1 Northern New England Intercity Rail Initiative (NNEIRI) Public Meeting Pioneer Valley Planning Commission Springfield, MA 1/23/14 7:00 8:30 PM Paul Nelson, Manager of Corridor Planning for the Massachusetts Department of Transportation welcomed attendees. He said that a presentation will be made on a planning effort to improve intercity rail service within the New England Region and the public will be asked to provide input on it. Paul introduced Ron O Blenis, head of the HDR consultant team that is conducting the study on behalf of MassDOT and the Vermont Agency of Transportation. Ron gave a PowerPoint presentation that described the rail study currently underway. A summary of the presentation is provided below. Public comments received at the meeting are provided following the presentation summary. Presentation Summary The Northern New England Intercity Rail Initiative (NNEIRI) study is a partnership of the Massachusetts Department of Transportation and the Vermont Agency of Transportation with support from the Federal Railroad Administration and in collaboration with Connecticut Department of Transportation and the Ministère des Transports du Québec. The study will examine the potential for operation of more frequent and higher speed intercity passenger rail service on the Inland Route and the Boston-to- Montreal corridors. It will examine ridership potential, necessary incremental infrastructure improvements and will maximize the use of the existing rail corridor. Specific project outcomes will be a NEPA (National Environmental Policy Act) Tier 1 Environmental Assessment and a Service Development Plan for the corridor. The following draft Purpose statement and summary of needs was presented. Draft Purpose The purpose of the Northern New England Intercity Rail Initiative is to provide additional regional travel options through improvements to the level and quality of passenger rail service in the Corridor. The Corridor rail services would provide improved passenger rail transportation, connecting major cities in New England with smaller cities and rural areas and internationally to Montreal, to help meet future travel demands in the Study Area. The Project would create a competitive rail transportation alternative to the available automobile, bus, and air service by implementing more frequent and higher speed intercity passenger rail service. The study of the Corridor will focus on incremental infrastructure improvement alternatives that will seek to maximize the use of the existing rail lines along the Corridor.

2 Summary of Draft Needs Economic Opportunity Job Access Expanded transit options for Education Centers Tourism Responsive to Population and Demographics Changes transportation preferences Accommodate existing reliance on public transit Meet future increase in travel demand The total route is 470 miles and can be broken into three segments: Boston to Springfield, 99 miles, Springfield to Montreal, 309 miles and Springfield to New Haven, 62 miles. Segments of the rail corridor have six different owners. The owners along the corridor are: the Commonwealth of Massachusetts: 44 miles between Boston and Worcester, CSX: 55 Miles between Worcester and Springfield, Pan Am Southern: 49 miles between Springfield and the MA/VT border, New England Central Railroad: 206 miles between the MA/VT border and the U.S./Canada border, Canadian National Railroad: 53 miles from the U.S./Canada border to Montreal and AMTRAK: 62 miles from Springfield to New Haven. The study will be guided by a stakeholder committee comprised of transportation agencies, transportation providers, and Regional Planning Agencies/Commissions. The public outreach plan includes four rounds of public meetings, a project website, newsletters/e-bulletins, publicity through local media and electronic communication using alerts. Outreach will specifically identify potentially affected communities, including minority and low-income populations that will require targeted outreach. The study will be coordinated with other projects and studies such as the New Haven Hartford Springfield Rail Project, the Vermont State Rail Plan, South Station Expansion and NEC Future. The Study will develop a series of alternatives that meet the Purpose and Need. Alternatives will include: variations of speed, frequency and fares, accommodation for operation and growth of freight, consistency with current and planned projects, and incorporation of public input. Once developed, the alternatives will be screened against a set of evaluation criteria. Corridor considerations that were identified are: existing use of rail corridor for freight and passenger operations, not considering significant route modifications, environmental considerations such as noise and vibration, historic resources and natural resources and customs and immigration. Infrastructure considerations of the study were described. They are: capacity of existing rail corridor, track improvements of existing rail alignments, and the need for signal installation or upgrades resulting

3 from potential speeds in excess of 79 mph. A total 404 grade crossings would be reviewed; crossings must be grade separated when train speeds exceed 110 mph. Although a final decision of train stations will be made later in the study, a preliminary list of stations was developed as follows: Massachusetts: Boston (Back Bay and South Station), suburban Boston, Worcester, Palmer, Springfield, Holyoke, Northampton and Greenfield Vermont: Brattleboro, Bellows Falls, White River Junction, Montpelier, Waterbury, Burlington (Essex Junction) and St. Albans Connecticut: Windsor Locks, Windsor, Hartford, Meriden, Wallingford, New Haven (Union Station) The presentation concluded with an overview of the study schedule. Service projections ridership 03/18/14 Preliminary alternatives 09/12/14 Finalize alternatives 10/31/14 Service Development Plans 09/03/15 Complete NEPA process 09/25/15 Public Comments The following questions or comments (noted in italics) were made by the public, followed by the response by the project team. Could you add seniors to what you consider as an environmental justice population? Environmental justice populations are defined by the federal government, but I will be happy to hear your thoughts on how we can better involve seniors. A good way to reach seniors is through senior centers I live in Windsor, CT and would love to be able to go to Boston on the train but I don't want to have to go from Windsor, Hartford to New Haven and then up to get to Boston. That's exactly the kind of feedback about destinations that we want to hear. What are you doing to support the population that gets stuck in an airport because of the weather? Trains do run in the snow but we are not looking at airport routes. Though I sympathize, our study is limited to existing track. We're trying to stay within existing footprint to utilize the rail that we already have, to minimize our environmental impact, and take advantage of the opportunities to make cross country connections. What about the impact of the interstate highways that were built since the existing railroads? They changed the whole game. We think we need to focus on infrastructure considerations and what do we need to do on existing rail corridors. We need capacity improvements within the corridor operations.

