1 ISO 9001:2008 Clause PR018 Internal Audit Procedure Strode Park Foundation Page 1 of 9

2 Approvals The signatures below certify that this procedure has been reviewed and accepted, and demonstrates that the signatories are aware of all the requirements contained herein and are committed to ensuring their provision. Name Signature Position Date Prepared by Jacky Moat HR Support 11/04/12 Reviewed by David Dye HR Director/Quality Manager 11/04/12 Approved by Quality Meeting 15/05/12 Amendment Record This procedure reviewed to ensure its continuing relevance to the systems and process that it describes. A record of contextual additions or omissions is given below: Page No. Context Revision Date Page 2 of 9

3 Contents CONTENTS 3 P018 INTERNAL AUDIT PROCEDURE 4 1. INTRODUCTION & PURPOSE 4 2. REFERENCES 4 3. TERMS & DEFINITIONS 4 4. APPLICATION & SCOPE 4 5. REQUIREMENTS 4 6. PROCESS Audit Planning Audit Preparation On-site Audit Wrap-up Meeting Follow-up Reporting Review Records Audit Process Matrix Internal Audit Process Map 9 Page 3 of 9

4 PR018 Internal Audit Procedure 1. Introduction & Purpose The purpose of this procedure is to define the Foundation s process for undertaking internal audits in order to assess the effectiveness of the application of ISO 9001:2008 and also to define the responsibilities for planning and conducting audits, reporting results and retaining associated records. 2. References Reference Title & Description Quality System Manual F018-3 Internal Audit Check List F018-5 Internal Audit Report 3. Terms & Definitions Term ISO Clause Definition Non-conformity Non-fulfilment of a requirement Preventive Action Action taken to eliminate a potential non-conformity Corrective Action Action taken to eliminate the cause of a non-conformity Audit A systematic, independent documented process for obtaining and evaluating audit evidence objectively to determine the extent to which audit criteria are fulfilled 4. Application & Scope The scope of this procedure is focused on assessing the effectiveness of the Foundation s QMS. Where such processes are found to be deficient, the audit will lead to improvement in those processes. By applying the principles of auditing, outlined by ISO 19011:2002, the Foundation ensures that all internal audits are conducted with due professional care, integrity and independence. All conclusions derived from the audit are based upon objective and traceable evidence. 5. Requirements An audit of the QMS is conducted at planned intervals to: Determine whether the QMS conforms to planned arrangements Determine whether the QMS is properly implemented and maintained Provide information on the results of audits to Top Management 6. Process Internal auditing is undertaken at least once annually. The maximum interval between audits is 12 months on an annual cycle with all departments audited. Audits may be completed with a greater frequency if determined by the Quality Management Representative or as determined by: Page 4 of 9

5 ISO 9001 requirements Customer complaint QMS requirements Quality objectives/policy Corrective actions Statutory/legal requirements Management decisions Concerns raised by 3 rd parties Results of 3rd party audits Employee concerns Management Review concerns 6.1 Audit Planning The Quality Management Representative is required to: Establish and communicate internal audit schedule Establish and implement internal audit plan Appoint audit team leader where required Select audit team, see below Assign audit duties to the auditor team Audit Team Evaluation & Selection To ensure impartiality and objectivity, the audit team will include personnel from departments not directly associated with the area/department being audited. Audit team members are selected on the basis of: Education: secondary or higher Relevant work or other Experience Relevant Training: provided in-house or externally Audit Experience: demonstrable knowledge/skills 6.2 Audit Preparation The Audit Team is required to: Review relevant management system documents and records Determine their adequacy with respect to the audit criteria and with ISO 9001:2008 Review and prepare the internal audit checklist Arrange audit appointment Issue the audit checklist to the responsible manager 6.3 On-site Audit The Audit Team is required to: Conduct opening meeting Page 5 of 9

6 Sample and observe process inputs/outputs Record objective evidence to verify process compliance or non-conformance Generate audit findings 6.4 Wrap-up Meeting The Audit Team Leader and responsible manager are required to: Review audit conclusions and discuss recommendations for improvement Decide whether any non-conformances observed should be included in correction reports or solved immediately Minor areas of non-conformance are taken care of immediately Prepare an audit report Review audit report with the responsible manager Corrective actions are reviewed by the responsible manager and close out action is agreed upon The audit leader and responsible manager sign off audit report 6.5 Follow-up The Auditee/Responsible Manager is required to: Ensure corrective actions are implemented and are closed-out within the agreed timeframe Ensure non-conformances are closed-out within the agreed timeframe Ensure the status of corrective actions and any non-conformances are kept up-to-date 6.6 Reporting The Quality Management Representative is required to: Review audit conclusions Indentify trends Make recommendations for improvement Finalise the internal audit report Issue internal audit report to Top Management 6.7 Review Top Management is required to: Consider and act upon audit findings during the management review process Use the internal audit report to promote best practice Ensure records are maintained 6.8 Records All documentation and records generated by the internal audit process are managed in accordance with ISO 9001:2008 Clauses & Page 6 of 9

7 6.5 Follow-up 6.4 Wrap-up meeting 6.3 Audit 6.2 Preparation 6.1 Planning Internal Audit Procedure PR Audit Process Matrix Action Responsibility Output Establish and communicate internal audit schedule Establish and implement internal audit plan Quality Management Representative Appoint the audit team leader where required Select the audit team Assign audit duties to the auditor F018-3 Review relevant QMS documents and records Audit Team Determine their adequacy with respect to the audit criteria Review relevant requirements of ISO 9001:2008 Review and prepare the internal audit checklist Arrange audit appointment Sample and observe necessary process inputs/outputs Audit Team Record objective evidence to verify process compliance Generate and record audit findings Decide whether any non-conformance observed should be included in correction reports or whether they can be solved immediately Minor areas of non-conformance are taken care of immediately, while a conclusion for the audit as a whole is written down Audit Team Leader and Responsible Manager An audit report is prepared which is examined together with the manager responsible for the area in question F018-5 Corrective actions are reviewed by the manager responsible and close out action is agreed upon The audit leader and responsible manager sign off audit report The reports are given to the QMR & the responsible manager Ensure corrective actions are closed-out within the agreed timeframe Responsible Manager Ensure non-conformances are closed-out within the agreed timeframe Ensure status of corrective actions and non-conformances communicated to the QMR Provide feedback on the audit process Page 7 of 9

