How To Be Safe On A Construction Site
|
|
- Russell Harris
- 3 years ago
- Views:
Transcription
1 Andersen Construction EXHIBIT A Subcontract Safety Exhibits Page 1 of 12 04/10
2 SITE SPECIFIC SAFETY REQUIREMENTS ACKNOWLEDGEMENT Dear Contractor: This acknowledgement must be signed and returned with your contract documents to obtain a fully executed agreement. The remaining requested and attached documents must be completed and provided to the site supervisor at the work location. One copy of the following documents needs to be submitted preferably two to four weeks prior to mobilization to the site supervisor for this project and updated as necessary. Site Specific Safety Checklist (see attached). Hazard Communication Checklist (see attached) complete and return with a copy of the material safety data sheets for products to be used on site. Site Specific Safety Plan with emergency contact information (see last page for guideline) Proof of current, valid drug and alcohol test for site employees (valid meaning the test result was negative and within the past 6 months or in compliance with the Washington Construction Industry Substance Abuse Program) For Washington State Jobsites You must provide a complete copy of your Accident Prevention Program unless already on file. Job Hazard Analysis / Pre-Task Plans must be submitted on an on-going basis as the work dictates. These must be submitted on the project, to the project superintendent or safety supervisor. Pre-task Plans for your work activities and your lower-tiered subcontractors. I,, certify that I am an authorized representative of and acknowledge that the required safety plans will be completed and provided to the project supervisor prior to this organization mobilizing on site. Contractor Acknowledged by: Project Title Reviewed by: Andersen Construction Site Representative Page 2 of 12 04/10
3 SITE SAFETY INFORMATION Andersen - Safety & Health Department The Remaining documents provided in Exhibit A (as it applies) must be completed and returned to the Andersen Construction site supervisor for the project under which this contract applies prior to beginning your work. The Subcontractor Site Specific Safety Checklist outlines what safety documentation will be expected, if applicable. This should be your cover sheet for your site specific safety plan. The Hazard Communication Checklist should be completed and returned as part of your site specific safety checklist. The purpose of this checklist is to communicate to Andersen Construction any hazardous chemicals you may be using on the project. As you review your Material Safety Data Sheets for this project note the comments in the checklist above the grouped chemicals. This is especially important when working in occupied facilities and healthcare facilities. o If this contract is for a master agreement for which there is yet to be an assigned project and you use the same chemical products for your work activities, keep a completed copy with your safety documentation that covers mobile and short term projects. Job Hazard Analysis / Pre-Task Plan these forms may be used by any subcontractor or you may use your own provided that the same or similar information is reviewed. JHA s / PTP s should be done at the start of new tasks, changes to a task and whenever a change in personnel occurs. For short duration, low risk tasks a JHA / PTP may suffice for the site safety procedures. This JHA format assists with the requirement to conduct a written PPE Hazard Assessment but may not include all PPE requirements for the task. Site Specific Safety Plan Guideline this serves as a guideline for a site specific safety plan. A template is available upon request. Any work hazards identified on the Subcontractor Site Specific Safety Checklist should be included in the Site Specific Safety Plan with the appropriate hazard corrections, safe work practices and personnel protection methods. A JHA / PTP may or may not suffice, dependent upon the magnitude of the work. Washington Jobsites In accordance with WAC , provide a copy of your Accident Prevention Program. If you are a small contractor that conducts multiple projects for Andersen Construction, one copy to be maintained in our Seattle office will suffice unless notified otherwise. If you have questions regarding Andersen Construction s Safety Requirements contact Kimberly Gamble, Corporate Safety and Health Director at our Portland office. Page 3 of 12 04/10
4 Andersen Construction Co., Inc. Subcontractor Site-Specific Safety Checklist Andersen - Safety & Health Department Company: Phone No.: Project: Site Supervisor: Contact: Fax No.: Start Date: Phone: This checklist is intended as a guide to assist with site specific safety planning. It may not be inclusive of all of the safety hazards associated with your trade, your scope of work, or the applicable site. Each contractor is responsible for adequate site specific safety planning for their workers, which includes communication with other employers working on the same site. When completing a site specific safety plan for Andersen Construction, refer to the front-end documents provided at bid time, and the exhibit "A" attached to your subcontract for guidance on safety rules that may differ slightly from OSHA. All subcontractors PRIOR TO SITE MOBILIZATION must submit the following items. Payment can be withheld for non-compliance. Your Site Specific Safety Plan see last page of this exhibit for an example listing of what a SSSP should contain. Andersen Construction Hazard Communication Checklist Completed AND copies of all Applicable Material Safety Data Sheets available on site, electronically or a contact person for immediate access. This Site Specific Safety Checklist Job Hazard Analysis / Pre-Task Plans (JHA s/ptp s may be an on-going submittal dependent upon scope & duration. You may use your own or the attached form.) Washington Projects a copy of your complete accident prevention program must be submitted or available on the site. If your scope of work includes any of the below listed activities, a work plan must be submitted to the site superintendent for review. Attached is a job hazard analysis form that may be used, if appropriate, to assist with your safety planning. Check Potential Work Hazards: Fall exposures > 6 feet Excavations > 4 feet Confined Space Entry Electrical Hot Work Welding/Cutting (req. permit/watch) Lock out/tag out activities Multi-level Scaffold Erection Multi-level Scaffold Use Steel Erection Mobile Crane(s) Use Asbestos Impact or Abatement Lead Install Sandblasting Traffic Control Structural Demolition Microbial Abatement Interior Spray Finishes Potential Silica Exposure(s) Welding on Stainless Steel Demo of lead containing paint Rotating Equipment Installation of underground power temporary or permanent Work within 10 of overhead utilities Working in Occupied Buildings Working above Others Dust Control/Containment(s) Critical Crane Lift(s) * Working in Client Classified Sensitive Areas Working in a residential structure built prior to 1978 or a child occupied facility built prior to 1978 Chemical(s) Regulated by OSHA/OR-OSHA/DOSH/ or Listed on Andersen Construction Hazard Chemical Checklist Submit a completed copy of this checklist with your site specific safety plan to the site superintendent prior to mobilizing on site. Completed by: Title / Project Role: Page 4 of 12 04/10
