1 PALMERSTON NORTH TRANSPORTATION MANAGEMENT PLAN Prepared by: Laura Skilton and Peter McCombs Traffic Design Group Lower Hutt Produced in collaboration with staff of the Roading Division of the City Networks Unit, and the City Future Unit of Palmerston North City Council. Approved for Issue by: Palmerston North City Council Resolution Dated: November

2 2

3 FORWARD The Palmerston North City Council formally adopted the Transportation Management Plan in December The plan was the end result of an extensive information gathering and consultation exercise that is outlined throughout the report. The conclusions and findings made in this plan have been based on inferences drawn from a range of existing and new data, and from the submissions from individuals, organisations and the public who had input to the review process. In addition, predictions of the effects of population and traffic growth were modelled to gauge the likely impacts throughout the study area. The information gathered has been used as a basis for further refinement of strategic planning initiatives, processes and plans subsequently adopted by Council. In particular, the report has assisted finalisation of the Council s Asset Management Plans, the Urban Growth Strategy and development of the draft Long Term Council Community Plan. Since the adoption of the Transportation Management Plan the following major developments have been noted. Estimated population growth by New Zealand Department of Statistics in the study area since early 2002 has been at a higher rate than was experienced in the years preceding the study. Estimated population growth is showing consistency with the high growth rate scenario used in the modelling of the Transport Management Plan; In December 2003 Council endorsed a strategy supporting development of an Eastern Growth Corridor. (Refer Planning and Environment Committee Recommendations, 17th November 2003, Report on Eastern Growth Corridor.) The strategy identifies a preference for a new bridge to be developed upstream of the existing Fitzherbert Avenue bridge to coincide with urban development in the Napier Road/Te Matai Road area. These proposals are included in the draft Long Term Council Community Plan 2004/ /14; The Eastern Growth Corridor proposal supersedes Council s previous decision of a preferred new bridge crossing at Maxwells Line. Ray Swadel General Manager - City Networks 3

4 4

5 TABLE OF CONTENTS 1 INTRODUCTION 7 2 OBJECTIVES OF THE PLAN 9 3 STUDY AREA 11 4 ECONOMIC GROWTH 13 5 GROWTH STATISTICS Population Trends Employment Trends Linton Growth Tertiary Education Trends Freight Movement Trends Airport Growth 19 6 LANDUSE FORECASTS Population Growth Older Population Total Forecasts Household Distributions Employment Distributions Modelled Scenarios 26 7 GROWTH SUMMARY 27 8 LEVELS OF SERVICE 29 9 NETWORK DESCRIPTORS Roading Hierarchy Road Classifications Proposed Roading Hierarchy Recommended Design Capacity CARRIAGEWAY WIDTH SPECIFICATIONS CHOICES OF TRAVEL MODE ALTERNATIVE TRANSPORT Public Transport Cycling Walking REGIONAL LINKS ARTERIAL STREETS 47 5

6 15 NEIGHBOURHOOD AREAS Residential Streets Living Streets Schools Land Use Zoning CENTRAL AREA PARKING Visitor Parking in the CBD Commuter Parking in the CBD Parking Dispensations Cycle Racks DIRECTIONAL SIGNS ROAD SAFETY INTERSECTION CONTROLS Priority Controlled Intersections Roundabout Controlled Intersections Signalised Intersections Accident Rates Intersection Delay Palmerston North Intersections TRAFFIC MANAGEMENT GUIDELINES TRANSPORT MODEL DEFICIENCY ANALYSIS Base Network Do Minimum Network Bridge Network PROPOSED NEW WORKS FUNDING POLICIES SUMMARY 83 This Transportation Management Plan describes the policies and provisions needed in meeting the present and expected traffic, road and transportation needs of Palmerston North through the course of the coming two decades in an efficient and sustainable manner. Its preparation has involved detailed technical investigations and assessment of options together with an extensive public consultation programme. This report provides a summary of the findings and recommendations. The last Transportation Management Plan for Palmerston North was produced in

7 1 INTRODUCTION This updated plan incorporates new trends and focuses on future growth with the prime goal of moving easily in and around the region. This Plan looks at transport issues over the coming 25 years. The roading network is one of Council s biggest assets, and includes: 449 km of road 2,790m of off-road cycle paths 84 bridges 465 km of footpath 7,370 street lights 3,160 parking spaces 10,600 street trees We are living in a rapidly changing world, and travelling more. The increased use of the private motorcars has increased congestion and delays faced by motorists. This Plan is a guide for Council officers to assist in making transport decisions, providing for and encouraging ongoing and sustainable city development and growth. To ensure Palmerston North s vitality into the future, it is necessary to plan for and provide for corresponding improvements to the city s infrastructure in an efficient and sustainable manner. This includes having appropriate land and opportunities for development and an effective and convenient transportation system. Positive planning achieves positive outcomes. Amongst other reasons, surveys show people and businesses are attracted to Palmerston North because it is easy to get around. To maintain this perceived value, we need to be able to keep MOVING EASILY. Economic growth and transportation also involves planning and providing for the efficient haulage of goods. The countries with the highest GDP also have the highest number of trucks per capita. To maintain and promote standards of living in Palmerston North, it is necessary to enable and provide access for trucks both in and out of the city; around the city; and to major destinations within the city. However, trucks need to be kept off residential streets, and a well designed and managed roading network will do this. An extensive community consultation programme was undertaken via a Community Liaison Group, and also including an interactive Website, public kiosks, ward committee meetings, newspaper and radio advertising, and stakeholder forums. 7

8 The input that the Community Liaison Group has made to this project is acknowledged with appreciation. Their role in discussing and identifying community issues and priorities has been important to the overall project and its findings. The inputs of the stakeholders who made presentations to the Design Team have also been a valuable component of the overall project. Their plans and aspirations are vital to Palmerston North s ongoing investment and growth. 8

9 2 OBJECTIVES OF THE PLAN The overall study purpose is to plan and prepare an overall transportation management plan for Palmerston North which makes best use of the city s road resources and establish policies and plans that enable present and future transportation needs to be anticipated and met in an efficient and sustainable manner. MOVING EASILY AND SAFELY IN A HEALTHY, EVOLVING AND DYNAMIC ENVIRONMENT The following particular objectives were established by the Community Liaison Group, in pursuing the overall goal: To have the best practical process for the future planning of transport needs for Palmerston North and its catchment area over the next 25 years and beyond Effective use of resources achieving effective, long term outcomes Enhance the viability of integrated planning of assets Support community aspirations Provide for pedestrians, cyclists, recreation and vehicle users alike Contributes to an ecologically and environmentally sustainable community Allow people to move easily and safely through and around the city Accommodate the differing characteristics of neighbourhoods Protect places of cultural heritage value identified by Tangata Whenua Allow for a wide range of funding options at a strategic level. Other considerations throughout the study included the issues of public transport, the airport passenger hub, parking, cycling, landscaping, amenity, the Central Business District, Massey, extra bridges and student buses. The community s concerns and values were sought to determine their preferences and priorities for roading matters, and which projects were more important to them. The main issues arising from the consultations were: Improve road safety and driver education Ensure a robust State Highway network, including bypass routes Ensure ample road widths, road reserves and better design standards Establish a high standard of cross city routes in the city hierarchy, including a possible inner suburban ring road Provide for pedestrian and cyclists safety and convenience Improve the living qualities of residential streets and neighbourhood precincts Improve the safety of access to schools. Additional river crossings, including possible toll facilities Better integration of road user needs Provision of heavy vehicle bypasses and extension of passing lanes Encourage alternative transport methods Improve suburban links 9

10 Minimise use of traffic signals Keep CBD as heart of city and reduce ribbon development Develop the living streets concept Protect the integrity of current inter-regional access roads 10

11 3 STUDY AREA Careful consideration has been given to the required extent of the study area. The study area needs to suitably coincide with statistical and administration boundaries, while also encompassing the full extent of land use activities and associated travel demands that are likely to have an effect on Palmerston North s transport needs over the next 20 to 25 years. Figure 1 : Study Area 11

12 The study area has accordingly been extended beyond the existing built-up urban boundaries of Palmerston North city. The study area also encompasses part of the Manawatu District, since there is a noticeable proportion of travel between these two areas, particularly between Fielding and Palmerston North. The study area, together with the associated territorial local authority (TLA) boundaries is shown in Figure 1. 12

13 4 ECONOMIC GROWTH Local businesses and Government agencies contacted as part of this project are all optimistic about Palmerston North s future. They all consider Palmerston North to be especially well placed strategically within the North Island, able to pull on resources from far afield. Where Auckland and Wellington have topographical restraints on their catchment size and transportation linkages, Palmerston North is well suited as a distribution centre. Palmerston North also has access to a large area of rural activity and production. The Manawatu Regional Strategic Economic Development Plan shows that there is potential for up to 3,000 more jobs to be created in the region over the next five years. Economic growth will involve an increase in traffic movements by both cars and trucks. The Transportation Management Plan is part of the forward planning needed to ensure that the needs of growth are not in conflict with the requirements of suburban residents. 13

14 14

15 5 GROWTH STATISTICS As noted, the study area for the Transportation Management Plan is larger than the Palmerston North City boundary and encompasses the area to and including Fielding. Data has been provided separately for both the Palmerston North City Council boundary and the study area. 5.1 POPULATION TRENDS The most reliable population data base is from the five-yearly Census survey undertaken by Statistics New Zealand. The main areas of interest are summarised below. More detailed information is available in the supporting information document. Table 1: Population Trends YEAR POPULATION HOUSEHOLDS AVERAGE AVERAGE NUMBER % INCREASE HOUSEHOLD CARS PER PER ANNUM OCCUPANCY HOUSEHOLD Palmerston North City ,559 20, ,828 22, ,320 23, ,080 25, ,471 26, * Study Area ,350 28, ,058 30, ,279 32, ,001 33, * *estimated Although the population has reduced between the last two Census years, the total number of households continued to rise, as the average household occupancy is reducing. The average number of cars per household is also increasing. These trends are likely to continue for some time. During the last 20 years, there has been an average of 265 new households being built each year within Palmerston North City and 360 within the study area. The average growth in the number of households is 1.2% pa over the study area. 15

