DAMAGE PREVENTION LEGISLATION ELEMENTS REQUIRED FOR CANADA
|
|
|
- Jesse Baldwin
- 10 years ago
- Views:
Transcription
1 DAMAGE PREVENTION LEGISLATION ELEMENTS REQUIRED FOR CANADA
2 Ensuring the Highest Level of Public, Worker and Community Safety with Effective Legislation for Damage Prevention / Protection of Buried Infrastructure Executive Summary Background: Uncontrolled excavation, or undertaking a digging project without the knowledge of where underground infrastructure are located (such as natural gas service lines, oil pipelines, electricity wires, and telecommunications wires) is the most frequent cause of damage to buried infrastructure. Following safe digging practices through accurately identifying, locating, and marking buried utilities by contacting a provincial One Call centre or line locating service before digging avoids delay of projects, disruption of essential services, property damage, environmental contamination, and serious injury. In Canada, safe excavation requirements near buried infrastructure are governed by a host of municipal, provincial, and federal regulators, each with respective legislation and governance. This patch work approach creates inconsistency across jurisdictions, is difficult to follow, and is difficult to enforce. In order to minimize damages and ensure the highest level of productivity and public, worker, and community safety, the Canadian Common Ground Alliance (CCGA) argues that damage prevention legislation must be nationally consistent. This white paper, developed by the CCGA, articulates a series of principles and specific elements for effective legislation that, along with other key elements like improved communication and the development of safe excavation best practices, would result in safer digging practices, greater protection of underground infrastructure, and community safety. Key Components of Effective Damage Prevention of Buried Infrastructure Legislation: The paper articulates 10 key components for effective and consistent damage prevention legislation and regulation across jurisdictions. These include: 1. Clarity: Regulatory language should be clear and concise in defining the accountabilities, roles and responsibilities of all parties. 2. One Call Legislation: In order to simplify the damage prevention process, every province and territory must have access to a One Call System, via one national phone number, and an internet access point. Every owner or operator of underground infrastructure must be a member of a One Call System. Prior to commencing their project, any party causing a ground disturbance must contact a One Call Centre to obtain the location of buried infrastructure. Infrastructure owners and operators must promptly respond to a locate request by dispatching trained personnel to accurately locate and mark buried infrastructure. Ground disturbance must commence before the expiry of the locate s specified lifespan. The American Public Works Association (APWA) uniform colour code for buried utility markings should be mandated.
3 3. Mandatory Damage Reporting: Excavators and owner/operators must report contact with or damage to buried infrastructure. 4. Protection of Buried Infrastructure through Permitting, Irrespective of Location: Risk based provisions would allow for the appropriate safety permitting and/or agreement processes for ground disturbances near or across buried infrastructure whether or not the buried infrastructure is within a right of way. 5. Excavation/Ground Disturbance: In certain circumstances, manual or soft excavation must precede mechanical ground disturbance to positively identify buried infrastructure. Legislation should outline procedures for emergency excavations and the pre identification of an excavation site. 6. Public Awareness Programs: Provisions should be included for the education of the digging community and general public on safe excavation and how to respond to an emergency by qualified individuals. 7. Mobile Crossings: Provisions should be included to manage heavy vehicle or mobile equipment crossings over buried infrastructure occurring outside the traveled portion of a highway or public road. 8. Identification and Authority of Inspectors: Provisions should ensure representatives are qualified and have the authority to inspect, locate, and authorize activities related to excavation near buried infrastructure. 9. Enforcement and Penalties: A formal enforcement authority and process should be defined to investigate and issue penalties for violations. 10. Continuous Improvement: Legislation should include a provision for periodic review of the effectiveness of the damage prevention legislation. About the Canadian Common Ground Alliance (CCGA) Through shared responsibility among all stakeholders, the CCGA works to reduce damages to underground infrastructure ensuring public safety, environmental protection, and the integrity of services by promoting effective damage prevention practices. Stakeholders interested in improving damage prevention include excavators, locators, road builders, electricity, telecommunications, oil, gas, railroad, water, one call centres, public works, equipment manufacturing, provincial and federal regulators, and insurance, emergency services and engineering and design companies. For further information contact: Mike Sullivan Chair Canadian Common Ground Alliance Tel: (403) [email protected]
