HOW CAN WE SECURE THE INFRASTRUCTURE AND INVESTMENT NEEDED FOR THE FUTURE?

Size: px
Start display at page:

Download "HOW CAN WE SECURE THE INFRASTRUCTURE AND INVESTMENT NEEDED FOR THE FUTURE?"

Transcription

1 HOW CAN WE SECURE THE INFRASTRUCTURE AND INVESTMENT NEEDED FOR THE FUTURE? HEALTH AND WELLBEING Plymouth Plan topic paper Infrastructure and Investment ECONOMY

2 WHAT IS THIS TOPIC PAPER ABOUT? This topic paper has been published as part of Plymouth Plan Connections. It is one of a series of topic papers that are being published to provide information and to support ongoing discussions with local people and organisations about the future of the city. This Topic Paper looks at the infrastructure that the city needs as well as the investment required to achieve the broader Plymouth Plan objectives. It explores how the city can identify and then provide both new infrastructure as well as the maintenance or improvement of existing infrastructure and facilities. It also discusses what processes are required to enhance the delivery capacity of the city to deliver the broader Plymouth Plan objectives. To view all the topic papers and find out more about the Plymouth Plan go to Make your comments on this document as part of the Plymouth Plan Connections before 25 October INFRASTRUCTURE AND INVESTMENT TOPIC PAPER Draft for Consultation

3 INFRASTRUCTURE: WHAT IS IT? By infrastructure, we mean the public systems, services, and facilities that are necessary for economic and social activity, including roads, schools, telecommunications, power and water supplies. Collectively, these constitute the physical and social foundations of our society. Infrastructure affects us every day, when the right infrastructure is in place and it works well it goes unnoticed but nevertheless continues to contribute to economic growth and social wellbeing. When it doesn t work - when the storm drains overflow, when the power goes off, when the rail line is closed, it can have dramatic and serious implications. Infrastructure is provided and maintained by a wide range of agencies and private companies. The key to the effective functioning and growth of the city is therefore in the planning and co-ordination of these activities, so that the necessary investments can be made at the right time to enable the delivery of the infrastructure necessary to enable us to achieve the objectives of the Plymouth Plan. The following table identifies the main infrastructure categories and is based on the list included within the Plymouth Infrastructure Needs Assessment with the addition of further categories which are referred to in the National Planning Policy Framework, and in the other Plymouth Plan Topic Papers: Main Infrastructure Categories waste and recycling flood defence and drainage infrastructure cemeteries and crematoria medical and healthcare facilities sport and recreation facilities emergency services civic governance facilities communications infrastructure food distribution facilities visitor facilities including hotels road, rail, cycle, parking and other transport facilities cultural facilities, including libraries, events, art open space, food growing and natural infrastructure public realm, heritage and interpretation/ wayfinding utilities, including renewable/low carbon energy schools, nurseries and other education facilities community facilities and social infrastructure infrastructure that mitigates climate change employment, skills and business infrastructure port, moorings, slipway and waterfront access facilities Have we identified all the infrastructure categories or have we missed anything? If the country is like the human body, the blood supply is infrastructure. If you ve got a good infrastructure, you ve got a better, fitter body. (CBI Infrastructure focus group participant) 1 Plymouth Infrastructure Needs Assessment 2011: INFRASTRUCTURE AND INVESTMENT TOPIC PAPER Draft for Consultation 3

4 WHY IS INFRASTRUCTURE IMPORTANT? Creating prosperous and sustainable communities can only be done if the necessary infrastructure is in place. Effective and co-ordinated investment in the right infrastructure, of the right quality, in the right location and at the right time is essential to ensure Plymouth s sustainable economic, social and environmental future. It also delivers an economic boost during construction and permanently raises an area s productive capacity. It is about place-shaping and therefore essential that all partners within Plymouth work collaboratively and that the planning and delivery of infrastructure is joined-up. Infrastructure is important for quality of life and specific benefits can include: Efficient transport infrastructure can increase the amount of free time people have to undertake leisure or social activities, thus improving personal wellbeing and social cohesion. It can also reduce the costs of business, improving productivity and competitiveness, and raise levels of economic activity. Improvements to the public realm can increase community safety as well as improving the attractiveness of an area for private investors. Investing in infrastructure for cycling and walking, as well as for example lowemission buses, can improve local quality of life and reduce carbon emissions. If one in ten journeys were made by bike, the NHS would save an estimated 250 million a year. Infrastructure is also important because of its enabling effects. The NPPF identifies the crucial role of infrastructure provision in the delivery of sustainable economic development (NPPF para 7). It states that planning policies should recognise and seek to address potential barriers to business investment (working with businesses to identify these barriers), including... any lack of infrastructure (para 21). Effective transport is, for example, a key component of the city infrastructure system and the Centre for Cities 2 has identified the key reasons why transport in cities is a key enabler for economic growth: Job access: Efficiency and affordable transport options can help people access the jobs they need; either attracting high-skilled mobile workers in, or enabling local low-skill workers to find work; The agglomeration economy: A long-witnessed phenomenon, crucial to the rise of cities as engines of national growth, but undermined when a lack of public transport, high traffic and poorly maintained infrastructure deters investment Attract new businesses and firms: 60% of UK firms say transport is a major factor in their business location decisions Unlocking new developments: Transport infrastructure investment facilitates and enables wider local regeneration (for example the Birmingham New Street station redevelopment acting as a spur for further regeneration in the South of the city) 2 Delivering Change: Making transport work for cities; Centre for Cities, May 2014: org/assets/files/2014/ delivering-change-transport.pdf 4 INFRASTRUCTURE AND INVESTMENT TOPIC PAPER Draft for Consultation

5 HOW DO WE IDENTIFY WHAT NEW INFRASTRUCTURE IS REQUIRED? The Plymouth Infrastructure Needs Assessment, 2011 (PINA) provides an overview of the infrastructure needs of the city as identified at the time of its preparation. Whilst not all infrastructure areas were then considered in detail, such as higher and further education and emergency services, it identified most of the strategic level infrastructure expected to be delivered in the city over the coming years in order for the city to grow in a sustainable manner. The Assessment will be refreshed during the process of preparing the Plymouth Plan. PINA is as an evidence base document and not a plan or strategy, (i.e. it does not seek to prioritise investment or provide timescales for delivery). The evidence was informed by the views and proposals of infrastructure providers as to what they felt needed to be delivered to support the future growth of the city and meet their operational objectives. In this respect, together with a funding gap analysis document 3, it formed part of the evidence base by which Plymouth s Community Infrastructure Levy was put into place. The starting points for updating the assessment of the city s infrastructure needs are the ambitions, objectives and proposals being promoted through the Plymouth Plan across the full range of spatial and thematic topic areas. For example, the Plymouth Plan will provide for the key infrastructure needed to realise the strategic growth potential of Plymouth s key economic nodes (the City Centre / Waterfront and Derriford) as well as the considerable growth potential along Plymouth s Eastern Corridor. Additionally, it will need to respond to the wider social, economic and environmental needs of the city, for example through providing for infrastructure to deliver improvements in health inequality, new forms of service to meet adult social care needs, the achievement of the city s cultural ambitions such as Mayflower 2020, and improvements to Plymouth s green spaces. There is a need to assess not only what new infrastructure is required, but also what existing infrastructure needs to be protected or improved, and indeed whether any of our existing infrastructure is no longer necessary. Infrastructure maintenance is currently a real challenge for Plymouth as it is for many cities. Much of our infrastructure such as transport, schools, flood defences etc. needs regular and sustained investment to keep it functioning effectively. A rolling programme of maintenance and improvement needs to sit alongside the plan for delivery of new infrastructure. What is the best way of identifying the city s infrastructure needs? Are you able to provide information that can help us update this part of the evidence base? 3 Plymouth CIL Viability Evidence Report, January 2012: evidence_report.pdf INFRASTRUCTURE AND INVESTMENT TOPIC PAPER Draft for Consultation 5

