Agenda Group Overview Areas of Activity Energy Projects (EPC) Infrastructure Projects Defence Projects Group Strategy Consolidated Financial Review 3

Size: px
Start display at page:

Download "Agenda Group Overview Areas of Activity Energy Projects (EPC) Infrastructure Projects Defence Projects Group Strategy Consolidated Financial Review 3"

Transcription

1 Sept

2 Disclaimer These preliminary materials and any accompanying oral presentation (together, the Materials ) have been prepared by Mytilineos Holdings SA (the Company ) and are intended solely for the information of the Recipient. The Materials are in draft form and the analyses and conclusions contained in the Materials are preliminary in nature and subject to further investigation and analysis. The Materials are not intended to provide any definitive advice or opinion of any kind and the Materials should not be relied on for any purpose. The Materials may not be reproduced, in whole or in part, nor summarised, excerpted from, quoted or otherwise publicly referred to, nor discussed with or disclosed to anyone else without the prior written consent of the Company. The Company has not verified any of the information provided to it for the purpose of preparing the Materials and no representation or warranty, express or implied, is made and no responsibility is or will be accepted by the Company as to or in relation to the accuracy, reliability or completeness of any such information. The conclusions contained in the Materials constitute the Company s preliminary views as of the date of the Materials and are based solely on the information received by it up to the date hereof. The information included in this document may be subject to change and the Company has no obligation to update any information given in this report. The Recipient will be solely responsible for conducting its own assessment of the information set out in the Materials and for the underlying business decision to effect any transaction recommended by, or arising out of, the Materials. The Company has not had made an independent evaluation or appraisal of the shares, assets or liabilities (contingent or otherwise) of the Company. All projections and forecasts in the Materials are preliminary illustrative exercises using the assumptions described herein, which assumptions may or may not prove to be correct. The actual outcome may be materially affected by changes in economic and other circumstances which cannot be foreseen. No representation or warranty is made that any estimate contained herein will be achieved. 2

3 Agenda Group Overview Areas of Activity Energy Projects (EPC) Infrastructure Projects Defence Projects Group Strategy Consolidated Financial Review 3

4 Group Overview 4

5 Group History 1962: Founded as a joint stock company. 1980: Absorption of the technical contracting firm TECHNOM S.A. 1999: Company acquired by Mytilineos Holdings S.A. 1999: Increase in Company s Share Capital. 2005: Acquisition of 83.5% of ELEMKA S.A : Company listed on the Athens Stock Exchange. 1989: Acquisition of 99.98% of SERVISTEEL S.A. 2002: Acquisition of TCB SA and RODAX S.A. 2002: Partial Acquisition of stake in EKME S.A. (40%), 3KP S.A. (40%). 5

6 Group Overview EPC Contractor with Industrial Background Primarily active in Infrastructure Projects, Energy - EPC and Defence sectors. Quoted on Athens Stock Exchange since 1973 with current market cap of 915 mn (1) Energy Projects (EPC) Long experience and specialized know-how, particularly Thermoelectric Power Plants (TPP) and Hydroelectric Power Plants (HPP). Main EPC Contractor or as equivalent partner in consortia with other international firms such as Alstom, Siemens and General Electric. Infrastructure Projects Plays a significant role in the execution of large scale infrastructure projects in Greece and abroad. Ability to carry out very demanding projects, demonstrated by successful completion of landmark projects such as the steel structures for the Rion - Antirrion bridge, Olympic Velodrome, etc. Defence Projects Major supplier of the Hellenic Armed Forces of armoured vehicles and other demanding military applications such as submarine pressure hulls etc. Proven Management Successful track record in implementing its growth strategy and delivering shareholder value. (1) As of 24 September

7 Mytilineos Group Corporate Structure Mytilineos Holdings Mkt Cap: mn METALLURGY & MINING ENERGY EPC VEHICLE 54.0% MANUFACTURING ALUMINA & ALUMINIUM (100%) ENDESA (HELLAS) (49.99%) METKA (51.63%) ELVO (43%) Not Listed Not Listed Mkt Cap: 915 mn Not Listed DELPHI DISTOMON (100%) Not Listed SOMETRA (93%) Not Listed Source: Company Information. Note: Market data as of 24 September

8 Financial Snapshot Group Turnover ( m; % on column indicates annual growth rate. Infrastructure 14% Turnover by Activity Infrastructure 12% 1,7% - 8,5% 30.1% 31.1% (1) 2007E (1) Management Estimates Defence 14% Defence 7% E (1) Energy 72% (1) Management Estimates. Energy 81% EBITDA EBITDA by Activity Ε (1) ( m; % on column indicates annual growth rate. 55,9% 15,1% 6,6% - 18% 72 Defence 26% Infrastructure 2% Defence 14% Infrastructure 6% (1) 2007E (1) Management Εκτιµήσεις ιοίκησης Estimates E (1) Energy 72% (1) Management Estimates. Energy 80% 8

9 Share Information Share Price Information Stock Symbols Market Cap: 915 mn Avg. Trading Value: 3.2 mn Total No of shares: 51,950,600 Free Float: 48% Listing FTSE/ASE Mid-40, FTSE Med 100, MSCI Small Cap and HSBC Small Cap ASE: Reuters: Bloomberg: METK MTKr.AT METTK GA Dividend Per Share ( )* Shareholder Structure 0,4 0,3 Greek Institutional Investors 9.17% 0,16 0,16 0,2 Retail 15.63% Mytilineos Holdings 51.63% Foreign Institutional Investors 23.57% Dividend Note: Market data as of 24 September

10 Human Resources Personnel Profile Change of emphasis existing engineering staff supplemented by additional highly qualified engineering recruits. Cost competitive with EPC competition. 500 employees, of which 200 are degree qualified, and 50 with post-graduate degrees. Approx. 40% of the company s employees hold engineering / scientific degrees. Strong emphasis on building appropriate resources Employees with Higher Education Degrees % of Total Employees with Technical / Scientific Degree Qualifications % 14% 14% 15% 16% 18% 30% 35% 39%

11 Areas of Activity 11

12 Energy Projects (EPC) Broad Range of Experience Thermal power projects - broad experience in coal / lignite, combined cycle, co-generation. Hydro projects - substantial expertise, including manufacturing of main equipment. Environmental - significant experience in environmental projects (Electrostatic Precipitators, etc.). Coal mining and materials handling - long-standing activity and expertise, including manufacturing of main equipment. Historical Evolution 1980: PPC Ag. Dimitrios Units I/II, 2x300MW Lignite fired. First major energy project as equal member of consortium. 1991: First of 3 major contracts for PPC Thissavros 3x100MW hydro. 2001: PPC Linoperamata 43MW gas turbine. First energy project as EPC contractor. 2005: EPC contract for Aluminium of Greece Cogen Plant. 2007: EPC contracts for KESC Pakistan & Endesa Hellas CCGT : PPC Lavrio Unit IV in consortium with GEC Alsthom. First combined cycle project in Greece. 2004: EPC contract for PPC Lavrio Unit V CCGT 378MW. 2004: EPC contract in consortium for PPC Megalopolis ESP s. 2006: PPC Lavrio Unit V Enters commercial operation. 12