4 That includes track and at grade crossing improvements, signal upgrades when necessary. We are looking at signal requirements if we start going above the speed of about 79 miles an hour, which we probably would do in many locations. Why have you left out the rail corridor from the Berkshires to Albany? At Springfield, our route goes north and south. We are focusing on capturing the demographics of Massachusetts and Connecticut and Vermont and are not focused on going west. I think as you get older and once you get out of your comfort zone with cars, train travel would be much preferred, so it would be nice to have the convenience of the train travel. It seems like there are a lot of different organization working within their own piece of the pie to create a full pie. How will all of this work together? When we travel, do we stop at state borders? We don t usually but many times states will only look at transportation within the state. This is study that is looking at where people want to go, regardless of state borders; we are looking at rail travel from a regional perspective. When the Federal Rail Administration (FRA) awarded grants to the State of Vermont and to the Knowledge Corridor in Massachusetts, they recognized these independent projects were part of a regional plan. I represent the Central Corridor which runs from Brattleboro, Vermont down to New London, Connecticut. Would you tell us what relationship this plan will have to that corridor and how it all gets tied together? MassDOT is taking a separate look at the Central Corridor. As we develop our alternative, with different services and schedules, we will seek to maximize the interconnection between these two corridors to help each service build the other up. So it's definitely a corridor we're aware of and will be including as best we can. My concern is when I see the Northern New England Intercity Rail Initiative it's from Boston to everywhere else. I know we are only a piece of the puzzle down in Connecticut, but it's a major economic piece for us. It's Transit Orient Development, and it just seems that this emphasis looks like it's from Boston to the rest of the world. I think you might want to consider making some other language about how many miles to here or there or it doesn't all lead to Boston. We really recognize that Boston is really just a part of this puzzle and many people who would be using these corridors would never be traveling to Boston or even on that branch. It's actually just a legacy of the designation the corridor by Congress that the route originates out of Boston. But, please be assured that we plan to plan for every kind of trip along the corridor, even those not headed towards Boston. This Knowledge Corridor, New Haven to Springfield has over 2.77 million people. It is the second largest region in New England area aside from Boston. Our rail system right now is like Third World. We're not globally competitive for attracting employers and talent right now. Are you addressing the absence of a second rail line between Hartford and Springfield, which is a serious impediment as we go forward? [response by John Bernick, Project Manager for the New Haven-Hartford-Springfield Rail Program, Connecticut Department of Transportation] CTDOT is doubletracking up to Windsor. With the current funding that we have now, that leaves a couple of pieces that

5 are short of the second track. It's not continuous. Enfield north is double-tracked already, so there are sections double-tracked. It was our intention to double-track all the way to Springfield; however, FRA did not award all the money that we needed. CTDOT plans on completing double track to Springfield and is actively looking for funding sources. If we get that second track, that allows us to go from 12 to 17 trains a day to 25 round trips a day. What do you think of the timeframes for us getting the service extended beyond Worcester from Boston to Springfield and also a potential rail service from Springfield up to Montreal? [response by Paul Nelson, MassDOT] I don't like to make predictions before I know what we have to do to establish that service, and that's really what this study is meant to identify. We are going to have to identify what types of improvements are needed, what type of equipment would be needed, and what potential environmental impacts there are. A lot of that really sets the timeline for funding that would be needed and really drives the schedule. It would be, you know, five or ten years from now at a minimum to establish this. We would obviously seek every opportunity to accelerate that timeline. Given our experience with other similar projects, it would be at least that amount of time. I think the ridership should include potential diversions from regional airlines. I notice that the route bypasses the Hartford/Springfield airport. The regional model that we will be looking at does consider if we make train travel or other modes more attractive that you could pull people from airline travel to rail. So even though we said we are not focusing on airports in general for the study, the ridership analysis takes diversion from air to rail into consideration. I was wondering if you could address the freight capacity on the track given the increase in passenger service coming through and whether or not some of that freight would be diverted over onto other tracks. The intent is not to divert any existing freight and we will be planning for future freight growth. Improvements will allow the trains to run faster and more reliable both the freight and passenger trains. I am just curious with the lowest speed at 60, is that truly the lowest it goes throughout? Up through Northampton trains go right behind peoples houses. The 60 is what we call the maximum operating speed. There are places where the train will actually have a slower speed. Holyoke is on your list of your potential station locations. Holyoke is granted money to build the stations that it's going to be serving. Is it a potential station location or is it a selected station location? As we look at these services, we are trying to capture larger travel markets. So we will see where it makes sense to stop when we consider cities such as Holyoke, Northampton, and Greenfield, Some trains may stop; other may not stop at the station. Holyoke Station will be served by the mainline train track. What is current capacity between Worcester and Springfield using the existing signaling and track if we want to just put additional trains on from Worcester today? I honestly can t answer that question right now. I think there is existing capacity there right now, because it has a fairly modern signal system even though it's a single track. As we develop the alternatives we will have a better understanding existing conditions and improvements that have to be made.

6 We tend to do the best of everything when we put in a new rail line or improve a service when maybe we can get by with what we have for now on some of these lines to avoid additional costs. Do we have current capacity to get service started without a huge investment? That will be one thing that we are trying to determine specifically but I can't tell you that right now. What you are going to do to create a public/private partnership with CSX much like that Virginia did with Norfolk/Suffolk to create the Norfolk service in Petersburg, Norfolk? CSX and the Commonwealth have worked together on the line between Boston and Worcester. We will be partnering with the rail owners. How many trains do you plan on running on the so-called Knowledge Corridor, in Massachusetts up to Greenfield? I don't see spending the bucket of money you are going to spend on rehabbing that line to run trains at maybe 70 miles per hour to run just to Vermont. There's one train a day on some of these routes that Amtrak runs, and just doesn't cut it. When you want to go is not when the train goes. You will need to run three trains a day on some of these routes to give people a chance for the train fit their schedule. The plan is once we get the Knowledge Corridor route started, let's move and consider other trains. There are some thoughts of how connects to some of Connecticut. There is planning being done. Amtrak used to run a couple of trains a day each way on the so-called Inland Route, Boston, New Haven, New York, to Washington, D.C. I think they have been all cut off. Nothing runs that way anymore. So are these trains that are going to run on the Inland Route, which I consider all the way to New Haven. What happens when those trains get to New Haven if you want to go beyond there? This is something Connecticut folks and Amtrak will be figuring out as connections to the corridor are very important. I am having a real problem with once again the people in Boston shutting out the counties west of the Connecticut River. I think that Boston, Springfield, Albany has great potential. The same public/private partnership that you use between Springfield and Worcester could work for Springfield to Albany. Amtrak is already planning on some track platform capacity at Union Station where they might be able to handle four or five trains each day across. In 2010, Governor Patrick said that it was unacceptable that Amtrak only ran one train and then proceeded to do nothing about it. The difficulty is that you just can't snap your fingers and have things happen overnight. Springfield is a hub. And as we improve and make Springfield work better, the next step would be to improve connections west. Right now we are moving forward on what makes sense, setting a foundation for future connections. What are you specifically looking at regarding Springfield to Boston? Currently it s a freight line. Will there be commuter rail and when will the study be done? We will be looking at what additional improvements have to be made to add whatever number of trains we think is reasonable. We will come back out and share that with you in the fall of There are a lot of people out here that really do understand how incredibly hard this is to do and how long it takes. In the last five or ten years, I have seen change in the attempts to improve passenger rail services in New England. The previous 50 or 60 years were a desert. With that said, I also want you to

