1 Urban Pipeline Replacement Project A Natural Gas Pipeline Initiative Calgary, Alberta Safety First. Always.
2 The Consequences of NOT Proceeding with the UPR Project If the Urban Pipeline Replacement (UPR) Project is not approved, ATCO Pipelines will pursue a course of action to improve the standards of the existing high-pressure pipelines in their current locations. This will be carried out over two phases. The first phase requires substantial work just to prepare the lines for the testing and ongoing inspection activities that will determine their reliability. The second phase will then replace those sections of the 50 to 60-year-old pipelines that fail the testing or are deemed unreliable. Both of these phases will require major construction activities that will disturb your neighbourhoods, roadways and green spaces, as well as cause disruptions to your natural gas service as the pipelines are being tested and replaced. We estimate the cost to complete the work that prepares the pipelines for testing and ongoing inspection capabilities to be approximately $200 million. There will be additional costs incurred to replace unsuitable sections of the pipeline. The scope of the required replacements can only be determined once the testing is completed. Under the UPR Project, the existing pipelines would be either decommissioned or converted to distribution lines carrying natural gas at a much lower, and safer, pressure. While these upgrades will improve the integrity of the existing pipelines, they do not address our other primary concerns. It leaves the pipelines near where we live, work and play. Without the ability to meet the growing demand for natural gas, new pipelines may still have to be constructed in the Transportation/Utility Corridor (TUC) in the future. This is why we believe the UPR Project is the only viable solution. Building new, modern pipelines in the TUC will dramatically improve public safety by reducing the risk of an incident and protecting the pipelines from other construction activities, while also ensuring we can meet the demand for natural gas as the cities continue to grow. Safety First. Always.
3 The Project ATCO Pipelines has developed a proactive solution, the Urban Pipeline Replacement (UPR) Project, that will be considered for approval by the Alberta Utilities Commission (AUC). The UPR Project is composed of 10 distinct projects that, if approved, will see a new, modern high-pressure network of natural gas pipelines constructed inside the Transportation/Utility Corridor (TUC) of each city over a period of five years. Unlike many other jurisdictions in North America, Calgary and Edmonton benefit from the Province of Alberta s foresight in establishing the TUCs in the 1970s to accommodate utility infrastructure as well as a ring road. These corridors were specifically designed to provide a controlled space to safely locate infrastructure for the growing cities. By shifting the high-pressure transmission of natural gas to a new, modern pipeline network located within the designated TUCs, the UPR Project will reduce the risk of a serious incident by up to 95%. The new pipelines will have significant technological improvements over the existing high-pressure network including: modern pipeline coatings that better protect the pipe from corrosion; enhanced welding practices that reduce the occurrence of leaks; inspection of 100% of the welds during construction; inline inspection capabilities that will detect defects in pipelines and identify repairs required prior to an incident occurring, and remote monitoring technologies that provide early warning of threats to the integrity of the pipeline. By shifting the high-pressure transmission of natural gas to the TUC, the UPR Project will greatly improve public safety and provide the additional capacity to meet the growing demand for natural gas. ATCO Pipelines believes that the UPR Project is the only viable solution to address the long-term safety and growth of the Calgary system. Cost of the UPR Project The project will be managed and funded by ATCO Pipelines, an investor-owned utility, that ultimately recovers its costs through customer natural gas bills. The impact on customers bills will be incrementally phased in as the project is completed. By the end of the project, the average residential bill will increase by less than $2 per month. The total cost of the UPR project is approximately $ million, which includes the cost to integrate the new high-pressure network with the ATCO Gas low-pressure distribution system. Make your voice heard! An important component of our submission to the Alberta Utilities Commission will be the feedback we receive from you. Online, on the phone, or in person, ATCO Pipelines is committed to listening to your comments, answering your questions, addressing your concerns and sharing your feedback. You can make your voice heard by completing and submitting the attached comment card, calling us at (Mon. to Fri., 8am - 4:30pm), visiting our web site at or meeting with us at our Open House. Open House: Carriage House Inn 9030 Macleod Trail S Tues. Jan. 29, 4-9pm
4 Calgary Pipeline Map
5 The corridors are nearly a kilometre wide and provide a safe designated space to place high-pressure natural gas pipelines. The Transportation/Utility Corridors (TUCs) were designed to facilitate infrastructure development in Calgary and Edmonton by accommodating the provincial ring road system, major power lines, pipelines, regional water and sewer lines and telecommunication lines. Transportation/Utility Corridors (TUCs) For a detailed view of this map visit Transportation/Utility Corridor Boundaries Existing High-Pressure Natural Gas Pipelines Proposed Relocation of High-Pressure Pipelines Natural Gas Pipelines to be removed from High-Pressure Service Safety First. Always. The TUC in Calgary includes Highway 22X and Stoney Trail (Hwy 201). They were established to protect utility alignments from advancing urban development and offer a long-term solution to many of the land use challenges associated with developing major facilities in an urban setting.
