SARAL Project Overview CNES Activities Progress Status

Size: px
Start display at page:

Download "SARAL Project Overview ----------- CNES Activities Progress Status"

Transcription

1 SARAL Project Overview CNES Activities Progress Status Dr. J. Noubel, P. Sengenes 2nd SARAL-AltiKa Science Workshop Ahmedabad 15-17, March, 2011 ISRO/SAC Ahmedabad - India

2 SARAL Program SARAL Program : joint mission conducted by ISRO and CNES Signature of SARAL and ARGOS-3/SARAL MoU on February 2007 Two missions on-board the SARAL satellite which is based on ISRO SSB (Small Satellite Bus) platform : ALTIKa mission SARAL Satellite with ARgos and ALtika ARGOS-3 mission SARAL Orbit: Polar (incl. = ) and Sun-Synchronous orbit local time at ascending/descending node : 6 am / 6 pm 800 km altitude, low eccentricity same orbit/ground-track as ENVISAT Ground-track repetition period : 35 days Ground-track stability requirement: +/- 1 km SARAL mission lifetime requirement : 5 years of exploitation, to be continued as long as the satellite ang ground components will be operational ARGOS-3/SARAL lifetime requirement: 5 years of operations, objective : 7 years AltiKa/SARAL lifetime requirement: 3 years of operations, objective : 5 years 2 nd SARAL-AltiKa Science Workshop Ahmedabad 15-17, March, 2011 CNES SARAL project overview 2

3 ALTIKA mission Need expressed by scientific oceanography community (IGOS, GODAE, OSTST,.. ) since 2000: «Continuity of high accuracy, high resolution near-real time observations of the ocean surface topography is required. At least, 2 simultaneous altimetry missions are required (including one of the Jason reference class)» That requires to prepare a post-envisat mission that would fly at the same time as JASON2 (launched on June 2008), to fill the gap between JASON1&2/ENVISAT and JASON3/SENTINEL3A (2013) Lisbon Fall 10 OSTST recommendation : to launch SARAL as soon as possible in 2011 ALTIKa mission Approved by CNES Governors Board on December, 2005 Research oriented altimetry mission but with operational products: new instrument, higher frequency (Ka-band), enhanced performances but with a consolidated architecture : conventional nadir altimeter Operational products: Near Real Time (Met. Agencies) and Off-line products (Science) new potential applications on ice, land, coastal areas, rain, clouds AltiKa scientific objectives Ocean meso-scale variability studies with an improvement in vertical and spatial measurement resolution thanks to Ka-band altimeter Data assimilation in a global ocean model contribution to : coastal altimetry, continental waters and inland ice sheet monitoring, light rainfall and clouds climatology, Geodetic reference system determination thanks to Doris and a Laser Retro-reflector Array 2 nd SARAL-AltiKa Science Workshop Ahmedabad 15-17, March, 2011 CNES SARAL project overview 3

4 ARGOS-3 mission ARGOS-3/SARAL mission Opportunity for the ARGOS-3 payload to flight on-board the SARAL satellite has been agreed by ISRO and CNES in 2006 to improve and to expand the capabilities (availability, performance) of the ARGOS Data Collection System in order to minimize the mean time delay and the data latency for a user to access to its ARGOS data product ARGOS-3/SARAL will add to ARGOS-3 constellation formed with ARGOS-3 payloads on board METOP-A (launched in Oct. 2006) and NOAA N (Feb. 2009) ARGOS-3 payloads are also embarked on-board METOP-B (2012) and METOP-C (2016) ARGOS users segment : ~ beacons spread all over the world 2 nd SARAL-AltiKa Science Workshop Ahmedabad 15-17, March, 2011 CNES SARAL project overview 4

5 SARAL system overview SARAL Satellite Integrated Payload Module CNES Payload Payload Interface Module ICU SSB SARAL Space Segment SARAL S-Band Ground Stations Network Flight Operation Control Center Laser Community SARAL Payload Data Segment AltiKa & ARGOS3 Missions Centers EUMETSAT Center AltiKa NRT ISRO Centers AltiKa NRT AltiKa OFL Auxiliary data providers CNES AltiKa Mission Center ARGOS Global Global Processing Centers DORIS Beacons Network Outside INDIA AltiKa Users IDS ARGOS ARGOS Users User Within INDIA AltiKa Users SARAL X-band TM PSLV Launch vehicle SARAL X-Band Ground Stations Network ARGOS Master Beacons 2 nd SARAL-AltiKa Science Workshop Ahmedabad 15-17, March, 2011 CNES SARAL project overview 5

6 AltiKa & Argos-3 payloads accommodation on SSB/IMS-2 platform : SARAL satellite INTEGRATED PAYLOAD MODULE STAR SENSORS SSB/IMS-2 PLATFORM ARGOS L-BAND ANTENNA ARGOS UHF ANTENNA ALTIKA ALTIMETER & RADIOMETER ANTENNA SARAL sat. characteristics DORIS ANTENNA TTC S-BAND ANTENNA X-BAND ANTENNA MAGNETOMETER # Mass : < 400 kg - SSB platform : ~215kg - Payload Module : ~163 kg - Argos UHF antenna: ~5 kg #Power : 850W / 720W ( BOL / EOL) - SSB platform: ~ 200W - Payload Module: typical consumption <250 W (max consumption < 350 W) # Size - ~ 1m x ~1m x 2.7 m - Solar panels : 2 wings of 1.2m x 1.62m 2 nd SARAL-AltiKa Science Workshop Ahmedabad 15-17, March, 2011 CNES SARAL project overview 6 LRA

7 Payload Integrated Module Progress Status PIM Definition and Design Reviews CNES/ISRO PIM PDR held in Toulouse on December 2008 after CNES/THALES (PIM Industrial Prime) PIM PDR held in October 2008, and followed by CNES/THALES PIM CDR held in June/July 2009 Flight models of AltiKa, Doris and ARGOS-3 payloads have been delivered to THALES PIM AIT team on August/September 2009 Qualification of AltiKa instrument FM has been formally pronounced by CNES Steering Board in Dec ICU equipments (PIM electrical Interface Control Units) delivered to PIM AIT team on November 2009 (AAIU) and on December 2009 (PDU) LRA FM delivered to CNES on Dec. 09, then to THALES AIT on Feb. 10 Integration of all electrical equipments completed by end of December 2009 Jan. / Feb 2010 : completion of PIM initial electrical reference tests: integrated payloads functional and performances validation tests 1st half of March 2010 : completion of EMC/EMI CE/CS tests at PIM level 2nd half of March 2010 : integration of AltiKa antenna sub-assembly, integration of Doris & ARGOS-3 L-band antennas and of LRA April 2010 : MLI and ESD/RF shields installation - Altika antenna alignment 1st half of May 2010: Shipment of PIM and associated test means to THALES/Cannes facilities to perform the environmental qualification tests. 2 nd SARAL-AltiKa Science Workshop Ahmedabad 15-17, March, 2011 CNES SARAL project overview 7

