BLASHFORD LAKES STRATEGIC MANAGEMENT PLAN SUMMARY
|
|
|
- Arnold Burke
- 9 years ago
- Views:
Transcription
1 BLASHFORD LAKES STRATEGIC MANAGEMENT PLAN SUMMARY Introduction 1. This Strategic Management Plan has been prepared to review and update the proposals of the s Management Strategy and Plan (BLMSP) (1992). The Strategic Management Plan has been prepared by Land Use Consultants, overseen by a s Steering Group comprising Hampshire County Council, New Forest District Council, English Nature, the Environment Agency, Wessex Water, Bournemouth & West Hampshire Water Company, and the Hampshire Wildlife Trust. 2. The purpose of the review was to build upon the success of the original BMLSP taking into account changes that have occurred in terms of land use and activities at the lakes, and also changes in legislation, policy and guidance since The area covered by this Strategic Management Plan has also been extended from the original BLMSP, so that it now includes all of the lakes and adjoining land within the s study area. Factors Influencing the Strategic Management Plan 3. A number of changes have taken place since the BLMSP was published, most notably: ending of much of the mineral extraction activity in the study area, (with the exception of the north of the study area), although processing of minerals continues in a number of locations, and several sites in the study area are still being restored. designation of a large proportion of the study area as a Special Protection Area and Ramsar site, which means that it is of national and international importance for its nature conservation interest, and in particular for over-wintering waterfowl. This has brought with it various statutory duties and responsibilities to protect and conserve the ecological interest in order to achieve nature conservation objectives. inclusion of the s study area in the proposed New Forest National Park. 4. The Strategic Management Plan has drawn on both detailed research relating to the study area, such as monitoring of waterfowl populations, and consultation with those with an interest in the study area. The Value of s 5. The s study area is a valuable resource, catering for a wide range of uses and interests: It has been an important source of minerals over many years, providing essential supplies for the construction industry. It represents an important ecological asset, as part of the wider Avon Valley, but also through the creation of large areas of open standing water. It is a strategic resource for water storage and supply. It is a regionally important location for water-sports, including sailing, water-skiing, and canoeing. It provides an important local resource for recreational fishing. It also caters for a range of other recreational pursuits, including shooting, walking and bird watching. It is an agricultural resource, providing back-up grazing for the New Forest.
2 It is an educational resource, linked to all the above uses. 6. The proposals in the Strategic Management Plan take into account the history and evolution of the study area, the various interests involved, and the statutory duties that need to be discharged by public authorities. 7. The Strategic Management Plan looks at the lakes as a whole, and defines an overall Strategic Aim and Key Principles to help to manage the multiple uses and potentially conflicting interests at the lakes. The Strategic Aim of the Plan is: To ensure that existing and future uses at s, including water storage and supply, sport and recreation, nature conservation, mineral working and restoration, and residential amenity, are mutually accommodated as far as is practicable, within the framework set by legislation. The Key Principles are: i Opportunities to achieve multiple objectives (e.g. water storage and supply; nature conservation; sport and recreation; access) should be pursued rather than single objectives (i.e. win-win solutions). ii Ensure safe and reliable water supply from specific lakes, within previously agreed drawdown limits, until further research has been undertaken to establish an appropriate management regime for water supply that is consistent with nature conservation and recreation objectives. iii Protect and enhance the nature conservation interest of the s study area as a whole, and in particular those areas designated for their nature conservation value and protected by legislation. iv Where there is a clear and obvious conflict between legal and policy obligations for nature conservation and other uses, nature conservation should take precedence, except where there is a proven over-riding public need for water supply. v Preserve and enhance the landscape, recognising that the lakes have their own unique character within the wider context of the Avon Valley, and carry out management to improve the landscape and nature conservation value of the lakes and land areas in between the lakes. vi Ensure that the restoration of mineral workings is co-ordinated and managed, and carried out to a high standard in keeping with nature conservation, amenity and landscape objectives. vii Maintain and manage current well-established sport and recreational uses at the lakes, and seek enhancement in such uses, within constraints set by nature conservation objectives. viii Improve footpath access for local residents and visitors. ix Improve educational interpretation at the lakes, including the nature conservation and historic interest of the area. x Implement the Strategic Management Plan through engagement with landowners, users of the lakes, local residents, and other interest groups, under the continued auspices of the s Consultative Committee, with the aim of extending its remit to cover those lakes currently outside the ownership of the water companies. These provide the framework for the Strategic Management Plan, allowing sufficient flexibility to accommodate changes over time.
