1 Towards Construction Excellence framework Newsletter march april 06 BCA AWARDS Green Mark Awards 8 Best Buildable Design Awards 12 Construction 21 Best Practice Awards 14 Construction Excellence Awards 18 BCA Awards Assessment Committees

2 The Green Mark scheme was introduced in 2005 to assess the environmental friendlines and water conservation measures which set them apart from other buildings. They have environmental quality is provided for their users. Green Mark Platinum Republic Polytechnic Developer : Republic Polytechnic Architect : DP Architects Pte Ltd Structural Engineer : Meinhardt (Singapore) Pte Ltd M&E Engineer : Beca Carter Hollings & Ferner (S.E. Asia) Pte Ltd Landscape Consultant : Ohtori Consultants Environmental Design Institute, Japan Landscape Contractor : Nature Landscape Pte Ltd Acoustics Consultants : Nagata Acoustic (Japan) & Acviron Acoustics Consultants Pte Ltd Façade Consultants : Meinhardt Façade Technology Pte Ltd : China Construction Taisei Joint Venture Among first few projects to use thermal energy storage system in the region. Campus in the Park feeling. Inspiration for the lawn came from well known campus grounds around the world, such as the Harvard Yard in Harvard University and Mills Yard in Cambridge University. Multiple ventilation modes for sports hall facilitate natural ventilation during normal usage and air conditioning during special occasions. Chemical Free water treatment for central cooling plant and ionisation water treatment for swimming pool. Photovoltaic solar energy panel for general lighting and general power. Use of pneumatic waste conveyance system. Tan Tock Seng Hospital Developer : Tan Tock Seng Hospital (TTSH) Project Manager : TTSH In-house Facilities Engineering Department Controls and Energy Specialist : CNA Group Ltd Use of clean and renewable hydrogen fuel cell technology as emergency back-up power saves energy. Improved indoor air quality by applying Bio-Kil technology onto air-con filter to eliminate bacteria and virus. Redesigned operating theatre air-con control system to allow staff to switch from full operation mode to economy mode when operating theatres are not in use. This innovation won the SPRING Singapore Star Award in 2004 and could save TTSH more than $120,000 per year. Installed heat exchanger to extract air-con package system s waste heat to supply hot water to the kitchen. Use of dual sensor (CO 2 & temperature) system to control the basement carpark mechanical ventilation, saving more than $290,000 per year on energy cost and prolong equipment life. Progressively replacing conventional T8 light fittings with recyclable and brighter T5 light fittings, hence reducing the number of tubes required. 2

3 s of buildings. In general, Green Mark buildings have adopted energy efficient features also made substantial use of greenery in their projects and ensured that a good indoor Green Mark Gold PLUS City Square Residences Developer : City Developments Limited Architect : Ong & Ong Architects Pte Ltd Structural Engineer : Meinhardt (S) Pte Ltd M&E Engineer : Parsons Brinckerhoff Pte Ltd Landscape Consultant : Belt Collins International (S) Pte Ltd Façade Consultant : Connell Wagner (Pte) Ltd : Woh Hup (Pte) Ltd Construction using circular diaphragm wall utilises less manpower and strutting materials. Extensive use of solar powered light-emitting tiles, pole lights and bollard lights for its external landscaping. Dual Chutes Pneumatic Refuse Collection System to segregate recyclable and non-recyclable wastes. Extensive use of sunpipes to bring natural daylight to the 3 basement levels. Silt treatment and water recycling plant to recycle treated water for washing and cleaning purpose. St Regis Hotel & Residences Developer : City Developments Limited, Hong Leong Holdings and TID Pte Ltd JV Architect : RSP Architects Planners & Engineers (Pte) Ltd Structural Engineer : RSP Architects Planners & Engineers (Pte) Ltd M&E Engineer : Squire Mech Pte Ltd Environmental Design Consultant : CP Green : Kajima Tiong Seng JV Ceramic Façade Cladding System self cleaning properties, saves labour and water. Condensate water recycling results in water savings of up to 19,300 m 3 per year. Motion detection system integrated with lighting for private lift lobbies at apartments. Dual Chutes Pneumatic Refuse Collection System to segregate recyclable and non-recyclable wastes. WetSep Silt Water Treatment System saves 3,210m 3 of water per month. RiverGate Developer : Riverwalk Promenade Pte Ltd (JV between CapitaLand and Hwa Hong Corporation) Architect : RSP Architects Planners & Engineers (Pte) Ltd Concept Architect : Cox Architects & Planners Structural Engineer : Meinhardt (S) Pte Ltd M&E Engineer : Squire Mech Pte Ltd : Davis Langdon & Seah Singapore Pte Ltd Landscape Consultant : Sitetectonix Pte Ltd : Shimizu Corporation Sprawling landscape on the ground level; green vista is extended vertically to the top of the residential towers. Water drip line systems, which operate via timers and rain sensors, are installed at the sky and roof gardens. All units are provided with dual flushing system water closets. All units are provided with inverter multi-split air-con systems. Guard houses use recycled water collected from integrated basins to flush toilets. 3

4 Green Mark Gold Singapore Botanic Gardens (Tanglin Core Development) Developer : National Parks Board Architect : Urban Redevelopment Authority Structural Engineer : Urban Redevelopment Authority M&E Engineer : Urban Redevelopment Authority Landscape Consultant : Tropical Environment Pte Ltd : Sanchoon Builders Pte Ltd First usage of green roof system on a pitched roof in Singapore for the Green Pavilion. First usage of greening system on vertical walls in Singapore. Careful planning minimises the project encroachment into the green space of Botanic Gardens. Building was configured to integrate with the existing trees and to protect tree roots. The Exchange Beijing Developer : Onward Science & Trade Center Co Ltd Architect : The Institute of Building Design, China Academy of Building Research Structural Engineer : The Institute of Building Design, China Academy of Building Research M&E Engineer : The Institute of Building Design, China Academy of Building Research Managing Agent : Beijing PREMAS Property Services Co Ltd (A subsidiary of United PREMAS Limited) : Beijing Uni-Construction Group Co Ltd Recycling programme to encourage occupant recycling. Close monitoring of energy and water consumption on a monthly basis. Variable Speed Drive in escalators and chiller system. Well maintained huge landscape area irrigated by a large scaled reclaimed water system. The Tresor Developer : Keppel Land Realty Pte Ltd Architect : Ong & Ong Architects Pte Ltd Structural Engineer : KTP Consultants Pte Ltd M&E Engineer : Alpha Engineering Consultant Landscape Consultant : Tierra Design (S) Pte Ltd Other Specialist Consultant : CCW Associates Pte Ltd : Poh Lian Construction Pte Ltd Waterless urinal at clubhouse toilet. Ductless mechanical ventilation fans in basement carpark. Sunpipes to bring natural lighting into the basement carpark. Use of recycled plastic in children s playground equipment. 4

5 ITE College East at Simei Avenue Developer : Institute of Technical Education Architect : RSP Architects Planners & Engineers (Pte) Ltd Structural Engineer : RSP Architects Planners & Engineers (Pte) Ltd M&E Engineer : Squire Mech Pte Ltd : Davis Langdon & Seah Singapore Pte Ltd Landscape Consultant : Sitetectonix Pte Ltd : Kajima Overseas Asia Pte Ltd Sun-shades along the corridors, low-emissivity performance glazing and laminated double-glazed curtainwall. Maximise day lighting into circulation spaces, multi-purpose rooms, classrooms and offices. Extensive planting with integrated themed landscape walks for nature conservation. Ceiling boards at all labs, classrooms, offices and toilets contain about 40% recycled content. King s Plot 3 Development Developer : City Developments Limited Architect : RSP Architects Planners & Engineers (Pte) Ltd Structural Engineer : RSP Architects Planners & Engineers (Pte) Ltd M&E Engineer : Squire Mech Pte Ltd : Davis Langdon & Seah Singapore Pte Ltd Landscape Consultant : Belt Collins International (S) Pte Ltd Lighting Consultant : Parsons Brinckerhoff Pte Ltd Acoustic Consultant : Acviron Acoustics Consultants Pte Ltd : Tiong Seng Contractors (Pte) Ltd All units are supplied with 4 ticks Energy Labeled air-cons. All units are provided with dimmer controls for living/dining and master bedroom. Rainwater collection tanks on fourth storey collect rainwater for watering plants on first storey by way of gravity fall. During construction, water treatment system is used to recycle treated water for washing and cleaning purposes. The Azure Developer : FCL View Pte Ltd Architect : ADDP Architects Structural Engineer : DE Consultants M&E Engineer : Squire Mech Pte Ltd Landscape Consultant : Site Concepts International : China Construction (South Pacific) Development Co Pte Ltd Solar powered light-emitting tiles, pole lamps, bollard lights at landscape areas and solar-powered water heater for clubhouse changing room showers. Sunpipes to bring daylight into basement carpark. Environmentally friendly lightweight plastic grid for turfing along fire engine access way. Pneumatic Refuse Collection System to segregate recyclable and non-recyclable wastes. 5