4 DAMAGE PREVENTION LEGISLATION ELEMENTS REQUIRED FOR CANADA INTRODUCTION In Canada, ground disturbance near buried infrastructure is governed by a host of municipal, provincial and federal regulators, each with their own legislation and governance. The majority of damage prevention legislative framework governing this infrastructure has been developed in a piecemeal fashion which has led to an inconsistent national patchwork. The legislative inconsistencies and variations across governing bodies at best provides for a difficult system to follow and enforce, particularly when ground disturbance occurs across legislative boundaries. In order to ensure the highest level of public, worker, and community safety, damage prevention legislation must be consistent and easy to navigate. In this white paper, the CCGA proposes to outline the minimum framework of effective damage prevention legislation. The CCGA is confident that successful implementation across Canada of this minimum and consistent framework by all governing bodies would radically reduce the number of damages to buried infrastructure thereby enhancing the integrity of Canada s buried critical infrastructure and the safety of all Canadians. Although this white paper focuses on the legislative requirements, it is understood that other elements such as comprehensive public outreach, education, and safe excavation practices are integral to a complete damage prevention system. However, these will not be discussed in detail here. Page 1 of 7
5 1. CLARITY Regulatory language should be clear and concise. It should be specific in defining the accountabilities, roles, and responsibilities of all parties. 2. ONE CALL LEGISLATION Legislation should include: 2.1. Access to a One Call System for every province and territory While access to a One Call System is required by all owners and operators of buried infrastructure, it is not necessary for a One Call Centre to be present in every province or territory. Where a One Call Centre does not exist, access to the nearest centre is provided via telephone system or internet Mandatory membership and registration in a One Call System for buried infrastructure owners and operators Every person or entity that owns or operates underground infrastructure that is within a public right of way or that crosses a public right of way or that is in the vicinity of a public right of way must be a member of a One Call System. This includes, but is not limited to, utilities, transmission, and telecommunication companies, municipalities (e.g. water, gas, sewer, cable, etc.), provincial, territorial, and federal agencies, and private or public institutions that operate their own infrastructure (e.g. railroads, hospitals, manufacturing plants, underground propane distribution companies, gathering, distribution, production, and transmission pipelines, and any hazardous material lines, etc.). This is not necessarily meant to include private landowners and other entities who may operate buried infrastructure which does not cross a public right of way (e.g. a homeowner who owns a propane gas line on his own property). Inclusion of all buried infrastructure increases the likelihood that all infrastructure is located, leading to safer excavation and reducing the likelihood of damage Mandatory Call Before You Dig system (no exemptions) Step 1: Any party that will cause a ground disturbance must contact the One Call Centre to obtain a locate of buried infrastructure within the specified timeframe prior to commencing their project. ( ground disturbance selected to capture both excavation and disturbances of the soil which would impact nearby buried infrastructure in order to truly create a damage prevention culture). Step 2: Buried infrastructure owners and operators must positively respond to a locate request (e.g. locate and mark, and / or, provide an all-clear and / or establish an Page 2 of 7
6 alternate locate agreement with the person undertaking ground disturbance) within a specified timeframe. Step 3: A locate has a specified lifespan. If this expires prior to commencement of work, a new locate is required before any ground disturbance commences Locator qualification and documentation Minimum training and practices should be adopted for locator training. Documentation of all training should be maintained to ensure infrastructure locators are properly trained. Proper locator training provides additional safety for the excavators who are following all the appropriate processes The APWA uniform colour for buried infrastructure markings should be mandated Page 3 of 7