3 Key Proposals (see Figure 1) 8. The key proposals included in the Strategic Management Plan are as follows: 9. Mineral workings Continued restoration and aftercare of mineral workings in line with planning consents, conditions and obligations. 10. Water storage and supply (see Figure 2) Continued use of certain lakes within the study area for water storage and supply, with management of the resource to be determined by detailed hydrological studies. The lakes where water supply is the primary purpose are: Pound Ibsley Water Ivy Other lakes with potential for water storage and supply are: Rockford North Somerley 11. Nature conservation (see Figure 3) Manage the sites designated for the nature conservation value in line with statutory requirements and nature conservation objectives, restoring to favourable condition those lakes designated for their nature conservation interest that are not achieving their conservation objectives. s currently in favourable nature conservation condition are: Ibsley Water (eastern part) Ivy s not in favourable condition are: (East) Mockbeggar Rockford (eastern part) Snails Dockens Water Restore sites currently not designated for their nature conservation interest to achieve nature conservation objectives: Ibsley Quarry Ibsley Water (western part) (west) North Somerley Rockford (western part)
4 Conserve and enhance the nature conservation interest of parts of the study area that have developed nature conservation interest but are not designated, in order to improve the ecological value of s as a whole. These are: Goblins Kingfisher Land surrounding the Wessex Water Treatment Plant Lin Brook. Pursue opportunities to enhance the nature conservation value of other areas not currently contributing to nature conservation interest Pound Hucklesbrook Hurst Ponds Morey's s (excluding Goblin's lake) Poulner (Northfield Wash Pit Hardstanding at Drove Public open space north of Wash Pit Undertake further survey and monitoring work to inform conservation management of the lakes. 12. Sport and recreation (see Figure 4) Continuation of sailing at, and water-skiing at, subject to appropriate arrangements being in place to ensure that nature conservation objectives are not compromised. Consideration of controlled water-based, non-powered recreational use (e.g. sailing/ canoeing) at Rockford provided there is no adverse impact on the nature conservation interest of the lake or Dockens Water. Maintain active water sports at Hucklesbrook s. Continuation of fishing at: Hucklesbrook Hurst Ponds Kingfisher Meadow, King's and Vincent s Poulner Wash Pit. For lakes that are part of the Special Protection Area or contribute to it, studies are to be undertaken to investigate and monitor the effects of fishing, e.g. at: Kingfisher (east) Fishing will only be allowed to continue at Rockford and Snail's if it can take place without affecting nature conservation interests.
5 Continue low-key recreation (e.g. non-powered water sports) at Hurst Ponds End shooting at Mockbeggar s and Ibsley Water as this is in conflict with the nature conservation designations. Also seek controls on shooting on the lakes outside the Special Protection Area e.g. North Somerley. 13. Access and parking (see Figure 5) The Strategy seeks to develop a network of linked footpaths to connect specific sites of interest and provide for walking facilities off roads. Footpaths and bridleways already proposed in mineral restoration plans are: a bridleway west of the A338 (which this Strategy recommends should become a definitive right of way with provision for cyclists if feasible) a footpath connecting Mockbeggar Lane with the Avon Valley Path. In addition, the strategy proposes the following routes: a north-south footpath potentially connecting Mockbeggar Lane and Drove. Two indicative routes are shown. There is also the potential to create a link with the former Ibsley Control Tower. a north-south footpath to the east and south of to link with the Study Centre and the bird hide between and Ivy Water. a north-south footpath to the west of Rockford connecting Mockbeggar with Ivy Lane and the Avon valley Path. east of Rockford, to take the Avon Valley Path off Highwood Lane. In addition, a footpath to the south and east of, which would create a circular route around the lake, has been proposed for some time. This should only be introduced if it can be shown that it will result in no additional disturbance to wildlife or adjoining properties. All these proposed paths would be permissive initially, with a view to becoming definitive rights of way in the long term. While it is not the intention to encourage access by car, it is recognised that some provision should be made, particularly to assist those with mobility problems. Four locations offer scope for additional parking: the hardstanding north of Rockford, off Drove near to Pound to the south-west of West, to be accessed off Woolmer Lane east of the former control tower, opposite Forelock Farm (if the control tower is brought into use). There is also limited potential to expand or formalise the parking arrangements at the Study Centre. 14. Agriculture and grazing Opportunities should be pursued to provide for agricultural use of land in the study area, particularly for back-up grazing for the New Forest. Locations that offer potential for this use are: South of Drove north of Rockford east of east of west of Ibsley Water west of at Ibsley Quarry north and east of Mockbeggar s.
6 15. Education The Strategic Management Plan aims to increase the educational use of the lakes area. Proposals comprise: additional use of the s Study Centre, which should be promoted to a wider range of interests beyond schools, and could include extending the existing building to create a Visitor Centre; the potential use of the former airfield control tower adjacent to Mockbeggar for educational purposes/ bird watching/ historic interpretation etc. A further study is needed of the feasibility of this proposal. Linked to these proposals, a strategy for interpretation and education in the study area should be drawn up, including links with any similar initiatives for the New Forest and the River Avon, and focusing on the history, nature conservation interest and recreational potential of the area. Implementation of the Strategic Management Plan 16. It is recommended that the s Consultative Committee continues to provide a forum for different interests to consider the future of the study area as a whole, and that stakeholders who currently are not represented on the Committee are invited to join. 17. At the detailed level, it is recommended that the s Strategic Management Plan Steering Group, comprising the partners who guided this project, continues to oversee implementation of the Plan. 18. It is recommended that the chair of the Consultative Committee and Steering Group are reviewed, to reflect the extended boundaries to the study area, and that New Forest District Council are invited to take on this role. This arrangement may need to be reviewed once the New Forest National Park Authority is established. S:\2300\ s\documents\formal Consultation May 04\Report\Executive Summary - Web Version.doc
