3.0 Site Information

Size: px
Start display at page:

Download "3.0 Site Information"

Transcription

1 3.0 Site Information

2 3.0 SITE INFORMATION 3.1 Local Conditions Market Conditions: In Washington D.C. there is a constant flood of construction making the market for building exceptional. The Concrete International Journal describes Washington DC as recession proof due to the number of businesses with interests related to the government that are located there. Although, not all buildings in Washington DC are concrete, it is the preferred method of construction. In 1899 a height restriction was enacted by Congress stating that no private structure can extend higher than the monument or capital building. Again in 1910 a bill was passed limiting the height of buildings in the business district to 130 ft. These height restrictions make concrete the material of choice in order to optimize floor area. Existing Site Conditions: The site is located on the corner of Massachusetts Avenue and Nebraska Ave. in Northwest Previously, the site was occupied by an indoor swimming pool, a two-story metal building, and one-story masonry block building. At that point in time the existing grades were EL 397 at the south part of the site and EL 385 at the north. The east portion of the site was an access and parking area at EL 396 EL 398. Boring Samples and Soil Classification Subsurface conditions were evaluated by using existing soil information from borings drilled in 1990 for the Washington College of Law on campus. In January of 2002 two additional borings were drilled. Boring locations can be found in Appendix B: Boring Plan. Boring Samples B-16 and B-17 are the two most recent samples. Test borings were completed using a 2-1/4 inch hollow stem auger. Standard penetration test were performed with a split sampling spoon driven with a 140 lb hammer, falling 30 inches. An initial six inches were penetrated to make sure the soil being tested is undisturbed and then the number of blows to get down 12 inches was recorded to determine inplace density of cohesionless soils. After the samples were recovered they were visually classified. Table 1 summarizes the boring sample results. 9

3 Table 1: Boring Sample Results Boring Number Boring Boring Boring Refusal Elevation Refusal Depth Elevation (ft.) (ft.) (ft.) Estimated Elevation where rock excavation methods will be required B N/A B N/A B N/A B-4R N/A B N/A B B-7R B B B B B B B B B B Soils encountered on site during test borings are classified as follows: Stratum A: Brown sandy silt sand FILL, silty sand FILL, clayey sand FILL, will asphalt, concrete, quartz, and gravel Below ground surface and pavement to 2.0 to 12.5 feet depth Stratum B: Brown clayey SAND (SC) and poorly graded SAND with clay and gravel (SC-SC) Below pavement and Stratum A to 6.0 to 20.0 feet depth Stratum C: Brown and reddish brown sandy LEAN CLAY (CL ) and LEAN CLAY (CL), with sand; stiff consistency Below the ground surface and Stratum B to 3.5 to 17.0 feet depth 10

4 Stratum D: Yellowish brown, brown, and grayish white silty SAND (SM) and sandy SILT (ML), with lean clay layer; loose to compact density Below Strata A, B, and C to 13.0 to 34.0 feet depth Stratum E: Brown and gray silty SAND (SM), sandy SILT (ML) and LEAN CLAY (CL), with sand and quartz; loose to very compact density Below ground surface and Strata A, C, and D to 5.0 to 49.5 feet depth Stratum F: Grayish white and yellowish brown DISINTEGRATED ROCK; very compact density Below Strata D and E to 38.1 to 59.7 feet depth Ground water was encountered at EL to EL 378. EL 378 is 28 feet above the lowest floor level at EL Site Layout Planning Construction Site Plan: The construction site plan identifies the location of all temporary facilities that are required on site in order for construction to occur. This includes site trailers, parking, access roads, and fences to name a few. A chain link fence surrounds the building at the construction limits and is locked nightly to prevent people from getting on site outside of working hours. There are three entrances/exits on site that are used for construction traffic. The first is located off Massachusetts Avenue where the future entrance to the parking deck will be. The second is further west on Massachusetts Avenue and the third is off of Nebraska Avenue near Nebraska Hall. Construction traffic utilizes these entrances and a temporary road that was set up around the perimeter of the building footprint; within the limits of construction. The temporary road is extended towards the west side of the site to mimic what will be the buildings loading dock following construction. All Holder Construction staff and both the mechanical and electrical subcontractors park across the street from the construction site on Massachusetts Avenue in an existing parking lot that belongs to the main campus. The mechanical and electrical subcontractors and Holder Construction also have their trailers in this area. The remaining subcontractors park on the other side of Ward Circle in a parking lot that is owned by American University. Construction of the Katzen Arts Center does not hinder normal traffic patterns. All regular traffic patterns exist with the exception of an additional stop due to a new traffic signal at the entrance to the parking deck on Massachusetts Avenue. Pedestrian traffic is closed off along the construction side of Massachusetts Avenue. 11