16 5.2 EMPLOYMENT TRENDS The employment data for Palmerston North City is shown below: Table 2: Employment Trends YEAR TOTAL PERCENT TOTAL PERCENT TOTAL PERCENT FULL-TIME INCREASE PART-TIME INCREASE EMPLOYED INCREASE EMPLOYED PER ANNUM EMPLOYED PER ANNUM PER ANNUM Palmerston North City ,590-4,710-30, , % 5, % 28, % , % 8, % 33, % , % 8, % 33, % Study Area ,420-6,000-38, , % 6, % 37, % , % 9, % 37, % , % 9, % 39, % In 2001, there was an average of 0.32 full-time and 0.11 part-time jobs per person across the study area. The growth in employment between 1991 and 1996 has come mainly from part-time employment. Between 1996 and 2001, total employment growth has been similar to population growth. Travel patterns for part-time employees differ from those of full-time employees, in that most trips are done outside the typical peak commuter hours. 5.3 LINTON GROWTH The New Zealand Defence Force is consolidating its resources, and intends to have Linton as its main base. Many of the army personnel currently in Waiouru will be relocated to Linton over the next four years. Linton is now the largest military base in New Zealand, and it is intended that this should continue. Waiouru will remain the main training camp, and there will be regular staff and machinery movements between the two military camps. As part of the military s housing requirements, many of the additional recruitments will be housed within the surrounding areas, rather than within Linton. This will increase travel demand across the Manawatu River. 16

17 The existing and future facilities are shown in Table 3: Table 3: Projected Linton Growth (NZ Defence Force) EXISTING FUTURE Staff Regular 1,700 2,400 Territorial 1,700 2,000 Civilians On-site Housing Houses Barracks 1,180 1,180 However this future growth can only occur if there continues to be a noise buffer zone between the military camp and residential properties. Similar provisions have already been established for the Massey research farms. In this regard, it is considered any future new bridge crossing south of Maxwells Line would inevitably have the effect of bringing residential subdivisions close to Linton. This is regarded as undesirable because of the prospect of increasing military operations in this area. 5.4 TERTIARY EDUCATION TRENDS Palmerston North is known as the knowledge city reflecting its many training institutes, including Massey University, the Universal College of Learning (UCOL) and the International Pacific College (IPC). Universal College of Learning UCOL is situated in the heart of the city, adjacent to Princess Street, between Queen and King Streets. UCOL has around 7,500 students enrolled every year, including full-time, part-time and short term courses. They employ around 220 full time and 150 part time staff. At any one time, there can be up to 2,000 people on their central city campus. The College is also open longer than most tertiary level education institutes, as there is only a two week break during Christmas, and courses run throughout all remaining months. The College has had significant growth over the last several years at around 10% per annum. It is expected that the College will continue to grow albeit at a lower rate. The College has no intention of dividing into two campuses and travel demands here will continue to increase accordingly. 17

18 Massey University Massey University now has four campuses in New Zealand, being the original site at Turitea, south of the Manawatu River, the Hokowhitu campus adjacent to the Hokowhitu Lagoon, Albany and Wellington. Massey University provides part-time and full-time study on campus and extramural study off campus. The student numbers in Palmerston North over the past few years have been fairly static, with around 8,250 internal students, 19,100 extramural students, and 1,180 students on block courses. It is estimated that around 1,100 of the internal students are at the Hokowhitu campus, with the majority of attendance being at Turitea. The split between full-time and part-time students is not known, nor have future projections been made. Given that in the previous few years student numbers have been static, it is not likely that there will be significant growth in travel demands associated with the Massey campuses. Massey provides a free bus service between the campuses for students needing to travel between the two. Some students take advantage of this by parking at the Hokowhitu campus and using the bus to access the Turitea campus. International Pacific College IPC is situated in Aokautere, south of the Manawatu River. Since opening in 1989, IPC has had a steady growth of around 2% per annum, with existing enrolments being around 420 full time students. By 2003 this is expected to be 480. IPC has around 90 full time staff and 35 part time staff. All the students at IPC are full-time and most of them live on campus, with only around 100 students living elsewhere in the city. These trends are likely to continue. 18

19 5.5 FREIGHT MOVEMENT TRENDS Freight transportation is considered to be vital for both the regional and national economy, and consideration needs to be given to truck routes both within the city and across the region. The percentage of trucks amongst present traffic flows is shown in Table 4: Table 4: Truck Percentages % HEAVY VEHICLES Rangitikei Street 5.8% Pioneer Highway % Fitzherbert Avenue 3.2% Main Street % Tremaine Avenue 10.0% Ruahine Street 2.7% JFK Drive 5.8% Albert Street 2.2% Princess Street 2.5% Ferguson Street 1.8% Pitt Street 1.9% Grey Street 2.6% Botanical Road 3.8% Broadway Avenue 1.3% Te Awe Awe Street 3.5% These truck percentages have generally remained stable over the past few years, with truck growth generally in line with general traffic growth. The growth rate of trucks may lessen slightly with the proposed change in trucking regulations. 5.6 AIRPORT GROWTH Palmerston North airport is unique in New Zealand in that it is accessible not only by road but also adjacent to the main North Island trunk railway line. With Palmerston North airport now being an international airport, and with the probability of a longer runway, traffic movements in and out of the city are likely to increase. An associated increase in truck movements will also occur, as more freight is airlifted. 19

20 20

21 6 LANDUSE FORECASTS 6.1 POPULATION GROWTH Various population forecasts are available for the Palmerston North area. Statistics New Zealand has high and low population forecasts for Palmerston North City. The low forecast is for an overall population increase of 7% over the next 20 years, whereas the high forecast is an increase of 30%. There is clearly considerable variation. Vision Manawatu predicts a high growth for the region, with a target of increasing the population by 25% over the next 20 years. The Palmerston North Industrial Land Use Study predicts the employment for Palmerston North City for the year The study predicts an increase of 26.3% above the 2001 figures. Within this study, the Community Liaison Group also considered that Palmerston North should be prepared for a high growth rate, and a growth of 25% over the next 25 years was agreed as a target for forward planning. It was also agreed that the employment rate should be at the same rate as it is today, i.e. the proportion of employed should remain constant, but take into account an aging population. The Palmerston North City Future Unit consider a more conservative population increase, in line with the previous five years, better reflects what is likely to happen, and agreed to using two growth scenarios, a high growth scenario of an increase of population at 1.0%pa and a low growth scenario of an increase at 0.5%pa. 21

22 6.2 OLDER POPULATION Statistics New Zealand projections shows that the number of elderly in the region will increase, while the number of younger people (<25 years) will remain fairly static, and decrease in percentage terms, as shown in Table 5. Table 5: Population Projections by Age - Palmerston North City AGE GROUP NUMBER PERCENT NUMBER PERCENT 0-4 4, % 4, % , % 9, % , % 16, % , % 28, % , % 15, % 65+ 8, % 12, % *Source: Statistics New Zealand The percent of the population in the workforce age bracket (15-65) is shown as 67.5% in 1996 and 70.1% in So, although there will be more retired people, the proportion of the population of working age is greater in 2021 than It can therefore be expected that the employment rates per total population will be similar to current levels. 6.3 TOTAL FORECASTS The average household occupancy is declining at a rate of around 0.6 percent per annum. At this rate, the household occupancy rate will reduce from 2.73 to 2.32 persons per household by As this rate it is unlikely to be maintained over the longer term, it has been assumed that the household occupancy in 2025 will be 2.57, being the household occupancy levels in 2011 if the existing trend was to continue. Two growth scenarios are used, being a low growth scenario where the total population will increase by 12.5%, and a high growth scenario where the total population will increase by 25%. For both scenarios it has been assumed that the growth in employment will be at the same rate as the growth in population, with employment rates in the city slightly higher than in the surrounding urban areas. Tables 6 and 7 summarise the resulting overall future land use projections. 22

23 Table 6: Population Projection LOW GROWTH RATE HIGH GROWTH RATE POPULATION HOUSEHOLDS POPULATION HOUSEHOLDS Palmerston North City ,030 26,424 72,030 26,424 Additional 9,004 5,107 18,008 8, ,034 31,531 90,038 35,034 Study Area ,001 33,666 92,001 33,666 Additional 11,500 6,607 23,000 11, ,501 40, ,001 44,748 Table 7: Employment Projection LOW GROWTH RATE HIGH GROWTH RATE TOTAL RETAIL TOTAL RETAIL Palmerston North City ,617 8,161 30,617 8,161 Additional 3,953 1,055 7,907 2, ,570 9,216 38,524 10,272 Study Area ,320 9,346 36,320 9,346 Additional 4,524 1,173 9,047 2, ,844 10,519 45,367 11,694 Under the low growth rate scenario, an additional 6,607 households occur within the study area with 4,524 jobs. These numbers increase to 11,082 and 9,047 for the high growth rate scenario. The distribution of the additional population and employment is discussed in the next chapters. 6.4 HOUSEHOLD DISTRIBUTIONS The City Future Unit at Palmerston North City Council estimate that within Palmerston North, there is currently land available for around 1,850 new households within the existing undeveloped residential zoned land. They also estimate that there is potential for up to 1,400 infill sites to become available through subdividing properties and building apartments, and up to 700 households could foreseeably be built in the existing ruralresidential zoned land. Together, these 3,950 building sites are insufficient to accommodate the future growth projections. From this position, the City Future Unit commissioned a study on the Future Urban Growth Fronts to determine the availability of future greenfield areas and to examine each of them in terms of urban form, physical location, ecological impact and associated infrastructure costs and ranked them accordingly. The report outcomes are shown in Table 8: 23