7 River Avon Reproduced from Ordnance Survey information with the permission of The Controller of Her Majesty's Stationery Office, Crown Copyright, LUC Licence No ALD Drawing Number: revfinal_ _015_fig4-6_management_proposals-summary_ mxd North Somerley SH Processing Plant Meadow Goblins Moreys s Vincent's King's Pound W ªS Dockens Water Ibsley Water Hurst Ponds Ibsley Quarry (Future North Mockbeggar ) Water Treatment Plant Study Centre Ivy Snails West Kingfisher Rockford Mockbeggar s Lin Brook ªI Wash Pit Ibsley Control Tower and associated land Hardstanding, Drove East Poulner (Northfield) Inset: Hucklesbrook s { î Hucklesbrook s m BLASHFORD LAKES STRATEGIC MANAGEMENT PLAN Figure 1: Overview of Management Proposals Key Water storage and supply Rivers/streams Confirmed use for water storage Potential use for water storage subject to appropriate permissions Nature conservation Designated sites to be managed in line with statutory requirements and nature conservation objectives Sites not designated where nature conservation interest should be conserved and/or enhanced Sites not designated to be restored to achieve nature conservation objectives Public open space (New Forest District Local Plan, Adopted 1999) Existing Proposed Sporting uses Fishing, subject to assessment and controls to accord with nature conservation objectives Other locations for fishing W î S H Shooting subject to assessment and controls to accord with nature conservation objectives Existing access Footpath (Public Right of Way) Route of Avon Valley path Existing birdwatching facilities Existing educational facilities ªS Possible additional access Permissive footpath (indicative potential routes subject to further assessment) Potential route for cycleway Possible location for additional/ improved car parking (subject to futher assessment) Ibsley control tower - potential for use as interpretation ªI and viewing location (subject to feasibility study) Study area Non-motorised watersports (e.g. sailing, canoeing) subject to assessment and controls to accord with nature conservation objectives Other locations for non-motorised water sports Waterskiing subject to assessment and controls to accord with nature conservation objectives Other motorised water sports associated with New Forest Water Park Bridleway (Public Right of Way) Permissive footpath Proposed footpath in current mineral restoration plans Proposed bridleway Bird hide/shelter Study Centre Possible location for additional bird hide/shelter LAND USE CONSULTANTS 43 Chalton Street London NW1 1JD Ph: Fax: May 2004 [email protected]
8 Inset: Hucklesbrook s BLASHFORD LAKES STRATEGIC MANAGEMENT PLAN Ibsley Quarry (Future North Mockbeggar ) Figure 2: Management Proposals - Water Storage and Supply Mockbeggar Lane Hucklesbrook s Key Study area Mockbeggar s Rivers/streams North Somerley Ibsley Water Confirmed use for water storage Potential use for water storage subject to appropriate permissions Drove River Avon Pound Rockford Highwood Lane Meadow Vincent's Moreys s Goblins King's Dockens Water Ivy Ivy Lane Snails West Snails Lane Lin Brook East Public open space Poulner (Northfield) Hurst Ponds Wash Pit Kingfisher Reproduced from Ordnance Survey information with the permission of The Controller of Her Majesty's Stationery Office, Crown Copyright, LUC Licence No ALD A388 RINGWOOD { m May 2004 LAND USE CONSULTANTS 43 Chalton Street London NW1 1JD Ph: Fax: [email protected] Drawing Number: revfinal_ _007_fig4-1_proposal_waterstorage_and_supply_ mxd
9 Ibsley Quarry (Future North Mockbeggar ) Inset: Hucklesbrook s Hucklesbrook s BLASHFORD LAKES STRATEGIC MANAGEMENT PLAN Figure 3: Management Proposals - Nature Conservation Key Study area Mockbeggar s Designated sites to be managed in line with statutory requirements and nature conservation objectives North Somerley Ibsley Water Ibsley Control Tower and associated land Sites not designated where nature conservation interest should be conserved and/or enhanced Sites not designated to be restored to achieve nature conservation objectives Hardstanding, Drove Pound Water Treatment Plant Rockford Processing Plant Study Centre Meadow Moreys s Goblins Ivy Vincent's King's Snails West East Public open space Poulner (Northfield) Wash Pit Hurst Ponds Kingfisher Reproduced from Ordnance Survey information with the permission of The Controller of Her Majesty's Stationery Office, Crown Copyright, LUC Licence No ALD { m May 2004 LAND USE CONSULTANTS 43 Chalton Street London NW1 1JD Ph: Fax: [email protected] Drawing Number: revfinal_ _013_fig4.2_management_proposals-nature_conservation_ mxd
10 Inset: Hucklesbrook s î BLASHFORD LAKES STRATEGIC MANAGEMENT PLAN Figure 4: Management Proposals - Sporting Uses Key Study area Fishing, subject to assessment and controls to accord with nature conservation objectives Other locations for fishing SH Non-motorised watersports (e.g. sailing, canoeing) subject to assessment and controls to accord with nature conservation objectives Other locations for non-motorised water sports W î Waterskiing subject to assessment and controls to accord with nature conservation objectives Other motorised water sports associated with New Forest Water Park W SH Shooting subject to assessment and controls to accord with nature conservation objectives Reproduced from Ordnance Survey information with the permission of The Controller of Her Majesty's Stationery Office, Crown Copyright, LUC Licence No ALD { m May 2004 LAND USE CONSULTANTS 43 Chalton Street London NW1 1JD Ph: Fax: [email protected] Drawing Number:revfinal_ _014_fig4.3_management_proposals-sporting_uses_ mxd
11 Inset: Hucklesbrook s BLASHFORD LAKES STRATEGIC MANAGEMENT PLAN Figure 5: Management Proposals - Access ªI Key Study area Existing access Footpath (Public Right of Way) Bridleway (Public Right of Way) Permissive footpath Route of Avon Valley path ªS Existing birdwatching facilities Existing educational facilities ªS Proposed footpath in current mineral restoration plans Proposed bridleway Bird hide/shelter Study Centre Possible additional access Permissive footpath (indicative potential routes subject to further assessment) Potential route for cycleway Possible location for additional/ improved car parking (subject to futher assessment) ªI Ibsley control tower - potential for use as interpretation and viewing location (subject to feasibility study) Possible location for additional bird hide/shelter Reproduced from Ordnance Survey information with the permission of The Controller of Her Majesty's Stationery Office, Crown Copyright, LUC Licence No ALD Drawing Number: revfinal_ _012_fig4-4_management_proposals-access_ mxd { m May 2004 LAND USE CONSULTANTS 43 Chalton Street London NW1 1JD Ph: Fax: [email protected]
The Roaches Asset Management Review. Draft Objectives for External Consultation. Fundamental Principles
The Roaches Asset Management Review Draft Objectives for External Consultation Fundamental Principles the area of land under review is the Roaches Estate and Gradbach Car Park as shown on the attached
A new Garden Neighbourhood for West Guildford An opportunity for Smart Growth. university of surrey November 2013
A new Garden Neighbourhood for West Guildford An opportunity for Smart Growth university of surrey November 2013 A new Garden Neighbourhood for West Guildford Preface Since the County and Borough Councils
Key Facts. Passenger growth at the airport is projected to grow to approximately 3 million passengers per annum by 2030.
