1 DOMINION ROAD SEWAGE PUMPING STATION AND FORCE MAIN REPLACEMENT Ryan Boone, EIT, R.V. Anderson Associates Limited*; Doug Pease, P. Eng., R.V. Anderson Associates Limited; Graeme Guthrie, CET, Niagara Region *R.V. Anderson Associates Limited 1 St. Paul Street, Suite 702, St. Catharines, ON L2R 7L2. rboone@rvanderson.com 1.0 OVERVIEW The Niagara Region (the Region ) is currently in the process of replacing the Dominion Road Sewage Pumping Station ( PS ). The original facility was constructed in 1972 and services a population of approximately 4500 of the Town of Fort Erie. In 2009, the Region completed a condition assessment of the existing station as a precursor to a planned facility upgrade. Upon reviewing the issues identified by the condition assessment, the Niagara Region elected to replace the existing facility with a new pumping station. The new facility is to be located on the same property, to the south of the existing PS. During preliminary design, it was decided to increase the station capacity which also necessitated the replacement of significant portion of the existing force main. This paper discusses the history and condition of the existing facility, design considerations for the new facility and force main, and various constructability issues associated with the proposed works. At the time of preparation of this paper the project is under construction. 2.0 EXISTING SYSTEM The existing Dominion Road PS was constructed in 1972, and is a dry/wet well design with an above ground generator/control building. The station is equipped with two 300 HP pump units, acting as one duty and one standby. The existing Peak Dry Weather Flow ( PDWF ) at the station is 33 L/s, and the existing station rated capacity is 225 L/s. The additional capacity above the PDWF is helpful to convey additional flows experienced during wet weather conditions. Flows from the station are conveyed, along with flows from other facilities, to the Region s Anger Avenue WWTP. The Dominion Road PS has the largest rated capacity of any pumping station in the Anger Avenue WWTP collection system. The PS receives flows from two local pumping stations, as well as local area sewers. The existing force main is approximately 4500m long and discharges into a gravity sewer at the intersection of Bertie Street and Concession Road in the WEAO 2013 Technical Conference, Toronto, Ontario Page 1

2 Town of Fort Erie. It is 400 mm nominal diameter HDPE, with three (3) different pressure classes (Series 100, 80 and 60) over its length. 3.0 CONDITION ASSESSMENT In 2009, the Niagara Region retained R.V. Anderson Associates Limited ( RVA ) to complete a condition assessment as a precursor to a planned upgrade at the existing Dominion Road PS. This process was intended to identify and address maintenance and operational concerns with existing equipment. Several key areas of concern were identified during this process and are discussed below. 3.1 Dry Well Consideration Working Space The existing dry well/pump room has extremely limited working space due to its small footprint and the horizontal configuration of the existing sewage pumps. Access to the pumps, motors and discharge is difficult and requires climbing over top of various piping elements Flooding The incoming influent sewer travels through the dry well before discharging into the wet well. This arrangement increases the risk of dry well flooding in the case of a pipe break or failure. The existing sewage pump units are horizontally mounted with non-immersible motors located just above the dry well floor and are at risk of damage due to flooding. For these reasons, the Region expressed a preference to replace the existing pump units with dry-pit submersible pumps. However, this was not feasible with the configuration of the existing intake piping Pump Removal There are several risks associated with the removal of the existing pumps. As discussed previously, the station influent sewer runs through the dry well at an elevation above the existing pumps. Pump removal requires the use of an overhead crane located in the control room directly above. This introduces a risk of damaging the incoming sewer, which could result in flooding of the dry well. Additionally, limited space in the control room makes maneuvering of the pumps a very difficult task. One of the pumps must be lifted over top of the generator in order to reach the main doors. WEAO 2013 Technical Conference, Toronto, Ontario Page 2

3 3.1.4 Access The only access to the dry well is a series of ladders from the electrical/control room. As a result, it is difficult to bring equipment and tools to the dry well floor. Due to space restrictions, it is not possible to install a stairwell access to the dry well within the existing structure. The only viable option to improve dry well access would be to construct a new stairwell on the exterior of the structure. Limited property and the existence of shallow bedrock at the PS site makes this option impractical. 3.2 Electrical Classification The Ontario Electrical Safety Code (OESC, 24th Edition / 2009) includes specific rules applicable to Sewage Lift and Treatment Plants. Based on the OESC, the dry well space is now considered a Class I, Zone 2 hazardous area. Due to lack of physical separation from the dry well area, the electrical/control room is also considered a Class I, Zone 2 hazardous area. The existing electrical equipment located in these areas is not suitable for operation in a hazardous area. Three possible options to address this issue were considered. First, all electrical equipment in these areas could be replaced with new equipment suitable for operation in a Class I, Zone 2 hazardous area. Secondly, the area classifications could be changed to unclassified by providing continuous positive pressure ventilation at a rate of 6 air changes per hour ( ACPH ). In the event of failure of the ventilation equipment, the areas would revert to Class I, Zone 2 and any electrical equipment not suitable for operating in such a hazardous area, including the pump units, would have to be de-energized. Finally, a new building physically separated from the existing PS structure could be constructed to house the electrical and control equipment. All three options were considered expensive, requiring extensive upgrades to the existing facility. The risk associated with the second option was also considered unacceptable. 3.3 Generator The existing generator was originally installed in 1972 and has reached the end of its useful life. Furthermore, it uses a single pass heat exchanger requiring municipal water for cooling. This arrangement is not considered environmentally friendly or economical. It is located in the electrical/control room with limited access for maintenance and operations. 3.4 Structural The aging control building superstructure and roof were found to be in generally poor condition, requiring significant remediation in order to extend their useful lives. WEAO 2013 Technical Conference, Toronto, Ontario Page 3

4 3.5 Preferred Solution The condition assessment identified a number of areas of concern that would greatly increase the scope and cost of the planned upgrade. Upon further review of these issues, the Region determined it would be more cost effective to replace the existing station with a completely new facility on the same property. In 2010, the Niagara Region retained R.V. Anderson Associates Limited to undertake the design of the new facility. 4.0 DESIGN 4.1 General The Region required the rated capacity of the new facility to be 260 L/s. This modest increase is to accommodate the built-out PDWF, maintaining the existing level of service available for wet weather flows. The new Dominion Road PS was designed to meet the Region s current design guidelines for stations with rated capacities greater than 100 L/s. It includes an 11 m deep, 144 m 2 substructure housing the pump room, pump room access stairway, inlet channel and two-cell wet well. The 5 m high, 185 m 2 control building houses the electrical/control room, pump room access, generator room and building mechanical room. The control building is located partially above the pump room, extending south of the substructure. 4.2 Process Wet Well Two equal sized wet wells are configured with isolation inlet gates and an interconnecting isolation gate. During normal station operation, the inlet and interconnecting isolation gates are all open. Either wet well can be isolated and drained while the other remains in operation. The wet well is covered with a reinforced concrete slab on grade which includes a number of access hatches. Personnel access to the wet well is through a stairwell leading to the inlet channel and a mid-level platform Pumps Consideration was given to both three pump (two duty and one standby) and four pump (three duty and one standby) configurations. It was found that two pumps equipped with 200 HP motors and operated by variable frequency drives ( VFDs ) are capable of handling the required range of flows. During low flow situations, VFDs will be used to slow a single pump, discharging as little as 120 L/s in order to provide the minimum required scouring velocity in the force main. WEAO 2013 Technical Conference, Toronto, Ontario Page 4

