PRE-PERMIT CONSTRUCTION APPROVAL GUIDANCE DOCUMENT

Size: px
Start display at page:

Download "PRE-PERMIT CONSTRUCTION APPROVAL GUIDANCE DOCUMENT"

Transcription

1 PRE-PERMIT CONSTRUCTION APPROVAL GUIDANCE DOCUMENT State of Idaho Department of Environmental Quality Updated May 2012

2 OVERVIEW Questions regarding the 15-Day Pre-Permit Construction Approval process may be directed to DEQ s Air Quality Permit Hotline ( ). A DEQ permit writer will be available on the Hotline to answer questions and schedule a consultation which is required by the Rule. DEQ encourages applicants to read this document and to call the Air Quality Permit Hotline to gain an understanding of the 15-Day Pre-Permit Construction Approval process. The 15-Day Pre-Permit Construction Approval is available in accordance with the Rules for Control of Air Pollution in Idaho (Rules) IDAPA only for those sources that satisfy and understand the following conditions: 1. The applicant will have completed a comprehensive air quality assessment and regulatory review; 2. The applicant is not proposing a new Prevention of Significant Deterioration (PSD) major facility, a PSD major modification (i.e. subject to PSD requirements), or a proposed major NSR source project in a non-attainment area; 3. The applicant is not utilizing emission offsets (netting); 4. The applicant is willing to commence construction at their own risk prior to issuance of a Permit to Construct. A risk exists because the owner or operator can not operate the source until a Permit to Construct is issued; if the Permit to Construct is ultimately denied the facility will be in violation of Section 201 (Permit to Construct Required) on the date that it commenced construction. The owner shall not contest the final permit to construct decision (denial) based on the fact they may have already begun construction after Pre-Permit Construction approval has been granted by DEQ (IDAPA d); 5. The applicant understands that: Pre-Permit Construction approval is granted or denied within 15-days of the receipt of the permit application; and That the Permit to Construct application is processed under the same administrative timelines as are applications that do not seek to obtain Pre-Permit Construction approval (i.e. 30 day completeness review; 60 day permit development period; and an opportunity for public comment. i. Opportunity for public comment is provided for by DEQ upon receipt of the permit application via publication in the local newspaper and through posting on DEQ s website. 6. The applicant understands that DEQ may not conduct a detailed technical completeness review of the application within 15-days. DEQ s review during the 15-day period is to determine if the application appears to have addressed all the necessary technical and regulatory requirements so that Pre-Permit Construction approval can be granted. If during the 15-day review period DEQ determines that information is lacking the Pre- Permit Construction approval request will be denied. 7. The applicant understands the Permit to Construct application may be determined incomplete, or denied, even though pre-construction approval may have been granted within 15-days Day Pre-permit Construction Approval

3 These concepts are the basis for of the 213" Rule (15-Day Pre-Permit Construction Approval). While developing the Rule, all negotiating parties (including participating industries and the Idaho Department of Environmental Quality (DEQ), concurred that only those sources that completely demonstrate compliance with all preconstruction rules through an application process are eligible for the 15-day approval. This portion of the negotiated Rule is found in IDAPA c. In short, a source must have a thorough understanding of air quality rules, ambient impact assessments, and appropriate methods to limit Potential to Emit. Pre- Permit Construction approval applications that do not fulfill these requirements will be denied. This guidance is intended to aid applicants in submitting an application in accordance with IDAPA The following list outlines the application requirements. 1. The applicant shall submit an application that fulfills all of the application procedures specified in IDAPA This includes submitting a $1,000 application fee in accordance with IDAPA , and completing all necessary application forms and checklists. The forms and checklists can be found DEQ s website: 2. The applicant shall consult with DEQ prior to submitting the application as specified in IDAPA b. The intent of the consultation is to assure that the applicant understands the procedures of the Pre-Permit Construction approval Rule, and to have a detailed discussion on the methods that the applicant will use to estimate emissions and determine ambient impacts. The meeting should include the DEQ Permit Coordinator, the DEQ Permit Writer who will be assigned the project, and DEQ Modeler who will review the modeling submissions. Applicants should contact the Air Quality Permit Hotline ( ) to schedule a meeting. The meeting may be at the DEQ office in Boise or may be a telephone conference call. Calls to the Hotline do not suffice for the consultation that is required by the Rules; though the consultation may be scheduled during the call to the Hotline. The consultation will be a meeting or teleconference, and will include DEQ Permit Coordinator, Permit Writer, and Molder as well as the applicant and the applicant s consultant. 3. The applicant shall request in writing the ability to construct prior to permit issuance (Rules Section c). 4. The applicant shall submit proof of eligibility for Pre-Permit Construction approval. Approval is not available for new PSD major facilities, PSD major modifications (facility s which are subject to PSD requirements), major PSD projects in non-attainment areas, sources which plan to utilize offsets (or netting), nor sources which impact air quality related values of Class I areas (Rules Section c). 5. Applicants seeking limitations on potential to emit, such that permitted emissions will be either below major source levels or below significant increase levels, must describe in detail in the application the proposed emission limitations and operational limitations which will adequately limit Potential to Emit below major source thresholds (Rules Section c). 6. The applicant shall certify in accordance with the Rules Section d that it will comply with all limitations it has imposed on Potential to Emit, including 15-Day Pre-permit Construction Approval 3

4 emission limitations, operational limitations, and monitoring and reporting requirements. 7. The applicant shall conduct ambient impact assessments for all air pollutants subject to regulation under the Rules. Ambient impact assessments shall be conducted in accordance with a written and DEQ-approved protocol. The protocol must be approved in writing by DEQ prior to submitting the application (Rules Section c). 8. Within ten (10) days after application submittal, the applicant shall hold an informational meeting in at least one (1) location in the region in which the source is to be located (Rules Section a). The informational meeting shall be made known by notice published at least ten (10) days before the meeting in a newspaper of general circulation in the county(ies) which the source will be located. A copy of the notice shall be included in the application, also submit proof of publication if you receive one from the publisher. The notice shall include the date, time and location of the meeting, a brief description of the source, and a statement that the purpose of the meeting is to discuss the air quality related aspects of the proposed project. This informational meeting is the responsibility of the applicant. During the meeting DEQ encourages the applicant to discuss their proposed process, proposed emissions, applicable rules, and procedures that will be followed to obtain a permit. Emphasis should be placed on the fact that the facility will not be able to operate until a permit to construct is issued by DEQ in accordance with the administrative procedures for issuing permits. It should be made clear that the administrative process includes providing an opportunity for a public comment period on DEQ s proposed action (i.e. draft permit, statement of basis) prior to issuing the final permit. Interested parties should be informed to contact DEQ if they want to request a public comment period. The application which has been submitted will be available on DEQ s web page, as is the ability to request a comment period on DEQ s proposed action. Provided below is an application structure that the applicant should follow. This will assist the applicant in determining if all information required by IDAPA has been submitted. The 15-day review period specified by the Rule does not allow the luxury for DEQ to solicit the source for information needed to grant Pre-Permit Construction approval. If information is lacking, DEQ will deny the Pre-Permit Construction approval request. In the case of a denial, the process does not allow time for DEQ to list in detail the specific information that is lacking in the submittal. The applicant may submit a new 15-day Pre-Permit Construction Approval application, along with a $1,000 application fee for the new application, upon thoroughly readdressing the application requirements. However, the fact that the original application was denied is indication that comprehensive knowledge needed to perform air quality impact assessments and regulatory reviews consistent with the basis for the Rule may be lacking. It should be noted that $1,000 application fee is required for each 15-day Pre-Permit Construction application, and that the fee is not transferable or refundable. Following is a specific outline that sources should follow to be eligible for the 15-Day Pre-Permit Construction Approval. Each section must be completed in sufficient detail to allow DEQ to quickly determine what the applicable requirements are, how the source will continuously determine compliance, whether process descriptions were provided, if detailed emission estimates were provided, and if the applicant stated all assumptions Day Pre-permit Construction Approval

5 As previously stated, an in-depth review of the information submitted may not occur during the 15-day period; DEQ s review during the 15-day period is to determine if the application appears to have addressed all the necessary technical and regulatory requirements so that Pre-Permit Construction approval can be granted. The permit to construct application will then be processed in accordance with Section 209 of the Rules. This means that the application may be determined incomplete within 30 days of submittal even if Pre-Permit Construction approval has been granted. If the application is determined complete DEQ will prepare either a proposed permit or permit denial within 60 days of determining the application complete. An opportunity for a public comment period will be provided on DEQ s proposed action. The intent of this document is to provide guidance, and where appropriate to provide examples of what should be submitted. If this document is not read from beginning to end, the applicant may not fully understand the procedures and requirements associated with applying for the 15- day approval. The applicant should follow the examples as closely as possible when completing the application. The applicant should be aware that seeking the 15-day pre-permit application will entail a significant amount of work. All Rules and Regulations which apply to new sources or modifications to existing sources must be addressed. Where necessary limitations on operations must be self-imposed such that they limit the potential to emit below PSD major source (or PSD major modification) thresholds. Ambient impact assessment must be performed to demonstrate that the proposed emission units will not exceed ambient air quality standards. As previously mentioned, this process mandates comprehensive knowledge of air quality rules and ambient impact assessments and a willingness of the applicant to commence construction at their own risk It is very important for the source to follow the outline and the guidance that is given. Fifteen (15) days is a very short period of time for DEQ to review an application and determine if approval to construct should be granted. The applicant must make every effort to make the application as organized and complete as possible. 15-Day Pre-permit Construction Approval 5