6 HOW DO WE DECIDE WHAT INFRASTRUCTURE IS IMPORTANT? The PINA divides infrastructure into three categories: Critical Some infrastructure is identified as being critical. This means that the delivery, improvement or maintenance of the infrastructure is critical because the consequences of not providing it in a short time frame are economically and/or socially unacceptable, or because growth is unlikely to happen in the timeframe envisaged unless the infrastructure in question is put in place up front. It is especially important that we can identify how and when such infrastructure can be secured so that risks to its timely delivery can be reduced and to ensure that this does not undermine the delivery of the PP itself. Necessary Most of the infrastructure we identify will be classed as necessary to achieving one or more of the Plymouth Plan objectives. This means that it does not necessarily need to be implemented up front to unlock development and growth, but can be implemented as development takes place, or over time as resources become available. Desirable Some infrastructure is identified as being desirable rather than necessary. Whilst it will support the vision for Plymouth, and will be of genuine benefit at a neighbourhood, city or sub-regional level, the achievement of the Plymouth Plan is not reliant on its implementation. Each category can, in-turn, be subdivided into 2 further sub-categories: Strategic infrastructure is defined as infrastructure that is often provided at a higher spatial level than that of the neighbourhood or locality of the city, to serve the wider needs of the city and its hinterland. It includes the big kit infrastructure necessary to provide for the sustainable growth of the city and surrounding areas; centralised facilities (in one or more locations) that provide the critical mass necessary for providing high quality services; and natural infrastructure (the environment) which is impacted by population growth. Neighbourhood infrastructure is that which has only a local impact. Facilities that serve a local area, such as a community centre or a new bus shelter are classified as local. This Topic Paper looks mainly at strategic infrastructure needs. Local facilities and the infrastructure that is required locally to support individual neighbourhood aspirations, as well as facilities required to reduce inequalities across the city are considered in the Local Community Topic Paper, and will also be able to be considered in detail through neighbourhood planning processes. 6 INFRASTRUCTURE AND INVESTMENT TOPIC PAPER Draft for Consultation

7 PAYING FOR INFRASTRUCTURE Over the past 10 years the city s regeneration and growth has been accompanied by considerable investment in infrastructure, some important examples include: 250m invested in Schools including the rebuilding of 16 schools 200m invested in transport including reworking of the George junction and the East End improvements. A range of flood defence schemes New hospitals including a CAMHS unit, reconfiguring Derriford, a medical centre and dental school New business centres at Cattedown, Union Street, Derriford and Plymouth Science Park 200m invested in the substantial expansion of the University Replacement or refurbishments of 70% of the city s libraries Over 45m invested in the Life Centre which now provides a facility of regional significance 250m invested in the replacement of the city s waste infrastructure with the capping and environmental controls at Chelson Meadow, the building of the energy from waste plant, new refuse transfer station and improvements to the HWRCs. Drake s circus shopping centre Roll out of city wide Broadband Saltram and Plym Valley country parks The success of the past 10 years show that achieving the funding necessary to deliver infrastructure to support growth is not unattainable. It does however remain a challenge to all the agencies that are responsible for ensuring the city s infrastructure runs smoothly. INFRASTRUCTURE AND INVESTMENT TOPIC PAPER Draft for Consultation 7

8 SOURCES OF FUNDING Who pays for infrastructure depends on the type of infrastructure but broadly conforms to the following: infrastructure principally funded from the public purse (e.g. roads and flood defences), infrastructure that is provided using a mix of private and public money (e.g. rail and waste) or infrastructure paid for mainly by the consumer (energy and water) Sources of funding for infrastructure include: Community Infrastructure Levy and S106 contributions The Council s own resources and borrowing capability Government grants such as those from the Department for Transport (DfT) and Department for Education (DfE) Other external grants and loans such as those from Heritage Lottery Fund and Heart of the South West Local Economic Partnership (LEP) Partner contributions Private finance such as pension funds, sovereign wealth funds Tax increment financing Municipal Bonds Guarantee schemes Direct provision. The following pie chart shows how the Council s Capital programme has been funded over the past three years. Given that most of the Capital programme is infrastructure - roads, schools, leisure facilities etc, this gives a good indication of where much of the funding for the city s infrastructure has come from. 8 INFRASTRUCTURE AND INVESTMENT TOPIC PAPER Draft for Consultation

9 DEVELOPER CONTRIBUTIONS Developer contributions play an important role in supporting the delivery of the infrastructure needed to enable an area to grow without damaging the environment and quality of life. Planning obligations negotiated through Section 106 Agreements have traditionally been the primary mechanism for securing contributions to address the cumulative impact of development on the infrastructure needs of an area. However, since 1 June 2013 Plymouth has also been operating a Community Infrastructure Levy (CIL). CIL is generally chargeable on the net increase in gross internal floorspace of all new development. The mechanism for securing CIL is a Charging Schedule, which identifies charges based on the floorspace area of different types of developments. Section 106 obligations are also used for other purposes for example, to provide affordable housing or deliver site specific measures to enable a development to proceed. However, the text below relates only to the use of Section 106 to secure infrastructure contributions. Infrastructure contributions secured through planning obligations must meet the requirements of the CIL Regulations, in particular Regulations 122 and 123 which set out legal tests governing a lawful obligation, and include restrictions relating to the pooling of planning obligations for infrastructure. The level of charge needs to be evidence based and negotiated on a case by case basis. The Council has made a general assessment of the costs of new infrastructure arising from development in its Planning Obligations and Affordable Housing Supplementary Planning Document Evidence Base Update, January CIL charges must be set at a level which does not put at serious risk the overall development of the area, and must therefore be informed by evidence on development viability. Charging Authorities must also draw on infrastructure planning that underpins the development strategy for their area, and there needs to be evidence of a funding gap in relation to the delivery of infrastructure in order to justify introducing a CIL. The money raised through the CIL can be used to support growth by providing funds to help with addressing demands that development places on the city, including funding infrastructure that the city, local communities and neighbourhoods need for example, new road schemes, park improvements or improvements to local school capacity. The Council must specify what it intends to spend CIL receipts on in what is known as a Regulation 123 List, so named after CIL Regulation 123. The current Charging Schedule was adopted in April 2013, near the end of a protracted period of deep recession in the UK, and development values generally were lower than they are now. Given that CIL will be a critical component of infrastructure delivery over coming years, a review of the Charging Schedule is now required, and this will take place alongside the preparation of the Plymouth Plan. 4 INFRASTRUCTURE AND INVESTMENT TOPIC PAPER Draft for Consultation 9

10 There are advantages and disadvantages to planning obligations and CIL as primary means of securing developer contributions. These are summarised below. Planning Obligations Advantages: Flexible can be adjusted depending on the viability of a particular scheme, therefore also helping to optimise the level of contribution secured Easily adaptable given that it is driven by policy and site specific evidence, not regulation. Disadvantages: Negotiation slows the planning decision making process, and it is difficult to maintain transparency of that decision where compromises need to be made given viability constraints Reg 123 of the CIL Regulations restricts the ability of authorities to pool more than five contributions to any infrastructure item The money raised is strictly constrained by the wording of the s106 agreement and what is necessary to the grant of planning permission (Reg 122 of CIL Regulations) Specific drafting of s106 clauses can be problematical and reduce the effectiveness of the contributions. Community Infrastructure Levy Advantages: Standardised enabling accurate costing of costs to be calculated by landowner / prospective developer in advance of selling / buying land; this also makes the system more transparent and fair, as there is no room for negotiating different levels of contribution Enforceability given that it operates in effect as a local tax with clear legal parameters Certainty given that a local tax must be paid if it is due, there is no negotiation If CIL is the only means used to secure development contributions, speed of planning decisions will be enhanced, as there will be no need for negotiating s106 contributions Do not have to be directly linked to the impacts of a particular development, therefore enabling an authority to take a strategic view of its infrastructure priorities and direct funding to those priorities. Disadvantages: Given that CIL charges need to be set at a level which does not affect the overall viability of development in an area, there is an inevitable downward pull on the levy that can be charged given that development values across an area can vary widely Cannot be updated quickly Can leave some development proposals without their adverse impacts being mitigated if the infrastructure needed for this is not prioritised and on the Council s Reg 123 list. Our existing approach to developer contributions is summarised below: It has aimed to keep its CIL Charging Schedule very simple, with single rates for the entire city, with the exception of the City Centre which has very different viability characteristics. As a consequence, it has needed to set its CIL rates at a relatively low level in order to safeguard the viability of development in lower value areas. This has resulted in the continuing use of planning obligations as a tool to secure developer contributions, given that the level of CIL secured is insufficient to mitigate the overall impacts of the growth of the city on its infrastructure. 10 INFRASTRUCTURE AND INVESTMENT TOPIC PAPER Draft for Consultation

