Indiana University. Vice President for Capital Planning and Facilities
|
|
- Clare Allen
- 7 years ago
- Views:
Transcription
1 Indiana University Vice President for Capital Planning and Facilities DELIVERABLES REQUIREMENTS for CONSTRUCTION DOCUMENTS and AS-BUILT & RECORD DOCUMENTS Revised June 1,
2 Overview of Project Document Deliverables PROJECT SIZE CATEGORIES: Deliverable requirements of construction projects for Indiana University are based on estimated projected costs associated within the scope of work. There are three categories: 1. Projects with an estimated cost at or over $5,000,000 and which would be publicly bid; 2. Projects with an estimated cost under $5,000,000 while also greater than $150,000 and which would be publicly bid; 3. Projects with an estimated cost at or under $150,000 for which invitational bidding would be solicited from pre-qualified contractors; and projects for which pricing was procured through Job Order Contracting (JOC) or other methods not qualifying for categories 1 or 2 above. STANDARD TIME POINTS: While specific requirements for deliverables associated with each of the three above categories vary, the time points establishing the submission of contractual document deliverables for these categories do not. The following time points are based on long-standing practices followed by architects, engineers and contractors. Contract Documents: The process begins with review and acceptance of the construction design documents, known as Contract Documents, or commonly referred to as CD s ; these being either prepared by architectural and or engineering design consultants performing under contract to the University, or by IU s in-house design professionals. Bid Documents: The CD documents (construction drawings, plans, specifications) along with bidding documents and any addendums, are presented as the project s bid documents to construction contractors for competitive bidding. Then the selected contractor will use these documents to effect the project s defined construction. As-built and Record Documents: During the construction phase, changes to the project that modify intent described in original Bid Documents (bid-upon set of plans and specifications) may arise. 1. As-built (or Field Data Set): Changes are recorded by the contractor, resulting in an asbuilt set (paper or electronic) documents, which are maintained by the contractor through the project s construction and then submitted by the contractor to the designer. 2. Record Drawings: The designer compiles all As-builts submitted by contractor(s) into Record Drawings and/or Record BIM model(s), with the design consultant s concurring review of what changes were denoted, why they were made (such as accepted alternate or a found condition, etc.), and where they occurred. Bid Document Deliverables are prepared for the University by a design professional (either consultants performing under contract to the University, or by the University s in-house design professionals when there is no consultant under contract for the project). Bid documents consist of construction drawings, plans, specifications, along with bidding directions and any addendums, in either or both of written and graphic formats. The design professional electronically transmits in.pdf format the full set of construction drawings, specification sections and the addenda to those documents. The University s printing contractor is responsible for paper reproduction and distribution to contractors who have registered to receive the bid documents in order to publically offer a bid proposal for construction of the project. Contract or Construction Documents Deliverables are the same issue of documents cited in the paragraph above, however these deliverables are to be submitted to the University as they were natively created - in Revit.rvt and/or AutoCAD.dwg format and in Word.docx format. These file types are commonly required for public and invitational bid contracts. Within 10 days following award of bid for contract for construction, the design consultant must provide the UAO with one set of files in digital/electronic format as follows: 2
3 1. CAD Files; one file each - representing every sheet in the bid documents and with Addenda incorporated. Native CAD files shall be in.dwg format, one file for each sheet in the complete set with all xrefs fully bound. These documents must comply with University Architects Office CAD Standards. Use of AutoCAD e-transmit is recommended to bind each file. 2. Word processing files: all specifications shall be in native Word docx format (other than those provided by IU Business Office for Divisions 0 & 1). 3. Revit files: a design model for each discipline. Refer to Indiana University BIM Guidelines and standards for Architects, Engineers and Contractors. 4. COBie design submittal: When the design of scope of work designates installation of operating building equipment requiring on-going regular maintenance, a COBIE Design submittal is also required to be submitted in standard COBie xlsx workbook format with worksheet info completed for each of the following tabs at a minimum: (Tab2) Facility-ies referenced in the design; (Tab3)(Floor) description of vertical levels; (Tab4) Spaces referenced in the project; (Tab5) System- systems referenced in the project; referenced in the project; (Tab6) Register-material or equipment types(submittal register); (Tab7) Component Individually named materials and equipment. As-Built Deliverables are revisions to the construction documents based on changes that occur in the field. Contractor marks changes onto a field set of prints of the construction plans (required by their contract to be kept on site) as a log, denoting what and where the changes were made. The entire field set of plans denoting the changes are either scanned or created electronically by the contractor such that they clearly show and differentiate changed elements from originally intended. The resultant contractor s field set drawing files (.pdf format file) must then be submitted to the design professional for review and to allow for producing necessary revisions to the native design program, whether created in a Revit Model or AutoCAD.dwg files. Changes may be indicated by either graphics or notations. The revised version recording all the changes in the field to the original construction documents is called a Record Drawing, created by the design professional. The submission of the contractor s field set scans and the revised native design files must be in accord for acceptance by the University of these two as-built documents. The University requires electronic project deliverables be submitted via hard copy (CD or DVD). The deliverable should include:.dwg files for each document sheet, and all addenda & specification files. Use of AutoCAD e-transmit to bind all.dwg files is recommended to insure that no x-ref files, text files, or plot styles are lost in the submittal. Refer to the Document Deliverables Matrix below for additional deliverables and their format(s). Specific requirements for Contractor s field record of changes to contract drawings: The Contractor shall keep at the construction site a complete set of full size prints of the contract drawings, reproduced at Contractor expense. During construction, these prints shall be marked to show all deviations in actual construction from the contract drawings. The color red shall be used to indicate all additions and green to indicate all deletions. The drawings shall show the following information but not be limited thereto: a. The locations and description of any utility lines and other installations of any kind or description known to exist within the construction area. The location includes dimensions and elevations of permanent features. b. The locations and dimension of any changes within the building or structure, and the accurate location and dimension of all underground utilities and facilities. 3
