1 Corporate Facilities Energy Management Plan Prepared by: Facilities Management Services Branch Corporate Services Department

2 Table of Contents Acknowledgements... 3 Introduction... 5 Theme: Cleaner Air and Water... 5 Strategies:... 5 Background to the Plan: Putting Conservation First... 6 About the City of Oshawa... 7 Energy Efficiency Initiatives to Date:... 7 The Community Centre Conservation Challenge (2009)... 7 Community Centre and Fire Hall Conservation Challenges (2010)... 7 Mayor s Megawatt Challenge (2003 to present)... 8 Corporate Energy Management Projects (2005 to 2011)... 8 FCM s Partners for Climate Protection Program (2009 to present) Other Initiatives Plan Scope Corporate vs. Community Energy Plan Corporate Facilities Inventory Scope: Ontario Regulation 397/11 Designated Facilities Operation Types for Municipalities: Ontario Regulation 397/11 Designated Facilities (for 2012) Other corporate facilities (2012 inventory) not stipulated by Ontario Regulation 397/11 15 Energy Use and Costs Approach Used To Develop the Plan Target Setting Non-technical Measures Technical Measures Preliminary Target Target for Each Year Performance Measurement Goals Technical Objectives and Proposed Measures Organizational Objectives and Proposed Measures Page

3 Behavioral Objectives and Proposed Measures Total Estimated Savings for 2014 over Order in Which Energy Efficiency Measures Are To Be Implemented Renewable Energy Projects Annual Update of Plan Appendix A... 1 ONTARIO REGULATION 397/ Page

4 Acknowledgements Thanks to staff from Corporate Services, Development Services, and Community Services for providing input. 3 Page

5 To request printed copies or a large print version of this plan, please contact Service Oshawa as follows: Location: Service Oshawa 1 st Floor, West Wing, City Hall 50 Centre Street South Oshawa, Ontario L1H 3Z7 Phone: Toll Free: Fax: TTY: Hours: service@oshawa.ca Monday through Friday - 8:00 a.m. to 6:00 p.m. Saturday - 9:00 a.m. to 1:00 p.m. PDF and accessible HTML versions of this Plan can be found at the City of Oshawa Website 4 Page

6 Introduction This Corporate Facilities Energy Management Plan (C.F.E.M.P.) for the City of Oshawa s corporate facilities is a five-year plan for the period 2014 to It outlines the actions/measures that will lead to the achievement of the City s goals and objectives for conserving energy, reducing energy consumption and greenhouse gas (G.H.G.) emissions where possible, and managing the demand for energy as required by: Provincial legislation: Ontario Regulation 397/11 (see Appendix A) The Oshawa Strategic Plan Oshawa Council adopted a new Oshawa Strategic Plan (O.S.P.) in October The Oshawa Strategic Plan, Creating Our Sustainable Tomorrow ( ) has given energy management strategic significance by adopting the following theme and strategies: Theme: Cleaner Air and Water Strategies: Develop and implement corporate and community plans to reduce greenhouse gas emissions. Promote and improve energy and water conservation. Encourage and implement actions that improve air and water quality Energy performance-based metrics/indicators will be used to measure the City s success in achieving these strategies. This demonstrates the City s commitment to energy conservation and links the O.S.P. to this Conservation and Demand Management Plan. The energy use reduction actions set out in this C.F.E.M.P. will help the City to: Improve its environmental performance Complete Milestones 3 through 5 of the Federation of Canadian Municipalities (F.C.M.) Partners for Climate Protection (P.C.P.) 5-Milestone Program Improve its accountability to taxpayers by controlling and reducing, where possible, the energy expenditure component of operating costs. Energy management has become increasingly important for municipalities as energy prices continue to rise. Ontario s Long Term Energy Plan predicts that electricity costs will rise an average of 20%, or roughly 4% per year, over the next five years. Natural gas prices, although relatively low compared to historical averages, have begun to rise as illustrated by significant increases in spot market prices through the winter of 2013/2014. The City of Oshawa s C.F.E.M.P. will be a living plan that will evolve as the City s corporate facility energy needs are revealed and better understood. 5 Page

7 Background to the Plan: Putting Conservation First Conservation is a key component of Ontario s Long Term Energy Plan as it is the cleanest and most cost-effective energy resource as the least expensive type of energy is the energy we do not use. The provincial government expects to offset most of the growth in electricity demand to 2032 using conservation programs and improved codes and standards. This will lessen the need to build new generation and transmission facilities. As the province plans for Ontario s energy needs for the next 20 years, conservation will be the first resource considered. Conservation is a key part of our collective effort to lower greenhouse gas (G.H.G.) emissions. It also offers consumers a way to reduce their electricity bills. Conservation has been forecast to contribute 30TWh to Ontario s electrical energy supply mix by This represents a 16% reduction in the forecast gross demand for electricity as shown in the diagram below: Ontario s 2032 Electricity Production Forecast (TWh) Nuclear 39% Gas 10% Hydro 22% Wind 9% Bioenergy 2% Solar PV 2% Conservation 16% Planned Flexibility <1% Public agencies play an important role in helping Ontario meet its ambitious conservation and G.H.G. reduction targets. As such, Ontario Regulation 397/11 under the Green Energy Act 2009 requires public agencies - municipalities, municipal service boards, school boards, universities, colleges and hospitals - to report on their energy consumption and greenhouse gas (G.H.G.) emissions annually beginning in 2013 and to develop and implement 5-year energy Conservation and Demand Management (C.D.M.) plans starting in Page

8 About the City of Oshawa The City of Oshawa is located in southern Ontario, 60 kilometers east of Toronto. It was founded in 1850, and is the largest municipality in the Regional Municipality of Durham with a population of approximately 157,000. The City has three universities, one community college, a deep-water port and an airport. It is also home to General Motors Canada, where the allelectric Chevrolet Volt was designed. The City owns, operates and/or leases approximately 100 facilities that cover approximately two million square-feet, including heritage buildings that date back to 1840, up to the recently constructed City Hall Council Chambers completed in Approximately 735 full-time and 500 part-time employees work at the City s various facilities. A new Consolidated Operations Depot is scheduled to be fully operational in Approximately 125,500 square-feet of building space and the surrounding property are being renovated and developed to consolidate a variety of operations including the City s fleet maintenance, public works and parks operations. Energy Efficiency Initiatives to Date: The City of Oshawa has already been making efforts to become more energy efficient. Some of these efforts include: The Community Centre Conservation Challenge (2009) Staff at eight of the City s recreational facilities, were challenged to reduce electricity consumption through no-cost energy efficiency improvements and to eliminate waste for a period of 90 days (June 1 to August 31). The net result was a reduction of 597,896 kilowatt hours of electricity over the same period in 2008, a total reduction of 19%. This translated into an avoided cost of $34,379. The environmental impact was the equivalent of taking 92 cars off the road for one year. Community Centre and Fire Hall Conservation Challenges (2010) The 2010 Community Centre Conservation Challenge challenged Recreation and Culture Services staff to reduce both electricity and natural gas consumption, using the same no-cost methods that were successful in 2009, for the period of June 1 to August 31. The cumulative savings for the 2009 and 2010 Community Centre Conservation Challenge were an overall reduction of 3,961 gigajoules of thermal (natural gas) and electrical energy compared to the same period in This is a 28% decrease in energy use, which translated into cost savings of $48,309 and was equivalent to a 189 tonne reduction in greenhouse gas emissions. In addition, the first Fire Hall Conservation Challenge took place from June 1 to August 31, The result of the challenge for the five fire halls was a reduction of 90 gigajoules of electrical energy compared to the same period in This was a 13.7% decrease in energy 7 Page

9 use, which translated into cost savings of $2,102 and was equivalent to a 5 tonne reduction in greenhouse gas emissions. Mayor s Megawatt Challenge (2003 to present) In 2003, Oshawa was one of ten Ontario municipalities that were the founding members of the Mayor s Megawatt Challenge. This is a benchmarking initiative for municipal facilities, which is a program of The Living City, and is delivered by the Toronto & Region Conservation Authority. In 2012, the City was recognized by the Mayors Megawatt Challenge for having achieved the following savings for 2003 versus 2011 for the two major renovation and retrofit projects carried out at City Hall between 2005 and 2011: 60% Total Energy Savings 46% Electricity Savings 69% Thermal Savings 75% G.H.G. Emission Savings Corporate Energy Management Projects (2005 to 2011) Ameresco Project In December 2004, the City entered into an energy performance contract (E.P.C.) to carry out energy savings retrofits at the following four City buildings: Civic Administration Complex (City Hall) Arts Resource Centre McLaughlin Library Robert McLaughlin Gallery The purpose of this project was to replace HVAC equipment that had reached the end of its useful life, was costly to maintain, and was no longer reliable. The goal was to replace the systems with more energy efficient equipment that would reduce operating budget costs and achieve the Community Strategic Plan goal of a green and sustainable community. Work also included the replacement of lighting at all four buildings, window replacement, refurbishing aluminum siding, renewal of the electrical system, and demolition of A-Wing at City Hall. The project's estimated energy savings over twenty years is estimated to be between $9.5 million and $10 million. The City received several awards resulting from the work undertaken through the Ameresco project. The Federation of Canadian Municipalities (F.C.M.) presented an award for demonstrating leadership, innovation, dedication and creativity in achieving a green and sustainable community, the Ontario Power Authority (O.P.A.) presented an award for long-term commitments to conserve electricity in Ontario, and the Region of Durham nominated the City for an environmental award. 8 Page

10 The total energy cost savings for all four buildings for the September 2005-August 2006 to September 2008-August 2009 four-year period versus the base year of September August 2003, totaled $1,092,430. The corresponding energy savings for both electricity and gas for all four buildings for the same period was 37,741 Gigajoules (GJ). The energy cost savings are used to pay the capital cost of the project that was funded by a debenture. These savings will be realized in the operating budget when this debenture is retired. The cost and energy savings are summarized in the following two charts: 9 Page

