1 LONDON BOROUGH OF ISLINGTON COMMUNITY INFRASTRUCTURE LEVY [CIL] CHARGING SCHEDULE EXAMINATION EXAMINER S ISSUES & QUESTIONS London Borough of Islington Response to Examiner s Issues & Comments Issue 2 Are the charging rates informed by and consistent with the evidence?
2 Table of Contents Issue 2 Are the charging rates informed by and consistent with the evidence?... 1 Appendix 1 Update and comparison of office rents... 11
3 2.1 In general terms, is the definition of the two charging areas robustly supported by economic viability evidence? The charging zone boundary is based on London s Central Activities Zone boundary which is established in the London Plan 1 and covers London s geographic, economic and administrative core. The CAZ serves a strategic economic function for London, with almost a third of London s jobs located within its boundary. The central location, high transport accessibility and concentration of uses within the CAZ which support London s function as a global city, underpin the development viability in this location Islington s section of the CAZ achieves the highest development values in the borough 2 and also the largest concentration of development which is a demonstration of viability in this part of the borough. The Islington Core Strategy (2011) indicates that this trend is expected to continue over the plan period Values in the south of the borough have been increasing rapidly, due to the expansion of Central London development market to fringe areas and in part to large scale investment in the Kings Cross area, the forthcoming Crossrail Station at Farringdon and the impact of Tech City in the Old Street area. 3 Has sufficiently fine-grained sampling of development sites taken place? Yes, 101 sites have been identified for development within the adopted Site Allocations (17) and Finsbury Local Plan (16). Forty-five of these sites have a current planning permission, are in the process of an application for planning permission, or otherwise are identified for infrastructure and so are unlikely to be charged CIL. The CIL Viability Study (23) and the Additional Hotel Viability Testing (24) together test 29 sites which amounts to more than half of potentially chargeable sites identified in the Development Plan These sites have been chosen carefully to reflect the criteria set out in CIL Guidance (April 2013) and to ensure they are representative of sites in the Development Plan 4. These sites have been tested in addition to many other sites and development scenarios tested in the other viability reports which also form part of the evidence base. 1 London Plan Map See 2.2 for further details. 3 This is well documented in the council s viability evidence, market research reports and articles. Please see Appendix 1, Draft Charging Schedule (1) Appendix 2, the Draft Charging Schedule Statement of Consultation. 4 Please see CIL Viability Study (June 2013, Appendix 2) for further information. 1
4 2.1.6 A number of sites have been tested that fall within the part of the borough within London s CAZ (Area A), where the largest concentration of development in Islington is expected, as well as throughout the rest of the borough (Area B). Has a sufficient amount of market and sensitivity testing taken place? The council has relied on a range of appropriate available evidence including market assessments, development trends, values of different land uses and the findings comprised in a number viability assessments, as well as the Local Plan and its evidence base The council has undertaken two statutory consultations on proposed rates inviting over 3,000 parties to submit representations. The council undertook an additional non-statutory consultation in February/ March 2013, inviting major landowners, developers and agents to meet with the council and submit viability evidence relevant to CIL. The council has taken into account comments received when setting rates within the Draft Charging Schedule A range of sensitivity testing has been undertaken within the viability assessments to inform the rate setting process and ensure that rates are not set at the margins of viability. For example, the viability of development has been tested with: different CIL rates 6 ; the Islington and Mayoral CIL charged on net additional floorspace, and on all new floorspace; differing development values and costs; and with other requirements varied. 2.2 Are the differential charging rates soundly based on evidence of differential values in the two charging areas? As noted above, the highest development values are achieved within the south of the borough within the part of Islington within London s Central Activities Zone. The CIL Viability Study (23) identifies that the highest residential values occur in the south of the borough, with lower values elsewhere 7. The council undertook research of residential prices in Islington in June 2013 that also highlights that higher values are prevalent in the south of the borough 8. 5 Please see Submission Documents 23-30, DCS Appendix 2 and references to market reports in the DCS Consultation Statement and in the council s Statements of Issues 1, 2 and 3. 6 Please see Combined Policy Viability Study (25) Paragraph 4.23, CIL Viability Study (23), Table and Study of Financial Viability of Student Accommodation (29), Table 6B. 7 This trend has been established for a number years. For example, the Islington Local Housing Needs Assessment (2008) identifies a definite north/south divide for postcode price data, with areas in the south of the borough generally the highest priced (p. 3). 8 Please see Draft Charging Schedule Appendix 2, p72. 2
5 2.2.2 The south of the borough also commands higher office rents. Currently average rents in the south, are identified as 390 per sq m. 9 Conversely, office rents in the mid/north of the borough are on average around 150 per sq m Retail values are also highest in the south, particularly in Angel Town Centre. From a review of current market retail rents, typical rents are 430 per sq m in Area A (Clerkenwell and Angel) and 290 per sq m in Area B (Archway, Finsbury, Nags Head/Upper Holloway Road) The CIL Viability Study (23) and Additional Hotel Viability Testing (24) identify that there are higher hotel capital values in the CAZ compared with other parts of the borough based on rental data and transactions of hotels. A review of hotel room rates also indicates a significant variation with average rates of 183 per night within eight hotels in the CAZ and 115 per night within four hotels within the rest of the borough The proposed differential charging rates reflect the variations in values that are achieved by these uses within the south of the borough in the London s CAZ (Area A) compared with other parts of the borough (Area B). Residential 2.3 Is the student accommodation charging rate soundly based on evidence of rental levels for this use across the Borough? Does this rate take account of other contributions required from this form of development? The Study of Financial Viability of Student Accommodation (2012) applies rental values which are based on a review of rents for student accommodation in Islington. 11 The review showed that rents are extremely high in Islington; and, for student accommodation completed since 2008, the average weekly rent was 268. However, much lower rents have been tested and these have been used as the basis for setting the CIL rates. This is one of a number of factors ensuring that the rates have not been set at the margin of viability for the vast majority of sites and also allows for variations in rents and site-specific matters Notwithstanding this, market reports indicate that demand for student accommodation in London is likely to remain strong. Unite have identified continued growth in international 9 Jones Lang LaSalle (Q3 2013) On: Point Central London Market. This relates to the area known as the Northern City Fringe which incorporates the majority of the part of Islington within the CAZ (south of the City and Pentonville Roads). 10 The Workspace Viability Report (2011). Rents within this report are no longer up to date, however at the time of publication there were marked differences in office rents between the south and north of the borough. 11 See Table 1 in the Study of Financial Viability of Student Accommodation, Please see also Statement to Issue I, response to Question 1.3, Paragraph
