THERMOTEK MODIFIED BITUMEN TORCH MEMBRANE OVER POLYSOCYANURATE SYSTEM DESCRIPTION TORCH SYSTEM OVER POLYISO (15,17,19 YR) TH/BS-TH/CS
|
|
- Jasper Parker
- 7 years ago
- Views:
Transcription
1 OPTIONAL TITLE 24 CRITICAL POINTS POLYISO THERMOTEK MODIFIED BITUMEN TORCH MEMBRANE OVER POLYSOCYANURATE DESCRIPTION TORCH OVER POLYISO (5,7,9 YR) TH/BS-TH/CS 2 No 0. SUBSTRATE. THERMOTEK USA PRO 2.0 FV TORCH SMOOTH 2. THERMOTEK USA PRO FP TORCH GRANULE COMPONENTS AND WEIGHTS Product Warranty Coverage (00 sq. ft.) THERMOTEK USA PRO 2.0 FV SMOOTH 50 sq ft Dry Weight Lb 5 years 7 years 9 years 5 years 7 years 9 years 4.0 mm 4.5 mm 5.0 mm 4.0 mm 4.5 mm 5.0 mm 46.9 LB/SQ 0 Dry Mils Mils 2 THERMOTEK USA PRO FP GRANULE 89 sq ft LB/SQ LB/SQ 20.5 LB/SQ Mils 77.7 Mils Mils LB/SQ LB/SQ LB/SQ Mils Mils Mils THERMOTEK DURAMASTIC THERMOTEK USA PRO 2.0 FV SMOOTH SILVER + GOLD + PLATINUM + SILVER + GOLD + PLATINUM + THERMOTEK COATING gallons 6.24 LB/SQ 7.25 LB/SQ 7.67 LB/SQ 6.86 Mils 8.06 Mils 8.2 Mils 2 THERMOTEK COATING gallons 6.24 LB/SQ 7.25 LB/SQ 7.67 LB/SQ 6.86 Mils 8.06 Mils 8.2 Mils ADD TO ADDITIONAL WARRANTY ( + YEARS ) LB/SQ LB/SQ LB/SQ Mils +6.2 Mils +6.4 Mils + 0 years + years + 2 years + 0 years + years + 2 years Note: Detail system information in file TORCH OVER POLYISO(5,7,9 YR) SA/BS-SA/CS (attached USB.)
2 PART GENERAL. GENERAL This document provides specifications for the application of product to roofing surface. This specification should be used only as a general guide, with the addition of specific details as different job conditions warrant. These tools include roofing products, coverage rate, installation procedures with THERMOTEK Roofing Products and complementary products. Final determination of the fitness of the application of any THERMOTEK product shall not be made by anyone other than an authorized representative of THERMOTEK Roofing Products..2 APPLICABLE PUBLICATIONS: The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only. A. American Society for Testing and Materials Publication (ASTM) B. Underwriters Laboratories Inc. (U.L.) C. CRRC Cool Roof Rating Council D. California Building Standards Code - Title 24 E. THERMOTEK Details, Drawings and Notes.3 QUALITY CONTROL A. Warranty: The contractor shall warrant 5 years, from the date of completion of the work by waterproof system is free from defects in materials and workmanship, all work repairs during this period must be performed by the contractor. Any additional warranty must be provided by the contractor to the owner. B. The manufacturer shall certify that the materials submitted have been used in like application and that they have been actively engaged in the manufacture of these materials for a minimum period of 3 years prior to Submittals, as required. The manufacturer shall certify that the contractor is authorized and approved for the Application of their materials. C. Applicator Qualifications ) The applicator shall have general knowledge and general understanding of roofing as well as all THERMOTEK Roofing products for any given specified project. 2) For all warranties, a firm, which has complete business stability, shall perform the work in this section, present a copy of certification upon request by the Architect or the owner. 3) The installer, owner or Architect must review all the documents related all critical points and check list. 4) For different roofing details the installer, owner or Architect must contact a THERMOTEK roofing representative for details, terms and conditions for warranty, All issues concerning the roof must be resolved by written way..4 JOB CONDITIONS A. To proceed with proper conditions, the applicator must be aware of the following: ) UV curing time for all products is critical. The applicator must allow for sufficient cure time for each product. Please be aware that outside temperatures will be a factor. 2) Do not begin work if rain or heavy dew is expected within twenty-four to forty-eight (24-48) hours of application. 3) Do not begin work if temperatures are expected to fall below 50 degrees Fahrenheit and over 04 degrees Fahrenheit during the duration of the job. 4) Other environmental conditions such as humidity, mist, dew, extreme temperatures, and condensation can affect products in an inconsistent way..5 SUBMITTALS A. In the normal course of bidding, descriptive literature, technical data, and wet or dry samples of all materials proposed for use under this specification shall be submitted upon request..6 PRODUCT STORAGE AND HANDLING A. All products should be stored in a warm, dry, clean, well-ventilated area. Store above 40 degrees Fahrenheit at all times..7 PROTECTION OF PROPERTY: A. Contractor shall take proper precautions to protect owners property against damage and overspray. The use of shield boards, maskings and protective coverings shall be used as necessary. THERMOTEK is not responsible for damages caused by the overspray of any of its products. 2