6 Project Overview Background For more than 100 years ATCO Pipelines has safely and reliably transported natural gas from producers to communities and industrial customers through a network of high-pressure pipelines. For residential customers, these high-pressure lines feed the low-pressure local distribution pipelines, managed by companies such as ATCO Gas, that deliver the natural gas to homes and businesses. In the 1950s and 60s a network of high-pressure pipelines was built on, what was predominately, the outskirts of both Calgary and Edmonton to deliver natural gas to the growing communities. Over the years, urban development in Calgary and Edmonton has overgrown the network of high-pressure natural gas pipelines placing homes, schools and businesses adjacent to these lines. This has created three serious concerns for ATCO Pipelines: 1. Public Safety Due to the proximity of these pipelines to densely populated areas, and the very high pressures at which they operate, an incident involving these pipelines has the potential for tragic consequences. Additionally, despite our best efforts to educate the public, pipelines are still hit by third parties during excavation activities. The current location of these pipelines continues to make them vulnerable to damage and increases the risk that an incident will occur. 2. Construction Standards - These pipelines were constructed to the standards of 50 years ago and are more vulnerable to failure as they near the end of their expected operating life as high-pressure lines. Pipelines built to today s standards have the advantage of substantial improvements in materials, inspection capabilities and damage prevention technologies that reduce the risk of an incident. 3. Meeting Demand - As Calgary and Edmonton continue to grow in size and population, the location and capacity of the existing high-pressure network will not be able to meet the associated growth in demand for natural gas in these cities. This situation is a matter of public safety that is challenging cities across North America. There have already been serious incidents in other jurisdictions prompting ATCO Pipelines to re-evaluate the integrity of its existing pipeline network. As a result, ATCO Pipelines has developed a solution that will dramatically improve public safety and ensure that customers receive safe, reliable natural gas service for decades to come. Safety First. Always.
7 Frequently Asked Questions What is natural gas used for? Natural gas is delivered to the vast majority of Alberta homes through a network of high-pressure and lowpressure pipelines. Natural gas fuels many of the comforts of our daily lives including heat for homes through natural gas furnaces, hot water through hot water tanks, as well as cooking appliances, clothes dryers and fireplaces. Natural gas is also used to generate the electricity that powers homes and businesses across the province. Are the existing urban high-pressure pipelines safe? The current system is operating safely. We undertake an intensive integrity program that includes cathodic protection surveys and leak inspections, as well as monitoring our lines 24-hours-a-day through our Control Centre. However, many of the pipelines were constructed 50 to 60 years ago. The new pipelines will benefit from the advancements in materials, construction practices and damage prevention technologies, and be located within the safety of the designated Transportation/Utility Corridor (TUC). What is the difference between the high-pressure pipelines used for transmission and the low-pressure lines used for distribution? High-pressure transmission pipelines are the most efficient way to transport large amounts of natural gas from producers to communities and industrial customers. Large volumes of gas in the pipeline increase the pressure in the pipeline. For residential customers, the highpressure transmission pipelines feed local distribution pipelines, managed by companies such as ATCO Gas. There are more than 9,000 kilometres of distribution pipelines running throughout Calgary and Edmonton bringing natural gas directly into your home. The distribution pipelines operate at a much lower pressure, as the amount of gas travelling through them is much less. A pipeline failure caused by a leak or hit line at these lower pressures is less likely to result in a serious incident. Why is it important to move high-pressure pipelines to the TUCs? Given the high pressures these pipelines operate at, any failure or damage to the pipeline can result in a serious incident. This presents a significant risk to public safety. If a serious incident were to occur in a densely populated area it could have tragic consequences. Why are you not moving all high-pressure pipelines to the TUCs? The lines that are not part of this project are either located in industrial areas that require high-pressure service or are already in a defined corridor and have been constructed to current standards. What will happen to the old high-pressure pipelines near my home? If the Urban Pipeline Replacement Project is approved there will be 260 kilometres of high-pressure pipelines in Calgary and Edmonton removed from high-pressure service. Where appropriate, some of these pipelines will be converted to low-pressure distribution service.