5 Excavation Site Plan: Excavation began in component C and then went to B, A, and D, respectively. Three excavators and a number of dump trucks were used to remove the 122,000 cubic yards of fill off of the site. Two ramps were constructed within the footprint in order to allow the machinery in/out of the excavation area at ease. The first ramp was located in component B and the second in component D/A as indicated on the site plan. The temporary road, as described above, was used as a loading area for the dump trucks. Once the dump trucks were loaded, they immediately exited the site using the nearest of the three exits. Little fill was required on, so all fill was taken from component D and transferred to the required location. By directly transferring the soil to the backfill location Holder Construction eliminated the need for fill storage on site. Structural Site Plan: Construction began on the structure in the same pattern as excavation; C, B, A, and D respectively. Three cranes were set up along the south side of the building and were positioned such that one of the three could reach within the building footprint, but so none could swing over the nearby residential property. The two cranes to the west have a swing of 143 and the third 200. The cranes were used for picking buckets of concrete off of trucks, hoisting the bucket within the site, and for placing the cast-in place concrete. Concrete trucks entered/exited the site at the nearest of the three gates, depending on where construction was occurring. A portion of the site, near the new location for the loading dock was accumulated for layout of rebar, embeds, etc. Exterior Enclosure Site Plan: Exterior enclosure materials were delivered to the site only shortly before enclosure began. The CMU, limestone veneer and precast were place around the perimeter of the building area that was being worked on at the particular time. Two hoists were used for building exterior locations that could not be reached from the ground. In addition, the cranes remained during the enclosure phase for pieces of precast veneer that were too heavy for a man and hoist. Construction of the exterior enclosure followed the same path as both excavation and structure. Finishes Site Plan: During the finish phase of the project the three cranes were deconstructed. As finishes arrived on site, a storage room was dedicated to a type of material (doors, hardware, etc.) in Parking Level one and the areas were locked to prevent damage/theft. The building finishes were completed from component C, B, A, and D, respectively. To review in further detail, please see Appendix C for figures of the Site Layout Plans. 12

Geotechnical Investigation Test Report

Geotechnical Investigation Test Report Geotechnical Investigation Test Report Report No. htsc/rcd/ 3457 Dated: - 20/03/2010 Asphalt Standard Penetration Test as per IS 2131 ------------- IS 6403 Soil Job Card No - 1649 Cement Client/Department

More information

APPENDIX F GEOTECHNICAL REPORT

APPENDIX F GEOTECHNICAL REPORT The City of Winnipeg Bid Opportunity No. 101-2016 Template Version: C420150806 - RW APPENDIX F GEOTECHNICAL REPORT AECOM 99 Commerce Drive 204 477 5381 tel Winnipeg, MB, Canada R3P 0Y7 204 284 2040 fax

More information

Hydraulic Excavators

Hydraulic Excavators Chapter 8 Hydraulic Excavators Hydraulic excavators are designed to excavate below the ground surface on which the machine rests. These machines have good mobility and are excellent for general-purpose

More information

PROCUREMENT SUBSTITUTION PROCEDURES

PROCUREMENT SUBSTITUTION PROCEDURES RPS 205 - Additions - Renovations Guilford High School Issued for Bid & Permit - 11-08-2013 DOCUMENT 002600 - PROCUREMENT SUBSTITUTION PROCEDURES 1.1 DEFINITIONS A. Procurement Substitution Requests: Requests

More information

COMPENDIUM OF INDIAN STANDARDS ON SOIL ENGINEERING PART 2

COMPENDIUM OF INDIAN STANDARDS ON SOIL ENGINEERING PART 2 (PREVIEW) SP 36 (Part 2) : 1988 COMPENDIUM OF INDIAN STANDARDS ON SOIL ENGINEERING PART 2 IS 1893 : 1979 (Reaffirmed 1987) CODE OF PRACTICE FOR SUBSURFACE INVESTIGATION FOR FOUNDATIONS 1.1 This code deals

More information

A study on the Effect of Distorted Sampler Shoe on Standard Penetration Test Result in Cohesionless soil

A study on the Effect of Distorted Sampler Shoe on Standard Penetration Test Result in Cohesionless soil ISSN: 319-53 (An ISO 39: 00 Certified Organization) A study on the Effect of Distorted Sampler Shoe on Standard Penetration Test Result in Cohesionless soil Utpal Kumar Das Associate Professor, Department

More information

SECTION 31 20 00 EARTH MOVING

SECTION 31 20 00 EARTH MOVING SECTION 31 20 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for excavating, filling, and grading for earthwork at Parking Structure, new exit stair and as required to

More information

E4055. Quiz. Soil Classification. Name: SOIL CLASSIFICATION QUESTIONS

E4055. Quiz. Soil Classification. Name: SOIL CLASSIFICATION QUESTIONS E4055 Soil Classification Quiz SOIL CLASSIFICATION Name: Date: QUESTIONS 1 TRUE/FALSE 1. An average cave-in can drop five yards or 13,500 pounds of dirt. 2. A competent person should be knowledgeable of

More information

INDIRECT METHODS SOUNDING OR PENETRATION TESTS. Dr. K. M. Kouzer, Associate Professor in Civil Engineering, GEC Kozhikode

INDIRECT METHODS SOUNDING OR PENETRATION TESTS. Dr. K. M. Kouzer, Associate Professor in Civil Engineering, GEC Kozhikode INDIRECT METHODS SOUNDING OR PENETRATION TESTS STANDARD PENETRATION TEST (SPT) Reference can be made to IS 2131 1981 for details on SPT. It is a field edtest to estimate e the penetration e resistance

More information

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin PLAN SUBGRADES

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin PLAN SUBGRADES Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering Geotechnical Bulletin GB 1 PLAN SUBGRADES Geotechnical Bulletin GB1 was jointly developed by the Offices

More information

20 ACRE UBATC SITE ( 650' x 1,350') UINTAH BASIN MASTER PLAN VERNAL CAMPUS. Architects Engineers Program and Construction Managers 10.18.