4 c. Correct grade or alignment of roads, structures, and utilities if any changes were made from contract plans. d. Correct elevations if changes were made in site grading from the contract plans. e. Changes in details of design or additional information obtained from working drawings specified to be prepared and/or furnished by the Contractor including, but not limited to, fabrication erection, installation, and placing details, pipe sizes, insulation material, dimensions of equipment foundations, etc. f. The topography and grades of all drainage installed or affected as part of the project construction. g. All changes or modifications from the original design and from the final inspection. h. Where contract drawings or specifications allow options, only the option actually used in the construction shall be shown on the as-built drawings. The option not used shall be indicated as deleted. These deviations shall be shown in the same general detail utilized in the contract drawings. Markings of the prints shall be pursued continuously during construction to keep them up to date. This information shall be maintained in a current condition at all times until the completion of the work. The resulting field-marked data shall be referred to and marked as As-Built Field Data and shall be used for no other purpose. They shall be made available for inspection by IU s representative whenever requested during construction and shall be jointly inspected for accuracy and completeness by IU s representative and a responsible representative of the Contractor prior to submission of each monthly pay estimate. Failure to keep the As-Built Field Data (including Equipment-in-Place lists in the COBIE spreadsheet) current shall be sufficient justification to withhold a retained percentage from the monthly pay estimate. Close-out / As-Built Documents Deliverable Requirements Indiana University requires that the As-Built Documents Deliverable be submitted via hard copy (CD or DVD and Paper). The electronic portion of this deliverable should include:.dwg files for each document sheet,.pdf files for each document sheet, As-built Field Data Set (a.pdf of each sheet), and O & M Manuals. When a sheet has no changes, it still must be included along with a notation of no changes on it. Use AutoCAD e-transmit to bind all.dwg files; this is the best way to insure that no x-ref files, text files, or plot styles are lost in the submittal. Follow the As- Built Document Matrix below to determine the responsible party for each deliverable, and in what format. O&M (Operations & Maintenance) Manuals The contractor shall submit to Indiana University one pdf of the O&M manuals along with the Construction Operations Building Information Exchange (COBIE) file; which shall include: (1) the make, model and serial number of each piece of installed equipment, (2) the location of any equipment installed in the building. As-Built and Record Document Deliverable Matrix The following matrix outlines the various As-Built and Record Documents deliverables that are required on two different project categories with the associated responsible parties that will be in place for contracts entered into as of February 1, All deliverables indentified in this article are to be provided as indicated. Document Deliverables Matrix The following matrix outlines the Document deliverables required on three different project categories; indicating the associated responsible parties. All deliverables identified in this article are to be provided as indicated. 4
5 Responsible Parties A/E = Architect/Engineer C = Contractor Category 1: for Bid Projects with an estimated project cost at or over $5 million: Construction Documents Deliverables Resp. Party Quantity Format Due Date IU BIM Proficiency Matrix A/E 1 set.xlsx Prior to selection as required IU BIM Execution Plan A/E, C 1 set.docx 30 days after contract awarded Design BIM Model(s) A/E 1 set.rvt 10 days after construction contract is awarded Construction Document CAD Drawings A/E 1 set.dwg &.pdf 10 days after construction contract is awarded Addenda A/E 1 set.docx &.pdf 10 days after construction contract is awarded Specifications A/E 1 set.docx &.pdf 10 days after construction contract is awarded COBie Data (COBie setup) A/E 1 set.xlsx 10 days after construction contract is awarded As-built and Record Documents Deliverables Resp. Party Quantity Format Due Date Record Document CAD Drawings and all project Affidavit(s) A/E (see note) (see note) * 1 set each.pdf &.dwg on CD or DVD as well as 2 sets hard copy (paper). Prior to Final Payment As-Built Field Mark-ups - Files and/or Scans C 1 set.pdf & hard At Substantial Completion & Prior to Final Payment Operations & Maintenance Manuals (O&M) C 1 set.pdf & hard At Substantial Completion & Prior to Final Payment COBie Construction Data C 1 set.xlsx Prior to Final Payment As-Built BIM Model(s) A/E 1 set.rvt Prior to Final Payment Category 2: for Bid Projects with an estimated project cost under $5 million: Construction Documents Deliverables Resp. Party Quantity Format Due Date Construction Document CAD Drawings A/E 1 set.dwg &.pdf 10 days after construction contract is awarded Addenda A/E 1 set.docx &.pdf 10 days after construction contract is awarded Specifications A/E 1 set.docx &.pdf 10 days after construction contract is awarded COBie Data (COBie setup) A/E 1 set.xlsx 10 days after construction contract is awarded As-built and Record Documents Deliverables Resp. Party Quantity Format Due Date Record Document CAD Drawings and all project Affidavit(s) A/E (see note) (see note) * 1 set each.pdf &.dwg on CD or DVD as well as 2 sets hard copy (paper). Prior to Final Payment As-Built Field Mark-ups - Files and/or Scans C 1 set.pdf & hard At Substantial Completion & Prior to Final Payment Operations & Maintenance Manuals (O&M) C 1 set.pdf & hard At Substantial Completion & Prior to Final Payment COBie Construction Data C 1 set.xlsx Prior to Final Payment 5