6 APPLICATION STRUCTURE Section 1 Section 2. Section 3. Section 4. Section 5. Section 6. Section 7. Application Forms/Checklists Process Description Process Flow Diagram Applicable Requirements Potential to Emit/Emission Estimates/Limitation on Potential to Emit Facility Classification Ambient Impact Assessments 1. APPLICATION FORMS/CHECKLISTS In accordance with the Rules for the Control of Air Pollution in Idaho ( ) applications for a permit to construct must be made using forms furnished by the Department. The application forms are located on DEQ s web page ( All applicable application forms must be completed and submitted. Checklists have been developed to aid the applicant in submitting complete applications. At a minimum the following checklists should be completed and submitted along with application forms: 15-Day Pre-Permit Construction Application Completeness Checklist Toxic Air Pollutant (TAP) Preconstruction Compliance Application Checklist Dispersion Modeling Protocol Checklist DEQ developed application forms which are designed to aid applicants in submitting the necessary information. However, because of the wide variety of sources it is not possible to generate application forms that work for all applicants. For that reason it is important for the applicant to review the application requirements of Section 202 of the Rules which states that the following shall be submitted: Site information, plans, descriptions, specifications, and drawings showing the design of the stationary source, the nature and amount of emissions (including secondary emissions), and the manner in which it will be operated and controlled. All estimates of ambient concentrations shall be based on the requirements of 40 CFR 51, Appendix W (Guideline on Air Quality Models). A schedule for construction of the stationary source or modification Day Pre-permit Construction Approval

7 There are three general requirements that apply to all applicants: 1) The applicant must identify and document compliance with all applicable emissions standards and regulatory requirements. 2) The applicant must provide an emission inventory for all regulated air pollutants. Emission estimates must be documented. 3) The applicant must demonstrate compliance with all ambient standards and toxic air pollutant increments. Often this requires air pollution dispersion modeling. Satisfying the application requirements of Section 202 of the Rules often requires submitting more information than what is asked for on the application forms. Following is guidance on what must be submitted. 2. PROCESS DESCRIPTION Process descriptions must be submitted with sufficient detail to convey how the proposed process will operate. Considerable effort should be given to the process description development. The process description must be from raw material in to final product out. In order for DEQ to appropriately regulate a source by limiting emissions and process throughput, a source s process must be thoroughly understood. The appropriateness of a limitation can only be determined when compared to how a source operates. Attention to detail in developing the process description may eliminate certain inappropriate permit limitations which may be imposed on the source in the absence of an adequate process description. Examples of process descriptions may be found in AP-42 (EPA s Compilation of Air Pollution Emission Factors). It is important to remember that the process description should detail air pollution emitting activities as well as the process as a whole. 3. PROCESS FLOW DIAGRAM Process flow diagrams should be a depiction of the process description and show the process from raw material in to final product out. All air pollution emission sources must be shown. Sources which emit through a stack should be represented as emitting through a stack. Sources of emissions that do not pass through a stack must also be shown. As with the process description, the process flow diagram should be detailed. All air pollution emitting activities must be shown. Any air pollution emitting activities not shown on the diagram cannot be considered part of the air pollution emitting activities subject to Pre-Permit Construction approval. Commencing construction of omitted emission units may be a violation of the Rules. 15-Day Pre-permit Construction Approval 7

8 4. LIST ALL APPLICABLE REQUIREMENTS All applicable requirements must be cited by the Rule or Regulation section/subpart that applies for each emission unit. If the applicant does not complete the application with all requirements cited, demonstration of compliance with all applicable air quality rules and regulations could not have been proven. Demonstration of compliance with all applicable Rules and regulations is mandated by IDAPA c. Rules for the Control of Air Pollution in Idaho Below is an example of what DEQ is looking for in an application regarding a listing of the applicable requirements of the Rules For the Control of Air pollution in Idaho (Rules). Included is a list of the Rules which apply to nearly all sources during day-to-day operations. When other rules apply, they should also be listed using the format given. Following the listing of each applicable Rule the applicant must provide a demonstration how they are, or will be, in compliance with that Rule. IDAHO ADMINISTRATIVE PROCEDURES ACT Rules for the Control of Air Pollution in Idaho 123. CERTIFICATION OF DOCUMENTS 210. DEMONSTRATION OF PRECONSTRUCTION COMPLIANCE WITH TOXIC STANDARDS 577. AMBIENT AIR QUALITY STANDARDS FOR SPECIFIC AIR POLLUTANTS 585. TOXIC AIR POLLUTANTS NON-CARCINOGENIC INCREMENTS 586. TOXIC AIR POLLUTANTS CARCINOGENIC INCREMENTS 590. NEW SOURCE PERFORMANCE STANDARDS 591. NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS 625. VISIBLE EMISSIONS 650. RULES FOR THE CONTROL OF FUGITIVE DUST 675. FUEL BURNING EQUIPMENT -- PARTICULATE MATTER 676. STANDARDS FOR NEW SOURCES 700. PARTICULATE MATTER -- PROCESS WEIGHT LIMITATIONS Many more rules exist which may apply. These are listed because they nearly always apply to new sources or modifications of existing sources. The applicant should address each of these rules, even if it is only to explain why they do not apply. Examples of how DEQ expects applicants to address each of the listed applicable requirements are given below for a few of these Rules. They all should be addressed in detail. It is the applicant s responsibility to ensure that all other applicable Rules are cited in accordance with the following format. The basic concept is that the applicant must 8 15-Day Pre-permit Construction Approval

9 provide: a listing of all applicable Rules; identify all emission units which the Rule applies; and a demonstration of how the applicant will comply with the Rule. Aside from ambient impact assessments, listing of all applicable requirements and providing documentation of compliance with those standards is the most demanding Pre-Permit Construction approval application requirements. Generally, DEQ will be able to quickly determine if the applicant has the comprehensive knowledge and ability to fulfill these requirements. In order to comply, considerable time is required to address each applicable rule in sufficient detail. The previous list of generally applicable rules should aid the applicant in completing this section of the application. Remember, it is not sufficient to simply list the applicable requirements. A listing of the emission units the rules apply to must be given as well as a demonstration on how the applicant will comply with each Rule or Regulation. Examples IDAPA DEMONSTRATION OF PRECONSTRUCTION COMPLIANCE WITH TOXIC STANDARD. DEQ has developed a Toxic Air Pollutant (TAP) Preconstruction Compliance Application Completeness Checklist. This checklist is designed to aid the applicant in submitting a complete preconstruction compliance demonstration for toxic air pollutants. This checklist should be completed and submitted. The checklist may be found at List each emission unit that emits a TAP. For each emission unit provide a documented TAP emission inventory and demonstration of compliance with the toxic increments listed in 585 and 586. Table 1 is an example of summary table that may be submitted. Table 1. TAPs Compliance Summary TAP Controlled Emissions (lb/hr) a Compliance Source #1 Source #2 Total EL Demonstration Benzene 1.0E-3 2.0E-3 3.0E-3 8.0E-4 Modeling Hydrogen Chloride Total below EL a) Emission calculations and assumptions are included on page 13 and 14 of the application. 15-Day Pre-permit Construction Approval 9