Bournemouth Airport & Business Park 7 7 Bournemouth Airport & Business Park Introduction 7.1 Bournemouth Airport is a key asset for the region, one of the UK s fastest growing regional airports and is
Queensland Parks and Wildlife Service PEST MANAGEMENT PLAN
QPWS Pest Management Plan Queensland Parks and Wildlife Service PEST MANAGEMENT PLAN 2010-2015 A plan to meet obligations under the Land Protection (Pest and Stock Route Management) Act (2002) Version:
Preparing a Green Wedge Management Plan
Preparing a Green Wedge Management Plan Planning Practice Note 31 JUNE 2015 This practice note provides a guide for the preparation of Green Wedge Management Plans and sets out the general requirements
Development proposals will require to demonstrate, according to scale, type and location, that they:-
Appendix 2 : Relevant Development Plan Policies Angus Local Plan Review 2009 Policy S1 : Development Boundaries (a) Within development boundaries proposals for new development on sites not allocated on
Site Deliverability Statement Development at: Beech Lane, Kislingbury. Persimmon Homes Midlands March 2015
Site Deliverability Statement Development at: Beech Lane, Kislingbury Persimmon Homes Midlands March 2015 Contents Site Deliverability Statement Development at: Beech Lane, Kislingbury 1.INTRODUCTION 1.1
Aiding the Hydro-scheme development process. Web-links to useful information sources
Aiding the Hydro-scheme development process. Web-links to useful information sources Web-pages are in bold. These pages aim at providing developers, land-owners, decision makers and advisors with a collation
Advice note. Linking River and Floodplain Management
Advice note Linking River and Floodplain Management Advice note Linking River and Floodplain Management Demonstrating STrategic REstoration And Management (STREAM) is a 1 million four-year conservation
approval of matters specified in conditions; and The Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013
Application for: planning permission; planning permission in principle; further applications; approval of matters specified in conditions; and mineral workings (if the planning authority do not have a
Subject: APPLICATION 10/02650/CA. DEMOLITION OF YOUTH CLUB, DEEPDALE LANE, BOSTON SPA, WETHERBY.
Originator: Victoria Hinchliff Walker Tel: 39 51343 Report of the Chief Planning Officer PLANS PANEL EAST Date: 28 th October 2010 Subject: APPLICATION 10/02650/CA. DEMOLITION OF YOUTH CLUB, DEEPDALE LANE,
Tree Condition Survey for Proposed Taplow Footbridge at Ray Mill Island and Taplow Riverside, Mill Lane Taplow, Buckinghamshire
Tree Condition Survey for Proposed Taplow Footbridge at Ray Mill Island and Taplow Riverside, Mill Lane Taplow, Buckinghamshire Tree Condition Survey for Proposed Taplow Footbridge at Ray Mill Island and
3.0 Planning Policies
3.0 Planning Policies 3.1 National Policy 3.1.1 Government Planning Policy Guidance Notes (PPGs), and Planning Policy Statements (PPSs) provide the background to most aspects of the planning system. The
MINERALS AND ASSOCIATED WASTE APPLICATIONS APPLICATION FORM
MINERALS AND ASSOCIATED WASTE APPLICATIONS APPLICATION FORM 1. Applicant Details (See guidance note 1) 2. Agent Details Please complete if the applicant has an agent (See guidance note 2) * Title: * Forename:
The Green Belt A Guide for Householders
The Green Belt A Guide for Householders Introduction Much of Mole Valley lies within the Metropolitan Green Belt. This leaflet outlines the purpose, importance and characteristics of the Green Belt and
APPLICATION FOR PLANNING PERMISSION FOR A SOIL TREATMENT FACILITY AT KINGS CLIFFE LANDFILL SITE, STAMFORD, NORTHAMPTONSHIRE
APPLICATION FOR PLANNING PERMISSION FOR A SOIL TREATMENT FACILITY AT KINGS CLIFFE LANDFILL SITE, STAMFORD, NORTHAMPTONSHIRE DESIGN AND ACCESS STATEMENT Report Reference: AU/KC/SPH/1449/01/D&A/FIN Baddesley
Glossop Design & Place Making Strategy
Supplementary Planning Document to the High Peak Local Plan June 2011 Design Brief for the Town Hall Complex GILLESPIES I GERALD EVE Reproduced from the Ordnance Survey map with the permission of Ordnance
Stowmarket Area Action Plan (AAP) Examination
Stowmarket Area Action Plan (AAP) Examination Main Matters, Issues and Questions Matter 3 - Employment (Appendix) This contains additional information in support of the Hearing Statement and relates to
BIDFORD PARISH NEIGHBOURHOOD PLAN NEIGHBOURHOOD DEVELOPMENT PLAN. Consultation Document on Draft Policies 25th May 2015 6th July 2015
BIDFORD ON-AVON PARISH NEIGHBOURHOOD PLAN NEIGHBOURHOOD DEVELOPMENT PLAN Consultation Document on Draft Policies 25th May 2015 6th July 2015 www.bidfordonavon-pc.gov.uk PLEASE FEEL FREE TO MAKE YOUR COMMENTS
Coventry Development Plan 2016 Appendix 89. Glossary of Key Terms
Coventry Development Plan 2016 Appendix 89 Glossary of Key Terms Area Action Plan A Development Plan Document which focuses upon a specific location or an area subject to significant change. Affordable
1 Welcome. The exhibition comprises a series of boards which provide some background information to show you our initial ideas for the site.
