1 Safety of Small/Rural Dams and Barrier Lake Management A. Introduction 1. Lessons learnt and recommendations are provided for artificial dams and barrier lakes. In the case of artificial dams, emphasis has been placed on small, rural dams, rather than on larger, well-engineered dams because smaller dams represent a higher hazard in China 1. That higher risk from smaller dams is also confirmed by international experience. Barrier lakes and their management are highlighted as they are formed as a specific outcome of earthquakes. 2. Key issues and lessons learnt from international experience are presented with reference to three case studies of relevant World Bank supported projects: Gujarat s 2001 Earthquake- Dam safety aspects; Lake Sarez Risk Mitigation Project; Armenia Dam Safety Program. 3. Brief descriptions of these projects are provided in boxes at the end of the note. Further information is available at NDRC s request. B. Key Issues and Lessons Learnt Artificial Dams 4. After the impact of an earthquake, priority should be placed on emergency measures to counteract immediate risk to human life. At the same time, dam rehabilitation and modernization measures should be planned and later implemented. 5. In the case of Gujarat s 2001 earthquake, (see Annex 1) emergency measures were carried out in less than 5 months, before the beginning of monsoon rains. Rehabilitation and modernization measures took 8 years. 6. Cumulative probability of failure of many small rural dams is much higher than that of a few larger reservoirs (see Annex 1). This is valid under seismic and flood conditions. 7. Defensive measures to enhance earth/rock dam resilience to earthquakes (H.B. Seed, 1979) are listed in the following box. 1 Large dam: reservoir capacity > or = 100m cubic meters Medium dam: 100m cubic meters > reservoir capacity >or= 10m cubic meters Small dam: reservoir capacity < 10m cubic meters World Bank Good Practice Notes 1 Dams and Barrier Lakes

2 1) Ample freeboard to allow for settlement, slumping, or fault movements. 2) Use wide transition zones of material not vulnerable to cracking. 3) Use chimney drains near the central portion of the embankment. 4) Provide for ample drainage zones to allow for possible flow of water through cracks. 5) Use wide core zones of plastic materials not vulnerable to cracking. 6) Use well-graded filter zone upstream of the core to serve as crack-stopper. 7) Provide crest details that will prevent erosion in the event of overtopping. 8) Flare the embankment core at abutment contacts. 9) Locate the core to minimize the degree of saturation of materials. 10) Stabilize zones around reservoir rim to prevent slides into the reservoir. 11) Provide special details if there is danger of fault movement in the foundation. Barrier Lakes 8. Barrier lakes can be formed by diverse mechanisms such as glacier movements, moraine barriers, landslides, avalanches, volcanic calderas, etc. 9. Barrier lakes normally last days or weeks;, their life span depends mainly on: water and sediment flow size and shape of the barrier materials forming the barrier rate of seepage through the barrier. 10. Only a few barrier lakes survive for months or years, very few reach a long lasting equilibrium (see Annex 2). 11. After the occurrence of a barrier lake, the immediate priority is to facilitate river flow by removing, at least partly, the barrier. 12. In case of large barriers, depending on composition and on local climate, the hazard may last for longer, therefore long term solutions need to be studied and implemented. 13. Satellite imagery and remote sensing techniques allow detection of recently formed lakes by comparison of before and after pictures. In addition it also allows for the identification of landslide features such as escarpments, typical forms of landslide bodies and failure mechanisms (rockslide, earth slide, debris flows, etc.). 14. Basic measurements of the lake area and mean depth permit the use of empirical relationships to estimate lake volume peak discharge in case of barrier failure (e.g. Costa and Schuster, 1988). This information is of vital importance for a rapid assessment of the downstream areas that could be potentially flooded. World Bank Good Practice Notes 2 Dams and Barrier Lakes

3 15. When access becomes possible, ground checks by expert teams are absolutely necessary. Site visits allow verification of the landslide dam geometry/profile, material types and likely internal structure. Seepage points should also be mapped and flows documented. An assessment of landslide type and mode of emplacement is an essential part of the observations, including the type and nature of rock mass in the source zone, travel profile (distance & height), disaggregating with travel etc. 16. For long term monitoring of the highest hazards, essential elements are lake level (for both rise and fall in the event of failure) flow gauging stations downstream rainfall station 17. Time lapse camera(s) looking upstream at the dam (generally with a few minute intervals) may be required in some cases. C. Recommendations Artificial Dams 18. More than 2,300 dams were affected by the Wenchuan Earthquake, of these only 30 dams are large or medium size dams. The small dams affected by the earthquake were built 30 or 40, even 50 years ago without proper design. The conditions of these dams are not sound. Even worse, most of these dams have no proper operation, maintenance and surveillance (OMS). It is recommended that the owners of these dams work out an OMS manual for their dams to strengthen dam safety management. 19. Several international guidelines exist on post-earthquake safety inspections of dams, but they are by necessity quite generalized because each dam owner needs to set up safety inspection procedures which are case-specific. These procedures should be specified in the standing operation procedures for each dam, and in particular in the Emergency Preparedness Plans (EPP). Most of the small dams in China have no EPPs at present. It is recommended that the Chinese Government issue guidelines on EPP for small dams with reference to international experiences. 20. A uniform and consolidated risk assessment of all dams within the earthquake affected area needs to be completed/ compiled. 21. The risk assessments should guide the prioritization of rehabilitation and modernization measures, with the objective to reduce the risk profile of the entire group of dams (see Annexes 1 & 3). The Bank, together with Chinese Government, has been conducting Portfolio Risk Assessment (PRA) using quantitative risk assessment techniques (Risk-Based Profile System (RBPS)) for a number of dams to identify the risks and remedial measures prioritized based on risk indexes. World Bank Good Practice Notes 3 Dams and Barrier Lakes

4 22. Risk assessment need not be complex. The level of sophistication should be appropriate to the specific case; semi-quantitative, empirical, methods can be efficient tools for large sets of dams (see Annex 3). 23. In terms of preventive actions, good practice includes risk assessment which should be done for all high hazard dams. This should be updated on a regular basis. 24. Adequate technical assistance should be provided for design, construction, operation, and modernization of small rural dams. 25. A census of rural dams should be completed and made available in different regions/ counties; water level in the reservoir is the priority information to be monitored. Barrier Lakes 26. Barrier lake occurrences should be monitored in those areas where their likelihood is higher. Satellite imagery and remote sensing techniques are essential tools for managing these hazards. 27. After successful implementation of emergency measures, the barrier lakes that are expected to last for some time require monitoring and, as appropriate, early warning systems. In some cases structural measures to reduce/ remove risk of failure are required, these may represent opportunities for delivering social services such as water supply, recreation, hydropower, irrigation, etc. (see Annex 2). 28. Awareness and training of the population at risk is essential during the life of those barrier lakes which are expected to remain in place for long periods of time (see box 2). 29. In special cases, risk assessment can be a powerful tool for design and operation of monitoring and early warning systems (see Annex 2). 30. Long living barrier lakes should have in place emergency preparedness plans such as those used for man-made reservoirs (see Annex 2). 31. Given the safety conditions and risk level of Tangjiashan Barrier Lake, long-term monitoring and management are needed. It is recommended that Chinese Government establish gauging station(s) and rainfall stations downstream and upstream of the lake. In addition, a monitoring system and EPP for the lake management should be set up. World Bank Good Practice Notes 4 Dams and Barrier Lakes