11 City Hall Revitalization Project The City embarked on a $15.4-million makeover of Oshawa City Hall commencing in April This project included; demolition of the existing Council Chamber and A-Wing office tower, construction of a new Council Chamber and exterior precinct, and interior renovations to the 9-storey Rundle Tower and 2-storey B Wing offices. It was implemented over 11 phases and took over 2 years to complete. The interior renovations were completed to Leadership in Energy and Environmental Design (L.E.E.D.) standards to improve energy and workplace efficiency. FCM s Partners for Climate Protection Program (2009 to present) On March 9, 2009, Council directed participation in the Partners for Climate Protection (P.C.P.) program which is intended to identify and reduce G.H.G. emissions by means of a Five Milestone program. The Partners for Climate Protection (P.C.P.) program is a network of Canadian municipal governments that have committed to reducing greenhouse gas emissions and acting on climate change. The program is a partnership between the Federation of Canadian Municipalities (F.C.M.) and the International Council for Local Environmental Initiatives (I.C.L.E.I.). Participation in the program is voluntary. 10 Page

12 The City has achieved Milestone 1 and 2 of the P.C.P. Program and is currently drafting Milestone 3 for both community and corporate plans. This Corporate Facilities Energy Management Plan will become part of the larger corporate plan under the P.C.P. program. Other Initiatives 1. An internal assessment was conducted throughout various City facilities prior to 2009 to identify energy efficiency opportunities. Some of the recommended energy conservation measures were implemented in at least 10 facilities during 2011 and A citywide fluorescent lighting retrofit project was undertaken in 27 facilities during 2013 in which T12 lamps were replaced with T8 lamps. 11 Page

13 Plan Scope Corporate vs. Community Energy Plan The energy used in the City s corporate facilities stipulated by Ontario Regulation 397/11 and other corporate facilities not stipulated by this regulation are the focus of this C.F.E.M.P. This C.F.E.M.P. is a component of a broader Community Energy Plan, which extends beyond corporate buildings to include energy use in all sectors in the community - residential, commercial, industrial and transportation - as illustrated below: Community Energy Plan Public Sector Residential Transportation Water Commercial & Industrial O.Reg 397/11 Schools Post-Secondary Hospitals Municipal Corporate Facilities that are heated or cooled Conservation and Demand Management Plan Annual Energy Report 5 Year C.F.E.M.P 12 Page

14 Corporate Facilities Inventory Scope: 1. Ontario Regulation 397/11 Designated Facilities Table 1 in Ontario Regulation 397/11 outlines the types of operations for which public agencies are required to report energy use and G.H.G. emissions and prepare C.D.M. plans. Listed below are the designated operation types for municipalities. Public agencies are encouraged to prepare a C.D.M. plan that encompasses all of its operations and does not need to be limited to building operations types outlined in the Regulation. Operation Types for Municipalities: 1. Administrative offices and related facilities, including municipal council chambers 2. Public libraries 3. Cultural facilities, indoor recreation facilities and community centres including art galleries, performing arts facilities, auditoriums, indoor sports arenas, indoor ice rinks, indoor swimming pools, gyms and indoor courts for playing tennis, basketball or other sports 4. Ambulance stations and associated offices and facilities 5. Fire stations and associated offices and facilities 6. Police stations and associated offices and facilities 7. Storage facilities where equipment or vehicles are maintained, repaired or stored. 8. Buildings/facilities or facilities related to the treatment or pumping of water or sewage 9. Parking garages The designated operations should be conducted in buildings/facilities: That the public agency owns or leases That are heated or cooled; the building/facility related to the treatment of water or sewage does not need to be heated or cooled however For which the public agency is issued the utility invoice and is responsible for paying the utility invoice The following corporate facilities are included in the City s C.D.M. plan: Ontario Regulation 397/11 Designated Facilities (for 2012) Floor Building/Structure Name Address Use Area (ft2) City Hall 50 Centre Street S Administrative Office 123,722 City Hall Parking Garage 50 Centre Street S Parking Garage 34,792 Parks Farewell Main Building 919 Farewell Street Administrative Office 22,500 Bathe Community Centre 298 Eulalie Street Community Centre (small) 3, Page

15 Building/Structure Name Address Use Connaught Community Centre Fernhill Community Centre Glen Stewart Community Centre Harman Park Community Centre Kingside Community Centre Lake Vista Community Centre McKenzie Park Community Centre North Oshawa Community Centre Rundle Community Centre Southmead Community Centre Storie Community Centre Sunnyside Community Centre Thornton/Dundee Community Centre Valleyview Community Centre Woodview Community Centre Cordova Community Centre Columbus Community Centre Arts Resource Centre Northview Community Centre Children's Arena Civic Recreation Complex Donevan Recreation Complex 435 Jarvis Street 144 Fernhill Boulevard 201 Cabot Street 799 Douglas Street 537 Tennyson Avenue 450 Emerald Street 1234 MacKenzie Avenue 1139 Mary Street N 241 Park Road S 137 Kawartha Avenue 111 Mill Street 260 McKim Street 210 Thornton Road 81 Gladstone Avenue 151 Cadillac Avenue 863 Glen Street 3265 Simcoe Street 45 Queen Street 150 Beatrice Street 155 Arena Street 99 Thornton Road 171 Harmony Road Community Centre (small) Community Centre (small) Community Centre (small) Community Centre (small) Community Centre (small) Community Centre (small) Community Centre (small) Community Centre (small) Community Centre (small) Community Centre (small) Community Centre (small) Community Centre (small) Community Centre (small) Community Centre (small) Community Centre (small) Community Centre (small) Community Centre (small) Community Centre (medium to large) Community Centre (medium to large) Indoor Recreation Facility Indoor Recreation Facility Indoor Recreation Facility Floor Area (ft2) 2,000 1,800 7,000 2,500 4,000 3,500 1,540 3,000 3,500 2,500 2,500 3,800 3,500 3,500 15,000 1,200 2,000 11,500 23,866 30, ,000 40, Page

16 Building/Structure Name Address Use Floor Area (ft2) Harman Park Arena 829 Douglas Street Indoor Recreation Facility 64,000 Legends Centre 1661 Harmony Road Indoor Recreation Facility 202,051 South Oshawa Community Indoor Recreation 1455 Cedar Street Centre Facility 45,361 Conant Depot 370 Conant Street Storage Facility 7,500 Howden Depot 235 Howden Road Storage Facility 7,100 Wilson Depot 871 Wilson Road Storage Facility 10,000 Ritson Depot 894 Ritson Road Storage Facility 48,300 Fire Hall #1 199 Adelaide Street Fire Facility 24,000 Fire Hall # Simcoe Street Fire Facility 6,500 Fire Hall #3 50 Beatrice Street Fire Facility 9,000 Fire Hall #4 50 Harmony Road Fire Facility 6,500 Fire Hall # Harmony Road Fire Facility 17,890 MLELS Office 44 Simcoe Street S Administrative Office 6,772 Carriage Works Drive Water Water Treatment 74 Carriage Works Dr. 1,600 Treatment Facility Facility 2. Other corporate facilities (2012 inventory) not stipulated by Ontario Regulation 397/11 Building / Structure Name Address Use Kinsmen Stadium Arena St Outdoor Recreation Facility Alexandra Park Hospital Court Outdoor Recreation Facility Parking Garage 1 1 Centre St N Parking Garage partially enclosed Parking Garage King St W (McMillan St) Parking Garage partially enclosed Parking Garage 3 1 Mary St N Parking Garage partially enclosed Airport facilities 1200 Airport Blvd Airport Owen D Friend Apartments 485 & 501 Normandy St Social Housing Rotary Pool 250 Centre St S Outdoor Pool GO Bus Terminal 47 Bond St W Bus Terminal Parks Greenhouse Farewell St Greenhouse Storm Water Retention Pond Grandview & Taunton Dr. Fountain pump 15 Page

17 Building / Structure Name Address Use Storm Water Retention Pond Glenbourne Dr. Fountain pump Energy Use and Costs The energy supply for the City s corporate buildings consists of electricity, natural gas propane and oil. The energy supply providers are as follows: Natural gas: Enbridge Gas Distribution Electricity: Oshawa Power and Utilities Corporation (O.P.U.C.) Propane: Superior Propane Oil: FREW Petroleum Natural gas is the main energy source for space heating and domestic hot water heating. Propane and oil are used for space heating at a few facilities. Electricity provides power for space cooling and ventilation, plug loads, lighting, and in a few instances, also provides power for domestic water heating and space heating. The City does not currently have any energy supply contracts. Electricity, natural gas, oil and propane are priced at the standard rates offered by the providers. As shown in the diagram below, the cost of utilities (electricity, natural gas, propane, water and fuel for vehicles) comprises 4% of the City s approved 2014 operating budget. This percentage includes the utilities used by the City s corporate facilities, vehicle fleet, streetlights and parks and amounts to $6.2 million. 16 Page

18 The total energy supply (electricity, natural gas, propane and oil) for the City s corporate facilities inventory amounted to 44,141,300 equivalent kilowatt hours (ekwh) in This total consisted of 53.3% (23,532,063 ekwh) for natural gas, 0.3% (121,000 ekwh) for oil, 0.2% (95545 ekwh) for propane and 46.2% (20,392,692 kwh) for electricity. The 2012 combined total cost for all fuels and electricity was $2,798, Electricity represented 81.5% ($2,281,452.37) of this total, natural gas 18.1% ($505,660.15) propane 0.3% ($7,595.42) and oil 0.2% ($4,214.54). The City spent the most on electricity for Energy Supply breakdown by ekwh for corporate facilities inventory for 2012 Gas % Oil - 0.3% Propane - 0.2% Electricity % Energy Supply breakdown by cost ($) for corporate facilities inventory for 2012 Gas % Oil - 0.2% Propane - 0.3% Electricity % 17 Page