24 Table 8: Urban Growth Fronts Study Findings AREA YIELD (HOUSEHOLDS) RECOMMENDATION Staces Road 650 First Level Option* Napier Road 750 First Level Option Cloverlea 980 First Level Option Ashhurst 233 First Level Option Pacific Drive 464 Second Level Option Keebles 1,100 Third Level Option James Line 525 Third Level Option Bunnythorpe 3,400 Fourth Level Option Hendersons 1,000 Not to be Considered Linton 1,100 Not to be Considered *with the inclusion of another bridge crossing The resulting total number of potential sites exceeds projected requirements, so alternative distributions have been assessed in order to ensure greater robustness of the transport model findings. The resulting alternative household distributions are shown in Table 9. Table 9: Alternative Household Distributions GROWTH DISTRIBUTION LOW LOW HIGH HIGH NORTH SOUTH NORTH SOUTH Existing 33,666 33,666 33,666 33,666 Palmerston North City Sites Infill - Urban 1,400 1,400 1,400 1,400 Infill - Rural ,705 Existing Greenfield 1,850 1,850 1,850 1,850 Cloverlea Napier Road Ashhurst Pacific Drive James Line Bunnythorpe 755 Hendersons 750 Staces 750 Remaining Study Area Sites Fielding 1,200 1,200 1,800 1,800 Infill - Rural TOTAL 40,273 40,273 44,748 44,748 All of the growth scenarios assume that all the available sites within Palmerston North City are used. The first level options have then been used in the low growth distributions, (excluding Staces Road as this would require an alternative bridge crossing), with an emphasis on households being either north of the river or south of the river. In the high growth scenario, the first level options were used in both distributions. The north distribution includes households in the third level options of James Line, Bunnythorpe and Hendersons, while the south distribution assumes the Staces development will go ahead and there will be a significant increase in the development of rural-residential land. 24

25 6.5 EMPLOYMENT DISTRIBUTIONS The City Future Unit agreed that the employment growth would be at the same rate as the population growth. The Unit considers that the employment distribution will become increasingly influenced by the Manawatu Economic Development Strategy. This will mean that the job areas that are most likely to be developed are industrial/distribution and research/educational. The City Future Unit has recently undertaken an Industrial Land Use study, which looked at the amount of available undeveloped Industrial Land, future demands and potential sites. The potential sites were then ranked, from which it was recommended that the Council rezone the area identified as NE Airport as industrial land, and that Longburn and Linton be incorporated as industrial expansion areas in future integrated long term urban growth plans. While included within this study, Longburn is outside the Palmerston North City boundary. Cloverlea was also shown to have potential as an industrial land zone, however it was felt that this land would be more useful if it was kept for residential purposes. In April 2002, the Palmerston North City Council accepted the recommendation to proceed with re-zoning the NE Airport area as industrial, but also decided to undertake further investigation of the Longburn area for future industry. Two employment distributions were developed for each of the growth rates, as summarised in Table 10. Table 10: Employment Distributions GROWTH DISTRIBUTION LOW LOW HIGH HIGH NORTH SOUTH NORTH SOUTH Existing 36,320 36,320 36,320 36,320 Palmerston North City Sites CBD 1,241 1,412 2,482 2,925 Linton 1,000 1,000 1,000 1,000 NE Airport 1,027 2,655 Longburn 685 1,770 Massey 856 2,212 Hokowhitu Campus CRI PCI Remaining Study Area Sites Fielding Other Rural TOTAL 40,844 40,844 45,367 45,367 In all the distributions, it was assumed that the proportion of employment within the CBD in general business and retail would remain the same as in 2001, and that Linton would have an additional 1,000 jobs as confirmed by the NZ Army. The industrial distributions assumed that 60% of the remaining jobs would be in the NE Airport site and the remaining 40% at Longburn. The educational/research distribution assumed that 50% of the remaining employment would be at Massey, 20% at CRI and 10% at the various other tertiary units, including UCOL in the CBD. 25

26 While it is likely that there will be a combination of both industrial and education growth, the corresponding ranges within each category have been used in order to ensure a robust and versatile outcome from the study as a whole. 6.6 MODELLED SCENARIOS The two growth rates, with two household distributions and two employment distributions provide a total of eight alternative land-use scenarios that have been evaluated in the transport model. The results from each scenario are summarised and reported with an expectation that Council officers will actively monitor actual growth rates, and the location of new housing and employment to determine which scenarios should be continued and extended in future updates of the Transportation Management Plan. 26

27 7 GROWTH SUMMARY The total existing and future population, households and trips used in this study is shown in Table 11. Table 11: Growth Summary STUDY AREA NUMBER % INCREASE SUMMARY 2001 LOW HIGH LOW HIGH Population 92, , , % 25.0% Households 33,666 40,273 44, % 32.9% Vehicle Trips Per Hour 29,495 37,299 41, % 40.1% As expected, the percent increase in households is greater than population and the percent increase in trips in the network is greater than the increase in households. The study has focussed on ensuring that the recommendations made should be capable of supporting the projected transportation needs of each of these possible scenarios. 27

28 28

29 8 LEVELS OF SERVICE The capacity of a roadway varies according to a wide range of influences including the road type, location in the network and the nature of adjoining land uses. Urban roads are limited by the capacity of downstream intersections, whereas the capacity of rural roads is principally determined by alignment and geometric characteristics. The term Level of Service is provided to characterise operational conditions within a traffic stream and their perception by motorists and passengers. Six Levels of Service (LOS) are defined with A representing the highest level, and F the worst. For most design or planning purposes, service flow rates D or C are usually used. The following general statements describe the various Levels of Service. 1 LOS A describes primarily free-flow operations. Vehicles are seldom impeded in their ability to manoeuvre in the traffic stream. Delay at intersections is minimal. 2 LOS B represents reasonably unimpeded operations at average travel speeds. The ability to manoeuvre in the traffic stream is only slightly restricted and delays are not bothersome. 3 LOS C represents stable operations; however, ability to manoeuvre and change lanes in midblock locations may be more restricted than in LOS B, and longer queues, adverse signal coordination, or both may contribute to lower average travel speeds. 4 LOS D borders on a range in which small increases in flow may cause substantial increases in approach delay and hence decreases in arterial speed. LOS D may be due to adverse signal progression, inappropriate signal timing, high volumes, or some combination of these. 5 LOS E is characterised by significant delays and average travel speeds of one-third the free-flow speed or less. Such operations are caused by some combination of adverse progression, high signal density, high volumes, extensive delays at critical intersections, and inappropriate signal timing. 6 LOS F characterises arterial flow at extremely low speeds, from less than one-third to one-quarter of the free-flow speed. Intersection congestion is likely at critical signalised locations, with long delays and extensive queuing. As traffic volumes increase, the Level of Service decreases, i.e. traffic volumes are highest in LOS F. 29

30 30

31 9 NETWORK DESCRIPTORS 9.1 ROADING HIERARCHY A roading hierarchy defines certain streets for different functions. Understanding the needs and characteristics of these different functions make it easier to establish appropriate policies and guidelines for each of the classes or types of street throughout the network, and helps to direct traffic onto routes that are more suitable for their needs, for example, to minimise heavy vehicles on residential streets. By concentrating resources on particular streets rather than dispersed amongst many, conflicts can be reduced. The seven levels of the road hierarchy for Palmerston North can be described as follows: Arterial Roads - designed to carry long distance through traffic and form part of the regional strategic network Principal Roads - providing access between suburbs and the arterial roads Collector Roads - distributing traffic and cyclists between and within local areas Local Roads - slow environments providing direct access to property Parking Streets - primarily for central area parking, all parking streets are within the ring road Pedestrian Streets - to facilitate a high standard of pedestrian amenity. All pedestrian streets are within the ring road Cycle Paths - off-road facilities. By clearly defining the role and function of each road, community values can be provided for in an effective and cost-efficient manner. The roading hierarchy provides a tool for determining appropriate traffic management measures and provides a basis for design standards on individual components of the network. Council resources are minimised if an appropriate, well-defined and effective roading hierarchy is achieved. 9.2 ROAD CLASSIFICATIONS The levels of the road hierarchy can be described as follows: Arterial Roads High standard, limited access roads, designed to carry long distance through traffic and form part of the regional and local strategic network. These roads will have priority at all intersections along them, and intersections with principal roads will be controlled in the form of a graded intersection, traffic signals or roundabout. Many of these streets will 31

32 have four lanes. Four laning can be provided during peak periods by the introduction of clearways between 7:30-9:00 and 4:00-6:00pm. The road design will ensure minimum delays along the route. Cyclists will be encouraged not to use these roads but to use collector or local roads, where the design speed is lower and risk of conflict is reduced. Cycle lanes will only be provided on arterials that form part of the cycle network. Principal Roads Principal roads provide access between suburbs and the arterial roads and between different land use activities providing property access mainly to non-residential land-uses. Intersections have their priority on the principal road, except where they intersect with an arterial road. Road design will ensure minimal delay along the route. Principal roads will carry the major public transport routes. Collector Roads Collector roads distribute traffic between and within local areas and form the main link between principal and local roads. Traffic movement and property access is of equal importance. Cyclists are recommended to use collector roads and local roads to travel around the city. Kerbside parking may need to be removed to allow for separate cycle lanes. Local Roads Local roads provide direct access to properties. They are slow environments. Except for vehicles servicing individual properties, there will be no heavy vehicles on local roads. Cross-sections are to be kept to a minimum to ensure the environment does not attract through traffic. Local roads include cul-de-sacs and private accessways, and separate design guides are laid out for these streets. A high level of pedestrian facilities are to be provided. Existing local roads that exceed the maximum recommended carriageway widths will use roadmarking techniques to make them appear narrower, thus reducing vehicle speeds. Parking and Pedestrian Parking and pedestrian streets are all located within the central business district where their significant function is either to provide parking for adjacent businesses or easy pedestrian linkages. Vehicle access to individual properties is not permitted on a pedestrian street. Traffic speeds in these streets are low. 32