3 OPTIONA L TITLE 24 CRITICA L POINTS No Product Warranty COMPONENTS AND WEIGHTS Coverage (00 sq. ft.) THERMOTEK USA PRO 2.0 FV SMOOTH 50 sq ft Dry Weight Lb 5 years 7 years 9 years 5 years 7 years 9 years 4.0 mm 4.5 mm 5.0 mm 4.0 mm 4.5 mm 5.0 mm 46.9 LB/SQ Dry Mils Mils 2 THERMOTEK USA PRO FP GRANULE 89 sq ft LB/SQ LB/SQ 20.5 LB/SQ Mils 77.7 Mils Mils LB/SQ LB/SQ LB/SQ Mils Mils Mils THERMOTEK DURAMASTIC THERMOTEK USA PRO 2.0 FV SMOOTH APPROXIMATE PART 2 PRODUCTS 2. MATERIALS A. THERMOTEK USA PRO 4.0, 4.5, 5.0 FP GRANULE. B. THERMOTEK USA PRO 2.0 FV Smooth SILVER + GOLD + PLATINUM + SILVER + GOLD + PLATINUM + THERMOTEK COATING gallons 6.24 LB/SQ 7.25 LB/SQ 7.67 LB/SQ 6.86 Mils 8.06 Mils 8.2 Mils 2 THERMOTEK COATING gallons 6.24 LB/SQ 7.25 LB/SQ 7.67 LB/SQ 6.86 Mils 8.06 Mils 8.2 Mils ADD TO ADDITIONAL WARRANTY ( + YEARS ) LB/SQ LB/SQ LB/SQ Mils +6.2 Mils +6.4 Mils + 0 years + years + 2 years + 0 years + years + 2 years A. THERMOTEK SILVER PLUS. B. THERMOTEK GOLD PLUS C. THERMOTEK PLATINUM PLUS 2.2 PRELIMINARY DETAIL INSPECTION Inspect Preliminary Work/Flashing Details for problem areas (e.g., gaps, cracks, fishmouths, air pockets, etc.) to ensure that work is complete and satisfactory. Inform Project Architect and THERMOTEK Technical Territory Representative when all preliminary work and flashing details will be complete and the Installer is ready to proceed with application of THERMOTEK ROOFGUARD Elastomeric Roofing Membrane. Allow a minimum of two weeks for the interim inspection. Any final roofing installation prior to this interim inspection is subject to rejection by the Project Architect and/or the THERMOTEK. Please be advised that technical on-site support for instructing certified contractors in the proper application of the THERMOTEK ROOFGUARD Roofing System is available. 2.3 PROCEDURE, COVERAGE RATE & APPLICATION INSTRUCTIONS. A. Surface Preparation: Surface to be repaired or coated must be clean, dry and free of dust, dirt, grease, wax, or other incompatible substances. THERMOTEK Modified Bitumen restoration System is approved for application over POLYISOCIANURATE roofs having positive drainage. ) All joints between layers should be staggered when multiple layers of insulation are installed. Insulation greater than 2.5 inches shall be installed in multiple layers. 2) Insulation shall be kept dry at all times. Install only as much insulation as can be covered with completed roofing membrane before the end of the day's work or prior to onset of inclement weather. 3) Edges shall butt tightly and all cuts shall fit neatly against adjoining surfaces to provide a smooth overall surface. Gaps of greater than /4 inch width shall be filled with insulation. 4) Install tapered insulation around roof drains and penetrations to provide adequate slope for proper drainage. 5) Mechanically attached insulation shall be fastened in accordance with FM Approvals requirements for the applicable geographic zone with the required number and type of fasteners and plates. Exception: where Polyglass requirements are more stringent than FM Approvals or third party manufacturers, Polyglass requirements shall be followed unless otherwise required by the applicable Code or Approval agency. 3
4 B. Apply Base Sheet THERMOTEK USA PRO 2.0 FV SMOOTH, the fasteners to attach must by inch (25mm) plus the thickness of the Polyisocianurate, the number of Fasteners varies from state to state, please refer the proper building code. ) The coverage rate for Base Sheet THERMOTEK USA PRO 2.0 FV SMOOTH is a.78 SQ (theoretical coverage). C. Review all critical points over the Surface and repair them with THERMOTEK DURAMASTIC or Base Sheet THERMOTEK 2.0 FV SMOOTH. D. Apply THERMOTEK USA PRO 2.0 FV SMOOTH torch. ) The coverage rate for THERMOTEK USA PRO 2.0 FV SMOOTH is a.3 SQ (theoretical coverage). E. Apply THERMOTEK USA PRO , 5.0 FP GRANULE Torch. ) The coverage rate for THERMOTEK USA PRO 4.0, 4.5, 5.0 FP GRANULE is a 0.89 SQ (theoretical coverage). F. Reflective Surfacing THERMOTEK ROOF COATING. ) The coverage rate for THERMOTEK ROOF COATING is a 2.0 gallons per 00 square feet, two coats of.00 gallon per 00 square feet each. G. The applicator shall repair and/or replace any defective work found at the end of the job, before any warranties will be issued. PART 3 WARRANTY* 3.0 WARRANTY A. This system is eligible for a. THERMOTEK USA PRO 2.0 FV SMOOTH + THERMOTEK USA PRO 4.0 FP GRANULE = 5 YEARS LIMITED WARRANTY 2. THERMOTEK USA PRO 2.0 FV SMOOTH + THERMOTEK USA PRO 4.5 FP GRANULE = 7 YEARS LIMITED WARRANTY 3. THERMOTEK USA PRO 2.0 FV SMOOTH + THERMOTEK USA PRO 5.0 FP GRANULE = 9 YEARS LIMITED WARRANTY B. This system is eligible for a TITLE 24. THERMOTEK USA PRO 2.0 FV SMOOTH + THERMOTEK USA PRO 4.0 FP GRANULE + THERMOTEK COATING SILVER PLUS = 5 YEARS LIMITED WARRANTY 2. THERMOTEK USA PRO 2.0 FV SMOOTH + THERMOTEK USA PRO 4.0 FP GRANULE + THERMOTEK COATING GOLD PLUS = 6 YEARS LIMITED WARRANTY 3. THERMOTEK USA PRO 2.0 FV SMOOTH + THERMOTEK USA PRO 4.0 FP GRANULE + THERMOTEK COATING PLATINUM PLUS = 7 YEARS LIMITED WARRANTY 4. THERMOTEK USA 2.0 FV SMOOTH + THERMOTEK USA PRO 4.5 FP GRANULE + THERMOTEK COATING SILVER PLUS = 7 YEARS LIMITED WARRANTY 5. THERMOTEK USA PRO 2.0 FV SMOOTH + THERMOTEK USA PRO 4.5 FP GRANULE + THERMOTEK COATING GOLD PLUS = 8 YEARS LIMITED WARRANTY 6. THERMOTEK USA PRO 2.0 FV SMOOTH + THERMOTEK USA PRO 4.5 FP GRANULE + THERMOTEK COATING PLATINUM PLUS = 9 YEARS LIMITED WARRANTY 7. THERMOTEK USA PRO 2.0 FV SMOOTH + THERMOTEK USA PRO 5.0 FP GRANULE + THERMOTEK COATING SILVER PLUS = 9 YEARS LIMITED WARRANTY 8. THERMOTEK USA PRO 2.0 FV SMOOTH + THERMOTEK USA PRO 5.0 FP GRANULE + THERMOTEK COATING GOLD PLUS = 20 YEARS LIMITED WARRANTY 9. THERMOTEK USA PRO 2.0 FV SMOOTH + THERMOTEK USA PRO 5.0 FP GRANULE + THERMOTEK COATING PLATINUM PLUS = 