1 FERC Engineering Guidelines Risk-Informed Decision Making Chapter R1 Introduction to Risk-Informed Decision Making Chapter R1, Risk-Informed Decision Making

2 Table of Contents Chapter R1 Introduction to Risk-Informed Decision Making R.1.1 Introduction to Risk-Informed Decision Making Engineering Guidelines R.1.2 Risk Management of Dams R.1.3 Risk Analysis R.1.4 Risk Assessment R.1.5 Required Steps to Proceed with a RIDM Based Approach to Dam Safety Appendix A RIDM Chapters Current and Proposed Chapter R1, Risk-Informed Decision Making

3 Chapter R1 Introduction to Risk-Informed Decision Making R.1.1 Introduction to Risk-Informed Decision Making Engineering Guidelines This chapter introduces the Risk-Informed Decision Making Engineering Guidelines (RIDM EGs) that will be used to analyze and assess the risk associated with FERCregulated dams. For the foreseeable future the FERC will maintain both the existing, deterministic, Engineering Guidelines and these RIDM Guidelines. In the near term the RIDM Guidelines will be used on an exception basis where either a licensee may request to utilize a RIDM approach or the FERC may suggest that a RIDM approach be considered. Over time the RIDM approach may become the standard of practice with the deterministic Guidelines then being used either on an exception basis or for dams with very low consequences. In general, the RIDM EGs do not address methods for conducting stability analyses or reproduce other parts of the deterministic guidelines. The RIDM EGs focus on how to use the information from deterministic analyses along with probability-based analysis tools. The decision-making process in RIDM is different than that used with deterministic methods. The decision-making aspects are discussed in the Risk Analysis and Risk Assessment Chapters, R24 through R28, Risk Analysis, Probability and Uncertainty, Risk Facilitation, Risk Assessment, and Consequence Assessment. The chapters in this RIDM EG provide guidance on how to: Clearly define the purpose and scope of the risk analysis and risk assessment Clearly define the dam system, i.e., all parts that contribute to risk, in order to develop a risk model. Conduct/refine the Potential Failure Mode Analysis (PFMA) to a level needed for the quantification of the risk. Develop probabilistic (or likelihood) estimates of loading. Estimate the probability or likelihood of dam failure given these loadings. Estimate the consequence of failure, both probable life loss and economic losses, Identify other consequences including possible environmental damages. Combine these estimates in a risk analysis into an estimate of the risk for each dam. Assess the risk at a dam to determine whether the risk is tolerable or if there is a need for risk reduction measures, including dam safety modifications. If needed, analyze risk reduction alternatives and justify potential dam safety modifications by making the case for these actions. Identify the urgency and priority of dam safety risk reduction actions. Incorporate a periodic review of the analyses and assessment for each dam as part of the overall FERC Dam Safety Program. Chapter R1, Risk-Informed Decision Making Draft

4 R.1.2 Risk Management of Dams Managing the risks associated with a dam or a portfolio of dams involves three distinct stages. These stages, each having their own purpose and function, are: Risk Analysis (including a PFMA) Risk Assessment Risk-Informed Decision Making In simplistic terms qualitative or quantitative risk analysis generates numbers associated with the risk of dam failure or uncontrolled release of the reservoir. Risk assessment is the process of determining what the numbers mean. Risk-informed decision making is the process of determining what, if anything, should be done to reduce the risk and how the risk should be managed in the long-term. More technical definitions can be found in Chapter R2. Dam safety risk management includes recurring and non-recurring activities and is the umbrella under which risk is used to inform decisions by owners and regulators. Risk communication, is also a critical part of each component of risk management. The nonrecurring parts of the Risk Management process are outlined in Figure 1 below. As described above, there are three stages in the process; the PFMA, Risk Analysis and, Risk Assessment, with risk-informed decisions being included under the Risk Assessment stage of the figure. The PFMA process is detailed in Chapter R3. The Risk Analysis and Risk Assessment processes are further discussed below and in Chapters R24 and R27. The other chapters, listed in Appendix A, describe procedures for developing risk estimates including consequences. R.1.3 Risk Analysis Risk analysis is defined as a qualitative or quantitative procedure that identifies potential modes of failure and the conditions and events that must take place for failure to occur. A quantitative risk analysis yields a numerical estimate of the risk of adverse consequence, multiplying the probability of load times the probability of dam failure given the load times the magnitude of adverse consequence given dam failure. Chapter R1, Risk-Informed Decision Making Draft

5 Figure 1 Flowchart of the Non-recurring Risk Management Process *Adapted from State of Victoria (2012) Chapter R1, Risk-Informed Decision Making Draft

6 Quantitative Risk Analysis (QRA) is a method that has many benefits in identifying and resolving dam safety issues including: Better understanding of the Potential Failure Modes (PFMs) Identification of previously unidentified PFMs Consideration of a full spectrum of potential consequences (not just High, Significant, Low Hazard) Explicit accounting of both life loss and economic consequences Explicit accounting of the probability of failure across the full range of PFMs Explicit accounting for uncertainty in the analyses Identifying critical systems and components R.1.4 Risk Assessment Risk assessment is the process of considering the quantitative or qualitative estimate of risk (the risk analysis), along with all significant related social, environmental, cost, temporal, and other factors to determine a recommended course of action to mitigate the risks or conclude that the risk is tolerable. Risk Assessment benefits include: Identifying potential risk reduction measures if needed Focusing surveillance and monitoring programs Improving emergency action plans (EAPs) Prioritizing resources both within a dam safety program and at a licensees Corporate level Improving communication with the public and other stakeholders. R.1.5 Required Steps to Proceed with a RIDM Based Approach to Dam Safety To proceed with a RIDM approach to dam safety the following initial steps should be followed. These steps ensure that all parties are fully informed and that the appropriate level of expertise is applied. 1. Attendance at FERC sponsored RIDM training programs. 2. Selection of an experienced risk analysis facilitator approved by the FERC. 3. FERC staff participation in working and formal RIDM meetings. 4. Selection and use of appropriate technical consultants with experience in risk analysis and/or probabilistic hazard analyses. 5. Completion of appropriate data collection for use in a comprehensive RIDM analysis. Chapter R1, Risk-Informed Decision Making Draft