8 We need your voice. An important component of our submission to the Alberta Utilities Commission will be the feedback we receive from you. Online, on the phone, or in person, ATCO Pipelines is committed to listening to your comments, answering your questions, addressing your concerns and sharing your feedback. This issue is a matter of public safety that will have a direct impact on your home and family. You can make your voice heard by completing the attached comment card, calling us at (Monday to Friday, 8am - 4:30pm), visiting our web site at or meeting with us at our Open House. Name: Address: Phone or Please provide your comments on the Urban Pipeline Replacement Project: I am interested in receiving updates on the project. Thank you for providing your comments and contact information above. We value your comments. As part of our Urban Pipeline Replacement (UPR) Project we will be consulting with various stakeholders, such as yourself, and will be collecting, using and disclosing your comments, feedback and other information that you may provide to us in connection with the planning, development and regulatory review of the UPR Project. By providing your information and comments above, you are asking to participate in this process and are consenting to the collection, use and disclosure of such information for such purposes. At ATCO Pipelines, we take your privacy seriously. For more information about our privacy practices and policies, please visit or contact our privacy officer at
9 Who is ATCO Pipelines? For more than 100 years, ATCO Pipelines has owned and operated key pipeline infrastructure throughout Alberta that transports natural gas to utilities, power generators and major industries. With offices in Calgary and Edmonton and facilities throughout the province, ATCO Pipelines is committed to operating in a responsible and sustainable manner. Our success depends on building and maintaining a safe and reliable natural gas pipeline system, while meeting high environmental standards and developing strong community relationships. ATCO Pipelines is part of the ATCO Group of Companies an investor-owned, Alberta-based, worldwide organization with more than 8,800 employees that deliver service excellence and innovative business solutions through leading companies engaged in Structures & Logistics, Utilities, Energy and Technologies. More information can be found at
ActewAGL Distribution Submission to the Australian Energy Regulator for the period 2016-2021
CONSUMER SUMMARY ActewAGL Distribution Submission to the Australian Energy Regulator for the period 2016-2021 The Gas Network - Our 5 Year Plan Inside Our 2016-21 Plan What makes up your gas bill? Our
APPENDIX J GAS DISTRIBUTION
APPENDIX J GAS DISTRIBUTION Ji Jii APPENDIX J GAS DISTRIBUTION NEIL G. THOMPSON, PH.D. 1 SUMMARY The natural gas distribution system includes 2,785,000 km (1,730,000 mi) of relatively small-diameter, low-pressure
SCHEDULE 12 DBFO AGREEMENT EXECUTION VERSION 4. LANDS
SCHEDULE 12 LANDS 1. GENERAL 1.1 Capitalized Terms Capitalized terms used in this Schedule have the definitions as set out in the Agreement to Design, Build, Finance and Operate Southeast Stoney Trail,
2015-18 Department Business Plan. Utilities
2015-18 Department Business Plan Utilities I am pleased to introduce Utilities 2015-18 Department Business Plan. The goals capture four main areas where Utilities will contribute to making Strathcona County
SOCALGAS APROACH TO PIPELINE INTEGRITY
SUMMER 2011 SOCALGAS APROACH TO PIPELINE INTEGRITY Southern California Gas Company (SoCalGas ) is committed to providing clean, safe and reliable natural gas to its customers and takes important steps
Program Design and Engineering Key to Infrastructure Replacement and Cost Containment
Program Design and Engineering Key to Infrastructure Replacement and Cost Containment By: Tom Ziegenfuss, COO Les Goodman VP/Distribution Dave Klimas, VP/Distribution Glen Armstrong, Senior Codes Specialist
SUMMARY OF DISTRIBUTION INTEGRITY MANAGEMENT PROGRAM
Page 1 of 9 SUMMARY OF DISTRIBUTION INTEGRITY MANAGEMENT PROGRAM Program Overview: The Distribution Integrity Management Program ( DIMP ) activities are focused on obtaining and evaluating information
Four Pillars of Urban Sustainability Submission
Four Pillars of Urban Sustainability Submission Introduction The sustainability of a city can, in part, be measured by the quality of its infrastructure. Physical assets such as roads, sewer lines, transit,
2015-18 Department Business Plan. Utilities
2015-18 Department Business Plan Utilities Updated June 2016 I am pleased to introduce Utilities 2015-18 Department Business Plan. The goals capture four main areas where Utilities will contribute to making
To learn more about Berkshire Hathaway Energy s commitment, please visit their website.