7 2.6. Simplified access to One Call Centres and the damage prevention process Establishing one national phone number, internet access point, and mobile device application will simplify access to One Call Centres thereby increasing the likelihood that the telephone number and / or internet access point will be contacted prior to digging. 3. MANDATORY DAMAGE REPORTING Legislation should include provisions for: Excavators / Digging Community to report contact with a buried infrastructure to the owner / operator; Owner / operators of buried infrastructure to report excavation damage to buried infrastructure to appropriate agency; Participation in anonymous incident tracking program by owner / operators and excavators / digging community; and Immunity from prosecution or penalties for reporting damages to buried infrastructure into an anonymous incident tracking program, except in the cases of willful misconduct or negligence. Mandatory reporting of damages would provide more accurate and comprehensive data to measure damage prevention progress. The data could help drive improvements in processes, training, education, advertising or possible legislative changes. 4. PROTECTION OF BURIED INFRASTRUCTURE THROUGH PERMITTING, IRRESPECTIVE OF LOCATION (e.g. within public rights of way, easements, public road allowances, etc.) Legislation should include risk-based provisions that allow for the appropriate permitting and / or agreement processes for ground disturbances near or across buried infrastructure (including crossing / proximity agreements, permitting process, etc.) wherever buried infrastructure are located. The protection of buried infrastructure is significantly enhanced when the Call Before You Dig / One Call process is accompanied by municipal / provincial / federal permitting processes, crossing permits, agreements or contractual language identifying the terms and conditions relative to the crossing (separation between facilities, nature of excavation, backfill requirements, etc.). Page 4 of 7
8 5. EXCAVATION / GROUND DISTURBANCE Legislation should include provisions for: 5.1. Excavation within identified tolerance zone(s) No mechanical ground disturbance is allowed within a defined tolerance zone until sufficient earth has been removed via soft excavation (e.g. the use of vacuum excavation techniques [air or water] and manual / hand digging) so the buried infrastructure can be positively identified and the direction and course of the existing buried infrastructure determined. Once direction and course is determined, mechanical ground disturbance must follow provisions as specified by owner / operator for working in close proximity of that buried infrastructure. Mechanical ground disturbance is the use of powered equipment that has a high likelihood of damaging buried infrastructure, such as backhoes, boring machines, drilling machines, augers, etc Emergency Excavation In the event of the need for emergency excavation for situations that involve danger to life, health or property, or that require immediate correction in order to continue the operation of or to assure the continuity of public utility service or public transportation, the excavator must place an emergency one-call prior to excavation. The One Call Center must be able to receive and process emergency one-calls 24 hours per day, 7 days per week and shall notify all affected buried infrastructure owner / operators immediately on receipt of the emergency one-call. The owner / operator shall respond within a reasonable time period Pre-identification of Excavation site If the location of the excavation cannot be clearly identified on the locate ticket, then the excavator must identify the excavation site by white-lining it prior to the arrival of the locator or, if this is not possible (e.g. the excavation site is too large to white-line or weather conditions such as snow cover preclude white-lining, etc.) conduct a pre-excavation meeting with the facility locator. 6. PUBLIC AWARENESS PROGRAM Legislation should include provisions for: Education and awareness targeting the digging community and the general public; and Qualification of those providing education and awareness. Education and awareness includes guidelines on how to respond to emergency situations. Page 5 of 7
9 7. MOBILE CROSSINGS Legislation should include provisions for: Managing mobile crossings over buried infrastructure where the mobile equipment is operated outside the travel portion of a highway or public road. 8. IDENTIFICATION AND AUTHORITY OF INSPECTORS Buried infrastructure owners and operators routinely employ authorized representatives to oversee and inspect ground disturbances near or across their respective infrastructure relative to the terms and conditions of a crossing, proximity agreement or permit. In order to be effective and clear, legislation must include provisions to: identify, qualify, and authorize regulatory inspectors; identify, and authorize buried infrastructure owner / operator Representatives or Inspectors; and authorize buried infrastructure owner / operator Representatives or Inspectors to stop dangerous work near buried infrastructure. 9. ENFORCEMENT AND PENALTIES An active enforcement authority (the agency) receives and investigates reports of violations of the applicable damage prevention law(s). The regulatory agency has enforcement authority to issue civil penalties on the spot for non-compliance with the damage prevention process by buried infrastructure owners and operators, locators / locating contractors, and digging community. Noncompliance includes, but may not be limited to, failure to conform to damage prevention governance, failure to accurately locate buried infrastructure, and disturbing the ground without proof of a valid one call ticket or permit (where applicable). Legislation should include: an escalating penalty scale with provisions for meaningful enforcement of non-compliance with damage prevention process; larger penalties for repeat offenders and violations of increased risk and consequence; provisions for public awareness and education imposed at every level of enforcement; the ability for legislation to allow for creative penalties that would increase public awareness and education; Page 6 of 7