5 Annex 1: Gujarat s 2001 Earthquake- Dam safety aspects 32. The Indian Subcontinent is characterized by a very large number of embankment dams for irrigation and rural water supply. Such dams are generally of small size (less than 30m high), and built by organizations with little or no experience in dam engineering. During the Bhuj earthquake of January 26, 2001 about 250 earth-fill dams were damaged. Soil liquefaction and slope failure caused extensive cracking, deformations and settlements. Courtesy Prof. S. K. Jain Courtesy Dr. R. Kishore 33. No major damage was reported in the larger, better engineered dams which were located in the earthquake affected region. Fortunately, the earthquake occurred before the monsoon period, when reservoirs were mostly empty. Had the earthquake happened during or after the monsoons, damage to saturated earth dams would have been much more severe and several reservoirs would have released water causing devastating floods. 34. Lack of design documents for most of the dams made the definition of emergency measures a difficult task. Such measures had to be implemented at 245 dams, from January to June 2001; repair works included opening and filling cracks, slope reinforcement, repair of intake works and spillways. Five dams, which could not be repaired, were breached and removed. Total expenditure in emergency repairs to dams was US$ 4 million. 35. Following the emergency, two teams composed of national and international experts identified the strengthening measures to be implemented at 225 dams. As there was no basic data available, about 12,000 soil samples were tested. Hydrological safety was updated at all dams. Stability analysis was carried out using updated seismic loading conditions. Design and construction was subject to independent review, seminars and workshops took place to strengthen capacity of field staff. 36. The Bhuj earthquake confirmed that small rural dams have a very high probability of failure and that such failures can occur over a very vast area, where several such dams are located storing water of similar volume as a large reservoir. The intuitive World Bank Good Practice Notes 5 Dams and Barrier Lakes

6 assumption that many smaller dams are safer than one or few large dams is incorrect. Besides, due to the fact that most rural dams were built by inexperienced organizations and no design records exist, it is almost impossible to assess their safety. One should therefore conclude that, especially in rural areas, the total earthquake risk of small dams may be significantly higher than that of large dams. World Bank Good Practice Notes 6 Dams and Barrier Lakes

7 Annex 2: Lake Sarez Risk Mitigation Project 37. Lake Sarez in Tajikistan was formed in 1911 when a massive earthquake-triggered landslide buried the village of Usoy under a 600m high obstruction of Murgab River. The resulting 60km long lake containing over 17 km3 of water is located behind the so-called Usoy landslide dam in the Pamir Range. The freeboard (i.e. the margin before overtopping occurs) is approximately 50m. Although the safety of the Lake has been studied over many years, there existed significant gaps and inconsistencies in the available data. At the same time, it was clear that the risk to the downstream population could be unacceptably high. The generated flood could affect up to 5 million people living along the Bartang, Pyandhz, and Amu Darya rivers. 38. In late 2000, the World Bank launched the Lake Sarez Risk Mitigation Project (LSRMP). The project s objective was to help alert and prepare vulnerable people in case of a disaster associated with an outburst flood from Lake Sarez, while seeking long-term solutions to this complex issue. LSRMP components were as follows: Design and installation of a monitoring system and of an early warning system. Social Component that identified safe havens and trained vulnerable communities within a disaster preparedness program. Studies on long term solutions. 39. A risk analysis guided the design and informed the operation of the monitoring system. A team of experts concluded that the highest probability of failure was associated with piping phenomena that could result in a sudden increase of seepage through the dam. The total probability of occurrence of this chain of events reached 6*10-5, which is comparable to that of man-made dams. The following figure shows the level of risk at Sarez together with generally accepted curves for man-made dams as well as for natural hazards. Sarez is located in between. World Bank Good Practice Notes 7 Dams and Barrier Lakes

8 40. Even without structural measures, the probability of uncontrolled release of water from Sarez is very low compared with other natural hazards. With long term structural measures, such as lowering the lake level, probability of failure could be reduced by one or two orders of magnitude and the lake could be used for hydropower generation. In any case, considering the number of people at risk, Usoy dam should have an emergency preparedness plan in the same way as other dams. Such a plan was put in place by the project. World Bank Good Practice Notes 8 Dams and Barrier Lakes

9 Annex 3: Armenia Dam Safety Program 41. The lack of resources allocated for maintenance of dams in Armenia since 1991 resulted in many deficiencies in the dams. In addition to the lack of maintenance, several dams had design deficiencies, such as inadequate spillway capacity and seismic vulnerability. The devastating earthquake that destroyed most of Spitak forced a revision of seismic criteria and stability requirements. This change in standards resulted in dams previously meeting safety standards, being classified as deficient. The need of dam safety improvements was also highlighted by the failures of Agarak Dam in 1974, Marmarik Dam in 1974 and Artik Dam in 1994; the latter resulted in two fatalities. 42. In addition to four dams that were never completed, there are 83 irrigation dams in Armenia. In the 1990s a long-term program started, with World Bank assistance, for the rehabilitation and restructuring of the irrigation sector. As part of that program, all 87 dams were investigated and, where necessary, improved to meet current dam safety standards. During the program, Armenian agencies had access to international experience and expertise in the field of dam safety through regular visits from World Bank and international specialists. 43. Risk assessment made use of a semi-quantitative method in which both the probability and the consequences of an event are ranked. This method, which has been used for assessing the safety of dams in Canada and the UK, is known as failure modes, effects and criticality analysis (FMECA). The following stages are required: i) identification of failure modes; ii) comparative assessment of probability of failure; iii) comparative assessment of consequence or impact of failure. 44. The impact score is the combination of the population at risk and the potential economic loss. The risk index is the product of the total impact score and the risk score. This score allowed ranking all dams and identifying priorities for remedial works. 45. The risk profile of the dams, as measured by the risk index, is presented in the figure below which also shows the reduction in risk that can be achieved by the implementation of Emergency Preparedness Plans (non-structural measure) and remedial works respectively. World Bank Good Practice Notes 9 Dams and Barrier Lakes