A new look with a new owner On Monday, December 1, 2014 Berkshire Hathaway Energy completed the purchase of AltaLink. The sale received the provincial approval from the Alberta Utilities Commission (AUC)
DAMAGE PREVENTION LEGISLATION ELEMENTS REQUIRED FOR CANADA
DAMAGE PREVENTION LEGISLATION ELEMENTS REQUIRED FOR CANADA Ensuring the Highest Level of Public, Worker and Community Safety with Effective Legislation for Damage Prevention / Protection of Buried Infrastructure
The Pipelines Regulations, 2000
PIPELINES, 2000 P-12.1 REG 1 1 The Pipelines Regulations, 2000 being Chapter P-12.1 Reg 1 (effective April 1, 2000) as amended by the Statutes of Saskatchewan, 2014, c.21. NOTE: This consolidation is not
Gas to the West INFORMATION LEAFLET. gastothewest.com. [email protected]. www
Gas to the West INFORMATION LEAFLET 0800 975 2322 gastothewest.com @ [email protected] Gas to the West 1. INTRODUCTION This Gas to the West Project is a major energy infrastructure project to extend
Frequently Asked Transmission Pipeline Questions
Frequently Asked Transmission Pipeline Questions Who is PennEast, LLC? PennEast was formed by the partnership of AGL Resources, NJR Pipeline Company, South Jersey Industries and UGI Energy Services (UGIES).
NW Natural & Pipeline Safety
NW Natural & Pipeline Safety We Grew Up Here NW Natural is an Oregon-based utility company founded in 1859. The company purchases natural gas for its core market in western Oregon and southwestern Washington,
Burlington County Board of Chosen Freeholders County Engineer s Office. NJ Natural Gas Company Proposed Secondary High Pressure Pipeline
Board of Chosen Freeholders County NJ Natural Gas Company Proposed Secondary High Pressure Pipeline NJ Board of Public Utilities Hearing August 26, 2015 NJ Natural Gas Company Company s Preferred Pipeline
AUC Information. How does Alberta s electric industry work?
AUC Information How does Alberta s electric industry work? Electricity and the AUC Getting electrical power to consumers involves three major steps: Generation (power plants) Transmission high voltage
Builder/developer gas service application
Builder/developer gas service application All gas service applications will be processed within three business days of receipt. Apply for gas service by: Phone: 1-888-224-2710 option 2 Fax: 1-877-413-1152
TOWNSVILLE WATER Customer Service Standards
TOWNSVILLE WATER Customer Service Standards CONTENTS Townsville Water who are we? 3 What is the Customer Service Standard? 3 >> Does the Customer Service Standard apply to me? 3 >> What will Townsville
Funding the Vision: Investing in Safe, Reliable Service
Funding the Vision: Investing in Safe, Reliable Service KUB Financial Plan Executive Summary Fiscal Year 2015 Table of Contents Funding The Vision: Investing in Safe, Reliable Service 1 KUB Proposed Fiscal
The State of Natural Gas Pipelines in Fort Worth
TheStateofNaturalGas PipelinesinFortWorth ProducedBy AccufactsInc. ClearKnowledgeintheOverInformationAge RichardB.Kuprewicz President,AccufactsInc. (425)836 4041 [email protected] 1155N.StateSt.Suite609
Dealing with leaks. Our code of practice: on leakage
Dealing with leaks Our code of practice: on leakage Our code of practice on leakage In this leaflet Here at Northumbrian Water we have a duty to all of our customers and to the environment to promote the
Community Legal Information Association of Prince Edward Island, Inc.