6 Green Mark Gold The Marina Bay Developer : City Developments Limited & AIG JV Architect : TEAM Design Architects Pte Ltd with Design Consultants NBBJ & Kiat Inc (USA) Structural Engineer : Meinhardt (S) Pte Ltd with Precast Design Consultants (USA) M&E Engineer : Meinhardt (S) Pte Ltd : Davis Langdon & Seah Singapore Pte Ltd Landscape Consultant : Belt Collins International (S) Pte Ltd Façade Consultant : Connell Wagner (Pte) Ltd Lighting Consultant : LPA Lighting Planners Associates Inc : Dragages (S) Pte Ltd Staircase shelter utilises less concrete and steel for construction and less materials for accessories. Construction using peanut-shaped diaphragm wall eliminates strutting, resulting in safer and cleaner working environment. Solar powered system for heated pool and aircraft warning lights. Dual Chutes Pneumatic Refuse Collection System to segregate recyclable and non-recyclable wastes. Singapore General Hospital (Bowyer Block A, B & C) Developer : Singapore General Hospital Pte Ltd Project Manager : Singapore Health Services Pte Ltd Architect : Urban 3 Architects Structural Engineer : TP Seow Consultants : WN Consultant Energy and Climate Consultant : Temasek Polytechnic Environmental Co-ordinator : Yeo Lee Pin Registered Architect M&E Contractor : TAC Distribution Pte Ltd : Kwan Yong Construction Pte Ltd Refrigeration plants (chillers) are equipped with leak detection system. Design studies include 3D computer simulation to maximise the use of daylighting and natural ventilation at internal courtyard. Use of low-emissivity glass for windows, lift core and the roof canopy of the internal courtyard. Innovative use of reflective fins along all the office windows to enhance day lighting and reduce glare. Varsity Park Condominium Developer : CapitaLand Residential Singapore Architect : TSP Architects + Planners Pte Ltd Structural Engineer : P&T Consultant Pte Ltd M&E Engineer : P&T Consultant Pte Ltd : Davis Langdon & Seah Singapore Pte Ltd Landscape Consultant : DLQ Design Pte Ltd : Woh Hup Pte Ltd Building blocks are placed and oriented to reduce direct sunlight into the apartment units. Basement carpark is designed with about 20% opening for natural light and ventilation. This eliminates the need to provide full mechanical ventilation and water sprinkler fire fighting system. Gearless traction elevator. Extensive use of precast components. 6

7 Neuros, Biopolis Phase 2 in One-North Developer : Ascendas (Tuas) Pte Ltd Project Manager : Ascendas Services Pte Ltd Architect : Architects Team 3 Pte Ltd Structural Engineer : Jurong Consultants Pte Ltd M&E Engineer : Jurong Consultants Pte Ltd : WT Partnership Landscape Consultant : Peridian Asia Pte Ltd Energy Consultant : SuperSolutions Pte Ltd : ACP Construction Pte Ltd Solar system for security lighting on the roof. Electronic water sub-meter to do constant monitoring of water consumption. Luminance sensors to control the lighting level of walkway at first storey. Use of district cooling system. Green Mark Award 138 Depot Road Developer : Ascendas (Tuas) Pte Ltd Project Manager : Ascendas Services Pte Ltd Architect : Architects Team 3 Pte Ltd Structural Engineer : Arup Singapore Pte Ltd M&E Engineer : Parsons Brinckerhoff Pte Ltd : WT Partnership Landscape Consultant : Geok Lan Landscape Energy Consultant : SuperSolutions Pte Ltd : ACP Construction Pte Ltd The Infiniti Developer : FCL Court Pte Ltd Architect : DCA Architects Pte Ltd Structural Engineer : DE Consultants (S) Pte Ltd M&E Engineer : United Project Consultants Pte Ltd Landscape Consultant : Belt Collins International (S) Pte Ltd Acoustic Consultant : CCW Associates Pte Ltd : Greatearth Construction Pte Ltd 7

8 The Best Buildable Design Awards competition was launched in October 1991 teams who contribute to construction efficiency through the use of buildable Best Buildable Residential Non-landed Buildings Category (for projects with GFA > 25,000m 2 ) Savannah CondoPark Architectural Consultant Structural Consultant Construction Period Gross Floor Area : 87,795 m 2 : 88 pts : Axis Architects Planners : KTP Consultants Pte Ltd : Dragages Singapore Pte Ltd (Design & Build) : City Developments Limited : S$138.2 million : 27 months Residential Non-landed Buildings Category (for projects with GFA > 25,000m 2 ) The Esparis Architectural Consultant Structural Consultant Construction Period Gross Floor Area : 35,000 m 2 : 87 pts : Team Design Architects Pte Ltd : Meinhardt (S) Pte Ltd : Ando Corporation Singapore Branch (Design & Build) : City Developments Limited : S$47.8 million : 27 months Residential Non-landed Buildings Category (for projects with GFA > 25,000m 2 ) Toa Payoh Redevelopment Contract 30 Architectural Consultant : Housing & Development Board Structural Consultant : Housing & Development Board Collaborating Architectural Consultant : Surbana International Consultants Pte Ltd Collaborating Structural Consultant : Surbana International Consultants Pte Ltd : Penta-Ocean Construction Co Ltd : Housing & Development Board : S$83.5 million Construction Period : 43 months Gross Floor Area : 114,408 m 2 : 90 pts 8

9 to promote the wider use of buildable designs and give recognition to design design. Design Awards Commercial and Office Buildings Category One George Street Architectural Consultant Structural Consultant Construction Period Gross Floor Area : 51,714 m 2 : 80 pts : DCA Architects Pte Ltd : T. Y. Lin International Pte. Ltd. : Kajima Overseas Asia Pte Ltd (Design & Build) : George Street Pte Ltd : S$98.0 million : 17 months Best Buildable Design Awards (Merit) Residential Landed Buildings Category Lucky Gardens House Architectural Consultant : Tan + Tsakonas Architects Structural Consultant : Aston Consulting Engineers : Caines Associates Pte Ltd : Mdm Yam Lee Foon : S$438,000 Construction Period : 10 months Gross Floor Area : 323 m 2 : 90 pts Residential Non-landed Buildings Category (for projects with GFA > 25,000m 2 ) Draycott Eight Architectural Consultant : RSP Architects Planners & Engineers (Pte) Ltd Structural Consultant : RSP Architects Planners & Engineers (Pte) Ltd : Thian Sung Construction Pte Ltd : Winworth Investment Pte Ltd : S$80.7 million Construction Period : 19 months Gross Floor Area : 33,551 m 2 : 75 pts Residential Non-landed Buildings Category (for projects with GFA > 25,000m 2 ) Monterey Park Condominium Architectural Consultant : Team Design Architects Pte Ltd Structural Consultant : SBT Consultants + Accredited Checkers : Woh Hup (Pte) Ltd (Design & Build) : City Developments Limited : S$61.1 million Construction Period : 24 months Gross Floor Area : 38,676 m 2 : 75 pts 9

10 Best Buildable Des Residential Non-landed Buildings Category (for projects with GFA > 25,000m 2 ) Grandeur 8 Architectural Consultant Structural Consultant Construction Period Gross Floor Area : 71,177 m 2 : 75 pts : Laud Architects Pte Ltd (novated from Chao Tse Ann & Partners Pte Ltd) : KTP Consultants Pte Ltd : Chip Eng Seng Contractors (1988) Pte Ltd (Design & Build) : AMK Properties Pte Ltd : S$91.0 million : 28 months Residential Non-landed Buildings Category (for projects with GFA > 25,000m 2 ) Bukit Merah Redevelopment Contract 29 Architectural Consultant : Housing & Development Board Structural Consultant : Housing & Development Board Collaborating Architectural Consultant : Surbana International Consultants Pte Ltd Collaborating Structural Consultant : Surbana International Consultants Pte Ltd : Evan Lim & Co. Pte. Ltd. : Housing & Development Board : S$78.0 million Construction Period : 42 months Gross Floor Area : 163,995 m 2 : 82 pts Residential Non-landed Buildings Category (for projects with GFA > 25,000m 2 ) Sembawang Neighbourhood 4 Contract 9 Architectural Consultant : Housing & Development Board Structural Consultant : Housing & Development Board Collaborating Architectural Consultant : Surbana International Consultants Pte Ltd Collaborating Structural Consultant : Surbana International Consultants Pte Ltd : Chip Eng Seng Contractors (1988) Pte Ltd : Housing & Development Board : S$48.9 million Construction Period : 33 months Gross Floor Area : 62,026 m 2 : 85 pts 10 m a r c h > a p r i l 0 6

11 ign Awards (Merit) Additions & Alterations / Upgrading Buildings Category Telok Blangah Crescent Main Upgrading Programme 16 Architectural Consultant : Housing & Development Board Structural Consultant : Housing & Development Board Collaborating Architectural Consultant : Surbana International Consultants Pte Ltd Collaborating Structural Consultant : Surbana International Consultants Pte Ltd : Hi-Tek Construction Pte Ltd : Housing & Development Board : S$16.8 million Construction Period : 22 months Gross Floor Area : 28,791 m 2 : 86 pts Institutional Buildings Category Yu Neng Primary School Architectural Consultant : CPG Consultants Pte Ltd Structural Consultant : CPG Consultants Pte Ltd : Singa Development Pte Ltd : Ministry of Education : S$14.3 million Construction Period : 12 months Gross Floor Area : 17,249 m 2 : 79 pts Institutional Buildings Category National Library Architectural Consultant Structural Consultant Project Manager Construction Period Gross Floor Area : 58,783 m 2 : 75 pts : DP Architects Pte Ltd : Maunsell Consultants (Singapore) Pte Ltd : Rider Hunt Levett & Bailey : Nishimatsu Lum Chang JV (Design & Build) : National Library Board : S$203 million : 20 months 11