10 with EPP and remedial works reduction in risk due to remedial works reduction in risk due to EPP Risk index Landjaghbiur-1 V.Talin-1 Irind Tsilkar Shenik Maralik Agarak V Sasnashen Shgarshik Kaps V Talin - 2 V. Karmir Karaundsh Akhurian Metsavan Spandarian Davidashen Talish Kosh Kechout Tolors Getik Joghaz Aghakchi Brnakot Karagloukh Vosketas Ors Angehakot Ashnak-1 Aghavnadzor N. Talin Gndevaz Ashnak-2 Hatsashen World Bank Good Practice Notes 10 Dams and Barrier Lakes

ICOLD POSITION PAPER ON DAM SAFETY AND EARTHQUAKES

ICOLD POSITION PAPER ON DAM SAFETY AND EARTHQUAKES ICOLD POSITION PAPER ON DAM SAFETY AND EARTHQUAKES August 2012 Dam Safety and Earthquakes Position Paper of International Commission on Large Dams (ICOLD) Prepared by ICOLD Committee on Seismic Aspects

More information

Management of flooding downstream of dams

Management of flooding downstream of dams Management of flooding downstream of dams Attachment to Victoria State Flood Emergency Plan Version 1.0 (6 February 2013) This plan is produced by the Victoria State Emergency Service and Department of

More information

FERC Engineering Guidelines Risk-Informed Decision Making

FERC Engineering Guidelines Risk-Informed Decision Making FERC Engineering Guidelines Risk-Informed Decision Making Chapter R1 Introduction to Risk-Informed Decision Making Chapter R1, Risk-Informed Decision Making Table of Contents Chapter R1 Introduction to

More information

Disaster Risk Management: prevention and urgent repair procedures for infrastructure and facilities

Disaster Risk Management: prevention and urgent repair procedures for infrastructure and facilities Disaster Risk Management: prevention and urgent repair procedures for infrastructure and facilities Jacob Greenstein Ph.D, PE, EGAT/ I&E EGAT workshop-december 2009 1 Natural disasters-new trends Natural

More information

6.0 Results of Risk Analyses

6.0 Results of Risk Analyses 6. Results of Risk Analyses A risk analysis of the optimized embankment designs for the Salton Sea restoration project was conducted jointly by Kleinfelder and representatives from Reclamation. A risk

More information

Emergency Spillways (Sediment basins)

Emergency Spillways (Sediment basins) Emergency Spillways (Sediment basins) DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short-Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1]

More information

Landslides & Mudflows

Landslides & Mudflows 1 2 - What is a Landslide? - Geologic hazard Common to almost all 50 states Annual global Billions in losses Thousands of deaths and injuries 3 1 - What is a Landslide? - Gravity is driving force Some

More information

USACE Dam Safety Program Current Approach & Methodology

USACE Dam Safety Program Current Approach & Methodology USACE Dam Safety Program Current Approach & Methodology Siamac Vaghar, PE, MASCE Chief, Geotechnical Engineering Section Dam Safety Program Manager US Army Corps of Engineers New England District Corps

More information

The correct answers are given below. Some talking points have been added for the teachers use.

The correct answers are given below. Some talking points have been added for the teachers use. Natural Resources Canada 2011: Lesson Plan Grades 11 and 12 Landslide activity 5b: Landslides in Canada quiz Description: This is an independent study activity for grades 11 and 12. Students will read

More information

Small Dam Hazard Assessment Inventory

Small Dam Hazard Assessment Inventory Small Dam Hazard Assessment Inventory What would happen if your dam were to fail? This is a question that most dam owners hope they will never have to answer. However it is a question you, as a responsible

More information

GEOTECHNICAL ISSUES OF LANDSLIDES CHARACTERISTICS MECHANISMS PREPARDNESS: BEFORE, DURING AND AFTER A LANDSLIDE QUESTIONS FOR DISCUSSIONS

GEOTECHNICAL ISSUES OF LANDSLIDES CHARACTERISTICS MECHANISMS PREPARDNESS: BEFORE, DURING AND AFTER A LANDSLIDE QUESTIONS FOR DISCUSSIONS GEOTECHNICAL ISSUES OF LANDSLIDES CHARACTERISTICS MECHANISMS PREPARDNESS: BEFORE, DURING AND AFTER A LANDSLIDE QUESTIONS FOR DISCUSSIONS Huge landslide Leyte, Phillipines, 1998 2000 casulties Small debris

More information

US Army Corps of Engineers BUILDING STRONG

US Army Corps of Engineers BUILDING STRONG Fort Worth District Public Meeting 20 August 2013 US Army Corps of Engineers Lewisville Dam - Authorization Authorized by the River and Harbor Act, approved 2 March 1945 (Public Law 14, 79th Congress,

More information

Flooding Hazards, Prediction & Human Intervention

Flooding Hazards, Prediction & Human Intervention Page 1 of 10 EENS 3050 Tulane University Natural Disasters Prof. Stephen A. Nelson Flooding Hazards, Prediction & Human Intervention This page last updated on 19-Oct-2015 Hazards Associated with Flooding

More information

Engineering Geological Asset Management for Large Dams. Yasuhito SASAKI (1)

Engineering Geological Asset Management for Large Dams. Yasuhito SASAKI (1) Engineering Geological Asset Management for Large Dams Yasuhito SASAKI (1) (1) Geology Research Team, Public Works Research Institute, Japan E-mail:ya-sasa@pwri.go.jp Abstract Comprehensive inspection

More information

Site C Clean Energy Project Topic Specific Sessions: Presentation by Natural Resources Canada

Site C Clean Energy Project Topic Specific Sessions: Presentation by Natural Resources Canada Site C Clean Energy Project Topic Specific Sessions: Presentation by Natural Resources Canada Fort St. John, British Columbia January 13, 2014 Outline 1. Context for NRCan s Participation in the Joint

More information

Rivers Group. Effect of Canterbury Earthquakes on Waimakariri, Kaiapoi, & Halswell Rivers. Flooding & Drainage Perspectives

Rivers Group. Effect of Canterbury Earthquakes on Waimakariri, Kaiapoi, & Halswell Rivers. Flooding & Drainage Perspectives Rivers Group Effect of Canterbury Earthquakes on Waimakariri, Kaiapoi, & Halswell Rivers Flooding & Drainage Perspectives Waimakariri River Catchment Waimakariri River Hydrology Catchment area - 3,990

More information

Glacial hazards and downstream effects of climate change on high mountain glaciers. John M. Reynolds Reynolds Geo-Sciences Ltd, Mold, UK

