1 Williamson County Major Thoroughfare Plan Projects Capacity related projects (C #) have been identified because of the need for increased roadway capacity in existing corridors due to existing or future traffic growth from new development. These improvements generally apply to existing roadways and would be accomplished through the widening of existing roads. Improvements are sometimes given as widen to 2/3 or 4/5 lanes. This means that, due to the contextual setting of these roads, one consistent cross section may not be most applicable. For example, a constant two way left turn lane may be needed in some places, but a left turn lane constructed at a particular location may be a preferred design in other places. More detailed design analysis will be required as implementation of these projects progress. C 1 Project: Highway 100 widening Description: Widen Highway 100 to 4/5 lanes from the Davidson County Line to SR 840 (assumes corresponding widening of Highway 100 through Fairview City Limits) Purpose: Segment expected to reach capacity by 2035 planning horizon with capacity exceeded in some locations. Project will accommodate Fairview s projected growth in population and employment. Coordinated Plans: 2035 LRTP (unfunded project), 1996 Williamson County MTP Right of Way: 120 Cost: $31,280,000 C 2 Project: Sneed Road widening Description: Widen Sneed Road to 3 lanes from the Davidson County Line to Hillsboro Road Purpose: Segment expected to reach capacity by 2035 planning horizon. Project should improve safety and non motorized accommodations. Coordinated Plans: 1996 Williamson County MTP Implementation: Plan and design as county improvement. Potential coordination with future development initiatives. Cost: $34,910,000
2 C 3 Project: Hillsboro Road widening Description: Widen Hillsboro Road to 4/5 lanes from the Davidson County Line to Berry s Chapel Road Purpose: Project should mitigate existing capacity shortages which are expected to worsen over planning horizon. Coordinated Plans: 2035 LRTP (unfunded project), 1996 Williamson County MTP Right of Way: 120 typical. 84 in Activity Center area at Grassland Cost: $47,740,000 C 4 Project: State Route 96 West widening Description: Widen SR 96 West to 3 lanes from the Franklin City Limit to Temple Road Ext (proposed see N 1) Purpose: Segment expected to reach capacity by 2035 planning horizon. Coordinated Plans: 2035 LRTP (unfunded project), 2010 Franklin MTP, 1996 Williamson County MTP Right of Way: 120 Cost: $26,580,000 C 5 Project: Rocky Fork Road widening Description: Widen Rocky Fork Road to 3 lanes from the Nolensville City Limit to Rutherford County Line Purpose: Some segments expected to approach capacity by 2035 planning horizon. Coordinated Plans: 2005 Nolensville MTP improvements and/or future developer initiatives Cost: $14,360,000
3 C 6 Project: Clovercroft Road Description: Widen Clovercroft Road to 2/3 lanes from Nolensville Road to Wilson Pike Purpose: Some segments expected to approach capacity by 2035 planning horizon. Facilitate Rutherford/Williamson commutes to Cool Springs, I 65. Coordinated Plans: 2035 LRTP (unfunded project) Implementation: Plan and design as county improvement. Potential coordination with future development initiatives. Cost: $21,990,000 C 7 Project: Nolensville Road widening Description: Widen Nolensville Road to 4/5 lanes from the Nolensville Town Limit to Shelbyville Highway Purpose: Segment expected to reach capacity by 2035 planning horizon with capacity exceeded in some locations. Coordinated Plans: 2035 LRTP (unfunded project), 2005 Nolensville MTP Right of Way: 120 typical. 84 in Village and Activity Center areas at Triune and Kirkland. Cost: $72,360,000 C 8 Project: State Route 96 East widening Description: Widen SR 96 to 4/5 lanes from Arno Road to the Rutherford County Line Purpose: Segment expected to reach capacity by 2035 planning horizon with capacity exceeded in some locations. Facilitate role as suburban character corridor in Preferred Growth scenario. Coordinated Plans: 2035 LRTP, 2010 Franklin MTP, 1996 Williamson County MTP Right of Way: 120 typical. 84 in Village and Activity Center areas at Arrington and Triune. Cost: $102,960,000
4 C 9 Project: Arno Road widening Description: Widen Arno Road to 3 lanes from SR 96 East to SR 840 Purpose: Some segments expected to exceed capacity by 2035 planning horizon. Implementation: Plan and design as county improvement. Potential coordination with future development initiatives. typical. 60 in Village area at Rudderville. Cost: $47,270,000 C 10 Project: Lewisburg Pike widening Description: Widen Lewisburg Pike to 4/5 lanes from the Franklin City Limit to Thompson's Station Road Purpose: Some segments expected to exceed capacity by 2035 planning horizon. Coordinated Plans: 2035 LRTP, 2010 Franklin MTP, 1996 Williamson County MTP Right of Way: 120 Cost: $57,270,000 C 11 Project: Columbia Pike widening Description: Widen Columbia Pike to 4/5 lanes from Coleman Road to Goose Creek Bypass Purpose: Segment expected to reach capacity by 2035 planning horizon. Coordinated Plans: 2035 LRTP (unfunded project), 2010 Franklin MTP, 1996 Williamson County MTP Right of Way: 120 Cost: $25,770,000 C 12 Project: Carters Creek Pike Description: Widen Carters Creek Pike to 2/3 lanes from the Franklin City Limit to SR 840 Purpose: Some segments expected to reach or exceed capacity by 2035 planning horizon. Coordinated Plans: 2035 LRTP (unfunded project), 2010 Franklin MTP, 1996 Williamson County MTP Right of Way: 96 Cost: $52,870,000
