1 Part 1: General 1.01 General Guidelines - The primary purpose of chemical laboratory hoods and other industrial ventilation systems is to protect the worker or researcher against exposure to hazardous material in laboratories. The design should be considered on a case-by-case basis by the designer, after thorough investigation of the proposed usage and the materials to be used in the hood or system Selection / Procurement / Installation of Local Exhaust Devices - The installation of chemical hoods and other local exhaust ventilation equipment represents a facilities modification. These devices may be installed only by employees/contractors working for recognized campus design or maintenance organizations as part of an approved facilities modification process. Equipment selected must meet or exceed the specifications listed in this section Installation - No equipment covered under this section may be installed, modified, or removed by NC State employees or contractors, other than those reporting to Universitydesignated design, maintenance, or construction organizations. Part 2: Design Guidelines 2.01 General Requirements Design requirements for laboratory ventilation will follow ANSI/AIHA Z guidelines (or latest edition) unless pre-empted by information contained in this section or applicable sections of the NC Building Codes. Specific Applications shall follow the requirements listed in the latest version of the ACGIH Ventilation Manual unless covered in this section. Where specific design references do not exist, design parameters should be reviewed and approved by Facilities with input from Environmental Health and Safety as appropriate. The ANSI/AIHA Z9.5 guidelines do not apply to the lab ventilation for the following conditions: Laminar Flow Chemical Hoods: Contact NC State EH&S for requirements Biological Safety Cabinets: Meet NSF 49 requirements and requirements listed in NC State Biological Safety Manual Gas Storage Cabinets: Reference NC Fire Code, section 2203 Lab and industrial ventilation control systems: Contact George Smith Design must carefully consider acoustics and result in a laboratory noise level of NC (noise criteria) 50 or lower. Proper acoustic design should be accomplished by appropriate fan size and type. Sound attenuators are acceptable, though not preferred. When used, sound attenuators must be constructed of 304 stainless steel Lab ventilation rates must be maintained as follows: Rev 0 07/9/02 Page 1 of 10

2 Chemistry Lab 6-8 air changes per hour (ACH) based on the lab/building application and NC State EH&S hazard evaluation. In some instances, rates lower than 6 ACH may be appropriate for lower hazard (non chemistry) labs. In some instances, safety controls or temperature demands may dictate a design, which results in air change rates in excess of 8 ACH. In any case, where air change rates lower than 6 ACH or greater than 8 ACH are proposed, NC State EH&S and Facilities Division feedback and approval should be obtained at the earliest stage of design. Off-hour/night setback Typically 4 ACH and requires NC State EH&S and Facilities Division design approval Supply Air System The supply air system will be equipped with a reheat coil for humidity control Transfer air from non-hazardous areas such as offices shall be used whenever possible to provide make-up air for heavily exhausted laboratories. Supply air diffuser in laboratories shall be low velocity such that containment performance of chemical hoods is not affected Air velocity caused by supply diffusers, window drafts, lab aisle traffic, etc., shall be less than ½ and preferably 1/3 of the chemical hood average hood face velocity, measured 1.5 feet in front of the plane of the sash Supply air shall be properly balanced with hood exhaust in each room. Supply air shall be slightly less than exhaust air (except for clean rooms) to allow for laboratory rooms to be under negative pressure at all times, or hallways and stairways should be pressurized to produce negative pressure in a lab room. Pressurization shall be established by initial balance and maintained by linked supply and exhaust flow. Through the wall differential pressurization controllers are not allowed (except for clean rooms). Minimum differential pressure between laboratory and hallway/adjacent nonlaboratory spaces shall be maintained between 0.01 to 0.02 in. w.g. VAV systems shall be able to maintain the room differential pressure negative to hallway and adjacent areas, regardless of laboratory hoods sash position and/or other exhaust devices flow adjustment dampers position. For CAV systems, provision shall be made to ensure that room differential pressure is maintained unchanged (always negative to hallway and adjacent areas) when the hood sash (or other exhaust devices exhaust dampers) is closed. This may include techniques such as isolating the hood sash pocket from the area above the suspended ceiling. Supply air delivery must be designed to ensure hood performance and safety. Perforated ceiling/plenum supply air or perforated duct diffusers are acceptable. Rev 0 07/9/02 Page 2 of 10

3 Chemical hoods shall be located away from activities or facilities such as high traffic areas, air supply diffusers, doors, and operable windows, which produce air currents or turbulence. The minimum horizontal distance from a diffuser to the face of the hood should be 4' (four feet). The recommended minimum distance from lab entrance door to the hood is 10' (ten feet). Supply Flow Monitors - Workstations used for the control/exhaust of hazardous materials and which also contain HEPA filtered air supply system, shall include a differential pressure gauge to measure the static pressure drop across the filter. The static pressure reading must be readily visible at the operator s workstation. An audible readout from this monitor is optional. Maximum supply air velocity at the working stations (draft air speed) shall meet the ANSI/ASHRAE (or latest version) requirements Chemical Hoods Chemical Hoods Design Requirements Hood Type Only bypass hoods shall be selected for new projects. The bypass must be able to maintain the exhaust volume unchanged (<5%) when the sash is in the fully closed position. Bypass is not required for VAV hoods For VAV hoods and hoods with combination or horizontal sash, only a restrictedtype bypass system shall be used. The diversity factor for VAV systems needs to be evaluated by the engineer and on a case-by-case basis with feedback from NC State EH&S and Facilities Division. Auxiliary air hoods and ductless hoods are not allowed. Low velocity hoods do not provide significant additional energy savings (based on the NCSU design criteria of 100 ) and are not considered to be a viable approach. Should the designer wish to utilize this approach, provision of justification and receipt of approval from NC State EH&S and Facilities Division must be obtained at the earliest stage of design. A mechanical sash stop is required to limit the maximum vertical sash height at 18. Vertical sashes are preferred to horizontal sashes. Horizontal sash hoods (i.e. Sash with horizontal panels that cannot move vertically) are not allowed, unless written EH&S approval is obtained. Combination sash hoods are allowed if pre-approved by EH&S. Rev 0 07/9/02 Page 3 of 10