33 Cycle Paths Off-road cycle paths are accessible only for cyclists and pedestrians. Cycle paths may be exclusive for cyclists, or in a shared environment with pedestrians. Cycle paths can also include cycle lanes on roads that have a physical means of separating cyclists from motorised vehicles, eg a solid median. Effectively such a path is similar to a footpath. A summary of the characteristics of each road classification is shown in Table 12. Table 12 : Road Classifications Characteristics TYPICAL TYPICAL FLOW DESIRABLE TRUCK TYPICAL PROPERTY CYCLE TRAFFIC NUMBER CHARACTERISTICS URBAN RESTRICTIONS SPACING ACCESS FACILITIES DAILY OF SPEEDS BETWEEN FLOW LANES (KM/H) TRAFFIC DEVICES (M) Arterial >20,000 4 Uninterrupted None 400 Controlled No Principal 8,000-20, Uninterrupted None 300 Controlled No Collector 2,500-8,000 2 Interrupted Permitted 200 Equal Yes Local 200-2,500 2 Interrupted Preferred 100 Primary Yes Accessway < Interrupted Preferred 50 Primary No Park & Ped. <6,000 2 Interrupted Permitted 150 Controlled No Cycle Path - 2 Uninterrupted Controlled 300 Controlled Yes Separate design specifications are provided in the next section of this report. 9.3 PROPOSED ROADING HIERARCHY The proposed roading hierarchy for Palmerston North is shown in Figure 2 and has been developed based on the existing road arrangements, future traffic flow patterns and strategic development. While it is appreciated that some of the proposed arterial roads have residential housing, the proposed network best utilises the existing streets and will reduce conflict for the majority of residents in Palmerston North. 33

34 Figure 2 : Proposed Urban Road Hierarchy Arterial roads are best utilised if they travel between major destinations on opposite sides of the city. Care was taken to minimise the number of schools on arterial roads, however all of the long through roads have schools on them, partially due to the easy access these sites had,making them suitable for school sites. The proposed roading network includes a new road connecting the Airport to Railway Avenue to reduce the impacts on McGregor Street. It is recommended that cycle facilities be provided on all the roads shown. Introduction of the cycle network should be staged over five years. Only the arterial and principal roads shown in Figure 2 that are marked as part of the cycle network will have cycle facilities marked. Additional cycle facilities may be introduced on other collector and local roads as required. In deriving the principal cycle network, the Principal Network Rules used by Christchurch City Council have been used, namely: all elements and links in the principal cycle network shall connect to other links or recognised major cycle destinations no domestic residence in the urban concentration areas of the city shall be more than 1.5 km from an element of the principal cycle Network. 34

35 9.4 RECOMMENDED DESIGN CAPACITY It is recommended that a minimum Level of Service C be used in design criteria. In rural areas, where speed limits are greater than 80 kph, this corresponds to a maximum flow rate of approximately 600 vehicles per hour per lane in each direction. Should the flow conditions be higher than this for more than five hours of the day, improvements in the form of road widening should be considered. In urban areas, where travel speeds are influenced by intersection capacity, intersection delays should not exceed an average of 25 seconds per vehicle for more than two hours every day on arterial roads. Should delays exceed these conditions, intersection improvements need to be considered. Recommended maximum delays for other road types are shown in the later Section Intersection Delay. 35

36 36

37 10 CARRIAGEWAY WIDTH SPECIFICATIONS It is important that traffic lanes are wide enough to allow free-flow conditions, but are not so wide that there is no control over vehicle paths. Individual roads can have slightly different lane configurations by adjusting the widths of painted flush medians, or increasing the width of cycle lanes in accordance with the overall carriageway width. If needed, parking lanes can be removed on narrow streets where there are low parking demands, in order to assist vehicle flow. The recommended minimum and maximum design standards are set out in Table 13. Table 13 : Minimum Design Standards ROAD MIN MIN MIN MIN MIN MAX RECOMM. RECOMM. ROAD BERM FOOTPATH PARKING TRAFFIC TRAFFIC CYCLE FLUSH WIDTH WIDTH WIDTH WIDTH LANE LANE LANE MEDIAN (M) (M) (M) (M) WIDTH WIDTH WIDTH WIDTH (KERB TO (INC (M) (M) (M) (M) KERB) FOOTPATH) WHERE MIN PERMITTED Urban Roads Arterial x x Principal x x x Collector x x x Local - Residential x x x Local - Industrial x x x Accessways x x Parking & Pedestrian x x x Rural Roads Arterial x Principal x Collector x Local x The above design standards should be incorporated into all new subdivisions. Existing roads should be slowly upgraded to meet these standards. Parking and cycle lanes should be incorporated onto Local Roads as part of routine pavement re-marking to reduce the overall lane widths. With the exception of Ashley Street, all the footpaths within the CBD are greater than the recommended 3.5m wide. Footpath widths in the pedestrian areas must be maintained to a high standard. Free-standing advertising signs and/or retail stock must be managed to maintain a high level of convenience, especially for mothers with prams, wheelchair users and the increasingly popular mobility scooters used by the elderly. 37

38 38

39 11 CHOICES OF TRAVEL MODE Several sources are available to look at existing travel patterns, as described below. The Census surveys undertaken by Statistics New Zealand include data on how people travel to work. The currently available data and trends for Palmerston North City are shown in Table 14: Table 14: Mode of Travel to Work PALMERSTON NORTH CITY Car Driver 66% 69% 68% 72% Car Passenger 6% 7% 6% 5% Public Transport 3% 2% 2% 1% Cycle 13% 11% 10% 7% Walk 9% 8% 8% 8% Work at Home 3% 3% 6% 7% The reliance on motor travel for the journey to work has increased, with fewer people cycling or walking. In order to stabilise or reverse this trend, significant fresh initiatives are required. Surveys have been reported from Palmerston North schools in both 1984 and The results are shown in Table 15: Table 15 : Mode of Travel to Secondary School PALMERSTON NORTH CITY Car 8% 19% Public Transport 4% 13% Cycle 72% 45% Walk 16% 23% As shown, cycling has seen a significant decline. 39

40 The mode of transport chosen for a particular journey is determined by several factors, including: cost of travel travel time distance of journey convenience of journey parking availability terrain and weather. Hidden or one-off costs such as vehicle insurance are often excluded when determining the preferred mode of travel for any particular journey. 40

41 12 ALTERNATIVE TRANSPORT 12.1 PUBLIC TRANSPORT In % of residents in Palmerston North took the bus to work compared with up to around 10.1% in Auckland and 19.4% in Wellington. The substantially lower figure for Palmerston North reflects the ease of driving during peak times, the availability of commuter parking and the geographical spread of the workforce. Public transport is most efficient if the city is reasonably dense. Public transport is usually found to be optimised in cities that have at least 40% of employment and retail activities in the CBD. In Palmerston North this is 28%. It is also best served in cities that have ribbon development such that the public transport can follow the lines of development. Buses are the best means of public transport for Palmerston North as they are able to use any route, can have route changes or extensions at later dates and can utilise the existing infrastructure. The most effective method of increasing public transport is to have a service with high frequency and strategically located stops. A reduction in commuter parking will also increase public transport usage. The existing bus network is shown in Figure 3. Figure 3 : Existing Bus Network 41

42 As will be evident from the plan, the bus network serves most residential areas. Buses generally depart every 70 minutes, with adjacent routes having departures every 35 minutes. This means that a resident situated between two bus routes has a choice of which route to take, if they know the timetable. All the bus routes lead to and from the CBD, requiring transfers in order to reach other suburban destinations, such as the hospital. Public transport rates could be increased to levels similar to Wellington and Auckland if the frequency of buses is increased, and that smaller buses are used. The introduction of new routes that travel around and between suburban areas, not just to and from the CBD would be useful in further improving accessibility and convenience, particularly for the hospital and technical training institutions. Over recent years, the number of bus passengers has increased. Most of this increase has occurred in off-peak times, primarily from students and the elderly. The unlimited access of buses to UCOL students and lecturers has proved to be very successful. One incentive being considered to increase alternative transport is to add cycle racks to buses, so that people can commute by cycle in one direction, and with the option of taking the bus home if it rains, etc CYCLING In 1996 Palmerston North had the highest level of commuting to work by cycling in New Zealand, with 10.5% of commuters cycling. By 2001 this has dropped to 7.5%. Cycling is beneficial to the community in reducing congestion (traffic and parking), for health reasons, and it is cheaper than running a car. It is recommended that cycling be encouraged by the use of on-road cycle lanes. Cycleways can be provided on many of the existing carriageways. There is a perception that cycling is a potentially hazardous activity. However there are more hospitalisations in Palmerston North from sporting injuries than from cycling. If driving and cycling are compared on the basis of the length of exposure to danger, the risk per hour is about the same. The British Medical Association has compared the life-years lost due to accidents versus the life-years gained for health reasons with the conclusion that there is a 20 to 1 ratio in favour of cycling. It is recommended that Council continue to provide for and pursue achievement of the goals set out in the Bike Plan. Palmerston North is ideally suited for cycling, due to its flat terrain, compact size and wide residential streets, however fewer than 5% of the community cycle on a regular basis, and this number is decreasing. Figure 4 shows the proposed principal cycle network. 42

