Fire Protection Design Services

Size: px
Start display at page:

Download "Fire Protection Design Services"

Transcription

1 Fire Protection Design Services Our extensive design experience includes every type of system to protect your facilities and hazards. More Capability and Services AREVA offers quality, cost-effective fire protection design services to a wide range of industries and facilities. Our staff includes registered fire protection engineers, NICET certified technicians, and CAD designers who have designed protection for virtually every type of occupancy and hazard. Our fire protection design services include: Modification implementation Water supply systems Water-based suppression systems Gaseous-based suppression systems Fire, gas and leak detection/alarm systems Passive barrier/architectural features design Comprehensive Design Change Implementation AREVA offers complete fire protection modification and engineering change package development and implementation services. With AREVA s full range of engineering services, including our Plant Modifications Engineering Group and the ADZ Joint Venture, plant fire protection changes are implemented through engineering change package development as well as Engineering/Procurement/ Construction (EPC) contracts. AREVA offers all facets of fire protection services from consulting services to construction implementation in support of plant design and operational changes. Water Supply System Design Experience AREVA has designed independent private water supply systems as well as those interconnected with municipal and site service water distribution systems. We understand our clients needs and the importance of maintaining adequate supply capacity under normal and adverse delivery conditions. Our dedicated design team will help you ensure system reliability by specifying durable components and piping for the prevailing service conditions. Our water supply services include: Elevated and surface water tanks Underground and above-ground fire mains Pump and prime mover arrangements Hydrant and hydrant hose house distribution/ arrangement Addressing piping degradation issues Water-Based Suppression Systems Our engineers have designed water-based suppression systems to protect nearly every type of facility and hazard. We follow advances in suppression system and component design to offer only the latest protection and maximum operational economy. AREVA water-based system design services include: Wet- and dry-pipe sprinklers Low- and high-expansion foam systems Pre-action and deluge sprinklers Standpipe and hose stations Water spray systems Automated and manual monitor nozzle systems In-rack, ESFR and high-density applications Water mist systems (dual and single-fluid technologies)

2 Gaseous-Based Suppression Systems Similar to our experience with water-based systems, our gaseous-based suppression system design experience includes numerous different hazards and occupancies. We understand the benefits and limitations of every type of gaseous system including life safety concerns, environmental impact and chemical deposition concerns, and life-cycle costs including recharge, testing and maintenance. Gaseous agent system design services include: Clean agent extinguishing systems (such as halocarbons, inerting agents) Low- and high-pressure carbon dioxide systems Dry chemical systems Alternate acceptance testing methodologies Fire, Gas and Leak Detection/ Alarm Systems: More Versatility AREVA alarm system design experience includes hard-wired, multiplex, addressable and multi-point programmable logic systems. We have designed and specified detection schemes, alarming and notification, signaling, voice communication, and agent releasing/safeguards activation systems for industry, power T&D and generation facilities, schools, hospitals, record storage centers, highrises, offices and other applications. We offer teaming with Siemens Industry, Inc. for full turnkey fire alarm and detection services. Our services include: Smoke, heat, flame and incipient fire detection Evacuation/voice alarm Toxic gas monitoring Local and networked fire alarm systems Liquid leak detection Proprietary signaling systems Security/intrusion alarm Audible/visual/tactile notification design (ADA compliant) Critical process monitoring AREVA Inc IBM Drive, Charlotte, NC Joel Drennan Business Development Manager 4100 International Plaza, Suite 750 Fort Worth, Texas Tel: Cell: or contact: AREVA Engineering Control Center Tel: us.areva.com Given the critical nature of fire protection systems, we tailor our designs to meet your protection and performance needs. Passive Barrier/Architectural Features Design: Attention to Detail Our team of professionals can design and specify fire-resistant barriers for new facility construction as well as plant retrofit and expansions. Working with architectural staff, we can provide criteria for ensuring the aesthetic incorporation of passive barriers into an overall building design. Our services include: Fire wall location/construction Through-penetration seal system design Egress/exit enclosure construction/ separation design Interior finishes Equivalency justification for rating reductions Fire wrap envelope systems Protection of atrium, large opening qualification Fire door, fire/smoke damper design Fire testing services Explosion venting analysis and design Features and Benefits High-quality and cost-effective fire protection design services from an experienced and versatile staff Ensure water supply needs are met System reliability you can count on Only the most advanced protection Aesthetically pleasing solutions Full understanding of nuclear power design change package development and documentation requirements The data and information contained herein are provided solely for illustration and informational purposes and create no legal obligations by AREVA. None of the information or data is intended by AREVA to be a representation or a warranty of any kind, expressed or implied, and AREVA assumes no liability for the use of or reliance on any information or data disclosed in this document AREVA. All rights reserved. 1/15 ANP:U-063-V7-15-ENG

3 Nuclear Plant Fire Protection and Hazards Analysis Industry-Leading Experience and Resources AREVA is the preeminent nuclear power fire protection analysis firm. We have expertise developing and managing all aspects of nuclear fire protection. In fact, our experience includes over 75% of the commercial nuclear power industry. Plus, our technical methodologies have set the standard. We leverage our extensive global resources to provide solutions to our clients for their specific nuclear plant operations. Risk-Informed / Performance-Based Methodologies: More Insight Our Fire, Safety and Risk Services team judiciously applies risk-informed / performance-based methods to characterize the real significance of inspection findings. Our approach: Develop realistic fire scenarios to determine the risk significance of fire protection inspection findings Verify fire scenarios postulated from inspection findings that would actually result in significant degradation of defense-in-depth features Ensure due credit given for all fire protection features such as prompt fire brigade response Utilization of fire modeling to support risk-informed, performance-based approaches Significance Determination Process: More Safety Assurance Significance Determination Process (SDP) requirements have increased the burden on utilities to determine the severity and safety consequences associated with numerous fire protection failures and deficiencies. Your plant s existing analyses may not identify all potential success paths and systems to achieve safe shutdown, which could affect the ability to characterize the risk significance of inspection findings. Our multi-disciplined staff of systems engineers, electrical / I&C engineers, and database programmers can enhance your safe shutdown analysis to implement the SDP effectively. You can rest assured that inspection findings are properly characterized.

4 Program Optimization: More Cost-Effective Many fire protection programs may not be optimized to balance regulatory compliance with cost-effective implementation. Our professionals can help you develop a more cost-effective program for your plant. Our approach: Perform detailed NFPA code assessments to justify areas of noncompliance or develop workable solutions Prepare technical evaluations to document the acceptability of all non-rated / non-tested fire protection features on a plant area basis Align program documents with plant PRA / IPEEE results Implement efficient controls to maintain fire protection program documentation concurrent with the plant configuration Implement cost-effective surveillance reduction measures, such as statistical sampling of penetration seals, based on historical plant operating data Services Significance Determination Process assessment Fire safe shutdown systems and circuit analysis Design basis documentation and reconciliation NFPA code compliance assessment and analysis Safe Shutdown Analysis System (DATATRAK) software Data Management (DATATRAK) software process change management Pre-fire and post-fire plan development Fire hazards assessment and analysis AREVA Inc IBM Drive, Charlotte, NC Joel Drennan Business Development Manager 4100 International Plaza, Suite 750 Fort Worth, Texas Joel.Drennan@areva.com Tel: Cell: or contact: AREVA Engineering Control Center EngineeringControlCenter@areva.com Tel: us.areva.com Fire protection surveillance reduction program implementation Plant modification package development and implementation Fire suppression and detection systems design and testing services Computerized combustible tracking and controls programs Fire barrier design, evaluation and testing services Fire protection program audit and self-assessment services Programmatic configuration controls implementation Smoke and heat effects analysis Fire PRA and modeling services Fire brigade training Fire events analysis Fire protection program fundamentals reviews Features and Benefits Accurate characterizations of inspection findings ensure compliance Our multi-disciplined staff of systems engineers, electrical / I&C engineers, and database programmers can enhance your safe shutdown analysis to implement the SDP effectively A more cost-effective program for your plant Determine the adequacy of installed barrier configurations based on actual plant hazards and the performance of tested configurations The data and information contained herein are provided solely for illustration and informational purposes and create no legal obligations by AREVA. None of the information or data is intended by AREVA to be a representation or a warranty of any kind, expressed or implied, and AREVA assumes no liability for the use of or reliance on any information or data disclosed in this document AREVA. All rights reserved. 1/15 ANP:U-070-V8-15-ENG

5 Nuclear Plant Fire Safe Shutdown Services Cost-Effective Solutions We have provided Fire Safe Shutdown Analysis and related services since the promulgation of the Fire Protection Rule, 10CFR50, Appendix R. Our in-depth understanding of safe shutdown licensing bases and technical requirements allows us to deliver the most cost-effective solutions for Appendix R licensing and technical issues. This includes re-analysis scopes in support of NFPA 805, Performance Based Standard for Fire Protection for Light Water Reactor Generator Plants. Expertise for All Aspects of Fire Protection Programs AREVA, the world s leading nuclear supplier, is recognized throughout the nuclear industry s fire protection community as the premier provider of fire protection engineering, design and analysis services. Our seasoned, responsive personnel have experience in all aspects of evaluation, development and implementation of nuclear fire protection programs. We actively participate in industry initiatives, forums and standard /code development to best serve the interests of our customers and the industry at large. With our extensive global resources, we can tailor nuclear plant fire safe shutdown services for the specific needs of our clients. A Long History of Success AREVA has a proven track record and long history of resolving generic industry fire protection issues and plant-specific concerns. We consistently provide cost-effective analytical techniques and compliance methods to help our clients meet regulatory requirements and plant-performance goals. Comprehensive Service Our multi-disciplined staff provides comprehensive services to address a broad spectrum of issues and concerns. We garner repeat business from numerous clients by consistently demonstrating our ability to resolve industry issues and plant-specific concerns and optimize performance of their Fire Safe Shutdown Programs. Features and Benefits We apply proven technical methods to resolve fire protection and safe shutdown concerns, and address compliance with applicable regulatory requirements. Cost-effective solutions are tailored to your specific needs. Our services optimize the performance of your plant s fire protection and safe shutdown program. Our multi-disciplined staff of systems engineers, electrical / I&C engineers, and database programmers provide the full spectrum of fire safe shutdown services. Our DATATRAK software fully integrates all aspects of your safe shutdown analysis into a single design-control tool.