6 student demand and a supply/ demand imbalance which is most acute in London, high occupancy levels and rental growth 13. Savills also identify increased student numbers, strong international demand, a shortfall in suitable accommodation and project rental growth of 3% within the UK market in 2013/ The Core Strategy restricts new student accommodation to City University and London Metropolitan University campus areas which is likely to increase the value of new sites that do come forward in these locations The Study of Financial Viability of Student Accommodation in Islington (2012) takes account of the Mayoral CIL, the student accommodation bursary as well as a charge to reflect any S106 costs that would not be addressed by CIL. The study concludes that there is scope for developers to make significant financial contributions through CIL and student bursaries and that the majority of student accommodation schemes would be able to pay CIL contributions of 450 per sq m 16 and an annual student bursary of 500 per unit over 30 years. The council intends to set a lower CIL rate of 400 per sq m and much lower bursary charge which varies according to the rent achieved in the development Unite Factsheet The UK s leading provider of student accommodation for over 20 years The council have undertaken a review of the rents charged in the eight Unite student accommodation blocks in Islington which indicates that average advertised rents increased from 265 per week in August 2012 to 287 per week in September Savills, Spotlight Student Housing, July CIL Viability Study, The study states that 500 per sq m could viably be supported which includes the Mayor of London s CIL of 50 per sq m. 17 The student bursary charge is based on rents achieved by a development each year. This flexibility will ensure that the bursary is appropriate for each site and is responsive to changes in rents, with a lower charge applied for schemes achieving lower rents. For example for developments achieving rents of 220 per week, the annual bursary would be 269 per room; for rents of 270 per week the annual bursary would be 330 per room; for rents of 320 per week, the annual bursary would be 391 per room. 4
7 Commercial Development 2.4 Are the Viability Study Update s appraisals in respect of commercial development robust and consistent with the evidence? Specifically: (a) are the charging rates for retail development supported by robust assessments of the economic viability of this use? The CIL Viability Study (23) tests 15 sites across Islington that incorporate retail floorspace. This is a significant sample given that no sites are allocated solely for retail development in the Local Plan and that opportunities for new retail development are relatively limited due to site constraints within town centres. The majority of the 15 retail sites tested were viable (11) and only 1 site became unviable when CIL was introduced. In this instance, the main issue affecting viability was the high proportion of office floorspace within the development. However it should be noted that a review of office rents indicates that current values are higher than those assumed in the study Due to the density of development in Islington and site constraints, many retail sites will involve the conversion of existing floorspace which would be deducted from the chargeable area, reducing the CIL charge. (b) are the charging rates for hotel development supported by robust assessments of the economic viability of this use? The Report on CIL Viability Assessment Studies (DVS, 2012) found that a rate of 450 per sq m could be supported by most hotel developments. This is significantly higher than the proposed hotel rates set out in the Draft Charging Schedule ( 350 in Area A and 250 in Area B) The CIL Viability Study (2013) and the Additional Hotel Viability Testing (2013) test a total of eight sites that include hotel floorspace. This is a comprehensive assessment of economic viability given that there are fewer sites than this identified specifically for hotel development in the Local Plan. New hotel developments granted permission after the introduction of CIL are not expected to account for a significant proportion of total new floorspace over the plan period. 18 See Appendix 1. 5
8 2.4.5 The Additional Hotel Viability Testing undertook appraisals for budget and luxury hotel models. The report found that 15 out of the 20 scenarios tested (with CIL applied on net additional and all floorspace) were viable and concluded that the proposed hotel rates can be absorbed without adversely impacting on viability. Inspector s Note: the Council is requested to specifically comment on the development appraisals submitted by Jones Lang LaSalle for Whitbread [ref. DSC912] Jones Lang LaSalle have provided two appraisals of hotel sites one for a proposed site at Hamlyn House in Archway, and one at Old Street The council is currently dealing with an application for a change of use from offices to hotel use at Hamlyn House. Jones Lang LaSalle have applied both the Islington CIL and Mayoral CIL to 100% of the floorspace in their appraisals. The council has however assessed the current application for mayoral CIL liability as Collecting Authority for the Mayor of London s CIL and has determined that this would be zero as no new floorspace is being created Mayoral CIL is calculated in the same way as the borough CIL and so if this application were determined after adoption of the Islington CIL, the liability for this would also be zero. CIL will therefore not affect the viability of this development Budget hotel providers actively seek sites with existing buildings that can be converted, typically from existing hotels or underused office space. In these cases the level of CIL due is likely to be low or zero Two appraisals have been provided showing with and without CIL scenarios. No benchmark land value indicating a required return to the land owner has been provided and so it is not possible to tell whether the scenario with CIL applied (on 100% of floorspace) is viable or not. Given that the existing site comprises outdated office accommodation that has been substantially vacant for a number of years (the reason for the change of use) it is likely that the site has a relatively low existing use value increasing the likelihood that the scheme is viable. Even if CIL were charged at this level, it has not been demonstrated that the hotel would not be viable It is considered that the Old Street appraisals relate to a development within the London Borough of Hackney consisting of a hotel (251 rooms) student accommodation (673 suites) and office floorspace (6520 sq m). Planning permission was granted in 2009 and then revised in 2010 and this development has now been completed. 6