Glacial hazards and downstream effects of climate change on high mountain glaciers. John M. Reynolds Reynolds Geo-Sciences Ltd, Mold, UK Glacial hazards and downstream effects of climate change on high mountain glaciers John M. Reynolds Reynolds Geo-Sciences Ltd, Mold, UK Glacial hazards Hazard Description Time scale Avalanche Slide or

More information

INFORMATION BULLETIN BUSINESS FLOOD PLANNING AND MITIGATION GUIDE ACE GLOBAL RISK ENGINEERING. Flood risk assessment. Introduction

INFORMATION BULLETIN BUSINESS FLOOD PLANNING AND MITIGATION GUIDE ACE GLOBAL RISK ENGINEERING. Flood risk assessment. Introduction ACE GLOBAL RISK ENGINEERING INFORMATION BULLETIN BUSINESS FLOOD PLANNING AND MITIGATION GUIDE Introduction The most common cause of flooding is due to established water storage areas (natural and man-made)

More information

Flood mitigation program for Gatun lake. Programa de mitigación de inundaciones del lago Gatún

Flood mitigation program for Gatun lake. Programa de mitigación de inundaciones del lago Gatún Flood mitigation program for Gatun lake Programa de mitigación de inundaciones del lago Gatún Moffatt & Nichol Engineers 10 de febrero de 2005 Contrato No. 126161 Introducción y Recomendaciones 1 INTRODUCTION

More information

Flood Risk Management

Flood Risk Management Flood Risk Management Value of Flood Risk Management Every year floods sweep through communities across the United States taking lives, destroying property, shutting down businesses, harming the environment

More information

Flood Risk Management

Flood Risk Management Flood Risk Management Value of Flood Risk Management Value to Individuals and Communities Every year floods sweep through communities across the United States taking lives, destroying property, shutting

More information

Outlet stabilization structure

Outlet stabilization structure Overview of Sedimentation and Erosion Control Practices Practice no. 6.41 Outlet stabilization structure Erosion at the outlet of channels, culverts, and other structures is common, and can cause structural

More information

NRCS Overview. National Dam Safety Program Technical Workshop #19 February 22-23, 2012

NRCS Overview. National Dam Safety Program Technical Workshop #19 February 22-23, 2012 NRCS Overview National Dam Safety Program Technical Workshop #19 February 22-23, 2012 Thomas Brown National Design, Construction, and Soil Mechanics Center (NDCSMC) Fort Worth, Texas NRCS Dam Inventory

More information

Frequently Asked Questions (FAQs) on Hydropower

Frequently Asked Questions (FAQs) on Hydropower Frequently Asked Questions (FAQs) on Hydropower What are the advantages of Hydropower? A renewable source of energy - saves scarce fuel reserves. Non-polluting and hence environment friendly. Long life

More information

Seismic Design and Performance Criteria for Large Storage Dams

Seismic Design and Performance Criteria for Large Storage Dams Seismic Design and Performance Criteria for Large Storage Dams Dr. Martin Wieland Chairman, ICOLD Committee on Seismic Aspects of Dam Design Poyry Switzerland Ltd., Zurich, Switzerland Integral Dam Safety

More information

IUCN Guidelines to Avoid Impacts of Water Resources Projects on Dams and Other Water Infrastructure

IUCN Guidelines to Avoid Impacts of Water Resources Projects on Dams and Other Water Infrastructure IUCN Guidelines to Avoid Impacts of Water Resources Projects on Dams and Other Water Infrastructure (December 2013) IUCN does not engage in projects which involve the design, construction or rehabilitation

More information

Technical Approach and Methodology

Technical Approach and Methodology 1 Dam Rehabilitation & Improvement Project (DRIP), India Technical Approach and Methodology relative to Section of Design Flood Review of TOR Making an integral part of Egis Eau Tender Technical Proposal

More information

Outline of Guidelines for Seismic Performance Evaluation of Dams During Large Earthquakes (Draft)

Outline of Guidelines for Seismic Performance Evaluation of Dams During Large Earthquakes (Draft) Outline of Guidelines for Seismic Performance Evaluation of Dams During Large Earthquakes (Draft) by Nario Yasuda 1, Kazuhito Shimamoto 2, Yoshikazu Yamaguchi 3 and Takashi Sasaki 4 ABSTRACT On March 2005,

More information

Leica Monitoring Solutions. Leica Monitoring Solutions Certainty builds confidence.

Leica Monitoring Solutions. Leica Monitoring Solutions Certainty builds confidence. Leica Monitoring Solutions Leica Monitoring Solutions Certainty builds confidence. Risk and Cost Reduction Proven Solutions Facing new challenges Engineering companies and contractors are facing challenges

More information

Flash Flood Science. Chapter 2. What Is in This Chapter? Flash Flood Processes

Flash Flood Science. Chapter 2. What Is in This Chapter? Flash Flood Processes Chapter 2 Flash Flood Science A flash flood is generally defined as a rapid onset flood of short duration with a relatively high peak discharge (World Meteorological Organization). The American Meteorological

More information

A disaster occurs at the point of contact between social activities and a natural phenomenon of unusual scale.

A disaster occurs at the point of contact between social activities and a natural phenomenon of unusual scale. Hazard Mapping and Vulnerability Assessment Mr. Toshiaki Udono Senior Project Manager, Kansai Division, PASCO Corporation, Japan Mr. Awadh Kishor Sah Project Manager, Project Implementation Department,

More information

Disaster Mitigation of Debris Flows, Slope Failures and Landslides 639

Disaster Mitigation of Debris Flows, Slope Failures and Landslides 639 Disaster Mitigation of Debris Flows, Slope Failures and Landslides 639 Anthropogenic Caused Mass Movements and their Impact on Railway Lines in Austria Christian Rachoy 1) and Manfred Scheikl 2) 1) Dept.

More information

Flooding Fast Facts. flooding), seismic events (tsunami) or large landslides (sometime also called tsunami).

Flooding Fast Facts. flooding), seismic events (tsunami) or large landslides (sometime also called tsunami). Flooding Fast Facts What is a flood? Flooding is the unusual presence of water on land to a depth which affects normal activities. Flooding can arise from: Overflowing rivers (river flooding), Heavy rainfall

More information

5.0 OVERVIEW OF FLOOD DAMAGE REDUCTION MEASURES

5.0 OVERVIEW OF FLOOD DAMAGE REDUCTION MEASURES 5.0 OVERVIEW OF FLOOD DAMAGE REDUCTION MEASURES Flood damage reduction consists of two basic techniques structural and non-structural. Structural methods modify the flood and take the flood away from people

More information

ENGINEERING-BASED EARTHQUAKE RISK MANAGEMENT

ENGINEERING-BASED EARTHQUAKE RISK MANAGEMENT ENGINEERING-BASED EARTHQUAKE RISK MANAGEMENT MRP Engineering Newsletter February 2012 The world recently experienced several major earthquakes, which caused severe local impacts and major worldwide repercussions.