10 IDAPA FUEL BURNING EQUIPMENT PARTICULATE MATTER Provide a listing of fuel burning equipment and the particulate matter standards which apply. Also provide a demonstration of how the emission unit will comply with the applicable standard. Fuel Burning Equipment Hog Fuel Boiler (Complete Form EU5) Fuel Oil Boiler (Complete Form EU5) IDAPA PM Standard Citation % O % O 2 Control Device Baghouse (Complete Form BCE) Scrubber (Complete Form SCE) Compliance Demonstration Calculations see page 14 of application Calculations see page 15 of application Code of Federal Regulations All New Source Performance Standards (NSPS), National Emission Standards for Hazardous Air Pollutants (NESHAPs), that may be applicable must be addressed by completing the DEQ air quality permit application form for Federal Regulation Review and Applicability (Form FRA) at ptc_checklist_tap_completeness.docx. For each applicable federal emissions standard provide documentation on how the emissions unit will comply with the standard. Show all calculations, state all assumptions, and provide documentation of air pollution control device removal efficiencies. 5. POTENTIAL TO EMIT, ESTIMATE EMISSIONS, LIMITATIONS ON POTENTIAL TO EMIT POTENTIAL TO EMIT All applicants must provide the potential to emit of all regulated air pollutants. Potential to Emit is defined by IDAPA : Potential to Emit/Potential Emissions. The maximum capacity of a facility to emit an air pollutant under its physical and operation design. Any physical or operational limitation on the capacity of the facility to emit an air pollutant, provided the limitation or its effect on emissions is state or federally enforceable, shall be treated as part of its design. Limitations may include, but are not limited to, air pollution control equipment, restrictions on hours of operation, and restrictions on the type or amount of material combusted, stored, or processed. Care should be given to correctly determine Potential to Emit. Potential to Emit is used to determine a facility s classification as PSD major or PSD minor. Commencing construction of a PSD major facility or PSD major modification prior to obtaining a Permit to Construct is a violation of both federal and state Rules and Regulations and is not allowed under the Pre-Permit Construction approval Rule Day Pre-permit Construction Approval

11 Potential to Emit is also used to determine the degree of restrictions that are appropriate to protect ambient air quality standards. For instance, a source having an uncontrolled Potential to Emit which would cause a 24-hour PM-10 concentration of 400 micrograms per cubic meter would likely have more restrictive Potential to Emit limitations than a source with an uncontrolled ambient impact of 100 micrograms per cubic meter. If you are unsure of a Potential to Emit determination, you may contact DEQ s Air Quality Permit Hotline at Permit ( ). ESTIMATE EMISSIONS Estimate emissions for all pollutants which have an applicable requirement. Clearly show all calculations and state all assumptions. Emission estimates must be documented using one of three methodologies. These methodologies are: standard engineering and scientific principles and practices; published emission factors; and source tests conducted on similar type emission units. If emissions estimates are based on source tests the source test report should be submitted. Work must be complete and shown in sufficient detail to allow review by someone with basic engineering knowledge. If steps are skipped in calculations, or if references, assumptions, and arguments are not presented to allow complete understanding of the applicant s emission estimates, the emission inventory is incomplete. These calculations are the basis for ambient impact assessments and for facility classifications as PSD major or PSD minor. Incomplete or unclear analysis does not imply comprehensive knowledge, which is one of the foundations for the negotiated rule for Pre-Permit Construction approval. If this comprehensive knowledge is not established solely by the application materials, the application will be denied. When calculations are being done to demonstrate compliance with an applicable requirement, that requirement must be cited. When estimating emissions, emission factors that reflect best data must be used when available. The following represents the data quality hierarchy for common sources of information: 1. Continuous Emissions Monitoring (CEM) data from the emissions point(s) in question. CEM emissions data on the actual source in questions provides is the most reliable source of emissions data for that source. CEM are typically calibrated and maintained according to federal regulations and are required to monitor emissions during the vast majority of the sources actual operating time. 2. Source test data from the emissions point(s) in question. In absence of CEM data, source test data from the source in question is the most reliable source of emissions data. Source test emission data must include information regarding the operation of the source and air pollution control equipment during the test. The source test report should be submitted for review. 15-Day Pre-permit Construction Approval 11

12 3. Manufacturer guarantee. Manufacture guarantees that are stated in specific and quantifiable terms are considered the next most reliable emissions information. The manufacturer guarantees must be submitted for review. 4. CEM data at similar emission points. CEM data from similar emissions units may be considered reliable provided it is clearly described why the emissions from the source are similar to the source in question, and the emissions data is submitted for review. Similar sources are those serving a similar operating function, using similar raw materials, having similar processing rates, and those using the same type of air pollution control equipment. 5. Source test data at similar emission points. Source data from similar emissions units may be considered reliable provided it is clearly described why the sources are similar and the source test report is submitted for review. Similar sources are those serving a similar operating function, using similar raw materials, having similar processing rates, and those using the same type of air pollution control equipment. 6. AP-42 or industry derived emission factors. AP-42 or industry derived emission factors should be used only when there is an absence of the emissions data of the type listed above. If industry derived emissions factors are used they must be accompanied with documentation on how the emission factor was derived. AP-42 emissions factors are often an average of a set of emissions data for the industry type in question. Because the emission factors are averages the factors must be used with caution, approximately half of the subject sources will have emission rates greater than the emission factor and the other half will have emission rates less than the factor. AP-42 emissions factors are rated A through E; A is considered the most reliable and E the least reliable. The rating of the AP- 42 factor must be considered in determining how accurately the AP-42 emissions factor represents actual emissions from the subject source. LIMITATIONS ON POTENTIAL TO EMIT Sources must propose limits on Potential to Emit. The applicant must demonstrate that the limitations are short-term, quantifiable, enforceable as a practical matter, and demonstrates compliance with all ambient standards. Examples of limitations are: emission limits, production (or throughput) limits, monitoring, and recordkeeping. Potential to Emit is appropriately limited by incorporating all of these elements (emission limits, operating, monitoring, and recordkeeping) for each emission unit to ensure continuous compliance with each particular limitation that affects the emission unit. These limitations must be short-term, relevant to the applicable standard that applies, quantifiable, practical (i.e., allow inspectors to determine compliance), and contain monitoring and recordkeeping consistent with limitations. Generally, enforceable restrictions are needed for two different reasons. One is to limit emissions below PSD major source permitting thresholds. This type of limitation typically requires annual emission limitations with, at least, monthly operating and Day Pre-permit Construction Approval

13 monitoring requirements. Often, one pollutant must be limited for both a PSD major source permitting threshold and to protect ambient air quality standards. When this type of dual limitation is required, the most stringent averaging period that applies to a particular air pollutant dictates the time period required for the emission limitation and for the corresponding operating restrictions and monitoring requirements. For instance, PM-10 emissions may need to be limited to keep the facility out of PSD major source permitting requirements. This may be accomplished by an annual emission limitation and at least monthly operating and monitoring requirements. However, when the PM-10 ambient air quality standards must be protected, there are additional averaging periods which must be considered. Obviously, these are the averaging periods of the primary and secondary standards for PM-10. They are 24-hour and annual averaging periods. To appropriately limit Potential to Emit for both the PSD major source threshold and the ambient standards, the source should have at least hourly and annual limitations on emissions. Applicants are encouraged to spend considerable effort in developing limitations which fulfill the requirements of enforceability. Estimating emissions then determining the facility classification and ambient impact are basic to all applications. Applications for Pre-Permit Construction approval must be raised to another level of thoroughness by addressing in detail emission limitations and operational limitations which are practical, quantifiable, assure compliance and have averaging periods consistent with the standard which applies. It is important to note that emission limitations alone do not fulfill the requirement of being enforceable. Emission limitations must be accompanied by operational limitations which ensure compliance with standards. To complete the enforceability requirements, there must be monitoring and recordkeeping requirements to document compliance with the operational limitation. The monitoring requirements must be consistent with the operational limitations. For instance, if the source must limit hourly throughput to limit ambient impacts to below acceptable levels, an hourly monitoring requirement must also be incorporated. The applicant must provide: Emission limits Operational Requirements Monitoring Requirements These limitations must prevent: PSD from being triggered; violations of the toxic air pollutant increments; and violations of the National Ambient Air Quality Standards. 15-Day Pre-permit Construction Approval 13

14 6. DETERMINE FACILITY S CLASSIFICATION Facilities subject to Prevention of Significant Deterioration (BACT, increment consumption analysis, monitoring, etc.) requirements may not utilize the 213" Rule. For this and subsequent Title V permitting purposes, the facility s classification must be determined. In order to determine a facility s classification the Potential to Emit (IDAPA ) must be determined. In listing the facility s classification, the following convention should be used: Designated: yes no If yes, give category: Give Potential to Emit: tons per year Give Pollutant which defines Potential to Emit: The application must clearly specify whether the existing facility is PSD major or PSD minor and whether the modification to the existing facility is a major modification. Detailed emission inventories are required for all proposed equipment and/or modified equipment. 7. AMBIENT IMPACT ASSESSMENT All ambient impact assessments must be conducted in accordance with a DEQ approved modeling protocol. The protocol must be approved prior to submitting the application. It is required that an ambient air quality modeling protocol be submitted to DEQ at least two (2) weeks before the Pre-Permit Construction approval application is submitted. Contact DEQ s Air Quality Modeling Coordinator at (208) for information about the protocol. The applicant should also review DEQ s Air Quality Modeling Guideline at A scaled plot plan showing emission release locations, nearby buildings, property lines, fence lines, and roads is required (Section 9.1.2(b), Guideline on Air Quality Models (EPA 2001)). The dimensions of the buildings (height, width, and length) should be noted either on the plot plan or in a table in the report. If building dimensions are listed in a table format, then it should be easy to crossreference between the plot plan, model input file, and table Day Pre-permit Construction Approval