9 Again the appraisal assumes that the Mayoral and Islington CIL would be applied on 100% of hotel floorspace. The site was however partly occupied at the point of permission and so if CIL did apply at this time, the charges would have been lower than that stated. For a scheme of this nature the Mayoral planning obligations Crossrail top up charge would not apply because this would be lower than the Mayoral CIL and the charge based on the existing office use Again, no benchmark land value has been provided and so it is also not possible to tell whether the development is viable or not. Prior to development the site comprised of offices which were under occupied and in need of refurbishment as well as light industry, storage and a car park. Given the use and condition of the site it is likely that this site also had a relatively low existing use value. If CIL were to apply, even if charged on 100% of floorspace, the scheme may well be viable, although it is not possible to determine viability without a viability benchmark The appraisals do not therefore show that the developments are unviable and do not demonstrate that the proposed CIL rates would impact adversely on the delivery of hotel development in Islington or delivery of the Development Plan. (c) are the charging rates for office development supported by robust assessments of the economic viability of this use? The CIL Viability Study, Report on Viability Assessments and Workspace Viability Report assess the viability of office development. The office charging rates are based on economic viability evidence that indicates that office development is generally less viable than student, hotel, residential and retail uses and so lower rates are proposed for offices There is a marked variation between office rents that can be achieved which are much higher in the south of the borough which is adjacent to the City of London, compared with the rest of the borough. Lower rents outside of the CAZ have a detrimental impact on viability and so a nil office rate is proposed here The Report on CIL Viability Assessment Studies (2012) concluded that a rate of 150 per sq m in the CAZ would amount to a small proportion of development costs and, would not put development at risk. However, the council has subsequently lowered its rate for Area A to 19 See Mayor of London s Crossrail Supplementary Planning Guidance 7
10 80 per sq m, which is at a level lower than current S106 infrastructure charges ( 105 per sq m) A review of current office rents shows that rental values within the south of the borough 21 have increased rapidly than in the last two years - by more than 25% between 2011 and Current average office rents are higher than those applied within the Combined Policy Viability Study (25) and the CIL Viability Study (23) (See Appendix 1) The significant improvement in the office market in the south of the borough confirms that the council has taken a cautious approach in lowering its proposed office rate in Area A. In all cases, has sufficient assessment been made of single-use (as opposed to mixed-use) developments in the Borough? The majority of development in Islington comes forward as part of mixed use developments. However, single-use residential sites have been tested in the CIL Viability Study (RD 23), the Affordable Housing Sub-Threshold Contributions Study (RD 27) and the Affordable Housing Viability Assessment (RD 28). Single-use hotel developments were tested in the CIL Viability Study and Additional Hotel Viability Testing. Student accommodation single-use sites were tested in the Study of Financial Viability of Student accommodation in Islington report. Single-use office sites were tested in the Workspace Viability Report and office led developments (incorporating a small proportion of retail floorspace) were tested in the CIL Viability Study A total of 15 sites that contain retail floorspace have been tested in the CIL Viability Report. No single retail use site has been tested which reflects the fact that no sites have been allocated as single-use retail sites within the Local Plan. 20 See comparison between CIL and S106 charges on p81 of the Draft Charging Schedule and Supporting Information Document for office developments in the CAZ. 21 This relates to the area known as the Northern City Fringe which incorporates the majority of the part of Islington within the CAZ (south of the City and Pentonville Roads). 22 See Appendix 1. The potential for growth in values in Area A is also well documented in a number of market research reports and articles referred in Appendix 2 of the Draft Charging Schedule (1). 8
11 Other 2.5 Is it clear how the sui generis charging rate has been derived and what actual development types this rate would apply to? The sui generis rate has been derived based on advice from DVS that a charge of 80 per sq m would not be likely to have a determining impact on the viability of sui generis uses 23. DVS advised that sui generis uses such as night clubs, members clubs, amusement centres and petrol stations are often built by owner occupiers for a specific operational function or on a pre-let basis which improves viability. The CIL Viability Study (23) also concludes that the proposed rate is of minimal significance when determining viability Following consultation on the Preliminary Draft Charging Schedule, the council has proposed a nil rate for certain uses that would normally fall under the sui generis use class. These relate to emergency service facilities, waste infrastructure and water and waste water infrastructure, and the list of these uses is within the Draft Charging Schedule Islington development monitoring data shows that the majority of sui generis applications are for changes of use of individual retail units. Most of these applications consist of less than 100 sq m floorspace and are conversions with no new floorspace and so would not be charged CIL. Where an increase in floorspace is proposed, the rate is lower than the proposed retail rates reflecting that retail uses are expected to be more viable. From a review of applications involving sui generic floorspace between , it is evident that very few sui generis sites do incorporate net additional floorspace and most would therefore not be CIL liable It is expected that the rate is only likely to apply to uses such as nightclubs, private members clubs or amusement centres where there is an increase in floorspace. Does the evidence base justify a charge on all likely sui generis uses? Very few developments that incorporate net additional floorspace include sui generis uses and for the reasons referred to above the sui generis CIL rate is not likely to apply in many cases. Even where there is an increase in floorspace, in most cases this is expected to account for a small proportion of new floorspace and so the charge would not be significant. 23 Report on CIL Viability Assessments (26) 24 See page 44. 9
12 2.5.6 DVS and BNP Paribas identify that the proposed sui generis charge is not likely to have a determining impact on viability 25. Based on appropriate available evidence in line with Paragraph 25 of the CIL Guidance (April 2013), the council considers that a low rate of 80 per sq m applied on relatively few developments that are likely to involve increases in sui generis floorspace is appropriate. This will not put the Development Plan as risk, but will help to address impacts on infrastructure associated with these uses. 25 Report on CIL Viability Assessments (26) and CIL Viability Study (23) 10