5 C 13 Project: Coleman Road widening Description: Widen Coleman Road to 3 lanes from Kittrell Road to Columbia Pike Purpose: Consistency with Franklin MTP improvements and/or future developer initiatives Cost: $10,010,000 C 14 Project: Duplex Road widening Description: Widen Duplex Road to 3 lanes from I 65 to Lewisburg Pike Purpose: Segment expected to reach capacity by 2035 planning horizon with capacity exceeded in some locations. Coordinated Plans: 2035 LRTP, Spring Hill MTP Right of Way: 96 Cost: $18,300,000 C 15 Project: I 65 widening Description: Widen I 65 to 8 lanes from SR 840 to the Maury County Line Purpose: Segment expected to reach capacity by 2035 planning horizon, Spring Hill MTP Implementation: Plan, design, and program as federal interstate improvement Right of Way: Per TDOT Cost: $36,600,000
6 C 16 Project: York Road widening Description: Widen York Road to 2/3 lanes from Fly Road Extension to Rocky Fork Road Purpose: Consistency with Nolensville MTP Coordinated Plans: Nolensville MTP improvements and/or future developer initiatives Cost: $8,830,000 C 17 Project: Kidd/Mcfarlin Road widening Description: Widen Kidd/Mcfarlin Road to 2/3 lanes from Nolensville Road to the Rutherford County Line Purpose: Consistency with Nolensville MTP Coordinated Plans: Nolensville MTP improvements and/or future developer initiatives Cost: $22,190,000
7 New roadway projects (N #) have been identified for construction in new alignments for various reasons. First, capacity shortages may exist in an existing corridor, but there is limited opportunity to add capacity in that existing corridor. In these cases, a new road would provide an alternative to the existing corridor. Second, a new road may be specified due to the lack of other alternative routes in a particular part of the county. Third, an existing road may be extended to provide a longer range of mobility and thereby increase the effectiveness of the existing roadway. Fourth, a new road may be needed to structure future development. These projects are marked with an asterisk and should be pursued only when development activities occur in a previously undeveloped portion of the county. Fifth, a new construction project may be shown in the Williamson County Major Thoroughfare Plan only in order to be consistent with the previously adopted roadway plans of adjacent jurisdictions. N 1* Project: Temple Road Extension Description: Extend Temple Road as 2/3 lanes from near Green Road to SR 96 West Purpose: Enhanced north south mobility. Alternative route to Old Natchez Trace. Coordinated Plans: 1996 Williamson County MTP Implementation: Plan, design, and program as county improvement in coordination with future developer initiatives Cost: $23,210,000 N 2 Project: Old Charlotte Pike Extension Description: Extend Old Charlotte Pike as 2 lanes from Del Rio Pike to SR 96 West Purpose: Enhanced north south mobility. Intermediate route in between Old Hillsboro Road and Hillsboro Road. Cost: $13,970,000
8 N 3 Project: Mack Hatcher Parkway Extension Description: Extend Mack Hatcher Parkway as 4/5 lanes from Hillsboro Road to Columbia Pike Purpose: Enhanced mobility west of Franklin., 1996 Williamson County MTP Implementation: Plan, design, and program as state route project Right of Way: 250 Cost: $159,810,000 N 4 Project: McEwen Drive Extension Description: Extend McEwen Drive as 4/5 lanes from Wilson Pike to Pleasant Hill Road Purpose: Enhanced east/west mobility to I 65/Cool Springs Coordinated Plans: 2035 LRTP Implementation: Plan, design, and program as county project with a high degree of local jurisdiction coordination and participation Right of Way: 120 Cost: $17,540,000 N 5 Project: Liberty Pike Extension Description: Extend Liberty Pike as 2/3 lanes to Wilson Pike Purpose: Logical terminus of Liberty Pike corridor Implementation: Plan, design, and program as county project with jurisdictional coordination Right of Way: 60 Cost: $4,190,000 N 6 Project: Wilson Pike Reconstruction Description: Reconstruct Wilson Pike as 2/3 lanes from McEwen Drive to SR 96 East Purpose: Correct substandard alignment, roadway features. Segment expected to reach or exceed capacity by 2035 planning horizon. Coordinated Plans: 2035 LRTP, 2010 Franklin MTP, 1996 Williamson County MTP Implementation: Plan, design, and program as state route project Right of Way: 96 typical. 60 in Village area at Arrington. Cost: $41,370,000
9 N 7 Project: Market Street Extension Description: Construct Market Street extension as 2 lanes from Clovercroft Road to SR 96 East Purpose: Consistency with Franklin MTP Implementation: Plan, design, and program as county project with jurisdictional coordination Cost: $7,550,000 N 8 Project: N Chapel Road Extension Description: Extend N Chapel Road as 2 lanes from 90 o curve to the proposed Trinity Road Extension Purpose: Consistency with Franklin MTP Implementation: Plan, design, and program as county project with jurisdictional coordination Cost: $4,090,000 N 9 Project: N Chapel Road Extension Description: Extend N Chapel Road as 2 lanes from SR 96 East to 90 o curve Purpose: Consistency with Franklin MTP Implementation: Plan, design, and program as county project with jurisdictional coordination Cost: $1,510,000 N 10* Project: Trinity Road Extension Description: Extend Trinity Road as 2/3 lanes from Trinity Road to Clovercroft Road Purpose: Provide north/south alternative to Wilson Pike from SR 840 to Clovercroft Road, 1996 Williamson County MTP Cost: $20,920,000