COMMONWEALTH OF MASSACHUSETTS DEPARTMENT OF ENVIRONMENTAL PROTECTION 310 CMR 7.00 AIR POLLUTION CONTROL REGULATIONS

COMMONWEALTH OF MASSACHUSETTS DEPARTMENT OF ENVIRONMENTAL PROTECTION 310 CMR 7.00 AIR POLLUTION CONTROL REGULATIONS COMMONWEALTH OF MASSACHUSETTS DEPARTMENT OF ENVIRONMENTAL PROTECTION 310 CMR 7.00 AIR POLLUTION CONTROL REGULATIONS 310 CMR 7.00 APPENDIX B U EMISSION BANKING, TRADING AND AVERAGING 310 CMR 7.00: Appendix

More information

Air Quality PERMIT TO CONSTRUCT

Air Quality PERMIT TO CONSTRUCT Air Quality PERMIT TO CONSTRUCT Permittee Chobani Idaho, Inc. Permit Number P-2012.0003 Project ID 60981 Facility ID 083-00138 Facility Location Permit Authority 3450 Kimberly Road East Twin Falls, ID

More information

Site Identification No.: 197809AAO Application No.: 15030051

Site Identification No.: 197809AAO Application No.: 15030051 Project Summary for a Construction Permit Application from Midwest Generation for a Natural Gas Conversion Project for the Joliet Electric Generating Station Joliet, Illinois Site Identification No.: 197809AAO

More information

Air Permitting in Colorado. Martha Hyder Wind River Environmental Group LLC September 2013

Air Permitting in Colorado. Martha Hyder Wind River Environmental Group LLC September 2013 Air Permitting in Colorado Martha Hyder Wind River Environmental Group LLC September 2013 Overview O Background (pollutants) O Federal permitting regulations O Colorado permitting regulations O Colorado

More information

Summary Fact Sheet for WEB Trading Program: Monitoring, Recordkeeping and Reporting

Summary Fact Sheet for WEB Trading Program: Monitoring, Recordkeeping and Reporting Summary Fact Sheet for WEB Trading Program: Monitoring, Recordkeeping and Reporting The monitoring provisions for the WEB trading program balance the need for accurate monitoring to provide certainty for

More information

ADEM Form 103 01/10 m5

ADEM Form 103 01/10 m5 ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT AIR DIVISION INSTRUCTIONS FOR COMPLETION OF FACILITY IDENTIFICATION FORM ADEM 103 This form is to be completed in duplicate for each facility operated by

More information

A Guide to Calculating Your Boiler Emissions. A step-by-step manual for your convenience

A Guide to Calculating Your Boiler Emissions. A step-by-step manual for your convenience A Guide to Calculating Your Boiler Emissions A step-by-step manual for your convenience Contents The Importance of Emissions Calculations... 3 Why You Need to Calculate Your Boiler Emissions... 4 The Newest

More information

Part I GENERAL CONDITIONS. 1. Any activities not identified in the application are not authorized by this permit.

Part I GENERAL CONDITIONS. 1. Any activities not identified in the application are not authorized by this permit. Page 2 of 9 Part I GENERAL CONDITIONS 1. Any activities not identified in the application are not authorized by this permit. 2. The permittee shall at all times maintain in good working order and operate

More information

Regulation No. 34. Emission Banking and Trading Program

Regulation No. 34. Emission Banking and Trading Program Regulation No. 34 Emission Banking and Trading Program (10/6/97) Section 1. PROGRAM OVERVIEW The purpose of this regulation is to establish a voluntary emission banking and trading program. Participation

More information

STATE OF MISSOURI, DEPARTMENT OF NATURAL RESOURCES MISSOURI AIR CONSERVATION COMMISSION PERMIT TO CONSTRUCT

STATE OF MISSOURI, DEPARTMENT OF NATURAL RESOURCES MISSOURI AIR CONSERVATION COMMISSION PERMIT TO CONSTRUCT --.--~.-------------------------------- STATE OF MISSOURI, DEPARTMENT OF NATURAL RESOURCES MISSOURI AIR CONSERVATION COMMISSION PERMIT TO CONSTRUCT Under the authority of RSMo 643 and the Federal Clean

More information

2. Do I have to certify? 1. What is the ERP Installation Compliance Certification? 3. How do I submit a Compliance Certification?

2. Do I have to certify? 1. What is the ERP Installation Compliance Certification? 3. How do I submit a Compliance Certification? Compliance Certification Instructions Emergency Engines and Emergency Turbines 1. What is the ERP Installation Compliance Certification? Operators of new emergency engines with a rated power output equal

More information

STATE OF CONNECTICUT DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF AIR MANAGEMENT

STATE OF CONNECTICUT DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF AIR MANAGEMENT Page 1 of 7 STATE OF CONNECTICUT DEPARTMENT OF ENVIRONMENTAL PROTECTION NEW SOURCE REVIEW PERMIT TO CONSTRUCT AND OPERATE A STATIONARY SOURCE Issued pursuant to Title 22a of the Connecticut General Statutes

More information

(b) One (1) natural gas-fired boiler identified as B1, with a maximum heat input rate of 4.6 million (MM) British thermal units (Btu) per hour;

(b) One (1) natural gas-fired boiler identified as B1, with a maximum heat input rate of 4.6 million (MM) British thermal units (Btu) per hour; Brandon S. Erlacher Elkhart Truth Publishing Company 421 South Second Street Elkhart, IN 46516 Re: Registered Operation Status, 039-11783-00269 Dear Mr. Erlacher: The application from Elkhart Truth Publishing

More information

New Jersey s Air Toxics Program

New Jersey s Air Toxics Program New Jersey s Air Toxics Program Olga Boyko NJ Dept. of Environmental Protection Division of Air Quality MARAMA Air Toxics Workshop August 21, 2012 1 In developing an air toxics program, NJ took a multi-pronged

More information

INDUSTRIAL BOILER MACT FACTSHEET

INDUSTRIAL BOILER MACT FACTSHEET INDUSTRIAL BOILER MACT FACTSHEET The National Emission Standards for Hazardous Air Pollutants (NESHAP) for Industrial/Commercial/Institutional Boilers and Process Heaters (40 CFR Part 63, Subpart DDDDD),

More information

CONSTRUCTION PERMIT OFFICE OF AIR MANAGEMENT. Lone Star Industries, Inc. 3301 South County Road 150 West Greencastle, Indiana 46135

CONSTRUCTION PERMIT OFFICE OF AIR MANAGEMENT. Lone Star Industries, Inc. 3301 South County Road 150 West Greencastle, Indiana 46135 CONSTRUCTION PERMIT OFFICE OF AIR MANAGEMENT Lone Star Industries, Inc. 3301 South County Road 150 West 46135 (herein known as the Permittee) is hereby authorized to construct the facilities listed in

More information

TECHNICAL BRIEFING SHEET NRG Texas Power LLC Permit No.: HAP-14

TECHNICAL BRIEFING SHEET NRG Texas Power LLC Permit No.: HAP-14 TECHNICAL BRIEFING SHEET NRG Texas Power LLC Permit No.: HAP-14 PROJECT DESCRIPTION: NRG Texas Power LLC (NRG Texas) has requested a Hazardous Air Pollutant (HAP) Major Source [FCAA 112(g)] Permit HAP-14,

More information

Connecticut Department of Energy and Environmental Protection

Connecticut Department of Energy and Environmental Protection Connecticut Department of Energy and Environmental Protection Connecticut s 1-Hour Sulfur Dioxide (SO 2 ) NAAQS Analysis and Management Strategy April 24, 2013 R/S/L Modelers Work Shop Dallas, TX Sam Sampieri

More information

Common Compliance Violations. The state belongs to all of us - "Kansas Don't Spoil It"

Common Compliance Violations. The state belongs to all of us - Kansas Don't Spoil It Common Compliance Violations The state belongs to all of us - "Kansas Don't Spoil It" The importance of compliance.. Take care of the environment, avoid additional inspections, and potential fines. Kansas

More information

Oil and Gas Air Quality Regulations and Permitting

Oil and Gas Air Quality Regulations and Permitting Oil and Gas Air Quality Regulations and Permitting Adam Berig Olsson Associates Colorado Springs Oil and Gas Committee Presentation February 2012 Who Regulates Air Quality? United States Environmental

More information

Texas Commission on Environmental Quality Page 1 Chapter 117 - Control of Air Pollution from Nitrogen Compounds

Texas Commission on Environmental Quality Page 1 Chapter 117 - Control of Air Pollution from Nitrogen Compounds Texas Commission on Environmental Quality Page 1 SUBCHAPTER G: GENERAL MONITORING AND TESTING REQUIREMENTS DIVISION 1: COMPLIANCE STACK TESTING AND REPORT REQUIREMENTS 117.8000, 117.8010 Effective June