13 Energy Projects Combined Cycle Thermoelectric Power Plants (TPP) Combined Cycle PPC Lavrio Unit V, Combined Cycle. Endesa Hellas, Aluminium of Greece Co-generation. Lump-sum EPC - Contract value mn. Lump-sum EPC - Contract value mn. Natural Gas fired, 378 MW combined cycle unit. Natural gas fired cogeneration plant (316MW plus 252MWth) in configuration. Single shaft GE STAG 109FA. HRSG Alstom. Awarded in 2004, entered commercial operation early GE gas turbines, Siemens steam turbine, Alstom HRSG s. Awarded 2005, completed mid

14 Energy Projects - Environmental Thermoelectric Power Plants (TPP) - Environmental PPC Agios Dimitrios ESP s. Lump-sum EPC - Contract awarded to METKA- Alstom consortium by the Public Power Corporation (PPC) of Greece. Contract value 130 mn (METKA participation 68,5%). Awarded in 2004, currently in progress. Upgrading of existing electrostatic ash precipitators, and addition of new ESPs for Units I,II,III,and IV. PPC Kardia ESP s. Lump-sum EPC - Contract awarded to METKA- Alstom consortium by the Public Power Corporation (PPC) of Greece. Contract value 42 mn (METKA participation 63%). Awarded in 2002, completed

15 Energy Projects Coal (Lignite) Fired Thermoelectric Power Plants (TTP) Coal Fired PPC Ag. Dimitrios Units I IV. 4 x lignite fired units, total 1220 MW Major consortium participant in two separate EPC contracts: Units I II of 300MW each, Units III IV of 310MW each. Execution period PPC Florina, Unit I. Lignite fired unit, 330MW awarded by the Public Power Corporation of Greece. Collaboration with Alstom. Contract period

16 Energy Projects - Hydro Hydroelectric Power Plants (HPP) PPC HES Thissavros, 3x100MW, Nestos River. PPC Ilarion Hydroelectric Project. Project execution Turn key EPC - Contract signed July Contract value 59.0 mn. 2 hydro-turbines of 70,7MW and 1 hydro-turbine of 4MW (Francis Type). Scope of supply includes design, engineering, supply, erection and commissioning of hydroturbines, governors, generators and all electromechanical equipment for the project. Supply, installation and start-up of pump turbines, auxiliary electromechanical equipment, trash racks, stop logs, penstock, gates for power tunnels, draft tubes and spillway. Consortium of METKA Cegelec - Alstom Jeumont Vevey. 16

17 Infrastructure Projects Key Strengths Strong track record: land-mark projects with demanding schedules. Blend of high value added manufacturing and turn-key project capabilities Focus: Sophisticated bridges, Port equipment, Complex Structures, Mining and mineral processing; Refining Petrochemicals. Major Projects Rion Antirion Bridge. Fabrication and erection of Pylon Head Structure Assembly and installation of steel deck. Execution Olympic Velodrome Fabrication and erection. Execution Contract value 24.2 mn. 17

18 Infrastructure Sector Heavy Industry Mining, Minerals Processing Refining & Petrochemicals Strong experience in major industrial facilities (cement, metallurgy, mining). Full turn-key / EPC capability. State-of-the-art manufacturing facilities for major mechanical equipment. Increasing international perspective - recent projects in South-East Europe. Clients include Titan Cement, PPC, Aluminium de Grèce, Union Minière (Bulgaria), etc. Significant presence in Refining & Petrochemical through METKA and subsidiary, EKME. State-of-the-art manufacturing at 3 facilities: 2 in Volos plus EKME in Thessaloniki. Manufacturing expertise includes reactors, pressure vessels, boilers, refinery towers,, etc. Turn-key supply and erection. Main clients: Hellenic Petroleum, MOH, etc. 18

19 Defence Projects - Highlights Defence Key Strengths Dynamic development through co-production contracts for major defence programs. Based on the company s state-of-the-art industrial facilities and manufacturing expertise. Significant amount of high technology workload for up to year Successful execution of projects provides solid foundation for future defence activity of any scope. Main Battle Tank Project Co-production of LEOPARD 2-Hel Main Battle Tank Co-production with KMW (Kraus Maffet Wegman) for 170 x LEOPARD armoured vehicles for the Greek Armed Forces. Contract value of 125,36 mn. Contract duration until 2009 assures high value added work-load for the Volos plant. 19

20 Defence Key Projects Defence Projects Armoured Hulls for U-214 type Submarines. Project with HDW (Howaldtswerke Deutsche Werft AG) Fabrication of pressure hulls Three latest generation submarines. Sophisticated manufacturing requirements. Contract value 21 mn. Successfully delivered during Patriot Missile Air Defence System. Co-production project with Raytheon Lockheed Martin for the Greek Armed Forces. Complete fabrication of 42 semi-trailers and 36 launcher mechanics for Patriot Missile System. Contract value 20,8 mn. Contract duration

21 Manufacturing Capability Capability Overview METKA and SERVISTEEL in Volos, plus EKME in Thessaloniki (40% owned subsidiary). Plant capabilities: Metal processing cleaning, cutting, marking, forming. Manufacture / fabrication: machining, welding, assembly of heavy &/or large, high precision parts with difficult materials. Assembly of electromechanical machinery, equipment, special vehicles etc. Main Facilities Overview METKA - VOLOS Total area of approx m2, of which m2 are covered production facilities. Strong experience in demanding applications with high quality standards. Recent investments of 15mn for new state-of-the-art equipment. Dedicated repairs and maintenance department for power plant equipment. SERVISTEEL - VOLOS Founded in 1982; acquired in Total covered area of approx m2, total area m2. Strong position in the first phase of metal construction cutting formation (bending and rolling) marking of metal sheets and sections. 21

22 Group Strategy 22

23 Prospects for METKA GREECE SOUTH-EAST EUROPE New Power Plants Award of 400MW Aliveri project recently confirmed by PPC BoD. First project in PPC s 2400MW+ capacity replacement program total est. 1.2bn in EPC for the investment portfolio of Endesa Hellas: 430MW IPP plant; additional CCGT and coal-fired projects under development MW of new generation capacity needed up to 2020 total 9,5 bn** This new capacity will be dominated by new lignite (coal) fired plants. Several major projects under development. Rehabilitation of Existing Plants Need for rehabilitation of PPC s existing lignite fired power plants Alliance with Alstom, with large installed base of Alstom equipment turbines, boilers. Rehabilitation of MW of existing thermal power generation - 4,8bn** 60% of this rehabilitation is planned to be carried out by Environmental Projects A series of environmental upgrades under completion by METKA/Alstom for PPC. Relatively limited potential for additional growth. Significant opportunity - EU environmental compliance for existing units - 2,3bn** Primary requirement, approx. 80% by value, is for sulphur removal. **Source: EC/World Bank, GIS for SEE report,