7 hear the urgency in the room and ignore how hard it is. Five to ten years to complete this is probably realistic. I want you to go beyond realistic. I want you to do that in five to seven years max. Amherst, along with its 29,000 students, is going to lose service when the Knowledge Corridor is complete. Having to wait for 10 to 15 years or longer for a connector to Palmer so people can go to and from the hub of the universe or anywhere else, I want you to go faster, do better. We will help. [Abby Swain, New England Region, USEPA] I was glad to hear what you were saying about accommodating future freight volume, which is very important. Increased freight volumes are definitely anticipated. Where will the freight trains have to pull over to give priority to passenger rail? I understand they will be relegated mainly to night moves but they have to respond to the needs of their crew s hours of service and their customers' needs. Also, they do have a federal obligation to accept goods and carry them over the rails. So it could come to the point where there will be trains pulling over to yield to passenger trains and then how will they behave? Where sidings are located will really affect the folks who happen to live near the sidings if, indeed, they are in populated areas. Freight trains run any time they need to, not just at night. We are working with CSX, New England Central, PanAm Southern and even the MBTA within the Boston area. We've started looking at existing conditions and what has to happen if we want to start operating more trains. We do not have an answer yet but it won't be one-size-fits-all response. We may look at phasing improvements, provide for adding a few trains and first but eventually make improvements to accommodate many more. Is the document on the website that references siding locations predicated on the anticipated realistic near term volumes? Yes. Between Holyoke and Northampton along Route 5 and there's a stretch of rail that was worked on rather extensively in the summer and fall of Welded rails were brought in, laid alongside the existing rails, and some is still sitting there rusting in the rain. When is that stretch of track going to be finished? A member of the audience said that work will resume in the spring and should be done by the end of July or August. What will the rail cars be like? Who will provide them? Will they have adaptive technology? Some of those questions will be part of the study. I and many others have been working on Central Corridor line which we think could make a great loop Amherst, New Haven, New London, Willimantic, Palmer. I'm hoping that the plans that you put forward can become a reality and that you take a look at this loop system because it would be a way to constantly move trains right behind each other. The study doesn't say Northern New England east of Connecticut River. So I think adding two percent to your plan in terms of budget and planning you may benefit in the long-run and look at the whole state.

8 In the closing minutes of the meeting Ron O Blenis asked for feedback from the audience about the Purpose and Need Statement that was presented. Does it make sense? He asked for a show of hands indicating support for Purpose and Need. The majority of attendees responded affirmatively. The meeting adjourned at 8:30 p.m.

New Haven Hartford Springfield Rail Corridor Glory Days: 1925 1955 1955 22 trains/day in 1947 Bankers Ltd 3 hour service to NYC Sleeper, parlor & gril

New Haven Hartford Springfield Rail Corridor Glory Days: 1925 1955 1955 22 trains/day in 1947 Bankers Ltd 3 hour service to NYC Sleeper, parlor & gril New Haven Hartford Springfield Rail Project Gateway to New England Program Update July 2011 1 New Haven Hartford Springfield Rail Corridor Glory Days: 1925 1955 1955 22 trains/day in 1947 Bankers Ltd 3

More information

Northern New England Intercity Rail Initiative Stakeholder Meeting October 22, 2014, 11:00 1:00 PM Pioneer Valley Planning Commission, Springfield, MA

Northern New England Intercity Rail Initiative Stakeholder Meeting October 22, 2014, 11:00 1:00 PM Pioneer Valley Planning Commission, Springfield, MA Northern New England Intercity Rail Initiative, 11:00 1:00 PM Pioneer Valley Planning Commission, Springfield, MA Agenda Project Overview Upcoming Public Meetings o White River Junction, Vermont on November

More information

Why NEC FUTURE? 457 MILES LONG 2,200 DAILY TRAINS 750,000 DAILY PASSENGERS. Study Partners. Key Needs

Why NEC FUTURE? 457 MILES LONG 2,200 DAILY TRAINS 750,000 DAILY PASSENGERS. Study Partners. Key Needs 457 MILES LONG 2,200 DAILY TRAINS 750,000 DAILY PASSENGERS THE NEC IS THE BUSIEST RAIL CORRIDOR IN THE NATION, AND IS VITAL TO THE ECONOMY AND CITIES OF THE NORTHEAST. Why NEC FUTURE? The Northeast United

More information

Passenger Rail. 2016 Regional Transportation Plan

Passenger Rail. 2016 Regional Transportation Plan 7 Passenger Rail 2016 Regional Transportation Plan 7 Passenger Rail Railroads have a long and proud history in Franklin County dating back to the 1840s. In 1920, there were four separate railroad companies

More information

Connecticut s Bold Vision for a Transportation Future

Connecticut s Bold Vision for a Transportation Future Connecticut s Bold Vision for a Transportation Future 1 Governor s Proposal: Presents bold vision Based on: technical analyses & public outreach done as part of TransformCT o 18-month strategic planning

More information

U.S. System Summary: EMPIRE CORRIDOR

U.S. System Summary: EMPIRE CORRIDOR U.S. System Summary: EMPIRE CORRIDOR Empire Corridor High-Speed Rail System (Source: NYSDOT) The Empire Corridor high-speed rail system is an established high-speed rail system containing 463 miles of

More information

Legislative Fiscal Bureau One East Main, Suite 301 Madison, WI 53703 (608) 266-3847 Fax: (608) 267-6873

Legislative Fiscal Bureau One East Main, Suite 301 Madison, WI 53703 (608) 266-3847 Fax: (608) 267-6873 Legislative Fiscal Bureau One East Main, Suite 301 Madison, WI 53703 (608) 266-3847 Fax: (608) 267-6873 February 16, 2010 TO: FROM: Members Joint Committee on Finance Bob Lang, Director SUBJECT: Governor's

More information

Performance Goals and Objectives:

Performance Goals and Objectives: Online Briefing Winter 2011 2012 Purpose: The purpose of the Project is to examine and recommend ways of introducing higher passenger train speeds on the Empire Corridor and ways to improve reliability,

More information

Virginia s Approach to Intercity Passenger Rail Development

Virginia s Approach to Intercity Passenger Rail Development Virginia s Approach to Intercity Passenger Rail Development Kevin B. Page Chief Operating Officer Virginia Department of Rail and Public Transportation June 14, 2013 www.drpt.virginia.gov High Speed Rail