12 Construction 21 B The Award The Construction 21 Best Practice Awards (C21 BPA) was launched in May 2000 to recognise companies and organisations which demonstrate leadership, innovation and sustained efforts in adopting best practices that exemplify the paradigm shift and strategic changes recommended in the C21 Report. This is to help develop a more progressive construction industry, which is able to realise its vision for the 21 st century: To be a World Class Builder in the Knowledge Age. Award Winner: Tiong Seng Contractors (Pte) Ltd Organisation Profile Established in 1959, Tiong Seng Contractors (Pte) Ltd is a leading Singapore contractor registered with BCA, under the highest financial grade of A1 for both general building and civil engineering categories. Besides Singapore, the company also has a presence in China, India, Laos and Papua New Guinea. Category: Improving Industry Practices & Techniques Description: Implementing Waste Water Recycling System for Silt Water Management and Recycling for Construction Usage Best Practice As part of its corporate culture of continuous improvement and the need for proper silt water management, Tiong Seng has pioneered the construction industry s first mobile water recycling system. The system uses Ultra-Filtration Membrane Technology to treat silt water and reduce the total suspended solids contents to well below the authority requirements. The recycled water is used for construction purposes. The practice has helped the company maintain good environmental record in earth control measures and ensured that drains and waterways around the construction sites remain clean. It has also helped to conserve water resources and reduced the dependency of potable water supplied by the Public Utilities Board. The water usage by Tiong Seng s construction sites has reduced substantially since the implementation of the water recycling system. Impact on Industry The practice can be replicated by other contractors as the water recycling system implemented on construction site is mobile, simple to operate, and can be easily configured within a shorter time. The mobile water recycling system was first introduced in Parc Emily Condominium and subsequently to other projects such as RiverEdge Condominium, The Arc Condominium and The Knolis at Sentosa. The practice will raise the level of environmental awareness among contractors in the construction industry on the need to conserve water and practise good earth control measures to reduce water pollution. Mobile Water Recycling Plant 12 m a r c h > a p r i l 0 6

13 est Practice Awards Merit Winner: YKK AP Singapore Pte Ltd Organisation Profile A member of YKK group of companies worldwide, YKK AP Singapore Pte Ltd was incorporated in 1976 with core businesses in building facade elements, including facade glass and cladding wall paneling, architectural features, trellis etc. The company is currently registered with BCA under the highest financial grade of L6 in the curtain walls, windows and doors category. Category: Improving Industry Practices & Techniques Description: Application of Top-down Facade Re-cladding Method with an Inverted Drainage System for Improved Performance in Retrofitting Projects Best Practice The top-down facade re-cladding method with built-in inverted internal drainage, introduced by YKK AP, is the first of its kind in Singapore. The practice has been successfully implemented at High Street Centre, an existing 30-storey building. The company is currently implementing a similar concept in another project - Singapore Power Building at Somerset Road. The top-down sequence is made possible through innovative modification of the conventional unitised curtain wall stack joint, and incorporation of an inverted splice plate. The advantages of this method include shorter construction period, lower construction cost and safer working environment. It allows minimum disturbances to existing tenants of the buildings under retrofitting, as they are able to resume full use of internal space in a shorter timeframe. It also eliminates the need of providing extensive temporary protection for weather tightness to the premises during the construction phase. Impact on Industry The top-down facade re-cladding method has not only benefited the company, but also the building owners, tenants and the subcontractors. There is potential for wider application in future retrofitting projects. High Street Centre Facade Recladding 13

14 Construction E One George Street (Commercial/Mixed Development Buildings Category) : Kajima Overseas Asia Pte Ltd : George Street Pte Ltd Architectural Consultant : DCA Architects Pte Ltd Structural Consultant : T.Y. Lin International Pte. Ltd. : Squire Mech Pte Ltd : Davis Langdon & Seah Singapore Pte Ltd : S$98.0 million Construction Period : 26.5 months Gross Floor Area : 51,713m 2 One Marina Boulevard (Commercial/Mixed Development Buildings Category) : Samsung - Tiong Seng J.V. : Singapore Labour Foundation Architectural Consultant : DP Architects Pte Ltd Structural Consultant : P&T Consultants Pte Ltd : Beca Carter Hollings & Ferner (S.E. Asia) Pte Ltd : Davis Langdon & Seah Singapore Pte Ltd : S$117.4 million Construction Period : 24 months Gross Floor Area : 48,302m 2 Chancery and Staff Residence Complex for Embassy of the Republic of Singapore in Yangon (Institutional Buildings Category) : Hexacon Construction Pte Ltd : Ministry of Foreign Affairs, Singapore Architectural Consultant : CPG Consultants Pte Ltd Structural Consultant : CPG Consultants Pte Ltd : CPG Consultants Pte Ltd : CPG Consultants Pte Ltd : S$18.0 million Construction Period : 27 months Gross Floor Area : 8,410m 2 ITE College East at Simei Avenue (Institutional Buildings Category) : Kajima Overseas Asia Pte Ltd : Institute of Technical Education Architectural Consultant : RSP Architects Planners & Engineers (Pte) Ltd Structural Consultant : RSP Architects Planners & Engineers (Pte) Ltd : Squire Mech Pte Ltd : Davis Langdon & Seah Singapore Pte Ltd : S$184.1 million Construction Period : 20 months Gross Floor Area : 129,440m 2 14 m a r c h > a p r i l 0 6

15 The Construction Excellence Awards was launched in 1986 to promote and enhance construction excellence in the industry. It gives recognition to construction firms for achieving excellence in areas of management, technology and construction quality. xcellence Awards Goldenhill Villas (Residential Buildings Category - $1000/m 2 & above) : Tiong Seng Contractors (Pte) Ltd : City Developments Limited Architectural Consultant : S H LIM Architects Pte Ltd Structural Consultant : Richard K C Lim & Partners : Alpha Engineering Consultant : KPK s (1995) Singapore Pte Ltd : S$31.9 million Construction Period : 38.5 months Gross Floor Area : 19,009m 2 Goldenhill Park Condominium (Residential Buildings Category - $1000/m 2 & above) : Hyundai Engineering & Construction Co Ltd : City Developments Limited Architectural Consultant : ADDP Architects Structural Consultant : LSW Consulting Engineers : Meinhardt (S) Pte Ltd : Davis Langdon & Seah Singapore Pte Ltd : S$31.9 million Construction Period : 30 months Gross Floor Area : 51,113m 2 Tanamera Crest Condominium (Residential Buildings Category - $1000/m 2 & above) : Woh Hup (Pte) Ltd : CapitaLand Residential Singapore Pte Ltd Architectural Consultant : RDC Architects Pte Ltd Structural Consultant : PB Merz & McLellan Pte Ltd : J Roger Preston (S) Pte Ltd : Davis Langdon & Seah Singapore Pte Ltd : S$44.3 million Construction Period : 31 months Gross Floor Area : 32,225m 2 Water Place (Residential Buildings Category - $1000/m 2 & above) : Woh Hup (Pte) Ltd : Far East Organization Architectural Consultant : Archurban Architects Planners Structural Consultant : KTP Consultants Pte Ltd : Beca Carter Hollings & Ferner (S.E. Asia) Pte Ltd : Rider Hunt Levett & Bailey : S$78.1 million Construction Period : 47 months Gross Floor Area : 58,576m 2 15

16 Construction Excellence Awards Amaryllis Ville (Residential Buildings Category - $1000/m 2 & above) : Thian Sung Construction Pte Ltd : Wingrove Investment Pte Ltd (A subsidiary company of Wing Tai Asia) Architectural Consultant : P & T Consultants Pte Ltd Structural Consultant : P & T Consultants Pte Ltd : United Project Consultants Pte Ltd : KPK s (1995) Singapore Pte Ltd : S$60.7 million Construction Period : 42 months Gross Floor Area : 34,920m 2 Construction Excellence Awards (Merit) School of Biological Sciences for Nanyang Technological University (Institutional Buildings Category) : Evan Lim & Co. Pte Ltd : Nanyang Technological University Architectural Consultant : CPG Consultants Pte Ltd Structural Consultant : CPG Consultants Pte Ltd : CPG Consultants Pte Ltd : CPG Consultants Pte Ltd : S$66.4 million Construction Period : Phase 1-89 weeks, Phase weeks Gross Floor Area : 37,281m 2 Bridge across Jurong River (Civil Engineering Projects Category) Principal Consultant Structural Consultant Construction Period : Hock Lian Seng Infrastructure Pte Ltd : Land Transport Authority : T.Y. Lin International Pte. Ltd. : T.Y. Lin International Pte. Ltd. : S$ 25.6 million : 40 months Belmond Green Condominium (Residential Buildings Category - $1000/m 2 & above) : Dragages Singapore Pte Ltd : CRL Realty Pte Ltd Architectural Consultant : RSP Architects Planners & Engineers (Pte) Ltd Structural Consultant : T.Y. Lin International Pte. Ltd. : Belmacs Consulting Engineers : Davis Langdon & Seah Singapore Pte Ltd : S$49.0 million Construction Period : 21 months Gross Floor Area : 27,167m 2 16 m a r c h > a p r i l 0 6