24 Recent Developments International Arena Recent International Award Karachi Electric Supply Co. Korangi Power Station, 220MW combined cycle power plant Contract value 110 mn, 24 months execution Major milestone first major international EPC contract significant future opportunities Future Prospects SOUTH-EAST EUROPE OTHER EUROPEAN DEVELOPING MARKETS Engagement with largest markets: Turkey, Romania - moving into strong investment cycle Environmental upgrades for coal plants, new-build projects emerging District heating (co-generation) prospects Primarily CCGT in the near term. Building relationships with major European utilities, e.g. qualified by E.ON for combined cycle projects in central Europe. Massive investment plans in Russia are of interest medium-long term Continuing to build on newly established presence in Pakistan. Massive need for energy infrastructure investments, often on fast-track basis. Transformation into major Regional EPC is well underway The market is receptive and supportive of this development 24

25 Consolidated Financial Review 25

26 Consolidated Income Statement (IFRS in m) E (1) Turnover Infrastructure Energy Defence Turnover Total EBITDA EBT EAT Margins (%) EBITDA 19,7% 23,6% 20,7% 21,7% - 22,5% EBT 16,8% 23,6% 18,6% 19,7% - 20% EAT 12,1% 17,3% 13,9% 15,3% - 15,6% (1) Management Estimates 26

27 Consolidated Balance Sheet (IFRS in m) Fixed Assets Current Assets Total Assets Bank Debt 1 2 Cash & Marketable Securities Equity Total Equity and Liabilities Net Debt (9) (19) (3) 27

28 Contact Information Nikos Kontos Investor Relations Officer Tel: Fax: Paul Smith Strategy Director Tel: Fax: Mytilineos Holdings S.A. 5-7 Patroklou Str Maroussi Athens Greece Tel: Fax: METKA S.A. 11 Mar. Antypa Str N. Iraklio Athens Greece Tel: Fax:

Alstom in Greece. Over 30 years of contribution to Greece. Alstom s Presence in Greece

Alstom in Greece. Over 30 years of contribution to Greece. Alstom s Presence in Greece Over 30 years of contribution to Greece Alstom s Presence in Greece THESSALONIKI INOI MENIDI THRIASIO Key Data: - Over 120 Employees - 2 Subsidiaries (Alstom Hellas [PO+TRA], Alstom Grid Hellas) - 3 Branches

More information

2011 Interim Results Presentation. Athens, 31 August 2011

2011 Interim Results Presentation. Athens, 31 August 2011 2011 Interim Results Presentation Athens, 31 August 2011 AGENDA Results Highlights Business Units Performance Financial Results Q&A 1 RESULTS HIGHLIGHTS INDUSTRY ENVIRONMENT: Conditions remain difficult

More information

ANNUAL REPORT 2013 2013 ANNUAL REPORT 8 Αrtemidos str., Μaroussi, 151 25 Αthens Greece Τ. +30 210 2709200 F. +30 210 275928 www.metka.

ANNUAL REPORT 2013 2013 ANNUAL REPORT 8 Αrtemidos str., Μaroussi, 151 25 Αthens Greece Τ. +30 210 2709200 F. +30 210 275928 www.metka. ANNUAL REPORT 2013 Contents BOARD OF DIRECTORS 02 CHAIRMAN S MESSAGE 03 COMPANY PROFILE 04-05 ACTIVITY SECTORS 06-07 LEADER IN PROJECT EXECUTION 08-09 HIGHLIGHTS OF 2013 10-11 OUR PEOPLE 12-13 SUSTAINABILITY

More information

AMTE is also active in the international market. Services have been provided for power plant projects in Chile, Cyprus, Libya, Poland, Syria.

AMTE is also active in the international market. Services have been provided for power plant projects in Chile, Cyprus, Libya, Poland, Syria. AMTE page 1 / 10 Power plants and Oil/Gas installations AMTE has participated in the vast majority of energy projects carried out in Greece: The Power Generation Plants in Florina, Megalopolis, Lavrion,

More information

First Quarter 2014 Results Presentation

First Quarter 2014 Results Presentation TECNICAS REUNIDAS Juan Lladó CEO First Quarter 2014 Results Presentation 19 th of May 2014 INDEX TECNICAS REUNIDAS AWARDS & BACKLOG 1Q 2014 FINANCIAL RESULTS OUTLOOK 1 1Q 2014 AWARDS Awards m 1Q 2014:

More information

Nordex SE Conference Call 9M 2012. Hamburg, 13/11/2012

Nordex SE Conference Call 9M 2012. Hamburg, 13/11/2012 Nordex SE Conference Call 9M 2012 Hamburg, 13/11/2012 AGENDA 1. Highlights 9M 2012 Dr. J. Zeschky 2. Financials 9M 2012 B. Schäferbarthold 3. Guidance 2012 and market outlook B. Schäferbarthold 4. Strategy

More information

Presentation of Grupo ACS. September 2009

Presentation of Grupo ACS. September 2009 Presentation of Grupo ACS September 2009 Strategic vision A global leader in infrastructure development In the fields of civil and industrial engineering activities With sustainable and profitable growing

More information

Power Plant Operations and Maintenance. Maximize Your Plant s Bottom-Line Results

Power Plant Operations and Maintenance. Maximize Your Plant s Bottom-Line Results Power Plant Operations and Maintenance Maximize Your Plant s Bottom-Line Results Since 1867, The Babcock & Wilcox Company (B&W) has engineered, supplied and constructed advanced steam generation and emissions

More information

Orascom Construction Reports Net Income of USD 64 Million in 9M 2015 and Announces Dividend Distribution of USD 0.36 per Share

Orascom Construction Reports Net Income of USD 64 Million in 9M 2015 and Announces Dividend Distribution of USD 0.36 per Share Dubai, UAE / 23 November 2015 9:00 AM Orascom Construction Reports Net Income of USD 64 Million in 9M 2015 and Announces Dividend Distribution of USD 0.36 per Share Highlights Healthy backlog level maintained

More information

Turkish power market entry. Cleaner & better energy. 4th December 2012

Turkish power market entry. Cleaner & better energy. 4th December 2012 Turkish power market entry Cleaner & better energy 4th December 2012 Summary Trilateral agreement between E.ON, Sabanci and Verbund is win-win for all parties Transaction Asset swap: Acquisition of 50%