More information

Project Work Plan. Inland Route & Boston-to-Montreal High Speed Rail Corridor Feasibility and Planning Study

Project Work Plan. Inland Route & Boston-to-Montreal High Speed Rail Corridor Feasibility and Planning Study Project Work Plan Inland Route & Boston-to-Montreal High Speed Rail Corridor Feasibility and Planning Study June 2013 Inland Route & Boston-to-Montreal High-Speed Rail Corridor This page intentionally

More information

VRE SYSTEM PLAN SUMMARY

VRE SYSTEM PLAN SUMMARY VRE System Plan Summary January 2014 VRE SYSTEM PLAN SUMMARY VRE A Cost-Effective Contributor to Regional Mobility During the last decade, VRE has demonstrated its ability to accommodate a rapid and substantial

More information

PURPOSE AND NEED FOR ACTION

PURPOSE AND NEED FOR ACTION Section 2 PURPOSE AND NEED FOR ACTION 2. Purpose and Need for Action 2.0 Purpose and Need for Action This chapter describes the purpose and need for improved high speed passenger rail on the Chicago to

More information

Technical Report Documentation Page. 2. Government Accession No. 3. Recipient's Catalog No. 1. Report No. FHWA/TX-13/0-6737-1

Technical Report Documentation Page. 2. Government Accession No. 3. Recipient's Catalog No. 1. Report No. FHWA/TX-13/0-6737-1 1. Report No. FHWA/TX-13/0-6737-1 4. Title and Subtitle EXECUTIVE REPORT: TOLL ROADS, TOLL RATES, AND DRIVER BEHAVIOR 2. Government Accession No. 3. Recipient's Catalog No. Technical Report Documentation

More information

Preapplication for HSIPR Program OMB No. 2130 0583

Preapplication for HSIPR Program OMB No. 2130 0583 U.S. Department of Transportation Federal Railroad Administration Preapplication for HSIPR Program OMB No. 2130 0583 Preapplication instructions: For each question, enter the appropriate information in

More information

SCOPE OF WORK for High Speed Rail and Intercity Passenger Rail Program Federal Grant Application Development

SCOPE OF WORK for High Speed Rail and Intercity Passenger Rail Program Federal Grant Application Development Draft 06162009 SCOPE OF WORK for High Speed Rail and Intercity Passenger Rail Program Federal Grant Application Development The Minnesota Department of Transportation (Mn/DOT) requires the services of

More information

The Gateway Program and Hudson Tunnel Project

The Gateway Program and Hudson Tunnel Project The Gateway Program and Hudson Tunnel Project Presented to: NJ State Senate Oversight Committee Stephen Gardner Executive Vice President NEC Business Development August 10, 2015 1 The Need for Gateway

More information

Wilmington to Newark Commuter Rail Improvement Project

Wilmington to Newark Commuter Rail Improvement Project Wilmington to Newark Commuter Rail Improvement Project The Delaware Transit Corporation (DTC), a subsidiary of the Delaware Department of Transportation (DelDOT), is undertaking a rail capacity expansion

More information

Greenfield Innovation Park

Greenfield Innovation Park Greenfield Innovation Park Site Available for Interconnection and Data Center Greenfield, Massachusetts Welcome to Western Massachusetts! 50 MILE RADIUS Western Massachusetts - two hours from Boston and

More information

JW Marriott Hotel Kuala Lumpur

JW Marriott Hotel Kuala Lumpur JW Marriott Hotel Kuala Lumpur An exclusive report to be distributed with THE INDEPENDENT Transcript of the interview with: Mr Mahmoud Skaf General Manager WORLD REPORT: In your opinion, what is it about

More information

Doing More with the Same: How the Trinity Railway Express Increased Service without Increasing Costs

Doing More with the Same: How the Trinity Railway Express Increased Service without Increasing Costs Doing More with the Same: How the Trinity Railway Express Increased Service without Increasing Costs W. T. "Bill" Farquhar Trinity Railway Express Irving, TX Abstract The Trinity Railway Express (TRE)

More information

Environmental Impact Statement for the Washington Union Station Expansion Project

Environmental Impact Statement for the Washington Union Station Expansion Project This document is scheduled to be published in the Federal Register on 11/04/2015 and available online at http://federalregister.gov/a/2015-28079, and on FDsys.gov 4910-06-P DEPARTMENT OF TRANSPORTATION

More information

Stouffville Corridor Rail Service Expansion

Stouffville Corridor Rail Service Expansion Stouffville Corridor Rail Service Expansion Stouffville Corridor Rail Service Expansion Class Environmental Assessment Study WELCOME PUBLIC INFORMATION CENTRE #2 Tuesday January 28, 2014 Agincourt Recreation

More information

Chunking? Sounds like psychobabble!

Chunking? Sounds like psychobabble! Chunking? Sounds like psychobabble! By Sarah Frossell Published in Rapport Magazine Winter 1998 So much of the business world depends on the fast, free flow of information but does the unit size the information

More information

2.1 Prior Richmond to South Hampton Roads Rail Service

2.1 Prior Richmond to South Hampton Roads Rail Service 2.0 BACKGROUND 2.1 Prior Richmond to South Hampton Roads Rail Service The Norfolk and Western (N&W), now NS, the Seaboard Air Line (SAL) and the Atlantic Coast Line (ACL), both now CSXT, previously operated

More information

Central Minnesota Freight Plan December 2012

Central Minnesota Freight Plan December 2012 6.0 RAIL PROFILE Statewide, Minnesota claims 4,481 miles of active railroad track in the state which ranks 8 th in the nation. Two Class I railroads and one switching/terminal railroad operate 391 miles

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS 1. How do solar panels work? FREQUENTLY ASKED QUESTIONS Your solar panels capture sunlight and convert it to DC electricity Your solar system converts that energy to an AC current that can power your home

More information

VIII. TRANSPORTATION

VIII. TRANSPORTATION VIII. TRANSPORTATION Railroad Railroads came to Vermont and Mount Holly in the late 1840s and early 1850s. The Rutland and Burlington Railroad was originally built through Mount Holly to Bellows Falls.