More information

AIR EMISSION PERMIT NO. 13100005-003 IS ISSUED TO MULTEK FLEXIBLE CIRCUITS INC

AIR EMISSION PERMIT NO. 13100005-003 IS ISSUED TO MULTEK FLEXIBLE CIRCUITS INC AIR EMISSION PERMIT NO. 13100005-003 IS ISSUED TO MULTEK FLEXIBLE CIRCUITS INC Multek Flexible Circuits Inc.-Sheldahl Road East and West Buildings 1150 Sheldahl Road and 805 North Highway 3 Northfield,

More information

Subpart I Delaware. 40 CFR Ch. I (7 1 98 Edition) (10) Amendments to Section V (Surveillance)

Subpart I Delaware. 40 CFR Ch. I (7 1 98 Edition) (10) Amendments to Section V (Surveillance) 52.420 Subpart I Delaware 52.420 Identification of plan. (a) Title of plan: State of Delaware Implementation Plans for Attainment and Maintenance of National Ambient Air Quality Standards. (b) The plan

More information

Certified Mail 6/8/2011. Roger Brown Chrysler Group LLC - Toledo North Assembly 4400 Chrysler Drive Toledo, OH 43608-4000

Certified Mail 6/8/2011. Roger Brown Chrysler Group LLC - Toledo North Assembly 4400 Chrysler Drive Toledo, OH 43608-4000 6/8/2011 Certified Mail Roger Brown 4400 Chrysler Drive Toledo, OH 43608-4000 RE: DRAFT AIR POLLUTION PERMIT-TO-INSTALL Permit Type: Administrative Modification County: Lucas Dear Permit Holder: No No

More information

NEW SOURCE REVIEW PERMIT TO CONSTRUCT AND OPERATE A STATIONARY SOURCE

NEW SOURCE REVIEW PERMIT TO CONSTRUCT AND OPERATE A STATIONARY SOURCE Page 1 of 9 STATE OF CONNECTICUT DEPARTMENT OF ENVIRONMENTAL PROTECTION NEW SOURCE REVIEW PERMIT TO CONSTRUCT AND OPERATE A STATIONARY SOURCE Issued pursuant to Title 22a of the Connecticut General Statutes

More information

Synthetic Minor Determination and/or Netting Determination Permit To Install: 03-17134

Synthetic Minor Determination and/or Netting Determination Permit To Install: 03-17134 A. Source Description Synthetic Minor Determination and/or Netting Determination Permit To Install: 03-17134 This permit encompasses the equipment used for a batch-mix asphalt plant of 150 tons per hour

More information

Tesoro Savage Vancouver Energy Distribution Terminal August 2013 Application No. 2013-01 Page 2-162

Tesoro Savage Vancouver Energy Distribution Terminal August 2013 Application No. 2013-01 Page 2-162 Crude Oil Storage Tanks The Facility includes six 360,000-bbl capacity crude oil storage tanks, each with a working capacity of approximately 340,000 bbl These tanks are subject to an NSPS that applies

More information

ENVIRONMENTAL PROTECTION AGENCY. 40 CFR Part 52. [EPA-R06-OAR-2015-0783; FRL-9940-79-Region 6]

ENVIRONMENTAL PROTECTION AGENCY. 40 CFR Part 52. [EPA-R06-OAR-2015-0783; FRL-9940-79-Region 6] This document is scheduled to be published in the Federal Register on 01/11/2016 and available online at http://federalregister.gov/a/2015-33098, and on FDsys.gov 6560-50-P ENVIRONMENTAL PROTECTION AGENCY

More information

BAAQMD Proposed NSR Changes: Case Study for PSD Applicability

BAAQMD Proposed NSR Changes: Case Study for PSD Applicability BAAQMD Proposed NSR Changes: Case Study for PSD Applicability Oakland, CA April 5, 2012 Melissa Hillman, Managing Consultant Objectives Highlight key PSD Applicability Principles Calculation Basis Review

More information

Guidance and Reporting Instructions on Temporary E-reporting for the MATS Rule

Guidance and Reporting Instructions on Temporary E-reporting for the MATS Rule Guidance and Reporting Instructions on Temporary E-reporting for the MATS Rule As explained in the interim MATS e-reporting rule, which was signed by the Administrator on March 9, 2015, the EPA plans to

More information

Notice of Decision: Approval Effective Immediately

Notice of Decision: Approval Effective Immediately INDIANA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT We Protect Hoosiers and Our Environment. 100 N. Senate Avenue Indianapolis, IN 46204 (800) 451-6027 (317) 232-8603 www.idem.in.gov Michael R. Pence Thomas

More information

Addition of general construction conditions applicable to the portable emergency turbine because they were omitted from the original Part 70 Permit.

Addition of general construction conditions applicable to the portable emergency turbine because they were omitted from the original Part 70 Permit. Ms. Heather N. Frosch Midwestern Gas Transmission P.O. Box 2511 Houston, Texas 77252-2511 Re: 153-11686 First Significant Permit Modification to Part 70 No.: T153-5975-00006 Dear Ms. Frosch: Midwestern

More information

Statement of Basis SCA Tissue North America, LLC. 701-0055

Statement of Basis SCA Tissue North America, LLC. 701-0055 Statement of Basis SCA Tissue North America, LLC. 701-0055 On December 26, 2012, the Department received SCA Tissue North America, LLC renewal Title V application. SCA is considered a major source for

More information

DRAFT White Paper Asphalt (non-permitted) Strategy Evaluation Portland Air Toxics Solutions

DRAFT White Paper Asphalt (non-permitted) Strategy Evaluation Portland Air Toxics Solutions DRAFT White Paper Asphalt (non-permitted) Strategy Evaluation Portland Air Toxics Solutions Table of Contents Introduction... 2 I. SOURCE CATEGORY: Asphalt (non-permitted)... 3 A. Source Category Description...3

More information

ENVIRONMENTAL PROTECTION AGENCY. 40 CFR Part 52. [EPA-R06-OAR-2013-0388; FRL- 9935-08-Region 6]

ENVIRONMENTAL PROTECTION AGENCY. 40 CFR Part 52. [EPA-R06-OAR-2013-0388; FRL- 9935-08-Region 6] This document is scheduled to be published in the Federal Register on 10/06/2015 and available online at http://federalregister.gov/a/2015-25337, and on FDsys.gov 6560-50-P ENVIRONMENTAL PROTECTION AGENCY

More information

Methane Emissions and Colorado Coal Mines

Methane Emissions and Colorado Coal Mines Colorado PUC E-Filings System Methane Emissions and Colorado Coal Mines Will Allison, Director Air Pollution Control Division 7/6/2012 Colorado PUC, CIM, 7/9/2013 1 GHG GWP and CO2e Global Warming Potential

More information

New Hampshire Code of Administrative Rules Env-A 3100

New Hampshire Code of Administrative Rules Env-A 3100 Disclaimer: The rules on this page are provided for the convenience of interested parties. While DES has taken care with the accuracy of the files accessible here, they are not necessarily the "official"

More information

GUIDELINES FOR SOURCE TESTING

GUIDELINES FOR SOURCE TESTING GUIDELINES FOR SOURCE TESTING Created August 12, 2011 Revised October 03, 2013 Source Testing Guidelines Rev. 2 TABLE OF CONTENTS 1.0 INTRODUCTION...6 1.1 Purpose...6 1.2 Application...6 1.3 Revisions...6

More information

EPA Requirements for Diesel Standby Engines In Data Centers. Bob Stelzer / CTO / Safety Power Inc. For 7x24 Fall 2014 Conference. 1.

EPA Requirements for Diesel Standby Engines In Data Centers. Bob Stelzer / CTO / Safety Power Inc. For 7x24 Fall 2014 Conference. 1. EPA Requirements for Diesel Standby Engines In Data Centers Bob Stelzer / CTO / Safety Power Inc For 7x24 Fall 2014 Conference 1.0 Introduction In order to get the Air Emissions Permit for facilities that

More information

NEW SOURCE REVIEW PERMIT TO CONSTRUCT AND OPERATE A STATIONARY SOURCE

NEW SOURCE REVIEW PERMIT TO CONSTRUCT AND OPERATE A STATIONARY SOURCE Page 1 of 7 STATE OF CONNECTICUT DEPARTMENT OF ENVIRONMENTAL PROTECTION NEW SOURCE REVIEW PERMIT TO CONSTRUCT AND OPERATE A STATIONARY SOURCE Issued pursuant to Title 22a of the Connecticut General Statues

More information

Addition of general construction conditions applicable to the portable emergency turbine because they were omitted from the original Part 70 Permit.