Community Legal Information Association of Prince Edward Island, Inc. Buying Property in Prince Edward Island Many people in Prince Edward Island will buy a home or land at some point in their life. This
Cathodic Protection. Remote Monitoring of Cathodic Protection on a Gas Distribution Network
Cathodic Protection Remote Monitoring of Cathodic Protection on a Gas Distribution Network Author: Martin Alderson Northern Gas Networks Issued for UKOPA members CP measurements are very labour intensive
CSA Group Safety Standards for Oil and Gas Pipeline Systems: A Life-Cycle Approach
CSA Group Safety Standards for Oil and Gas Pipeline Systems: A Life-Cycle Approach Greg Orloff, MBA Government Relations Officer North America and Europe CSA Group Z662 Technical Committee (TC) Over 250
FEDERAL GOVERNMENT OVERSIGHT OF PIPELINE SAFETY
Operational Safety INTRODUCTION The Millennium Pipeline Company (Millennium) is proud of the key role it plays in New York s energy infrastructure. The Millennium Pipeline is a vital link in a system that
THE ENMAX ENERGY BILL
Bites of ENMAX and industry information THE ENMAX ENERGY BILL 1 ENMAX Corporation Each month, ENMAX Energy Corporation customers receive a bill (also called an invoice or statement) outlining their costs
UNDERGROUND OIL STORAGE TANKS
L E S P E R A N C E M E N D E S L A W Y E R S UNDERGROUND OIL STORAGE TANKS A Property Owner s Guide Robert J Lesperance and Naomi R Rozenberg If your home, townhouse or condominium was built before 1970,
S Y S T E M M O D E R N I Z A T I O N
S Y S T E M M O D E R N I Z A T I O N T H E L I N E M B E X T E N S I O N P R O J E C T B A L T I M O R E A N D H A R F O R D C O U N T I E S, M A R Y L A N D Project Overview Columbia Gas Transmission
Aquatera 2015/16 Business Plan Highlights
Who We Are Aquatera 2015/16 Business Plan Highlights Aquatera is a full-service utility corporation the provider of choice for governments, businesses, and communities. Our business is to provide high-quality
A Property Owner s Guide
The Operation and Maintenance of Domestic and Commercial Sewers A Property Owner s Guide KILDARE LOCAL AUTHORITIES WATER SERVICES DEPARTMENT TABLE OF CONTENTS Introduction 1. Why should I care? 2. What
Energy Market Reform Working Group (EMRWG) Consultation Paper New Products and Services in the Electricity Market
13 March 2015 COAG Energy Council Secretariat via email: [email protected] Jemena Limited ABN 95 052 167 405 321 Ferntree Gully Road Mount Waverley VIC 3149 Locked Bag 7000 Mount Waverley VIC
NATIONAL ENERGY BOARD PIPELINE PERFORMANCE MEASURES 2013 DATA REPORT
NATIONAL ENERGY BOARD PIPELINE PERFORMANCE MEASURES 2013 DATA REPORT October 2014 Amended July 2015 Permission to Reproduce Materials may be reproduced for personal, educational and/or non-profit activities,
The Engineering Science of Oil Pipelines
The Engineering Science of Oil Pipelines From the Keystone XL pipeline project to spills and leaks in existing lines, pipelines are in the news. The SMCC has prepared this backgrounder on crude oil and
Electric system improvements near you South and West of Edmonton Area Transmission Development
Electric system improvements near you South and West of Edmonton Area Transmission Development SAUNDERS LAKE SUBSTATION AND TRANSMISSION LINES January 2014 Volume 2 PLEASE NOTE: We want to inform you that
Foothills Area Transmission Development South Calgary - Project Overview
CHAPARRAL BV SE DEERFOOT TR SE Foothills Area Transmission Development South Calgary - Project Overview The demand for power is increasing as Calgary continues to grow. The Alberta Electric System Operator
APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND TELECOMMUNICATION CABLES IN THE VICINITY OF TRANSPORTATION FACILITIES
APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND TELECOMMUNICATION CABLES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE JURISDICTION OF ALBERTA TRANSPORTATION 1.0 Application Procedures 2.0
Disclosure of Customer Rights and Company Policies
May 8, 2013 Disclosure of Customer Rights and Company Policies Qualifications The Company operates in the State of New Jersey (depending upon geographic area) under the name AmeriGas Propane ( AmeriGas
NSW Licensed Pipeline Performance Reporting Guidelines
NSW Licensed Pipeline Performance Reporting Guidelines NSW Trade & Investment Resources and Energy Division GPO Box 3889 Sydney NSW 2001 Rev Jan 2012 NSW T & I Division of Resources and Energy Contents
GOOD LANDLORD CODE OF PRACTICE FOR PRIVATE RENTED SECTOR MANAGEMENT
GOOD LANDLORD CODE OF PRACTICE FOR PRIVATE RENTED SECTOR MANAGEMENT GUIDANCE DOCUMENT Each section contains general information on why the standard was set (Yellow text boxes). In many cases, the standards
Repairs & maintenance
Tenancy Facts Information for tenants and residents in Queensland Repairs & maintenance When you rent a place to live, the lessor, agent or provider must ensure the place is fit for you to live in and
2013 Flood Recovery Framework
PFC2013-0646 ATTACHMENT 2013 Flood Recovery Framework calgary.ca contact 3-1-1 Onward/ Calgary: A great place to make a living; a great place to make a life. Contents Context...4 Weather conditions...5
Victorian Purchasing Guide for UEG11 Gas Industry Training Package Version No 2
Victorian Purchasing Guide for UEG11 Gas Industry Training Package Version No 2 July 2014 State of Victoria (Department of Education and Early Childhood Development) 2014. Copyright of this material is
Managing the integrity of pipeline assets
ROSEN Integrity Solutions Managing the integrity of pipeline assets Pipeline Integrity Services ROSEN: Leading the way in integrity management The safe and efficient operation of major transmission pipe
Vancouver s Housing and Homelessness Strategy 2012-2021 A home for everyone
Vancouver s Housing and Homelessness Strategy 2012-2021 A home for everyone A home for everyone Vancouver s Housing and Homelessness Strategy 2012-2021 Prepared by Context Ltd. June 2011 ACKNOWLEDGEMENTS:
May 30, 2012. Expert Panel on Tax Room 105-617 Government Street Victoria, BC V8W 9V8 [email protected]. Dear Expert Panel on Tax,
May 30, 2012 Expert Panel on Tax Room 105-617 Government Street Victoria, BC V8W 9V8 [email protected] Dear Expert Panel on Tax, Re: British Columbia Tax Competitiveness The Canadian Energy Pipeline
UNDERGROUND INFRASTRUCTURE SPECIALISTS TABLE OF CONTENTS
U UNDERGROUND INFRASTRUCTURE SPECIALISTS TABLE OF CONTENTS 3. COMPANY PROFILE A growing company excelling in the fields of infrastructure repair and maintenance. 6. MANDREL TESTING Individually approved
CONSTRUCTION PERMIT APPLICATION AND INSTRUCTIONS (Permit Application follows instructions)
CONSTRUCTION PERMIT APPLICATION AND INSTRUCTIONS (Permit Application follows instructions) When is a permit required? Section 403.42 and Section 403.62 of the Uniform Construction Code states: Any owner
SYNERGY GAS CUSTOMER CHARTER. Small Use Business Customers
SYNERGY GAS CUSTOMER CHARTER Small Use Business Customers If you don t speak English and need help with this guide, call the telephone interpreter service (TIS National) on 13 14 50 to arrange an interpreter.
The first steps when you buy a home
The first steps when you buy a home Do you think you want to buy a home? There are lots of things to think about before you make up your mind to buy a home. Are you ready to take a big step like this?
Water Leakage & Your Responsibilities
Water Leakage & Your Responsibilities Information & Guidance Contents 1. Introduction 2. Who is responsible for underground pipework? 3. Who is responsible for repairing the supply pipe if there is a leak?