1 Welcome Thank you for taking the time to attend this public exhibition of our proposals for residential development on Land at Daws Farm, Back Road, Writtle (site shown opposite). The exhibition comprises
Wildlife Habitat Conservation and Management Program
Wildlife Habitat Conservation and Management Program Manual for Counties and Cities Oregon Department of Fish and Wildlife 2015 Table of Contents 1. Introduction Purpose of the habitat program Objective
www.thefurlongphase2.co.uk
Welcome Thank you for coming along today to view our plans for Phase 2 of The Furlong Shopping Centre. We are undertaking a consultation programme that will run up to and beyond submission of the planning
Lincolnshire Walks. Marston & Hougham
Lincolnshire Walks Marston & Hougham Three circular walks of 4, 8 and 11km (2 ½, 5 and 7 miles) Introduction The villages of Marston and Hougham are situated six miles north of Grantham to the east of
Kings Road, Beith. Development Brief. Part 1: Site Specific Information
Kings Road, Beith Development Brief Part : Site Specific Information Introduction Kings Road is a greenfield site on the north west edge of Beith and is currently let for grazing. The site is roughly rectangular
The NSS - Rural Development and Rural Settlement
The NSS - Rural Development and Rural Settlement Spatial Planning Unit, Department of the Environment and Local Government, February 2003 Introduction. This paper has three main parts that outline: (1)
Cathkin Relief Road Planning Statement
Cathkin Relief Road Planning Statement The Proposal This statement sets out the background to the Cathkin Relief Road project currently being progressed by South Lanarkshire Council. The project will provide
National Planning Policy for Waste
National Planning Policy for Waste October 2014 Department for Communities and Local Government Crown copyright, 2014 Copyright in the typographical arrangement rests with the Crown. You may re-use this
Didcot Further Expansion
Didcot Further Expansion Landscape and Visual Resources Appendix 2 to the RPS Examination Statement Prepared by: October 2011 RPS Mallams Court 18 Milton Park Abingdon Oxon OX14 4RP Tel 01235 838 200 Fax
10.1 WILL HEY FARM WATFORD LANE NEW MILLS RETENSION OF NEW STABLE BLOCK, SAND PADDOCK AND ASSOCIATED EARTHWORKS AND LANDSCAPING (FULL - MINOR)
HPK/2012/0207 03/04/2012 WILL HEY FARM WATFORD LANE NEW MILLS MR & MRS M WILSON KIRSTY WILSON EQUINE AND WILL HEY FARM BED & BREAKFAST RETENSION OF NEW STABLE BLOCK, SAND PADDOCK AND ASSOCIATED EARTHWORKS
Marchand Provincial Park. Draft Management Plan
Marchand Provincial Park Draft Management Plan Marchand Provincial Park Draft Management Plan Table of Contents 1. Introduction... 3 2. Park History... 3 3. Park Attributes... 4 3.1 Natural... 4 3.2 Recreational...
Living & Working Managing Natural Resources and Waste
Living & Working Managing Natural Resources and Waste 5.13 Managing Natural Resources and Waste Background 5.13.1 This chapter focuses on how we manage resources within the AONB. It includes renewable
Earls Court Farm Worcester
Earls Court Farm Worcester LOCAL DEVELOPMENT FRAMEWORK www.worcestercitycouncil.gov.uk SUPPLEMENTARY PLANNING DOCUMENT Earls Court Farm Development & Design Brief SPD FEBRUARY 07 4 2 Site-Context
28.0 Development Permit Area #2 (Neighbourhood District)
28.0 Development Permit Area #2 (Neighbourhood District) Goals and Objectives To provide a guide for infill and new development in the Neighbourhood District. To outline the nature, form and character
Peninsular Florida Landscape Conservation Cooperative. Charter. Background
Charter Background The Peninsular Florida Landscape Conservation Cooperative (Conservation Cooperative) is part of a national network of Landscape Conservation Cooperatives (LCCs). LCCs are applied conservation
Protected Areas on Private Land: Shaping the Future of the Park System in Australia
11 Protected Areas on Private Land: Shaping the Future of the Park System in Australia Greg Leaman, Director of National Parks and Wildlife, Department of Environment, Water and Natural Resources, GPO
CORPORATE POLICY STATEMENT NO. 12 MANAGEMENT OF PEST ANIMALS
1. OBJECTIVE CORPORATE POLICY STATEMENT NO. 12 MANAGEMENT OF PEST ANIMALS August 2015 To provide direction and guidance for the management of pest animals on lands and waters managed by the Department
No. 132. Land Use and Building Act (132/1999, amendment 222/2003 included) Chapter 1. General provisions. Section 1 General objective of the Act
NB: UNOFFICIAL TRANSLATION FINLAND No. 132 Land Use and Building Act (132/1999, amendment 222/2003 included) In accordance with the decision of Parliament the following is enacted: Chapter 1 General provisions
London Borough of Waltham Forest LOCAL FLOOD RISK MANAGEMENT STRATEGY. Summary Document
LOCAL FLOOD RISK MANAGEMENT STRATEGY Summary Document October 2013 Local Flood Risk Management Strategy Summary 1 Introduction 2 Partner responsibilities 3 What do we know about flooding in the borough?