5 The benefits of adding a third duty pump were outweighed by the added overall cost of equipment, associated controls and the increase in building footprint. The selected pumps are dry pit submersible style, mounted in a vertical configuration. The submersible style pump was selected to ensure continued station operation in the event of an emergency in which the pump room is flooded. The pump disconnects were located at the mid-level platform above the maximum station liquid level such that they are accessible in the event of a catastrophic pump room flood. The vertically mounted configuration was selected to reduce the pump room floor area requirements Pump Controls A Programmable Logic Controller ( PLC ) will control the operation of the three (3) raw sewage pumps. The PLC is also programmed to alternate duty pumps. When the level in the wet well rises to the Duty Pump 1 start level, Duty Pump 1 will start at maximum speed. As the level drops, Duty Pump 1 will be slowed to match the incoming flow. The minimum allowable pump speed is based on a flow rate of 120 L/s, ensuring a minimum scouring velocity of 0.8 m/s is achieved in the force main. Duty Pump 1 will stop when the water level reaches the Low Level set point. If the level continues to rise, Duty Pump 2 will start and both pumps will maintain maximum speed while the wet well level remains above the Duty Pump 2 Start set point. As the level drops below the Duty Pump 2 Start set point, both pumps are slowed to match the incoming flow. Both pumps are stopped at a common low level elevation Suction and Discharge Piping Although the station will have three sewage pumps, there will be four suction lines in the wet well. The centre pump will be connected to two suction lines such that it can draw from either wet well cell. This allows for two pumps to draw from one wet well cell should the other be taken offline for maintenance. Each suction line is configured with a bell mouth intake and isolation valve. The combination of the wet well benching and the addition of the fourth suction intake will mitigate dead zones in the wet wells that can often result in accumulation of solids resulting in the generation of odours. Each pump is equipped with a discharge check valve, isolation knife gate valve and discharge pipe connected to a common header at a higher elevation. The discharge check and knife gate valves are located at an elevation accessible from the pump room floor. As a result, an expensive mid-level platform in the pump room was not required. The discharge check valve was elevated above the pump volute to help minimize the effects of air-locking in the pump. Air-locking of a pump occurs when a gas becomes trapped in the volute and discharge line and cannot escape. WEAO 2013 Technical Conference, Toronto, Ontario Page 5

6 Air locking typically occurs when a pump has not operated for some time and wastewater in the suction line, pump volute and discharge line releases gas. Alternatively, air can be introduced into the pump by the action of vortices forming around the suction intake when the wet well levels are allowed to get too low. The closed discharge check valve prevents the air/gas from escaping when the pump is idle. If the pump is started in this condition it may not develop enough pressure to open the check valve. In this case, the pump could run dry, resulting in damage to the seals and wear rings. One way to prevent air-locking is to alternate the duty pumps, so that each pump is operated on a regular basis. However, at the Dominion Road PS, a single pump operated by VFD will be capable of handling the incoming flows during most situations. As a result, there is the possibility that two of the three pumps may be at rest for some duration, increasing the risk of becoming air-locked. Any gas in the suction piping, pump or discharge piping will naturally travel to the highest point possible in this case, the elevated section of discharge piping rather than the pump volute Flow Meter Chamber The Region requires magnetic flow meters to be installed in all of their sewage pumping stations. Most magnetic flow meter installations require a straight runs of pipe upstream and downstream of the flow tube. This additional pipe length would require an increase in the pump room footprint. To avoid the expensive of a larger footprint, the flow meter will be located in a dedicated chamber constructed adjacent to the substructure at an elevation above the top of rock. The chamber will also include a valve bypass connection terminating at grade. In the event of a force main break, the operator will have the option of using the station pumps to discharge to haulage trucks. 4.3 Electrical/Control Room The electrical/control room is physically separated from all hazardous area. As such, the equipment installed in this room does not require any special hazardous area classifications. 4.4 Standby Power Standby power to the station will be provided by a 600 kw radiator cooled diesel generator, located in a dedicated room in the above grade building. This room is designated as an unclassified area as it is physically separated from the pump room area. During generator operation, the intake, exhaust and recirculation dampers will modulate to use heat from the generator to maintain a WEAO 2013 Technical Conference, Toronto, Ontario Page 6

7 constant room temperature. The double walled diesel fuel storage tank is located outside, adjacent to the generator room. 4.5 Force Main Transient Analysis A previous study undertaken by the Region had raised concerns regarding the condition and pressure rating of the existing thin walled force main, in particular with respect to transient conditions. Accordingly, a transient analysis was performed during the preliminary design stage to determine the effects of the increased station flows and associated pressures. A transient condition in a pipeline is the phenomenon of pressure variations in both time and location brought about by a change in flow at some point in the system. These rapid flow changes often occur during pump start and stop conditions (either routine or from power loss), or in the event of a broken force main. The transient analysis was performed using propriety software called Pipe2010. This software was developed by the University of Kentucky, and is used throughout the water and wastewater industry to simulate transient conditions in pipe systems. It was found that negative pressures generated during a transient condition would exceed the collapse pressure rating throughout the Series 100 and 80 sections of force main. The total length of pipe in question is approximately 2150 m. Combination air release/vacuum relief valves could be installed at regular intervals to mitigate the upsurges and downsurges generated during the transient conditions. However, any failure in this equipment would place the force main in danger of damage or failure. Based on the results of the transient analysis, it was decided to replace the Series 100 and 80 sections of force main. The new force main section will be constructed of 450 mm diameter PVC C905 DR 25 pipe. In order to reduce the impacts of a transient condition, the new section will also include combination air release/vacuum relief equipment at four (4) locations along the force main. In the event of failure of this equipment, the selected C905 pipe class is capable of withstanding a range of negative and positive transient pressures. The valves will be housed in a total of four (4) pre-cast concrete chambers located at approximately 900 m intervals along the alignment. The approximate chamber locations were confirmed by additional transient modeling, and the exact locations were selected based on existing site conditions. The chambers also provide a convenient location for isolation valves, so that sections of the force main can be isolated in the event of a pipe break. WEAO 2013 Technical Conference, Toronto, Ontario Page 7