6 Safe Shutdown Analysis Software (DATATRAK) The AREVA DATATRAK program is an engineering software tool that develops a configuration control model of safe shutdown analysis data relationships such as equipment, cable, raceway, fire area, fire zone and compliance disposition data in support of a plant safe shutdown analysis. The analysis model supports the necessary relationships between equipment, cables, routing and their locations in order to identify the impact on safe shutdown capability in each fire area and fire zone. The analysis model design is based on extensive safe shutdown analysis expertise and familiarity with key safe shutdown-related issues including associated circuits from spurious and circuit coordination concerns. The DATATRAK application is versatile since it is designed to link with existing plant cable-raceway systems. Plus, DATATRAK can easily import most of the necessary data relationships from existing Appendix R database programs. AREVA can customize DATATRAK to support specific client needs, and it can operate in a client /server environment using either a backend database management system (e.g., SQL Server or Oracle) or an Access database. The main features of the program include the following: Component Selection Cable Selection Routing/Equipment Location Drawing Reference and Revision Tracking Power Source Dependencies Interlock Dependencies Sub-Component Relationships Fire Area Impacts Fire Zone Impacts Compliance Assessment Dispositions Fire PRA Basic Event Cable Mapping Fire PRA Cable Impacts by Location NFPA 805 Transition Support Link to Existing Cable-Raceway Data User Access Level Control Data Revision Tracking Cable Block Diagram Generator Fire Safe Shutdown Services include: Fire safe shutdown logic diagrams Component circuit analysis Separation analysis and compliance assessments Breaker / fuse coordination calculations Fire safe shutdown procedures Ampacity-derating calculations NEI circuit analysis method NFPA 805 performance-based, risk-informed fire protection program development and analysis NFPA 805 Data Management Software (DATATRAK) Manual / Recovery Action Feasibility study and timeline analysis AREVA Inc IBM Drive, Charlotte, NC Joel Drennan Business Development Manager 4100 International Plaza, Suite 750 Fort Worth, Texas Joel.Drennan@areva.com Tel: Cell: or contact: AREVA Engineering Control Center EngineeringControlCenter@areva.com Tel: us.areva.com The data and information contained herein are provided solely for illustration and informational purposes and create no legal obligations by AREVA. None of the information or data is intended by AREVA to be a representation or a warranty of any kind, expressed or implied, and AREVA assumes no liability for the use of or reliance on any information or data disclosed in this document AREVA. All rights reserved. 1/15 ANP:U-076-V9-15-ENG

7 Fire Modeling and Emergency System Response Performance-Based Analysis There is a movement toward risk-informed, performance-based analyses in the field of fire protection engineering, both domestically and worldwide. In response to this movement, the U.S. Nuclear Regulatory Commission (NRC) has amended its fire protection requirements in Regulatory Guidance to permit existing reactor licensees to voluntarily use risk-informed, performance-based fire protection methods to supplement existing deterministic fire protection requirements. Fire Modeling AREVA utilizes Fire Dynamics Simulator (FDS), a Computational Fluid Dynamics (CFD) model of fire-driven fluid flow, developed by the National Institute of Standards and Technology (NIST) Fire modeling is the fundamental tool for evaluation of acceptance criteria in risk-informed, performancebased fire protection. Using fire modeling, it is possible to virtually assess the extent of damage, to impose design criteria, and to evaluate the effectiveness of emergency systems. AREVA engineers have the expertise and experience to perform detailed fire modeling computations consistent with the requirements of the NRC and National Fire Protection Association (NFPA). Our team is focused on delivering application-specific solutions to meet your performance objectives. The Big Picture To effectively utilize the results of fire modeling, it is important to understand the overall fire safety envelope. We have effectively used fire modeling output in Fire Probabilistic Risk Assessment (PRA) and to sustain/support code variances, alternative positions, risk-informed performance-based approaches, regulatory exemptions, and other legal positions. AREVA fire protection engineers are missionoriented, not task-oriented. We keep your needs in mind throughout every phase of the project. Our knowledge of the limitations and ranges of application of all fire modeling software approved for use in nuclear power plants allows us to select the most cost-effective methods to meet your project goals. AREVA engineers know how to interpret the results of fire modeling, and we know how to clearly convey those results to our clients. Features and Benefits Cost reduction benefits can be provided in applying fire modeling techniques as follows: Provides clients with alternatives to prescriptive regulatory requirements Produces system designs tailored to meet your specific performance objectives Features of the fire modeling application include: Uses state-of-the-art computational fire and egress modeling software Calculations performed by engineers with industryrecognized expertise Computational methods based on NFPA requirements using NRC-approved calculation procedures

8 Tools, Techniques & Applications In applying fire modeling to performance-based analysis, AREVA retains experienced engineers with degrees in fire protection to construct the necessary scenarios for evaluation. Fire modeling requires skillful application to ensure that the input data is appropriate for the conditions being analyzed. Following are some potential fire modeling applications. Fire Suppression Systems AREVA engineers can model the effects of a wide range of fire scenarios to determine the necessity and suitability of fire suppression systems such as wet, dry, pre-action and deluge sprinkler systems, fixed water spray, water mist, and gaseous fire suppression systems. We can also utilize fire modeling to gain insight on various fire suppression system designs and their associated performance. Fire Detection and Alarm AREVA engineers can model detection devices within a compartment, establishing a sequence of events. Detector types supported by available fire models include heat detection, ionization, photoelectric, beam type and air-sampling incipient stage type smoke detection. We can also represent fire alarm system signal reporting logic as required for modeling suppression or smoke control system activation, closing fire and smoke dampers, and initiating other alarm sequences. AREVA employs sophisticated egress models that can track the movement of individual site personnel and create a three-dimensional video animation of building evacuation. Smoke Control Systems Our team has the technical expertise to correctly model smoke control systems including smoke exhaust, post-event smoke purging systems, smoke and heat vents, opposed airflow systems, elevator, stairwell and corridor pressurization systems. Tenability & Timed Egress Analysis AREVA engineers can establish emergency system design criteria to maintain tenability in occupied spaces such as the MCR, and can also use timed egress analysis to demonstrate the effectiveness of emergency systems during evacuation. Timed egress analysis is applicable for zoned evacuation, building evacuation, and site-wide evacuation. Building & Target Survivability AREVA engineers can produce a real-time analysis of target performance criteria. We can evaluate survivability of mechanical, electrical, instrumentation and control systems, analyze thermal impact to building structural elements, and evaluate extent of damage for post-incident recovery. AREVA Inc IBM Drive, Charlotte, NC Joel Drennan Business Development Manager 4100 International Plaza, Suite 750 Fort Worth, Texas Joel.Drennan@areva.com Tel: Cell: or contact: AREVA Engineering Control Center EngineeringControlCenter@areva.com Tel: us.areva.com The data and information contained herein are provided solely for illustration and informational purposes and create no legal obligations by AREVA. None of the information or data is intended by AREVA to be a representation or a warranty of any kind, expressed or implied, and AREVA assumes no liability for the use of or reliance on any information or data disclosed in this document AREVA Inc. All rights reserved. 1/15 ANP:U-178-V9-15-ENG

9 Nuclear Plant Transition to NFPA 805 AREVA, the world s leading nuclear supplier, is recognized throughout the industry as a premier provider of fire protection engineering, design and analysis services. Background The Nuclear Regulatory Commission endorsed National Fire Protection Association (NFPA) Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, as an acceptable voluntary approach for demonstrating compliance with 10 CFR 50.48, Fire Protection. This endorsement allows plants to move away from prescriptive fire protection requirements and realize the benefits of using risk-informed, performancebased methods to analyze the consequences of fires and their impact on the ability to achieve and maintain safe shutdown. Involved and Engaged AREVA has actively supported the development of NFPA 805 and is a leader in fire protection standards development, industry working groups, and industry forum presentations. Additionally, as part of a Nuclear Energy Institute (NEI) initiative, members of our team helped develop the advanced performance-based methods for circuit analysis described in NEI 00-01, Guidance for Post-Fire Safe Shutdown Circuit Analysis. We were also selected by NEI to support pilot plant evaluations of this methodology to demonstrate compliance with regulatory requirements. Considering the Transition to NFPA 805 Adopting NFPA 805 is a significant undertaking. Potential benefits must be thoroughly evaluated against costs each step of the way. Our team of professionals can help determine if transforming your licensing basis to NFPA 805 makes sense for your plant. We do this by evaluating the following attributes of your compliance approach: Maximizing the use of your current licensing basis and documentation Minimizing the need to reconstitute the current design and licensing bases Identifying potential program vulnerabilities and formulating the specific cost-effective changes needed for NFPA 805 compliance Assessing short-term and long-term costs versus benefits Features and Benefits Cost savings in addressing future FP issues Reduced reliance on manual operator actions Reduced reliance on fire barriers Eliminate deviations and exemption requests More realistic analysis of plant fire scenarios Reduced surveillance frequencies Enhanced license renewal support by meeting contemporary regulatory expectations

10 A Complete Solution We offer full scope, turn-key engineering services for all three phases of the NFPA 805 transition process: Preliminary assessment and letter of intent Analysis and License Amendment Request (LAR) Completion of transition including revising your PRA, fire hazards analysis and safe shutdown analysis The NFPA 805 transition assessment process is depicted in the following simplified flow chart (taken from the NEI 04-02):