5 HAZARD COMMUNICATION CHECKLIST Contractor: 1. Attach the material safety data sheets for the chemicals to be used on this project. 2. Evaluate your attached material safety data sheets for the following chemicals; identify your products that contain these chemicals. CHEMICAL PRODUCT Examples where chemical product may be found (not a complete list) PRODUCT CONTAINING SUCH CHEMICAL OR PROCESS CREATING THE EXPOSURE USE OSHA Data Yes / No (Attach) BANNED PRODUCTS FOR NEW CONSTRUCTION DO NOT ALLOW! (except lead for shielding / sealing & only under site specific workplan with personnel exposure data and/or protection methods) Asbestos Mastics; roof & ext wall waterproofing; sheet vinyl; acoustical ceilings & plasters; monokote prior to 1987 Lead* (allowed for shielding) Lead lined sheetrock Benzene (other than gasoline) Styrene; phenols;,n, hexane, hexane Solvent based duct sealants; roofing glues (severe fire hazard) THE FOLLOWING PRODUCTS HAVE SUBSTANCE SPECIFIC OSHA REGULATIONS; MONITORING DATA MUST BE SUMBITTED PRIOR TO USE IF THE USE MAKES THE PRODUCT AIRBORNE OR IT IS USED IN LIQUID FORM Cadmium Metals Methylene Chloride or Paint remover Dichloromethane Ethylene Oxide Anti-freeze Formaldehyde Floor glue Methylenedianiline (MDA) Mfg of polyurethane foam; some glues & epoxies Vinyl Chloride Mfg of pvc Inorganic Arsenic Contaminated soils MBOCA (4,4-Methylene bis (2- chloroaniline)) Mfg of plastics; coating in chemical reactions to "set" glues, plastics, and adhesives Coal tar pitch volatiles (creosote) Contaminated soils; wood preservative; roofing; road paving 1,2-dibromo-3-chloropropane Contaminated soil & groundwater; well water near farms Acrylonitrile used to make plastics, synthetic rubber, and acrylic fibers Thiram Used in agriculture; seed protectant
6 CHEMICAL PRODUCT Examples where chemical product may be found (not a complete list) 1,3-Butadiene production of synthetic rubber; contaminated water near mfg plant Chromates / Hexavalent Chromates found in paints; Stainless steel; portland cement; electroplating; contaminated Chromium (Chromium VI) * see groundwater note below PRODUCT CONTAINING SUCH CHEMICAL OR PROCESS CREATING THE EXPOSURE USE OSHA Data Yes / No (Attach) THE FOLLOWING PRODUCTS MAY CREATE STRONG ODORS & MAY REQUIRE EMPLOYEE MONITORING & PPE SPECIAL PLANNING & VENTILATION MAY BE REQUIRED! Methyl Methacrylate Concrete waterproofing Heptane, Toluene, Xylene, Methyl Ethyl Ketone, Acetone, Naptha, aliphatic or aromatic hydrocarbons ; Petroleum distillates Paint thinner; lacquer thinner; clear spray sealants; mineral spirits; degreasers Oils & lubricants; camp fuel; shoe polish; degreasers; contaminated soils Stonhard waterproofers & floor coatings Isocyanates ; diisocyanates Spray on polyurethane; industrial uses to protect cement, polyureathane foam; spray paints; surface (methylenebis(phenyl isocyanate) (MDI), coatings; resins toluene diisocyanate (TDI)) Roofing Tars WELDING / TORCH CUTTING ON ANY OF THE FOLLOWING TYPES OF METALS OR METALS COATED / CLEANED WITH THE FOLLOWING PRODUCTS MAY REQUIRE SPECIAL PLANNING & VENTILATION Stainless Steel Nickel, chromium, manganese, Cadmium (electrical panels) Lead Painted / primed steel Chlorinated Solvents Paint removers; Zinc (galvanized metals) q-deck Page 6 of 12 04/10
7 CHEMICAL PRODUCT Examples where chemical product may be found (not a complete list) PRODUCT CONTAINING SUCH CHEMICAL OR PROCESS CREATING THE EXPOSURE USE OSHA Data Yes / No (Attach) THE CREATION OF ANY SILICA DUST, LEAD DUST, BERYLLIUM DUST OR HEXAVALENT CHROMIUM CONTAINING DUSTS REQUIRES CONTROL AND/OR SPECIAL PLANNING & PERSONAL PROTECTION Grinding, crushing, chipping of concrete or other cementitious products Demolation of painted structures built / painted prior to 1980 Silica - Dry Monokote; sandblasting grit; Black Beauty (creates beryllium dust during sandblasting) Demolition of concrete structures REVIEW OF MSDS FOR ANY PRODUCTS WHICH STATE: PRODUCT CAN CAUSE SENSITIZATION OR ALLERGIC REACTIONS OR HYPERSENSITIVITY (such as isocyanates or epoxies) PRODUCT USE SPRAY APPLIED - YES or NO Non Identified Flammable(s) OTHER PRODUCTS WITH SPECIAL CONCERN If any of the above-identified products specified by the plan documents please identify. Attach any personnel exposure monitoring for any of the hazardous products you will be using on this jobsite. *Potential Hexavalent Chromium containing or producing products: Page 7 of 12 04/10
8 Ammonium Dichromate; Barium Chromate; Tert-Butyl Chromate; Calcium Chromate; Chromium Trioxide; Chromium (VI) ion; Hexavalent Chromium; Lead Chromate; Potassium Chromate; Potassium Dichromate; Silver Chromate; Sodium Chromate; Sodium Dichromate; Strontium Chromate; Zinc Chromate; Zinc Dichromate Page 8 of 12 04/10