More information

USA: INFRASTRUCTURES DAY

USA: INFRASTRUCTURES DAY USA: INFRASTRUCTURES DAY Business Opportunities for Infrastructures in the US Market Business Conference 21th November 2014 Auditório do Banco Popular Rua Ramalho Ortigão, 51 Lisboa Organização: Patrocinadores:

More information

Action Steps for Setting Up a Successful Home Web Design Business

Action Steps for Setting Up a Successful Home Web Design Business Action Steps for Setting Up a Successful Home Web Design Business In this document you'll find all of the action steps included in this course. As you are completing these action steps, please do not hesitate

More information

TRANSPORTATION. Georgia s Strength in Transportation 4 TRANPORTATION SYSTEMS IN GEORGIA. Highways 2 Airport 3 Railroads 4 Ports 5. Inside this issue:

TRANSPORTATION. Georgia s Strength in Transportation 4 TRANPORTATION SYSTEMS IN GEORGIA. Highways 2 Airport 3 Railroads 4 Ports 5. Inside this issue: TRANSPORTATION SS8G2 highway system, airport, deepwater ports, and railroads 4 TRANPORTATION SYSTEMS IN GEORGIA Georgia s Strength in Transportation Many teachers dig in to the stories of our state s history

More information

Responses to Rail Comments December 11, 2015

Responses to Rail Comments December 11, 2015 s to Rail s December 11, 2015 The Caretakers along with Amtrak Marketing Department and the VT Department of Tourism with some leadership from the Rail Division could collaborate to provide a better face

More information

FTP/SIS/FMTP Regional Workshop - Tampa

FTP/SIS/FMTP Regional Workshop - Tampa Meeting Highlights Welcome and Introductions FTP/SIS/FMTP Regional Workshop - Tampa September 2, 2015 FDOT District 7 Auditorium 11201 N. Malcolm McKinley Drive Tampa, FL 32612 Debbie Hunt, FDOT District

More information

Railway Age, Passenger Trains on Freight Railroads. Negotiating Insurance and Liability Issues: Constructive Solutions. October 21-22, 2008

Railway Age, Passenger Trains on Freight Railroads. Negotiating Insurance and Liability Issues: Constructive Solutions. October 21-22, 2008 Railway Age, Passenger Trains on Freight Railroads Negotiating Insurance and Liability Issues: Constructive Solutions October 21-22, 2008 Kevin M. Sheys 1 My topic today is Constructive Solutions for Negotiating

More information

When is BRT the Best Option? 1:30 2:40 p.m.

When is BRT the Best Option? 1:30 2:40 p.m. TRB/APTA 2004 Bus Rapid Transit Conference When is BRT the Best Option? 1:30 2:40 p.m. Paul Larrousse Director, National Transit Institute (NTI) (Moderator) TRB/APTA 2004 Bus Rapid Transit Conference Session

More information

Can I collect if I quit my job?

Can I collect if I quit my job? work LEGAL SERVICES Self Help Series Your Rights to Unemployment Benefits Can I collect if I quit my job? April 2011 Introduction You might be able to collect unemployment benefits if you have a very good

More information

Next Generation Tech-Talk. Cloud Based Business Collaboration with Cisco Spark

Next Generation Tech-Talk. Cloud Based Business Collaboration with Cisco Spark Next Generation Tech-Talk Cloud Based Business Collaboration with Cisco Spark 2 [music] 00:06 Phil Calzadilla: Hello, hello! Welcome. This is Phil Calzadilla founder and CEO of NextNet Partners, and I'd

More information

What s Wrong with the Airline Industry? Diagnosis and Possible Cures. Statement of

What s Wrong with the Airline Industry? Diagnosis and Possible Cures. Statement of What s Wrong with the Airline Industry? Diagnosis and Possible Cures Statement of Steven A. Morrison Professor and Chair, Department of Economics Northeastern University Boston, MA 02115 617-373-2873 s.morrison@neu.edu

More information

How To Expand Commuter Rail Between Worcester And Boston

How To Expand Commuter Rail Between Worcester And Boston AN INDEPENDENT VOICE FOR RESPONSIBLE GOVERNMENT CONNECTING THE HEART OF THE COMMONWEALTH WITH THE HUB OF THE UNIVERSE: MAKING THE CASE FOR EXPANDING COMMUTER RAIL SERVICE BETWEEN WORCESTER AND BOSTON Report

More information

Scripts. WARM MARKET (someone you know of ) CALL BACK SCRIPT (POSTCARDS, ProSTEP, COLD CALLS) SCHEDULE THE LIVE PRESENTATION CALL

Scripts. WARM MARKET (someone you know of ) CALL BACK SCRIPT (POSTCARDS, ProSTEP, COLD CALLS) SCHEDULE THE LIVE PRESENTATION CALL Scripts WARM MARKET (someone you know of ) Hi ( ) listen, a group of professionals recently showed me how to cut my taxes by 50%, are you open to that? (If yes schedule the Live Presentation Call.) CALL

More information

Terminology and Scripts: what you say will make a difference in your success

Terminology and Scripts: what you say will make a difference in your success Terminology and Scripts: what you say will make a difference in your success Terminology Matters! Here are just three simple terminology suggestions which can help you enhance your ability to make your

More information

Layover Facility Alternatives Analysis

Layover Facility Alternatives Analysis Layover Facility Alternatives Analysis March 2013 Version 0 Back of cover page March 2013 South Station Expansion Massachusetts Department of Transportation Table of Contents 1. Introduction...1 1.1. Layover

More information

TeachingEnglish Lesson plans

TeachingEnglish Lesson plans Worksheets Meetings (1): Getting down to business Reading: Text 1 Let s stop wasting time and get on with it! TeachingEnglish Lesson plans Did you know you can download a clock from the internet to calculate

More information

Lone Star Regional Rail Project - Update. Joseph Black Rail Director, Lone Star Rail District Joseph Lessard Planning Director, Knudson LP

Lone Star Regional Rail Project - Update. Joseph Black Rail Director, Lone Star Rail District Joseph Lessard Planning Director, Knudson LP Lone Star Regional Rail Project - Update Joseph Black Rail Director, Lone Star Rail District Joseph Lessard Planning Director, Knudson LP August 20, 2015 Lone Star Regional Rail Project - Update Presentation

More information

B&P Tunnel Project Scoping Report. Sample Elected Official and Key Stakeholder Correspondence. Appendix B

B&P Tunnel Project Scoping Report. Sample Elected Official and Key Stakeholder Correspondence. Appendix B B&P Tunnel Project Scoping Report Appendix B: Sample Elected Official and Key Stakeholder Correspondence September 2014 Appendix B 81 Mosher Street Baltimore, MD 21217 bptunnel.com info@bptunnel.com May