6 Category 3: non-public bid Projects at or under $150,000 of invitational bidding from contractors, or procured through job order contracting (JOC), or other methods not qualifying for categories 1 or 2: Construction Documents Deliverables Resp. Party Quantity Format Due Date Construction Document CAD Drawings A/E 1 set.dwg &.pdf 10 days after construction contract is awarded Addenda A/E 1 set.docx &.pdf 10 days after construction contract is awarded Specifications A/E 1 set.docx &.pdf 10 days after construction contract is awarded As-built and Record Documents Deliverables Resp. Party Quantity Format Due Date Record Document CAD Drawings and all project Affidavit(s) A/E (see note) (see note) * 1 set each.pdf &.dwg on CD or DVD as well as 2 sets hard copy (paper). Prior to Final Payment As-Built Field Mark-ups - Files and/or Scans C 1 set.pdf & hard At Substantial Completion & Prior to Final Payment Operations & Maintenance Manuals (O&M) C 1 set.pdf At Substantial Completion & Prior to Final Payment Responsible Parties A/E = Architect/Engineer C = Contractor Responsible Party shall not be relieved of responsibility when files delivered do not meet established requirements or are defective. Indiana University shall verify all files and the Owner s Representative shall be notified of acceptance. Submittal Standards BIM (Building Information Modeling) - refer to requirements in The Indiana University Building Information Modeling (BIM) Guidelines For Architects, Engineers, and Contractors at: CAD (Computer Aided Design) - refer to the Indiana University and National CAD Standards as outlined at: COBIE (Construction Operations Building Information Exchange) - for spreadsheets, instructions, and guidance go to: COBie 2.26* is the version to be used. (*8-9-15: made correction in bold) GIS/SITE for Site, Civil, Landscape and Utilities guidance go to: File Format Standards BIM - Autodesk Revit.rvt - Revit version should closely be coordinated with entire team and Owner and indicated in IU BIM Execution Plan CAD - Autodesk AutoCAD.dwg - format should be AutoCAD version 2014.dwg (AutoCAD release 2014) and each file named for each individual drawing sheet PDF - Adobe pdf format should be configured to allow for text searches and printing. Pdfs should also be rotated to drawing/sheet orientation. Files should be named to match the individual sheet/drawing number. RVT (see BIM above). 6
7 Definitions Affidavit Signed letter affirmation to the University. A Code Affidavit would be the Architect/Engineer s assurance of project s design meeting current required restrictive codes and laws (such as ADA), and will also list any/all unique deviations allowed by the State to be taken, such as any variance(s). Environmental Affidavit would be the Architect/Engineer s assurance of project s design meeting current required environmental codes and laws, and will also list any and all unique deviations that may have been allowed by the legal jurisdiction. Check with Team Leader for required affidavits on project. As-Built Documents - As-built documents are the collection of paper drawings or electronic drawings that typically reside in the contractor s onsite trailer that contain mark-ups, annotations, and comments about changes that have been made to the contract documents during the construction phase. As-Built Model - Design Intent Models that have been updated throughout the construction process. These changes and updates have been communicated from the Contractor to the Design Team through the comments, annotations, and markups from the As-Built Documents. These typically, but not always, are discipline-specific models. Building Information Model (BIM) - A digital representation of physical and functional characteristics of a facility; a shared knowledge resource for information about a facility forming a reliable basis of decisions during life-cycle, which is defined as existing conception to demolition. BIM Execution Plan (BEP) - A plan that is created from Indiana Universities BIM Execution Plan Template that is to be submitted thirty (30) days after contract award. The BEP helps to define roles and responsibilities within a project team. BIM Proficiency Matrix (BPM) - A matrix that was designed to measure the expertise of a firm as it relates to using a BIM process on projects. It will be used by Indiana University as one of the many selection criteria during the selection process. C.O.B.i.e. Construction Operations Building Information Exchange COBIE spreadsheet replaces submission of multiple copies of paper documents delivered at the conclusion of construction. The data required by COBIE is the same information as is currently required by project handover/o&m data. The contractor is to insert installed equipment data in the spreadsheet that will link into designer provided space, and installation information. Operations and Maintenance Manuals (O&M s) Includes all manufacturers warrantee information, product data and maintenance requirements and recommendations as would be required to properly and safely maintain installed building elements and equipment and maintain the warrantee status of same. Also shall include all temperature control drawings, fire protection system documents, security system documents, and Interior Finishes binders (in format as required by UAO Interiors Dept.) Record Drawing - The production of Record Drawings is the capturing of the As-Built Documents annotations, comments, and mark-ups in a drawing format only. This requirement is separate of any updating of any models. Related Documents (for others see VPCPF website: Building Design Standards - CADD Standards G.I.S. Deliverables - Engineering Deliverables - Interiors Standards (web page under construction as of date of this edition of this document) Site and Landscape Standards - Space Planning Guidelines - [End of Document] 7
2012 BIM Guidelines and Standards (Rev. 00) University at Albany
A. Building Information Modeling (BIM) Guidelines: The Office of AECM will require the submission of BIM modeling files as part of an electronic file submission to the AECM project manager as requested
More informationLANSING COMMUNITY COLLEGE 14205.00 TLC BUILDING SERVER ROOM UPGRADES SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.
SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 SUMMARY A. Section includes requirements for the submittal schedule and administrative and procedural requirements for submitting Shop Drawings,
More informationCAD Standards Guideline For Facility Documentation and Construction Projects
CAD Standards Guideline For Facility Documentation and Construction Projects Implemented March 2010 Page 1 of 9 Table of Contents A. Software B. CAD Methods 1. Layer Standards 2. Font 3. Lineweights 4.
More informationCAD Standards Guideline For Facility Documentation and Construction Projects
CAD Standards Guideline For Facility Documentation and Construction Projects Page 1 of 12 Table of Contents A. Software B. CAD Methods 1. Layer Standards 2. Font 3. Lineweights 4. External References 5.
More informationMANAGING THE PROJECT RECORD
MANAGING THE PROJECT RECORD Project Record Filing System 2 Agency Submittals 2 Site Acquisition 3 Planning 3 Pre-Qualification of Bidders 3 Bidding 4 Construction 4 Inspection 4 Legal 5 Contracts 5 Accounting
More informationSECTION 01 78 29 AS-BUILT DOCUMENTATION
SECTION 01 78 29 AS-BUILT DOCUMENTATION PART 1: GENERAL 1.01 AS-BUILTS Where identified as a product of the Work, provide as-built drawings adhering to the criteria provided here and in the special conditions.