4 Combination sash VAV hoods need to have VAV sensors on both vertical and horizontal sashes. For a 5-foot hood, vertical sash opening shall not require more than 5 lbs force (for larger hoods, an additional one lb of force may be required for each additional linear foot of fume hood width) and sash should remain stationery when force is removed. ADA hoods shall be selected from an EH&S-approved list and will be installed in. above the finished floor for ADA compliance Hoods shall be equipped with a front edge air foils to reduce airflow eddies All utility valves and switches need to be located outside the hood. Non-electrical utilities may be installed inside the hood provided they have outside cutoffs and can be connected/operated without increased exposure risk or other unsafe conditions Fume hoods must be UL listed. The hood work surface should be recessed at least 1/8 in. with a seamless vertical lip to contain spills. If the hood is provided with a recessed sink, the perimeter of the sink shall also contain a 1/8 in. lip. Storage cabinets beneath the hood should be vented as long as it does not compromise hood performance (determined by local fire authority). The hood light shall be in a vapor resistant panel, accessible from outside the hood. The light shall provide a minimum of 80 foot-candle on any part of the bench level (36 form the floor). Chemical hoods (fume hoods) shall be designed to provide a continuous face velocity of 110 fpm at a sash height of 18. Final balance shall indicate 100 fpm at 18- inch sash height. Chemical hoods (fume hoods), which are designed to operate with variable air flow rates, shall draw a minimum rate of 25ft3 per sq foot of hood surface area, with the hood sash in the closed position. Deviation from this must be approved by EH&S. Exhaust Flow/velocity monitor and alarm All chemical hoods shall be equipped with an exhaust flow/velocity indicator and alarm to alert users to improper exhaust flow The flow/velocity alarm shall sound whenever average face velocity drops below 60 fpm. In addition to low flow alarm, a VAV chemical hood alarm shall sound when the sash is opened in excess of the design sash opening limit (18 ) Rev 0 07/9/02 Page 4 of 10

5 Hood Material Chemical hood material shall be non-porous and resistant to the chemicals Liner material shall be flame retardant, self-extinguishing and have a flame rating of 25 or less in accordance with ASTM-E84. The chemical hood sash needs to be constructed of shatter- proof transparent material, suitable for the intended use Chemical Hood Selection EH&S keeps an updated list of pre-qualified laboratory hoods for project managers to choose from. This list is developed based on the NCSU ASHRAE (or latest edition) test data, tests performed by other academic institutions, and data from hood balancing contractors. For a list of the pre-qualified hoods, refer to EH&S Laboratory and Industrial Ventilation Systems requirements: Selecting a chemical hood that is not included in pre-qualified list will require EH&S official approval 2.04 Exhaust System Exhaust system material shall be resistant to laboratory chemicals for the designed application A manifolded exhaust plenum on the roof is preferred in lieu of individual exhaust fans (i.e. 1 fan per hood or lab module). This does not apply to perchloric acid, acid digestion, and Iodination hoods. Hoods which are high hazard or unique use, such as perchloric acid, carcinogen glove boxes or radio iodination hoods shall not be installed in plenum-type systems and shall be separately exhausted. Manifolded exhaust systems are preferred, provided that they are designed in accordance with NFPA 30 and 45 (this requires that each laboratory unit have a dedicated exhaust system, which is manifolded with exhaust systems from other laboratory units unless such connection made above the roof level or otherwise exterior to the building). Manifolding of exhaust systems serving more than one laboratory unit must be approved by NCSU Facilities and NCSU Environmental Health and Safety prior to design. Provisions should be made for local exhaust of instruments, gas cabinets, vented storage cabinets or special operations not requiring the use of a chemical hood (local capture devices). Exhaust discharges from vacuum pumps shall be hard piped to local exhaust systems. Inserting the exhaust tube into the exhaust drop without a sealed connection is not acceptable. Rev 0 07/9/02 Page 5 of 10

6 Exhaust systems for systems such as gas cabinets or processes shall be monitored with a monitor similar to that used for chemical hoods with the exception that it shall have an auxiliary relay for connection to a process control system. NCSU has a standard design for this control panel. Gas cabinets for gas cylinders shall be in accordance with the building codes and shall be designed with an average face velocity of 200 FPM at the inspection door, when the inspection door is opened. To optimize and/or adjust exhaust flow to levels required for hazard control, flow adjust devices such as dampers shall be installed in each exhaust duct branch connected to exhaust devices. Exhaust Fans Exhaust stacks shall be high velocity type, with a minimum of 3000 FPM with preferable velocities approaching 4000 FPM. In congested areas, an analysis of the air patterns at the roof level may be required to insure that contaminated exhaust air is not re-entrained into building make-up air and that the exhaust air is discharged beyond the boundary layer of the building For manifolded exhaust systems the fan set shall be of the Strobic or MK Plastics high plume, induced air type. Preferably, fans should be direct drive. Air induction shall take place downstream of the fan impeller. Fans to have stainless, motorized isolation damper. Depending on system size, one fan shall provide stand-by with the capacity to match one of the remaining fans For an individual hood exhaust set: Exhaust stacks shall extend a minimum of 10 ft. above adjacent roof lines andair intakes in a vertical up direction Guy wires shall not be used to support exhaust stacks unless the stack is of unusual height. In general, exhaust stacks may be supported by bolting to a flanged fan discharge or by extending support steel from the fan support curb or steel frame. In general, exhaust stacks shall have a coned discharge to achieve discharge velocity. On a regular basis, fans shall be provided with a zero-loss style exhaust discharge. All fans shall be provided with a drain and ball valve in the bottom of the scroll. For manifolded systems, there shall be at least two exhaust fans for redundancy, and at least one fan shall be connected to emergency power. Emergency power, pressurization, and emergency exit (Ken) Exhaust duct Rev 0 07/9/02 Page 6 of 10

7 General-purpose chemical hood ductwork shall be butt-welded 304 stainless steel with 304 stainless steel fillet material. Flanged joints may be used only where field conditions prevent welded joints. Iodination hoods ductwork shall be butt-welded stainless steel. Perchloric ductwork shall be fire resistant fiberglass. Iodination and biological hoods shall be adequately filtered prior to connection to a centralized exhaust system Downdraft Exhaust Systems Downdraft tables are recommended for anatomy lab dissection tables and may be appropriate for certain lab benchtop applications. Proposed designs should be discussed with Facilities and EH&S at the earliest opportunity in the project Perchloric Acid Hood and Exhaust Systems Laboratories that utilize perchloric acid require a specially designed fume hood dedicated to perchloric acid use. A perchloric acid hood is a specialized stainless steel hood with non-reactive/acid resistant duct and exhaust fan, and built-in water wash-down system, designed to prevent the deposition and a build up of explosive perchloric salts on the hood and exhaust system. For specific perchloric acid applications, laboratory design may exclude perchloric acid hood installations. However, this can be carried out only after EH&S written approval. Perchloric acid hoods and exhaust systems shall meet the ANSI Z9.5 and NFPA 45 requirements Connecting Perchloric acid hood ductwork to other exhaust equipment is prohibited. Hoods, exhaust ductwork, fans, gaskets, and other material/components shall be constructed of acid resistant, non-reactive, impervious materials. All duct work seams and joints shall be welded. Hood baffles shall be removable to allow for periodic inspection. Ductwork shall take the shortest and straightest path to the outside. Positive drainage shall be provided back to the hood. A water spray system shall be provided to wash down the entire exhaust system from the hood interior behind the baffle, through the fan, up to the roofline. The hood work surface shall be watertight with a minimum depression of 1/2 inch at the front and sides. An integral trough shall be provided at the rear of the hood to collect wash down water and direct it to a drain. The baffle shall be removable for cleaning. Provide a hose bib within 40 feet of the discharge stack to allow for manual wash down. Provide controls so that the user can easily initiate wash down. Provide an automatic wash down cycle. The duration of the automatic cycle depends on the configuration of the ductwork. Because wash down of a contaminated hood requires up to 24 hours of continuous washing, provide for manual override of the automatic cycle. Rev 0 07/9/02 Page 7 of 10