More information

100 Ways To Improve Your Sales Success. Some Great Tips To Boost Your Sales

100 Ways To Improve Your Sales Success. Some Great Tips To Boost Your Sales 100 Ways To Improve Your Sales Success Some Great Tips To Boost Your Sales 100 Ways To Improve Your Sales Success By Sean Mcpheat, Managing Director Of The Sales Training Consultancy What makes a successful

More information

Introduction to Public Safety Project Management. Table of Contents. Introduction to Public Safety Project Management

Introduction to Public Safety Project Management. Table of Contents. Introduction to Public Safety Project Management Introduction to Public Safety Project Management Introduction to Public Safety Project Management Table of Contents Introduction to Public Safety Project Management... 2 What is Project Management... 3

More information

STATEMENT OF LINDA BAUER DARR PRESIDENT AMERICAN SHORT LINE & REGIONAL RAILROAD ASSOCIATION

STATEMENT OF LINDA BAUER DARR PRESIDENT AMERICAN SHORT LINE & REGIONAL RAILROAD ASSOCIATION STATEMENT OF LINDA BAUER DARR PRESIDENT AMERICAN SHORT LINE & REGIONAL RAILROAD ASSOCIATION BEFORE THE UNITED STATES HOUSE OF REPRESENTATIVES COMMITTEE ON TRANSPORTATION AND INFRASTRUCTURE S SUBCOMMITTEE

More information

MIPRC Universities & Colleges Passenger Rail Survey: Regional Results and Analysis

MIPRC Universities & Colleges Passenger Rail Survey: Regional Results and Analysis The Midwest Interstate Passenger Rail Commission s survey of students, faculty and staff at 30 colleges and universities along Amtrak passenger routes across nine states suggests good overall news for

More information

Effect on structures. Uniform settlement - no concerns. Angular distortion - causes damage due to tensile strain

Effect on structures. Uniform settlement - no concerns. Angular distortion - causes damage due to tensile strain Effect on structures Uniform settlement - no concerns Angular distortion - causes damage due to tensile strain 1/500 - safe limit for no cracking of buildings 1/150 - potential structural damage 36 37

More information

Connecticut s Bold Vision for a Transportation Future

Connecticut s Bold Vision for a Transportation Future Connecticut s Bold Vision for a Transportation Future Middlesex Chamber October 15, 2015 Commissioner Jim Redeker 1 2 The Challenge, Vision, & Plan The Challenge our infrastructure, our economy, our quality

More information

Book of over 45 Spells and magic spells that actually work, include love spells, health spells, wealth spells and learning spells and spells for life

Book of over 45 Spells and magic spells that actually work, include love spells, health spells, wealth spells and learning spells and spells for life Book of over 45 Spells and magic spells that actually work, include love spells, health spells, wealth spells and learning spells and spells for life Stop Chasing Happiness, Make it Find You! Here's how

More information

Thameslink new Class 700 trains

Thameslink new Class 700 trains Thameslink new Class 700 trains Your questions answered 1. When will the new trains enter service? The first trains are expected to enter passenger service in spring 2016 on the existing Bedford to Brighton,

More information

Nationwide Fixed Guideway

Nationwide Fixed Guideway 1. CONCEPT SUMMARY Solar Transportation Technologies is developing a completely new mass transit system, utilizing privately owned electric cars on an elevated fixed guideway, called Freedom Transit (FT).

More information

Understanding the market with PVSRA

Understanding the market with PVSRA Understanding the market with PVSRA PVSRA PVSRA stands for Price, Volume, Support, Resistance Analysis. Price includes consideration of individual candlestick configurations as well as the pattern, or

More information

Teacher Evaluation Using the Danielson Framework 6. A Professional Portfolio: Artifact Party A. Using Artifacts to Help Determine Performance Levels

Teacher Evaluation Using the Danielson Framework 6. A Professional Portfolio: Artifact Party A. Using Artifacts to Help Determine Performance Levels Teacher Evaluation Using the Danielson Framework 6. A Professional Portfolio: Artifact Party A. Using Artifacts to Help Determine Performance Levels Artifact Party Guidelines CHARLOTTE DANIELSON: Of course,

More information

Exhibit Book Metro-North Railroad Committee Meeting 3/23/2015. Table of Contents: April 26 Schedule Change - Page 2

Exhibit Book Metro-North Railroad Committee Meeting 3/23/2015. Table of Contents: April 26 Schedule Change - Page 2 Exhibit Book Metro-North Railroad Committee Meeting 3/23/2015 Table of Contents: April 26 Schedule Change - Page 2 Master Page # 1 of 5 - Metro-North Railroad Committee Meeting 3/23/2015 Memorandum Date:

More information

years in the community

years in the community Montréal-Trudeau, from the 70 past to the future years in the community The airport s beginnings Montréal Pierre Elliott Trudeau International Airport is 70 years old! It was on September 1, 1941, that

More information

Midlands Connect. Economic Impacts Study

Midlands Connect. Economic Impacts Study Midlands Connect Economic Impacts Study May 2015 In 2036, if journey times were cut by 20% across all of the intensive growth corridors Introduction The location of the Midlands, at the heart of the UK

More information

"High-tech" or "High-touch" Network Marketing- What s the difference between the two and which way should you go?

High-tech or High-touch Network Marketing- What s the difference between the two and which way should you go? "High-tech" or "High-touch" Network Marketing- What s the difference between the two and which way should you go? If you are already in or you are considering Network Marketing, you may want to read this

More information

IDOT Chicago - St. Louis High-Speed Rail Program Management

IDOT Chicago - St. Louis High-Speed Rail Program Management 1 www.idothsr.org www.connectthemidwest.com IDOT Chicago - St. Louis High-Speed Rail Program Management Lessons Learned: Sealing the Corridor For 110 MPH Operations Thomas W. Hunter Parsons Brinckerhoff

More information

Senior/T.A.P. User Guide. Get a new ID card and a new level of service.

Senior/T.A.P. User Guide. Get a new ID card and a new level of service. Senior/T.A.P. User Guide Get a new ID card and a new level of service. Table of Contents Letter to our Senior/T.A.P. Customers.......3 What you need to do..........4 Where to go to apply for your new Senior/T.A.P.