11 Transitioning to NFPA 805 The transition to NFPA 805 requires performing several evaluations and analyses: Fire Protection (FP) Fundamentals Assessment Chapter 3 of NFPA 805 requires that licensees assess their current compliance status. Prior approved alternates to the existing FP program may take precedence over NFPA 805 criteria so it is vital that the plant licensing basis be well understood. The NRC may accept these changes, but will undoubtedly review them again in the context of the change to a performance-based approach. Nuclear Safety Analyses Most NFPA 805 nuclear safety performance goals are comparable to existing regulatory requirements (10 CFR 50 Appendix R III.G and III.L). The nuclear safety analysis includes a systematic review of the following existing program elements: Nuclear safety system and equipment selection Nuclear safety capability circuit analysis Nuclear safety equipment and cable location Fire area assessments Manual Action Feasibility Breaker Coordination /common enclosure Those plants with well-documented safe shutdown methodologies will be able to integrate much of their current analysis for risk significant areas. However, NFPA 805 also requires the assessment of fires originating during non-power operational modes and fires that result in radioactive release that were not previously part of most FP programs. Non-Power Operational Mode Assessment This assessment requires an evaluation of different components and time-sequences from the normal safe shutdown paths (primarily assessing decay heat removal capability) as well as an evaluation of key safety functions needed for high risk evolutions during non-power modes (see NUMARC 91-06). Radioactive Release Assessment Licensees are also required to show that FP goals are also met with respect to limiting radioactive releases with the objective of showing no releases due to loss of boundary controls (other than those already evaluated as primary nuclear safety boundaries). NFPA 805 Transition Software (DATATRAK) The NFPA 805 Transition Data Tracking System (DATATRAK) has been developed by AREVA as a tool for modeling, managing and reporting data related to performing an NFPA 805 Transition analysis. The application has been designed to integrate the data elements and relationships required to support the various tasks related to performing both Fire Safe Shutdown and NFPA 805 Transition Analyses. Data screens and reports have been designed to accommodate the data input and reporting requirements for NFPA 805 Transition tasks such as the following: Safe Shutdown System and Component Selection Modeling Interlock, Power and Sub-component Dependencies Cable Selection for SSD, PRA and NPO Cable Routing and Location Fire Area SSD Assessments Non-Power Operation Assessments Basic Event Mapping to Cables Fire PRA Impact Assessments Fire PRA Scenario Zone of Influence Calculations Determing impact to analyses due to data revisions Generate LAR Tables This analysis involves modeling information associated with components, cables and raceways to determine the impact of fire damage on the ability to achieve safe shutdown within each fire zone or fire area. The DATATRAK application supports both the Nuclear Safety Analysis plus the additional NFPA 805 related tasks such as Non-Power Operational Mode assessments and calculating Fire PRA cable impacts including Basic Event mapping and Fire Scenario cable impacts. The database system is also designed to link to external data sources such as selected plant cable raceway data tables and selected PRA CAFTA Basic Event data tables in support of the analysis. In addition, the software is also designed to identify the delta resulting from revisions to these external data sources used as design input to the Transition Analysis in order to maintain data configuration control. This software solution has been developed from AREVA s expertise in supporting various NFPA 805 transition projects and has received favorable reviews from the NRC during Pilot Plant reviews. Furthermore, the design of the application supports customization to meet the needs of each plantspecific project by integrating all the elements required to support this analysis.

12 Probabilistic Risk Analysis (PRA) Fire PRA is dependent on the application of event tree/fault tree analysis, which is a core competency of AREVA fire PRA personnel. Our detailed knowledge of plant accident sequences, design and operation helps customers understand the overall risk to their plant especially from postulated fire-induced component failures, system interactions, and dependencies. AREVA has supported the latest methods for fire PRA for full power operations as contained in EPRI/NRC-RES Fire PRA Methodology for Nuclear Power Facilities, NUREG/CR This methodology enhances cable selection and circuit analysis, and uncertainty analysis. Significant changes include development of ignition frequencies, post-fire HRA and fire modeling. Plus, the methodology improves component selection, development of the fire-induced risk model, and quantitative screening. Fire Modeling As an integral component of NFPA 805, fire modeling is used to determine the survivability of plant structures, systems and components as well as predict tenability within the fire areas of concern. However, for fire modeling to be effective, each program must be applied with a clear understanding of its limitations. Fire scenario construction must be fully cognizant of the following attributes: Proper characterization of fire source term Target pass/fail criteria Plume and ceiling jet/layer development and orientation Direct flame radiation exposure Ignition criteria for proximate/contributory combustibles AREVA Inc IBM Drive, Charlotte, NC Joel Drennan Business Development Manager 4100 International Plaza, Suite 750 Fort Worth, Texas Joel.Drennan@areva.com Tel: Cell: or contact: AREVA Engineering Control Center EngineeringControlCenter@areva.com Tel: us.areva.com AREVA has the expertise and experience to construct the proper scenarios and apply the right fire modeling tools to yield technically sound results. Program Change and Licensing Basis Other aspects of the transition to the risk-informed, performance-based approach of NFPA 805 is evaluating the convertability of the program itself. The adequacy of existing configuration control, quality assurance, program surveillance and monitoring, administrative control attributes, and corrective action processes are all items that must be considered and appropriately integrated/ updated as needed. This process ensures that the new licensing basis for fire protection is correctly oriented to accommodate and manage future change and will stand up to regulatory scrutiny for the life of the plant. Experience You Can Count On AREVA offers the complete range of engineering services needed to help you navigate a successful transition to NFPA 805. Working in concert with your fire protection personnel, we will help map the transition process, develop the cost-benefit analyses needed to support key decisions, and perform the required engineering analyses, licensing submittals and supporting documentation. The data and information contained herein are provided solely for illustration and informational purposes and create no legal obligations by AREVA. None of the information or data is intended by AREVA to be a representation or a warranty of any kind, expressed or implied, and AREVA assumes no liability for the use of or reliance on any information or data disclosed in this document AREVA. All rights reserved. 1/15 ANP:U-228-V8-15-ENG

13 Nuclear Facility Fire Alarm Solutions An Experienced Resource Limited engineering resources and tighter inspection and maintenance budgets are challenging operations personnel at U.S. nuclear plants. As a result, environmental, regulatory, economic and operational drivers are changing the nuclear industry and will influence it for the next 60 years. From plant life extensions to the next generation of plants, these trends could affect plant safety systems, especially fire alarm systems inside and outside the plant critical power block boundaries. With more than 40 years of nuclear power plant fire protection engineering experience and 15 years of fire alarm system modification/implementation experience, AREVA can deliver comprehensive fire alarm system solutions to help resolve the obsolescence/compliance issues for meeting the plant extended life. These comprehensive solutions are based on decades of field-proven project and systems analysis experience. It is all about mitigating fire alarm system operational cost pressures with innovation backed by global technological leadership from a single, responsible source. AREVA Advantage AREVA delivers a focused, comprehensive conceptual analysis of existing systems within the context of your plant s design and modification legacy. We also provide a measured, balanced approach to system upgrades and technology migration, including: System compatibility with existing cabling and field devices. Selecting the system technology that best suits the environmental application (i.e., incipient detection in areas with high radiation exposure to address device longevity and operating staff dose exposure). Taking advantage of new addressable device technology for maintenance cost reductions. Better operator emergency response with specific alarm annunciation information. Reduced overall system life cycle costs. AREVA is focused on creating the most cost-effective solution, tailored specifically to meet the particular needs of your facility. State-of-the-art Fire Alarm System Technology Regulatory Expertise AREVA is a leader in participating in the development of NFPA 72, National Fire Alarm Signaling Code in addition to supporting the development of other important fire protection standards, industry working groups, and industry forum presentations. Our team will ensure the transition to new alarm system technology will comply with the plant s licensing basis. Through our regulatory expertise, we understand the need for alarm system interface requirements and limitations (e.g., existing device/circuit compatibility with the alarm vendor s equipment while maintaining UL Listing & NFPA 72).

14 Fire Alarm System Design Expertise AREVA s fire protection engineering capabilities include specific working experience with multiple vendor alarm system products for furnishing the most advanced, highly reliable, and high-performance fire alarm systems for the nuclear power industry. We were instrumental in developing the design changes required to install alarm system upgrades at five different plant sites in addition to supporting the implementation of the packages. Our projects are managed to meet our client s expectations including: Meeting project scope of work and objectives. Establishing project team interfaces and AREVA s team resources. Following client document flow and control interfaces. Maintaining agreed project costs and schedule. Ensuring implementation of applicable AREVA and Client QA program requirements. Features and Benefits A comprehensive solution to address Fire Protection Licensing variables (e.g., license basis, fire watch and administrative control requirements, etc.). Our team devotes uncompromising attention to quality and process flexibility (e.g., we can develop modifications, support client package development and supply system material if requested). A single point of responsibility, if requested. Replacement system operation and maintenance cost saving provisions with temporary system component outage flexibility. State-of-the-art fire alarm systems have enhanced monitoring and status reporting capabilities. Faster detection and detailed alarm annunciation information for operator emergency response. The installation of the new alarm system is always evaluated for ongoing support for hardware and software components through the duration of your plant s life cycle. AREVA can provide a single source for all your facility-specific fire alarm system needs from conceptual design through final installation and testing. We have provided effective methods for reducing construction and testing costs by utilizing state-of-the-art alarm system equipment and AREVA engineering experience. Our team is poised to help deliver significant overall fire alarm system cost savings and value. We thrive on generating safety and operational dividends that will resonate across your facility. AREVA Inc IBM Drive, Charlotte, NC Joel Drennan Business Development Manager 4100 International Plaza, Suite 750 Fort Worth, Texas Joel.Drennan@areva.com Tel: Cell: or contact: AREVA Engineering Control Center EngineeringControlCenter@areva.com Tel: us.areva.com The data and information contained herein are provided solely for illustration and informational purposes and create no legal obligations by AREVA. None of the information or data is intended by AREVA to be a representation or a warranty of any kind, expressed or implied, and AREVA assumes no liability for the use of or reliance on any information or data disclosed in this document AREVA Inc. All rights reserved. 1/15 ANP:U-259-V6-15-ENG

15 Nuclear Plant Breaker Coordination Services for NFPA 805 Is Your Plant Ready for NFPA 805 LAR Submittal? Existing breaker coordination calculations that were prepared for Fire Protection Safe Shutdown may not be adequate for transition to NFPA 805. Risk- Informed Performance-Based analyses require a more finite approach to cable analysis and subsequent breaker coordination. These finite scenarios may separate what was once one Fire Area into multiple Fire PRA fire scenarios based on ignition sources. Credit Power Supply Fire PRA Scenario Boundary Exposure Fire Non-PRA Component A Long History of Success AREVA has a proven track record and long history of resolving generic industry fire protection issues and plant-specific concerns. We consistently provide cost-effective analytical techniques and compliance methods to help our clients meet regulatory requirements and plant-performance goals. Comprehensive Services Our multi-disciplined staff provides comprehensive services to address a broad spectrum of issues and concerns. We garner repeat business from numerous clients by consistently demonstrating our ability to resolve industry issues and plant-specific concerns and optimize performance of their Fire Safe Shutdown Programs. Credited PRA Component Fire Area Boundary (Typical) In addition, there is a potential to include more station equipment into a Fire PRA than previous Fire Safe Shutdown Analysis, including non-safety related components. This more finite area analysis along with a potential increase in required power supplies demonstrates the need to re-evaluate the plants breaker coordination for transition to NFPA 805. What Is Required? NFPA 805, Section , requires the inclusion of those circuits that could cause a loss of a power supply required to achieve the nuclear safety performance criteria. This loss could be due to protection devices (i.e. breaker or fuse) that are not properly coordinated with its upstream protection devices. ASME Standard for Probabilistic Risk Assessment for Nuclear Power Plant Applications (ASME-RA-S-2002) requires the confirmation of satisfactory electrical coordination for Fire PRA power supplies. This requirement is part of the Fire PRA Peer Review performed to determine the quality of the PRA. Features and Benefits Our DATATRAK software fully integrates all aspects for Fire Safe Shutdown Analysis into a single design tool including breaker coordination Fire safe shutdown logic diagrams Component circuit analysis Separation analysis and compliance assessments Safe shutdown analysis software (DATATRAK)