9 Project Name: Contractor: Crew Supervisor Review: Andersen Superintendent Review: Task: JOB HAZARD ANALYSIS / PRE-TASK PLAN Andersen - Safety & Health Department Start Date: End Date: Review Date: Andersen Safety Review: YES NO YES NO Does this task require special training? If yes verify completion Does this task impact traffic or public? Attach traffic or public control plan Does this task require any chemicals? If yes, review MSDS with crew. Attach copy Does this task require an impact to concrete with potential to contain power? If yes locate, lock out If unknown check with supervisor before proceeding submit locate tickets Was this plan conducted at the worksite? If not it needs to be reviewed at the worksite to ensure site conditions are considered. Does this task require special coordination with other trades? Does this task impact egress routes? If yes coordinate with Andersen and/or facilities Is there any potential impact to client operating facilities? If yes remediate potential impact prior to starting work. Is this a child occupied facility older than 1978? If yes, STOP, contact Safety Office. Do site utilities need to be shut down & locked out? If yes, attach lock out / tag out plan ASBESTOS, LEAD & HAZARDOUS MATERIALS PRE-CHECK FOR DEMOLITION ACTIVITIES YES Has the owner provided a hazardous substances survey? If not STOP! Does this work require an impact to potential asbestos containing material? If yes, contact safety office. Does this work impact any painted substrates that are older than 1978? If yes contact safety office. Are there any lead containing sheetrock, shielding, piping etc. to be impacted? If yes, contact safety office. Has demolition checklist been completed? Checklist must be completed prior to demo proceeding PPE & RISK HAZARD ASSESSMENT * Activities that include the following PPE or risks may require safety planning & training documentation beyond what can be completed in a JHA / Pre-Task Plan Fall exposures > 6 feet Excavations > 4 feet Confined Space Entry Electrical Hot Work Welding/Cutting (req. permit/watch) Lock out/tag out activities Multi-level Scaffold Erection Multi-level Scaffold Use Steel Erection Mobile Crane(s) Use Asbestos Impact or Abatement Lead Install Sandblasting Traffic Control Structural Demolition Microbial Abatement Interior Spray Finishes Potential Silica Exposure(s) Welding on Stainless Steel Demo of lead containing paint Rotating Equipment Installation of underground power temporary or permanent Work within 10 of overhead utilities Working in Occupied Buildings Working above Others Dust Control/Containment(s) Critical Crane Lift(s) * Working in Client Classified Sensitive Areas Working in a residential structure built prior to 1978 or a child occupied facility built prior to 1978 Chemical(s) Regulated by OSHA/OR-OSHA/DOSH/ or Listed on Andersen Construction Hazard Chemical Checklist NO PPE& CONTROLS REQUIRED Hardhat Safety Glasses Welding goggles / helmet Special footwear Safety Goggles / faceshield Hearing Protection Gloves material handling Gloves chemical Gloves electrical Arm cut protection Whole body - Dust, chemical, heat Whole body electrical Leg cut protection Respirators (air purifying p100) Respirators (apr chemical) Respirators supplied air Fall Protection High visibility clothing Barricades soft (caution tape) Barricades solid Danger tape & signage
10 JOB HAZARD ANALYSIS / PRE-TASK PLAN Andersen - Safety & Health Department Task: WORK TASKS HAZARDS (of work, to workers & other trades) MITIGATION MEASURES The tasks for today have been reviewed in the work area they will be performed and the workers on this crew have been through the required training. Supervisor or Task Lead Signature: CREW NAMES SIGN LEGIBLY Attach a second page if necessary Supervisor or Task Lead Phone: Page 10 of 12 04/10
11 Site Safety Plan Contents Guideline Site Safety Plans should be the first brush to review the work tasks of a project, the expected hazards associated with the work processes and the process the contractor will take to address the hazards in a timely fashion. Site Safety Plans are not finished until the project is finished as they should include work plans developed as the work develops. A blank site safety plan template is available upon request. Completed copy of Andersen Subcontractor Site Specific Safety Checklist o All identified hazards on the site specific safety checklist must be addressed in writing prior to that work activity commencing. Contractor Name, Address, On-site supervisor and contact information Emergency contact information for contractor in case of injury to personnel o Include after hours emergency contact information for on site supervisor(s) Name of contractor safety & claims representative Outline of drug testing program Listing of employees to work on the project and current drug test information (update as necessary) List of lower tier subcontractors to be utilized on the project & method to be used to ensure the lower tier sub obtains required pass down information and who to review their safety plans Scope of work description Expected hazards associated with scope of work Company policies for associated hazards, i.e. respirators expected to be used so brief outline of policy to ensure employees are properly trained and fit tested) Hazard correction / control measures * (detail most often comes in form of pre-task plan or JHA as project progresses) Company absolutes regarding safety, (i.e. Company ABC requires the use of gloves for all handling of sharp sheet metal at all times.) Company accident, near miss and hazard reporting procedures Subcontractor s methods for inspecting their own work areas and processes, how often and how hazards will be corrected o Schedule of inspections o Who to conduct o How often o Who to ensure correction Verification of employee training for those items that require training o Example list of aerial lift trained employees or forklift trained employees MSDS Inventory for project Completed Andersen Hazard Communication Checklist As the project progresses, special work plans such as a site specific fall protection work plan or crane plan, required work permits such as hot work permits,and Job Hazard Analysis (JHA s) or Pre-Task Plans will be required to be submitted. These become a part of the site safety plan files for each subcontractor. Page 11 of 12 04/10
12 WASHINGTON JOBSITES In addition to the site safety plan contents listed on the previous page, Subcontractors working on a Washington State Jobsite must provide a copy of their Accident Prevention Program in accordance with Washington State Labor & Industries Department of Occupational Safety & Health (DOSH) Accident Prevention Program Requirements. SAMPLE MINIMUM REQUIREMENTS OFAN APP Company Safety Policy Safety Disciplinary Policy First Aid Training and Emergency Procedures General Safety Rules Ladder Safety Rules Trenching and Excavation (if applicable Motorized Vehicles and Equipment Lockout / Tagout Checklist (if applicable) Hazard Communication Program Hearing Conservation Program Confined Space (if applicable) Responsibilities Basic Rules for Accident Investigation Weekly Safety Meetings Personal Protective Equipment Fall Protection Safety Rules Scaffold Safety Rules (if applicable) Fire Prevention and Protection Welding and Cutting Safety rules (if applicable) Respirator Program (if applicable) Heat Stress (Heat Illness) If you will be bringing a crane to any jobsite within the State of Washington, refer to the Construction Crane Rules under to ensure compliance with the required regulations. Page 12 of 12 04/10
