARD SPECIFICATIONS SECTION 02956 CLOSED CIRCUIT TELEVISION INSPECTION OF SEWER MAINS, MANHOLES AND LATERALS PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements to execute internal closed
SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.
02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily
FY08 SEWER POINT REPAIRS BID TABULATION
6-07-831 Page 1 of 12 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING "
AGA White Paper: Natural Gas Pipelines and Unmarked Sewer Lines A Damage Prevention Partnership
` AGA White Paper: Natural Gas Pipelines and Unmarked Sewer Lines A Damage Prevention Partnership Copyright 2010 American Gas Association, All Rights Reserved See Notice and Disclaimer on final page. April
TRAFFIC ACCIDENT STUDY GUIDE 2010
TRAFFIC ACCIDENT STUDY GUIDE 2010 SECTION SEVEN This study guide is designed to provide the law enforcement Explorer with basic principles. The guide is not all inclusive, and does not delineate specific
505.3.6 For a building with a crawl space, see Figure 10. 505-1
505 WATER SERVICE INSTALLATION 505.1 DEFINITION A service line is comprised of the piping and related appurtenances including the connection installed from the Des Moines Water Works water main to the
ELECTRIC SERVICE GUIDELINES (For Indiana)
ELECTRIC SERVICE GUIDELINES (For Indiana) FOR COMMERCIAL / INDUSTRIAL DEVELOPMENTS ELECTRIC SERVICE GUIDELINES FOR COMMERCIAL/INDUSTRIAL DEVELOPMENTS INTRODUCTION... 2 WHAT YOU NEED TO OBTAIN ELECTRIC
VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL
VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL I/We hereby agree to furnish to the Village of Lombard all necessary materials, equipment, and labor, to complete the North Industrial
SECTION 33 11 00.11 POLYVINYL CHLORIDE (PVC) PIPE
SECTION 33 11 00.11 POLYVINYL CHLORIDE (PVC) PIPE PART 1: GENERAL 1.01 SECTION INCLUDES PVC pressure pipe and fabricated fittings in nominal sizes 4-inches through 12-inches with cast iron pipe equivalent
PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS
C PROJECT ESTIMATE ASSUMPTIONS AND EXCLUSIONS In support of the alternatives development process, preliminary cost estimates were prepared for each of the three Candidate Build Alternatives. The cost estimates
Damage Information Reporting Tool (DIRT) USER S GUIDE
Damage Information Reporting Tool (DIRT) USER S GUIDE In order to comply with the Reporting & Evaluation best practices, identified in Chapter 9 of the 1999 Common Ground Study of One-Call Systems & Damage
DWG 001. Blueprint Reading. Line Standards Drawing Symbols. Instructor Guide
DWG 001 Blueprint Reading Line Standards Drawing Symbols Instructor Guide Module Purpose Introduction The purpose of the Blueprint Reading modules is to introduce students to production drawings and blueprint
GUIDELINES FOR PARALLEL CONSTRUCTION OF PIPELINES
GUIDELINES FOR PARALLEL CONSTRUCTION OF PIPELINES Technical support to The INGAA Foundation, Inc. by: Process Performance Improvement Consultants 1200 Post Oak Road, Suite 2705 Houston, TX 77056 USA F-2008-05
STANDARD SPECIFICATIONS SECTION 02956 CLOSED CIRCUIT TELEVISION INSPECTION OF SEWER MAINS, MANHOLES AND LATERALS
STANDARD SPECIFICATIONS SECTION 02956 CLOSED CIRCUIT TELEVISION INSPECTION OF SEWER MAINS, MANHOLES AND LATERALS PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements to execute internal closed
SECTION 22 LIGHTNING PROTECTION SYSTEM
SECTION 22 LIGHTNING PROTECTION SYSTEM 22.01 SCOPE: A. These Specifications shall form a part of the Contract Documents and shall govern construction work for all buildings to be built or modified for
BY-LAW NUMBER 284-94
BY-LAW NUMBER 284-94 A by-law to consolidate the by-laws that regulate traffic on roads under the jurisdiction of The Corporation of the City of Vaughan, and to repeal By-laws Numbered 281-90, 54-83, 299-86,
TREE ORDINANCE. Section
CHAPTER 27: TREE ORDINANCE Section 27-101 Definitions 27-102 Tree City Board 27-103 Adoption of Administrative Guidelines 27-104 Tree Surgeon and Landscaping License 27-105 Permits 27-106 Landscape Strips/Islands
Chapter 162 SHADE TREE COMMISSION
Chapter 162 SHADE TREE COMMISSION 162-1. Purpose. 162-2. Definitions. 162-3. Shade Tree Commission. 162-4. Powers and duties of Commission. 162-5. Approval required. 162-6. Duties and responsibilities.
Pipe Bursting. Case Study at Zeeland, MI Collections Seminar September 6, 2012. Presentation Agenda. What is Pipe Bursting? What is Pipe Bursting?