10 N 11 Project: Peytonsville Road Extension Description: Extend Peytonsville Road as 2/3 lanes from Peytonsville Road to Long Lane Purpose: East/west mobility, including access to existing Peytonsville Road interchange Coordinated Plans: 2035 LRTP (unfunded project), 2010 Franklin MTP, 1996 Williamson County MTP Implementation: Plan, design, and program as county project with jurisdictional coordination and possible extension/redesignation of state route system Right of Way: 60 Cost: $4,880,000 N 12 Project: Buckner Road Extension Description: Extend Buckner Road as 2/3 lanes from Buckner Lane to Lewisburg Pike Purpose: East/west mobility, including access to potential future I 65 interchange Coordinated Plans: 2035 LRTP, Spring Hill MTP Implementation: Plan, design, and program as county improvement with high degree of coordination with multi municipal objectives and future developer initiatives Cost: $13,900,000 N 13 Project: Saturn Parkway Extension Description: Extend Saturn Parkway as 4/5 lanes from I 65 to Lewisburg Pike Purpose: East/west mobility, including access to existing Saturn Parkway interchange Coordinated Plans: Spring Hill MTP Implementation: Plan, design, and program as state route project Right of Way: 148 Cost: $23,500,000
11 N 14* Project: Evergreen Road Extension Description: Extend Evergreen Road as 2/3 lanes from Town Center Parkway Extension (proposed) to Carters Creek Pike (use partial Sedberry Road alignment) Purpose: North/south alternative to Columbia Pike, Spring Hill MTP Cost: $60,970,000 N 15* Project: Thompson s Station Road Extension Description: Extend Thompson s Station Road as 2/3 lanes from Thompson s Station Road to Carters Creek Pike (use partial alignments of Evergreen Road and Backer Road) Purpose: East/west mobility south of SR 840 Coordinated Plans: Cost: $34,750,000 N 16 Project: Lewisburg Pike Connector and Interchange Description: Construct Lewisburg Pike Connector as 2/3 lanes from Lewisburg Pike to a proposed I 65 interchange Purpose: Additional interstate access in between Goose Creek and SR 840 in coordination with Franklin MTP projects Right of Way: 96 Cost: $24,650,000
12 N 17* Project: New Roadway construction Description: Construct new roadway as 2/3 lanes from Hillsboro Road to Urban Growth Boundary Purpose: Accommodate growth in Franklin s western sector in coordination with Franklin MTP Right of Way: 60 Cost: $7,350,000 N 18 Project: Lewisburg Pike Connector Extension Description: Construct new roadway as 2/3 lanes from the proposed I 65 Interchange to Long Lane Purpose: Consistency with Franklin MTP projects Cost: $12,390,000 N 19* Project: Del Rio Pike Extension Description: Extend Del Rio Pike as 2 lanes from Carlisle Lane to Urban Growth Boundary Purpose: Accommodate growth in Franklin s western sector in coordination with Franklin MTP Right of Way: 60 Cost: $5,310,000
13 N 20 Project: Split Log Road Extension Description: Extend Split Log Road as 2/3 lanes from Sam Donald Road to Sunset Road Purpose: East/west alternative to Ragsdale Road Coordinated Plans: Brentwood current planning initiatives Cost: $8,400,000 N 21 Project: Town Center Parkway Extension Description: Extend Buckner Road (Town Center Parkway) as 2/3 lanes from Buckner Road to Maury County Line Purpose: Circumferential mobility in western Spring Hill (project extends south into Maury County) Coordinated Plans: Spring Hill MTP Cost: $18,900,000 N 22 Project: Kedron Road Connector Description: Construct new roadway as 2/3 lanes from Buckner Road Extension (prop) to the Maury County Line Purpose: North/south mobility east of I 65 in coordination with Spring Hill MTP Coordinated Plans: Spring Hill MTP Cost: $43,700,000
14 N 23 Project: Waller Road Extension Description: Extend Waller Road as 2/3 lanes from Sunset Road to Clovercroft Road Purpose: North/south alternative to Nolensville Road Coordinated Plans: Nolensville MTP Cost: $13,510,000 N 24 Project: New Roadway construction Description: Construct new road as 2 lanes from Kidd Road to Rocky Fork Road Purpose: Accommodate growth in Nolensville s eastern sector in coordination with Nolensville MTP Coordinated Plans: Nolensville MTP Cost: $11,210,000 N 25 Project: New Roadway construction Description: Construct new road as 2 lanes from proposed road (N 24) to Fly Road Purpose: Accommodate growth in Nolensville s eastern sector in coordination with Nolensville MTP Coordinated Plans: Nolensville MTP Cost: $5,510,000
15 N 26 Project: Fly Road Extension Description: Extend Fly Road as 2 lanes from Rocky Springs Road to York Road Purpose: North/south alternative to Nolensville Road Coordinated Plans: Nolensville MTP Cost: $7,410,000