8 The new 450 mm diameter PVC pipe section has a significantly larger cross sectional area than the existing 400 mm HDPE. As a result of this larger cross sectional area, the system head loss developed at the new station rated capacity of 260 L/s will be reduced by approximately 45%. This allowed for the use of sewage pumps with smaller motors and associated electrical equipment, reducing the overall project construction cost and reducing the amount of energy the station will consume during its lifecycle Alignment The majority of the existing force main is located within a railway easement, surrounded on both sides by dense vegetation. The existing thin walled HDPE pipe has a history of breaks, and the Region has had difficulties accessing the pipe for repairs within the rail alignment. For this reason, the replacement section of force main will be installed in an existing municipal right of way, providing easy access during future maintenance operations In order to completely avoid the railway easement, the amount of force main to be replaced increased from 2150 m to 3550 m. While the new alignment increased the overall force main length by approximately 300 m, the additional head loss from the longer pipe section was more than offset by the decrease in system head losses resulting from the larger diameter pipe. 4.6 CONSTRUCTABILITY CONSIDERATIONS Several constructability issues were identified during the design phase of the project Geotechnical Investigation A geotechnical investigation was completed during the design stage to establish the foundation requirements for the new pumping station. The presence of limestone bedrock at shallow elevations of five to six meters below grade was found to provide an adequate foundation. However, the bedrock was found to be quite hard and would require either heavy mechanical rock breaking equipment or blasting to remove. In order to minimize the amount of rock removal, efforts were made throughout design to minimize the footprint of the new structure. Additionally, identification of a relatively high ground water level in the area of the PS resulted in special design considerations for the deep structure to avoid uplift forces. WEAO 2013 Technical Conference, Toronto, Ontario Page 8

9 4.6.2 Hydrogeological Investigation A hydrogeological investigation was completed to assess issues relating to groundwater ingress during the construction. Due to existing hydrogeological conditions and the close proximity of Lake Erie, the dewatering rate in the excavation was calculated to exceed 50,000 L/day. As a result, the Region made application for and received a Permit to Take Water for the duration of construction. Special construction dewatering considerations were also included in the contract documents. Early identification of the dewatering requirements and the need for permits mitigates potential delays during construction Force Main The selection of an alternate force main alignment and a special valve chamber at the connection to the existing force main will allow the new pipe to be constructed with little impact to the existing station operation. This will also reduce the duration and associated cost for bypass haulage from the station to the Anger Avenue WWTP. The construction of the new tie-in valve chamber will allow the new PS and force main to be fully tested and commissioned while keeping the existing system as a fully functional backup. 5.0 SUMMARY R.V. Anderson Associates Limited was retained by the Niagara Region to design a new 260 L/s sewage pumping station located in the Town of Fort Erie. The new facility will replace an existing aging facility that has a number of ongoing maintenance and operational concerns, and has reached the end of its service life. The new facility is a dry/wet well design, featuring an 11m deep substructure and 5m tall control building. The pump room will contain three (3) 200 HP dry-pit submersible pumps, operating in a two (2) duty and one (1) standby configuration. The electrical/control room will be electrically unclassified, as defined by OESC. The project also includes the replacement of 3550 m of the existing force main with new larger diameter 450mm PVC pipe. The force main work includes four (4) new air/vacuum relief chambers designed to minimize the effects from transients in the system. The project is currently in the early stages of construction and is expected to be completed by the winter of WEAO 2013 Technical Conference, Toronto, Ontario Page 9

Emerging Technologies in Wastewater Collection Systems

Emerging Technologies in Wastewater Collection Systems Keville Enterprises Emerging Technologies in Wastewater Collection Systems Douglas McCutchen, CCM Brian Karmasin, P.E., BCEE CMAA Annual Conference Oct 2008 San Francisco, California Today s s Presentation

More information

Design Specifications & Requirements Manual

Design Specifications & Requirements Manual 4 SEWAGE PUMPING STATIONS 4.1 DEFINITION AND PURPOSE... 1 4.2 PERMITTED USES... 1 4.3 DESIGN CRITERIA... 1 4.3.1 General... 1 4.3.2 Site Layout and Servicing... 2 4.3.3 Structural... 3 4.3.4 Flow Capacity...

More information

Standard Operating Procedures for Flood Preparation and Response

Standard Operating Procedures for Flood Preparation and Response Standard Operating Procedures for Flood Preparation and Response General Discussion Hurricanes, tropical storms and intense thunderstorms support a conclusion that more severe flooding conditions than

More information

MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION

MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION Fire Pump Plan Review 2009 International Fire Code and NFPA 20 Date of Review / / BLD201 - Project Address: Project Name: Contractor s Business

More information

Class Environmental Assessment Schedule B Project File Report

Class Environmental Assessment Schedule B Project File Report R.J. Burnside & Associates Limited 16775 Yonge Street Suite 200 Newmarket ON L3Y 8J4 Canada telephone (905) 953-8967 fax (905) 953-8945 web www.rjburnside.com Class Environmental Assessment Schedule B

More information

How To Install An Overhead Sewer

How To Install An Overhead Sewer Village of Broadview Flood Control Assistance Program Village of Broadview 2350 S. 25 th Avenue, Broadview, IL 60155 INTRODUCTION The Village of Broadview is served by combined sewers which carry sewage

More information

Wastewater Collection System Supplemental Design Standards for Capital Improvement Program Projects

Wastewater Collection System Supplemental Design Standards for Capital Improvement Program Projects Wastewater Collection System Supplemental Design Standards for Capital Improvement Program Projects March 2013 i Metropolitan Sewer District of Greater Cincinnati Wastewater Collection System Supplemental

More information

Terry Biederman, PE- Director of Public Works Greg Gucwa, PE- Principal Johnson and Anderson Engineering

Terry Biederman, PE- Director of Public Works Greg Gucwa, PE- Principal Johnson and Anderson Engineering DON T JUST REHAB IT, RENEW IT! WATERFORD TOWNSHIP, MICHIGAN IMPROVEMENTS TO A 3.0 MGD SEWAGE PUMPING STATION Terry Biederman, PE- Director of Public Works Greg Gucwa, PE- Principal Johnson and Anderson

More information

SAM HOUSTON STATE UNIVERSITY

SAM HOUSTON STATE UNIVERSITY PART 1: GENERAL 1.01 General Requirements A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the

More information

Type of Sewer Systems. Solomon Seyoum

Type of Sewer Systems. Solomon Seyoum Type of Sewer Systems Solomon Seyoum 0 Learning objectives Upon completion of this lecture, the participants will be able to differentiate between types of sewer systems and discuss different aspects of

More information

SANITARY SEWER BACKUP. Causes & Prevention

SANITARY SEWER BACKUP. Causes & Prevention SANITARY SEWER BACKUP Causes & Prevention A. PURPOSE The purpose of this publication is twofold: 1. It provides homeowners with basic information on the causes of sanitary sewer backups. 2. It provides