8 Mechanical Qualification tests (sine vibrations, acoustics, shocks) successfully passed in the 1st half of June nd SARAL-AltiKa Science Workshop Ahmedabad 15-17, March, 2011 CNES SARAL project overview 8

9 In August 2010, EMC/EMI RE/RS tests including PIM RF self-compatibility test: OK 2 nd SARAL-AltiKa Science Workshop Ahmedabad 15-17, March, 2011 CNES SARAL project overview 9

10 1st half of September 2010, Thermal Vacuum test including PIM Thermal Balance: OK 2 nd SARAL-AltiKa Science Workshop Ahmedabad 15-17, March, 2011 CNES SARAL project overview 10

11 PIM Final Electrical Reference tests sequence final functional and performances validation tests In October 2010, a formal «electronic part alert» was raised by THALES because of some failures observed on some other programs Failures were due to an excess of coating on some particular parts (KSO components) during PCB manufacturing process No anomaly was observed on SARAL equipments Nevertheless, as a precautionary measure, we decided to retrofit three PIM equipments (AAIU, PDU and AltiKa ARFU) which could be affected. These 3 equipments have been retrofitted and post-retrofit qualification tests have been performed by the end of PDU and AltiKa ARFU have been re-integrated inside PIM in January 2011 AAIU has been re-integrated in February PIM final functional and performances reference tests are currently being done in THALES/Toulouse facilities CNES/THALES Qualification Review is planned to be held on April/May 11. PIM ready to be shipped to India: end of 2 nd Quarter of nd SARAL-AltiKa Science Workshop Ahmedabad 15-17, March, 2011 CNES SARAL project overview 11

12 SARAL Ground Segment i i Shadnagar XBAND Shadnagar Bangalore ISRO SBAND ET LEOP ISRO SBAND ETs Kiruna XBAND Kiruna KRX Inuvik XBAND Inuvik IVK 1b 5b 5c NMC Kiruna Bangalore POLARXET Access Point tests with ISRO/NRSC and ISRO/SAC ISTRAC SCC 10 i Interface tests covered by GSOV document 1 Toulouse CNES NOC Darmstadt EUM Data server Toulouse CNES SARAL Mission Centre 7 TM-NRT UMARF EUMET Cast/GTS Aux. data providers CNES Users Users ISRO Users 2 nd SARAL-AltiKa Science Workshop Ahmedabad 15-17, March, 2011 CNES SARAL project overview ILRS 3 Shadnagar NRSC FTP access point 8 9 SD 6 Washington ARGOS Processing ARGOS Centers Processing Center Toulouse Darmstadt Shadnagar Laser DB SSALTO NRSC TM-NRT Ahmedabad SPA Ahmedabad MOSDAC ARGOS Users

13 SARAL System & Ground Segment (1/2) October 2009 : CNES/ISRO/EUMETSAT SARAL System Interfaces, Performances and Validation Review SALP/SSALTO (CNES altimetry multi-missions Center) March 2010 : SSALTO/AltiKa upgrade V2 Integration/Validation achieved for system tests Payload Command & Control Orbitography : MOE / POE processing Altimetry/radiometry : OGDR / IGDR / GDR processing April 2010 : installation of TM_NRT software in EUMETSAT facility June 2010 : installation of TM_NRT system in ISRO/NRSC Shadnagar facility installation of OFL system in ISRO/SAC Ahmedabad facility November 2010 : End of SSALTO/AltiKa upgrade V2 Acceptance Scientific validation completed identification of processing algorithms tuning Ground files and parameters processing review May 2011 : End of SSALTO/AltiKa upgrade V3 Acceptance Trend analysis functions (IMIS) Algorithm/parametrization tuning (Files review output) final versions of SPA and TM-NRT ready for installation in EUMETSAT and ISRO/SAC and ISRO/NRSC facilities for the Long Term Routine tests and System Operational Qualification 2 nd SARAL-AltiKa Science Workshop Ahmedabad 15-17, March, 2011 CNES SARAL project overview 13

14 SARAL System & Ground Segment (2/2) X-band Polar Ground Stations : Kiruna (Sweden) & Inuvik (Canada) Sept 15, 2010 : establishment of the data link (2 Mb/sec) between Esrange Space Center and EUMETSAT/Darmstadt Center Sept : IT-1 global test Dec 2010 : IVK Partnership Polar Station Technical Qualification & establishment of the data link (2 Mb/sec) between Inuvik and Esrange Space Center From Jan 2011 : KRX Partnership Polar Station Technical Qualification in progress EUMPC Dec 2010 : System Integration and Verification completion Dec 2010 : DCN between EUMETSAT and NRSC Shadnagar : link exists, via Svalbard, using the high data rate link set up between EUMETSAT and ISRO according to both agencies agreement (Oceansat2, ) Satellite Control Center (SCC) and S-band stations ISRO presentation 2 nd SARAL-AltiKa Science Workshop Ahmedabad 15-17, March, 2011 CNES SARAL project overview 14

15 System and Ground Segment forthcoming activities DCN between CNES/SSALTO in Toulouse and SARAL SCC in ISTRAC/ISRO in Bangalore Still to be discussed between CNES and ISRO (CNES proposes to use Internet with secured protocol) Completion of Ground Segment Overall Validation (GSOV) & Mission System tests GSOV Integration tests : interfaces compatibility tests between all GS elements achieved for all Payload Data segment IFs; pending the Satellite Control Center availability GSOV Technical Validation tests : Realistic scenarios and maximising the use of operational interfaces, hardware and software GSOV-VT : SARAL GS VALIDATION TESTS MIS-VT : MISSION SYSTEM VERIFICATION TEST (with payloads-s/c-scc-ssalto) System Operational Qualification tests LTR : LONG TERM ROUTINE TESTS DR : Launch DRESS REHEARSALS (ISRO definition) Will be concluded by the SARAL System Operational Readiness Review (ORR) 2 nd SARAL-AltiKa Science Workshop Ahmedabad 15-17, March, 2011 CNES SARAL project overview 15

16 Archive Dissemination Users services in operational phase ISRO : NRT and OFL products archive and dissemination to users within India (except for DORIS products), and corresponding Users services EUMETSAT : NRT processing, archive and dissemination to users outside India, and corresponding Users services User Service Helpdesk: Web : ops@eumetsat.int CNES : OFL processing, archive and dissemination to users outside India, and corresponding Users services User Service Helpdesk: AVISO Altimetry Web : aviso@oceanobs.com Science Data policy : all OSS data products will be made available to WMO users on a free basis and without any restriction either geographical or temporal Archive for at least 10 years after the end of the SARAL operations 2 nd SARAL-AltiKa Science Workshop Ahmedabad 15-17, March, 2011 CNES SARAL project overview 16

17 2 nd SARAL-AltiKa Science Workshop Ahmedabad 15-17, March, 2011 CNES SARAL project overview 17