Service Level Agreement (SLA)
Hertford College, Oxford Service Level Agreement (SLA) For Maintenance, Risk Management, and Domestic Accommodation Services At Hertford College, its residential annexes and non- residential properties
Your Guide to Household Water Metering
Your Guide to Household Water Metering Introduction It s generally considered that it s fairer to pay for the amount of water you actually use, rather than by a fixed amount. After all, you pay for electricity
APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE
APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE JURISDICTION OF ALBERTA TRANSPORTATION 1.0 Application Procedures 2.0
Risk Assessment / Risk Management Protocol
1 Canadian Pacific Railway Risk Assessment / Risk Management Protocol Overview / Outline At Canadian Pacific Railway, we conduct risk assessments of our activities and operations for a number of different
Hughes Natural Gas, Inc. Customer Information and Rules of Service Updated September 2014
Hughes Natural Gas, Inc. Customer Information and Rules of Service Updated September 2014 LOCATION: 31830 State Highway 249, Ste A, Pinehurst, TX 77362 PHONE: (281) 766-1290 Toll Free: (866) 601-3507 WEBSITE:
Building Permits: When are they required?
Building Permits: When are they required? Generally, you need to obtain a building permit from the City whenever you construct, enlarge, alter, repair, move, remove, improve, convert, or demolish a building
Riga Smart City Concept. Timurs Safiuļins Riga Energy Agency
Riga Smart City Concept Timurs Safiuļins Riga Energy Agency City development pillars Riga long-term development objectives Riga smart city Sustainable energy action plan 2014-2020 SEAP includes an initial
Emergency Support Function 12 Energy
Emergency Support Function 12 Energy ESF 12 Primary Agency Support Agencies Illinois Commerce Commission (ICC) Illinois Department of Central Management Services (CMS) Illinois Department of Corrections
Understanding Residential Electricity and Natural Gas Bills and Prices in Edmonton
15006-103 AVENUE Phone: +1 780 484 0476 EDMONTON, ALBERTA Fax: +1 780 484 3956 CANADA T5P 0N8 E-mail: [email protected] Understanding Residential Electricity and Natural Gas Bills and Prices in Edmonton 2007
FIRE CODE INTERPRETATION
FIRE CODE INTERPRETATION March 2008 ISSUE: Existing Fire Alarm Systems FCI-08-06 Page 1 of 9 The purpose of this bulletin is to identify conditions where a building fire alarm system may be subject to
Pendleton Solar Energy Centre COMMUNITY ENGAGEMENT PLAN
Pendleton Solar Energy Centre COMMUNITY ENGAGEMENT PLAN Large Renewable Procurement (LRP) I PENDLETON SOLAR ENERGY CENTRE 844.553-3336 [email protected] www.pendletonsolar.ca Table of Contents 1.
Let s get down to. business. This quick introduction covers the main things you need to know about being a Contact electricity or natural gas customer
Let s get down to business This quick introduction covers the main things you need to know about being a Contact electricity or natural gas customer Running a business can be hectic. No two businesses
MAJOR PROJECTS CONSTRUCTION SAFETY STANDARD HS-09 Revision 0
MAJOR PROJECTS CONSTRUCTION SAFETY SECURITY MANAGEMENT PROGRAM STANDARD HS-09 Document Owner(s) Tom Munro Project/Organization Role Supervisor, Major Projects Safety & Security (Canada) Version Control:
Demo Permit Guide For Homeowners
Demo Permit Guide For Homeowners Building Services Tel: 705-436-3710 ext. 3504 or 3506 Fax: 705-436-7120 2101 Innisfil Beach Road, Innisfil, ON L9S 1A1 Website: www.innisfil.ca A Demo Permit Guide for
A Guide to Building Permits for Home Owners / Renovators. Address: 1 Carden Street Guelph, Ontario N1H 3A1
