1 Resettlement Plan Document stage: Draft for consultation Project number: February 2015 NEP: Kathmandu Valley Water Supply Improvement Project (Additional Financing) Distribution Network Improvement (DNI) VII Prepared by the Kathmandu Upatyaka Khanepani Limited, Ministry of Urban Development, Government of Nepal for the Asian Development Bank. This resettlement plan is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

2 CURRENCY EQUIVALENTS (as of 12 February 2015) Currency unit Nepalese rupee (NRs/NRe) NRs1.00 = $ $1.00 = NRs ABBREVIATIONS ADB Asian Development Bank BDS Bulk Distribution System CAPC Community Awareness and Participant Consultant CDC Compensation Determination Committee CIRT Community Issues Resolution Team DNI Distribution Network Improvement DSC Design and supervising consultant EMP Environmental Management Plan GESI Gender Equity and Social Inclusion GRM Grievance Redress Mechanism KUKL Kathmandu Upatyaka Khanepani Limited KVWSMB Kathmandu Valley Water Supply Management Board lpcd liters per capita per day MOUD Ministry of Urban Development MWSDB Melamchi Water Supply Development Board NGO Non Governmental Organization PID Project Implementation Directorate PPTA Project Preparatory Technical Assistance RoW Right of Way SPS Safeguard Policy Statement VDC Village Development Council WEIGHTS AND MEASURES ha hectare km kilometer m meter m 2 square meter m 3 cubic meter mm millimeter MTD metric tons per day km 2 square kilometer

3 TABLE OF CONTENTS Page I. PROJECT DESCRIPTION 1 A. Background 1 B. Project Component 1 II. SCOPE OF LAND ACQUISITION AND RESETTLEMENT 3 III. SOCIO ECONOMIC INFORMATION AND PROFILE 5 A. Socioeconomic Profile of Kathmandu Valley 5 B. Gender Status and Considerations 7 IV. INFORMATION DISCLOSURE, CONSULTATION, AND PARTICIPATION 8 A. Public Consultation 8 B. Information Disclosure 9 C. Continued Consultation and Participation 9 V. GRIEVANCE REDRESS MECHANISM 10 VI. POLICY AND LEGAL FRAMEWORK 13 VII. ENTITLEMENTS, ASSISTANCE, AND BENEFITS 13 A. Eligibility 13 B. Entitlements 13 C. RP Updating, Implementation and Contract Awards 16 D. Determination of Compensation 17 VIII. INCOME RESTORATION AND REHABILITATION 18 IX. RESETTLEMENT BUDGET AND FINANCING PLAN 18 X. INSTITUTIONAL ARRANGEMENTS 19 XI. IMPLEMENTATION SCHEDULE 20 XII. MONITORING AND REPORTING 21 ANNEXES 1 Photographs 22 2 Sample ID Card for Entitled Persons 23 3 Sample Monitoring Indicators 24 4 Sample Questionnaire 25 5 Summary Procedures for Resettlement Planning 26 6 Attendance Sheet 27 7 Outline of Social Safeguards Monitoring Report 29 8 Google Map of Project Location 31 9 Endorsement of the Safeguards and Due Diligence Documents 32

4 I. PROJECT DESCRIPTION A. Background 1. The proposed additional financing of the Kathmandu Valley Water Supply Improvement Project 1 will support the ongoing efforts of the Government of Nepal towards improving the water supply services in Kathmandu Valley. The project will invest in bulk water transmission, water treatment plant capacity, and distribution network improvement (DNI) systems, and will complement the past and ongoing Asian Development Bank (ADB) financed projects. 2 The resultant synergy is expected to lead to increased efficiencies, greater improvement in service delivery, and higher impact on health outcomes and quality of life for inhabitants of Kathmandu Valley. 2. Kathmandu Valley is characterized by high urban population growth (5.3% per annum) and a high population density (estimated at about 2,800 persons per km). 3. The total population of Kathmandu Valley in 2011 is estimated at about 2.5 million. Rapid and largely unplanned urban growth, high population density, lack of sustainable water sources, and inadequate past investments in water supply infrastructure have resulted in abysmally poor availability and quality of drinking water. 4 Moreover, poor access to sanitation facilities, improper solid waste management systems, and groundwater and surface water pollution from untreated domestic sewage have caused increased disease incidence, health risks, and associated economic burdens disproportionately impacting the poor and vulnerable This is the draft resettlement plan for one specific package under the additional financing: DNI 7. It has been prepared to disclose the potential impacts that have been identified as a result of future works related to DNI 7 to be implemented by the Project Implementation Directorate of the Kathmandu Upatyaka Khanepani Limited (KUKL). The preliminary survey identified 23 businesses in the DNI 7 service area that are likely to be impacted during the pipe lying period. Final impact will be identified after detailed design and recorded in the updated RP. B. Project Component 4. DNI VII: The project will improve the distribution network and water supply services in the northern area of Kathmandu municipality within the ring road. The field survey for detailed design is complete and detailed design are ongoing. The works will improve water supply service by ensuring an adequate supply of potable water, in compliance with the KUKL operator license. The DNI area is 1, 722 ha. and will directly benefit approximately 118,352 people. The project includes the installation of more than 210 km of water distribution pipes, ranging in diameter from 50 mm to 500 mm. Most of these pipes will be within dense, narrow streets (one to two lane roads, with five to seven meter carriageways). Minor temporary disruption to businesses is anticipated in the DNI component. However, most streets will remain openand 1 The Kathmandu Valley Water Supply Improvement Project (KVWSIP) was approved on 16 September Loan 1820-NEP (SF): Melamchi Water Supply Project was approved on 21 December 2000 and became effective on 28 November Loans 2058/2059-NEP (SF): Kathmandu Valley Water Services Sector Development Program were approved on 18 December 2003 and became effective on 7 December Central Bureau of Statistics, Government of Nepal, A baseline survey done by CRISIL under PPTA 4893-NEP in September 2010 estimates water availability at 20 liters per capita per day (lpcd) and average duration of water supply at 0.4 hours per day. Kathmandu Upatyaka Khaneani Limited (KUKL), the operator, assesses the current availability as 45 lpcd. 5 Vulnerable groups include female-headed households and below poverty line households (According to the NLSS Survey 2011, an individual is considered poor if his/her per capita total annual consumptions is below Rs. 19,261.)

5 2 accessable to business. To further minimize business disruption, night works will also be conducted on narrow roads. Figure 1 Location Map 1. Table 1: Proposed Water Supply Project Investments Infrastructure Function Description Location Resettlement Impact Distribute 1. All pipes 150 Supply and a. Distribution treated mm in diameter complete pipes water to or above will be laying including customers, DI; distribution surface replacing pipes for improvement existing Kathmandu works in pipes and Metro Zone will trenches in the expanding range from 75 to alongside the 140 mm in public roads in: network diameter and will into areas be of DI or HD PE 2. Pipes mm in diameter will be used for trunk mains, and distribution mains dia = diameter, ha = hectares, m 3= cubic meter, mm = millimeter, km = kilometer. For linear works, temporary disruption to business activity leading to potential income loss is possible. Contractors will maintain access to extent possible to limit short-term impacts. Businesses will be compensated for lost income on fully closed streets, where customer access to shops is disrupted. An income survey will serve as the cut-off date. All businesses identified in the projectimpacted areas on the cut-off date will be entitled to compensation for their lost income based on the tax record or, in its absence, comparable rates from registered businesses of the same type with tax records. For shops not qualifying under these categories (hawkers, vendors, etc.), there is the option of using the actual income based on survey, followed by a verification of the income data based on comparable incomes in the project area.

6 3 II. SCOPE OF LAND ACQUISITION AND RESETTLEMENT 5. There is no land acquisition associated with the proposed component. The anticipated impacts include a few temporary disruptions to business activities and income in DNI area. 6 Temporary disruptions in the DNI area will be approximately one to four days. Based on the detailed design, the design and supervision consultant (DSC) Social Safeguard Expert will update the impacts and will indicate them in the updated resettlement plan (RP).Trench sections for DNI will be m in length. To avoid or limit the disturbance to the least extent possible, contractors are required to maintain access to shops. Mitigation measures will also be incorporated into their contracts and will be monitored by the construction supervision consultants. Economic impacts to businesses along the DNI routes are expected to be temporary and may be avoided and/or mitigated through good traffic management planning and implementation, night works, and maintaining access to shops during the construction period, as outlined in the Environmental Management Plan (EMP). 7 Under the DNI, some mobile hawkers and vendors, including those with stalls and temporary structures, will be assisted by contractors in moving to alternative locations during the short period of construction.they will also be allowed to return once the area is declared complete of construction, usually within seven days. In the event that road closure disrupts access to shops, compensation for lost income will be made for the time of disruption. 8 The Implementing Agency KUKL/PID is responsible for the implementation of the RP, including compensation and vendor assistance with sufficient budget. 6. Closing the roads during construction is not an option, as expressed by local authorities; therefore, good traffic management by the contractors in coordination with police, roads department, and communities is critical to ensure the smooth flow of vehicles, safe passage of pedestrians, and limited business impacts. The contractors will be required to maintain access to shops during trenching (metal planks, spaces, etc.), which is expected to take three to five days for larger sized pipes ( mm). For DNI workstrench stretches range between 50 m to 100 m, requiring one to four days for backfilling. DNI works will primarily use the hand digging method. The roads within the DNI areas are narrower (one to two lane roads, with five to seven meter carriageways).the pipes are also smaller in diameter, resulting to fewer disturbances to residents and businesses. Based on preliminary design, it is identified that 23 businesses will be impacted. Streets requiring full closure will be closed for about one to four days. Prior to construction, contractors and DSC, with the assistance of the community participation consultants (CAPC), will be required to provide at least one to two weeks advance notice, along with an awareness campaign involving local area committees (Tole committees). 7. Business Survey: In December 2014, a survey of businesses was undertaken in order to: (i) estimate the scale of temporary impacts during construction; (ii) develop a budget for compensation; and (iii) determine the daily income of different types of businesses and hawkers in the DNI service area. For the proper estimate of temporary impacts, the design team conducted a transect walk throughout the DNI service. The technical design team assisted in identifying potential businesses that will be affected during the pipe lying period. The narrow streets where partial disruption are expected have been selected. A total of 23 different types 6 In some areas along the ring road, works are proposed outside the carriageway or shoulder, while still within the RoW. 7 To ensure disturbance is minimized to the extent possible, contractors will be required to expedite works in front of businesses, provide pedestrian planks across trenches, manage traffic flows, conduct works at night, etc. 8 The full closure of roads is expected to be minimal under the project, and based on preliminary design, it is estimated that 23 shops in DNI area experience closure. Full closure is limited to DNI zones, where night works will also be considered to limit impacts. If closed, full closure is not expected to exceed 1-4 days.