Addition of general construction conditions applicable to the portable emergency turbine because they were omitted from the original Part 70 Permit. Ms. Heather N. Frosch Midwestern Gas Transmission P.O. Box 2511 Houston, Texas 77252-2511 Re: 125-11685 First Significant Permit Modification to Part 70 No.: T 125-5976-00004 Dear Ms. Frosch: Midwestern

More information

Wolverine Clean Energy Venture

Wolverine Clean Energy Venture Prepared for: Wolverine Power Supply Cooperative Cadillac, Michigan Supplement to CAA Section 112(g) MACT Auxiliary Boiler Amended Application No. 317-07 Wolverine Clean Energy Venture Rogers City, MI

More information

Part 4: How to Avoid Being a Title V Major Source

Part 4: How to Avoid Being a Title V Major Source Part 4: How to Avoid Being a Title V Major Source Many smaller sources of air pollution have a high PTE but have actual emissions well below the Title V major source thresholds. If your PTE makes you a

More information

Continuous Monitoring Manual

Continuous Monitoring Manual January, 1992 Revisions: April, 2015 Operations Division 811 SW 6 th Avenue Portland, OR 97204 Phone: 503-229-5696 800-452-4011 Fax: 503-229-5850 Contact: Jill Inahara www.oregon.gov/deq DEQ is a leader

More information

Certified Mail 6/15/2012. Robert Mouk Storopack Inc. 4758 Devitt Drive Cincinnati, OH 45246

Certified Mail 6/15/2012. Robert Mouk Storopack Inc. 4758 Devitt Drive Cincinnati, OH 45246 6/15/2012 Robert Mouk 4758 Devitt Drive Cincinnati, OH 45246 RE: FINALAIR POLLUTION PERMIT-TO-INSTALL AND OPERATE Permit Type: Initial Installation County: Butler Certified Mail No TOXIC REVIEW No PSD

More information

Assessing the Changes Required by the Industrial Boiler MACT Regulations

Assessing the Changes Required by the Industrial Boiler MACT Regulations Technical Paper MS-17 Assessing the Changes Required by the Industrial Boiler MACT Regulations Authors: A.L. LeClair L.M. McDermitt Babcock & Wilcox Power Generation Group, Inc. Barberton, Ohio, U.S.A

More information

EPA GUIDELINE ON DATA HANDLING CONVENTIONS FOR THE 8-HOUR OZONE NAAQS

EPA GUIDELINE ON DATA HANDLING CONVENTIONS FOR THE 8-HOUR OZONE NAAQS United States Office of Air Quality EPA-454/R-98-017 Environmental Protection Planning and Standards December 1998 Agency Research Triangle Park, NC 27711 Air EPA GUIDELINE ON DATA HANDLING CONVENTIONS

More information

Fuel Burning Equipment. Maximum Firing Rate (gal/hr)

Fuel Burning Equipment. Maximum Firing Rate (gal/hr) A-806-71-B-A ) Amendment #1 After review of the air emissions license amendment application, staff investigation reports and other documents in the applicant s file in the Bureau of Air Quality, pursuant

More information

AIR EMISSION PERMIT NO. 13700318-003 Major Amendment IS ISSUED TO. Mesabi Nugget Delaware LLC Steel Dynamics Inc

AIR EMISSION PERMIT NO. 13700318-003 Major Amendment IS ISSUED TO. Mesabi Nugget Delaware LLC Steel Dynamics Inc AIR EMISSION PERMIT NO. 13700318-003 Major Amendment IS ISSUED TO Mesabi Nugget Delaware LLC Steel Dynamics Inc MESABI NUGGET DELAWARE LLC 6500 Hwy 135 Aurora, St. Louis County, MN 55750 The emission units,

More information

ADEQ MINOR SOURCE AIR PERMIT

ADEQ MINOR SOURCE AIR PERMIT ADEQ MINOR SOURCE AIR PERMIT Permit #: IS ISSUED TO: Farr Company 3501 Airport Rd. Jonesboro, AR 72401 Craighead County CSN: THIS PERMIT IS YOUR AUTHORITY TO CONSTRUCT, MODIFY, OPERATE, AND/OR MAINTAIN

More information

Approval Order: New Approval Order for a Produced Water Treatment Facility Project Number: N14185-0003

Approval Order: New Approval Order for a Produced Water Treatment Facility Project Number: N14185-0003 Department of Environmental Quality State of Utah GARY R. HERBERT Governor Amanda Smith Executive Director DIVISION OF AIR QUALITY Bryce C. Bird Director SPENCER J. COX Lieutenant Governor DAQE-AN141850003-14

More information

Emissions Control - Designing a New Source Review Permits Northwest Environmental Project

Emissions Control - Designing a New Source Review Permits Northwest Environmental Project Defending New Source Review Permits Northwest Environmental Conference and Trade Show Portland, Oregon December 4 th & 5 th 2012 Alyssa Moir K & L Gates LLP Environmental, Land Use, and Natural Resources

More information

Top Ten Mistakes In Title V Deviation and Certification Reports

Top Ten Mistakes In Title V Deviation and Certification Reports Top Ten Mistakes In Title V Deviation and Certification Reports M A U R E E N N. H A R B O U R T K E A N M I L L E R L L P B A T O N R O U G E N E W O R L E A N S L A K E C H A R L E S P L A Q U E M I

More information

UTAH STATE IMPLEMENTATION PLAN SECTION XIX SMALL BUSINESS ASSISTANCE PROGRAM

UTAH STATE IMPLEMENTATION PLAN SECTION XIX SMALL BUSINESS ASSISTANCE PROGRAM UTAH STATE IMPLEMENTATION PLAN SECTION XIX SMALL BUSINESS ASSISTANCE PROGRAM Adopted by the Utah Air Quality Board December 18, 1992 UTAH STATE IMPLEMENTATION PLAN SECTION XIX SMALL BUSINESS ASSISTANCE

More information

California s Cap-and-Trade Voluntary Renewable Electricity Program

California s Cap-and-Trade Voluntary Renewable Electricity Program California s Cap-and-Trade Voluntary Renewable Electricity Program Cap-and-Trade Overview Outline Purpose of the Voluntary Renewable Electricity Account (VRE) Holding Account VRE Program Requirements Application

More information

State of the Art (SOTA) Manual for Boilers and Process Heaters

State of the Art (SOTA) Manual for Boilers and Process Heaters State of the Art (SOTA) Manual for Boilers and Process Heaters Original Date: July 1997 Revision Date: February 22, 2004 State of New Jersey Department of Environmental Protection Air Quality Permitting

More information

Potential to Emit A Guide for Small Businesses

Potential to Emit A Guide for Small Businesses 1EPA United States Office of Air Quality EPA-456/B-98-003 Environmental Protection Planning and Standards October 1998 Agency Research Triangle Park, NC Potential to Emit A Guide for Small Businesses EPA-456/B-98-003

More information

Phoenix Process Engineering, Inc. Project Experience Helping Clients Achieve MACT Compliance

Phoenix Process Engineering, Inc. Project Experience Helping Clients Achieve MACT Compliance Phoenix Process Engineering, Inc. Project Experience Helping Clients Achieve MACT Compliance The Boiler MACT, 40 CFR 63, Subpart DDDDD, was vacated in 2007 by the U.S Court of Appeals and the 2004 rule

More information

Environmental Protection Agency 71.9

Environmental Protection Agency 71.9 Environmental Protection Agency 71.9 (c) Waiver of notice requirements. The Administrator may waive the requirements of paragraph (a) of this section for any category of sources (including any class, type,

More information

PART 70 PERMIT TO OPERATE

PART 70 PERMIT TO OPERATE G Missouri Department of Natural Resources ~ ~ ~ Air Pollution Control Program PART 70 PERMIT TO OPERATE Under the authority of RSMo 643 and the Federal Clean Air Act the applicant is authorized to operate

More information

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGION 4 ATLANTA FEDERAL CENTER 61 FORSYTH STREET ATLANTA, GEORGIA 30303-8960.