18 LEOP SODAP Assessment Phase ALK Verification Phase NRT Verif. Phase OFL Verif. Phase NRT Op. Phase OFL Op. Phase Operational Phase SARAL Ops. Phase SARAL Mission Phases and associated responsabilities 1 day satellite on injection orbit 1 week ARGOS Verification Phase Nominal satellite and instruments modes 2 months cycle 1 In-Flight Assessment Review 9 to 10 months 5 months First Verification Workshop 3 months Start of nominal operations Resp : CNES for System coordination Resp : ISRO with CNES support Resp : CNES/ISRO Resp : CNES/ISRO/EUMETSAT with PIs support Near RT products delivery by ISRO and EUM ARGOS-3 Commissioning Review Resp : ISRO Platform/CNES Payload Final Verification Workshop OFL delivery & reprocessing Resp : CNES with CLS support Resp : EUMETSAT & ISRO (generation and distribution) Resp : CNES & ISRO (generation and distribution) Resp :ISRO/CNES Sat Operations CNES ALK Operations Resp :CNES/CLS ARGOS-3 Operations 2 nd SARAL-AltiKa Science Workshop Ahmedabad 15-17, March, 2011 CNES SARAL project overview 18

SARAL ACCESS TO OFF-LINE DATA

SARAL ACCESS TO OFF-LINE DATA SARAL AltiKa introduction Plot of the SARAL/AltiKa ground track over Africa (Credits: Google). S ARAL/AltiKa is a new mission in cooperation between CNES and ISRO (Indian Space Research Organization),

More information

SARAL/AltiKa Products Handbook

SARAL/AltiKa Products Handbook References: CNES : SALP-MU-M-OP-15984-CN ISRO: xxx Issue: 2 rev 4 Date: December 9, 2013 Iss : 2.4 - date : December 9, 2013 i.1 Chronology Issues: Issue: Date: Reason for change: 1rev0 March 9, 2011

More information

THE CURRENT EVOLUTIONS OF THE DORIS SYSTEM

THE CURRENT EVOLUTIONS OF THE DORIS SYSTEM THE CURRENT EVOLUTIONS OF THE DORIS SYSTEM TAVERNIER, G.; GRANIER, J.P.; JAYLES, C.; SENGENES, P. (CNES) ROZO, F. (COFRAMI) presented by P. VINCENT (CNES) Table of Contents System and Missions Satellites:

More information

25 Years of Indian Remote Sensing Satellite (IRS) Series

25 Years of Indian Remote Sensing Satellite (IRS) Series 25 Years of Indian Remote Sensing Satellite (IRS) Series Vinay K Dadhwal Director National Remote Sensing Centre (NRSC), ISRO Hyderabad, INDIA 50 th Session of Scientific & Technical Subcommittee of COPUOS,

More information

Update on EUMETSAT ocean colour services. Ewa J. Kwiatkowska

Update on EUMETSAT ocean colour services. Ewa J. Kwiatkowska Update on EUMETSAT ocean colour services Ewa J. Kwiatkowska 1 st International Ocean Colour Science meeting, 6 8 May, 2013 EUMETSAT space data provider for operational oceanography Operational data provider

More information

Indian Diplomacy At Work

Indian Diplomacy At Work Indian Diplomacy At Work 50 YEARS OF INDO-FRENCH SPACE CO-OPERATION BRINGING BENEFITS TO MANKIND 50 YEARS OF INDO-FRENCH SPACE CO-OPERATION Bringing Benefits to Mankind A time-tested partnership India

More information

How To Monitor Sea Level With Satellite Radar

How To Monitor Sea Level With Satellite Radar Satellite Altimetry Wolfgang Bosch Deutsches Geodätisches Forschungsinstitut (DGFI), München email: bosch@dgfi.badw.de Objectives You shall recognize satellite altimetry as an operational remote sensing

More information

Jason-2 GDR Quality Assessment Report. Cycle 059 07-02-2010 / 17-02-2010. M. Ablain, CLS. P. Thibaut, CLS

Jason-2 GDR Quality Assessment Report. Cycle 059 07-02-2010 / 17-02-2010. M. Ablain, CLS. P. Thibaut, CLS Jason-2 GDR Quality Assessment Report Cycle 059 07-02-2010 / 17-02-2010 Prepared by : S. Philipps, CLS M. Ablain, CLS P. Thibaut, CLS Accepted by : Approved by : DT/AQM, CLS E. Bronner, CNES Edition 01.0,

More information

Mission Operations and Ground Segment

Mission Operations and Ground Segment ESA Earth Observation Info Days Mission Operations and Ground Segment ESA EO Ground Segment and Mission Operations department (EOP-G) May 2013 EOEP 2013 Page 1 ESA Unclassified For Official Use MISSION

More information

QBITO Development and Students Involvement. Ignacio Barrios Tascón E-USOC, Universidad Politécnica de Madrid

QBITO Development and Students Involvement. Ignacio Barrios Tascón E-USOC, Universidad Politécnica de Madrid QBITO Development and Students Involvement Ignacio Barrios Tascón E-USOC, Universidad Politécnica de Madrid 1 Contents Who we are E-USOC Educational activities Project based learning QBITO 2 Who we are

More information

AltiKa Radiometer performance assessment

AltiKa Radiometer performance assessment AltiKa Radiometer performance assessment R. Rodriguez Suquet & N. Steunou, J.L. Courrière DCT/SI/AR 2 nd SARAL/AltiKa Science Workshop March 15 th -17 st, 2011 - AHMEDABAD 1 Overview Radiometer Instrument

More information

ESA Earth Observation and the need for high speed networking

ESA Earth Observation and the need for high speed networking ESA Earth Observation and the need for high speed networking Pisa, 11 th May 25 11 th May 25 GARR Conference 5 1 ESA Earth Observation 11 th May 25 GARR Conference 5 2 The European Space Agency The European

More information

The European Satellite Navigation Programmes EGNOS and Galileo

The European Satellite Navigation Programmes EGNOS and Galileo The European Satellite Navigation Programmes EGNOS and Galileo Olivier Crop European GNSS Agency (GSA) Paris, 17 March 2014 20 March, 2014 The European GNSS Programmes 2 Basics of Satellite Navigation

More information

Jason-2 GDR Quality Assessment Report. Cycle 243 05-02-2015 / 15-02-2015. S. Philipps, CLS. M. Ablain, CLS. P. Thibaut, CLS

Jason-2 GDR Quality Assessment Report. Cycle 243 05-02-2015 / 15-02-2015. S. Philipps, CLS. M. Ablain, CLS. P. Thibaut, CLS Jason-2 GDR Quality Assessment Report Cycle 243 05-02-2015 / 15-02-2015 Prepared by : H. Roinard, CLS S. Philipps, CLS M. Ablain, CLS P. Thibaut, CLS Accepted by : Approved by : DT/AQM, CLS E. Bronner,

More information

The NASA Global Differential GPS System (GDGPS) and The TDRSS Augmentation Service for Satellites (TASS)