More information

How To Manage Wildlife And Wildlife Damages At Earthen Dams

How To Manage Wildlife And Wildlife Damages At Earthen Dams Dam Owner s Guide To Animal Impacts On Earthen Dams FEMA L-264 / September 2005 Twenty-five states across the U.S. can write headlines of unsafe dam operations caused by nuisance wildlife intrusions,

More information

Chincha and Cañete, Peru, Based

Chincha and Cañete, Peru, Based Reconstruction of Ica, Pisco, Chincha and Cañete, Peru, Based on Updated Hazard Maps Julio Kuroiwa Professor emeritus National University of Engineering and UNDP Reconstruction Program/Sustainable Cities.

More information

Dam Safety Guidelines Ministry of Environment, Lands and Parks Water Management Branch Inspection & Maintenance of Dams ii Canadian Cataloguing in Publication Data BC Environment. Water Management Branch.

More information

Post-Flood Assessment

Post-Flood Assessment Page 1 of 7 Post-Flood Assessment CHAPTER 4 AGENCY COORDINATION Agency coordination is an essential element for the operation of the flood management systems in the Central Valley. Due to the nature of

More information

Department of Energy and Water Supply

Department of Energy and Water Supply Department of Energy and Water Supply Guidelines on Acceptable Flood Capacity for Water Dams January 2013 State of Queensland, Department of Energy and Water Supply, 2012. The Queensland Government supports

More information

HUDSON RIVER-BLACK RIVER REGULATING DISTRICT BOARD MEETING JUNE 10, 2014

HUDSON RIVER-BLACK RIVER REGULATING DISTRICT BOARD MEETING JUNE 10, 2014 HUDSON RIVER-BLACK RIVER REGULATING DISTRICT BOARD MEETING JUNE 10, 2014 PRESENTATION TOPICS Analysis Objectives Analysis Dam Removal Plan Dam Remediation Plan Effects Analysis Permit Requirements Decision

More information

STORMWATER MANAGEMENT CHECKLIST

STORMWATER MANAGEMENT CHECKLIST STORMWATER MANAGEMENT CHECKLIST *This checklist must be completed and part of the Land Disturbing Permit submittal for review if the acreage disturbed is one (1) acre or more: I. SUPPORTING DATA Narrative

More information

Landslides & Mudslides

Landslides & Mudslides Landslides & Mudslides Landslides, also known as mudslides and debris flow, occur in all U.S. states and territories. In snowy mountainous areas winter snow landslides are called avalanches. Landslides

More information

Small Dam Repair The Stone Lake Dam Story. Joe Barron, P.E. SynTerra formerly the Fletcher Group, Inc. 148 River St. Suite 220 Greenville, S.C.

Small Dam Repair The Stone Lake Dam Story. Joe Barron, P.E. SynTerra formerly the Fletcher Group, Inc. 148 River St. Suite 220 Greenville, S.C. Small Dam Repair The Stone Lake Dam Story Joe Barron, P.E. SynTerra formerly the Fletcher Group, Inc. 148 River St. Suite 220 Greenville, S.C. 29601 1 Historical background of Stone Lake A series of three

More information

Federal Energy Regulatory Commission Division of Dam Safety and Inspections DRAFT RECOVERY PLAN FORMAT

Federal Energy Regulatory Commission Division of Dam Safety and Inspections DRAFT RECOVERY PLAN FORMAT RECOVERY PLAN FORMAT Below is a suggested Table of Contents for an Internal Emergency Recovery (Response) Plan. This Internal Emergency Recovery Plan (IERP) is designed as a separate document which can

More information

Landslides. Landslides-1. March 2007

Landslides. Landslides-1. March 2007 Landslides Learn if landslides, including debris flows, could occur in your area by contacting local officials, your state geological survey or department of natural resources, or the geology department

More information

PACIFIC CATASTROPHE RISK ASSESSMENT AND FINANCING INITIATIVE

PACIFIC CATASTROPHE RISK ASSESSMENT AND FINANCING INITIATIVE PACIFIC CATASTROPHE RISK ASSESSMENT AND FINANCING INITIATIVE NIUE SEPTEMBER 11 COUNTRY RISK PROFILE: NIUE Niue is expected to incur, on average,.9 million USD per year in losses due to earthquakes and

More information

Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1

Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1 6 Index inlet protection excavated drop inlet protection (Temporary) 6.50.1 HARDWARE CLOTH AND GRAVEL INLET PROTECTION Block and gravel inlet Protection (Temporary) sod drop inlet protection ROCK DOUGHNUT

More information

DAM BREACH MODELING AN OVERVIEW OF ANALYSIS METHODS. Tony L. Wahl, Hydraulic Engineer, Bureau of Reclamation, Denver, CO, twahl@usbr.

DAM BREACH MODELING AN OVERVIEW OF ANALYSIS METHODS. Tony L. Wahl, Hydraulic Engineer, Bureau of Reclamation, Denver, CO, twahl@usbr. DAM BREACH MODELING AN OVERVIEW OF ANALYSIS METHODS Tony L. Wahl, Hydraulic Engineer, Bureau of Reclamation, Denver, CO, twahl@usbr.gov Abstract The two primary tasks in the analysis of a potential dam

More information

DAMS AND EARTHQUAKES IN NEW ZEALAND

DAMS AND EARTHQUAKES IN NEW ZEALAND DAMS AND EARTHQUAKES IN NEW ZEALAND Peter Amos 1 and Murray Gillon 2 ABSTRACT New Zealand is located in the area of active seismicity on the boundary between the Australian and Pacific plates. Most dams

More information

Federal Guidelines for Dam Safety

Federal Guidelines for Dam Safety Federal Guidelines for Dam Safety Selecting and Accomodating Inflow Design Floods for Dams April 2004 FEDERAL GUIDELINES FOR DAM SAFETY: SELECTING AND ACCOMMODATING INFLOW DESIGN FLOODS FOR DAMS prepared

More information

1 2 A very short description of the functional center network: regarding the Hydraulic and Hydrogeological risk, the national alert system is ensured by the National Civil Protection Department (DPCN),

More information

GEO4180. Strategies for Mitigation of Risk Associated with Geohazards

GEO4180. Strategies for Mitigation of Risk Associated with Geohazards GEO4180 Geohazard Mitigation Strategies for Mitigation of Risk Associated with Geohazards Classification of geohazard mitigation strategies (1) land use plans, (2) enforcement of building codes and good

More information

Discussion about the practicability of implementing flood risk. management and urban flood insurance in China. Longhua Gao, Xiaoqing Zhou

Discussion about the practicability of implementing flood risk. management and urban flood insurance in China. Longhua Gao, Xiaoqing Zhou Discussion about the practicability of implementing flood risk management and urban flood insurance in China Longhua Gao, Xiaoqing Zhou Abstract: This paper explains the flood risk management at first,

More information

How can we defend ourselves from the hazard of Nature in the modern society?

