EARTHQUAKE DAMAGE TO PIPELINES A CHRISTCHURCH PERSPECTIVE

Size: px
Start display at page:

Download "EARTHQUAKE DAMAGE TO PIPELINES A CHRISTCHURCH PERSPECTIVE"

Transcription

1 ABSTRACT EARTHQUAKE DAMAGE TO PIPELINES A CHRISTCHURCH PERSPECTIVE Author: J R Black, Technical Principal Pipeline Materials Opus International Consultants Ltd, Christchurch New Zealand. It can be said that there is no perfect pipe material for any purpose. Ground shaking and permanent ground deformation (PGD) during seismic events bring additional forces to bear on pipes and these forces can be destructive, particularly to any weak links. Some pipe materials and jointing systems have performed very poorly while others have suffered only minimal damage (or none) during the internationally significant Christchurch earthquakes between September 2010 and December This paper considers the effects of the Christchurch earthquakes on buried pipelines, gives examples of failure modes and presents some conclusions regarding earthquake resilience of water supply and drainage infrastructure as well as some final comments from a Pipe Whisperer of over 40 years experience. Key Words Pipe materials, earthquake, liquefaction, lateral spreading, pipe failure, earthquake resilience, asbestos cement, HDPE and PVC-U pipes. 1 Introduction Quote: Civilisation exists by geological consent, subject to change without notice (Attributed to Durant, [Nur and Burgess, 2008]). The Canterbury earthquake sequence has served as reinforcement of the relevance of this quote. Each of the main earthquake events has resulted in serious disruption to the essential horizontal services and parts of Christchurch are now no longer viable and may never be rebuilt. Christchurch, the second largest city in New Zealand with a population of 376,700 in 2010 was awakened by a magnitude 7.1 earthquake at 4:36am on Saturday September The quake epicentre was 40 kilometres west of the city, southeast of the town of Darfield near Greendale in the Selwyn District. The depth of the earthquake (about 10 kilometres below the surface) was relatively shallow and produced the strongest earthquake ground-shaking ever recorded in New Zealand up to that time, with the ground near the epicentre moving up 1.25 times the acceleration due to gravity. The fault rupture occurred along a previously unknown east-west fault-line which is buried deeply under the gravels that were deposited on the Canterbury plains at the end of the last glaciation period, estimated at about 16,000 years ago. ( The 4 September 2010 earthquake literally provided a wake-up call regarding the vulnerability of the buried pipelines and utility structures within the Selwyn and Waimakariri Districts, Christchurch City as well as the rest of New Zealand. The Canterbury area had not been perceived to be a particularly high-risk earthquake area but this event supported what the seismologists and geo-technical engineers had been saying since the original University of Canterbury Centre for Advanced Engineering s (CAE) Lifelines projects in Wellington (1991) and Christchurch (1997). Page 1 of 29

2 There was a sense of complacency because there was no loss of life and most buildings remained standing and were functional. There was a feeling that we had survived a significant earthquake and had escaped relatively unscathed. This complacency was shattered on February 22, 2011 when the 6 km deep, 6.3 magnitude earth quake struck at 12:51 pm. The vertical ground acceleration above the epicentre near the Port Hills was 2.2 times the acceleration due to gravity. 185 lives were lost and the cost of damage to property and buried infrastructure was immense. 2 Background It is this writer s general observation that ground shaking intensities of greater than 5 Modified Mercalli (MM) were needed to re-activate the liquefaction processes in the most susceptible areas. Many of the earthquakes and aftershocks between September 2010 and December 2011 exceeded this threshold and resulted in damaged sewers being re-choked with fine silty sand. The extent of liquefaction during the Christchurch earthquake sequence has been almost unprecedented and at the time of writing this paper (January 2013) the ground in many of the worst affected areas is still unstable with residents that remain in these areas urging motorists to reduce speeds to minimise the shaking. The Canterbury region (as with most parts of New Zealand) has a history of damaging earthquake events. Ground shaking intensities of 5 Modified Mercalli Intensity scale (MMI) have occurred on at least 16 occasions from 1848 to 1995 as shown In TABLE-1 (adapted from J. R. Pettinga et al 2002) and updated with the 2010 and 2011 Canterbury and Christchurch earthquakes. TABLE-1: List of Damaging Earthquakes Affecting Christchurch City Since Date & Year Known Name / Location Magnitude (Richter) Christchurch (MMI) Depth Oct Marlborough Shallow Jan Wairarapa km June Pegasus Bay Shallow Aug Lake Ellesmere 6 6, 7 Crustal Dec Castle Hill 6 6, 7 Crustal Aug Hope fault Nth Canterbury , 6, 7 12 km Nov Cheviot 6.9 6, 7 12 km Dec Motunau km Mar Arthurs Pass < 15 km June Buller, White Creek fault km June Lake Coleridge km May Waiau km 24 May 1968 Inangahua km May Marlborough km June Arthur s Pass km Nov Cass km Sept Darfield km Feb Lyttelton km June Redcliffs km 23 Dec 2011 South New Brighton km Over 500,000 tonnes of liquefaction ejecta was removed from Christchurch city during the Canterbury earthquake sequence (M. Villemure et al, 2012). This does not include the liquefaction removed from Kaiapoi, Pines Beach and Karaki Beach in the Waimakariri District that were also heavily affected by liquefaction in the September 2010 event. Page 2 of 29

3 The consequences of liquefaction and lateral spreading on the buried infrastructure were not really understood or had been partly ignored by most infrastructure designers, even although the subject had been raised locally in the Report Risks and Realities (Christchurch Engineering Lifelines Group 1997) as well as in a paper about the 1901 Cheviot earthquake which caused liquefaction at Kaiapoi in the Waimakariri District, approximately 15 km north of Christchurch. ( Liquefaction at Kaiapoi in the 1901, Cheviot, New Zealand Earthquake [Berrill et al, 1994]). The dangers had also been highlighted in the Q Files Exposing Canterbury s Shaky Future (Environment Canterbury, circa 2001). FIG-1 shows the locations of earthquakes and after-shocks of greater than magnitude 3.0 that occurred between September 2010 and September 2012, including the four major events, Darfield, Sept 2010, Lyttelton, Feb 2011, Redcliffs, June 2011, and South New Brighton Dec FIG-1: Map Showing Earthquakes Magnitude 3.0 From September 2010 to September Source; Each of the main earthquake events resulted in serious disruption to the essential horizontal services, including power supply, in the worst affected areas. Many residents were without water supply for days or weeks at a time after the 4 September 2010, 22 February and 13 June 2011 events and raw sewage was still being pumped into the Avon and Heathcote rivers more than six months after the June 2011 event. Each new earthquake and significant after-shock re-activated the liquefaction and the damaged pipes allowed more silt and sand to enter and choke the sewers. CHART-1 shows the estimated daily volume of sewage overflowed to rivers and streams after the February 2011 earthquake. (Source, Christchurch City Council). Page 3 of 29

4 CHART-1: Chart Showing the Estimated Volume of Sewage Overflowed 3 Water Supply Network Damage after February 2011 Earthquakes find the weak-links in any system and can cause immediate breakage of many vulnerable pipes. There are also more subtle leaks that develop and these may take months or years to become large enough to be detectable or to show as wet spots on the ground surface. FIG-2 shows the location of repairs/faults on the watermains network following the 22 February 2011 earthquake superimposed on a background of the liquefaction map (Cubrinovski, 2012). FIG-2: Liquefaction Map of Christchurch & Locations of Water Network Mains Repairs After Feb 2011 From the concentration of repairs, there is a clear link between the damage to the pipe network and liquefaction severity. Cubrinovski, (2012) also found that polyethylene (PE) pipes and polyvinylchloride (PVC) pipes suffered significantly less damage (three to five times less on average) than asbestos cement (AC), steel (ST), galvanized iron (GI) and pipes of other materials. Page 4 of 29