11 This hybrid-approach maintains some of the advantages and disadvantages of both mechanisms. The Plymouth Plan process provides an opportunity to consider alternatives to this hybrid approach. Three alternatives are summarised in the table below: Alternative Description Relative advantages and disadvantages Maintain existing hybrid approach CIL dominated approach (no infrastructure contributions negotiated through s106) Planning Obligations dominated approach (CIL abandoned) This approach involves setting CIL rates at a low level to reflect the viability considerations of lower value areas of the city. This approach requires CIL receipts to be optimised. This can only be achieved through an area based approach to the setting of CIL rates, where higher levies will be charged in higher value areas. This approach would involve formally abandoning Plymouth s CIL, and reverting to the use of planning obligations as the means by which contributions are sought. Key advantages over other options: Simple and standardised approach across most of city Key disadvantages over other options: A hybrid approach is more complex given that two systems need to be operated in tandem. Key advantages over other options: Highest CIL yield and certainty about funding given that CIL is in effect a local tax Simplified and quicker planning application process Council chooses how to spend all receipts in accordance with its priorities Key disadvantages over other options: Potentially a risk to some developments where the infrastructure they need is not prioritised The identification of appropriate areas for differential CIL rates will be a challenging process given the complexity of development values across the city; it will be important to get this right if development in lower value areas is not to be put at risk. Key advantages over other options: Each contribution bespoke to each scheme, enabling viability to be considered on case by case basis Key disadvantages over other options: Reduced level of overall contribution given pooling restrictions of Reg 123 of CIL Regulations and the interpretation of Reg 122 which sets out the key tests for a lawful planning obligation Puts the most pressure on planning application process to deliver, slowing the time made Do you agree that these are the main alternative approaches; are there any missing? INFRASTRUCTURE AND INVESTMENT TOPIC PAPER Draft for Consultation 11

12 Provided that an area-based approach to CIL rates can be achieved without unacceptable risk to development viability in lower value areas, option 2 (a CIL dominated approach) is considered to have particular merit. The increased certainty around infrastructure funding likely to come forward will be particularly beneficial given the significant challenge of delivering the infrastructure necessary to grow the city in a sustainable way. The next step in working up our preferred approach to developer contributions will be to provide spatial evidence and mapping of the city s viability characteristics. An understanding of the city s broad viability situation is clearly of great importance to determining our approach to developer contributions. In Plymouth there is acknowledged market failure and low development values in some areas making many developments only marginally viable. This can seriously impact on a development s ability to contribute proportionately to the provision of the required infrastructure. Paragraph 173 of the National Planning Policy Framework provides the context for viability analysis. Pursuing sustainable development requires careful attention to viability and costs in plan-making and decision-taking. Plans should be deliverable. Therefore, the size and scale of development identified in the plan should not be subject to such a scale of obligations and policy burdens that their ability to be developed viably is threatened. To ensure viability, the costs of any requirements likely to be applied to development, such as requirements for affordable housing, standards, infrastructure contributions or other requirements should, when taking account of the normal cost of development and mitigation, provide competitive returns to a willing land owner and willing developer to enable the development to be deliverable. However, the National Planning Policy Guidance also makes it clear that developments must be acceptable in planning terms in order to obtain planning permission: Assessing viability should lead to an understanding of the scale of planning obligations which are appropriate. However, the National Planning Policy Framework is clear that where safeguards are necessary to make a particular development acceptable in planning terms, and these safeguards cannot be secured, planning permission should not be granted for unacceptable development. Other key issues that will need to be considered in the review of our approach to developer contributions include: Ensuring that the CIL rate is set at a level that reflects the current state of the economy Considering whether certain categories of development should have different CIL rates dependent on the scale of the development; for example, schemes below the threshold for affordable housing provision might have greater potential viability and justify a higher CIL rate Learning from our experience of having operated a CIL for over a year, and the experience of other local authorities Updating our policies on developer contributions (including Policy CS33 of the Adopted Plymouth Core Strategy, 2007), to reflect the provisions of the CIL Regulations as currently in place Updating the Regulation 123 list of schemes to which CIL funding will be allocated, as part of a wider investment planning process for the city Lobbying for the ability to borrow against future CIL receipts to enable critical infrastructure to be forward funded, and for other delivery mechanisms that can make best use of CIL do you have any views on the viability of development in Plymouth? How does this affect our ability to negotiate S106 agreements and set a CIL charge level 12 INFRASTRUCTURE AND INVESTMENT TOPIC PAPER Draft for Consultation

13 INVESTMENT AND DELIVERY Identifying, planning and coordinating the provision and maintenance of infrastructure is clearly a critical activity. It is however only part of the story. Infrastructure is a key component in achieving the wider objectives of the Plymouth Plan both in terms of the wider quality of life outcomes but also in terms of its ability to enable and unlock development and growth. The interrelationships between these wider objectives and the provision of infrastructure require very careful planning in order to achieve effective delivery. It is important therefore that we establish the sequencing of the necessary interventions and the investment required to make them happen. We also need to demonstrate to the satisfaction of an independent Inspector, at least over the short term (i.e. 5 years), that the wider objectives are achievable. A robust delivery process is therefore required. Planning and co-ordinating the provision and maintenance of infrastructure is a critical activity, especially given the multiplicity of agencies involved in its delivery and its fundamental role in quality of life and growth. The Planning Advisory Service suggests taking account of the following: Ensure a focus on delivery be proportionate and take account of information to hand identify the funding commitments of short term projects where possible justify the likelihood of funding - this may be necessary for longer term aspirations identify and involve key stakeholders from the outset use your local strategic partnership where possible work with other council departments. INFRASTRUCTURE AND INVESTMENT TOPIC PAPER Draft for Consultation 13

14 THE ROLE OF THE PLYMOUTH PLAN IN DELIVERING INFRASTRUCTURE The Plan should set out the strategic priorities for the provision of infrastructure (NPPF, para 156), and should plan positively for the development and infrastructure required (NPPF, para 157). The NPPF also advises that infrastructure and development policies should be planned at the same time, taking into account district wide development costs, so that there is a reasonable prospect that planned infrastructure is deliverable in a timely fashion (para 177). Consideration should also be given to producing joint planning policies on strategic matters and informal strategies such as joint infrastructure and investment plans (para 179). Local planning authorities should also work collaboratively with private sector bodies, utility and infrastructure providers (para 180). Our proposed approach to meeting these needs is illustrated in the diagram and narrative below. Evidence Base Viability Assessment Infrastructure Needs Plymouth Plan (strategic policies) Investment Plan Investment Prospectus Specific Delivery Plans Detailed Delivery Roadmaps Capital Programme 14 INFRASTRUCTURE AND INVESTMENT TOPIC PAPER Draft for Consultation