17 Construction Excellence Awards (Merit) Grange Residences (Residential Buildings Category - $1000/m 2 & above) : Shimizu Corporation : Wheelock Properties (Singapore) Ltd Architectural Consultant : RSP Architects Planners & Engineers (Pte) Ltd Structural Consultant : RSP Architects Planners & Engineers (Pte) Ltd : Squire Mech Pte Ltd : WT Partnership : S$117.2 million Construction Period : 38 months Gross Floor Area : 46,998m 2 Nuovo Executive Condominium (Residential Buildings Category - $1000/m 2 & above) : Poh Lian Construction Pte Ltd : City Developments Limited Architectural Consultant : Architects Vista Pte Ltd Structural Consultant : KTP Consultants Pte Ltd : Squire Mech Pte Ltd : Davis Langdon & Seah Singapore Pte Ltd : S$46.6 million Construction Period : 26 months Gross Floor Area : 40,565m 2 Caribbean at Keppel Bay (Residential Buildings Category - $1000/m 2 & above) : Shimizu Corporation : Keppel Bay Pte Ltd Architectural Consultant : DCA Architects Pte Ltd Structural Consultant : T.Y. Lin International Pte. Ltd. : Beca Carter Hollings & Ferner (S.E. Asia) Pte Ltd : Davis Langdon & Seah Singapore Pte Ltd : S$267.2 million Construction Period : 35.5 months Gross Floor Area : 132,780m 2 The Gardens at Bishan (Residential Buildings Category - $1000/m 2 & above) : Woh Hup (Pte) Ltd : GuocoLand Ltd Project Manager : GuocoLand Property Management Pte Ltd Architectural Consultant : Design Link Architects Structural Consultant : KKT Consultants : United Project Consultants Pte Ltd : OTN Building Cost Consultants Pte Ltd : S$118.4 million Construction Period : Phase 1 : 36 months, Phase 2 : 42 months Gross Floor Area : 87,373m 2 Building Works at Bukit Batok Neighbourhood 3 Contract 10 (Residential Buildings Category Below $1000/m 2 ) : Chip Eng Seng Contractors (1988) Pte Ltd : Housing Development Board Architectural Consultant : Surbana Consultants Pte Ltd Structural Consultant : Surbana Consultants Pte Ltd : Surbana Consultants Pte Ltd : Surbana Consultants Pte Ltd : S$43.5 million Construction Period : 36 months Gross Floor Area : 114,580m 2 17

18 BCA Awards Asses BCA would like to thank all the chairmen and members of the Assessment Committees for their hard wo Green Mark 2006 Advisory Committee Chairman Mr Lee Chuan Seng Members Mr Abdul Rashid Bin Ibrahim Mr Chng Chee Beow Mr Fung John Chye Er Vincent Han Kim Siew A/Prof. Lee Siew Eang Mr Ong Seng Eng Mr Peng Kah Poh Mr Howard Shaw Chai Li Mr Tony Tay Chye Teck A/Prof. Tay Seow Ngie Mr Tan Tian Chong Mr Wong Wai Ching Chairman Beca Carter Hollings & Ferner (S.E.Asia) Pte Ltd Energy Market Authority Wing Tai Land Pte Ltd Point Architects Vincent Han & Associates National University of Singapore National Environmental Agency Public Utilities Board Singapore Environment Council Parsons Brinckerhoff Pte Ltd Nanyang Technological University Building and Construction Authority Building and Construction Authority Best Buildable Design Awards 2006 Assessment Committee Chairman Mr Lim Ee Seng Members Mr Chang Meng Teng Mr Goh Peng Thong Mr Koo Tin Chew, Vincent A/Prof. Joseph Lim Ee Man Mr Satoshi Inoue Mr Shum Chee Hoong Dr Tan Guan Mr Tan Tai Soon Mr Wong Peng Yan Mr Yeo Siang Thong Mr Tan Tian Chong Mr William Tan Yong Keh Chief Executive Officer Frasers Centrepoint Limited Squire Mech Pte Ltd Alfred Wong Partnership Pte Ltd DCA Architects Pte Ltd National University of Singapore Shimizu Corporation Housing & Development Board T.Y. Lin International Pte. Ltd. Straits Developments Pte Ltd Far East Organization Chip Eng Seng Corporation Ltd Building and Construction Authority Building and Construction Authority 18 m a r c h > a p r i l 0 6

19 sment Committees rk and valuable contributions to the BCA Awards. Construction 21 Best Practice Awards 2006 Assessment Committee Chairman Mr Eugene Yong Kon Yoon Members Mr Patrick Chia Mr Michael Ho Mr Khor Thong Meng Mr Lai Huen Poh Prof. George Ofori Mr Satyanarayan R Mr Alex Siow Mr Tan Kian Huay Mr Yee Chen Fah Mr William Tan Yong Keh Director Woh Hup (Pte) Ltd AT-II Architects SembCorp Environmental Management Pte Ltd Allgreen Properties Ltd RSP Architects Planners & Engineers (Pte) Ltd National University of Singapore KPMG Corporate Finance Pte Ltd StarHub Ltd Hainan Jian Feng Tourism Development Co. Ltd PricewaterhouseCoopers Building and Construction Authority Construction Excellence Awards 2006 Assessment Committee Chairman Mr Lee Kut Cheung Members Ms Chia Oi Leng Mr Chng Chee Beow Mr Chue Fook Chee Mr Peter Lee Mr Ler Seng Ann Mr Pek Lian Guan Mr Tan Kim Chwee Mr Tan Soon Kian Mr Tan Swee Yiow A/Prof. Ting Seng Kiong Mr Eddie Wong Mr Eugene Yong Kon Yoon Mr Lam Siew Wah Mr Tan Tian Chong Director RSP Architects Planners & Engineers (Pte) Ltd Nanyang Technological University Wing Tai Property Management Pte Ltd CPG Consultants Pte Ltd Singapore Polytechnic Urban Redevelopment Authority Tiong Seng Contractors (Pte) Ltd Housing & Development Board Poh Lian Construction Pte Ltd Keppel Land International Ltd Nanyang Technological University City Developments Limited Woh Hup (Pte) Ltd Building and Construction Authority Building and Construction Authority 19

20 Coming soon Date Event Contact May 06 - Mar 07 9-month Part-time Specialist Diploma Programmes Ms Xiao Man Business Administration DID: Construction Management Huang_Xiaoman@bca.gov.sg Facility Management & Enhancement Interior & Landscape Design M&E Co-ordination Construction Quality, Environmental, Occupational Health & Safety Management May 06 Course on Good Industry Practices Ms Xanna Tan Waterproofing for Internal Wet Areas (9 May 06) DID: Painting (16 May 06) Xanna_Tan@bca.gov.sg Aluminium Window (23 May 06) May 06 Course on Project Management Ms Xanna Tan DID: Xanna_Tan@bca.gov.sg For more courses at CITI, please visit CITI's webpages at or call for CITI's training programme. Your views and contributions Please give us your feedback and comments on our newsletter or suggestions on what you would like to see in the newsletter. You are also welcomed to contribute an article in the Framework subject to the approval of BCA. Please attention it to The Editor, Framework if you send by post or fax to the BCA address below. Alternatively, you can to bca_enquiry@bca.gov.sg Contact Us General Enquiries Tel: Advertisement Licensing Tel: Building Management Tel: Construction Activity Feedback Tel: Household Shelter Tel: Plan Approval, TOP, CSC Tel: Plan Search Tel: CITI Courses and Tests Tel: (Training) Tel: (Testing) CONQUAS / Quality Mark Tel: ISO Certification Tel: Contractors Registry Tel: CORENET Tel: (e-info) Tel: (e-submission) Incentive Schemes Tel: (IAS) Framework is published bi-monthly by the Corporate Communications Department, Building and Construction Authority 5 Maxwell Road #16-00 Tower Block MND Complex Singapore Tel: Fax: bca_enquiry@bca.gov.sg Website: Written permission must be obtained from BCA to reproduce any part of Framework. Editor: Lam Fei Yen Editorial Advisor: Jeanna Das Circulation Officer: Nor Ainah Bte Ali designed & produced by

Green and Sustainable Buildings

Green and Sustainable Buildings Green and Sustainable Buildings Design Criteria and Application in Hong Kong Green building is the practice of increasing the efficiency with which buildings use resources energy, water and materials.