8 Provide an easily readable placard stating: "Wash down often. Perchloric acid (HClO4) can violently decompose on contact with organic compounds such as acetic acid, alcohols, ketones, aldehydes, ethers, dialkyl sulfoxides, paper, wood, grease or oils. Perchlorate compounds formed by reaction with heavy metals, alkali metals, ammonium or some organics are shock sensitive explosives." 2.07 Acid Hoods (non-perchloric) Acid hoods must be considered for acid digestions, large volumes/high temperature ((e.g. boiling)) acid applications,. Acid hoods might be built with or without a water wash down system. Review with EH&S for wash down system requirements Connecting ductwork from water wash hoods to other exhaust equipment is prohibited. Hoods, exhaust ductwork, fans, gaskets, and other material/components (e.g. light fixtures) shall be constructed of acid resistant, non-reactive, compatible, and impervious materials. Ductwork shall take the shortest and straightest path to the outside. Positive drainage shall be provided back to the hood Testing/Commissioning Airflows in hoods must be certified. The air flow quantity of each hood must be tested by an independent testing agency. The results must be certified by the contractor and engineer and submitted to Facilities Planning and Design. Balancing/Approval for Use - Balancing is required for chemical hoods, gas cabinets, laminar flow chemical hoods, and other exhausted devices where hazardous materials are stored or used. Vacuum pump exhausts do not require balancing. Where balancing is required, it will be performed by persons certified by the Associated Air Balance Council (AABC) or the National Environmental Balancing Bureau (NEBB), unless otherwise indicated by Facilities Planning and Design. Where certified balance contractors are not required (e.g. single-hood installations), hood adjustment and initial balancing will be performed according to manufacturer s instructions (unless otherwise indicated in this document) and flow measurements conducted in accordance with NC State flow testing procedures. A white sticker containing hood identification information shall be applied by the balancing contractor to the face panel of the exhaust device. Where this is not practical, the sticker can be applied to the duct that is measured. Duct traverse pilot holes shall be capped with a removable plug to allow for future readings at the same location. Stickers applied to ductwork should be located near the monitoring point for clarification. Laboratory chemical hoods and laminar flow chemical hoods may not be used until Environmental Health and Safety receives the completed NCSU New and Renovated Fume Hood Construction From (Form FH-1) from the CPM, verifies proper flow/installation/calibration, and applies a green label to the face panel.. The final test shall be requested after the installation is complete, the building ventilation Rev 0 07/9/02 Page 8 of 10

9 system is balanced, all connections are made and all control devices are calibrated/adjusted, and CPM has completed and submitted the FH-1 form to EH&S. All newly installed laboratory chemical hoods (100%) shall be tested to As Installed (AI) EH&S test criteria, developed based on the ASHRAE (or most current edition) and ANSI Z9.5 (latest edition), as specified in EH&S Laboratory and Industrial Ventilation Systems requirements: ( A qualified third party (approved by EH&S) shall perform the AI tests on 100% of the installed chemical hoods., If AI test reveals any hood design/installation deficiency, the manufacturer/contractor shall remediate the deficiency and repeat the full ASHRAE 110 test (EH&S test criteria). The manufacturer/contractor would be financially responsible for all additional tests required after modifications/repairs are made. A chemical hood that does not meet the ASHRAE 110 test criteria even after modifications shall be replaced. Test data shall be electronically imported from instruments The AI containment test shall include: Exhaust Flow Measurement Hood Static Pressure Measurement Face Velocity test (adjusted to fpm) Cross draft velocities Airflow visualization (small and large volume smoke test) Tracer Gas Containment Test (static and dynamic) Hood monitor calibration check Room pressurization check VAV hoods require additional commissioning tests: Flow/face velocity measurements at different sash heights (full open, 18 and 12 ) o VAV systems shall prevent flow variations in excess of 10% from design at each sash location. VAV response time measurement o A response time of <3-5 sec. after the completion of the sash movement is acceptable o. Fume hoods will be released for users after tests are final, system is fully commissioned, and EH&S test/evaluations indicates no defects/malfunctions Other local exhaust ventilation systems Canopy hoods Rev 0 07/9/02 Page 9 of 10

10 Canopy hoods provide limited protection and shall not be used to control exposure against hazardous materials in laboratories. Canopy hoods may only be used for non-hazardous odor or heat control at the source. Canopy hood design shall meet the ACGIH Industrial Ventilation guidelines and requires EH&S pre-approval Slot hoods, snorkels, and special design/purpose hoods These local exhaust devices provide limited protection compared to a fume hood and shall not be used as the primary engineering protection or as a replacement for chemical laboratory hoods unless the application is approved by NC State EH&S. In some cases, this method can provide acceptable contaminant controls with reduced energy consumption. Design shall meet the latest ACGIH Industrial Ventilation guidelines. Design and installation requires EH&S approval Ductless hoods Because of limited protection, ductless hoods are not permitted for use at NCSU. Contact EH&S for additional information. Exhausted laminar flow chemical hoods with built-in supply blower Contact NC State EH&S for selection and balancing information Selecting exhausted Biological Safety Cabinets (class II type B2 or higher) that are directly connected to the building exhaust system must be approved by EH&S Glove box: - Glove boxes shall meet the requirements of ANSI Z (or latest edition) Balance Enclosures Exhausted balance enclosures shall meet all fume hood requirements listed/referenced in this document. Using balance enclosures that return air back into the laboratory after filtration requires EH&S hazard evaluation and preapproval. Rev 0 07/9/02 Page 10 of 10

Fume Hood Questions and Answers

Fume Hood Questions and Answers Fume Hood Questions and Answers 1. When should I use a fume hood? Use a chemical fume hood anytime your work involves: Chemicals with a National Fire Protection Association (NFPA) Health rating of 3 or

More information

Chemical Fume Hoods. Environmental Health and Safety 974-5084

Chemical Fume Hoods. Environmental Health and Safety 974-5084 Chemical Fume Hoods Environmental Health and Safety 974-5084 Regulatory References Prudent Practices in the Laboratory 2011 (National Research Council of The National Academies): Laboratory chemical hoods

More information

COMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES

COMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES COMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES These guidelines are to be used for ALL commercial cooking hoods, ventilation systems and related fire suppression

More information

CETA Application Guide for the Exhaust System Requirements of Class II, Type B Biosafety Cabinets CAG-007-2010 March 24, 2010

CETA Application Guide for the Exhaust System Requirements of Class II, Type B Biosafety Cabinets CAG-007-2010 March 24, 2010 CETA Application Guide for the Exhaust System Requirements of Class II, Type B Biosafety Cabinets CAG-007-2010 March 24, 2010 1. Background Class II Type B Biosafety Cabinets (BSCs) are unique laboratory

