1 INDUSTRIAL BOILER MACT FACTSHEET The National Emission Standards for Hazardous Air Pollutants (NESHAP) for Industrial/Commercial/Institutional Boilers and Process Heaters (40 CFR Part 63, Subpart DDDDD), also known as the Industrial Boiler MACT, is a complex set of emission standards and compliance requirements based on the application of maximum achievable control technology (MACT). While the rule affects both new and existing sources, the only existing boilers or process heaters that are affected, however, are large, solid fuel-fired units with a heat input rating greater than 10 MMBtu/hr and limited use, solid fuel-fired units that operate less than 10% of capacity. The rule was finalized on 2/26/04 and becomes effective 60 days after publication in the Federal Register. As of 7/9/04, EPA has indicated that the rule will be published very soon. Existing sources are allowed three years to comply but some sources may petition for an extra year to comply if additional time is required for the installation of controls. New industrial boilers and process heaters (built after 1/13/03) must comply with the new rule within six months of the effective date or six months after startup, whichever is later. The final rule contains a variety of compliance provisions for emissions of carbon monoxide (CO), hydrogen chloride (HCl), mercury (Hg), particulate matter (PM) and total selected metals (TSM) the combination of arsenic, beryllium, cadmium, chromium, lead, manganese, nickel and selenium. Emission limits vary depending on unit size, fuel type, frequency of operation, and whether the source is new or existing. The impact of the rule for existing sources will depend largely on whether the source is able to meet the new standards without the need of a control device. Sources that burn a relatively consistent fuel or fuel blend that can demonstrate compliance based on fuel analysis will likely find that the rule will have minimal impact. However, new sources and existing sources that are unable to demonstrate compliance based on fuel analysis will likely find the rule to be very costly to implement. These sources will have to conduct ongoing, expensive stack tests and meet prescriptive monitoring, reporting and record keeping requirements. Applicability The rule affects all industrial, commercial, or institutional process heaters 1 or boilers 2 located at a facility that emits more than 10 tons/year of any one hazardous air pollutant (HAP) or 25 tons/year of any combination of HAP. 3 Note that applicability is based on the facility emissions, not the individual units. Boilers or process heaters do not need to be a major source of HAP to be affected by the rule. The rule allows exemptions for the following types of units: 1 A process heater is defined as an enclosed device using controlled flame, that is not a boiler, where the primary purpose of the device is other than steam generation. 2 A boiler refers to an enclosed device using controlled flame combustion and has the primary purpose of steam generation. 3 EPA maintains a list of all affected HAPs, including over 150 specific chemicals and approximately 20 families of chemicals. 1

2 Waste heat boilers Hot water heaters Temporary boilers Boilers/process heaters used specifically for research and development Electric utility steam generating units Existing small, gas/liquid/solid-fuel fired units The rule includes emission standards for virtually all new units built after January 13, 2003, all existing large, solid fuel-fired units with a heat input rating greater than 10 MMBtu/hr and all existing, limited use, solid fuel-fired units that operate less than 10% of capacity. While the rule also affects the following sources, these sources are only subject to limited initial notification requirements. The rule does not provide emissions standards for these sources. Existing large and limited use gas-fired units Existing large and limited use liquid-fired units New, small gas and liquid-fired units Emissions Standards In developing the emissions standards, EPA divided HAPs into the following four categories and selected a representative HAP for each category: HAP Category Mercury Non-Mercury Metallic HAP Inorganic HAP Organic HAP Regulated HAP Mercury (Hg) Non-Condensable Particulate Mass (PM) or Total Selected Metals (TSM) 4 Hydrogen chloride (HCl) Carbon monoxide (CO) Affected sources may be subject to one or more of the regulated HAPs, depending on the classification of the boiler or process heater. Emissions standards for each regulated HAP also vary depending on the classification of the unit. There are 10 classifications or subcategories of affected units based on the age of the unit, fuel type, unit size, and frequency of operation. Tables 1 and 2 show each of the classifications, the regulated HAP(s) to which they are subject, and the corresponding emissions standard(s) for new/reconstructed and existing units. 5 It is anticipated that virtually all new units and roughly half of the existing affected sources will require some form of emissions controls to meet the new standards. 4 Total Selected Metals includes the combination of arsenic, beryllium, cadmium, chromium, lead, manganese, nickel and selenium. 5 Reconstructed refers to the replacement of components on a previously unaffected unit such that the total, fixed capital cost of the replacement is greater than 50% or more than the fixed capital cost of constructing a comparable, new unit. 2

3 The rule allows new and existing solid fuel-fired units to comply with either a total PM standard or a TSM standard. PM was proposed as a surrogate for TSM because nonmercury metallic HAPs exist in the flue gas combined with fly ash. EPA included both standards because, while all fuels emit particulate, not all fuels emit the same amount of metallic HAPs. Sources that burn fuels with a low TSM concentration would likely elect to comply with the TSM standard, instead of PM. Fuel Unit Regulated Emissions Standard Type Size 6 HAP Solid Large PM or TSM lb/mmbtu lb/mmbtu HCl 0.02 lb/mmbtu Hg lb/mmbtu CO 400 ppmvd 7 Solid Small PM or TSM lb/mmbtu lb/mmbtu HCl 0.02 lb/mmbtu Hg lb/mmbtu Liquid Large PM 0.03 lb/mmbtu HCl lb/mmbtu CO 400 ppmvd 7 Liquid Small PM 0.03 lb/mmbtu HCl lb/mmbtu Gas Large CO 400 ppmvd 7 Table 1. Emissions Standards for New or Reconstructed Units Fuel Type Unit Size Regulated HAP Solid Large PM or TSM HCl Hg Emissions Standard 0.07 lb/mmbtu lb/mmbtu 0.09 lb/mmbtu lb/mmbtu Table 2. Emissions Standards for Existing Units As shown in Tables 3 and 4, the rule also includes alternative emission standards for large, sources that operate infrequently. In order to qualify for these alternative limited use standards, a source must have a federally enforceable annual average capacity factor 6 Large refers to a unit with a heat input capacity > 10 MMBtu/hr. Small refers to a unit with a heat input capacity < 10 MMBtu/hr 7 Corrected to 7% O 2, based on a 30-day rolling average for units > 100 MMBtu/hr or a 3-run average for units < 100 MMBtu/hr 3

4 less than or equal to 10 percent. Limited use, liquid fuel-fired units include those units that either burn only liquid fuel or regularly co-fire with a gaseous fuel. Use units that burn liquid fuel on a limited basis, during periods of gas curtailment or supply emergencies, are classified as limited use, gas-fired units. Fuel Type Regulated Emissions Standard HAP Solid PM or TSM lb/mmbtu lb/mmbtu HCl 0.02 lb/mmbtu Hg lb/mmbtu CO 400 ppmvd 8 Liquid PM 0.03 lb/mmbtu HCl lb/mmbtu CO 400 ppmvd 8 Gas CO 400 ppmvd 8 Table 3. Alternative Emissions Standards for Limited Use New or Reconstructed Units Compliance Alternatives Fuel Type Solid Regulated HAP PM or TSM Emissions Standard 0.21 lb/mmbtu lb/mmbtu Table 4. Alternative Emissions Standards for Limited Use Existing Units The rule provides two primary mechanisms for demonstrating initial and ongoing compliance. All sources have the option of complying with each applicable emission limit using either a fuel-based or stack emission-based approach, although the fuel-based approach is preferred because of the simplified compliance requirements. Virtually all new solid fuel-fired sources, however, and many existing sources will be unable to meet these requirements. Existing units likely to be affected by the rule include those that fire bituminous coal, which typically has higher mercury and chlorine concentrations. Fuel-Based Approach In order to demonstrate initial and continuous compliance using the fuel-based approach, a fuel analysis must be conducted which shows that the pollutant concentration of the combusted fuel is below the applicable limit. Sources that co-fire fuels must demonstrate that the prorated pollutant concentration of the fuel blend is below the applicable limit. Once a source demonstrates initial compliance, additional fuel sampling is required every 8 Corrected to 7% O 2, based on a 3-run average 4