2 YEARS LIMITED WARRANTY Product Warranty a Product Warranty states that our product is free of any defects in manufacturing. THERMOTEK will replace the product when such product proves to be defective in manufacture as determined by THERMOTEK. PART 4 CARE AND MAINTENANCE 4.0 CARE AND MAINTENANCE PROGRAM In order to ensure that your THERMOTEK Roofing Products will continue to perform to its fullest, you should follow, implement and satisfy this Care and Maintenance program. A. Maintain a file for all records relating to this roof, including the THERMOTEK Roofing Products agreements, reports, invoices, repair and maintenance bills, original drawings and specifications, etc. B. Inspect the roof and coating at least twice each year, typically in the spring and fall. The most common areas of damage or distress are at drainage points, penetrations, perimeter flashings and in traffic areas. C. Pressure wash the coating as needed (and not less often than once every 2 months) in order to remove all dirt and debris on the surface. Wash using THERMOTEK WASH and clean water with appropriate pressure washing equipment 4
5 (500 psi feet away). Surface should be maintained in clean white condition. Do not use anything but clean water unless directed by THERMOTEK Roofing Products and in such case, use only approved wash products. D. Inspect for damage from the elements after severe weather conditions, such as hailstorms, heavy rains, high winds, acts of God, etc. E. Arrange for prompt repairs necessary to correct non-guaranteed conditions affecting the roof surface. Repairs to the surface must be promptly performed by THERMOTEK Roofing Products approved contractors with approved products and repair methods that are consistent with the type and quality of the warranted coating so that such repairs will last as long as the THERMOTEK Roofing Products. F. Regularly remove any debris, such as leaves, branches, dirt, rocks, bottles, refuse, that may accumulate on the roof surface. Clean gutters, downspouts, scuppers, and surrounding roof areas ensure proper drainage. G. Examine all metal flashings, counter flashings, expansion joints and pitch pockets for rust, detachment, deteriorated sealant, and damage. Reattach loose metalwork. Replace sealant as necessary. Prepare and paint rusted surfaces. H. Examine masonry walls and copings for cracks, bad mortar joints, deteriorated sealant, loose masonry/coping stones, and indications of water absorption. Repair all such conditions to prevent water infiltration. I. Examine rooftop equipment such as air conditioners, ductwork, gooseneck vents, powered ventilators, evaporative coolers, antennas, equipment screens, skylights, satellite dishes, etc. for excessive movement, spillage of coolant, condensation, oil, grease, water/liquid release, etc., and damage to sheet metal cabinets and rubber or fabric gaskets that may allow water infiltration. Employ, keep and maintain drainage systems for release of water, etc. from rooftop equipment to avoid surface water buildup. Keep all roof top equipment in good condition. J. Regularly examine for any cracks, blistering, or flaking. Promptly contact THERMOTEK Roofing Products representative regarding any such cracks, blistering or flaking and recoat/patch any such areas with approved THERMOTEK products. K. Minimize rooftop traffic. Establish paths which confine roof traffic to designated areas only. Service personnel should take care to avoid dropping tools, equipment, parts, etc. on the roof surface. Service personnel should not make any penetrations of or repairs to the coating. All work affecting the coating must be performed by an approved THERMOTEK Roofing Products contractor. This THERMOTEK Roofing Products Care and Maintenance information is intended to address conditions commonly found on buildings. Other conditions may exist that require special maintenance considerations. It is the responsibility of the Building Owner to ensure that the care and maintenance program followed for a particular building is adequate, given that building s specific conditions. END OF SECTION 5
THERMOTEK MODIFIED BITUMEN TORCH MEMBRANE OVER
THERMOTEK MODIFIED BITUMEN TORCH MEMBRANE OVER DESCRIPTION TORCH OVER (15,17,19 YR) TH/BS-TH/CS 2 1 0 No 0. SUBSTRATE 1. THERMOTEK USA 2.0 FV TORCH SMOOTH 2. THERMOTEK USA PRO FP TORCH GRANULE COMPONENTS
More informationTHERMOTEK SELF ADHESIVE MEMBRANE +G2 OVER WOOD SYSTEM DESCRIPTION SELF ADHESIVE OVER WOOD (8YR) BS-SA/CS
THERMOTEK SELF ADHESIVE MEMBRANE +G OVER DESCRIPTION SELF ADHESIVE OVER (8YR) BS-SA/CS 1 0 No 0. SUBSTRATE 1. BASE SHEET G FIBER GLASS BASE. THERMOTEK SELF ADHESIVE 3.0 FP GRANULE COMPONENTS AND WEIGHTS
More informationWESTERN COOL ROOF SYSTEMS Sustainable - Energy Efficient FLUID APPLIED REINFORCED ROOF SYSTEM
WESTERN COOL ROOF SYSTEMS Sustainable - Energy Efficient FLUID APPLIED REINFORCED ROOF SYSTEM SPECIFICATION NO. SMAA-2P-8xE UPGRADE SMOOTH SURFACE / CAP SHEET / SINGLE PLY 2 PLY POLYESTER REINFORCED ACRYLIC
More informationROOF INSPECTION & MAINTENANCE
Physical Plant Administration Facilities Maintenance Department ROOF INSPECTION & MAINTENANCE All roofs require periodic inspection and maintenance in order to perform as designed and to provide a long
More informationSECTION 07550 - MODIFIED BITUMINOUS MEMBRANE ROOFING. A. Vapor barrier (base ply); cover board at existing roof deck.