15 THE INVESTMENT PLAN An Investment Plan will be at the heart of the investment planning process. The Plymouth Plan will contain strategic policies for infrastructure provision as well as delivery and investment, and its linked Investment Plan will outline in more detail how the Plymouth Plan is to be delivered over its lifetime and establish the city s investment priorities. Both the Plymouth Plan itself and the Investment Plan will be underpinned by evidence on infrastructure needs and viability, which will also support the review of Plymouth s Community Infrastructure Levy. The Investment Plan will set the direction of travel of delivery and investment for the entire plan-period to 2031 and will include a detailed programme for at least the first 5 years of the Plan. It will take a sub-regional view, in cooperation with neighbouring authorities and infrastructure providers. It will explore alternative delivery and funding mechanisms, as well as contingency planning. It will provide the broader context for the more detailed and focussed delivery plans and roadmaps. It will also provide the basis for the Investment Prospectus. IDENTIFYING INVESTMENT PRIORITIES IN THE INVESTMENT PLAN Identifying priorities for investment is a challenging process, particularly given the constrained funding environment. The priorities will be driven by the City Vision which is discussed in the separate Strategic Overview topic paper 5, and the strategic objectives of the Plymouth Plan which seek to deliver this vision. They must also respond to the demands for investment on organisations and agencies that have responsibilities to customers for delivering quality services. Investment will therefore support economic, financial, social, environmental and sustainability objectives. To deliver the Plymouth Plan s strategic ambition, there will be a need to prioritise investment in accordance with identified spatial priorities. This issue too is considered in the Strategic Overview topic paper. At the spatial level, for example within a development area such as the City Centre, there must be a clear idea of the critical path so that decisions can be made at the right time to ensure that investment is secured and infrastructure delivered, thereby facilitating achievement of the wider objectives. Some of the key infrastructure investment issues that Plymouth currently faces are summarised briefly below 6 : Strategic connectivity (particularly road, rail, and air) to support the city s future prosperity. This is about how well connected Plymouth is to the rest of the country and external markets. The issue, which is also a key priority of the Local Enterprise Partnership s Strategic Economic Plan 7, is considered further in the Connectivity topic paper. Transport investment needed to unlock the city s growth potential. This is particularly about delivering infrastructure improvements as part of a wider transport strategy which secure sustainable travel benefits and address network constraints which would otherwise 5 ppstrategicoverviewtopicpaper.htm 6 For more detail, please see the relevant Plymouth Plan topic papers, which can be found at INFRASTRUCTURE AND INVESTMENT TOPIC PAPER Draft for Consultation 15

16 constrain the growth potential of the key growth opportunity areas of the City Centre, Derriford / Northern Corridor and Eastern Corridor. This issue is considered further in the Local Transport topic paper. Economic infrastructure. This is about putting in place the key investments to support the sustainable growth of Plymouth s economy. The Local Economic Strategy Review 8 summarises the issues that need to be addressed if the vision for the city is to be realised. It acknowledges the key role of the Plymouth and Peninsula City Deal which places the city at the centre of wider sub-regional growth, recognising its ability to deliver significant productivity and employment growth beyond its administrative boundaries. It suggests that Mayflower 2020 could be a pivotal moment for the city s economy. If designed and delivered as a dynamic and innovative event, it has the potential to drive forward many aspects of the city s economy. Investment will be needed in visitor facilities including hotels, ensuring we have sufficient facilities to deliver our visitor economy ambitions including Mayflower This issue is considered further in the Strategic Overview and Economy topic papers. High quality natural spaces available so that growth is sustainable and everyone has access to these opportunities for health and quality of life, whilst also protecting designated habitats and features around Plymouth. This is about interventions that improve access to natural spaces for all communities as well as providing high quality new strategic natural sites (e.g. Saltram and Derriford Community Parks), enabling the city to grow in a sustainable manner. This issue is considered further in the Natural Environment topic paper. Strategic public realm and city gateway improvements, to make Plymouth a more welcoming city that its people can be proud of. This is particularly about delivering investment in the City Centre, the Waterfront and key city gateways such as the railway station and coach station. The welcoming city agenda is considered further in the Strategic Overview topic paper. Low carbon infrastructure to help respond to climate change whilst also addressing social inequalities. This is about promoting and making provision for renewables and low carbon energy, as well as delivering more localised solutions which address fuel poverty. The issue is considered further in the Low Carbon topic paper. Education infrastructure required in order to meet the needs of a growing city. This is about providing new and expanded schools, nurseries and other education facilities to support high levels of attainment as the city grows through demographic change and economic performance improvements that lead to net in-migration. New primary schools are already planned in Plymstock and Derriford to address the issue of growth. The issue is considered further in the Education and Learning topic paper. What other infrastructure issues do we need to address and what should the priorities be? 8 Plymouth s Local Economic Strategy Review 2013/14 can be found at localeconomicstrategy 16 INFRASTRUCTURE AND INVESTMENT TOPIC PAPER Draft for Consultation

17 DELIVERY PLANS AND ROADMAPS Once the high level infrastructure and delivery strategy and objectives have been determined and included within the Plymouth Plan itself and its associated Investment Plan, and the Plymouth Plan has moved on to the more detailed stage, delivery plans and/or roadmaps can be prepared for each key spatial area / theme. Some policies and themes are relatively self-contained and will therefore rely on their own delivery and action plans to implement the strategy identified in the Plymouth Plan. However, there will be other more complex Plymouth Plan objectives where a higher level of coordination will be required to ensure delivery; these would be covered in the detailed Delivery Roadmaps. Such roadmaps need to identify in some detail, the critical path for achievement of the objective, together with any supporting infrastructure and the investment required. They also need to remain flexible and responsive to changes in circumstances and to take advantage of opportunities that might arise. Delivery roadmaps are particularly likely to be required for driving delivery in the city s growth opportunity areas of the City Centre, Derriford and the Eastern Corridor, as well for strategic thematic initiatives such as coordinating activities and delivery around the Mayflower 2020 celebrations. INFRASTRUCTURE AND INVESTMENT TOPIC PAPER Draft for Consultation 17

18 THE INVESTMENT PROSPECTUS The Investment Prospectus will create the means by which investment opportunities can be communicated and marketed to potential investors and funding agencies. It will be a medium term promotional and negotiating document, which seeks to secure the investment required to deliver the city s ambitions. The Prospectus will include both infrastructure and other key projects that require capital investment. is this the right approach to delivery and investment and have we identified the right components of an effective system? 18 INFRASTRUCTURE AND INVESTMENT TOPIC PAPER Draft for Consultation

19 WHAT HAPPENS NEXT? Any comments received on this topic paper will be considered in the preparation of the Plymouth Plan. You can make comments at or by Alternatively, please post your comments to: Strategic Planning and Infrastructure Plymouth City Council Ballard House West Hoe Road Plymouth PL1 3BJ The closing date for consultation responses is 25 October List of key Plymouth Plan evidence base documents. Plymouth Infrastructure Needs Assessment 2011: plymouthinfrastructureneedsassessment.htm Plymouth CIL Viability Evidence Report, January 2012: uk/plymouth_cil_viability_evidence_report.pdf Plymouth Community Infrastructure Levy documents: uk/communityinfrastructurelevy.htm Planning Obligations and Affordable Housing SPD Second Review Evidence Base Update; January 2012: obligations_evidence_document.pdf Planning Obligations and Affordable Housing SPD Second Review; July 2012: review.pdf Plymouth s Local Economic Strategy Review 2013/14: localeconomicstrategy INFRASTRUCTURE AND INVESTMENT TOPIC PAPER Draft for Consultation 19

20 Topic Paper - Infrastructure and Investment Published by Plymouth City Council August 2014 CONTACT Strategic Planning and Infrastructure Service Plymouth City Council T E plymouthplan@plymouth.gov.uk

SOCIAL INFRASTRUCTURE

SOCIAL INFRASTRUCTURE 10 SOCIAL INFRASTRUCTURE 233 Social infrastructure 10.1 This chapter contains policies addressing the following policy themes: SI1: Strategic Policy for Social Infrastructure SI2: Educational SI3: Health

More information

City Plan Part 1 Sustainability Appraisal Summary February 2012

City Plan Part 1 Sustainability Appraisal Summary February 2012 City Plan Part 1 Sustainability Appraisal Summary February 2012 1.0 Introduction The Council is in the process of preparing its new Local Plan in consultation with the public, developers, landowners and

More information

Site Assessment for Neighbourhood Plans: A toolkit for neighbourhood planners

Site Assessment for Neighbourhood Plans: A toolkit for neighbourhood planners Site Assessment for Neighbourhood Plans: A toolkit for neighbourhood planners Action the COI Table Of Contents Introduction... 3 Benefit of carrying out a site assessment... 4 How to carry out a site assessment

More information

LONDON BOROUGH OF HAVERING

LONDON BOROUGH OF HAVERING LONDON BOROUGH OF HAVERING CORPORATE ASSET MANAGEMENT PLAN 2015-2019 Sections LONDON BOROUGH OF HAVERING CORPORATE ASSET MANAGEMENT PLAN CONTENTS 1 Introduction and Context 2 Corporate Vision 3 Policy