More information

http://www.bca.gov.sg/greenmark/others/gm_nreb_v2.1.pdf

http://www.bca.gov.sg/greenmark/others/gm_nreb_v2.1.pdf Green Mark Criteria for Non-residential Existing Building (Version 2.1) GM for Non-residential Existing Buildings Criteria (Ver. 2.1) can be downloaded from : http://www.bca.gov.sg/greenmark/others/gm_nreb_v2.1.pdf

More information

Holistic Approach in Delivering Government Buildings The Low Carbon Concept

Holistic Approach in Delivering Government Buildings The Low Carbon Concept International Conference on Planning for Low Carbon Cities 22 May 2009 Holistic Approach in Delivering Government Buildings The Low Carbon Concept Ir. HO Sai-king, Assistant Director (Building Services),

More information

GREEN FACTS. Marina Bay Sands

GREEN FACTS. Marina Bay Sands Marina Bay Sands GREEN FACTS Marina Bay Sands is committed to integrating sustainability into the core business strategy. We drive sustainability through our Sands ECO360 Sustainability programme, a global

More information

Year project completed or estimated year of completion: October 2014

Year project completed or estimated year of completion: October 2014 Name (Mr/Ms/Dr): Mr Rainer Tenius Job title: General Manager Company s name: Swissôtel Merchant Court, Singapore Award won: BCA Green Mark Award (Platinum) Name of Project that won the award, if applicable:

More information

Companies Certified by Building and Construction Authority

Companies Certified by Building and Construction Authority Certification Standard : SS ISO 9001:2008 Construction Ah Boon Civil Engineering & Building Contractor Pte Ltd AHC Enterprises Pte Ltd Aik Chuan Construction Pte Ltd BBR Construction Systems Pte Ltd BBR

More information

BCA EXTENDS ITS GREEN MARK CERTIFICATION TO RESTAURANTS - BCA Green Mark certification for Asia s first green McDonald s restaurants

BCA EXTENDS ITS GREEN MARK CERTIFICATION TO RESTAURANTS - BCA Green Mark certification for Asia s first green McDonald s restaurants MEDIA RELEASE BCA EXTENDS ITS GREEN MARK CERTIFICATION TO RESTAURANTS - BCA Green Mark certification for Asia s first green McDonald s restaurants - McDonald s Jurong Central Park outlet first to clinch

More information

APPOINTMENTS TO THE SINGAPORE ACCOUNTANCY COMMISSION (SAC)

APPOINTMENTS TO THE SINGAPORE ACCOUNTANCY COMMISSION (SAC) Press Release APPOINTMENTS TO THE SINGAPORE ACCOUNTANCY COMMISSION (SAC) 1. The Minister for Finance has re-appointed Mr Michael Lim, Chairman of the Land Transport Authority and Nomura Singapore Limited,

More information

Circular No : URA/PB/2004/29-CUDD Fax: 6220 3201 Our Ref : DC/ADMIN/CIRCULAR/PB_04 Date : 6 Sep 2004

Circular No : URA/PB/2004/29-CUDD Fax: 6220 3201 Our Ref : DC/ADMIN/CIRCULAR/PB_04 Date : 6 Sep 2004 Circular No : URA/PB/2004/29-CUDD Fax: 6220 3201 Our Ref : DC/ADMIN/CIRCULAR/PB_04 Date : 6 Sep 2004 CIRCULAR TO PROFESSIONAL INSTITUTES GUIDELINES TO ENCOURAGE MORE INNOVATIVE AND BETTER DESIGN OF ROOFTOPS.

More information

9.20am. Welcome Address Mr Chan Kok Way Chairman, Building and Construction Standards Committee Managing Partner, SD Architects LLP

9.20am. Welcome Address Mr Chan Kok Way Chairman, Building and Construction Standards Committee Managing Partner, SD Architects LLP Launch of Technical Reference on Facility Design Guidelines for Acute General Hospitals (TR 42: 2015) 18 August 2015 (Tuesday), 8.45 am to 12.00 pm, LIFELONG LEARNING INSTITUTE 9.20am Speaker/ Topic Welcome

More information

CASE STUDY: The EVERGREEN

CASE STUDY: The EVERGREEN CASE STUDY: The EVERGREEN 1691 Palm Ave Summary Information Type: Residential Occupancy: Single Family Residence Size: 3,075 square feet Completed: 2009 Owner: Rob and Denise Smith Developer: E2 Homes,

More information

FIRST FACILITIES MANAGEMENT COHORT FROM BCA AND UNIVERSITY COLLEGE LONDON POSTGRADUATE MASTER S PROGRAMME GRADUATES

FIRST FACILITIES MANAGEMENT COHORT FROM BCA AND UNIVERSITY COLLEGE LONDON POSTGRADUATE MASTER S PROGRAMME GRADUATES MEDIA RELEASE FIRST FACILITIES MANAGEMENT COHORT FROM BCA AND UNIVERSITY COLLEGE LONDON POSTGRADUATE MASTER S PROGRAMME GRADUATES - UCL s first global postgraduate Master of Science degree in Facility

More information

Sustainable Strategies for Rehabilitation Projects: 9th Street Office Building Adaptive Reuse Case Study

Sustainable Strategies for Rehabilitation Projects: 9th Street Office Building Adaptive Reuse Case Study Sustainable Strategies for Rehabilitation Projects: 9th Street Office Building Adaptive Reuse Case Study Robert C. Burns, AIA, LEED AP Principal Director of Historic Architecture 804. 648. 5040, ext. 1107

More information

IMMERSION MANAGEMENT SERVICE KG

IMMERSION MANAGEMENT SERVICE KG IMMERSION MANAGEMENT SERVICE KG German Based Engineering and Consulting Group developing and implementing High Efficiency HVAC Solutions for Green Buildings Innovative Water Saving Technologies IMMERSION

More information

Gloria Marshall Elementary School. Spring Independent School District Houston, TX

Gloria Marshall Elementary School. Spring Independent School District Houston, TX Gloria Marshall Elementary School Spring Independent School District Houston, TX Gloria Marshall Elementary School Spring Independent School District Houston, TX Size: 105,390SF Cost: 15.6 million Completed:

More information

Singapore, 31 July 2013 The Building and Construction Authority (BCA) has organised a new competition to encourage more innovative ideas on mobile

Singapore, 31 July 2013 The Building and Construction Authority (BCA) has organised a new competition to encourage more innovative ideas on mobile MEDIA RELEASE BIM TECHNOLOGY PAVES THE WAY FOR GREATER INDUSTRY COLLABORATION - Inaugural BIM Mobile Apps Competition draws creative solutions for construction site management - Multi-disciplinary category

More information

List of Communication School in Singapore

List of Communication School in Singapore List of School in No / 1 School of, Arts and Social Sciences 2 LASALLE College of The Arts Country Major / Programme Dean Contact Diploma in Media and Diploma in Applied Drama and Psychology Diploma in

More information

BCA Green Mark for Existing Non-Residential Buildings Version 3.0

BCA Green Mark for Existing Non-Residential Buildings Version 3.0 BCA Green Mark for Existing Non-Residential Buildings Version 3.0 Framework BCA Green Mark for Existing Non-Residential Buildings (version 3.0) To achieve Green Mark Award Pre-requisite Requirement All

More information

Global conglomerate China Sonangol buys 15 million OKP Holdings shares; move prepares ground for future business collaboration

Global conglomerate China Sonangol buys 15 million OKP Holdings shares; move prepares ground for future business collaboration China Sonangol International (S) Pte Ltd No. 6 Tagore Drive 9 Temasek Boulevard #42-01 #B1-06 Tagore Building #42-01, Suntec Tower 2 Singapore 787623 Singapore 038989 Tel: (65) 6456 7667 Tel: (65) 6808

More information

OKP HOLDINGS LIMITED SECURES S$9.8 MILLION PUB PROJECT FOR DRAINAGE IMPROVEMENT WORKS AT VARIOUS LOCATIONS IN WESTERN REGION OF SINGAPORE

OKP HOLDINGS LIMITED SECURES S$9.8 MILLION PUB PROJECT FOR DRAINAGE IMPROVEMENT WORKS AT VARIOUS LOCATIONS IN WESTERN REGION OF SINGAPORE 30 Tagore Lane Singapore 787484 Tel: (65) 6456 7667 Fax: (65) 6459 4316 For Immediate Release OKP HOLDINGS LIMITED SECURES S$9.8 MILLION PUB PROJECT FOR DRAINAGE IMPROVEMENT WORKS AT VARIOUS LOCATIONS

More information

Rainwater Harvesting

Rainwater Harvesting Rainwater Harvesting With climate change now a reality rather than a speculated possibility, the demand on water resources has gone up, whilst the amount of water available for supply has gone down. Forth

More information

GREEN SCHOOLS CASE STUDY. West Wing Elementary

GREEN SCHOOLS CASE STUDY. West Wing Elementary GREEN SCHOOLS CASE STUDY School School name: School Deer Valley Union School District Address: 26716 N. High Desert Drive, Peoria, Arizona Contact: Jerry Cipriano Phone number: 602-467-5131 General location:

More information

MASTER OF ENGINEERING TECHNOLOGY & BACHELOR OF ENGINEERING WITH HONOURS IN SUSTAINABLE INFRASTRUCTURE ENGINEERING (BUILDING SERVICES)

MASTER OF ENGINEERING TECHNOLOGY & BACHELOR OF ENGINEERING WITH HONOURS IN SUSTAINABLE INFRASTRUCTURE ENGINEERING (BUILDING SERVICES) MASTER OF ENGINEERING TECHNOLOGY & BACHELOR OF ENGINEERING WITH HONOURS IN SUSTAINABLE INFRASTRUCTURE ENGINEERING (BUILDING SERVICES) ARE YOU MADE FOR AN SIT DEGREE?? PHYSICAL SCIENCE & ENGINEERING Master