More informationUniversity of Northern Iowa Design Documents Standards. October 2014
University of Northern Iowa Design Documents Standards October 2014 2014 UNI BUILDING AND DESIGN STANDARDS 1.1 CONTRACT DOCUMENT FORMAT 1.1.1 The Electronic Word Programs used for the Project manual shall
More informationCapital Project Closeout. Construction Documentation Requirements
Capital Project Closeout Construction Documentation Requirements Guidelines for Architects, Contractors, and Project Managers For further information about this document contact: HARVARD UNIVERSITY PROPERTY
More informationRevised Work Scope Dated April 23 rd, 2015
Revised Work Scope Dated April 23 rd, 2015 2.4 SCOPE OF SERVICES The following combines the Scope of Services included in RFQ No. 671 dated March 12, 2015 and the Invitation to Interview letter dated March
More informationPractical Strategy and Workflow for Large Projects: A Realistic Solution
Practical Strategy and Workflow for Large Projects: A Realistic Solution Marco Brasiel/Diego Faria Frazillio & Ferroni SE3193 This class presents a strategy for development of structural projects using
More informationCITY OF POWAY REQUEST FOR PROPOSALS (RFP) FOR GEOGRAPHIC INFORMATION SYSTEM (GIS) WATER / WASTEWATER SYSTEM DATA CONVERSION PROJECT ADDENDUM SIX
CITY OF POWAY REQUEST FOR PROPOSALS (RFP) FOR GEOGRAPHIC INFORMATION SYSTEM (GIS) WATER / WASTEWATER SYSTEM DATA CONVERSION PROJECT ADDENDUM SIX In reference to the Request for Proposals for Geographic
More informationCHAPTER 12 Revised January 1, 2013 SIGNING AND SEALIN OF PROFESSIONAL SURVEY DELIVERABLES
CHAPTER 12 Revised January 1, 2013 SIGNING AND SEALIN OF PROFESSIONAL SURVEY DELIVERABLES Chapter Contents Sec. 12.01 Sec. 12.02 Sec. 12.03 Sec. 12.04 Sec. 12.05 Sec. 12.06 Introduction Business & Legal
More information5.2 Drawing Information. 0400 Consultants Procedure Manual. 5.2 Drawing Information: 5.2.2 Large Format Document Standards: Page 1 of 5
Page 1 of 5 5.2 : 5.2.1 General Information:.1 Final drawings for all projects shall be one of the following sizes: 11" x 17", 24" x 36" or 30" x 42". The dimensions refer to the outside edge or cut line.
More informationATTACHMENT B PROJECT DATA & DELIVERABLES STANDARDS
EASTERLY SECONDARY SYSTEMS IMPROVEMENTS WBS NO. TP.E. 1255 JANUARY 2011 ATTACHMENT B PROJECT DATA & DELIVERABLES STANDARDS Overview This Attachment, Project Standards & Requirements Data, Drawings & Deliverables,
More informationSharePoint for Engineering Document Management & Control
SharePoint for Engineering Document Management & Control Managing and controlling engineering documents and drawings with SharePoint A white paper by Cadac Organice BV Date: 01-03-2012 Table of contents
More informationCPIx on Line. Post Contract-Award Building Information Modelling (BIM) Execution Plan (BEP) Supporting the HMG Construction Strategy.
CPIx on Line Post Contract-Award Building Information Modelling (BIM) Execution Plan (BEP) Project Name: Project Address: Project Number: Date: Document No: Date: March 2013 Revision: R1 Status: Published
More informationUtility Coordination Procedures for Hillsborough County Construction Projects within County Rights-of-Way
Public Works Department Utility Coordination Procedures for Hillsborough County Construction Projects within County Rights-of-Way October 2015 HillsboroughCounty.org HILLSBOROUGH COUNTY Office of the County
More informationAGREEMENT FOR PROFESSIONAL DESIGN SERVICES
AGREEMENT FOR PROFESSIONAL DESIGN SERVICES This Professional Design Services (this "Agreement"), made as of 20 by and between the University of Cincinnati (the "University") by the Division of Administration
More informationRequest for Proposal Autodesk CAD Support
Request for Proposal Autodesk CAD Support Introduction Denver Water is inviting your firm to submit a proposal to provide Autodesk product-based services and support to meet the requirements of Denver
More informationNotes. Score. 1 Basic Services 1.1. A few instances; could have been more proactive
Jacobs Contract performance Tracking spreadsheet = Excellent 2 = Meets performance standards 1 = Improvement needed 0= Unsatisfactory Report for the time period: Annual report 210 Total average score 2.86
More informationExhibit C: Scope of Work and Schedule of Deliverables
Exhibit C: Scope of Work and Schedule of Deliverables Project Scope of Work Phases: A City Hall Envelope Renovations B City Hall Skylight Replacement C City Hall Chiller Replacement D City Hall Annex Plaza
More informationCAD Standards. Design Guidelines and Standards. June 2004. Office of the University Architect
Design Guidelines and Standards CAD Standards June 2004 Office of the University Architect Construction Management P.O. Box 210181 Cincinnati, Ohio 45221-0181 Table of Contents Contents CAD STANDARDS Introduction...
More informationSchool Building Authority of West Virginia BUILDING INFORMATION MODELING (BIM) EXECUTION PLAN SBA FORM 191
School Building Authority of West Virginia BUILDING INFORMATION MODELING (BIM) EXECUTION PLAN SBA FORM 191 Section 1: General 1.0 Alignment with Organizational Vision In the space provided below, read
More informationBIM GUIDE. Developed for
BIM GUIDE Developed for BIM GUIDE Protocols and Project Execution Plan 1 Table of Contents.. Objective... P. 4.. Roles & Responsibilities... P. 5.. Contract Strategies... P. 8.. Level of Development...
More informationREQUEST FOR QUALIFICATIONS CIVIL ENGINEERING SERVICES ELECTRICAL ENGINEERING SERVICES MECHANICAL ENGINEERING SERVICES STRUCTURAL ENGINEERING SERVICES
REQUEST FOR QUALIFICATIONS ANNUAL CONTRACT FOR CIVIL ENGINEERING SERVICES ELECTRICAL ENGINEERING SERVICES MECHANICAL ENGINEERING SERVICES STRUCTURAL ENGINEERING SERVICES CONSTRUCTION PROJECTS NOT TO EXCEED
More informationREQUEST FOR PROPOSAL FOR PROFESSIONAL SERVICES (PS-0748-A) Appendix 1 Project Information. PS-0748-A Page 1 5/4/2016 Appendix 1
REQUEST FOR PROPOSAL FOR PROFESSIONAL SERVICES (PS-0748-A) Project Information PS-0748-A Page 1 5/4/2016 Table of Contents Project Budget Worksheet Program Plan Project Location (Site Plan) Scope of Services
More informationTHIS PAGE INTENTIONALLY LEFT BLANK
Facilities Management June 29, 2015 THIS PAGE INTENTIONALLY LEFT BLANK Page 2 of 31 CAD Guidelines and Standards Table of Contents SECTION 1: THE PURPOSE OF USING CAD DATA STANDARDS... 5 1.1 Industry Standards...