19 Approach Used To Develop the Plan The goals, objectives and measures are the key components of this C.F.E.M.P. The measures roll up to the objectives, which ultimately roll up to the goals. The goals and objectives are used to drive the measures of the plan from which a detailed day-to-day work plan will be developed. The goals and objectives are not quantified; they do not contain performance targets. The following table outlines the time scale, level of detail and quantification aspect of the goals, objectives and measures of the plan: Plan Component Time Scale Level of Detail Quantified (in terms of an energy reduction target) Goals Long-term Low broad brush No Objectives (technical Medium-term Medium No & non-technical) Measures (technical & non-technical) Short-term High specific actions Yes technical measures This C.F.E.M.P. consists of technical (i.e. directly related to energy consuming equipment) and non-technical (organizational and behavioural) objectives and measures. Benefits are maximized when a combination of technical, organizational and behavioural objectives and measures are implemented simultaneously. 18 Page

20 Target Setting Non-technical Measures In many cases, it will be difficult to determine exactly if, or how, specific non-technical measures (i.e. organizational and behavioural measures) are responsible for energy savings. Estimating the costs, savings and lifespan of these measures will be more difficult. Targets will therefore be in terms of an appropriate indicator for these non-technical measures. Energy savings are however maximized when a combination of technical, behavioural and organizational changes are implemented simultaneously. Technical Measures Targets will be set based on information derived from: retro-commissioning/re-commissioning: generally 2 10% energy monitoring energy audits/surveys external benchmarking facilities/operations staff and managers who have a good sense of the building systems and the energy saving opportunities will provide the basis for setting targets. Technical measures usually result in direct measureable energy savings and as such can therefore be easily quantified. Preliminary Target 2010 has been identified as the period of best historical energy performance as significant efforts to improve the energy efficiency of City facilities occurred up to this year. These efforts include: The Community Centre Conservation Challenge which yielded an overall savings of 3,961 Gigajoules of thermal (natural gas) and electrical energy compared to the same period in The Fire Hall Conservation Challenge which yielded a reduction of 90 gigajoules of electrical energy compared to the same period in The completion of the Rundle Tower and B-Wing portion of the City Hall Revitalization Project. Performing at the historical average consumption of the 2010 will be used as the initial or preliminary target, which will be reset where necessary based on subsequent analysis. Target for Each Year The sum of the estimated energy savings for the technical measures for the entire corporate facility inventory for the current year will be used as the overall target for each year. 19 Page

21 Performance Measurement Performance measurement will be by means of base lining on a weather-corrected basis. Energy savings or losses for the entire corporate facilities inventory will be determined on a weather-corrected basis by computing the: Variance from the preliminary target: the consumption of the current year will be compared to the 2010 preliminary target to determine if the savings achieved by 2010 have been sustained; Variance from year-to-year: the consumption of the current year will be compared to the previous year; Variance for the Ministry s 5-year reporting period: the consumption for 2018 will be compared to that for Page

22 Goals To demonstrate leadership in energy conservation and the efficient use of energy in the community. To be an example in these areas to the wider community. To be accountable for energy performance and costs by controlling and reducing, where possible, the consumption and energy expenditure component of the cost to provide municipal services while optimizing our delivery of services to enhance the overall quality of life in our community. To create a culture of conservation within the City that encourages actions that will result in the wise use of energy resources. To reduce the environmental impact of the City s corporate facility energy use by reducing the associated G.H.G. emissions and thereby contribute to Ontario achieving its G.H.G. emission reduction targets. 21 Page

23 Technical Objectives and Proposed Measures 1. To optimize energy efficiency and realize cost avoidance where possible, by first focusing on no-cost/low-cost opportunities (typically operational & possibly maintenance actions) before money is invested in new equipment (technological measures) or system retrofits. Proposed Measures Implementation Schedule Responsible Estimated Implementation Cost ($) Estimated Cost Avoidance if applicable ($/year) Estimated Electricity Savings if applicable (kwh/year) Estimated Gas Savings if applicable (m3/year) Estimated Lifespan of Measure if applicable 1.1 Conduct a retro-commissioning exercise to review operations and maintenance procedures to identify no-cost/low-cost operational and maintenance improvements where possible. To Be Determined Energy Coordinator To Be Determined $44,000 - $231,000 (2-10%) 400,000 2,100,000 (kwh/yr) (2-10%) Not Applicable 3-5 years 1.2 Install occupancy sensors in City Hall Parking Garage. Ensure that light levels are sufficient to ensure safety and security. June 2014 December 2014 Facilities Management Services $8,260 $411 3,735 Not applicable 7 years 1.3 Replace existing computers with a model that uses approximately 50% less electricity, but with no reduction in performance. January 2014 December 2015 Manager, Systems & Security Operations, Information Technology Services $472,290 $6,100 55,453 Not applicable Equipment is leased for 3 years 22 Page

24 2. To undertake rigorous energy monitoring to identify energy waste and opportunities for improvement; measure and verify energy savings and to ensure persistence of energy savings. Proposed Measures 2.1 Set realistic and achievable energy savings targets, where possible, track progress towards targets, identify the variance from targeted performance so that corrective actions can be taken. 2.2 Use the monitoring & targeting technique to perform internal comparative analysis from which targets can be subsequently developed. 2.3 Complement with energy savings potential targets identified from internal and external benchmarking. 2.4 Use various performance monitoring/tracking methods/tools to analyze interval and non-interval energy use data at the whole-building and system level in order to detect deviations/changes in use overtime and identify efficiency improvements. 2.5 Install interval electricity meters at Harman Park Arena, Donevan Recreation Complex as these facilities are eligible for this type of meter. 2.6 Develop a measurement and verification plan to quantify actual savings from any energy efficiency measures which have been implemented so that these results can be published in 2019 as required by Ontario Regulation 397/11 and for Federal Gas Tax Fund reporting purposes, where applicable. 2.7 Ensure that the savings achieved through retro-commissioning are sustained by developing a strategy for regularly reviewing and updating set points and operating parameters where necessary. Facility operators to log comfort complaints from staff and the public as this can often indicate whether problems have arisen with the implemented improvements from retro-commissioning. 2.8 Optimize the use of the building automation system (B.A.S.) to facilitate energy performance monitoring (over the long haul and in real-time where necessary) and the identification and diagnosis of deficiencies that impact energy consumption. 3. To optimize energy efficiency without compromising the delivery of services or sacrificing occupant comfort. Proposed Measures 3.1 Ensure that energy is used at the right time, in the required amount/magnitude (volume, pressure, temperature etc.) and for the required duration. 3.2 Discuss recommended operational changes with facility managers prior to implementation. 4. To optimize the energy supply; seek the optimum energy source or sources to meet the overall energy requirement of City facilities after reducing the requirement for energy by eliminating waste (matching the energy used to what is needed, considering the duration and magnitude of use) and maximizing system efficiencies by ensuring that the system components meeting the need are operating as efficiently as possible. Proposed Measures 23 Page

25 4.1 Evaluate the feasibility of the proposed Combined Heat & Power (C.H.P.) plant for the Legend s Centre which is proposed to provide a free source of thermal energy for space and process heating thereby displacing the natural gas purchased for these end-uses (the electricity generated will be fed into the grid). 4.2 Explore the possibility of maximizing the use of the proposed C.H.P. plant for the Legends Centre to provide free cooing as well, by replacing the heat pump system with an adsorption chiller when the heat pumps reach the end of their useful life (i.e. Combined Cooling Heat and Power (C.C.H.P.) given that some of the heat generated during the summer months will not be utilized). 4.3 Convert the oil-fired furnaces at the Bathe Park and Sunnyside community centers to gas. 4.4 Determine if there is a need to secure/negotiate fixed rate energy supply contracts to mitigate against cost increases versus procuring energy directly from utility companies (may become necessary as energy commodity prices are projected to increase). City must do its own energy market research. Potential energy supply contracts must appropriately address the City s cost considerations, energy supply quality and reliability and other performance factors. 4.5 Use renewable energy, where feasible, to help offset the City s energy supply requirements and thereby reduce utility costs. 5. To promote the use of cleaner, sustainable energy sources in order to reduce G.H.G. emissions. Proposed Measures 5.1 Use renewable energy where feasible. Facilities should be made as energy efficient as possible before renewable energy is installed. 24 Page

26 Organizational Objectives and Proposed Measures 6. To promote energy efficiency throughout the City s operations by linking the Energy Management Plan to all relevant departments, branches, units and facilities so that all potential energy efficiency opportunities can be seized. Proposed Measures Implementation Schedule Responsible Estimated Implementation Cost ($) Indicator 6.1 Identify opportunities to incorporate improved energy efficiency into the City s planned asset renewal capital projects. January December 2018 Project Manager - Facilities Management Services; Energy Management Services Coordinator To Be Determined Project specific performance indicators dependent on the nature of the project. 6.2 Review purchasing by-law - ensure purchasing policy/guidelines incorporate costeffective, energy efficiency requirements. November December 2015 Energy Management Services Coordinator Not applicable Percentage of vending machines that are Energy Star qualified. Percentage of computer technology that is Energy Star Qualified 6.3 Ensure that the design of new buildings or major renovation of newly acquired buildings will incorporate as many energy efficiency, renewable energy, and sustainable measures as is economically feasible, in order to minimize the need to engage in continual energy retrofit actions to lower utility costs. Consolidated Operations Depot -January May 2015 Fire Hall 6 To be determined Project Manager - Facilities Management Services; Energy Management Services Coordinator Consolidated Operations Depot - $700, Fire Hall 6 To be determined Consolidated Operations Depot - Percentage better than base building Fire Hall 6 - Percentage better than code 25 Page