20 ACRE UBATC SITE ( 650' x 1,350') UINTAH BASIN MASTER PLAN VERNAL CAMPUS. Architects Engineers Program and Construction Managers 10.18. 20 ACRE UBATC SITE ( 650' x 1,350') UINTAH BASIN MASTER PLAN VERNAL CAMPUS Architects Engineers Program and Construction Managers 10.18.06 BUILDING MAINTENANCE BUILDING TRADES CLASSROOMS COMMONS/CIRCULATION

More information

How To Prepare A Geotechnical Study For A Trunk Sewer Project In Lincoln, Nebraska

How To Prepare A Geotechnical Study For A Trunk Sewer Project In Lincoln, Nebraska APPENDIX B Geotechnical Engineering Report GEOTECHNICAL ENGINEERING REPORT Preliminary Geotechnical Study Upper Southeast Salt Creek Sanitary Trunk Sewer Lincoln Wastewater System Lincoln, Nebraska PREPARED

More information

SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM

SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM Shepherd University Board of Governors June 9, 2005 Agenda Item No. 9 SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM In 1994 construction began on the Byrd Science and

More information

VILLAS OF TRADITIONS AT GREY OAKS

VILLAS OF TRADITIONS AT GREY OAKS Report of Turnover Survey VILLAS OF TRADITIONS AT GREY OAKS Grey Oaks Development Naples, Collier County, Florida Forge Engineering Project Number 2907-001.01 March 2015 Richard P..Lundberg, P.E cn=richard

More information

LABORATORY CLASSIFICATION OF SOILS FOR ENGINEERING PURPOSES

LABORATORY CLASSIFICATION OF SOILS FOR ENGINEERING PURPOSES Test Procedure for LABORATORY CLASSIFICATION OF SOILS FOR ENGINEERING PURPOSES TxDOT Designation: Tex-142-E Effective Date: August 1999 1. SCOPE 1.1 This method is a system for classifying disturbed and

More information

Seattle Public Schools Building Excellence IV Projects Under Construction

Seattle Public Schools Building Excellence IV Projects Under Construction Seattle Public Schools Building Excellence IV Projects Under Construction Project Slide Number Arbor Heights Elementary School 2 Cascadia Elementary School & Robert Eagle Staff Middle School 13 Genesee

More information

KWANG SING ENGINEERING PTE LTD

KWANG SING ENGINEERING PTE LTD KWANG SING ENGINEERING PTE LTD 1. INTRODUCTION This report represents the soil investigation works at Aljunied Road / Geylang East Central. The objective of the soil investigation is to obtain soil parameters

More information

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250. 02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily

More information

Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1

Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1 6 Index inlet protection excavated drop inlet protection (Temporary) 6.50.1 HARDWARE CLOTH AND GRAVEL INLET PROTECTION Block and gravel inlet Protection (Temporary) sod drop inlet protection ROCK DOUGHNUT

More information

BUILDING PERMIT SPECIFICATIONS

BUILDING PERMIT SPECIFICATIONS BUILDING PERMIT SPECIFICATIONS The below noted requirements are based upon La Plata County Building Code. These specifications are not intended as a complete set of requirements, but are intended to provide

More information

load on the soil. For this article s examples, load bearing values given by the following table will be assumed.

load on the soil. For this article s examples, load bearing values given by the following table will be assumed. How Many Piers? By Gary Collins, P.E. A clear-cut guide to helical pier spacing Introduction Helical pier spacing is not an exact science. How many does it take to support a structure adequately or repair

More information

Construction Management Thesis Requirements: Fall 2008 Department of Architectural Engineering

Construction Management Thesis Requirements: Fall 2008 Department of Architectural Engineering Construction Management Thesis Requirements: Fall 2008 Department of Architectural Engineering AE 481W: Senior Thesis Faculty Consultants Michael Horman, Ph.D. (Spring Only) 211 Engineering Unit A 863

More information

Site Development Information Worksheet for single family residential development

Site Development Information Worksheet for single family residential development Site Development Information Worksheet for single family residential development Project description: Address: Owner Name: Phone No. Date Signature & phone number of Individual who Completed this Worksheet

More information

G-126 (Continued) MTA Westside Subway Extension Los Angeles, California. Figure: A-2.22c

G-126 (Continued) MTA Westside Subway Extension Los Angeles, California. Figure: A-2.22c LA METRO PBTUNNEL ZONE S:\131 GEOTECH\GINTW\LIBRARY MACTEC JUNE11.GLB G:\PROJECT_DIRECTORIES\43\\61_METRO_WESTSIDE_EXTENSION\6.2.3.1 GEOTECHNICAL DESIGN\3.2 ALL FIELD NOTES\GINT LOG\NEW TEMPLATE MARCH

More information

PROPERTY EVALUATION AND RESERVE FUND STUDY

PROPERTY EVALUATION AND RESERVE FUND STUDY PROPERTY EVALUATION AND RESERVE FUND STUDY COMPLEX NORTH & WEST AVENUES LAS VEGAS, NV Prepared for: HOMEOWNER S ASSOCIATION Prepared by: CRITERIUM ENGINEERS 22 Monument Square Portland, ME 04101 CONTENTS