7 6. Perform an External Peer Review by an engineer with experience in RIDM related to dams. 7. Preparation of a RIDM report signed and stamped by a Registered Professional Engineer. Chapter R1, Risk-Informed Decision Making Draft

8 Appendix A RIDM Chapters Current and Proposed Section A Introduction R1 Introduction to Risk-Informed Decision Making R2 Key Terms and Definitions Section B How Dams Fail R3 Potential Failure Mode Analysis R4 Development of Event Trees Section C Probabilistic Analysis R5 Concrete Dam Analysis (Arch, Gravity, and Buttress R6 Embankment Dam Analysis (Earthfill and Rockfill) R7 Analysis of Other Dam Types R8 Analysis of Gates and Other Water Outlet Works R9 Water Conveyance Systems R10 Internal Erosion and Piping R11 Erosion of Soil and Rock R12 Overtopping of Dams R13 Reservoir Landslide Induced Overtopping R14 Operational Issues and SCADA Systems R15 Spillway Analysis R16 Construction Risks R17 Dam Safety for New Projects Section D Determining the Probability of Loading R18 Determining Reservoir Level Exceedance Curves R19 Probabilistic Flood Hazard Analysis R20 Probabilistic Seismic Hazard Analysis Section E Consequences R21 Dam Breach Analysis R22 Estimation of Life Safety Consequences R23 Estimation of Economic Consequences Section F Risk Analysis - Risk Assessment R24 Risk Analysis R25 Probability and Uncertainty R26 Risk Facilitation R27 Risk Assessment R28 Consequence Assessment Legend Bold Font Posted Chapter Italics Font Chapter in Draft Normal Font Future Chapter Chapter R Draft

9 Section G Systems Analysis R29 Systems Analysis R30 Owner s Dam Safety Program R31 Owner s Annual Dam Safety Report Section H Risk Management - Risk Mitigation R32 Surveillance and Monitoring R33 Emergency Action Plans R34 Interim Risk Reduction Measures R35 Issue Evaluation Studies R36 Dam Safety Modification Studies R37 Reservoir Filling Plans Section I Other Guidelines R38 Part 12D Inspections R39 Supporting Technical Information R40 Standard Operating Procedures R41 Geotechnical Investigations and Studies R42 Construction Quality Control and Inspection Programs R43 Incident Reporting R44 Security Chapter R Draft

USACE Dam Safety Program Current Approach & Methodology

USACE Dam Safety Program Current Approach & Methodology USACE Dam Safety Program Current Approach & Methodology Siamac Vaghar, PE, MASCE Chief, Geotechnical Engineering Section Dam Safety Program Manager US Army Corps of Engineers New England District Corps

More information

Federal Energy Regulatory Commission Division of Dam Safety and Inspections DRAFT RECOVERY PLAN FORMAT

Federal Energy Regulatory Commission Division of Dam Safety and Inspections DRAFT RECOVERY PLAN FORMAT RECOVERY PLAN FORMAT Below is a suggested Table of Contents for an Internal Emergency Recovery (Response) Plan. This Internal Emergency Recovery Plan (IERP) is designed as a separate document which can

More information

ICOLD POSITION PAPER ON DAM SAFETY AND EARTHQUAKES

ICOLD POSITION PAPER ON DAM SAFETY AND EARTHQUAKES ICOLD POSITION PAPER ON DAM SAFETY AND EARTHQUAKES August 2012 Dam Safety and Earthquakes Position Paper of International Commission on Large Dams (ICOLD) Prepared by ICOLD Committee on Seismic Aspects

More information

Safety of Small/Rural Dams and Barrier Lake Management

Safety of Small/Rural Dams and Barrier Lake Management Safety of Small/Rural Dams and Barrier Lake Management A. Introduction 1. Lessons learnt and recommendations are provided for artificial dams and barrier lakes. In the case of artificial dams, emphasis

More information

Dam Safety Monitoring 101: Monitoring the Health of Dams Why & How We Do It

Dam Safety Monitoring 101: Monitoring the Health of Dams Why & How We Do It Dam Safety Monitoring 101: Monitoring the Health of Dams Why & How We Do It 0 Why We Monitor Dams Potential Failure Modes Outline Development of a Dam Safety Surveillance and Monitoring Program (DSSMP)

More information

6.0 Results of Risk Analyses

6.0 Results of Risk Analyses 6. Results of Risk Analyses A risk analysis of the optimized embankment designs for the Salton Sea restoration project was conducted jointly by Kleinfelder and representatives from Reclamation. A risk

More information

Management of flooding downstream of dams

Management of flooding downstream of dams Management of flooding downstream of dams Attachment to Victoria State Flood Emergency Plan Version 1.0 (6 February 2013) This plan is produced by the Victoria State Emergency Service and Department of

More information

Federal Energy Regulatory Commission. Division of Dam Safety and Inspections FERC. Security Program for Hydropower Projects.