More information

Developing Power Projects in Southern Africa. Cape Town Presentation 8 th February 2016

Developing Power Projects in Southern Africa. Cape Town Presentation 8 th February 2016 Developing Power Projects in Southern Africa Cape Town Presentation 8 th February 2016 Company Highlights AFR now participating in the development of three large-scale power projects in Botswana Completion

More information

ESBI Carbon Solutions. Partnering with Countries to Achieve their Full Carbon Credit Potential

ESBI Carbon Solutions. Partnering with Countries to Achieve their Full Carbon Credit Potential ESBI Carbon Solutions Partnering with Countries to Achieve their Full Carbon Credit Potential ESB International ESB International (ESBI) is a growing international energy company and one of Europe s leading

More information

Business plan 2009-2014. Repositioning for Performance and Growth

Business plan 2009-2014. Repositioning for Performance and Growth Public Power Corporation SA Business plan 2009-2014 Repositioning for Performance and Growth November 18, 2008 18 November 2008 0 Agenda PPC PPC is is facing financial, operational and and strategic challenges.

More information

Developing Power Projects in Southern Africa. Annual General Meeting Presentation 20 th November 2015

Developing Power Projects in Southern Africa. Annual General Meeting Presentation 20 th November 2015 Developing Power Projects in Southern Africa Annual General Meeting Presentation 20 th November 2015 2015 Company Highlights AFR now participating in the development of three large-scale power projects

More information

PACIFIC ENERGY LIMITED POWER GENERATION

PACIFIC ENERGY LIMITED POWER GENERATION PACIFIC ENERGY LIMITED POWER GENERATION 2015 RESULTS PRESENTATION August 2015 ASX: PEA Important Notice and Disclaimer This presentation has been prepared by (PEL) for information purposes only. This presentation

More information

PNE WIND AG. Presentation January 2012. Buchholz wind farm

PNE WIND AG. Presentation January 2012. Buchholz wind farm PNE WIND AG Presentation January 2012 Buchholz wind farm Agenda 1. PNE WIND AG at a glance 2. Business model 3. Market and strategy 4. Financials 5. PNE WIND AG share 6. Investment highlights Langwedel

More information

PRE-QUALIFICATION ANNOUNCEMENT

PRE-QUALIFICATION ANNOUNCEMENT Warsaw March 9, 2011 PRE-QUALIFICATION ANNOUNCEMENT The contracting authority 00-526 Warsaw, ul. Krucza 24/26, Poland Website: www.elektrowniapolnoc.pl Contact person: Mr. Marek Obuchowicz E-mail: info@elektrowniapolnoc.pl

More information

Wisconsin Energy Corporation Plan

Wisconsin Energy Corporation Plan Wisconsin Energy Corporation Plan Disclaimer All statements in this presentation other than historical facts are forward-looking statements that involve risks and uncertainties which are subject to change

More information

2014 FIRST QUARTER RESULTS CONFERENCE CALL. May 15th, 2014

2014 FIRST QUARTER RESULTS CONFERENCE CALL. May 15th, 2014 2014 FIRST QUARTER RESULTS CONFERENCE CALL May 15th, 2014 DISCLAIMER This presentation has been prepared by Eurotech S.p.A.(or Eurotech ) and has to be read in conjunction with its oral presentation. The

More information

H1 2014 LEVELISED COST OF ELECTRICITY - PV

H1 2014 LEVELISED COST OF ELECTRICITY - PV H1 2014 LEVELISED COST OF ELECTRICITY - PV JENNY CHASE 4 FEBRUARY 2014 LCOE OF PV, FEBRUARY 2014 1 PV EXPERIENCE CURVE, 1976-2013 (2013 $/W) 100 Cost per W (2013 $) 1976 10 1985 2003 2006 1 2012 2013 Q3

More information

The River Devoll Project

The River Devoll Project EVN Hydropower Development in Albania The River Devoll Project Dr. Michael Laengle, CFO Agenda > EVN Overview and strategy > Albania Electricity market in SEE > The River Devoll project 2 Company profile

More information

PUBLIC POWER CORPORATION S.A.

PUBLIC POWER CORPORATION S.A. PUBLIC POWER CORPORATION S.A. Annual Results 2006 Athens, March 27 2007 1 Agenda Highlights of 2006 Dr. Takis Athanasopoulos, Chairman and CEO Financial Results Mr. George Angelopoulos, CFO Strategic Priorities

More information

Company Overview. Chieti, May 7 th 2012

Company Overview. Chieti, May 7 th 2012 Chieti, May 7 th 2012 AGENDA 1 Toto Group Structure 2 Toto S.p.a. Costruzioni Generali: Overview 3 Business Interests 4 5 6 7 8 Toto s Strenght: Know How Toto s Technological Assets The Construction Business

More information

Nordex SE Conference Call Q3 2014. Hamburg 13 November 2014

Nordex SE Conference Call Q3 2014. Hamburg 13 November 2014 Nordex SE Conference Call Q3 2014 Hamburg 13 November 2014 AGENDA 1. Highlights 9m 2014 Dr. Jürgen Zeschky 2. Market snapshots Dr. Jürgen Zeschky 3. Operational progress Dr. Jürgen Zeschky 4. Financials

More information

VERBUND AG, www.verbund.com

VERBUND AG, www.verbund.com VERBUND Results quarter 1/2015 Vienna, 06/05/2015 Results quarter 1/2015 Page 3 At a glance Influencing factors Water supply 3% above long-term average and 10%-points above Q1/2014 Reduction of average

More information

Aksa Enerji OUTPERFORM. 07 September 2011. Massive cut in 2011 production target more than priced in... Upside Potential* 80%

Aksa Enerji OUTPERFORM. 07 September 2011. Massive cut in 2011 production target more than priced in... Upside Potential* 80% Equity / Mid Cap. / Utilities 07 September 2011 Bloomberg: AKSEN TI Massive cut in 2011 production target more than priced in... We have revised our valuation for reflecting the changes in the company

More information

2015 FIRST HALF RESULTS CONFERENCE CALL. August 31st, 2015

2015 FIRST HALF RESULTS CONFERENCE CALL. August 31st, 2015 2015 FIRST HALF RESULTS CONFERENCE CALL August 31st, 2015 DISCLAIMER This presentation has been prepared by Eurotech S.p.A.(or Eurotech ) and has to be read in conjunction with its oral presentation. The

More information

Business and Strategy Update. 27 April 2010

Business and Strategy Update. 27 April 2010 Business and Strategy Update 27 April 2010 1 Agenda Contents Retention of US Business Outcome of German and French Asset Sale Processes Focus on Growth in Australia Distribution Guidance and Policy Presenter:

More information

Company Profile. New and overhauled Power Plants for sale

Company Profile. New and overhauled Power Plants for sale 1 Company Profile New and overhauled Power Plants for sale - Combined Cycle - Gas & Steam Turbines - Gas & Diesel Engines - Wind Turbines & Green Energy - Coal fired Power & Waste to Energy - Biomass &

More information

Pilot testing the EWA Interventions in Greece Institute of Preventive Medicine, Environmental & Occupational Health, Prolepsis

Pilot testing the EWA Interventions in Greece Institute of Preventive Medicine, Environmental & Occupational Health, Prolepsis Pilot testing the EWA Interventions in Greece Institute of Preventive Medicine, Environmental & Occupational Health, Prolepsis Dina Zota Brussels, 22/11/2013 Description of the pilots Companies 8 companies

More information

Nordex SE Conference Call Q1 2015

Nordex SE Conference Call Q1 2015 Nordex SE Conference Call Q1 2015 Hamburg 13 May 2015 AGENDA 1. Highlights Dr. Jürgen Zeschky 2. Operational progress and order intake Dr. Jürgen Zeschky 3. Financials Q1 2015 Bernard Schäferbarthold 4.

More information

Subject: Technology Collaboration for Gas Turbine and its auxiliaries of a 1.5 MW (ISO) rating, suitable for marine (defence) application.

Subject: Technology Collaboration for Gas Turbine and its auxiliaries of a 1.5 MW (ISO) rating, suitable for marine (defence) application. Subject: Technology Collaboration for Gas Turbine and its auxiliaries of a 1.5 MW (ISO) rating, suitable for marine (defence) application. 1) Introduction This Expression of Interest (EoI) seeks response

More information

Earnings Release 9M2015

Earnings Release 9M2015 Earnings Release 9M2015 19 November 2015 Results overview Regional segments Final remarks PAGE 3 PAGE 12 PAGE 22 Europe Africa Latin America 2 Key highlights Consolidation of EGF in the 3Q15, according

More information

Energy Division Lahmeyer International GmbH Rehabilitation Vasilikos PS Unit 5 CCPP after Naval Base explosion

Energy Division Lahmeyer International GmbH Rehabilitation Vasilikos PS Unit 5 CCPP after Naval Base explosion Energy Division Lahmeyer International GmbH Rehabilitation Vasilikos PS Unit 5 CCPP after Naval Base explosion Speaker: Richard Wilhelm Event: PowerGen 2014, Köln - Germany Date: 4 June 2014 2014 Topic

More information

Entering in Mexico s electricity generation business with 2,000 MW. October 23, 2015

Entering in Mexico s electricity generation business with 2,000 MW. October 23, 2015 Entering in Mexico s electricity generation business with 2,000 MW October 23, 2015 Strategic compliance Sector overview Project description Final remarks Page 2 Page 4 Page 14 Page 18 1 Compliance with

More information

Alstom Power in Chattanooga, USA Bringing State-of-the-Art Engineering & Manufacturing Capabilities to the North American Market POWER

Alstom Power in Chattanooga, USA Bringing State-of-the-Art Engineering & Manufacturing Capabilities to the North American Market POWER POWER Alstom Power ramps up its presence in North America Alstom Power has opened a new manufacturing and engineering facility in Chattanooga, on the banks of the Tennessee river, to serve both new and

More information

COMPETITIVE ELECTRIC ENERGY MARKET IN GREECE

COMPETITIVE ELECTRIC ENERGY MARKET IN GREECE NATIONAL TECHNICAL UNIVERSITY OF ATHENS (NTUA) GREECE COMPETITIVE ELECTRIC ENERGY MARKET IN GREECE EVANGELOS DIALYNAS Professor NTUA Director of Electric Power Division 1 Competitive Electric European

More information

Press conference, Prague, Czech Republic, December 20, 2007 Martin Roman, CEO CEZ Group Zsolt Hernádi, CEO MOL Group

Press conference, Prague, Czech Republic, December 20, 2007 Martin Roman, CEO CEZ Group Zsolt Hernádi, CEO MOL Group CEZ MOL STRATEGIC ALLIANCE Press conference, Prague, Czech Republic, December 20, 2007 Martin Roman, CEO CEZ Group Zsolt Hernádi, CEO MOL Group TWO LARGEST REGIONAL PLAYERS AGREED TO FORM STARTEGIC ALLIANCE

More information

Nippon Mining Holdings, Inc.

Nippon Mining Holdings, Inc. Supplementary Explanation for Financial Results for Fiscal 2008 - From April 1, 2008 to March 31, 2009 - April 30, 2009 Disclaimers concerning forward-looking statements are prepared on the last page of

More information

TLG IMMOBILIEN AG H1 2015 Results August 2015

TLG IMMOBILIEN AG H1 2015 Results August 2015 TLG IMMOBILIEN AG H1 2015 Results August 2015 Disclaimer This presentation includes statements, estimates, opinions and projections with respect to anticipated future performance of TLG IMMOBILIEN ("Forward-Looking

More information

Nordex SE Conference Call H1 2013. Hamburg August 15, 2013

Nordex SE Conference Call H1 2013. Hamburg August 15, 2013 Nordex SE Conference Call H1 2013 Hamburg August 15, 2013 AGENDA 1. Highlights Dr. J. Zeschky 2. Market update Dr. J. Zeschky 3. Business performance Dr. J. Zeschky 4. Financials B. Schäferbarthold 5.

More information

Downer Group 2014 Full Year Results. 5 August 2014

Downer Group 2014 Full Year Results. 5 August 2014 Downer Group 2014 Full Year Results 5 August 2014 Financial overview Earnings Net Profit After Tax (NPAT) $216.0 million, up 5.9%1 Earnings Before Interest and Tax (EBIT) $341.1 million, down 4.9% 1 Return

More information

First Half 2015 Results (January-June) Madrid, July 24 th 2015

First Half 2015 Results (January-June) Madrid, July 24 th 2015 First Half 2015 Results (January-June) Madrid, July 24 th 2015 Table of Contents 1. 1H 2015 Highlights 2. Backlog Execution 3. Update on Tulpar Transaction 4. Commercial Activity 5. Profit & Loss 6. Cash

More information

Acquisition of SAIT Communications. 28 July 2015

Acquisition of SAIT Communications. 28 July 2015 Acquisition of SAIT Communications 28 July 2015 Conference call details SpeedCast acquires SAIT Communications The company has scheduled a conference call as follows: Time: 11.00am (Sydney time), 28 th

More information

New Developments on Industrial Steam Turbines

New Developments on Industrial Steam Turbines New Developments on Industrial Steam Turbines Enhanced Platform The next generation of Siemens industrial steam turbines Flexibility meets Efficiency The new pre-designed multistage steam turbine SST-111