8 6.7 Review 6.6 Reporting Internal Audit Procedure PR018 Action Responsibility Output Review audit conclusions Indentify trends Quality Management Representative Make recommendations for improvement Finalise internal audit report Issue internal audit report to Top Management Consider and act upon audit findings during Management Review Top Management Use the internal audit report to promote best practice Page 8 of 9

9 6.10 Internal Audit Process Map Quality Management Representative Audit Team Responsible Manager Top Management Audit Considerations ISO 9001 requirements Customer feedback QMS requirements Quality objectives/policy Corrective actions Statutory/legal requirements Management decisions 3 rd party concerns Results of 3rd party audits Employee concerns Management Review Additional Considerations Status Importance Frequency Document review Prepare audit schedule Prepare audit checklist Devise audit plan Conduct audit Provide feedback on audit Assign audit duties F018-3 Noncompliance found? YES Initiate corrective actions NO Review audit findings Prepare audit report F018-5 Close-out corrective actions UPDATE Recommendations for improvement Verify close-out at follow-up meeting Management review Page 9 of 9

ISO 9001:2008 CLAUSE PR018 INTERNAL AUDIT PROCEDURE

ISO 9001:2008 CLAUSE PR018 INTERNAL AUDIT PROCEDURE ISO 9001:2008 CLAUSE 8.2.2 PR018 INTERNAL AUDIT PROCEDURE Prepared by Approvals Amendment Record The signatures below certify that this procedure has been reviewed and accepted, and demonstrates that the

More information

ISO 9001:2008 Clause P018 Internal Audit Procedure

ISO 9001:2008 Clause P018 Internal Audit Procedure ISO 9001:2008 Clause 8.2.2 P018 Internal Audit Procedure Document No Rev Uncontrolled Copy Controlled Copy Date COMPANY PROPRIETARY INFORMATION Prior to use, ensure this document is the most recent revision

More information

ISO 9001:2008 Clause 5.6 PR004 Management Review Procedure

ISO 9001:2008 Clause 5.6 PR004 Management Review Procedure ISO 9001:2008 Clause 5.6 PR004 Management Review Procedure Strode Park Foundation for People with Disabilities Approvals 1 The signatures below certify that this procedure has been reviewed and accepted,

More information

ISO 9001:2008 Clause PR017 Customer Satisfaction Procedure

ISO 9001:2008 Clause PR017 Customer Satisfaction Procedure ISO 9001:2008 Clause 8.2.1 PR017 Customer Satisfaction Procedure Strode Park Foundation for People with Disabilities Page 1 of 8 Approvals The signatures below certify that this procedure has been reviewed

More information

ISO 9001:2008 Clause 4.2.3 PR001 Document Control Procedure

ISO 9001:2008 Clause 4.2.3 PR001 Document Control Procedure ISO 9001:2008 Clause 4.2.3 PR001 Document Control Procedure Strode Park Foundation for People with Disabilities Approvals The signatures below certify that this procedure has been reviewed and accepted,

More information

ISO 9001:2000 Gap Analysis Checklist

ISO 9001:2000 Gap Analysis Checklist ISO 9001:2000 Gap Analysis Checklist Type: Assessor: ISO 9001 REQUIREMENTS STATUS ACTION/COMMENTS 4 Quality Management System 4.1 General Requirements Processes needed for the quality management system

More information

ISO 9001:2000 AUDIT CHECKLIST

ISO 9001:2000 AUDIT CHECKLIST ISO 9001:2000 AUDIT CHECKLIST No. Question Proc. Ref. Comments 4 Quality Management System 4.1 General Requirements 1 Has the organization established, documented, implemented and maintained a quality

More information

Quality management systems

Quality management systems L E C T U R E 9 Quality management systems LECTURE 9 - OVERVIEW Quality management system based on ISO 9000 WHAT IS QMS (QUALITY MANAGEMENT SYSTEM) Goal: Meet customer needs Quality management system includes

More information

GAP-ANALYSIS CROSS REFERENCE BETWEEN ISO/IEC 17020:2012 AND ISO/IEC 17020:1998

GAP-ANALYSIS CROSS REFERENCE BETWEEN ISO/IEC 17020:2012 AND ISO/IEC 17020:1998 GAP-ANALYSIS CROSS REFERENCE BETWEEN ISO/IEC 17020:2012 AND ISO/IEC 17020:1998 The principle standard used by International Accreditation Service (IAS) for the accreditation of Inspection Bodies is ISO/IEC

More information

ISO QMS Standards and Requirements

ISO QMS Standards and Requirements ISO 9001-2001 QMS Standards and Requirements ISO Sections ISO Standards Requirements 4 Quality management system 4.1 General requirements The organization shall establish, document implement and maintain

More information

AUDITOR GUIDELINES. Responsibilities Supporting Inputs. Receive AAA, Sign and return to IMS with audit report. Document Review required?