Federal Energy Regulatory Commission. Division of Dam Safety and Inspections FERC. Security Program for Hydropower Projects. FERC Security Program for Hydropower Projects Revision 3 August 31, 2015 TABLE OF CONTENTS SUMMARY OF CHANGES 1 1.0 PURPOSE 2 2.0 OBJECTIVE 2 3.0 REQUIREMENTS AND RESPONSIBILITIES 2 3.1 General Requirements

More information

Queensland Dam Safety Management Guidelines. February 2002

Queensland Dam Safety Management Guidelines. February 2002 Queensland Dam Safety Management Guidelines February 2002 QNRM02013 ISBN 0 7345 2633 4 The State of Queensland (Department of Natural Resources and Mines) 2002 Copyright protects this publication. Except

More information

ARMY CORPS OF ENGINEERS. Actions Needed to Improve Cost Sharing for Dam Safety Repairs

ARMY CORPS OF ENGINEERS. Actions Needed to Improve Cost Sharing for Dam Safety Repairs United States Government Accountability Office Report to Congressional Requesters December 2015 ARMY CORPS OF ENGINEERS Actions Needed to Improve Cost Sharing for Dam Safety Repairs GAO-16-106 December

More information

PROBABILISTIC RISK ASSESSMENT AND RISK MANAGEMENT OF A NUCLEAR POWER PLANT

PROBABILISTIC RISK ASSESSMENT AND RISK MANAGEMENT OF A NUCLEAR POWER PLANT PROBABILISTIC RISK ASSESSMENT AND RISK MANAGEMENT OF A NUCLEAR POWER PLANT 1 Introduction 3 2 Scope of application 3 3 Development and use of the PRA 4 3.1 General requirements 4 3.2 PRA during the design

More information

Department of Energy and Water Supply

Department of Energy and Water Supply Department of Energy and Water Supply Guidelines on Acceptable Flood Capacity for Water Dams January 2013 State of Queensland, Department of Energy and Water Supply, 2012. The Queensland Government supports

More information

Dams and Extreme Events Reducing Risk of Aging Infrastructure under Extreme Loading Conditions

Dams and Extreme Events Reducing Risk of Aging Infrastructure under Extreme Loading Conditions Dams and Extreme Events Reducing Risk of Aging Infrastructure under Extreme Loading Conditions 34th Annual USSD Conference San Francisco, California, April 7-11, 2014 Hosted by San Francisco Public Utilities

More information

Decision and uncertainty management for human and human/agent teams. Dr. David Ullman President Robust Decisions, Inc. www.robustdecisions.

Decision and uncertainty management for human and human/agent teams. Dr. David Ullman President Robust Decisions, Inc. www.robustdecisions. Decision and uncertainty management for human and human/agent teams Dr. David Ullman President Robust Decisions, Inc. www.robustdecisions.com Topics What is Decision Management and why is it important?

More information

Flood mitigation program for Gatun lake. Programa de mitigación de inundaciones del lago Gatún

Flood mitigation program for Gatun lake. Programa de mitigación de inundaciones del lago Gatún Flood mitigation program for Gatun lake Programa de mitigación de inundaciones del lago Gatún Moffatt & Nichol Engineers 10 de febrero de 2005 Contrato No. 126161 Introducción y Recomendaciones 1 INTRODUCTION

More information

REGULATORY GUIDE OFFICE OF NUCLEAR REGULATORY RESEARCH. REGULATORY GUIDE 1.174 (Draft was issued as DG-1226, dated August 2009)

REGULATORY GUIDE OFFICE OF NUCLEAR REGULATORY RESEARCH. REGULATORY GUIDE 1.174 (Draft was issued as DG-1226, dated August 2009) U.S. NUCLEAR REGULATORY COMMISSION May 2011 Revision 2 REGULATORY GUIDE OFFICE OF NUCLEAR REGULATORY RESEARCH REGULATORY GUIDE 1.174 (Draft was issued as DG-1226, dated August 2009) AN APPROACH FOR USING

More information

Dam Safety Guidelines Ministry of Environment, Lands and Parks Water Management Branch Inspection & Maintenance of Dams ii Canadian Cataloguing in Publication Data BC Environment. Water Management Branch.

More information

US Army Corps of Engineers BUILDING STRONG

US Army Corps of Engineers BUILDING STRONG Fort Worth District Public Meeting 20 August 2013 US Army Corps of Engineers Lewisville Dam - Authorization Authorized by the River and Harbor Act, approved 2 March 1945 (Public Law 14, 79th Congress,

More information

Using HEC-RAS for Dam Break Studies

Using HEC-RAS for Dam Break Studies Using HEC-RAS for Dam Break Studies August 2014 Approved for Public Release. Distribution Unlimited. TD-39 REPORT DOCUMENTATION PAGE Form Approved OMB No. 0704-0188 The public reporting burden for this

More information

CHAPTER VII CONSTRUCTION QUALITY CONTROL INSPECTION PROGRAM 1

CHAPTER VII CONSTRUCTION QUALITY CONTROL INSPECTION PROGRAM 1 CHAPTER VII CONSTRUCTION QUALITY CONTROL INSPECTION PROGRAM 1 1 This Chapter of the FERC Engineering Guidelines has been prepared under contract with R & H Thomas, Inc. JANUARY 1993 Chapter VII Construction

More information

Seismic Design and Performance Criteria for Large Storage Dams

Seismic Design and Performance Criteria for Large Storage Dams Seismic Design and Performance Criteria for Large Storage Dams Dr. Martin Wieland Chairman, ICOLD Committee on Seismic Aspects of Dam Design Poyry Switzerland Ltd., Zurich, Switzerland Integral Dam Safety

More information

How To Improve Safety At A Nuclear Power Plant

How To Improve Safety At A Nuclear Power Plant OVERVIEW OF THE OPERATING REACTORS BUSINESS LINE August 6, 2015 Michael Johnson Deputy Executive Director for Reactor and Preparedness Programs Program Overview Bill Dean Director Office of Nuclear Reactor

More information

Federal Guidelines for Dam Safety

Federal Guidelines for Dam Safety Federal Guidelines for Dam Safety Selecting and Accomodating Inflow Design Floods for Dams April 2004 FEDERAL GUIDELINES FOR DAM SAFETY: SELECTING AND ACCOMMODATING INFLOW DESIGN FLOODS FOR DAMS prepared

More information

OVERVIEW OF THE OPERATING REACTORS BUSINESS LINE. July 7, 2016 Michael Johnson Deputy Executive Director for Reactor and Preparedness Programs