27 7. Link the Corporate Facilities Energy Management Plan with other relevant municipal plans, initiatives and management processes. Proposed Measures Implementation Schedule Responsible Estimated Implementation Cost ($) Indicator 7.1 Coordinate this Corporate Facilities Energy Management Plan with the City s budget planning process. Not applicable Manager - Capital & Technical Services; Energy Management Services Coordinator; Not applicable Proposed energy efficiency projects submitted by October 31 each year 7.2 Provide energy performance & water use efficiency data for the City s corporate inventory included in this plan, for Oshawa Strategic Plan reporting. Not applicable Energy Management Services Coordinator Not applicable Data to be provided by September of each year 7.3 Provide G.H.G. emissions data for the energy used by the City s corporate inventory included in this plan. Not applicable Energy Management Services Coordinator Not applicable Data to be provided by January of each year 8. To take advantage of all available resources and funding options for funding energy efficiency/conservation projects. Proposed Measures Implementation Schedule Responsible Estimated Implementation Cost ($) Indicator 8.1 Actively pursue and secure grants and financial assistance/incentives from various levels of government and utility companies for energy related projects Not applicable Project Manager - Facilities Management Services; Energy Management Services Coordinator Not applicable Capital and/or operation budget savings due to the utilization of incentives. 26 Page

28 Proposed Measures Implementation Schedule Responsible Estimated Implementation Cost ($) Indicator 8.2 Where possible, make use of operating budgets for small projects (e.g. purchasing more energy efficient lighting when they are due for replacement) rather than having to go through the capital budgeting process. Not applicable Facilities Operators Not applicable Number of energy efficiency-related projects identified Number of energy efficiency-related projects funded from operating budget 8.3 Develop a savings re-investment mechanism whereby savings (at least 50%) from energy efficiency projects can be re-invested into proposed energy efficiency improvements. Explore the possibility of creating a fund from: documented energy savings, incentive payments received for completed projects and energy commodity purchase price savings. 8.4 Evaluate borrowing capital or project funding opportunities provided by Energy Service Companies (E.S.C.O.) to fund energy efficiency projects To be determined To be determined Not applicable Not applicable Finance Services To be determined Revolving fund established. Cost-benefit analysis of using borrowed capital to finance projects. 27 Page

29 9. To leverage the goals, objectives and benefits of this plan to increase the prioritization of energy related projects. Proposed Measures Implementation schedule Responsible Estimated Implementation Cost ($) Indicator 9.1 Measure and verify the actual energy savings and Return of Investment realized from implemented projects. 9.2 Employ methods that consider costs that are incurred over the life of a piece of equipment rather than just considering the initial capital cost. 9.3 Bundle projects with a longer payback with projects having a shorter payback to achieve a shorter overall payback period. 9.4 Obtain pre-approval of incentives from utility companies so that the incentive to be received can be included in the payback calculations. January December 2018 These alternative economic evaluation methods will be proposed for consideration under the new asset management plan. October - November each year as a part of the capital scoring process. January December 2019 Energy Management Services Coordinator Manager - Capital & Technical Services Manager - Capital & Technical Services Project Manager - Facilities Management Services; Energy Management Services Coordinator Not applicable Not applicable Not applicable Not applicable Present this data to those responsible for approving project funding (Council etc.). Percentage of projects with a long payback period for which life cycle costing and Net Present Value methods are used instead of first cost evaluation (simple payback) to make a better business case. Projects with a shorter payback support projects with payback greater than 5 years. Percentage of energyrelated projects preapproved for incentives 28 Page

30 10. To coordinate actions so that the goals and objectives of the plan will be achieved. Proposed Measures Implementation Schedule Responsible Estimated Implementation Cost ($) Indicator 10.1 Facility Managers/Operators are requested to report energy savings measures funded from their operating budgets so that information can be included in the Energy Plan and also serve to explain any changes observed in facility energy use patterns. The following information regarding the identified energy efficiency measures should be provided to the Energy Management Services Coordinator: Implementation Schedule, Estimated Cost ($), Estimated Cost Savings/year ($/yr), Estimated Electricity Savings/year (kwh/yr), Estimated Natural Gas Savings/year (m3/yr), and Estimated Lifespan of Measure. The Energy Management Services Coordinator will assist with this data gathering if requested. January 2014 December 2018 Facility Managers/Operators Not applicable Number of reports received 10.2 Ensure that critical building and equipment documentation is up-to-date and available for use in energy surveys/audits/retrocommissioning. Ongoing Facility Managers/Operators Not applicable Percentage of document requests granted 10.3 Energy Coordinator to be advised regarding planned installations of energy efficient equipment so that the energy savings can be quantified and reported. Ongoing Facility Managers/Operators including Department Heads Not applicable Information to Energy Coordinator by end of September each year 29 Page

31 Behavioral Objectives and Proposed Measures 11. To implement an Energy Conservation/Efficiency Awareness program. Proposed Measures Implementation Schedule Responsible Estimated Implementation Cost ($) Indicator 11.1 Provide an opportunity for staff to: understand the goals and objectives of this plan and the need for this plan, review and obtain buy-in to the plan. November - December 2014 Energy Management Services Coordinator Not applicable Plan reviewed and comments received from Facility Managers/Operators Assess the need for an on-going program of awareness for staff and other facility users to promote energy conservation/efficiency. November - December 2014 Senior Environmental Coordinator; Energy Management Services Coordinator Not applicable Program content and mode of delivery determined Automate the computer software updating process to include waking up machines when necessary so that staff will be able to shut them off entirely when they have finished using them. December 2014 Manager, Systems & Security Operations To be determined Percentage of computers left on each night/month. 30 Page

32 Total Estimated Savings for 2014 over 2013 Electricity (kwh) Demand (kw) Thermal (ekwh) Total Energy (ekwh) Water (m3) Greenhouse gas emissions - CO2e (tonnes) Energy Cost Savings ($) 59, Not applicable 56, , Page

33 Order in Which Energy Efficiency Measures Are To Be Implemented The recommended order for implementing energy efficiency measures for this C.F.E.M.P. is: 1. Reduce the requirement for energy by: I. Eliminating wasted energy by matching what is actually used to what is needed by considering the duration and magnitude of use. II. Maximizing system efficiencies by ensuring that the system components meeting the need are operating as efficiently as possible. 2. Optimize the energy supply. This order is especially important if the City wishes to introduce renewable energy in the energy supply that directly serves each individual facility or secure energy supply contracts. 32 Page

34 Renewable Energy Projects The City of Oshawa and the Oshawa Power and Utilities Corporation (O.P.U.C.) implemented a solar energy program in which solar photovoltaic (PV) panels were installed by the O.P.U.C. on the roofs of four recreation facilities during under the Ontario Power Authority s Feed-In-Tariff program. As the sole shareholder of the O.P.U.C., this undertaking provided the City with the opportunity to contribute to Ontario s goal to increase the renewable energy capacity in the province s supply mix, thereby reducing Ontario s reliance on fossil fuels. The City will continue to seek feasible opportunities to develop renewable energy projects as part of its goal to optimize its energy supply, and support Ontario s greenhouse gas reduction and renewable energy targets. 33 Page

35 Annual Update of Plan In order to remain an effective planning tool, the Corporate Facilities Energy Management Plan (E.M.P.) will be updated annually to reflect changing needs and priorities and progress towards goals and targets. The C.F.E.M.P. will be a living plan that will evolve as the City s corporate facility energy needs are revealed and better understood. 34 Page

36 Appendix A Français ONTARIO REGULATION 397/11 made under the GREEN ENERGY ACT, 2009 Made: August 17, 2011 Filed: August 23, 2011 Published on e-laws: August 25, 2011 Printed in The Ontario Gazette: September 10, 2011 ENERGY CONSERVATION AND DEMAND MANAGEMENT PLANS

37 Definitions 1. In this Regulation, municipal service board means, (a) a municipal service board or joint municipal service board established or continued under the Municipal Act, 2001, (b) a city board or joint city board established or continued under the City of Toronto Act, 2006, or (c) a joint board established in accordance with a transfer order made under the Municipal Water and Sewage Transfer Act, 1997; ( commission de services municipaux ) post-secondary educational institution means a university in Ontario, a college of applied arts and technology in Ontario or another post-secondary educational institution in Ontario, if the university, college or institution receives an annual operating grant; ( établissement d enseignement postsecondaire ) public hospital means, (a) a hospital within the meaning of the Public Hospitals Act, or (b) the University of Ottawa Heart Institute/Institut de cardiologie de l Université d Ottawa; ( hôpital public ) school board means a board within the meaning of the Education Act. ( conseil scolaire ) Application 2. Sections 4, 5 and 6 apply only to public agencies prescribed by section 3. Public agencies 3. The following are prescribed as public agencies for the purposes of the Act: 1. Every municipality. 2. Every municipal service board. 3. Every post-secondary educational institution. 4. Every public hospital.