16 Some primary county roads have been identified as in need of safety improvements which are not capacity related or identified in other jurisdictional plans. Generally, the roads identified for these safety improvements are those which have no shoulders, travel lane widths of less than 11 feet, and an average daily traffic volume of more than 1,000 vehicles per day. The recommended improvements would consist of adding a minimum two foot stabilized shoulder and, where more complete construction could be accomplished without major property impacts, widening the travel lanes to at least 11 feet wide. Contextual sensitivity will be stressed in implementing these roadway improvements. Safety improvements have been identified for the following road segments: Carothers Road from South Carothers Parkway to Arno Road Del Rio Pike from Old Hillsboro Road to Cotton Lane Old Natchez Trace from Sneed Road to Old Hillsboro Road N Berrys Chapel Road from Hidden Valley Road to Holly Tree Gap Road Mobleys Cut Road from Leipers Creek Road to Johnson Hollow Road Johnson Hollow Road from Mobleys Cut Road to Carters Creek Pike Popes Chapel Road from Carters Creek Pike to Sugar Ridge Road County Roadways not in the Major Thoroughfare Plan Other functionally classified roadways not included in the Major Thoroughfare Plan list of projects have minimum right of way requirements. The right of way widths listed below are applicable when improvements to or development along a roadway not included in the Major Thoroughfare Plan occurs. The widths mentioned are total right of way, and will generally be measured symmetrically from the existing roadway centerline. Arterial: 96 Collector: 60 Safety: 50 Local: 50
GREENSBORO - HIGH POINT ROAD (SR 1486 / 4121)
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION GREENSBORO - HIGH POINT ROAD (SR 1486 / 4121) FROM PROPOSED US 311 BYPASS TO HILLTOP ROAD (SR 1424) TIP PROJECT U-2412 WBS Element 34802 Federal Project Number
MINUTES OF THE WILLIAMSON COUNTY REGIONAL PLANNING COMMISSION MEETING OF MARCH 13, 2008
MINUTES OF THE WILLIAMSON COUNTY REGIONAL PLANNING COMMISSION MEETING OF MARCH 13, 2008 MEMBERS PRESENT Don Crohan Susan Fisher Holli Givens John Lackey Steve Lane Robert Medaugh Pete Mosley Tom Murdic
Chapter 5. Transportation. Decatur County Comprehensive Plan. Introduction. Goals and Objectives. Goal. Objectives. Goal.
Chapter 5 Transportation Chapter 5: Transportation Introduction The transportation system forms the backbone of a community. I-74 connects Decatur County with the large metropolitan areas of Cincinnati
The financial plan was prepared in conjunction with the Technical Working Group. Refer to Table 3-1: Funding and Implementation Plan.
3 Financial Plan The purpose of the financial plan is to identify funding options that would be likely sources of money to advance recommendations made by this study. The Capitol Region Transportation
Roadway Cost Per Centerline Mile Revised June 2014
Rural Arterial From LRE MOT * Mobilization * Subtotal Total PE Design (15%) CEI (15%) Total Project ** New (2-Lane Roadway) with 5' Paved Shoulders $3,351,896 $335,190 $368,709 $4,055,794 $1,013,949 $5,069,743
HIGHWAY DEPARTMENT ACCESS AND RIGHT OF WAY WIDTH GUIDELINES
Approved 6/26/01 HIGHWAY DEPARTMENT ACCESS AND RIGHT OF WAY WIDTH GUIDELINES All new, modified and/or changed use access(es) onto county roads shall be subject to the access and corridor protection guidelines
DOUGLAS COUNTY RESOLUTION NO. 87-38 CITY OF LAWRENCE RESOLUTION NO. 5094
DOUGLAS COUNTY RESOLUTION NO. 87-38 CITY OF LAWRENCE RESOLUTION NO. 5094 A JOINT RESOLUTION OF THE GOVERNING BODIES OF DOUGLAS COUNTY AND THE CITY OF LAWRENCE CONCERNING THE SOUTH LAWRENCE TRAFFICWAY;
TOWN OF NEW HAVEN ROAD PLAN
1 TOWN OF NEW HAVEN ROAD PLAN BACKGROUND The Town of New Haven, Vermont consists of 42 square miles of land and a population of approximately 1400 people. At the start of the 21 st century, it is served
Effect on structures. Uniform settlement - no concerns. Angular distortion - causes damage due to tensile strain
Effect on structures Uniform settlement - no concerns Angular distortion - causes damage due to tensile strain 1/500 - safe limit for no cracking of buildings 1/150 - potential structural damage 36 37
Executive Director s Recommendation Commission Meeting: July 11, 2013
Executive Director s Recommendation Commission Meeting: July 11, 2013 PROJECT Russell Road Widening Phase 2 United States Marine Corps Base Quantico Prince William County, Virginia SUBMITTED BY United
The Northwest Arkansas Travel Demand Model
The Northwest Arkansas Travel Demand Model Creation and Results John McLarty Northwest Arkansas Regional Planning Commission Cristina Scarlat Center for Advanced Spatial Technologies What is a Travel Demand
Executive Summary. Transportation Needs CHAPTER. Existing Conditions
CHAPTER 1 Executive Summary The City of Forest Grove Transportation System Plan (TSP) was updated to keep it consistent with recent growth trends in the city and other transportation planning efforts in
STREET LIGHTING CONSTRUCTION DESIGN CRITERIA
STREET LIGHTING CONSTRUCTION DESIGN CRITERIA DC9-001 GENERAL. Proposed street lighting construction in the city of Olathe shall in all respects conform to the technical criteria for analysis and design
Section 6 Traffic Analysis
Section 6 Traffic Analysis Traffic Operations of the Preferred Network Alternative After the Preferred Network was identified and confirmed by local policy makers and area residents, detailed traffic analysis
INDOT 2000-2025 Long Range Plan