16 AREVA Inc IBM Drive, Charlotte, NC Joel Drennan Business Development Manager 4100 International Plaza, Suite 750 Fort Worth, Texas Tel: Cell: or contact: AREVA Engineering Control Center Tel: us.areva.com The data and information contained herein are provided solely for illustration and informational purposes and create no legal obligations by AREVA. None of the information or data is intended by AREVA to be a representation or a warranty of any kind, expressed or implied, and AREVA assumes no liability for the use of or reliance on any information or data disclosed in this document AREVA Inc. All rights reserved. 1/15 ANP:U-334-V5-15-ENG

17 Nuclear Plant NFPA 805 Program Maintenance AREVA, the world s leading nuclear supplier, is recognized throughout the industry as a premier provider of fire protection engineering, design and analysis services. Background AREVA has provided fire protection engineering services to the nuclear power industry for plants that have committed to transition their licensing basis from a NRC prescriptive program to a riskinformed / performance-based NFPA 805 program. Upon the completion of the plant Licensing Amendment Request submittal, plants need to commence with the new program implementation and maintenance process. Involved and Engaged AREVA has actively supported the development of NFPA 805 and is a leader in fire protection standards development, industry working groups, and industry forum presentations. Additionally, as part of a Nuclear Energy Institute (NEI) initiative, members of our team helped develop the circuit analysis methods described in NEI 00-01, Guidance for Post-Fire Safe Shutdown Circuit Analysis. We were also selected by NEI to support pilot plant evaluations of this methodology to demonstrate compliance with regulatory requirements. AREVA currently is engaged in supporting several plants with the implementation and maintenance of their NFPA 805 Programs, post-transition. Continuing the NFPA 805 Program, Post-Transition Transitioning to a NFPA 805 program is a significant undertaking, and AREVA has the knowledge and experience to supplement the plant engineering staff with fire protection, safe shutdown and other engineers for reviewing plant modification impacts on the NFPA 805 Fire Protection Program. This effort typically includes having AREVA project team resources available to support initiation of revised and new procedures, training of modification engineers and assessment of modification impacts to the program. AREVA can provide the following minimum services for maintaining the NFPA 805 program: Review of new and completed Engineering Change packages for impacts on the NFPA 805 Program. Perform Analysis updates based on the results of new / existing modification change impacts. Provide mentoring services for the plant engineering staff for maintaining the NFPA 805 Program. Provide NFPA 805 Fire Protection Program general engineering support for Fire PRA Reviews, change evaluations, and NRC Inspections. Features and Benefits Cost and man-hour savings for maintaining the program Mentoring services for the plant engineering staff NFPA 805 Fire Protection Program change evaluation support activities

18 Modifications Impact Screening Reviews on the NFPA 805 Program The review of plant modification packages include performing a screening review to ensure the modifications do not make changes in the plant that can negatively affect the NFPA 805 Fire Protection Program. Some of the initial review steps include: The review of new, existing and emergent modification packages. Review of elementary drawings and flow diagrams for impacts. Review of critical analyses / evaluations including: a. Fire Probabilistic Risk Assessment b. Nuclear Safety Capability Assessment for At Power c. Nuclear Safety Capability Assessment for Non-power Operations d. Classical Fire Protection e. Breaker Coordination f. Code Compliance Typically, the NFPA 805 modification reviews will require the identification and development of the necessary work processes and procedures for maintaining configuration control. This effort will be key for maintaining configuration control of the program for the ongoing life of the plant. AREVA has developed these processes / procedures for other plant sites and can use the lessons learned from these projects to streamline the process for your plant. AREVA Inc IBM Drive, Charlotte, NC Joel Drennan Business Development Manager 4100 International Plaza, Suite 750 Fort Worth, Texas Joel.Drennan@areva.com Tel: Cell: or contact: AREVA Engineering Control Center EngineeringControlCenter@areva.com Tel: us.areva.com Maintaining NFPA 805 Program Documentation In addition to the modification screening for NFPA 805 impacts, revisions to analyses and calculations may be necessary for the modification design. The analyses that may require update could include: Classical Fire Protection Design Basis Documentation Nuclear Safety Capability Assessment for Post-Fire Safe Shutdown Nuclear Safety Capability Assessment for Nonpower Operations Radiation Release Assessment Breaker Coordination Study Fire PRA Updates The updates and screening reviews can be a living process for every modification performed following the License Amendment Request submittal. Mentoring of Plant Engineering Resources AREVA understands that the plant engineering staff must be responsible to implement and maintain the NFPA 805 Fire Protection Program. Therefore, AREVA can provide mentoring services so this responsibility can be transferred to the plant staff as quickly as possible. This typically is accomplished with the simultaneous mentoring and training of the plant staff in the process and tools used during the screening. To accomplish this, AREVA will commit engineering personnel on site to work with the plant staff for implementing the plant screenings and documentation updates. Experience You Can Count On AREVA offers the complete range of engineering services needed to help you successfully maintain your NFPA 805 Program. Working in concert with your plant staff personnel, we will help develop the maintenance process, provide any necessary mentoring activities and support updates to required engineering analyses and supporting documentation. The data and information contained herein are provided solely for illustration and informational purposes and create no legal obligations by AREVA. None of the information or data is intended by AREVA to be a representation or a warranty of any kind, expressed or implied, and AREVA assumes no liability for the use of or reliance on any information or data disclosed in this document AREVA Inc. All rights reserved. 1/15 ANP:U-449-V3-15-ENG

19 Nuclear Plant Fire PRA Program Implementation AREVA, the world s leading nuclear supplier, is recognized throughout the industry as a premier provider of fire protection engineering, design and analysis services. Industry Issue For utilities that have decided to retain their 10CFR 50, Appendix R licensing basis, NRC Regulatory Guide has provided a path to use specific performance-based tools to evaluate and mitigate risks within the plant. Based on the NRC guidance, Fire Probabilistic Risk Assessment (Fire PRA) methodology can be used to mitigate circuit issues, such as Multiple Spurious Operations (MSOs). AREVA Solution AREVA is currently supporting our clients with the development of a new Fire PRA program with a proven track record. In addition, AREVA has supported clients in addressing the impacts of fire induced circuit MSOs, analyzing impacts on circuit routings, and updating component / cable selection data. Involved and Engaged AREVA has actively supported the development of fire protection NFPA standards, industry working groups, and industry forum presentations. Additionally, as part of a Nuclear Energy Institute (NEI) initiative, members of our team helped develop the advanced performance-based methods for circuit analysis described in NEI 00-01, Guidance for Post- Fire Safe Shutdown Circuit Analysis. We were also selected by NEI to support pilot plant evaluations with the application of this methodology to demonstrate compliance with regulatory requirements. Considering Developing a Fire PRA Program Utilities often determine the implementation of risk-informed Fire PRA methodology is the most beneficial methodology by evaluating the risk impacts of fire induced circuit MSOs versus the potential for rerouting circuits or relocating components. AREVA has the knowledge and experience to supplement the plant engineering staff with fire protection (FPE) and safe shutdown (SSE) engineers for developing and implementing a Fire PRA program as allowed by Regulatory Guide 1.189, while maintaining the current plant licensing basis. This effort typically includes having AREVA project team resources available to support initiation of revised and new procedures, and training of modification engineers for impacts on the program. AREVA can provide the following services in developing a Fire PRA program: Review of impacted cables and components for updated routing location information or for missing cable routes / endpoints Develop component failure tag cable mapping data Perform the modeling and reports for identifying MSO risks Provide mentoring services for the plant engineering staff for maintaining the Fire PRA Program Update DATATRAK software to interface with the plant cable and raceway database to maintain configuration control Features and Benefits Cost and man-hour savings for future modifications in identifying MSO risks Mentoring program for the plant engineering staff

20 Fire PRA Supporting Software (DATATRAK) The Fire PRA supporting Data Tracking System (DATATRAK) software has been developed by AREVA as a tool for modeling, managing and reporting data related to a Fire PRA program. The application has been designed to integrate the data elements and relationships required to support Fire Safe Shutdown Analyses and Fire PRA related tasks. Data screens and reports have been designed to accommodate the data input and reporting requirements for Fire PRA tasks such as the following: The System and Component Selection Modeling Interlock, Power and Sub-component Dependencies Cable Selection for Safe Shutdown, Probabilistic Risk Assessment and Non-Power Operations Cable Routing and Location Basic Event Mapping Fire PRA Impact Assessments Fire PRA Scenario Zone of Influence Calculations Evaluation / Analysis of Impact Due to Data Revisions The use of DATATRAK involves modeling information associated with components, cables and raceways to determine the impact of fire damage on Core Damage Frequency (CDF) risks within each fire zone or fire area. The software also includes Basic Event mapping and Fire Scenario cable impacts. The database system is also designed to link to external data sources such as selected plant cable raceway data tables and selected PRA Computer Aided Fault Tree Analysis CAFTA Basic Event data tables in support of the analysis. In addition, the software is also designed to identify the delta resulting from revisions to these external data sources used as design input in order to maintain data configuration control. This software solution has been developed from AREVA s expertise in supporting various NFPA 805 transition projects and has received favorable reviews from the NRC during Pilot Plant reviews. Furthermore, the design of the application supports customization to meet the needs of each plant-specific project by integrating all the elements required to support this analysis. Mentoring of Plant Engineering Resources AREVA understands that the plant engineering staff must ultimately implement the Fire PRA Program; therefore, we provide mentoring of the program so this responsibility can be transferred to the plant staff as quickly as possible. This transition typically is accomplished with the simultaneous mentoring and training of the plant staff in the process and tools used during the screening. To accomplish this, AREVA will provide our engineering personnel on site to work with the plant engineering for implementing the process of performing screenings and documentation updates. Experience You Can Count On AREVA offers the complete range of engineering services needed to help you successfully maintain your Fire PRA Program. Working in concert with your fire protection personnel, we will help map the maintenance process, develop the needed mentoring program and support the update to the required engineering analyses and supporting documentation. AREVA Inc IBM Drive, Charlotte, NC Joel Drennan Business Development Manager 4100 International Plaza, Suite 750 Fort Worth, Texas Joel.Drennan@areva.com Tel: Cell: or contact: AREVA Engineering Control Center EngineeringControlCenter@areva.com Tel: us.areva.com The data and information contained herein are provided solely for illustration and informational purposes and create no legal obligations by AREVA. None of the information or data is intended by AREVA to be a representation or a warranty of any kind, expressed or implied, and AREVA assumes no liability for the use of or reliance on any information or data disclosed in this document AREVA Inc. All rights reserved. 9/14 ANP:U-450-V3-15-ENG

NUCLEAR REGULATORY COMMISSION

NUCLEAR REGULATORY COMMISSION GAO United States Government Accountability Office Report to Congressional Requesters October 2012 NUCLEAR REGULATORY COMMISSION Oversight and Status of Implementing a Risk-Informed Approach to Fire Safety

More information

Harris Nuclear Plant (HNP) NFPA 805 Transition. NFPA 805 Monitoring Program

Harris Nuclear Plant (HNP) NFPA 805 Transition. NFPA 805 Monitoring Program Harris Nuclear Plant (HNP) NFPA 805 Transition NFPA 805 Monitoring Program Oconee / Harris NFPA 805 Pilot Observation Meeting April 14-16, 2008 Charlotte, NC Keith Began, CES/FP Review from Nov. 2007 Pilot

More information

Global Leaders in Fire Engineering. Company Overview. Finding simple solutions to complex problems.