More informationREQUEST FOR PROPOSALS
REQUEST FOR PROPOSALS Solicitation Number: R-14-007-MR Transfer and Implementation of Data Records to GIS Ready Files ADDENDUM #2 05:00 PM Central June 5, 2014 This addendum answers questions submitted
More informationIndiana University Agreement Between Owner and Architect for a Small Project
Indiana University Agreement Between Owner and Architect for a Small Project This AGREEMENT is made: (Date) BETWEEN the Owner: The Trustees of Indiana University 1800 N. Range Road Bloomington, IN 47408
More informationMandatory Addendum to the Owner/Architect Contract For Projects Funded in Whole or in Part with State Capital Outlay Funds
Page 1 of 5 Mandatory Addendum to the Owner/Architect Contract For Projects Funded in Whole or in Part with State Capital Outlay Funds The Owner may use any form of agreement mutually agreed upon by the
More informationRequest for Proposal Architectural/Engineering Services. Adapt/SouthRiver CHC. P a g e 1
P a g e 1 Request for Proposal Architectural/Engineering Services Adapt/SouthRiver CHC RFP for Architectural/Engineering Services P a g e 2 Introduction (SRCHC), a Federally Qualified Health Center, is
More informationEffective Collaboration
AUTODESK BUILDING SOLUTIONS Effective Collaboration Exporting Revit Architecture Models as ACIS Solids for Use in AutoCAD MEP The intent of this paper is to explain a process by which architects using
More informationAGREEMENT BETWEEN THE BOARD OF REGENTS OF THE TEXAS A&M UNIVERSITY SYSTEM AND EVOLVE INFRASTRUCTURE SOLUTIONS, LLC, DESIGN-BUILD CONTRACTOR
DB-BIM Contract No. 5890 07/14 Project No. 02-3210 AGREEMENT BETWEEN THE BOARD OF REGENTS OF THE TEXAS A&M UNIVERSITY SYSTEM AND EVOLVE INFRASTRUCTURE SOLUTIONS, LLC, DESIGN-BUILD CONTRACTOR 1 DB-BIM Contract
More informationPROJECT AND CONSTRUCTION MANAGEMENT SERVICES FOR KUWAIT PORT AUTHORITY FOR PROJECTS AT SHUAIBA PORT
PROJECT AND CONSTRUCTION MANAGEMENT SERVICES FOR KUWAIT PORT AUTHORITY FOR PROJECTS AT SHUAIBA PORT - INTRODUCTION 1.1. General. Kuwait Ports Authority (KPA) through the Ministry Of Finance (MOF) wishes
More informationBIM: FOR PROJECT MANAGERS. 2011 CSI Southwest Region Conference Program 1B 8:45am 11:00am
BIM: FOR PROJECT MANAGERS ANA BAKER BRANDON GARRETT 2011 CSI Southwest Region Conference Program 1B 8:45am 11:00am 1 2 3 4 BIM Overview BIM Level of Development Evolution of the Drawing Process BIM Workflow
More informationAGREEMENT BETWEEN OWNER AND ARCHITECT/ENGINEER
AGREEMENT BETWEEN OWNER AND ARCHITECT/ENGINEER Project: BT Project Name: Architect/Engineer: April 2016 Edition AGREEMENT BETWEEN OWNER AND ARCHITECT/ENGINEER This Agreement Between Owner and Architect/Engineer
More informationPROJECT DELIVERABLES FORMAT
PROJECT DELIVERABLES FORMAT TABLE OF CONTENTS 1. PROJECT DELIVERABLES FORMAT... 2 1.1. ELECTRONIC DELIVERABLES... 2 1.2. PHOTOGRAPHS... 2 1.3. FORMAT OF THE DESIGN SUBMISSION DELIVERABLES... 2 2. PREPARATION
More informationUNIT 20: SOLICITATION PREPARATION
UNIT CERTIFICATION Statement of Completion has satisfactorily completed training in the duty of this Unit under the conditions described below and in accordance with the overall standard(s) for this Unit.