Chapter 9 INDOT 2000-2025 Long Range Plan Highway Needs Analysis Overview The statewide transportation planning process provides for the identification of highway needs through a comprehensive process
3.1 Historical Considerations
3. Recommended Scope of Bridge improvements 3.1 Historical Considerations In the fall of 2000, an outside consultant, Fraser Design, suggested that the existing 4 th St. Bridge is potentially eligible
(Last revised 06/15) Form MP 227 - Hauling Permit Geographical Regulations Applicable for Travel Thru Cities/Towns/Counties
(Last revised 06/15) Form MP 227 - Hauling Permit Geographical Regulations Applicable for Travel Thru Cities/Towns/Counties Except when travel is upon the Interstate Highway System, no travel is permitted
Stop The stop sign, a red octagon with white lettering, means come to a full stop and be sure the way is clear before proceeding.
Tr a f f i c S i g n s 7 7. TRAFFIC SIGNS Many collisions and near crashes occur as a result of drivers who ignore or fail to respond appropriately to traffic signs. It is essential that the meaning of
REGIONAL NON-MOTORIZED TRANSPORTATION NETWORK
Chapter 10 Bicycle and Pedestrian SAFETEA-LU legislation requires that non-motorized users be considered in the LRTP. The legislation allows for bicycle and pedestrian safety to be incorporated into the
GTA Cordon Count Program
Transportation Trends 2001-2011 Executive Summary Project No. TR12 0722 September 2013 1.0 Introduction The Cordon Count program was established to collect traffic data as a tool for measuring travel trends
Colorado Off-System Bridge Program Description and Guidelines for Selecting Bridges for Rehabilitation or Replacement Funding
C Colorado Off-System Bridge Program Description and Guidelines for Selecting Bridges for Rehabilitation or Replacement Funding These guidelines are intended to provide assistance in selecting OFF-SYSTEM
14-97. 14-97.002 Definitions. For the purposes of this rule chapter the following definitions shall apply unless the context clearly shows otherwise:
14-97 14-97.001 Purpose. This rule chapter sets forth an access control classification system and access management standards to implement the State Highway System Access Management Act of 1988. The implementation
CITY OF ROANOKE AND TOWN OF VINTON, VIRGINIA. RSTP Funds Joint Application FOR
CITY OF ROANOKE AND TOWN OF VINTON, VIRGINIA RSTP Funds Joint Application FOR Tinker Creek Pedestrian Bridge: Tinker Creek and Glade Creek Greenways Connection Date: September 15, 2014 RSTP Project Profile
5.14 Floodplains and Drainage/Hydrology
I-70 East Final EIS 5.14 Floodplains and Drainage/Hydrology 5.14 Floodplains and Drainage/Hydrology This section discusses floodplain and drainage/hydrology resources and explains why they are important
DESIGN ASSISTANCE APPLICATION
DESIGN ASSISTANCE APPLICATION for FY 2016 NEW RIVER MULTI USE PATH: PINNACLE PEAK ROAD TO HAPPY VALLEY ROAD CITY OF PEORIA APPLICATIONS ARE DUE VIA ONLINE SUBMITTAL BY 10:00 AM ON MONDAY, JUNE 29, 2015
General Obligation Bond Projects FYE 2013-2018
General Obligation Bond Projects FYE 2013-2018 2009 City of Norman Community Survey Final Report 2011 CTP Survey Results Storm Drainage and Street Widening Projects Combined Storm Water/Transportation
Sector Design Concepts
Section C Sector Design Concepts C7 Sector 7 Great North Road Underpass 6 6 6 C7. Existing situation Sector 7 refers to the cut and cover section of the project linking the northern end of the deep tunnels
Phases 2 & 3, & Addendum Urban Structure Plan Options for West Whitby
7. 5 A d v a n t a g e s a n d D i s a d v a n t a g e s Table 22 summarizes the advantages and disadvantages of each option based on the evaluation of Table 16. Dillon Consulting Limited Page 75 Table
Eagle Commuter Rail Denver, Colorado Final Design (Based upon information received by FTA in November 2010)
Eagle Commuter Rail Denver, Colorado Final Design (Based upon information received by FTA in November 2010) Summary Description Proposed Project: Electrified Commuter Rail 30.2 Miles, 13 Stations Total
Texas Motor Speedway Area Master Plan January 2009 WATER INFRASTRUCTURE
WATER AND SEWER INFRASTRUCTURE Water and Sewer Infrastructure in the TMS Study Area Streets and other transportation infrastructure are addressed in Chapter 6 of this plan. Non-transportation infrastructure
Corridor Goals and Objectives
Corridor Goals and Objectives This chapter presents the goals and objectives, developed by the Corridor Study Committee, that serve as the purpose and intent of the Corridor Plan. This plan covers a twenty
Surface Transportation Program (STP) Projects
Toledo Metropolitan Area Council of Governments American Reinvestment and Recovery Act (Economic Stimulus Program) Application Packet for: Surface Transportation Program (STP) Projects APPLICATIONS DUE
Chapter 4 TRANSPORTATION A BACKGROUND AND ANALYSIS
Chapter 4 TRANSPORTATION A lthough the Virginia Department of Transportation (VDOT) has primary responsibility for the highway system, Tappahannock is a strong partner in transportation planning. This
Examples of Transportation Plan Goals, Objectives and Performance Measures
Examples of Transportation Plan Goals, Objectives and Performance Measures The next step in the Long Range Transportation Plan (LRTP) process is to develop goals, objectives, and performance measures.