More information

MUNICIPAL WASTEWATER PUMP STATION DESIGN PROBLEMS AND SOLUTIONS

MUNICIPAL WASTEWATER PUMP STATION DESIGN PROBLEMS AND SOLUTIONS MUNICIPAL WASTEWATER PUMP STATION DESIGN PROBLEMS AND SOLUTIONS Presented at: WEFTEC 2006 Dallas, TX October 24, 2006 New England Water Environment Association Meeting Westford, MA September 12, 2006 Virginia

More information

Guidelines for Precast Concrete Grease Interceptors

Guidelines for Precast Concrete Grease Interceptors Guidelines for Precast Concrete Grease Interceptors Purpose Provide an overview of the basic design principals that govern why gravity grease interceptors work Provide a forum for discussion of common

More information

DIVISION OF WATER QUALITY CONSTRUCTION GRANTS & LOANS SECTION FAST TRACK AUDIT CHECKLIST

DIVISION OF WATER QUALITY CONSTRUCTION GRANTS & LOANS SECTION FAST TRACK AUDIT CHECKLIST DIVISION OF WATER QUALITY CONSTRUCTION GRANTS & LOANS SECTION FAST TRACK AUDIT CHECKLIST CERTIFICATION 1. Did the engineer submit a certificate of completion utilizing the appropriate page of the issued

More information

Chapter 4 - Preferred Alternative...25

Chapter 4 - Preferred Alternative...25 Preliminary Design Report Chapter 1 - Background... 1 Introduction... 1 Condition Assessment... 1 Reliable Capacity... 2 Forcemain Header Structural Integrity... 2 Wetwell Corrosion... 2 Manhole Corrosion...

More information

DEPARTMENT OF ENVIRONMENTAL QUALITY

DEPARTMENT OF ENVIRONMENTAL QUALITY PROJECT IDENTIFICATION DEPARTMENT OF ENVIRONMENTAL QUALITY City of Burton Sanitary Sewer Collection System Improvements State Revolving Fund (SRF) Environmental Assessment April 2015 Applicant: Authorized

More information

CCU Engineering Specifications. Section 003300 PRECAST CONCRETE PRODUCTS

CCU Engineering Specifications. Section 003300 PRECAST CONCRETE PRODUCTS CCU Engineering Specifications Section 003300 Effective Date: Nov. 1st, 2011 Page 1 of 5 PRECAST CONCRETE PRODUCTS PART 1 - GENERAL The following specification is intended for use for the design, selection

More information

March 2006 DIVISION 3 - CW 2140-R3 TABLE OF CONTENTS

March 2006 DIVISION 3 - CW 2140-R3 TABLE OF CONTENTS March 2006 CW 2140 - SEWER AND MANHOLE CLEANING TABLE OF CONTENTS 1. DESCRIPTION... 1 1.1 General... 1 1.2 Definitions... 1 1.3 Referenced Standard Constructions... 1 3. CONSTRUCTION METHODS... 1 3.1 High

More information

SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS

SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS SECTION 08000 STORM DRAINAGE 08010 DESIGN A. Location B. Sizing TABLE OF CONTENTS 08020 MATERIALS A. Pipe Materials B. Structure Materials C. Installation D. Inlets and Outlets 08030 INSPECTIONS AND TESTING

More information

Review of Footing Drain Disconnection Projects

Review of Footing Drain Disconnection Projects Wastewater Master Plan DWSD Project No. CS-1314 Review of Footing Drain Disconnection Projects Technical Memorandum Original Date: August 8 2002 Revision Date: September 2003 Author: CDM Table of Contents

More information

Fire Pump Plan Review March 2010

Fire Pump Plan Review March 2010 Fire Pump Plan Review March 2010 Date of Review: / / Permit Number: Business/Building Name: Address of Project: Designer Name: Designer s Phone: Contractor: Contractor s Phone: Occupancy Classification:

More information

SUFFOLK COUNTY DEPARTMENT OF HEALTH SERVICES TOXIC/HAZARDOUS MATERIAL TRANSFER FACILITY DESIGN GUIDELINES

SUFFOLK COUNTY DEPARTMENT OF HEALTH SERVICES TOXIC/HAZARDOUS MATERIAL TRANSFER FACILITY DESIGN GUIDELINES SUFFOLK COUNTY DEPARTMENT OF HEALTH SERVICES TOXIC/HAZARDOUS MATERIAL TRANSFER FACILITY DESIGN GUIDELINES 1.0 GENERAL 1.1 Article 12 of the Suffolk County Sanitary Code requires that toxic/hazardous material

More information

Theory, Application, and Sizing of Air Valves

Theory, Application, and Sizing of Air Valves Theory, Application, and Sizing of Air Valves VAL-MATIC VALVE AND MANUFACTURING CORP. 905 RIVERSIDE DRIVE, ELMHURST, IL 60126 TEL. (630) 941-7600 FAX. (630) 941-8042 www.valmatic.com 1 THEORY, APPLICATION,

More information

Town of Essex NE Lagoon. Service Area. Essex Plant. Service Area. Pumping Station No. 4. Wastewater Pumped To NE Lagoons (Treatment Plant No.

Town of Essex NE Lagoon. Service Area. Essex Plant. Service Area. Pumping Station No. 4. Wastewater Pumped To NE Lagoons (Treatment Plant No. Town of Essex Basement Flooding Study Town of Essex NE Lagoon Service Area Pumping Station No. 4 Essex Plant Service Area Wastewater Pumped To NE Lagoons (Treatment Plant No. 2) Essex Treatment Plant (Treatment

More information

Heating Water by Direct Steam Injection

Heating Water by Direct Steam Injection Heating Water by Direct Steam Injection Producing hot water by direct steam injection provides a solution where large volumes of hot water at precise temperatures are required, and where energy and space

More information

Coast Trunk Sewer Rehabilitation Project for the Orange County Sanitation District

Coast Trunk Sewer Rehabilitation Project for the Orange County Sanitation District Coast Trunk Sewer Rehabilitation Project for the Orange County Sanitation District Paul F. Wilson 1 and Robert J. Warren 2 1 1525 Faraday Ave, Suite 290, Carlsbad, California, USA 92008; e-mail: pwilson@pirnie.com.

More information

Signature and ISX CM870 Fuel System

Signature and ISX CM870 Fuel System Signature and ISX CM870 Fuel System Cummins Ontario Training Center HPI-TP Fuel System Heavy Duty High Pressure Injection - Time Pressure Fuel System The fuel system developed for the Signature and ISX

More information

Water hammering in fire fighting installation

Water hammering in fire fighting installation Water hammering in fire fighting installation Forward One of major problems raised in the fire fighting network installed at Pioneer company for pharmaceutical industry /Sulaymania was the high water hammering

More information

Grit Removal Systems Simple, low cost, effective grit removal to enhance plant performance

Grit Removal Systems Simple, low cost, effective grit removal to enhance plant performance LAKESIDE Water Purification Since 1928 Bulletin #1603 April 2005 Grit Removal Systems Simple, low cost, effective grit removal to enhance plant performance Aeroductor Model L Grit Classifier SpiraGrit

More information

Element D Services Plumbing

Element D Services Plumbing Medical Vacuum and Gas PART 1 - GENERAL 1.01 OVERVIEW A. This section addresses medical vacuum, waste anesthetic gas disposal, compressed air, oxygen, nitrous oxide, nitrogen and carbon dioxide systems.