AUDITOR GUIDELINES. Responsibilities Supporting Inputs. Receive AAA, Sign and return to IMS with audit report. Document Review required? 1 Overview of Audit Process The flow chart below shows the overall process for auditors carrying out audits for IMS International. Stages within this process are detailed further in this document. Scheme

More information

ISO 9001 (2000) QUALITY MANAGEMENT SYSTEM ASSESSMENT REPORT SUPPLIER/ SUBCONTRACTOR

ISO 9001 (2000) QUALITY MANAGEMENT SYSTEM ASSESSMENT REPORT SUPPLIER/ SUBCONTRACTOR Page 1 of 20 ISO 9001 (2000) QUALITY MANAGEMENT SYSTEM ASSESSMENT REPORT SUPPLIER/ SUBCONTRACTOR SUPPLIER/ SUBCONTRACTOR NAME: ADDRESS: CITY AND STATE: ZIP CODE: SUPPLIER/MANUFACTURER NO PHONE: DIVISION:

More information

KENYA FOREST SERVICE DOCUMENT TITLE: INTERNAL QUALITY AUDITS

KENYA FOREST SERVICE DOCUMENT TITLE: INTERNAL QUALITY AUDITS REF NO: KFS-MP-IQA-04 ISSUE NO: 1 PAGE: 1 of 13 ISSUE HISTORY ISSUE DESCRIPTION OF CHANGE PROCESS PILOT EFFECTIVE DATE 1 None, no change has been done. Management Representative REFERENCED DOCUMENTS COPY

More information

ISO 9001:2008 Requirements Summary

ISO 9001:2008 Requirements Summary ISO 9001:2008 Requirements Summary In Plain English Created by Larry Whittington RABQSA Lead QMS Auditor (2406) IRCA Lead QMS Auditor (A6472) ASQ Senior Member Whittington & Associates, LLC Distributed

More information

ISO 9001 : 2008 QUALITY MANAGEMENT SYSTEM AUDIT CHECK LIST INTRODUCTION

ISO 9001 : 2008 QUALITY MANAGEMENT SYSTEM AUDIT CHECK LIST INTRODUCTION INTRODUCTION What auditors should look for: the items listed in these headings that the ISO requirement is met that the requirement is met in the manner described in the organization's documentation Page

More information

ISO-9001:2000 Quality Management Systems

ISO-9001:2000 Quality Management Systems ISO-9001:2000 Quality Management Systems REQUIREMENTS 10/10/2003 ISO-9001:2000 Requirements 1 Process Based Approach C U S MANAGEMENT RESPONSIBILITY RESOURCE MANAGEMENT C U S T O M Requirements PRODUCT

More information

ISO 9001:2008 Quality Manual Clause 3.7.4

ISO 9001:2008 Quality Manual Clause 3.7.4 ISO 9001:2008 Quality Manual Clause 3.7.4 Strode Park Foundation for People with Disabilities Approvals The signatures below certify that this Quality Manual has been reviewed and accepted, and demonstrates

More information

INTERNAL QUALITY AUDITS

INTERNAL QUALITY AUDITS Page 1 of 12 INTERNAL QUALITY AUDITS Name Prepared: Quality Management Representative Signature 14/6/2010 Date Approved By : Director 14/6/2010 Page 2 of 12 Contents 1. GENERAL... 3 1.1 PURPOSE... 3 1.2

More information

DNV GL Assessment Checklist ISO 9001:2015

DNV GL Assessment Checklist ISO 9001:2015 DNV GL Assessment Checklist ISO 9001:2015 Rev 0 - December 2015 4 Context of the Organization No. Question Proc. Ref. Comments 4.1 Understanding the Organization and its context 1 Has the organization

More information

RGBLase LLC. The ISO 9001:2000 Quality Manual

RGBLase LLC. The ISO 9001:2000 Quality Manual The ISO 9001:2000 Quality Manual Table of Contents 1 Approval and Revision... 4 1.1 Approval... 4 1.2 Revision History... 4 2 Company... 4 2.1 Introduction to RGBLase LLC... 4 2.2 Mission... 4 2.3 Company

More information

ISO 9001:2008 Audit Checklist

ISO 9001:2008 Audit Checklist g GE Power & Water ISO 9001:2008 Audit Checklist Organization Auditor Date Page 1 Std. 4.1 General s a. Are processes identified b. Sequence & interaction of processes determined? c. Criteria for operation

More information

QUALITY MANAGEMENT SYSTEM REQUIREMENTS General Requirements. Documentation Requirements. General. Quality Manual. Control of Documents

QUALITY MANAGEMENT SYSTEM REQUIREMENTS General Requirements. Documentation Requirements. General. Quality Manual. Control of Documents Chapter j 38 Self Assessment 729 QUALITY MANAGEMENT SYSTEM REQUIREMENTS General Requirements 1. Establishing and implementing a documented quality management system 2. Implementing a documented quality

More information

HOW TO IMPLEMENT ISO 9001

HOW TO IMPLEMENT ISO 9001 HOW TO IMPLEMENT ISO 9001 CHECKLISTS 2015 Page 1 Overview of - Quality management systems What needs to be in place? Before you start your quality journey or your organization has decided to review what

More information

FINE LOGISTICS. Quality Manual. Document No.: 20008. Revision: A

FINE LOGISTICS. Quality Manual. Document No.: 20008. Revision: A FINE LOGISTICS Quality Manual Document No.: 20008 Revision: A 20008 Rev. A FINE LOGISTICS, Quality Manual Page 1 of 24 Quality Manual: Table of contents Number Section Page 1. GENERAL 3 1.1 Index and revision

More information

ISO 14001:2004 EMS Internal Audit Checklist & Gap Analysis

ISO 14001:2004 EMS Internal Audit Checklist & Gap Analysis Page 1 of 31 Audit Date Audit Description Lead Auditor Audit Team Members ISO 14001:2004 Auditable Clauses: (Tick those to be evaluated during this audit) 1. The checklist should be used by auditors to

More information

QUALITY MANAGEMENT SYSTEM Corporate

QUALITY MANAGEMENT SYSTEM Corporate Page 1 of 12 4 Quality Management System 4.1 General Requirements The Peerless Pump Quality Management System shall include: Documented statements of a quality policy and of quality objectives; A quality

More information

ISO 9001:2015 Quality Management Systems - The 2008-to-2015 Gap Analysis Checklist