More information

Latrobe City Council Submission Emissions Reduction Fund Green Paper February 2014

Latrobe City Council Submission Emissions Reduction Fund Green Paper February 2014 Latrobe City Council Submission Emissions Reduction Fund Green Paper February 2014 For further information in relation to this submission please contact Allison Jones General Manager Economic Sustainability

More information

Place Scrutiny Briefing AGENDA ITEM 13

Place Scrutiny Briefing AGENDA ITEM 13 Place Scrutiny Briefing AGENDA ITEM 13 Meeting date: 13.7.15 Heading: Joint Spatial Plan and Joint Transport Study - Update Ward: All Bristol wards Author: Sarah O Driscoll Ext. No: 36722 Officer presenting

More information

OVERARCHING SPATIAL POLICIES

OVERARCHING SPATIAL POLICIES 3 OVERARCHING SPATIAL POLICIES 29 Overarching Spatial Policies 3.1 This chapter contains policies addressing the following policy themes: OSP 1: Optimising growth OSP 2: Land use OSP 3: Connections and

More information

Asset Management Policy March 2014

Asset Management Policy March 2014 Asset Management Policy March 2014 In February 2011, we published our current Asset Management Policy. This is the first update incorporating further developments in our thinking on capacity planning and

More information

Community Infrastructure Levy

Community Infrastructure Levy Woking Borough Council Local Development Framework Community Infrastructure Levy Charging Schedule October 2014 Produced by the Planning Policy Team. For further information please contact: Planning Policy,

More information

Regeneration in a time of Austerity

Regeneration in a time of Austerity Regeneration in a time of Austerity Discussion note from Localis workshops with Cheshire West & Chester Council on 24 March 2011 and the Barnet London Borough Council on 11 November 2011 Introduction The

More information

LEWES DISTRICT AND SOUTH DOWNS NATIONAL PARK AUTHORITY LEWES DISTRICT JOINT CORE STRATEGY INDEPENDENT EXAMINATION

LEWES DISTRICT AND SOUTH DOWNS NATIONAL PARK AUTHORITY LEWES DISTRICT JOINT CORE STRATEGY INDEPENDENT EXAMINATION 1 LEWES DISTRICT AND SOUTH DOWNS NATIONAL PARK AUTHORITY LEWES DISTRICT JOINT CORE STRATEGY INDEPENDENT EXAMINATION STATEMENT BY CROUDACE STRATEGIC LIMITED ISSUES 7 AND 8 STRATEGIC SITES (POLICIES SP5/SP6)

More information

Infrastructure Plan. Scoping Report

Infrastructure Plan. Scoping Report Infrastructure Plan Scoping Report November - I - 2009 Infrastructure Plan Scoping Report Contents: Page 1.0 Introduction 1 2.0 Approach 5 3.0 Timetable 7 - I - 1.0 Introduction 1.1 The Infrastructure

More information

Cycle Strategy 2006 2011

Cycle Strategy 2006 2011 Cycle Strategy 2006 2011 TABLE OF CONTENTS 1 INTRODUCTION... 1 2 POLICY BACKGROUND... 2 3 BACKGROUND... 6 4 MAIN OBJECTIVES... 8 5 TARGETS... 9 6 THE CYCLE NETWORK... 10 7 CONCLUSION... 13 Appendix A:

More information

Corporate Director Environment and Community Services

Corporate Director Environment and Community Services CABINET Meeting date: 27 November 2014 From: Corporate Director Environment and Community Services RESPONSE TO SOUTH LAKELAND DISTRICT COUNCILS COMMUNITY INFRASTRUCTURE LEVY REGULATION 16 CONSULTATION

More information

Investment Partnership for South Leeds

Investment Partnership for South Leeds Investment Partnership for South Leeds June 2011 INVESTMENT STRATEGY Connecting Communities & Opportunities SUMMARY REPORT SUMMARY REPORT What is The Investment Strategy for South Leeds... It provides

More information

Strategic Guidance for Community Planning Partnerships: Community Learning and Development

Strategic Guidance for Community Planning Partnerships: Community Learning and Development Strategic Guidance for Community Planning Partnerships: Community Learning and Development COMMUNITY LEARNING AND DEVELOPMENT: STRATEGIC GUIDANCE FOR COMMUNITY PLANNING PARTNERSHIPS EXECUTIVE SUMMARY This

More information

APPENDIX B - PL1 Homes that meet people s needs and aspirations

APPENDIX B - PL1 Homes that meet people s needs and aspirations APPENDIX B - PL1 Homes that meet people s needs and aspirations Decent and accessible homes are vital to all. Our focus on providing affordable homes is being progressed primarily through the Affordable

More information

POLICY DP6 Mitigating the impacts of development

POLICY DP6 Mitigating the impacts of development POLICY DP6 Mitigating the impacts of development 1 Purpose of policy To ensure that developments provide appropriate mitigation for any negative impacts that they may have and additional needs that they

More information

E: Business support and access to finance

E: Business support and access to finance E: Business support and access to finance 41 The North East Local Enterprise Partnership area benefits from a committed workforce, a good business environment and a competitive cost base. However, the

More information

Gateshead Economic Growth Acceleration Plan 2014-18

Gateshead Economic Growth Acceleration Plan 2014-18 Gateshead Economic Growth Acceleration Plan 2014-18 Foreword by Councillor Mick Henry, Leader of Gateshead Council I m delighted to introduce the Gateshead Economic Growth Acceleration Plan 2014-18. This

More information

Healthcare and New Housing Development

Healthcare and New Housing Development Healthcare and New Housing Development Supplementary Guidance SG11 Consultative Draft SG11 SG11 Supplementary Guidance A suite of supplementary guidance (SGs) is currently being produced by the Council.

More information

Draft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT

Draft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT Draft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT MAY 2015 1 Contents 1 INTRODUCTION 3 2 DRAFT NEW MUSEUMS SITE SPD 4 3 STRATEGIC ENVIRONMENTAL

More information

RE: CONSULTATION ON THE DEVELOPMENT MANAGEMENT AND THE SITE ALLOCATIONS DPD CONSULTATION DOCUMENT REPRESENTATIONS MADE ON BEHALF OF SAFESTORE.

RE: CONSULTATION ON THE DEVELOPMENT MANAGEMENT AND THE SITE ALLOCATIONS DPD CONSULTATION DOCUMENT REPRESENTATIONS MADE ON BEHALF OF SAFESTORE. 23 March 2015 Haringey Planning Policy River Park House 225 High Road London N22 8HQ Dear Sir RE: CONSULTATION ON THE DEVELOPMENT MANAGEMENT AND THE SITE ALLOCATIONS DPD CONSULTATION DOCUMENT REPRESENTATIONS

More information

Camden Development Policies

Camden Development Policies Camden Local Development Framework Camden Development Policies Adoption version 2010 1 CAMDEN LOCAL DEVELOPMENT FRAMEWORK CAMDEN DEVELOPMENT POLICIES Camden Development Policies 2010 Introduction 1. Location

More information

Stirling s Economic Strategy A Strategy for Jobs

Stirling s Economic Strategy A Strategy for Jobs Stirling s Economic Strategy A Strategy for Jobs Contents Vision for Stirling s Economy 2 Background 3 Stirling s Economic Development and Support Services 4 Purpose of Stirling s Economic Strategy 6

More information

Development Management Policies. Topic Paper: Social & strategic infrastructure and cultural facilities

Development Management Policies. Topic Paper: Social & strategic infrastructure and cultural facilities Development Management Policies Topic Paper: Social & strategic infrastructure and cultural facilities August 2012 1. Outline 1.1. This topic paper provides justification for the Social and Strategic Infrastructure

More information

APPENDIX B Consultation comments and Council response

APPENDIX B Consultation comments and Council response APPENDIX B Consultation comments and Council response # Stage / 1.1 Draft Transport for London A draft R123 is encouraged as early as possible and should reflect the Borough s transport needs TfL will