5 It is worth noting here (based on this writer s personal experience with PVC pipes in Christchurch) that the City has had an on-going problem with PVC-U pipe failures over the years. Christchurch City Council adopted PVC pipes for water supply and sewage earlier than most other NZ cities and as a result, received some of the early production runs of quite poorly processed (brittle, low toughness) pipes. Many of these were already failing by longitudinal splitting before the earthquake sequence and some are continuing to fail. Poor quality pipes are more likely to split and fail catastrophically (by longitudinal splitting from end to end) than the high toughness PVC-U pipes produced from the late 1990 s onwards. 4 Increase in Background Water Supply Repair Rates Aside from the major pipe bursts that occurred immediately during the main earthquakes, more subtle damage also occurs and this damage may take weeks, months or years before it shows at the surface. This subtle damage includes leaks at deflected run-lead joints on cast iron (CI) and steel mains, joints on all pipe materials partially pulled out, breakage of CI gibault joints due to poor installation or overdeflection due to permanent ground deformation (PGD). Electro-fusion joints on PE pipes can start to leak and tapping saddles on all pipe materials can fracture or rotate and lose sealing. It is this writer s opinion that once a slow leak develops, a usually slow process begins. The escaping water damages the corrosion protection system on ferrous materials and allows corrosion to start. The leak develops slowly or it may increase in a number of discrete jumps if ground movement or water-hammer events occur. The increasing leak rate develops sufficient energy to activate sand particles in the pipe bedding and a wet sandblasting process gradually wears away the pipe wall to the point where the leak rate is detectable or shows at the ground surface. Plastics pipes are also frequently eroded to detectable leakage levels. (Kunkel, et al, 2008) has also reported that if these tiny leaks can be found early, they can be repaired before they lead to major pipeline ruptures. There has been a significant increase in the numbers of water supply leak repairs during 2012, particularly in Christchurch City. Many of these repairs are associated with run-lead joints that have been reported to be leaking and are believed to be the result of one or more of the main earthquake events. The data used to prepare CHART-2 was provided by Citycare (Christchurch City s maintenance contractor) (Blake-Manson, 2012). CHART-2: Chart of Water Supply Network Repair Numbers For Christchurch Number of Jobs Total Water Supply Network Repairs (Christchurch City Maintenance Contractor's Records) 12/13 11/12 10/11 09/10 08/09 07/ Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Page 5 of 29

6 The numbers of watermain repairs during the recovery phase after the September 2010 and February 2011 events do not show in CHART-1. The figures used to prepare CHART-1 include all water supply jobs, not just watermain repairs, that were carried out under the maintenance contract. Seasonal trends are obvious and there was already a clearly increasing trend over the three years prior to the September 2010 earthquake. It is expected that earthquake related damage repairs will continue for many years as slow leaks continue to grow to detectable size and ground conditions stabilise. Selwyn District, just south of Christchurch, had relatively few damaged horizontal services despite employing similar designs, pipe materials, construction methods and contractors. This was mainly due to the different ground conditions. The majority of Selwyn s 48 water and sewage schemes are located in stony soils with ground water levels well below the surface. Liquefaction was therefore limited and isolated to areas with recent marine sediments. The small township of Waimate, located approximately 100 km from the epicentre of the September 2010 earthquake experienced a significant increase in the number of water main bursts after the earthquake (McTigue, 2012). Waimate has a significant number of small diameter, 3 and 4 diameter (DN 80 and DN 100) cast iron water-mains that were installed in about These pipes are unusually thin in the wall, being only half the thickness of the lowest pressure class cast iron pipes covered by the earliest British or American standards, BS 78 and AWWA C-100. Waimate also has a number of old AC pipes (from the mid 1950 s) which have deteriorated to grade 5 i.e. very poor condition. (Black, 2012 A). The Waimate and Christchurch experiences serve to confirm that deteriorated pipes are more susceptible to failures caused by earthquake activity than pipes that are in better condition. 5 Pipe and System Vulnerability Observations of the earthquake response and on-going recovery phases has confirmed that piped networks can be divided into three categories of vulnerability, high, medium and low and within these categories, individual pipe materials can be roughly ranked in terms of relative vulnerability. The following lists represent the writer s opinion, based on years of experience and many direct observations over the period since the September 2010 earthquake. (Black, 2012). These lists are presented in the writers perceived order of damage susceptibility with the most vulnerable at the top. It should be noted that pipes and pipelines of any materials that have been poorly designed, are of poor quality, have deteriorated significantly, or have been poorly installed will be more vulnerable to damage than listed. (Black, 2011). 5.1 High Vulnerability Pipes & Joint Systems Ceramic pipes with rigid mortar joints. Unreinforced concrete pipes with rigid mortar joints Brick and stone barrels generally with lime mortar jointing. Old reinforced concrete pipes with rigid, mortar or run-lead joints. Ceramic pipes with rubber ring joints. Cast iron pipes with rigid, run-lead joints. Unreinforced concrete pipes with rubber ring joints. Low pressure class AC pipes of DN 150. High pressure class AC pipes of DN 150. Old, small diameter reinforced concrete (RC) pipes with rubber ring joints. Page 6 of 29

7 Screwed galvanised steel (GS) pipes (generally DN 50). Steel pipes with lead joints. CI pipes with rubber ring joints. AC pipes with rubber ring joints, DN Medium Vulnerability Pipes & Joint Systems Glass reinforced plastic (GRP) pipes with butt and strap joints. PVC-U pipes with solvent cement joints and poor quality PVC-U and modified PVC (PVC-M) pipes with rubber ring joints. Large diameter RC pipes with rubber ring joints. GRP filament wound pipes with rubber ring joints. Ductile Iron (DI) pipes with rubber ring joints. Steel pipes, generally concrete lined steel (CLS) with rubber ring joints. PE pipes with structured walls and rubber ring joints. PE pipes of the first generation (type 5 high density polyethylene [HDPE] resins) with end load bearing joints. High toughness PVC-U and PVC-M spigot and socket pipes with rubber ring joints. 5.3 Low Vulnerability Pipes & Joint Systems DI pipes with locking rings e.g. Tyton-Lok. PE 80B or PE 100 (Slow crack growth resistant HDPE) pipes with end-load bearing mechanical joints. Steel pipes with full strength welded joints. PE pipes with high quality butt fusion or full strength electro-fusion joints (Pipes of PE 80B & PE 100). 6 Response and Recovery Urgency In the aftermath of any major earthquake event, there is immense pressure on utilities and their operators to effect repairs and to get systems operating again, especially during the response phase. However, in the haste to make the essential repairs, some unique opportunities to investigate pipe condition and failure modes can be lost. Even in non-emergency times, broken and leaking pipes exhumed during repairs can often tell a story and teach valuable lessons. In the initial response phase after a major earthquake, pipe failure repairs are undertaken by multitudes of contractors which makes it difficult to keep track of the works in progress let alone carry out informed assessments and inspections to identify possible underlying causes. The damaged pipes are either loaded on trucks for immediate disposal or stockpiled in unidentifiable heaps for later disposal. By then it is too late to know where they came from and impossible to identify what is earthquake damage and what is damage caused by excavation and repair crews. A lesson that could be learned for future earthquake events is to appoint at least one independent and experienced pipe condition expert (a pipe-whisperer) to liaise with operations staff and contractors so that as many of the out-of-the-ordinary failures as possible are documented and investigated. This roving-brief could continue throughout the recovery phase as earthquake damaged pipes are likely to continue to be recovered for many years after the main event. Page 7 of 29

8 7 Pipe Failures 7.1 General Comments There is no perfect pipe material. All pipe materials have their advantages and disadvantages and the lifetimes of pipelines and their vulnerability can be affected by any one of the following: (Black, 2012 A) Pipe manufacturing faults (pipe quality), Poor workmanship during construction, Poor detailing and lack of flexibility at connections to structures and anchors (design issues), Misapplication of the pipe material through lack of understanding of pipe material limitations or the mitigation measures needed (design issues). In the course of pipe condition assessments and cause of failure investigations over 40 years, this writer has found combinations of any (or sometimes all) of these have contributed to pipe failures. Pipe failures usually occur at the weakest link in the pipeline at any time, but particularly so during an earthquake event or other event that imposes stress on the pipe. Brittle pipe materials with rigid joints usually are relatively short, have a greater number of weak links and usually suffer the greatest amount of damage and numbers of failures. As a general rule, the larger the pipes and the deeper their burial, the less susceptible they are to earthquake damage. Larger diameter pipes (even of brittle materials) have significantly greater beam strength than smaller pipes of the same materials and are therefore less susceptible to bending and circumferential cracking (broken-back) failures. Pipe materials such as AC, CI, DI and steel all suffer from a range of corrosion mechanisms which reduce their strength and make them progressively more vulnerable to failure as they deteriorate. Modern corrosion protection systems will certainly delay the onset of corrosion but to be effective, they must be applied correctly and remain undamaged throughout the design life of the pipe, usually at least 100 years. The plastics pipes, PVC and PE, do not suffer from corrosion but there are other mechanisms at play that affect the vulnerability of these pipes. Chemical break-down of the polymer structure can occur (Burn, et al, 2005). Poor quality plastics pipes can have a compromised lifetime (failures within 10 years are not unheard of) especially if the pipes are subjected to additional stresses caused by poor bedding, pressure over-load or cyclic fatigue, etc. In pipes extruded from the older PE resins (particularly type 5 HDPE in New Zealand) break-down of the stabilisers leads to longitudinal splitting, particularly associated with point load stresses caused by impingement of large angular bedding particles. Very few pipelines were installed in the Darfield fault shear zone (horizontal movement 3 m [10 ]) but those that were (mainly small bore PE and PVC pipes) stretched, buckled and ruptured. In the areas worst affected by liquefaction, the maximum ground settlement was over 1 metre (3-3 ) and lateral spreading caused up to 2 metres (6-6 ) of horizontal movement adjacent to stream and river channels. PGD of this magnitude is sufficient to damage pipes and pipelines of any materials. 7.2 Brick Barrels Brick barrels were constructed in Christchurch in the late 1870 s. Many have an egg shaped profile and have a concrete base which forms the lower part of the egg shape. The upper, semi-circular crown section was formed using special tapered, fired clay bricks. FIG-3 shows a typical brick barrel sewer in Christchurch. Page 8 of 29