43 Figure 4 : Proposed Principal Cycle Network Cycling is safer on roads with fewer cars, and it is accordingly sensible to encourage cyclists to use low volume roads such as local and collector streets. With the grid nature of the Palmerston North roading network, this will not require longer journey distances. It is recommended that on-street cycle lanes be marked on all residential and collector streets carrying more than 4,500 vpd that have a carriageway width greater than 12.0m and 15.4m respectively. Particular off-road cycle facilities should be considered for any corridor that has more than 100 cycles per hour for a minimum of four hours a day. In 1999 a study was undertaken to assess the feasibility of a cycle/ pedestrian bridge over the Manawatu River. The study showed the economics of such a bridge facility were marginal and with the continuing decline in cycling, a cycle bridge at the present time is not warranted. Similarly, a separate cycle bridge over the railway line is not warranted. However it is highly recommended that any new roading bridges have separate cycle facilities provided at the time of construction. Road safety for cyclists can be improved by using coloured paving for an area dedicated to cyclists. This practice is to be encouraged as budgets permit. Cycling can be promoted in the District Plan. For instance, commercial buildings with a floor area greater than 800m2 GFA should be encouraged to have specific cycle parking provisions for the use of cycle commuters. Table 16 sets out suggested cycle parking facilities: 43

44 Table 16 : Recommended Commuter Cycle Parking Requirements LAND-USE ACTIVITY Offices Retail Manufacturing/Industry MINIMUM CYCLE PROVISION 1 space/200 m2 GFA 1 space/350 m2 GFA 1 space/300 m2 GFA Dispensations to developers for providing cycle parking in lieu of vehicle parking is discussed in the later Section Parking Dispensations WALKING Walking is a mode that is often shared by other modes, eg walking from a bus stop or car park. City footpaths need to be sufficiently wide to cater for pedestrians. Footpaths in the CBD need to be wider than those in residential areas. Walking is an ideal alternative transport for short trips, and also forms part of all trips made by a motorised vehicle. Areas of high pedestrian usage, such as within the CBD, between commuter parking areas and the city, adjacent to schools and suburban shopping precincts need to include the highest standard of walking facilities. Pedestrian footpaths must be wide enough to cope with the demands, pedestrian crossings must be adequately located, and appropriate lighting is needed in areas where people walk at nighttime and early evenings. All intersections controlled by traffic signals must have pedestrian facilities on all approaches to the intersection, unless such provisions are inconsistent with the required efficiency and safe operating. Regular assessments of other crossing facilities are to be made, and reference is made to the pedestrian crossing warrant specified in TR11 (National Roads Board Publication : Recommended Practice for Pedestrian Crossings, RCM Dunn & GW Main). TR11 suggests that a pedestrian crossing is warranted if, during a normal weekday both the pedestrian volumes are greater than 300 per hour and the product of pedestrians and vehicles is greater than 45,000 per hour. Should there be an existing pedestrian crossing that does not meet this warrant, the crossing should be removed such that consistency is maintained and vehicle drivers will continue to respect and observe other pedestrian crossings. Pedestrian crossings that aren t used very often are potentially dangerous as motorists who regularly drive through these crossings know pedestrians seldom use them. Crossings outside schools fall into this category as they are generally only used immediately before and after school. Kea crossings are part-time crossings that only operate when a school patrol and fluorescent orange flags are present. When there are no school patrols and flags, the crossing point is just like any other section of road. It is recommended that Kea crossings are considered adjacent to schools that do not meet the full pedestrian warrant and have a half-hour product of pedestrians and vehicles of at least 3,000. Pedestrian walkways should be included with any off-road cycle facility. 44

Trends and issues Lake Te Koutu walkway, Cambridge

Trends and issues Lake Te Koutu walkway, Cambridge 27 Trends and issues Lake Te Koutu walkway, Cambridge 3 Trends 3.1 Journey to work Over the past two to three decades there has been a significant increase in private vehicle ownership and usage and a

More information

Goals & Objectives. Chapter 9. Transportation

Goals & Objectives. Chapter 9. Transportation Goals & Objectives Chapter 9 Transportation Transportation MISSION STATEMENT: TO PROVIDE A TRANSPORTATION NETWORK CAPABLE OF MOVING PEOPLE AND GOODS EFFICIENTLY AND SAFELY. T he transportation system

More information

CAPACITY AND LEVEL-OF-SERVICE CONCEPTS

CAPACITY AND LEVEL-OF-SERVICE CONCEPTS CHAPTER 2 CAPACITY AND LEVEL-OF-SERVICE CONCEPTS CONTENTS I. INTRODUCTION...2-1 II. CAPACITY...2-2 III. DEMAND...2-2 IV. QUALITY AND LEVELS OF SERVICE...2-2 Service Flow Rates...2-3 Performance Measures...2-3

More information

2 Integrated planning. Chapter 2. Integrated Planning. 2.4 State highway categorisation and integrated planning

2 Integrated planning. Chapter 2. Integrated Planning. 2.4 State highway categorisation and integrated planning 2 Integrated planning Chapter 2 Integrated Planning This chapter contains the following sections: Section No. Topic 2.1 Introduction to integrated planning 2.2 Transit s Integrated Planning Policy 2.3

More information

OVERVIEW PROJECT SUMMARY

OVERVIEW PROJECT SUMMARY OVERVIEW Cesar Chavez showcases how to successfully redesign a primary arterial route into a neighborhood destination, improving modal share, water sensitive design, biodiversity and safety whilst maintaining

More information

Lawson Outline Plan External Traffic Analysis Working Paper

Lawson Outline Plan External Traffic Analysis Working Paper Total Lawson Development ACTPLA 16 January 2009 Document No.: Prepared for ACTPLA Prepared by Maunsell Australia Pty Ltd Level 2, 60 Marcus Clarke Street, Canberra ACT 2600, Australia T +61 2 6201 3000

More information

THE WANGANUI CYCLING STRATEGY

THE WANGANUI CYCLING STRATEGY THE WANGANUI CYCLING STRATEGY For Review by May 2008 1. INTRODUCTION Cycling is a practical, healthy and fun form of transport and recreation. The formation of the Wanganui Cycling Strategy is aimed at

More information

Department of State Development, Infrastructure and Planning. State Planning Policy state interest guideline. State transport infrastructure

Department of State Development, Infrastructure and Planning. State Planning Policy state interest guideline. State transport infrastructure Department of State Development, Infrastructure and Planning State Planning Policy state interest guideline State transport infrastructure July 2014 Great state. Great opportunity. Preface Using this state

More information

Submission from Living Streets Aotearoa Wellington City Public Transport Spine Study

Submission from Living Streets Aotearoa Wellington City Public Transport Spine Study Submission from Living Streets Aotearoa Wellington City Public Transport Spine Study Contact person: Ellen Blake Email: wellington@livingstreets.org.nz Phone: 021 1067139 Date: 30 September 2013 About

More information

IPENZ TRANSPORTATION GROUP CONFERENCE 2013 KEEP CHRISTCHURCH MOVING FORWARD CHRISTCHURCH TRANSPORT STRATEGIC PLAN

IPENZ TRANSPORTATION GROUP CONFERENCE 2013 KEEP CHRISTCHURCH MOVING FORWARD CHRISTCHURCH TRANSPORT STRATEGIC PLAN Keep Christchurch moving forward Foxon R. Kurucz R. Cheeseborough T. Page 0 IPENZ TRANSPORTATION GROUP CONFERENCE 2013 KEEP CHRISTCHURCH MOVING FORWARD CHRISTCHURCH TRANSPORT STRATEGIC PLAN RUTH FOXON

More information

Engagement with the community will be in accordance with Council s Community Participation Policy.

Engagement with the community will be in accordance with Council s Community Participation Policy. CLARENCE CITY COUNCIL ASSET MANAGEMENT 7 DEC 2015 86 11.5 ASSET MANAGEMENT 11.5.1 CLARENCE STREET SAFETY ASSESSMENT PROJECT (File No 04-03-01) EXECUTIVE SUMMARY PURPOSE The purpose of this report is to

More information

Walkable Communities Florida Department of Transportation State Safety Office Pedestrian and Bicycle Program April 1995 www.dot.state.fl.us/safety Twelve Steps for an Effective Program Page 1 Twelve Steps

More information

Journey to Work Patterns in the Auckland Region

Journey to Work Patterns in the Auckland Region Analysis of Census Data for 2001-2013 1 INTRODUCTION... 1 DEFINITIONS OF WORKERS, JOBS AND EMPLOYMENT... 1 2 SCOPE OF THE ANALYSIS... 2 2.1 LEVELS OF ANALYSIS... 2 2.2 DATA INCLUDED IN THE ANALYSIS...

More information

Footpath Extension Policy

Footpath Extension Policy 16.6.9 Footpath Extension Policy 1.0 FOOTPATH EXTENSION POLICY - INTENTION The Footpath Extension Policy provides for the ranking of new footpaths in the Council s footpath construction programme. The

More information

Integrated Public Transport Service Planning Guidelines. Sydney Metropolitan Area

Integrated Public Transport Service Planning Guidelines. Sydney Metropolitan Area Integrated Public Transport Service Planning Guidelines Sydney Metropolitan Area December 2013 CONTENTS 1. INTRODUCTION 3 1.1 Purpose 3 1.2 Background 3 1.3 Travel in Sydney Metropolitan Area 5 1.4 Objectives

More information

Route Optimisation / Traffic Signals Efficiency

Route Optimisation / Traffic Signals Efficiency Route Optimisation / Traffic Signals Efficiency Glossary Auckland Council Advanced Real-time Traffic Information System Auckland Transport Closed Circuit Television (Traffic cameras) Full Time Equivalent

More information

SAFETY PROCESS. Martin Small

SAFETY PROCESS. Martin Small SAFETY PROCESS Martin Small With a broad transport policy background including extensive work in the maritime sector, Martin Small has been working in road safety for five years, in a variety of roles

More information

Development Layout Design

Development Layout Design Development Layout Design General Design Considerations for Adoptable Highways Version 1 June 2012 Transportation, Waste and Environment Service Issue and Revisions Record Revision Date Originator Purpose

More information

Roads Task Force - Technical Note 10 What is the capacity of the road network for private motorised traffic and how has this changed over time?