The NASA Global Differential GPS System (GDGPS) and The TDRSS Augmentation Service for Satellites (TASS) The Global Differential GPS System (GDGPS) and The TDRSS Augmentation Service for Satellites (TASS) Yoaz Bar-Sever, Larry Young, Frank Stocklin, Paul Heffernan and John Rush s Global Differential GPS System

More information

The National Strategy, Current Activities for Space Technology Development and Application

The National Strategy, Current Activities for Space Technology Development and Application 14-18 November 2011, Putrajaya, Malaysia The National Strategy, Current Activities for Space Technology Development and Application Lai Anh Khoi Space Technology Institute, VAST, Vietnam Bief History Space

More information

The DLR Multi Mission EO Ground Segment

The DLR Multi Mission EO Ground Segment The DLR Multi Mission EO Ground Segment Payload Ground Segment Erhard Diedrich Remote Sensing Workshop Mexico 22-24 April 2008 DLR Ground Segment for Earth Observation: Servicing GMES, national and commercial

More information

16 th IOCCG Committee annual meeting. Plymouth, UK 15 17 February 2011. mission: Present status and near future

16 th IOCCG Committee annual meeting. Plymouth, UK 15 17 February 2011. mission: Present status and near future 16 th IOCCG Committee annual meeting Plymouth, UK 15 17 February 2011 The Meteor 3M Mt satellite mission: Present status and near future plans MISSION AIMS Satellites of the series METEOR M M are purposed

More information

Figure 2. IASI technical expertise center main interfaces

Figure 2. IASI technical expertise center main interfaces SpaceOps 2010 ConferenceDelivering on the DreamHosted by NASA Mars 25-30 April 2010, Huntsville, Alabama AIAA 2010-2310 The IASI technical expertise center : IASI tuning and performance

More information

Spacecraft Operations Course

Spacecraft Operations Course , DLR Spacecraft Operations Course Course Content The following subjects and topics will be addressed during the Spacecraft Operations Course Table of Content Spacecraft Operations Course, DLR TABLE OF

More information

Ensuring the Preparedness of Users: NOAA Satellites GOES R, JPSS Laura K. Furgione

Ensuring the Preparedness of Users: NOAA Satellites GOES R, JPSS Laura K. Furgione Ensuring the Preparedness of Users: NOAA Satellites GOES R, JPSS Laura K. Furgione U.S. Permanent Representative with the WMO Deputy Director, NOAA s s National Weather Service WMO Executive Council 65

More information

C-S TEAM. Page 1 of 5

C-S TEAM. Page 1 of 5 Title: Medium/large vehicle tracking system Primary POC: Jacoba Auret Organization: C-S Team (Cape Peninsula University of Technology-Stellenbosch University) POC email: 14807599@sun.ac.za Need We exist

More information

Jason-1 Project Status

Jason-1 Project Status 2009 Ocean Surface Topography Science Team Meeting (Seattle) Jason-1 Project Status Glenn M. Shirtliffe NASA/JPL Jason-1 Project Manager GMS - 1 Jason-1 Mission Overview The 17+ year combined data record

More information

The Multimission National Center of the Italian Space Agency

The Multimission National Center of the Italian Space Agency The Multimission National Center of the Italian Space Agency L. Garramone - ASI GSCB Workshop, ESA/ESRIN Frascati Table of contents Multimission National Center (CNM): status of the activities; Main functions

More information

Satellite Snow Monitoring Activities Project CRYOLAND

Satellite Snow Monitoring Activities Project CRYOLAND Satellite Snow Monitoring Activities Project CRYOLAND Background material for participants to the Workshop on European Snow Monitoring Perspectives, Darmstadt, 4-5 December 2012. CryoLand provides Snow,

More information

Sentinel-1 Mission Overview

Sentinel-1 Mission Overview Sentinel-1 Mission Overview Pierre Potin Sentinel-1 Mission Manager, ESA Advanced Course on Radar Polarimetry ESRIN, Frascati, 19 January 2011 Global Monitoring for Environment and Security GMES is established

More information

Satellite Altimetry Missions

Satellite Altimetry Missions Satellite Altimetry Missions SINGAPORE SPACE SYMPOSIUM 30 TH SEPTEMBER 2015 AUTHORS: LUCA SIMONINI/ ERICK LANSARD/ JOSE M GONZALEZ www.thalesgroup.com Table of Content General Principles and Applications

More information

SSALTO/DUACS User Handbook:

SSALTO/DUACS User Handbook: Reference : CLS-DOS-NT-06-034 Nomenclature : SALP-MU-P-EA-21065- CLS Issue : 4rev 4 Date : 2015/06/30 CLS-DOS-NT-06-034 - Issue 4.4 - Date : 2015/06/30 - Nomenclature : SALP-MU-P-EA-21065-CLS i.1 Chronology

More information

ASCAT services status Global and regional services

ASCAT services status Global and regional services ASCAT services status Global and regional services Craig Anderson, Hans Bonekamp, Leonid Butenko, Colin Duff, Julia Figa-Saldaña, Christelle Ponsard, Arthur de Smet and Julian Wilson (EUMETSAT) A.Stoffelen,

More information

Development of an Integrated Data Product for Hawaii Climate

Development of an Integrated Data Product for Hawaii Climate Development of an Integrated Data Product for Hawaii Climate Jan Hafner, Shang-Ping Xie (PI)(IPRC/SOEST U. of Hawaii) Yi-Leng Chen (Co-I) (Meteorology Dept. Univ. of Hawaii) contribution Georgette Holmes

More information

Joint Polar Satellite System (JPSS)

Joint Polar Satellite System (JPSS) Joint Polar Satellite System (JPSS) John Furgerson, User Liaison Joint Polar Satellite System National Environmental Satellite, Data, and Information Service National Oceanic and Atmospheric Administration

More information

CCAR Near Real Time and Historical Altimeter Data Server

CCAR Near Real Time and Historical Altimeter Data Server CCAR Near Real Time and Historical Altimeter Data Server http://eddy.colorado.edu/ccar/data_viewer/index Bob Leben March 2015 GCOOS BOD Meeting CCAR Near Real Time Altimeter Data System! In late 1995,

More information

8. Communications Subsystem

8. Communications Subsystem PM-1.1-03 Rev C 8. Communications Subsystem The GOES-NOP spacecraft communications subsystem provides requisite conditioning, transmission, reception, and routing of mission data signals and telemetry

More information

IDS Data Flow Coordination (2009)

IDS Data Flow Coordination (2009) IDS Data Flow Coordination (2009) Introduction Two data centers currently support the archiving and access activities for the IDS: Crustal Dynamics Data Information System (CDDIS), NASA GSFC, Greenbelt,

More information

DATA ACCESS AT EUMETSAT

DATA ACCESS AT EUMETSAT 1 EUM/OPS/VWG/15/793789 v1a DATA ACCESS AT EUMETSAT Copernicus Climate Data Store Workshop ECMWF 3-6 March 2015 Harald Rothfuss Overview of Presentation 1. Introduction to EUMETSAT 2. EUMETSAT Data Access

More information

Sentinel-3 Marine Test Data Set processed at EUMETSAT

Sentinel-3 Marine Test Data Set processed at EUMETSAT Sentinel-3 Marine Test Data Set processed at EUMETSAT Doc.No. : EUM/TSS/TEN/15/822144 Issue : v2 e-signed Date : 15 December 2015 WBS/DBS : EUMETSAT Eumetsat-Allee 1, D-64295 Darmstadt, Germany Tel: +49

More information

What, Why and How. Hosted Payloads: A guide to commercially hosted government payloads from the Hosted Payload Alliance. www.hostedpayloadalliance.