7 4 were identified and interviewed in the DNI service area. The final alignments and impacts will be known in the detailed design of DNI area. DNI Area DNI Package VII (DNI A,B,C, G,H,I, J Table 2: Proposed DNI Works and Potential Impacts Size and length Estimated Road widths Level of period of access disturbance disruption to (low, businesses medium, DI pipe will be 150 to 300 mm 1-4 days 3-10 m Low high) and HDPE pipe will be 75 to 110 mm ad the total length 210 KM dia = diameter, DNI = Distribution Network Improvement, km = kilometer, m = meter, mm = millimeter. 8. The following mitigation measures are proposed in the EMP to avoid and/or reduce the impacts to businesses during linear pipe works: (i) (ii) (iii) (iv) (v) (vi) (vii) (viii) Provide at least one to two weeks prior advance notice to the community along the stretch and conduct awareness campaigns in coordination with contractor, DSC, and community participation consultant. Distribute project information. Maintain access by providing planks and leaving spaces for businesses and residents. Manage traffic flows in accordance with the traffic management plan prepared by the contractor, in coordination with local authorities and communities, and conduct works at night where possible. Limit the amount of time when trenches are open, and complete works quickly where lots of businesses are located. Avoid full street closure to the highest extent possible. Provide employment opportunity to the affected people. Place KUKL phone hotline in visible areas. Make community fully aware of grievance mechanism and provide contact information of PID and KUKL branch offices. Contractors will assist vendors and hawkers in shifting to alternative location and returning back after work completion. 9. Table 3 summarizes the occupants within selected proposed alignments of the DNI service area. Based on preliminary design, the technical team conducted a census survey in the DNI service area. The survey found out that the following businesses and vendors in DNI service area will experience full closure, thus affecting their business activities and requiring compensation.

8 5 Table 3: Types and number of potential affected businesses (DNI 7) S.N. Nature of Affected Business Number of Affected Income range Business 1 General Store 10 NRs /day 2 Small hotels/restaurants 3 NRs /day 3 Grocery 3 NRs /day 4 Meat shop 2 NRs /day 5 Beauty parlour 2 NRs /day 6 Tailoring 1 NRs 600/day 7 Tea Shop 1 NRs 300/day 8 Cold store 1 NRs 150/day Total The survey, based on preliminary design, identified 23 businesses in the DNI service area that will likely be impacted during the pipe lying period. After completion of the detailed design of DNI service area, DSC Safeguard Specialist will update the RP and submit to ADB for approval. All compensation will be paid by PID before the commencement of any civil work. In the proposed DNI service area, average daily income of potentially affected shops, after deducting rent, is NRs /day (or approximately USD 6.14/day). 9 During RP updating, final assessment on the impact of affected people will be finalized and costed. This will include the possible impacts that may occur to the daily workers in the affected business places, if any. III. SOCIO ECONOMIC INFORMATION AND PROFILE A. Socioeconomic Profile of Kathmandu Valley 11. The Kathmandu Valley includes the three districts of Kathmandu, Lalitpur, and Bhaktapur. These include one metropolitan city, one sub-metropolitan, and three municipalities of KUKL service area. Kathmandu Metropolitan area has the highest population and number of households, followed by Lalitpur sub-metropolitan, Madhyapurthimi, Kirtipur, and Bhaktapur municipalities as given in the Table 4. Metro/Sub-metro/ Municipality and VDCs covered Table 4: Household Profile in Kathmandu Valley Population Total Male Female Total household s Average size of household s Literac y rate Kathmandu Metro 511, , , , Kirtipur Municipality 36,476 29,126 65,602 19, Lalitpur Sub- Metro 113, , ,802 54, Bhaktapur Municipality 41,081 40,667 81,748 17, Madhyapur Thimi Municipality 42,723 40,313 83,036 20, Total 745, ,739 1,426, , VDC = Village Development Council. Source: Compiled from Census 2011, Central Bureau of Statistics. 12. The Sub Project Area The subproject area is located in the northern part of Kathmandu metropolitan city. The boundary of DNI service area is Dhobi khola opposite side of Om Hospital inside the Ring Road up to older bridge (Bhatke ko pul) through strait road backside Bhatbhateni, Police Head Quarter, Raj Darbar and Amrit Science Campus in South, Sorakhutte 9 The exchange rate used is $1.00 = NRs 98.72

9 6 to Bishnumati Khola bridge in West. From Sorakhutte Bishnumati Khola bridge to Ring Road back side of Gongabu Buspark in North and inside of Ring Road from Gongabu Buspark to Dhobi Khola this side of Om Hospital in East. The major settlement names are Baluwatar, Gairidhara, Lazimpat; Basundhara; Handigoan, Naxal; Lainchaur, Golkhapakha, Mehpi, Nayabazar; Samakhusi, Nayabasti, Kantimarg; Ranibari, Chandol. Dhumbarahi and Maharjgunj, etc. 13. Social classification. According to a 2011 census, the majority of the people living in the valley are Hindus (80%), followed by Buddhists (15%). The percentage of other religions in the valley is minimal. The households are divided into different ethnic groups (i.e. Newar, Brahmin, Chettri, Tamang, and Magar). These ethnic groups are not at the same level of socioeconomic development. In the Kathmandu Valley, Newar is considered an advanced indigenous people group. This group comprises about 40% of the valley population; followed by Brahmin (17%), Chhetri (20%), Tamang (7%), and Magar (3%). 14. Age. The economically active age group between 15 and 59 years constitutes about 71% of the valley population. The other main age group is between 0 and 14 years. Only about 7% of the population are over 60 years old. There are no significant differences in the percentage of age distribution in KUKL service areas. 15. Health. The number of health facilities owned by the government or provided by nongovernmental organizations (NGOs) and the private sector is relatively better in Kathmandu than in other districts. More health institutions are available in Kathmandu than in Lalitpur and Bhaktapur. However, the population served by the number of health institutions (hospital, PHCC/HC, HP, SHP, PHC outreach clinic, EPI clinic, NGO/INGO and FCHV) in Kathmandu is less (ratio is 1:951) than Lalitpur (1:739) and Bhaktapur (1:703). It shows that the number of health institutions is low in comparison to the size of the population in Kathmandu. 16. Education. The Kathmandu Valley has long been considered the centre of higher education in Nepal. In 2011, there were 6,783 primary to secondary school level and 438 higher secondary to college level education institutions. The number of students enrolled during the period at the high school and higher education levels in Kathmandu Valley were 1,276,318 and 582,786 respectively (s-cbs-2011and District &VDC profile of Nepal 2014/15). 17. Employment. The economy of the Kathmandu Valley is based on trade, commerce, and manufacturing industries like carpets and garments. Other economic sectors include foreign employment, agriculture, education, transport, hotels, and restaurants. Tourism is also a key component of the valley s economy. However, in the rural areas, the economy is still based on agriculture. 18. Economically active population. About 78% of the total population in the valley aged 15 and above are economically active (Census 2011). Majority of the population in the Kathmandu Valley are engaged in agriculture. The other major industries include manufacturing (24%), trade (42.6%), service (28.6%), and others (4.7%) (source-nlss statistical report vol- 2.2/2011). 19. Poverty. According to the 2001 census and the Nepal Human Development Report 2004, the poverty status of the Kathmandu Valley is lower than the national level. Table 5 indicates the human development index in the Kathmandu Valley compared with the national values.

10 7 Districts Table 5: Kathmandu Valley Development Indicators Human Development Human Poverty Index (HDI) Index (HPI) Gender-related Development Index (GDI) All Nepal Kathmandu * Lalitpur * Bhaktapur * GDI = Gender-related Development Index, HDI = Human Development Index, HPI = Human Poverty Index. Source: Census 2011, Nepal Human Development Report by UNDP 2014.*HDR/UNDP Slums and squatter settlements. The rapid population growth has created a number of slums and squatter settlements in the Kathmandu Valley. Table 6 summarizes the findings of a survey conducted by LICSU, KUKL in There were 39 squatter settlements and 137 slums in the Kathmandu Valley, where a population of 40,237 live in 8,846 households. Of these, 22% had no access to piped water supply and none had adequate sanitation. Table 6: Slums and Squatter Settlements in Kathmandu Valley Type of residence No. of households Total population Average household size Slums Bhaktapur Municipality 754 3, Madhyapur Thimi 382 1, Municipality Lalitpur Sub - Metropolitan 391 1, Kathmandu Metropolitan 3,784 16, Kirtipur Municipality 1,674 7, Squatters Kathmandu Metropolitan 1,861 8, Percentage of households without piped water supply Total 8,846 40, Source: Mapping of Slums, Squatters, and Stand Posts in Kathmandu Valley updated by LICSU, KUKL, June 2008, AVIYAAN Consulting (P) Ltd. 21. Vulnerability Status The vulnerability assessment was carried out during the survey. It was observed that none of the households are vulnerable in terms of income, disability, female headed, ethnic minority and old age. B. Gender Status and Considerations 22. The project will provide universal connections, including for poor and vulnerable households, including female-headed households. Employment will also be granted to females, with equal pay for men and women. In addition to the measures provided for addressing the gender concerns of the affected households, the resettlement plan will be implemented in consonance with the gender equity and social inclusion (GESI) plan for the project. 23. Women Headed Households According to the 2011 census, about 25.73% of households are female-headed. In the urban areas, it was a little bit more than the country as a whole (i.e % in 2011). The survey in the DNI area indicated that about 28% were femaleheaded households; of this figure, about 13% were widows.

11 8 24. Literacy There is still some difference in the literacy rate between male and female. It was found that about 71% of females were literate in comparison to 84% of the male population of the project area. 25. Economic Activity In the study area, about 24.48% of the women are housewife Only 20% of female household members are involved in income earning activities compared to 51% of the male members. They are involved particularly in the service sector, trade and business, and labor inside and outside the country. It has been reported that in addition to the economic activities outside the home, women are extensively involved in household activities like cooking, cleaning, washing clothes, child care, care of elderly, and others. 26. Decision Making: The respondents were also asked about women s involvement in household decision making pertaining to matters like finance, education, health care, purchase of assets, day to day household matters, social function, and others. It was found that women were involved in the decision making of almost all household matters. 27. Ownership: In most of the developing countries, family land and household assets have been owned by male population. In some cases, both male and female own land and assets through inheritance. However, in recent years, land ownership of women has increased in Nepal due to the government policy of 20% rebate/concession on land registration fees while purchasing land. Almost half of the households women in the survey own assets like land, houses, and other structures. Majority of them also keep money separately in the bank or elsewhere. 28. Participation: The participation of women in social, political, religious, and community gatherings in Nepal has increased in recent years. During the survey, respondents were asked about gender participation in community meetings. The percentage of female in social/religious gatherings was slightly more than the men; whereas tmen s participation in community gatherings is much higher than females. However, around 65% of male and 69% of female together participates in social/religious work. IV. INFORMATION DISCLOSURE, CONSULTATION, AND PARTICIPATION A. Public Consultation 29. An extensive consultation program with key stakeholders was carried out, in line with the requirements pertaining to environment and social considerations of ADB. The tools used for consultations were stakeholder meetings, interviews, structured questionnaires, and focus group discussions. These consultations provided inputs for identification of the felt needs of the communities and the relevant stakeholders. The public, business owners, and shopkeepers were informed about the possibility of disruption to the business. A number of household surveys and community consultations have been undertaken in DNI area as a part of the preparation of the report. The public was informed from time to time about the construction of reservoirs, water transmission lines, distribution of pipelines, and land acquisition, together with the project s resettlement, rehabilitation, and compensation modalities. 30. During the visits, potential areas that could experience partial/temporary disruption of roads/galli were identified; census income survey of shops and vendors were also conducted for assessing the average daily income. Consultations were held during the time of RP preparation in DNI service area. Vendors, and business owners were informed about the possibility of