ISO 9001:2015 Quality Management Systems - The 2008-to-2015 Gap Analysis Checklist 1. PURPOSE The purpose of this document is to detail the gaps between the superseded standard ISO 9001: 2008 and the current standard ISO 9001: 2015, to assist existing and potential clients assess their

More information

3 Terms and definitions 3.5 client organization whose management system is being audited for certification purposes

3 Terms and definitions 3.5 client organization whose management system is being audited for certification purposes 3 Terms and definitions 3.4 third-party certification audit audit carried out by an auditing organization independent of the client and the user, for the purpose of certifying the client's management system

More information

ISO 9001:2008 Internal Audit & Gap Analysis Checklist

ISO 9001:2008 Internal Audit & Gap Analysis Checklist Page 1 of 54 Audit Date: Audit Description: Lead Auditor: Audit Team Members: ISO 9001:2008 Auditable Clauses (Tick those to be evaluated during this audit) Each auditor should complete the section of

More information

Luminus Devices, Inc Quality Management Systems Manual ISO 9001:2008

Luminus Devices, Inc Quality Management Systems Manual ISO 9001:2008 Luminus Devices, Inc Quality Management Systems Manual ISO 9001:2008 This document belongs to Luminus Devices, Inc. It cannot be reproduced without authorized authority. Area: Quality System Document Page

More information

CENTRIS CONSULTING. Quality Control Manual

CENTRIS CONSULTING. Quality Control Manual CENTRIS CONSULTING Quality Control Manual ISO 9001:2008 Introduction Centris Consulting developed and implemented a Quality Management System in order to document the company s best business practices,

More information

IAS ACCREDITED INSPECTION AGENCIES: GUIDELINES FOR CONDUCTING INTERNAL AUDITS AND MANAGEMENT REVIEWS. Revised January, 2016

IAS ACCREDITED INSPECTION AGENCIES: GUIDELINES FOR CONDUCTING INTERNAL AUDITS AND MANAGEMENT REVIEWS. Revised January, 2016 IAS ACCREDITED INSPECTION AGENCIES: GUIDELINES FOR CONDUCTING INTERNAL AUDITS AND MANAGEMENT REVIEWS Revised January, 2016 IAS has found that inspection agency personnel are often confused by the requirements

More information

K E M R I STANDARD OPERATING PROCEDURE FOR INTERNAL QUALITY AUDITS

K E M R I STANDARD OPERATING PROCEDURE FOR INTERNAL QUALITY AUDITS K E M R I STANDARD OPERATING PROCEDURE FOR INTERNAL QUALITY AUDITS ISSUE NUMBER ISSUE DATE REVISION STATUS REVISION DATE 02 7 TH NOVEMBER, 2012 01 18 TH OCT0BER, 2012 REF NO: KEMRI/QMS/SOP/IQA/06 ISSUE

More information

EMS Example Example EMS Audit Procedure

EMS Example Example EMS Audit Procedure EMS Example Example EMS Audit Procedure EMS Audit Procedures must be developed and documented with goals which: Ensure that the procedures incorporated into the EMS are being followed; Determine if the

More information

NATIONAL ACCREDITATION BOARD FOR TESTING AND CALIBRATION LABORATORIES MANAGEMENT REVIEW FOR LABORATORIES

NATIONAL ACCREDITATION BOARD FOR TESTING AND CALIBRATION LABORATORIES MANAGEMENT REVIEW FOR LABORATORIES NABL 161 NABL NATIONAL ACCREDITATION BOARD FOR TESTING AND CALIBRATION LABORATORIES GUIDE for INTERNAL AUDIT AND MANAGEMENT REVIEW FOR LABORATORIES ISSUE NO : 04 AMENDMENT NO : 00 ISSUE DATE: 27.06.2012

More information

HSB REGISTRATION SERVICES ISO 9001:2000 AUDIT CHECKLIST

HSB REGISTRATION SERVICES ISO 9001:2000 AUDIT CHECKLIST HSB REGISTRATION SERVICES ISO 9001:2000 AUDIT CHECKLIST COMPANY NAME: AUDIT LOCATION: AUDIT DATE(S): EAC CODE: AUDIT SCOPE: Exclusions / Notes: AUDIT TEAM INFORMATION: Lead Auditor: Auditor(s): ISO FO

More information

ISO 9001:2008 STANDARD OPERATING PROCEDURES MANUAL

ISO 9001:2008 STANDARD OPERATING PROCEDURES MANUAL 8200 Brownleigh Drive Raleigh, NC 27617-7423 Phone: (919) 510-9696 Fax: (919) 510-9668 ISO 9001:2008 STANDARD OPERATING PROCEDURES MANUAL ALLIANCE OF PROFESSIONALS & CONSULTANTS, INC. - 1 - Table of Contents

More information

QUALITY MANAGEMENT SYSTEM (QMS) ASSESSMENT CHECKLIST

QUALITY MANAGEMENT SYSTEM (QMS) ASSESSMENT CHECKLIST 1. QUALITY MANAGEMENT SYSTEM QUALITY MANAGEMENT SYSTEM (QMS) ASSESSMENT CHECKLIST 1.1 Quality Management System General 1.1.1 Is objective evidence available to demonstrate that the MDSAP site has defined,

More information

Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF)

Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF) Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF) Technical Guideline Audit and Inspection Version 2.0 February 2012 Table of Contents 1. Introduction... 3 2. Definitions... 3 3. Internal Audit... 3 3.1

More information

QUALITY MANUAL ISO 9001. Quality Management System

QUALITY MANUAL ISO 9001. Quality Management System Page 1 of 20 QUALITY MANUAL ISO 9001 Quality Management System Printed copies are not controlled unless marked "CONTROLLED". Upon receipt of this document, discard all previous copies. Page 2 of 20 Approval

More information

Quality Policy Manual

Quality Policy Manual Quality Policy Manual (ISO 9001:2000) Page 1 of 21 Management Approval of Quality Manual The signatures that appear below indicate that the executive management of has reviewed and approved the following