What, Why and How. Hosted Payloads: A guide to commercially hosted government payloads from the Hosted Payload Alliance. www.hostedpayloadalliance. Hosted Payloads: What, Why and How A guide to commercially hosted government payloads from the Hosted Payload Alliance The Hosted Payload Alliance (HPA) is a satellite industry alliance formed in 2011

More information

CONSTRUCTING A CONSTELLATION OF 6U SOLAR POWER CUBE SATELLITES

CONSTRUCTING A CONSTELLATION OF 6U SOLAR POWER CUBE SATELLITES CONSTRUCTING A CONSTELLATION OF 6U SOLAR POWER CUBE SATELLITES Authors: Corey Bergsrud 1, Jeremy Straub 2, Matthew Clausing 3, Johnathan McClure 1, and Sima Noghanian 1. 1 Department of Electrical Engineering,

More information

NODC s Data Stewardship for Jason-2 and Jason-3

NODC s Data Stewardship for Jason-2 and Jason-3 NODC s Data Stewardship for Jason-2 and Jason-3 Meeting October, 2013 Dr. Deirdre A. Byrne Dr. Yongsheng Zhang NOAA/NODC 1 What is NODC? NODC was founded in 1961 as part of the Naval Oceanographic Office

More information

Ocean surface currents: What can we do with Earth Observations?

Ocean surface currents: What can we do with Earth Observations? Ocean surface currents: What can we do with Earth Observations? G. Larnicol, G.Dibarboure, Y Faugère, I Pujol, S Labroue, C Dufau, MH Rio, Space Oceanography Division, CLS Globcurrent UCM 7-9 march, Brest

More information

http://www.isac.cnr.it/~ipwg/

http://www.isac.cnr.it/~ipwg/ The CGMS International Precipitation Working Group: Experience and Perspectives Vincenzo Levizzani CNR-ISAC, Bologna, Italy and Arnold Gruber NOAA/NESDIS & Univ. Maryland, College Park, MD, USA http://www.isac.cnr.it/~ipwg/

More information

How To Run A Space Station From A Polar Relay Station

How To Run A Space Station From A Polar Relay Station SSC space expertise on high latitudes FMV Sensor Symposium Stockholm, September 2014 Björn Ohlson 1 50 years in space 1961 The first sounding rocket launch from Sweden 1962 Building of Esrange starts 1966

More information

LANDSAT 7 - GROUND SEGMENT ACTIVITIES AT THE GERMAN REMOTE SENSING DATA CENTER. Deutsches Fernerkundungsdatenzentrum (DFD) DLR (*)

LANDSAT 7 - GROUND SEGMENT ACTIVITIES AT THE GERMAN REMOTE SENSING DATA CENTER. Deutsches Fernerkundungsdatenzentrum (DFD) DLR (*) LANDSAT 7 - GROUND SEGMENT ACTIVITIES AT THE GERMAN REMOTE SENSING DATA CENTER Günter Strunz (*), Hans-Dietrich Bettac (**), Jörg Gredel (*), Klaus-Dieter Reiniger (*) & Gunter Schreier (*) Deutsches Fernerkundungsdatenzentrum

More information

Proba-V: Earthwatch Mission as part of ESA s Earth Observation Programmes

Proba-V: Earthwatch Mission as part of ESA s Earth Observation Programmes Proba-V: Earthwatch Mission as part of ESA s Earth Observation Programmes Antwerp 05.07.2013 Bianca Hoersch Proba-V Mission Manager Third Party Mission & Sentinel-2 Mission Manager Earth Observation Directorate,

More information

NOAA Direct Broadcast Real-Time Network: Current Status and Plans for Delivering Sounder Data to DRARS

NOAA Direct Broadcast Real-Time Network: Current Status and Plans for Delivering Sounder Data to DRARS NOAA Direct Broadcast Real-Time Network: Current Status and Plans for Delivering Sounder Data to DRARS Liam Gumley (NOAA DB Demonstration Technical Manager), Bruce Flynn, Heath Skarlupka, David Santek,

More information

Marine route optimization. Jens Olaf Pepke Pedersen Polar DTU / DTU Space www.polar.dtu.dk www.space.dtu.dk

Marine route optimization. Jens Olaf Pepke Pedersen Polar DTU / DTU Space www.polar.dtu.dk www.space.dtu.dk Marine route optimization Jens Olaf Pepke Pedersen Polar DTU / DTU Space www.polar.dtu.dk www.space.dtu.dk Early attempt at route optimization Jens Munk (1579-1628) Tries to find a way to India through

More information

Internal Calibration Software Requirements

Internal Calibration Software Requirements REQUIREMENT SPECIFICATION Internal Calibration Software Requirements This document is stored electronically. Printed version might not be the latest. SAOCOM PROJECT COMISION NACIONAL DE ACTIVIDADES ESPACIALES

More information

Comisión Nacional de Actividades Espaciales Servicio Meteorológico Nacional

Comisión Nacional de Actividades Espaciales Servicio Meteorológico Nacional Direct Readout and Relay of Satellite Data (DRARS) South America/South DRARS - Argentina Spatial Agency (CONAE) - National Meteorological Service (SMN) Status Report on South America RARS Argentina (Regional

More information

Small Satellite Attitude Determination With RF Carrier Phase Measurement

Small Satellite Attitude Determination With RF Carrier Phase Measurement Politecnico di Torino Electronics Department IAC-09.C1.6.9 Small Satellite Attitude Determination With RF Carrier Phase Measurement Danilo Roascio, Leonardo M. Reyneri, Claudio Sansoé, Maurizio Bruno International

More information

Fernando Aguado-Agelet University of Vigo - INTA

Fernando Aguado-Agelet University of Vigo - INTA Fernando Aguado-Agelet University of Vigo - INTA August 10th 2008 2008 Cubesat Summer Developer s Workshop 1 Project Presentation GENERAL DESCRIPTION University of Vigo: Leader Spanish university in R+D

More information

Description of the AAU satellite Project. CubeSat Concept. Financing. Organization

Description of the AAU satellite Project. CubeSat Concept. Financing. Organization Projects Catalogue for AAU satellite /DRAFT by Rafael Wisniewski (I8), Ole Thybo (15), Stig Munk Nielsen (I14), Brian Nielsen (I16), Thomas Bak (I8), Lasse Rosendahl (I14) Description of the AAU satellite