9 FIG-3 : Egg-profile brick barrel 1878 (Photo 2007) The construction of these sewers pre-dated the production of Portland cement in New Zealand by nearly 10 years. It is therefore likely that the concrete and the mortar between the bricks is a hydraulic lime product, although Portland cement could have been imported from the UK. (Black, 2007). Photo, J Black. These brick barrels had been in operation for over 130 years with few problems (apart from significant levels of infiltration) before the 2010/2011 earthquakes struck. It is not known how much damage they had suffered from the 11 earthquake events between 1881 and 2010 that were capable of initiating liquefaction (>MMI 5 see Table-1). However, is highly likely that some damage could have happened as subsidence of streets above the brick barrels has occurred over the years. This subsidence was caused by cracking of the brick crown and concrete base which allowed the groundwater to carry silt and sand into the barrel, leaving voids that gradually collapsed. These brick barrel sewers are generally laid at least 1 metre (3-3 ) below the water table level. The earthquake sequence increased the number of fractures in these barrels and required repeated cleaning by high pressure water-jet to remove the sand and silt and to restore the flow capacity, before remedial work involving cure-in-place liners began. FIG s-4 and 5 show CCTV views of cracking in the concrete base and silty water flowing in weeks after the June 2011 earthquake. FIG-4 & FIG-5: Near vertical cracks in the concrete base & silt ingress into the brick barrels Page 9 of 29

10 CCTV images from C. Manse, Stronger Christchurch Infrastructure Recovery Team (SCIRT) 7.3 Ceramic (Earthenware) Pipes Ceramic pipes have been used extensively for gravity sewers in Christchurch since the first sewers were laid in the 1870 s. Under normal circumstances, the principal forces acting on gravity sewers are due to the soil column above the pipe plus any surcharge loads. In earthquake and liquefaction events, the pipes are subjected to shaking, bending and joint rotation, as well as sometimes fluctuating compression and tension forces. Ceramic pipes are brittle, the sockets and pipe ends shatter and pipes break. The damage to ceramic sewer mains and laterals was widespread and allowed massive ingress of liquefied silt and sand, completely blocking the network. Each successive aftershock > MMI 5 reactivated the liquefaction process and required repeated high pressure water-jet cleaning as well as Page 10 of 29

11 wide-spread repairs to damaged pipes. The water-jet cleaning also created problems and frequently made the damage worse. Pipes with deteriorated cement mortar joints have been highly susceptible to damage but even the more modern elastomeric ring jointed ceramic pipes suffered severe damage (see FIG s-6 and 7). Customer lateral connections, mainly DN 100 (4 ) with rigid (mortar) joints, were particularly susceptible to damage. In many cases, laterals were completely ripped from the main see(fig-8. FIG-6 to FIG-8: Broken ceramic pipes and broken lateral junction G. Boot, Waimakariri DC 7.4 Asbestos Cement (AC) Pipes The response of AC pipes to the earthquakes has been quite variable. In areas not subjected to PGD, e.g. Rangiora in the Waimakariri District, only 8.5 km (5.2 miles) from the closest damaging events and most of the Selwyn District including Darfield, also only 8.5 km, from the September 2010 event, there were remarkably few AC pipe failures, even in the relatively fragile DN 50 (2 ), DN 80 (3 ) and DN 100 (4 ) sizes. In the areas subjected to lateral spreading, AC watermains and gravity sewers suffered badly with failures ranging from broken collars and fractured spigots to circumferential cracking (broken-back), blow-outs and longitudinal splits. AC pipes of greater than DN 150 (6 ) have significant beam strength (even in a deteriorated state) and this strength combined with the flexible elastomeric ring jointing system and their relatively short length (4.0 m [13-1½ ]) allow movement before pipes break. Most of the failures in AC pipes of DN 200 (8 ) and larger occurred near to points where the pipe was securely anchored e.g. thrust blocks on bends, tees, valves or connections to structures. During the response to the earthquakes, AC watermains and pressure sewers were re-commissioned progressively and broken pipes were repaired as they were found. If there were more than 2-3 failures on any pipeline, the entire AC pipeline was abandoned and replaced with a new butt fusion jointed PE 100 (HDPE) pipeline. In one DN 300 (12 ) Class B ( 85 psi) AC sewage pressure main, 2 breaks (in close proximity to concrete thrust blocks at bends) were located and repaired immediately after the 22 February 2011 earthquake. These two repairs were sufficient to have this main put on the list for urgent replacement even although this pipeline continued to operate through the June earthquake and thousands of aftershocks until it was replaced with a new DN 355 (12 ) PE 100 pipeline in July There were a number of similar instances where pipelines were replaced unnecessarily due to the need to make decisions quickly. For future reference a more measured approach to determining whether repair or replacement is the best option would be desirable. Such an approach should take into account the nature and location of the damage (relative to thrust blocks, etc.) and the amount of damage to street paving etc. (this gives an indication of the potential for damage to the buried pipes) as well as the condition and estimated remaining life of the pipe. These sorts of decisions take time and require experience and expertise in Page 11 of 29

12 pipe design and condition assessment. Other issues, e.g. the responsibilities to customers and the number of customers affected will also affect the decision making process. Unfortunately, it may not be possible to take the time to evaluate the options. In the Christchurch case, contractors from around New Zealand were waiting for works to be allocated. Delays would have been frustrating and could have led to some contractors moving their work-forces out of the area. FIG s-9 to 12 show a few of the broken AC sewer and watermain pipes that were removed during repair works or to allow new pipes to be installed. It is impossible to tell from piles of broken pipes what actually failed and what the main cause was. FIG-9 to FIG-12: Broken AC sewer and water main pipes removed during renewal works Photos J Black 7.5 PVC Pipes Photos, F O Callaghan, IPLEX PIPELINES NZ In general, well processed PVC pipe varieties (PVC-U, PVC-M) have proved to be satisfactory for use in all but a few areas where significant liquefaction and associated PGD is identified as a risk. There was little PVC-O (bi-axially molecularly oriented PVC) installed in the Christchurch piped networks but we would expect PVC-O to perform as well as (or potentially better than) the other PVC pipe varieties. The CCTV surveys of hundreds of kilometres of PVC gravity sewers viewed to date indicate that there have been remarkably few failures. Of those failures, partial joint pull-out is reasonably common. Over-insertion in sewers has not been reported, largely as it is likely to be difficult to recognise in the relatively thin walled (non-pressure generally SDR 36) pipes and CCTV pipe inspection operators may not recognise this type of problem. Over-insertion (sometimes known as super-socketing) of PVC pipe joints both in gravity sewers and pressure pipes is rare but certainly happened. Over-insertion at joints in gravity sewers is unlikely to require remedial work, even in the long term, because well processed PVC is unlikely to split or crack and the forces in the pipe wall gradually relax with time. The restriction in the pipe bore is small and is unlikely to compromise flow capacity or cause blockage. In two areas of Christchurch, Parklands and Brookhaven, the PVC-U gravity sewer pipes survived the earthquakes but the pipelines were no longer functional due to major grade disruption. It is unlikely that a gravity flow system could be designed to survive the PGD that occurred. The number of examples presented below reflects more the need to illustrate and document the types of failures that occurred, rather than the total number of failures that occurred. Fig-14 shows an over-inserted DN 100 (4 ), PN 6, (87 psi) PVC-U watermain pipe that had not split. There were a number of these found in the Pines/Karaki Beach after the September 2010 earthquake. FIG-15 shows an over inserted DN 100 (4 ) PN 12 (174 psi) pressure pipe joint that was found. This joint required a force of 34.6 kn (7,800 lbs.) to start to move. It should also be noted that the sockets had not split. FIG-14: Over-inserted PN 6 (87 psi) PVC Pipe FIG-15: DN 100 (4 )PN 12 Pipe Over-inserted Page 12 of 29