More information

Green House, Hungary

Green House, Hungary Further information Skanska AB www.skanska.com Contact Noel Morrin, SVP Sustainability & Green Support noel.morrin@skanska.se Green House, Hungary Case Study 109 Aspects of Sustainability This project

More information

Building Condition Assessment Report

Building Condition Assessment Report C2 - Nurses Resident (aka Administration) Building Condition Assessment Report Asset Address Address Construction Year Size (Gross Floor Area) Asset Type Floors Above Ground Inspection Date C2 - Nurses

More information

Tysons Sustainability Summit Evidence Based Urban Design. Roger E. Frechette III, PE, LEED-AP

Tysons Sustainability Summit Evidence Based Urban Design. Roger E. Frechette III, PE, LEED-AP Tysons Sustainability Summit Evidence Based Urban Design 2013 Autodesk Roger E. Frechette III, PE, LEED-AP Live in Harmony with Nature Transit Community Energy Waste Air Quality Water Yujiapu Financial

More information

ABLE CONSTRUCTION PTE LTD. Company Profile. Project Management Construction Services

ABLE CONSTRUCTION PTE LTD. Company Profile. Project Management Construction Services ABLE CONSTRUCTION PTE LTD Company Profile Project Management Construction Services History & Philosophy ABLE Construction began as a general works contractor in 1995. Over the years, the group has undertaken

More information

LEED PRESENTATION OUTLINE

LEED PRESENTATION OUTLINE 16902 BOLSA CHICA STREET, SUITE 101 HUNTINGTON BEACH, CA 92649 TELEPHONE (714) 840-8230 FACSIMILE (714) 840-2490 LEED PRESENTATION OUTLINE I. Overview of Green Building and Risks Involved with Sustainability

More information

(Constituted in Republic of Singapore pursuant to a Trust Deed dated 29 January 2008 (as amended))

(Constituted in Republic of Singapore pursuant to a Trust Deed dated 29 January 2008 (as amended)) (Constituted in Republic of Singapore pursuant to a Trust Deed dated 29 January 2008 (as amended)) PRESS RELEASE BCA-IDA Green Mark Platinum Award for Mapletree Industrial Trust s Build-To-Suit Data Centre

More information

SEC(K) Trade Tests PlanT OPEraTiOn Civil EnginEEring STruCTural

SEC(K) Trade Tests PlanT OPEraTiOn Civil EnginEEring STruCTural SEC(K) Trade Tests Available At BCA s Overseas Testing Centres Structural Civil Engineering Plant Operation Precast Kerb & Drain Laying Tower Crane Operation Timber Formwork Welding Pipe Fitting Bored

More information

CALIBRATION OF EQUIPMENT FOR PILE LOAD TEST BY SAC-SINGLAS ACCREDITED LABORATORIES

CALIBRATION OF EQUIPMENT FOR PILE LOAD TEST BY SAC-SINGLAS ACCREDITED LABORATORIES Our Ref : APPBCA-2016-02 1 March 2016 Building Engineering Group (#12-00) Fax : 6334 2561 DID : 6804 4600 See Distribution Dear Sir/Madam CALIBRATION OF EQUIPMENT FOR PILE LOAD TEST BY SAC-SINGLAS ACCREDITED

More information

Each icon on this map represents the physical location of a station.

Each icon on this map represents the physical location of a station. ABBOTSFORD SCHOOL DISTRICT: GREEN TOUR TOMORROW S SUSTAINABLE SOLUTIONS TODAY Welcome to the Abbotsford School District: Green Tour. Our goal is to create an interactive learning experience for visitors

More information

Green Mark for Buildings Award 08

Green Mark for Buildings Award 08 Contents Green Mark for Buildings Award 08 Education Resource Centre 10 Lian Beng Building 11 Solaris 12 United World College South East Asia (East Campus) 13 W Singapore Sentosa Cove 14 Woh Hup Building

More information

Minimum Housing and Health Standards

Minimum Housing and Health Standards APPENDIX M.O. 57/2012 Minimum Housing and Health Standards Original version July 20, 1999. Revisions to Part lll, Housing Premises, sections 3 and 4, June 30, 2012 (all revisions are bolded and underlined).

More information

Energy Efficiency and Renewable Energy For Schools

Energy Efficiency and Renewable Energy For Schools Energy Efficiency and Renewable Energy For Schools Jesse Putzel & David Pitcher (energy conservation and solar centre) ecsc - who we are Environmental Charity involved in both energy efficiency and renewable

More information

SIA Event: SIA Fire Safety Seminar 2015: Unprotected Openings, Means of Escape, Fire Forensic Cases

SIA Event: SIA Fire Safety Seminar 2015: Unprotected Openings, Means of Escape, Fire Forensic Cases EVENT DETAILS Programme: 1.30pm 2.00pm 2.45pm 3.15pm 4.00pm 4.30pm Registration Presentation by Mdm Eng Yew Hoon Unprotected Openings Part 1: Interpretation & Application of Clause 3.5 Presentation by

More information

DEADLINES FOR PROJECTS REQUIRING MANDATORY BIM (BUILDING INFORMATION MODELLING) E-SUBMISSION FOR REGULATORY APPROVAL

DEADLINES FOR PROJECTS REQUIRING MANDATORY BIM (BUILDING INFORMATION MODELLING) E-SUBMISSION FOR REGULATORY APPROVAL Our Ref: APPBCA-2015-07 15 Apr 2015 See Distribution Dear Sir/Madam DEADLINES FOR PROJECTS REQUIRING MANDATORY BIM (BUILDING INFORMATION MODELLING) E-SUBMISSION FOR REGULATORY APPROVAL Objective This circular

More information

WATER. Water Management Protect your building from water damage. Intent. Information & Tips

WATER. Water Management Protect your building from water damage. Intent. Information & Tips Water Management Protect your building from water damage If not managed properly, rain can drain into unwanted areas damaging your roof, windows, walls and facade. Eliminate water damage to your property

More information

NYC Department of Education Building Condition Assessment Survey 2014-2015 BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 10004

NYC Department of Education Building Condition Assessment Survey 2014-2015 BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 10004 School: InspectionId Asset Data Inspection Type Building Assessment Survey 204-205 BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 0004 Time In Last Edited 255 MECHANICAL 205-05-8 09:00AM

More information

Energy Efficiency HOSPITALITY. www.energia.ie

Energy Efficiency HOSPITALITY. www.energia.ie Energy Efficiency HOSPITALITY www.energia.ie Your chance to reduce your business energy usage by as much as 20%! 20% is a significant figure and reducing your energy bill by this amount could make a real

More information

BREEAM Refurbishment and Fit-out 2014 Briefings. Part of the BRE Trust

BREEAM Refurbishment and Fit-out 2014 Briefings. Part of the BRE Trust BREEAM Refurbishment and Fit-out 2014 Briefings Part of the BRE Trust BREEAM for Refurbishment and Fit-out Follows 2 years of development Draft scheme published and consultation from 19 th July 2014 Launched

More information

Caring for. our. harbour

Caring for. our. harbour Caring for our harbour What s HATS? Stonecutters Island Sewage Treatment Works Harbour Area Treatment Scheme (HATS) is a major Government infrastructure project in Hong Kong. It is being implemented in

More information

BCA-IDA Green Mark for Existing Data Centres Version EDC/1.0

BCA-IDA Green Mark for Existing Data Centres Version EDC/1.0 BCA-IDA Green Mark for Existing Data Centres Version EDC/1.0 To achieve GREEN MARK Award Pre-requisite Requirement All relevant pre-requisite requirements for the specific Green Mark Rating are to be complied

More information

HOW AN ENERGY EFFICIENT HOME CAN HELP THE ENVIRONMENT

HOW AN ENERGY EFFICIENT HOME CAN HELP THE ENVIRONMENT HOW AN ENERGY EFFICIENT HOME CAN HELP THE ENVIRONMENT During the last century, concern about the environment increased, as issues such as global warming and the Greenhouse Effect convinced us that the

More information

energy in education promoting energy efficiency in schools

energy in education promoting energy efficiency in schools The DART Energy Research Programme Recognising that the programme should be as much about people and changing cultures while delivering service the approach was developed initially through the four different

More information

BCA Green Mark for Restaurants

BCA Green Mark for Restaurants BCA Green Mark for Restaurants Updated: 10/5/2011 1 Point Allocations - BCA Green Mark for Restaurants (I) Energy Related Requirements Part 1 : Energy Efficiency Category Point Allocations Minimum 20 points

More information

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components Infrastructure Facility Condition Summary Weighted Avg Condition Score Facility Components Systems Surveyor/ Date Done Comments G Sitework.9 Site Improvements Parking Pedestrian Paving Site Development

More information

CitySwitch Green Office Sustainability Action Plan Small Business

CitySwitch Green Office Sustainability Action Plan Small Business CitySwitch Green Office Sustainability Action Plan Small Business Organisation details Organisation name: Address: Energy Manager: Contact details: Number of employees in office: NABERS rating commitment:

More information

The built environment : a policy framework for climate adaptation

The built environment : a policy framework for climate adaptation The built environment : a policy framework for climate adaptation The Hon. Tom Roper President, Australian Sustainable Built Environment Council Board Member, Climate Institute Thriving Neighbourhoods