5 five years or whenever the source changes fuel type or fuel blends. A change in fuel vendor does not constitute a change in fuel type. Examples of fuel type switching include burning a different rank of coal, burning pet-coke blends, or switching between coal and some other type of solid fuel (or vice versa). Stack testing is not required for sources using the fuel-based approach. Stack Emission-Based Approach The stack emission-based compliance procedures, which are much more complicated, implement a test and cap approach. Sources are required to perform an initial stack test while combusting fuel containing the highest expected concentration of the applicable pollutant. During the stack test, the source must also perform fuel sampling and collect control device operating data to define the normal operating range of the control device during the test (except for units equipped with only a baghouse or electrostatic precipitator (ESP)). Initial compliance is based on the stack test results. Continuous compliance is based on (1) maintaining the fuel pollutant concentration below the level that was measured during the initial test and (2) maintaining control device operating parameters within the limits observed during the initial test (except for units equipped with only a baghouse or ESP). Units equipped with an ESP as the only control device must maintain opacity below 20% for existing sources or 10% for new sources in order to demonstrate compliance. If a unit is unable to demonstrate compliance with the 20% opacity limit, unit-specific testing may be conducted to determine a more appropriate opacity limit for the unit. Units equipped with a baghouse as the only control device have the option of complying with the same opacity requirements as ESPs or may demonstrate compliance by using a bag leak detection system. Sources electing to use the stack emission-based approach are required to conduct additional stack testing every year for three years. If a source is able to demonstrate compliance for three consecutive years, then the source is eligible to conduct compliance testing thereafter every three years. If the source fails any of these subsequent tests, they must again conduct additional tests every year until they achieve three consecutive years of compliance. Also, if a source changes fuel types, they must conduct another compliance test for that fuel or fuel mixture. One of the more onerous requirements of the rule is that sources must conduct additional fuel sampling (even if the fuel type is the same) and reestablish or verify control device indicator ranges with each ongoing compliance test. Emissions Averaging One of the major changes from the proposed rule is the addition of emissions averaging provisions. Emissions averaging may only be used for existing large, solid fuel-fired boilers and with the permission of the state agency. Sources with multiple affected units that are likely to implement emissions averaging include (1) sources with one or more units that are unable to demonstrate compliance using the fuel-based approach and (2) sources with one or more units that are unable to demonstrate compliance using the stack emissions-based approach, without upgrading or replacing existing control equipment. 5

6 Emissions averaging procedures can be applied using either the fuel-based or stack emission-based methods. The initial compliance procedures require the source to calculate the average weighted emissions for the averaging group by weighting the emissions rate of each unit (either by fuel analysis or stack test results) by the individual rated heat input capacity. In order to demonstrate initial compliance, the average weighted emissions must be less than the applicable emission limit. Ongoing compliance is demonstrated based on a 12-month rolling average using a similar procedure. Each calendar month, the source must calculate the average weighted emissions of the averaging group by weighting the emissions rate of each unit (using the result of the last fuel test or stack test) by the average heat input of each unit during that calendar month. In order to demonstrate compliance, the average weighted emissions must be less than the applicable emission limit. The rule provides similar procedures based on steam generation for units that can not monitor heat input. Unlike the proposed utility boiler MACT averaging procedures, there are no specific requirements for data availability or minimum operating time of the individual units. The emissions averaging provisions also include a requirement to establish indicator ranges and monitor the operation of the control device(s) used to comply with the applicable limit. Although the language in this section is unclear, it appears that the monitoring requirements are the same as those for units that do not implement emissions averaging, and apply to averaging groups that use either fuel-based or stack emissionbased compliance approaches. It is important to note that emissions averaging procedures do not permit sources to de-tune or otherwise reduce the efficiency of the control devices during the initial compliance test Sources electing to use emissions averaging must submit an averaging plan no later than 180 days prior to the initial compliance test. Health-Based Compliance Alternative for HCl and TSM In addition to the technology-based MACT compliance approach, EPA has included an alternative health-based or risk-based approach for HCl and TSM emissions. These compliance approaches do not require any ongoing compliance tests, monitoring, or reporting/recordkeeping. 9 While the benefits of using these alternative compliance criteria may seem attractive, sources are required to incorporate the process parameters (heat input, flow rates, fuel flow, etc.) used to demonstrate compliance into the Title V operating permit. These operating conditions then become Federally enforceable and may limit subsequent operation of all units at the facility. For HCl emissions, sources must conduct HCl and chlorine emission tests for all affected units at the facility and calculate an equivalent maximum, hourly HCl emission rate. The rule provides maximum acceptable facility-wide emission rates based on stack height and 9 Additional testing is not required unless the facility undergoes a process change that results in increased emissions of HCl and/or manganese. 6

7 the distance between the stack and the property boundary. If the calculated hourly HCl emission rate for the facility is below the accepted maximum value, then the facility is eligible to use the alternative compliance criteria. However, if the facility is unable to meet the maximum accepted emissions value, the source may conduct a risk-assessment analysis for the facility. In this case, in order to use the alternative compliance criteria, the risk-assessment must demonstrate that the facility s hazard index for HCl and chlorine emissions is less than one. The alternative compliance criteria for TSM is similar to that for HCl, except manganese is used as a surrogate for TSM emissions. Sources must first test all affected units to determine the maximum emission rate of manganese for the facility. If the facility emission rate is below the allowable value, based on stack height and property boundary proximity, then the source is eligible to use the alternative compliance criteria. Alternatively, the source may conduct site-specific testing to demonstrate that the facility s hazard index for manganese is less than one. Monitoring Requirements For sources that demonstrate compliance using the stack emission-based approach, the new rule includes prescriptive monitoring requirements and ongoing monitor quality assurance activities. These requirements will be very costly to implement for sources without existing continuous monitoring systems (for sources that are required to demonstrate compliance with a CO or opacity limit) or modern control systems on their emissions control equipment. (1) For new units subject to a work-practice CO standard, sources are required to install, operate, and maintain a continuous emissions monitoring system (CEMS) for monitoring CO emissions that meets the requirements of Performance Specification 4A (PS-4A) of Part 60. (2) Sources required to demonstrate compliance using opacity must install, operate, and maintain a continuous opacity monitoring system (COMS) in accordance with PS-1. Sources are also required to perform a daily calibration error test, quarterly performance audit, and an annual zero alignment audit. It should be noted that most older COMS will not meet PS-1 requirements. These sources may need to upgrade their opacity monitor in order to comply with the new rule. (3) Sources required to demonstrate compliance by monitoring control device operating parameters must install the appropriate sensors and continuously monitor the output of these sensors. The rule specifies the parameter(s) that must be monitored, depending on the type of control device, and instructions for the placement of each sensor. Sources that do not have the capability of recording this data automatically must also install and operate a continuous parameter monitoring system (CPMS). This will be a particularly expensive 7

8 task for many older units, as the existing control systems may need to be upgraded or replaced. The rule requires that monitoring systems automatically reduce the data to three-hour averages (as applicable) to demonstrate continuous compliance. This means that although many existing sources already have a CPMS, CEMS, or COMS, they will need to reprogram the systems to provide the appropriate averaging period. The monitoring provisions do not include procedures for handling missing data. Averages are based on the available quality assured data, excluding calibration checks, span adjustments, repairs, or monitor malfunctions. Any period where the monitor is out-of-control constitutes a deviation from the monitoring requirements and must be included in the semi-annual compliance reports. Reporting and Recordkeeping Requirements The new rule also contains an array of reporting and recordkeeping requirements. Affected sources must maintain records of control device operating data, monthly fuel consumption and type(s) of fuel burned, operating hours, unit startups and shutdowns, CEMS calibration data, CEMS maintenance events, CEMS out of control periods, fuel sampling reports, information on compliance deviations (including a description of the deviation, the duration of the deviation, and any corrective action that was taken), and a number of other pieces of information. Sources must maintain this data onsite for a period of five years. Sources are also required to submit semi-annual compliance reports that include much of this information, although the rule does not specify a standardized data format (e.g. Part 75 electronic data reports). Given the amount of data that is involved in demonstrating compliance, it is likely that this portion of the rule will be very costly and complicated to implement, particularly for sources with multiple affected units. Many sources will need to install CEMS, COMS, and/or CPMS. These systems will need to be programmed to track monitor downtime, unit start-up and shutdown, monitor maintenance activities, and compliance deviations. Additional resources will be required to gather other compliance data that may not available in electronic format, such as fuel analysis reports and fuel consumption data, and prepare compliance reports. Compliance Deadline Summary Table 5 contains a summary of the various compliance requirements and the associated deadlines. 8