J.J. Keller Safety Materials
J.J. Keller Safety Materials Using safety talks will allow your employees to analyze Real Life Stories and share what they feel the individuals did right and wrong, and what should happen next. Safety
More informationOnline Training Course Library
Online Training Course Library FEATURED COURSES As the leader in online safety training solutions, ClickSafety practices Safety every single day. Our entire library of 300+ courses (with over 55 in Spanish)
More informationTABLE OF CONTENTS 4. CONTRACTOR SHE MANAGEMENT PROGRAM R1400.00 --MANAGEMENT STATEMENT
4. CONTRACTOR SHE MANAGEMENT PROGRAM R1400.00 TABLE OF CONTENTS --MANAGEMENT STATEMENT ADMINISTRATIVE 1. SHE AND ACCIDENT PREVENTION 1-A Discipline 2. NEW HIRE ORIENTATION (Outline) 2-A New Hire Orientation
More informationBusiness & Legal Reports (BLR) Training. Workplace Safety Online Courses. Accident Investigations. Aerial Lift Safety
Business & Legal Reports (BLR) Training Workplace Safety Online Courses COURSE TITLE Accident Investigations Aerial Lift Safety Americans with Disabilities Act - What Supervisors Need to Know Arc Flash
More informationJ. J. KELLER S 5-MINUTE WORKPLACE SAFETY TALKS
Acrylonitrile Air Contaminants How Much Is Too Much? Air Contaminants Standard Alcohol- and Drug-Free Workplace Anhydrous Ammonia Refrigeration Units Asbestos Automated External Defibrillators (AEDs) Behavior-Based
More informationSITE CONTRACTOR PROCEDURES
SITE CONTRACTOR PROCEDURES Asset Collection Type B Assets are considered High risk ; the site activities must be in accordance with Graysonline contractor procedures and are to be collected by appointment
More informationIndependent Contractor Policy
Independent Contractor Policy This Policy has been implemented to prevent accidents and personal injuries. It is not intended to be entirely inclusive. It is the responsibility of the Independent Contractor
More informationWaterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries
Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries Introduction Wastewater of petrochemical industries and refineries contains high amounts of emulsified aliphatic or
More informationALVERNIA UNIVERSITY OSHA REGULATION: 29 CFR 1910.252 WELDING, CUTTING, AND BRAZING ( HOT WORK ) SECTION: 3600
OSHA REGULATION: 9 CFR 90.5 WELDING, CUTTING, AND BRAZING ( HOT WORK ) A. POLICY. This procedure follows requirements set forth in 9 CFR 90.5.. This policy applies to all Hot Work operations being done
More informationXYZ Contract Company Industrial Hygiene Program
[This is an example of a general Industrial Hygiene program intended to help Industrial Hygienists in the development of a specific contractor IH program if one is not yet developed. It is not intended
More informationPERSONAL PROTECTIVE EQUIPMENT HAZARD ASSESSMENT, EQUIPMENT SELECTION AND TRAINING DOCUMENTATION
DRAFT SAMPLE WRITTEN PERSONAL PROTECTIVE EQUIPMENT HAZARD ASSESSMENT, EQUIPMENT SELECTION AND TRAINING DOCUMENTATION For Compliance With 1910.132 Wyoming General Rules and Regulations Wyoming Department
More informationConducting a Job Hazard Assessment. Environmental, Health and Safety 275-3241
Conducting a Job Hazard Assessment Environmental, Health and Safety 275-3241 EH&S Programs: Fire Safety Blood Borne Pathogens Hazard Communication Personal Protective Equipment Emergency Preparedness General
More informationSection 2 Hazard Assessment and Risk Control Table of Contents
Section 2 Hazard Assessment and Risk Control Table of Contents 2.1 INTRODUCTION... 2 Class A Hazard... 3 Class B Hazard... 3 Class C Hazard... 3 Class D Hazard... 3 2.2 HAZARD ASSESSMENT... 4 2.2.1 Hazard
More informationAsbestos Procedures. Asbestos Products
Asbestos Procedures Asbestos Products Where is asbestos known to be located on The Evergreen State College? Please see Appendix A for a list of known asbestos containing materials located on the Olympia
More informationTable of Contents Introduction How to Use This Manual How to Do a Facility Audit
Table of Contents Introduction How to Use This Manual How to Do a Facility Audit OSHA Plant Safety Audit Checklist: Self-Inspection Types of Hazards Addressing the Hazards in Your Work Area Safety and
More informationSECTION 00335 EXISTING HAZARDOUS MATERIALS CONDITIONS
PART 1 GENERAL 1.01 SUMMARY SECTION 00335 EXISTING HAZARDOUS MATERIALS CONDITIONS A. This section provides a list of known and assumed hazardous materials that may be impacted during renovation, demolition,
More informationUNIVERSITY OF CHICAGO ELEVATOR PIT LEAK REPAIR
ITEM: UNIVERSITY OF CHICAGO ELEVATOR PIT LEAK REPAIR DESCRIPTION: General Furnish all labor, equipment, and materials necessary and incidental thereto to perform all required operations to eliminate the
More information1.0 Purpose... 4. 2.0 Definitions...4. 3.0 Hot Work Operations. 5
HOT WORK PROGRAM Introduction The University of Kentucky recognizes a potential for fire from hot work operations. For that reason this program should be implemented in all departments at the University
More informationDUST AND DEBRIS MANAGEMENT PROCEDURES HPD HOUSING REHABILITATION PROGRAMS
DUST AND DEBRIS MANAGEMENT PROCEDURES HPD HOUSING REHABILITATION PROGRAMS Dust and Debris Management Procedures refers to preventive measures that shall be undertaken by the contractor to prevent exposure
More informationWORK PLACE SAFETY TRAINING
Click web link and follow directions: WORK PLACE SAFETY TRAINING https://safety.army.mil/training/distanclearningonlinetrainning/tabid/1210/de fault.aspx List of training classes: ATRRS: The Supervisor
More informationHOT WORK PERMIT PROGRAM TRAINING. John Braun
HOT WORK PERMIT PROGRAM TRAINING John Braun 1.0 INTRODUCTION 1.2 Purpose The Hot Work Permit Program has been developed for University employees that work on or around hot work activities. This program
More informationA Workplace Accident and Injury Reduction (AWAIR) Program for Small Construction Employers
A Workplace Accident and Injury Reduction (AWAIR) Program for Small Construction Employers May 2012 Minnesota Department of Labor and Industry Occupational Safety and Health Division This material can
More informationPITTSBURG TANK AND TOWER CO., INC.