More information

Towards a Green and Sustainable IIT Kanpur

Towards a Green and Sustainable IIT Kanpur Towards a Green and Sustainable IIT Kanpur Saving the environment is not only about introducing energy saving devices. It is about changing people s mindset and making them want to save the environment

More information

Site visit to the University of Nottingham Jubilee Campus

Site visit to the University of Nottingham Jubilee Campus Site visit to the University of Nottingham Jubilee Campus Peter Heaslip. Chris Bruce, John Lawlor, Paul Horan 25 February 2003 Original Campus Map University Park Existing University Park The main campus,

More information

CLP Power Inspires Business Customers to Excel at Energy Saving with Industrywide Roll-out of Energy Benchmarking Tool

CLP Power Inspires Business Customers to Excel at Energy Saving with Industrywide Roll-out of Energy Benchmarking Tool 7 November 2012 中 華 電 力 有 限 公 司 CLP Power Hong Kong Ltd CLP Power Inspires Business Customers to Excel at Energy Saving with Industrywide Roll-out of Energy Benchmarking Tool CLP Power Hong Kong Limited

More information

The South Carolina Sustainable Universities Initiative and its impact on the University of South Carolina

The South Carolina Sustainable Universities Initiative and its impact on the University of South Carolina The South Carolina Sustainable Universities Initiative and its impact on the University of South Carolina Francis A. Gadala-Maria Department of Chemical Engineering University of South Carolina 2005 Annual

More information

TYPE APPROVALS FOR VERTICAL PLATFORM LIFTS AND STAIRLIFTS COMPYLING WITH EUROPEAN DIRECTIVE 98/37/E, 95/16/EC OR BS 5776:1996 TO LAPSE

TYPE APPROVALS FOR VERTICAL PLATFORM LIFTS AND STAIRLIFTS COMPYLING WITH EUROPEAN DIRECTIVE 98/37/E, 95/16/EC OR BS 5776:1996 TO LAPSE Our Ref: BCA BC 15.0.3 Building Plan and Management Group 18 February 2014 See Distribution Dear Sir/Madam TYPE APPROVALS FOR VERTICAL PLATFORM LIFTS AND STAIRLIFTS COMPYLING WITH EUROPEAN DIRECTIVE 98/37/E,

More information

Green Codes & IGCC Update

Green Codes & IGCC Update City of Houston Code Enforcement Green Codes & IGCC Update CATEE Conference Dallas, TX November 9, 2011 Sheila Blake MBA, CBO, LEED AP Assistant Director, PWE Planning and Development Services 1 Houston

More information

MILTON HALL BCO AWARDS 2014 THE WORKSPACE CONSULTANTS LLP

MILTON HALL BCO AWARDS 2014 THE WORKSPACE CONSULTANTS LLP MILTON HALL BCO AWARDS 2014 EXTERNAL ELEVATIONS MILTON HALL THE EAST WING THE LINK BUILDING NORTH - WEST ELEVATION (1:200@A3) MILTON HALL THE LINK BUILDING THE NORTH WING SOUTH - EAST ELEVATION (1:200@A3)

More information

Part 1 : Energy and environmental management systems

Part 1 : Energy and environmental management systems SINGAPORE STANDARD SS 564 : Part 1 : 2013 (ICS 13.020.10; 33.020; 35.020) SINGAPORE STANDARD FOR Green data centres Part 1 : Energy and environmental management systems Published by SPRING Singapore 1

More information

DISCOVERY HALL, UNIVERSITY OF WASHINGTON BOTHELL Bothell, Washington 78,200 sf

DISCOVERY HALL, UNIVERSITY OF WASHINGTON BOTHELL Bothell, Washington 78,200 sf DISCOVERY HALL, UNIVERSITY OF WASHINGTON BOTHELL Bothell, Washington 78,200 sf Discovery Hall reflects its dynamic program and dramatic site, as well as the collaborative and student-centered spirit of

More information

SCHEDULE A BY-LAW B-6 CLASSES OF PERMITS AND FEES

SCHEDULE A BY-LAW B-6 CLASSES OF PERMITS AND FEES 1. CALCULATION OF PERMIT FEES SCHEDULE A BY-LAW B-6 CLASSES OF PERMITS AND FEES Permit fees shall be calculated based on the formula given below, unless otherwise specified in this schedule: Permit Fee

More information

case studies Safely applied, Environmentally creative and effective engineering solutions

case studies Safely applied, Environmentally creative and effective engineering solutions Safely applied, Environmentally creative and effective engineering solutions T: 02392 435050 @: eng@itdconsultants.co.uk www.itdconsultants.co.uk case studies Churchill House Main Features: A 1.5m refurbishment

More information

Whistler Green: Project Checklist

Whistler Green: Project Checklist Whistler Green: Project Checklist (Detached and duplex dwellings) Whistler Green is our community standard for healthy homes that use energy and resources efficiently in a mountain setting. Considered

More information

Technical seminar - Modern Technology for Solid Waste Management

Technical seminar - Modern Technology for Solid Waste Management Technical seminar - Modern Technology for Solid Waste Management co-organized by: Hong Kong Waste Management Association Environmental Division of Hong Kong Institute of Engineers Preparations at Wembley

More information

Zug, January 27, 2016

Zug, January 27, 2016 Zug, January 27, 2016 Education for sustainability s sake Energy efficiency and sustainability are at the heart of the philosophy on education of the United World College South East Asia (UWCSEA). From

More information

IMPLEMENTATION OF STRUCTURAL EUROCODES FROM 1 APR 2015

IMPLEMENTATION OF STRUCTURAL EUROCODES FROM 1 APR 2015 We shape a safe, high quality, sustainable and friendly built environment. Our Ref : BCA BC 15.0.3 APPBCA-2015-05 18 Mar 2015 Building Engineering Group (#12-00) Fax : 6334 2561 DID : 6804 4644 E-mail

More information

Welcome. Purpose of the exhibition

Welcome. Purpose of the exhibition Welcome Welcome to our exhibition, setting out plans for a redevelopment of Ten Broadway. It is currently the headquarters of the Metropolitan Police, which has made a decision to rationalise and relocate

More information

This report presents the findings and recommendations of the assessment of energy use and

This report presents the findings and recommendations of the assessment of energy use and This report presents the findings and recommendations of the assessment of energy use and environmental stewardship of Arlington Street Church, Boston, MA. As stewards of the earth it is important that

More information

Green Buildings Guidelines for Harvard

Green Buildings Guidelines for Harvard Green Buildings Guidelines for Harvard Presentation to the Administrative Deans. October 26th 2007 Leith Sharp, Director, Harvard Green Campus Initiative What is a Green Building? Average Savings of Green

More information

EarthCents (DSM) Program Summary

EarthCents (DSM) Program Summary EarthCents (DSM) Program Summary Renewable Energy EarthCents Programs Solar Water Heating This program is available to residential customers for the installation of a qualifying solar thermal water heater.

More information

Apartments. Setting a new standard in medium density public housing. Change View

Apartments. Setting a new standard in medium density public housing. Change View Setting a new standard in medium density public housing Enter Department of Human Services - Office of Housing Main menu 03 Introduction 05 Site Planning 07 Building Form 08 Passive Solar Design 10 Life

More information

St Vincent s University Hospital New Clinical Block Dublin, Ireland. 500 Bed Acute University Teaching Hospital Main Clinical Block

St Vincent s University Hospital New Clinical Block Dublin, Ireland. 500 Bed Acute University Teaching Hospital Main Clinical Block St Vincent s University Hospital New Clinical Block Dublin, Ireland 500 Bed Acute University Teaching Hospital Main Clinical Block EuHPN Health Facility Fact File Series No. 3 November 2011 Health Facility

More information

HEATING, VENTILATION & AIR CONDITIONING

HEATING, VENTILATION & AIR CONDITIONING HEATING, VENTILATION & AIR CONDITIONING as part of the Energy Efficiency Information Grants Program Heating and cooling can account for approximately 23 % of energy use in pubs and hotels 1. Reducing heating

More information

BOMA BESt Assessment Overview

BOMA BESt Assessment Overview BOMA BESt Assessment Overview BOMA Building Environmental Standards OFFICE Module August 2013 The Voice of the Commercial Real Estate Industry in Canada The Building Owners and Managers Association of

More information

Innovation in Affordable Housing Incorporating GREEN in Development

Innovation in Affordable Housing Incorporating GREEN in Development Innovation in Affordable Housing Incorporating GREEN in Development 2014 Housing Innovation Marketplace Conference INTRODUCTION A small idea can grow into something that really bears fruit and, if good

More information

Klosterenga, Oslo, Norway, 1998-2000 page - 1

Klosterenga, Oslo, Norway, 1998-2000 page - 1 Klosterenga, Oslo, Norway, 1998-2000 page - 1 Introduction Klosterenga is an urban revitalisation project close to the city centre of Oslo. The 3 apartments were built with a focus on energy saving. Next

More information

CHECKLIST FOR SUBMISSION Construction Productivity Awards - Projects 2015

CHECKLIST FOR SUBMISSION Construction Productivity Awards - Projects 2015 CHECKLIST FOR SUBMISSION Construction Productivity Awards - Projects 2015 PROJECT NAME: - Please check by ticking: - The following list of printed documents is enclosed: Nomination Form, duly completed