Pipe Bursting Case Study at Zeeland, MI Collections Seminar September 6, 2012 By: Brian Hannon, PE and John Racek, PE Presentation Agenda What is Pipe Bursting? History of Pipe Bursting Types of Pipe Bursting
CD i -STREETS- Detail #
-STREETS- Detail # 3000 Vertical Curb, Gutter and Sidewalk 3010 Low-Profile Curb, Gutter and Sidewalk 3020 Rolled Curb, Gutter and Sidewalk 3030 Separated Sidewalk, Curb & Gutter 3040 Sidewalk Staged Construction
Area and Circumference
4.4 Area and Circumference 4.4 OBJECTIVES 1. Use p to find the circumference of a circle 2. Use p to find the area of a circle 3. Find the area of a parallelogram 4. Find the area of a triangle 5. Convert
STANDARD SPECIFICATIONS FOR SIGNAGE, STRIPING, AND LIGHTING TOWNSHIP OF STANFORD
STANDARD SPECIFICATIONS FOR SIGNAGE, STRIPING, AND LIGHTING TOWNSHIP OF STANFORD TABLE OF CONTENTS 1.00 2.00 3.00 4.00 GENERAL REQUIREMENTS MATERIALS DESIGN LAYOUT STANDARD PLATES Page No. 1 1 3 5 STANDARD
ARTICLE VI (ALTERNATE) STANDARD SPECIFICATIONS. for (PVC) SANITARY SEWER MAIN CONSTRUCTION
ARTICLE VI (ALTERNATE) STANDARD SPECIFICATIONS for (PVC) SANITARY SEWER MAIN CONSTRUCTION VI(A).1 General VI(A).2 Materials and Equipment VI(A).3 Installation of Sanitary Sewer Mains VI(A).4 Laying of
Basic Math for the Small Public Water Systems Operator
Basic Math for the Small Public Water Systems Operator Small Public Water Systems Technology Assistance Center Penn State Harrisburg Introduction Area In this module we will learn how to calculate the
Evaluation of the Shared-Use Arrow
Evaluation of the Shared-Use Arrow Table of Contents Page Evaluation of the Shared-Use ARROW Background... 1 ARROW Design... 1 ARROW Placement... 2 Wayne E. Pein William W. Hunter J. Richard Stewart Report
Reference Guide for Obtaining Permits and Utility Services For New Construction
Reference Guide for Obtaining Permits and Utility Services For New Construction (Revised 04-2012) Table of Contents City Offices Telephone Numbers...1 Application for Utilities...2 Building Permits New
SANITARY SEWER SERVICE CONNECTION INSTRUCTIONS
1 SANITARY SEWER SERVICE CONNECTION INSTRUCTIONS TABLE OF CONTENTS I. Introduction II. General Information and Requirements A. Applying for Sewer connection B. Excavation C. Cutting Concrete and Asphalt
CHAPTER 1 TRAFFIC SIGNAL DESIGN STANDARDS AND GUIDELINES
CHAPTER 1 TRAFFIC SIGNAL DESIGN STANDARDS AND GUIDELINES SECTION 1: INTRODUCTION... 1 ACKNOWLEDGMENTS... 1 SECTION 2: TRAFFIC SIGNAL PLAN REQUIREMENTS... 2 SECTION 3: VDOT Project Development Process...
SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.
SECTION LS 2530 SANITARY SEWERS PART 1 GENERAL 1.1 SUBMITTALS A. General: Submit the following in accordance with The General Conditions. 1. Product data for drainage piping specialties. 2. Shop drawings
2.0 DESIGN CRITERIA FOR WATER DISTRIBUTION SYSTEMS
2.0 DESIGN CRITERIA FOR WATER DISTRIBUTION SYSTEMS Water system improvements proposed for inclusion into Western s service area shall be designed in accordance with all appropriate AWWA standards, include
Los Angeles County Department Of Public Works. Land Development Division. Bond Calculation Sheets
Los Angeles County Department Of Public Works Land Development Division Bond Calculation Sheets Effective July 1, 2015 COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS LAND DEVELOPMENT DIVISION ROADS COST
General Utility Work Obligations
General Utility Work Obligations This Section addresses the Utility Company (or Utility Owner) requirements. It does not apply to existing stormwater facilities, irrigation ditches, Intelligent Transportation
DITCH WITCH MT12 MICROTRENCHER. ditchwitch.com
DITCH WITCH MT12 MICROTRENCHER ditchwitch.com Rule With An Iron Fist. ditchwitch.com DITCH WITCH MT12 MicroTrencher Throughout the world, demand is increasing for faster broadband communications, necessitating
Utilities Section Update
Utilities Section Update DelDOT Winter Workshop, 2015 February 19, 2015 Eric Cimo DelDOT Utilities Engineer 302 760 2642 [email protected] Agenda Overview of section and structure Section Updates Utility
ARTICLE 167 Shade Tree Commission, Shade Trees
ARTICLE 167 Shade Tree Commission, Shade Trees 167.01 Definitions 167.07 Signs and Cables 167.02 Shade Tree Commission Prohibited 167.03 Street Tree Planting 167.08 Shade Tree Damage 167.04 Street Tree
SWIMMING POOL, SPA, & HOT TUB GUIDELINES
SWIMMING POOL, SPA, & HOT TUB GUIDELINES Pool permit cost is based on the total value of the project. See Permit Fee Schedule Table 1A. A. Adopted construction codes and installation requirements 1. 2015
AWWA Small Systems Pipe Repair Checklist, as published in July 2008 Opflow Question of the Month
, as published in July 2008 Opflow Question of the Month Thanks to: Mike Grahek, Los Angeles Department of Water, Los Angeles, California Ahmad Havivian, Black & Veatch, Gaithersburg, Maryland David Kroon,