More information

Connect Renfrewshire

Connect Renfrewshire How the council will use its information and technology assets to achieve successful change Contents Strategy Context 2 Digital Delivery and Citizen Engagement 4 Operational Excellence and Transformation

More information

The Community Infrastructure Levy: advice note for culture, arts and planning professionals

The Community Infrastructure Levy: advice note for culture, arts and planning professionals The Community Infrastructure Levy: advice note for culture, arts and planning professionals Martin J Elson, Emeritus Professor in Planning, Oxford Brookes University April 2012 Contents Aims of the advice

More information

Renewable Energy for Kent

Renewable Energy for Kent Design + Planning Building Engineering Renewable Energy for Kent Part I: Overview and Action Plan April 2012 Updated Version 1 Committing a Path The development of low carbon and renewable energy sources

More information

Access Fund for Sustainable Travel Guidance on Bidding. Moving Britain Ahead

Access Fund for Sustainable Travel Guidance on Bidding. Moving Britain Ahead Access Fund for Sustainable Travel Guidance on Bidding Moving Britain Ahead July 2016 The Department for Transport has actively considered the needs of blind and partially sighted people in accessing this

More information

Sustainable Development Strategy

Sustainable Development Strategy Sustainable Development Strategy Our vision and strategy: A railway fit for the future 2013 2024 Document Ref: SBPT204 Version 0.71 Executive summary Network Rail exists to generate outstanding value for

More information

Black Country Local Enterprise Partnership Report of the Level 1 LEED Workshop

Black Country Local Enterprise Partnership Report of the Level 1 LEED Workshop Black Country Local Enterprise Partnership Report of the Level 1 LEED Workshop Held on 20 March 2014 at the Black Country Consortium The Deckhouse Brierley Hill, Dudley. Produced on behalf of the Black

More information

A new Garden Neighbourhood for West Guildford An opportunity for Smart Growth. university of surrey November 2013

A new Garden Neighbourhood for West Guildford An opportunity for Smart Growth. university of surrey November 2013 A new Garden Neighbourhood for West Guildford An opportunity for Smart Growth university of surrey November 2013 A new Garden Neighbourhood for West Guildford Preface Since the County and Borough Councils

More information

Leicester and Leicestershire Local Investment Plan

Leicester and Leicestershire Local Investment Plan Page 1 of 43 Foreword Since 2008 the impact and implications of the downturn in the global economy for the national and sub regional economies are evident. In response, the Coalition Government has set

More information

The Road to Growth Is transport the driver of local economic development?

The Road to Growth Is transport the driver of local economic development? Is transport the driver of local economic development? November 2014 Executive Summary The recent Growth Deals unveiled by the Government have set out how up to 12 billion will be invested in local economies

More information

Key Facts. Passenger growth at the airport is projected to grow to approximately 3 million passengers per annum by 2030.

Key Facts. Passenger growth at the airport is projected to grow to approximately 3 million passengers per annum by 2030. Bournemouth Airport & Business Park 7 7 Bournemouth Airport & Business Park Introduction 7.1 Bournemouth Airport is a key asset for the region, one of the UK s fastest growing regional airports and is

More information

new challenges and how its delivery can be improved in order to maximise its impact in the future.

new challenges and how its delivery can be improved in order to maximise its impact in the future. Contribution of the Kent, Greater Essex and East Sussex Local Enterprise Partnership to the consultation on the conclusions of the Fifth Cohesion Report on Economic, social and territorial cohesion: the

More information

FIRST STREET NORTH CREATING PLACES FOR PEOPLE

FIRST STREET NORTH CREATING PLACES FOR PEOPLE About This Consultation Manchester City Council and Ask Property Developments are seeking to develop First Street North, a 2.2 acre site to the north of the Number One Building, within the 20 acre First

More information

INTEGRATED PLANNING AND REPORTING

INTEGRATED PLANNING AND REPORTING Government of Western Australia Department of Local Government INTEGRATED PLANNING AND REPORTING Framework and Guidelines Integrated Planning and Reporting Framework and Guidelines p1. Contents Foreword

More information

1 The Incidence, Value and Delivery of Planning Obligations in England in 2007 08, University of Sheffield 2010.

1 The Incidence, Value and Delivery of Planning Obligations in England in 2007 08, University of Sheffield 2010. What is a Community Infrastructure Levy (CIL)? This is a new system of funding infrastructure through planning charges that the Council can ask developers to pay for most new building projects. It does

More information

WEST YORKSHIRE BUS STRATEGY

WEST YORKSHIRE BUS STRATEGY WEST YORKSHIRE BUS STRATEGY Phase 1 Consultation on Vision and Principles Introduction and Purpose There is a statutory requirement for the West Yorkshire Combined Authority (WYCA) to produce a Local Transport

More information

Alternative infrastructure funding and financing

Alternative infrastructure funding and financing Alternative infrastructure funding and financing Research Paper (commissioned by the Queensland Government) 21 March 2016 Department Of Infrastructure, Local Government and Planning This page intentionally

More information

Better Bus Area Monitoring and Evaluation Framework

Better Bus Area Monitoring and Evaluation Framework Do Better Bus Area Monitoring and Evaluation Framework March 2014 The Department for Transport has actively considered the needs of blind and partially sighted people in accessing this document. The text

More information

21.04 LAND USE. Managing amenity through land use strategies

21.04 LAND USE. Managing amenity through land use strategies 21.04 LAND USE This section contains objectives and strategies for land use, under the themes of: Housing and community Retail, entertainment and the arts Office and commercial use Industry Education and

More information

HIGHWAY INFRASTRUCTURE ASSET MANAGEMENT STRATEGY

HIGHWAY INFRASTRUCTURE ASSET MANAGEMENT STRATEGY HIGHWAY INFRASTRUCTURE ASSET MANAGEMENT STRATEGY 16 November 2015 Highway Infrastructure Asset Management Strategy Contents Introduction 1.0 The Need for Asset Management 1.1. Background 1.2. Aims and

More information

Derbyshire County Council Performance and Improvement Framework. January 2012

Derbyshire County Council Performance and Improvement Framework. January 2012 Derbyshire County Council Performance and Improvement Framework January 2012 Contents 1. Introduction 3 2. About the framework 4 3. Planning 7 5. Monitoring Performance 8 6. Challenge and Review 11 7.

More information

Plan Melbourne Refresh Discussion paper

Plan Melbourne Refresh Discussion paper Attachment 1 Bayside City Council Submission to the Victoria State Government Plan Melbourne Refresh Discussion paper November 2015 Submission Contents 1. Introduction and scope... 3 2. Background.3 3.

More information

Procurement and Contract Management Strategy 2013-2017

Procurement and Contract Management Strategy 2013-2017 Procurement and Contract Management Strategy 2013-2017 Title Owner Version 1 Distribution Procurement and Contract Management Strategy 2013 2017 Procurement and Performance Manager Corporate Issue date

More information

Around 33 million journeys are currently made on Metrolink every year. This is forecast to increase to 44 million journeys by 2019.