38 5. Every school board. Energy conservation and demand management plans 4. (1) A public agency shall prepare, publish, make available to the public and implement energy conservation and demand management plans or joint plans in accordance with sections 6 and 7 of the Act and with this Regulation. (2) An energy conservation and demand management plan is composed of two parts as follows: 1. A summary of the public agency s annual energy consumption and greenhouse gas emissions for its operations. 2. A description of previous, current and proposed measures for conserving and otherwise reducing the amount of energy consumed by the public agency s operations and for managing the public agency s demand for energy, including a forecast of the expected results of current and proposed measures. Summary of annual energy consumption and greenhouse gas emissions 5. (1) Subject to subsection (2), a summary of the public agency s annual energy consumption and greenhouse gas emissions must include a list of the energy consumption and greenhouse gas emissions for the year with respect to each of the public agency s operations that are set out in Table 1 of this Regulation for the type of public agency to which the public agency belongs and that are conducted in buildings or facilities the public agency owns or leases that, (a) are heated or cooled and in respect of which the public agency is issued the invoices and is responsible for making the payments for the building or facility s energy consumption; or (b) are related to the treatment or pumping of water or sewage, whether or not the building or facility is heated or cooled, and in respect of which the public agency is issued the invoices and is responsible for making the payments for the building or facility s energy consumption. (2) If only part of a building or facility where an operation is conducted is heated or cooled, the public agency s summary referred to in subsection (1) must only include energy consumption and greenhouse gas emissions for the part of the building or facility where the operation is conducted that is heated or cooled. (3) The public agency s summary referred to in subsection (1) must be prepared using the form entitled Energy Consumption and Greenhouse Gas Emissions Template

39 that is available from the Ministry and must include the following information and calculations for each of the public agency s operations: 1. The address at which the operation is conducted. 2. The type of operation. 3. The total floor area of the indoor space in which the operation is conducted. 4. A description of the days and hours in the year during which the operation is conducted and, if the operation is conducted on a seasonal basis, the period or periods during the year when it is conducted. 5. The types of energy purchased for the year and consumed in connection with the operation. 6. The total amount of each type of energy purchased for the year and consumed in connection with the operation. 7. The total amount of greenhouse gas emissions for the year with respect to each type of energy purchased and consumed in connection with the operation. 8. The greenhouse gas emissions and energy consumption for the year from conducting the operation, calculating, i. the annual mega watt hours per mega litre of water treated and distributed, if the operation is a water works, ii. the annual mega watt hours per mega litre of sewage treated and distributed, if the operation is a sewage works, or iii. per unit of floor space of the building or facility in which the operation is conducted, in any other case. (4) If a public agency conducts, in the same building or facility, more than one operation set out in Table 1 of this Regulation for the type of public agency to which the public agency belongs, it shall make a reasonable allocation of the amount of energy purchased and consumed for the year among each of those operations. (5) In preparing its annual Energy Consumption and Greenhouse Gas Emission Template, a public agency may exclude its energy consumption and green house gas emissions relating to its temporary use of an emergency or back-up generator in order to continue operations.

40 (6) On or before July 1, 2013, every public agency shall submit to the Minister, publish on its website and intranet site, if it has either or both, and make available to the public in printed form at its head office the public agency s Energy Consumption and Greenhouse Gas Emission Template for operations conducted in (7) On or before July 1 of each year after 2013, every public agency shall submit to the Minister, publish on its website and intranet site, if it has either or both, and make available to the public in printed form at its head office the public agency s Energy Consumption and Greenhouse Gas Emission Template for operations conducted in the year following the year to which the last annual Template related. (8) The following information, if applicable, must also be submitted, published and made available to the public with every Energy Consumption and Greenhouse Gas Emission Template: 1. If the operation is a school operated by a school board, i. the number of classrooms in temporary accommodations at the school during the year, and ii. whether there is an indoor swimming pool in the school. 2. If the public agency is a public hospital, whether a facility operated by the public hospital is a chronic or acute care facility, or both. Energy conservation and demand management measures 6. (1) On or before July 1, 2014, every public agency shall publish on its website and intranet site, if it has either or both, and make available to the public in printed form at its head office, (a) the information referred to in subsection 6 (5) of the Act with respect to each of the public agency s operations set out in Table 1 of this Regulation for the type of public agency to which the public agency belongs; (b) the information referred to in paragraph 2 of subsection 4 (2) of this Regulation with respect to each of the public agency s operations set out in Table 1 of this Regulation for the type of public agency to which the public agency belongs; and (c) the following information: (i) information on the public agency s annual energy consumption during the last year for which complete information is available for a full year,

City of Peterborough s Corporate Energy Management Plan

City of Peterborough s Corporate Energy Management Plan City of Peterborough s Corporate Energy Management Plan 1. troduction Successful energy management depends on the integration of energy efficient practices into the business as usual conduct of the organization,

More information

Corporate Energy Conservation & Demand Management Plan (CECDMP) 2014-2019

Corporate Energy Conservation & Demand Management Plan (CECDMP) 2014-2019 Corporate Energy Conservation & Demand Management Plan (CECDMP) 2014-2019 Table of Contents Our Commitment to Energy Conservation...1 1.0 Introduction...2 2.0 Energy Supply in Ontario...3 2.1 Energy Supply

More information

Township of T Tay Energy Conservation and Demand Management Plan July 1, 2014 to June 30, 2019

Township of T Tay Energy Conservation and Demand Management Plan July 1, 2014 to June 30, 2019 Township of Tay Energy Conservation and Demand Management Plan July 1, 2014 to June 30, 2019 Table of Contents Executive Summary... 4 Introduction... 5 Organization... 5 Personnel Involved... 6 Commitment...

More information

Town of Whitby Corporate Energy Management Plan

Town of Whitby Corporate Energy Management Plan Town of Whitby Corporate Energy Management Plan Corporate Energy Management Plan Town of Whitby This document was prepared for the Corporation of the Town of Whitby by IndEco Strategic Consulting Inc.

More information

DATE: June 16, 2014 REPORT NO. PW2014-050. Chair and Members Committee of the Whole Operations and Administration

DATE: June 16, 2014 REPORT NO. PW2014-050. Chair and Members Committee of the Whole Operations and Administration PUBLIC WORKS COMMISSION PUBLIC WORKS COMMISSION DATE: June 16, 2014 REPORT NO. PW2014-050 TO: FROM: Chair and Members Committee of the Whole Operations and Administration Geoff Rae, MBA, P.Eng. General

More information

COUNTY OF PETERBOROUGH - ENERGY MANAGEMENT PLAN TEMPLATE

COUNTY OF PETERBOROUGH - ENERGY MANAGEMENT PLAN TEMPLATE COUNTY OF PETERBOROUGH - ENERGY MANAGEMENT PLAN TEMPLATE Energy management plans can be extremely large, complicated, and expensive. But they don t need to be. In its simplest form, an energy management

More information

Corporate Energy Conservation and Demand Management Plan 2014. Engineering Department. Public Works Division

Corporate Energy Conservation and Demand Management Plan 2014. Engineering Department. Public Works Division Engineering Department Public Works Division August 14 th, 2014 Table of Contents 1.0 Current State of Corporate Energy Management... 3 1.1 Energy Data Management... 3 1.2 Energy Supply Management... 3

More information

Engineering Department. Public Works Division. August 14th, 2014

Engineering Department. Public Works Division. August 14th, 2014 Corporate Energy Conservation and Demand Management Plan 201,) C000ui Ontaria,Canada "Ontario's Feel Good Town' Engineering Department Public Works Division August 14th, 2014 Corporate Energy Conservation

More information

Energy Conservation and Demand Management Plan. Township of Wellesley: 2014-2019. Developed by Wendy Smith, Administrative Assistant Fire/Recreation

Energy Conservation and Demand Management Plan. Township of Wellesley: 2014-2019. Developed by Wendy Smith, Administrative Assistant Fire/Recreation Energy Conservation and Demand Management Plan Township of Wellesley: 2014-2019 The Township of Wellesley will strive to continually reduce our total energy consumption and associated greenhouse gases

More information

Energy Conservation and Demand Management Plan Municipality of Oliver Paipoonge 2011 to 2018

Energy Conservation and Demand Management Plan Municipality of Oliver Paipoonge 2011 to 2018 Energy Conservation and Demand Management Plan Municipality of Oliver Paipoonge 2011 to 2018 COMMITMENT Declaration of Commitment: The Municipality of Oliver Paipoonge will allocate the necessary resources

More information

University Health Network. Energy Management Plan 2014 to 2019. Energy & Environment. University Health Network

University Health Network. Energy Management Plan 2014 to 2019. Energy & Environment. University Health Network University Health Network Energy Management Plan 2014 to 2019 Energy & Environment University Health Network July 1, 2014 Reviewed September 2015 Background While the links between environmental health

More information

Corporate Energy Management Plan

Corporate Energy Management Plan Corporate Energy Management Plan Corporate Energy Management Plan Town of Aurora This document was prepared for the Town of Aurora by IndEco Strategic Consulting Inc. For additional information about

More information

Rules of Thumb Energy Efficiency in Buildings

Rules of Thumb Energy Efficiency in Buildings Energy Efficiency in Buildings Energy Savings Cost Savings Increased Productivity Economic Development Other Standard lighting retrofits: $0.90-$1.20 per square foot. High-efficiency packaged and split

More information

Electrical infrastructure serving the city of London CITY OF LONDON. 2012 Corporate Energy Consumption Report

Electrical infrastructure serving the city of London CITY OF LONDON. 2012 Corporate Energy Consumption Report Electrical infrastructure serving the city of London CITY OF LONDON 2012 Corporate Energy Consumption Report September 2013 TABLE OF CONTENTS CORPORATE ENERGY MANAGEMENT - UPDATE... 3 1 CORPORATE ENERGY

More information

Business Plan: Energy Conservation

Business Plan: Energy Conservation Business Plan: Energy Conservation How does this service contribute to the results identified in the City of London Strategic Plan? A Green and Growing City A Strong Economy This business area s key focus

More information

school energy consumption assessment

school energy consumption assessment school energy consumption assessment understanding our school s energy use Adapted from EcoSpark s Wattwize: Teacher Guide, Handout #1, available at ecospark.ca. The energy consumption assessment offers

More information

Greenhouse Gas Implications of HVAC Upgrades in Multi-Unit Residential Buildings

Greenhouse Gas Implications of HVAC Upgrades in Multi-Unit Residential Buildings Greenhouse Gas Implications of HVAC Upgrades in Multi-Unit Residential Buildings J A NUARY 2015 INTRODUCTION This Research Report explores best practices and approaches for reducing greenhouse gas (GHG)

More information

Township of Severn Energy Management Plan

Township of Severn Energy Management Plan Township of Severn Management Plan Figure 1: Management Plan Framework Commit Declaration of Commitment Vision Statement Understand Stakeholder Needs Current Situation Past & Present Initiatives Plan Goals

More information

BEST ENERGY MANAGEMENT PRACTICES in 13 North American Municipalities www.cec.org/municipalenergy

BEST ENERGY MANAGEMENT PRACTICES in 13 North American Municipalities www.cec.org/municipalenergy BEST ENERGY MANAGEMENT PRACTICES in 13 North American Municipalities www.cec.org/municipalenergy Case Study Municipal Energy Efficiency Program, Saint John, New Brunswick, Canada Summary The City of Saint