SECTION 07550 - PART I GENERAL 1.01 SECTION INCLUDES A. Vapor barrier (base ply); cover board at existing roof deck. B. Roof insulation at new roof deck. C. Modified bitumen membrane. D. Fluid applied
More informationCommercial Roof Inspection Form
Inspection Date: Inspector: Building Information Building ID: No.: Used For: Year Roof Applied: Building Description: Permanent Temporary Building Type: Retail Industrial Residential Building Name: Building
More informationMETAL ROOF RESTORATION SAMPLE DESIGN GUIDELINES
METAL ROOF RESTORATION SAMPLE DESIGN GUIDELINES REFLECTICLEAN ACRYLIC/URETHANE Elastomeric Roofing Systems, Inc 6900 Bleck Dr. Rockford, MN 55373 800.403.7747 -or- 763.565.6900 fax: 763.565.6901 email:
More informationColorado State University. Durrell Center Roof Repair
Colorado State University Durrell Center Roof Repair SPECIFICATION: POLYURETHANE FOAM ROOFING l.0 GENERAL REQUIREMENTS The successful application of a polyurethane foam roofing system is dependent upon
More informationSELF-INSPECTION CHECKLIST Maintain Your Roof and Identify Potential Issues With Bloom s Comprehensive Self-Inspection Guide
SELF-INSPECTION CHECKLIST Maintain Your Roof and Identify Potential Issues With Bloom s Comprehensive Self-Inspection Guide Inspection Questions? Call Bloom At 800-483-9932 www.bloomroofing.com DISCLAIMER
More informationTITLE: MASONRY PARAPET WALLS AND FLAT ROOF REQUIREMENTS 11/1/09
TITLE: MASONRY PARAPET WALLS AND FLAT ROOF REQUIREMENTS 11/1/09 PMT GUIDE # 10 Book of Order Section G-10.0102o: "The session is responsible for the mission and government of the particular church. It
More informationHow to repair your existing low slope flat roof.
How to repair your existing low slope flat roof. Recycled Rubber Roofing is not a "Roof Coating." It is a liquid emulsion used as the underlayment of a new or retrofit, built-up roofing system. One of
More informationSECTION 07720 PREFORMED METAL STANDING SEAM ROOFING
SECTION 07720 PREFORMED METAL STANDING SEAM ROOFING PART ONE GENERAL DESCRIPTION This section includes pre-formed standing seam metal roofing and related flashings, closures, trim and accessories including,
More informationBUILT-UP ROOF COATING SMOOTH and GRANULE SURFACE SPECIFICATION
07560 BUR BUILT-UP ROOF COATING SMOOTH and GRANULE SURFACE SPECIFICATION PART 1: GENERAL 1.01 SCOPE: To extend the useful service life of the aged or new asphalt built-up roof system and to reduce cooling
More informationCommercial Roof Management
Disclaimer: This material is designed and intended for general informational purposes only, and is not intended, nor shall it be construed or relied upon, as specific legal advice. Roof damage is a leading
More informationSECTION 07 61 13 STANDING SEAM METAL ROOFING
SECTION 07 61 13 STANDING SEAM METAL ROOFING PART 1 GENERAL 1.01 SCOPE OF WORK A. The Work shall include all labor, materials, equipment and supervision required to complete the work of the above referenced
More informationRe-Cover Board-3. Insulation for Above the Deck ROOF WALL SPECIALTY
Insulation for Above the Deck WALL SPECIALTY PRODUCT DESCRIPTION Rmax Re-Cover Board-3 is an energy-efficient thermal insulation board composed of a closed-cell polyisocyanurate (polyiso) foam core bonded
More informationHEB 38 BLANCO AND WEST AVENUE FLUID APPLIED EPDM RUBBER ROOF RECOVERY SYSTEM APPLICATION
HEB 38 BLANCO AND WEST AVENUE FLUID APPLIED EPDM RUBBER ROOF RECOVERY SYSTEM APPLICATION David Marut TEST CASE REPORT July 1, 2014 Case Study Pro Guard EPDM Super Coat Liquid Rubber Membrane Roof System
More informationBuilding Owners Guide to a Duro-Last System!
Building Owners Guide to a Duro-Last System Table of Contents Section 1: Introduction to Duro-Last Roofing Systems Section 2: Benefits of a Duro-Last Roofing System Section 3: Comparing a Duro-Last Roof
More informationFIRESTOPPING & SMOKE SEALS
SPECIFICATION SECTION 07 84 00 FIRESTOPPING & SMOKE SEALS 1 GENERAL 1.1 SECTION INCLUDES 1.1.1 Comply with Division 1, General Requirements and Documents referred to therein. 1.1.2 It is the intent of
More informationA. This Section includes rubberized asphalt sheet membrane waterproofing systems.
SECTION 07110 SHEET MEMBRANE WATERPROOFING PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification
More informationStandard Method for Sampling and Analysis of. of Chlorine Containing Bleaches. Soap Products
GUIDE SPECIFICATION FOR GENERAL CLEANING AND REMOVAL OF MOLD AND MILDEW ON EXTERIOR INSULATED AND FINISH SYSTEMS AND STUCCO DIVISION 07240 and DIVISION 09240 8/05 PART I: GENERAL 1.01 DESCRIPTION AND SCOPE
More informationRECOATING AND RENEWING SPF ROOFING SYSTEMS
RECOATING AND RENEWING SPF ROOFING SYSTEMS Procedures, Regional Differences and type of coating systems Bruce Schenke Premium Spray Products REASONS TO RECOAT/RENEW Add a new coating layer to renew the
More informationNEOGARD. Preventive Maintenance Manual
NEOGARD Preventive Maintenance Manual Fluid-Applied Roof Coating Systems December 2014 Notes NEOGARD luid-applied roof coating systems are designed to be long lasting, monolithic membranes which provide
More informationRead and understand all installation instructions and precautions before installing. GENERAL APPLICATION INSTRUCTIONS
AC TOPSEAL SELF-ADHERED, GRANULAR SURFACED, SINGLE PLY, LOW SLOPE ROLLED ROOFING 3 X 33.3 = 100 SQ. FT. 10 YEAR MATERIAL LIMITED WARRANTY For Use on Porches / Sheds / Utility Buildings / Accessory Buildings
More informationSWD URETHANE COATED FOAM ROOFING SYSTEM MASTER ROOF SPECIFICATION SECTION 075700
SWD URETHANE COATED FOAM ROOFING SYSTEM MASTER ROOF SPECIFICATION SECTION 075700 Part 1 GENERAL SUMMARY Section Includes: Coated foam roofing system and acceptable alternative applications as specified
More informationClear Fork Valley Local School District. Roofing Repairs Spring/Summer 2015
Clear Fork Valley Local School District Roofing Repairs Spring/Summer 2015 Instructions to Bidders: Public Notice To Bidders (ORC 3313.46) Notice is hereby given that sealed bids will be received at the
More information!!! !!!! !!! !!! !!! !!! !!!!!!!!! Table of Contents! Section 1: Most Common Types of Flat Roofing! Section 2: Better Understand Your Flat Roof!