Around 33 million journeys are currently made on Metrolink every year. This is forecast to increase to 44 million journeys by 2019. 1. Introduction Transport for Greater Manchester oversees transport and travel across Greater Manchester, home of the UK s largest regional economy outside London and a diverse population of over 2.7 million

More information

Commissioning and Financial Plan Guidance 2013/14

Commissioning and Financial Plan Guidance 2013/14 Page 127 Agenda Item 6 Appendix C Commissioning and Financial Plan Guidance 2013/14 Agenda Item 6 Page 128 INTRODUCTION 1. This document sets out the formal guidance to the London Borough of Sutton for

More information

Site Specific Policies Local Plan

Site Specific Policies Local Plan A N E W V I S I O N F O R D E V E L O P I N G W A K E F I E L D D I S T R I C T Site Specific Policies Local Plan Local Development Framework www.wakefield.gov.uk/ldf Site Specific Policies Local Plan

More information

Planning Policy Statement 2015

Planning Policy Statement 2015 Planning Policy Statement 2015 Introduction It is just over 50 years since national planning legislation was first implemented in Ireland. The Government wishes to reaffirm its strong belief in the value

More information

Big Lottery Fund Research Issue 24. Out of School Hours Childcare: lessons learnt and themes for the future

Big Lottery Fund Research Issue 24. Out of School Hours Childcare: lessons learnt and themes for the future Big Lottery Fund Research Issue 24 Out of School Hours Childcare: lessons learnt and themes for the future 1 Out of School Hours Childcare: lessons learnt and themes for the future Stock code BIG-OSHCHILD

More information

Annex 5. Planning ICT Infrastructure

Annex 5. Planning ICT Infrastructure Annex 5 Planning ICT Infrastructure Introduction and Summary: This annex focuses on the rising importance and the changing ways in which information and communications technology (ICT) is being used to

More information

BASSETLAW DISTRICT COUNCIL ASSET MANAGEMENT PLAN 2012/13 2016/17

BASSETLAW DISTRICT COUNCIL ASSET MANAGEMENT PLAN 2012/13 2016/17 BASSETLAW DISTRICT COUNCIL ASSET MANAGEMENT PLAN 2012/13 2016/17 1 TABLE OF CONTENTS Page Number Forward. 5 1.0 Executive Summary.. 1.1 Why Asset Management matters to Bassetlaw 6 2.0 Strategic Context..

More information

The Transport Business Cases

The Transport Business Cases Do not remove this if sending to pagerunnerr Page Title The Transport Business Cases January 2013 1 Contents Introduction... 3 1. The Transport Business Case... 4 Phase One preparing the Strategic Business

More information

National Planning Policy for Waste

National Planning Policy for Waste National Planning Policy for Waste October 2014 Department for Communities and Local Government Crown copyright, 2014 Copyright in the typographical arrangement rests with the Crown. You may re-use this

More information

St Albans Local Development Framework. Core Strategy: Spatial Strategy Options

St Albans Local Development Framework. Core Strategy: Spatial Strategy Options Centre for Sustainability St Albans Local Development Framework Core Strategy: Spatial Strategy Options Sustainability Appraisal (incorporating Strategic Environmental Assessment) Working Note September

More information

Foreword 4. 1 Introduction 6. 2 Our Approach 7. Strategic Framework 8. Delivering Together 9. The Liverpool City Region 10.

Foreword 4. 1 Introduction 6. 2 Our Approach 7. Strategic Framework 8. Delivering Together 9. The Liverpool City Region 10. Contents Foreword 4 1 Introduction 6 2 Our Approach 7 Strategic Framework 8 Delivering Together 9 The Liverpool City Region 10 3 Governance 11 4 Our Vision, Mission and Values 12 5 Delivery Drivers 13

More information

SOUTH EAST GROWTH DEAL

SOUTH EAST GROWTH DEAL SOUTH EAST GROWTH DEAL 1 SOUTH EAST LOCAL ENTERPRISE PARTNERSHIP GROWTH DEAL The South East Growth Deal agreed on 7 July 2014 and expanded on 29 January 2015 aims to contribute to the Local Enterprise

More information

Design for Independent Schools

Design for Independent Schools Design for Independent Schools Developing Your School Re-Format is an award-winning architecture and design studio which has been specialising in buildings for the education sector for twenty years. We

More information

Photo/image: David Howard LCF Publication No.68 guidance tools. LCF/Just Space Response to Planning for a Better London. London Civic Forum

Photo/image: David Howard LCF Publication No.68 guidance tools. LCF/Just Space Response to Planning for a Better London. London Civic Forum Photo/image: David Howard LCF Publication No.68 guidance tools LCF/Just Space Response to Planning for a Better London London Civic Forum JUST SPACE RESPONSE TO PLANNING FOR A BETTER LONDON Environment

More information

Charnwood Borough Council. Corporate Performance Management Framework

Charnwood Borough Council. Corporate Performance Management Framework Charnwood Borough Council Corporate Performance Management Framework Contents 1 Introduction... 1 2 Background... 1 3 Role of the Performance Team... 2 4 Charnwood Framework... 2 4.1 Corporate Plan...2

More information

Revenue and Financing Policy

Revenue and Financing Policy Revenue and Financing Policy The Revenue and Financing Policy explains how the Council funds each activity it is involved in and why. Council provides a number of distinct activities and services to its

More information

ASSET MANAGEMENT STRATEGY

ASSET MANAGEMENT STRATEGY ASSET MANAGEMENT STRATEGY Transport and Highways June 2013 Asset Management Strategy (June 2013) Page 1 of 10 CONTENTS INTRODUCTION 3 SECTION 1: WHY ASSET MANAGEMENT 4 1.1 Background 4 1.2 Strategic Framework

More information

Development Viability

Development Viability Development Viability Supplementary Planning Document January 2016 1 Contents Section Title Page number 1. INTRODUCTION... 3 2. VIABILITY IN THE PLANNING PROCESS... 4 ISLINGTON CONTEXT... 4 POLICY CONTEXT...

More information

The government s social mobility strategy Is fairness enough?

The government s social mobility strategy Is fairness enough? The government s social mobility strategy Is fairness enough? Number 83 Author: Clare Goff, Deputy Editor, New Start, claregoff@cles.org.uk 0161 236 7036 Introduction The government has committed itself

More information

Warmer Healthier Homes: A Consultation Paper on a new Fuel Poverty Strategy for Northern Ireland

Warmer Healthier Homes: A Consultation Paper on a new Fuel Poverty Strategy for Northern Ireland Warmer Healthier Homes: A Consultation Paper on a new Fuel Poverty Strategy for Northern Ireland A Response by the Chartered Institute of Housing in Northern Ireland September 2010 The Chartered Institute

More information

Oxford City Council ICT Strategy 2015 2018

Oxford City Council ICT Strategy 2015 2018 Oxford City Council ICT Strategy 2015 2018 1 Contents 2 Overview... 2 3 OCC Business Drivers... 2 4 ICT Principles... 3 4.1 Business Requirements... 3 4.2 Information Management... 3 4.3 Applications...

More information

Central Cardiff Enterprise Zone. Strategic Plan 2015

Central Cardiff Enterprise Zone. Strategic Plan 2015 Central Cardiff Enterprise Zone Strategic Plan 2015 June 2015 1 Contents Contents Page 1. BACKGROUND 3 2. VISION 5 3. KEY PRIORITIES 6 4. CROSS SECTORAL PRIORITIES 7 Transport Skills ICT Other Infrastructure

More information

City and County of Swansea. Human Resources & Workforce Strategy 2013-2017. Ambition is Critical 1

City and County of Swansea. Human Resources & Workforce Strategy 2013-2017. Ambition is Critical 1 City and County of Swansea Human Resources & Workforce Strategy 2013-2017 Ambition is Critical 1 Delivering quality services for a safer, greener, smarter, fairer, healthier, richer Swansea Executive Summary

More information

Performance Detailed Report. May 2008. Review of Performance Management. Norwich City Council. Audit 2007/08

Performance Detailed Report. May 2008. Review of Performance Management. Norwich City Council. Audit 2007/08 Performance Detailed Report May 2008 Review of Performance Management Audit 2007/08 External audit is an essential element in the process of accountability for public money and makes an important contribution

More information

Havering Employment Land Review

Havering Employment Land Review Havering Employment Land Review Executive Summary April 2015 47071356 Prepared for: London Borough of Havering UNITED KINGDOM & IRELAND 1. Introduction URS Infrastructure and Environment UK Ltd (URS)

More information

A Guide to Pre-Application Advice and Fees and Planning Performance Agreements

A Guide to Pre-Application Advice and Fees and Planning Performance Agreements A Guide to Pre-Application Advice and Fees and Planning Performance Agreements V3 Sept 2014 Contents 1. Introduction 2. The Benefits of Pre-Application Advice 3. How do I obtain pre-application advice?