9 Rule Becomes Effective Deadline for Compliance (Existing Units) Deadline for Compliance (New/Reconstructed Units) Initial Compliance Testing Submission of Site Specific Fuel Analysis Plan (for both compliance approaches) Submission of Emissions Averaging Plan (if necessary) Notification of Intent to Conduct Performance ( Stack ) Testing Submission of Site-Specific Test Plan for Performance ( Stack ) Test Submission of Stack Test/Fuel Analysis Results Notification of Compliance Status (for both compliance approaches) First Ongoing Compliance Report All Units 60 days after publication in FR 3 years after publication in FR. Units that require installation of control equipment may be eligible for one additional year The later of the publication date in FR or unit startup 180 days after the Deadline for Compliance 180 days prior to the date of the compliance test (initial or ongoing) 180 days prior to the date of the compliance test (initial or ongoing) 30 days prior to the date of the compliance test (initial or ongoing) 30 days prior to the date of the compliance test (initial or ongoing). Submit simultaneously with Notification of Intent to Conduct Performance Testing 60 days after conducting stack test and/or fuel test 60 days after conducting the initial compliance test Covers the operating period through June 30 th or December 31, whichever date is the first date that occurs at least 180 days after the Deadline for Compliance. Sources have one month after the end of the operating period to submit the ongoing compliance report New Units Initial Notification of New Unit Startup For startup date before FR publication, Initial Notification is required within 120 days after FR publication date. For startup date after FR publication, within 120 days of startup. Units Requiring CEMS/COMS/CPMS Installation/Certification of CEMS, Same as the Deadline for Compliance COMS, or CPMS Submission of Site Specific Monitoring 60 days prior to the performance evaluation of the Plan for Units Using Stack Emission- CEMS/COMS/CPMS Based Compliance Approach Notification of Performance Evaluation 30 days prior to the date of the performance evaluation of the of CEMS, COMS, or CPMS CEMS/COMS/CPMS Performance Evaluation of CEMS, No specific guidance prior to initial compliance test COMS, or CPMS Test Results from Performance Submit with initial compliance test results Evaluation of CEMS, COMS, or CPMS Table 5. Summary of Compliance Deadlines 9

10 RMB Recommendations for Newly Affected Sources Start Early One of the best recommendations for any newly affected source is to begin to address the rule early. The Industrial Boiler MACT is a complex rule that will require careful analysis of potential compliance options, performance testing, installation of new or upgrades to existing CEMS/COMS hardware, and development of new reporting and record keeping procedures. Some sources may also need to install control device(s) to meet the new limits. While the three (and potential four) year implementation schedule may seem like a long time, many sources will need most of this time to address the requirements of the rule. Sources should consider the following issues when putting together an implementation timetable: - Learning Curve of the State Agency The new rule will be unfamiliar to many state agencies. As a result, sources should be very familiar with the rule to ensure that the compliance program is not overly stringent. - Control Equipment Installation The installation of new control equipment or upgrading existing equipment is a major project. Installation of new control equipment can sometimes take up to 18 months. - CEMS/COMS/CPMS Procurement Installation of new CEMS or COMS can take up to 12 months. Installation of new sensors or upgrades to control systems to provide continuous parameter monitoring may take even longer. Experience with Part 75 has shown that many affected sources procrastinate CEMS procurement and program development. As vendor backlogs increased, CEMS costs escalated and compliance deadlines were jeopardized. - Compliance Testing Schedules Previous experience with other regulatory compliance test requirements has shown that it can take up to six months to schedule the necessary testing. Factors to consider are unit outages, production schedules, and test contractor availability. Many testing firms are unfamiliar with some of the reference methods specified in the rule. Sources that procrastinate performance testing may find these firms are backlogged. Conduct Initial Fuel Sampling and Stack Testing 10

11 Given the complexity of the rule, RMB recommends that sources perform testing early on to assist in determining compliance options. Fuel-based compliance is likely to be the preferred approach because of the simplified requirements, although virtually all new sources and many existing sources will be unable to demonstrate compliance using this method. RMB recommends conducting all evaluation fuel sampling and stack testing in accordance with the requirements of the rule. It is possible that this data may be used later to demonstrate initial compliance, although EPA has not definitively addressed this issue. 11

Wolverine Clean Energy Venture

Wolverine Clean Energy Venture Prepared for: Wolverine Power Supply Cooperative Cadillac, Michigan Supplement to CAA Section 112(g) MACT Auxiliary Boiler Amended Application No. 317-07 Wolverine Clean Energy Venture Rogers City, MI

More information

Assessing the Changes Required by the Industrial Boiler MACT Regulations

Assessing the Changes Required by the Industrial Boiler MACT Regulations Technical Paper MS-17 Assessing the Changes Required by the Industrial Boiler MACT Regulations Authors: A.L. LeClair L.M. McDermitt Babcock & Wilcox Power Generation Group, Inc. Barberton, Ohio, U.S.A

More information

SMALL ENTITY COMPLIANCE GUIDE FOR MAJOR SOURCE BOILERS AND PROCESS HEATERS

SMALL ENTITY COMPLIANCE GUIDE FOR MAJOR SOURCE BOILERS AND PROCESS HEATERS SMALL ENTITY COMPLIANCE GUIDE F MAJ SOURCE BOILERS AND PROCESS HEATERS National Emission Standards for Hazardous Air Pollutants for Major Sources: Industrial, Commercial, and Institutional Boilers and

More information

Guidance and Reporting Instructions on Temporary E-reporting for the MATS Rule

Guidance and Reporting Instructions on Temporary E-reporting for the MATS Rule Guidance and Reporting Instructions on Temporary E-reporting for the MATS Rule As explained in the interim MATS e-reporting rule, which was signed by the Administrator on March 9, 2015, the EPA plans to

More information

TECHNICAL BRIEFING SHEET NRG Texas Power LLC Permit No.: HAP-14

TECHNICAL BRIEFING SHEET NRG Texas Power LLC Permit No.: HAP-14 TECHNICAL BRIEFING SHEET NRG Texas Power LLC Permit No.: HAP-14 PROJECT DESCRIPTION: NRG Texas Power LLC (NRG Texas) has requested a Hazardous Air Pollutant (HAP) Major Source [FCAA 112(g)] Permit HAP-14,

More information

Site Identification No.: 197809AAO Application No.: 15030051

Site Identification No.: 197809AAO Application No.: 15030051 Project Summary for a Construction Permit Application from Midwest Generation for a Natural Gas Conversion Project for the Joliet Electric Generating Station Joliet, Illinois Site Identification No.: 197809AAO

More information

State of the Art (SOTA) Manual for Boilers and Process Heaters

State of the Art (SOTA) Manual for Boilers and Process Heaters State of the Art (SOTA) Manual for Boilers and Process Heaters Original Date: July 1997 Revision Date: February 22, 2004 State of New Jersey Department of Environmental Protection Air Quality Permitting

More information

Texas Commission on Environmental Quality Page 1 Chapter 117 - Control of Air Pollution from Nitrogen Compounds