13 1.0 Appendix 1: Update and Comparison of Office Rents 1.1 A marked improvement in the Central London office market has been identified with increased office 'take up', increased rents, and lower yields in Quarter Investor demand continues to be strong with increased interest in fringe locations. 1.2 During the same period, GVA report that the City Fringe saw the highest proportion of office take up at 42%. The Technology Media Telecommunications (TMT) sector is underpinning rents in the City Fringes and record rents are being achieved in a number of locations including Clerkenwell Recent market reports indicate that office rents in the south of Islington have increased significantly in the last 2 years. The Northern City Fringe market is defined by Jones Lang LaSalle and GVA as encompassing all of the area to the south of Pentonville Road and City Road. This part of the City Fringe experienced an average increase in rents of 9.8% 28 over the last year and a 15.9% annual change in between 2011 and 2012, putting total growth at 25.7%. 29 Office Rents in the Northern City Fringe ( per sq m) Period Max Min Average % annual change (average) Q Q Q Total Growth 25.7% : Source: Jones Lang LaSalle (Q3 2013) On Point: The Central London Market Rents have been converted to /sq m in accordance with the Inspector s Guidance Notes 1.4 Jones Lang LaSalle identifies that average office rents in the Northern City Fringe are currently 390 per sq m (see table above) 30. The prices used to generate this average relate to all offices and not specifically new stock which would typically attract higher rents. 1.5 Both Jones Lang LaSalle and GVA report that prime office rents in the Northern City Fringe can command in the region of 500 per sq m. 31 In Clerkenwell, office space can achieve up 26 Jones Lang LaSalle (Q3 2013) On Point: The Central London Market 27 GVA (Q3 2013) Central London Office Analysis p7. 28 Jones Lang LaSalle (Q3 2013) On Point: The Central London Market, p Jones Lang LaSalle (Q4 2012) The Central London Market 30 Up to date market rental prices are not currently available for the mid and north of the borough. 11
14 to 538 per sq m. Additional market data indicates that current average office rents for existing stock in Kings Cross, Clerkenwell and Silicon Roundabout are 355, 409 and 431 per sq m respectively These rental values are notably higher than the figures applied in the Combined Policy Viability Study and the CIL Viability Study. Reviewing the current average office rental price of c. 390 per sq m for the Northern City Fringe (see Table above) against the average value applied in these studies for sites in the CAZ ( 281 per sq m) indicates that recent rental growth may not have been fully captured the studies. 1.7 Jones Lang LaSalle also report that there is evidence that yields have reduced in the Northern Fringe and, investors are increasingly buying in anticipation of rental uplift which will drive further value growth. This has resulted in a narrowing margin between yields in core and fringe sub-markets GVA (Q3 2013) Central London Office Analysis & Jones Lang LaSalle (Q3 2013) On Point: The Central London Market 32 November Jones Lang LaSalle (Q3 2013) On Point: The Central London Market 12
Date: 13 March 2013. Chief Executive
Item No. Classification: Open Date: 13 March 2013 Decision Taker: Cabinet Member for Regeneration and Corporate Strategy Report title: Wards affected: From: Application to apply for exemptions from the
More informationTechnical Advice Note: Retail Impact Assessments
Technical Advice Note: Retail Impact Assessments 1 A GUIDE FOR RETAIL IMPACT ASSESSMENTS INTRODUCTION This Technical Advice Note (TAN) has been prepared to assist applicants seeking planning permission
More informationThe Impact of Permitted Development Rights for Office to Residential Conversions. a London Councils briefing
The Impact of Permitted Development Rights for Office to Residential Conversions a London Councils briefing August 2015 Background The previous government introduced temporary permitted development rights
More informationHow To Develop The Kingsgate Business Centre
Kingsgate Business Centre Employment Report Introduction The subject property comprises serviced offices arranged over two floors within a building in the north side of Kingsgate Road. It is served by
More informationRE: CONSULTATION ON THE DEVELOPMENT MANAGEMENT AND THE SITE ALLOCATIONS DPD CONSULTATION DOCUMENT REPRESENTATIONS MADE ON BEHALF OF SAFESTORE.
23 March 2015 Haringey Planning Policy River Park House 225 High Road London N22 8HQ Dear Sir RE: CONSULTATION ON THE DEVELOPMENT MANAGEMENT AND THE SITE ALLOCATIONS DPD CONSULTATION DOCUMENT REPRESENTATIONS
More information1 To review the office market in Bakewell in the light of pressures for change from office to residential in town centre sites.
Page 1 5. THE BAKEWELL OFFICE MARKET (A610611/BT) Proposal 1 To review the office market in Bakewell in the light of pressures for change from office to residential in town centre sites. Within the context
More informationDRAFT CENTRAL ACTIVITIES ZONE SUPPLEMENTARY PLANNING GUIDANCE SEPTEMBER 2015 LONDON PLAN 2015 IMPLEMENTATION FRAMEWORK
DRAFT CENTRAL ACTIVITIES ZONE SUPPLEMENTARY PLANNING GUIDANCE SEPTEMBER 2015 LONDON PLAN 2015 IMPLEMENTATION FRAMEWORK CENTRAL ACTIVITIES ZONE SPG DRAFT CENTRAL ACTIVITIES ZONE SUPPLEMENTARY PLANNING GUIDANCE
More informationCommunity Infrastructure Levy
Woking Borough Council Local Development Framework Community Infrastructure Levy Charging Schedule October 2014 Produced by the Planning Policy Team. For further information please contact: Planning Policy,
More informationDerwent London plc ( Derwent London / the Group )
17 November 2011 Derwent London plc ( Derwent London / the Group ) INTERIM MANAGEMENT STATEMENT FOR THE NINE MONTHS ENDED 30 SEPTEMBER 2011 Continued strong letting progress and further rental growth during
More informationGuildford borough Local Plan Local Development Scheme 2015
Guildford borough Local Plan Local Development Scheme 2015 Summary The Local Development Scheme (LDS) is the timetable and project plan for the new Guildford borough Local Plan. The LDS explains what documents
More informationReport. Prepared for. Report for CIL Charging. GVA St Catherine s Court Berkeley Place Bristol BS8 1BQ (0)8449 02 03 04. gva.co.uk
Assumptions report Report Plymouth Assumptions Report for CIL Charging Schedule October 2011 Prepared for GVA St Catherine s Court Berkeley Place Bristol BS8 1BQ (0)8449 02 03 04 gva.co.uk Contents 1.
More informationTechnical consultation on planning
Technical consultation on planning Consultation response form We are seeking your views to the following questions on the proposals to streamline the planning system. How to respond to this consultation
More informationOffices. City Management Plan workshop briefing notes PART A OFFICES INSIDE AND OUTSIDE CAZ. What are the issues?
City Management Plan workshop briefing notes Offices PART A OFFICES INSIDE AND OUTSIDE CAZ What are the issues? Offices are supported as a strategic use within Westminster. Our office stock is the largest
More informationPreventing Wasted Housing Supply Draft Supplementary Planning Document
Preventing Wasted Housing Supply Draft Supplementary Planning Document December 2014 1. Introduction 1.1. This Supplementary Planning Document (SPD) will address the issue of so called Buy to Leave : when
More informationCommunity Infrastructure Levy in Croydon. A guide
Community Infrastructure Levy in Croydon A guide February 2014 1 Contents 1. Introduction to the Community Infrastructure Levy... 2 2. Who will have to pay the CIL... 2 3. How much is the CIL?... 3 4.