05 AREA/SITE SPECIFIC GUIDELINES
05 AREA/SITE SPECIFIC GUIDELINES Site 1 - Glass Yard The leisure centre that is currently located on this site should move to a more central location in the town centre close to the existing public squares.
Rev Issue Status Prepared / Date Approved/Date. - Draft 1 LOA / 15.09.14 JSE / 19.09.14
Nancy Hawksworth Barn Conversion: Moor Farm, London Road, Shardlow, Derbyshire Bat Survey Report September 2014 FPCR Environment and Design Ltd Registered Office: Lockington Hall, Lockington, Derby DE74
Corridor Goals and Objectives
Corridor Goals and Objectives This chapter presents the goals and objectives, developed by the Corridor Study Committee, that serve as the purpose and intent of the Corridor Plan. This plan covers a twenty
Lincolnshire Walks. Round Horncastle
Lincolnshire Walks Round Horncastle A walk of 221/ 2 km (14miles) (with shorter options) Introduction Horncastle is an attractive market town lying at the south-west foot of the Lincolnshire Wolds and
Creating the environment for business
1. Introduction 1.1 Introduction to Water Cycle Strategies (WCS) 1.1.1 Background The water cycle describes the pathways and processes through which water moves through the natural and built environment,
PLANNING SERVICES UNIT
SUPPLEMENTARY PLANNING GUIDANCE DEVELOPMENT INVOLVING HORSES PLANNING SERVICES UNIT 1. INTRODUCTION 1.1 This document provides supplementary planning guidance on development involving horses, which is
BASILDON BOROUGH COUNCIL
BASILDON BOROUGH COUNCIL Report to: Planning Committee December 05 PLANNING APPLICATION NO. 5/00699/FULL DEMOLITION OF ALL EXISTING OUTBUILDINGS AND REMOVAL OF ASSOCIATED LAWFUL USES AND TWO NO. RESIDENTIAL
September 2005. Sponsored by: John H. Chafee Blackstone River Valley National Heritage Corridor Commission Woonsocket, RI
Sponsored by: John H. Chafee Blackstone River Valley National Heritage Corridor Commission Woonsocket, RI Worcester Historical Museum Worcester, MA September 2005 mawald/ld/0909700/graphics/covers/september05cover
Introduction. Two storey & first floor rear extensions. two storey rear 1
Introduction This advice leaflet has been produced to help in the planning of your house extension, by identifying the main points to consider, in order to achieve an acceptable proposal. This leaflet
Newsletter Jumbo Glacier Alpine Resort Proposal
Newsletter Jumbo Glacier Alpine Resort Proposal August 1995 - Number 1 - Environmental Assessment Office Province of British Columbia The Jumbo Glacier Alpine Resort Proposal Pheidias Project Management
Dorset Green SANGs Report
Dorset Green SANGs Report April 2012 FARRELLS Contents 1.0 Introduction 1.1 Accessible Green Spaces 2.0 SANGs Objectives 2.1 Proposals 2.2 Ecology Park 2.3 Village Green 2.4 Country Heritage Park 2.5 Dorset
THE SECRETARY OF THE INTERIOR WASHINGTON
THE SECRETARY OF THE INTERIOR WASHINGTON ORDER NO. 3336 Subject: Rangeland Fire Prevention, Management and Restoration Sec. 1 Purpose. This Order sets forth enhanced policies and strategies for preventing
Reference: 05/00928/FUL Officer: Mr David Jeanes
DEVELOPMENT CONTROL BOARD 5 January 2006 Reference: 05/00928/FUL Officer: Mr David Jeanes Location: Proposal: Applicant: Whiffens Farm Clement Street Sutton-At-Hone Kent BR8 7PQ Retrospective application
COPCUT RISE COPCUT RISE DROITWICH SPA CONSULTATION STATEMENT. November 2010. Prepared by Capita Lovejoy on behalf of William Davis Limited
COPCUT RISE DROITWICH SPA CONSULTATION STATEMENT COPCUT RISE November 2010 Prepared by Capita Lovejoy on behalf of William Davis Limited Copcut Rise Land north of Copcut Lane, Droitwich Spa: Consultation
4 Adoption of Asset Management Policy and Strategy
4 Adoption of Asset Management Policy and Strategy Abstract The report recommends the adoption of an updated Asset Management Policy 2014 and an Asset Management Strategy 2014-2019. Both documents are
SOUTH DEVON AONB PARTNERSHIP DRAFT MEMORANDUM OF AGREEMENT