More information

Corporate Energy Management Plan

Corporate Energy Management Plan Corporate Energy Management Plan 2014-2019 Corporate energy management plan of Pickering This document was prepared for the of Pickering by IndEco Strategic Consulting Inc. For additional information

More information

County of Hastings. Energy Management Plan. July 1, 2014- June 30, 2019

County of Hastings. Energy Management Plan. July 1, 2014- June 30, 2019 County of Hastings Energy Management Plan July 1, 2014- June 30, 2019 Energy Management Plan Framework Commitment Declaration of Commitment Vision Statement Energy Management Champion & Team Understanding

More information

TOWN OF CARRBORO NORTH CAROLINA

TOWN OF CARRBORO NORTH CAROLINA TOWN OF CARRBORO NORTH CAROLINA TRANSMITTAL PLANNING DEPARTMENT DELIVERED VIA: HAND MAIL FAX EMAIL To: From: Board of Aldermen David Andrews, Town Manager Department Directors Chris Lazinski, Consultant

More information

Earth Hour 2013. City Hall, City of London CITY OF LONDON. Culture of Conservation The Next Steps

Earth Hour 2013. City Hall, City of London CITY OF LONDON. Culture of Conservation The Next Steps Earth Hour 2013. City Hall, City of London CITY OF LONDON Culture of Conservation The Next Steps September 2013 TABLE OF CONTENTS CORPORATE ENERGY MANAGEMENT - UPDATE... 3 CULTURE OF CONSERVATION PROGRAM

More information

ENERGY STAR Data Verification Checklist

ENERGY STAR Data Verification Checklist ENERGY STAR Data Verification Checklist 86 ENERGY STAR Score 1 Sample Property Primary Function: Office Gross Floor Area (ft²): 200,000 Built: 1980 For Year Ending: 04/30/2013 Date Generated: 06/28/2013

More information

TOWN OF CALEDON. Corporate Energy Management Plan

TOWN OF CALEDON. Corporate Energy Management Plan TOWN OF CALEDON Corporate Energy T A B L E O F C O N T E N T S Click below to learn more about the Town of Caledon Corporate Energy. Current State of Corporate Energy Current Energy Concerns Background

More information

Corporate Carbon Neutral Plan

Corporate Carbon Neutral Plan This Carbon Neutral Plan will guide the District of 100 Mile House decision making process in terms of reducing corporate energy consumption and greenhouse gas emissions and in achieving carbon neutrality.

More information

JACKSON HOLE ENERGY EFFICIENCY ACTION PLAN FALL 2007. Page 1 of 9

JACKSON HOLE ENERGY EFFICIENCY ACTION PLAN FALL 2007. Page 1 of 9 JACKSON HOLE ENERGY EFFICIENCY ACTION PLAN FALL 2007 Page 1 of 9 TABLE OF CONTENTS I. SUMMARY 1. Introduction 2. Purpose 3. Energy Use Snapshot 4. Strategies 5. Short-Term Recommendations 6. Long-Term

More information

EnerSmart Programs. enercase. Performance Contracting. contracting. Tired of. chasing capital for infrastructure upgrades?

EnerSmart Programs. enercase. Performance Contracting. contracting. Tired of. chasing capital for infrastructure upgrades? EnerSmart Programs enercase Tired of contracting chasing capital for infrastructure upgrades? enercase Summary Summary Hamilton Health Sciences is implementing one of the largest energy saving retrofit

More information

Overview. PG&E and Energy Efficiency. CA Energy Efficiency Regulatory & Policy Roadmap. Financing Options for Efficiency & Demand Response

Overview. PG&E and Energy Efficiency. CA Energy Efficiency Regulatory & Policy Roadmap. Financing Options for Efficiency & Demand Response Overcoming Financial Barriers to Energy Efficiency April 6, 2010 Overview PG&E and Energy Efficiency CA Energy Efficiency Regulatory & Policy Roadmap Financing Options for Efficiency & Demand Response

More information

The Business Case for Cutting Greenhouse Gas Emissions from Municipal Operations

The Business Case for Cutting Greenhouse Gas Emissions from Municipal Operations The Business Case for Cutting Greenhouse Gas Emissions from Municipal Operations Prepared for: Federation of Canadian Municipalities 24 Clarence Street Ottawa, Ontario K1N 5P3 Prepared by: ICLEI Energy

More information

STAFF REPORT Facilities & Fleet

STAFF REPORT Facilities & Fleet 1 Corporate Services STAFF REPORT Facilities & Fleet Title: Energy Efficient & Greenhouse Gas Emission Reducing Retrofits in City of Waterloo Facilities Report Number: CORP2013-034 Author: Jean Starchuk,

More information

Town of Halton Hills Corporate Energy Plan

Town of Halton Hills Corporate Energy Plan Town of Halton Hills Corporate Energy Plan MAY 2014 Corporate Energy Plan Town of Halton Hills 2014 The Corporation of the Town of Halton Hills. All Rights Reserved. The preparation of this plan was carried

More information

2015 CARIP Climate Action/Carbon Neutral Progress Survey

2015 CARIP Climate Action/Carbon Neutral Progress Survey 2015 CARIP Climate Action/Carbon Neutral Progress Survey Filled Monday, March 14, 2016 BROAD PLANNING ACTIONS Broad planning refers to high level planning that sets the stage for GHG emissions reductions,

More information

PE9.4 Corrected Report

PE9.4 Corrected Report PE9.4 Corrected Report STAFF REPORT ACTION REQUIRED Toronto s 2013 Greenhouse Gas Inventory Date: December 17, 2015 To: From: Wards: Reference Number: Parks and Environment Committee Chief Corporate Officer

More information

Clean State Energy Actions 2011 Update. connecticut

Clean State Energy Actions 2011 Update. connecticut Energy Efficiency Appliance/Equipment Efficiency Standards Building Energy Codes Utility Demand-Side-Management Utility Rate Realignment Energy Savings Targets/Energy Efficiency Resource Standards Public

More information

POLICY ACTIONS INVESTING IN INNOVATION

POLICY ACTIONS INVESTING IN INNOVATION The BC Energy Plan ALTERNATIVE ENERGY Government will work with other agencies to maximize opportunities to develop, deploy and export British Columbia clean and alternative energy technologies. POLICY

More information

SUSTAINABLE ENERGY ACTION PLAN AND SOLAR PILOT PROJECTS

SUSTAINABLE ENERGY ACTION PLAN AND SOLAR PILOT PROJECTS T&E AGENDA: 03 05 07 ITEM: 6 TO: TRANSPORTATION & ENVIRONMENT COMMITTEE FROM: John Stufflebean Peter Jensen SUBJECT: SEE BELOW DATE: 02 20 07 Approved Date SUBJECT: SUSTAINABLE ENERGY ACTION PLAN AND SOLAR

More information

CANADIAN RENEWABLE ENERGY POLICIES. Matthew H. Brown InterEnergy Solutions 2007

CANADIAN RENEWABLE ENERGY POLICIES. Matthew H. Brown InterEnergy Solutions 2007 CANADIAN RENEWABLE ENERGY POLICIES Matthew H. Brown InterEnergy Solutions 2007 The following offers an overview of Canadian federal and provincial policies that promote renewable energy. It is excerpted

More information

Multiple sources of energy will be available, giving the consumer choices. A Higher Percentage of Energy will come from renewable energy sources

Multiple sources of energy will be available, giving the consumer choices. A Higher Percentage of Energy will come from renewable energy sources Editor s comments: Numbers in parentheses indicate the number of duplicate or extremely similar comments made. The headings are editor s best attempt to draft vision statements reflecting the participants

More information

Commercial Building Energy Initiative Tenant Business Case

Commercial Building Energy Initiative Tenant Business Case Commercial Building Energy Initiative Tenant Business Case April 2010 An initiative of the Greater Toronto CivicAction Alliance The business case for GTA tenants Why to invest in energy efficiency programs

More information

Energy Conservation and Demand Management Plan. From: 2014-07-01 to: 2018-12-31

Energy Conservation and Demand Management Plan. From: 2014-07-01 to: 2018-12-31 Commitment Management Plan Township of Douro-Dummer From: 2014-07-01 to: 2018-12-31 1. Declaration of Commitment: The Township of Douro-Dummer will use existing resources and will leverage outside agencies

More information

This guidebook provides an overview of the eligibility requirements, available funding, and process for municipalities to participate in TAME+.

This guidebook provides an overview of the eligibility requirements, available funding, and process for municipalities to participate in TAME+. TAME+ Guidebook This guidebook provides an overview of the eligibility requirements, available funding, and process for municipalities to participate in TAME+. November 2015 Contents 1.0 Program Overview...