12 9 disruption to the business. Table below 7 shows the date, location and detail of public consultations. Date No. of Participants 1 Dec. Male: Female:5 3 Dec Dec Dec Male:4 Female:4 Male:6 Female:2 Male:4 Female:3 Table 7 Summary of Public Consultations Location Participants Topic/issues attended discussed Samakhusi Local vendors, Local employment, teachers, local GRM Compensation people, for business disruption, quality of works, Basundhara Vendors, users Quality of Works, committee local Entitlements matrix, people construction time Sorakhuttee Lazimpat Local, vendors, local people Hawkers vendors, people local Wage discrimination, Compensation package, and common construction time Entitlement matrix, compensation providing authority construction time and GRM Information disseminated Priority to local in construction work, compensation will be provided based on entitlements and maintain quality Quality of works will be maintained and disseminate project entitlements, less traffic time No discrimination in wage rate, construction time will be in less traffic period and complete rehabilitation work immediately Discussed entitlement matrix, KUKL authority for compensation construction time will be in less traffic period and complete rehabilitation work immediately B. Information Disclosure 31. To provide for more transparency in planning and for further active involvement of affected people and other stakeholders, project information was disseminated through disclosure of the translated versions of the resettlement planning documents. The information was made available in public places, including the offices of PID, KUKL s main office and branch offices, contractor site office, and Ward Office of Kathmandu Metropolitan city. A copy of the final/updated RP will be disclosed on the ADB and project related websites, will be translated in local language, and will also be available from PID upon request. C. Continued Consultation and Participation 32. The PID has extended and expanded the consultation and disclosure process during the detailed design stage and will be continued during construction period of the project. CAPC has been recruited to ensure ongoing consultations and public awareness during project implementation. This has been coordinated with the PID, DSC, and contractors to ensure that communities are made fully aware of project activities in all stages of construction. The affected vendors and business will be made aware of their entitlement and compensation, if any, by the PID/DSC safeguards experts, in coordination with CAPC. A community awareness and participation plan was also prepared for the project and implementationsupport provided by CAPC, in coordination with the PID and DSC safeguards expert. Community groups such as TLO and vendor associations have been consulted and made aware of the civil works and project activities prior to construction.

13 10 V. GRIEVANCE REDRESS MECHANISM 33. A grievance redress mechanism (GRM) has been established (safeguard officer from PID, safeguard expert from DSC, CAPC, contractor and TLO member) in PID to receive, evaluate, and facilitate the resolution of affected people s concerns, complaints, and grievances about the social and environmental performance at the level of the project. A Community Issue Resolution Team (CIRT) is also established to address the grievances immediately in the field level. The Safeguard officer from PID has been assigned as coordinator for grievance handling. The name and contact number for GRM team has been mentioned in brochures and leaflets. The GRM aims to provide a trusted way to voice and resolve concerns linked to the project, and to be an effective way to address affected people s concerns 10. The GRM for the project is outlined below, and consists of four levels with time-bound schedules and specific persons to address grievances. (i.) (ii.) First level of GRM. The first level and most accessible and immediate contact for the fastest resolution of grievances by CIRT (contractors, CAPC, TLO member and DSC supervisor) on site. Prior to construction of any works, CAPC, DSC, and contractors are to hold local community meetings to notify the local residents and businesses of the temporary disturbance, and to inform them of the project. If a local area committee (tole committee) exists in the area, they should also be informed and made aware of the project. If any complaints arise, the contractors, DSC, and PID can immediately resolve the complaint on site, and if necessary, with the assistance of the local tole committee. The PID office can also be involved in grievance redress at this stage. The Contractor and CAPC office phone number will be posted in public areas within the project area and construction sites. Any person with a grievance related to the project works can contact the project to file a complaint. The CAPC consultants will document the complaint, and immediately address and resolve the issue with the contractor within one to two days, if the complaint remains unresolved at the field level. The assistance of the DSC safeguards specialists (the environmental specialist or social safeguards specialist) to help resolve the issue. The CAPC consultants will notify the PID safeguards unit that a complaint was received, and whether it was resolved. The CAPC will fully document the following information: (i) name of the person, (ii) date complaint was received, (iii) nature of complaint, (iv) location, and (v) how the complaint was resolved. Second level of GRM. Should the grievance remain unresolved, the CAPC consultants will forward the complaint to the PID safeguards unit. The person filing the grievance will be notified by the CAPC consultants that the grievance was forwarded to the PID safeguards unit. The PID safeguard unit Chief will address the grievance. Grievances will be resolved through continuous interactions with affected persons, and the PID will answer queries and resolve grievances regarding various issues, including environmental, social, or livelihood impacts. Corrective measures will be undertaken at the field level by the PID safeguards staff within seven days. The relevant safeguards unit staff will fully document the following information: (i) name of the person, (ii) date complaint was received, (iii) nature of complaint, (iv) location, and (v) how the complaint was resolved. 10 To date all issues has been resoved at the first level of GRM and managed by CAPC staff. Detail records of complaints received at this level are kept by the CAPC in the project data base.

14 11 (iii.) (iv.) Third level of GRM. Should the grievance remain unresolved, the PID project director will activate the third level of the GRM by referring the issue (with written documentation) to the local Grievance Redress Committee (GRC) of the KUKL, who will, based on review of the grievances, address them in consultation with the PID safeguards unit, project director, and affected persons. The local GRC will consist of members of the PID, affected persons, and local area committee, among others determined to provide impartial, balanced views on any issues. The GRC should consist of around five persons. A hearing will be called with the GRC, if necessary, where the affected person can present his or her concerns/issues. The process will promote conflict resolution through mediation. The local GRC will meet as necessary when there are grievances to be addressed. The local GRC will suggest corrective measures at the field level and assign clear responsibilities for implementing its decision within 15 days. The functions of the local GRC are as follows: (i) to provide support to affected persons on problems arising from environmental or social disruption, asset acquisition (if necessary), and eligibility for entitlements, compensation and assistance; (ii) to record grievances of affected persons, categorize and prioritize them, and provide solutions within 15 days; and (iii) to report to the aggrieved parties developments regarding their grievances and decisions of the GRC. The PID safeguards officers will be responsible for processing and placing all papers before the GRC, recording decisions, issuing minutes of the meetings, and taking follow-up action to see that formal orders are issued and the decisions carried out. Fourth level of GRM. In the event that a grievance is not addressed by the contractor, DSC, branch office, PID, or GRC, the affected person can seek legal redress of the grievance in the appropriate courts, the fourth level of the GRM, which is the formal legal court system. The grievance redress mechanism and procedure is depicted in Figure 2.

15 12 Figure 2: Grievance Redress Mechanism (GRM) Affected Person 1st Level Grievances Field Level: (CIRT) DSC Contractor, CAPC, 1-2 Days Grievance redressed Not Redressed 2nd Level Grievances PID Safeguards Unit 7 Days Grievance redressed Not Redressed 3rd Level Grievances Grievance Redress Committee 15 Days Grievance redressed Not Redressed 4th Level Grievances Higher Authority DSC= design and supervision consultant, GRM= grievance redress mechanism, PID= project implementation directorate.

16 13 VI. POLICY AND LEGAL FRAMEWORK 34. ADB Safeguards Policy Statement (2009). The three important elements of the ADB s Safeguards Policy Statement (SPS) are: (i) compensation to replace lost assets, livelihood, and income; (ii) assistance for relocation, including provision of relocation sites with appropriate facilities and services; and (iii) assistance for rehabilitation to achieve at least the same level of well-being with the project as without it. In addition, the absence of legal title to land should not be a bar to compensation. ADB SPS requires compensation prior to actual income loss. In cases where the contractors know which streets will be closed and for how long, compensation can be paid out to the businesses prior to construction. 35. Government of Nepal Laws. As there is no land acquisition, the government s policies, (i.e The Land Acquisition Act, 2034 of 1977) are not relevant for this project. The Government of Nepal has no policy to compensate for temporary impacts during construction. VII. ENTITLEMENTS, ASSISTANCE, AND BENEFITS A. Eligibility 36. Compensation eligibility is limited by a cut-off date as set for this project on the day of the beginning of the income survey (Appendix 5) prior to commencement of civil works. Once a contractor confirms that a road is likely to be fully closed (no access to traffic), the DSC social safeguards specialist will conduct an income survey of businesses along the relevant sections. 11 The DSC social safeguards specialist may recruit enumerators to assist in this activity. An income survey will serve as the cut-off date. All businesses identified in the project-impacted areas (sections ready for construction) on the cut-off date will be entitled to compensation for their lost income based on the tax record or, in its absence, comparable rates from registered businesses of the same type with tax records. For shops not qualifying under these categories (hawkers, vendors, etc.), there will be the option of using the actual income based on survey, followed by a verification of the income data based on comparable incomes in the project area. 37. Hawkers or business owners who settle in the affected areas after the cut-off date will not be eligible for compensation. They will, however, be given sufficient advance notice (at least one week), and will be requested to vacate premises and dismantle affected structures prior to project implementation. Contractors will provide shifting assistance to any vendors needing help. B. Entitlements 38. The entitlement matrix (Table 8) summarizes the main types of losses and the corresponding entitlements in accordance with the ADB policies. In addition to temporary impacts, the entitlement matrix also covers damages to structures during construction. The business experiencing full closure during the civil works are entitled to receive compensation. 11 Compensation is only applicable to businesses experiencing disturbance on fully closed roads.