More information

XING AG Acquisition of amiando AG

XING AG Acquisition of amiando AG XING AG Acquisition of amiando AG Dr. Stefan Gross-Selbeck (CEO) December 9, 2010 01 XING AG - Acquisition of amiando AG Executive Summary 1. XING AG acquires amiando AG Objective: to form a fully integrated

More information

Areva & Gamesa Joint Venture: Creation of an Offshore Wind Leader

Areva & Gamesa Joint Venture: Creation of an Offshore Wind Leader Areva & Gamesa Joint Venture: Creation of an Offshore Wind Leader 7 July 2014 1 Resumen Ejecutivo 1. Transaction Overview 2 Summary Areva and Gamesa have entered into an agreement to form a 50%/50% Joint

More information

Australian Accounting Standards Board (AASB)

Australian Accounting Standards Board (AASB) Standards Board () FACT SHEET September 2011 1038 Life Insurance Contracts (This fact sheet is based on the standard as at 1 January 2011.) Important note: This standard is an Australian specific standard

More information

Nordex SE Conference Call Q1 2013. Frankfurt/Main May 15, 2013

Nordex SE Conference Call Q1 2013. Frankfurt/Main May 15, 2013 Nordex SE Conference Call Q1 2013 Frankfurt/Main May 15, 2013 AGENDA 1. Highlights Dr. J. Zeschky 2. Market Update and business performance Dr. J. Zeschky 3. Financials B. Schäferbarthold 4. Summary and

More information

RAJESH EXPORTS LIMITED GLOBAL PRESENCE IN GOLD AND GOLD PRODUCTS. Earnings Presentation Q2 FY16

RAJESH EXPORTS LIMITED GLOBAL PRESENCE IN GOLD AND GOLD PRODUCTS. Earnings Presentation Q2 FY16 RAJESH EXPORTS LIMITED GLOBAL PRESENCE IN GOLD AND GOLD PRODUCTS Earnings Presentation Q2 FY16 Company Overview COMPANY OVERVIEW Rajesh Exports Ltd. (REL) was incorporated in 1989. Currently REL is a leader

More information

RHI AG. May 12, 2016

RHI AG. May 12, 2016 RHI AG Results 1Q/16 May 12, 2016 Highlights & Lowlights Highlights Positiv Steel Division operating EBIT margin of 7.8% in 1Q/16 driven by Europe and North America as a result of an improved product mix

More information

2007 Earnings Presentation February, 26th 2008

2007 Earnings Presentation February, 26th 2008 2007 Earnings Presentation February, 26th 2008 With the sun we produce thermoelectric and photovoltaic electric energy With biomass we produce ecologic biofuels and animal feed With wastes produce new

More information

SBERBANK GROUP S IFRS RESULTS. March 2015

SBERBANK GROUP S IFRS RESULTS. March 2015 SBERBANK GROUP S IFRS RESULTS 2014 March 2015 SUMMARY OF PERFORMANCE FOR 2014 STATEMENT OF PROFIT OR LOSS Net profit reached RUB 290.3bn (or RUB 13.45 per ordinary share), compared to RUB 362.0bn (or RUB

More information

Conference call First half of fiscal year 2014

Conference call First half of fiscal year 2014 Conference call First half of fiscal year EnBW Energie Baden-Württemberg AG Karlsruhe, 1 August Thomas Kusterer, Chief Financial Officer Ingo Peter Voigt, Senior Vice President, Head of Finance / Investor

More information

NEUTRAL. Weak FY14, but positive outlook thereafter. June 5 th, 2015

NEUTRAL. Weak FY14, but positive outlook thereafter. June 5 th, 2015 EQUITY RESEARCH FY14 Update June 5 th, 2015 Weak FY14, but positive outlook thereafter NEUTRAL Current Share Price ( ): 3.4 Target Price ( ): 3.8 Enertronica 1Y Performance 120 Weak FY2014 figures, due

More information

Kuehne + Nagel International AG Analyst Conference Call Q1 results 2015. April 14, 2015 (CET 14.00) Schindellegi, Switzerland

Kuehne + Nagel International AG Analyst Conference Call Q1 results 2015. April 14, 2015 (CET 14.00) Schindellegi, Switzerland Kuehne + Nagel International AG Analyst Conference Call Q1 results 2015 (CET 14.00) Schindellegi, Switzerland Forward-looking statements This presentation contains forward-looking statements. Such statements

More information

FY 2014 Results March 19, 2015

FY 2014 Results March 19, 2015 FY 2014 Results March 19, 2015 1 This document has been prepared by Maire Tecnimont S.p.A. (the Company ) solely for use in the presentation of its results. This document does not constitute or form part

More information

Electric Utilities. Introduction to the module

Electric Utilities. Introduction to the module Introduction to the module The electric utilities module is based on a reporting framework produced by the Institutional Investors Group on Climate Change (IIGCC), Ceres, and the Investor Group on Climate

More information

Subject: Technology Collaboration for Fired Heaters (FH)

Subject: Technology Collaboration for Fired Heaters (FH) 1) Introduction: Subject: Technology Collaboration for Fired Heaters (FH) This Expression of Interest (EoI) seeks response from Original Equipment Manufacturers (OEMs), who are willing to be associated

More information

Smart solutions for fleets of all types & sizes of power generation. Marcus König, E F IE SGS / September 2013

Smart solutions for fleets of all types & sizes of power generation. Marcus König, E F IE SGS / September 2013 Smart solutions for fleets of all types & sizes of power generation Marcus König, E F IE SGS / September 2013 Instrumentation, Controls & Electrical The Siemens structure: Four Sectors close to the customer

More information

2015 Results and Prospects

2015 Results and Prospects PRESS RELEASE Paris, 23 March 2016 2015 Results and Prospects Revenues: 2,579.3 million, up 3.2% EBITDA: 342.0 million, an operating margin of 13.3% 2016 Objectives: revenues close to 3 billion and an

More information

Tetragon Financial Group Limited ( TFG )

Tetragon Financial Group Limited ( TFG ) Tetragon Financial Group Limited ( TFG ) 12 August 2014 THE INFORMATION CONTAINED HEREIN DOES NOT CONSTITUTE AN OFFER TO SELL OR A SOLICITATION OF AN OFFER TO PURCHASE ANY SECURITY OF TFG. THIS INFORMATION

More information

ASX code - LCM. 2015 full year results investor briefing

ASX code - LCM. 2015 full year results investor briefing ASX code - LCM 2015 full year results investor briefing 3 September 2015 performance summary FY15 against previous corresponding period (pcp) $133.8m Revenue FY14: $127.9m $8.3m Statutory NPAT FY14: $5.0m

More information

YE08 Consolidated Financial Results. February 13, 2009

YE08 Consolidated Financial Results. February 13, 2009 YE08 Consolidated Financial Results February 13, 2009 1 We support our strategy with strong risk management Proven risk management track record and the highest credit ratings given to a bank in Turkey