More information

Energy Systems Engineering Technician & Technologist Diploma Program (ESET) ESET Program Description

Energy Systems Engineering Technician & Technologist Diploma Program (ESET) ESET Program Description Energy Systems Engineering Technician & Technologist Diploma Program (ESET) 2012 Program Information Guide and Frequently Asked Questions May 2012 ESET Program Description The Energy Systems Engineering

More information

Building Energy Management: Using Data as a Tool

Building Energy Management: Using Data as a Tool Building Energy Management: Using Data as a Tool Issue Brief Melissa Donnelly Program Analyst, Institute for Building Efficiency, Johnson Controls October 2012 1 http://www.energystar. gov/index.cfm?c=comm_

More information

Examples of Corporate Sustainability

Examples of Corporate Sustainability Examples of Corporate Sustainability Sustainability is a journey that the City of Oshawa has already embarked on. In fact, the City already has many policies, programs and practices that support a sustainable

More information

CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON MARCH 29, 2016 JAY STANFORD, M.A., M.P.A. DIRECTOR, ENVIRONMENT FLEET & SOLID WASTE

CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON MARCH 29, 2016 JAY STANFORD, M.A., M.P.A. DIRECTOR, ENVIRONMENT FLEET & SOLID WASTE 1 TO: FROM: SUBJECT: CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON MARCH 29, 2016 JAY STANFORD, M.A., M.P.A. DIRECTOR, ENVIRONMENT FLEET & SOLID WASTE LANDFILL GAS UTILIZATION STATUS OF OPPORTUNITIES

More information

How to Earn the LEED Green Power Credit

How to Earn the LEED Green Power Credit 3D EG REES WH ITE PAPER How to Earn the LEED Green Power Credit Using on-site and off-site renewable energy to mitigate the impact of greenhouse gas emissions associated with a LEED project s energy use

More information

Clean State Energy Actions 2011 Update. north carolina. Energy efficiency included in North Carolina s REPS

Clean State Energy Actions 2011 Update. north carolina. Energy efficiency included in North Carolina s REPS Energy Efficiency Building Energy Codes Utility Demand-Side-Management Utility Rate Realignment Energy Savings Targets/Energy Efficiency Resource Standards 2009 North Carolina Energy Conservation Code

More information

STRATEGIC ENERGY MANAGEMENT PLAN ENGLEHART AND DISTRICT HOSPITAL 2014-2019

STRATEGIC ENERGY MANAGEMENT PLAN ENGLEHART AND DISTRICT HOSPITAL 2014-2019 STRATEGIC ENERGY MANAGEMENT PLAN ENGLEHART AND DISTRICT HOSPITAL 2014-2019 TABLE OF CONTENTS Introduction Energy Management Vision Guiding Principles for Energy Management Business Case for Strategic Energy

More information

Energy Management Strategy

Energy Management Strategy Energy Management Strategy Gloucester s Energy Management Strategy sets out the way for the organisation to measure and manage all the energy and water resources it uses. The main areas it looks at are

More information

Achieving Balance. Ontario s Long-Term Energy Plan

Achieving Balance. Ontario s Long-Term Energy Plan Achieving Balance Ontario s Long-Term Energy Plan Table of Contents Minister s Message... 2 Executive Summary... 4 1 Where We Are Now... 8 2 Putting Conservation First... 20 3 A Reliable and Clean Supply...28

More information

October 2010 CITY OF SURREY. Corporate Emissions Action Plan

October 2010 CITY OF SURREY. Corporate Emissions Action Plan October 2010 CITY OF SURREY Corporate Emissions Action Plan SUMMARY Overview The City of Surrey has undertaken this project to define opportunities to reduce energy consumption and greenhouse gas (GHG)

More information

TOWER RENEWAL CASE STUDY

TOWER RENEWAL CASE STUDY TOWER RENEWAL CASE STUDY Energy Monitoring and Management: A Case Study of Brentwood Towers, Toronto Executive Summary Through good management, and new technologies, O Shanter Development has achieved

More information

Corporate Energy Management Plan Date: June 18, 2014

Corporate Energy Management Plan Date: June 18, 2014 Corporate Management Plan Date: June 18, 2014 Local Authority (LAS) Contents 1. Executive Summary... 3 2. Commitments... 4 2.1 Declaration of Commitment... 4 2.2 Vision... 4 2.3 Policy... 4 2.4 Goals...

More information

Town of Petawawa Corporate Energy Management Plan

Town of Petawawa Corporate Energy Management Plan Town of Petawawa Corporate Energy Management Plan 2014/05/20 Page i TABLE OF CONTENTS SECTION PAGE 1. PURPOSE... 3-1 1. ENERGY MANAGEMENT PLAN OUTLINE FOUR VITAL PILLARS... 3-2 1.1 Top Management Support...

More information

Corporate Energy Management Plan

Corporate Energy Management Plan - 1-2014 Amanda Martin, CEM, CDSM Graham Seaman, P.Eng, CEM, LEED AP Corporate Energy Team Markham Energy Conservation Office City of Markham 7/1/2014 - 2 - Table of Contents 1 Introduction...- 6-1.1 Executive

More information

Energy Update Report Summary 2014

Energy Update Report Summary 2014 Energy Update Report Summary 2014 City Energy Use Overview 2014 Cost of energy in 2014 for the City of Richmond buildings, lighting, water and wastewater services = $6.1 million dollars or 80.4 GWh (this

More information

Our Path to Carbon Neutrality. City of Prince George Carbon Neutral Plan

Our Path to Carbon Neutrality. City of Prince George Carbon Neutral Plan Our Path to Carbon Neutrality City of Prince George Carbon Neutral Plan December 2010 Executive Summary The Carbon Neutral Plan (the Plan) supports Council s two voluntary commitments regarding Greenhouse

More information

Carbon Management Plan

Carbon Management Plan E-2015-02-02 Addendum Carbon Management Plan Date: 14 May 2014 Owners: Approval: K.W.Bullimore & M.Sackett A.Burrell Executive Summary This document sets out the Carbon Management Plan (CMP) for The Open

More information

BOMA BESt Assessment Overview

BOMA BESt Assessment Overview BOMA BESt Assessment Overview BOMA Building Environmental Standards OFFICE Module August 2013 The Voice of the Commercial Real Estate Industry in Canada The Building Owners and Managers Association of

More information

City of Niagara Falls. 5 Year Corporate Energy Management Plan Final Report

City of Niagara Falls. 5 Year Corporate Energy Management Plan Final Report City of Niagara Falls 5 Year Corporate Energy Management Plan Final Report May 16, 2014 Table of Contents Preface Executive summary Background Process Energy Management Goals for Future Energy Management

More information

Green Building Incentives in New York, New Jersey and Connecticut

Green Building Incentives in New York, New Jersey and Connecticut Green Building Incentives in New York, New Jersey and Connecticut By Yuanshu Deng and Jared Eigerman Goulston & Storrs October 2009 The reduction of greenhouse gas emissions to mitigate climate change

More information

Sustainable Building Policy

Sustainable Building Policy Sustainable Building Policy Oliver Bowen Maintenance Facility 2011 Annual Report Building a great city The City achieved three LEED certifications in 2011. Executive Summary This report, the fifth annual

More information

Energy Audits. Good energy management begins with an energy audit

Energy Audits. Good energy management begins with an energy audit Energy Audits Good energy management begins with an energy audit Effective management of energy-consuming systems can lead to significant cost and energy savings as well as increased comfort, lower maintenance

More information

FINANCIAL EVALUATION OF ENERGY SAVING PROJECTS: BUILDING THE BUSINESS CASE

FINANCIAL EVALUATION OF ENERGY SAVING PROJECTS: BUILDING THE BUSINESS CASE FINANCIAL EVALUATION OF ENERGY SAVING PROJECTS: BUILDING THE BUSINESS CASE CFAA 2010 Canadian Rental Housing Conference June 14, 2010 Presented by Robert Greenwald, PEng., MBA President, Prism Engineering

More information

Farm Energy Resource Kit for Nova Scotia Farmers

Farm Energy Resource Kit for Nova Scotia Farmers 9 Farm Energy Resource Kit for Nova Scotia Farmers Improving energy sustainability through energy efficiency, energy conservation and the adoption of renewable energy options can reduce farm operating

More information

Energy Efficiency Opportunities Report 2010. Continuing our sustainability journey

Energy Efficiency Opportunities Report 2010. Continuing our sustainability journey Energy Efficiency Opportunities Report 2010 Continuing our sustainability journey Contents Our sustainability journey 2 Commonwealth Bank Place 2 Extending solar photovoltaic expertise to our customers

More information

A Green Sector Overview

A Green Sector Overview A Green Sector Overview Micro Hydro Electric Power Ontario's Waterpower Resources: Past and Present The first hydroelectric generator in Canada was installed near Ottawa, which was the first city in North

More information

Oakland County Executive Department of Facilities Management. Energy Management Procedures October 5, 2009

Oakland County Executive Department of Facilities Management. Energy Management Procedures October 5, 2009 Oakland County Executive Department of Facilities Management Energy Management Procedures October 5, 2009 1. Goal The acquisition and management of energy is fundamental to the mission and operation of

More information

CONSERVATION AND DEMAND MANAGEMENT REQUIREMENT GUIDELINES FOR ELECTRICITY DISTRIBUTORS

CONSERVATION AND DEMAND MANAGEMENT REQUIREMENT GUIDELINES FOR ELECTRICITY DISTRIBUTORS Ontario Energy Board Commission de l énergie de l Ontario CONSERVATION AND DEMAND MANAGEMENT REQUIREMENT GUIDELINES FOR ELECTRICITY DISTRIBUTORS December 19, 2014 TABLE OF CONTENTS 1. BACKGROUND AND OVERVIEW...

More information

Appendix J Demand Response Pilot

Appendix J Demand Response Pilot Appendix J Demand Response Pilot City Light s power resources are unusual for an electric utility serving a major urban area. About 90% of the energy served to Seattle originates from water, or hydropower.

More information

ENERGY EFFICIENCY EXPERTS. MCW's. Environmental Record. Green Design REDUCING OUR CLIENTS' ENVIRONMENTAL FOOTPRINT

ENERGY EFFICIENCY EXPERTS. MCW's. Environmental Record. Green Design REDUCING OUR CLIENTS' ENVIRONMENTAL FOOTPRINT ENERGY EFFICIENCY EXPERTS MCW's Environmental Record Green Design ENERGY EFFICIENCY EXPERTS Green Design The MCW Group of Companies have created the largest block of verified carbon emissions savings of

More information

Using Performance Contracting and Incentives to Accelerate Energy Efficiency Projects

Using Performance Contracting and Incentives to Accelerate Energy Efficiency Projects White Paper Using Performance Contracting and Incentives to Accelerate Energy Efficiency Projects Andre E. Davis Director of Structured Finance, Global Energy Solutions, Americas Johnson Controls, Inc.