More information

Prevention through Design: Eliminating Confined Spaces and Minimizing Hazards

Prevention through Design: Eliminating Confined Spaces and Minimizing Hazards Prevention through Design: Eliminating Confined Spaces and Minimizing Hazards American Industrial Hygiene Association Developed by the AIHA Confined Spaces Committee Approved by the AIHA Board of Directors

More information

SECTION 6A STORM DRAIN DESIGN Mar. 2002 S E C T I O N 6A STORM DRAIN - DESIGN

SECTION 6A STORM DRAIN DESIGN Mar. 2002 S E C T I O N 6A STORM DRAIN - DESIGN S E C T I O N 6A STORM DRAIN - DESIGN 6A.l Scope 6A.2 Storm Water Quantity 6A.3 Storm Drain Hydraulics 6A.4 Depths 6A.5 Locations 6A.6 Curved Storm Drains 6A.7 Manholes 6A.8 Catch basins 6A.9 Storm Drain

More information

Subpart 1. Installation. All plumbing systems must be. installed and tested according to this chapter and chapter 4715,

Subpart 1. Installation. All plumbing systems must be. installed and tested according to this chapter and chapter 4715, 4658.4500 PLUMBING SYSTEMS; NEW CONSTRUCTION. Subpart 1. Installation. All plumbing systems must be installed and tested according to this chapter and chapter 4715, the Minnesota Plumbing Code. Subp. 2.

More information

PART 5 : WASTEWATER DRAINAGE

PART 5 : WASTEWATER DRAINAGE Authorised by : City Waters Unit Manager Page 1 of 15 PART 5 : WASTEWATER DRAINAGE 5.1 INTRODUCTION This Manual sets out the basic design principles for drainage of wastewater. While some construction

More information

Why and How we Use Capacity Control

Why and How we Use Capacity Control Why and How we Use Capacity Control On refrigeration and air conditioning applications where the load may vary over a wide range, due to lighting, occupancy, product loading, ambient weather variations,

More information

NFPA31FuelOilPiping 1 Revised 3-1-11

NFPA31FuelOilPiping 1 Revised 3-1-11 NFPA 31 Fuel Oil Piping, Installation and Testing Chapter 8 Fuel Piping Systems and Components 8.1 Scope. This chapter shall apply to piping systems and their components used to transfer fuel oil from

More information

Outline. Background. NFPA 820 Applicability to Wastewater Treatment Facilities. Hazardous Area Classifications. Treatment Plant Area Classifications

Outline. Background. NFPA 820 Applicability to Wastewater Treatment Facilities. Hazardous Area Classifications. Treatment Plant Area Classifications Outline Background NFPA 820 Applicability to Wastewater Treatment Facilities Hazardous Area Classifications Treatment Plant Area Classifications Locations of Concern Background NFPA 820 Standard for fire

More information

Does Part of My Basement Floor Have to Be Removed to Install. Where Does the Water from the Sump Pump Go?...Page 5

Does Part of My Basement Floor Have to Be Removed to Install. Where Does the Water from the Sump Pump Go?...Page 5 PROTECTIVE PLUMBING - WHAT IS IT? TABLE OF CONTENTS Protective Plumbing What is it?...page 1 What is Foundation Drainage?...Page 2 What is a Sump Pumping System?...Page 4 Does Part of My Basement Floor

More information

Executive Director, Engineering & Construction Services Director, Purchasing & Materials Management Division

Executive Director, Engineering & Construction Services Director, Purchasing & Materials Management Division PW8.5 STAFF REPORT ACTION REQUIRED Contract Award Request for Proposal No. 9117-15-7122 Engineering Services for the Detailed Design, Services During Construction, and Post-Construction Services for an

More information

Jay R. Smith Mfg. Co.

Jay R. Smith Mfg. Co. Jay R. Smith Mfg. Co. Automatic Backwater Valve SMITH CUSTOMER DRIVEN FLOOD-GATE FEATURES Index Page Flood-Gate Features and Applications 2 How Flood-Gate Works 3 Flood-Gate Operation & Approvals 4 Valve

More information

Module 9: Basics of Pumps and Hydraulics Instructor Guide

Module 9: Basics of Pumps and Hydraulics Instructor Guide Module 9: Basics of Pumps and Hydraulics Instructor Guide Activities for Unit 1 Basic Hydraulics Activity 1.1: Convert 45 psi to feet of head. 45 psis x 1 ft. = 103.8 ft 0.433 psi Activity 1.2: Determine

More information

How To Clean Up A Reactor Water Cleanup

How To Clean Up A Reactor Water Cleanup General Electric Systems Technology Manual Chapter 2.8 Reactor Water Cleanup System TABLE OF CONTENTS 2.8 REACTOR CLEANUP SYSTEM... 1 2.8.1 Introduction... 2 2.8.2 System Description... 2 2.8.3 Component

More information

Fats, Oil and Grease. Best Management Practices Manual. Information, Pollution Prevention, and Compliance Information For Food Service Facilities

Fats, Oil and Grease. Best Management Practices Manual. Information, Pollution Prevention, and Compliance Information For Food Service Facilities Fats, Oil and Grease Best Management Practices Manual Information, Pollution Prevention, and Compliance Information For Food Service Facilities Pinellas County Utilities Water Quality Management Division

More information

Module 7: Hydraulic Design of Sewers and Storm Water Drains. Lecture 7 : Hydraulic Design of Sewers and Storm Water Drains

Module 7: Hydraulic Design of Sewers and Storm Water Drains. Lecture 7 : Hydraulic Design of Sewers and Storm Water Drains 1 P age Module 7: Hydraulic Design of Sewers and Storm Water Drains Lecture 7 : Hydraulic Design of Sewers and Storm Water Drains 2 P age 7.1 General Consideration Generally, sewers are laid at steeper

More information

Chapter 9 Sanitary Sewers

Chapter 9 Sanitary Sewers Chapter 9 Sanitary Sewers S:/Engineering/Design Standards/Chapter 9 12/29/2014 Section 9.1 Topic General Requirements Chapter 9 Sanitary Sewers Page 9-1 9.2 Plan Submittals 9-1 9.3 Determination of Flow

More information

Repairs Made With Under Pressure Installations Can Offer Reduced Risks And Expenses

Repairs Made With Under Pressure Installations Can Offer Reduced Risks And Expenses Repairs Made With Under Pressure Installations Can Offer Reduced Risks And Expenses They also give the community a built-in re-entry system for future monitoring and repair. BY BRETT HANES According to