More information

This financial report has been translated from the original report that has been prepared in the Greek language. Reasonable care has been taken to

This financial report has been translated from the original report that has been prepared in the Greek language. Reasonable care has been taken to Grivalia Properties REIC CONDENSED CONSOLIDATED AND COMPANY INTERIM FINANCIAL STATEMENTS FOR THE PERIOD ENDED MARCH 31, 2015 This financial report has been translated from the original report that has

More information

eeef - European Energy Efficiency Fund

eeef - European Energy Efficiency Fund eeef - European Energy Efficiency Fund Agenda 1 2 3 Introduction to eeef Eligibility check for projects Technical Assistance 4 Potential project structures 5 Case Studies 2 eeef at a glance Objective Beneficiaries

More information

TO OUR SHAREHOLDERS PROFITABLE GROWTH COURSE INTERNATIONALIZATION FURTHER EXTENDED US MARKET IN FOCUS

TO OUR SHAREHOLDERS PROFITABLE GROWTH COURSE INTERNATIONALIZATION FURTHER EXTENDED US MARKET IN FOCUS QUARTERLY STATEMENT AS OF MARCH 31, 2015 TO OUR SHAREHOLDERS Patrik Heider, Spokesman of the Executive Board and CFOO The Nemetschek Group has made a dynamic start in the 2015 financial year and continues

More information

IFGL REFRACTORIES LTD. RESULT UPDATE PRESENTATION, February 2016

IFGL REFRACTORIES LTD. RESULT UPDATE PRESENTATION, February 2016 IFGL REFRACTORIES LTD RESULT UPDATE PRESENTATION, February 2016 Safe Harbor This presentation and the accompanying slides (the Presentation ), has been prepared by IFGL Refractories Limited (the Company

More information

International Financial Reporting Standards (IFRS)

International Financial Reporting Standards (IFRS) FACT SHEET September 2011 IAS 27 Consolidated and separate financial statements (This fact sheet is based on the standard as at 1 January 2011.) Important note: This fact sheet is based on the requirements

More information

GE Oil & Gas. Air cooled heat exchangers Robust and reliable for all loads and applications

GE Oil & Gas. Air cooled heat exchangers Robust and reliable for all loads and applications GE Oil & Gas Air cooled heat exchangers Robust and reliable for all loads and applications What it is Air cooled heat exchangers are commonly used in industrial applications where a reliable source of

More information

CMM PRE-FINANCE INFORMATION. Krasnogorskaya Mine Methane Utilisation Synopsis. Entire report available from Uglemetan (tailakov@uglemetan.

CMM PRE-FINANCE INFORMATION. Krasnogorskaya Mine Methane Utilisation Synopsis. Entire report available from Uglemetan (tailakov@uglemetan. CMM PRE-FINANCE INFORMATION Krasnogorskaya Mine Methane Utilisation Synopsis Entire report available from Uglemetan (tailakov@uglemetan.ru) 1 JUNE 2008 2 IMPORTANT NOTICE This Pre-Finance Information (

More information

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK ISO/IEC 17021:2011 to provide environmental management systems certification to Unit 6, Gordano Court Gordano Gate Business Park Serbert Close

More information

Nordex SE Conference Call FY 2014

Nordex SE Conference Call FY 2014 Nordex SE Conference Call FY 2014 Frankfurt 23 March 2015 AGENDA 1. Highlights Dr. Jürgen Zeschky 2. Operational progress Dr. Jürgen Zeschky 3. Financials 2014 Bernard Schäferbarthold 4. Market development

More information

QSC AG Company Presentation Results Q1 2011. Cologne, May 9, 2011

QSC AG Company Presentation Results Q1 2011. Cologne, May 9, 2011 QSC AG Company Presentation Results Q1 2011 Cologne, May 9, 2011 1 AGENDA 1. Highlights Q1 2011 2. Financial Results Q1 2011 3. Outlook 2011 4. Questions & Answers 2 MAJOR ACHIEVEMENTS IN 2011 UP TO NOW

More information

What s Hot in Oil, Gas and Energy Equipment Leasing

What s Hot in Oil, Gas and Energy Equipment Leasing WWW.IBISWORLD.COM October 2013 1 Follow on head on Master page A October 2013 What s Hot in Oil, Gas and Energy Equipment Leasing By David Yang Effective portfolio risk management is vital to the long-term

More information

Investor & Analyst Presentation Acquisition of Centor US Holding Inc. Uwe Röhrhoff, CEO Rainer Beaujean, CFO Duesseldorf, July 28, 2015

Investor & Analyst Presentation Acquisition of Centor US Holding Inc. Uwe Röhrhoff, CEO Rainer Beaujean, CFO Duesseldorf, July 28, 2015 Investor & Analyst Presentation Acquisition of Centor US Holding Inc. Uwe Röhrhoff, CEO Rainer Beaujean, CFO Duesseldorf, July 28, 2015 Disclaimer 1. This presentation may contain certain forward-looking

More information

Electricity Supply Board

Electricity Supply Board Electricity Supply Board Investor Presentation 2012 Interim Results December 2012 Disclaimer Forward looking statements: This presentation contains certain forward-looking statements with respect to ESB

More information

Full Year Report 2005. 26 January 2006

Full Year Report 2005. 26 January 2006 Full Year Report 2005 26 January 2006 Important Notice This Presentation has been produced by TradeDoubler AB (the Company ) and is furnished to you solely for your information. This document contains

More information

Disclaimer. No offer of securities This presentation does not constitute an offer to sell or the solicitation of an offer to buy any securities.

Disclaimer. No offer of securities This presentation does not constitute an offer to sell or the solicitation of an offer to buy any securities. Disclaimer Forward looking statements Certain statements in this document are not historical facts and are or are deemed to be forward-looking. NWR s prospects, plans, financial position and business strategy,

More information

International Financial Reporting Standards (IFRS)

International Financial Reporting Standards (IFRS) FACT SHEET September 2011 IAS 7 Statement of Cash Flows (This fact sheet is based on the standard as at 1 January 2010.) Important note: This fact sheet is based on the requirements of the International

More information

16 Cheung Kong Infrastructure Holdings Limited

16 Cheung Kong Infrastructure Holdings Limited CKI holds a 38.87% interest in Hongkong Electric, the sole electricity supplier for over 550,000 customers on Hong Kong Island and Lamma Island. Generating a stable cash income year after year, Hongkong

More information

E.ON Nordic: Steady Value Growth

E.ON Nordic: Steady Value Growth E.ON Nordic: Steady Value Growth Lars Frithiof Chief Executive Officer, E.ON Nordic E.ON Capital Market Day Nordic Stockholm, July 3, 2006 Topics for the day Introduction to E.ON Nordic Our achievements