10 consideration of a graduated Administrative Monetary Penalty System (AMPS); provisions for regulatory authorities to invoice for attendance at incidents for emergency response and investigative purposes and to bill a party for punitive purposes; and annual statistics on investigations, enforcement actions, and proposed and collected penalties to be made available by the agency to interested parties. Evidence shows that damages to buried infrastructure have decreased where a formal enforcement process is in place. 10. CONTINUOUS IMPROVEMENT Legislation should include provisions for: Continuous improvement, assessment and effectiveness of the damage prevention legislative elements described herein. Page 7 of 7
Excavation & Trenching Procedure
Excavation & Trenching 1. Overview The will ensure, as far as is reasonably practicable, that the conduct of work relating to excavation and trenching will not be harmful to the health and safety of employees
Vendor Management Program
The Corporation of the City of Kawartha Lakes is committed to the provision of a safe and healthy work environment for its employees, contractors and visitors. To promote this type of environment, the
Guidelines for Excavations
O c t o b e r 2 0 0 1 Guidelines for Excavations in the vicinity of gas lines Technical Standards & Safety Authority Putting Public Safety First Guidelines for Excavations in the Vicinity of Gas Lines
Permit No. Permit Fee: $295.00. Permit Expires (D+90 days): Business Name: Applicants Name: Telephone Number: E-mail Address:
City of Woodland Park Internet Service Provider (IPS) Permit for Installation of Telecommunication Infrastructure within City Owned Rights-of-Way (up to five locations per single permit) Permit No. Permit
Effective July 1, 2010 WYOMING STATE LAW Title 37 Public Utilities Chapter 12 Article 3. DAMAGE TO UNDERGROUND PUBLIC UTILITY FACILITIES
Effective July 1, 2010 WYOMING STATE LAW Title 37 Public Utilities Chapter 12 Article 3. DAMAGE TO UNDERGROUND PUBLIC UTILITY FACILITIES 37-12-301. Short title; definitions. (a) This act may be known and
FEDERAL GOVERNMENT OVERSIGHT OF PIPELINE SAFETY
Operational Safety INTRODUCTION The Millennium Pipeline Company (Millennium) is proud of the key role it plays in New York s energy infrastructure. The Millennium Pipeline is a vital link in a system that
HIGHWAYS ACT 1980 SECTION 171 : LICENCE APPLICATION PACK. Consent to deposit building materials and making of excavations in the Public Highway
HIGHWAYS ACT 1980 SECTION 171 : LICENCE APPLICATION PACK Consent to deposit building materials and making of excavations in the Public Highway All Correspondence to : Reading Borough Council Highways Department
Damage Information Reporting Tool (DIRT) USER S GUIDE
Damage Information Reporting Tool (DIRT) USER S GUIDE In order to comply with the Reporting & Evaluation best practices, identified in Chapter 9 of the 1999 Common Ground Study of One-Call Systems & Damage
PLEASE NOTE. For more information concerning the history of this Act, please see the Table of Public Acts.
PLEASE NOTE This document, prepared by the Legislative Counsel Office, is an office consolidation of this Act, current to September 1, 2013. It is intended for information and reference purposes only.
APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE
APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE JURISDICTION OF ALBERTA TRANSPORTATION 1.0 Application Procedures 2.0
Plumbing and Drainage Regulation 2012
Regulatory Impact Statement Subordinate Legislation Act 1989 Plumbing and Drainage Regulation 2012 A regulation under the Plumbing and Drainage Act 2011 April 2012 Enquiries to: NSW Fair Trading Policy
All Oil and Gas Companies under the Jurisdiction of the National Energy Board (the Board or NEB) and All Interested Parties
File 172-A000-73 24 April 2002 To: All Oil and Gas Companies under the Jurisdiction of the National Energy Board (the Board or NEB) and All Interested Parties SECURITY AND EMERGENCY PREPAREDNESS AND RESPONSE
S Y S T E M M O D E R N I Z A T I O N
S Y S T E M M O D E R N I Z A T I O N T H E L I N E M B E X T E N S I O N P R O J E C T B A L T I M O R E A N D H A R F O R D C O U N T I E S, M A R Y L A N D Project Overview Columbia Gas Transmission
Heavy Loads on Roads By-law
Heavy Loads on Roads By-law S-2 Consolidated May 2006 This by-law is printed under and by authority of the Council of the City of London, Ontario, Canada Disclaimer: The following consolidation is an electronic
Chapter 15 Saskatchewan Government Insurance Monitoring Certified Vehicle Inspection Stations 1.0 MAIN POINTS
Chapter 15 Saskatchewan Government Insurance Monitoring Certified Vehicle Inspection Stations 1.0 MAIN POINTS On behalf of the Saskatchewan Auto Fund (Fund), Saskatchewan Government Insurance (SGI) is
NEW HOME CONSTRUCTION
NEW HOME CONSTRUCTION A New Home Purchaser s Guide to the Construction of New Subdivisions and Homes in the City of Brampton Provided by Developer/Builder Responsibilities Ontario Building Code Compliance
Presentation Outline. Introduction Ontario s Spill Legislation Spills Action Centre Ministry Field Response Roles and responsibilities