More information

German Antarctic Receiving Station GARS O Higgins: Remote sensing as core for a broader range of activities

German Antarctic Receiving Station GARS O Higgins: Remote sensing as core for a broader range of activities DLR.de Chart 1 > Kathrin Hoeppner > EU-Chile-Workshop > November 28-29, 2013 > Punta Arenas, Chile German Antarctic Receiving Station GARS O Higgins: Remote sensing as core for a broader range of activities

More information

COASTAL ALTIMETRY AT THE CENTRE DE TOPOGRAPHIE DES OCEANS ET DE L HYDROSPHERE

COASTAL ALTIMETRY AT THE CENTRE DE TOPOGRAPHIE DES OCEANS ET DE L HYDROSPHERE COASTAL ALTIMETRY AT THE CENTRE DE TOPOGRAPHIE DES OCEANS ET DE L HYDROSPHERE Florence Birol, Caroline Delebecque, Laurent Roblou, Sara Fleury, Rosemary Morrow, Fernando Niño and Guillaume Pernot http://ctoh.legos.obs-mip.fr/

More information

'l'ehisat. A IfICROSATBLLI'l'E SYS'l'EH FOR AlJ'rONOHOUS ENVIRONIfElI'.rAL IfONI'l'ORING SERVICR

'l'ehisat. A IfICROSATBLLI'l'E SYS'l'EH FOR AlJ'rONOHOUS ENVIRONIfElI'.rAL IfONI'l'ORING SERVICR 'l'ehsat A fcrosatbll'l'e SYS'l'EH FOR AlJ'rONOHOUS ENVRONfEl'.rAL fon'l'orng SERVCR Brunella Paves! (1), Giuseppe Rondinelli (1) Nikolaos Balteas (2) (1) f!lesp1zo S.p.a. - Via 'l'iburtlna 965-00156 ROJa,

More information

ICES Guidelines for Profiling Float Data (Compiled January 2001; revised April 2006)

ICES Guidelines for Profiling Float Data (Compiled January 2001; revised April 2006) ICES Guidelines for Profiling Float Data (Compiled January 2001; revised April 2006) Profiling floats are neutrally buoyant devices that periodically surface to transmit data to a satellite system. The

More information

RS platforms. Fabio Dell Acqua - Gruppo di Telerilevamento

RS platforms. Fabio Dell Acqua - Gruppo di Telerilevamento RS platforms Platform vs. instrument Sensor Platform Instrument The remote sensor can be ideally represented as an instrument carried by a platform Platforms Remote Sensing: Ground-based air-borne space-borne

More information

SpaceLoft XL Sub-Orbital Launch Vehicle

SpaceLoft XL Sub-Orbital Launch Vehicle SpaceLoft XL Sub-Orbital Launch Vehicle The SpaceLoft XL is UP Aerospace s workhorse space launch vehicle -- ideal for significant-size payloads and multiple, simultaneous-customer operations. SpaceLoft

More information

Enabling RTK-like positioning offshore using the global VERIPOS GNSS network. Pieter Toor GNSS Technology Manager

Enabling RTK-like positioning offshore using the global VERIPOS GNSS network. Pieter Toor GNSS Technology Manager Enabling RTK-like positioning offshore using the global VERIPOS GNSS network Pieter Toor GNSS Technology Manager Introduction PPP/RTK Positioning Techniques PPP-AR Technology Presentation Overview PPP-AR

More information

Visualizing Wireless Transfer of Power: Proposal for A Five-Nation Demonstration by 2020. ISDC2012: Washington DC, May 26, 2012

Visualizing Wireless Transfer of Power: Proposal for A Five-Nation Demonstration by 2020. ISDC2012: Washington DC, May 26, 2012 Visualizing Wireless Transfer of Power: Proposal for A Five-Nation Demonstration by 2020 Don Flournoy Ohio University Brendan Dessanti & Narayanan Komerath Georgia Institute of Technology ISDC2012: Washington

More information

Satellite technology

Satellite technology Satellite technology Overview What is a satellite? The key elements of orbital position Satellite manufacturers and design The components of a satellite: payload and bus Digital versus analogue How do

More information

An Introduction to the MTG-IRS Mission

An Introduction to the MTG-IRS Mission An Introduction to the MTG-IRS Mission Stefano Gigli, EUMETSAT IRS-NWC Workshop, Eumetsat HQ, 25-0713 Summary 1. Products and Performance 2. Design Overview 3. L1 Data Organisation 2 Part 1 1. Products

More information

FlexPlan: An Operational Mission Planning & Scheduling COTS Used Internationally

FlexPlan: An Operational Mission Planning & Scheduling COTS Used Internationally FlexPlan: An Operational Mission Planning & Scheduling COTS Used Internationally J.A. Tejo, M. Pereda, Iker Veiga GMV S.A. Calle Isaac Newton, 11 PTM-Tres Cantos 28760 Madrid, SPAIN +34 91 807 2100 jatejo@gmv.es

More information

Automated Spacecraft Scheduling The ASTER Example

Automated Spacecraft Scheduling The ASTER Example Automated Spacecraft Scheduling The ASTER Example Ron Cohen ronald.h.cohen@jpl.nasa.gov Ground System Architectures Workshop 2002 Jet Propulsion Laboratory The Concept Scheduling by software instead of

More information

European Space Agency EO Missions. Ola Gråbak ESA Earth Observation Programmes Tromsø, 17 October 2012

European Space Agency EO Missions. Ola Gråbak ESA Earth Observation Programmes Tromsø, 17 October 2012 European Space Agency EO Missions Ola Gråbak ESA Earth Observation Programmes Tromsø, 17 October 2012 Europe and Space, A POLICY Article 189 of the Lisbon Treaty (2009) gives the European Union an explicit

More information

Table Of Contents. iii

Table Of Contents. iii Argos User s Manual 2007-2015 CLS Last updated on March 2, 2015 Table Of Contents 1. Introduction... 1 2. System components... 2 2.1 Overview... 2 2.2 Platforms... 2 2.3 Satellites... 3 2.4 Receiving stations...