More information

Conference Call Q1-2015/2016

Conference Call Q1-2015/2016 Conference Call Q1-2015/2016 DIRK KALIEBE August 12, 2015 Highlights Q1-2015/2016 Strategic reorientation is taking effect Good order situation, improved backlog Strong revenue growth due to solid order

More information

Nordex SE Conference Call 9M 2015. Frankfurt 11 November 2015

Nordex SE Conference Call 9M 2015. Frankfurt 11 November 2015 Nordex SE Conference Call 9M 2015 Frankfurt 11 November 2015 AGENDA 1. Highlights Lars Bondo Krogsgaard 2. Operational progress and order intake Lars Bondo Krogsgaard 3. Financials 9M 2015 Bernard Schäferbarthold

More information

Power Island. Industrial Power Plants. www.siemens.com / energy

Power Island. Industrial Power Plants. www.siemens.com / energy Power Island Industrial Power Plants www.siemens.com / energy Flexible combined-cycle power plants With today s increasing demands for flexible power plants, intensified by the increased amount of electricity

More information

BROOKFIELD RENEWABLE ANNOUNCES 7% DISTRIBUTION INCREASE AND FOURTH QUARTER RESULTS Distribution increased from $1.66 to $1.

BROOKFIELD RENEWABLE ANNOUNCES 7% DISTRIBUTION INCREASE AND FOURTH QUARTER RESULTS Distribution increased from $1.66 to $1. PRESS RELEASE BROOKFIELD RENEWABLE ANNOUNCES 7% DISTRIBUTION INCREASE AND FOURTH QUARTER RESULTS Distribution increased from $1.66 to $1.78 per share BROOKFIELD, News, February 4, 2016 Brookfield Renewable

More information

Rocket Internet Co-Investment Fund

Rocket Internet Co-Investment Fund Presentation1 Agenda Page [ P R E S E N T A T I O N T I T L E ] April 2015 Rocket Internet Co-Investment Fund [ C L I E N T N A M E ] 19 th January 2016 1 Disclaimer This document is being presented solely

More information

TO OUR SHAREHOLDERS DYNAMIC FIRST HALF YEAR

TO OUR SHAREHOLDERS DYNAMIC FIRST HALF YEAR HALF YEAR REPORT AS OF JUNE 30, 2015 TO OUR SHAREHOLDERS Patrik Heider, Spokesman of the Executive Board and CFOO The Nemetschek Group maintained its dynamic development from the first quarter of 2015

More information

MAHINDRA CIE AUTOMOTIVE

MAHINDRA CIE AUTOMOTIVE MAHINDRA CIE AUTOMOTIVE June 2013 Industrial Group specialized in Managing High Value Added Processes 1 Table of Contents 1 Introduction to the Mahindra CIE Alliance 2 Rationale for the Alliance 3 Introduction

More information

Financing Wind Energy in Turkey. Emre Hatem Head of Project & Acquisition Finance Garanti Bank

Financing Wind Energy in Turkey. Emre Hatem Head of Project & Acquisition Finance Garanti Bank Financing Wind Energy in Turkey Emre Hatem Head of Project & Acquisition Finance Garanti Bank DISCLAIMER This document has been drafted with an informative purpose, having the information contained herein

More information

www.pwc.com/mn/capital-markets

www.pwc.com/mn/capital-markets www.pwc.com/mn/capital-markets Listing in London A guide to premium and standard listings of equity and flotation on AIM Capital Markets About this brochure This brochure summarises the different London

More information

Consolidated Interim Report

Consolidated Interim Report Consolidated Interim Report as of 31 March 2015 UNIWHEELS AG CONTENTS 1. Key performance data 2. Condensed group management report as of 31 March 2015 3. Condensed consolidated financial statements as

More information

Conference Call Annual Results 2013/14

Conference Call Annual Results 2013/14 AT&S first choice for advanced applications Conference Call Annual Results 2013/14 Andreas Gerstenmayer (CEO) Karl Asamer (CFO) Martin Theyer (IR/PR) 8th May 2014 8:30am CET AT & S Austria Technologie

More information

Scotiabank Financials Summit September 4, 2014

Scotiabank Financials Summit September 4, 2014 Scotiabank Financials Summit September 4, 2014 Customers Capital Bank ~7,000 customers, high level of recurring revenue 2 Forward-Looking Statements This presentation contains certain statements that constitute

More information

VESI JA ENERGIA VIENTITUOTTEENA. Fortum Miko Olkkonen Senior Executing Manager, Hydro Projects Fortum Power & Heat Oy

VESI JA ENERGIA VIENTITUOTTEENA. Fortum Miko Olkkonen Senior Executing Manager, Hydro Projects Fortum Power & Heat Oy VESI JA ENERGIA VIENTITUOTTEENA Fortum Senior Executing Manager, Hydro Projects Fortum Power & Heat Oy Fortum s strategy relies strongly in Hydro Mission Fortum s purpose is to create energy that improves

More information

Tipco Asphalt Public Company Limited (TASCO)

Tipco Asphalt Public Company Limited (TASCO) (TASCO) Q1/2015 Opportunity Day 4 th June 2015 1 Disclaimer This presentation material has been prepared solely for informational purposes only. TASCO is furnishing it solely for use by prospective investors

More information

ABENGOA. 2014: Financial Review. Barbara Zubiria. 8th Annual Analyst and Investor Day. EVP, Capital Markets & IR

ABENGOA. 2014: Financial Review. Barbara Zubiria. 8th Annual Analyst and Investor Day. EVP, Capital Markets & IR Innovative Technology Solutions for Sustainability ABENGOA 2014: Financial Review Barbara Zubiria EVP, Capital Markets & IR 8th Annual Analyst and Investor Day April 3 & 4, 2014 Forward-looking Statement

More information

Capital Stage AG, Conference Call, Monday, 11/17/14 Strategic Partnership with Gothaer Insurance Group

Capital Stage AG, Conference Call, Monday, 11/17/14 Strategic Partnership with Gothaer Insurance Group Capital Stage AG, Conference Call, Monday, 11/17/14 Strategic Partnership with Gothaer Insurance Group Who we are We are an independent operator of PV and wind parks in Germany, Italy and France. Over

More information

Tupras OUTPERFORM (M) 15 February 2010. Strong 2009 results on refining side...

Tupras OUTPERFORM (M) 15 February 2010. Strong 2009 results on refining side... Equity / Large Cap. / Petroleum and Energy 15 February 2010 Bloomberg: TUPRS TI Strong 2009 results on refining side... Reuters: TUPRS IS released its 2009 year end tax purpose financials. The main differences

More information

Financial Year 2013/14

Financial Year 2013/14 Financial Year Investor Relations June 2014 voestalpineag AG www.voestalpine.com Overview From a steel producer to a technology and industrial goods corporation High-tech steel is the base of voestalpine,