SOUTH DEVON AONB PARTNERSHIP DRAFT MEMORANDUM OF AGREEMENT Note for Executive meeting: 1. relevant sections are highlighted by underlining 2. this draft Memorandum is subject to agreement with the Countryside
Handsworth Library, Soho Road, Handsworth, Birmingham, B21 9DP
Committee Date: 2/08/204 Application Number: 204/064/PA Accepted: 07/03/204 Application Type: Listed Building Target Date: 02/05/204 Ward: Lozells and East Handsworth Handsworth Library, Soho Road, Handsworth,
Wildlife Habitat Conservation and Management Plan
Wildlife Habitat Conservation and Management Plan For [Applicant Name] [Insert photo of property] Developed in Cooperation with Jane Doe Habitat Conservation Biologist Oregon Department of Fish and Wildlife
Draft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT
Draft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT MAY 2015 1 Contents 1 INTRODUCTION 3 2 DRAFT NEW MUSEUMS SITE SPD 4 3 STRATEGIC ENVIRONMENTAL
Camp. plan template. elements. This section that need to. identify the. vegetation. of flying-fox. also
Camp management plan template Introduction The following templatee guides local government in compiling a Camp Management Plan that will facilitate licensing of camp management actions for a five-year
Carmarthenshire LDP Site Assessment Proforma
Carmarthenshire LDP Site Assessment Proforma 1. Site Details Ref: SC1/h1 Site Ref (where applicable): Location: Parc Puw, Drefach Felindre Site Area (Ha): Eisting Use* *if candidate site as proposed by
DEVELOPMENT BRIEF FOR LAND AT ALLOA ROAD, TULLIBODY
DEVELOPMENT BRIEF FOR LAND AT ALLOA ROAD, TULLIBODY 1.0 Introduction and Purpose 1.1 Clackmannanshire Council is seeking to dispose of a site at Alloa Road, Tullibody for redevelopment. The site extends
River Wensum Restoration Strategy Swanton Morley Restoration Scheme Reach 14a
River Wensum Restoration Strategy Swanton Morley Restoration Scheme Reach 14a At a glance River restoration benefits: Improved planform, channel cross-section, flow variation and sediment process. Improved
TABLE OF CONTENTS. INTRODUCTION...1 Purpose of a Comprehensive Plan...1 McKenzie County Comprehensive Plan...1 Definitions...2 Goal...2 Vision...
MCKENZIE COUNTY COMPREHENSIVE PLAN TABLE OF CONTENTS INTRODUCTION...1 Purpose of a Comprehensive Plan...1 McKenzie County Comprehensive Plan...1 Definitions...2 Goal....2 Vision...3 ECONOMIC DEVELOPMENT...4
Planning application process improvements
Planning application process improvements Government response to consultation January 2015 Department for Communities and Local Government Crown copyright, 2015 Copyright in the typographical arrangement
Taylor Wimpey UK Ltd. December 2007
Taylor Wimpey UK Ltd December 2007 QM Issue/revision Issue 1 Revision 1 Revision 2 Revision 3 Remarks Draft For Planning Date 3 August 2007 20 December 2007 Prepared by D Gooding P Barton Signature Checked
Strategy. Strategy for Lorry Parking Provision in England
Strategy Strategy for Lorry Parking Provision in England Contents 1 Introduction 1 2 Strategic Objectives 3 3 Action Plan 5 4 Action Plan Matrix 17 Disclaimer: While the Department for Transport (DfT)
Manthorpe Grantham Conservation Area
U E N SO KES T VE Manthorpe Grantham Conservation Area TH N I CI L T D S CT C OU I R DESIGNATED DECEMBER 1970 APPRAISAL & AMENDMENT AUGUST 2007 1 MANTHORPE CONSERVATION AREA Location and context The village
Technical Memorandum No. 1: Environmental Approach and Decision Making Criteria
Memorandum TO: FROM: Michael Bergstrom and Robin Cole City of Bellevue Nancy Bird, AICP EDAW, Inc. DATE: July 23, 2008 RE: Technical Memorandum No. 1: Environmental Approach and Decision Making Criteria
Charging for Pre-application Advice
Charging for Pre-application Advice Guidance Note - London Borough of Islington April 2016 1 Introduction The London Borough of Islington has a rich built heritage, a diverse community and high land values.