PITTSBURG TANK AND TOWER CO., INC. HEALTH, SAFETY & ENVIROMENTAL PROGRAM INDEX 1.SAFETY POLICY & MANAGEMENT RESPONSIBILITIES - Safety Policy - Administrative Duties * Top Management * Safety Director *
More informationSafety Training Needs Assessment
Safety Needs Assessment Form Instructions: Please review each question and either check YES or NO. If a question is checked YES you will be required to complete the training topic before initial assignment
More informationInjury Prevention for the Construction Industry
Injury Prevention for the Workers in the construction industry encounter a variety of hazards, some of which can lead to serious injuries and fatalities. This fact sheet: Increases awareness of the primary
More informationSAFETY AND HEALTH TRAINING AND INSTRUCTION REQUIREMENTS REFERENCED IN SUBCHAPTER 4 & 7, TITLE 8, CALIFORNIA CODE OF REGULATIONS (August 2005)
SAFETY AND HEALTH TRAINING AND INSTRUCTION REQUIREMENTS REFERENCED IN SUBCHAPTER 4 & 7, TITLE 8, CALIFORNIA CODE OF REGULATIONS (August 2005) The following is a list of the instruction and training requirements
More informationHow to use the Selection Guide
How to use the Selection Guide 1 Select colour tab This symbol indicates additional products and filters are required in conjunction with the Reusable Respirator. 2 Select your type of WORK & HAZARD 3
More informationCONTRACTOR INDUCTION HANDBOOK
CONTRACTOR INDUCTION HANDBOOK POLICY The health and safety of all school employees and contractor employees is a vital concern at the school. Contract personnel will be treated in a manner consistent with
More informationHOT WORK PERMIT PROCEDURES
COLUMBIA UNIVERSITY ENVIRONMENTAL HEALTH & SAFETY HOT WORK PERMIT PROCEDURES COLUMBIA UNIVERSITY MEDICAL CENTER February 2010 1 TABLE OF CONTENTS A. PURPOSE 3 B. SCOPE 3 C. POLICIES AND PROCEDURES 3-4
More informationH-0123 Contractor Safety Program
H-0123 Contractor Safety Program SUBJECT: Contractor Safety H-0123 REVISION NO: 4 REFERENCES: 29 CFR190 29CFR1926 CP-04-201 Contract Labor CP-04-215 Contract Services CP-28-111 Badging P&P 40-19 CP-04-107
More informationENVIRONMENT, HEALTH & SAFETY
ORACLE ENVIRONMENT, HEALTH AND SAFETY: CONTRACTOR SAFETY PROGRAM Oracle has a comprehensive and structured approach to sourcing third-party companies and contractors ( contractors ) to perform a variety
More informationSample Hazard Communications Program for Spray Polyurethane Foam Applications
Sample Hazard Communications Program for Spray Polyurethane Foam Applications Sample Hazard Communication Program for Spray Polyurethane Foam Applications Introduction This sample Hazard Communication
More informationCourse Description List
Course Description List Arc Flash This course is used to raise awareness about the specific electrical hazards of an arc flash. This course will also introduce a new CSA Standard on workplace electrical
More informationGuidance Notes on Health Hazards in Construction Work
Guidance Notes on Health Hazards in Construction Work This guide is prepared by the Occupational Safety and Health Branch Labour Department This edition February 2004 This guide is issued free of charge
More informationLead Management Program for Building Maintenance and Construction Projects. Office of Environmental Health and Safety University of Toronto
Lead Management Program for Building Maintenance and Construction Projects Office of Environmental Health and Safety University of Toronto TABLE OF CONTENTS 1 INTRODUCTION 4 OBJECTIVES 4 PROGRAM ELEMENTS
More informationGibson Door & Millwork, Inc.