Roads Task Force - Technical Note 10 What is the capacity of the road network for private motorised traffic and how has this changed over time? Roads Task Force - Technical Note 10 What is the capacity of the road network for private motorised traffic and how has this changed over time? Introduction This paper forms one of a series of thematic

More information

Cycle Strategy 2006 2011

Cycle Strategy 2006 2011 Cycle Strategy 2006 2011 TABLE OF CONTENTS 1 INTRODUCTION... 1 2 POLICY BACKGROUND... 2 3 BACKGROUND... 6 4 MAIN OBJECTIVES... 8 5 TARGETS... 9 6 THE CYCLE NETWORK... 10 7 CONCLUSION... 13 Appendix A:

More information

1. REPORT CONTEXT Description of the development (include all of the following that are known at the time of the application):

1. REPORT CONTEXT Description of the development (include all of the following that are known at the time of the application): Transportation Assessment and Management Study Guidelines for Consultants INTRODUCTION This document is intended to provide guidelines for transportation consultants who produce Transportation reports

More information

Regional Cycling Strategy. May 2004

Regional Cycling Strategy. May 2004 Regional Cycling Strategy May 2004 they also have the largest number of cyclists. Fault rests approximately two thirds with drivers and one third with cyclists. Figure 1 illustrates

More information

Central London ongestion charging

Central London ongestion charging Transport for London Central London ongestion charging Impacts monitoring Fourth Annual Report, June 2006 Overview MAYOR OF LONDON Transport for London 2006 All rights reserved. Reproduction permitted

More information

Bedford s Network Management Strategy (2011 2021) November 2010

Bedford s Network Management Strategy (2011 2021) November 2010 Bedford s Network Management Strategy (2011 2021) November 2010 Page 1 of 13 1. Introduction 1.1. The Bedford Borough Council Network Management Strategy has been developed to support local and national

More information

VISION, DESIGN PRINCIPLES & OVERALL PLANNING STRATEGY

VISION, DESIGN PRINCIPLES & OVERALL PLANNING STRATEGY 3 VISION, DESIGN PRINCIPLES & OVERALL PLANNING STRATEGY The overall planning strategy for the Bank Street CDP is to ensure that future development is undertaken in a coordinated and planned approach, supported

More information

Draft Plan Change 1 - Central Business Zones. Palmerston North. Transportation Assessment Report. November 2010

Draft Plan Change 1 - Central Business Zones. Palmerston North. Transportation Assessment Report. November 2010 Draft Plan Change 1 - Central Business Zones Palmerston North Transportation Assessment Report November 2010 PO Box 30 721 Lower Hutt 5040 P: +64 4 569 8497 www.tdg.co.nz New Zealand Draft Plan Change

More information

HIGHWAY DESIGN REPORT. Appendix 4. Proposed Design Principles for City Passings

HIGHWAY DESIGN REPORT. Appendix 4. Proposed Design Principles for City Passings HIGHWAY DESIGN REPORT Appendix 4 Proposed Design Principles for City Passings June 2000 Contents Page 1 Introduction 2 1.1 Purpose 2 1.2 Definition of city passing 2 1.3 Safety Problems 2 1.4 Planning

More information

How To Develop A Balanced Transport System In Devon

How To Develop A Balanced Transport System In Devon Devon Structure Plan First Review - 1995 to 2011 7 Transportation (T Policies) Explanatory Memorandum (September 1999) (Policies and Proposals adopted February 1999) 7. TRANSPORTATION 7.1 Transportation

More information

Bicycle Safety Webinar December 1 st 2010

Bicycle Safety Webinar December 1 st 2010 Bicycle Safety Webinar December 1 st 2010 Kay Teschke Kay Teschke is Professor in the Schools of Population and Public Health and of Environmental Health at the University of British Columbia. She is principal

More information

21.04 LAND USE. Managing amenity through land use strategies

21.04 LAND USE. Managing amenity through land use strategies 21.04 LAND USE This section contains objectives and strategies for land use, under the themes of: Housing and community Retail, entertainment and the arts Office and commercial use Industry Education and

More information

DEPARTMENT OF TRANSPORT CYCLING STRATEGY 29 February 2008

DEPARTMENT OF TRANSPORT CYCLING STRATEGY 29 February 2008 DEPARTMENT OF TRANSPORT CYCLING STRATEGY 29 February 2008 INTRODUCTION The Department of Transport s Business Plan for the 2007/08 financial year stated the following: Government Aim: Quality Environment

More information

CROYDON MAJOR ACTIVITY CENTRE PARKING STUDY

CROYDON MAJOR ACTIVITY CENTRE PARKING STUDY CROYDON MAJOR ACTIVITY CENTRE PARKING STUDY December 2011 EXECUTIVE SUMMARY Strategic Context The Croydon Town Centre has been classified as a Major Activity Centre (MAC) in the Melbourne 2030 metropolitan

More information

Downtown Tampa Transportation Vision

Downtown Tampa Transportation Vision Downtown Tampa Transportation Vision Executive Summary August 1, 2006 Hillsborough County Metropolitan Planning Organization County Center, 18 th Floor Tampa, Florida 33602 813-272-5940 www.hillsboroughmpo.org

More information

Significant investment and improvement of infrastructure and transport networks, delivered at no cost and no risk

Significant investment and improvement of infrastructure and transport networks, delivered at no cost and no risk December 2014 FACT SHEET: TRANSPORT AND INFRASTRUCTURE Significant investment and improvement of infrastructure and transport networks, delivered at no cost and no risk The Gold Coast Integrated Resort

More information

2013 QUALITY/ LEVEL OF SERVICE HANDBOOK

2013 QUALITY/ LEVEL OF SERVICE HANDBOOK 2013 QUALITY/ LEVEL OF SERVICE HANDBOOK STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION 2013 TABLE OF CONTENTS 1 Executive Summary... 1 2 Q/LOS Handbook Purpose and Scope... 3 2.1. Levels of Analysis...4

More information

A Bicycle Accident Study Using GIS Mapping and Analysis

A Bicycle Accident Study Using GIS Mapping and Analysis A Bicycle Accident Study Using GIS Mapping and Analysis Petra Staats, Graduate Assistant, Transportation Policy Institute, Rutgers University, New Brunswick, NJ, USA pstaats@eden.rutgers.edu Summary Surveys

More information

Alternatives to the Circ Project Prioritization Methodology Prepared for Circ Task Force July 28, 2011

Alternatives to the Circ Project Prioritization Methodology Prepared for Circ Task Force July 28, 2011 Alternatives to the Circ Project Prioritization Methodology Prepared for Circ Task Force July 28, 2011 CCRPC staff has developed a draft methodology described below and detailed in the attached pages for

More information

28.0 Development Permit Area #2 (Neighbourhood District)

28.0 Development Permit Area #2 (Neighbourhood District) 28.0 Development Permit Area #2 (Neighbourhood District) Goals and Objectives To provide a guide for infill and new development in the Neighbourhood District. To outline the nature, form and character

More information

Transportation Impact Assessment Guidelines

Transportation Impact Assessment Guidelines Transportation Impact Assessment Guidelines Preface The following TIA Guidelines have been developed jointly by the City s Planning and Growth Management and Public Works and Services departments in an

More information

Traffic Management During Construction

Traffic Management During Construction Traffic Management During Construction The construction of Dublin Port Tunnel couldn t begin until a traffic management plan had been developed and agreed to facilitate construction of the Tunnel and to

More information

Christchurch Cycle Design Guidelines

Christchurch Cycle Design Guidelines Christchurch Cycle Design Guidelines 2013 Acknowledgements We would like to thank the contributions from ViaStrada and other contributors including Glen Koorey, Spokes, NZTA, Canterbury Public Health,

More information

Temporary Traffic Management

Temporary Traffic Management Temporary Traffic Management Tom Kiddle 4 th July 2012 Temporary Traffic Management Auckland Transport TTM Operation Requirements AT TTM Audits Qualified Persons on site Pedestrian Management 1 AT Temporary

More information

Development of Shanghai Integrated Transport (2010-2015) XIAO Hui and GU Yu

Development of Shanghai Integrated Transport (2010-2015) XIAO Hui and GU Yu Development of Shanghai Integrated Transport (2010-2015) XIAO Hui and GU Yu Abstract This article summarises the general situation of Shanghai s integrated transport system and then determines the trends

More information

Delineation. Section 4 Longitudinal markings

Delineation. Section 4 Longitudinal markings Delineation Section 4 Longitudinal markings The delineation guidelines have been developed to assist in designing and maintaining a quality delineation system. The guidelines are to comprise 19 sections

More information

Guidelines for the Preparation of Transportation Impact Studies 8 th Revision

Guidelines for the Preparation of Transportation Impact Studies 8 th Revision Guidelines for the Preparation of Transportation Impact Studies 8 th Revision Halifax Regional Municipality Traffic and Right of Way Transportation and Public Works P.O. Box 1749 Halifax, Nova Scotia B3J

More information

Needs Analysis. Long Beach Bicycle Master Plan. Bicycle Commuter Needs. LONG BEACH BICYCLE MASTER PLAN Needs Analysis

Needs Analysis. Long Beach Bicycle Master Plan. Bicycle Commuter Needs. LONG BEACH BICYCLE MASTER PLAN Needs Analysis Long Beach Bicycle Master Plan Needs Analysis The purpose of reviewing the needs of commuter and recreational bicyclists is twofold: (1) it is instrumental when planning a system which must serve both

More information

City of Kamloops Notre Dame Corridor Access Plan

City of Kamloops Notre Dame Corridor Access Plan FINAL REPORT This report is prepared for the sole use of ICBC. No representations of any kind are made by Urban Systems Ltd. or its employees to any party with whom Urban Systems Ltd. does not have a contract.