More information

CONSOLIDATED EDISON CO. OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003 DISTRIBUTION ENGINEERING DEPARTMENT SUBSTATION & EQUIPMENT SECTION

CONSOLIDATED EDISON CO. OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003 DISTRIBUTION ENGINEERING DEPARTMENT SUBSTATION & EQUIPMENT SECTION CONSOLIDATED EDISON CO. OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003 DISTRIBUTION ENGINEERING DEPARTMENT SUBSTATION & EQUIPMENT SECTION SPECIFICATION EO-5023 REVISION 3 MARCH 2003 REQUIREMENTS FOR

More information

ELECTRIC/DIESEL FIRE PUMP CHECK LIST

ELECTRIC/DIESEL FIRE PUMP CHECK LIST BUILDING NAME: DESIGNER: SCO REPRESENTATIVE: PUMP MANUF.: LOCATION: INSTALLER: DATE: OWNER NAME: INSTALLATION Certificate for flushing and hydrostatic test furnished Piping been hydrostatically tested

More information

Steam System Best Practices Condensate System Piping

Steam System Best Practices Condensate System Piping Steam System Best Practices Condensate System Piping Summary The best method for improving steam system energy efficiency, reducing chemical costs, and reducing make-up water costs is to return the maximum

More information

CHAPTER 8 CIVIL DESIGN

CHAPTER 8 CIVIL DESIGN CHAPTER 8 CIVIL DESIGN A. GENERAL This Chapter includes standards and design considerations for other civil engineering design in structural, drainage and utilities. Design considerations for electrical

More information

Datacenter Site Selection Checklist

Datacenter Site Selection Checklist Checklist Use this checklist to aid in the process of selecting a new site for the data center. When visiting potential building sites, print the checklist off and take it along to record impressions and

More information

MANURE COLLECTION AND TRANSFER SYSTEMS IN LIVESTOCK OPERATIONS WITH DIGESTERS. A. C. Lenkaitis GEA Farm Technologies Inc. (Houle USA), Naperville, IL

MANURE COLLECTION AND TRANSFER SYSTEMS IN LIVESTOCK OPERATIONS WITH DIGESTERS. A. C. Lenkaitis GEA Farm Technologies Inc. (Houle USA), Naperville, IL MANURE COLLECTION AND TRANSFER SYSTEMS IN LIVESTOCK OPERATIONS WITH DIGESTERS A. C. Lenkaitis GEA Farm Technologies Inc. (Houle USA), Naperville, IL INTRODUCTION Manure collection systems are influenced

More information

Second Place: Industrial Facilities or Processes, New

Second Place: Industrial Facilities or Processes, New Second Place: Industrial Facilities or Processes, New Photo: Paul Howell Texas Medical Center in Houston is the largest medical center in North America. It has a chilled water system of 160,000 tons. Big

More information

Revised April (May) 2015

Revised April (May) 2015 Section 19.0 Cross Connection Control Policy 19.1 Responsibility 19.1.1 The Elkhart Water Utility has the responsibility to supply safe, potable water from the source to the point of delivery defined as

More information

OVER-HEAD SEWER ASSISTANCE GRANT

OVER-HEAD SEWER ASSISTANCE GRANT OVER-HEAD SEWER ASSISTANCE GRANT The Village of North Aurora has a vested interest in the proper operation of the North Aurora sanitary system. Understanding that some residential users of the sanitary

More information

SANITARY SEWER SPECIFICATIONS

SANITARY SEWER SPECIFICATIONS SANITARY SEWER SPECIFICATIONS OCTOBER 2003 HARVEST-MONROVIA WATER, SEWER, AND FIRE PROTECTION AUTHORITY SECTION 1.00 1.10 Purpose The purpose of this document is to assemble the sewer specifications, policies,

More information

SECTION 3 SANITARY SEWER DESIGN

SECTION 3 SANITARY SEWER DESIGN SECTION 3 SANITARY SEWER DESIGN 3.1 GENERAL DESIGN CRITERIA 3.1.1 Requirement for Sanitary Sewer 3.1.2 Design Approval 3.1.3 IEPA Permit Required 3.1.4 Differentiation Between Public and Private Sanitary

More information

COMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY

COMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY COMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY Revised: April 2014 Village of Wilmette, Illinois NPDES CSO Permit No. ILM580012 Chapter 1 Introduction This Operational and Maintenance

More information

Construction Specification for Sewer Bypass Flow Pumping

Construction Specification for Sewer Bypass Flow Pumping Engineering and Construction Services Division Standard Specifications for Sewers and Watermains TS 4.01 April 2013 Pumping Table of Contents TS 4.01.01 SCOPE... 2 TS 4.01.02 REFERENCES... 2 TS 4.01.03

More information

Proposed Construction of Basement Flood Risk Assessment. 35 Edwardes Square London W8 6HH

Proposed Construction of Basement Flood Risk Assessment. 35 Edwardes Square London W8 6HH Proposed Construction of Basement Flood Risk Assessment 35 Edwardes Square London W8 6HH 1 Introduction This FRA has been carried out in accordance with the National Planning Policy Statement (NPPF), the

More information

C. starting positive displacement pumps with the discharge valve closed.

C. starting positive displacement pumps with the discharge valve closed. KNOWLEDGE: K1.04 [3.4/3.6] P78 The possibility of water hammer in a liquid system is minimized by... A. maintaining temperature above the saturation temperature. B. starting centrifugal pumps with the

More information

A Code Review for Emergency Generators and Indoor Use of Portable Generators

A Code Review for Emergency Generators and Indoor Use of Portable Generators A Code Review for Emergency Generators and Indoor Use of Portable Generators By: the Fire and Life-Safety Group (FLS) Fire Code requires that emergency generators be stationary generators. Therefore, a

More information

CHAPTER 11 STORM DRAINAGE

CHAPTER 11 STORM DRAINAGE CHAPTER STORM DRAINAGE SECTION PC 0 GENERAL 0. Scope. The provisions of this chapter shall govern the materials, design, construction and installation of storm drainage. Storm water discharge shall be

More information

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT Page 1 CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT CIVIC CENTRE 2141 MAJOR MACKENZIE DRIVE MAPLE ONTARIO L6A 1T1 905-832-2281 Page 2 SECTION 1 - GENERAL OBJECTIVES To provide

More information

REPORT TITLE: TERM OF COUNCIL PRIORITY NO. 6 - ENHANCE INTEGRITY OF WASTEWATER COLLECTION SYSTEM INCLUDING FLOOD REMEDIATION PROGRAM