Gibson Door & Millwork, Inc. Gold Award This is to certify that Gibson Door & Millwork, Inc. has successfully completed the ConstructSecure independent Construction Safety Assessment Program (CSAP).Gibson
More informationCourse Title: Safety Issues in Electronics Engineering Technology Number of Credits: 3 B.A. B.S. B.A.S A.A. A.S. Degree Type
GENERAL INFORMATION Name: Diane King Phone #: 77021 Course Prefix/Number: ETI3704 Course Title: Safety Issues in Electronics Engineering Technology Number of Credits: 3 B.A. B.S. B.A.S A.A. A.S. Degree
More informationPollution Liability Exposure: Adjustments your automotive business should consider to maintain compliance
: Adjustments your automotive business should consider to maintain compliance Pollution sounds like such a dirty word. And as an automotive service business owner, employee or operator, you might be producing
More informationLead Exposure Management Plan
Lead Exposure Management Plan 1.0. Policy CSUF has developed the Lead Exposure Management Plan to reduce occupational and environmental exposure to lead, a potent neurotoxin and carcinogen that causes
More informationCONSTRUCTION SAFETY POLICY
California Institute of Technology CONSTRUCTION SAFETY POLICY Caltech Environment, Health, and Safety Office 1200 E. California Blvd., M/C 25-6 Pasadena, CA 91125 Phone: 626.395.6727 Fax: 626.577.6028
More informationA Workplace Accident and Injury Reduction (AWAIR) Program for Small Construction Employers
A Workplace Accident and Injury Reduction (AWAIR) Program for Small Construction Employers June 2000 Minnesota Department of Labor and Industry Occupational Safety and Health Division This material can
More informationOSHA Training Guidelines (An Unofficial Summary)
OSHA Training Guidelines (An Unofficial Summary) Many standards promulgated by the Occupational Safety and Health Administration (OSHA) explicitly require the employer to train employees in the safety
More informationTractor Painting Tips
Keeping your tractor or equipment well kept & free from rust & corrosion will extend the life of your investment & help retain its value for a longer period of time. It can be difficult, in many cases,
More informationPLUMBING, HEATING & AIR CONDITIONING, REFRIGERATION & BOILER INSTALLATION CONTRACTORS QUESTIONNAIRE
PLUMBING, HEATING & AIR CONDITIONING, REFRIGERATION & BOILER INSTALLATION CONTRACTORS QUESTIONNAIRE 1. General Information Name of Applicant: Website Address: Annual Receipts: 2. Indicate the percentage
More informationTEMPORARY EMPLOYEES SAFETY PROCEDURES
TEMPORARY EMPLOYEES SAFETY PROCEDURES Temporary Agencies will ensure that any temporary employee sent to work at Modern will have received and understand the General Safety Rules. GENERAL SAFETY RULES
More informationWHS Contractor Management Procedure
Procedure Approved: 09/07/2013 Next Review: 09/07/2015 1. Overview The District council of Mount Remarkable Council is committed to engaging quality Contractors who have a sound understanding and commitment
More informationMillersville University - Office Of Environmental Health & Safety Scope & Application
Confined Space Entry Millersville University - Office Of Environmental Health & Safety Scope & Application The Confined Space Entry (CSE) program applies to the safe working practices for entering and
More informationConfined Space Procedures
Confined Space Procedures Table of Contents Purpose... 2 Primary Objectives... 2 Operational Objectives... 2 Legislation... 2 Definitions... 2 Responsibilities... 4 1. Vice-President (Administration) 2.
More informationPersonal Protective Equipment Guidelines
Personal Protective Equipment Guidelines Purpose To establish guidelines for use and care of personal protective equipment, which is to be used by employees and /or students when a hazard is found to exist
More informationPage 1 CONTRACTOR HEALTH, SAFETY AND ENVIRONMENTAL POLICY HANDBOOK
Page 1 CONTRACTOR HEALTH, SAFETY AND ENVIRONMENTAL POLICY HANDBOOK HS-105-00 Rev 4 January 12, 2015 Page 2 Table of Contents Table of Contents 2 CORPORATE HEALTH AND SAFETY POLICY 3 CORPORATE ENVIRONMENTAL
More informationTwenty-four contracting services environmental claim scenarios you may not have thought about.
Environmental DIVISION Twenty-four contracting services environmental claim scenarios you may not have thought about. Contracting Services Environmental Liability Policy Great American Insurance Group
More informationOCCUPATIONAL SAFETY AND HEALTH MANAGEMENT AND CONTAMINATED SITES WORK 2 0 0 5
GUIDANCE NOTE OCCUPATIONAL SAFETY AND HEALTH MANAGEMENT AND CONTAMINATED SITES WORK 2 0 0 5 Guidance for employers, employees, site owners, consultants, self-employed people and contractors C O M M I S
More informationFactSheet. Hazard Communication in the Maritime Industry
FactSheet Hazard Communication in the Maritime Industry This fact sheet describes the hazard communication requirements for work performed in the maritime industry (see 29 CFR Parts 1915, 1917, and 1918),
More informationContractor Safety Program
Contractor Safety Program Introduction Excellence in safety is the number one goal at Renaissance Manufacturing Group. Our objective is to have zero injuries occur within our facility, and take the standpoint
More informationF002... The following spent
261.31 Hazardous wastes from non-specific sources. (a) The following solid wastes are listed hazardous wastes from non-specific sources unless they are excluded under 260.20 and 260.22 and listed in appendix
More informationAPPENDIX A BUILDING MAINTENANCE MECHANIC D.O.T. CODE 899.381-010 O*NET CODE 49-9042.00
APPENDIX A BUILDING MAINTENANCE MECHANIC D.O.T. CODE 899.381-010 O*NET CODE 49-9042.00 This training outline is the current standard for Work Processes and Related Instruction. Changes in technology, regulations,
More informationWELDING & CUTTING. Course Description:
WELDING & CUTTING This course attempts to discuss the two most common types of welding and cutting (gas and arc), the danger that are involved in working with them and the safety measure that can be undertaken
More informationWORKING IN CONFINED SPACES GUIDELINES
WORKING IN CONFINED SPACES GUIDELINES Contents 1 Introduction... 2 2 Scope... 2 3 Definitions... 2 4 Responsibilities... 3 4.1 Permit Authoriser... 3 4.2 Permit Receiver... 3 4.3 Responsible UOW Officer...