Texas Commission on Environmental Quality Page 1 Chapter 117 - Control of Air Pollution from Nitrogen Compounds Texas Commission on Environmental Quality Page 1 SUBCHAPTER G: GENERAL MONITORING AND TESTING REQUIREMENTS DIVISION 1: COMPLIANCE STACK TESTING AND REPORT REQUIREMENTS 117.8000, 117.8010 Effective June

More information

Bill Maxwell, U.S. Environmental Protection Agency, OAQPS (C439-01)

Bill Maxwell, U.S. Environmental Protection Agency, OAQPS (C439-01) TO: Bill Maxwell, U.S. Environmental Protection Agency, OAQPS (C439-01) FROM: Jeffrey Cole, RTI International DATE: December 2003 SUBJECT: Methodology for Estimating Cost and Emissions Impact for Coal-

More information

EPA Emissions Rules for Boilers

EPA Emissions Rules for Boilers EPA Emissions Rules for Boilers The EPA has published two new rules for boilers in an effort to reduce emissions of air pollutants. The two rules are the Major Source Rule (also known as the Boiler MACT

More information

State of Colorado Comments Docket ID No. EPA-HQ-OAR-2009-0234 and Docket ID No. EPA-HQ-OAR-2011-0044

State of Colorado Comments Docket ID No. EPA-HQ-OAR-2009-0234 and Docket ID No. EPA-HQ-OAR-2011-0044 U.S. Environmental Protection Agency EPA Docket Center (EPA/DC) Mail Code: 2822T 1200 Pennsylvania Ave., N.W. Washington, DC 20460 RE: State of Colorado Comments Docket ID No. EPA-HQ-OAR-2009-0234 and

More information

Continuous Emissions Monitoring - Program 77

Continuous Emissions Monitoring - Program 77 Program Description Program Overview Coal-fired power plants are in increased need of robust, accurate, and certifiable continuous emissions monitors (CEMs) for mercury, particulate matter (PM), acid gases,

More information

STATE OF CONNECTICUT DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF AIR MANAGEMENT

STATE OF CONNECTICUT DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF AIR MANAGEMENT Page 1 of 7 STATE OF CONNECTICUT DEPARTMENT OF ENVIRONMENTAL PROTECTION NEW SOURCE REVIEW PERMIT TO CONSTRUCT AND OPERATE A STATIONARY SOURCE Issued pursuant to Title 22a of the Connecticut General Statutes

More information

SLMA Meeting. Boiler MACT and Related Rules. Atlanta, GA March 2, 2011. Martin Rollins, P. E. H. M. Rollins Company, Inc. Gulfport, Mississippi

SLMA Meeting. Boiler MACT and Related Rules. Atlanta, GA March 2, 2011. Martin Rollins, P. E. H. M. Rollins Company, Inc. Gulfport, Mississippi SLMA Meeting Atlanta, GA March 2, 2011 Boiler MACT and Related Rules Martin Rollins, P. E. H. M. Rollins Company, Inc. Gulfport, Mississippi Boiler MACT and Related Rules EPA Had Requested 15 Month Delay

More information

Air Quality PERMIT TO CONSTRUCT

Air Quality PERMIT TO CONSTRUCT Air Quality PERMIT TO CONSTRUCT Permittee Chobani Idaho, Inc. Permit Number P-2012.0003 Project ID 60981 Facility ID 083-00138 Facility Location Permit Authority 3450 Kimberly Road East Twin Falls, ID

More information

NEW SOURCE REVIEW PERMIT TO CONSTRUCT AND OPERATE A STATIONARY SOURCE

NEW SOURCE REVIEW PERMIT TO CONSTRUCT AND OPERATE A STATIONARY SOURCE Page 1 of 9 STATE OF CONNECTICUT DEPARTMENT OF ENVIRONMENTAL PROTECTION NEW SOURCE REVIEW PERMIT TO CONSTRUCT AND OPERATE A STATIONARY SOURCE Issued pursuant to Title 22a of the Connecticut General Statutes

More information

New RCSA section 22a-174-22 Subcommittee Definitions, Applicability, Tune ups, Record keeping 4/29/15 Summary of Discussion

New RCSA section 22a-174-22 Subcommittee Definitions, Applicability, Tune ups, Record keeping 4/29/15 Summary of Discussion New RCSA section 22a-174-22 Subcommittee Definitions, Applicability, Tune ups, Record keeping 4/29/15 Summary of Discussion Before the meeting Bob Silvestri (PSEG) shared diluent cap description and definition.

More information

MATS and Boiler Rules

MATS and Boiler Rules em feature MATS and Boiler Rules Practical, Data-Driven Standards by Gina McCarthy Gina McCarthy is Assistant Administrator for Air and Radiation at the U.S. Environmental Protection Agency. The U.S. Environmental

More information

INDEX 9-7-100 GENERAL

INDEX 9-7-100 GENERAL REGULATION 9 INORGANIC GASEOUS POLLUTANTS RULE 7 NITROGEN OXIDES AND CARBON MONOXIDE FROM INDUSTRIAL, INSTITUTIONAL AND COMMERCIAL BOILERS, STEAM GENERATORS AND PROCESS HEATERS INDEX 9-7-100 GENERAL 9-7-101

More information

Appendix 5A: Natural Gas Use in Industrial Boilers

Appendix 5A: Natural Gas Use in Industrial Boilers Appendix 5A: Natural Gas Use in Industrial Boilers Industrial boilers consumed 2.1 Tcf of natural gas in 2006, accounting for 36% of total natural gas in manufacturing. 1 In this appendix, we provide further

More information

POTENTIAL TO EMIT SUMMARY FIBERIGHT, LLC HAMPDEN, MAINE

POTENTIAL TO EMIT SUMMARY FIBERIGHT, LLC HAMPDEN, MAINE POTENTIAL TO EMIT SUMMARY FIBERIGHT, LLC HAMPDEN, MAINE s (Ton/Year) Thermal Flare Oxidizer Boiler#1 Boiler #2 Scrubber #1 Scrubber #2 Total Carbon Monoxide (CO) 6.91 2.90 43.59 24.90 78.3 Oxides of Nitrogen

More information

ADEQ OPERATING AIR PERMIT

ADEQ OPERATING AIR PERMIT ADEQ OPERATING AIR PERMIT Pursuant to the Regulations of the Arkansas Operating Air Permit Program, Regulation #26: Permit #: 263-AOP-R4 IS ISSUED TO: Renewal #1 Entergy Arkansas, Inc. - White Bluff 1100

More information

GUIDELINES FOR SOURCE TESTING

GUIDELINES FOR SOURCE TESTING GUIDELINES FOR SOURCE TESTING Created August 12, 2011 Revised October 03, 2013 Source Testing Guidelines Rev. 2 TABLE OF CONTENTS 1.0 INTRODUCTION...6 1.1 Purpose...6 1.2 Application...6 1.3 Revisions...6

More information

Statement of Basis SCA Tissue North America, LLC. 701-0055

Statement of Basis SCA Tissue North America, LLC. 701-0055 Statement of Basis SCA Tissue North America, LLC. 701-0055 On December 26, 2012, the Department received SCA Tissue North America, LLC renewal Title V application. SCA is considered a major source for

More information

Control Device Requirements Charts For Oil and Gas Handling and Production Facilities

Control Device Requirements Charts For Oil and Gas Handling and Production Facilities Device Charts For Oil and Gas Handling and Production Facilities Purpose/Scope: The purpose of this document is to provide standardized guidance for use by the regulated community and air permit reviewers,

More information

SULFURIC ACID MIST PERFORMANCE TEST PROTOCOL. Duke Energy Florida, Inc. Crystal River Power Plant Units 4&5 Crystal River, Citrus County, Florida

SULFURIC ACID MIST PERFORMANCE TEST PROTOCOL. Duke Energy Florida, Inc. Crystal River Power Plant Units 4&5 Crystal River, Citrus County, Florida SULFURIC ACID MIST PERFORMANCE TEST PROTOCOL Duke Energy Florida, Inc. Crystal River Power Plant Units 4&5 Crystal River, Citrus County, Florida August 2013 CONTENTS SECTION 1.0 INTRODUCTION...3 SECTION