17 14 Table 8: Entitlement Matrix Type of Loss Entitlement Unit Description of Entitlement and Implementation Procedures 1.Damages caused during construction 1.1 Government and private structures Titleholder Tenant Informal settlers on government land 2. Community facilities and resources 2.1 Loss of Local community community structures 2.2 Loss of drinking water and sanitation Where damages occur to private, community, or government property as a result of construction works, the cost of restoring these to at least their original condition will be the responsibility of the contractor as part of their contract. Restoration of affected community buildings and structures to at least previous condition, or replacement in areas identified in consultation with affected communities and relevant authorities will be carried out. Residents and businesses There will be immediate replacement and restoration of the water points. Remarks Extreme care should be taken by the contractors to avoid damaging any properties during construction. Compensation for the losses will be borne by the contractor. Extreme care should be taken by the contractors to avoid damaging any properties during construction. Compensation for the losses will be borne by the contractor. Community structures include service roads, inner roads, temples, footpaths/trails, culverts, and water points. The time gap between the construction of new system and transfer from the old system should be minimized. Alternative sources of water should be made available during the construction period. Responsibility Contractor/PID/DSC/CIRT Contractor/PID/DSC Contractor/PID/DSC/CIRT

18 15 Type of Loss Entitlement Unit Description of Entitlement and Implementation Procedures 3. Temporary loss of income 3.1 Temporary loss of business 3.2 Vulnerable persons 4. Structures 4.1 Temporary loss of structures in right of way Titleholder Licensed and nonlicensed vendors, and titled and non-titled households/tenants Daily worker of the affected business Female-headed, and below poverty line households, the annual poverty line data is NRs. 19,261 per capita/year or NRs 93,994 per household/year: NLSS Survey, 2011 Temporary or semipermanent structures or stalls that belong to licensed and non-licensed vendors, and titled and non-titled households Businesses are entitled to compensation for each day of disturbance on fully closed roads. An income survey will serve as the cut-off date. All businesses identified in the project-impacted areas (sections ready for construction) on the cut-off date will be entitled to compensation for their lost income based on the tax record or, in its absence, comparable rates from registered businesses of the same type with tax records. For shops not qualifying under these categories (hawkers, vendors, etc.), there is the option of using the actual income based on survey followed by a verification of the income data based on comparable incomes in the project area. Mobile hawkers and vendors will be assisted by contractors in moving to alternative locations during the period of construction. Vulnerable persons will be entitled to preferential employment (unskilled labor) under the project. Affected persons will: (i) receive advanced notice of at least 2 weeks; (ii) cash or in kind compensation for any damaged structures occurred during relocation (iii) have rights to salvage materials from structure; (iv) (iii)receive assistance in shifting to nearby location; and (v) (iv) be allowed to return to original site after completion of construction works. DSC = Design and Supervision Consultants, PID = Project Implementation Directorate Remarks An income survey prior to construction will serve as the cut-off date. Vulnerable persons will be identified during income survey, with the list given to PID and contractor. There will be temporary shifting for 5-7 days during period of construction. DSC CAPC and contractor will identify alternative site and help in shifting. Responsibility DSC/PID/CIRT DSC/PID/contractor Contractor/ DSC/PID/CIRT

19 16 C. RP Updating, Implementation and Contract Awards 39. Upon the completion of final detailed engineering design of each relevant project section by DSC engineers, the following activities will be conducted for RP finalization and implementation under the responsibility, coordination and supervision of PID social safeguard officer, supported by DSC resettlement specialist and CAPC staff: (i) (ii) (iii) (iv) (v) (vi) (vii) establish project cut-off date, and notification for areas/sections of the subproject where the final design is completed and the dates for civil works activities in the area; conduct consultations/ project information dissemination with the affected communities 12 ; conduct census to the final affected peoples (APs) and final business survey to determine the compensation unit rate of loss income to be received by the affected vendors/shop keepers 13 ; preparation of photo identity cards and issuance of ID cards to all eligible containing details, types of loss, and entitlement as early as possible to avoid encroachers and squatters after cutoff date. These identity cards will be verified by the PID safeguard team, DSC specialist, CAPC staff and the DPs with signatures of all involved; update and submitt the final RP containing the final impacts, final APs, and entitled compensation/ assistance to the identified APs in the sections where the final engineering design is completed and ready for construction to ADB for review and approval prior implementation; upon the completion of the ADB approved RP implementation, PID safeguards specialist will report to ADB on the completion of the RP implementation in the affected section(s) and issue notice to proceed (NTP) to the contractor to start working in the affected area; submit regular semiannual safeguards monitoring report to ADB for review and disclosure, which includes the RP updating and implementation progress; GRM records, if any, and ADB policy compliance during project implementation. 40. Award of contracts for civil works of this subproject will be based on the following conditions 14 : (i) (ii) upon completion of final RP with identified impacts based on final design for the entire subproject; or upon received confirmation report (due diligence report) that no involuntary resettlement (IR) impacts are identified in particular/relevant sections based on the final detailed design of that sections. Under this condition, the contractor will be given contract award with sectional release of the works. This means that the civil works will be limited to the sections that no IR impacts are identified. For sections where IR impacts are identified, the civil works will have to wait until the final RP for sections with IR impacts is prepared, endorsed by ADB, and 12 For sections that are confirmed will not have any impacts on IR (land/income), due diligence report will be preared and will be included in the semiannual safeguards monitoring report 13 One updated RP can consist of several DNI sections where the final designs are already completed. More than one final/updated RPs maybe prepared for this subproject 14 The appropriate option will be chosen based on the gravity of the IR issues of the subproject and the engineering design status.

20 17 implemented, and confirmed by the PID by the issuance of the NTP to the contractor. D. Determination of Compensation 41. Income. Businesses will be compensated for lost income on fully closed streets where customer access to shops is disrupted. 15 Once a contractor confirms a road is likely to be fully closed (with disruption to customer access), the DSC social safeguards specialist will conduct an income survey of businesses along the relevant sections. An income survey will serve as the cut-off date. All businesses identified in the project-impacted areas (sections ready for construction) on the cut-off date will be entitled to compensation for their lost income based on the tax record or, in its absence, comparable rates from registered businesses of the same type with tax records. For shops not qualifying under these categories (hawkers, vendors, etc.), there is the option of using the actual income based on survey followed by a verification of the income data based on comparable incomes in the project area. A summary table of resettlement procedures is presented in Appendix Compensation procedures. Paying compensation to the affected persons will involve the following steps: (i) (ii) (iii) (iv) (v) (vi) Step 1. Conduct public awareness and information dissemination prior to construction works. This is to be done by the community awareness and participation consultants. Step 2. In collaboration with the contractor, the DSC will identify the roads which will be fully closed and estimated period of closure. Two types of disturbance are anticipated from full closure of roads: (i) partial disturbance, where there is no vehicular access, but pedestrian access is maintained; or (ii) full disturbance, where there is no vehicular and no pedestrian access. Step 3. The DSC social specialist will then (i) conduct an income survey 16 of shops along sections of road closure identified for full closure; (ii) update the RP (identifying income and potential loss based on actual income losses); and (iii) send the updated RP to ADB for review and approval after detailed designs are complete. Step 4. After ADB approval of the revised RP, the DSC safeguard specialist will distribute identity cards with compensation amount to the affected persons. Step 5. Affected persons can then collect payment at PID office or on site, based on PID discretion. Step 6. PID will issue checks to affected persons based on survey record and identity card prior to construction works (if feasible). All payments will be recorded for accounting purposes with signature of affected person to verify 15 Compensation is only applicable to fully closed roads where customer access is disrupted leading to income loss. To the extent possible, contractors will identify these types of roads prior to construction. However, if during construction, a road not previously identified for full closure is unexpectedly required to be fully closed, inhibiting customer access, the contractor is to immediately notify the DSC social safeguard specialist and PID so that a rapid income survey can be conducted and compensation paid for period of disruption. 16 Compensation is based on lost income based on the tax record or, in its absence, comparable rates from registered businesses of the same type with tax records. For shops not qualifying under these categories (hawkers, vendors, etc.), there is the option of using the actual income based on survey followed by a verification of the income data based on comparable incomes in the project area. Compensation for daily workers of the affected business, if any, will also be included in the final computation in the updated RP.

21 18 payment made. The project director will closely monitor payments with PID accounting office. 43. Vendor Assistance Vendors requiring temporary shifting during construction period will be notified in advance and allowed to salvage all materials for temporary shifting to alternative location. They will be allowed to return to the original location after construction is declared complete. Vendor assistance will involve the following steps: (i) (ii) (iii) (iv) (v) step 1 - identification of impacted vendors based on detailed design by DSC social specialist and PID safeguards unit in coordination with contractor; step 2 - notification of vendors at least one to two weeks in advance; consultation with local vendor associations if any; step 3 - identification of alternative location nearby for affected vendors to continue their business; step 4 - assistance by contractor to shift to new location. Any damaged on affected mobile assets due to the relocation will be provided with additional assistance (cash or in kind); and step 5 - assistance by contractor to return to original location after construction works are completed. 44. Project Benefits The project will support the delivery of much-needed water to Kathmandu and its surroundings. The project will support KUKL in expanding water services in its service area, where affected businesses are among the beneficiaries. Moreover, the project will employ local people during implementation. VIII. INCOME RESTORATION AND REHABILITATION 45. Incomes of affected persons will be compensated based on the tax record or the actual income based on survey, as detailed in the entitlement matrix. Preferential employment will be offered to local people, with preference to affected persons. Any damage on movable assets of the affected vendors during relocation will be provided with additional assistance (cash or in kind) by the contractor(s). IX. RESETTLEMENT BUDGET AND FINANCING PLAN 46. The resettlement cost for the proposed project (Table 9) includes eligible compensation for temporary impacts on income. The government financing has provided funds to support all compensation for lost income. The total estimated resettlement cost for the project is NRs 63,078 (USD ) The Implementation Agency (KUKL-PID) has allocated sufficient budget and human resources to implement the RP. 47. The cost items are outlined below: (i) (ii) For linear works, temporary loss of income to shops and businesses due to disturbance caused by construction for roads fully closed. Businesses are entitled to income compensation on fully closed roads where customer access is inhibited. Vulnerable persons entitled to preferential treatment in project-related employment A list of names of vulnerable persons will be submitted by the DSC to PID and contractors.