Spill Response in Ontario Ministry of the Environment June 20, 2012 Presentation Outline Introduction Ontario s Spill Legislation Spills Action Centre Ministry Field Response Roles and responsibilities
O N T A R I O B U I L D I N G C O D E
Professional Engineers Ontario GUIDELINE P R O F E S S I O N A L E N G I N E E R S P R O V I D I N G G E N E R A L R E V I E W O F C O N S T R U C T I O N A S R E Q U I R E D B Y T H E O N T A R I O B
A Guide to Development of Land over Natural Gas Pipeline Rights-of-Way
A Guide to Development of Land over Natural Gas Pipeline Rights-of-Way 1 Introduction Q uestar Corporation is an integrated natural gas company headquartered in Salt Lake City, Utah. Through subsidiaries
Department of Transportation Grants Management Process (PHMSA) Process Description: Pipeline Safety One-Call Grants Discretionary
Department of Transportation Grants Management Process (PHMSA) Process Description: Pipeline Safety One-Call Grants Discretionary Introduction to the One-Call Grant The U.S. Department of Transportation,
Statutes in translation Please note that this translations are not official translations. The translation is furnished for information purposes only
Statutes in translation Please note that this translations are not official translations. The translation is furnished for information purposes only and the documents are not legal documents. The texts
A Guide to the SPILL CONTINGENCY PLANNING AND REPORTING REGULATIONS
A Guide to the SPILL CONTINGENCY PLANNING AND REPORTING REGULATIONS Environment and Natural Resources Updated March 2011 INTRODUCTION This guide has been developed to assist individuals or companies in
Preparation of a Rail Safety Management System Guideline
Preparation of a Rail Safety Management System Guideline Page 1 of 99 Version History Version No. Approved by Date approved Review date 1 By 20 January 2014 Guideline for Preparation of a Safety Management
Corporate Standard. Contractor Management
Corporate Standard Contents Purpose... 2 Scope... 2 Definitions... 2 Background... 3 Specific Requirements... 4 Responsibilities... 11 Review Date... 11 References... 11 Date Issued July 2010 Management
PLEASE NOTE. For more information concerning the history of these regulations, please see the Table of Regulations.
PLEASE NOTE This document, prepared by the Legislative Counsel Office, is an office consolidation of this regulation, current to June 1, 2014. It is intended for information and reference purposes only.
GUIDELINES FOR PARALLEL CONSTRUCTION OF PIPELINES
GUIDELINES FOR PARALLEL CONSTRUCTION OF PIPELINES Technical support to The INGAA Foundation, Inc. by: Process Performance Improvement Consultants 1200 Post Oak Road, Suite 2705 Houston, TX 77056 USA F-2008-05
4.05e WHS Guidelines for Incident Investigation Procedures Page 1 of 7
Page 1 of 7 1 Purpose It is a legal requirement under the NSW Work Health and Safety Act 2011 and NSW Work Health and Safety Regulation 2011 to identify hazards, assess the risk of those hazards, implement
Permits to Dig / Permits to Excavate / Permits to work near underground services
Permits to Dig / Permits to Excavate / Permits to work near underground services Aim and purpose The aim of this guidance is to identify what should be included in a permit to excavate / dig and additional
Public Awareness Programs for Pipeline Operators API RECOMMENDED PRACTICE 1162 FIRST EDITION, DECEMBER 2003
Public Awareness Programs for Pipeline Operators API RECOMMENDED PRACTICE 1162 FIRST EDITION, DECEMBER 2003 Public Awareness Programs for Pipeline Operators Pipeline Segment API RECOMMENDED PRACTICE 1162
TABLE OF CONTENTS CHAPTER 6 CABLE COMMUNICATIONS SYSTEMS/GAS COMPANY FACILITIES
TABLE OF CONTENTS CHAPTER 6 CABLE COMMUNICATIONS SYSTEMS/GAS COMPANY FACILITIES Articles: I. Cable Communications Systems Sec. 6-1 Operation requirements; nonexclusivity of franchise Sec. 6-2 Franchise
The Electrical Safety Regulation (pre and post 1 January 2014)
The Electrical Safety Regulation (pre and post 1 January 2014) The following table provides an overview comparison between the Electrical Safety Regulation 2002 (the ESR 2002) current as at 1 July 2013
Trenching and Excavation Safety
1.0 ACTIVITY DESCRIPTION 1.1 This document provides basic safety guidelines related to excavation and trenching in pipeline construction activities. These guidelines are applicable to the locating, marking
ENERGY, MINES AND RESOURCES (EMR) ASSESSMENT REGULATORY GUIDE:
Energy, Mines and Resources Energy, Mines and Resources Energy, Mines and Resources Energy, Mines and Resources ENERGY, MINES AND RESOURCES (EMR) ASSESSMENT REGULATORY GUIDE: A guide to explain how EMR
APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND TELECOMMUNICATION CABLES IN THE VICINITY OF TRANSPORTATION FACILITIES
APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND TELECOMMUNICATION CABLES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE JURISDICTION OF ALBERTA TRANSPORTATION 1.0 Application Procedures 2.0
PART 2.11 SERVICE NL WORKPLACE HEALTH AND SAFETY INSPECTIONS
PART 2.11 SERVICE NL WORKPLACE HEALTH AND SAFETY INSPECTIONS Executive Summary Service NL (the Department) through its Occupational Health and Safety (OHS) Branch (the Branch) has a mandate to maintain
INTRODUCTION... 3. 1.0 Purpose... 4. 2.0 Policy... 4. Exception for Short-Term Workplace Visits... 4. Relevant Legislation and Regulations...