ROUTE 178 CORRIDOR STUDY. Prepared For: KERN COG, CALTRANS, CITY OF BAKERSFIELD
ROUTE 178 CORRIDOR STUDY Prepared For: KERN COG, CALTRANS, CITY OF BAKERSFIELD Prepared By: Barton-Aschman Associates, Inc. December 1986 TABLE OF CONTENTS 1. INTRODUCTION 1 Study Background 1 Study Purpose
Multi Modal Roadway Transportation Impact Fees and Asset Value
January 2010 SB 360 Article Series: Factors to be Considered in Transitioning from a Road Impact Fee to a Mobility Fee Contributing Authors: Steven A. Tindale, P.E., AICP Robert P. Wallace, P.E., AICP
EXPERIENCE WITH GEOGRAPHIC INFORMATION SYSTEMS (GIS) / MAPPING
EXPERIENCE WITH GEOGRAPHIC INFORMATION SYSTEMS (GIS) / MAPPING TEC has performed many GPS/GIS inventory projects and studies for the Ohio Department of Transportation (ODOT), Counties, and municipalities.
EPA Technical Assistance for Sustainable Communities Building Blocks
EPA Technical Assistance for Sustainable Communities Technical Assistance Tool: Complete Streets Deerfield Beach, Florida February 16, 2012 To: CC: Amanda Martinez, City of Deerfield Beach Roger Millar,
D3 April 8, 2015 Public Hearing
D3 April 8, 2015 Public Hearing APPLICANT AND PROPERTY OWNER: ASSEMBLY OF YAH, INC. STAFF PLANNER: Kevin Kemp REQUEST: Conditional Use Permit (Religious Facility - church) ADDRESS / DESCRIPTION: 5151 Locke
TRANSPORTATION SERVICE STANDARDS ELEMENT GOALS, OBJECTIVES & POLICIES
TRANSPORTATION SERVICE STANDARDS ELEMENT GOALS, OBJECTIVES & POLICIES Background One of the most critical public services provided by a community is the community s transportation system. An effective
Mercer County Multi-Modal Transportation Plan Year 2025 Travel Demand Model
Mercer County Multi-Modal Transportation Plan Year 2025 Travel Demand Model Prepared For West Virginia Department of Transportation Transportation Planning Division Building 5, Room 824 1900 Kanawha Blvd.
Transportation Network Analysis. A. Overview
Transportation Network Analysis A. Overview The goal of this analysis is to evaluate existing roadways and specific intersections within the County. The focus will be on areas identified as probable growth
PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013
PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 NAME LOCATION Audubon Properties, LLC. 4700 & 4960 Dauphin Island Parkway West side of Dauphin Island Parkway, 580
SECTION 2 CORRIDOR A
SECTION 2 CORRIDOR A 2.1 CORRIDOR A (HILLSBOROUGH RIVER TO 40 TH STREET IN TAMPA) The boundaries for Corridor A can be seen in Figure 2-1. They are as follows: North: I-4 South: Crosstown Expressway (now
HERS_IN. HIGHWAY ECONOMIC REQUIREMENTS SYSTEM (for) INDIANA. AASHTO Transportation Estimator Association Conference October 16, 2001
AASHTO Transportation Estimator Association Conference October 16, 2001 HERS_IN HIGHWAY ECONOMIC REQUIREMENTS SYSTEM (for) INDIANA OVERVIEW HERS Background System Planning Tool Development HERS_IN Structure
0.0 Curb Radii Guidelines Version 1.0.2
Background In early 2014, Transportation Services initiated a review of the Division's design guidelines and standards to move our organization in a direction consistent with the transportation departments
Wilmington to Newark Commuter Rail Improvement Project
Wilmington to Newark Commuter Rail Improvement Project The Delaware Transit Corporation (DTC), a subsidiary of the Delaware Department of Transportation (DelDOT), is undertaking a rail capacity expansion
Downtown Vancouver Full Block For Sale 1.03 Acre Redevelopment Opportunity
FOR SALE E Mill Plain & E Main Street, Vancouver, WA E 16th St Main St Columbia St Washington St E 15th St E Mill Plain Blvd Downtown Vancouver Full Block For Sale 1.03 Acre Redevelopment Opportunity $2,00,000
2014 Vanderbilt Golf Camp Information
2014 Vanderbilt Golf Camp Information CAMP SCHEDULE Friday, August 1st 3:00pm 4:30pm 6:00-6:45pm 6:45-7:30pm 7:30pm 8:15pm- 10:00pm 10:00pm Registration/Check- in the Cool Springs Embassy Suites Go over
TABLE OF CONTENTS. Executive Summary 1-3. Introduction 4-6. Illustrative Site Plan 7. East-West Streets 8. Cooper Street 9-10. Market Street 11-14
TABLE OF CONTENTS Executive Summary 1-3 Introduction 4-6 Illustrative Site Plan 7 East-West Streets 8 Cooper Street 9-10 Market Street 11-14 Federal Street 15-16 MLK Boulevard 17-20 North-South Streets
100 Design Controls and Exceptions
Table of Contents 100 Introduction... 1 101 Functional Classification... 1 101.1 General... 1 101.2 Urban & Rural... 1 101.3 Classification Used In ODOT Design Criteria... 1 102 Traffic Data... 2 102.1
Comment #1: Provide an interchange at Route 7 and Farm Market Road/White Gate Road. This was studied in the late 1990 s.