More informationApplication No : 13/00389/FULL2 Ward: Bromley Town. Applicant : Bromley Conservative Club Objections : NO
SECTION 2 Applications meriting special consideration Application No : 13/00389/FULL2 Ward: Bromley Town Address : Lancaster House 7 Elmfield Road Bromley BR1 1LT OS Grid Ref: E: 540487 N: 169009 Applicant
More informationLondon: the Plan for growth
A presentation for London: the Plan for growth Key development issues for London First Faraz Baber MRTPI MRICS FRSA What I plan to cover London Plan Crossrail: Mayoral CIL Charging Schedule Localism Bill
More information8 Albert Embankment and Land to the Rear
8 Albert Embankment and Land to the Rear Representations to Proposed Modifications to the Lambeth Local Plan (Proposed Submission) on behalf of London Fire and Emergency Planning Authority 12 January 2015
More informationCurrent Issues Note 27 Central London office market through the recession By Yeukai Muchenje and Nick Ennis
Current Issues Note 27 By Yeukai Muchenje and Nick Ennis copyright Greater London Authority November 2010 Published by Greater London Authority City Hall The Queen s Walk London SE1 2AA www.london.gov.uk
More informationCamden Development Policies
Camden Local Development Framework Camden Development Policies Adoption version 2010 1 CAMDEN LOCAL DEVELOPMENT FRAMEWORK CAMDEN DEVELOPMENT POLICIES Camden Development Policies 2010 Introduction 1. Location
More informationPRE-APPLICATION ADVICE ON PLANNING PROPOSALS
PRE-APPLICATION ADVICE ON PLANNING PROPOSALS Planning Civic Offices Bridge Street Reading RG1 2LU Tel: 0118 9373787 Email: plgadmin@reading.gov.uk Website: www.reading.gov.uk Pre-application advice on
More informationSection 106 affordable housing requirements
Section 106 affordable housing requirements Review and appeal April 2013 Department for Communities and Local Government Crown copyright, 2013 Copyright in the typographical arrangement rests with the
More informationDraft London Plan Early Minor Alterations Mayor s response to comments at Assembly & Functional Bodies consultation stage
Summary The consultation ran from 7 th November to 20 th December 2011 and generated 15 responses. 1 Transport for London Welcome alterations, particularly greater provision for cycle parking for office
More informationIssue Number 3 Representor Number - 635815. Canary Wharf Group Position Statement
Issue 3 Are employment policies consistent with the NPPF, the London plan and the Core Strategy and/or supported by clear and robust evidence; are they reasonable and realistic and clear, deliverable and
More informationDevelopment Viability
Development Viability Supplementary Planning Document January 2016 1 Contents Section Title Page number 1. INTRODUCTION... 3 2. VIABILITY IN THE PLANNING PROCESS... 4 ISLINGTON CONTEXT... 4 POLICY CONTEXT...
More informationOFFICE RETENTION. Date: 28 July 2015
OFFICE RETENTION Date: 28 July 2015 CONTENTS 1: Aim of the document 2: Background Information 3: Current Context 4: Commercial Provision in Croydon 5: Demand 6: Permitted Development Rights 7: Future 1.
More informationNorth Somerset Council Core Strategy Affordable Housing Policy: Viability and Deliverability Advice
North Somerset Council Core Strategy Affordable Housing Policy: Viability and Deliverability Advice Final Report February 2011 Dr Andrew Golland, BSc (Hons), PhD, MRICS drajg@btopenworld.com Three Dragons
More informationSpotlight The Future of Manchester December 2015
Savills World Research UK cross-sector Spotlight The Future of Manchester December 215 SUMMARY Manchester is facing a decade of strong growth but the city needs to build more to meet demand Lower property
More informationQuestions: QEa: Are there any other employment policy themes that you think OPDC s Local Plan should be addressing?
8 EMPLOYMENT 185 Employment This chapter contains policies addressing the following policy themes: E1: Strategic Policy for employment E2: Old Oak E3: Park Royal E4: Open workspaces E5: Local access to
More informationChapter 10. Employment, Business and Industry
Chapter 10 Employment, Business and Industry 10.1 Introduction Overview 10.1.1 This chapter sets out the council s policies for employment, business and industry in the borough. It aims to protect, provide
More informationLEWISHAM: DRAFT DEVELOPMENT MANAGEMENT LOCAL PLAN WRITTEN REPRESENTATIONS ON BEHALF OF SHURGARD UK LIMITED
SUBMITTED VIA EMAIL TO: planning.policy@lewisham.gov.uk Our Ref: MM/AE/17334 (email address: mairead.murphy@cgms.co.uk) Direct dial: 0207 832 1472 Planning Policy, 3 rd Floor London Borough of Lewisham
More informationReview of Financial Appraisal Supporting Statement April 2013 update The Shell Centre
Review of Financial Appraisal Supporting Statement April 2013 update The Shell Centre Prepared for London Borough of Lambeth May 2013 Contents 1 Introduction 3 2 Description of the Development 5 3 Methodology
More informationCommunity Infrastructure Levy (CIL) Form 2: Claiming Exemption or Relief
Community Infrastructure Levy (CIL) Form 2: Claiming Exemption or Relief This form should be used to claim charitable relief, social housing relief, and/or exceptional circumstances relief prior to the
More informationMerton Sites and Policies and Policies Plan (the plan) Public Examination
Merton Sites and Policies and Policies Plan (the plan) Public Examination Main matter 7: Site selection process 7. Site Selection Process. The Council s Call for Sites Consultation (SP4.20) yielded a number
More informationSUPPLEMENTARY PLANNING DOCUMENT PLANNING OBLIGATIONS
London Borough of Hillingdon SUPPLEMENTARY PLANNING DOCUMENT PLANNING OBLIGATIONS July 2014 Planning Policy Team Residents Services London Borough of Hillingdon 1 CONTENTS Chapter Page 1. Introduction
More informationAn Introduction to BREEAM and the Code for Sustainable Homes
www.islington.gov.uk An Introduction to BREEAM and the Code for Sustainable Homes Ropemaker, a BREEAM Excellent office development in South Islington 1 Two key methods for assessing the sustainability
More informationDevelopment Management Policies. Topic Paper: Social & strategic infrastructure and cultural facilities
Development Management Policies Topic Paper: Social & strategic infrastructure and cultural facilities August 2012 1. Outline 1.1. This topic paper provides justification for the Social and Strategic Infrastructure
More informationLambeth Student Housing Assessment November 2013. London Borough of Lambeth. Student Housing Assessment November 2013
Borough of Lambeth Student Housing Assessment November 2013 1. Higher education provision in Lambeth 1.1 There are 41 higher education institutions in funded by the Higher Education Funding Council for
More information48-50 Well Street Hackney London E9 7PX. Marketing History