March 2006 INTRODUCTION... 3 1.0 Purpose... 4 2.0 Policy... 4 Exception for Short-Term Workplace Visits... 4 Relevant Legislation and Regulations... 5 Definitions... 5 Contractor Safety Coordination Overview...
10. BUILDING AN EFFECTIVE ENFORCEMENT PROGRAM
10. BUILDING AN EFFECTIVE ENFORCEMENT PROGRAM This chapter discusses issues involved in building and managing enforcement programs. While program structure and resources depend greatly on the roles, responsibilities,
TOWN OF RAYNHAM APPLICATION FOR COMMERCIAL BUILDING PERMIT
MAP PARCEL TOWN OF RAYNHAM APPLICATION FOR COMMERCIAL BUILDING PERMIT This form is an application for approval, not a building permit. Fill out application carefully. Applications lacking required data
IAC 7/2/08 Utilities[199] Ch 9, p.1 CHAPTER 9 RESTORATION OF AGRICULTURAL LANDS DURING AND AFTER PIPELINE CONSTRUCTION
IAC 7/2/08 Utilities[199] Ch 9, p.1 CHAPTER 9 RESTORATION OF AGRICULTURAL LANDS DURING AND AFTER PIPELINE CONSTRUCTION 199 9.1(479,479B) General information. 9.1(1) Authority. The standards contained herein
Building Permit Application Packet. BUILDING CODES Adopted by La Plata County For Enforcement In The Unincorporated Areas Of La Plata County
Building Permit Application Packet The purpose of Building Codes is to establish the minimum requirements to safe guard the public health, safety and general welfare through structural strength, means
Article 1: Subject. Article 2: Orders - Order Confirmation
GENERAL CONDITIONS OF PURCHASE Article 1: Subject 1.1 The following general conditions of purchase (the "General Conditions") establish the contractual conditions governing the purchase of raw materials,
SAMPLE RETURN POLICY
DISCLAIMER The sample documents below are provided for general information purposes only. Your use of any of these sample documents is at your own risk, and you should not use any of these sample documents
CHOOSE YOUR NATURAL GAS OPTION:
Get Energy Sign-Up Form The offer to buy Natural Gas from Get Energy is open only to existing Electricity Customers. Simply choose your rate option and fill out your personal information including your
MAJOR PROJECTS CONSTRUCTION SAFETY STANDARD HS-09 Revision 0
MAJOR PROJECTS CONSTRUCTION SAFETY SECURITY MANAGEMENT PROGRAM STANDARD HS-09 Document Owner(s) Tom Munro Project/Organization Role Supervisor, Major Projects Safety & Security (Canada) Version Control:
PLEASE NOTE. For more information concerning the history of this Act, please see the Table of Public Acts.
PLEASE NOTE This document, prepared by the Legislative Counsel Office, is an office consolidation of this Act, current to December 2, 2015. It is intended for information and reference purposes only. This
EDUCATION AND CULTURE - REGULATION OF PRIVATE TRADE SCHOOLS
DEPARTMENTAL AUDITS EDUCATION AND CULTURE - REGULATION OF PRIVATE TRADE SCHOOLS. EDUCATION AND CULTURE - REGULATION OF PRIVATE TRADE SCHOOLS BACKGROUND.1 The Minister of Education and Culture is responsible
TOWN OF OHIO BUILDING PERMIT APPLICATION
DATE OF APPLICATION APPLICANT'S NAME, ADDRESS OWNER, ADDRESS PHONE:[ ] - PHONE:[ ] - E-MAIL: APPLICANT IS: OWNER [ ] CONTRACTOR [ ] PROJECT LOCATION: ROAD DIRECTIONS TAX MAP # NATURE OF WORK: [CHECK ALL
Guideline to the Duties and Responsibilities of Licensed Electrical Contractors (LECs) and Designated Master Electricians (DMEs)
Guideline to the Duties and Responsibilities of Licensed Electrical Contractors (LECs) and Designated Master Electricians (DMEs) August 2014 LEGAL DISCLAIMER This document has been prepared as a guideline
CHBA Briefing Note on Liability in the Residential Building Industry
CHBA Briefing Note on Liability in the Residential Building Industry Introduction Objectives The objective of this report is to present some recent developments in Canada on the topic of liability in the
APPLICATION KIT AND GUIDELINES FOR ORGANISATIONS SEEKING TO UNDERTAKE WORKS WITHIN ROAD RESERVE LOW COMPLEXITY WORKS.