13 Over insertion 70 mm Normal socket depth Over insertion 50 mm Normal socket depth Photos J Black. Joint pull-out also occurred in some areas subject to significant PGD. One joint leak occurred on a DN 300 (12 ), PN 9 (130 psi), PVC-U sewage rising main, 1,100 m long (3,610 ) that was laid in an area that suffered severe liquefaction. However, a number of other joints that have partially pulled out (but are still sealing) were found by CCTV survey. FIG-16 shows the joint that had pulled apart sufficiently to allow loss of seal. FIG-17 shows a partially pulled-out joint on this same DN 300 (12 ) sewage rising main that was identified by CCTV, recovered and cut open. The photo shows that there is a significant angular deflection at the joint and that 25 mm of additional pull-out would be needed to cause leakage. FIG-16 DN 300 (12 ) pipe joint with pull-out and leakage. FIG-17: Another joint with partial pull-out G. Boot, Waimakariri DC In the Pines Beach area of the Waimakariri District (one of the areas most severely affected by liquefaction and lateral spreading), complete joint pull-out and re-insertion (a little offset) occurred at a few joints (only 3 are known). FIG s-18 to 21 show examples of watermain pipe joints (viewed from the inside and the outside) that have suffered pull-out and re-insertion a little offset (enough to cause splitting of the socket or spigot end of the pipe). FIG-18 & FIG-19: Example of joint pull-out & re-insertion, offset viewed from pipe exterior & interior Page 13 of 29

14 Photos J Black FIG-20 & FIG-21: Example of joint pull-out & re-insertion, offset - viewed from pipe exterior & interior Photos J Black. The most extreme amount of re-insertion found is shown in FIG-22. In this case, the pipe has completely pulled-out to clear the socket and then more than fully re-inserted but offset enough to cause the pipe spigot end to split. The jointing witness mark is clearly inside the mouth of the socket and pull-out of > 100 mm (4 ) with re-insertion of 115 mm (4½ ) must have occurred to cause this damage. FIG-22: Example of joint pull-out & re-insertion to full depth with sufficient off-set to split the spigot Joint witness mark Photo J Black Many other PVC-U and PVC-M pressure mains (water supply and sewage) of all diameters up to DN 500 (20 ), some installed in areas within 1 km of areas of severe PGD, survived all of the earthquakes and after-shocks without developing leaks although some older (pre 2000) low-toughness PVC-U pipes have split longitudinally. Page 14 of 29

15 FIG-23 shows an example of a vertically deflected DN 300 (12 ) PVC-U sewer pipe showing what was reported by the CCTV camera technician as deformed plastic pipe, medium. The superimposed red circle shows that the actual vertical deflection is approximately 14%. The extensive CCTV surveys carried out in the region have shown excessive vertical deflection on very few pipes in the hundreds of kilometres of PVC gravity sewers surveyed. FIG-23: Vertically deflected PVC-U sewer pipe CCTV Survey image Christchurch CC. 14% deflection is almost double the maximum allowed long-term deflection given in AS/NZS :2002 (Buried Flexible Pipes - Construction) and would suggest that the pipe could be in danger of collapse. It is difficult to know how much influence the earthquake had because deflection testing and CCTV inspections were not undertaken until the 1990 s, long after this particular sewer main was installed. It is possible that poor installation and lack of attention to embedment compaction could have caused some (if not most) of the observed deflection, long before the earthquake. 7.6 Steel Pipes Steel pipes are ductile and will generally buckle and bend when earthquakes occur. Compression and tension forces due to shaking lateral spreading have been sufficient to cause unrestrained rubber ring spigot and socket joints to pull-out and cast iron gibault joints to break or pull-out. Joint pull-out has occurred on a number of concrete lined steel (CLS) water mains that have been jointed using CI gibault type joints and in areas where liquefaction and PGD have been severe. As with the PVC pipe examples, some joints have pulled out and then re-inserted a little off-set. FIG-24 shows a DN 300 (12 ) CLS watermain pipe that was subjected to compressive forces, sufficient to break the cast iron gibault joint and split the steel longitudinally. FIG-25 shows a DN 300 (12 ) CLS pipe joint at a bridge abutment. Compressive forces have also broken the cast iron gibault joint and caused shearing of the pipe end. Page 15 of 29

16 FIG-24: DN 300 (12 ) CLS Pipe Split FIG-25: DN 300 CLS Pipe at bridge abutment Photo by P. Free Photo by J Walter, SCIRT There were numerous examples of old, screwed GS sub-main pipes generally DN 50 (2 ) that had fractured at threaded joints. Threading GS pipes cuts up to 50% of the pipe wall away and corrosion weakens the remaining wall making these pipes highly vulnerable to damage. FIG s-26 and 27 show other examples of lateral spreading damage to steel pipes. The DN 80 (3 ) galvanized steel water pipe (FIG-26) has deflected upwards due to lateral spread of 0.8 m. The adjacent DN 100 welded steel sewer lateral was strong enough to crush the connected ceramic pipes. FIG-26 shows an old DN 25 (1 ) galvanized steel pipe that was forced to the surface. FIG-26 & FIG-27: Bent steel pipes Photos J Black. A number of 1920 s spiral riveted steel water main pipes of various diameters up to DN 250 (10 ) are still in service in parts of Christchurch. The steel shell is as little as 2.0 mm ( 0.08 ) thick in some DN 100 (4 ) pipes. These pipes have been in service for 90 years and have performed remarkably well. They were protected from corrosion by a hot-dip in a vat of bitumen and then wrapped with hessian. With such a thin wall, it is no surprise that the corroded DN 100 (4 ) steel pipe shown in FIG s-27 to 29 has ruptured. FIG-28: DN 100 (4 ) spiral riveted pipe. FIG-29 & FIG-30: DN 100 (4 ) spiral riveted pipe end Photos J Black Page 16 of 29

17 7.7 PE Pipes The 1980 s and 1990 s Type 5 HDPE pipes used mainly for water supply sub-mains and consumer connections in sizes of DN 50 (2 ) are jointed using compression couplers. Many of these joints pulled apart under the tension loads imposed by lateral spreading. Type 5 HDPE resin pipes are also highly susceptible to longitudinal splitting. There were few of the second and third generation PE pipes (PE 80B) or PE 100) water supply or sewage pumping mains in service prior to September A number of PE 100 water supply pipelines and sewage rising mains were installed in the response phase after the September 2010 and February 2011 earthquakes and aftershocks. As expected, these PE pipes (manufactured to AS/NZS 4130:2009 Polyethylene [PE] Pipes for Pressure Applications) using PE 100 have survived the June and December 2011 events without incident. Long coils of DN 63 (2 ) PN 12.5 (180 psi) PE 80B pipe laid out over the ground allowed the water supply to be quickly re-established to areas that had suffered extensive damage to the existing (mostly DN 100 (4 ) and DN 150(6 ) AC) water mains. In some cases these temporary pipelines were still in place more than 18 months after the September 2010 event. FIG-31 shows one such temporary DN 63 (2 ) PN 12.5 (180 psi) PE 80B pipe laid along a grass verge and connected to individual customer supply pipes. FIG-31: View of temporary water supply main Photo G. Boot, Waimakariri DC PE pipes have become more widely used over the last years and improvements in resins and extrusions techniques have made it possible to produce ever larger pipes. The Achilles heel of these pipes is the jointing process. Butt fusion joints have an extremely high rate of success. Electro-fusion (EF) joints on the other hand, have a greater risk of failure and leaking joints are found from time to time most (if not all) have been leaking since installation and are usually the result of faulty technique and poor workmanship. EF joints are frequently used to make joints between strings of butt-fused pipes in the trench. There is often limited space in the trench, the conditions are dirty and wet and the pipe strings may not be well aligned. These constraints work against the chances of long-term success of the joint. Earthquake stresses can cause partial or full pull-out of poorly fused EF joints. When leakage starts, the escaping water jet can erode the pipe wall by a wet sandblasting process, to the point of failure. FIG-32 shows one leaking EF coupler (of four installed at the same time in a short length of pipeline) that had been leaking for six years when it was repaired (not earthquake damage). FIG-33 shows one EF coupler (of five failures on this pipeline to date) that had been leaking for 3 years. The erosion is up to 30% of the wall thickness and is approaching the burst point. Page 17 of 29

18 FIG-32: View of leaking DN 180 (6 ) PE EF coupler FIG-33: PN 16 (232 psi) DN 180 PE Coupler Photos J Black 7.8 RC Pipes RC pipes in small diameters DN 450 have generally suffered spigot and socket damage caused by bending, joint rotation and fluctuating tension and compression forces. The larger diameter RC pipes (including pressure pipes used for rising mains) have generally suffered less damage than the smaller pipes. However, the full extent of damage is still unclear as many of the main sewer pipelines are still running nearly full because of infiltration and loss of capacity due to sediment from liquefaction. It has been difficult to conduct detailed CCTV inspections of some of these sewer mains. FIGs -34 and 35 show part of a DN 1200 (4 ft) RC rubber ring jointed (RCRRJ) pipeline laid in 1975 that jack-knifed during the September 2010 earthquake even although the pipes were full at the time. The pipes were undamaged and were re-installed on line and grade before 22 February No further damage has occurred during any of the subsequent earthquakes. FIG-34: Displaced RCRRJ pipes FIG-35: Displaced RCRRJ pipes Photos John Walter, SCIRT FIG s-36 and 37 show a DN 525 (21 ) RC stormwater outlet to a tidal estuary that had been encased in concrete. The concrete broke and pulled away from the retaining wall when the estuary level settled by more than 500 mm (20 ). Page 18 of 29