More information

Za abeel Energy City Master Plan. Dubai, United Arab Emirates

Za abeel Energy City Master Plan. Dubai, United Arab Emirates Dubai, United Arab Emirates Dubai, United Arab Emirates The Energy Master Plan is uniquely positioned as a center for both commerce and residential development. The project will embody modern, sustainable

More information

MORE JOB AND TRAINING OPPORTUNITIES FOR LOCALS IN CONSTRUCTION SECTOR

MORE JOB AND TRAINING OPPORTUNITIES FOR LOCALS IN CONSTRUCTION SECTOR MEDIA RELEASE MORE JOB AND TRAINING OPPORTUNITIES FOR LOCALS IN CONSTRUCTION SECTOR Despite the gloomy economic outlook, the construction sector, with the surge in construction projects these two years,

More information

5 th Seminar on Best Practices for Urban Tree Management

5 th Seminar on Best Practices for Urban Tree Management Latest Development of Landscape Architectural Education and Accredited Arboricultural Practitioners Paul Chan Hong Kong Institute of Landscape Architects Milestone Development of Landscape Architectural

More information

Columbia Theological Seminary to Celebrate Ground-blessing for New, Green Residence Hall

Columbia Theological Seminary to Celebrate Ground-blessing for New, Green Residence Hall FOR IMMEDIATE RELEASE News Release Contact: Anne Taylor Lord, Aeck & Sargent 404-253-6710 ataylor@lasarchitect.com or Ann Kohut Kohut Communications Consulting 770-913-9747 annielk@bellsouth.net Columbia

More information

Archant London Environmental Awards

Archant London Environmental Awards Archant London Environmental Awards Environmental Business of the Year Big Yellow Self Storage PLC Barking Central, Hertford Road, Barking, IG11 8BL Introduction Big Yellow is a local business that has

More information

RULES FOR THE SETTING UP OF SUSTAINABLE BRANCHES Summary

RULES FOR THE SETTING UP OF SUSTAINABLE BRANCHES Summary RULES FOR THE SETTING UP OF SUSTAINABLE BRANCHES Summary January 2013 TABLE OF CONTENTS INTRODUCTION... 3 GENERAL RECOMMENDATIONS... 3 Communication with customers in the field of environmental sustainability...

More information

Sustainable Features. High-performance HVAC. High-performance Envelope Green Roof Day-Lighting Bicycle Infrastructure

Sustainable Features. High-performance HVAC. High-performance Envelope Green Roof Day-Lighting Bicycle Infrastructure Sustainable Features High-performance HVAC High-performance Envelope Green Roof Day-Lighting Bicycle Infrastructure Sustainable Landscaping Recycled and Regional Materials Storm-water Management District

More information

IBF CELEBRATES PROFESSIONAL EXCELLENCE, CONFERS AWARDS ON 27 VETERANS

IBF CELEBRATES PROFESSIONAL EXCELLENCE, CONFERS AWARDS ON 27 VETERANS 10 Shenton Way T: +65 6220 8566 #13-07/08, MAS Building F: +65 6224 4947 Singapore 079117 www.ibf.org.sg EMBARGOED UNTIL 7.30PM, THURSDAY, 3 SEPTEMBER, 2015 IBF CELEBRATES PROFESSIONAL EXCELLENCE, CONFERS

More information

ALWAYS ON GLOBALSWITCH.COM

ALWAYS ON GLOBALSWITCH.COM ALWAYS ON GLOBALSWITCH.COM Data Centre Design Considerations Kelvin Fong Managing Director, Hong Kong ALWAYS ON GLOBALSWITCH.COM Agenda 1. Introduction to Global Switch 2. Customer Requirements 3. Development

More information

University of Melbourne Symposium on ICT Sustainability Dan Pointon 25 November 2008

University of Melbourne Symposium on ICT Sustainability Dan Pointon 25 November 2008 University of Melbourne Symposium on ICT Sustainability Dan Pointon 25 November 2008 Contents Welcome and Introduction Chapter 1: Data centre energy recap Chapter 2: Co-generation Chapter 3: CTC case study

More information

Brock Commons Phase 1 University of British Columbia, Vancouver, Canada

Brock Commons Phase 1 University of British Columbia, Vancouver, Canada Construction Underway on World s Tallest Timber Tower Construction of the 18 storey Brock Commons Student Residence at the University of British Columbia in Vancouver, Canada got underway in November 2015.

More information

PEPPER VINER HOMES WARRANTY GUIDELINES

PEPPER VINER HOMES WARRANTY GUIDELINES PEPPER VINER HOMES WARRANTY GUIDELINES All non-emergency warranty and customer service requests MUST be made in writing. This provides you with documentation and allows Pepper Viner to operate efficiently.

More information

250 St Georges Tce, Perth, WA (QV1)

250 St Georges Tce, Perth, WA (QV1) 250 St Georges Tce, Perth, WA (QV1) Building Profile Building Construction date 1991 Refurbishment date Owner Building Size Refurbishment Team Building Management Awards Ratings QV.1, 250 St Georges Terrace,

More information

SECTION 00 0110 TABLE OF CONTENTS. H. 00 2115.01 - Proposed Material, Product or Equipment Substitution Request

SECTION 00 0110 TABLE OF CONTENTS. H. 00 2115.01 - Proposed Material, Product or Equipment Substitution Request SECTION 00 0110 PROCUREMENT AND CONTRACTING REQUIREMENTS 1.1 DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS A. 00 0101 - Project Title Page B. 00 0105 - Certifications Page C. 00 0110 - Table

More information

BCA Awards 2014 Listing (Green Mark Awards Category)

BCA Awards 2014 Listing (Green Mark Awards Category) 1 BCA Awards 2014 Listing (Green Mark Awards Category) The BCA Awards is an annual event to honour and pay tribute to displays of excellence in the built environment in the areas of safety, quality, sustainability

More information

Reduce its carbon emissions by 100 tonnes and save 30% in energy expenses each year

Reduce its carbon emissions by 100 tonnes and save 30% in energy expenses each year Cool Kitchen Cool Kitchen A Brand New Catering Business Concept O pened in July, Cool Kitchen is a private kitchen style restaurant that is built on a low carbon emission business model. It has successfully

More information

Board of Directors. 12 DBS Annual Report 2013 Board of Directors

Board of Directors. 12 DBS Annual Report 2013 Board of Directors 12 DBS Annual Report 2013 Board of s 13 Board of s 1 Andre Sekulic 2 Piyush Gupta 3 Ho Tian Yee 4 Peter Seah Lim Huat 5 Danny Teoh Leong Kay 6 Ow Foong Pheng 7 Nihal Vijaya Devadas Kaviratne CBE 8 Euleen

More information

Air Conditioning. The opportunity for energy efficiency. Low cost actions to reduce energy usage now

Air Conditioning. The opportunity for energy efficiency. Low cost actions to reduce energy usage now Fact Sheet #6 Air Conditioning In this fact sheet you will discover: The opportunity for energy efficiency How air conditioning works Low cost actions to reduce energy usage now Investments to reduce costs

More information

STANDARD FEATURES & PROCESS- NEW HOME CONSTRUCTION. Now offered for a limited period of time, free solar with each home!

STANDARD FEATURES & PROCESS- NEW HOME CONSTRUCTION. Now offered for a limited period of time, free solar with each home! STANDARD FEATURES & PROCESS- NEW HOME CONSTRUCTION Now offered for a limited period of time, free solar with each home! ENERGY EFFICIENT ITEMS BUILD IN YOUR HOME 50 Gal Energy Star Hot Water Heaters with

More information

Experience Our Innovation

Experience Our Innovation Experience Our Innovation Rinnai Holdings (Pacific) Pte Ltd 47 Tannery Lane #05-01/02 Elite Industrial Buiding II Singapore 347794 T. +65 6748 9011 F. +65 6745 9240 E. Solution@rinnai.sg www.rinnai.sg

More information

Corporate Office Energy Efficiency Initiatives

Corporate Office Energy Efficiency Initiatives Corporate Office Energy Efficiency Initiatives Annaly Capital Management, Inc. ( Annaly ) Corporate Office Energy Efficiency Recognition for the Building Housing Annaly s Corporate Office LEED Silver Certification

More information

Enhancing Building Quality With 6D BIM

Enhancing Building Quality With 6D BIM Henderson Land Development Company Limited Project: Proposed Office Development at 14-30 King Wah Road Location: 14-30 King Wah Road, North Point, Hong Kong Type: Office Scheduled Time of Completion: End

More information

Design Essentials. Stockland Residential Communities 1 st January 2014

Design Essentials. Stockland Residential Communities 1 st January 2014 Design Essentials Stockland Residential Communities 1 st January 2014 WELCOME TO THE DESIGN ESSENTIALS The Design Essentials form part of your Contract of Sale and assist when designing your home and landscape.

More information

ANNEX A. Page 4 of 30

ANNEX A. Page 4 of 30 ANNEX A CPA Advocates The Construction Productivity Award (CPA) Advocates recognises outstanding developers, consultants, builders and subcontractors for their achievements in improving productivity at