How can we defend ourselves from the hazard of Nature in the modern society? How can we defend ourselves from the hazard of Nature in the modern society?, University of Bologna President of the EGU Division of Natural Hazards Email: stefano.tinti@unibo.it nh@egu.eu GIFT 2013 Natural

More information

ICOLD s revised seismic design and performance criteria for large storage dams

ICOLD s revised seismic design and performance criteria for large storage dams ICOLD s revised seismic design and performance criteria for large storage dams Martin Wieland Chairman, ICOLD Committee on Seismic Aspects of Dam Design, Poyry Energy Ltd., Hardturmstrasse 161 CH-8037

More information

District Disaster Risk Management Planning

District Disaster Risk Management Planning District Disaster Risk Management Planning GUIDELINES JULY 2007 National Disaster Management Authority 1. Introduction Notifications for establishment of the District Disaster Management Authorities (DDMAs)

More information

THE UNIVERSITY OF TRINIDAD & TOBAGO

THE UNIVERSITY OF TRINIDAD & TOBAGO THE UNIVERSITY OF TRINIDAD & TOBAGO FINAL ASSESSMENT/EXAMINATIONS APRIL 2014 Course Code and Title: Programme: Date and Time: Duration: HYDRAULICS FLUD2006 BASc. Civil Engineering Wednesday 16 th April,

More information

Disaster Preparedness and Safety Element

Disaster Preparedness and Safety Element Disaster Preparedness and Safety Element Element Objectives The policies and actions of the Disaster Preparation and Safety Element are intended to achieve the following six objectives: 1. Establish and

More information

Social and Environmental Impacts of Landslides

Social and Environmental Impacts of Landslides Social and Environmental Impacts of Landslides Latsis Symposium 2007 Research Frontiers in Environment and Sustainability ETH-Zurich September 18, 2007 Dr. A. Keith Turner Emeritus Professor Geological

More information

Flood Emergency Response Planning: How to Protect Your Business from a Natural Disaster RIC005

Flood Emergency Response Planning: How to Protect Your Business from a Natural Disaster RIC005 Flood Emergency Response Planning: How to Protect Your Business from a Natural Disaster RIC005 Speakers: Tom Chan, CEO, Global Risk Miyamoto Greg Bates, Principal, Global Risk Consultants Learning Objectives

More information

Jackson Gulch Outlet Canal Rehabilitation Project

Jackson Gulch Outlet Canal Rehabilitation Project Jackson Gulch Outlet Canal Rehabilitation Project Preliminary Budgetary Estimate for Rehabilitation February 2004 Prepared for the Mancos Water Conservancy District Jackson Gulch Reservoir 42888 County

More information

A CASE-STUDY OF CUA_DAT CFRD IN VIETNAM

A CASE-STUDY OF CUA_DAT CFRD IN VIETNAM A CASE-STUDY OF CUA_DAT CFRD IN VIETNAM Giang Pham Hong, Michel Hotakhanh, Nga Pham Hong, Hoai Nam Nguyen, Abstract:Dams have been taken an important role in time and surface redistribution of water for

More information

NATIONAL REPORT AUSTRIA

NATIONAL REPORT AUSTRIA 26th Session of the EFC Working Party on the Impact of Climate Change on Natural Hazards in Austria NATIONAL REPORT AUSTRIA Seite 1 16.04.2009 Global increase of temperatures: between 1.8 C and 4.0 C (IPCC

More information

Contents. Specific and total risk. Definition of risk. How to express risk? Multi-hazard Risk Assessment. Risk types

Contents. Specific and total risk. Definition of risk. How to express risk? Multi-hazard Risk Assessment. Risk types Contents Multi-hazard Risk Assessment Cees van Westen United Nations University ITC School for Disaster Geo- Information Management International Institute for Geo-Information Science and Earth Observation

More information

Risks of future Earthquake- and extreme hydrological Disasters in Southeast Asia with a Focus on Thailand

Risks of future Earthquake- and extreme hydrological Disasters in Southeast Asia with a Focus on Thailand Risks of future Earthquake- and extreme hydrological Disasters in Southeast Asia with a Focus on Thailand Manfred Koch Department of Geohydraulics and Engineering Hydrology University of Kassel Germany

More information

Integrated Water and Sediment Management of Yellow River

Integrated Water and Sediment Management of Yellow River Keeping Health Life of Yellow River: Integrated Water and Sediment Management of Yellow River Shang Hongqi Yellow River Conservancy Commission 18 March 2009 Istanbul, Turkey Outline: I. Yellow River Characteristic

More information

Application of Space Technology for Disaster monitoring and assessment current state in Vietnam

Application of Space Technology for Disaster monitoring and assessment current state in Vietnam Application of Space Technology for Disaster monitoring and assessment current state in Vietnam Lai Anh Khoi SPACE TECHNOLOGY INSTITUTE 8th GEOSS Asian Pacific Symposium Beijing, Sep. 09-11, 2015 Types

More information

WATER STORAGE, TRANSPORT, AND DISTRIBUTION Multi-Dam Systems and their Operation - J.J. Cassidy MULTI-DAM SYSTEMS AND THEIR OPERATION

WATER STORAGE, TRANSPORT, AND DISTRIBUTION Multi-Dam Systems and their Operation - J.J. Cassidy MULTI-DAM SYSTEMS AND THEIR OPERATION MULTI-DAM SYSTEMS AND THEIR OPERATION J.J. Cassidy Consulting Hydraulic and Hydrologic Engineer, Concord, California, USA Keywords: Dams, reservoirs, rivers, water storage, dam safety, floods, environment,

More information

Plan Plus Volume 1 No 1 2002 (117-123)

Plan Plus Volume 1 No 1 2002 (117-123) Plan Plus Volume 1 No 1 2002 (117-123) APPLICATION OF GIS (GEOGRAPHIC INFORMATION SYSTEM) FOR LANDSLIDE HAZARD ZONATION AND MAPPING DISASTER PRONE AREA: A STUDY OF KULEKHANI WATERSHED, NEPAL Purna Chandra