OVERVIEW OF THE OPERATING REACTORS BUSINESS LINE. July 7, 2016 Michael Johnson Deputy Executive Director for Reactor and Preparedness Programs OVERVIEW OF THE OPERATING REACTORS BUSINESS LINE July 7, 2016 Michael Johnson Deputy Executive Director for Reactor and Preparedness Programs Program Overview Bill Dean Director Office of Nuclear Reactor

More information

1.20 Appendix A Generic Risk Management Process and Tasks

1.20 Appendix A Generic Risk Management Process and Tasks 1.20 Appendix A Generic Risk Management Process and Tasks The Project Manager shall undertake the following generic tasks during each stage of Project Development: A. Define the project context B. Identify

More information

ENTERPRISE RISK MANAGEMENT FRAMEWORK

ENTERPRISE RISK MANAGEMENT FRAMEWORK ENTERPRISE RISK MANAGEMENT FRAMEWORK COVENANT HEALTH LEGAL & RISK MANAGEMENT CONTENTS 1.0 PURPOSE OF THE DOCUMENT... 3 2.0 INTRODUCTION AND OVERVIEW... 4 3.0 GOVERNANCE STRUCTURE AND ACCOUNTABILITY...

More information

APPENDIX F. Baker County. Mason Dam Hydroelectric Project FERC No. P-12686. Turbidity Monitoring Plan

APPENDIX F. Baker County. Mason Dam Hydroelectric Project FERC No. P-12686. Turbidity Monitoring Plan APPENDIX F Baker County Mason Dam Hydroelectric Project FERC No. P-12686 Turbidity Monitoring Plan April 2011 857 Table of Contents 1.0 Introduction 1 2.0 Purpose and Scope 2 3.0 Turbidity Monitoring and

More information

JUSTIFICATION OF RISK-TAKING THROUGH REASONING, REASONABLENESS AND PRACTICABILITY

JUSTIFICATION OF RISK-TAKING THROUGH REASONING, REASONABLENESS AND PRACTICABILITY JUSTIFICATION OF RISK-TAKING THROUGH REASONING, REASONABLENESS AND PRACTICABILITY D.N.D. Hartford, Scientific Advisor: - Safety and Risk Assessment BC Hydro The demand to specify what is safe by means

More information

Engineering Geological Asset Management for Large Dams. Yasuhito SASAKI (1)

Engineering Geological Asset Management for Large Dams. Yasuhito SASAKI (1) Engineering Geological Asset Management for Large Dams Yasuhito SASAKI (1) (1) Geology Research Team, Public Works Research Institute, Japan E-mail:ya-sasa@pwri.go.jp Abstract Comprehensive inspection

More information

DAM SAFETY: AN OWNER'S GUIDANCE MANUAL

DAM SAFETY: AN OWNER'S GUIDANCE MANUAL DAM SAFETY: AN OWNER'S GUIDANCE MANUAL As a safety guide for dam owners, this manual includes important steps that dam owners can take on a direct and indirect basis to reduce the consequences of dam failure.

More information

3.4.4 Description of risk management plan Unofficial Translation Only the Thai version of the text is legally binding.

3.4.4 Description of risk management plan Unofficial Translation Only the Thai version of the text is legally binding. - 1 - Regulation of Department of Industrial Works Re: Criteria for hazard identification, risk assessment, and establishment of risk management plan B.E. 2543 (2000) ---------------------------- Pursuant

More information

COST EFFECTIVE APPROACHES FOR PRESCRIBED DAM ASSET MANAGEMENT

COST EFFECTIVE APPROACHES FOR PRESCRIBED DAM ASSET MANAGEMENT COST EFFECTIVE APPROACHES FOR PRESCRIBED DAM ASSET MANAGEMENT Haris Pinidiya Sydney Water, NSW, Australia ABSTRACT Dams need to be dewatered in an emergency, typically by operating scour valves. Operating

More information

Interim Staff Guidance on Implementation of a Probabilistic Risk Assessment-Based Seismic Margin Analysis for New Reactors DC/COL-ISG-020

Interim Staff Guidance on Implementation of a Probabilistic Risk Assessment-Based Seismic Margin Analysis for New Reactors DC/COL-ISG-020 Interim Staff Guidance on Implementation of a Probabilistic Risk Assessment-Based Seismic Margin Analysis for New Reactors DC/COL-ISG-020 1.0 Purpose For the licensing process in Title 10 of the Code of

More information

Controlling Risks Risk Assessment

Controlling Risks Risk Assessment Controlling Risks Risk Assessment Hazard/Risk Assessment Having identified the hazards, one must assess the risks by considering the severity and likelihood of bad outcomes. If the risks are not sufficiently

More information

National Operation and Maintenance Manual

National Operation and Maintenance Manual United States Department of Agriculture Natural Resources Conservation Service National Operation and Maintenance Manual For Conservation Practices Installed With NRCS Assistance 180-V-NOMM, Second Edition,

More information

IUCN Guidelines to Avoid Impacts of Water Resources Projects on Dams and Other Water Infrastructure

IUCN Guidelines to Avoid Impacts of Water Resources Projects on Dams and Other Water Infrastructure IUCN Guidelines to Avoid Impacts of Water Resources Projects on Dams and Other Water Infrastructure (December 2013) IUCN does not engage in projects which involve the design, construction or rehabilitation

More information

A Risk Management Standard

A Risk Management Standard A Risk Management Standard Introduction This Risk Management Standard is the result of work by a team drawn from the major risk management organisations in the UK, including the Institute of Risk management

More information

ERM Program. Enterprise Risk Management Guideline

ERM Program. Enterprise Risk Management Guideline ERM Program Enterprise Management Guideline Table of Contents PREAMBLE... 2 When should I refer to this Guideline?... 3 Why do we need a Guideline?... 4 How do I use this Guideline?... 4 Who is responsible

More information

Outline of Guidelines for Seismic Performance Evaluation of Dams During Large Earthquakes (Draft)