More informationGEORGIA INSTITUTE OF TECHNOLOGY ENVIRONMENTAL HEALTH AND SAFETY PERSONAL PROTECTIVE EQUIPMENT
PURPOSE To protect the health and welfare of GEORGIA TECH employees in areas where there may be a risk of injury or exposure to hazardous substances or conditions employees who work in areas where physical
More informationStandard Method for Sampling and Analysis of. of Chlorine Containing Bleaches. Soap Products
GUIDE SPECIFICATION FOR GENERAL CLEANING AND REMOVAL OF MOLD AND MILDEW ON EXTERIOR INSULATED AND FINISH SYSTEMS AND STUCCO DIVISION 07240 and DIVISION 09240 8/05 PART I: GENERAL 1.01 DESCRIPTION AND SCOPE
More informationPERSONAL PROTECTIVE EQUIPMENT (PPE)
Page 1 of 6 (PPE) Personal protective equipment (PPE) is used to protect an individual from hazards associated with their work tasks or environment. Specific types of personal protective equipment include
More informationAsbestos Management POLICY
Asbestos Management POLICY All Asbestos Containment Material (ACM) removal activities shall comply with applicable federal, state, and local regulations. Areas of responsibility of Facilities Management
More informationCLASSES & SERVICES OFFERED
CLASSES & SERVICES OFFERED Please contact us for information regarding any items in the listing below: Course content Hiring U.S.S. as your Company s Safety Director U.S.S. as your Company's litigator
More informationENVIRONMENTAL HEALTH & SAFETY/RISK MANAGEMENT Contractor Management (including Sub-Contractors)
ENVIRONMENTAL HEALTH & SAFETY/RISK MANAGEMENT Contractor Management (including Sub-Contractors) Contractors have the responsibility to ensure the health and safety of their workers and that their work
More informationCONTROL METHODS. There are five ways to control the release of asbestos fibers:
Control Methods CONTROL METHODS When asbestos containing materials are found in a building, the owner must decide which method or methods will be used to deal with the asbestos. The decision will be based
More informationContractor Name: Foremen/Superintendent on-site: email: phone: 24 Hr Phone# Email: Project Address: Floor(s)
FACILITIES & CONSTRUCTION MANAGEMENT SAFE WORK PLAN This document must be submitted with typed responses. Hand written forms will not be acceptable. All responses must be completed or filled in with N/A
More informationOffice of Research Facilities Development and Operations Contractor Safety Policy
Office of Research Facilities Development and Operations Contractor Safety Policy The National Institutes of Health (NIH) is committed to providing a safe environment for everyone who enters the NIH campus.
More informationPERSONAL PROTECTIVE EQUIPMENT POLICY & GUIDANCE
Health and Safety Policy PERSONAL PROTECTIVE EQUIPMENT POLICY & GUIDANCE ROYAL FREE HOSPITAL NHS TRUST & SCHOOL OF MEDICINE CONTENTS 1. SUMMARY OF THE REGULATIONS 2. INTRODUCTION 3. DEFINITION OF PERSONAL
More informationABC CIRCUITS 10 Circuit Drive Circuit Town, IN 12345 SLUG CONTROL PLAN
ABC CIRCUITS 10 Circuit Drive Circuit Town, IN 12345 SLUG CONTROL PLAN The purpose of this plan is to provide detailed instructions for slug prevention and control. A complete copy of this plan is maintained
More informationRegulated Building Materials in Property Management. July 30, 2013
Regulated Building Materials in Property Management July 30, 2013 Nicole Gladu Property Redevelopment Business Line Manager URS Corporation Century Square 1501 4 th Avenue, Suite 1400 Seattle, Washington
More informationCompany Name Chemical Spill Prevention & Clean-up Procedures Program. Last Revised On 00/00/0000
Company Name Chemical Spill Prevention & Clean-up Procedures Program Last Revised On 00/00/0000 PURPOSE The following program will discuss how prevent chemical spills from occurring and setting forth procedures
More informationAsbestos WHAT TO DO? Studies of people who were exposed to high levels of asbestos in factories and shipyards, are at increased risk of:
Asbestos WHAT TO DO? What Is Asbestos? Asbestos is mineral fiber. It can be positively identified only with a special type of microscope. There are several types of asbestos fibers. In the past, asbestos
More informationAddendum 1 Clarifications
Addendum 1 Clarifications Asbestos 1. Clarifications CONTRACTOR is instructed to incorporate standard abatement procedures as mandated by the Federal OSHA Construction Industry Standard; 29 CFR 1926.1101,
More informationTraining Program Order # Check If this applies to your workplace. Description of Hazard Or Training. Training Title
WHY? Many employers question the reason for employee safety training. The simple answer to those questions is: OSHA requires safety training. Here are some annual statistics from 2001 to prove the point:
More informationDemolition Program Checklist
Apollo General Insurance Agency, Inc. License Number 0606980 Demolition Program Checklist Information Needed: 5 years currently valued loss runs Narrative on any Losses in Excess of $10,000 Completed questionnaire,
More informationMechanical Systems Competency 1.20
Competency 1.20 Mechanical systems personnel shall demonstrate a working level knowledge of the safety and health fundamentals of mechanical systems and/or components. 1. Supporting Knowledge and Skills
More informationScotch-Weld TM. Epoxy Adhesive 1838 B/A Green 1838 B/A Tan 1838-L B/A Translucent. Technical Data February, 2016. Product Description
3 Scotch-Weld TM 1838 1838 1838-L Technical Data February, 2016 Description 3M TM Scotch-Weld TM s 1838 and are controlled flow products; Scotch-Weld 1838-L is flowable. These epoxy adhesives are two-part,
More informationParticularly Hazardous Substances (PHS) Standard Operating Procedure (SOP)
Particularly Hazardous Substances (PHS) Standard Operating Procedure (SOP) Formaldehyde, formalin, paraformaldehyde solutions, and paraformaldehyde solids Principal Investigator: Room & Building #: Department:
More informationCHAPTER 7 - OFFICE OF OCCUPATIONAL SAFETY AND HEALTH SUBCHAPTER 7A - GENERAL RULES AND OPERATIONAL PROCEDURES