More information

FACT SHEET PROPOSED MERCURY AND AIR TOXICS STANDARDS

FACT SHEET PROPOSED MERCURY AND AIR TOXICS STANDARDS FACT SHEET PROPOSED MERCURY AND AIR TOXICS STANDARDS ACTION On March 16, 2011, the Environmental Protection Agency (EPA) issued a proposed rule that would reduce emissions of toxic air pollutants from

More information

Quality Assurance Program Quality Assurance Plan Periodic Audits Standard Operating Procedures Preventive Maintenance Outline Quality Assurance Plan (QAP) What is a QAP Why is a QAP required? What does

More information

NSPS Subpart OOOO: Applicability and Compliance Basics

NSPS Subpart OOOO: Applicability and Compliance Basics NSPS Subpart OOOO: Applicability and Compliance Basics Kentucky Oil & Gas Association 2013 Western Kentucky Meeting September 12, 2013 Roy Rakiewicz All4 Inc. Rob Flynn Environmental Standards, Inc. www.all4inc.com

More information

Rob Barton RMB Consulting & Research, Inc. EPRI CEM User Group Conference May 8, 2013

Rob Barton RMB Consulting & Research, Inc. EPRI CEM User Group Conference May 8, 2013 Rob Barton EPRI CEM User Group Conference May 8, 2013 Unique Reporting Challenges Compilation of various reporting requirements Electronic submittal of most data/records Adapting existing tools to new

More information

Air Permitting in Colorado. Martha Hyder Wind River Environmental Group LLC September 2013

Air Permitting in Colorado. Martha Hyder Wind River Environmental Group LLC September 2013 Air Permitting in Colorado Martha Hyder Wind River Environmental Group LLC September 2013 Overview O Background (pollutants) O Federal permitting regulations O Colorado permitting regulations O Colorado

More information

Continuous Emission Monitoring Guide

Continuous Emission Monitoring Guide Continuous Emission Monitoring Guide Course No: C08-015 Credit: 8 PDH Harlan H. Bengtson, PhD, P.E. Continuing Education and Development, Inc. 9 Greyridge Farm Court Stony Point, NY 10980 P: (877) 322-5800

More information

VENTURA COUNTY AIR POLLUTION CONTROL DISTRICT 669 County Square Drive, Ventura CA 93003 805/ 645-1401 FAX 805/ 645-1444 www.vcapcd.

VENTURA COUNTY AIR POLLUTION CONTROL DISTRICT 669 County Square Drive, Ventura CA 93003 805/ 645-1401 FAX 805/ 645-1444 www.vcapcd. VENTURA COUNTY AIR POLLUTION CONTROL DISTRICT 669 County Square Drive, Ventura CA 93003 805/ 645-1401 FAX 805/ 645-1444 www.vcapcd.org AB 2588 COMBUSTION EMISSION FACTORS Emission factors for combustion

More information

CONSTRUCTION PERMIT OFFICE OF AIR MANAGEMENT. Lone Star Industries, Inc. 3301 South County Road 150 West Greencastle, Indiana 46135

CONSTRUCTION PERMIT OFFICE OF AIR MANAGEMENT. Lone Star Industries, Inc. 3301 South County Road 150 West Greencastle, Indiana 46135 CONSTRUCTION PERMIT OFFICE OF AIR MANAGEMENT Lone Star Industries, Inc. 3301 South County Road 150 West 46135 (herein known as the Permittee) is hereby authorized to construct the facilities listed in

More information

Continuous Monitoring Manual

Continuous Monitoring Manual January, 1992 Revisions: April, 2015 Operations Division 811 SW 6 th Avenue Portland, OR 97204 Phone: 503-229-5696 800-452-4011 Fax: 503-229-5850 Contact: Jill Inahara www.oregon.gov/deq DEQ is a leader

More information

GUIDELINES FOR PROCESSING AND USING REFUSE DERIVED FUEL (RDF) IN CEMENT INDUSTRY

GUIDELINES FOR PROCESSING AND USING REFUSE DERIVED FUEL (RDF) IN CEMENT INDUSTRY 1 GUIDELINES FOR PROCESSING AND USING REFUSE DERIVED FUEL (RDF) IN CEMENT INDUSTRY August, 2012 Government of Pakistan Pakistan Environmental Protection Agency (Ministry of Climate Change) Islamabad 2

More information

FINAL REPORT. Small Business Advocacy Review Panel on EPA s Planned Proposed Rule:

FINAL REPORT. Small Business Advocacy Review Panel on EPA s Planned Proposed Rule: FINAL REPORT Small Business Advocacy Review Panel on EPA s Planned Proposed Rule: Combined Rulemaking for Industrial, Commercial, and Institutional Boilers and Process Heaters at Major Sources of HAP and

More information

COMMONWEALTH OF MASSACHUSETTS DEPARTMENT OF ENVIRONMENTAL PROTECTION 310 CMR 7.00 AIR POLLUTION CONTROL REGULATIONS

COMMONWEALTH OF MASSACHUSETTS DEPARTMENT OF ENVIRONMENTAL PROTECTION 310 CMR 7.00 AIR POLLUTION CONTROL REGULATIONS COMMONWEALTH OF MASSACHUSETTS DEPARTMENT OF ENVIRONMENTAL PROTECTION 310 CMR 7.00 AIR POLLUTION CONTROL REGULATIONS 310 CMR 7.00 APPENDIX B U EMISSION BANKING, TRADING AND AVERAGING 310 CMR 7.00: Appendix

More information

A GUIDANCE NOTE ON THE BEST PRACTICABLE MEANS FOR ELECTRICITY WORKS BPM 7/1 (2014)

A GUIDANCE NOTE ON THE BEST PRACTICABLE MEANS FOR ELECTRICITY WORKS BPM 7/1 (2014) A GUIDANCE NOTE ON THE BEST PRACTICABLE MEANS FOR ELECTRICITY WORKS (COAL-FIRED PLANT, GAS-FIRED GAS TURBINE, AND OIL-FIRED GAS TURBINE (PEAK LOPPING PLANT)) BPM 7/1 (2014) Environmental Protection Department

More information

Iron and Steel Manufacturing

Iron and Steel Manufacturing Pollution Prevention and Abatement Handbook WORLD BANK GROUP Effective July 1998 Iron and Steel Manufacturing Industry Description and Practices Steel is manufactured by the chemical reduction of iron

More information

NEW SOURCE REVIEW PERMIT TO CONSTRUCT AND OPERATE A STATIONARY SOURCE

NEW SOURCE REVIEW PERMIT TO CONSTRUCT AND OPERATE A STATIONARY SOURCE Page 1 of 7 STATE OF CONNECTICUT DEPARTMENT OF ENVIRONMENTAL PROTECTION NEW SOURCE REVIEW PERMIT TO CONSTRUCT AND OPERATE A STATIONARY SOURCE Issued pursuant to Title 22a of the Connecticut General Statues

More information

PRE-PERMIT CONSTRUCTION APPROVAL GUIDANCE DOCUMENT

PRE-PERMIT CONSTRUCTION APPROVAL GUIDANCE DOCUMENT PRE-PERMIT CONSTRUCTION APPROVAL GUIDANCE DOCUMENT State of Idaho Department of Environmental Quality Updated May 2012 OVERVIEW Questions regarding the 15-Day Pre-Permit Construction Approval process may

More information

Implementation Question and Answer Document. for

Implementation Question and Answer Document. for Implementation Question and Answer Document for National Emission Standards for Hazardous Air Pollutants for Stationary Reciprocating Internal Combustion Engines and New Source Performance Standards for

More information

ENGINEERING CALCULATION SHEET AIR RESOURCES DIVISION

ENGINEERING CALCULATION SHEET AIR RESOURCES DIVISION Page 1 of 13 DATE APPLICATION RECEIVED: June 6, 1996. Application # FY96-TV010 FACILITY DESCRIPTION Wheelabrator-Claremont (Wheelabrator) operates a resource recovery facility in Claremont, NH. The resource