More information

QUALITY MANAGEMENT SYSTEM

QUALITY MANAGEMENT SYSTEM QUALITY MANAGEMENT SYSTEM Klein Steel Service, Inc UNCONTROLLED 4/11/11 Page 1 of 30 Revision Level: 001 Printed Date: 11/15/2013 1:02 Table of Contents Scope... 1.1 General... 1.2 Application... 7.3 Design

More information

COMPANY NAME. Environmental Management System Manual

COMPANY NAME. Environmental Management System Manual Revision No. : 1 Date : DD MM YYYY Prepared by : Approved by : (EMR) (Top Management) Revision History Revision Date Description Sections Affected Revised By Approved By Table of Content 0.0 Terms and

More information

MAIN CIVIL WORKS CONTRACT SCHEDULE 8 QUALITY MANAGEMENT TABLE OF CONTENTS

MAIN CIVIL WORKS CONTRACT SCHEDULE 8 QUALITY MANAGEMENT TABLE OF CONTENTS MAIN CIVIL WORKS CONTRACT SCHEDULE 8 QUALITY MANAGEMENT TABLE OF CONTENTS 1 INTERPRETATION... 1 1.1 Definitions... 1 2 QUALITY MANAGEMENT SYSTEM... 2 2.1 Quality Management System... 2 2.2 Contractor Responsibilities...

More information

SMALL BUSINESS OH&S SELF APPRAISAL

SMALL BUSINESS OH&S SELF APPRAISAL SMALL BUSINESS OH&S SELF APPRAISAL This questionnaire is designed to help you judge whether your Occupational Health & Safety Management System (OHSMS) is ready for assessment. Completing this questionnaire

More information

Quality Manual. UK Wide Security Solutions Ltd. 1 QM-001 Quality Manual Issue 1. January 1, 2011

Quality Manual. UK Wide Security Solutions Ltd. 1 QM-001 Quality Manual Issue 1. January 1, 2011 Quality Manual 1 QM-001 Quality Manual Issue 1 January 1, 2011 This document is uncontrolled when printed. Please verify with Quality Management Representative 16 Dukes Close, West Way, Walworth Industrial

More information

ISO IEC GAP ANALYSIS TOOL 7. ISMS MANAGEMENT REVIEW GAP ANALYSIS QUESTIONNAIRE

ISO IEC GAP ANALYSIS TOOL 7. ISMS MANAGEMENT REVIEW GAP ANALYSIS QUESTIONNAIRE 7.1 PERFORM MANAGEMENT REVIEWS 1 Do you carry out management reviews of your ISMS? 2 Does your management carry out management reviews of your ISMS at planned intervals? 3 Does your management carry out

More information

Row Manufacturing Inc. Quality Manual ISO 9001:2008

Row Manufacturing Inc. Quality Manual ISO 9001:2008 Row Manufacturing Inc. Quality Manual ISO 9001:2008 Row Manufacturing 210 Durham Drive Athens, Alabama 35611 Phone:256.232.4151 Fax:256.232.4133 Page 2 of 33 This Page intentionally left Blank Page 3 of

More information

Quality Management System Manual

Quality Management System Manual Quality Management System Manual 10V Gill Street Woburn, MA USA 01801 INTRODUCTION RL CONTROLS, LLC RL Controls, LLC is a privately held company headquartered in Woburn, MA, USA. RLC has more than 80 years

More information

Free Download ISO/TS 16949:2009. Requirements Checklist. 29 of 57 pages (PDF) For additional information see www.rcglobal.com

Free Download ISO/TS 16949:2009. Requirements Checklist. 29 of 57 pages (PDF) For additional information see www.rcglobal.com RCGLOBAL.COM Free Download ISO/TS 16949:2009 Requirements Checklist 29 of 57 pages (PDF) For additional information see www.rcglobal.com RCGLOBAL(Canada), for internal use only. Page 1 of 57 Review performed

More information

ISO 9001 Quality Systems Manual

ISO 9001 Quality Systems Manual ISO 9001 Quality Systems Manual Revision: D Issue Date: March 10, 2004 Introduction Micro Memory Bank, Inc. developed and implemented a Quality Management System in order to document the company s best

More information

Registrars. Independent third parties who assess an organization s Quality Management System Not controlled by ISO

Registrars. Independent third parties who assess an organization s Quality Management System Not controlled by ISO Registrars Independent third parties who assess an organization s Quality Management System Not controlled by ISO US registrars have no government sanction Private companies performing their service for

More information

ISO 9001:2008 Quality Management System Requirements (Third Revision)

ISO 9001:2008 Quality Management System Requirements (Third Revision) ISO 9001:2008 Quality Management System Requirements (Third Revision) Contents Page 1 Scope 1 1.1 General. 1 1.2 Application.. 1 2 Normative references.. 1 3 Terms and definitions. 1 4 Quality management

More information

INTERNAL AUDITS FOR LABORATORIES AND INSPECTION BODIES

INTERNAL AUDITS FOR LABORATORIES AND INSPECTION BODIES APLAC TC 002 INTERNAL AUDITS FOR LABORATORIES AND INSPECTION BODIES Issue No. 4 Issue Date: 09/10 Page 1 of 10 PURPOSE This document gives guidance to laboratories and inspection bodies on how to establish

More information

Effective Internal Audit Planning:

Effective Internal Audit Planning: Audit practices that add the most value! Effective Internal Audit Planning: ISO 9000 Users Group - ASQ Section 509, Wednesday, January 20, 2010 By David Collingham, CQA/CQE Outline Definitions of Key Audit

More information

Procedure for Internal Audit. Procedure No. 305

Procedure for Internal Audit. Procedure No. 305 Procedure for Internal Audit Procedure No. 305 Print Name Title Date Prepared by Louise Quality Assurance 09/04/09 Naughton Consultant Reviewed by Niamh Mooney Assistant fire and Safety Officer 09/04/09

More information

MCA QA (ISO) 1: Procedure for Assessments to ISO 9001:2008 and ISO 14001:2004 Standards