48-50 Well Street Hackney London E9 7PX Marketing History June 2013 Appendices 1. Instruction Letter 2. Marketing Board Instruction Letter 3. Property Details: Well Street, 48 4. Email from Landlord 14/10/2011
More informationPlanning Officers Society
Planning Officers Society Spring Conference: Working in Partnership 15 May 2014 Stewart Murray Assistant Director Planning Email: stewart.murray@london.gov.uk; Mayor s 2020 Vision Global Leading City Double
More informationCommunity Infrastructure Levy (CIL) Guidance Note 7. Examples of how CIL liabilities are calculated
Community Infrastructure Levy (CIL) Guidance Note 7 Examples of how CIL liabilities are calculated Purpose of document This document contains simplified examples of how CIL liabilities are calculated and
More informationan Inspector appointed by the Secretary of State for Communities and Local Government
Appeal Decision Hearing held on 17 December 2014 by Philip Major BA (Hons) DipTP MRTPI an Inspector appointed by the Secretary of State for Communities and Local Government Decision date: 14 January 2015
More informationGuidance on Affordable Workspace December 2014
Guidance on Affordable Workspace December 2014 This paper sets out Islington Council s framework for securing and operating affordable workspace in line with adopted planning policies. The intention is
More informationCity Plan Part 1 Sustainability Appraisal Summary February 2012
City Plan Part 1 Sustainability Appraisal Summary February 2012 1.0 Introduction The Council is in the process of preparing its new Local Plan in consultation with the public, developers, landowners and
More informationBusiness Profile: Ramidus Consulting Limited
1 Introduction Ramidus Consulting Limited was established in 2003 as a specialist, independent, built environment research and advisory business. Property market research We undertake property market research,
More informationCamden Council CAMDEN EMPLOYMENT LAND REVIEW. Final Report
Camden Council CAMDEN EMPLOYMENT LAND REVIEW June 2008 ROGER TYM & PARTNERS Fairfax House 15 Fulwood Place London WC1V 6HU t (020) 7831 2711 f (020) 7831 7653 e london@tymconsult.com w www.tymconsult.com
More informationTAXATION OF PRIVATE LANDLORDS
TAXATION OF PRIVATE LANDLORDS The Tax Position of the Small Private Landlord The private rented sector is possibly the only sector of the economy where the tax and regulatory systems work to prevent the
More informationCorporate Director Environment and Community Services
CABINET Meeting date: 27 November 2014 From: Corporate Director Environment and Community Services RESPONSE TO SOUTH LAKELAND DISTRICT COUNCILS COMMUNITY INFRASTRUCTURE LEVY REGULATION 16 CONSULTATION
More information24.3% increase in value of development properties. 485,000 sq ft PROJECTS
PROJECTS Over the next few years we look forward to delivering a substantial phased development programme to meet occupier demand. SIMON SILVER EXECUTIVE DIRECTOR 4.3% increase in value of development
More informationSOCIAL INFRASTRUCTURE
10 SOCIAL INFRASTRUCTURE 233 Social infrastructure 10.1 This chapter contains policies addressing the following policy themes: SI1: Strategic Policy for Social Infrastructure SI2: Educational SI3: Health
More informationOUT OF TOWN NORTH LIVERPOOL CITY FRINGE OUT OF TOWN WAVERTREE
LIVERPOOL COMMERCIAL OFFICE MARKET REVIEW 2013 WATERLOO NORTH LIVERPOOL BOOTLE CITY FRINGE KNOWSLEY ST HELENS CITY CENTRE RIVER MERSEY WAVERTREE LIVERPOOL CITY REGION MAP SOUTH LIVERPOOL SUMMARY Combining
More informationSpotlight London Mixed Use Development
Savills World Research UK Cross Sector Spotlight London Mixed Use Development 2016 SUMMARY The capital needs a combination of more homes and workplaces beyond central London London needs 64,000 new homes
More informationManchester City Council Planning and Highways Committee 2 June 2011
Application Number 095804/FO/2011/N1 Date of Appln 21st Mar 2011 Committee Date 2nd Jun 2011 Ward Cheetham Ward Proposal Location Applicant Agent Installation of 929 square metre mezzanine floor area to
More informationGold Property Developments welcomes you to this exhibition of the draft plans for the regeneration of the Holborn Studios site on Eagle Wharf Road.
WELCOME Gold Property Developments welcomes you to this exhibition of the draft plans for the regeneration of the Holborn Studios site on Eagle Wharf Road. The site covers approximately 0.37 hectares and
More informationLondon Borough of Havering. Draft Planning Guidance Note on Affordable Housing. Commuted Sum Payments
London Borough of Havering Draft Planning Guidance Note on Affordable Housing Commuted Sum Payments May 2016 Affordable housing circumstances where Havering Council will use commuted sum payments to the
More informationMount Browne (Surrey Police Head Quarters), Sandy Lane, Guildford Vision Statement. November 2013. with
Mount Browne (Surrey Police Head Quarters), Sandy Lane, Guildford Vision Statement November 2013 with Tibbalds Planning & Urban Design 19 Maltings Place 169 Tower Bridge Road London SE1 3JB Telephone 020
More informationNLA Conference Sep 2014 1
1 Economic Context 1 London & UK economic indicators GDP Growth (%) House Hold Disposable Income Growth (%) 12 10 8 6 4 2 0-2 -4-6 -8 6 4 2 0-2 -4-6 UK London UK London 3 2.5 2 1.5 1 0.5 0-0.5-1 Working
More informationHow To Plan For A Mixed Use Scheme At King S Cross Central
King s Cross Central Retail Impact Assessment March Black ARUP for Argent St George, Exel and LCR Executive Summary 1 1 Introduction 8 1.1 Purpose of the study 8 1.2 Study approach 8 1.3 Previous relevant
More informationPage 69. Sutton Living Business Plan and Loan Agreement. Mary Morrissey, Strategic Director of Environment, Housing and Regeneration
Page 69 Agenda Item 5b Report to: Opportunity Sutton Limited Sub- Committee Date: 4 August 2015 Report title: Report from: Ward/Areas affected: Chair of Committee/Lead Member: Author(s)/Contact Number(s):
More informationOfficer Update Report. Section 1 Site Location Map
Officer Update Report Section 1 Site Location Map 1 Section 2 Application Summary Location Ward Proposal Application Applicant Agent 137 Stamford Street, London SE1 9NN Bishop s Retrospective change of
More informationLondon Borough of Hackney
London Borough of Hackney Permitted Development Rights for Change of Use from Commercial to Residential Exemption Request A Loss of a Nationally Significant Area of Economic Activity February 2013 Contact
More informationEconomic Land Use Vision Euston Area Plan London Borough of Camden. Report. January 2013. Work Report in Progress. December 2013
Report Work Report in Progress GVA 10 Stratton Street London W1J 8JR Economic Land Use Vision Euston Area Plan London Borough of Camden December 2013 January 2013 gva.co.uk Prepared By. Christopher Hall...