Document No: 16-02-12A Issue Date: 09 December 2014 APPLICATION KIT AND GUIDELINES FOR ORGANISATIONS SEEKING TO UNDERTAKE WORKS WITHIN ROAD RESERVE LOW COMPLEXITY WORKS (An approved Traffic Management
INTRODUCTION TO THE WORK HEALTH AND SAFETY ACT
INTRODUCTION TO THE WORK HEALTH AND SAFETY ACT Harmonisation Topics Agenda Person Conducting a Business or Undertaking (PCBU s) Directors & Officers inc due diligence Workers Consultation Health & Safety
Canadian Council of Independent Laboratories (CCIL) Association of Consulting Engineering Companies - Canada (ACEC)
SUBMISSION TO: Canadian Nuclear Safety Commission PO Box 1046 Station B Ottawa, Ontario K1P 5S9 [email protected] FROM: RE: Canadian Council of Independent Laboratories (CCIL) Association of
PHI Air Medical, L.L.C. Compliance Plan
Page No. 1 of 13 Introduction: The PHI Air Medical, L.L.C. is to be used by employees, contractors and vendors to get a high level understanding of the key regulatory requirements relating to our participation
Part of Your Community Important Safety Information. TransCanada - Bison Pipeline
Part of Your Community Important Safety Information TransCanada - Bison Pipeline Public Safety Information Pipeline Safety is Everybody s Business This brochure contains important safety information about
GUIDELINES FOR FOOD IMPORT CONTROL SYSTEMS
GUIDELINES FOR FOOD IMPORT CONTROL SYSTEMS SECTION 1 SCOPE CAC/GL 47-2003 1. This document provides a framework for the development and operation of an import control system to protect consumers and facilitate
SECTION BY SECTION ANALYSIS COMPTETITIVE CABLE AND VIDEO SERVICE ACT
SECTION BY SECTION ANALYSIS COMPTETITIVE CABLE AND VIDEO SERVICE ACT Sections 1-3 These introductory sections explain that the new act will amend the existing cable law (Title 7, Chapter 59), name the
Guide to Assessment and Rating for Regulatory Authorities
Guide to Assessment and Rating for Regulatory Authorities January 2013 Copyright The details of the relevant licence conditions are available on the Creative Commons website (accessible using the links
The Control of Major Accident Hazards Regulations (Northern Ireland) 2015
STATUTORY RULES OF NORTHERN IRELAND 2015 No. 325 HEALTH AND SAFETY The Control of Major Accident Hazards Regulations (Northern Ireland) 2015 Made - - - - 26th August 2015 Coming into operation - 28th September
Demo Permit Guide For Homeowners
Demo Permit Guide For Homeowners Building Services Tel: 705-436-3710 ext. 3504 or 3506 Fax: 705-436-7120 2101 Innisfil Beach Road, Innisfil, ON L9S 1A1 Website: www.innisfil.ca A Demo Permit Guide for
PLEASE PRINT. Job Name: Job # City File No. SIDEWALK; DRIVEWAY APPROACH; CURB & GUTTER; PEDESTRIAN RAMP; STREET LIGHT; PLANTER STRIP;
City of Santa Rosa ENCROACHMENT PERMIT APPLICATION Application#: Inspector: Liability Ins: WComp. Ins: FOR OFFICE USE ONLY NOTE: YOUR APPLICATION CANNOT BE PROCESSED WITHOUT COMPLETE INFORMATION IN AREAS
Definitions Landscape architect: A person who holds a license to practice landscape architecture in the state.
Landscape Architecture Licensure Laws ASLA Summary of Provisions CALIFORNIA California Statutes: Business and Professions Code, 5600 California Code of Regulations: Title 16, Division 26 Type of Law: Practice/title
CONTRACTOR SAFETY MANAGEMENT PROCEDURE
CONTRACTOR SAFETY MANAGEMENT PROCEDURE Version 1.0 TRIM file number Short description Relevant to Authority Responsible officer Responsible office Date introduced July 20, 2015 Date(s) modified June 11,
Pipelines and Informed Planning Alliance (PIPA): Land-Use Planning for Schools Near Transmission Lines
Pipelines and Informed Planning Alliance (PIPA): Land-Use Planning for Schools Near Transmission Lines Presented at NSBA s Annual Conference April 12 th, 2010 Presented by: Cynthia Munyon, Utility Specialist/Paralegal,
CHAPTER 53 CARE & PROTECTION OF HIGHWAYS
CHAPTER 53 CARE & PROTECTION OF HIGHWAYS 53101. Definitions. 53102. Permits: Petty Misdemeanor. 53103. Permit Terms. 53104. Cost of Work Supervision. 53105. Bond May Be Required. 53106. Notice Demanding
Occupational Health and Safety Act
Occupational Health and Safety Act CHAPTER 7 OF THE ACTS OF 1996 as amended by 2000, c. 28, ss. 86, 87; 2004, c. 6, s. 24; 2007, c. 14, s. 7; 2009, c. 24; 2010, c. 37, ss. 117-126; 2010, c. 66; 2011, c.