PLANNING & REGULATION COMMITTEE 16 JANUARY 2012
Division(s): Sutton Courtenay & Harwell Contact Officer: John Duncalfe ([email protected]) Tel: 01865 815356 PLANNING & REGULATION COMMITTEE 16 JANUARY 2012 TO CRUSH, SCREEN, BLEND AND STOCK
THE TOWN AND COUNTRY PLANNING ACT 1990 Grant of Planning Permission
Civic Offices Havant Hampshire PO9 2AX Tel (023)9247 4174 Fax(023)9244 6588 DX50005 Havant www.havant.gov.uk To: ADP Architects Ltd Richmond Court 94 Botley Road Park Gate Southampton, Hants SO311BA For:
Chehalis River Basin Flood Damage Reduction 2013-2015 Capital Budget Approved by Legislature in June 2013
Chehalis River Basin Flood Damage Reduction 2013-2015 Capital Budget Approved by Legislature in June 2013 1. Design alternatives for large capital flood projects (basinlevel water retention and Interstate
Koser Field. 7th St SE 2.25
Submited on: 1/31/2014 Managing Entity: Contact Information: Watford City Park District PO Box 13 Watford City, ND 58854 Robin Arndt PO Box 13 Watford City, ND 58854 PHONE : Email: [email protected]
Public Land Management and Interdependent Collection of Programs
FS Agreement Number: 00-SU-11130142-080 MASTER SERVICE-WIDE MEMORANDUM OF UNDERSTANDING Between the EASTERN LANDS AND RESOURCES COUNCIL THE WESTERN STATES LAND COMMISSIONERS ASSOCIATION And the UNITED
Site Assessment for Neighbourhood Plans: A toolkit for neighbourhood planners
Site Assessment for Neighbourhood Plans: A toolkit for neighbourhood planners Action the COI Table Of Contents Introduction... 3 Benefit of carrying out a site assessment... 4 How to carry out a site assessment
Michigan Wetlands. Department of Environmental Quality
Department of Environmental Quality Wetlands are a significant component of Michigan s landscape, covering roughly 5.5 million acres, or 15 percent of the land area of the state. This represents about
Management Plan Template For Conservation Easements Held by CPW
Management Plan Template For Conservation Easements Held by CPW The following template provides guidelines for developing a management plan for a property that will have a Conservation Easement held by
Los Angeles Union Station, CA Sustainable Neighborhood Assessment. April 22-23, 2014
Los Angeles Union Station, CA Sustainable Neighborhood Assessment April 22-23, 2014 Sustainable Neighborhood Assessment Through the Sustainable Neighborhood Assessment Tool developed by Global future development
Development Management Report
Committee and Date Central Planning Committee 5 th April 2012 Item 13 Public Development Management Report Responsible Officer: Stuart Thomas email: [email protected] Tel: 01743 252665 Fax:
an Inspector appointed by the Secretary of State for Environment, Food and Rural Affairs
Order Decision Inquiry opened on 25 July 2012 by Michael R Lowe BSc (Hons) an Inspector appointed by the Secretary of State for Environment, Food and Rural Affairs Decision date: 27 September 2012 Order
Northern Territory Fisheries Resource Sharing Framework
Northern Territory Fisheries Resource Sharing Framework Page 1 of 11 Introduction Fishing is important in the Northern Territory (Territory). Coastal Aboriginal people recognise sea country out to the
Green Infrastructure Case Study Template
Green Infrastructure Case Study Template The aim of the exercise is to provide information on how the elements of the Green Infrastructure Strategy are implemented at national level and to provide case
Restoration. a brief look at
Copyright 2009 Canin Associates, Inc. All rights reserved. No part of this publication may be reproduced or transmitted by any means without written permission from Canin Associates, Inc. a brief look
The Mersey Gateway Project
The Mersey Gateway Project Work is well underway on the Mersey Gateway Project, a major civil engineering scheme to build a new six-lane cable-stayed toll bridge over the River Mersey and a 9.2 kilometre
THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.)
THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.) THE NATURAL RESOURCES AND ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER, 1994 (Made under section 11A(1)) (Incorporating
How To Write A New Bill On Flood Management In Scotland
Scottish Environment LINK is the forum for Scotland's voluntary environment organisations representing a broad spectrum of environmental interests with the common goal of contributing to a more environmentally
ASSESSMENT OF LANDCAPE PROVISIONS FOR PROPOSED PLAN CHANGE 1. Inner Business Zone. Outer Business Zone PALMERSTON NORTH CITY COUNCIL
A division of Hudson Group Ltd ASSESSMENT OF LANDCAPE PROVISIONS FOR PROPOSED PLAN CHANGE 1 Inner Business Zone Outer Business Zone PALMERSTON NORTH CITY COUNCIL 1 2 A division of Hudson Group Ltd Prepared
Guidelines for State Agency Management of Volunteer Activity
Guidelines for State Agency Management of Volunteer Activity June 2008 Department of Premier and Cabinet Contents Introduction... 3 Scope and Definitions... 4 Relationship between Agencies and Volunteers...
PROPOSAL FOR HOUSTON COUNTY BAN ON SILICA SAND MINING / PROCESSING ACTIVITY. Introduction and Assumptions
PROPOSAL FOR HOUSTON COUNTY BAN ON SILICA SAND MINING / PROCESSING ACTIVITY Introduction and Assumptions 1. The existing section 27 Mineral Extraction of the Zoning Ordinance would remain and continue
November 2006. General Notes. Tree Protection. Tree Protection and New Development Guidance Note
Tree Protection and New Development Guidance Note November 2006 General Notes The retention and planting of trees within a development can add to the character and aesthetic value of a site whilst maintaining
LANDSCAPE AND DEVELOPMENT CHECKLIST FOR MONMOUTHSHIRE COUNTY COUNCIL
LANDSCAPE AND DEVELOPMENT CHECKLIST FOR MONMOUTHSHIRE COUNTY COUNCIL 1 Introduction It is to the advantage of the developer to treat the environmental aspects of development proposals seriously and take
2 NEW BUILD PLOTS, ST DAVIDS, PERTHSHIRE, PH7 3PJ Madderty School 0.5m Crieff 5m Perth 11m
2 NEW BUILD PLOTS, ST DAVIDS, PERTHSHIRE, PH7 3PJ Madderty School 0.5m Crieff 5m Perth 11m PLOT 1 0.52 acres partially serviced house plot with detailed consent for a detached 5 bedroom one and a half
WELCOME PROPOSALS FOR PENTAVIA RETAIL PARK WELCOME TO OUR EXHIBITION WHICH SETS OUT OUR PLANS TO DEVELOP THE PENTAVIA RETAIL PARK SITE.
WELCOME WELCOME TO OUR EXHIBITION WHICH SETS OUT OUR PLANS TO DEVELOP THE PENTAVIA RETAIL PARK SITE. The purpose of the exhibition is to provide the community with the opportunity to view our initial ideas