Proposed Truck Climbing Lane Route 7 Westbound Between West Market Street and Route 9 UPC# 58599, Project # 6007-053-133, P101 Date of Meeting: August 24, 2010 Time: 6:00PM to 8:00PM Location: Rust Library
THE COMMONWEALTH OF MASSACHUSETTS MASSACHUSETTS HIGHWAY DEPARTMENT PROJECT INITIATION FORM (PIF)
THE COMMONWEALTH OF MASSACHUSETTS MASSACHUSETTS HIGHWAY DEPARTMENT PROJECT INITIATION FORM (PIF) To: From: Contact Information: Roland Bartl, Planning, Town of Acton, 472 Main St. Acton MA 01440; 978-264-9639;
TH 23 Access Management Study Richmond to Paynesville
TH 23 Access Management Study Richmond to Paynesville Prepared For: Minnesota Department of Transportation District 8 Prepared By: Short Elliott Hendrickson Inc. July 2015 Table of Contents I. Introduction...
3 Tappan Zee Bridge Rehabilitation Options
3 Tappan Zee Bridge Rehabilitation Options 3.1 Introduction This chapter describes possible options that rehabilitate and enhance the existing Tappan Zee Bridge. Four Rehabilitation Options have been developed:
Paul Deutsch. NDDOT Office of Project Development Conference November 9, 2010
Paul Deutsch NDDOT Office of Project Development Conference November 9, 2010 What is a Horizontal Curve? Provides a transition between two tangent lengths of roadway. PI PC PT PC (Point of Curvature at
REST HOME & ASSISTED LIVING CABARRUS COUNTY
REST HOME & ASSISTED LIVING CABARRUS COUNTY Updated 7/3/08 BIG ELM RETIREMENT CENTER 1310 Glenn Avenue Medicaid (704) 932-0000 (ask for Admissions Director) Directions: Depart NorthEast Medical Center
Transportation Policy and Design Strategies. Freight Intensive. Level of Freight Presence
Appendix G Transportation Policy and Design Strategies CONTEXT SENSITIVE SOLUTIONS To address the need to describe freight systems which account for the population distress which may result, an analysis
Caledon Transportation Needs Study. Study Report
Caledon Transportation Needs Study Study Report March 2009 PROJECT SUMMARY PROJECT NAME:...CALEDON TRANSPORTATION NEEDS STUDY UPDATE CLIENT:... THE TOWN OF CALEDON & THE REGIONAL MUNICIPALITY OF PEEL CALEDON
HIGHLAND COUNTY OHIO WE RE OPEN FOR BUSINESS
HIGHLAND COUNTY OHIO WE RE OPEN FOR BUSINESS Overview: Highland County is a wonderful blend of both agriculture and industry. The historic influence of farming communities carries on today with area residents
AIR QUALITY TECHNICAL MEMORANDUM
AIR QUALITY TECHNICAL MEMORANDUM AIR QUALITY TECHNICAL MEMORANDUM GOLDEN GLADES INTERCHANGE PD&E STUDY Miami-Dade County, Florida Financial Management Number: 428358-1-22-01 Efficient Transportation Decision
Southwest Light Rail Transit Minneapolis-St. Paul, Minnesota New Starts Project Development (Rating Assigned November 2014)
Southwest Light Rail Transit Minneapolis-St. Paul, Minnesota New Starts Project Development (Rating Assigned November 2014) Summary Description Proposed Project: Light Rail Transit 15.7 Miles, 17 Stations
COUNTY OF ALBEMARLE PLANNING STAFF REPORT SUMMARY. Staff: Claudette Grant
COUNTY OF ALBEMARLE PLANNING STAFF REPORT SUMMARY Project Name: ZMA 2013-00004 Hollymead Town Center Block VI Planning Commission Public Hearing: July 29, 2014 Staff: Claudette Grant Board of Supervisors
Strategic Regional Transit Plan
Strategic Regional Transit Plan December 2008 Chapter 6: Run Time nalysis (Chapter 6 originally prepared October 2007) RUN TIME NLYSIS TLE OF CONTENTS 1.0 INTRODUCTION... 1 2.0 SCREEN TWO LTERNTIVES...