MCA QA (ISO) 1: Procedure for Assessments to ISO 9001:2008 and ISO 14001:2004 Standards 1 of 33 MCA QA (ISO) 1: Procedure for CONTENTS 1.0 Purpose 2.0 Scope 3.0 References 4.0 Responsibilities 5.0 Definitions 6.0 Actions 6.1 Initial Enquiries 6.2 Defining MCAQA Resource Requirements 6.3 Application

More information

ISO 20000-1:2005 Requirements Summary

ISO 20000-1:2005 Requirements Summary Contents 3. Requirements for a Management System... 3 3.1 Management Responsibility... 3 3.2 Documentation Requirements... 3 3.3 Competence, Awareness, and Training... 4 4. Planning and Implementing Service

More information

QUALITY MANUAL 3 KENDRICK ROAD WAREHAM, MA 02571 508-295-9591 FAX 508-295-6752

QUALITY MANUAL 3 KENDRICK ROAD WAREHAM, MA 02571 508-295-9591 FAX 508-295-6752 QUALITY MANUAL 3 KENDRICK ROAD WAREHAM, MA 02571 508-295-9591 FAX 508-295-6752 Section 1. REVISION STATUS Revision 01 Initial Issue 02/13/95 Revision 02 ECO No.Q-0032 05/07/96 Revision 03 ECO No.97171

More information

Quality Manual Printed copy valid for 24 hours from time of printing unless stamped CONTROLLED COPY in red. Page

Quality Manual Printed copy valid for 24 hours from time of printing unless stamped CONTROLLED COPY in red. Page Quality Manual Page 1 of 20 Change Log Document Revision Date Description of Change 15/04/09 Initial Release Page 2 of 20 1.0 Scope and Exclusions Scope This Quality Manual contains policies that have

More information

The following paragraphs, identified to coincide with the OHSAS 18001:2007 numbering system, provide a clause-by-clause summary of the standard.

The following paragraphs, identified to coincide with the OHSAS 18001:2007 numbering system, provide a clause-by-clause summary of the standard. Summary of OHSAS 18001:2007 Requirements With this article, the 18000 store provides a brief and clear summary of the OHSAS 18001:2007 requirements. First of all, OHSAS 18001 is an international standard

More information

ISO 9001:2008 Internal Audit Guidance

ISO 9001:2008 Internal Audit Guidance ISO 9001:2008 Internal Audit Guidance Contents Introduction... 3 About the Internal Audit Solution... 3 Forms & Records... 3 Internal Audit Procedure... 3 Document Reference Numbering... 4 Navigating the

More information

ONTIC UK SUPPLIER QUALITY SURVEY

ONTIC UK SUPPLIER QUALITY SURVEY MAIL-IN / ONSITE This report is intended to furnish data relative to the Suppliers capability to control the quality of supplies and services furnished to Ontic UK. Please complete this Survey and return

More information

CHECKLIST ISO/IEC 17021:2011 Conformity Assessment Requirements for Bodies Providing Audit and Certification of Management Systems

CHECKLIST ISO/IEC 17021:2011 Conformity Assessment Requirements for Bodies Providing Audit and Certification of Management Systems Date(s) of Evaluation: CHECKLIST ISO/IEC 17021:2011 Conformity Assessment Requirements for Bodies Providing Audit and Certification of Management Systems Assessor(s) & Observer(s): Organization: Area/Field

More information

Implementing an Energy Management System Using ISO 50001

Implementing an Energy Management System Using ISO 50001 Implementing an Energy Management System Using ISO 50001 This article will address issues related to sustainability efforts, through energy management as it relates to ISO 50001, Energy Management System

More information

ABC COMPANY INC ISO 9001:2000 QUALITY MANUAL

ABC COMPANY INC ISO 9001:2000 QUALITY MANUAL Page 1 of 25 ABC COMPANY INC QUALITY MANUAL Page 2 of 25 DOCUMENT INTRODUCTION PURPOSE OF THIS MANUAL This describes the quality management system at ABC Company Ltd, Buffalo, USA described as the Organization,

More information

QMS Operational Procedure QOP-42-02

QMS Operational Procedure QOP-42-02 QMS Operational Procedure QOP-42-02 DEVICE MASTER RECORD Issued by: Quality Assurance Eff. Date: 00/00/00 Rev.: A Pg. 1 of 4 ISO 13485 requires that for each type or model of medical device the organization

More information

SAMPLE POLICY FROM ISO 9001 QMS POLICIES, PROCEDURES AND FORMS MANUAL INCLUDES A LIST OF TOPICS AND FORMS

SAMPLE POLICY FROM ISO 9001 QMS POLICIES, PROCEDURES AND FORMS MANUAL INCLUDES A LIST OF TOPICS AND FORMS US$ 595.00 How to Order: Online: www.bizmanualz.com By Phone: 314-384-4183 866-711-5837 Email: sales@bizmanualz.com ISO 9001 Quality Procedures For Quality Management Systems The Bizmanualz ISO 9001 Quality

More information

Checklist. Standard for Medical Laboratory

Checklist. Standard for Medical Laboratory Checklist Standard for Medical Laboratory Name of hospital..name of Laboratory..... Name. Position / Title...... DD/MM/YY.Revision... 1. Organization and Management 1. Laboratory shall have the organizational

More information

Supplier Quality Management System Audit Checklist (ISO 9000:2000, TS 16949:2002)

Supplier Quality Management System Audit Checklist (ISO 9000:2000, TS 16949:2002) Supplier Quality Management System Audit Checklist (ISO 9000:2000, TS 16949:2002) Supplier: Plant/Location: Date: Audit Team: Scope of Audit: Number of C.A.R. s: Corrective Action Due: Potential suppliers

More information

Camar Aircraft Products Co. QUALITY MANUAL Revision D

Camar Aircraft Products Co. QUALITY MANUAL Revision D QUALITY MANUAL Revision D Gujll'y Manual Introduction The purpose of this manual is to describe the Quality Assurance Program implemented by Camar Aircraft Products Co. (hereafter referred to as C.A.P.C.)