More information

Class II Type B2 Laminar Flow Biological Safety Cabinets at Ordering Criteria for the National Institutes of Health

Class II Type B2 Laminar Flow Biological Safety Cabinets at Ordering Criteria for the National Institutes of Health Background Class II Type B2 Laminar Flow Biological Safety Cabinets at Ordering Criteria for the National Institutes of Health This document provides guidelines for the design and installation of Class

More information

Geismar Site Reviewed: 07/05/16 Effective: 07/05/16 Supersedes: 08/04/14 Preparer: Owner: Approver: S/IH Team Leader S/IH Team Leader Manager LA Hub

Geismar Site Reviewed: 07/05/16 Effective: 07/05/16 Supersedes: 08/04/14 Preparer: Owner: Approver: S/IH Team Leader S/IH Team Leader Manager LA Hub BASF Corporation Title: LOCAL EXHAUST VENTILATION Individual Unit Function: Industrial Hygiene Procedure No.: IH-3 Page: 1 of 12 Geismar Site Reviewed: 07/05/16 Effective: 07/05/16 Supersedes: 08/04/14

More information

LABORATORY GUIDELINES AND STANDARDS

LABORATORY GUIDELINES AND STANDARDS LABORATORY GUIDELINES AND STANDARDS APPLICATION NOTE LC-125 Introduction This publication provides excerpts from some of the many guidelines and standards that pertain to the construction and operation

More information

SAM HOUSTON STATE UNIVERSITY

SAM HOUSTON STATE UNIVERSITY PART 1: GENERAL 1.01 General Requirements A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the

More information

Element D Services Heating, Ventilating, and Air Conditioning

Element D Services Heating, Ventilating, and Air Conditioning PART 1 - GENERAL 1.01 OVERVIEW A. This section supplements Design Guideline Element D3041 on air handling distribution with specific criteria for projects involving design of a Data Center spaces B. Refer

More information

Subpart 1. Installation. All plumbing systems must be. installed and tested according to this chapter and chapter 4715,

Subpart 1. Installation. All plumbing systems must be. installed and tested according to this chapter and chapter 4715, 4658.4500 PLUMBING SYSTEMS; NEW CONSTRUCTION. Subpart 1. Installation. All plumbing systems must be installed and tested according to this chapter and chapter 4715, the Minnesota Plumbing Code. Subp. 2.

More information

Components HVAC General Standards HVAC Guidelines HVAC System Selection Life Cycle Cost Analysis

Components HVAC General Standards HVAC Guidelines HVAC System Selection Life Cycle Cost Analysis Components HVAC General System Selection Life Cycle Cost Analysis Outdoor Air Design Values Indoor Air Design Values Outdoor Air Ventilation Welding Ventilation Temperature Control Systems Ductwork HVAC

More information

3. Alberta Occupational Health and Safety Act, Regulation and Code, July 1, 2009.

3. Alberta Occupational Health and Safety Act, Regulation and Code, July 1, 2009. 6.3 Laboratory Spaces 6.3.1 Regulations 1. Alberta Building Code, 2006 2. Alberta Fire Code, 2006 3. Alberta Occupational Health and Safety Act, Regulation and Code, July 1, 2009. 4. Canadian Nuclear Safety

More information

SECTION 23 81 03 - PACKAGED ROOFTOP AIR CONDITIONING UNITS NON-CUSTOM

SECTION 23 81 03 - PACKAGED ROOFTOP AIR CONDITIONING UNITS NON-CUSTOM SECTION 23 81 03 - PACKAGED ROOFTOP AIR CONDITIONING UNITS NON-CUSTOM PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Packaged rooftop air conditioning unit (5 tons and smaller). 2. Roof curb. 1.2

More information

SPACE TYPE: LABORATORY (WET) FOR CHEMISTRY AND BIOLOGY

SPACE TYPE: LABORATORY (WET) FOR CHEMISTRY AND BIOLOGY SPACE TYPE: LABORATORY (WET) FOR CHEMISTRY AND BIOLOGY Construction Criteria The unit costs for (Wet) space types are based on the construction quality and design features in the following table. This

More information

Element D Services Plumbing

Element D Services Plumbing Medical Vacuum and Gas PART 1 - GENERAL 1.01 OVERVIEW A. This section addresses medical vacuum, waste anesthetic gas disposal, compressed air, oxygen, nitrous oxide, nitrogen and carbon dioxide systems.

More information

TYPICAL FIRE SAFETY INSPECTION VIOLATIONS

TYPICAL FIRE SAFETY INSPECTION VIOLATIONS TYPICAL FIRE SAFETY INSPECTION VIOLATIONS The following is a list of typical violations often found by inspectors and a generic solution. You can use this list to improve the safety of your facility, to

More information

SECTION 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC INTRODUCTORY INFORMATION

SECTION 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC INTRODUCTORY INFORMATION SECTION 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC INTRODUCTORY INFORMATION The purpose of this guide specification is to assist the specifier in correctly specifying Mechanical System Testing

More information

NEBB STANDARDS SECTION-8 AIR SYSTEM TAB PROCEDURES

NEBB STANDARDS SECTION-8 AIR SYSTEM TAB PROCEDURES NEBB STANDARDS SECTION-8 AIR SYSTEM TAB PROCEDURES 8.1 INTRODUCTION Testing, adjusting, and balancing of HVAC systems can best be accomplished by following a series of systematic procedures. The NEBB TAB

More information

SECTION 23 01 30.51 HVAC AIR-DISTRIBUTION SYSTEM CLEANING

SECTION 23 01 30.51 HVAC AIR-DISTRIBUTION SYSTEM CLEANING SECTION 23 01 30.51 HVAC AIR-DISTRIBUTION PART 1 - GENERAL 1.1 SUMMARY A. Section includes cleaning of interior surfaces of HVAC equipment. The HVAC equipment cleaning work includes the following: 1. Air

More information

Basics of HVAC Cleaning

Basics of HVAC Cleaning Basics of HVAC Cleaning Seminar Outline Residential 1. Types of systems used and why 2. Types of air distribution systems 3. System components 4. Determining the need for cleaning (ACR2002) 5. Project

More information

UNIVERSITY OF MISSOURI 23 0000 - Heating Ventilating and Air-Conditioning (HVAC) March 2015.01

UNIVERSITY OF MISSOURI 23 0000 - Heating Ventilating and Air-Conditioning (HVAC) March 2015.01 GENERAL: This section provides general standards for overall sizing and design of Heating, Ventilating, and Air Conditioning (HVAC) systems. Other sections contain specific standards for each system per

More information

VAV Laboratory Room Airflow The Lowdown on Turndown

VAV Laboratory Room Airflow The Lowdown on Turndown Technology Report March, 2003 VAV Laboratory The Lowdown on Turndown Turndown comparison of these two turndown ratios. Note the small actual airflow difference between them. control ranges are normally