More information

Rockhampton Office Brisbane Office Tarong Site. Barron Gorge Hydro PS Kareeya Hydro PS Mica Creek PS

Rockhampton Office Brisbane Office Tarong Site. Barron Gorge Hydro PS Kareeya Hydro PS Mica Creek PS Business Procedure Traffic Management Document Number OHS-PROC-130 This document applies to the following sites: All Sites Rockhampton Office Brisbane Office Tarong Site Barron Gorge Hydro PS Kareeya Hydro

More information

SECTION 3.3 - PAVEMENT DESIGN

SECTION 3.3 - PAVEMENT DESIGN SECTION 3.3-3.3.1 GENERAL 3.3.2 SUBSURFACE DRAINAGE 3.3.3 DETERMINATION OF DESIGN TRAFFIC 3.3.4 SUBGRADE EVALUATION 3.3.5 PAVEMENT THICKNESS 3.3.5.1 GRANULAR PAVEMENTS WITH THIN BITUMINOUS SURFACING 3.3.5.2

More information

Chapter 3 Pre-Installation, Foundations and Piers

Chapter 3 Pre-Installation, Foundations and Piers Chapter 3 Pre-Installation, Foundations and Piers 3-1 Pre-Installation Establishes the minimum requirements for the siting, design, materials, access, and installation of manufactured dwellings, accessory

More information

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) 55-1 GENERAL The Contractor shall perform all work required by the plans for construction of pipe for storm drains, precast polymer trench drains

More information

Design, Testing and Automated Monitoring of ACIP Piles in Residual Soils

Design, Testing and Automated Monitoring of ACIP Piles in Residual Soils Design, Testing and Automated Monitoring of ACIP Piles in Residual Soils Stephen W. Lacz 1, M. ASCE, P.E. and Richard C. Wells 2, F. ASCE, P.E. 1 Senior Professional, Trigon Kleinfelder, Inc., 313 Gallimore

More information

PILE FOUNDATIONS FM 5-134

PILE FOUNDATIONS FM 5-134 C H A P T E R 6 PILE FOUNDATIONS Section I. GROUP BEHAVIOR 6-1. Group action. Piles are most effective when combined in groups or clusters. Combining piles in a group complicates analysis since the characteristics

More information

EARTHWORKS COMPLETION REPORT ELLEN STIRLING PARADE, ELLENBROOK. Ellenbrook, W.A. Georgiou Group Pty Ltd

EARTHWORKS COMPLETION REPORT ELLEN STIRLING PARADE, ELLENBROOK. Ellenbrook, W.A. Georgiou Group Pty Ltd EARTHWORKS COMPLETION REPORT ELLEN STIRLING PARADE, ELLENBROOK Ellenbrook, W.A. Georgiou Group Pty Ltd GEOTPERT08050AZ-AH 27 March 2013 EARTHWORKS COMPLETION REPORT ELLEN STIRLING PARADE, ELLENBROOK Ellenbrook,

More information

Appendix D.1. Testing Requirements for Infiltration, Bioretention and Sand Filter Subsoils

Appendix D.1. Testing Requirements for Infiltration, Bioretention and Sand Filter Subsoils Appendix D.1 Testing Requirements for Infiltration, Bioretention and Sand Filter Subsoils General Notes Pertinent to All Testing 1. For infiltration trench (I-1) and basin (I-2) practices, a minimum field

More information

SWIMMING POOL, SPA, & HOT TUB GUIDELINES

SWIMMING POOL, SPA, & HOT TUB GUIDELINES SWIMMING POOL, SPA, & HOT TUB GUIDELINES Pool permit cost is based on the total value of the project. See Permit Fee Schedule Table 1A. A. Adopted construction codes and installation requirements 1. 2015

More information

Residential Foundations and Basements

Residential Foundations and Basements Residential Foundations and Basements Disclaimer All of the following information is based on the 2006 International Residential Code with Kentucky Amendments. As some information is paraphrased, article

More information

5/1/2013. Topics. The challenge is to better maintain native characteristics of soils during and after construction

5/1/2013. Topics. The challenge is to better maintain native characteristics of soils during and after construction PIN Foundations Topics Applications Design and Construction Flow Control Credits www.pinfoundations.com Copyright 2008, Pin Foundations, Inc. Curtis Hinman WSU Extension Faculty, Watershed Ecologist chinman@wsu.edu

More information

FINAL REPORT ON SOIL INVESTIGATION

FINAL REPORT ON SOIL INVESTIGATION FINAL REPORT ON SOIL INVESTIGATION FOR PROPOSED CONSTRUCTION AT SS-6B AREA AT HPCL VISAKH REFINERY VISAKHAPATNAM ANDHRA PRADESH J.J. ASSOCIATES(VISAKHAPATNAM) AETP(P) LIMITED #11-6-3, RockDale Layout,