More information

ED FAGAN INC. QUALITY SYSTEM MANUAL

ED FAGAN INC. QUALITY SYSTEM MANUAL ED FAGAN INC. QUALITY SYSTEM MANUAL APPROVED BY: Ed Fagan President ED FAGAN INC. January 13, 2010 TABLE OF CONTENTS 1. PURPOSE AND SCOPE 2 2. PRODUCTS, SERVICES AND CAPABILITIES 2 3. REVISION HISTORY

More information

Specific Requirements Certification scheme for Food Safety Systems in compliance with FSSC 22000

Specific Requirements Certification scheme for Food Safety Systems in compliance with FSSC 22000 Specific Requirements Certification scheme for Food Safety Systems in compliance with FSSC 22000 Organisation s SANAS No/s. Name of Certification Body Name of person observed Role in the audit: Type of

More information

FINAL DOCUMENT. Guidelines for Regulatory Auditing of Quality Management Systems of Medical Device Manufacturers Part 1: General Requirements

FINAL DOCUMENT. Guidelines for Regulatory Auditing of Quality Management Systems of Medical Device Manufacturers Part 1: General Requirements GHTF/SG4/N28R4:2008 FINAL DOCUMENT Title: Guidelines for Regulatory Auditing of Quality Management Systems of Medical Device Manufacturers Authoring Group: GHTF Study Group 4 Endorsed by: The Global Harmonization

More information

Quarterly Meeting. Risk-Based Auditing QSG, Inc.

Quarterly Meeting. Risk-Based Auditing QSG, Inc. Quarterly Meeting Risk-Based Auditing 2015 QSG, Inc. Welcome, Introductions and Expectations 2 4 Context of the organization ISO 9001:2015 Structure 5 Leadership 6 Planning for the 7 Support 8 Operations

More information

FMC Technologies Measurement Solutions Inc.

FMC Technologies Measurement Solutions Inc. Table of Contents 1 Revision History... 4 2 Company... 5 2.1 Introduction... 5 2.2 Quality Policy... 6 2.3 Quality Organization... 6 2.4 Company Processes... 7 3 Scope and Exclusions... 8 3.1 Scope...

More information

Rev: Issue 4 Rev 4 Quality Manual AOP0101 Date: 10/07/13. Quality Manual. CBT Technology, Inc. 358 North Street Randolph, MA 02368

Rev: Issue 4 Rev 4 Quality Manual AOP0101 Date: 10/07/13. Quality Manual. CBT Technology, Inc. 358 North Street Randolph, MA 02368 Quality Manual CBT Technology, Inc. 358 North Street Randolph, MA 02368 Issue 4 Revision 4 Note: updates are in italics Page 1 of 18 1.0 Scope and Exclusions Scope This Quality Manual contains policies

More information

ISO 9001: 2008 Quality Manual

ISO 9001: 2008 Quality Manual ISO 9001: 2008 Quality Manual EPSGQAM-001 Revision C UnControlled Copy COMPANY PROFILE EPSGQAM-001 rev B Engineered Plastics Solutions Group (EPSG) located at 76 Astor Avenue, Bldg 101 Norwood, Massachusetts,

More information

QUALITY MANUAL ISO 9001:2015

QUALITY MANUAL ISO 9001:2015 Page 1 of 22 QUALITY MANUAL ISO 9001:2015 Quality Management System Page 1 of 22 Page 2 of 22 Sean Duclos Owner Revision History Date Change Notice Change Description 11/02/2015 1001 Original Release to

More information

ISO 9001 Registration Guidance Document

ISO 9001 Registration Guidance Document ISO 9001 Registration Guidance Document Introduction This document is written to help you understand your organization s role and responsibilities in the registration/certification process and to understand

More information

MANAGEMENT RESPONSIBILITY

MANAGEMENT RESPONSIBILITY Process Flow: (5.0) Page No. 1 of 7 Management Commitment Customer Focus Quality Policy Quality Planning Quality Objectives System Planning Resource Provision Human Infrastructure Work environment Responsibility

More information

NIST HANDBOOK 150-5 CHECKLIST CONSTRUCTION MATERIALS TESTING

NIST HANDBOOK 150-5 CHECKLIST CONSTRUCTION MATERIALS TESTING NIST HANDBOOK 150-5 CHECKLIST CONSTRUCTION MATERIALS TESTING Instructions to the Assessor: This checklist addresses specific accreditation criteria prescribed in NIST Handbook 150-5, Construction Materials

More information

PAS 99: Integrated Management Systems Checklist IMPLEMENTATION CHECKLIST

PAS 99: Integrated Management Systems Checklist IMPLEMENTATION CHECKLIST PAS 99: Integrated Management Systems Checklist IMPLEMENTATION CHECKLIST INTRODUCTION This checklist is intended to be used by those organizations who are either looking at implementing an integrated management

More information

Revision Date Author Description of change. 10 07Jun13 Mark Benton Removed Admin. Manager from approval

Revision Date Author Description of change. 10 07Jun13 Mark Benton Removed Admin. Manager from approval Page 2 of 15 Document Revision History Revision Date Author Description of change 10 07Jun13 Mark Benton Removed Admin. Manager from approval 12Feb13 Mark Benton 08 01Oct12 Mark Benton 07 8/30/2012 Refer

More information

Quality Manual Rev. P

Quality Manual Rev. P Contents Page 1. Organization Chart 4 2. Quality Organization 4 3. Authority and Responsibility 4 4. Quality Management System 5 4.1 General Requirements 4.2 Documentation Requirements 4.2.1 General 4.2.2

More information

F Organisation s SANAS No/s. 4. General requirements 4.1 Impartiality and independence Are Inspection activities undertaken impartially?