Table of Contents Section 1: Most Common Types of Flat Roofing Section 2: Better Understand Your Flat Roof Section 3: Flat Roofing Cost in 2015: Four Factors that Dictate Section 4: Planning A Flat Roofing
More informationSCENIC VIEW SV 10 SECTION 08 87 13 SOLAR CONTROL FILMS
PART 1 GENERAL SCENIC VIEW SV 10 SECTION 08 87 13 SOLAR CONTROL FILMS 1.1 SUMMARY A. Optically clear dual reflective, neutral sputtered and aluminum metallized polyester film for solar control. 1.2 RELATED
More informationRoof Maintenance Scope of Work
Roof Maintenance Scope of Work Reviewed By: Approved By: Version 3.0 Date 08-09-07 Author K. Vandenbussche 1 BACKGROUND The Integrated Service Provider s program will provide superior on-site equipment,
More informationNRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS
NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS The (NRDCA) has prepared this document to provide customers and installers information that the industry
More informationTARRANT COUNTY DETAIL STANDARDS
TARRANT COUNTY DETAIL STANDARDS 1. Standard Coping 2. Coping at End Wall 3. Standard Sheet Metal Engagement Details 4. Gravel Guard 5. Gravel Guard Wall Termination 6. Gravel Guard, Gutter, and Downspout
More informationSECTION 07530 SINGLE PLY MEMBRANE ROOFING. 4. Minor repair to adjacent clay tile roofing and flashings.
SECTION 07530 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section includes the flowing: 1. Removal of existing roofing membrane. Existing bur roof has one overlay and penetration mastic is asbestos containing.
More informationUNIVERSITY OF WASHINGTON Facilities Services Design Guide. Architectural. Roofing. Basis of Design
Basis of Design This section applies to roofing membranes, flashing and accessories. Design Criteria Adhere to the standards and details of the latest editions of the National Contractors Association (NRCA)
More informationSECTION 07 57 16 CEMENTITIOUS COATED FOAMED ROOFING
SECTION 07 57 16 CEMENTITIOUS COATED FOAMED ROOFING PART 1 GENERAL 1.01 SUBMITTALS A. Product Data: Submit manufacturer's literature and technical data (specifications, installation instructions and evidence
More information1. Adhered KEE membrane roofing system. 2. Mechanically fastened KEE membrane roofing system.
SECTION 075416 - PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Adhered KEE membrane roofing system. 2. Mechanically fastened KEE membrane roofing system. 1.2 PERFORMANCE REQUIREMENTS A. Solar Reflectance
More informationWastewater Capital Projects Management Standard Construction Specification
CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 10.1 Precast Concrete Pipe 10.1.1 General This section covers material requirements,
More informationFOUNDATION INSULATING SYSTEM, INCLUDING WATERPROOFING AND DAMP PROOFING
FOUNDATION INSULATING SYSTEM, INCLUDING WATERPROOFING AND DAMP PROOFING insulation installed on foundation walls must be separated from the building interior with a code approved thermal barrier. Foam
More informationALPHA 15-Year Permathane II FR w/granules
ALPHA 15-Year Permathane II FR w/granules Section 07 57 13 Sprayed Polyurethane Foam Roofing Guide Specification PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Furnish all labor, materials, tools and
More informationBLACK JACK ALL WEATHER ROOF COATING
PAGE: 1 of 6 PRINT DATE: 16/09/2004 BLACK JACK ALL WEATHER ROOF COATING DESCRIPTION BLACK JACK ALL WEATHER ROOF COATING is a solvent based, full bodied black brushable compound with added fibres for reinforcement.
More informationWATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12
WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12 87 88 GOOD INDUSTRY PRACTICES 12 WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12.1 BACKGROUND Most roofs in Singapore are constructed using reinforced
More informationITEM 599.06060008 THERMOPLASTIC MEMBRANE ROOFING
DESCRIPTION Construct adhered membrane roofing system, roof insulation, and vapor retarder in accordance with these specifications. MATERIALS: General: Provide installed roofing membrane and base flashings
More informationMaintenance & Inspection Guide
ADDRESSING THE NEEDS OF OUR CUSTOMERS AND THE ENVIRONMENT ONE high Performance roofing SOLUTION AT A TIME. Maintenance & Inspection Guide TABLE OF CONTENTS Topic: Page: I. Introduction 1 II. Maintenance
More informationABOVE ALL, IT S A ROOF SERVICED BY THE JAMES MYERS COMPANY
ABOVE ALL, IT S A ROOF SERVICED BY THE JAMES MYERS COMPANY BEAM A Premiere Roof Asset Management Program WITH BEAM WE CAN HELP YOU MAINTAIN AND PROTECT THE ROOF THAT PROTECTS YOU. A FRAGILE BARRIER Consider
More informationRoofing Repairs 07511-1
SECTION 07511 ROOF AND FLASHING RESTORATION WITH TITLE 24 / COOL ROOF SURFACING PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the contract, including General and Supplementary
More informationSWEPCO HEAVY DUTY POLYMASTER ROOF SYSTEM 201
31 SC: 33 SWEPCO POLYMASTER ROOF SYSTEM 201 APPLICATION SPECIFICATIONS IMPORTANT -- These application specifications are provided for the use of all persons who are to apply SWEPCO Products. Please read
More informationGeorgia State University. Urban Life Building Roof Replacement
ENGINEERING AND ENVIRONMENTAL 140 DECATUR STREET SE, ATLANTA, GA 30303 GEORGIA STATE UNIVERSITY - FACILITIES DESIGN & CONSTRUCTION 34 BROAD STREET, SUITE 100 ATLANTA, GA 30303 DRAWING INDEX A-0 PROJECT
More informationWater Damage & Repair
Water Damage & Repair Chinatown Preservation Talks 2015 James Engler, P.A Glenn Mason, AIA Mason Architects Program Outline Terminology & Waterproofing Basics Discussion of why this is important Below
More informationRoof Repair Project Report. Fairbank Complex 40 Fairbank Road Sudbury, Massachusetts. February 14, 2014. RBA Project No. 2014007.00.