More information

1.2 Refrigerant Equipment. General

1.2 Refrigerant Equipment. General Part 1 General 1.1 Summary.1 Unless otherwise indicated, follow the standards below when specifying heating, ventilation and air conditioning (HVAC) work. These standards are not intended to restrict or

More information

Department of Environmental Health and Safety & Emergency Management

Department of Environmental Health and Safety & Emergency Management Date: February 2014 Revision: 02 Page: 1 of 13 This Guideline is issued jointly by the Department of Environmental Health and Safety & (EHSEM) and Facilities Management to provide guidance and consistency

More information

SPECIAL APPLICATIONS

SPECIAL APPLICATIONS Page 1 SPECIAL APPLICATIONS The protection of microelectronics clean rooms using aspirating smoke detection systems requires special consideration. The physical configuration of the room(s) and the direction

More information

LABORATORY SAFETY INSPECTION CHECKLIST

LABORATORY SAFETY INSPECTION CHECKLIST LABORATORY SAFETY INSPECTION CHECKLIST As part of EH&S's laboratory safety survey program, we have compiled a list of the most common safety problems. This is not a list of every possible hazard, but can

More information

Stanford Laboratory Standard & Design Guide TABLE OF CONTENTS

Stanford Laboratory Standard & Design Guide TABLE OF CONTENTS Section 1.1: VENTILATION TABLE OF CONTENTS Page A. Regulations, Standards and References 1.1-3 B. Scope 1.1-3 C. General Ventilation Considerations 1.1-3 D. Negative Pressurization 1.1-6 E. Supply Air

More information

ENHANCED LABORATORY HVAC SYSTEM

ENHANCED LABORATORY HVAC SYSTEM ENHANCED LABORATORY HVAC SYSTEM INTRODUCTION Since the early 1980's the attention to more energy efficient laboratory designs has been on the rise due to the increase in energy cost and the emergence of

More information

Laboratory Ventilation Safety. J. Scott Ward

Laboratory Ventilation Safety. J. Scott Ward Laboratory Ventilation Safety J. Scott Ward In 1925, Laboratory Construction Company was born. The first product was a Kjeldahl Nitrogen Determination Apparatus. We may have shortened our name, but we

More information

Element D Services Plumbing

Element D Services Plumbing PART 1 - GENERAL 1.01 OVERVIEW A. This section addresses domestic cold, hot and hot water return distribution systems within and to five feet beyond building perimeter. PART 2 - DESIGN CRITERIA 2.01 GENERAL

More information

Commercial Kitchen Fire Safety

Commercial Kitchen Fire Safety Commercial Kitchen Fire Safety Commercial grade kitchens are a common feature found in many churches today, as religious institutions are providing meals for daycares, soup kitchens, meals on wheels and

More information

Spray Booth Guideline

Spray Booth Guideline Department of Development Service 135 North D Street, Perris CA. 92570 Phone: (951) 443-1029 Fax: (951) 943-3293 PURPOSE The intent of this guideline is to provide the information necessary to ensure that

More information

Laboratory Design & Construction Guidelines

Laboratory Design & Construction Guidelines Laboratory Design & Construction Guidelines Department of Environmental Health & Safety EHS-M-35 Page 1 Issue Date: 03/01/10 General Health and Safety The USC Environmental Health and Safety Department

More information

Procedures for the Effective Use of Biological Safety Cabinets

Procedures for the Effective Use of Biological Safety Cabinets Procedures for the Effective Use of Biological Safety Cabinets APPROVAL DATE BY BIOHAZARDS SUBCOMMITTEE: August 10, 2012 SUPERSEDES: March 1, 2012 This corporate guideline/procedure is intended as a minimum

More information

Mechanical Heating Ventilation and Air Conditioning Ductwork and Duct Accessories

Mechanical Heating Ventilation and Air Conditioning Ductwork and Duct Accessories Basis of Design This section applies to the design and installation of ductwork, air terminal boxes, air outlets and inlets, volume dampers, pressure relief dampers, smoke/fire dampers, and smoke/fire

More information

FINAL December 2012 SECTION 233100 DUCTWORK

FINAL December 2012 SECTION 233100 DUCTWORK SECTION 233100 DUCTWORK 1.0 Acoustical duct lining in any part of the duct system is prohibited. All ductwork requiring insula tion shall be externally insulated (Refer to the Sheet Metal Ductwork Insulation

More information

Air-Conditioning, Heating, and Refrigeration Institute. Sheet Metal and Air-Conditioning Contractors National Association

Air-Conditioning, Heating, and Refrigeration Institute. Sheet Metal and Air-Conditioning Contractors National Association Air-Conditioning, Heating, and Refrigeration Institute Sheet Metal and Air-Conditioning Contractors National Association GUIDELINE B-1997 ACKNOWLEDGEMENT These guidelines for Roof Mounted Outdoor Air-

More information

Laboratory Biosafety Level 3 Criteria

Laboratory Biosafety Level 3 Criteria Laboratory Biosafety Level 3 Criteria Biosafety in Microbiological and Biomedical Laboratories (BMBL) 5th Edition Section IV Biosafety Level 3 (BSL-3): Biosafety Level 3 is applicable to clinical, diagnostic,

More information

PI s Name Date Bldg./Rm# CDC Biosafety Level 3 (BSL-3)

PI s Name Date Bldg./Rm# CDC Biosafety Level 3 (BSL-3) PI s Name Date Bldg./Rm# CDC Biosafety Level 3 (BSL-3) Yes No 1. Is access to the laboratory limited or restricted at the discretion of the laboratory director when experiments are in progress? Yes No

More information

Risk Assessment: Biosafety Cabinet

Risk Assessment: Biosafety Cabinet Risk Assessment: Biosafety Cabinet Biosafety cabinets (BSCs) serve as primary containment devices for operations involving potential splashes, spills or aerosolization of hazardous biological materials.

More information

Current as of 11/10/08 1 of 1

Current as of 11/10/08 1 of 1 BEST PRACTICES STANDARDS FOR SCHOOLS UNDER CONSTRUCTION OR BEING PLANNED FOR CONSTRUCTION I. Site Layout A. School buildings shall be provided with a securable perimeter. A securable perimeter means that

More information

AABC Specifications for Testing and Balancing HVAC Systems

AABC Specifications for Testing and Balancing HVAC Systems AABC Specifications for Testing and Balancing HVAC Systems The Associated Air Balance Council (AABC) Total System Balancing Specifications for HVAC Testing, Balancing and Performance Verification TOTAL

More information

SECTION 15950 - TESTING, ADJUSTING, AND BALANCING

SECTION 15950 - TESTING, ADJUSTING, AND BALANCING SECTION 15950 - TESTING, ADJUSTING, AND BALANCING PART 1 - GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