A Guide to Building Permits for Home Owners / Renovators Address: 1 Carden Street Guelph, Ontario N1H 3A1 Oct 2009 Telephone: 519-837-5615 Committee of Adjustment 519-837-5615 option #5 email: [email protected]
THE STATE OF THE NATIONAL PIPELINE INFRASTRUCTURE
US DEPARTMENT OF TRANSPORTATION Introduction THE STATE OF THE NATIONAL PIPELINE INFRASTRUCTURE Over the past 70 plus years, a nationwide system of pipelines has been constructed to transport almost 100
Township of Enniskillen. Asset Management Plan
Township of Enniskillen Asset Management Plan 2014 1 TABLE OF CONTENTS Page A. Introduction 3 B. State of Local Infrastructure 4 C. Desired Levels of Service 7 D. Asset Management Strategy 8 E. Financing
Regulation of Natural Gas Pipelines. June 23, 2008
Regulation of Natural Gas Pipelines June 23, 2008 Federal and State Regulations Federal: 49 United States Code 60101. et. seq. Title 49 Code of Federal Regulations The Office of Pipeline Safety (OPS),
Network Monitoring Plan. Executive Summary
Network Monitoring Plan Executive Summary January, 2014 BACKGROUND Historically, Fort Air Partnership s (FAP) primary monitoring objective was to ensure compliance with regulatory monitoring requirements
Owner-User Pressure Equipment Integrity Management Requirements
the pressure equipment safety authority Owner-User Pressure Equipment Integrity Management Requirements AB-512 Edition 2, Revision 0 Issued 2015-06-25 Owner-user Pressure Equipment Integrity Management
SCHEDULE F-1 1-2-5-10 HOME WARRANTY INSURANCE POLICY
Home Warranty Toll Free: 800.555.9431 Toll Free Fax: 877.762.7922 Travelers Insurance Company of Canada Suite #810, 540 5 th Avenue S.W. Calgary, AB T2P 0M2 www.travelerscanada.ca SCHEDULE F-1 1-2-5-10
COMMUNICATIONS ALLIANCE LTD NATIONAL BROADBAND NETWORK FIBRE READY DISTRIBUTION NETWORKS
COMMUNICATIONS ALLIANCE LTD NATIONAL BROADBAND NETWORK FIBRE READY DISTRIBUTION NETWORKS National Broadband Network - Fibre Ready Distribution Networks Industry Guideline Communications Alliance Ltd (formerly
ABN: 92 089 531 984 Address: Level 1, 1 William Street, Perth WA 6000 Fax: [08] 9486 3346 or [08] 9486 3951 Email: [email protected].
Gas Supply Standard Form Contract Terms & Conditions Alinta Sales Pty Ltd ABN: 92 089 531 984 Address: Level 1, 1 William Street, Perth WA 6000 Fax: [08] 9486 3346 or [08] 9486 3951 Email: [email protected]
CLAIMS PROCESS - CONDOMINIUM COMMON ELEMENTS
49 Issue Date: June 2010 Effective Date: Condominium Projects registered on or after July 1, 2010 CLAIMS PROCESS - CONDOMINIUM COMMON ELEMENTS Note: Vacant land condominiums and common element condominiums
THE DASH FOR GAS WHY UK BUSINESS CONSUMERS OF HEAVY FUEL OIL NEED TO CONSIDER CONVERTING TO NATURAL GAS
THE DASH FOR GAS WHY UK BUSINESS CONSUMERS OF HEAVY FUEL OIL NEED TO CONSIDER CONVERTING TO NATURAL GAS CONTENTS 3 Executive summary 4 Introduction 5 Key points to consider when converting from heavy fuel
STATE OF NEW YORK PUBLIC SERVICE COMMISSION
STATE OF NEW YORK PUBLIC SERVICE COMMISSION At a session of the Public Service Commission held in the City of Albany on November 27, 2012 COMMISSIONERS PRESENT: Garry A. Brown, Chairman Patricia L. Acampora
STATE OF SOUTH CAROLINA RESIDENTIAL PROPERTY CONDITION DISCLOSURE STATEMENT
STATE OF SOUTH CAROLINA RESIDENTIAL PROPERTY CONDITION DISCLOSURE STATEMENT The South Carolina Code of Laws (Title 27, Chapter 50, Article 1) requires that an owner of residential real property (single
Chapter 13: Implementation Plan
Chapter 13: 13.1. INTRODUCTION The purpose of the implementation chapter of the Comprehensive Plan is to set forth the actions that the City will take to ensure that the plans, programs and policies set