Global Leaders in Fire Engineering. Company Overview. Finding simple solutions to complex problems. Company Overview Finding simple solutions to complex problems. ON M9B 6H7 AB T2H 1Z9 339941 From our offices in,, and, we serve our national and international clients by providing cost-effective solutions

More information

POSITION STATEMENT THE ENGINEER AND THE ENGINEERING TECHNICIAN DESIGNING FIRE PROTECTION SYSTEMS. July 28, 2008

POSITION STATEMENT THE ENGINEER AND THE ENGINEERING TECHNICIAN DESIGNING FIRE PROTECTION SYSTEMS. July 28, 2008 SOCIETY OF FIRE PROTECTION ENGINEERS (SFPE) NATIONAL SOCIETY OF PROFESSIONAL ENGINEERS (NSPE) NATIONAL INSTITUTE FOR CERTIFICATION IN ENGINEERING TECHNOLOGIES (NICET) POSITION STATEMENT THE ENGINEER AND

More information

NEI 06-13A [Revision 0] Template for an Industry Training Program Description

NEI 06-13A [Revision 0] Template for an Industry Training Program Description NEI 06-13A [Revision 0] Template for an Industry Training Program Description NEI 06-13A [Revision 0] Nuclear Energy Institute Template for an Industry Training Program Description ACKNOWLEDGEMENTS This

More information

AP1000 European 18. Human Factors Engineering Design Control Document

AP1000 European 18. Human Factors Engineering Design Control Document 18.2 Human Factors Engineering Program Management The purpose of this section is to describe the goals of the AP1000 human factors engineering program, the technical program to accomplish these goals,

More information

F.Y.I. Specifying Fire Protection Systems Using Division 13

F.Y.I. Specifying Fire Protection Systems Using Division 13 F.Y.I. Specifying Fire Protection Systems Using Division 13 Automatic fire sprinkler systems and fire alarm and detection systems are increasingly installed in modern buildings. Even where building codes

More information

ANNUAL FIRE PROTECTION SUMMARY INFORMATION REPORTING GUIDE Revised: May 2011

ANNUAL FIRE PROTECTION SUMMARY INFORMATION REPORTING GUIDE Revised: May 2011 ANNUAL FIRE PROTECTION SUMMARY INFORMATION REPORTING GUIDE Revised: May 2011 Organizations responsible for maintaining property under stewardship of DOE and the Administrator, NNSA, will seek concurrence

More information

Table F-1 NEI 00-01 MSO IDENTIFICATION CHECKLIST

Table F-1 NEI 00-01 MSO IDENTIFICATION CHECKLIST Table F-1 NEI 00-01 MSO IDENTIFICATION CHECKLIST Stage Step Outcome Complete? Phase I: Pre- Review Generic MSO List for Identification of each MSO on the generic list as either review of Applicability

More information

UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REACTOR REGULATION WASHINGTON, D.C. 20555-0001. June 1, 2005

UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REACTOR REGULATION WASHINGTON, D.C. 20555-0001. June 1, 2005 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REACTOR REGULATION WASHINGTON, D.C. 20555-0001 June 1, 2005 NRC INFORMATION NOTICE 2005-14: FIRE PROTECTION FINDINGS ON LOSS OF SEAL COOLING

More information

Rhode Island State Fire Marshal Fire Protection Systems Narrative Reports. What is a Narrative Report?

Rhode Island State Fire Marshal Fire Protection Systems Narrative Reports. What is a Narrative Report? RHODE ISLAND DIVISION OF STATE FIRE MARSHAL 1951 Smith Street, North Providence, RI 02911 Telephone: (401) 383-7717 Fax: (401) 383-8879 John E. Chartier, EFO, CFI State Fire Marshal Rhode Island State

More information

FIRE RISK ASSESSMENT IN GERMANY - PROCEDURE, DATA, RESULTS -

FIRE RISK ASSESSMENT IN GERMANY - PROCEDURE, DATA, RESULTS - International Conference Nuclear Energy in Central Europe 2000 Golf Hotel, Bled, Slovenia, September 11-14, 2000 FIRE RISK ASSESSMENT IN GERMANY - PROCEDURE, DATA, RESULTS - H.P. Berg Bundesamt für Strahlenschutz

More information

Published in the Official State Gazette (BOE) number 166 of July 10th 2009 [1]

Published in the Official State Gazette (BOE) number 166 of July 10th 2009 [1] Nuclear Safety Council Instruction number IS-22, of July 1st 2009, on safety requirements for the management of ageing and long-term operation of nuclear power plants Published in the Official State Gazette

More information

FIRE ALARM AND DETECTION SYSTEMS SECTION 16721

FIRE ALARM AND DETECTION SYSTEMS SECTION 16721 PART 1 - GENERAL 1.01 WORK INCLUDED FIRE ALARM AND DETECTION SYSTEMS SECTION 16721 A. Provide a complete fully addressable, power limited, fire detection and evacuation system. The system shall be connected

More information

The Locomotive. Risk-Informed Fire Protection

The Locomotive. Risk-Informed Fire Protection Risk-Informed Fire Protection By Thomas F. Barry, P.E., and Theresa Stone, HSB Professional Loss Control, The Hartford Steam Boiler Fire Safety And Tight Budgets Fire safety specialists are meeting the

More information

On-Site Risk Management Audit Checklist for Program Level 3 Process

On-Site Risk Management Audit Checklist for Program Level 3 Process On-Site Risk Management Audit Checklist for Program Level 3 Process Auditor name: Date: I. Facility Information: Facility name: Facility location: County: Contact name: RMP Facility I.D. Phone Number:

More information

APPENDIX B SUPPLEMENTAL INSPECTION PROGRAM A. OBJECTIVES AND PHILOSOPHY OF THE SUPPLEMENTAL INSPECTION PROGRAM

APPENDIX B SUPPLEMENTAL INSPECTION PROGRAM A. OBJECTIVES AND PHILOSOPHY OF THE SUPPLEMENTAL INSPECTION PROGRAM APPENDIX B SUPPLEMENTAL INSPECTION PROGRAM A. OBJECTIVES AND PHILOSOPHY OF THE SUPPLEMENTAL INSPECTION PROGRAM The supplemental inspection program is designed to support the NRC s goals of maintaining

More information

Life Safety Code Enabling References

Life Safety Code Enabling References SUPPLEMENT 4 Life Safety Code Enabling References Editor s Note: Supplement 4 provides users of NFPA 72, National Fire Alarm and Signaling Code, with a summary of requirements from NFPA 101, Life Safety

More information

REGULATORY GUIDE OFFICE OF NUCLEAR REGULATORY RESEARCH. REGULATORY GUIDE 1.174 (Draft was issued as DG-1226, dated August 2009)

REGULATORY GUIDE OFFICE OF NUCLEAR REGULATORY RESEARCH. REGULATORY GUIDE 1.174 (Draft was issued as DG-1226, dated August 2009) U.S. NUCLEAR REGULATORY COMMISSION May 2011 Revision 2 REGULATORY GUIDE OFFICE OF NUCLEAR REGULATORY RESEARCH REGULATORY GUIDE 1.174 (Draft was issued as DG-1226, dated August 2009) AN APPROACH FOR USING

More information

ALBERTA FIRE CODE SAFETY EQUIPMENT MAINTENANCE REQUIREMENTS

ALBERTA FIRE CODE SAFETY EQUIPMENT MAINTENANCE REQUIREMENTS ALBERTA FIRE CODE SAFETY EQUIPMENT MAINTENANCE REQUIREMENTS In this document are the fire safety equipment maintenance requirements that are found in Division B of the Alberta Fire Code (AFC 2006) for

More information

Winnipeg Fire Department Fire Prevention Branch

Winnipeg Fire Department Fire Prevention Branch Winnipeg Fire Department Fire Prevention Branch Manitoba Fire Code Life-Safety Equipment Maintenance Requirements The Fire Prevention Branch of the Winnipeg Fire Department has prepared this document of

More information

Rancho Cucamonga Fire Protection District Prevention Bureau Standard

Rancho Cucamonga Fire Protection District Prevention Bureau Standard Rancho Cucamonga Fire Protection District Prevention Bureau Standard Title: Fire Alarm and Monitoring Systems Standard # 9-3 Effective: May 2002 Number of Pages: 7 Revised: January 2014 INTENT The intent

More information

Fire Protection Program Of Chashma Nuclear Power Generating Station Pakistan Atomic Energy Commission 5/28/2015 1

Fire Protection Program Of Chashma Nuclear Power Generating Station Pakistan Atomic Energy Commission 5/28/2015 1 Fire Protection Program Of Chashma Nuclear Power Generating Station Pakistan Atomic Energy Commission 5/28/2015 1 Nuclear Power in Pakistan Nuclear Power Plants Capacity (MWe) Year of Commissioning In

More information

Copyright 2011 S&S Sprinklers All Rights Reserved. Family Honesty Integrity Spiritual Growth Fairness Teamwork

Copyright 2011 S&S Sprinklers All Rights Reserved. Family Honesty Integrity Spiritual Growth Fairness Teamwork Copyright 2011 S&S Sprinklers All Rights Reserved Family Honesty Integrity Spiritual Growth Fairness Teamwork AUTOMATIC SPRINKLERS Wet, Dry, Pre-Action & Deluge Sprinkler Systems Foam Systems Standpipes