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGION 4 ATLANTA FEDERAL CENTER 61 FORSYTH STREET ATLANTA, GEORGIA 30303-8960. UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGION 4 ATLANTA FEDERAL CENTER 61 FORSYTH STREET ATLANTA, GEORGIA 30303-8960 May 19,1999 4APT-ARB Mr. Randy C. Poole Air Hygienist II Mecklenburg County Department

More information

TECHNICAL SUPPORT DOCUMENT For DRAFT/PROPOSED AIR EMISSION PERMIT NO. 07500003 008

TECHNICAL SUPPORT DOCUMENT For DRAFT/PROPOSED AIR EMISSION PERMIT NO. 07500003 008 TECHNICAL SUPPORT DOCUMENT For DRAFT/PROPOSED AIR EMISSION PERMIT NO. 07500003 008 This technical support document (TSD) is intended for all parties interested in the draft/proposed permit and to meet

More information

REGULATORY ANALYSIS. February 11, 2014. Colorado Department of Public Health and Environment

REGULATORY ANALYSIS. February 11, 2014. Colorado Department of Public Health and Environment REGULATORY ANALYSIS for Proposed Revisions to Colorado Air Quality Control Commission Regulation Numbers 3, 6 and 7 (5 CCR 1001-5, 5 CCR 1001-8, and CCR 1001-9) February 11, 2014 Colorado Department of

More information

Point Source Emission Inventory For Non-Electric Companies in Georgia

Point Source Emission Inventory For Non-Electric Companies in Georgia Improvements in the Point Source Emissions Inventory for Georgia Jaemeen Baek, Alper Unal, Di Tian, and Armistead Russell Georgia Institute of Technology, School of Civil and Environmental Engineering

More information

(2) The Compliance Determination Requirements in Section D of this permit; (3) The Compliance Monitoring Requirements in Section D of this permit;

(2) The Compliance Determination Requirements in Section D of this permit; (3) The Compliance Monitoring Requirements in Section D of this permit; Mr. Alan Brittingham Arvin Exhaust, OEM, Technical Center Route 450 South Walesboro, IN 47201 Re: AT 005-11038-00080 First Administrative Amendment to Part 70 005-7482-00080 Dear Mr. Brittingham: Arvin

More information

DEPARTMENT ADMINISTRATIVE ORDER No. 2016-

DEPARTMENT ADMINISTRATIVE ORDER No. 2016- DEPARTMENT ADMINISTRATIVE ORDER No. 2016- SUBJECT : ACCREDITATION OF THIRD PARTY CONTINUOUS EMISSION MONITORING SYSTEMS (CEMS) AND CONTINUOUS OPACITY MONITORING SYSTEMS (COMS) TEST AUDIT FIRMS PURSUANT

More information

2010 MARINE ENGINE GRANT PROGRAM

2010 MARINE ENGINE GRANT PROGRAM 2010 MARINE ENGINE GRANT PROGRAM GUIDELINES FOR REQUEST FOR PROPOSALS GRANT APPLICATION June 11, 2010 San Luis Obispo County Air Pollution Control District 3433 Roberto Court San Luis Obispo, California

More information

Air Pollution - 1940s, 1950s. Air Pollution Laws 1950s

Air Pollution - 1940s, 1950s. Air Pollution Laws 1950s Air Pollution - 1940s, 1950s 1940s: Smog severe in Los Angeles 1947: Los Angeles Air Pollution Control District forms 1948: Donora, Pennsylvania smog disaster 1949: National symposium on air pollution

More information

Appendix 5A: Natural Gas Use in Industrial Boilers

Appendix 5A: Natural Gas Use in Industrial Boilers Appendix 5A: Natural Gas Use in Industrial Boilers Industrial boilers consumed 2.1 Tcf of natural gas in 2006, accounting for 36% of total natural gas in manufacturing. 1 In this appendix, we provide further

More information

STATE OF MISSOURI DEPARTMENT OF NATURAL RESOURCES MISSOURI AIR CONSERVATION COMMISSION PERMIT TO CONSTRUCT

STATE OF MISSOURI DEPARTMENT OF NATURAL RESOURCES MISSOURI AIR CONSERVATION COMMISSION PERMIT TO CONSTRUCT STATE OF MISSOURI flle COPl DEPARTMENT OF NATURAL RESOURCES MISSOURI AIR CONSERVATION COMMISSION PERMIT TO CONSTRUCT Under the authority of RSMo 643 and the Federal Clean Air Act the applicant is authorized

More information

Small Business Stationary Sources and Technical Assistance Programs by the EPA

Small Business Stationary Sources and Technical Assistance Programs by the EPA GUIDELINES FOR IMPLEMENTATION OF SECTION 507 OF THE 1990 CLEAN AIR ACT AMENDMENTS FINAL GUIDELINES U.S. EPA Office of Air Quality Planning and Standards Office of Air and Radiation Research Triangle Park,

More information

a GAO-05-289 GAO ENVIRONMENTAL JUSTICE EPA Should Devote More Attention to Environmental Justice When Developing Clean Air Rules

a GAO-05-289 GAO ENVIRONMENTAL JUSTICE EPA Should Devote More Attention to Environmental Justice When Developing Clean Air Rules GAO July 2005 United States Government Accountability Office Report to the Ranking Member, Subcommittee on Environment and Hazardous Materials, Committee on Energy and Commerce, House of Representatives

More information

GUIDELINES FOR PROCESSING AND USING REFUSE DERIVED FUEL (RDF) IN CEMENT INDUSTRY

GUIDELINES FOR PROCESSING AND USING REFUSE DERIVED FUEL (RDF) IN CEMENT INDUSTRY 1 GUIDELINES FOR PROCESSING AND USING REFUSE DERIVED FUEL (RDF) IN CEMENT INDUSTRY August, 2012 Government of Pakistan Pakistan Environmental Protection Agency (Ministry of Climate Change) Islamabad 2

More information

A GUIDANCE NOTE ON THE BEST PRACTICABLE MEANS FOR ELECTRICITY WORKS BPM 7/1 (2014)

A GUIDANCE NOTE ON THE BEST PRACTICABLE MEANS FOR ELECTRICITY WORKS BPM 7/1 (2014) A GUIDANCE NOTE ON THE BEST PRACTICABLE MEANS FOR ELECTRICITY WORKS (COAL-FIRED PLANT, GAS-FIRED GAS TURBINE, AND OIL-FIRED GAS TURBINE (PEAK LOPPING PLANT)) BPM 7/1 (2014) Environmental Protection Department

More information

Instructions for Reporting 2016 TSCA Chemical Data Reporting. U.S. Environmental Protection Agency Office of Pollution Prevention and Toxics

Instructions for Reporting 2016 TSCA Chemical Data Reporting. U.S. Environmental Protection Agency Office of Pollution Prevention and Toxics Instructions for Reporting 2016 TSCA Chemical Data Reporting U.S. Environmental Protection Agency Office of Pollution Prevention and Toxics May 13, 2016 DOCUMENT HISTORY Document Date March 21, 2016 April

More information

Air Quality Regulation of the Oil and Gas Production Sector in Colorado and Beyond. Garry Kaufman Holland & Hart LLP

Air Quality Regulation of the Oil and Gas Production Sector in Colorado and Beyond. Garry Kaufman Holland & Hart LLP Air Quality Regulation of the Oil and Gas Production Sector in Colorado and Beyond Garry Kaufman Holland & Hart LLP 1 Important Information This presentation is similar to any other legal education presentation

More information

SRBC STAFF RECOMMENDED DRAFT OF PROPOSED RULEMAKING REDLINE VERSION MAY 25, 2010

SRBC STAFF RECOMMENDED DRAFT OF PROPOSED RULEMAKING REDLINE VERSION MAY 25, 2010 SRBC STAFF RECOMMENDED DRAFT OF PROPOSED RULEMAKING REDLINE VERSION MAY 25, 2010 To be considered at the June 11, 2010, Commission Meeting SUBJECT TO CHANGE TITLE 18--CONSERVATION OF POWER AND WATER RESOURCES

More information

FINAL DRAFT: July 1999. Appendix E METHODOLOGY FOR EMPLOYMENT IMPACTS ANALYSIS

FINAL DRAFT: July 1999. Appendix E METHODOLOGY FOR EMPLOYMENT IMPACTS ANALYSIS Appendix E METHODOLOGY FOR EMPLOYMENT IMPACTS ANALYSIS Appendix E METHODOLOGY FOR EMPLOYMENT IMPACTS ANALYSIS INTRODUCTION The HWC MACT standards are likely to cause sectoral shifts in employment. As specific

More information

Reproduction of Permit Terms and Conditions

Reproduction of Permit Terms and Conditions Page 1 of 5 Facility ID: 0536010011 Issuance type: Final State Permit To Operate This version of facility specific terms and conditions was converted from a database format to an HTML file during an upgrade

More information

Haulsey Engineering, Inc. Quality Management System (QMS) Table of Contents

Haulsey Engineering, Inc. Quality Management System (QMS) Table of Contents Haulsey Engineering, Inc. Quality Management System (QMS) Table of Contents 1.0 Introduction 1.1 Quality Management Policy and Practices 2.0 Quality System Components 2.1 Quality Management Plans 2.2 Quality

More information

Technical Guidance for Offset Verifiers Verification of Offset Project Data Reports:

Technical Guidance for Offset Verifiers Verification of Offset Project Data Reports: Technical Guidance for Offset Verifiers Verification of Offset Project Data Reports: California Air Resources Board Stationary Source Division Climate Change Program Evaluation Branch October 2013 Page

More information

ENVIRONMENTAL PROTECTION AGENCY. 40 CFR Part 52. [EPA-R06-OAR-2013-0808; FRL-9932-50-Region 6]