Report Fairbank Complex 40 Fairbank Road RBA Project No. 2014007.00 Prepared by: 33 Center Street, 2 nd Floor Burlington, MA Tel: 781-273-1537 Fax: 781-273-1695 TABLE OF CONTENTS Roof Repair Project Report...
More informationBituminous Sheet Flat Roofs: Their repair and maintenance
Bituminous Sheet Flat Roofs: Their repair and maintenance Flat roof covered in sheets of bituminous felt Introduction Whilst flat roofs are often regarded as inferior to their pitched counterparts and
More informationAir-Conditioning, Heating, and Refrigeration Institute. Sheet Metal and Air-Conditioning Contractors National Association
Air-Conditioning, Heating, and Refrigeration Institute Sheet Metal and Air-Conditioning Contractors National Association GUIDELINE B-1997 ACKNOWLEDGEMENT These guidelines for Roof Mounted Outdoor Air-
More information07 5423-1 THERMOPLASTIC-POLYOLEFIN ROOFING (TPO) Data Center
PART 1 GENERAL 1.01 SECTION INCLUDES SECTION 07 5423 THERMOPLASTIC-POLYOLEFIN ROOFING (TPO) Data Center A. Tear off existing roof system down to wood deck and install new Thermoplastic membrane roofing
More informationThe Perfect Fit For Metal Retrofit
D u r o - S h i e l d M e t a l R e t r o f i t R o o f i n g S y s t e m The Perfect Fit For Metal Retrofit Lock out leaks. Lock in your investment. Has time caught up with your metal roof? There are
More informationCrescent Valley High School Roof Investigation
Crescent Valley High School Roof Investigation Project: Corvallis School District Crescent Valley High School Roof Date: July 26, 2011 Report By: Rowell Brokaw Architects: Mark Young, AIA, Chris Andrejko
More informationDurapax Coal Tar BUR Application Guide
400 Old Reading Pike, Suite 304 Pottstown, PA 19464 Tel: 610-579-9075 Fax: 610-323-0115 www.durapax.com Durapax Coal Tar BUR Application Guide DESIGN CONSIDERATIONS The proper specifications of any roof
More informationSECTION 07540 - THERMOPLASTIC MEMBRANE ROOFING
SECTION 07540 - THERMOPLASTIC MEMBRANE ROOFING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification
More informationSECTION 07 42 13 METAL WALL PANELS
Mitsubishi Plastics Composites America, Inc. 401 Volvo Parkway Chesapeake, VA 23320 Phone: (800) 422-7270 Fax: (757) 436-1896 E-mail: info@alpolic.com www.alpolic-northamerica.com This MANU-SPEC utilizes
More informationINDIAN HEAD ELEMENTARY SCHOOL
ROOF ASSESSMENT REPORT INDIAN HEAD ELEMENTARY SCHOOL NOVEMBER 08, 2010 PREPARED FOR: FACILITIES DEPARTMENT WHITMAN HANSON REGIONAL SCHOOL DISTRICT 1. Purpose This Roofing Assessment Report provides a summary
More informationGUIDE SPECIFICATION. Manufacturer: DECRA Roofing Systems, Inc.
GUIDE SPECIFICATION Manufacturer: DECRA Roofing Systems A Fletcher Building Company 1230 Railroad Street Corona, CA 92882 951-272-8180 phone 951-272-4476 facsimile www.decra.com SECTION 07314 [07 31 14]
More informationSINGLE FAMILY RESIDENCE HURRICANE MITIGATION APPLICATION
SINGLE FAMILY RESIDENCE HURRICANE MITIGATION APPLICATION As of October 1, 2007, this mitigation form must be submitted as part of the roofing permit application package. Secondary water barrier (if applicable)
More informationCITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN 55110 Fax: 651-429-8503. Re-Roofing: Asphalt Shingles
CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN 55110 Fax: 651-429-8503 Re-Roofing: Asphalt Shingles This is a summary of the standard requirements based on the
More informationDivision 9. SignaFlor Pad and Pour Flooring System
Division 9 SignaFlor Pad and Pour Flooring System SPECIFICATIONS Page 1. General... 2 1.1 Description 2 1.2 Quality Assurance 2 1.3 Submittals 2 1.4 Delivery and Storage 3 1.5 Warranty 3 1.6 Working Conditions
More informationREROOFING - SCOPE OF WORK
REROOFING - SCOPE OF WORK 1.0 GENERAL A. Summary of work: 1. Information herein is provided as a general overview of the project scope, and as such, does not grant authority for deviation from the manufacturers
More informationSECTION 07400 STANDING SEAM METAL ROOF
SECTION 07400 STANDING SEAM METAL ROOF PART 1 - GENERAL 1.01 SECTION INCLUDES A. Work described in this section includes pre-formed standing seam metal roofing system complete with clips, perimeter and
More informationCHAPTER VII. TITLE: STANDARDS FOR NEW ROOFING July 2015 CONSTRUCTION, RE-ROOFING CONSTRUCTION AND ROOFING SYSTEM GUARANTEE REQUIREMENTS
TITLE: STANDARDS FOR NEW ROOFING CONSTRUCTION, RE-ROOFING CONSTRUCTION AND ROOFING SYSTEM GUARANTEE REQUIREMENTS Responsible Organization: Office of Facilities Planning Instructions: This Manual supersedes
More informationThird Party Inspection Guidelines For Inspectors As Part of the dryvitcare EIFS Repair/Restoration
Third Party Inspection Guidelines For Inspectors As Part of the dryvitcare EIFS Repair/Restoration DS497 SECTION ONE A. Objective The objective of this guide is to provide owners and general contractors/construction
More informationSection 07540 BUILT UP ROOF (BUR) SPECIFICATION. 3 Coat Protocol. Material Only_10 yr Warranty