ALVERNIA UNIVERSITY OSHA REGULATION: 29 CFR 1910.252 WELDING, CUTTING, AND BRAZING ( HOT WORK ) SECTION: 3600

ALVERNIA UNIVERSITY OSHA REGULATION: 29 CFR 1910.252 WELDING, CUTTING, AND BRAZING ( HOT WORK ) SECTION: 3600 OSHA REGULATION: 9 CFR 90.5 WELDING, CUTTING, AND BRAZING ( HOT WORK ) A. POLICY. This procedure follows requirements set forth in 9 CFR 90.5.. This policy applies to all Hot Work operations being done

More information

Medicine Hat Fire Department. Special Event Requirements. medicinehat.ca/fire. August 2012

Medicine Hat Fire Department. Special Event Requirements. medicinehat.ca/fire. August 2012 Medicine Hat Fire Department Special Event Requirements August 202 medicinehat.ca/fire The following is a standard guide for event organizers to ensure occupant safety and compliance with the Alberta Fire

More information

How To Select The Right Laboratory Hood System

How To Select The Right Laboratory Hood System How To Select The Right Laboratory Hood System An Industry Service Publication Foreword This booklet has been developed to serve as an aid in selecting a laboratory fume hood ventilation system. The information

More information

Fume Hood Program 2003-2011. UNH Office of Environmental Health and Safety. All rights reserved.

Fume Hood Program 2003-2011. UNH Office of Environmental Health and Safety. All rights reserved. Fume Hood Program 2003-2011. UNH Office of Environmental Health and Safety. All rights reserved. UNH Fume Hood Program Page 1 Table of Contents I. INTRODUCTION... 4 II. GOAL... 5 III. LABORATORY FUME HOODS

More information

The Basics of Commercial Kitchen Exhaust Cleaning

The Basics of Commercial Kitchen Exhaust Cleaning The Basics of Commercial Kitchen Exhaust Cleaning ANSI/IKECA C 10 ANSI/IKECA C 10: Standard for Cleaning of Commercial Exhaust Systems IKECA Introduces the Kitchen Exhaust Cleaning Industry s First American

More information

Safety Inspection Checklist

Safety Inspection Checklist Inspector(s): Building: Room Number (s): Department/Unit: Date Inspected: Supervisor: To customize your local inspection checklist, delete or add as required. Inspection Headings: 1. Administrative 8.

More information

Requirements for Hydrogen Storage and Use

Requirements for Hydrogen Storage and Use Requirements for Hydrogen Storage and Use I. INTRODUCTION Fire and Life-Safety Group (FLS) The following is a summary of the fire and building code requirements for the storage and use of hydrogen. These

More information

Cooktop Low-Profile Ventilation Hoods

Cooktop Low-Profile Ventilation Hoods INSTALLATION GUIDE Cooktop Low-Profile Ventilation Hoods Contents Wolf Cooktop Low-Profile Ventilation Hoods........ 3 Cooktop Low-Profile Hood Specifications.......... 4 Cooktop Low-Profile Hood Installation............

More information

CITY OF LONG BEACH Department of Development Services BUILDING AND SAFETY BUREAU MECHANICAL PLAN REVIEW CHECKLIST

CITY OF LONG BEACH Department of Development Services BUILDING AND SAFETY BUREAU MECHANICAL PLAN REVIEW CHECKLIST CITY OF LONG BEACH Department of Development Services BUILDING AND SAFETY BUREAU MECHANICAL PLAN REVIEW CHECKLIST PROJECT NO.: BMEC DATE: STATUS: INFORMATION PROJECT ADDRESS: WORK DESCRIPTION: APPLICANT

More information

A Guide to Laboratory Fume Hoods

A Guide to Laboratory Fume Hoods A Guide to Laboratory Fume Hoods INTRODUCTION Laboratory fume hoods are a type of ventilation system with the primary function is to exhaust chemical fumes, vapors, gasses, dust, mist and aerosol. Fume

More information

Radford University. Indoor Air Quality Management Plan

Radford University. Indoor Air Quality Management Plan Radford University Indoor Air Quality Management Plan Spring 2015 Introduction Concerns with Indoor Air Quality (IAQ) have increased since energy conservation measures were instituted in office buildings

More information

Guide Specification for Laboratory Fume Hood Commissioning

Guide Specification for Laboratory Fume Hood Commissioning Guide Specification for Laboratory Fume Hood Commissioning 3 February, 1997 Application notes: This specification is intended to be used by qualified, experienced engineers and industrial hygienists as

More information

PRE-ASSEMBLED INSTALLATION INSTRUCTIONS FOR PACB SERIES COAL FIRED OVENS

PRE-ASSEMBLED INSTALLATION INSTRUCTIONS FOR PACB SERIES COAL FIRED OVENS PRE-ASSEMBLED INSTALLATION INSTRUCTIONS FOR PACB SERIES COAL FIRED OVENS OVENS MANUFACTURED BY: EARTHSTONE OVENS-6717 SAN FERNANDO RD GLENDALE CA 91201 TELEPHONE: 800-840-4915 818-553-1134 FAX: 818-553-1133

More information

HOSPITAL ISOLATION ROOM HVAC SYSTEM DESIGN

HOSPITAL ISOLATION ROOM HVAC SYSTEM DESIGN HOSPITAL ISOLATION ROOM HVAC SYSTEM DESIGN Presented to: ASHRAE YEA Illinois Chapter Specialty Environment Design Conference March 24, 2014 Jean O. Gibbons, PE, LEED AP Senior Vice President Grumman/Butkus

More information

Name Of Occupancy Date. Yes No Describe

Name Of Occupancy Date. Yes No Describe FIRE PREVENTION INSPECTION CHECKLIST For Class A Occupancy (For Assembly Buildings, Bars, Restaurants, Gyms, Churches, Arenas, Theatres or wherever people gather) Name Of Occupancy Date Physical Address

More information

KITCHEN HOODS GUIDELINES

KITCHEN HOODS GUIDELINES KITCHEN HOODS GUIDELINES City of Palo Alto Building Inspection Division 285 Hamilton Ave. Inspection Request: 650 329-2496 Revision Date:6/27/12 General Requirements/Checklist for: Commercial Codes Enforced:

More information

F-900 HOPEC Bench Hood Framed Vertical Sash

F-900 HOPEC Bench Hood Framed Vertical Sash F-900 Series HOPEC Bench Hoods Product Features F-900 HOPEC Bench Hood Framed Vertical Sash The ISOLATOR HOPEC (Hand Operated Positive Energy Control) bench fume hood is based on the design of Jerry Koenigsberg*.