22 The compensation budget is estimated impact identified based on preliminary design. During detailed design stage, the number of days of full closure will be more clearly known and actual impact could be identified. Once the detailed design is completed, the DSC Social Safeguard Specialist will conduct final RP survey and update RP based on final design. Construction on the closed roads will not commence until compensation is fully provided. It is estimated that a total of 23 shops in the DNI area will be potentially impacted. The total estimated resettlement budget is NRs 63,078 (USD ). Table 9 provides details of the costs. Table 9: Summary of Compensation Costs 18 Item Estimated number Daily Estimated number NRs USD 22 of days of compensation 19 Income (NRs) 20 of shops in DNI service area 21 Assistance for 4 income loss Income type I , Income type II , Income type III , TOTAL 23 62, DNI = Distribution Network Improvement, USD = United States Dollars. X. INSTITUTIONAL ARRANGEMENTS 49. The Ministry of Urban Development (MOUD) will be the executing agency responsible for overall strategic planning, guidance, and management of the project, and for ensuring compliance with loan covenants. As part of institutional reforms under the ongoing loans, three water and wastewater organizations were created: (i) Kathmandu Valley Water Supply Management Board (KVWSMB), the asset owner; (ii) KUKL, the asset operator and service provider; and (iii) Water Supply Tariff Fixation Commission, the regulator. KVWSMB will continue to discharge its responsibilities as asset owner of water supply and wastewater systems as well as monitoring the performance of KUKL, as provided in the lease and license agreement between KVWSMB and KUKL. PID will be the implementing agency, and responsible for: (i) project planning, implementation, monitoring, and supervision; (ii) reporting to MOUD, and ADB; and (iii) coordination of all activities in the project. The experience of PID, KUKL in implementing subproject 2 of the Melamchi Water Supply Project, Loan 2776, and Loan 3000 will be useful in taking advance action for the Project. For safeguards, the PID has 18 Other management cost associated with the implementation of resettlement plan, GRM and safeguard related issue is included in the original loan of KVWSIP. 19 Businesses are entitled to income compensation for each day of disturbance on fully closed roads. For budgeting purposes, it is estimated that streets will be closed for 4 days. Among the identified business no one of them are vulnerable. During implementation, income compensation is based on actual losses based on tax record or, in its absence, comparable rates from registered businesses of the same type with tax records. For shops not qualifying under these categories (hawkers, vendors, etc.), there is the option of using the actual income based on survey followed by a verification of the income data based on comparable incomes in the project area. 20 Estimated daily income is based on the rapid business survey conducted in the DNI areas in December, Compensation is based on actual income loss. The figures presented in Table 9 are for budget estimation purposes only and are purposefully conservative. 21 The DNI covers an area of about 3,139 ha, it is estimated t 23 shops will effected due to fully closed roads and 9orequired compensation and esimated for budgeting purposes. 22 The exchange rate used is $1.00 = NRs 99.30

23 20 an already established safeguards unit staffed with environmental, social, and legal specialists. The institutional roles and responsibilities are detailed in Table 10. Table 10: Institutional Roles and Responsibilities S.No. Activity Responsibility Project Initiation Stage 1 ADB website disclosure ADB 2 Disclosure of summary resettlement plan in local PID/DSC language 3 Finalization of BDS and DNI alignments PID/DSC 4 Update resettlement plan based on detailed design PID/DSC/ADB and send to ADB for review and approval prior to contract award. 5 Meetings at community/household level with displaced persons Contractor/DSC/community participation consultant Resettlement Plan Implementation 6 Contractor to identify roads for full closure Contractor 7 Detailed income survey on streets identified for full DSC closure 8 Calculation of compensation and entitlements PID/DSC 9 Award of checks for compensation PID 10 Contractor to begin works PID/Contractor 11 Grievances redressed PID/DSC/CAPC 12 Internal monitoring PID ADB = Asian Development Bank, BDS = Bulk Distribution System, DNI = Distribution Network Improvement, DSC = Design and Supervision Consultants, PID = Project Implementation Directorate. XI. IMPLEMENTATION SCHEDULE 50. Detailed design of DNI and BDS package is ongoing and reservoir is almost complete. Construction is scheduled to commence in Q and completed by end of The RP is to be updated after the completion of detailed design, and reviewed and approved by ADB prior to contract award. Civil works activity in the areas where IR impacts are identified should start only after the completion of final RP implementation/compensation provided, as confirmed by the PID/DSC safeguards team. The implementation schedule is shown in Figure 3 Design of DNI package RP updating, submission to ADB and contract award Implementation of RP Construction of DNI 7 Implementation of GESI/CAPP Figure 3 Resettlement Plan Implementation Schedule Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4

24 21 XII. MONITORING AND REPORTING 51. The DSC is to submit quarterly reports to PID, while the PID will submit semi-annual monitoring reports to ADB. If any unanticipated environmental and/or social risks and impacts arise during construction, implementation, or operation of the project that were not considered in the resettlement plan, the government is to promptly inform ADB of the occurrence of such risks or impacts, with detailed description of the event and proposed corrective action plan. The PID will report any actual or potential breach of compliance with the measures and requirements set forth in the RP promptly after becoming aware of the breach. The internal monitoring by PID will include: (i) administrative monitoring to ensure that all compensation as per the resettlement plan is paid, implementation is on schedule, and (ii) problems are dealt with on a timely basis. Sample ID cards, monitoring indicators, business survey, RP procedures, and outline of semiannual report are given in Annexes of this document. 52. Monitoring will also include the following: (i) (ii) (iii) (iv) consultations with affected persons; issues raised through the GRM; status of compensation amounts and all assistance; and progress of the resettlement.

25 22 Annex 1 Annex 1: Photographs Photo 1 Enumerator interviewing with hawker Photo 2 Narrow streets of DNI Area Photo 3 Vendors at streets Photo 4 Interviewing with shop owner

26 Annex 2: Sample Identity (ID) Card for Entitled Persons Annex 2 23

NEP: Kathmandu Valley Water Supply Improvement Project (Additional Financing) Small Works Package No 01/21

NEP: Kathmandu Valley Water Supply Improvement Project (Additional Financing) Small Works Package No 01/21 Due Diligence Report Document stage: Draft for consultation Project number: 34304-044 February 2015 NEP: Kathmandu Valley Water Supply Improvement Project (Additional Financing) Small Works Package 01/21

More information

Semi Annual Environmental Monitoring Report. July 2013 L2557/2558. SRI: Greater Colombo Wastewater Management Project

Semi Annual Environmental Monitoring Report. July 2013 L2557/2558. SRI: Greater Colombo Wastewater Management Project Semi Annual Environmental Monitoring Report July 2013 L2557/2558 SRI: Greater Colombo Wastewater Management Project This environmental monitoring report is a document of the borrower. The views expressed

More information

VIE: Second Upper Secondary Education Development Project (USEDP II) - Ha Giang Province

VIE: Second Upper Secondary Education Development Project (USEDP II) - Ha Giang Province Due Diligence Report November 2014 VIE: Second Upper Secondary Education Development Project (USEDP II) - Ha Giang Province Quyet Tien Upper Secondary School Prepared by the Ministry of Education and Training,

More information

Environmental Assessment and Review Framework (Updated) NEP: Kathmandu Valley Water Supply Improvement Project (Additional Financing)

Environmental Assessment and Review Framework (Updated) NEP: Kathmandu Valley Water Supply Improvement Project (Additional Financing) Environmental Assessment and Review Framework (Updated) Project Number: 32430 February 2015 NEP: Kathmandu Valley Water Supply Improvement Project (Additional Financing) Prepared by Department of Urban

More information

Environmental & Social Assessment Procedures Basics

Environmental & Social Assessment Procedures Basics African Development Bank Group Environmental & Social Assessment Procedures Basics For public sector operations Compliance & Safeguards Division (ORQR.3) safeguards@afdb.org AFRICAN DEVELOPMENT BANK GROUP

More information

NEWMONT GHANA GOLD LTD. AHAFO SOUTH PROJECT COMPLETION AUDIT TERMS OF REFERENCE RESETTLEMENT ACTION PLAN

NEWMONT GHANA GOLD LTD. AHAFO SOUTH PROJECT COMPLETION AUDIT TERMS OF REFERENCE RESETTLEMENT ACTION PLAN NEWMONT GHANA GOLD LTD. AHAFO SOUTH PROJECT COMPLETION AUDIT TERMS OF REFERENCE RESETTLEMENT ACTION PLAN November 2009 BACKGROUND Newmont Ghana Gold Ltd. (NGGL) has developed gold reserves at the Ahafo

More information

Performance Standard 8:

Performance Standard 8: Overview of Performance Standards on Environmental and Social Sustainability 1. IFC s Sustainability Framework articulates the Corporation s strategic commitment to sustainable development, and is an integral

More information

Section 7. Terms of Reference

Section 7. Terms of Reference APPENDIX-A TERMS OF REFERENCE UNION-LEVEL TECHNICAL ASSISTANCE TO PROVIDE INSTITUTIONAL SUPPORT TO THE MYANMAR NATIONAL COMMUNITY DRIVEN DEVELOPMENT PROJECT I. INTRODUCTION IDA GRANT H814MM FY 2013-16

More information

ANNEX 7.1 Guide to Land Acquisition and Compensation (GLAC) LAND ACQUISITION

ANNEX 7.1 Guide to Land Acquisition and Compensation (GLAC) LAND ACQUISITION ANNEX 7.1 Guide to Land Acquisition and Compensation (GLAC) LAND ACQUISITION Overview Expropriation is a legal way to enable the government or a public legal entity to use immovable assets owned by natural

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The Government of Azerbaijan, the Ministry of Transport and Baku Metro Company requested ADB to help improving its urban transport system and

More information

Grievance Management Guidance Note

Grievance Management Guidance Note May 2012 1 Grievance Management Guidance Note 1 EBRD S REQUIREMENTS 1.1 PERFORMANCE REQUIREMENT (PR) 10 INFORMATION DISCLOSURE AND STAKEHOLDER ENGAGEMENT Key Bank requirements relating to grievance management

More information

Supplementary Materials: The Status of Domestic Water Demand: Supply Deficit in the Kathmandu Valley, Nepal

Supplementary Materials: The Status of Domestic Water Demand: Supply Deficit in the Kathmandu Valley, Nepal Supplementary Materials: The Status of Domestic Water Demand: Supply Deficit in the Kathmandu Valley, Nepal Parmeshwar Udmale, Hiroshi Ishidaira, Bhesh Raj Thapa and Narendra Man Shakya 1. Data S1 of S6

More information

PR 5: Land Acquisition, Involuntary Resettlement and Economic Displacement

PR 5: Land Acquisition, Involuntary Resettlement and Economic Displacement 34 Environmental and Social Policy PR 5: Land Acquisition, Involuntary Resettlement and Economic Displacement Introduction 1. Involuntary resettlement refers both to physical displacement (relocation or

More information

EBRD Performance Requirement 7

EBRD Performance Requirement 7 EBRD Performance Requirement 7 Indigenous Peoples Introduction 1. This Performance Requirement (PR) recognises that projects can create opportunities for Indigenous Peoples to participate in and benefit

More information

Executive Summary Community Profiles

Executive Summary Community Profiles Executive Summary Community Profiles The Community Profiles focus on four study areas in Waco and compare the demographics in those study areas to the overall city. The study areas are North Waco area,

More information

GUIDELINES FOR IDENTIFICATION OF ELIGIBLE HOUSEHOLDS TO RECEIVE FOOD GRAINS AT SUBSIDIZED PRICES UNDER NATIONAL FOOD SECURITY ORDINANCE 2013

GUIDELINES FOR IDENTIFICATION OF ELIGIBLE HOUSEHOLDS TO RECEIVE FOOD GRAINS AT SUBSIDIZED PRICES UNDER NATIONAL FOOD SECURITY ORDINANCE 2013 GUIDELINES FOR IDENTIFICATION OF ELIGIBLE HOUSEHOLDS TO RECEIVE FOOD GRAINS AT SUBSIDIZED PRICES UNDER NATIONAL FOOD SECURITY ORDINANCE 2013 1. In case of most vulnerable & vulnerable households who are

More information

HOUSING AND LAND RIGHTS NETWORK H a b i t a t I n t e r n a t i o n a l C o a l i t i o n

HOUSING AND LAND RIGHTS NETWORK H a b i t a t I n t e r n a t i o n a l C o a l i t i o n HOUSING AND LAND RIGHTS NETWORK H a b i t a t I n t e r n a t i o n a l C o a l i t i o n National Habitat III Parallel-reporting Tool Evaluation of Habitat II Implementation Following the commitments