New York Laws. Title 11, ARTICLE 48-B REGISTRATION OF ALL TERRAIN VEHICLES
New York Laws 2281. Definitions. For the purposes of this article: 1. (a) "All terrain vehicle" or "ATV" means any self-propelled vehicle which is manufactured for sale for operation primarily on off-highway
HEALTH SAFETY & ENVIRONMENT MANAGEMENT SYSTEM
HEALTH SAFETY & ENVIRONMENT MANAGEMENT SYSTEM September 2011 OUR HEALTH, SAFETY AND ENVIRONMENT POLICY OUR PRINCIPLE OF DUE CARE We care about the wellbeing of our people and our impact on the environment.
BY-LAWS OF MISSOURI ONE CALL SYSTEM, INC.
BY-LAWS OF MISSOURI ONE CALL SYSTEM, INC. Inc." Section 1. ARTICLE I Name and Purposes of the Business Name. The name of this Corporation shall be "Missouri One Call System, Section 2. Purpose. The purpose
8.0 ENVIRONMENTAL PROTECTION MONITORING AND FOLLOW-UP
8.0 ENVIRONMENTAL PROTECTION MONITORING AND FOLLOW-UP 8.1 INTRODUCTION Mitigation measures, monitoring and other follow-up actions identified in Chapter 7 (Environmental Effects Assessment and Mitigation)
June 2010 HEALTH, SAFETY, AND ENVIRONMENT MANAGEMENT SYSTEM (HSEMS)
June 2010 HEALTH, SAFETY, AND ENVIRONMENT MANAGEMENT SYSTEM (HSEMS) TABLE OF CONTENTS PAGE PART I INTRODUCTION Corporate Health, Safety and Environment Policy.. 1 Purpose... 2 HSEMS Framework... 3 PART
GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2015 H 1 HOUSE BILL 255. Short Title: Building Code Reg. Reform. (Public)
GENERAL ASSEMBLY OF NORTH CAROLINA SESSION H 1 HOUSE BILL Short Title: Building Code Reg. Reform. (Public) Sponsors: Referred to: Representatives Brody, Riddell, Cotham, and Watford (Primary Sponsors).
MISLEADING ADVERTISING GUIDE
MISLEADING ADVERTISING GUIDE Complying with The Competition Act CREA THE CANADIAN REAL ESTATE ASSOCIATION Table of Contents Introduction...............................................2 What is Misleading
PLEASE NOTE. For more information concerning the history of these regulations, please see the Table of Regulations.
PLEASE NOTE This document, prepared by the Legislative Counsel Office, is an office consolidation of this regulation, current to January 01, 2007. It is intended for information and reference purposes
WHS CONTRACTOR MANAGEMENT PROCEDURE
1. Overview The Port Augusta City Council as part of its commitment under its WHS Contractor Management policy, recognises its obligation to: Ensure, so far as is reasonably practicable, the health and
Role in the project (e.g. Prime Engineering Consultant or Contractor), and summary of professional Duties : Name Professional Duties Contract Awarded?
PROPOSAL FORM FOR SINGLE PROJECT PROFESSIONAL INDEMNITY NOTE: THIS IS A PROPOSAL FOR A CLAIMS MADE POLICY Note : Please provide any necessary explanations or additional details by attachment to this Proposal
NEW HAMPSHIRE CODE OF ADMINISTRATIVE RULES. CHAPTER Puc 800 UNDERGROUND UTILITY DAMAGE PREVENTION PROGRAM
CHAPTER Puc 800 UNDERGROUND UTILITY DAMAGE PREVENTION PROGRAM Statutory Authority: RSA 374:50 PART Puc 801 APPLICATION OF RULES Puc 801.01 Purpose. (a) The purpose of Puc 800 is to protect the public,
REFERENCE. All National Grid personnel who plan and perform work involving protected water resources are responsible for:
EG-30NY ENVIRONMENTAL GUIDANCE PAGE 1 of 9 DATE 10/1/10 EP 3 Natural Resource Protection 1.0 SCOPE AND RESPONSIBILITIES National Grid s New York service territory encompasses thousands of wetlands, lakes,