More information

MSC/Circ.1002 26 June 2001 GUIDELINES ON ALTERNATIVE DESIGN AND ARRANGEMENTS FOR FIRE SAFETY

MSC/Circ.1002 26 June 2001 GUIDELINES ON ALTERNATIVE DESIGN AND ARRANGEMENTS FOR FIRE SAFETY INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR Telephone: 020 7735 7611 Fax: 020 7587 3210 Telex: 23588 IMOLDN G IMO E Ref. MSC/Circ.1002 26 June 2001 GUIDELINES ON ALTERNATIVE

More information

COMMONWEALTH OF MASSACHUSETTS STATE BUILDING CODE 780 CMR, 6 th Edition FIRE PROTECTION SYSTEMS CHAPTER 9

COMMONWEALTH OF MASSACHUSETTS STATE BUILDING CODE 780 CMR, 6 th Edition FIRE PROTECTION SYSTEMS CHAPTER 9 COMMONWEALTH OF MASSACHUSETTS STATE BUILDING CODE 780 CMR, 6 th Edition FIRE PROTECTION SYSTEMS CHAPTER 9 GUIDELINES FOR THE PREPARATION OF FIRE PROTECTION SYSTEM NARRATIVE REPORTS 780 CMR 903.1.1 State

More information

Criteria for Flight Project Critical Milestone Reviews

Criteria for Flight Project Critical Milestone Reviews Criteria for Flight Project Critical Milestone Reviews GSFC-STD-1001 Baseline Release February 2005 Approved By: Original signed by Date: 2/19/05 Richard M. Day Director, Independent Technical Authority

More information

SECTION 16721 FIRE ALARM AND DETECTION SYSTEMS

SECTION 16721 FIRE ALARM AND DETECTION SYSTEMS SECTION 16721 FIRE ALARM AND DETECTION SYSTEMS The equipment requirements of this section apply to the IUB Campus. The IUPUI Campus has a preferred vendor agreement for fire alarm systems. Contact Pat

More information

2014 Limited Plan Submittal Checklist

2014 Limited Plan Submittal Checklist City of Aurora Public Works Department WET AND DRY CHEMICAL HOOD SUPPRESSION SYSTEM 2014 Limited Plan Submittal Checklist Building Division 15151 E. Alameda Parkway, Ste 2400 Aurora, CO 80012 303-739-7420

More information

PLAN REVIEW GUIDE FOR FIRE ALARM

PLAN REVIEW GUIDE FOR FIRE ALARM PLAN REVIEW GUIDE FOR FIRE ALARM PROJECT NAME: PERMIT # PROJECT ADDRESS: CONTACT PERSON: PHONE Fire alarm system installation information shall be provided on the appropriate architectural and electrical

More information

DEPARTMENT OF CONSUMER AND INDUSTRY SERVICES DIRECTOR'S OFFICE

DEPARTMENT OF CONSUMER AND INDUSTRY SERVICES DIRECTOR'S OFFICE DEPARTMENT OF CONSUMER AND INDUSTRY SERVICES DIRECTOR'S OFFICE CERTIFICATION OF FIRMS FOR FIRE ALARM SYSTEMS AND FIRE SUPPRESSION SYSTEMS IN STATE-REGULATED FACILITIES (By authority conferred on the state

More information

Exova Warringtonfire fire safety engineering

Exova Warringtonfire fire safety engineering Consultancy - Fire Engineering Exova Warringtonfire fire safety engineering We are committed to the philosophy where the fire safety design supports the vision, innovation or imagination of the building

More information

In Reference 3, the RAI includes two questions for which responses are provided in Attachment 1.

In Reference 3, the RAI includes two questions for which responses are provided in Attachment 1. Jon A. Franke Site Vice President Susquehanna Nuclear, LLC 769 Salem Boulevard Berwick, PA 18603 Tel. 570.542.2904 Fax 570.542.1504 jon.franke@talenenergy.com TALEN ~ ENERGY SEP 2 1 2015 U.S. Nuclear Regulatory

More information

FLORIDA ATLANTIC UNIVERSITY FIRE ALARM SYSTEM INSTALLATION MANUAL

FLORIDA ATLANTIC UNIVERSITY FIRE ALARM SYSTEM INSTALLATION MANUAL FLORIDA ATLANTIC UNIVERSITY FIRE ALARM SYSTEM INSTALLATION MANUAL January, 2003 Environmental Health and Safety Florida Atlantic University 777 Glades Rd. Boca Raton, FL 33431 Phone: 561-297-3129 Fax:

More information

FOR CERTIFICATION AS PRESCRIBED BY THE STATE FIRE PREVENTION COMMISSION ON NOVEMBER 11, 2009 IN ACCORDANCE WITH THE STATE FIRE PREVENTION REGULATIONS

FOR CERTIFICATION AS PRESCRIBED BY THE STATE FIRE PREVENTION COMMISSION ON NOVEMBER 11, 2009 IN ACCORDANCE WITH THE STATE FIRE PREVENTION REGULATIONS EXAMINATION REQUIREMENTS FOR FIRE SUPPRESSION SYSTEM CERTIFICATION AS PRESCRIBED BY THE STATE FIRE PREVENTION COMMISSION ON NOVEMBER 11, 2009 IN ACCORDANCE WITH THE STATE FIRE PREVENTION REGULATIONS REGULATION

More information

PLAN SUBMITTAL REQUIREMENTS FOR SPRAY BOOTHS AND SPRAYING ROOMS EXTINGUISHING SYSTEMS

PLAN SUBMITTAL REQUIREMENTS FOR SPRAY BOOTHS AND SPRAYING ROOMS EXTINGUISHING SYSTEMS January 1997 PLAN SUBMITTAL REQUIREMENTS FOR SPRAY BOOTHS AND SPRAYING ROOMS EXTINGUISHING SYSTEMS 1.0 PERMIT 1.1 After receipt of a Building Permit from the City of San Jose Building Department, submit

More information

UNIVERSITY OF TOLEDO

UNIVERSITY OF TOLEDO UNIVERSITY OF TOLEDO SUBJECT: INTERIM LIFE SAFETY MEASURES AND INFECTION Procedure No: LS-08-008 CONTROL PROCEDURE STATEMENT Interim life safety and infection control measures will be implemented to protect

More information

NATIONAL FIRE ALARM AND SIGNALING CODE

NATIONAL FIRE ALARM AND SIGNALING CODE GAP.11.1.1.0 A Publication of Global Asset Protection Services LLC NATIONAL FIRE ALARM AND SIGNALING CODE INTRODUCTION National Fire Protection Association (NFPA) documents describe a level of fire protection

More information

TAMARAC FIRE RESCUE INSTRUCTIONS FOR FIRE ALARM PRE-SUBMITTAL CHECKLIST

TAMARAC FIRE RESCUE INSTRUCTIONS FOR FIRE ALARM PRE-SUBMITTAL CHECKLIST TAMARAC FIRE RESCUE INSTRUCTIONS FOR FIRE ALARM PRE-SUBMITTAL CHECKLIST In order to provide a comprehensive plan review in a timely manner, and to insure the design and installation of fire alarm systems

More information

EXHIBIT A SCOPE OF WORK

EXHIBIT A SCOPE OF WORK EXHIBIT A SCOPE OF WORK 1. (Contractor) shall provide fire alarm system maintenance/repair/testing services as described herein to the California Department of Veterans Affairs (hereinafter CDVA, CalVet,

More information

Nuclear Safety Council Instruction number IS-19, of October 22 nd 2008, on the requirements of the nuclear facilities management system

Nuclear Safety Council Instruction number IS-19, of October 22 nd 2008, on the requirements of the nuclear facilities management system Nuclear Safety Council Instruction number IS-19, of October 22 nd 2008, on the requirements of the nuclear facilities management system Published in the Official State Gazette (BOE) number 270 of November

More information

Required Certification Documentation. Contractor's installation certification for range hood fire suppression systems.

Required Certification Documentation. Contractor's installation certification for range hood fire suppression systems. OFFICE OF UNIVERSIT BUILDING OFFICIAL PROJECT/CONSTRUCTION MAGER: Sample Manager Required Aboveground only Required Certification Documentation Contractor s material and test certifications for both above

More information

Guidance for the Quality Assurance of Fire Protection Systems

Guidance for the Quality Assurance of Fire Protection Systems Guidance for the Quality Assurance of Fire Protection Systems Prepared for: Office of Energy Research Office of Environment, Safety and Health Technical Support Prepared by: Roy F. Weston, Inc. October

More information

Fire Alarm and Protection Impairment Policy and Procedures

Fire Alarm and Protection Impairment Policy and Procedures 1.0 Policy Statement The University of New Haven has developed a Fire Alarm and Protection Impairment Plan in accordance with the National Fire Protection Associations (NFPA) codes. Specific codes referenced

More information

Sample Company SECTION 019113 GENERAL COMMISSIONING REQUIREMENTS PART 1 GENERAL 1.1 SUMMARY AND CONTRACT RESPONSIBILITIES

Sample Company SECTION 019113 GENERAL COMMISSIONING REQUIREMENTS PART 1 GENERAL 1.1 SUMMARY AND CONTRACT RESPONSIBILITIES SECTION 019113 GENERAL COMMISSIONING REQUIREMENTS PART 1 GENERAL 1.1 SUMMARY AND CONTRACT RESPONSIBILITIES A. The Owner will contract separately and directly for the majority of the commissioning work

More information

FIRE ALARM SYSTEMS PERMIT APPLICATION, PLAN SUBMITTAL, DESIGN, INSTALLATION AND INSPECTION REQUIREMENTS Effective Date: January, 2011

FIRE ALARM SYSTEMS PERMIT APPLICATION, PLAN SUBMITTAL, DESIGN, INSTALLATION AND INSPECTION REQUIREMENTS Effective Date: January, 2011 Office of the Fire Marshal 1.0 PERMITS FIRE ALARM SYSTEMS PERMIT APPLICATION, PLAN SUBMITTAL, DESIGN, INSTALLATION AND INSPECTION REQUIREMENTS Effective Date: January, 2011 1.1 To acquire an installation

More information

Using Risk Assessment Tool to Evaluate the Fire-Induced Core Damage Frequency

Using Risk Assessment Tool to Evaluate the Fire-Induced Core Damage Frequency , June 30 - July 2, 2010, London, U.K. Using Risk Assessment Tool to Evaluate the Fire-Induced Core Damage Frequency Sh. Kamyab, M. Nematollahi, M. Famourihoseinzade Abstract the frequency of fire-induced