More information

Summary Fact Sheet for WEB Trading Program: Monitoring, Recordkeeping and Reporting

Summary Fact Sheet for WEB Trading Program: Monitoring, Recordkeeping and Reporting Summary Fact Sheet for WEB Trading Program: Monitoring, Recordkeeping and Reporting The monitoring provisions for the WEB trading program balance the need for accurate monitoring to provide certainty for

More information

State of New Jersey. General Permit. For. Boilers and Heaters [Individually Less Than 10 MMBTU/HR]

State of New Jersey. General Permit. For. Boilers and Heaters [Individually Less Than 10 MMBTU/HR] State of New Jersey Department of Environmental Protection Air Quality Permitting General Permit For This General Permit allows for the construction, installation, reconstruction and operation of single

More information

By Robert Bivens. RMB Consulting & Research, Inc. Raleigh, NC www.rmb-consulting.com (919) 791-3133 @RMBConsulting

By Robert Bivens. RMB Consulting & Research, Inc. Raleigh, NC www.rmb-consulting.com (919) 791-3133 @RMBConsulting CEMS Certification and Compliance Testing Lessons Learned on Turbines By Robert Bivens RMB Consulting & Research, Inc. Raleigh, NC www.rmb-consulting.com (919) 791-3133 @RMBConsulting Background While

More information

Boiler Tune-up Guide

Boiler Tune-up Guide Boiler Tune-up Guide National Emission Standards for Hazardous Air Pollutants for Area Sources: Industrial, Commercial, and Institutional Boilers What is a boiler tune-up? 40 CFR Part 63 Subpart JJJJJJ

More information

Emission monitoring, reporting, and verification (MRV) for U.S. cap and trade programs. Jeremy Schreifels US EPA

Emission monitoring, reporting, and verification (MRV) for U.S. cap and trade programs. Jeremy Schreifels US EPA Emission monitoring, reporting, and verification (MRV) for U.S. cap and trade programs Jeremy Schreifels US EPA Principles of MRV for cap and trade programs Cap & trade requires a complete record of total

More information

EPA Requirements for Diesel Standby Engines In Data Centers. Bob Stelzer / CTO / Safety Power Inc. For 7x24 Fall 2014 Conference. 1.

EPA Requirements for Diesel Standby Engines In Data Centers. Bob Stelzer / CTO / Safety Power Inc. For 7x24 Fall 2014 Conference. 1. EPA Requirements for Diesel Standby Engines In Data Centers Bob Stelzer / CTO / Safety Power Inc For 7x24 Fall 2014 Conference 1.0 Introduction In order to get the Air Emissions Permit for facilities that

More information

Phoenix Process Engineering, Inc. Project Experience Helping Clients Achieve MACT Compliance

Phoenix Process Engineering, Inc. Project Experience Helping Clients Achieve MACT Compliance Phoenix Process Engineering, Inc. Project Experience Helping Clients Achieve MACT Compliance The Boiler MACT, 40 CFR 63, Subpart DDDDD, was vacated in 2007 by the U.S Court of Appeals and the 2004 rule

More information

Electronic Reporting to BTS

Electronic Reporting to BTS Electronic Reporting to BTS EPA s Electronic Reporting Tool (ERT) Software to Standardize Source Test Planning, Reporting and Assessment. http://www.epa.gov/ttnchie1/ert/ Enhancements made to improve and

More information

A Guide to Calculating Your Boiler Emissions. A step-by-step manual for your convenience

A Guide to Calculating Your Boiler Emissions. A step-by-step manual for your convenience A Guide to Calculating Your Boiler Emissions A step-by-step manual for your convenience Contents The Importance of Emissions Calculations... 3 Why You Need to Calculate Your Boiler Emissions... 4 The Newest

More information

Industrial Combustion Boilers

Industrial Combustion Boilers IEA ETSAP - Technology Brief I1 May 21 - www.etsap.org Industrial Combustion Boilers HIGHLIGHTS PROCESS AND TECHNOLOGY STATUS Combustion boilers are widely used to generate steam for industrial applications

More information

2. Do I have to certify? 1. What is the ERP Installation Compliance Certification? 3. How do I submit a Compliance Certification?

2. Do I have to certify? 1. What is the ERP Installation Compliance Certification? 3. How do I submit a Compliance Certification? Compliance Certification Instructions Emergency Engines and Emergency Turbines 1. What is the ERP Installation Compliance Certification? Operators of new emergency engines with a rated power output equal

More information

STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS DEPARTMENT OF ENVIRONMENTAL MANAGEMENT OFFICE OF AIR RESOURCES NOTICE OF PUBLIC COMMENT PERIOD

STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS DEPARTMENT OF ENVIRONMENTAL MANAGEMENT OFFICE OF AIR RESOURCES NOTICE OF PUBLIC COMMENT PERIOD STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS DEPARTMENT OF ENVIRONMENTAL MANAGEMENT OFFICE OF AIR RESOURCES NOTICE OF PUBLIC COMMENT PERIOD IN RE: Proposed revisions to Air Pollution Control Regulation

More information

AIR EMISSION PERMIT NO. 13100005-003 IS ISSUED TO MULTEK FLEXIBLE CIRCUITS INC

AIR EMISSION PERMIT NO. 13100005-003 IS ISSUED TO MULTEK FLEXIBLE CIRCUITS INC AIR EMISSION PERMIT NO. 13100005-003 IS ISSUED TO MULTEK FLEXIBLE CIRCUITS INC Multek Flexible Circuits Inc.-Sheldahl Road East and West Buildings 1150 Sheldahl Road and 805 North Highway 3 Northfield,

More information

PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION

PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION Page 1 of 9 PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION COMPLIANCE DEMONSTRATION INSTRUCTIONS FOR THE CATEGORY NO. 38 AIR QUALITY PERMIT EXEMPTION CRITERIA The Category No. 38 exemption criteria

More information

GUIDELINE FOR THE INSTALLATION AND OPERATION OF CONTINUOUS EMISSION MONITORING SYSTEMS (CEMS) AND THEIR USE FOR REPORTING UNDER THE PROVISIONS OF

GUIDELINE FOR THE INSTALLATION AND OPERATION OF CONTINUOUS EMISSION MONITORING SYSTEMS (CEMS) AND THEIR USE FOR REPORTING UNDER THE PROVISIONS OF GUIDELINE FOR THE INSTALLATION AND OPERATION OF CONTINUOUS EMISSION MONITORING SYSTEMS (CEMS) AND THEIR USE FOR REPORTING UNDER THE PROVISIONS OF REGULATION O.Reg. 127/01 Ontario Ministry of the Environment

More information

Energy Efficient Operations and Maintenance Strategies for Boilers

Energy Efficient Operations and Maintenance Strategies for Boilers Energy Efficient Operations and Maintenance Strategies for Boilers Large, complex and widely used, industrial boilers are major consumers of fuel. Proper operations and maintenance (O&M) procedures must

More information

STATE OF MISSOURI, DEPARTMENT OF NATURAL RESOURCES MISSOURI AIR CONSERVATION COMMISSION PERMIT TO CONSTRUCT

STATE OF MISSOURI, DEPARTMENT OF NATURAL RESOURCES MISSOURI AIR CONSERVATION COMMISSION PERMIT TO CONSTRUCT --.--~.-------------------------------- STATE OF MISSOURI, DEPARTMENT OF NATURAL RESOURCES MISSOURI AIR CONSERVATION COMMISSION PERMIT TO CONSTRUCT Under the authority of RSMo 643 and the Federal Clean

More information

Part 4: How to Avoid Being a Title V Major Source

Part 4: How to Avoid Being a Title V Major Source Part 4: How to Avoid Being a Title V Major Source Many smaller sources of air pollution have a high PTE but have actual emissions well below the Title V major source thresholds. If your PTE makes you a

More information

1 March 2013. Al Dussinger Embrace Home Loans 25 Enterprise Center Middletown, RI 02842. Dear Mr. Dussinger,

1 March 2013. Al Dussinger Embrace Home Loans 25 Enterprise Center Middletown, RI 02842. Dear Mr. Dussinger, 1 March 2013 Al Dussinger Embrace Home Loans 25 Enterprise Center Middletown, RI 02842 Dear Mr. Dussinger, The Department of Environmental Management, Office of Air Resources has reviewed and approved

More information

Enclosed is a General Permit issued pursuant to our review of your application (General Permit No. GPEG-235).