More information

Watershed Works Manual

Watershed Works Manual National Rural Employment Guarantee Act Watershed Works Manual DRAINAGE LINE TREATMENT: GABION STRUCTURE Baba Amte Centre for People s Empowerment Samaj Pragati Sahayog September 2006 Drainage Line Treatment:

More information

Structural Damage Due to Floods

Structural Damage Due to Floods Structural Damage Due to Floods By Craig D. Rogers, P.E. The Federal Emergency Management Agency (FEMA) reports that each year approximately 90 percent of all disaster-related property damage results from

More information

USSD Workshop on Dam Break Analysis Applied to Tailings Dams

USSD Workshop on Dam Break Analysis Applied to Tailings Dams USSD Workshop on Dam Break Analysis Applied to Tailings Dams Antecedents Newtonian / non-newtonian flows Available models that allow the simulation of non- Newtonian flows (tailings) Other models used

More information

February 4, 2011. hoffman.stephen@epa.gov. Report Recommendations and NIPSCO Responses. 4.3 Maintaining and Controlling Vegetation Growth

February 4, 2011. hoffman.stephen@epa.gov. Report Recommendations and NIPSCO Responses. 4.3 Maintaining and Controlling Vegetation Growth February 4, 2011 VIA E-MAIL AND CERTIFIED MAIL #7010 0290 0002 0577 6226 Mr. Stephen Hoffman US Environmental Protection Agency (5304P) 1200 Pennsylvania Avenue, NW Washington, DC 20460 hoffman.stephen@epa.gov

More information

P-23 - DEVELOPMENT OF DELAWARE DEPARTMENT OF TRANSPORTATION STORMWATER BEST MANAGEMENT PRACTICE INSPECTION PROGRAM

P-23 - DEVELOPMENT OF DELAWARE DEPARTMENT OF TRANSPORTATION STORMWATER BEST MANAGEMENT PRACTICE INSPECTION PROGRAM P-23 - DEVELOPMENT OF DELAWARE DEPARTMENT OF TRANSPORTATION STORMWATER BEST MANAGEMENT PRACTICE INSPECTION PROGRAM A. INTRODUCTION Peter Mattejat, PE KCI Technologies, Inc.; Laurel, Maryland Bruce Thompson

More information

City of Shelbyville Site Inspection Checklist

City of Shelbyville Site Inspection Checklist City of Shelbyville Site Inspection Checklist General Information Project Name: KYR10 Permit Number: Date: Project Location: Contractor: Conractor Representative: Inspector's Name: Title: Signature : Weather

More information

Extreme Flood Events & their Prevention in Jordan

Extreme Flood Events & their Prevention in Jordan The Hashemite Kingdom of Jordan Ministry of Water & Irrigation Extreme Flood Events & their Prevention in Jordan Eng. Abeer Nassar Eng. Mohammed Bany-Mustafa 2nd Regional Workshop on Dams in the Mediterranean:

More information

FLOOD CONTROL FOR SPECIFIC TYPES OF FLOODS. A.F. Mandych Department of Physical Geography and Land Use, Institute of Geography, Moscow, Russia

FLOOD CONTROL FOR SPECIFIC TYPES OF FLOODS. A.F. Mandych Department of Physical Geography and Land Use, Institute of Geography, Moscow, Russia FLOOD CONTROL FOR SPECIFIC TYPES OF FLOODS A.F. Mandych Department of Physical Geography and Land Use, Institute of Geography, Moscow, Russia Keywords: control, dam, dike (dyke), embankment, flood, flood

More information

Earthquakes. Earthquakes: Big Ideas. Earthquakes

Earthquakes. Earthquakes: Big Ideas. Earthquakes Earthquakes Earthquakes: Big Ideas Humans cannot eliminate natural hazards but can engage in activities that reduce their impacts by identifying high-risk locations, improving construction methods, and

More information

NATURAL AND HUMAN INDUCED HAZARDS Vol. I - Case Studies of Natural Disasters - Chen Yong and Li Juan

NATURAL AND HUMAN INDUCED HAZARDS Vol. I - Case Studies of Natural Disasters - Chen Yong and Li Juan CASE STUDIES OF NATURAL DISASTERS Chen Yong and Li Juan China Seismological Bureau, Beijing, China Keywords: Flood, Earthquake, Hurricane, Volcanic eruption, Tsunamis, Landslides Contents 1. 1998 Yangtze

More information

Anchorage All-Hazard Mitigation Plan October 2004

Anchorage All-Hazard Mitigation Plan October 2004 EXECUTIVE SUMMARY The Municipality of Anchorage (MOA) is vulnerable to a wide range of natural, technological, and human/societal hazards including earthquakes, avalanches, and hazardous material accidents.

More information

Comments. EPA HQ - Auxiliary Ash Pond Report, Page 2-1: Third paragraph, first sentence, correct.

Comments. EPA HQ - Auxiliary Ash Pond Report, Page 2-1: Third paragraph, first sentence, correct. Comments EPA HQ - Auxiliary Ash Pond Report, Page 2-1: Third paragraph, first sentence, correct. EPA Region None. State See attachment from email dated January 28, 2010. Company See attached letter dated

More information

Final. Contact person: Colin Whittemore Aurecon Centre 1 Century City Drive Waterford Precinct, Century City Cape Town, South Africa

Final. Contact person: Colin Whittemore Aurecon Centre 1 Century City Drive Waterford Precinct, Century City Cape Town, South Africa Review Report and Recommendations for the Remediation of Flood Damage at the Berg River Causeway and the Dam Bypass Channel on Portion of Farms 1646 and 1014, Franschhoek Contact person: Colin Whittemore

More information

Bolton s Flood Risk Management Strategy

Bolton s Flood Risk Management Strategy Bolton s Flood Risk Management Strategy www.bolton.gov.uk Public Summary Bolton s Flood Risk Management Strategy Public Summary Introduction Over 5.5 million properties in England and Wales are at risk

More information

The AIR Inland Flood Model for the United States In Spring 2011, heavy rainfall and snowmelt produced massive flooding along the Mississippi River,

The AIR Inland Flood Model for the United States In Spring 2011, heavy rainfall and snowmelt produced massive flooding along the Mississippi River, The AIR Inland Flood Model for the United States In Spring 2011, heavy rainfall and snowmelt produced massive flooding along the Mississippi River, inundating huge swaths of land across seven states. As

More information

PERFORMANCE OF DAMS AND SPILLWAYS 2009 GEORGIA FLOOD. Randall P. Bass, P.E. 1, 2. James R. Crowder, P. Joseph S. Monroe, P.E.