More information

Wisconsin Library Law: Chapter 43. Summaries of Sections

Wisconsin Library Law: Chapter 43. Summaries of Sections Wisconsin Library Law: Chapter 43 Summaries of Sections I. Legal Basis/Rationale and Library Definitions Legislature recognizes 1) the importance of free access to information and diversity of ideas, 2)

More information

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: The Democratic Socialist Republic of Sri Lanka Project: New Bridge Construction Project over the Kelani River

More information

Resettlement Policy Framework

Resettlement Policy Framework Wuhan Intelligent Transportation Demonstration Project, a subproject of the World Bank-funded Wuhan Urban Circle Transportation Integration Demonstration Project Resettlement Policy Framework Wuhan Municipal

More information

PUBLIC SERVICE COMMISSION

PUBLIC SERVICE COMMISSION ANNEX A PUBLIC SERVICE COMMISSION Open Merit Based Recruitment and Selection Guideline 1 1.0 OBJECTIVES 1.1 The objectives of this guideline are to: Define Merit and provide the policy basis for Permanent

More information

Cambodia: Flood Damage Emergency Reconstruction Project

Cambodia: Flood Damage Emergency Reconstruction Project Social Monitoring Report Project Number: 46009 March 2013 Cambodia: Flood Damage Emergency Reconstruction Project First Annual Report on Resettlement Prepared by Consultant of Project Coordination and

More information

JAMAICA SOCIAL INVESTMENT FUND LAND ACQUISITION AND RESETTLEMENT POLICY FRAMEWORK

JAMAICA SOCIAL INVESTMENT FUND LAND ACQUISITION AND RESETTLEMENT POLICY FRAMEWORK Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized JAMAICA SOCIAL INVESTMENT FUND LAND ACQUISITION AND RESETTLEMENT POLICY FRAMEWORK I.

More information

MEASURING THE SOCIOECONOMIC STATUS OF URBAN BELOW POVERTY LINE FAMILIES IN IMPHAL CITY, MANIPUR: A LIVELIHOODS STUDY

MEASURING THE SOCIOECONOMIC STATUS OF URBAN BELOW POVERTY LINE FAMILIES IN IMPHAL CITY, MANIPUR: A LIVELIHOODS STUDY MEASURING THE SOCIOECONOMIC STATUS OF URBAN BELOW POVERTY LINE FAMILIES IN IMPHAL CITY, MANIPUR: A LIVELIHOODS STUDY DR. G.R. RATHOD*; MR. ATHING NINGSHEN** *Director, Social Sciences Centre, Bharati Vidyapeeth

More information

Environmental and Social Management System Arrangements

Environmental and Social Management System Arrangements Environmental and Social Management System Arrangements Project Number: 48015-002 Loan Number: LXXXX September 2015 Proposed Loan and Technical Assistance Grant Mongolia: Supporting the Credit Guarantee

More information

Child Selection. Overview. Process steps. Objective: A tool for selection of children in World Vision child sponsorship

Child Selection. Overview. Process steps. Objective: A tool for selection of children in World Vision child sponsorship Sponsorship in Programming tool Child Selection Objective: A tool for selection of children in World Vision child sponsorship We ve learned some things about selecting children. It is not a separate sponsorship

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE. Report No.: 40552 Project Name

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE. Report No.: 40552 Project Name Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: 40552 Project Name GPOBA W3 Expanding Piped Water Supply to Surabaya s Urban Poor

More information

Implementation of Nepal National Building Code Through Automated Building Permit System

Implementation of Nepal National Building Code Through Automated Building Permit System Implementation of Nepal National Building Code Through Automated Building Permit System By: Naresh Giri Background Electronic - Building Permit System (E-BPS), the automation of a building permit system,

More information

Annex 8: SDG Indicator Mapping

Annex 8: SDG Indicator Mapping Annex 8 SDG Indicator Mapping 1. Annex 8 responds to Executive Board decision below, regarding the refinement of indicators and targets of the Strategic Plan Integrated Results and Resources Framework

More information

TRANSPORT SECTOR SUPPORT PROJECT: BASE-GICUMBI-NYAGATARE ROAD (SECTION BASE - GICUMBI-RUKOMO: 51.5KM) SUMMARY OF THE RESETLEMENT ACTION PLAN

TRANSPORT SECTOR SUPPORT PROJECT: BASE-GICUMBI-NYAGATARE ROAD (SECTION BASE - GICUMBI-RUKOMO: 51.5KM) SUMMARY OF THE RESETLEMENT ACTION PLAN PROJECT: COUNTRY: TRANSPORT SECTOR SUPPORT PROJECT: BASE-GICUMBI-NYAGATARE ROAD (SECTION BASE - GICUMBI-RUKOMO: 51.5KM) REPUBLIQUE DU RWANDA SUMMARY OF THE RESETLEMENT ACTION PLAN Project Team Philippe

More information

Summary of Sachar Committee Report

Summary of Sachar Committee Report Summary of Sachar Committee Report Background On March 9, 2005 the Prime Minister issued a Notification for the constitution of a High Level Committee to prepare a report on the social, economic and educational

More information

Measuring Women Status And Gender Statistics in Cambodia Through the Surveys and Census

Measuring Women Status And Gender Statistics in Cambodia Through the Surveys and Census Global Forum on Gender Statistics 27 29 March 2012, Dead Sea, Jordan Measuring Women Status And Gender Statistics in Cambodia Through the Surveys and Census By Mrs. Hang Lina, Deputy Director General National

More information

Open Spaces Inventory and Analysis for Planning of Earthquake Emergencies for Safe Evacuation Sites in Kathmandu Valley

Open Spaces Inventory and Analysis for Planning of Earthquake Emergencies for Safe Evacuation Sites in Kathmandu Valley USMCA2015 The 14 th International Symposium on New Technologies for Urban Safety of Mega Cities in Asia Open Spaces Inventory and Analysis for Planning of Earthquake Emergencies for Safe Evacuation Sites

More information

APPENDIX 7 : PHYSICAL CULTURAL RESOURCES MANAGEMENT PLAN

APPENDIX 7 : PHYSICAL CULTURAL RESOURCES MANAGEMENT PLAN APPENDIX 7 : PHYSICAL CULTURAL RESOURCES MANAGEMENT PLAN Contents 1.0 Introduction... 2 1.1 Definitions... 3 1.2 Purpose / Goals of the Plan... 3 1.3 Timing... 3 1.4 EMP Framework... 3 1.5 Plan Revision,

More information

Social Performance Management

Social Performance Management SPTF Universal Standards for Social Performance Management 1 2 3 DEFINE AND MONITOR SOCIAL GOALS ENSURE BOARD, MANAGEMENT, AND EMPLOYEE COMMITMENT TO SOCIAL GOALS DESIGN PRODUCTS, SERVICES, DELIVERY MODELS

More information

Environmental Assessment

Environmental Assessment OP 4.01 Page 1 of 5 Environmental Assessment Note: OP 4.01 replaces the policy elements of IFC s Environmental Analysis and Review of International Finance Corporation Projects (Washington, D.C.: IFC,

More information

PROCEDURES FOR ENVIRONMENTAL AND SOCIAL APPRAISAL AND MONITORING OF INVESTMENT PROJECTS

PROCEDURES FOR ENVIRONMENTAL AND SOCIAL APPRAISAL AND MONITORING OF INVESTMENT PROJECTS PROCEDURES FOR ENVIRONMENTAL AND SOCIAL APPRAISAL AND MONITORING OF INVESTMENT PROJECTS Approved 10 July 2015 CONTENTS 1. INTRODUCTION 1 2. OVERVIEW OF THE ENVIRONMENTAL AND SOCIAL APPRAISAL AND MONITORING

More information

Chapter 3 Office of Human Resources Absenteeism Management

Chapter 3 Office of Human Resources Absenteeism Management Office of Human Resources Absenteeism Management Contents Section A - Background, Objective and Scope............................ 24 Section B - Criterion 1 - Communicating Expectations.......................

More information

GHANA S LAND ADMINISTRATION PROJECT: ACCOMPLISHMENTS, IMPACT, AND THE WAY AHEAD. W. ODAME LARBI (PhD, FGhIS) CHIEF EXECUTIVE OFFICER LANDS COMMISSION

GHANA S LAND ADMINISTRATION PROJECT: ACCOMPLISHMENTS, IMPACT, AND THE WAY AHEAD. W. ODAME LARBI (PhD, FGhIS) CHIEF EXECUTIVE OFFICER LANDS COMMISSION GHANA S LAND ADMINISTRATION PROJECT: ACCOMPLISHMENTS, IMPACT, AND THE WAY AHEAD W. ODAME LARBI (PhD, FGhIS) CHIEF EXECUTIVE OFFICER LANDS COMMISSION PRESENTATION OUTLINE Background The National Land Policy

More information

Statistics Knowledge Sharing Workshop on Measurements for the Informal Economy

Statistics Knowledge Sharing Workshop on Measurements for the Informal Economy NEPAL Statistics Knowledge Sharing Workshop on Measurements for the Informal Economy 14 15 May, 2013 New Delhi, India Outline of the Presentation 1. Background Information in measuring the informal sector.

More information

Forest Carbon Partnership Facility (FCPF)

Forest Carbon Partnership Facility (FCPF) Forest Carbon Partnership Facility (FCPF) Readiness Mechanism Review and Assessment of Readiness Preparation Proposals DRAFT September 4, 2009 This Program Document updates Program Document FMT 2009-1-Rev.2

More information

Women, Wages and Work A report prepared by the UNC Charlotte Urban Institute for the Women s Summit April 11, 2011

Women, Wages and Work A report prepared by the UNC Charlotte Urban Institute for the Women s Summit April 11, 2011 A report prepared by the UNC Charlotte Urban Institute for the Women s Summit April 11, 2011 A report prepared for the Women s Summit by the UNC Charlotte Urban Institute 1 Table of Contents Table of Contents...