More informationHavering Employment Land Review
Havering Employment Land Review Executive Summary April 2015 47071356 Prepared for: London Borough of Havering UNITED KINGDOM & IRELAND 1. Introduction URS Infrastructure and Environment UK Ltd (URS)
More information1 The Incidence, Value and Delivery of Planning Obligations in England in 2007 08, University of Sheffield 2010.
What is a Community Infrastructure Levy (CIL)? This is a new system of funding infrastructure through planning charges that the Council can ask developers to pay for most new building projects. It does
More informationInvestIng In london commercial real estate
InvestIng In london commercial real estate contacts gareth Williams Partner Property Department for Royds LLP Tel: +44 (0) 20 7583 2222 gwilliams@royds.com andrew cruickshank Tel: +44 (0) 020 7338 4434
More informationThe West Way Shopping Centre
The West Way Shopping Centre Assessment of Development Options Viability and Deliverability July 2015 1. INTRODUCTION 2 INTRODUCTION Current Occupiers include the Co-op Supermarket, Iceland, Lloyds Pharmacy
More informationFinancial Analysis for the Ambleside Centre Zoning Districts
Financial Analysis for the Ambleside Centre Zoning Districts July 2013 Prepared for: The District of West Vancouver By: Coriolis Consulting Corp. Table of Contents 1.0 Introduction... 1 1.1 Purpose...
More informationPre Application Advice Charging Scheme and Post Application Service Introduction (1 st February 2014)
Pre Application Advice Charging Scheme and Post Application Service Introduction (1 st February 2014) The Development Control Service is responsible for providing planning advice, processing planning applications
More informationSection 151 Officer Monitoring Officer
Subject: Borough of Rochdale (Brunswick Street, Rochdale) Compulsory Purchase Order 2012 Status: For Publication Report to: Rochdale Township Committee Date: 11 th July 2012 Report of: Director of Planning
More informationSTATEMENT ON SUITABILITY FOR CONTINUED EMPLOYMENT USE
STATEMENT ON SUITABILITY FOR CONTINUED EMPLOYMENT USE 41-45 Neal Street for Kennedy Wilson Europe March 2015 CONTENTS 1.0 Introduction 1 2.0 Existing Building and Proposed Development 2 3.0 Planning Policy
More informationEarl s Court West Kensington Opportunity Area: Office Market
Roger Tym & Partners t: 020 7028 7100 7 Soho Square e: london@tymconsult.com London W1D 3QB w: www.tymconsult.com Greater London Authority/Royal Borough of Kensington and Chelsea/London Borough of Hammersmith
More informationCommittee(s): Date(s): Item no. (1) Barbican Residential (2) Policy and Resources (3) Community and Children's Services. Ref No; CS.204/12.
Committee(s): Date(s): Item no. (1) Barbican Residential (2) Policy and Resources (3) Community and Children's Services (1) 11 June 2012 (2) 5 July 2012 (3) 12 July 2012 Subject: Barbican YMCA, 2 Fann
More informationUBS Global Real Estate Conference. Offices: Bullish Times Ahead?
UBS Global Real Estate Conference Stephen Hester, Chief Executive We are real estate investors and create value by actively managing, financing and developing prime commercial property to provide the environment
More informationMIXED USE AND OFFICE TO RESIDENTIAL CONVERSION DEVELOPING WESTMINSTER S CITY PLAN
MIXED USE AND OFFICE TO RESIDENTIAL CONVERSION DEVELOPING WESTMINSTER S CITY PLAN Booklet No. 18 Westminster City Plan Revision December 2014 Foreword Cllr Robert Davis DL Westminster has had a long standing
More informationSmall Offices and Mixed Use in CAZ
1 Contents Page No. Management summary ii 1.0 Introduction 1 1.1 Project background 1.2 Project brief 1.3 Method statement 1.4 Acknowledgements 2.0 Context 6 2.1 Spatial planning 2.2 Commercial office
More informationARLA Members Survey of the Private Rented Sector
Prepared for The Association of Residential Letting Agents ARLA Members Survey of the Private Rented Sector Fourth Quarter 2013 Prepared by: O M Carey Jones 5 Henshaw Lane Yeadon Leeds LS19 7RW December,
More informationHorsham Office Conversion Capacity Study
Horsham Office Conversion Capacity Study Horsham District Council June 2009 www.gvagrimley.co.uk Contents Contents 1. INTRODUCTION... 1 2. RATIONALE FOR APPROACH... 3 3. GUIDING PRINCIPLES... 8 4. APPROPRIATE
More informationEast Sussex County Council Grants and Loans for Business - May 2015
East Sussex County Council Grants and Loans for Business - May 2015 Companies in East Sussex are being offered help to grow and create new jobs through a new funding scheme delivered by Locate East Sussex
More informationA Guide to the Fees for Planning Applications in England
A Guide to the Fees for Planning Applications in England These fees apply from 15 April 2015 onwards. This document is based upon The Town and Country Planning (Fees for Applications, Deemed Applications,
More informationCITY FLOOR REVIEW. A floor-by-floor analysis of the City office market Q2 2015
CITY FLOOR REVIEW A floor-by-floor analysis of the City office market Q2 215 SECOND QUARTER REVIEW THE QUARTER IN NUMBERS Q ON Q Y ON Y Comment 377 floors available, totalling 2.85m sq ft 1% by floors
More informationCITY FLOOR REVIEW. A floor-by-floor analysis of the City office market Q1 2015
CITY FLOOR REVIEW A floor-by-floor analysis of the City office market Q1 215 FIRST QUARTER REVIEW THE QUARTER IN NUMBERS Q ON Q Y ON Y Comment 374 floors available, totalling 2.9m sq ft 24 floors taken-up
More informationLuton Borough Council Review of town centre office/business premises for alternative re-use