More information

presents Cooking With Fire Fixed Fire Suppression & Exhaust Systems for Cooking Environments Monday, 17 June, 13

presents Cooking With Fire Fixed Fire Suppression & Exhaust Systems for Cooking Environments Monday, 17 June, 13 presents Cooking With Fire Fixed Fire Suppression & Exhaust Systems for Cooking Environments Who is the AFSA? Safe and Secure Alberta Fire Safety Association Fire industry members working together to improve

More information

MECHANICAL AND PLUMBING BASIS OF DESIGN FOR BRIDGING DOCUMENT

MECHANICAL AND PLUMBING BASIS OF DESIGN FOR BRIDGING DOCUMENT MECHANICAL AND PLUMBING BASIS OF DESIGN FOR BRIDGING DOCUMENT 1. MECHANICAL 1.1. Goal: A. Provide design, engineering, installation, and start-up, testing, adjusting, balancing, and commissioning of the

More information

CROWN BOILER COMPANY BWF SERIES BOILER CATEGORY I VENT KIT INSTALLATION AND OPERATING INSTRUCTIONS

CROWN BOILER COMPANY BWF SERIES BOILER CATEGORY I VENT KIT INSTALLATION AND OPERATING INSTRUCTIONS CROWN BOILER COMPANY BWF SERIES BOILER CATEGORY I VENT KIT INSTALLATION AND OPERATING INSTRUCTIONS WARNING Improper installation, adjustment, alteration, service, or maintenance of this product can cause

More information

Arapahoe County Residential Water Heater Installation and Inspection Guide

Arapahoe County Residential Water Heater Installation and Inspection Guide Arapahoe County Residential Water Heater Installation and Inspection Guide The attached handout is designed to be a general permit submittal and inspection guide covering most installation instances, however

More information

HVAC Checklist - Long Form

HVAC Checklist - Long Form HVAC Checklist - Long Form Page 1 of 14 Appendix B discusses HVAC system components in relation to indoor air quality. utside Air Intake Location pen during occupied hours? Unobstructed? Standing water,

More information

PART 6: VENTING, COMBUSTION AIR & CONDENSATE REMOVAL

PART 6: VENTING, COMBUSTION AIR & CONDENSATE REMOVAL PART 6: VENTING, COMBUSTION AIR & CONDENSATE REMOVAL Boiler Manual A. INSTALLING EXHAUST VENT AND INTAKE AIR VENT B. GENERAL n DANGER The Elite Heating Boiler must be vented as detailed in this section.

More information

DRYER VENTING SPECIFICATIONS DRYER SAFETY

DRYER VENTING SPECIFICATIONS DRYER SAFETY DRYER VENTING SPECIFICATIONS Table of Contents DRYER SAFETY...1 INSTALLATION REQUIREMENTS...4 Venting Requirements...5 DRYER INSPECTION AND CLEANING...7 Frequency of Exhaust System Cleaning...7 Inspecting

More information

1. Certification: Employ an ASCS certified by NADCA on a full-time basis. 2. Supervisor Qualifications: Certified as an ASCS by NADCA.

1. Certification: Employ an ASCS certified by NADCA on a full-time basis. 2. Supervisor Qualifications: Certified as an ASCS by NADCA. PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

More information

LABORATORY DESIGN HANDBOOK

LABORATORY DESIGN HANDBOOK LABORATORY DESIGN HANDBOOK UNDERSTANDING, ACCELERATED LABORATORY DESIGN HANDBOOK TSI, TSI logo, are registered trademarks of TSI Incorporated. Copyright 2014 by TSI Incorporated This handbook is not intended

More information

Ontario Fire Code SECTION 5.13 DIP TANKS. Illustrated Commentary. Office of the Ontario Fire Marshal

Ontario Fire Code SECTION 5.13 DIP TANKS. Illustrated Commentary. Office of the Ontario Fire Marshal Ontario Fire Code SECTION 5.13 DIP TANKS Illustrated Commentary Office of the Ontario Fire Marshal Dip Tanks Illustrated Commentary 1 5.13.1. Location 5.13.1.1. Dip tank operations involving flammable

More information

Australian/New Zealand Standard

Australian/New Zealand Standard Australian/New Zealand Standard The use of ventilation and air conditioning in buildings - Part 1: Fire and smoke control in buildings UPDATED AS/NZS 1668.1:2015 What is the scope of this Standard? The

More information

Biosafety Level 2 (BSL-2) Safety Guidelines

Biosafety Level 2 (BSL-2) Safety Guidelines BLS-4 Biosafety Level 2 (BSL-2) Safety Guidelines BSL-3 BSL-2 BSL-1 BSL-2 builds upon BSL-1. If you work in a lab that is designated a BSL-2, the microbes used pose moderate hazards to laboratory staff

More information

NADCA GENERAL SPECIFICATIONS FOR THE CLEANING OF COMMERCIAL HEATING, VENTILATING AND AIR CONDITIONING SYSTEMS

NADCA GENERAL SPECIFICATIONS FOR THE CLEANING OF COMMERCIAL HEATING, VENTILATING AND AIR CONDITIONING SYSTEMS NADCA GENERAL SPECIFICATIONS FOR THE CLEANING OF COMMERCIAL HEATING, VENTILATING AND AIR CONDITIONING SYSTEMS National Air Duct Cleaners Association 1518 K Street, N.W. Suite 503 Washington, DC 20005 (202)

More information

KITCHEN AND BATH REMODELING BUILDING PERMIT REQUIREMENTS

KITCHEN AND BATH REMODELING BUILDING PERMIT REQUIREMENTS St. Louis County Department of Public Works Division of Code Enforcement KITCHEN AND BATH REMODELING BUILDING PERMIT REQUIREMENTS This guideline is intended to provide the homeowner/contractor with the

More information

Laminar Flow Cabinets and Workstations

Laminar Flow Cabinets and Workstations VERTICAL AND HORIZONTAL HEPA FILTERED SYSTEMS FOR PROCESS OR OPERATOR PROTECTION Laminar Flow Cabinets and Workstations For procedures requiring protection from particulate contamination and for aseptic

More information

APC APPLICATION NOTE #112

APC APPLICATION NOTE #112 #112 Best Practices for Deploying the InfraStruXure InRow SC By David Roden Abstract The InfraStruXure InRow SC (ACSC100 and ACSC101) is a self-contained air conditioner for server rooms and wiring closets.

More information

Laminar Flow Cabinets

Laminar Flow Cabinets Laminar Flow Cabinets The World s Most Practical Selection of Benchtop Laminar Flow Cabinets. 24 36 48 Simple, Effective Protection for Samples and Work Processes, Uncompromised Performance, Economical

More information

SECTION 23 00 01 HEATING, VENTILATION AND AIR CONDITIONING EQUIPMENT

SECTION 23 00 01 HEATING, VENTILATION AND AIR CONDITIONING EQUIPMENT SECTION 23 00 01 HEATING, VENTILATION AND AIR CONDITIONING EQUIPMENT PART 1 - GENERAL 1.1 DESCRIPTION A. The Work specified in this Section consists of designing, furnishing and installing factory-assembled

More information

MISSION CRITICAL FACILITIES DESIGN UPS BATTERY ROOM ENVIRONMENT CRITICAL DESIGN CONSIDERATIONS

MISSION CRITICAL FACILITIES DESIGN UPS BATTERY ROOM ENVIRONMENT CRITICAL DESIGN CONSIDERATIONS MISSION CRITICAL FACILITIES DESIGN UPS BATTERY ROOM ENVIRONMENT CRITICAL DESIGN CONSIDERATIONS Allen Wood Vice President Data Center Division Engineering Design Group INTRODUCTION It can be very effectively