More information

INTERNATIONAL REAL ESTATE BRIEFING

INTERNATIONAL REAL ESTATE BRIEFING September 2004 INTERNATIONAL REAL ESTATE BRIEFING CONTENTS LAND USE RIGHTS IN CHINA 1 I.1 Introduction 1 I.2 State-owned and Collectively-owned Land 2 I.3 Land Use Rights 2 a. Granted land use rights 2

More information

SECTOR ASSESSMENT (SUMMARY): MICRO, SMALL AND MEDIUM-SIZED ENTERPRISE DEVELOPMENT 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): MICRO, SMALL AND MEDIUM-SIZED ENTERPRISE DEVELOPMENT 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities Small Business and Entrepreneurship Development Project (RRP UZB 42007-014) SECTOR ASSESSMENT (SUMMARY): MICRO, SMALL AND MEDIUM-SIZED ENTERPRISE DEVELOPMENT 1 Sector Road Map 1. Sector Performance, Problems,

More information

PROJECT : LAKE TURKANA WINDFARM ACCESS ROAD REHABILITATION COUNTRY : KENYA EXECUTIVE SUMMARY OF THE ABBREVIATED RESETTLEMENT ACTION PLAN

PROJECT : LAKE TURKANA WINDFARM ACCESS ROAD REHABILITATION COUNTRY : KENYA EXECUTIVE SUMMARY OF THE ABBREVIATED RESETTLEMENT ACTION PLAN PROJECT : LAKE TURKANA WINDFARM ACCESS ROAD REHABILITATION COUNTRY : KENYA Project reference: P-KE-FZ0-001 EXECUTIVE SUMMARY OF THE ABBREVIATED RESETTLEMENT ACTION PLAN Head of team: M. GABISCH Investment

More information

OAKLAND PARK COMMUNITY REDEVELOPMENT AGENCY. DEVELOPMENT and RELOCATION INCENTIVE PROGRAM

OAKLAND PARK COMMUNITY REDEVELOPMENT AGENCY. DEVELOPMENT and RELOCATION INCENTIVE PROGRAM OAKLAND PARK COMMUNITY REDEVELOPMENT AGENCY DEVELOPMENT and RELOCATION INCENTIVE PROGRAM DEVELOPMENT AND RELOCATION INCENTIVE PROGRAM I. Introduction The Development/Relocation Incentive program is designed

More information

Technical Assistance for Socioeconomic Impact of Road Crashes (Financed by the Poverty Reduction Cooperation Fund)

Technical Assistance for Socioeconomic Impact of Road Crashes (Financed by the Poverty Reduction Cooperation Fund) Technical Assistance TAR: STU 38081 Technical Assistance for Socioeconomic Impact of Road Crashes (Financed by the Poverty Reduction Cooperation Fund) October 2005 ABBREVIATIONS ADB Asian Development Bank

More information

PROGRAM IMPLEMENTATION SCHEDULE

PROGRAM IMPLEMENTATION SCHEDULE Water Sector Improvement Program (RRP PAL 44031) A. Program Description PROGRAM IMPLEMENTATION SCHEDULE 1. The Program will support reform of the water and sanitation sector, focusing on improving policy

More information

Indicators of Sustainable Development Principles and Practices

Indicators of Sustainable Development Principles and Practices Indicators of Sustainable Development Principles and Practices Division for Sustainable Development United Nations Department of Economic and Social Affairs Policy demand for SD indicators (UNCED) Chapter

More information

Pre-Feasibility Study Bhopal Solid Waste Management. May 2015 Executive Summary

Pre-Feasibility Study Bhopal Solid Waste Management. May 2015 Executive Summary Pre-Feasibility Study Bhopal Solid Waste Management May 2015 Executive Summary Cities Development Initiative for Asia P a g e 2 A. Rationale i. The Project 1. Bhopal is the capital and second largest city

More information

UNITED NATIONS CHILDREN S FUND. Office in Serbia is seeking qualified

UNITED NATIONS CHILDREN S FUND. Office in Serbia is seeking qualified UNITED NATIONS CHILDREN S FUND Office in Serbia is seeking qualified Consultants for further analysis of the Multiple Indicator Cluster Surveys (MICS) VN: OPS/BEL/2014-29 The purpose of the assignment

More information

PRESENTATION. Improving the performance of Public Water Utilities A case study of Bangalore N.C. MUNIYAPPA, Chairman, BWSSB LOCATION MAP OF BANGALORE

PRESENTATION. Improving the performance of Public Water Utilities A case study of Bangalore N.C. MUNIYAPPA, Chairman, BWSSB LOCATION MAP OF BANGALORE Arabian Sea Mumbai KARNATAKA Delhi Chennai Nepal Calcutta Bay of Bengal PRESENTATION Improving the performance of Public Water Utilities A case study of Bangalore By N.C. MUNIYAPPA, Chairman, BWSSB LOCATION

More information

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE JURISDICTION OF ALBERTA TRANSPORTATION 1.0 Application Procedures 2.0

More information

5. The Model Strategies and Practical Measures are aimed at providing de jure and de

5. The Model Strategies and Practical Measures are aimed at providing de jure and de MODEL STRATEGIES AND PRACTICAL MEASURES ON THE ELIMINATION OF VIOLENCE AGAINST WOMEN IN THE FIELD OF CRIME PREVENTION AND CRIMINAL JUSTICE 1. The multifaceted nature of violence against women suggests

More information

V-1 Reference Material for Social Analysis

V-1 Reference Material for Social Analysis Manual for PIP Project Management (Version 3.0, August 2010) Section V Technical Approached in PIP Management Manual for PIP Project Management Section V Technical Approaches in PIP Management Section

More information

Population, Health, and Human Well-Being-- Benin

Population, Health, and Human Well-Being-- Benin Population, Health, and Human Well-Being-- Benin Demographic and Health Indicators Benin Sub- Saharan Africa World Total Population (in thousands of people) 1950 2,046 176,775 2,519,495 2002 6,629 683,782

More information

OCCUPATIONS & WAGES REPORT

OCCUPATIONS & WAGES REPORT THE COMMONWEALTH OF THE BAHAMAS OCCUPATIONS & WAGES REPORT 2011 Department of Statistics Ministry of Finance P.O. Box N-3904 Nassau Bahamas Copyright THE DEPARTMENT OF STATISTICS BAHAMAS 2011 Short extracts

More information

Table of International Standards Related to Human Rights at the Marlin Mine

Table of International Standards Related to Human Rights at the Marlin Mine APPENDIX E Table of International Standards Related to Human Rights at the Marlin Mine Consultation International Human Right Instruments International Good Practice Standards and Guidance GRI (G3 & MMSS)

More information

HOME OWNERSHIP THE REAL COSTS

HOME OWNERSHIP THE REAL COSTS HOME OWNERSHIP THE REAL COSTS THE GOVERNMENT REQUIRES US TO PROVIDE YOU WITH THIS INFORMATION PURSUANT TO SECTION 121AA HOUSING ACT 1985 If you just compare the cost of a mortgage with the cost of your

More information

Model Customer Rights Policy

Model Customer Rights Policy Model Customer Rights Policy Customer protection is an integral aspect of financial inclusion. The following comprehensive Customer Rights Policy based on domestic experience and global best practices

More information

Urban Water Supply Sector Reform in Kathmandu Valley. Dol Prasad Chapagain

Urban Water Supply Sector Reform in Kathmandu Valley. Dol Prasad Chapagain TUTA/IOE/PCU Journal of the Institute of Engineering, Vol. 9, No. 1, pp. 130 141 TUTA/IOE/PCU All rights reserved. Printed in Nepal Fax: 977-1-5525830 Urban Water Supply Sector Reform in Kathmandu Valley

More information

Rio Political Declaration on Social Determinants of Health

Rio Political Declaration on Social Determinants of Health Rio Political Declaration on Social Determinants of Health Rio de Janeiro, Brazil, 21 October 2011 1. Invited by the World Health Organization, we, Heads of Government, Ministers and government representatives

More information

Meeting Urban Development Challenges

Meeting Urban Development Challenges Discussion Draft Meeting Urban Development Challenges Its importance for both growth and poverty calls for a coherent national framework toward urbanization. The objective of such a framework should be

More information

LAW Nº 5.248 (JANUARY 27TH, 2011) MUNICIPAL LAW ON CLIMATE CHANGE AND SUSTAINABLE DEVELOPMENT

LAW Nº 5.248 (JANUARY 27TH, 2011) MUNICIPAL LAW ON CLIMATE CHANGE AND SUSTAINABLE DEVELOPMENT LAW Nº 5.248 (JANUARY 27TH, 2011) MUNICIPAL LAW ON CLIMATE CHANGE AND SUSTAINABLE DEVELOPMENT States the Municipal Policy on Climate Change and Sustainable Development, regulates about the establishment

More information

S.B.S. Resolution Nº 1928-2015 The Head of the Superintendency of Banks, Insurance Companies and Private Pension Fund Administrators

S.B.S. Resolution Nº 1928-2015 The Head of the Superintendency of Banks, Insurance Companies and Private Pension Fund Administrators Waiver of Responsibility The law and any other regulation translated into English are only referential. The official language for any legal purposes is Spanish as published in the Official Journal El Peruano.

More information

FROM SOCIAL PERFORMANCE ASSESSMENT TO MANAGEMENT: CASE OF ESAF MICROFINANCE AND INVESTMENTS PRIVATE LTD., INDIA

FROM SOCIAL PERFORMANCE ASSESSMENT TO MANAGEMENT: CASE OF ESAF MICROFINANCE AND INVESTMENTS PRIVATE LTD., INDIA FROM SOCIAL PERFORMANCE ASSESSMENT TO MANAGEMENT: CASE OF ESAF MICROFINANCE AND INVESTMENTS PRIVATE LTD., INDIA Thrissur, June 2010 - Noémie Renier wrote this case study in the course of her Complementary

More information

West Valley City Grants Department Rehabilitation Loan Program Policy & Information Packet

West Valley City Grants Department Rehabilitation Loan Program Policy & Information Packet West Valley City Grants Department Rehabilitation Loan Program Policy & Information Packet Current Revision: 9/09 1 CONTENTS REHABILITATION LOAN PROGRAM (RLP) POLICY: Section I Section II Section III Section

More information

The post holder will be guided by general polices and regulations, but will need to establish the way in which these should be interpreted.