19 FIG-36 and FIG-37: Fractured concrete encasement on DN 525 stormwater outfall Photos J Black 7.9 Glass Reinforces Plastic (GRP) pipes There are only a few GRP pipelines installed in Christchurch. No failures have occurred and this is as expected for flexible, segmented pipe systems with flexible joints. At a major sewage pumping station where the differential movement exceeded the flexibility provided by the length of rocker pipes, the GRP pipes and fabricated bends, reducers, etc. were undamaged. 8 Detailed Examination of Failed Pipes & Fittings A few earthquake damaged pipes and fittings failures have been examined and investigated in reasonable detail by the writer. This has enabled identification of likely contributing factors that resulted in failure, aside from the earthquake. The principal contributors to failure identified include: The pipes or fittings were of poor quality and probably should never have escaped the manufacturer s quality assurance checking, The design has not had sufficient flexibility and allowance for differential movement, The pipes have been poorly installed, They have deteriorated to become the weak-link. Examples of poor quality pipes and fittings that failed during the earthquakes (the weak links) are presented below. Other pipes failed because of insufficient flexibility and provision for differential movement, or survived because of the inherent flexibility of the pipe material in spite of design and installation issues. It should be noted that without a close inspection many of these issues may not have been recognised or recorded. 8.1 CI Pipes FIG s-38 to 41 show an example of a 1930, DN 150 (6 ) Class B (design pressure rating 60 metres head [87 psi]) CI sewage pressure main with rigid, run-lead joints. The pipe OD was 178 mm (7 ), average wall thickness 11.0 mm (0.43 ), minimum thickness, 8.3 mm (0.33 ). The contemporary manufacturing standard was BS 78:1917. The measured dimensions of the pipe show that the minimum wall thickness was < 85% of the allowed minimum of the standard. The standard required all pipes to be tested to 400 ft head (120 m, 173 psi) without showing any signs of leakage, sweating or other defect before being coated with an approved (bituminous) composition. Page 19 of 29

20 FIG-38 to FIG-41: Fractured DN 150 (6 ) CI pipe (as recovered and after cleaning) Photos J Black The photos show what appears to be just a rusty old CI pipe. However, the real weakness is only revealed by a much closer examination, in this case by sandblasting the pipe surface to white metal (Sa3) as shown in FIG s-42 to 45. The extreme levels of porosity in the metal are clearly obvious. This pipe would have had minimal resistance to bending forces and the original factory test pressure is likely to have been close to causing failure, if it was carried out. These casting faults, combined with a thinner wall than allowed by the standard have resulted in a pipe that is at greater risk of failure under earthquake imposed stresses than other higher quality pipes. It is a little surprising that a pipe in this condition passed the factory proving tests. The hot-dip bitumen compound coating process would have covered up any traces of the porosity (the weak link) and without the earthquake generated bending forces on the pipe it may have lasted for many more years as the operating pressure was less than 200 kpa (30 psi), i.e. of its nominal design rating. While this pipeline was in service for nearly 80 years and had probably reached the original design expectations, had the pipe been full strength, the likelihood of failure would have been reduced. In this case, two similar failures dictated replacement of the entire pipeline (approximate length 1,100 m [3,600 ]). FIG-42 to FIG-45: Views of sandblasted pipe showing close-ups of the porosity Photos J Black FIG s-46 and 47 show a fairly typical run lead joint on a 1914 DN 100 (4 ) cast iron watermain that had been deflected almost 3º by earthquake induced movement and was repaired in January Some streets with lead jointed watermains (steel and cast iron) have shown a marked upsurge in the number of leaking joint repairs recently (more than a year after the last significant earthquake). FIG-46 and FIG-47: Views of a deflected, leaking lead joint as recovered and after cleaning Photos J Black Page 20 of 29

Appendix A: Acceptable pipe and fitting materials

Appendix A: Acceptable pipe and fitting materials Watercare Services Limited Water and Code of Practice Content from the NZS 4404:2010 Land development and subdivision infrastructure has been reproduced for use in the Infrastructure Design s Manual for

More information

Pipeline Replacement using Relining

Pipeline Replacement using Relining Pipeline Replacement using Relining Mark Heathcote, March 2006 Relining of old pipeline systems is becoming an increasingly attractive option to asset owners and operators as an effective alternative to

More information

Module 3: Sewer Material Lecture 3: Sewer Material

Module 3: Sewer Material Lecture 3: Sewer Material Module 3: Sewer Material Lecture 3: Sewer Material [NPTEL, IIT Kharagpur, Prof. M.M.Ghangrekar, Department of Civil Engineering Page 1 3.0 SEWER MATERIAL 3.1 Important Factors Considered for Selecting

More information

TG 105 ALLOWABLE PIPE SIZE, CLASS AND MATERIALS FOR WATER MAINS TECHNICAL GUIDELINE. Manager Asset Management SOUTH AUSTRALIAN WATER CORPORATION

TG 105 ALLOWABLE PIPE SIZE, CLASS AND MATERIALS FOR WATER MAINS TECHNICAL GUIDELINE. Manager Asset Management SOUTH AUSTRALIAN WATER CORPORATION TG 105 SOUTH AUSTRALIAN WATER CORPORATION TECHNICAL GUIDELINE ALLOWABLE PIPE SIZE, CLASS AND MATERIALS FOR WATER MAINS Issued by: Manager Asset Management Issue Date: SA WATER 2007 This document is copyright

More information

Module 3 : Sewer Material. Lecture 3 : Sewer Material

Module 3 : Sewer Material. Lecture 3 : Sewer Material 1 P age Module 3 : Sewer Material Lecture 3 : Sewer Material 2 P age 3.1 Important Factors Considered for Selecting Material for Sewer Following factors should be considered before selecting material for

More information

SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION

SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION 1. SCOPE Pipe subsoil drains shall be constructed in accordance with this specification and in conformity with the lines, grades and cross-sections shown

More information

SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE

SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE 6.01 SCOPE The work covered by this section of the specifications consists of the furnishing of all plant, labor, materials, equipment and supervision and performing all operations involved in the construction

More information

IS THAT LINER THICK ENOUGH?

IS THAT LINER THICK ENOUGH? IS THAT LINER THICK ENOUGH? Philip McFarlane, Opus International Consultants Ltd ABSTRACT The amount of pipeline rehabilitation being undertaken in New Zealand is increasing each year. Larger diameter

More information

1.3.2 Method of construction and restoration of existing water service connections. This shall include:

1.3.2 Method of construction and restoration of existing water service connections. This shall include: 1.0 GENERAL 1.1 DESCRIPTION: This specification shall cover the rehabilitation of existing water lines using the GRUNDOCRACK PIPE BURSTING SYSTEM. Pipe bursting is a system by which the pneumatic bursting

More information

Greater Dublin Strategic Drainage Study Regional Drainage Policies - Volume 2 New Development

Greater Dublin Strategic Drainage Study Regional Drainage Policies - Volume 2 New Development 7 SPECIFICATIONS There is currently no Irish specification for construction of drainage works, or water supply works. There are several publications that give guidance on drainage works, such as the Building

More information

Earthquake damage in wastewater systems and postearthquake repair methods; limitation and practice

Earthquake damage in wastewater systems and postearthquake repair methods; limitation and practice Earthquake damage in wastewater systems and postearthquake repair methods; limitation and practice M. R. Zare 1, S. Wilkinson 2, R. Potangaroa 3 1. PhD candidate, University of Auckland, Auckland, New

More information

Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe

Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe 1. GENERAL The following supplemental sewer main specifications are intended to address the installation of high-density polyethylene

More information

SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS

SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS PART 1 GENERAL 1.01 SECTION INCLUDES A. The requirements for pipe material and installation in sewer and drainage collection systems. All materials

More information

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL 1.01 DESCRIPTION A. Furnish and install all storm drains, including manholes, inlets, service lines and other appurtenant

More information

SECTION 33 11 00.11 POLYVINYL CHLORIDE (PVC) PIPE

SECTION 33 11 00.11 POLYVINYL CHLORIDE (PVC) PIPE SECTION 33 11 00.11 POLYVINYL CHLORIDE (PVC) PIPE PART 1: GENERAL 1.01 SECTION INCLUDES PVC pressure pipe and fabricated fittings in nominal sizes 4-inches through 12-inches with cast iron pipe equivalent

More information

Reticulation sewers in basements Technical guidelines

Reticulation sewers in basements Technical guidelines Reticulation sewers in basements Technical guidelines Overview What These guidelines explain our technical requirements for laying sewers in building basements. The scope of the guide is restricted to

More information

SECTION 02630 STORM DRAINAGE SYSTEM

SECTION 02630 STORM DRAINAGE SYSTEM SECTION 02630 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for storm drainage systems including modifications and connections to existing storm drainage systems. 1.02 REFERENCE

More information

INDEX. Sec. No. Items Page Nos.