REPORT TITLE: TERM OF COUNCIL PRIORITY NO. 6 - ENHANCE INTEGRITY OF WASTEWATER COLLECTION SYSTEM INCLUDING FLOOD REMEDIATION PROGRAM J Wokking foh y or REPORT Meeting Date: November 28,2013 Regional Council DATE: October 22,201 3 REPORT TITLE: TERM OF COUNCIL PRIORITY NO. 6 - ENHANCE INTEGRITY OF WASTEWATER COLLECTION SYSTEM INCLUDING

More information

NEBB STANDARDS SECTION-8 AIR SYSTEM TAB PROCEDURES

NEBB STANDARDS SECTION-8 AIR SYSTEM TAB PROCEDURES NEBB STANDARDS SECTION-8 AIR SYSTEM TAB PROCEDURES 8.1 INTRODUCTION Testing, adjusting, and balancing of HVAC systems can best be accomplished by following a series of systematic procedures. The NEBB TAB

More information

Design recommendations FOR PUMP STATIONS WITH LARGE CENTRIFUGAL FLYGT WASTEWATER PUMPS

Design recommendations FOR PUMP STATIONS WITH LARGE CENTRIFUGAL FLYGT WASTEWATER PUMPS Design recommendations FOR PUMP STATIONS WITH LARGE CENTRIFUGAL FLYGT WASTEWATER PUMPS 2 Contents Flygt large centrifugal pumps introduction...................................................... 4 General

More information

ecmar SECTION INSTRUCTIONS: Sanitary Sewer Collection Systems

ecmar SECTION INSTRUCTIONS: Sanitary Sewer Collection Systems ecmar SECTION INSTRUCTIONS: Sanitary Sewer Collection Systems Please see the DEFINITIONS of terms at the end of this section. If you have any questions about these definitions, do not understand a question,

More information

Data Realty Colocation Data Center Ignition Park, South Bend, IN. Owner: Data Realty Engineer: ESD Architect: BSA LifeStructures

Data Realty Colocation Data Center Ignition Park, South Bend, IN. Owner: Data Realty Engineer: ESD Architect: BSA LifeStructures Data Realty Colocation Data Center Ignition Park, South Bend, IN Owner: Data Realty Engineer: ESD Architect: BSA LifeStructures Project Overview Data Realty is a data center service provider for middle

More information

CHAPTER 9 VENTS. copper drainage tube Type DWV, Schedule 40 plastic piping, or borosilicate glass.

CHAPTER 9 VENTS. copper drainage tube Type DWV, Schedule 40 plastic piping, or borosilicate glass. CHAPTER 9 VENTS 901 GENERAL 901.1 Scope The provisions of this chapter shall govern the materials, design, construction, and installation of vents. 901.2 Protection of Trap Seals The protection of trap

More information

Parkhill Road Sewage Pumping Station Class EA Study

Parkhill Road Sewage Pumping Station Class EA Study Parkhill Road Sewage Pumping Station Class EA Study Public Information Centre October 4, 2011 6:30 pm 8:30 pm Westmount Public School DRAWING ON EXPERIENCE BUILDING ON STRENGTH Sewage Pumping Station (SPS)

More information

DRAINS The graphical and text database of all underground sewer Infrastructure. Progress over the last few years includes:

DRAINS The graphical and text database of all underground sewer Infrastructure. Progress over the last few years includes: Drainage Information Management Systems Strategy While a formal strategy document is still underway, significant progress has been made on the Information systems that from the lifeblood of Drainage Services:

More information

Design recommendations. for pump stations with large centrifugal wastewater pumps

Design recommendations. for pump stations with large centrifugal wastewater pumps Design recommendations for pump stations with large centrifugal wastewater pumps General considerations for sump design Design capacity Sump dimensions Required sump volume Installation tips for submerged

More information

4.0 SEWER LIFT STATION AND FORCE MAIN GUIDELINES

4.0 SEWER LIFT STATION AND FORCE MAIN GUIDELINES 4.0 SEWER LIFT STATION AND FORCE MAIN GUIDELINES 4.01 INTRODUCTION Sewage collection within Western Municipal Water District s (Western s) service area shall be provided by the construction of gravity

More information

Aging sewer pipes buried in the Bow River bed, from the foot of Muskrat Street to Glen Avenue must be replaced A raised crossing pipes crossing over

Aging sewer pipes buried in the Bow River bed, from the foot of Muskrat Street to Glen Avenue must be replaced A raised crossing pipes crossing over ewer utility crossing pedestrian bridge Aging sewer pipes buried in the Bow River bed, from the foot of Muskrat Street to Glen Avenue must be replaced A raised crossing pipes crossing over the river at

More information

City of Mill Valley Sewer Capital Improvement Plan 2012 2016

City of Mill Valley Sewer Capital Improvement Plan 2012 2016 City of Mill Valley Sewer Capital Improvement Plan 2012 2016 I. BACKGROUND Between December 2004 and February 2008, the ed States Environmental Protection Agency (EPA) conducted inspections of the SASM

More information

Vertical Pumps for the Oil & Gas Industry

Vertical Pumps for the Oil & Gas Industry Vertical Pumps for the Oil & Gas Industry ITT API Expert ITT Commitment ITT is committed to the Oil and Gas market, which is the largest segment of our business. We have been investing in technology to

More information

31. ECO-INFO -- SEPTIC SAFE PROTECT YOUR HEALTH AND ENVIRONMENT YOUR SEPTIC PUMP-OUT SYSTEM with SELF ASSESSMENT TROUBLE SHOOTING GUIDE

31. ECO-INFO -- SEPTIC SAFE PROTECT YOUR HEALTH AND ENVIRONMENT YOUR SEPTIC PUMP-OUT SYSTEM with SELF ASSESSMENT TROUBLE SHOOTING GUIDE 31. ECO-INFO -- SEPTIC SAFE PROTECT YOUR HEALTH AND ENVIRONMENT YOUR SEPTIC PUMP-OUT SYSTEM with SELF ASSESSMENT TROUBLE SHOOTING GUIDE Edited 21/12/01 Wyong Shire Council has many non sewered areas that

More information

BASEMENT FLOODING PART II: Reducing Flooding Risks on Your Property HISTORIC CHICAGO BUNGALOW ASSOCIATION

BASEMENT FLOODING PART II: Reducing Flooding Risks on Your Property HISTORIC CHICAGO BUNGALOW ASSOCIATION BASEMENT FLOODING PART II: Reducing Flooding Risks on Your Property HISTORIC CHICAGO BUNGALOW ASSOCIATION HCBA 2 Launched in September, 2000 HCBA is a nonprofit organization whose mission is to help owners

More information

Element D Services Plumbing

Element D Services Plumbing PART 1 - GENERAL 1.01 OVERVIEW A. This section addresses domestic cold, hot and hot water return distribution systems within and to five feet beyond building perimeter. PART 2 - DESIGN CRITERIA 2.01 GENERAL

More information

Presentation Agenda. Introduction. Types of Flooding Identifying Flood Risks Property Improvements Additional Resources.