1480 Englewood Ave. www.elastikote.com Akron, Ohio 44305 330-669-2552 800-992-1053 Section 07540 3 Coat Protocol Page 2 of 16 Page 3 of 16 Environmentally Responsible LIQUID MEMBRANE SYSTEM Roof restoration
More informationRACKING AND ATTACHMENT CRITERIA FOR EFFECTIVE MEMBRANE ROOF SYSTEM INTEGRATION Public Version 1: July 9, 2012
RACKING AND ATTACHMENT CRITERIA FOR EFFECTIVE MEMBRANE ROOF SYSTEM INTEGRATION Public Version 1: July 9, 2012 Commercial rooftops represent the most available, sustainable and secure real estate for new
More informationWarranty Information TABLE OF CONTENTS PROCEDURES FOR WARRANTY 2
Warranty Information TABLE OF CONTENTS PROCEDURES FOR WARRANTY 2 PROTECTING YOUR DURO-LAST ROOFING 3 Safety Measures 3 Inspection 3 Maintenance Program 4 Sealants 4 Drainage 4 Parapets Walls 4 Building
More informationRooftop Matters. 2 0 1 2 Benchmark Report. Executive Summary
The 2012 Benchmark Report is our initial survey covering results from roof inspections and service calls over a six-month period. Our intention is to update these results annually in order to provide meaningful
More informationFLAT ROOF REPAIR CUT COST WITHOUT CUTTING CORNERS
FLAT ROOF REPAIR CUT COST WITHOUT CUTTING CORNERS Table of Contents Chapter 1: FLAT ROOF REPAIR - CUT COST WITHOUT CUTTING CORNERS Chapter 2: PVC RECOVER SYSTEM HOW IT WORKS Chapter 3: 8 STRATEGIES TO
More informationFIRESTONE BUILT-UP ROOFING SYSTEMS APPLICATION GUIDE 3/14/2011
FIRESTONE BUILT-UP ROOFING SYSTEMS APPLICATION GUIDE TABLE OF CONTENTS 2.01.1 GENERAL......2 2.02.1 JOB SITE CONSIDERATIONS (CAUTION AND WARNINGS)...2 2.03.1 ROOF SUBSTRATE PREPARATION...2 2.04.1 WOOD
More informationWhite rust on galvanized and galvanized pre-painted steel. Technical Information
Technical Information White rust on galvanised steel Prevention It is easier to prevent white rust than to cure it! Reasonable precautions to protect steel during both transport and storage can considerably
More informationCHAPTER 7: Building Systems ROOFING SYSTEMS
ROOFING SYSTEMS Purpose Examples 1. Shingle roof system 2. Metal roof with blanket insulation 3. Metal roof with rigid insulation 4. Built-up asphalt roof system 5. Single-ply roof system 6. Modified Bitumen
More informationROOF INSPECTION REPORT
ROOF INSPECTION REPORT Date: October 9, 2012 Requesting Firm: FIRST CHOICE INSPECTIONS Santiago Salazar Address: 447 Chilberg Court, San Jose, CA 95133 Phone #: 408-771-7563 Roof Inspected At: 1465 Gerlach
More informationResidential Roofing Guide
Residential Roofing Guide TABLE OF CONTENTS Building Detail and Accessories...... 1 Panel Introduction and Handling...... 2 Cutting and Trimming.... 3 Roof Preparation..... 3 Roof Slope..... 3 Re-roofing...
More informationbout your HOUSE before you start Repairing And Replacing Materials Exterior Walls
A bout your HOUSE before you start Repairing And Replacing Materials Exterior Walls CE 28 h Exterior finish materials are expected to protect the house from the elements while providing an attractive appearance.
More informationPrices Effective April 1, 2016
Domestic U.S. Warranty Pricing Guide Longer term warranties have additional installation requirements and not all warranty terms are available for all roofing specifications. Please refer to the Firestone
More informationSection 04810 EXTERIOR STONE VENEER Full Mortar
Full Mortar PART 1 GENERAL 1.1 SUMMARY A. Section includes: 1. Portland cement mortar bed 2. Stone Veneer 3. Expansion and control joints. 4. Portland cement and hydraulic mortar and grout. 5. Sealer and
More informationSeptember 3, 2009. Ric Boyd, Public Works Director Ketchikan Gateway Borough 344 Front St. Ketchikan, AK 99901
September 3, 2009 Ric Boyd, Public Works Director Ketchikan Gateway Borough 344 Front St. Ketchikan, AK 99901 RE: Ketchikan Gateway Borough Gateway Recreation Center Roof Observations and Intrusive Inspections
More informationThank You! Owner Aaron Perry! Email info@exteriorproinc.com! 2936 Clifty Drive! Madison IN 47250! (855) 274-0444! (812) 274-0444!
A properly installed and maintained flat roof can be one of a building s biggest assets while a leaking or failing roof can quickly become a building s biggest expense. We ve put this simple guide together
More informationBITUMINOUS ROOF COATINGS, CEMENTS, PRIMERS AND ADHESIVES
BITUMINOUS ROOF COATINGS, CEMENTS, PRIMERS AND ADHESIVES ABOUT POLYGLASS U.S.A., INC. MODIFIED CEMENTS & ADHESIVES MASTICS ALUMINUM COATINGS EMULSIONS & PRIMERS PROTECTIVE COATINGS Polyglass manufactures
More informationSECTION 08 41 1 ALUMINUM FRAMED ENTRANCES and STOREFRONTS. System 402 Flush-Glazed Screw Spline Storefront
PART 1 GENERAL 1.01 Work Included SECTION 08 41 1 ALUMINUM FRAMED ENTRANCES and STOREFRONTS System 402 Flush-Glazed Screw Spline Storefront A. Furnish and install aluminum architectural storefront system
More informationSECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS
SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS Section Page 36-1 GENERAL... 36.1 36-2 PIPEMAKING EQUIPMENT... 36.1 36-3 TRENCH EXCAVATION... 36.1 36-4 SPECIAL FOUNDATION TREATMENT...