Outline of Guidelines for Seismic Performance Evaluation of Dams During Large Earthquakes (Draft) Outline of Guidelines for Seismic Performance Evaluation of Dams During Large Earthquakes (Draft) by Nario Yasuda 1, Kazuhito Shimamoto 2, Yoshikazu Yamaguchi 3 and Takashi Sasaki 4 ABSTRACT On March 2005,

More information

EMERGENCY ACTION PLAN

EMERGENCY ACTION PLAN EMERGENCY ACTION PLAN INDIAN SPRINGS LAKE ESTATES PROPERTY OWNERS ASSOCIATION WILD INDIAN LAKE DAM Inventory No.: TX04915 Water Right Adjudication: 04416 Prepared April 12, 2010 by ISLEPOA PARTIALLY REVISED

More information

Flood Protection Structure Accreditation Task Force

Flood Protection Structure Accreditation Task Force Flood Protection Structure Accreditation Task Force August 2013 Update Presenter: Geoff Henggeler, USACE Outline for Presentation Bottom Line Up Front Task Force Charge Current Agency Practices & Operating

More information

Amherst Dam. Michael Juris - Village President Joe Behlen, P.E. WDNR Dam Safety Engineer Gerald Krueger, P.E. AECOM

Amherst Dam. Michael Juris - Village President Joe Behlen, P.E. WDNR Dam Safety Engineer Gerald Krueger, P.E. AECOM Amherst Dam Public Informational Meeting Michael Juris - Village President Joe Behlen, P.E. WDNR Dam Safety Engineer Gerald Krueger, P.E. AECOM April 3, 2014 Welcome Michael Juris Village President Introduction

More information

FlyntGroup.com. Enterprise Risk Management and Business Impact Analysis: Understanding, Treating and Monitoring Risk

FlyntGroup.com. Enterprise Risk Management and Business Impact Analysis: Understanding, Treating and Monitoring Risk Enterprise Risk Management and Business Impact Analysis: Understanding, Treating and Monitoring Risk 2012 The Flynt Group, Inc., All Rights Reserved FlyntGroup.com Enterprise Risk Management and Business

More information

United States Society on Dams. Routine Instrumented and Visual Monitoring of Dams Based on Potential Failure Modes Analysis

United States Society on Dams. Routine Instrumented and Visual Monitoring of Dams Based on Potential Failure Modes Analysis United States Society on Dams Routine Instrumented and Visual Monitoring of Dams Based on Potential Failure Modes Analysis March 2013 United States Society on Dams Routine Instrumented and Visual Monitoring

More information

Performance Based Design and Fire Safety Engineering in Australia

Performance Based Design and Fire Safety Engineering in Australia Performance Based Design and Fire Safety Engineering in Australia Peter Johnson Arup Melbourne Introduction In the period in Australia up until 1997, fire safety design had largely been based on compliance

More information

Security Risk Assessment and Mitigation Prioritization

Security Risk Assessment and Mitigation Prioritization Security Risk Assessment and Mitigation Prioritization Stephanie King, PhD, PE Weidlinger Associates, Inc. FFC Committee on Physical Security and Hazard Mitigation July 15, 2008 www.wai.com New York Massachusetts

More information

Nova Scotia EMO. Hazard Risk Vulnerability Assessment (HRVA) Model. Guidelines for Use. October, 2010

Nova Scotia EMO. Hazard Risk Vulnerability Assessment (HRVA) Model. Guidelines for Use. October, 2010 Nova Scotia EMO Hazard Risk Vulnerability Assessment (HRVA) Model Guidelines for Use October, 2010 EMO NS Hazard Risk Vulnerability Assessment Model Page 1 of 10 Table of Contents 1. Background 2. Definitions

More information

INCORPORATING UNCERTAINTY INTO DAM SAFETY RISK ASSESSMENT

INCORPORATING UNCERTAINTY INTO DAM SAFETY RISK ASSESSMENT INCORPORATING UNCERTAINTY INTO DAM SAFETY RISK ASSESSMENT Sanjay S. Chauhan 1 and David S. Bowles 2 ABSTRACT Risk assessment is becoming more widely used to supplement traditional approaches to dam safety

More information

CHAPTER III GRAVITY DAMS. (Revised October 2002)

CHAPTER III GRAVITY DAMS. (Revised October 2002) CHAPTER III GRAVITY DAMS (Revised October 2002) Chapter III Gravity Dams 3-0 Contents Title Page 3-1 Purpose and Scope 3-1 3-1.1 General 3-1 3-1.2 Review Procedures 3-1 3-2 Forces 3-2 3-2.1 General 3-2

More information

COMPARING DSS-WISE- LITE TO OTHER DAM BREACH SOFTWARE

COMPARING DSS-WISE- LITE TO OTHER DAM BREACH SOFTWARE National Dam Safety Program Technical Seminar No. 22 Dam Breach Modeling and Consequence Assessment National Emergency Training Center February 18-19, 2015 Emmitsburg, MD Brian Shane Cook, PE, LSIT formerly

More information

John Keel, CPA State Auditor. An Audit Report on The Dam Safety Program at the Commission on Environmental Quality. May 2008 Report No.

John Keel, CPA State Auditor. An Audit Report on The Dam Safety Program at the Commission on Environmental Quality. May 2008 Report No. John Keel, CPA State Auditor An Audit Report on The Dam Safety Program at the Commission on Environmental Quality Report No. 08-032 An Audit Report on The Dam Safety Program at the Commission on Environmental

More information

Technical Approach and Methodology

Technical Approach and Methodology 1 Dam Rehabilitation & Improvement Project (DRIP), India Technical Approach and Methodology relative to Section of Design Flood Review of TOR Making an integral part of Egis Eau Tender Technical Proposal

More information

Small Dam Hazard Assessment Inventory

Small Dam Hazard Assessment Inventory Small Dam Hazard Assessment Inventory What would happen if your dam were to fail? This is a question that most dam owners hope they will never have to answer. However it is a question you, as a responsible