More information

DYNAMIC CONE PENETRATION TEST INSTRUCTIONAL MANUAL GEOTECHANICAL

DYNAMIC CONE PENETRATION TEST INSTRUCTIONAL MANUAL GEOTECHANICAL DYNAMIC CONE PENETRATION TEST INSTRUCTIONAL MANUAL GEOTECHANICAL J. P. Scientific Instruments 7, Civil Lines, Roorkee-247667 DYNAMIC CONE PENETRATION TEST CONTENTS: PAGE NO. 1.0 INTRODUCTION 03 2.0 PROBLEM

More information

Use of a Reinforced Jet Grout Excavation Support System for a Major Sewer Line Repair

Use of a Reinforced Jet Grout Excavation Support System for a Major Sewer Line Repair Use of a Reinforced Jet Grout Excavation Support System for a Major Sewer Line Repair Eric M. Klein, P. E., Rummel, Klepper & Kahl, LLP, Baltimore, Maryland Kenneth B. Andromalos, P. E., Brayman Environmental,

More information

Specification Guidelines: Allan Block Modular Retaining Wall Systems

Specification Guidelines: Allan Block Modular Retaining Wall Systems Specification Guidelines: Allan Block Modular Retaining Wall Systems The following specifications provide Allan Block Corporation's typical requirements and recommendations. At the engineer of record's

More information

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary

More information

SPACE ALLOCATION AND ENCLOSURE DESIGN GUIDELINES FOR TRASH AND RECYCLING

SPACE ALLOCATION AND ENCLOSURE DESIGN GUIDELINES FOR TRASH AND RECYCLING SPACE ALLOCATION AND ENCLOSURE DESIGN GUIDELINES FOR TRASH AND RECYCLING For Residential and New Commercial Construction and Remodel Dated July 1, 2010 If you have any questions regarding the Design Guidelines

More information

Waterleaf ARB Application

Waterleaf ARB Application To: Waterleaf ARB Application Waterleaf Architectural Review Board c/o Property Management Systems, Inc. P.O. Box 1987 Yulee, FL 32097-1987 From: Name: Address: City, State, Zip: Phone: Fax: Lot Number:

More information

C. Section 014510 TESTING LABORATORY SERVICE.

C. Section 014510 TESTING LABORATORY SERVICE. SECTION 014500 QUALITY CONTROL PART 1 GENERAL 1.01 RELATED REQUIREMENTS A. Drawings and General Provisions of Contract, including General and Special Conditions and other Division 1 Specification Sections,

More information

Chittagong Hill Tract Development Facilities (CHTDF) United Nations Development Programme

Chittagong Hill Tract Development Facilities (CHTDF) United Nations Development Programme Chittagong Hill Tract Development Facilities (CHTDF) United Nations Development Programme Main Report Deliverable 02 Sub-Surface Properties of Soil Development in Rangamati, Bandarban and Khagrachari Municipality

More information

Soils, Foundations & Moisture Control

Soils, Foundations & Moisture Control Soils, Foundations & Moisture Control Soil The top loose layer mineral and/or organic material on the surface of the Earth that serves as a natural medium for the growth of plants and support for the foundations

More information

GLOSSARY OF TERMINOLOGY

GLOSSARY OF TERMINOLOGY GLOSSARY OF TERMINOLOGY AUTHORIZED PILE LENGTHS - (a.k.a. Authorized Pile Lengths letter) Official letter stating Engineer's recommended length of concrete piles to be cast for construction of foundation.

More information

Geotechnical Investigation Reports and Foundation Recommendations - Scope for Improvement - Examples

Geotechnical Investigation Reports and Foundation Recommendations - Scope for Improvement - Examples Geotechnical Investigation Reports and Foundation Recommendations - Scope for Improvement - Examples Prof. V.S.Raju (Formerly: Director, IIT Delhi & Professor and Dean, IIT Madras) Email: rajuvs_b@yahoo.com

More information

ENCE 4610 Foundation Analysis and Design

ENCE 4610 Foundation Analysis and Design This image cannot currently be displayed. ENCE 4610 Foundation Analysis and Design Shallow Foundations Total and Differential Settlement Schmertmann s Method This image cannot currently be displayed. Strength

More information

Geotechnical Investigation using Standard Penetration Test (SPT) in Rangamati, Bandarban and Khagrachari Towns

Geotechnical Investigation using Standard Penetration Test (SPT) in Rangamati, Bandarban and Khagrachari Towns 1. Introduction 1.1 Scope of Work The Asian Disaster Preparedness Centre (ADPC) is implementing the project Seismic Hazard and Vulnerability Mapping for Rangamati, Bandarban and Khagrachari Municipality.

More information

Hunter College school of Social Work Thesis Proposal

Hunter College school of Social Work Thesis Proposal Fall 2009 Hunter College school of Social Work Thesis Proposal To analyze how energy efficiency can be implemented using facade and green roof redesign. It ties structural engineering concepts with existing

More information

SOILS AND FOUNDATIONS

SOILS AND FOUNDATIONS CHAPTER 1 SOILS AND FOUNDATIONS SECTION 101 GENERAL 101.1 Scope. The provisions of this chapter shall apply to building and foundation systems in those areas not subject to scour or water pressure by wind

More information

Lighthouse Engineering, L.L.C.