Enclosed is a General Permit issued pursuant to our review of your application (General Permit No. GPEG-235). 28 October 2015 Brian Murphy President Home Loan Investment Bank 1 Home Loan Plaza Warwick, RI 02886 Dear Mr. Murphy: The Department of Environmental Management, Office of Air Resources has reviewed and

More information

White Paper: EPRI s Preliminary Evaluation of the Available HAPs ICR Data Paul Chu, Naomi Goodman Amended January 7, 2011

White Paper: EPRI s Preliminary Evaluation of the Available HAPs ICR Data Paul Chu, Naomi Goodman Amended January 7, 2011 White Paper: EPRI s Preliminary Evaluation of the Available HAPs ICR Data Paul Chu, Naomi Goodman Amended January 7, 2011 1. Background In December 2009, the U.S. Environmental Protection Agency (EPA)

More information

REGULATION 6 PARTICULATE MATTER AND VISIBLE EMISSIONS RULE 3 WOOD-BURNING DEVICES INDEX

REGULATION 6 PARTICULATE MATTER AND VISIBLE EMISSIONS RULE 3 WOOD-BURNING DEVICES INDEX 6-3-100 GENERAL REGULATION 6 PARTICULATE MATTER AND VISIBLE EMISSIONS RULE 3 WOOD-BURNING DEVICES INDEX 6-3-101 Description 6-3-110 Limited Exemption, Natural Gas Service Unavailability 6-3-111 Limited

More information

Fuel Burning Equipment. Maximum Firing Rate (gal/hr)

Fuel Burning Equipment. Maximum Firing Rate (gal/hr) A-806-71-B-A ) Amendment #1 After review of the air emissions license amendment application, staff investigation reports and other documents in the applicant s file in the Bureau of Air Quality, pursuant

More information

MATHESON STACK EMISSION CALIBRATION PROGRAM. Experience the MATHESON Commitment to Supply Chain Excellence

MATHESON STACK EMISSION CALIBRATION PROGRAM. Experience the MATHESON Commitment to Supply Chain Excellence MATHESON STACK EMISSION CALIBRATION PROGRAM MATHESON STACK EMISSION CALIBRATION PROGRAM MATHESON is a single source for industrial, medical, specialty, and electronics gases as well as gas handling equipment,

More information

FINAL DRAFT: July 1999. Appendix B BASELINE COST REPORT

FINAL DRAFT: July 1999. Appendix B BASELINE COST REPORT Appendix B BASELINE COST REPORT Revised Estimation of Baseline Costs for Hazardous Waste Combustors for Final MACT Rule Prepared for: Industrial Economics, Incorporated 2067 Massachusetts Avenue Cambridge,

More information

Data Validation Clarification Document (DRAFT) Continuous Source Monitoring Manual Revision No. 8 (Manual)

Data Validation Clarification Document (DRAFT) Continuous Source Monitoring Manual Revision No. 8 (Manual) Data Validation Clarification Document (DRAFT) Continuous Source Monitoring Manual Revision No. 8 (Manual) Disclaimer: The Continuous Source Monitoring Manual Revision No. 8 (Manual) - Data Validation

More information

Emissions Control - Hazardous Emissions & Bagle Detection Systems

Emissions Control - Hazardous Emissions & Bagle Detection Systems 63.11407 40 CFR Ch. I (7 1 15 Edition) (3) Approval of a major change to monitoring under 63.8(f). A major change to monitoring is defined in 63.90. (4) Approval of a major change to recordkeeping/reporting

More information

Subpart XX Standards of Performance. Terminals. Environmental Protection Agency 60.501

Subpart XX Standards of Performance. Terminals. Environmental Protection Agency 60.501 lpowell on DSK54DXVN1OFR with $$_JOB Environmental Protection Agency 60.501 a State under section 111(c) of the Act, approves reporting requirements or an alternative means of compliance surveillance adopted

More information

Enclosed are the General Permits issued pursuant to our review of your applications (General Permit No. GPEG-101, GPEG-102 and GPEG-103).

Enclosed are the General Permits issued pursuant to our review of your applications (General Permit No. GPEG-101, GPEG-102 and GPEG-103). 5 March 2012 David F. Gaipo, Superintendent East Providence Wastewater Treatment Facility 1 Crest Avenue East Providence, RI 02915 Dear Mr. Gaipo: The Department of Environmental Management, Office of

More information

Source: EIA Natural Gas Issues and Trends 1998

Source: EIA Natural Gas Issues and Trends 1998 7.0 System Redesign Analysis 7.1 Emissions Natural gas is a clean burning fossil fuel. It consists of a mixture of hydrocarbon gases, primarily Methane (CH 4 ). In analyzing the combustion process, it

More information

FAC 7.1: Generators. EPA Impacts on Emergency Gensets for 2015 Installations

FAC 7.1: Generators. EPA Impacts on Emergency Gensets for 2015 Installations FAC 7.1: Generators EPA Impacts on Emergency Gensets for 2015 Installations Speaker: Bob Stelzer, CTO Safety Power Inc bob.stelzer@safetypower.ca Speaker: Randy Sadler, SME, Safety Power Inc. randy.sadler@safetypower.ca

More information

Application Note 12: TrendView Recorders Continuous Emissions Monitoring

Application Note 12: TrendView Recorders Continuous Emissions Monitoring Application Note 12: TrendView Recorders Continuous Emissions Monitoring Continuous Emissions Monitoring (often abbreviated to CEM) is the term commonly used to describe instantaneous or real-time environmental

More information

ARTICLE 3. MONITORING REQUIREMENTS

ARTICLE 3. MONITORING REQUIREMENTS ARTICLE 3. MONITORING REQUIREMENTS Rule 1. Continuous Monitoring of Emissions (Repealed) (Repealed by Air Pollution Control Division; filed Aug 28, 1990, 4:50 p.m.: 14 IR 81) Rule 1.1. Continuous Monitoring

More information

Exposures to Coal Fly Ash During Maintenance of Air Cleaning Devices in Power Plants

Exposures to Coal Fly Ash During Maintenance of Air Cleaning Devices in Power Plants Exposures to Coal Fly Ash During Maintenance of Air Cleaning Devices in Power Plants Harry J Beaulieu, PhD, CIH, CSP President & Senior Scientist Industrial Hygiene Resources Boise, ID Arlen W Siert, PhD,

More information

Boiler NOx Emissions and Energy Efficiency

Boiler NOx Emissions and Energy Efficiency Boiler NOx Emissions and Energy Efficiency Prepared For: Boiler Operators and Facility Managers Prepared By: 100 Montgomery Street, Suite 600 San Francisco, CA 94104 AGENDA Introduction Boiler NOx Formation

More information

Emissions from Waste-to-Energy: A Comparison with Coal-fired Power Plants

Emissions from Waste-to-Energy: A Comparison with Coal-fired Power Plants Proceedings of IMECE 03 2003 ASME International Mechanical Engineering Congress & Exposition Washington, D.C., November 16-21, 2003 IMECE2003-55295 Emissions from Waste-to-Energy: A Comparison with Coal-fired

More information

Chapter 2 Compliance Branch CEMS Guidance Manual Table of Contents. Applicability... 1.0

Chapter 2 Compliance Branch CEMS Guidance Manual Table of Contents. Applicability... 1.0 Chapter 2 Compliance Branch CEMS Guidance Manual Table of Contents Page No. Applicability... 1.0 1.0 Continuous Emissions Monitor Operating Principles... 3.0 1.1 Introduction... 3.0 1.2 Definitions...