More informationDIA Survey Requirements. Thomas Breitnauer, PLS thomas.breitnauer@flydenver.com DIA Land Surveyor December 10, 2014
DIA Survey Requirements Thomas Breitnauer, PLS thomas.breitnauer@flydenver.com DIA Land Surveyor December 10, 2014 Survey Requirements - During Pre-Construction meeting - Contractor should receive a survey
More informationEffective Collaboration using Revit Structure and AutoCAD MEP
REVIT STRUCTURE Effective Collaboration using Revit Structure and AutoCAD MEP This white paper explains how structural engineers using Revit Structure software and mechanical/electrical/plumbing (MEP)
More informationRequest for Qualifications for Program Management Support Services for The Greenville-Spartanburg International Airport Terminal Improvement Program
Request for Qualifications for Program Management Support Services for The Greenville-Spartanburg International Airport Terminal Improvement Program SECTION 1 - GENERAL INFORMATION The Greenville-Spartanburg
More informationAGREEMENT BETWEEN OWNER AND ARCHITECT (Where Contractor is a Construction Manager at Risk)
AGREEMENT BETWEEN OWNER AND ARCHITECT (Where Contractor is a Construction Manager at Risk) This Agreement made as of the effective date set forth below. Between: Austin Community College District 9101
More informationTOWN OF MILFORD REQUEST FOR QUALIFICATIONS DESIGNER SERVICES FOR LIBRARY ROOF REPLACEMENT
TOWN OF MILFORD REQUEST FOR QUALIFICATIONS DESIGNER SERVICES FOR LIBRARY ROOF REPLACEMENT The Milford Board of Library Trustees, as the Awarding Authority, invites the submission of qualifications by responsible
More informationARCHITECTURAL SERVICES AGREEMENT
ARCHITECTURAL SERVICES AGREEMENT This AGREEMENT is made and entered into this 10th day of May in the year 2013 by and between the ST. HELENA UNIFIED SCHOOL DISTRICT, hereinafter referred to as DISTRICT,
More informationApplicant. User Guide. www.beverlyhills.org/electronicreview
Applicant User Guide Quick References Page 2 Table of Contents Page 3 How to submit eplans. Page 7 Preparing eplans. Page 9-10 eplan File Names. Page 18 Resubmit Plans. www.beverlyhills.org/electronicreview
More informationwww.cadac.com White Paper Microsoft SharePoint for Engineering Document Management and Control
www.cadac.com White Paper Microsoft SharePoint for Engineering Document Management and Control Microsoft SharePoint is a powerful platform for document management and project collaboration. Many project-driven
More informationCONTRACT FOR THE APPOINTMENT OF AN APPROVED INSPECTOR
CONTRACT FOR THE APPOINTMENT OF AN APPROVED INSPECTOR CIC/AppInsp The Construction Industry Council - Association of Consultant Approved Inspectors contract for the appointment of an approved inspector
More informationRequest for Qualifications (CM at Risk Contract) State of Ohio Standard Forms and Documents
Request for Qualifications (CM at Risk Contract) State of Ohio Standard Forms and Documents Administration of Project: Local Higher Education Project Name Shideler Hall Renovation Response Deadline 12/20/13
More informationRevit and BIM for Facilities Management
Revit and BIM for Facilities Management Course Length: 1 day Revit and BIM for Facilities Management is a one day hands-on workshop that will introduce you to what Building Information Modeling is and
More informationDocument B101 TM. Standard Form of Agreement Between Owner and Architect
Document B101 TM 2007 Standard Form of Agreement Between Owner and Architect AGREEMENT made as of the day of in the year 2014 (In words, indicate day, month and year.) BETWEEN the Architect s client identified
More informationCITY COLLEGE OF SAN FRANCISCO (CCSF) Building Information Modeling (BIM) Standards for Design-Bid Build Projects. CCSFBIMS Version 1.
CITY COLLEGE OF SAN FRANCISCO (CCSF) Building Information Modeling (BIM) Standards for Design-Bid Build Projects CCSFBIMS Version 1.0 Prepared by: CCSF Facilities Planning & Construction (FPC) Department
More informationExplore. Analyze. Optimize. AutoCAD. Civil 3d
Explore. Analyze. Optimize. AutoCAD Civil 3d A Powerful Building Information Modeling Solution for Civil Engineering Use an integrated process built on a coordinated, consistent, digital model for design,
More informationREQUEST FOR PROPOSAL MECHANICAL, ELECTRICAL, PLUMBING ENGINEERING SERVICES VARIOUS BUILDING RENOVATIONS AND NEW CONSTRUCTION
REQUEST FOR PROPOSAL For MECHANICAL, ELECTRICAL, PLUMBING ENGINEERING SERVICES For VARIOUS BUILDING RENOVATIONS AND NEW CONSTRUCTION CITY OF ROCHESTER November 2009 TABLE OF CONTENTS GENERAL INFORMATION
More informationAssistant Project Management - Training Program A 3-year Program Beginning strategy places the new employee into a three-year program that provides
Assistant Project Management - Training Program A 3-year Program Beginning strategy places the new employee into a three-year program that provides for experience in the Construction Company's three areas
More informationFacilities Management
Facilities Management June 29, 2015 THIS PAGE INTENTIONALLY LEFT BLANK University of South Florida BIM Guidelines and Standards Page 2 of 32 BIM Guidelines and Standards Table of Contents SECTION 1: BIM
More informationWork Breakdown Structure Element Dictionary Construction
Initiation CON 5.1 Initiation encompasses deliverables associated with the development, implementation and control of the project s schedule, budget and scope, including the solicitation for a contractor
More informationAGREEMENT BETWEEN THE BOARD OF REGENTS OF THE TEXAS A&M UNIVERSITY SYSTEM AND HUCKABEE & ASSOCIATES, INC., ARCHITECT/ENGINEER
AGREEMENT BETWEEN THE BOARD OF REGENTS OF THE TEXAS A&M UNIVERSITY SYSTEM AND HUCKABEE & ASSOCIATES, INC., ARCHITECT/ENGINEER TABLE OF CONTENTS ARTICLE 1 ARCHITECT/ENGINEER S SERVICES AND RESPONSIBILITIES
More informationTHURSTON COUNTY PUBLIC WORKS DEPARTMENT Design and Construction Division. CADD & Civil 3D User Guidelines. v2.0_12_12_09
THURSTON COUNTY PUBLIC WORKS DEPARTMENT Design and Construction Division CADD & Civil 3D User Guidelines v2.0_12_12_09 THURSTON COUNTY PUBLIC WORKS DEPARTMENT DESIGN AND CONSTRUCTION DIVISION CADD & Civil
More informationBIM UNDERSTANDING THE PROCESS The State of the Art Tool in Design and Construction SPONSORED BY SAME, DC POST IN ASSOCIATION WITH ACEC M/W
BIM UNDERSTANDING THE PROCESS The State of the Art Tool in Design and Construction SPONSORED BY SAME, DC POST IN ASSOCIATION WITH ACEC M/W Insanity: doing the same thing over and over again and expecting
More informationACQUISITION ALERT 11-04. Delegation of Invoice Approval Authority
February 2, 2011 ACQUISITION ALERT 11-04 Delegation of Invoice Approval Authority This Acquisition Alert is being transmitted to all NOAA Heads of Contracting Offices (HCOs) for dissemination within their
More informationAttachment 5 Electrical Engineering
A. Phase 1, Preliminary Design: The CONSULTANT shall: Attachment 5 Electrical Engineering 1. Ascertain the requirements for each project through a meeting with the Capital Projects Division Manager or
More informationTerms of Reference. Egypt Post - Several position: Architects, Interior Design, Structure Design, Site Engineer and Electromechanical Design.