Lighthouse Engineering, L.L.C. Registered Engineering Firm (F: 9334) Phone: 214-577-1077 Fax: 214-224-0549 Website: www.lighthouseeng.com Email: Office@LighthouseEng.com Thursday, September 04, 2014 TO: Our Client RE: Initial Engineering

More information

ALLOWABLE LOADS ON A SINGLE PILE

ALLOWABLE LOADS ON A SINGLE PILE C H A P T E R 5 ALLOWABLE LOADS ON A SINGLE PILE Section I. BASICS 5-1. Considerations. For safe, economical pile foundations in military construction, it is necessary to determine the allowable load capacity

More information

NJ650.1404 Interception Drainage

NJ650.1404 Interception Drainage NJ650.1404 Interception Drainage Interception drainage is used to intercept surface and subsurface water. The investigation, planning, and construction of surface interception drains follow the requirements

More information

SE-10 STORM DRAIN INLET PROTECTION. Objectives

SE-10 STORM DRAIN INLET PROTECTION. Objectives STORM DRAIN INLET PROTECTION SE-10 Objectives Erosion Control - EC Sediment Control - SE Tracking Control - TC Wind Erosion Control - WE Non-Storm Water Management - NS Waste and Materials Management -

More information

TD AMERITRADE Park Omaha

TD AMERITRADE Park Omaha TD AMERITRADE Park Omaha November 19, 2009 Report No. 6 MONTHLY CONSTRUCTION PROGRESS REPORT METROPOLITAN ENTERTAINMENT & CONVENTION AUTHORITY MONTHLY CONSTRUCTION PROGRESS REPORT Metropolitan Entertainment

More information

Building Your Interlocking Concrete Pavement to Last a Lifetime

Building Your Interlocking Concrete Pavement to Last a Lifetime Building Your Interlocking Concrete Pavement to Last a Lifetime A Guide for Consumers Contents Building Your Interlocking Concrete Pavement to Last a Lifetime.... 3 What Does Installation Involve?....

More information

SPECIAL SPECIFICATION 5757 Power Duct System

SPECIAL SPECIFICATION 5757 Power Duct System 2004 Specifications CSJ 0353-04-088 SPECIAL SPECIFICATION 5757 Power Duct System 1. Description. This Item shall govern for the furnishing and installing of all materials, equipment, and labor listed in

More information

Building Permit Application Packet. BUILDING CODES Adopted by La Plata County For Enforcement In The Unincorporated Areas Of La Plata County

Building Permit Application Packet. BUILDING CODES Adopted by La Plata County For Enforcement In The Unincorporated Areas Of La Plata County Building Permit Application Packet The purpose of Building Codes is to establish the minimum requirements to safe guard the public health, safety and general welfare through structural strength, means

More information

CAREY L. STECKLER HIGHLAND ELEMENTARY SCHOOL ADVISOR: DR. RILEY TECHNICAL ASSIGNMENT 3 15 NOVEMBER 2004 CONTENTS

CAREY L. STECKLER HIGHLAND ELEMENTARY SCHOOL ADVISOR: DR. RILEY TECHNICAL ASSIGNMENT 3 15 NOVEMBER 2004 CONTENTS CAREY L. STECKLER HIGHLAND ELEMENTARY SCHOOL ADVISOR: DR. RILEY TECHNICAL ASSIGNMENT 3 15 NOVEMBER 2004 CONTENTS A. SUMMARY... 1 B. SITE LAYOUT PLANNING... 2 C. TEMPORARY UTILITIES... 2 D. DETAILED SYSTEMS

More information

Highway 23 Paynesville Richmond Soils Borings, Soils Tests, and Reporting

Highway 23 Paynesville Richmond Soils Borings, Soils Tests, and Reporting Highway 23 Paynesville Richmond Soils Borings, Soils Tests, and Reporting MnDOT Contract No. 1003249 General Project Overview This work is located along Trunk Highway (TH) 23, for State Project (SP) 7305-124.

More information

17 East Main Street Cuba,NewYork 14727 www.cubany.org 585-968-1560. Code Enforcement

17 East Main Street Cuba,NewYork 14727 www.cubany.org 585-968-1560. Code Enforcement 17 East Main Street Cuba,NewYork 14727 www.cubany.org 585-968-1560 Code Enforcement Useful Information Office Information What is zoning? When Do I Need a Building Permit? When are Permits Not Required?

More information

CW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS

CW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS December 2014 CW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS 1. DESCRIPTION... 1 1.1 General... 1 1.2 Definitions... 1 1.3 Referenced Standard Construction Specifications...

More information

STRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.

STRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL. STRUCTURES 1. General. Critical structures may impact the integrity of a flood control project in several manners such as the excavation for construction of the structure, the type of foundation, backfill

More information

National Archives and Record Administration

National Archives and Record Administration National Archives and Record Administration Installation of Self-Closing Flood Barriers and Loading Dock Turntable Removal and Structural Slab Repairs ! 2010 Baltimore Washington Chapter Outstanding Repair

More information

Testing Procedures. Note: Please refer to Table 2 for a list of completed borings.

Testing Procedures. Note: Please refer to Table 2 for a list of completed borings. Testing Procedures Drilling and Sampling: Standard penetration tests (SPT) were conducted for every ten feet of boring advancement. SPT tests were conducted in accordance with ASTM D1586, using a 140 pound

More information

Pavements should be well drained both during and upon completion of construction. Water should not be allowed to pond on or near pavement surfaces.