More information

MOTION NO. M2016-76 Contingency Increase for Flatiron West, Inc. Construction Contract for Tacoma Trestle Track & Signal Project

MOTION NO. M2016-76 Contingency Increase for Flatiron West, Inc. Construction Contract for Tacoma Trestle Track & Signal Project MOTION NO. M2016-76 Contingency Increase for Flatiron West, Inc. Construction Contract for Tacoma Trestle Track & Signal Project MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Capital Committee Board 7/14/2016

More information

SYSTEMWIDE REQUIREMENTS

SYSTEMWIDE REQUIREMENTS SYSTEMWIDE REQUIREMENTS for the Peninsula Rail Program San Francisco to San Jose on the Caltrain Corridor Description of the Systemwide Context for the High Speed Train Project This document provides a

More information

12. Event Planning and Evaluation

12. Event Planning and Evaluation 12. Event Planning and Evaluation What is an event? Events include fundraisers, public outreach campaigns, general meetings, and combinations of the above. No matter what the objective of an event is,

More information

CONTENTS. Welcome to the inaugural Premier Inn Business Travel Report 2015, highlighting the latest business travel trends across the UK.

CONTENTS. Welcome to the inaugural Premier Inn Business Travel Report 2015, highlighting the latest business travel trends across the UK. BUSINESS TRAVEL REPORT 2015 CONTENTS Welcome to the inaugural Premier Inn Business Travel Report 2015, highlighting the latest business travel trends across the UK. Introduction 1 Welcome 2 Business Travel

More information

On the Public Transport Spine Study

On the Public Transport Spine Study On the Public Transport Spine Study Submission of the Wellington City Youth Council to Greater Wellington Regional Council The Wellington City Youth Council would also like to make an oral submission.

More information

Project, Portfolio Management (PPM) for the Enterprise Whose System is it Anyway?

Project, Portfolio Management (PPM) for the Enterprise Whose System is it Anyway? Project, Portfolio Management (PPM) for the Enterprise Whose System is it Anyway? Protecting Your Investment with a Bottom-up Approach Revised December 2012 Heather Champoux, PMP http://epmlive.com Contents

More information

Pathways to Recovery Evaluation Protocol

Pathways to Recovery Evaluation Protocol Pathways to Recovery Evaluation Protocol Goals Goal 1-Link people in medication assisted treatment with Vermont s recovery system Goal 2-Engage and provide support, in recovery centers and in broader recovering

More information

Preparation For Professional Practice - The Hole is Getting Bigger

Preparation For Professional Practice - The Hole is Getting Bigger Preparation For Professional Practice - The Hole is Getting Bigger Margaret-Ann Cook Principal Consultant - Nursing Territory Health Services, Darwin 4th National Rural Health Conference Perth, Western

More information

6 REGIONAL COMMUTE PATTERNS

6 REGIONAL COMMUTE PATTERNS 6 REGIONAL COMMUTE PATTERNS INTRODUCTION One of the challenges for this study, which has a primary goal of looking at commute opportunities in MnDOT District 3, is that in some portions of the study area,

More information

CHAPTER 8: INTELLIGENT TRANSPORTATION STSTEMS (ITS)

CHAPTER 8: INTELLIGENT TRANSPORTATION STSTEMS (ITS) CHAPTER 8: INTELLIGENT TRANSPORTATION STSTEMS (ITS) Intelligent Transportation Systems (ITS) enables people and goods to move more safely and efficiently through a state-of-the-art multi-modal transportation

More information

Chapter 1 GOAL SETTING. Your Road Map to Success

Chapter 1 GOAL SETTING. Your Road Map to Success Chapter 1 GOAL SETTING Your Road Map to Success Let s Take a Road Trip. GOAL SETTING Your Road Map to Success Excuse me, Sir, Alice inquires. Could you tell me which road to take? Wisely, the caterpillar

More information

L E G I S L A T I V E A N A L Y S T S O F F I C E

L E G I S L A T I V E A N A L Y S T S O F F I C E November 29, 2011 High-Speed Rail Authority: The Draft 2012 Business Plan and Funding Plan L E G I S L A T I V E A N A L Y S T S O F F I C E Presented to: Assembly Transportation Committee Hon. Bonnie

More information

The Amtrak Vision for the Northeast Corridor. 2012 Update Report

The Amtrak Vision for the Northeast Corridor. 2012 Update Report 2012 Update Report July 2012 A Letter from Joe Boardman, Amtrak President and CEO The aging and congested multimodal transportation network of the Northeast region is facing a crisis. An expected increase

More information

Demand for Long Distance Travel

Demand for Long Distance Travel Demand for Long Distance Travel April 2011 Demand for long distance travel 1 Structure of this paper 1.1 This paper is structured as follows: Section 2 sets out past trends in the demand for long distance

More information

Augmented reality enhances learning at Manchester School of Medicine

Augmented reality enhances learning at Manchester School of Medicine Augmented reality enhances learning at Manchester School of Medicine Welcome to the Jisc podcast. The University of Manchester is taking a unique approach to prescription training for its medical students

More information

The 2014 Ultimate Career Guide

The 2014 Ultimate Career Guide The 2014 Ultimate Career Guide Contents: 1. Explore Your Ideal Career Options 2. Prepare For Your Ideal Career 3. Find a Job in Your Ideal Career 4. Succeed in Your Ideal Career 5. Four of the Fastest

More information

TRANSPORTATION MODELLING IN CALGARY

TRANSPORTATION MODELLING IN CALGARY TRANSPORTATION MODELLING IN CALGARY Why Do We Use Transportation Models? There are three approaches that can be used for proceeding to develop a transportation system for Calgary s future. One approach

More information

NEW DRIVERS HOW TO TAKE THE ON-THE-ROAD SKILLS TEST. KELLY MANNING: Welcome to DMV Infocast, an audio production of the

NEW DRIVERS HOW TO TAKE THE ON-THE-ROAD SKILLS TEST. KELLY MANNING: Welcome to DMV Infocast, an audio production of the NEW DRIVERS HOW TO TAKE THE ON-THE-ROAD SKILLS TEST KELLY MANNING: Welcome to DMV Infocast, an audio production of the Connecticut Department of Motor Vehicles. This is Kelly Manning, Infocast Editor.