Terms of Reference Duty Station: Type of contract: Title: Duration of the contract: Egypt Service Contract (Only Egyptians) Egypt Post - Several position: Architects, Interior Design, Structure Design,
More informationBuilding Commissioning 17900-1
SECTION 17900 BUILDING COMMISSIONING PART 1 - GENERAL 1.01 WORK DESCRIPTION: A. General: 1. The Commissioning process is a joint team effort to ensure that all mechanical equipment, controls, and systems
More informationCPIx on Line. Pre-Contract Building Information Modelling (BIM) Execution Plan (BEP) Project Name: Project Address: Project Number: Date:
CPIx on Line Pre-Contract Building Information Modelling (BIM) Execution Plan (BEP) Project Name: Project Address: Project Number: Date: Document No: Date: April 2013 Revision: v2.0 Status: For review
More informationExplore. Analyze. Optimize. AutoCAD. Civil 3d
Explore. Analyze. Optimize. AutoCAD Civil 3d A Powerful Building Information Modeling Solution for Civil Engineering Use an integrated process built on a coordinated, consistent, digital model for design,
More informationFlorida s Turnpike Enterprise (FTE) Shop Drawing Review Process for Design Bid Build (Conventional) Projects
General: Florida s Turnpike Enterprise (FTE) Shop Drawing Review Process for Design Bid Build (Conventional) Projects The information outlined within this document, depicts a portion of Florida s Turnpike
More informationTOWN OF LINCOLN INVITATION TO BID EMERGENCY PLANNING, DISASTER RECOVERY AND HAZARD MITIGATION GRANT PROGRAM SERVICES RFP #2015-12
TOWN OF LINCOLN INVITATION TO BID EMERGENCY PLANNING, DISASTER RECOVERY AND HAZARD MITIGATION GRANT PROGRAM SERVICES RFP #2015-12 Sealed bids are due by 10:30 am on Friday, January 30, 2015 Bid Specs are
More informationMASTER AGREEMENT CONSTRUCTION MANAGEMENT SERVICES
MASTER AGREEMENT CONSTRUCTION MANAGEMENT SERVICES This Master Agreement made this 11 day of December, 2012, by and between the St. Lucie County School Board (hereinafter referred to as the School Board
More informationCITY OF MESA, ARIZONA ENGINEERING DEPARTMENT REQUEST FOR QUALIFICATIONS
CITY OF MESA, ARIZONA ENGINEERING DEPARTMENT REQUEST FOR QUALIFICATIONS On-Call Consultant List for Mechanical Engineering Services TABLE OF CONTENTS REQUEST FOR QUALIFICATIONS PAGE NO. SECTION I PROJECT
More informationADDENDUM NUMBER ONE (1)
Page 1 of 1 MINNESOTA DEPARTMENT OF TRANSPORTATION Office of Maintenance: Building Services Section ADDENDUM NUMBER ONE (1) ADDENDUM DATE: 19 October 2012 Request for Proposals for Designer Selection for
More informationCITY OF MESA, ARIZONA ENGINEERING DEPARTMENT
CITY OF MESA, ARIZONA ENGINEERING DEPARTMENT REQUEST FOR QUALIFICATIONS EAST VALLEY ADULT RESOURCES TENANT IMPROVEMENT Project Funding by the United States Department of Housing and Urban Development Through
More informationRoadway Plan Production
AutoCAD Civil 3D 2010 Education Curriculum Instructor Guide Unit 5: Transportation Design Lesson 5 Roadway Plan Production Overview This lesson describes how to automate the generation of plan and profile
More informationProject Document Manager. For Subcontractors
Network Project Document Manager For A guide to understanding how PDM 3.0 will connect your entire business workflow to reduce project costs, mitigate risk and increase profits, with a single, secure resource.
More informationCREATING AN IMAGE FROM AUTOCAD CADD NOTE 16. MENU: AutoCAD, File, Plot COMMAND: plot ICON:
CADD NOTE 16 This CADD Note provides instructions on creating an image from an AutoCAD drawing that can be pasted into another application (e.g., Word, Powerpoint, etc.). These instructions assume the
More informationSTATE OF COLORADO OFFICE OF THE STATE ARCHITECT STATE BUILDINGS PROGRAM. University of Colorado Boulder
STATE OF COLORADO OFFICE OF THE STATE ARCHITECT STATE BUILDINGS PROGRAM University of Colorado Boulder DESIGN/BUILD LUMP SUM (LS) AGREEMENT (STATE FORM ) DEPARTMENT ID: CONTRACT ID #: PROJECT NUMBER: PR007259/HSG10910
More informationATTACHMENT A1 SCOPE OF WORK
ATTACHMENT A1 SCOPE OF WORK Title-I Services June 6, 2016 Page 1 of 5 DISTRICT OF COLUMBIA DEPUTY MAYOR FOR PLANNING AND ECONOMIC DEVELOPMENT RENOVATION TO WILSON BUILDING 2 ND AND 3 RD FLOOR SUITES TITLE-I
More informationREQUEST FOR QUALIFICATIONS. For ENGINEERING SERVICES
REQUEST FOR QUALIFICATIONS For ENGINEERING SERVICES For FY17/FY18 Fiscal Years Mecklenburg County Storm Water Services (MCSWS) Projects Mecklenburg County, North Carolina June 14, 2016 Submittal Deadline:
More informationACG Commissioning Guideline
ACG Commissioning Guideline Appendix A Sample Commissioning Specification NOTES TO APPENDIX A This appendix contains a sample Request for Proposal (RFP) for Commissioning Services as would be issued by
More informationHow To Design A Bim Project
BIM Virtual Construction & Integrated Project Delivery Randy LaNear BIM Manager Barnhart - Heery Synonyms & Related Terms Integrated Practice Integrated Project Delivery Virtual Building (Environment)
More informationRequest for Proposal. Study: Site Plan Approval Process in Ontario. This Request for Proposal Closes at 16:00:00 EST on Monday, November 5, 2012
Request for Proposal Study: Site Plan Approval Process in Ontario This Request for Proposal Closes at 16:00:00 EST on Monday, November 5, 2012 Issued: October 24, 2012 Table of Contents A GENERAL INSTRUCTIONS
More informationOlilo's AEC Design Services. SrinSoft Inc, Partners of
Olilo's AEC Design Services SrinSoft Inc, Partners of Olilo provides design services that include design and analysis, cost estimation, 3D modeling, 2D drafting, conversion from 2D to 2D, quantity take-off,