Presentation Agenda. Introduction. Types of Flooding Identifying Flood Risks Property Improvements Additional Resources. Presentation Agenda Introduction Types of Flooding Identifying Flood Risks Property Improvements Additional Resources Discussion / Q&A 4 RainReady Home an initiative of RainReady is an initiative of the

More information

SECTION 33 31 00.11 GRAVITY SANITARY SEWERS

SECTION 33 31 00.11 GRAVITY SANITARY SEWERS SECTION 33 31 00.11 GRAVITY SANITARY SEWERS PART 1: GENERAL 1.01 SCOPE A. Gravity sanitary sewers and appurtenances. 1.02 SUBMITTALS A. Conform to requirements of Section 01 33 00 Submittals. B. Submit

More information

Boiling Water Reactor Systems

Boiling Water Reactor Systems Boiling Water (BWR) s This chapter will discuss the purposes of some of the major systems and components associated with a boiling water reactor (BWR) in the generation of electrical power. USNRC Technical

More information

The checklist utilized by the Authority will be similar to that which is shown below. Project Name: Location: Consulting Engineering Firm:

The checklist utilized by the Authority will be similar to that which is shown below. Project Name: Location: Consulting Engineering Firm: Page 1 of 6 Section 1. PURPOSE This policy is an Engineering checklist of the Local Review Program for sanitary sewer improvement projects by the Bedford Regional Water Authority ( Authority ). Section

More information

MAP KEYS GLOSSARY FOR THE DRAINAGE AND WATER REPORT

MAP KEYS GLOSSARY FOR THE DRAINAGE AND WATER REPORT Record MAP KEYS GLOSSARY FOR THE DRAINAGE AND WATER REPORT Abandoned Gravity Private Combined Gravity Private Foul Gravity Private Surface Water Gravity Public Combined Gravity Public Foul Gravity Public

More information

Proposed standard significant deficiency language is provided in italics. Notes to staff are provided in blue and are [bracketed].

Proposed standard significant deficiency language is provided in italics. Notes to staff are provided in blue and are [bracketed]. Significant Deficiencies: A Quick Fact Sheet for Hawaii PWSs Definition: Significant deficiencies are currently defined in HAR 11-20-46.1 as any defect in a system s design, operation and maintenance,

More information

Storm Sewer Trenchless Upgrade Alternatives and Recommendations

Storm Sewer Trenchless Upgrade Alternatives and Recommendations Storm Sewer Trenchless Upgrade Alternatives and Recommendations Background Approximately 1,930 feet of the 40-inch and 42-inch CMP storm sewer pipe from manhole M22 to manhole M12 will be evaluated for

More information

Wastewater Collection Practice Test #3 Page 1 of 15

Wastewater Collection Practice Test #3 Page 1 of 15 Wastewater Collection Practice Test #3 Page 1 of 15 1) A 54 in. storm sewer flowing half full, at a velocity of 1.35 Ft./sec., will discharge how much flow into a creek in MGD? 13.85 MGD 10.73 MGD 1.85

More information

Centrifugal Fans and Pumps are sized to meet the maximum

Centrifugal Fans and Pumps are sized to meet the maximum Fans and Pumps are sized to meet the maximum flow rate required by the system. System conditions frequently require reducing the flow rate. Throttling and bypass devices dampers and valves are installed

More information

A Century of Progress with Pride

A Century of Progress with Pride The City of Berwyn Engineering Department A Century of Progress with Pride November 12, 2014 Re: Waiting List Application I am interested in the following programs and would like to be added to the waiting

More information

SEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER

SEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER Village of Shorewood, Wisconsin SEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER Prepared By: Thomas A. Zoulek, P.E., LEED A.P. Vice President Mid City Plumbing & Heating

More information

Weeping Tile Disconnection to Reduce the Impact of Basement Flooding London, Ontario

Weeping Tile Disconnection to Reduce the Impact of Basement Flooding London, Ontario Weeping Tile Disconnection to Reduce the Impact of Basement Flooding London, Ontario September 19, 2013 Kyle Chambers, P.Eng. City of London Environmental and Engineering Services Department Today s presentation

More information

FY08 SEWER POINT REPAIRS BID TABULATION

FY08 SEWER POINT REPAIRS BID TABULATION 6-07-831 Page 1 of 12 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING "

More information

PART 6 - STANDARD DESIGN AND CALCULATION FORMS 6.1 SANITARY SEWER DATA SHEET

PART 6 - STANDARD DESIGN AND CALCULATION FORMS 6.1 SANITARY SEWER DATA SHEET PART 6 - STANDARD DESIGN AND CALCULATION FORMS 6.1 SANITARY SEWER DATA SHEET Name of Municipality or Sewer District Name of Project Original Township and Lot Number Name of Engineer of Firm Preparing Plans

More information

Flygt N-Pumps 3085, 3102 & 3127. For reliable and efficient wastewater handling

Flygt N-Pumps 3085, 3102 & 3127. For reliable and efficient wastewater handling Flygt N-Pumps 3085, 3102 & 3127 For reliable and efficient wastewater handling The Concept Flygt N-Pump series Reduced pumping efficiency, high energy and maintenance costs shouldn t be a fact of life

More information

N-PUMP SERIES FOR MAXIMUM RELIABILITY AND EFFICIENCY IN WASTEWATER HANDLING. Flygt

N-PUMP SERIES FOR MAXIMUM RELIABILITY AND EFFICIENCY IN WASTEWATER HANDLING. Flygt N-PUMP SERIES FOR MAXIMUM RELIABILITY AND EFFICIENCY IN WASTEWATER HANDLING Flygt The Concept N-Pump series. Bringing NEW levels of efficiency to wastewater handling applications Reduced pumping efficiency,

More information

Overview. Introduction Cooling Tower Basics Principles of Operation Types of Cooling Towers Common Applications Design Considerations

Overview. Introduction Cooling Tower Basics Principles of Operation Types of Cooling Towers Common Applications Design Considerations Stephen Lowe ASHRAE Hampton Roads Chapter Past President AECOM Design Mechanical Engineering Discipline Manager, Virginia Beach Division Professional Engineer Commonwealth of Virginia, NCEES BSME University

More information

City of Edmonton Page 1 of 5 Foundation Drain Discharge Collection System Guideline November, 2005

City of Edmonton Page 1 of 5 Foundation Drain Discharge Collection System Guideline November, 2005 City of Edmonton Page 1 of 5 This guideline will apply to all new developments involving singledetached, semi-detached or duplex houses in the City of Edmonton effective January 1, 2006. Preamble: This

More information

1 DESCRIPTION OF THE APPLIANCE

1 DESCRIPTION OF THE APPLIANCE 1 DESCRIPTION OF THE APPLIANCE 1.1 INTRODUCTION The cast iron SF boilers are a valid solution for the present energetic problems, since they can run with solid fuels: wood and coal. These series of boilers

More information