ENVIRONMENTAL PROTECTION AGENCY. 40 CFR Part 52. [EPA-R06-OAR-2013-0808; FRL-9932-50-Region 6] This document is scheduled to be published in the Federal Register on 09/04/2015 and available online at http://federalregister.gov/a/2015-22035, and on FDsys.gov 6560-50-P ENVIRONMENTAL PROTECTION AGENCY

More information

CHAPTER 1200-3-20 LIMITS ON EMISSIONS DUE TO MALFUNCTIONS, START-UPS, AND SHUTDOWNS 1200-3-20-.01 PURPOSE

CHAPTER 1200-3-20 LIMITS ON EMISSIONS DUE TO MALFUNCTIONS, START-UPS, AND SHUTDOWNS 1200-3-20-.01 PURPOSE 1200-3-20-.01 PURPOSE CHAPTER 1200-3-20 LIMITS ON EMISSIONS DUE TO MALFUNCTIONS, START-UPS, AND SHUTDOWNS (1) The purpose of this chapter is to place reasonable limits on the amount of emissions an air

More information

EPA Can Strengthen Its Reviews of Small Particle Monitoring in Region 6 to Better Ensure Effectiveness of Air Monitoring Network

EPA Can Strengthen Its Reviews of Small Particle Monitoring in Region 6 to Better Ensure Effectiveness of Air Monitoring Network U.S. ENVIRONMENTAL PROTECTION AGENCY OFFICE OF INSPECTOR GENERAL Air Quality EPA Can Strengthen Its Reviews of Small Particle Monitoring in Region 6 to Better Ensure Effectiveness of Air Monitoring Network

More information

Energy Efficiency Measurement & Verification

Energy Efficiency Measurement & Verification PJM Manual 18B: Energy Efficiency Measurement & Verification Revision: 02 Effective Date: 12/17/2015 Prepared by PJM Forward Market Operations PJM 2015 PJM 2008 Revision, Effective Date: i Table of Contents

More information

State of New Jersey. General Permit. For. Boilers and Heaters [Individually Less Than 10 MMBTU/HR]

State of New Jersey. General Permit. For. Boilers and Heaters [Individually Less Than 10 MMBTU/HR] State of New Jersey Department of Environmental Protection Air Quality Permitting General Permit For This General Permit allows for the construction, installation, reconstruction and operation of single

More information

ONTARIO REGULATION proposed to be made under the

ONTARIO REGULATION proposed to be made under the Caution: This draft regulation is provided solely to facilitate dialogue concerning its contents. Should the decision be made to proceed with the proposal, the comments received during consultation will

More information

QUESTIONS AND RESPONSES FROM JULY 21, 2011 TECHNOLOGY ADVANCEMENT PROGRAM WORKSHOP

QUESTIONS AND RESPONSES FROM JULY 21, 2011 TECHNOLOGY ADVANCEMENT PROGRAM WORKSHOP QUESTIONS AND RESPONSES FROM JULY 21, 2011 TECHNOLOGY ADVANCEMENT PROGRAM WORKSHOP July 27, 2011 1 SUMMARY OF QUESTIONS AND RESPONSES FROM JULY 21, 2011 TECHNOLOGY ADVANCEMENT PROGRAM WORKSHOP 1. QUESTION:

More information

4.09 THE IMPORTANCE OF BUILDING DOWNWASH IN ASSESSING THE NEED TO HEIGHTEN STACKS OF EXISTING SMALL AND MEDIUM SIZED INDUSTRIES

4.09 THE IMPORTANCE OF BUILDING DOWNWASH IN ASSESSING THE NEED TO HEIGHTEN STACKS OF EXISTING SMALL AND MEDIUM SIZED INDUSTRIES 4.09 THE IMPORTANCE OF BUILDING DOWNWASH IN ASSESSING THE NEED TO HEIGHTEN STACKS OF EXISTING SMALL AND MEDIUM SIZED INDUSTRIES João F. P. Gomes 1, Rogério Duarte 2 1 Centro de Tecnologias Ambientais,

More information

Worship Facility Matching Grant Program 2010 Program Manual

Worship Facility Matching Grant Program 2010 Program Manual Worship Facility Matching Grant Program 2010 Program Manual Chapter 1 Introduction TABLE OF CONTENTS 1 1 INTRODUCTION 4 1.1 DEFINITIONS... 4 1.2 PROGRAM GOALS... 4 1.3 PROGRAM PARTICIPANTS... 5 1.3.1 PROGRAM

More information

MEMORANDUM March 7, 2013. Phillip Fielder, P.E., Permits and Engineering Group Manager

MEMORANDUM March 7, 2013. Phillip Fielder, P.E., Permits and Engineering Group Manager DRAFT OKLAHOMA DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION MEMORANDUM March 7, 2013 TO: THROUGH: THROUGH: THROUGH: FROM: SUBJECT: Phillip Fielder, P.E., Permits and Engineering Group Manager

More information

Certified Mail 6/23/2014. Nathan Wheldon Humphreys Compressor Station 1515 Arapahoe St Tower 1, Suite 1600 Denver, CO 80202

Certified Mail 6/23/2014. Nathan Wheldon Humphreys Compressor Station 1515 Arapahoe St Tower 1, Suite 1600 Denver, CO 80202 John R. Kasich, Governor Mary Taylor, Lt. Governor Craig W. Butler, Director 6/23/2014 Certified Mail Nathan Wheldon 1515 Arapahoe St Tower 1, Suite 1600 Denver, CO 80202 RE: FINALAIR POLLUTION PERMIT-TO-INSTALL

More information

Emissions Uncertainty: Focusing on NOx Emissions from Electric Generating Units

Emissions Uncertainty: Focusing on NOx Emissions from Electric Generating Units Emissions Uncertainty: Focusing on NOx Emissions from Electric Generating Units Emily Wisner +, David Mobley *, George Pouliot * & Bill Hunt + + Statistics Department, North Carolina State University,

More information

ENVIRONMENTAL PROTECTION AGENCY. 40 CFR Part 52. [EPA-R06-OAR-2011-0864; FRL-9935-67-Region 6]

ENVIRONMENTAL PROTECTION AGENCY. 40 CFR Part 52. [EPA-R06-OAR-2011-0864; FRL-9935-67-Region 6] This document is scheduled to be published in the Federal Register on 10/15/2015 and available online at http://federalregister.gov/a/2015-26122, and on FDsys.gov 6560-50-P ENVIRONMENTAL PROTECTION AGENCY

More information

ESSENTIALS OF ENVIRONMENTAL LAW. Craig B. Simonsen, Paralegal Seyfarth Shaw LLP

ESSENTIALS OF ENVIRONMENTAL LAW. Craig B. Simonsen, Paralegal Seyfarth Shaw LLP ESSENTIALS OF ENVIRONMENTAL LAW Craig B. Simonsen, Paralegal Seyfarth Shaw LLP This presentation is based on Craig B. Simonsen s, Essentials of Environmental Law, 3 rd Ed. (Pearson Prentice Hall, 2007)

More information

State of Colorado Comments Docket ID No. EPA-HQ-OAR-2009-0234 and Docket ID No. EPA-HQ-OAR-2011-0044

State of Colorado Comments Docket ID No. EPA-HQ-OAR-2009-0234 and Docket ID No. EPA-HQ-OAR-2011-0044 U.S. Environmental Protection Agency EPA Docket Center (EPA/DC) Mail Code: 2822T 1200 Pennsylvania Ave., N.W. Washington, DC 20460 RE: State of Colorado Comments Docket ID No. EPA-HQ-OAR-2009-0234 and

More information

Air Quality Permit. SECTION I: Permitted Facilities. A. Plant Location:

Air Quality Permit. SECTION I: Permitted Facilities. A. Plant Location: Air Quality Permit Issued to: Barretts Minerals, Inc. Permit #1995-12 8625 MT HWY 91 South Administrative Amendment (AA) Dillon, MT 59725 Request Received: 03/16/04 Department Decision on AA: 05/05/04

More information

ENGINEERING EVALUATION/FACT SHEET

ENGINEERING EVALUATION/FACT SHEET west virginia department of environmental protection Division of Air Quality 601 57 th Street SE Charleston, WV 25304 Phone (304) 926-0475 FAX: (304) 926-0479 Earl Ray Tomblin, Governor Randy C. Huffman,

More information

EPA Emissions Rules for Boilers

EPA Emissions Rules for Boilers EPA Emissions Rules for Boilers The EPA has published two new rules for boilers in an effort to reduce emissions of air pollutants. The two rules are the Major Source Rule (also known as the Boiler MACT

More information

ATTAINMENT PROJECTIONS

ATTAINMENT PROJECTIONS ATTAINMENT PROJECTIONS Modeling is required to assess monitored exceedances of the PM10 NAAQS at all sites that cause the District to be classified as nonattainment for the 24-hour standard. Modeling is

More information