More information

SARATOGA FIRE DISTRICT EARLY WARNING FIRE ALARM SYSTEM STANDARDS AND REQUIRMENTS CONTENTS

SARATOGA FIRE DISTRICT EARLY WARNING FIRE ALARM SYSTEM STANDARDS AND REQUIRMENTS CONTENTS SARATOGA FIRE DISTRICT EARLY WARNING FIRE ALARM SYSTEM STANDARDS AND REQUIRMENTS CONTENTS I. APPLICATION AND DEFINITIONS 1.01 Authorization for Standards 1.02 Application of Standards 1.03 Definitions

More information

Overview of Hotel Fire Safety Requirements

Overview of Hotel Fire Safety Requirements Overview of Hotel Fire Safety Requirements in the Fire Code Susan Clarke, P.Eng. Office of the Fire Marshal - January 10, 2012 1 Agenda Regulation History - Hotels Fire Code Overview (Parts 1 to 8) Defined

More information

Transformer Deluge Systems

Transformer Deluge Systems Transformer Deluge Systems How Do Transformer Fires Ignite? Common causes of transformer failure: Weather-related events such as lightning Short circuits in electrical equipment The most common cause is

More information

FACILITY FIRE PREVENTION AND EMERGENCY PREPAREDNESS INSPECTION CHECKLIST

FACILITY FIRE PREVENTION AND EMERGENCY PREPAREDNESS INSPECTION CHECKLIST FACILITY FIRE PREVENTION AND EMERGENCY PREPAREDNESS INSPECTION CHECKLIST Date of Inspection: Conducted by: Location: Reviewed by: Date of Review: Comments or additional corrective action taken as a result

More information

ISA CERTIFIED AUTOMATION PROFESSIONAL (CAP ) CLASSIFICATION SYSTEM

ISA CERTIFIED AUTOMATION PROFESSIONAL (CAP ) CLASSIFICATION SYSTEM ISA CERTIFIED AUTOMATION PROFESSIONAL (CAP ) CLASSIFICATION SYSTEM Domain I: Feasibility Study - identify, scope and justify the automation project Task 1: Define the preliminary scope through currently

More information

Nuclear Safety Council Instruction number IS- 23 on in-service inspection at nuclear power plants

Nuclear Safety Council Instruction number IS- 23 on in-service inspection at nuclear power plants Nuclear Safety Council Instruction number IS- 23 on in-service inspection at nuclear power plants Published in the Official State Gazette (BOE) No 283 of November 24 th 2009 Nuclear Safety Council Instruction

More information

Gas Standards and Safety. Guidance Note GAS INSTALLATIONS SUPPLIED FROM BIOGAS FACILITIES - ACCEPTANCE REQUIREMENTS GAS ACT 2000

Gas Standards and Safety. Guidance Note GAS INSTALLATIONS SUPPLIED FROM BIOGAS FACILITIES - ACCEPTANCE REQUIREMENTS GAS ACT 2000 Gas Standards and Safety Guidance Note January 2015 (GN106) Version 1.0 GAS INSTALLATIONS SUPPLIED FROM BIOGAS FACILITIES - ACCEPTANCE REQUIREMENTS GAS ACT 2000 A guide to assist in the design of biogas

More information

A. The Commissioning Authority (CxA) has been contracted or will be contracted directly with the Owner for this project.

A. The Commissioning Authority (CxA) has been contracted or will be contracted directly with the Owner for this project. DIVISION 23 HEATING, VENTILATING, AND AIR CONDITIONING (HVAC) SECTION 23 08 02 PART 1 GENERAL 1.01 AUTHORITY (CxA) A. The Commissioning Authority (CxA) has been contracted or will be contracted directly

More information

SECTION 13850 (28 31 00) FIRE DETECTION AND ALARM SYSTEM

SECTION 13850 (28 31 00) FIRE DETECTION AND ALARM SYSTEM SECTION 13850 (28 31 00) FIRE DETECTION AND ALARM SYSTEM ENGINEERING SPECIFICATION INTELLIGENT REPORTING FIRE DETECTION SYSTEM PART 1 GENERAL 1.1 DESCRIPTION A. This specification includes the furnishing,

More information

CAN/ULC S1001-11 Integrated Systems Testing of Fire Protection and Life Safety Systems and Fire Protection Commissioning

CAN/ULC S1001-11 Integrated Systems Testing of Fire Protection and Life Safety Systems and Fire Protection Commissioning CAN/ULC S1001-11 Integrated Systems Testing of Fire Protection and Life Safety Systems and Fire Protection Commissioning Presentation To: Canadian Fire Alarm Association (CFAA) Alberta Technical Seminar

More information

Fire Protection Options for Data Centres

Fire Protection Options for Data Centres Fire Protection Options for Data Centres Mark L. Robin, PhD DuPont Chemicals & Fluoroproducts mark.l.robin@usa.dupont.com Introduction Modern data centres are characterized by spaces filled with ever-increasing

More information

Proposed Residential Complex At Holding No. - 98, B.T. Road, Kolkata - 700090 Developer Premier Mica Mining And Manufacturing Company

Proposed Residential Complex At Holding No. - 98, B.T. Road, Kolkata - 700090 Developer Premier Mica Mining And Manufacturing Company RISK MANAGEMENT PLAN is an integral part of a modernized and sophisticated residential complex. No efforts will be spared in identifying the all possible risks and disasters, evaluating them, installing

More information

Program No. 1.6.1. Section Heading

Program No. 1.6.1. Section Heading ENVIRONMENTAL HEALTH AND SAFETY EHS PROGRAM MANUAL Program Title 1.0 INTRODUCTION The New York City Fire Department (FDNY) is responsible for approving and/or inspecting fire alarm systems, buildings,

More information

IFE Level 4 Certificate in Fire Science and Fire Safety (HL)

IFE Level 4 Certificate in Fire Science and Fire Safety (HL) IFE Level 4 Certificate in Fire Science and Fire Safety (HL) Unit 2: Fire Safety Unit Reference Number: D/505/5932 Introduction This unit focuses on the prevention and detection of fire in premises and

More information

DRAFT REGULATORY GUIDE DG-1154 (Proposed Revision 2 of Regulatory Guide 1.128, dated October 1978)

DRAFT REGULATORY GUIDE DG-1154 (Proposed Revision 2 of Regulatory Guide 1.128, dated October 1978) U.S. NUCLEAR REGULATORY COMMISSION October 2006 OFFICE OF NUCLEAR REGULATORY RESEARCH Division 1 DRAFT REGULATORY GUIDE Contact: W.S. Raughley (301) 415-7577 DRAFT REGULATORY GUIDE DG-1154 (Proposed Revision

More information

University Design Standard. Fire Alarm Systems

University Design Standard. Fire Alarm Systems University Design Standard Fire Alarm Systems 1.0 Overview This document provides Virginia Tech s standards for the design and installation of fire alarm systems and equipment in new construction, retrofit

More information

ENVIRONMENTAL HEALTH & SAFETY 6 East Dr., Amherst MA 01002-5000

ENVIRONMENTAL HEALTH & SAFETY 6 East Dr., Amherst MA 01002-5000 AMHERST COLLEGE ENVIRONMENTAL HEALTH & SAFETY 6 East Dr., Amherst MA 01002-5000 Michael Zlogar April 11, 2001 Assistant Fire Chief Amherst Fire Department 68 North Pleasant St. Amherst, MA 01004 FIRE ALARM

More information

COMMISSIONING OF FIRE ALARM SYSTEMS

COMMISSIONING OF FIRE ALARM SYSTEMS COMMISSIONING OF FIRE ALARM SYSTEMS OWNER FURNISHED The owner directly contracts an independent third party commissioning agent for this project. This Commissioning Plan has been included for reference

More information

Important Ontario Fire Code Information for Building Owners in the City of Windsor

Important Ontario Fire Code Information for Building Owners in the City of Windsor Important Ontario Fire Code Information for Building Owners in the City of Windsor This information is intended to be used a reference only. For a complete listing consult the Ontario Fire Code or contact

More information

Safety Analysis for Nuclear Power Plants

Safety Analysis for Nuclear Power Plants Regulatory Document Safety Analysis for Nuclear Power Plants February 2008 CNSC REGULATORY DOCUMENTS The Canadian Nuclear Safety Commission (CNSC) develops regulatory documents under the authority of paragraphs

More information

Compliance Schedules and Building Warrant of Fitness

Compliance Schedules and Building Warrant of Fitness Compliance Schedules and Building Warrant of Fitness Purpose of this guidance information The purpose of this guidance information is to help building owners and managers of commercial, industrial or communal

More information

An inventory of hazardous materials used in your workplace will prove useful.

An inventory of hazardous materials used in your workplace will prove useful. Introduction Fire Protection is an organized approach designed to prevent fires. In the event of a fire, a fire protection program will help prevent or minimize personal injuries, losses, and harm to the

More information

Module 6 Fire Probabilistic Risk Assessment (PRA) Methodology for Nuclear Power Facilities

Module 6 Fire Probabilistic Risk Assessment (PRA) Methodology for Nuclear Power Facilities Module 6 Fire Probabilistic Risk Assessment (PRA) Methodology for Nuclear Power Facilities Objectives, Readings, Scope and Assignment Schedule Objectives By the end of this module, students should be able

More information

BRANCH SOLUTION. Automatic fire extinguishing systems for paint spraying plants. Safe for certain.