More information

1. What aspects of your job do you enjoy? Please explain. The people coming in and out of the office constantly.

1. What aspects of your job do you enjoy? Please explain. The people coming in and out of the office constantly. 1. What aspects of your job do you enjoy? Please explain. The people coming in and out of the office constantly. I especially like the fact that I can do homework and interact with people. My co-workers/boss

More information

Exchange to the Furthest Place from Home

Exchange to the Furthest Place from Home Exchange to the Furthest Place from Home My decision to go on a student exchange to Finland took place long before I went to University. I was about 16 in my second to last year of high school when I started

More information

Risk Management in the Development of a Penta-P Project

Risk Management in the Development of a Penta-P Project Risk Management in the Development of a Penta-P Project Bill Van Meter Regional Transportation District Denver, CO Julie Skeen Jacobs Engineering Denver, CO Damian Carey Jacobs Engineering Denver, CO Don

More information

Profiles of Mechanical Engineers

Profiles of Mechanical Engineers Profiles of Mechanical Engineers Jeffrey P. Martin, P.E. Product Design Engineer Ford Motor Company Dearborn, MI Education: MS, Mechanical Engineering, Washington University BS, Mechanical Engineering,

More information

1. Amend Article XIV, Section 1(a) of the September 26, 1996 National Agreement to read: Additional $36.00 payments for each 100 mile increments.

1. Amend Article XIV, Section 1(a) of the September 26, 1996 National Agreement to read: Additional $36.00 payments for each 100 mile increments. STATEMENT OF THE BROTHERHOOD OF MAINTENANCE OF WAY EMPLOYES DIVISION/IBT REGARDING IMPROVEMENTS IN THE REST-DAY TRAVEL ALLOWANCE PAID TO EMPLOYEES WORKING AWAY FROM HOME The Brotherhood of Maintenance

More information

Learn How to Set and Achieve Your Goals

Learn How to Set and Achieve Your Goals Create a definite plan for carrying out your desire and begin at once, whether you are ready or not, to put this plan into action. Personal Goal Setting Find direction. Live your life your way. Goal setting

More information

What the New Healthcare Connect Fund Means to You

What the New Healthcare Connect Fund Means to You Paloma Costa: Welcome to our first Healthcare Connect Fund webinar. Our presenters are Linda Oliver and Chin Yu from the FCC who will be providing an overview of the new program. Linda Oliver: This is

More information

Math: Study Skills, Note Taking Skills, And Test Taking Strategies

Math: Study Skills, Note Taking Skills, And Test Taking Strategies Math: Study Skills, Note Taking Skills, And Test Taking Strategies Math Study Skill Active Study vs. Passive Study Be actively involved in managing the learning process, the mathematics and your study

More information

ORANGE COUNTY TRANSPORTATION AUTHORITY. Final Long-Range Transportation Plan - Destination 2035. Attachment A

ORANGE COUNTY TRANSPORTATION AUTHORITY. Final Long-Range Transportation Plan - Destination 2035. Attachment A ORANGE COUNTY TRANSPORTATION AUTHORITY Final Long-Range Transportation Plan - Destination 2035 Attachment A DESTINATION 2035 DESTINATION 2035 EXECUTIVE SUMMARY ATTACHMENT A Moving Toward a Greener Tomorrow

More information

Guide to PanAm Agent and Online Booking Tool Services!

Guide to PanAm Agent and Online Booking Tool Services! Guide to PanAm Agent and Online Booking Tool Services Sections: 1. Getting Started with PanAm 2. Booking with An Agent 3. TripCase 4. Online Booking Tool - Logging In & Completing Your Profile 5. Book

More information

WhatWorks: Blocking Complex Malware Threats at Boston Financial

WhatWorks: Blocking Complex Malware Threats at Boston Financial WhatWorks: Blocking Complex Malware Threats at Boston Financial with WhatWorks is a user-to-user program in which security managers who have implemented effective internet security technologies tell why

More information

cprax Internet Marketing

cprax Internet Marketing cprax Internet Marketing cprax Internet Marketing (800) 937-2059 www.cprax.com Table of Contents Introduction... 3 What is Digital Marketing Exactly?... 3 7 Digital Marketing Success Strategies... 4 Top

More information

CITY OF ROANOKE AND TOWN OF VINTON, VIRGINIA. RSTP Funds Joint Application FOR

CITY OF ROANOKE AND TOWN OF VINTON, VIRGINIA. RSTP Funds Joint Application FOR CITY OF ROANOKE AND TOWN OF VINTON, VIRGINIA RSTP Funds Joint Application FOR Tinker Creek Pedestrian Bridge: Tinker Creek and Glade Creek Greenways Connection Date: September 15, 2014 RSTP Project Profile

More information

Accessibility Advisory Committee

Accessibility Advisory Committee Accessibility Advisory Committee 600 Fifth Street NW Washington, DC 20001 202-962-6060 BUS AND RAIL SUBCOMMITTEE MEETING MINUTES: February 8, 2016 In attendance: Brian Miller (Chair), William Staderman

More information

SAY IT BETTER IN ENGLISH

SAY IT BETTER IN ENGLISH PHRASE GUIDE FOR THE BOOK SAY IT BETTER IN ENGLISH Useful Phrases for Work & Everyday Life Directions for use: This guide contains all the phrases included in the book Say it Better in English. If you

More information

BBBT Podcast Transcript

BBBT Podcast Transcript BBBT Podcast Transcript About the BBBT Vendor: The Boulder Brain Trust, or BBBT, was founded in 2006 by Claudia Imhoff. Its mission is to leverage business intelligence for industry vendors, for its members,

More information

Ep #19: Thought Management

Ep #19: Thought Management Full Episode Transcript With Your Host Brooke Castillo Welcome to The Life Coach School podcast, where it s all about real clients, real problems and real coaching. And now your host, Master Coach Instructor,

More information

Railroad Job Vacancies Reported to the RRB June 21, 2016

Railroad Job Vacancies Reported to the RRB June 21, 2016 The following list provides information about job vacancies reported to the Railroad Retirement Board's (RRB) field offices. The list includes orders that the receiving field office does not expect to

More information

The Truth about Finding the Lowest Airfare

The Truth about Finding the Lowest Airfare The Truth about Finding the Lowest Airfare My employees tell me they can find lower airfares on the Internet 2011 Hurley Travel Experts, Inc. Reproduction Prohibited. This paper includes data that shall

More information

CONNECTICUT FORUMS ADDITIONAL COMMENTS

CONNECTICUT FORUMS ADDITIONAL COMMENTS Plan for the Achievement of Transportation Coordination in Human Services CONNECTICUT FORUMS ADDITIONAL COMMENTS June August 2005 HELPING SHAPE THE STATE ACTION PLAN FOR A COORDINATED TRANSPORTATION SYSTEM

More information

Northeast Corridor State of Good Repair Spend Plan

Northeast Corridor State of Good Repair Spend Plan Northeast Corridor State of Good Repair Spend Plan Prepared by Amtrak Under Section 211 of the Passenger Rail Investment and Improvement Act of 2008 (Public Law 110-432) Submitted to the U.S. Secretary

More information