INDEX. Sec. No. Items Page Nos. INDEX Sec. No. Items Page Nos. 1. Types of Pipe............... MSSP- 2 2. Concrete Pipe............... MSSP- 2 thru MSSP-3 3. ABS and PVC Truss Pipe............... MSSP- 3 4. ABS and PVC Solid Wall Pipe...............

More information

June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL

June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL 7.0 7.1 GENERAL For the purpose of this manual, culverts are defined as structures that are completely surrounded by soil and located below the surface of the roadway parallel to the general direction

More information

Session: HDPE Pipe Test Rafael Ortega, Vice President, Lockwood, Andrews & Newnam

Session: HDPE Pipe Test Rafael Ortega, Vice President, Lockwood, Andrews & Newnam Session: HDPE Pipe Test Rafael Ortega, Vice President, Lockwood, Andrews & Newnam Education Master of Business Administration University of Houston, 1985 Bachelor of Science, Civil Engineering University

More information

District Cooling Best Practices Piping Systems

District Cooling Best Practices Piping Systems District Cooling Best Practices Piping Systems International District Cooling Conference January 14-17, 2007 Abu Dhabi, United Arab Emirates Bryan Kleist Agenda Chiller Water Piping Materials Pipe Insulation

More information

Sewer Rehabilitation Design Requirements

Sewer Rehabilitation Design Requirements Sanitary Sewer Overflow (SSO) Control and Wastewater Facilities Program Sewer Rehabilitation Design Requirements City of Baton Rouge/Parish of East Baton Rouge Department of Public Works Submitted by Prepared

More information

SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE

SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE SECTION 15076 CEMENT-MORTAR LINED AND COATED (CML&C) STEEL PIPE PART 1 GENERAL 1.01 DESCRIPTION This section designates the requirements for steel pipe fabrication, test in shop, installation of steel

More information

Chapter 3 DESIGN AND CONSTRUCTION FEATURES IMPORTANT TO SEISMIC PERFORMANCE

Chapter 3 DESIGN AND CONSTRUCTION FEATURES IMPORTANT TO SEISMIC PERFORMANCE Chapter 3 DESIGN AND CONSTRUCTION FEATURES IMPORTANT TO SEISMIC PERFORMANCE To satisfy the performance goals of the NEHRP Recommended Seismic Provisions, a number of characteristics are important to the

More information

Pipes and Fittings for Gravity Sewer Mains. SewerMAX

Pipes and Fittings for Gravity Sewer Mains. SewerMAX SewerMAX High resistance to tree root intrusion and groundwater infiltration lightweight for ease of installation low embodied energy for environmental benefits long service life Excellent chemical resistance

More information

SECTION 02400 - STORM DRAIN SYSTEM

SECTION 02400 - STORM DRAIN SYSTEM SECTION 02400 - STORM DRAIN SYSTEM CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And

More information

Meeting the Challenge of Pipeline Emergency Repair

Meeting the Challenge of Pipeline Emergency Repair Meeting the Challenge of Pipeline Emergency Repair Michael R. McReynolds, PE, SE 1 Tao Peng, PE, SE 2 ABSTRACTS The Metropolitan Water District of Southern California (MWD) is the nation s largest provider

More information

BEST PRACTICE GUIDELINES FOR CULVERT LINER SELECTION

BEST PRACTICE GUIDELINES FOR CULVERT LINER SELECTION BEST PRACTICE GUIDELINES FOR CULVERT LINER SELECTION GENERAL Rehabilitation of culverts with pipe liners is one of several methods available for extending the life of an existing culvert. It is often cost

More information

AIR RELEASE, CLEANOUT, AND SEWER MANHOLES

AIR RELEASE, CLEANOUT, AND SEWER MANHOLES AIR RELEASE, CLEANOUT, AND SEWER MANHOLES **From Hartford IM BLDG(10) DESCRIPTION. This work shall consist of the construction of air release, cleanout, and sanitary sewer manholes; and the furnishing

More information

Table of Contents 2.1 INTRODUCTION...2-1 2.2 MATERIALS IN USE...2-1

Table of Contents 2.1 INTRODUCTION...2-1 2.2 MATERIALS IN USE...2-1 Table of Contents PIPING Page 2.1 INTRODUCTION...2-1 2.2 MATERIALS IN USE...2-1 2.3 ABOVE OR BELOW GRADE INSTALLATION...2-3 2.3.1 Buried Pipes...2-3 2.3.2 Utilidor Construction...2-4 2.4 PIPE MATERIAL

More information

GUIDE TO SETTLEMENT OF CANTERBURY FLAT LAND CLAIMS

GUIDE TO SETTLEMENT OF CANTERBURY FLAT LAND CLAIMS GUIDE TO SETTLEMENT OF CANTERBURY FLAT LAND CLAIMS April 2013 i Introduction This guide focuses on repair methods for some of the types of land damage that occurred on flat residential land as a result

More information

Royal Seal Gasketed Sewer Pipe

Royal Seal Gasketed Sewer Pipe Royal Seal Gasketed Sewer Pipe Royal Seal Gasketed Sewer Pipe Royal Seal gasketed sewer pipe with our specially designed Double Seal Locked-In (DSLI ) gasket is an extremely durable pipe with a leak proof

More information

TECHNICAL SPECIFICATION

TECHNICAL SPECIFICATION THOMAS - G-FLEX GFLEX TECH SPEC CONNECTING INNOVATION JOHANNESBURG TEL: +27 11 794 7594 CAPE TOWN TEL: +27 21 556 5258 POLOKWANE TEL: 015 298 9142 DESIGNER, MANUFACTURER AND DISTRIBUTOR OF PIPE CONNECTION,

More information

LIFELINE PIPELINE RESTORATION AND SEISMIC MITIGATION

LIFELINE PIPELINE RESTORATION AND SEISMIC MITIGATION LIFELINE PIPELINE RESTORATION AND SEISMIC MITIGATION Le Val LUND 1 And P E M ASCE 2 SUMMARY A number of methods are discussed which can be used for lifeline pipeline rehabilitation and improving the seismic

More information

DIVISION 4300 STORM DRAINAGE

DIVISION 4300 STORM DRAINAGE DIVISION 4300 STORM DRAINAGE SECTION 4305 STORM SEWER PART 1 - GENERAL 1.01 SCOPE This section covers the construction of storm sewers for the collection and transport of stormwater runoff. 1.02 REFERENCES

More information

Oil and Gas Pipeline Design, Maintenance and Repair

Oil and Gas Pipeline Design, Maintenance and Repair Oil and Gas Pipeline Design, Maintenance and Repair Dr. Abdel-Alim Hashem Professor of Petroleum Engineering Mining, Petroleum & Metallurgical Eng. Dept. Faculty of Engineering Cairo University aelsayed@mail.eng.cu.edu.eg

More information

SECTION 02110 - ASBESTOS CEMENT PIPE REPAIRS, DEMOLITION, AND DISPOSAL

SECTION 02110 - ASBESTOS CEMENT PIPE REPAIRS, DEMOLITION, AND DISPOSAL SECTION 02110 - ASBESTOS CEMENT PIPE REPAIRS, DEMOLITION, AND DISPOSAL PART 1 - GENERAL 1.1 WORK INCLUDED IN THIS SECTION A. The WORK of this Section includes the repair, demolition, and disposal of asbestos

More information

SANITARY SEWER SPECIFICATIONS

SANITARY SEWER SPECIFICATIONS SANITARY SEWER SPECIFICATIONS OCTOBER 2003 HARVEST-MONROVIA WATER, SEWER, AND FIRE PROTECTION AUTHORITY SECTION 1.00 1.10 Purpose The purpose of this document is to assemble the sewer specifications, policies,

More information

CCU Engineering Specifications. Section 003300 PRECAST CONCRETE PRODUCTS

CCU Engineering Specifications. Section 003300 PRECAST CONCRETE PRODUCTS CCU Engineering Specifications Section 003300 Effective Date: Nov. 1st, 2011 Page 1 of 5 PRECAST CONCRETE PRODUCTS PART 1 - GENERAL The following specification is intended for use for the design, selection