CHAPTER 7 - OFFICE OF OCCUPATIONAL SAFETY AND HEALTH SUBCHAPTER 7A - GENERAL RULES AND OPERATIONAL PROCEDURES SECTION.0600 - SAFETY AND HEALTH PROGRAMS AND COMMITTEES 13 NCAC 07A.0601 PURPOSE AND SCOPE
More informationCONFINED SPACE ENTRY WORK STANDARD
CONFINED SPACE ENTRY WORK STANDARD CONFINED SPACE ENTRY WORK STANDARD Copyright 2007 All rights reserved. Reproduction of this document in whole or in part by any means is prohibited, unless authorized
More informationSafety, Health, and Environmental (SHE) Program Visitor Awareness Training (SHE 101V)
Marshall Space Flight Center Safety, Health, & Environmental (SHE) Program Safety, Health, and Environmental (SHE) Program Visitor Awareness Training (SHE 101V) SHE 101V Presented By: MSFC Industrial Safety
More informationAsbestos Abatement Work Plan for the Carter Carburetor Superfund Site
for the Prepared for: ACF Industries LLC 101 Clark Street St. Charles, Missouri 63301 Prepared by: AMEC Environment & Infrastructure, Inc. 15933 Clayton Road, Suite 215 Ballwin, Missouri 63011 Project
More informationSafety and Health Resource Manual. Sample Permit-Required Confined Space Written Program
Sample Permit-Required Confined Space Written Program Purpose The purpose of this document is to communicate Employer s compliance with MIOSHA s requirements for a permit-required confined space entry
More informationUDOT SPILL PREVENTION and RESPONSE PLAN for CONSTRUCTION SITES
UDOT SPILL PREVENTION and RESPONSE PLAN for CONSTRUCTION SITES February 2014 The plan contained in the following pages was developed in part from UDOT Construction Division s Safety and Health Manual,
More informationMTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS
Los Angeles, CA Project Manual and Specification DIVISION 1 GENERAL CONDITIONS 01 01 10 STATEMENT OF WORK 01 11 00 SUMMARY OF THE WORK 01 14 05 METRO (OWNER) - DIRECTED STOPPAGES 01 20 00 PRICE AND PAYMENT
More informationPersonal Protective Equipment Policy & Procedure Date: August, 2001 Approved by:
OCCUPATIONAL SAFETY AND HEALTH POLICY Topic: Personal Protective Equipment Policy & Procedure Date: August, 2001 Approved by: Author(s): Distribution: Cindy Davis, Risk Management; Ed Polluconi, EH&S;
More informationBritish Columbia Institute of Technology. BCIT Safety Manual ASBESTOS MANAGEMENT
BCIT Safety Manual Contents 1. Purpose... 3 2. Definitions... 3 2.1 Asbestos... 3 2.2 Asbestos Containing Material (ACM)... 3 2.3 Friable Material... 3 2.4 Low Risk Work Activity... 3 2.5 Moderate Risk
More information3. Asbestos Abatement Course 1. Introduction and Background to Asbestos Abatement. 4. Health Effects and Medical Surveillance
St. Louis Brownfields Worker Training Program St. Louis Community College Harrison Education Center and St. Louis University Environmental Education & Training 1. Introduction to Environmental Technologies
More informationRESIDENTIAL COURSE OF CONSTRUCTION QUESTIONNAIRE
RESIDENTIAL COURSE OF CONSTRUCTION QUESTIONNAIRE Residential Course of Construction policies, also known as Builder s Risk, are designed to cover the property owner for potential loss while the property
More informationSUBJECT: Effective Date: Procedure Number: Contractor Environmental Management. 09/03/13 emp11 Procedures
SUBJECT: Effective Date: Procedure Number: Contractor Environmental Management 09/03/13 emp11 Procedures APPLICABILITY/ACCOUNTABILITY: Supersedes: Page Of EMS Procedure-011 1 11 Responsible Authority:
More informationALLEGANY WIND POWER PROJECT CONSTRUCTION SPILL PREVENTION PLAN
ALLEGANY WIND POWER PROJECT CONSTRUCTION SPILL PREVENTION PLAN Best Management Practices (BMPs) will be implemented during construction of the Allegany Wind Power Project to prevent and contain spills.
More informationLEGAL REVIEW & UPDATE
LEGAL REVIEW & UPDATE There are lots of laws and regulations designed to protect workers, the general public, and the environment. However, not everyone follows the laws. Many people deliberately break
More informationElevating Devices Mechanic Safety Training
Elevating Devices Mechanic Page 1 PREFACE This Elevating Devices Mechanic Curriculum Training Standard has been developed in keeping with the Common Format Guidelines prescribed by the Technical Standards
More informationA Case Study: Best Practices to Ensure Safety on a Construction Project
Session No. 503 A Case Study: Best Practices to Ensure Safety on a Construction Project Kenneth Bogdan, CSP J.A. Montgomery Risk Control Marlton, NJ Utilizing Resources to Effectively Reduce Accident Frequency
More informationContractor s Safe Working Agreement
Contractor s Safe Working Agreement This statement provides details on how I/we, the Trade Contractor will manage the health and safety hazards associated with my/our work. ASSESSING WORKPLACE HEALTH AND
More informationOxidizer(s) Management and Use Guidelines
Facilities and Campus Services EHS/RMS 3101 Science Circle CPISB Room 102B Anchorage, AK 99508 Oxidizer(s) Management and Use Guidelines This document provides information concerning the handling, storage,
More informationManaging Floor Drains and Flammable Traps
Managing Floor Drains and Flammable Traps Contents: Problem... 1 Solution... 2 Maintenance... 2 Waste Management Options... 2 For More Information... 4 BMP Chart... 5 This fact sheet discusses recommended
More informationSAFETY TRAINING CLASSES & SERVICES LIST
SAFETY TRAINING CLASSES & SERVICES LIST CUSTOM CLASS ROOM TRAINING AVAILABLE, BACKED WITH ON-SITE SUPPORT SAFETY, TRAINING COURSES OFFERED BY OUR CERTIFIED ELITE RISK CONTROL TEAM: EM 385-1-1 (Military)
More informationHealth and Technical Assistance for the World Trade Center (WTC) Dust Cleaning Program OSHA Activity Final Report
Health and Technical Assistance for the World Trade Center (WTC) Dust Cleaning Program OSHA Activity Final Report December 9, 2002-February 21, 2003 BACKGROUND In the aftermath of the terrorist attacks
More informationOccupational Safety and Health Division Training Course Catalog
Occupational Safety and Health Division Training Course Catalog Improving the safety & health culture through education, training and outreach N.C. Department of Labor Occupational Safety and Health Division
More information