Pavements should be well drained both during and upon completion of construction. Water should not be allowed to pond on or near pavement surfaces. Project No. 208-8719 January, 2009 Ref: 2-8719BR Anthony Hudson - Broadscale Geotechnical Investigation - Proposed Commercial Development - 52 Old Pacific Highway, Pimpama Page 32 iii) Pavements should

More information

SECTION 02221 SELECTIVE DEMOLITION

SECTION 02221 SELECTIVE DEMOLITION SECTION 02221 PART 1 -GENERAL 1.01 DESCRIPTION This section includes all material, labor, machinery and supervision required to demolish and remove the following items where applicable and as noted on

More information

4. ANCHOR BOLTS AND STRAPS a. ½" anchor bolts shall be embedded 7" into concrete a maximum of 6' on center and 12" from corners and ends of plates.

4. ANCHOR BOLTS AND STRAPS a. ½ anchor bolts shall be embedded 7 into concrete a maximum of 6' on center and 12 from corners and ends of plates. GENERAL CODE REQUIREMENTS (BASEMENTS) 1. FOOTINGS a. Footings shall be below frost line depth (42"). b. For an 8" foundation wall, footings shall be no less than 8" deep and 16" wide. c. Steel reinforcement

More information

BLOCK 400 PLANNED COMMUNITY DISTRICT

BLOCK 400 PLANNED COMMUNITY DISTRICT BLOCK 400 PLANNED COMMUNITY DISTRICT Newport Center December 1983 Newport Beach, California Ordinance 88-119 Adopted December 12, 1988 Amendment No. 672 Resolution No. 95-115 Adopted October 9, 1995 Amendment

More information

How to Design and Build a Fence/G traverse Bridge or Graffiti Project

How to Design and Build a Fence/G traverse Bridge or Graffiti Project Outline Project Location Project Description Project History Site Constraints Geotechnical Investigation & Soil Profile Foundation Design Process Photos Project Location Project Limits: The Grand River

More information

Strength Determination of "Tooth-Paste" Like Sand and Gravel Washing Fines Using DMT

Strength Determination of Tooth-Paste Like Sand and Gravel Washing Fines Using DMT Strength Determination of "Tooth-Paste" Like Sand and Gravel Washing Fines Using DMT David L. Knott, P.E. and James M. Sheahan, P.E. HDR Engineering, Inc. 3 Gateway Center Pittsburgh, PA 15222-1074 Phone:

More information

CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES

CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES INTRODUCTION What is a Construction Management Plan? The City of Vincent requires careful management of construction involving excavation and retention

More information

Storm Drain Inlet Protection - IP

Storm Drain Inlet Protection - IP Storm Drain Inlet Protection - IP DEFINITION A temporary protective device formed around a storm drain drop inlet to trap sediment. PURPOSE To prevent sediment from entering storm drainage systems, prior

More information

BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY

BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY MURRAY SHIRE COUNCIL BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY ADOPTED: 1 May 2012 1 BUILDING OVER OR NEAR WATER AND SEWER MAINS POLICY CONTENTS 1. Objective... 2 2. Requirements for Building Near

More information

INSITU TESTS! Shear Vanes! Shear Vanes! Shear Vane Test! Sensitive Soils! Insitu testing is used for two reasons:!

INSITU TESTS! Shear Vanes! Shear Vanes! Shear Vane Test! Sensitive Soils! Insitu testing is used for two reasons:! In-situ Testing! Insitu Testing! Insitu testing is used for two reasons:! To allow the determination of shear strength or penetration resistance or permeability of soils that would be difficult or impossible

More information

Machine Foundation Design

Machine Foundation Design Machine Foundation Design As the structural engineer who recently designed the machine foundation for one of the largest vertical turning and milling centers in the country, in addition to over 250 other

More information

Residential Plan Routing Information

Residential Plan Routing Information Residential Plan Routing Information BUILDING INSPECTIONS 800 4th AVENUE EAST WEST FARGO, ND 58078 PHONE: 701-433-5480 The building Inspection s Department receives and issues all applications for building

More information

CID STREET INFRASTRUCTURE ASSESSMENT

CID STREET INFRASTRUCTURE ASSESSMENT ABSTRACT An evaluation of the street infrastructure in Foxberry Estates Phase 1, including pavement condition, verification of construction techniques, and subgrade quality. Recommendations and costs for

More information

SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT RESOURCE REGULATION TRAINING MEMORANDUM

SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT RESOURCE REGULATION TRAINING MEMORANDUM SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT RESOURCE REGULATION TRAINING MEMORANDUM DATE: December 04, 1996 This document is subject to change. If in doubt, verify current status with Technical Services

More information

STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION

STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION Design Criteria Drainage Area The drainage area for storm drain inlets shall not exceed one acre. The crest elevations of these practices shall

More information

How to Estimate the Cost of Support of Excavation for Foundation Installation. CPE Candidate No. 0113013. May 15, 2013

How to Estimate the Cost of Support of Excavation for Foundation Installation. CPE Candidate No. 0113013. May 15, 2013 How to Estimate the Cost of Support of Excavation for Foundation Installation CPE Candidate No. 0113013 May 15, 2013 1 How to Estimate the Cost of Support of Excavation for Foundation Installation Table