CHAPTERTWO. Alternatives 2.1 ALTERNATIVES DEVELOPMENT PROCESS
2. Section 2 TWO CHAPTERTWO 2.1 ALTERNATIVES DEVELOPMENT PROCESS This EIS has been prepared in compliance with the Council on Environmental Quality (CEQ) regulations for implementing NEPA (40 CFR 1500-1508).
MAP 21 themes. Strengthens America s highway and public transportation systems. Supports the Department s aggressive safety agenda
MAP 21 themes Strengthens America s highway and public transportation systems Creates jobs and supports economic growth Supports the Department s aggressive safety agenda Simplifies and focuses the Federal
CUSTOMS BROKER EXAM REVIEW COURSE LOCATION/DIRECTIONS ATLANTA CHARLESTON CHARLOTTE DALLAS LOS ANGELES NEW YORK WASHINGTON, D.C.
CUSTOMS BROKER EXAM REVIEW COURSE LOCATION/DIRECTIONS ATLANTA CHARLESTON CHARLOTTE DALLAS LOS ANGELES NEW YORK WASHINGTON, D.C. DIRECTIONS: ATLANTA One Atlantic Center 1201 West Peachtree Street Atlanta,
SR-18 Corridor Improvements in Wood County
Public Meeting Information Package SR- Corridor Improvements in Wood County Thursday, May 19, 2011 10:00 a.m. to 1:00 p.m. Meeting Location: Hancock-Wood Electric Cooperative Building 1399 Business Park
1. REPORT CONTEXT Description of the development (include all of the following that are known at the time of the application):
Transportation Assessment and Management Study Guidelines for Consultants INTRODUCTION This document is intended to provide guidelines for transportation consultants who produce Transportation reports
A Break Even Analysis and Potential Profitability of a Proposed Residential Development within the City of La Crosse, Wisconsin USA
A Break Even Analysis and Potential Profitability of a Proposed Residential Development within the City of La Crosse, Wisconsin USA Chad M. Clower Department of Resource Analysis, Saint Mary s University
Citizen Advisory Group Meeting #1 December 8, 2011 6:00 p.m.
Citizen Advisory Group Meeting #1 December 8, 2011 6:00 p.m. Meeting Agenda 1. Background Information 2. Policy Framework 3. Plan Development Process 4. Public Input Results 5. Vision Statement 6. Group
Chapter Forty-seven. RURAL TWO-LANE/MULTILANE STATE HIGHWAYS (New Construction/Reconstruction) BUREAU OF DESIGN AND ENVIRONMENT MANUAL
Chapter Forty-seven RURAL TWO-LANE/MULTILANE STATE HIGHWAYS (New Construction/Reconstruction) BUREAU OF DESIGN AND ENVIRONMENT MANUAL Illinois RURAL TWO-LANE/MULTILANE STATE HIGHWAYS December 2009 2 Illinois
Narrative Response/Attachment 1 (WisDOT 2014-2018 TAP- Second Round Application ID-SWBP22)
Narrative Response/Attachment 1 (WisDOT 2014-2018 TAP- Second Round Application ID-SWBP22) 2. For Bicycle and Pedestrian Projects: Clearly indicate the location, length, width, surface materials, and any
APPLICATION LAFAYETTE METROPOLITAN PLANNING ORGANIZATION (MPO) SURFACE TRANSPORTATION PROGRAM (STP) FUNDS TRANSPORTATION IMPROVEMENT PROGRAM (TIP)
APPLICATION LAFAYETTE METROPOLITAN PLANNING ORGANIZATION (MPO) SURFACE TRANSPORTATION PROGRAM (STP) FUNDS TRANSPORTATION IMPROVEMENT PROGRAM (TIP) To be considered for STP funding, a proposed project must
SPECIAL USE PERMIT 22-01. JCSA Groundwater Treatment Facility Staff Report for the November 5, 2001, Planning Commission Public Hearing
SPECIAL USE PERMIT 22-01. JCSA Groundwater Treatment Facility Staff Report for the November 5, 2001, Planning Commission Public Hearing This report is prepared by the James City County Planning Division
Introduction & Welcome
Proposed SM Wright Freeway Redevelopment Dallas District Halff Associates Baker Consulting Associates April 28, 2009 Introduction & Welcome Alva Baker Baker Consulting Associates Page 1 Project Overview
Evaluation of the Shared-Use Arrow
Evaluation of the Shared-Use Arrow Table of Contents Page Evaluation of the Shared-Use ARROW Background... 1 ARROW Design... 1 ARROW Placement... 2 Wayne E. Pein William W. Hunter J. Richard Stewart Report
Accident Analysis of Sheridan Road between Isabella Street and South Boulevard
Accident Analysis of Sheridan Road between Isabella Street and South Boulevard Prepared for TranSystems Corporation for the City of Evanston Submitted by Regina Webster & Associates, Inc. Date: 08/15/2008