More information

PROVIDING THE SAFE CHOICE FOR UNDERGROUND PIPE RENEWAL, INTEGRITY MANAGEMENT AND ASSET RELIABILITY

PROVIDING THE SAFE CHOICE FOR UNDERGROUND PIPE RENEWAL, INTEGRITY MANAGEMENT AND ASSET RELIABILITY PROVIDING THE SAFE CHOICE FOR UNDERGROUND PIPE RENEWAL, INTEGRITY MANAGEMENT AND ASSET RELIABILITY Cured-In-Place Pipe Pressure & Gravity Lines Pipe Splitting Trenchless Pipe Replacement EcoCast Advanced

More information

Guide to working on Public Sewers

Guide to working on Public Sewers Guide to working on Public Sewers affected by Building Works Introduction Severn Trent Water Ltd requires the work to be done in order to protect the public sewer and minimise the risk of us having to

More information

Structural Failures Cost Lives and Time

Structural Failures Cost Lives and Time Structural Failures Cost Lives and Time Recent failures of storage bins, silos and other structures highlight the need to increase awareness of hazards associated with these structures. Since 2010, one

More information

High Density Polyethylene Liners for Rehabilitation of Corroded Pipelines

High Density Polyethylene Liners for Rehabilitation of Corroded Pipelines High Density Polyethylene Liners for Rehabilitation of Corroded Pipelines Jeff Schell General Manager United Pipeline Middle East, Inc. Introduction HDPE Liners A cost effective and environmentally beneficial

More information

Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing

Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing 1 Most basements show some signs of leaking and cracking. Through the years, problems with water, poor soils, grading, drainage and possible settling affect the integrity of a basement. Being able to recognize

More information

Failing Culverts Structural Problems & Economic Considerations

Failing Culverts Structural Problems & Economic Considerations Failing Culverts Structural Problems & Economic Considerations Al Tenbusch, President, Tenbusch, Inc. Brian Dorwart, Senior Associate, Brierley Associates Albert F. Tenbusch, Engineer, Tenbusch, Inc. June

More information

STANDARD SPECIFICATIONS SECTION 02701 INSTALLATION OF GRAVITY SEWER PIPELINES. 1. Trenching, Backfilling and Compacting: 02223

STANDARD SPECIFICATIONS SECTION 02701 INSTALLATION OF GRAVITY SEWER PIPELINES. 1. Trenching, Backfilling and Compacting: 02223 STANDARD SPECIFICATIONS SECTION 02701 INSTALLATION OF GRAVITY SEWER PIPELINES PART 1 - GENERAL A. Description This section describes the installation of gravity sewer pipelines fabricated of vitrified

More information

Sewer Line Rehabilitation

Sewer Line Rehabilitation 1.0 GENERAL 1.1 DESCRIPTION: This specification shall cover the rehabilitation of existing sanitary sewers using the GRUNDOCRACK PIPE BURSTING SYSTEM. Pipe bursting is a system by which the pneumatic bursting

More information

SECTION 603 SANITARY SEWER FORCE MAINS

SECTION 603 SANITARY SEWER FORCE MAINS SECTION 603 SANITARY SEWER FORCE MAINS 1. GENERAL Pipelines for sanitary sewer force main systems shall conform to the following specifications and shall be installed at the locations indicated on the

More information

STRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.

STRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL. STRUCTURES 1. General. Critical structures may impact the integrity of a flood control project in several manners such as the excavation for construction of the structure, the type of foundation, backfill

More information

Couplings. Drain Couplings Standard Couplings Large Diameter Couplings Adaptor Couplings Flexible Saddles Bushes

Couplings. Drain Couplings Standard Couplings Large Diameter Couplings Adaptor Couplings Flexible Saddles Bushes Drain Couplings Standard Couplings Large Diameter Couplings Adaptor Couplings Flexible Saddles Bushes Flex-Seal couplings meet a range of UK and international legislation requirements and quality standards

More information

SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS

SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS SECTION 08000 STORM DRAINAGE 08010 DESIGN A. Location B. Sizing TABLE OF CONTENTS 08020 MATERIALS A. Pipe Materials B. Structure Materials C. Installation D. Inlets and Outlets 08030 INSPECTIONS AND TESTING

More information

SECTION 15125 HIGH DENSITY POLYETHYLENE (HDPE) PIPE AND FITTINGS FOR WATER DISTRIBUTION AND TRANSMISSION

SECTION 15125 HIGH DENSITY POLYETHYLENE (HDPE) PIPE AND FITTINGS FOR WATER DISTRIBUTION AND TRANSMISSION SECTION 15125 HIGH DENSITY POLYETHYLENE (HDPE) PIPE AND FITTINGS FOR WATER DISTRIBUTION AND TRANSMISSION PART 1 GENERAL.01 SECTION INCLUDES Furnishing and installing 4 inch through 16 inch high density

More information

SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO)

SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO) SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO) 1 Intent: The intent of trenchless sewer pipe Insertion is to rehabilitate the existing sewer

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 1100 SLIP-LINING SANITARY SEWERS

San Antonio Water System Standard Specifications for Construction ITEM NO. 1100 SLIP-LINING SANITARY SEWERS ITEM NO. 1100 SLIP-LINING SANITARY SEWERS 1100.1 DESCRIPTION: This item shall consist of slip-lining sanitary sewer pipe, which is accomplished by pulling or pushing liner pipe into existing sewers by

More information

Pipe Bursting. Case Study at Zeeland, MI Collections Seminar September 6, 2012. Presentation Agenda. What is Pipe Bursting? What is Pipe Bursting?

Pipe Bursting. Case Study at Zeeland, MI Collections Seminar September 6, 2012. Presentation Agenda. What is Pipe Bursting? What is Pipe Bursting? Pipe Bursting Case Study at Zeeland, MI Collections Seminar September 6, 2012 By: Brian Hannon, PE and John Racek, PE Presentation Agenda What is Pipe Bursting? History of Pipe Bursting Types of Pipe Bursting

More information

SHOALHAVEN RIVER CROSSING (NOWRA NSW) SEWER MAIN REPAIR. Steve Glennan. Shoalhaven Water, Shoalhaven City Council

SHOALHAVEN RIVER CROSSING (NOWRA NSW) SEWER MAIN REPAIR. Steve Glennan. Shoalhaven Water, Shoalhaven City Council SHOALHAVEN RIVER CROSSING (NOWRA NSW) SEWER MAIN REPAIR Paper Presented by: Steve Glennan Authors: Steve Glennan, Co-ordinator, Phil Critchley, Acting Operations Manager, Shoalhaven Water, Shoalhaven City

More information

WATER & SEWER CORROSIVE RESISTANT PRODUCTS

WATER & SEWER CORROSIVE RESISTANT PRODUCTS WATER & SEWER CORROSIVE RESISTANT PRODUCTS The Standard of Excellence in the Industry CASING SPACERS COUPLINGS & FLANGE COUPLING ADAPTERS REPAIR CLAMPS DUCTILE IRON SADDLES STAINLESS STEEL SADDLES TAPPING

More information

Model Specification 509 DRISCOPLEX 4200 and DRISCOPLEX 4300 Gravity Flow Sanitary Sewer

Model Specification 509 DRISCOPLEX 4200 and DRISCOPLEX 4300 Gravity Flow Sanitary Sewer Model Specification 509 DRISCOPLEX 4200 and DRISCOPLEX 4300 Gravity Flow Sanitary Sewer The user may choose to adopt part or all of this Model Specification; however, the user should ensure that all parts

More information

WATER MAIN CONSTRUCTION TECHNIQUES DEPARTMENT OF PUBLIC WORKS WATER & WASTEWATER DIVISION

WATER MAIN CONSTRUCTION TECHNIQUES DEPARTMENT OF PUBLIC WORKS WATER & WASTEWATER DIVISION WATER MAIN CONSTRUCTION TECHNIQUES Overview Water Main - Materials Specifications Installation Future? Water Main Materials Material Types There are various material types used for water mains, these include:

More information

TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe

TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe TN 5.14 February 2010 Introduction It may be at times necessary, in an aging infrastructure, to rehabilitate drainage and sanitary lines

More information

Repair or Replacement - Band-Aids vs. Surgery

Repair or Replacement - Band-Aids vs. Surgery Repair or Replacement - Band-Aids vs. Surgery Using RCP for the Replacement of Failed or Undersized Culverts www.concrete-pipe.org Introduction and Background Our Nation s infrastructure owners are facing

More information

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) 55-1 GENERAL The Contractor shall perform all work required by the plans for construction of pipe for storm drains, precast polymer trench drains

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS

San Antonio Water System Standard Specifications for Construction ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS 1103.1 DESCRIPTION: 1. Repair of sanitary sewer lines by replacing short lengths of failed pipe with new pipe. 2. Repair of service laterals located

More information

Date, Time and Place: Presented by: Presented to: 22 August 2013, 0900 hrs, Pier 1 The Embarcadero, San Francisco