The post holder will be guided by general polices and regulations, but will need to establish the way in which these should be interpreted. JOB DESCRIPTION Job Title: Membership and Events Manager Band: 7 Hours: 37.5 Location: Elms, Tatchbury Mount Accountable to: Head of Strategic Relationship Management 1. MAIN PURPOSE OF JOB The post holder

More information

Rules of Department of Social Services Division 40 Family Support Division Chapter 7 Family Healthcare

Rules of Department of Social Services Division 40 Family Support Division Chapter 7 Family Healthcare Rules of Department of Social Services Division 40 Family Support Division Chapter 7 Family Healthcare Title Page 13 CSR 40-7.010 Scope and Definitions...3 13 CSR 40-7.015 Application Procedure for Family

More information

MINISTRY OF TRANSPORT AND COMMUNICATIONS OF KYRGYZ REPUBLIC. CAREC Transport Corridor 1 (Bishkek-Torugart Road) Project 3

MINISTRY OF TRANSPORT AND COMMUNICATIONS OF KYRGYZ REPUBLIC. CAREC Transport Corridor 1 (Bishkek-Torugart Road) Project 3 MINISTRY OF TRANSPORT AND COMMUNICATIONS OF KYRGYZ REPUBLIC CAREC Transport Corridor 1 (Bishkek-Torugart Road) Project 3 financed by the Asian Development Bank under Loan 2755-KGZ (SF) TERMS OF REFERENCE

More information

ESF 14. Long-Term Community Recovery

ESF 14. Long-Term Community Recovery 1. Purpose This annex provides an overview of the general process to be followed in recovering from the economic results of a natural disaster or other major emergency that may impact Coos County. It outlines

More information

SECTOR ASSESSMENT (SUMMARY): WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES 1. 1. Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES 1. 1. Sector Performance, Problems, and Opportunities Country Partnership Strategy: Kyrgyz Republic, 2013 2017 SECTOR ASSESSMENT (SUMMARY): WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES 1 Sector Road Map 1. Sector Performance, Problems, and

More information

INDONESIA - LAW ON WATER RESOURCES,

INDONESIA - LAW ON WATER RESOURCES, Environment and Development Journal Law LEAD INDONESIA - LAW ON WATER RESOURCES, 2004 VOLUME 2/1 LEAD Journal (Law, Environment and Development Journal) is a peer-reviewed academic publication based in

More information

Manpower survey 1993: Occupational information

Manpower survey 1993: Occupational information Manpower survey 1993: Occupational information 1993 Embargo: 08:00 Date: 27 November 1996 Read the following notice with regard to the eleven official languages INTERPRETIVE SUMMARY According to the 1994

More information

RESETTLEMENT POLICY FRAMEWORK (RPF)

RESETTLEMENT POLICY FRAMEWORK (RPF) Public Disclosure Authorized Road Asset Management Project (RAMP) Works and Highways (MPWH) Republic of Yemen Road Maintenance Fund Implementation Unit(RMFIU) Ministry of Public Public Disclosure Authorized

More information

FINAL DOCUMENT. Guidelines for Regulatory Auditing of Quality Management Systems of Medical Device Manufacturers Part 1: General Requirements

FINAL DOCUMENT. Guidelines for Regulatory Auditing of Quality Management Systems of Medical Device Manufacturers Part 1: General Requirements GHTF/SG4/N28R4:2008 FINAL DOCUMENT Title: Guidelines for Regulatory Auditing of Quality Management Systems of Medical Device Manufacturers Authoring Group: GHTF Study Group 4 Endorsed by: The Global Harmonization

More information

Compliance by Parties with Statement of Labor Values

Compliance by Parties with Statement of Labor Values Compliance by Parties with Statement of Labor Values As part of the compliance audit conducted for the Report, Paul Hastings examined whether the Parties complied with the standards set forth in the Statement

More information

Kathmandu Valley Profile Briefing Paper

Kathmandu Valley Profile Briefing Paper Kathmandu Valley Profile Briefing Paper Authored by Pradip Raj Pant PhD Candidate, East-West Center Graduate Fellow, Department of Urban and Regional Planning, University of Hawaii at Manoa, Honolulu,

More information

Rural Business Enterprise Loan Program (RBE)

Rural Business Enterprise Loan Program (RBE) Courthouse PO Box 607 Carlton, MN 55718 Rural Business Enterprise Loan Program (RBE) Mailing Address: Carlton County Economic Development Office PO Box 607 Carlton, MN 55718 (218) 384-9597 or (218)384-9564

More information

Construction Bond Audit Report. Office of Auditor General

Construction Bond Audit Report. Office of Auditor General Construction Bond Audit Report (This page was left blank) TABLE OF CONTENTS Executive Summary 5 Background, Scope and Objectives, and Methodology....7 Audit Findings, Recommendations, and Management s

More information

LOAN AGREEMENT (Special Operations)

LOAN AGREEMENT (Special Operations) LOAN NUMBER 3044-VIE (SF) LOAN AGREEMENT (Special Operations) (Secondary Cities Development Project in Quang Nam Province (Tam Ky), Ha Tinh Province (Ha Tinh) and Dak Lak Province (Buon Ma Thuot)) between

More information

BRENTWOOD PLACE APARTMENTS 32 BRENTWOOD PLACE FORSYTH, GA 31029 TENANT SELECTION PLAN MANAGED BY:

BRENTWOOD PLACE APARTMENTS 32 BRENTWOOD PLACE FORSYTH, GA 31029 TENANT SELECTION PLAN MANAGED BY: BRENTWOOD PLACE APARTMENTS 32 BRENTWOOD PLACE FORSYTH, GA 31029 TENANT SELECTION PLAN MANAGED BY: TOWER MANAGEMENT COMPANY, INC. P.O. BOX 509 CASSVILLE, GA 30123 770-386-2921 Effective: April 1, 2016 A

More information

COMPONENT 2 - TKB DRAFT

COMPONENT 2 - TKB DRAFT 2015 Resettlement Policy Framework for the Turkey Geothermal Development Project COMPONENT 2 - TKB DRAFT Contents 1. Project Description & Background... 2 2. Principles & Objectives... 3 3. Process for

More information

Request for Proposal (RFP) Black Forest Community Wildfire Protection Plan (CWPP) Update

Request for Proposal (RFP) Black Forest Community Wildfire Protection Plan (CWPP) Update Black Forest Together Inc. (BFT) 11590 Black Forest Road, Suite 30 Colorado Springs, CO 80908 719-495-2445 (office) Request for Proposal (RFP) Black Forest Community Wildfire Protection Plan (CWPP) Update

More information

Canada and Africa: A Contrast

Canada and Africa: A Contrast Canada and Africa: A Contrast In this lesson, students will examine statistics pertaining to nations in Sub-Saharan Africa to which Canada contributes foreign aid. The students will be expected to summarize

More information

SLUMS IN CHENNAI: A PROFILE

SLUMS IN CHENNAI: A PROFILE Chandramouli, Dr.C., I.A.S. Slums In Chennai: A Profile in Martin J. Bunch, V. Madha Suresh and T. Vasantha Kumaran, eds., Proceedings of the Third International Conference on Environment and Health, Chennai,

More information

LOAN AGREEMENT (Special Operations) (Power Transmission Rehabilitation Project) between REPUBLIC OF ARMENIA. and ASIAN DEVELOPMENT BANK

LOAN AGREEMENT (Special Operations) (Power Transmission Rehabilitation Project) between REPUBLIC OF ARMENIA. and ASIAN DEVELOPMENT BANK LOAN NUMBER 3150-ARM(SF) LOAN AGREEMENT (Special Operations) (Power Transmission Rehabilitation Project) between REPUBLIC OF ARMENIA and ASIAN DEVELOPMENT BANK DATED 5 SEPTEMBER 2014 ARM 46416 LOAN AGREEMENT

More information

Waste Production of KMC. Waste Management Policy & Laws. Solid Waste Management in Kathmandu City. Katmandu Metropolitan city at a glance.

Waste Production of KMC. Waste Management Policy & Laws. Solid Waste Management in Kathmandu City. Katmandu Metropolitan city at a glance. Solid Waste Management in Kathmandu City Ganesh Rai, Chief Executive Officer Kathmandu Metropolitan City Office Kathmandu, Nepal Date: 10 th February, 2010 Katmandu Metropolitan city at a glance Kathmandu

More information

SHRIRAM TRANSPORT FINANCE COMPANY LIMITED. Business Responsibility Policy

SHRIRAM TRANSPORT FINANCE COMPANY LIMITED. Business Responsibility Policy SHRIRAM TRANSPORT FINANCE COMPANY LIMITED INTRODUCTION Business Responsibility Policy Shriram Transport Finance Company Limited ( the Company ), conscious about its social, environmental and economic responsibilities

More information

A Look at the Contribution and Future of IT in Customer Service for the Tokyo Waterworks

A Look at the Contribution and Future of IT in Customer Service for the Tokyo Waterworks A Look at the Contribution and Future of IT in Customer Service for the Tokyo Waterworks Toshitake Amano Tama Collection System Department,Waterworks Business System Division, Public Utility Services Center

More information

Convention on the Elimination of All Forms of Discrimination against Women

Convention on the Elimination of All Forms of Discrimination against Women United Nations CEDAW/C/ETH/Q/6-7 Convention on the Elimination of All Forms of Discrimination against Women Distr.: General 4 November 2010 Original: English Committee on the Elimination of Discrimination

More information

Environmental Assessment

Environmental Assessment BP 4.01 January 1999 These procedures were prepared for use by World Bank staff and are not necessarily a complete treatment of the subject. Environmental Assessment (Archived August 2004) Note: OP and

More information

Unemployment: Causes and its Economics Outcomes during Recent Years in Afghanistan

Unemployment: Causes and its Economics Outcomes during Recent Years in Afghanistan Unemployment: Causes and its Economics Outcomes during Recent Years in Afghanistan Summary, Conclusion and Recommendations The objective of the paper is to study the current situation of labor market in

More information

The Gender Wage Gap by Occupation 2014

The Gender Wage Gap by Occupation 2014 IWPR # C431 April 2015 The Gender Wage Gap by Occupation 2014 and by Race and Ethnicity Women s are lower than men s in nearly all s, whether they work in s predominantly done by women, s predominantly

More information

HAVING REGARD to Article 5 b) of the Convention on the Organisation for Economic Cooperation and Development of 14 December 1960;

HAVING REGARD to Article 5 b) of the Convention on the Organisation for Economic Cooperation and Development of 14 December 1960; THE COUNCIL, HAVING REGARD to Article 5 b) of the Convention on the Organisation for Economic Cooperation and Development of 14 December 1960; HAVING REGARD to the 1976 Recommendation of the Council on

More information

PUBLIC RIGHT-OF-WAY ACCESSIBILITY TRANSITION PLAN

PUBLIC RIGHT-OF-WAY ACCESSIBILITY TRANSITION PLAN PUBLIC RIGHT-OF-WAY ACCESSIBILITY TRANSITION PLAN FOR THE VILLAGE OF HUNTLEY, ILLINOIS 2015 Contents Introduction 1 Purpose 1 Officials Responsible for Implementation 2 Public Notice 2 Grievance Procedure

More information

Application for Mississippi Medicaid Aged, Blind and Disabled Medicaid Programs

Application for Mississippi Medicaid Aged, Blind and Disabled Medicaid Programs Application for Mississippi Medicaid Aged, Blind and Disabled Medicaid Programs This application is used for an individual, couple or child to apply for Medicaid due to age or disability. Please read each

More information

Draft Terms of Reference for appointment of Design and Supervision Consultants (DSC)

Draft Terms of Reference for appointment of Design and Supervision Consultants (DSC) Draft Terms of Reference for appointment of Design and Supervision Consultants (DSC) 1.0 BACKGROUND: 1. Introduction: Indian coasts of about 5700 kilometers are highly vulnerable to tropical cyclones and

More information

Public Invitation of Ideas for Developing a Global Tourism Hub in Yumeshima

Public Invitation of Ideas for Developing a Global Tourism Hub in Yumeshima This English translation is for reference only. Japanese is the official language used for this public invitation of ideas. Public Invitation of Ideas for Developing a Global Tourism Hub in Yumeshima May

More information

Construction CONSTRUCTION

Construction CONSTRUCTION 135 R. English CONSTRUCTION Construction GOOD PRACTICE POINTERS Identify stakeholders most likely to be affected by construction. Notify local stakeholders of construction activities and changes to schedules.

More information