More information

ICOLD s revised seismic design and performance criteria for large storage dams

ICOLD s revised seismic design and performance criteria for large storage dams ICOLD s revised seismic design and performance criteria for large storage dams Martin Wieland Chairman, ICOLD Committee on Seismic Aspects of Dam Design, Poyry Energy Ltd., Hardturmstrasse 161 CH-8037

More information

London Underground Comprehensive Review of Flood Risk (LUCRFR)

London Underground Comprehensive Review of Flood Risk (LUCRFR) London Underground Comprehensive Review of Flood Risk (LUCRFR) Nick Bean Mott MacDonald Anthony Fernihough London Underground Ian Uttley London Underground 23 rd February 2016 LUCRFR To undertake a comprehensive

More information

Flood Protection Structure Accreditation Task Force: Final Report

Flood Protection Structure Accreditation Task Force: Final Report Flood Protection Structure Accreditation Task Force: Final Report November 2013 Message from the Administrator and the Assistant Secretary of the Army (Civil Works) The United States Army Corps of Engineers

More information

Developing an Effective Enterprise Risk Management Program

Developing an Effective Enterprise Risk Management Program Developing an Effective Enterprise Risk Management Program Jay Brietz, CPA and CIA Senior Manager This material was used by Elliott Davis Decosimo during an oral presentation; it is not a complete record

More information

DAMS AND EARTHQUAKES IN NEW ZEALAND

DAMS AND EARTHQUAKES IN NEW ZEALAND DAMS AND EARTHQUAKES IN NEW ZEALAND Peter Amos 1 and Murray Gillon 2 ABSTRACT New Zealand is located in the area of active seismicity on the boundary between the Australian and Pacific plates. Most dams

More information

Safety Analysis for Nuclear Power Plants

Safety Analysis for Nuclear Power Plants Regulatory Document Safety Analysis for Nuclear Power Plants February 2008 CNSC REGULATORY DOCUMENTS The Canadian Nuclear Safety Commission (CNSC) develops regulatory documents under the authority of paragraphs

More information

THE APPLICATION OF A VALUE ASSURANCE SYSTEM TO OIL & GAS DEVELOPMENT PROJECTS (Guido Mattu, Franca Marini)

THE APPLICATION OF A VALUE ASSURANCE SYSTEM TO OIL & GAS DEVELOPMENT PROJECTS (Guido Mattu, Franca Marini) PAGE 1 THE APPLICATION OF A VALUE ASSURANCE SYSTEM TO OIL & GAS DEVELOPMENT PROJECTS (Guido Mattu, Franca Marini) Ing. Guido Mattu More than 25 years experience in Engineering and Project Management activities

More information

Force Main Condition Assessment: New Technologies & Case Studies

Force Main Condition Assessment: New Technologies & Case Studies Force Main Condition Assessment: New Technologies & Case Studies Andy Dettmer, Ph.D., P.E. CMOM Workshop August 19, 2014 2 1 Three takeaways 1. Most of your force mains are good 2. We can pinpoint the

More information

Hazard Identification and Risk Assessment for the Use of Booster Fans in Underground Coal Mines

Hazard Identification and Risk Assessment for the Use of Booster Fans in Underground Coal Mines Hazard Identification and Risk Assessment for the Use of Booster Fans in Underground Coal Mines Felipe Calizaya Michael G. Nelson Mahesh Shriwas Feb 26, 2013 Outline Introduction Booster Fans in U/G Coal

More information

February 4, 2011. hoffman.stephen@epa.gov. Report Recommendations and NIPSCO Responses. 4.3 Maintaining and Controlling Vegetation Growth

February 4, 2011. hoffman.stephen@epa.gov. Report Recommendations and NIPSCO Responses. 4.3 Maintaining and Controlling Vegetation Growth February 4, 2011 VIA E-MAIL AND CERTIFIED MAIL #7010 0290 0002 0577 6226 Mr. Stephen Hoffman US Environmental Protection Agency (5304P) 1200 Pennsylvania Avenue, NW Washington, DC 20460 hoffman.stephen@epa.gov

More information

Landslides & Mudflows

Landslides & Mudflows 1 2 - What is a Landslide? - Geologic hazard Common to almost all 50 states Annual global Billions in losses Thousands of deaths and injuries 3 1 - What is a Landslide? - Gravity is driving force Some

More information

Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans

Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans APPENDIX IV Version: February 2, 2015 Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans Please fill in all blanks and please reference the plan sheets/pages where the information may

More information

Sustainable. Infrastructure and Asset. Management. Kiyoshi KOBAYASHI

Sustainable. Infrastructure and Asset. Management. Kiyoshi KOBAYASHI Sustainable Infrastructure and Asset Management Kiyoshi KOBAYASHI What is Asset Management? The optimal allocation of the scare budget between the new arrange-ment of infrastructure and rehabilitation/maintenance

More information

A Regulatory Approach to Cyber Security

A Regulatory Approach to Cyber Security A Regulatory Approach to Cyber Security Perry Pederson Security Specialist (Cyber) Office of Nuclear Security and Incident Response U.S. Nuclear Regulatory Commission 1 Agenda Overview Regulatory Framework

More information

Project Knowledge Areas

Project Knowledge Areas From Houston S: The Project Manager s Guide to Health Information Technology Implementation. Chicago: HIMSS; 2011; pp 27 39. This book is available on the HIMSS online bookstore at www. himss.org/store.

More information

1. INTRODUCTION 2. DSC INTERNAL PROCEDURAL ARRANGEMENTS 3. NOTES ON FLOW CHART

1. INTRODUCTION 2. DSC INTERNAL PROCEDURAL ARRANGEMENTS 3. NOTES ON FLOW CHART DSC2B June 2010 DOCUMENAION AND INFORMAION FLOW OVER DAM LIFE CYCLE able of Contents Item Page 1. Introduction... 2 2. DSC Internal Procedural Arrangements... 2 3. Notes on Flow Chart... 2 4. Information

More information

Clarius Group Risk Management Policy and Framework

Clarius Group Risk Management Policy and Framework 1. Introduction Clarius Group Risk Management Policy and Framework 1.1 Definition Risk is the chance of something happening that will have an impact on objectives. Risk provides the opportunity (upside)

More information

Comments. EPA HQ - Auxiliary Ash Pond Report, Page 2-1: Third paragraph, first sentence, correct.