More informationHHS J.W. Peavy Center Exterior Walls Waterproofing and Roof Replacement Project WBS # H-000018-0006-4 SECTION 07610 STANDING SEAM METAL ROOFING
PART 1 - GENERAL 1.01 DESCRIPTION SECTION 07610 A. Furnish and install a weather and watertight prefabricated standing seam roof system complete, in place, as shown on the drawings and as specified herein.
More informationSC2000 CEMENT BONDING PROCEDURES
Pg.1 SC2000 CEMENT BONDING PROCEDURES Widely recognized as the world s finest cold vulcanizing cement REMA SC2000 is the solution to your industrial bonding problems. By using REMA UTR20 hardener with
More informationWATERPROOFING FOR CONCRETE STRUCTURES
MANUAL OF CONTRACT DOCUMENTS FOR ROAD WORKS VOLUME 1 SPECIFICATION FOR ROAD WORKS SERIES 2000 WATERPROOFING FOR CONCRETE STRUCTURES Contents Clause Title Page 2001 General 2 2002 Protection of Bridge Deck
More informationOwner s Care & Maintenance Guide For Viridian Systems Roof Membranes
Owner s Guide For Viridian Systems Roof Membranes VIRIDIAN SYSTEMS ROOF MEMBRANE SYSTEM CARE & MAINTENANCE GUIDE TABLE OF CONTENTS A. INTRODUCTION... 2 B. PREVENTIVE MAINTENANCE... 2 C. LEAK INVESTIGATION...
More informationSECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND.
SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND. 623.10.1 Description. This work shall consist of preparing the surface,
More informationfoot skylight) is enough to knock a worker off their feet. A 10 mph wind gust on a 5 x 6 skylight develops a wind force of 270 lbs.
Skylight Installation Instructions This document provides instruction and guidelines for installation of both curb mount (CM) and self flashing (SF) unit skylights on flat, pitched (> or equal to 3/12
More informationGUIDE SPECIFICATION COMBINATION SURFACE SYSTEM FOR NEW HOT MIX ASPHALT TENNIS COURTS I. PART 1 - GENERAL
COMBINATION SURFACE SYSTEM FOR NEW HOT MIX ASPHALT TENNIS COURTS I. PART 1 - GENERAL 1.1 SUMMARY A. This section is a part of the entire set of Contract Documents and shall be coordinated with the applicable
More informationREQUEST FOR PROPOSALS
Page 1 of 6 REQUEST FOR PROPOSALS Issue Date: 2/19/2013 RFP# WHS-2013-001 Title: Services for roofing improvements and annual roof assessments, Windsor School Complex, State Street, Windsor, Vermont Issuer
More informationROOFS - Guidance for Repair, Maintenance and Replacement
ROOFS - Guidance for Repair, Maintenance and Replacement Guilford Association Architectural Committee ROOFING Slate and tile roofs are a critical design feature of Guilford homes. The homes were designed
More informationNEW ELECTRICAL SUBSTATION Building 300 SECTION 07 53 23 ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK
ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK PART 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to within
More informationJoseph Laquatra Cornell University
Joseph Laquatra Cornell University Animals get displaced during floods May enter homes If there is standing water in the home: Turn off power from a dry location if possible Don t turn power off or use
More informationReroof or Restore? The right decision can save weeks of time and thousands of dollars
APOC A DIVISION OF GARDNER - GIBSON 5903 Paramount Boulevard Long Beach, California 90805 Telephone (800) 562-5669 Fax (562) 423-9597 www.apoc.com THE FOLLOWING TECHNICAL ARTICLE WAS PUBLISHED IN A MAJOR
More informationSECTION XXXXXX TECHNICAL SPECIFICATIONS FOR INSTALLATION OF PROTECTIVE COATINGS FOR MANHOLES, WETWELLS, AND OTHER SANITARY SEWER STRUCTURES
1.00 PART 1 GENERAL 1.01 SCOPE A. It is the intent of this contract to install a 100% solids epoxy monolithic coating to the walls, benches and inverts of all manholes and the specified surfaces of other
More informationGigaCrete Specification PlasterMax
GigaCrete Inc. 6775 Speedway Blvd. Suite M105 Las Vegas, NV 89115 Ph (702) 643-6363 Fax (702) 643 1453 www.gigacrete.com GigaCrete Specification PlasterMax PlasterMax : Fire Rated Plaster for Direct Application
More informationTHERMAL AND MOISTURE PROTECTION 07100. WATERPROOFING
DIVISION 7 THERMAL AND MOISTURE PROTECTION 07100. WATERPROOFING 07110. MEMBRANE WATERPROOFING: The following are minimum requirements to assure adequately designed waterproofed floors for machine and equipment
More informationAPPLICATION INFORMATION FOR RESIDENTIAL ROOFING AND RESIDENTIAL ROOFING PACKET
Environmental Protection and Growth Management Department PERMITTING, LICENSING AND CONSUMER PROTECTION DIVISION 1 N. University Drive, Box #302 Plantation, Florida 33324 954-765-4400 www.broward.org/permittingandlicensing
More informationSTANDARD REQUIREMENTS FOR BONDING OR MECHANICAL ATTACHMENT OF INSULATION PANELS AND MECHANICAL ATTACHMENT OF ANCHOR AND/OR BASE SHEETS TO SUBSTRATES
ROOFING APPLICATION STANDARD (RAS) No. 117 STANDARD REQUIREMENTS FOR BONDING OR MECHANICAL ATTACHMENT OF INSULATION PANELS AND MECHANICAL ATTACHMENT OF ANCHOR AND/OR BASE SHEETS TO SUBSTRATES Scope 1.1.
More information