More information

AUTOMATED OPERATIONAL MULTI-TRACKING HIGH PRECISION ORBIT DETERMINATION FOR LEO MISSIONS

AUTOMATED OPERATIONAL MULTI-TRACKING HIGH PRECISION ORBIT DETERMINATION FOR LEO MISSIONS AUTOMATED OPERATIONAL MULTI-TRACKING HIGH PRECISION ORBIT DETERMINATION FOR LEO MISSIONS J. Fernández Sánchez, F. M. Martínez Fadrique, A. Águeda Maté, D. Escobar Antón GMV S.A., Isaac Newton 11, 876 Tres

More information

International coordination for continuity and interoperability: a CGMS perspective

International coordination for continuity and interoperability: a CGMS perspective International coordination for continuity and interoperability: a CGMS perspective Peng Zhang, CGMS WG-III Co-Chair NSMC/CMA In Cooperation with Suzanne Hilding, CGMS WG-III Co-Chair OPPA/NESDIS/NOAA 1

More information

102 26-m Antenna Subnet Telecommunications Interfaces

102 26-m Antenna Subnet Telecommunications Interfaces DSMS Telecommunications Link Design Handbook 26-m Antenna Subnet Telecommunications Interfaces Effective November 30, 2000 Document Owner: Approved by: Released by: [Signature on file in TMOD Library]

More information

CONTROL, IOT AND OBSERVATION STATIONS

CONTROL, IOT AND OBSERVATION STATIONS CONTROL, IOT AND OBSERVATION STATIONS Satellite communications, earth observation, navigation and positioning and control stations indracompany.com ENGINEERING SERVICES CONTROL, IOT AND OBSERVATION STATIONS

More information

DT CorSSH and DT SLA Product Handbook

DT CorSSH and DT SLA Product Handbook AVISO DT CorSSH and DT SLA Product Handbook Reference: CLS-DOS-NT-08.341 Nomenclature: - Issue: 2 rev 0 Date: October 2012 Aviso Altimetry 8-10 rue Hermès, 31520 Ramonville St Agne, France aviso@oceanobs.com

More information

ERS and ENVISAT missions status

ERS and ENVISAT missions status FRINGE 2005 Workshop ERS and ENVISAT missions status Wolfgang Lengert ERS Mission Manager ERS-2 mission 14 years of ERS-1/2 data in the archive (suitable for applications requiring long term series products)

More information

Status, Development and Application

Status, Development and Application Federal Space Agency GLONASS GLONASS Status, Development and Application Sergey G. Revnivykh International Committee on Global Navigation Satellite Systems (ICG) Second Meeting, September 4-7, 2007, Bangalore,

More information

Estimating Firn Emissivity, from 1994 to1998, at the Ski Hi Automatic Weather Station on the West Antarctic Ice Sheet Using Passive Microwave Data

Estimating Firn Emissivity, from 1994 to1998, at the Ski Hi Automatic Weather Station on the West Antarctic Ice Sheet Using Passive Microwave Data Estimating Firn Emissivity, from 1994 to1998, at the Ski Hi Automatic Weather Station on the West Antarctic Ice Sheet Using Passive Microwave Data Mentor: Dr. Malcolm LeCompte Elizabeth City State University

More information

7th Agile Meeting & The Bright Gamma-Ray Sky Frascati, 29 September - 1 October, 2009. Carlotta Pittori, on behalf of the ADC

7th Agile Meeting & The Bright Gamma-Ray Sky Frascati, 29 September - 1 October, 2009. Carlotta Pittori, on behalf of the ADC 7th Agile Meeting & The Bright Gamma-Ray Sky Frascati, 29 September - 1 October, 2009 The AGILE Data Center and the First AGILE Catalog Carlotta Pittori, on behalf of the ADC AGILE GS Architecture Fucino,

More information

Exploiting the potential of an improved multimission altimetric data set over the coastal ocean

Exploiting the potential of an improved multimission altimetric data set over the coastal ocean GEOPHYSICAL RESEARCH LETTERS, VOL. 35, L10601, doi:10.1029/2008gl033488, 2008 Exploiting the potential of an improved multimission altimetric data set over the coastal ocean J. Bouffard, 1 S. Vignudelli,

More information

NOAA and Its Role in Managing Satellite Data

NOAA and Its Role in Managing Satellite Data NOAA is dedicated to serving society by providing timely access to global environmental data from satellites and other sources to promote, protect, and enhance the Nation s economy, security, environment,

More information

Space Flight Project Work Breakdown Structure

Space Flight Project Work Breakdown Structure APPENDIX G. (WBS) Space Flight Project Work Breakdown Structure G.1 Introduction G.1.1 The Project Work Breakdown Structure (WBS) is a key element of project management. The purpose of a WBS is to divide

More information

www.thalesgroup.com/watchkeeper WATCHKEEPER X UNMANNED AIRCRAFT SYSTEM (UAS)

www.thalesgroup.com/watchkeeper WATCHKEEPER X UNMANNED AIRCRAFT SYSTEM (UAS) www.thalesgroup.com/watchkeeper WATCHKEEPER X UNMANNED AIRCRAFT SYSTEM (UAS) Certified Foundation Watchkeeper X is built to the same standards as a manned aircraft, and conforms to CAA/MAA standards. It

More information

VIETNAM ACADEMY OF SCIENCE AND TECHNOLOGY VIETNAM NATIONAL SATELLITE CENTER CUBESAT PICO DRAGON. Presenter Name: Do Xuan Phong

VIETNAM ACADEMY OF SCIENCE AND TECHNOLOGY VIETNAM NATIONAL SATELLITE CENTER CUBESAT PICO DRAGON. Presenter Name: Do Xuan Phong VIETNAM ACADEMY OF SCIENCE AND TECHNOLOGY VIETNAM NATIONAL SATELLITE CENTER CUBESAT PICO DRAGON Presenter Name: Do Xuan Phong Co-authors: Vu Viet Phuong, Truong Xuan Hung, Le Xuan Huy, Bui Nam Duong, Do

More information

Architectures for Fleet Management. B. L. Kizzort. Harris Corporation, Melbourne, Florida, USA.

Architectures for Fleet Management. B. L. Kizzort. Harris Corporation, Melbourne, Florida, USA. Architectures for Fleet Management B. L. Kizzort Harris Corporation, Melbourne, Florida, USA. Abstract With the increasing reliance on space systems for communications, the number of multi-satellite, multimission

More information

Outline. Case Study over Vale do Paraiba 11 February 2012. Comparison of different rain rate retrievals for heavy. Future Work

Outline. Case Study over Vale do Paraiba 11 February 2012. Comparison of different rain rate retrievals for heavy. Future Work Outline Short description of the algorithms for rain rate retrievals from passive microwave radiometers on board low-orbiting satellites (i.e., SSMI/S) Case Study over Vale do Paraiba 11 February 2012

More information

M I S S I O N T O P L A N E T E A R T H TOPEX/POSEIDON NASA/CNES PRESS KIT

M I S S I O N T O P L A N E T E A R T H TOPEX/POSEIDON NASA/CNES PRESS KIT M I S S I O N T O P L A N E T E A R T H TOPEX/POSEIDON NASA/CNES PRESS KIT AUGUST, 1992 PUBLIC AFFAIRS CONTACTS Brian Dunbar Headquarters, Washington, D.C. (Phone: 202/358-0873) Mary Hardin Jet Propulsion

More information

Examination Space Missions and Applications I (AE2103) Faculty of Aerospace Engineering Delft University of Technology SAMPLE EXAM

Examination Space Missions and Applications I (AE2103) Faculty of Aerospace Engineering Delft University of Technology SAMPLE EXAM Examination Space Missions and Applications I AE2103 Faculty of Aerospace Engineering Delft University of Technology SAMPLE EXAM Please read these instructions first: This are a series of multiple-choice

More information

Günter Seeber. Satellite Geodesy 2nd completely revised and extended edition

Günter Seeber. Satellite Geodesy 2nd completely revised and extended edition Günter Seeber Satellite Geodesy 2nd completely revised and extended edition Walter de Gruyter Berlin New York 2003 Contents Preface Abbreviations vii xvii 1 Introduction 1 1.1 Subject of Satellite Geodesy...