More information

The minimum reinforcement for the stem wall is the placement of:

The minimum reinforcement for the stem wall is the placement of: PolySteel creates an ideal insulated stem wall for concrete slabs that can make this part of your project easier and faster, in addition to making your finished project more energy-efficient. Figures 3.20

More information

Table 4.9 Storm Drain Inlet Protetion Applicable for

Table 4.9 Storm Drain Inlet Protetion Applicable for BMP C220: Storm Drain Inlet Protection Purpose To prevent coarse sediment from entering drainage systems prior to permanent stabilization of the disturbed area. Conditions of Use Type of Inlet Protection

More information

Outlet stabilization structure

Outlet stabilization structure Overview of Sedimentation and Erosion Control Practices Practice no. 6.41 Outlet stabilization structure Erosion at the outlet of channels, culverts, and other structures is common, and can cause structural

More information

Appendix D: Geotechnical Investigation

Appendix D: Geotechnical Investigation City of Fontana Sierra Lakes Commerce Center Recirculated Draft EIR Appendix D: Geotechnical Investigation FirstCarbon Solutions H:\Client (PN JN)\0144\01440050\EIR\3 RDEIR\01440050 Sec99 99 Appendix Dividers.doc

More information

SECTION 02400 - STORM DRAIN SYSTEM

SECTION 02400 - STORM DRAIN SYSTEM SECTION 02400 - STORM DRAIN SYSTEM CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And

More information

The Verdura Wall check with your local building department

The Verdura Wall check with your local building department The Verdura Wall The Verdura Wall by Soil Retention Products, Inc of Carlsbad, California can be constructed as a gravity retaining structure or a geosynthetic reinforced segmental retaining wall, depending

More information

How To Protect A Swimming Pool

How To Protect A Swimming Pool County of Gloucester Codes Compliance Building Department Building Three P. O. Box 329 Gloucester, Virginia 23061 Building Code Guidelines Residential Swimming Pools & Spas KEEP YOUR POOL SAFE CODE REQUIREMENTS

More information

GEOTECHNICAL ENGINEERING FORMULAS. A handy reference for use in geotechnical analysis and design

GEOTECHNICAL ENGINEERING FORMULAS. A handy reference for use in geotechnical analysis and design GEOTECHNICAL ENGINEERING FORMULAS A handy reference for use in geotechnical analysis and design TABLE OF CONTENTS Page 1. SOIL CLASSIFICATION...3 1.1 USCS: Unified Soil Classification System...3 1.1.1

More information

Safe & Sound Bridge Terminology

Safe & Sound Bridge Terminology Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries

More information

Eurocode 7 - Geotechnical design - Part 2 Ground investigation and testing

Eurocode 7 - Geotechnical design - Part 2 Ground investigation and testing Brussels, 18-20 February 2008 Dissemination of information workshop 1 Eurocode 7 - Geotechnical design - Part 2 Ground investigation and testing Dr.-Ing. Bernd Schuppener, Federal Waterways Engineering

More information

GOOD NEWS BUT NOT ALWAYS

GOOD NEWS BUT NOT ALWAYS GOOD NEWS BUT NOT ALWAYS The prospective homebuyer and homeowner in the Amarillo area are indeed fortunate. Typically, he has a wide choice of type home, size, and location for wide ranges of pricing.

More information

How To Design A Foundation

How To Design A Foundation The Islamic university - Gaza Faculty of Engineering Civil Engineering Department CHAPTER (2) SITE INVESTIGATION Instructor : Dr. Jehad Hamad Definition The process of determining the layers of natural

More information

Architectural Inspection Site Structures

Architectural Inspection Site Structures 0141 Freestanding Shelters Open air shelters not attached to the building. Bike rack shelter with bike racks: This 8'x30' structure is located on the north east side of the building on the wooded landscape

More information

City of Surrey PLANNING & DEVELOPMENT REPORT File: 7908-0284-00

City of Surrey PLANNING & DEVELOPMENT REPORT File: 7908-0284-00 City of Surrey PLANNING & DEVELOPMENT REPORT PROPOSAL: Planning Report Date: March 30, 2009 Development Permit in order to permit the development of a new concrete bagging and storage facility on the site

More information

BUTE Department of Construction Management and Technology

BUTE Department of Construction Management and Technology BUTE Department of Construction Management and Technology 02.10.2012 Definition 1: Foundation: The structure, that transmits the load of the building to the soil Definition 2: Load bearing soil (strata):

More information

SANITARY SEWER SERVICE CONNECTION INSTRUCTIONS

SANITARY SEWER SERVICE CONNECTION INSTRUCTIONS 1 SANITARY SEWER SERVICE CONNECTION INSTRUCTIONS TABLE OF CONTENTS I. Introduction II. General Information and Requirements A. Applying for Sewer connection B. Excavation C. Cutting Concrete and Asphalt

More information

Current as of 11/10/08 1 of 1

Current as of 11/10/08 1 of 1 BEST PRACTICES STANDARDS FOR SCHOOLS UNDER CONSTRUCTION OR BEING PLANNED FOR CONSTRUCTION I. Site Layout A. School buildings shall be provided with a securable perimeter. A securable perimeter means that

More information