Comments. EPA HQ - Auxiliary Ash Pond Report, Page 2-1: Third paragraph, first sentence, correct. Comments EPA HQ - Auxiliary Ash Pond Report, Page 2-1: Third paragraph, first sentence, correct. EPA Region None. State See attachment from email dated January 28, 2010. Company See attached letter dated

More information

How can you support RIDM/CRM/RM through the use of Risk Analysis

How can you support RIDM/CRM/RM through the use of Risk Analysis How can you support RIDM/CRM/RM through the use of Risk Analysis Supply Chain Conference 2011 Panel Session NASA s Approach to Integrated Risk Management Tony DiVenti Reliability and Risk Analysis Branch

More information

RISK MANAGEMENT FOR INFRASTRUCTURE

RISK MANAGEMENT FOR INFRASTRUCTURE RISK MANAGEMENT FOR INFRASTRUCTURE CONTENTS 1.0 PURPOSE & SCOPE 2.0 DEFINITIONS 3.0 FLOWCHART 4.0 PROCEDURAL TEXT 5.0 REFERENCES 6.0 ATTACHMENTS This document is the property of Thiess Infraco and all

More information

Project Risk Management

Project Risk Management Project Risk Management Study Notes PMI, PMP, CAPM, PMBOK, PM Network and the PMI Registered Education Provider logo are registered marks of the Project Management Institute, Inc. Points to Note Risk Management

More information

Lockport Pool Chicago Sanitary & Ship Canal Illinois Waterway

Lockport Pool Chicago Sanitary & Ship Canal Illinois Waterway Presentation to the Inland Waterways Users Board Lockport Pool Chicago Sanitary & Ship Canal Illinois Waterway by Gary Loss, P.E. Rock Island District July 13, 2006 Chicago Sanitary and Ship Canal A

More information

Why Include Instrumentation in Dam Monitoring Programs?

Why Include Instrumentation in Dam Monitoring Programs? United States Society on Dams Why Include Instrumentation in Dam Monitoring Programs? November 2008 Version 1.00 United States Society on Dams Why Include Instrumentation in Dam Monitoring Programs? November

More information

Peer Review of Dam Safety at Suorva Dams

Peer Review of Dam Safety at Suorva Dams Peer Review of Dam Safety at Suorva Dams Prepared by Professor Kaare Höeg, Professor Jean Jacques Fry & Dr Robin Charlwood November 16, 2007 Executive Summary Vattenfall Vattenkraft appointed an International

More information

Site C Clean Energy Project Topic Specific Sessions: Presentation by Natural Resources Canada

Site C Clean Energy Project Topic Specific Sessions: Presentation by Natural Resources Canada Site C Clean Energy Project Topic Specific Sessions: Presentation by Natural Resources Canada Fort St. John, British Columbia January 13, 2014 Outline 1. Context for NRCan s Participation in the Joint

More information

DAM BREACH MODELING AN OVERVIEW OF ANALYSIS METHODS. Tony L. Wahl, Hydraulic Engineer, Bureau of Reclamation, Denver, CO, twahl@usbr.

DAM BREACH MODELING AN OVERVIEW OF ANALYSIS METHODS. Tony L. Wahl, Hydraulic Engineer, Bureau of Reclamation, Denver, CO, twahl@usbr. DAM BREACH MODELING AN OVERVIEW OF ANALYSIS METHODS Tony L. Wahl, Hydraulic Engineer, Bureau of Reclamation, Denver, CO, twahl@usbr.gov Abstract The two primary tasks in the analysis of a potential dam

More information

Environmental Assessment

Environmental Assessment OP 4.01 Page 1 of 5 Environmental Assessment Note: OP 4.01 replaces the policy elements of IFC s Environmental Analysis and Review of International Finance Corporation Projects (Washington, D.C.: IFC,

More information

Living With Dams Know Your Risks FEMA P-956 / February 2013

Living With Dams Know Your Risks FEMA P-956 / February 2013 Living With Dams Know Your Risks FEMA P-956 / February 2013 FICTION The Army Corps of Engineers is responsible for most dams in the U.S. FACT State dam safety programs have oversight of most dams in the

More information

Xavier Catholic College Risk Management - Policy & Procedure

Xavier Catholic College Risk Management - Policy & Procedure Xavier Catholic College Risk Management Policy 18 March 2013 Sourced from CSOHS Online. Source CSO Broken Bay 2012 Page 1 Risk Management Policy (Draft) PURPOSE Risk management is the culture, processes

More information

Seismic Risk Assessment Procedures for a System consisting of Distributed Facilities -Part three- Insurance Portfolio Analysis

Seismic Risk Assessment Procedures for a System consisting of Distributed Facilities -Part three- Insurance Portfolio Analysis Seismic Risk Assessment Procedures for a System consisting of Distributed Facilities -Part three- Insurance Portfolio Analysis M. Achiwa & M. Sato Yasuda Risk Engineering Co., Ltd., Tokyo, Japan M. Mizutani

More information

HUDSON RIVER-BLACK RIVER REGULATING DISTRICT BOARD MEETING JUNE 10, 2014

HUDSON RIVER-BLACK RIVER REGULATING DISTRICT BOARD MEETING JUNE 10, 2014 HUDSON RIVER-BLACK RIVER REGULATING DISTRICT BOARD MEETING JUNE 10, 2014 PRESENTATION TOPICS Analysis Objectives Analysis Dam Removal Plan Dam Remediation Plan Effects Analysis Permit Requirements Decision

More information

STATE OF COLORADO DEPARTMENT OF NATURAL RESOURCES DIVISION OF WATER RESOURCES OFFICE OF THE STATE ENGINEER DAM SAFETY BRANCH