More informationFACILITIES, NEBRASKA STATE COLLEGE SYSTEM. POLICY: 8064 Capital Construction and Information Technology (IT); Bids Page 1 of 6 BOARD POLICY
Technology (IT); Bids Page 1 of 6 BOARD POLICY Applicability Board Policy 7010 applies to bidding and purchases of general items, supplies and ordinary services. Board Policy 7016 applies to contracts
More informationHow To Get Construction Procurement Services
Construction Procurement William C. Charvat, AIA, CSI Excerpt from The Architect s Handbook of Professional Practice, 13th edition 2000 The procurement of construction services brings together the team
More informationContractor s Guide. April 2016
Contractor s Guide April 2016 The Minnesota Housing Finance Agency does not discriminate on the basis of race, color, creed, national origin, sex, religion, marital status, status with regard to public
More informationCONSTRUCTION MANAGEMENT-AT-RISK AGREEMENT
04-2016 CONSTRUCTION MANAGEMENT-AT-RISK AGREEMENT This Construction Management-at-Risk Agreement ( Agreement ), by and between the Lone Star College, hereinafter referred to as LSC or Owner, and, hereinafter
More informationGuidelines to create Building Information Modelling (BIM) models for AAP, P1, SOM & SPC
Appendix 5 Guidelines to create Building Information Modelling (BIM) models for AAP, P1, SOM & SPC Preparation for Architectural Assessment Panel(AAP) Submission (Same details requirements on Revit models
More informationINTEGRATING BIM AND GIS FOR ASSET MANAGEMENT
INTEGRATING BIM AND GIS FOR ASSET MANAGEMENT Andy Chan MHKIBIM Project Manager Spatial Technology Limited Agenda Introduction of Asset Management Why GIS is not sufficient for Asset Management Data model
More informationJumpStart Guide. Trimble QuickPen PipeDesigner 3D Software
L JumpStart Guide Trimble QuickPen PipeDesigner 3D Software Revision A February 2013 F Englewood Office Trimble Navigation Limited 384 Inverness Parkway, Suite 200 Englewood, Colorado 80112 (800) 234-3758
More informationGENERAL INFORMATION. REQUIRED SERVICES: are described in the enclosure consisting of 4 pages, dated 3/29/12 OR: are described as follows:
These documents consist of three parts (Part A - Request for Proposals; Part B - Proposal Form; Part C - Contract Award, Notice to Proceed & Invoice Summary), -- plus the current edition dated February
More informationNote: All terms which are defined and which are used throughout this document appear in italicized text beginning with a CAPITAL letter.
SCHEDULE OF CONSULTANT S SERVICES Note: All terms which are defined and which are used throughout this document appear in italicized text beginning with a CAPITAL letter. Project (Insert name and description
More informationBIM Strategy for NHSScotland
BIM Strategy for NHSScotland Professor Bimal Kumar and Graham Hayne GCU BIM Partnership School of Engineering and Built Environment Glasgow Caledonian University Agenda Introduction to BIM GCU BIM Partnership
More informationRequest for Qualifications (Design-Build Contract) State of Ohio Standard Forms and Documents
Request for Qualifications (Design-Build Contract) State of Ohio Standard Forms and Documents Administration of Project: Local Higher Education Project Name Campus Elevator Upgrades Response Deadline 9/03/13
More informationWhat s New in Autodesk Revit 2014
Building Design Suite 2014 What s New in Revit 2014 * Revit 2014 software is only available as part of the Building Design Suite 2014 Premium and Ultimate Editions. New & Enhanced Features Platform & For
More informationThe Shorten AutoCAD the road solution for mechanical, electrical, to done. and plumbing engineering. AutoCAD AutoCAD.
The Shorten AutoCAD the road solution for mechanical, electrical, to done. and plumbing engineering. AutoCAD AutoCAD Civil 3D MEP 2009 More Productivity, Same Skills Michigan-based Peter Basso Associates
More informationTexas Commission on Environmental Quality Page 1 Chapter 293 - Water Districts
Texas Commission on Environmental Quality Page 1 SUBCHAPTER F: DISTRICT ACTIONS RELATED TO CONSTRUCTION PROJECTS AND PURCHASE OF FACILITIES 293.62-293.70 Effective November 13, 2014 293.62. Construction
More informationGetting to a Facility Management BIM
Getting to a Facility Management BIM By: Duane Gleason Lake Constance 5D-Conference 2013 Constance, 28th-29th of October Introduction The evolution of building information modeling (BIM) has been very
More informationTLHAMATSI AFRICA PROJECTS CONSTRUCTION MANAGEMENT PRESENTATION. PRESENTED BY: BAKANG MOENG info@tlhamatsi.co.za
TLHAMATSI AFRICA PROJECTS CONSTRUCTION MANAGEMENT PRESENTATION PRESENTED BY: BAKANG MOENG info@tlhamatsi.co.za CONSTRUCTION MANAGEMENT - DEFINED Act of managing the construction process Contractual arrangement
More informationWork Type Definition and Submittal Requirements Work Type: Construction Contract Administration & Management
The first section, Work Type Definition, provides a detailed explanation of the work type. The second section, Work Type Submittal Requirements, identifies the requirements a firm must meet to become pre-qualified
More informationOverview of Land Construction Courses at Kansas State University
Overview of Land Construction Courses at Kansas State University Developed by Professor Day in the mid 1960 s at KSU, continuing to present time, is a vision of a Land Construction course series that examines
More informationRequest for Proposal East Tower Nursing Unit and Infrastructure Upgrade Grossmont Hospital
Request for Proposal East Tower Nursing Unit and Infrastructure Upgrade Grossmont Hospital June 21, 2007 The Grossmont Healthcare District (GHD) will accept proposals for Architectural and Engineering
More information