More information

FILE MANAGEMENT AND FILE TRANSFER CNES VIEWS. Christian POULIQUEN

FILE MANAGEMENT AND FILE TRANSFER CNES VIEWS. Christian POULIQUEN FILE MANAGEMENT AND FILE TRANSFER CNES VIEWS Christian POULIQUEN 1 SOMMAIRE INTRODUCTION NEEDS AND OPS CONCEPT STANDARDS OVERVIEW CNES MISSION STATUS OPEN POINTS 2 FILES IN SPACE - SHORT INTRODUCTION Many

More information

The European GNSS Programmes EGNOS and Galileo

The European GNSS Programmes EGNOS and Galileo The European GNSS Programmes EGNOS and Galileo 6th ICG Conference Pieter De Smet European Commission 5 September 2011 1. State of Play of EGNOS 2. State of Play of Galileo 5 September, 2011 The European

More information

Suomi / NPP Mission Applications Workshop Meeting Summary

Suomi / NPP Mission Applications Workshop Meeting Summary Suomi / NPP Mission Applications Workshop Meeting Summary Westin City Center, Washington, DC June 21-22, 2012 Draft Report (updated March 12, 2013) I. Background The Suomi National Polar- orbiting Partnership

More information

Monitoring a Changing Environment with Synthetic Aperture Radar. Alaska Satellite Facility National Park Service Don Atwood

Monitoring a Changing Environment with Synthetic Aperture Radar. Alaska Satellite Facility National Park Service Don Atwood Monitoring a Changing Environment with Synthetic Aperture Radar Don Atwood Alaska Satellite Facility 1 Entering the SAR Age 2 SAR Satellites RADARSAT-1 Launched 1995 by CSA 5.6 cm (C-Band) HH Polarization

More information

GALILEO In-Orbit Testing (IOT) Services

GALILEO In-Orbit Testing (IOT) Services GALILEO In-Orbit Testing (IOT) Services GALILEO IOV Phase Full Motion C-Band Antenna System & Transmission Equipment for In Orbit Testing (IOT) Mission May, 11th 2009 The GALILEO Program The GALILEO Program

More information

TIMED Mission System Engineering and System Architecture

TIMED Mission System Engineering and System Architecture TIMED Mission System Engineering and System Architecture David Y. Kusnierkiewicz Aspace mission consists of more than just a spacecraft and scientific instruments. It also includes a ground system to support

More information

Mission Spacecraft and Operations Overview MAVEN Science Community Workshop December 2, 2012

Mission Spacecraft and Operations Overview MAVEN Science Community Workshop December 2, 2012 Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission Mission Spacecraft and Operations Overview MAVEN Science Community Workshop December 2, 2012 Chris Waters Spacecraft Design Lead Lockheed Martin MAVEN

More information

NuSTAR Ground Systems and Operations Approach Lessons Learned

NuSTAR Ground Systems and Operations Approach Lessons Learned University of California, Berkeley Space Sciences Laboratory NuSTAR Ground Systems and Operations Approach Lessons Learned Manfred Bester, Bryce Roberts, Mark Lewis, and William Marchant Space Sciences

More information

SLSTR Breakout Summary - Gary Corlett (22/03/2012)

SLSTR Breakout Summary - Gary Corlett (22/03/2012) SLSTR Breakout Summary - Gary Corlett (22/03/2012) [Updated 16/04/2012 with post meeting comments from Gorm Dybkjær, Simon hook and David Meldrum] The breakout session started with a clean slate and identified

More information

GAGAN-FOP/PMR-05. Indian SBAS System - GAGAN

GAGAN-FOP/PMR-05. Indian SBAS System - GAGAN GAGAN-FOP/PMR-05 Indian SBAS System - GAGAN GAGAN GPS Aided GEO Augmented Navigation (GAGAN) is India s regional Satellite Based Augmentation System (SBAS) India is working towards attaining APV 1 capability

More information

Indian Space Programme -Update on activities (Feb 2015)

Indian Space Programme -Update on activities (Feb 2015) Indian Space Programme -Update on activities (Feb 2015) Vinay K Dadhwal India Director, National Remote Sensing Centre (NRSC), INDIAN SPACE RESEARCH ORGANISATION 52 nd Science & Technology Sub-Committee,

More information

How To Write A Call To Action For Terrasar-X

How To Write A Call To Action For Terrasar-X Doc.: TX-PGS-PL-4127 TerraSAR-X Announcement of Opportunity: Utilization of the TerraSAR-X Archive 1 Page: 2 of 11 TABLE OF CONTENTS TERRASAR-X... 1 ANNOUNCEMENT OF OPPORTUNITY: UTILIZATION OF THE TERRASAR-X

More information

Chapter 2 ENVISAT SCIAMACHY s Host

Chapter 2 ENVISAT SCIAMACHY s Host Chapter 2 ENVISAT SCIAMACHY s Host M. Gottwald, F.-J. Diekmann, and T. Fehr Abstract ENVISAT is Europe s ambitious Earth Observation enterprise to study the many facets of the Earth system. It carries

More information

THE ON-ORBIT VERIFICATION MISSION TET-1 PROJECT STATUS OF THE SMALL SATELLITE MISSION & OUTLOOK FOR A ONE YEAR MISSION OPERATION PHASE

THE ON-ORBIT VERIFICATION MISSION TET-1 PROJECT STATUS OF THE SMALL SATELLITE MISSION & OUTLOOK FOR A ONE YEAR MISSION OPERATION PHASE THE ON-ORBIT VERIFICATION MISSION TET-1 PROJECT STATUS OF THE SMALL SATELLITE MISSION & OUTLOOK FOR A ONE YEAR MISSION OPERATION PHASE Stefan Föckersperger (1), Klaus Lattner (1), Clemens Kaiser (1), Silke

More information

AUTOMATED DEM VALIDATION USING ICESAT GLAS DATA INTRODUCTION

AUTOMATED DEM VALIDATION USING ICESAT GLAS DATA INTRODUCTION AUTOMATED DEM VALIDATION USING ICESAT GLAS DATA Mary Pagnutti Robert E. Ryan Innovative Imaging and Research Corp. Building 1103, Suite 140C Stennis Space Center, MS 39529 mpagnutti@i2rcorp.com rryan@i2rcorp.com

More information

ESA Climate Change Initiative contributing to the Global Space-based Architecture for Climate Monitoring

ESA Climate Change Initiative contributing to the Global Space-based Architecture for Climate Monitoring ESA Climate Change Initiative contributing to the Global Space-based Architecture for Climate Monitoring Pascal Lecomte Head of the ESA Climate Office ESA/ECSAT Global Space-based Architecture for Climate

More information