STATE OF COLORADO DEPARTMENT OF NATURAL RESOURCES DIVISION OF WATER RESOURCES OFFICE OF THE STATE ENGINEER DAM SAFETY BRANCH STATE OF COLORADO DEPARTMENT OF NATURAL RESOURCES DIVISION OF WATER RESOURCES OFFICE OF THE STATE ENGINEER DAM SAFETY BRANCH RULES AND REGULATIONS FOR DAM SAFETY AND DAM CONSTRUCTION EFFECTIVE DATE: JANUARY

More information

Jackson Gulch Outlet Canal Rehabilitation Project

Jackson Gulch Outlet Canal Rehabilitation Project Jackson Gulch Outlet Canal Rehabilitation Project Preliminary Budgetary Estimate for Rehabilitation February 2004 Prepared for the Mancos Water Conservancy District Jackson Gulch Reservoir 42888 County

More information

Risk Management at Chevron

Risk Management at Chevron Risk Management at Chevron Jean Bruney AIChE/SACHE Workshop Context for HES Risk Management Corporation Sets policies & expectations Centers of Expertise Establish processes & verify Oversight Level Global

More information

Exploring the Possibilities of Small Hydropower Development Utilizing NRCS-Assisted Flood Control Dams

Exploring the Possibilities of Small Hydropower Development Utilizing NRCS-Assisted Flood Control Dams Exploring the Possibilities of Small Hydropower Development Utilizing NRCS-Assisted Flood Control Dams A report prepared by the National Watershed Coalition December 2011 1 Exploring the Possibilities

More information

Strategic Planning Guide

Strategic Planning Guide Planning Guide Social Enterprise Start-Up Tool Kit Emily Bolton, Enterprise Development Manager, 1 Plan Process Clarity Priorities Resource Implications Performance Metrics Objective To develop a concrete

More information

QUALITY RISK MANAGEMENT (QRM): A REVIEW

QUALITY RISK MANAGEMENT (QRM): A REVIEW Lotlikar et al Journal of Drug Delivery & Therapeutics; 2013, 3(2), 149-154 149 Available online at http://jddtonline.info REVIEW ARTICLE QUALITY RISK MANAGEMENT (QRM): A REVIEW Lotlikar MV Head Corporate

More information

Analyzing Risks in Healthcare. February 12, 2014

Analyzing Risks in Healthcare. February 12, 2014 Analyzing s in Healthcare February 12, 2014 1 Content What is Enterprise Management (ERM) ERM Benefits ERM Standards / ISO 31000:2009 ERM Process Register ERM Governance Model s Q&A 2 What is Enterprise

More information

chapter 9 conduct a climate change

chapter 9 conduct a climate change CONDUCT A CLIMATE RESILIENCY STUDY The following chapters recommend how to reach CRC Milestone Two, Conduct a Climate Resiliency Study. 2 MILESTONE Chapter 8: Conduct a Climate Change Vulnerability Assessment

More information

STATE OF COLORADO DEPARTMENT OF NATURAL RESOURCES DIVISION OF WATER RESOURCES GUIDELINES FOR DAM BREACH ANALYSIS

STATE OF COLORADO DEPARTMENT OF NATURAL RESOURCES DIVISION OF WATER RESOURCES GUIDELINES FOR DAM BREACH ANALYSIS STATE OF COLORADO DEPARTMENT OF NATURAL RESOURCES DIVISION OF WATER RESOURCES OFFICE OF THE STATE ENGINEER DAM SAFETY BRANCH GUIDELINES FOR DAM BREACH ANALYSIS February 10, 2010 Telephone (303) 866-3581

More information

Safety Assessment for a major hazard facility

Safety Assessment for a major hazard facility Guidance Note Safety Assessment Advice for operators of major hazard facilities on conducting and documenting a Safety Assessment. May 2011 1. Introduction 1 1.1. What is a Safety Assessment? 1 1.2. Features

More information

Strengthening Risk Evaluation and Mitigation Strategies (REMS) Through Systematic Analysis, Standardized Design, and Evidence-Based Assessment

Strengthening Risk Evaluation and Mitigation Strategies (REMS) Through Systematic Analysis, Standardized Design, and Evidence-Based Assessment September 25, 2013 Discussion Guide Strengthening Risk Evaluation and Mitigation Strategies (REMS) Through Systematic Analysis, Standardized Design, and Evidence-Based Assessment Background With the passage

More information

Negative Risk. Risk Can Be Positive. The Importance of Project Risk Management

Negative Risk. Risk Can Be Positive. The Importance of Project Risk Management The Importance of Project Risk Management Project risk management is the art and science of identifying, analyzing, and responding to risk throughout the life of a project and in the best interests t of

More information

Emergency Spillways (Sediment basins)

Emergency Spillways (Sediment basins) Emergency Spillways (Sediment basins) DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short-Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1]

More information

Audit of the Disaster Recovery Plan

Audit of the Disaster Recovery Plan Audit of the Disaster Recovery Plan Report # 11-05 Prepared by Office of Inspector General J. Timothy Beirnes, CPA, Inspector General Kit Robbins, CISA, CISM, CRISC, Lead Information Systems Auditor TABLE

More information

Outlet stabilization structure

Outlet stabilization structure Overview of Sedimentation and Erosion Control Practices Practice no. 6.41 Outlet stabilization structure Erosion at the outlet of channels, culverts, and other structures is common, and can cause structural

More information

AGENDA ASTORIA CITY COUNCIL WORK SESSION / REGULAR SESSION

AGENDA ASTORIA CITY COUNCIL WORK SESSION / REGULAR SESSION AGENDA ASTORIA CITY COUNCIL WORK SESSION / REGULAR SESSION October 19, 2015 6:00 p.m. 2 nd Floor Council Chambers 1095 Duane Street Astoria OR 97103 6:00 P.M. WORK SESSION 1. CALL TO ORDER 2. ROLL CALL

More information