More information

G U I D E L CERTIFICATION EDUCATION TRAINING. Procurement Guideline. National Air Filtration Association Recommended Practice

G U I D E L CERTIFICATION EDUCATION TRAINING. Procurement Guideline. National Air Filtration Association Recommended Practice G U National Air Filtration Association Recommended Practice I D E L I N E Procurement Guideline TRAINING EDUCATION CERTIFICATION HVAC Air Filter Purchasing Specification Guideline 1.0 Purpose To provide

More information

Biosafety Level 2 Criteria

Biosafety Level 2 Criteria Biosafety Level 2 Criteria Biosafety in Microbiological and Biomedical Laboratories (BMBL) 5th Edition Biosafety Level 2 (BSL-2): Biosafety Level 2 builds upon BSL-1. BSL-2 is suitable for work involving

More information

Laboratory Standards and Guidelines

Laboratory Standards and Guidelines Laboratory Standards Copyright 2002 Phoenix Controls Corporation Newton, Massachusetts 02458 Reproduced with permission from AIA, Washington, DC 20006. From American Conference of Governmental Industrial

More information

PIPES AND TUBES FOR HVAC PIPING AND EQUIPMENT

PIPES AND TUBES FOR HVAC PIPING AND EQUIPMENT PIPES AND TUBES FOR HVAC PIPING AND EQUIPMENT GENERAL INFORMATION 1.1 This section applies to piping systems for chilled water, hot water, condenser water, steam, condensate return, fuel oil, refrigerant

More information

Fume Cupboard Guidance

Fume Cupboard Guidance Health and Safety Office Fume Cupboard Guidance Document control information Published document name: fume-cupboards-gn.pdf Date issued: Version: 1.0 Previous review dates: December 2013 Next review date:

More information

Automatic fire-extinguishing systems for commercial cooking

Automatic fire-extinguishing systems for commercial cooking Automatic fire-extinguishing systems for commercial cooking Leading Items First Ignited in Eating and Drinking Establishment Structure Fires, 2000-2004 Annual Averages Cooking materials, incl. food and

More information

Stainless Steel Worksurface 3 Feet Hood A10-WS-PR3 A10-WS-SR3 4 Feet Hood A10-WS-PR4 A10-WS-SR4 6 Feet Hood A10-WS-PR6 A10-WS-SR6.

Stainless Steel Worksurface 3 Feet Hood A10-WS-PR3 A10-WS-SR3 4 Feet Hood A10-WS-PR4 A10-WS-SR4 6 Feet Hood A10-WS-PR6 A10-WS-SR6. Product Sampler #1 Laminar Flow Hoods / Laminar Flow Cabinets: 1- Benchtop Vertical Laminar Flow Hoods- Air Recirculation Available s: Clean Bench Class 100 Bench-top Vertical Laminar Flow Hoods with Air-recirculation

More information

Notes. Material 1. Appropriate Flammable Liquids

Notes. Material 1. Appropriate Flammable Liquids 29 CFR 1910.106 Flammable Materials Flammable Liquids Preparation 1. Read Applicable Background information and related Company Policy Chapter. 2. Make Copies of this Lesson Plan for Personnel 3. Make

More information

SPECIAL ISSUE: NATIONAL SCIENCE FOUNDATION WORKSHOP

SPECIAL ISSUE: NATIONAL SCIENCE FOUNDATION WORKSHOP research journal 2013 / VOL 05.01 www.perkinswill.com SPECIAL ISSUE: NATIONAL SCIENCE FOUNDATION WORKSHOP ARCHITECTURE AND ENGINEERING OF SUSTAINABLE BUILDINGS Current Trends in Low-Energy HVAC Design

More information

Industrial Ventilation Design Guidebook Chapter 10 LOCAL VENTILATION

Industrial Ventilation Design Guidebook Chapter 10 LOCAL VENTILATION Industrial Ventilation Design Guidebook Chapter 10 LOCAL VENTILATION LARS OLANDER, LORRAINE CONROY, ILPO KULMALA, RICHARD P. GARRISON, MICHAEL ELLENBECKER, BERNHARD BIEGERT, BERNARD FLETCHER, HOWARD D.

More information

FIRE DAMPER APPLICATION GUIDE

FIRE DAMPER APPLICATION GUIDE FIRE AND CEILING RADIATION DAMPERS FIRE DAMPER APPLICATION GUIDE Use this application guide to help determine what type of fire damper best suits the application. Below are listed the ten Metal-Fab fire

More information

How To Make A House Safe

How To Make A House Safe 1 RESIDENTIAL Screen Enclosures Orange County Residential Code Compliance Alternative design method for screen enclosures R301.2.1.1.3 PLAN REVIEW Engineered plans must state that the Alternative Design

More information

Terms of Reference Air Handling Unit (HVAC System) Cleaning

Terms of Reference Air Handling Unit (HVAC System) Cleaning Terms of Reference Air Handling Unit (HVAC System) Cleaning Introduction General cleaning of the air handling units is currently undertaken by the Mechanical Division staff composing of 3 personnel. Cleaning

More information

ROOF TOP MOUNTED Air Handler Specification

ROOF TOP MOUNTED Air Handler Specification ROOF TOP MOUNTED Air Handler Specification PART 1: GENERAL (Model RT) Mechanical Specification 1.01 WORK INCLUDED A. Provide complete air handling unit(s) suitable for outdoor installation. Contractor

More information

Innovent LASER Packaged Fresh Air Conditioning Units

Innovent LASER Packaged Fresh Air Conditioning Units LASER Latent And Sensible Energy Reduction Latent And Sensible Energy Reduction For Outside Air Innovent LASER Packaged Fresh Air Conditioning Units Innovent LASER units provide both sensible and latent

More information

MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION

MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION Fire Pump Plan Review 2009 International Fire Code and NFPA 20 Date of Review / / BLD201 - Project Address: Project Name: Contractor s Business

More information

Building Code Clarifications - 7. Fire Resistance

Building Code Clarifications - 7. Fire Resistance Building Code Clarifications - 7. Fire Resistance 7.1 (15-12-030) Use of combustibles in Type III construction roof assemblies Code Section (15-12-030) Use of Combustibles was revised on May 17, 2000,

More information

NFPA31FuelOilPiping 1 Revised 3-1-11

NFPA31FuelOilPiping 1 Revised 3-1-11 NFPA 31 Fuel Oil Piping, Installation and Testing Chapter 8 Fuel Piping Systems and Components 8.1 Scope. This chapter shall apply to piping systems and their components used to transfer fuel oil from

More information

Fire Pump Plan Review March 2010

Fire Pump Plan Review March 2010 Fire Pump Plan Review March 2010 Date of Review: / / Permit Number: Business/Building Name: Address of Project: Designer Name: Designer s Phone: Contractor: Contractor s Phone: Occupancy Classification:

More information