PERFORMANCE OF DAMS AND SPILLWAYS 2009 GEORGIA FLOOD. Randall P. Bass, P.E. 1, 2. James R. Crowder, P. Joseph S. Monroe, P.E. PERFORMANCE OF DAMS AND SPILLWAYS 2009 GEORGIA FLOOD Randall P. Bass, P.E. 1, 2 James R. Crowder, P. Joseph S. Monroe, P.E. 3 ABSTRACT During the latter part of September 2009, the Atlanta metro area received

More information

Lockport Pool Chicago Sanitary & Ship Canal Illinois Waterway

Lockport Pool Chicago Sanitary & Ship Canal Illinois Waterway Presentation to the Inland Waterways Users Board Lockport Pool Chicago Sanitary & Ship Canal Illinois Waterway by Gary Loss, P.E. Rock Island District July 13, 2006 Chicago Sanitary and Ship Canal A

More information

Standard Operating Procedures for Flood Preparation and Response

Standard Operating Procedures for Flood Preparation and Response Standard Operating Procedures for Flood Preparation and Response General Discussion Hurricanes, tropical storms and intense thunderstorms support a conclusion that more severe flooding conditions than

More information

Watershed Rehabilitation Program in Texas

Watershed Rehabilitation Program in Texas Watershed Rehabilitation Program in Texas 1 Dams Constructed by Year (nationwide) 700 600 500 PL-566 Pilot/RC&D PL-534 400 300 200 100 0 48 51 54 57 60 63 66 69 72 75 78 81 84 87 90 93 96 99 Year 2 Number

More information

Natural Disasters & Assessing Hazards and Risk. Natural Hazards and Natural Disasters

Natural Disasters & Assessing Hazards and Risk. Natural Hazards and Natural Disasters Page 1 of 9 EENS 3050 Tulane University Natural Disasters Prof. Stephen A. Nelson Natural Disasters & Assessing Hazards and Risk This page last updated on 19-Aug-2014 Natural Hazards and Natural Disasters

More information

Minimizes sediment and debris from entering storm drains that lead to waterways and watercourses.

Minimizes sediment and debris from entering storm drains that lead to waterways and watercourses. 4.5-p DRAIN INLET PROTECTION Alternative Names: DI protection, Drop Inlet Protection DESCRIPTION Storm drain inlet (DI) protection slows and ponds stormwater, and filters sediment and debris before it

More information

COSMOS 2012: Earthquakes in Action COSMOS 2012

COSMOS 2012: Earthquakes in Action COSMOS 2012 COSMOS 2012 What is SFSI and why is it important? Soil issues in Earthquakes Structures where SFSI important Retaining structures (lateral earth pressure) Foundations (spread and pile footings, bearing

More information

Flood Protection Structure Accreditation Task Force

Flood Protection Structure Accreditation Task Force Flood Protection Structure Accreditation Task Force August 2013 Update Presenter: Geoff Henggeler, USACE Outline for Presentation Bottom Line Up Front Task Force Charge Current Agency Practices & Operating

More information

ALTERNATIVES EVALUATION. SWEET POND DAM VT Dam #90.01 Town of Guilford, Vermont

ALTERNATIVES EVALUATION. SWEET POND DAM VT Dam #90.01 Town of Guilford, Vermont ALTERNATIVES EVALUATION SWEET POND DAM VT Dam #90.01 Town of Guilford, Vermont Prepared for: Vermont Department of Forests, Parks and Recreation Prepared by: January 27, 2012 D&K #221179 SWEET POND DAM

More information

Queensland Dam Safety Management Guidelines. February 2002

Queensland Dam Safety Management Guidelines. February 2002 Queensland Dam Safety Management Guidelines February 2002 QNRM02013 ISBN 0 7345 2633 4 The State of Queensland (Department of Natural Resources and Mines) 2002 Copyright protects this publication. Except

More information

Indiana Office of Community and Rural Affairs. Disaster Recovery and Mitigation Planning Ft. Worth, Texas February 15, 2012

Indiana Office of Community and Rural Affairs. Disaster Recovery and Mitigation Planning Ft. Worth, Texas February 15, 2012 Indiana Office of Community and Rural Affairs Disaster Recovery and Mitigation Planning Ft. Worth, Texas February 15, 2012 Floods Indiana s costliest hazard State ranks 5 th in annual median flood damages

More information

Appendix 3: Glossary. Queensland Floods Commission of Inquiry Interim Report

Appendix 3: Glossary. Queensland Floods Commission of Inquiry Interim Report Appendix 3: Glossary ABC means the Australian Broadcasting Corporation. ACCESS forecast means a Bureau of Meteorology forecast obtained from the Australian Community Climate and Earth-System Simulator.

More information

HAZARD RISK ASSESSMENT, MONITORING, MAINTENANCE AND MANAGEMENT SYSTEM (HAMMS) FOR LANDSLIDE AND FLOOD. Mohd. Nor Desa, Rohayu and Lariyah, UNITEN

HAZARD RISK ASSESSMENT, MONITORING, MAINTENANCE AND MANAGEMENT SYSTEM (HAMMS) FOR LANDSLIDE AND FLOOD. Mohd. Nor Desa, Rohayu and Lariyah, UNITEN HAZARD RISK ASSESSMENT, MONITORING, MAINTENANCE AND MANAGEMENT SYSTEM (HAMMS) FOR LANDSLIDE AND FLOOD Mohd. Nor Desa, Rohayu and Lariyah, UNITEN WHAT WE HAVE IN MIND AND FROM OUR PREVIOUS PROJECT CONTRIBUTION

More information

STRUCTURAL FAILURES OF EARTH DAMS IN NIGERIA: A CASE STUDY OF CHAM DAM IN GOMBE STATE

STRUCTURAL FAILURES OF EARTH DAMS IN NIGERIA: A CASE STUDY OF CHAM DAM IN GOMBE STATE STRUCTURAL FAILURES OF EARTH DAMS IN NIGERIA: A CASE STUDY OF CHAM DAM IN GOMBE STATE Umaru A. 1, Ogedengbe K. 2 and Omobowale M. O. 2 1 Department of Agricultural and Environmental Engineering, Federal

More information

LIVING WITH FLOOD IN THE MEKONG DELTA, VIETNAM. Tran Thi Trieu, Nguyen Hieu Trung, Le Anh Tuan

LIVING WITH FLOOD IN THE MEKONG DELTA, VIETNAM. Tran Thi Trieu, Nguyen Hieu Trung, Le Anh Tuan LIVING WITH FLOOD IN THE MEKONG DELTA, VIETNAM Tran Thi Trieu, Nguyen Hieu Trung, Le Anh Tuan THE MEKONG RIVER DELTA Mekong River Delta is in the most southern of Vietnam. The MD is considered as a biggest

More information