More information

Section 106 Planning Obligations speeding up negotiations

Section 106 Planning Obligations speeding up negotiations Section 106 Planning Obligations speeding up negotiations Student accommodation and affordable housing contributions Consultation February 2015 Department for Communities and Local Government Crown copyright,

More information

What we said we d achieve in 2011/12 Priority Outcome: Prosperity Economic Resilience

What we said we d achieve in 2011/12 Priority Outcome: Prosperity Economic Resilience What we said we d achieve in 2011/12 Priority Outcome: Prosperity Economic Resilience How did we do? RED AMBER GREEN Not Rated 5 0 14 2 We said we would: Facilitate economic growth through job creation

More information

Approved by Management Committee 24/03/11 Strategy Document

Approved by Management Committee 24/03/11 Strategy Document ELHA POLICY Date Issued May 2007 Last Revised March 2011 Department Asset Management Title Asset Management Strategy Objective To outline the Association s strategy for managing its assets Responsible

More information

Executive 29 October 2015

Executive 29 October 2015 Executive 29 October 2015 Report of the Assistant Director - Finance, Property & Procurement Portfolio of the Executive Member for Finance and Performance The Future of York s Guildhall & Riverside Summary

More information

CORPORATE BUSINESS PLAN 2014-2017

CORPORATE BUSINESS PLAN 2014-2017 CORPORATE BUSINESS PLAN 2014-2017 Contents Introduction Introduction 1 Background 2 The Integrated Planning Framework Informing Plans and Strategies 4 Vision and Values 8 Business Decision Making Framework

More information

University of Glasgow Strategic Travel Plan 2010 2015

University of Glasgow Strategic Travel Plan 2010 2015 University of Glasgow Strategic Travel Plan 2010 2015 Jess Bailey Travel Plan Specialist Viola Retzlaff University of Glasgow Document Control Date Reviewed: March 2010 Version Number: 1 Author/Revised

More information

National Planning Policy Framework

National Planning Policy Framework National Planning Policy Framework www.communities.gov.uk community, opportunity, prosperity National Planning Policy Framework March 2012 Department for Communities and Local Government Crown copyright,

More information

CIL and Infrastructure Planning. An advice note. October 2011

CIL and Infrastructure Planning. An advice note. October 2011 CIL and Infrastructure Planning An advice note October 2011 The Planning Officers Society Registered Office: 20-22 Bedford Row, London WC1R 4JS Registered in England No 6709078 Registered Charity No 1140770

More information

Issue 2 Are the charging rates informed by and consistent with the evidence?

Issue 2 Are the charging rates informed by and consistent with the evidence? LONDON BOROUGH OF ISLINGTON COMMUNITY INFRASTRUCTURE LEVY [CIL] CHARGING SCHEDULE EXAMINATION EXAMINER S ISSUES & QUESTIONS London Borough of Islington Response to Examiner s Issues & Comments Issue 2

More information

Section 1: Our assessment of the importance of housing for wellbeing in Scotland

Section 1: Our assessment of the importance of housing for wellbeing in Scotland Commission on Housing and Wellbeing Consultation 2014 North Lanarkshire Council Response Section 1: Our assessment of the importance of housing for wellbeing in Scotland Q1 Has our assessment of housing

More information

FLOOD RISK STATEMENT IN SUPPORT OF THE CONNECTING HERNE BAY AREA ACTION PLAN PREFERRED OPTIONS DOCUMENT

FLOOD RISK STATEMENT IN SUPPORT OF THE CONNECTING HERNE BAY AREA ACTION PLAN PREFERRED OPTIONS DOCUMENT FLOOD RISK STATEMENT IN SUPPORT OF THE CONNECTING HERNE BAY AREA ACTION PLAN PREFERRED OPTIONS DOCUMENT Canterbury City Council January 2008 1 APPLICATION OF THE PPS25 SEQUENTIAL AND EXCEPTION TESTS 1.0

More information

The Institute Business Plan - Review

The Institute Business Plan - Review Guildford Institute Strategic Plan to 2020 Foreword The objects of the Institute are set out in its Memorandum of Association [Art3]. They may be summarised as follows: To promote and advance the education

More information

place-based asset management

place-based asset management place-based asset management Managing public sector property to support aligned local public services TOWN HALL CIPFA, the Chartered Institute of Public Finance and Accountancy, is the professional body

More information

Public Consultation Series - The Strategic and Cost Planning Process in Dublin

Public Consultation Series - The Strategic and Cost Planning Process in Dublin Consultation Summary DOCUMENT CONTROL SHEET Client Project Title Document Title Document No. This Document Comprises National Transport Authority 2030 Vision Consultation Summary MDE0758RP0012 DCS TOC

More information

London Borough of Havering. Draft Planning Guidance Note on Affordable Housing. Commuted Sum Payments

London Borough of Havering. Draft Planning Guidance Note on Affordable Housing. Commuted Sum Payments London Borough of Havering Draft Planning Guidance Note on Affordable Housing Commuted Sum Payments May 2016 Affordable housing circumstances where Havering Council will use commuted sum payments to the

More information

Executive summary. Chapter one: Foreword. Jochen Kreusel

Executive summary. Chapter one: Foreword. Jochen Kreusel Chapter one: Foreword 2. Executive summary This report gives a comprehensive outlook towards an electricity system for Europe and North Africa based completely on renewable energy in 2050. Its particular

More information

PROPOSED PLANNING SCHEME AMENDMENT FOR FORMER CARLTON AND UNITED BREWERIES SITE, CARLTON

PROPOSED PLANNING SCHEME AMENDMENT FOR FORMER CARLTON AND UNITED BREWERIES SITE, CARLTON Page 1 of 57 PLANNING COMMITTEE REPORT Agenda Item 5.4 PROPOSED PLANNING SCHEME AMENDMENT FOR FORMER CARLTON AND UNITED BREWERIES SITE, CARLTON 4 September 2007 Division Sustainability and Regulatory Services

More information

Housing Association Regulatory Assessment

Housing Association Regulatory Assessment Welsh Government Housing Directorate - Regulation Housing Association Regulatory Assessment Melin Homes Limited Registration number: L110 Date of publication: 20 December 2013 Welsh Government Housing

More information

Procurement Strategy 2013-2017 Delivering Social Value for our Community

Procurement Strategy 2013-2017 Delivering Social Value for our Community Procurement Strategy 2013-2017 Delivering Social Value for our Community Making Bath & North East Somerset an even better place to live, work and visit 1 Picture courtesy of Bath & News Media Group Our

More information

How To Develop The Kingsgate Business Centre

How To Develop The Kingsgate Business Centre Kingsgate Business Centre Employment Report Introduction The subject property comprises serviced offices arranged over two floors within a building in the north side of Kingsgate Road. It is served by

More information

London Paramount Entertainment Resort Workshops : Masterplanning & Infrastructure February / March 2015

London Paramount Entertainment Resort Workshops : Masterplanning & Infrastructure February / March 2015 London Paramount Entertainment Resort Workshops : Masterplanning & Infrastructure February / March 2015 Workshop agenda Presentations Breakout workshop sessions Feedback and outcomes for the masterplan

More information

Sustainability Appraisal of the Lichfield Local Plan: Strategy

Sustainability Appraisal of the Lichfield Local Plan: Strategy Lichfield District Council Sustainability Appraisal of the Lichfield Local Plan: Strategy Post Adoption Statement February 2015 U R S U S C O N S U L T I N G L T D Quality Management URSUS Consulting Ltd

More information

Accounting for Infrastructure Projects within Enterprise Zones (EZ) and Tax Increment Financing (TIF) Funded Programmes.

Accounting for Infrastructure Projects within Enterprise Zones (EZ) and Tax Increment Financing (TIF) Funded Programmes. Accounting for Infrastructure Projects within Enterprise Zones (EZ) and Tax Increment Financing (TIF) Funded Programmes. Background 1 A number of initiatives are under way that involve local authorities

More information

PLANNING APPLICATION: 12/00056/APP

PLANNING APPLICATION: 12/00056/APP PLANNING APPLICATION: 12/00056/APP In the event that a recommendation on this planning application is overturned the Committee is reminded of the advice contained on the front page of the agenda for Reports

More information

Guidance on the template contract for social impact bonds and payment by results

Guidance on the template contract for social impact bonds and payment by results Guidance on the template contract for social impact bonds and payment by results Introduction These guidance notes have been prepared to assist users of the Cabinet Office template contract. The guidance

More information