F Organisation s SANAS No/s. 4. General requirements 4.1 Impartiality and independence Are Inspection activities undertaken impartially? Checklist for Accreditation of Diagnostic X-Ray Imaging System Inspection Bodies to SANS/ISO/IEC 17020: 2012 incorporating TR 78: Technical Requirements for the Application of ISO/IEC 17020 Organisation

More information

CP14 ISSUE 5 DATED 1 st OCTOBER 2015 BINDT Audit Procedure Conformity Assessment and Certification/Verification of Management Systems

CP14 ISSUE 5 DATED 1 st OCTOBER 2015 BINDT Audit Procedure Conformity Assessment and Certification/Verification of Management Systems Certification Services Division Newton Building, St George s Avenue Northampton, NN2 6JB United Kingdom Tel: +44(0)1604-893-811. Fax: +44(0)1604-893-868. E-mail: pcn@bindt.org CP14 ISSUE 5 DATED 1 st OCTOBER

More information

Control No: QQM-02 Title: Quality Management Systems Manual Revision 10 07/08/2010 ISO 9001:2008 Page: 1 of 22

Control No: QQM-02 Title: Quality Management Systems Manual Revision 10 07/08/2010 ISO 9001:2008 Page: 1 of 22 ISO 9001:2008 Page: 1 of 22 Central Technologies has developed a Quality Management System, and the associated procedures and work instructions, to be compliant to ISO 9001:2008. Utilizing this Quality

More information

Internal Quality Management System Audit Checklist (ISO9001:2015) Q# ISO 9001:2015 Clause Audit Question Audit Evidence 4 Context of the Organization

Internal Quality Management System Audit Checklist (ISO9001:2015) Q# ISO 9001:2015 Clause Audit Question Audit Evidence 4 Context of the Organization Internal Quality Management System Audit Checklist (ISO9001:2015) Q# ISO 9001:2015 Clause Audit Question Audit Evidence 4 Context of the Organization 4.1 Understanding the organization and its context

More information

COMBINE. Part B. Manual for Marine Monitoring in the. Programme of HELCOM. General guidelines on quality assurance for monitoring in the Baltic Sea

COMBINE. Part B. Manual for Marine Monitoring in the. Programme of HELCOM. General guidelines on quality assurance for monitoring in the Baltic Sea Manual for Marine Monitoring in the COMBINE Programme of HELCOM Part B General guidelines on quality assurance for monitoring in the Baltic Sea Annex B-3 Quality audit ANNEX B-3 QUALITY AUDIT 1. Objectives

More information

G & R Labs. Quality Assurance Manual. G&R Labs. 2996 Scott Boulevard Santa Clara CA 95054. Light Meters and Calibration

G & R Labs. Quality Assurance Manual. G&R Labs. 2996 Scott Boulevard Santa Clara CA 95054. Light Meters and Calibration G & R Labs Light Meters and Calibration Quality Assurance Manual G&R Labs 2996 Scott Boulevard Santa Clara CA 95054 QM01 QUALITY MANUAL ISO9001:2008 Manual Contents QM 01 Manual Contents 2 QM 02 Copy Holder

More information

Micro Plastics, Inc. Quality Manual

Micro Plastics, Inc. Quality Manual ISO 9001:2008 11 Industry Lane Flippin, Arkansas 72634 QM-001-2008-F Page 2 of 39 Introduction Micro Plastics, Inc. developed and implemented a Quality Management System in order to document the company

More information

ISO 9001 Quality Management Systems Professional

ISO 9001 Quality Management Systems Professional ISO 9001 Quality Management Systems Professional Professional Certifications Sample Questions Sample Questions 1. The non-fulfillment of a specified requirement is called a: A. Concession B. Nonconformity

More information

The Initial Internal Audit of an ISO 9001:2015 QMS. Michael Prior, CQA Quality Institute of America

The Initial Internal Audit of an ISO 9001:2015 QMS. Michael Prior, CQA Quality Institute of America The Initial Internal Audit of an ISO 9001:2015 QMS Michael Prior, CQA Quality Institute of America 9.2 Internal audit 9.2.1 The organization shall conduct internal audits at planned intervals to provide

More information

The President of Inductors Inc. is the senior executive responsible for operations.

The President of Inductors Inc. is the senior executive responsible for operations. Title: Quality Management System Manual Page: 1 of 20 INTRODUCTION Inductors Inc., founded in 1991, specializes in the distribution of inductive components, including but not limited to standard and custom

More information

ISO 9001: 2008 Boosting quality to differentiate yourself from the competition. xxxx November 2008

ISO 9001: 2008 Boosting quality to differentiate yourself from the competition. xxxx November 2008 ISO 9001: 2008 Boosting quality to differentiate yourself from the competition xxxx November 2008 ISO 9001 - Periodic Review ISO 9001:2008 Periodic Review ISO 9001, like all standards is subject to periodic

More information

RECOMMENDATION FOR USE. Number of pages : 1 Date : To be approved by : Approved on : Origin : VG13 Full quality assurance

RECOMMENDATION FOR USE. Number of pages : 1 Date : To be approved by : Approved on : Origin : VG13 Full quality assurance CNB/M/13.001 Revision : 3 Number of pages : 1 Date : 2008-01-21 o be approved by : Approved on : Origin : VG13 Full quality assurance Vertical Group Horizontal Committee Standing Committee 2008-06-10 Annex

More information

ISO 14001:2004 Environmental Management System Manual

ISO 14001:2004 Environmental Management System Manual ISO 14001:2004 Environmental Management System Manual Company Name/Logo Document No Rev Uncontrolled Copy Controlled Copy Date COMPANY PROPRIETARY INFORMATION Prior to use, ensure this document is the

More information

Certification Process Requirements

Certification Process Requirements SAAS Certification Process Requirements SAAS Procedure 200 and ISO/IEC 17021 Social Accountability Accreditation Services, June 2010 Accreditation Process and Policies SAAS Normative Requirements SAAS

More information