More information

Solar systems provide a range of flexible heating

Solar systems provide a range of flexible heating f a c t s h e e t 7 Solar Power Production photo by Alex Nikada Why solar? Solar systems provide a range of flexible heating and electricity options and are particularly wellsuited to remote or off-grid

More information

ENVIRONMENTAL, ENERGY AND TRANSPORTATION MANAGEMENT

ENVIRONMENTAL, ENERGY AND TRANSPORTATION MANAGEMENT Court Services and Offender Supervision Agency for the District of Columbia POLICY STATEMENT ENVIRONMENTAL, ENERGY AND TRANSPORTATION MANAGEMENT I. COVERAGE This Policy Statement and its appended procedures

More information

Best Practice Guide BPGCS007

Best Practice Guide BPGCS007 Best Practice Guide BPGCS007 ENERGY MANAGEMENT Introduction: With rising fuel costs, opening of electricity and gas markets to alternate suppliers and climate change, the requirement to monitor and reduce

More information

CTBUH Copyright. What every tenant wants. Chairman, Jones Lang LaSalle. Dan Probst

CTBUH Copyright. What every tenant wants. Chairman, Jones Lang LaSalle. Dan Probst What every tenant wants Dan Probst Chairman, Jones Lang LaSalle Chicago, USA Industry drivers Converging forces Mass acceptance of global warming, climate change Rising energy prices Widely accepted green

More information

Corporate Energy Conservation & Demand Management Plan (2014-2019) - Green Energy Act - Regulation 397/11

Corporate Energy Conservation & Demand Management Plan (2014-2019) - Green Energy Act - Regulation 397/11 STAFF REPORT ACTION REQUIRED Corporate Energy Conservation & Demand Management Plan (2014-2019) - Green Energy Act - Regulation 397/11 Date: June 9, 2014 To: From: Wards: Reference Number: Parks and Environment

More information

TECHNICAL GUIDE A GUIDE FOR THE SELECTION OF ENERGY EFFICIENT TECHNOLOGIES

TECHNICAL GUIDE A GUIDE FOR THE SELECTION OF ENERGY EFFICIENT TECHNOLOGIES TECHNICAL GUIDE A GUIDE FOR THE SELECTION OF ENERGY EFFICIENT TECHNOLOGIES Table of Contents 1. Introduction 1 2. Estimating Energy Savings and Costs 1 Direct Energy Savings 1 Indirect Energy Savings 2

More information

San Antonio College. Energy Systems Laboratory TEXAS ENGINEERING EXPERIMENT STATION TEXAS A&M UNIVERSITY SYSTEM

San Antonio College. Energy Systems Laboratory TEXAS ENGINEERING EXPERIMENT STATION TEXAS A&M UNIVERSITY SYSTEM CLIMATE ACTION PLAN 2011 For: San Antonio College 1300 San Pedro Ave., San Antonio, TX 78212. (210) 486-0000 Prepared by: Energy Systems Laboratory TEXAS ENGINEERING EXPERIMENT STATION TEXAS A&M UNIVERSITY

More information

Corporate Energy Conservation & Demand Management Plan (CECDMP) 2014-2019

Corporate Energy Conservation & Demand Management Plan (CECDMP) 2014-2019 Corporate Energy Conservation & Demand Management Plan (CECDMP) 2014-2019 Developed by the Energy Management Committee with Assistance from: Table of Contents 1.0 Introduction...1 1.1 Overview... 1 1.2

More information

ENERGY SAVINGS ACTION PLAN 2014 2018

ENERGY SAVINGS ACTION PLAN 2014 2018 Environment Unit ENERGY SAVINGS ACTION PLAN 2014 2018 LISA MILLER ENVIRONMENT MANAGER JOHN HAZELTON ENERGY & WATER SUSTAINABILITY PROJECTS ENGINEER FACILITIES MANAGEMENT DIVISION MAY 2014 APPROVED BY:

More information

Introduction to Energy Codes & Green Building Programs

Introduction to Energy Codes & Green Building Programs Introduction to Energy Codes & Green Building Programs David Neiger B.S. Arch, LEED AP Homes, Certified HERS Rater Principal Populus Sustainable Design Consulting Why green homes? The Building Sector:

More information

Examples of State Tax Credits and Incentive Programs for Renewable Energy Projects and Energy Efficiency Improvements

Examples of State Tax Credits and Incentive Programs for Renewable Energy Projects and Energy Efficiency Improvements TN TVA - Generation Partners Program i Performance-based incentive Tennessee Valley Authority (TVA) and participating power distributors of TVA power offer a production-based incentive program to Valley

More information

Program: Facilities and Construction Management. Program Based Budget 2016-2018. Facilities and Construction Management. Page 81

Program: Facilities and Construction Management. Program Based Budget 2016-2018. Facilities and Construction Management. Page 81 Program: Program Based Budget 2016-2018 Page 81 Program: Vision: To develop and maintain town buildings which are safe, comfortable and welcoming to all. Mission Statement: To provide technical expertise

More information

MECHANICAL PROJECT PROPOSAL

MECHANICAL PROJECT PROPOSAL PSUAE MECHANICAL PROJECT PROPOSAL REDESIGN PROJECT Nicholas B Scheib 2010 M e c h a n i c a l O p t i o n - IP Table of Contents Executive Summary... 2 Project Summary... 3 Existing Mechanical System Summary...

More information

Vectren Commercial/Industrial New Construction Incentive Application

Vectren Commercial/Industrial New Construction Incentive Application Vectren Commercial/Industrial New Construction Application Completing and submitting this application is the first step to apply for incentives through Vectren s Commercial/Industrial New Construction

More information

STRATEGIC ENERGY MANAGEMENT PLAN FOR NORFOLK GENERAL HOSPITAL 2014

STRATEGIC ENERGY MANAGEMENT PLAN FOR NORFOLK GENERAL HOSPITAL 2014 STRATEGIC ENERGY MANAGEMENT PLAN FOR NORFOLK GENERAL HOSPITAL 2014 1 TABLE OF CONTENTS Introduction Energy Management Vision Guiding Principles for Energy Management Business Case for Strategic Energy

More information

Customer Energy Solutions

Customer Energy Solutions Customer Energy Solutions Program Progress Report 2013-2014 1 Customer Energy Solutions The Customer Energy Solutions team is committed to providing the best service to our customers and our community.

More information

REPORT TO THE CHIEF ADMINISTRATIVE OFFICER FROM THE PARKS, RECREATION, AND CULTURAL SERVICES DEPARTMENT

REPORT TO THE CHIEF ADMINISTRATIVE OFFICER FROM THE PARKS, RECREATION, AND CULTURAL SERVICES DEPARTMENT January 27, 2016 REPORT TO THE CHIEF ADMINISTRATIVE OFFICER FROM THE PARKS, RECREATION, AND CULTURAL SERVICES DEPARTMENT ON WESTSYDE POOL AND COMMUNITY CENTRE ROOF REPAIR OPTIONS UPDATE PURPOSE To provide

More information

Regional District of Okanagan Similkameen CORPORATE CLIMATE ACTION PLAN. Prepared by Stantec Consulting Ltd. January 2011 FINAL

Regional District of Okanagan Similkameen CORPORATE CLIMATE ACTION PLAN. Prepared by Stantec Consulting Ltd. January 2011 FINAL Regional District of Okanagan Similkameen CORPORATE CLIMATE ACTION PLAN Prepared by Stantec Consulting Ltd. January 2011 FINAL The South Okanagan Similkameen Climate Action Planning Project is a collaborative

More information

Greenhouse gas abatement potential in Israel

Greenhouse gas abatement potential in Israel Greenhouse gas abatement potential in Israel Israel s GHG abatement cost curve Translated executive summary, November 2009 1 Executive Summary Background At the December 2009 UNFCCC Conference in Copenhagen,

More information

DATE: April 14, 2014 REPORT NO. PW2014-024. Chair and Members Committee of the Whole Operations and Administration

DATE: April 14, 2014 REPORT NO. PW2014-024. Chair and Members Committee of the Whole Operations and Administration PUBLIC WORKS COMMISSION DATE: April 14, 2014 REPORT NO. PW2014-024 TO: FROM: Chair and Members Committee of the Whole Operations and Administration Geoff Rae, MBA, P.Eng. General Manager, Public Works

More information

Ontario Hydro. September 28, 1995

Ontario Hydro. September 28, 1995 Ontario Hydro Ontario Hydro 700 University Avenue Toronto, Ontario M5G 1X6 O. Allan Kupcis, President & CEO September 28, 1995 Honourable Anne McLellan Minister of Natural Resources Canada Sir William

More information

Instructions for Form 5695

Instructions for Form 5695 2014 Instructions for Form 5695 Residential Energy Credits Department of the Treasury Internal Revenue Service Section references are to the Internal Revenue Code unless otherwise noted. General Instructions

More information

Peace River Regional District Corporate Energy Plan

Peace River Regional District Corporate Energy Plan Peace River Regional District Corporate Energy Plan Final Prepared for Peace River Regional District Project Contact: Bruce Simard General Manager of Development Services Prepared by The Sheltair Group

More information

E N G I N E E R I N G

E N G I N E E R I N G Purpose If the customer s proposed project proceeds to Gate 1 of the Integrated Customer Solutions (ICS) process (see the ICS Process and Proposal Submission Guide), the customer must prepare a Load Displacement

More information

2015-18 Department Business Plan. Utilities

2015-18 Department Business Plan. Utilities 2015-18 Department Business Plan Utilities I am pleased to introduce Utilities 2015-18 Department Business Plan. The goals capture four main areas where Utilities will contribute to making Strathcona County

More information

Energy Action Plan 2015

Energy Action Plan 2015 Energy Action Plan 2015 Purpose: In support of the Texas A&M University Vision 2020: Creating a Culture of Excellence and Action 2015: Education First Strategic Plan, the Energy Action Plan (EAP) 2015

More information

Becoming America s greenest big city

Becoming America s greenest big city 40,000 That s how many LED Siemens technicians installed in Houston s traffic lights to replace the old incandescent light bulbs in just over one year. This modern technology lowers electricity consumption,