Roger Tym & Partners t: 020 75668600 16 Brewhouse Yard e: London@peterbrett.com Clerkenwell w: www.peterbrett.com London EC1V 4LJ Luton Borough Council Review of town centre office/business premises for
More informationChapter 2: Commerce (Offices, Industry and Showrooms) Temporary Office Policy Areas. Portland Place Special Policy Area
CONTENTS Page Introduction 111 COM 1 Office renewal and growth 112 COM 2 Offices and mixed use development in Central Westminster 115 COM 3 Relocation of uses 121 COM 4 Small offices 123 COM 5 Temporary
More informationBrewhouse Yard, St John Street, London EC1
1 Brewhouse Yard, St John Street, London EC1 Single Let Office Investment 2 Investment Summary Long leasehold with a share of the Freehold. Prime Clerkenwell location situated approximately five minutes
More informationMid-Coast Corridor Transit Project San Diego, California New Starts Project Development (Rating Assigned November 2014)
Mid-Coast Corridor Transit Project San Diego, California New Starts Project Development (Rating Assigned November 2014) Summary Description Proposed Project: Light Rail Transit 10.9 Miles, 9 Stations Total
More informationCoventry Development Plan 2016 Appendix 89. Glossary of Key Terms
Coventry Development Plan 2016 Appendix 89 Glossary of Key Terms Area Action Plan A Development Plan Document which focuses upon a specific location or an area subject to significant change. Affordable
More informationTHE ARLA REVIEW & INDEX
THE ARLA REVIEW & INDEX for Residential Investment FOURTH Quarter 2014 Fourth Quarter 2014 Compared with three months ago, the average weighted rental return for houses is up from 5.0% to 5.1%, its second
More informationDeliverability of Housing and the Strategic Housing Land Availability Assessment Housing Evidence Base Briefing Note 8:
Deliverability of Housing and the Strategic Housing Land Availability Assessment Housing Evidence Base Briefing Note 8: National Policy Context The NPPF i (paragraph 159) states that local planning authorities
More informationLondon Office Policy Review 2006
August 2006 A Review of Office Market Trends 2004-2006 and Their Implications for Strategic Planning Policy David Chippendale Chippendale Consulting & Research Geoff Marsh London Property Research August
More informationCarys Roberts. March 2016 IPPR 2016 START ME UP WHY LONDON NEEDS OPEN WORKSPACES FOR CREATIVITY, INNOVATION AND GROWTH
Carys Roberts March 2016 IPPR 2016 START ME UP WHY LONDON NEEDS OPEN WORKSPACES FOR CREATIVITY, INNOVATION AND GROWTH ABOUT IPPR IPPR, the Institute for Public Policy Research, is the UK s leading progressive
More informationOffice market commentary in. Kensington and Chelsea
Office market commentary in Kensington and Chelsea Office market commentary in Kensington & Chelsea in relation to the proposed changes to permitted development rights February 2013 For the Royal Borough
More informationWILTSHIRE CORE STRATEGY EXAMINATION - LAND AT STATION ROAD, WESTBURY.
30 July 2013 Delivered by email Mr. Andrew Seaman BA (HONS) MA MRTPI Planning Inspector c/o The Programme Officer 49 All Saints Place Bromsgrove Worcestershire B61 0AX 10 Queen Square Bristol BS1 4NT T:
More informationMid-Coast Corridor Transit Project San Diego, California New Starts Engineering (Rating Assigned November 2015)
Mid-Coast Corridor Transit Project San Diego, California New Starts Engineering (Rating Assigned November 2015) Summary Description Proposed Project: Light Rail Transit 10.9 Miles, 9 Stations Total Capital
More informationLabour Market Analysis: Islington & London
Labour Market Analysis: Islington & London April 2013 LABOUR MARKET ANALYSIS: ISLINGTON & LONDON Key messages The Local Economy The local economy is bearing up well, despite the recession In 2010 there
More informationFREEHOLD RETAIL & RESIDENTIAL INVESTMENT WITH OFFICE OR RESIDENTIAL DEVELOPMENT POTENTIAL, STP
FREEHOLD RETAIL & RESIDENTIAL INVESTMENT WITH OFFICE OR RESIDENTIAL DEVELOPMENT POTENTIAL, STP 2 INVESTMENT CONSIDERATIONS Kingston upon Thames is an established affluent university town situated on the
More information80 Clerkenwell Road, London EC1M 5RJ Prime Clerkenwell Investment Opportunity with Considerable Active Management Potential
31 Old Burlington Street, Mayfair, London W1S 3AS 020 7292 7404 www.burlingtonpartners.com 80 Clerkenwell Road, London EC1M 5RJ Prime Clerkenwell Investment Opportunity with Considerable Active Management
More informationAPPENDIX D. Property Market Overview. The Retail Sector. Retail Trends and District Centres
Property Market Overview Introduction & Context CB Richard Ellis was instructed by the London Borough of Merton as part of a consultancy team to prepare a master plan for Mitcham Town Centre. CB Richard
More informationHow To Get Through The Month Of August
London Market Snapshot October 2015 10/15 Global Macro Overview Global equities experienced their sharpest falls since 2011, with most major markets moving into correction territory (a fall of more than
More informationSovereign Court, The Highway, Wapping Change of Use Consent. Councillor David Edgar, Cabinet Member for Resources
Cabinet 28 July 2015 Report of: Corporate Director, Development & Renewal Classification: Unrestricted Sovereign Court, The Highway, Wapping Change of Use Consent Lead Member Originating Officer(s) Wards
More informationGateshead and Newcastle Viability and Deliverability Report Gateshead and Newcastle Core Strategy and Urban Core Plan Evidence Base
Gateshead and Newcastle Viability and Deliverability Report Gateshead and Newcastle Core Strategy and Urban Core Plan Evidence Base Update February 2014 1 Contents 1. Purpose of Report 2. National Policy