More information

(b) One (1) natural gas-fired boiler identified as B1, with a maximum heat input rate of 4.6 million (MM) British thermal units (Btu) per hour;

(b) One (1) natural gas-fired boiler identified as B1, with a maximum heat input rate of 4.6 million (MM) British thermal units (Btu) per hour; Brandon S. Erlacher Elkhart Truth Publishing Company 421 South Second Street Elkhart, IN 46516 Re: Registered Operation Status, 039-11783-00269 Dear Mr. Erlacher: The application from Elkhart Truth Publishing

More information

36.0 EMERGENCY REGULATIONS

36.0 EMERGENCY REGULATIONS 36.0 EMERGENCY REGULATIONS 36.1 Episode Criteria The pollutant concentrations in the ambient air which would trigger these control actions were selected primarily from expected changes in air quality that

More information

The Fate of Ammonia and Mercury in the Carbon Burn-Out (CBO ) Process

The Fate of Ammonia and Mercury in the Carbon Burn-Out (CBO ) Process The Fate of Ammonia and Mercury in the Carbon Burn-Out (CBO ) Process Vincent M Giampa Progress Materials, Inc., One Progress Plaza, St. Petersburg, Florida 33701 KEYWORDS: mercury, ammonia, carbon burn-out,

More information

ADEM Form 103 01/10 m5

ADEM Form 103 01/10 m5 ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT AIR DIVISION INSTRUCTIONS FOR COMPLETION OF FACILITY IDENTIFICATION FORM ADEM 103 This form is to be completed in duplicate for each facility operated by

More information

Sludge Treatment Facility Stack Gas Monitoring Report February 2016

Sludge Treatment Facility Stack Gas Monitoring Report February 2016 I. INTRODUCTION This Monthly Report aims to provide a summary of environmental performance of the Sludge Treatment Facility (STF) over the monitoring period, which includes the air emission data collected

More information

PART 70 PERMIT TO OPERATE

PART 70 PERMIT TO OPERATE G Missouri Department of Natural Resources ~ ~ ~ Air Pollution Control Program PART 70 PERMIT TO OPERATE Under the authority of RSMo 643 and the Federal Clean Air Act the applicant is authorized to operate

More information

MARSHALL UNIVERSITY HAZARDOUS WASTE DISPOSAL SECTION

MARSHALL UNIVERSITY HAZARDOUS WASTE DISPOSAL SECTION MARSHALL UNIVERSITY HAZARDOUS WASTE DISPOSAL SECTION TABLE OF CONTENTS POLICY STATEMENT.2 REFERENCE PROCEDURE 3 l.0 Purpose.3 2.0 Scope 3 3.0 Definitions 4 4.0 Responsibilities 5 5.0 Procedure.7 11/16/2005

More information

Criteria Air Pollutant and Greenhouse Gas Emission Factors Compiled by Eastern Research Group for Incorporation in GREET

Criteria Air Pollutant and Greenhouse Gas Emission Factors Compiled by Eastern Research Group for Incorporation in GREET Criteria Air Pollutant and Greenhouse Gas Emission Factors Compiled by Eastern Research Group for Incorporation in GREET Systems Assessment Group Energy Systems Division Argonne National Laboratory October,

More information

BOILER EMISSION GUIDE

BOILER EMISSION GUIDE BOILER EMISSION GUIDE 3 rd Edition Reference Guide Boiler Emissions Reference Guide Table of Contents Regulations...2 Federal Actions...2.. The Clean Air Act...2.. Clean Air Act Amendment of 1990...2...

More information

Tampa Electric Company. Biomass Test Burn Report Polk Power Station Unit 1

Tampa Electric Company. Biomass Test Burn Report Polk Power Station Unit 1 Tampa Electric Company Biomass Test Burn Report Polk Power Station Unit 1 April 2002 1.0 INTRODUCTION...2 2.0 BACKGROUND...2 2.1 BIOMASS FUEL HANDLING...2 2.2 PROCESS DATA COLLECTION...3 2.3 EMISSIONS

More information

Reproduction of Permit Terms and Conditions

Reproduction of Permit Terms and Conditions Page 1 of 339 Facility ID: 0243000024 Issuance type: Title V Draft Permit This version of facility specific terms and conditions was converted from a database format to an HTML file during an upgrade of

More information

(Adopted July 7, 1989)(Amended December 7, 1990) (Amended May 13, 1994) FUGITIVE EMISSIONS OF VOLATILE ORGANIC COMPOUNDS

(Adopted July 7, 1989)(Amended December 7, 1990) (Amended May 13, 1994) FUGITIVE EMISSIONS OF VOLATILE ORGANIC COMPOUNDS (Adopted July 7, 1989)(Amended December 7, 1990) (Amended May 13, 1994) RULE 1173. FUGITIVE EMISSIONS OF VOLATILE ORGANIC COMPOUNDS (a) (b) Purpose This rule is intended to control volatile organic compounds

More information

Environmental Protection Agency

Environmental Protection Agency Vol. 77 Thursday, No. 32 February 16, 2012 Part II Environmental Protection Agency 40 CFR Parts 60 and 63 National Emission Standards for Hazardous Air Pollutants From Coal- and Oil-Fired Electric Utility

More information

Tips for a Successful Diesel Retrofit Project

Tips for a Successful Diesel Retrofit Project Tips for a Successful Diesel Retrofit Project Tips for a Successful Diesel Retrofit Project Transportation and Climate Division Office of Transportation and Air Quality U.S. Environmental Protection Agency

More information

Best Available Retrofit Technology Analysis Report

Best Available Retrofit Technology Analysis Report Report Best Available Retrofit Technology Analysis Report Weyerhaeuser Corporation Longview, WA Prepared for Weyerhaeuser Corporation P.O. Box 188 Longview, Washington 98632 December 2007 Revised June

More information

CHAPTER 1200-3-20 LIMITS ON EMISSIONS DUE TO MALFUNCTIONS, START-UPS, AND SHUTDOWNS 1200-3-20-.01 PURPOSE

CHAPTER 1200-3-20 LIMITS ON EMISSIONS DUE TO MALFUNCTIONS, START-UPS, AND SHUTDOWNS 1200-3-20-.01 PURPOSE 1200-3-20-.01 PURPOSE CHAPTER 1200-3-20 LIMITS ON EMISSIONS DUE TO MALFUNCTIONS, START-UPS, AND SHUTDOWNS (1) The purpose of this chapter is to place reasonable limits on the amount of emissions an air

More information

Chemical Engineer Office of Resource Conservation and Recovery

Chemical Engineer Office of Resource Conservation and Recovery Waste-to to-energy in the U.S. and Trends for the Future Jesse Miller Chemical Engineer Office of Resource Conservation and Recovery Tuesday, August 9, 2011 1 Presentation Outline ORCR Atiiti Activities

More information

ATTACHMENT B California Energy Commission Air Quality Self-Certification Checklist for Simple-Cycle Gas Turbine Generation Units

ATTACHMENT B California Energy Commission Air Quality Self-Certification Checklist for Simple-Cycle Gas Turbine Generation Units ATTACHMENT B California Energy Commission Air Quality Self-Certification Checklist for Simple-Cycle Gas Turbine Generation Units License Application for: [ X ] New Emissions Unit(s) at a New Stationary

More information

ERCOT Analysis of the Impacts of the Clean Power Plan Final Rule Update

ERCOT Analysis of the Impacts of the Clean Power Plan Final Rule Update ERCOT Analysis of the Impacts of the Clean Power Plan Final Rule Update ERCOT Public October 16, 2015 ERCOT Analysis of the Impacts of the Clean Power Plan Final Rule Update In August 2015, the U.S. Environmental

More information