More information

ENGINEERING SOLUTIONS FOR DESIGNING YOUR SAFE ROUTES

ENGINEERING SOLUTIONS FOR DESIGNING YOUR SAFE ROUTES How to Get Started ENGINEERING SOLUTIONS FOR DESIGNING YOUR SAFE ROUTES Design Elements Selecting appropriate design treatments for school neighborhoods creates environments that address the needs of all

More information

A new Garden Neighbourhood for West Guildford An opportunity for Smart Growth. university of surrey November 2013

A new Garden Neighbourhood for West Guildford An opportunity for Smart Growth. university of surrey November 2013 A new Garden Neighbourhood for West Guildford An opportunity for Smart Growth university of surrey November 2013 A new Garden Neighbourhood for West Guildford Preface Since the County and Borough Councils

More information

11. Managing our Transport Assets

11. Managing our Transport Assets 11. Managing our Transport Assets 11.1 The Need for an Asset Management Plan 11.1.1 A key challenge is to make transport assets work for the city in a way which fully contributes to the delivery of corporate

More information

A23 CHEQUERS ROUNDABOUT, HORLEY: PREDESTRIAN AND CYCLING CROSSING IMPROVEMENTS

A23 CHEQUERS ROUNDABOUT, HORLEY: PREDESTRIAN AND CYCLING CROSSING IMPROVEMENTS s A23 CHEQUERS ROUNDABOUT, HORLEY: PREDESTRIAN AND CYCLING CROSSING IMPROVEMENTS SURREY COUNTY COUNCIL S LOCAL COMMITTEE FOR REIGATE AND BANSTEAD 12 JANUARY 2004 KEY ISSUE To consider the conclusions of

More information

Energy and. Resources

Energy and. Resources Tasmaniann Government 20122 Submission to Nation Buildin g 2 Program Domain Highway Planning (Part of Brooker Highway Upgrades submission to Infrastructure Australia) September 2012 Department of Infrastructure,

More information

SUMMARY: LAND TRANSPORT ASSET MANAGEMENT PLAN

SUMMARY: LAND TRANSPORT ASSET MANAGEMENT PLAN SUMMARY: LAND TRANSPORT ASSET MANAGEMENT PLAN Introduction This Asset Management Plan (AMP) for Land Transport Network 2012 describes in detail how the District s land transport network will be managed

More information

Bus and Transit Lanes Review - Planning and Implementation Model for Auckland - July 2011

Bus and Transit Lanes Review - Planning and Implementation Model for Auckland - July 2011 Agenda Item 9(i) Bus and Transit Lanes Review - Planning and Implementation Model for Auckland - July 2011 Purpose The purpose of this study is two-fold: - To put forward a policy that aligns with strategic

More information

TRANSPORTATION SERVICE STANDARDS ELEMENT GOALS, OBJECTIVES & POLICIES

TRANSPORTATION SERVICE STANDARDS ELEMENT GOALS, OBJECTIVES & POLICIES TRANSPORTATION SERVICE STANDARDS ELEMENT GOALS, OBJECTIVES & POLICIES Background One of the most critical public services provided by a community is the community s transportation system. An effective

More information

Transport Construction Authority Report for Auburn Stabling Project. Traffic Impact Assessment

Transport Construction Authority Report for Auburn Stabling Project. Traffic Impact Assessment Transport Construction Authority Report for Auburn Stabling Project November 2010 Contents 1. Introduction 1 2. Existing Conditions 2 2.1 Site Description 2 2.2 Existing Operations 4 2.3 Existing Road

More information

Planning for Safe Transport Infrastructure at Schools

Planning for Safe Transport Infrastructure at Schools Planning for Safe Transport Infrastructure at Schools Technical guidance for the provision of effective and safe transport infrastructure at schools April 2011 DRAFT NOT GOVERNMENT POLICY Planning for

More information

6 Streetscape character 6.1

6 Streetscape character 6.1 6 6.1 6 Streetscape character Introduction Transport interchanges The TLRN is the strategic road network for London and varies in character across the capital. The variation of the land use across London

More information

Protected Bicycle Lanes in NYC

Protected Bicycle Lanes in NYC Protected Bicycle Lanes in NYC New York City Department of Transportation Polly Trottenberg, Commissioner September 2014 NEW YORK CITY DEPARTMENT OF TRANSPORTATION 1 Overview Since 2007, the New York City

More information

Construction of a pedestrian footbridge between Chiswick Business Park and Bollo Lane/Colonial Drive.

Construction of a pedestrian footbridge between Chiswick Business Park and Bollo Lane/Colonial Drive. planning report D&P/2857b/01 30 November 2015 Bollo Lane, Chiswick Business Park and Colonial Drive, Chiswick in the London Borough of Ealing planning application no. PP/2015/5442 Strategic planning application

More information

COPCUT RISE COPCUT RISE DROITWICH SPA CONSULTATION STATEMENT. November 2010. Prepared by Capita Lovejoy on behalf of William Davis Limited

COPCUT RISE COPCUT RISE DROITWICH SPA CONSULTATION STATEMENT. November 2010. Prepared by Capita Lovejoy on behalf of William Davis Limited COPCUT RISE DROITWICH SPA CONSULTATION STATEMENT COPCUT RISE November 2010 Prepared by Capita Lovejoy on behalf of William Davis Limited Copcut Rise Land north of Copcut Lane, Droitwich Spa: Consultation

More information

Traffic Information in NYC

Traffic Information in NYC Traffic Information in NYC What We Know, What We Need to Know Prepared for Transportation Alternatives January 23, 2007 Schaller Consulting 94 Windsor Place, Brooklyn, NY (718) 768-3487 schaller@schallerconsult.com

More information

6. Social & Community Facilities

6. Social & Community Facilities 6.1. Objectives The built environment, with appropriate housing, public spaces and community facilities provides a basic platform to ensure residents have the best opportunity to build their own community.

More information

0.0 Curb Radii Guidelines Version 1.0.2

0.0 Curb Radii Guidelines Version 1.0.2 Background In early 2014, Transportation Services initiated a review of the Division's design guidelines and standards to move our organization in a direction consistent with the transportation departments

More information

Advantages and Disadvantages of One Way Streets October 30, 2007

Advantages and Disadvantages of One Way Streets October 30, 2007 Advantages and Disadvantages of One Way Streets October 30, 2007 0 P age Background As the revitalization of the Central Waterfront area moves forward, one issue that might need closer analysis is the

More information

Cycle Network Modelling A new evidence-based approach to the creation of cycling strategy

Cycle Network Modelling A new evidence-based approach to the creation of cycling strategy Cycle Network Modelling A new evidence-based approach to the creation of cycling strategy A The Business Cycle, London, mapping of commuter cycle routes and hotspots, 2000. A It is refreshing to see an

More information

Technical Memorandum PERFORMANCE MEASURES. Prepared by:

Technical Memorandum PERFORMANCE MEASURES. Prepared by: Technical Memorandum PERFORMANCE MEASURES Prepared by: March 2014 TABLE OF CONTENTS Executive Summary... 1 1. Introduction... 2 1.1 Performance Measures and the Public Sector... 2 1.2 National Focus: MAP

More information

SECTION 6: TRANSPORTATION

SECTION 6: TRANSPORTATION 6.0 INTRODUCTION SECTION 6: TRANSPORTATION This section covers the design of the transportation system including but not limited to roadways, lanes, sidewalks and pathways located within road right of

More information

Mount Royal College Transit Service Plan

Mount Royal College Transit Service Plan Mount Royal College Transit Service Plan Background In 2007 November response to Council Report C2007-78 West LRT Alignment, Budget and Project Delivery, Council directed the Administration to report back

More information

How To Increase Vehicle Height Of A Tunnel In Daugherd Port

How To Increase Vehicle Height Of A Tunnel In Daugherd Port Height of Dublin Port Tunnel Background Note The Dublin Port Tunnel 1. The Dublin Port Tunnel will run from the existing M1 Motorway at Santry to link with Dublin Port and the local road network. Construction

More information

Overview of the Travel Demand Forecasting Methodology

Overview of the Travel Demand Forecasting Methodology Overview of the Travel Demand Forecasting Methodology Prepared by the Central Transportation Planning Staff (CTPS) Authors: Scott A. Peterson, Manager Ian Harrington, Chief Planner March 29, 2008 1 OVERVIEW

More information

21.08 ECONOMIC DEVELOPMENT. Retail

21.08 ECONOMIC DEVELOPMENT. Retail 21.08 ECONOMIC DEVELOPMENT Retail Retailing is an important component of Melbourne s Capital City function. The Hoddle Grid will remain the State s pre-eminent retail centre and retailing in its Retail

More information

Tier 1 Strategies. WV Route 14 Corridor Management Plan

Tier 1 Strategies. WV Route 14 Corridor Management Plan 1.1 1.2 1.3 1.4 Signal timing optimization system improvements. Improve geometry traffic control at high crash intersections. Construct intersection capacity improvement projects. Widen longer sections

More information

Measuring the Street:

Measuring the Street: Measuring the Street: New Metrics for 21st Century Streets 1 Measuring the Street: New Metrics for 21st Century Streets New York City s streets are constantly called on to the meet new and varied needs

More information

2.50 Retirement villages - section 32 evaluation for the Proposed Auckland Unitary Plan

2.50 Retirement villages - section 32 evaluation for the Proposed Auckland Unitary Plan 2.50 Retirement villages - section 32 evaluation for the Proposed Auckland Unitary Plan 1 OVERVIEW AND PURPOSE...2 1.1 Subject Matter of this Section...2 1.2 Resource Management Issue to be Addressed...2

More information

The Northwest Arkansas Travel Demand Model

The Northwest Arkansas Travel Demand Model The Northwest Arkansas Travel Demand Model Creation and Results John McLarty Northwest Arkansas Regional Planning Commission Cristina Scarlat Center for Advanced Spatial Technologies What is a Travel Demand

More information

Newmarket Level Crossing Project. - Survey Results. Newmarket Level Crossing Survey January 2015, July 2015 rev.