BRANCH SOLUTION. Automatic fire extinguishing systems for paint spraying plants. Safe for certain. BRANCH SOLUTION Automatic fire extinguishing systems for paint spraying plants Safe for certain. ISK IDENTIFYING With the extreme high degree of automation in painting technology, the risk of fire has

More information

Bold items are particular to the City of Euless

Bold items are particular to the City of Euless EULESS FIRE DEPARTMENT FIRE MARSHAL S OFFICE INFORMATION LINE: Revised 2/12 Fire Chief Wes Rhodes Fire Marshal Paul Smith EFD-FMO 3-2 2009 International Fire & Building Code as Amended NFPA Standards Adopted

More information

Inspection and Testing of Water-Based Systems

Inspection and Testing of Water-Based Systems Inspection and Testing of Water-Based Systems Standard Model/Computer-Based Testing Level III Content Outline The candidate for NICET certification at Level III in the Inspection and Testing of Water-Based

More information

OVERVIEW OF THE OPERATING REACTORS BUSINESS LINE. July 7, 2016 Michael Johnson Deputy Executive Director for Reactor and Preparedness Programs

OVERVIEW OF THE OPERATING REACTORS BUSINESS LINE. July 7, 2016 Michael Johnson Deputy Executive Director for Reactor and Preparedness Programs OVERVIEW OF THE OPERATING REACTORS BUSINESS LINE July 7, 2016 Michael Johnson Deputy Executive Director for Reactor and Preparedness Programs Program Overview Bill Dean Director Office of Nuclear Reactor

More information

CLARK COUNTY FIRE DEPARTMENT Fire Hazard & Prevention Services

CLARK COUNTY FIRE DEPARTMENT Fire Hazard & Prevention Services CLARK COUNTY FIRE DEPARTMENT Fire Hazard & Prevention Services 575 E. Flamingo Road, Las Vegas, NV 89119 (702) 455-7316 FAX (702) 455-7347 105.8a-6.1 TITLE: FIRE ALARM SYSTEM REQUIREMENTS SCOPE: This guideline

More information

SECTION A... 3 SECTION B... 7

SECTION A... 3 SECTION B... 7 BRITISH COLUMBIA SAFETY AUTHORITY Manual for Owners and Operators of Special Status Plants Risk Assessed and General Supervision Date: March 12, 2012 Controlled Document: MAN -4000-03 I TABLE OF CONTENTS

More information

RADIATION MONITORING SYSTEMS

RADIATION MONITORING SYSTEMS RADIATION MONITORING SYSTEMS Area monitors Process monitors In-line, Adjacent-to-Line monitors Local/remote processors, Data Acquisition Systems NUPIC Certified, NRC Approved Vendor Wide Range Sensitivity

More information

Selecting Sensors for Safety Instrumented Systems per IEC 61511 (ISA 84.00.01 2004)

Selecting Sensors for Safety Instrumented Systems per IEC 61511 (ISA 84.00.01 2004) Selecting Sensors for Safety Instrumented Systems per IEC 61511 (ISA 84.00.01 2004) Dale Perry Worldwide Pressure Marketing Manager Emerson Process Management Rosemount Division Chanhassen, MN 55317 USA

More information

THE HONG KONG INSTITUTION OF ENGINEERS 香 港 工 程 師 學 會. Admission Requirements for the Fire Discipline (Normal Route) Item Description Remarks

THE HONG KONG INSTITUTION OF ENGINEERS 香 港 工 程 師 學 會. Admission Requirements for the Fire Discipline (Normal Route) Item Description Remarks Admission Requirements for the Fire Discipline (Normal Route) Item Description Remarks Age Academic requirements (either (a), (b), (c) or (d) ) 25 minimum The academic requirement for Member in the Fire

More information

General Fire Code Requirements Within Commercial Tenant Spaces

General Fire Code Requirements Within Commercial Tenant Spaces FIRE DEPARTMENT in cooperation with Scope: General Fire Code Requirements Within Commercial Tenant Spaces This handout is designed to assist owners, architects, contractors and others in understanding

More information

SECTION 16721 FIRE ALARM AND SMOKE DETECTION SYSTEMS

SECTION 16721 FIRE ALARM AND SMOKE DETECTION SYSTEMS SECTION 16721 PART 1 - GENERAL 1.1 SECTION INCLUDES A. Fire Alarm Control Panels B. Manual Fire Alarm Stations C. Automatic Smoke D. Fire Alarm Notification Appliances E. Auxiliary Fire Alarm Equipment

More information

Results and Insights of Internal Fire and Internal Flood Analyses of the Surry Unit 1 Nuclear Power Plant during Mid-Loop Operations*

Results and Insights of Internal Fire and Internal Flood Analyses of the Surry Unit 1 Nuclear Power Plant during Mid-Loop Operations* BNL-NUREG-61792 Results and Insights of Internal Fire and Internal Flood Analyses of the Surry Unit 1 Nuclear Power Plant during Mid-Loop Operations* Tsong-Lun Chu, Zoran Musicki, and Peter Kohut Brookhaven

More information

Environment of Care Fire Safety Management Plan 2014

Environment of Care Fire Safety Management Plan 2014 Environment of Care Fire Safety Management Plan 2014 Updated 4.29.2014 PURPOSE The purpose of the Fire Safety Management Plan is to ensure that all facilities are designed, constructed, maintained, and

More information

The Mission Critical Fire Protection Experts

The Mission Critical Fire Protection Experts The Mission Critical Fire Protection Experts Protection Systems Protection Systems HFC-227ea / FM200 / FE-227 FE-25 / ECARO-25 Novec 1230 Inergen / Argonite Halon Drop-in Systems High and Low Pressure

More information

Health Chapter 420-5-22 ALABAMA STATE BOARD OF HEALTH ALABAMA DEPARTMENT OF PUBLIC HEALTH ADMINISTRATIVE CODE

Health Chapter 420-5-22 ALABAMA STATE BOARD OF HEALTH ALABAMA DEPARTMENT OF PUBLIC HEALTH ADMINISTRATIVE CODE Health Chapter 420-5-22 ALABAMA STATE BOARD OF HEALTH ALABAMA DEPARTMENT OF PUBLIC HEALTH ADMINISTRATIVE CODE CHAPTER 420-5-22 SUBMISSION OF PLANS AND SPECIFICATIONS FOR HEALTH CARE FACILITIES TABLE OF

More information

City of Columbus Department of Building and Zoning Services

City of Columbus Department of Building and Zoning Services City of Columbus Department of Building and Zoning Services Introduction This manual is designed to provide you, the contractor, owner or design professional with a step-by-step guide to our process, beginning

More information

Original Document 10/16/07 Revised 01/30/09 2 nd Revision 01-23-12 3 rd Revision- 12/18/14

Original Document 10/16/07 Revised 01/30/09 2 nd Revision 01-23-12 3 rd Revision- 12/18/14 North Collier Fire Control & Rescue District Greater Naples Fire Rescue District Immokalee Fire Control & Rescue District 2800 North Horseshoe Drive Naples, Florida 34104 SYSTEM REHABILITATION PLAN CHECKLIST

More information

A Regulatory Approach to Cyber Security

A Regulatory Approach to Cyber Security A Regulatory Approach to Cyber Security Perry Pederson Security Specialist (Cyber) Office of Nuclear Security and Incident Response U.S. Nuclear Regulatory Commission 1 Agenda Overview Regulatory Framework

More information

ENGINEERING SPECIFICATION. Engineering Specification SAPPHIRE 42 Bar

ENGINEERING SPECIFICATION. Engineering Specification SAPPHIRE 42 Bar Engineering Specification SAPPHIRE 42 Bar PART 1 GENERAL 1.1 DESCRIPTION OF WORK This specification outlines the requirements for a "Total Flood" SAPPHIRE Clean Agent Fire Suppression System. The work

More information

FIRE ALARM SYSTEM SUBMITTAL CHECKLIST AND APPLICATION

FIRE ALARM SYSTEM SUBMITTAL CHECKLIST AND APPLICATION PERMITS AND INSPECTIONS FIRE ALARM SYSTEM SUBMITTAL CHECKLIST AND APPLICATION 911 Assigned PROJECT LOCATION Subdivision: Lot: Blk: Sec: PROJECT New Construction Addition/Remodel Demolition Other: Number

More information

Fire Alarm System Plans Submittal Guidelines For New and Existing Systems

Fire Alarm System Plans Submittal Guidelines For New and Existing Systems Fire Alarm System Plans Submittal Guidelines For New and Existing Systems SCOPE The Temecula Fire Prevention Bureau (TFPB) has established the following requirements for the submittal of all fire alarms,

More information

CORPORATE QUALITY MANUAL

CORPORATE QUALITY MANUAL Corporate Quality Manual Preface The following Corporate Quality Manual is written within the framework of ISO 9001:2008 Quality System by the employees of CyberOptics. CyberOptics recognizes the importance

More information

General Safety & Health Standards Published by the Division of Building Safety In Cooperation with the Idaho Industrial Commission

General Safety & Health Standards Published by the Division of Building Safety In Cooperation with the Idaho Industrial Commission General Safety & Health Standards Published by the Division of Building Safety In Cooperation with the Idaho Industrial Commission Local Fire Alarm 064. FIRE ALARM SYSTEMS 01. Scope 02. Definitions 03.

More information

FIRE-FIGHTING DESIGN BRIEF REPORT

FIRE-FIGHTING DESIGN BRIEF REPORT P a g e 1 SECTION 04 (Doc.No.A/DBR 001) FIRE-FIGHTING DESIGN BRIEF REPORT P a g e 2 1.0 SCOPE 2.0 STANDARDS AND CODES 3.0 TYPES OF SYSTEM PROPOSED 4.0 FIRE HYDRANT SYSTEM 5.0 AUTOMATIC SPRINKLER SYSTEM

More information

FIRE SAFETY SELF-INSPECTION FORM FOR CULTURAL INSTITUTIONS

FIRE SAFETY SELF-INSPECTION FORM FOR CULTURAL INSTITUTIONS FIRE SAFETY SELF-INSPECTION FORM FOR CULTURAL INSTITUTIONS The attached self-inspection form is intended for staff use at regular, frequent intervals. It should not take the place of two other vital measures

More information

Invitation to Bid FIRE ALARM & DETECTION SYSTEM

Invitation to Bid FIRE ALARM & DETECTION SYSTEM Invitation to Bid FIRE ALARM & DETECTION SYSTEM Responses to an Invitation to Bid will be received by the Purchasing Supervisor, Sumner County Board of Education, 1500 Airport Road, Gallatin, TN 37066

More information

C. Conform to requirements of Americans with Disabilities Act (ADA).

C. Conform to requirements of Americans with Disabilities Act (ADA). SECTION 28 31 00 - FIRE ALARM AND DETECTION SYSTEMS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Fire alarm and detection systems 1.2 REFERENCES A. NFPA 70 - National Electrical Code B. NFPA 72 - National

More information

NC State University Design and Construction Guidelines Division 26 Fire Alarm Systems

NC State University Design and Construction Guidelines Division 26 Fire Alarm Systems NC State University Design and Construction Guidelines Division 26 Fire Alarm Systems 1.0 Purpose A. The following guideline provides the minimum standards and requirements for fire alarm systems. 2.0

More information

(2) Various fire sections enclosed by various classes of fire divisions; (3) Arrangement of fire detectors and manual fire alarm stations;

(2) Various fire sections enclosed by various classes of fire divisions; (3) Arrangement of fire detectors and manual fire alarm stations; (1979) (Rev.1 1990) (Rev.2 1996) (Rev.3 Jan 2012) Safety features.1 Fire protection and extinction.1.1 General Fire protection arrangements and fire extinguishing systems are to be in accordance with the

More information