Newmarket Level Crossing Project. - Survey Results. Newmarket Level Crossing Survey January 2015, July 2015 rev. Newmarket Level Crossing Project - Survey Results Overview Auckland Transport received 59 survey responses, 1 from residents or landowners in directly affected roads: Cowie Street: 1 survey responses.

More information

Getting there on foot, by cycle. A strategy to advance walking and cycling in New Zealand transport. February 2005 ISBN: 0 478 10004 3

Getting there on foot, by cycle. A strategy to advance walking and cycling in New Zealand transport. February 2005 ISBN: 0 478 10004 3 Getting there on foot, by cycle A strategy to advance walking and cycling in New Zealand transport February 2005 ISBN: 0 478 10004 3 FOREWORD In 2002, the Government released the New Zealand Transport

More information

CONSTRUCTION TRAFFIC MANAGEMENT PLAN (CTMP)

CONSTRUCTION TRAFFIC MANAGEMENT PLAN (CTMP) CONSTRUCTION TRAFFIC MANAGEMENT PLAN (CTMP) [Colston Budd Hunt & Kafes Pty Ltd AS AMENDED BY City of Sydney] 23 March 2010 1. PREAMBLE 1.1 This document constitutes the Demolition and Traffic Management

More information

New Jersey SRTS Travel Plan Guide

New Jersey SRTS Travel Plan Guide New Jersey SRTS Travel Plan Guide Prepared For: Funded By: Prepared By: New Jersey Department of Transportation Federal Highway Administration Alan M. Voorhees Transportation Center Edward J. Bloustein

More information

Overdimension vehicles and loads

Overdimension vehicles and loads Overdimension vehicles and loads Factsheet 53 June 2013 ISSN 1172-0689 (print) ISSN 1172-0778 (online) THIS FACTSHEET summarises the overdimension requirements of the Land Transport Rule: Vehicle Dimensions

More information

STOP CONSOLIDATION TRANSIT STRATEGIES

STOP CONSOLIDATION TRANSIT STRATEGIES TRANSIT STRATEGIES STOP CONSOLIDATION Transit stops are the places where people access transit service, and greatly impact many elements of passengers transit experiences. They are typically thought of

More information

POLICY FOR THE PROVISION OF DEDICATED SCHOOL BUS SERVICES

POLICY FOR THE PROVISION OF DEDICATED SCHOOL BUS SERVICES Purpose: The purpose of this paper is to articulate the ACTION s policy for the provision of dedicated school bus services. Definitions: Dedicated school bus services follow a regular timetable and route,

More information

Regional Road Safety Strategy September 2004

Regional Road Safety Strategy September 2004 Regional Road Safety Strategy September 2004 Regional Road Safety Strategy September 2004 Cover photo courtesy of St Mark s Church School Executive Summary The vision of the Regional Road Safety Strategy

More information

Moving Together Corporate Plan

Moving Together Corporate Plan Moving Together Corporate Plan 2010-2014 CONTENTS Vision 4 Our values 5 Ministers message 6 Director General s message 7 Transport NSW at a glance 8 Delivering our transport vision 11 Organisational structure

More information

Speed Limit Policy Isle of Wight Council

Speed Limit Policy Isle of Wight Council APPENDIX C - 59 Speed Limit Policy Isle of Wight Council June 2009 Contents Section 1 Introduction 1.1 Links with the Local Transport Plan Section 2 Speed Limits on Urban Roads and Residential Areas 2.1

More information

TRANSPORT ASSESSMENT GUIDANCE

TRANSPORT ASSESSMENT GUIDANCE TRANSPORT ASSESSMENT GUIDANCE Contents 1 INTRODUCTION...1 Purpose of the Guidance...1 Policy Context...1 Who Should Read This Document?...2 Structure of Guidance...3 2 ASSESSMENT PRINCIPLES AND PROCESS...4

More information

Deaths/injuries in motor vehicle crashes per million hours spent travelling, July 2008 June 2012 (All ages) Mode of travel

Deaths/injuries in motor vehicle crashes per million hours spent travelling, July 2008 June 2012 (All ages) Mode of travel Cyclists CRASH STATISTICS FOR THE YEAR ENDED 31 DECEMBER 212 Prepared by the Ministry of Transport CRASH FACTSHEET November 213 Cyclists have a number of risk factors that do not affect car drivers. The

More information

How To Design A Crash Investigation Site

How To Design A Crash Investigation Site CHAPTER 7 CRASH INVESTIGATION SITES December, 2000 7. Crash Investigation Sites (CIS) 7.1. Introduction and Usage The idea of "crash investigation sites" or areas outside of the freeway mainline where

More information

Segregation of Shared Use Routes

Segregation of Shared Use Routes Segregation of Shared Use Routes Technical Information Note No. 19 April 2014 About Sustrans Sustrans makes smarter travel choices possible, desirable and inevitable. We re a leading UK charity enabling

More information

Proposed Service Design Guidelines

Proposed Service Design Guidelines Proposed Service Design Guidelines July 2015 I. Introduction During Phase II of the Reimagining CityBus project, feedback from public outreach and data analysis conducted during Phase I of the project

More information

Comment #1: Provide an interchange at Route 7 and Farm Market Road/White Gate Road. This was studied in the late 1990 s.

Comment #1: Provide an interchange at Route 7 and Farm Market Road/White Gate Road. This was studied in the late 1990 s. Proposed Truck Climbing Lane Route 7 Westbound Between West Market Street and Route 9 UPC# 58599, Project # 6007-053-133, P101 Date of Meeting: August 24, 2010 Time: 6:00PM to 8:00PM Location: Rust Library

More information

Customer Satisfaction Index 2014

Customer Satisfaction Index 2014 Customer Satisfaction Index 01 Contents Executive summary Customer satisfaction methodology Initiatives to improve customer satisfaction November 01 results Overall train network Overall bus regions Overall

More information

Transport for Canberra. Transport for a sustainable city

Transport for Canberra. Transport for a sustainable city Transport for Canberra Transport for a sustainable city 2012 2031 Australian Capital Territory, Canberra 2012 This work is copyright. Apart from any use as permitted under the Copyright Act 1968, no part

More information

RUNNYMEDE LOCAL AREA TRANSPORTATION PROGRAMME PROGRESS FOR 2003/04 2004/05 AND BID FOR 2005/06 TO 2010/11

RUNNYMEDE LOCAL AREA TRANSPORTATION PROGRAMME PROGRESS FOR 2003/04 2004/05 AND BID FOR 2005/06 TO 2010/11 S RUNNYMEDE LOCAL AREA TRANSPORTATION PROGRAMME PROGRESS FOR 2003/04 2004/05 AND BID FOR 2005/06 TO 2010/11 22 nd OCTOBER 2004 KEY ISSUES The Transportation Select Committee has asked all local transportation

More information

Key Facts. Passenger growth at the airport is projected to grow to approximately 3 million passengers per annum by 2030.

Key Facts. Passenger growth at the airport is projected to grow to approximately 3 million passengers per annum by 2030. Bournemouth Airport & Business Park 7 7 Bournemouth Airport & Business Park Introduction 7.1 Bournemouth Airport is a key asset for the region, one of the UK s fastest growing regional airports and is

More information

SCHEDULE 16 TO THE SPECIAL USE ZONE. Shown on the planning scheme map as SUZ16. BALLARAT RAILWAY STATION PRECINCT. Purpose

SCHEDULE 16 TO THE SPECIAL USE ZONE. Shown on the planning scheme map as SUZ16. BALLARAT RAILWAY STATION PRECINCT. Purpose SCHEDULE 16 TO THE SPECIAL USE ZONE Shown on the planning scheme map as SUZ16. BALLARAT RAILWAY STATION PRECINCT Purpose To facilitate the revitalisation of the Ballarat Station Precinct in accordance

More information

Visiting Artists Scheme

Visiting Artists Scheme Community Arts Palmerston North Visiting Artists Scheme Massey University and Square Edge Residencies for Artists AN EXCITING INITIATIVE Massey University, the Palmerston North City Council and Community

More information

3 Tappan Zee Bridge Rehabilitation Options

3 Tappan Zee Bridge Rehabilitation Options 3 Tappan Zee Bridge Rehabilitation Options 3.1 Introduction This chapter describes possible options that rehabilitate and enhance the existing Tappan Zee Bridge. Four Rehabilitation Options have been developed:

More information

Draft Non Transportation Performance Measures Including Related Qualitative Assessment of Example Sections

Draft Non Transportation Performance Measures Including Related Qualitative Assessment of Example Sections Draft Non Transportation Performance Measures Including Related Qualitative Assessment of Example Sections Phil Erickson Community Design + Architecture Mike Johnson HDR Engineering CTF Charrette Approach

More information