Date, Time and Place: Presented by: Presented to: 22 August 2013, 0900 hrs, Pier 1 The Embarcadero, San Francisco Date, Time and Place: 22 August 2013, 0900 hrs, Pier 1 The Embarcadero, San Francisco Presented by: Nick Rogers, Mike Jacka, Kate Williams, Sjoerd van Ballegooy and Rick Wentz, Tonkin & Taylor International

More information

Recent Earthquakes: Implications for U.S. Water Utilities [Project #4408]

Recent Earthquakes: Implications for U.S. Water Utilities [Project #4408] Recent Earthquakes: Implications for U.S. Water Utilities [Project #4408] ORDER NUMBER: 4408 DATE AVAILABLE: July 2012 PRINCIPAL INVESTIGATORS: John Eidinger and Craig A. Davis PROJECT PURPOSE: The purpose

More information

SECTION 15105 DUCTILE IRON PIPE AND FITTINGS

SECTION 15105 DUCTILE IRON PIPE AND FITTINGS SECTION 15105 DUCTILE IRON PIPE AND FITTINGS PART 1 GENERAL.01 COORDINATION OF WORK Connection to existing pipelines may require shutdown of Owner facilities. Closely coordinate construction work and connections

More information

DISTRIBUTION PIPING MATERIALS: BUILDING HYDRONIC SYSTEM MANAGEMENT. Jim Riley, Texas A&M University February 10, 2015

DISTRIBUTION PIPING MATERIALS: BUILDING HYDRONIC SYSTEM MANAGEMENT. Jim Riley, Texas A&M University February 10, 2015 DISTRIBUTION PIPING MATERIALS: BUILDING HYDRONIC SYSTEM MANAGEMENT Jim Riley, Texas A&M University February 10, 2015 Piping at Texas A&M 2 History of Distribution Piping at Texas A&M Concrete reinforced

More information

SECTION 21 REHABILITATION OF SANITARY SEWER MAINS BY THE PIPE BURSTING AND TRENCHLESS PIPE REPLACEMENT METHOD

SECTION 21 REHABILITATION OF SANITARY SEWER MAINS BY THE PIPE BURSTING AND TRENCHLESS PIPE REPLACEMENT METHOD SECTION 21 REHABILITATION OF SANITARY SEWER MAINS BY THE PIPE BURSTING AND TRENCHLESS PIPE REPLACEMENT METHOD 21.01 SCOPE: It is the intent of the Specification to define the approved methods and materials

More information

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary

More information

FOUNDATION TECHNICAL CATEGORY 3 (TC3) AUGUST 2012

FOUNDATION TECHNICAL CATEGORY 3 (TC3) AUGUST 2012 FOUNDATION TECHNICAL CATEGORY 3 (TC3) AUGUST 2012 Building and Housing has published technical guidance for foundation repairs and reconstruction for residential properties in green zone Foundation Technical

More information

Understanding the Seismic Vulnerability of Water Systems

Understanding the Seismic Vulnerability of Water Systems Understanding the Seismic Vulnerability of Water Systems Lessons Learned and What You Can Do Donald Ballantyne October 2, 2013 Regional Water Providers Consortium Board Overview Oregon Resilience Plan

More information

PART 5 : WASTEWATER DRAINAGE

PART 5 : WASTEWATER DRAINAGE Authorised by : City Waters Unit Manager Page 1 of 15 PART 5 : WASTEWATER DRAINAGE 5.1 INTRODUCTION This Manual sets out the basic design principles for drainage of wastewater. While some construction

More information

Force Main Condition Assessment: New Technologies & Case Studies

Force Main Condition Assessment: New Technologies & Case Studies Force Main Condition Assessment: New Technologies & Case Studies Andy Dettmer, Ph.D., P.E. CMOM Workshop August 19, 2014 2 1 Three takeaways 1. Most of your force mains are good 2. We can pinpoint the

More information

REVIEW OF TRENCHLESS TECHNIQUES FOR THE REHABILITATION OF SEWERS. Gerhard (Gerry) P. Muenchmeyer, P.E. Muenchmeyer Associates, LLC

REVIEW OF TRENCHLESS TECHNIQUES FOR THE REHABILITATION OF SEWERS. Gerhard (Gerry) P. Muenchmeyer, P.E. Muenchmeyer Associates, LLC REVIEW OF TRENCHLESS TECHNIQUES FOR THE REHABILITATION OF SEWERS Gerhard (Gerry) P. Muenchmeyer, P.E. Muenchmeyer Associates, LLC What is really out there? DO YOU DIG IT? INDUSTRY CONCERNS UNEXPECTED DEVELOPMENTS

More information

SIDE SEWER CONDITION ASSESSMENT AND REPAIR RECOMMENDATIONS

SIDE SEWER CONDITION ASSESSMENT AND REPAIR RECOMMENDATIONS SIDE SEWER CONDITION ASSESSMENT AND REPAIR RECOMMENDATIONS Introduction City of Tacoma property owners are responsible for the construction, maintenance and repair of private side sewers, which connect

More information

Section 02702 SEWER PIPE INSTALLATION AND TESTING

Section 02702 SEWER PIPE INSTALLATION AND TESTING PART 1 - GENERAL Section 02702 SEWER PIPE INSTALLATION AND TESTING 1-1. SCOPE. This section covers the installation and testing of all sewer pipe furnished under the following specification sections: Concrete

More information

Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries

Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries Introduction Wastewater of petrochemical industries and refineries contains high amounts of emulsified aliphatic or

More information

Installation of Large Diameter Buried Pipes

Installation of Large Diameter Buried Pipes Installation of Large Diameter Buried Pipes Sullivan (Sully) Curran P. E., Executive Director I. Introduction and Scope There is an ongoing need to provide designers, specifiers, engineers, consultants

More information

LARGE DIAMETER PIPELINE INNOVATIVE FAST TRACKED REPAIR

LARGE DIAMETER PIPELINE INNOVATIVE FAST TRACKED REPAIR LARGE DIAMETER PIPELINE INNOVATIVE FAST TRACKED REPAIR ABSTRACT Phil Hubbard, P.E., HRSD Paul Wilson, P.E., Brown and Caldwell* Mark Harber, P.E., Brown and Caldwell *301 Bendix Road, Suite 400 Virginia

More information

Storm Sewer Trenchless Upgrade Alternatives and Recommendations

Storm Sewer Trenchless Upgrade Alternatives and Recommendations Storm Sewer Trenchless Upgrade Alternatives and Recommendations Background Approximately 1,930 feet of the 40-inch and 42-inch CMP storm sewer pipe from manhole M22 to manhole M12 will be evaluated for

More information

Chapter. Earthquake Damage: Types, Process, Categories

Chapter. Earthquake Damage: Types, Process, Categories 3 Chapter Earthquake Damage: Types, Process, Categories Earthquakes leave behind a trail of damage and destruction. People s lives are affected by the loss of loved ones, destruction of property, economic

More information

SECTION 33 11 00.15 DUCTILE IRON PIPE AND FITTINGS

SECTION 33 11 00.15 DUCTILE IRON PIPE AND FITTINGS SECTION 33 11 00.15 DUCTILE IRON PIPE AND FITTINGS PART 1: GENERAL 1.01 COORDINATION OF WORK Connection to existing pipelines may require shutdown of AW facilities. Closely coordinate construction work

More information

ENGINEERING STANDARDS MANUAL SECTION 5 WASTEWATER DRAINAGE

ENGINEERING STANDARDS MANUAL SECTION 5 WASTEWATER DRAINAGE CODE OF PRACTICE FOR CITY INFRASTRUCTURE & LAND DEVELOPMENT ENGINEERING STANDARDS MANUAL SECTION 5 WASTEWATER DRAINAGE Issue 4.6 Sept 2008 Section 5 Page 1 SECTION 5.0 WASTEWATER DRAINAGE Note: The adoption

More information

LEE S SUMMIT USES PIPE BURSTING TO BROADEN ITS ASSET MANAGEMENT TOOLBOX AND REHABILITATE POTABLE WATER DISTRIBUTION SYSTEM

LEE S SUMMIT USES PIPE BURSTING TO BROADEN ITS ASSET MANAGEMENT TOOLBOX AND REHABILITATE POTABLE WATER DISTRIBUTION SYSTEM North American Society for Trenchless Technology (NASTT) No-Dig Show 2010 Chicago, Illinois May 2-7, 2010 Paper D-4-02 LEE S SUMMIT USES PIPE BURSTING TO BROADEN ITS ASSET MANAGEMENT TOOLBOX AND REHABILITATE

More information

WEFTEC.06. Kent Von Aspern,* Collins Orton** *Carollo Engineers 2700 Ygnacio Valley Rd Suite 300 Walnut Creek, CA 94598

WEFTEC.06. Kent Von Aspern,* Collins Orton** *Carollo Engineers 2700 Ygnacio Valley Rd Suite 300 Walnut Creek, CA 94598 Lessons Learned from Large Diameter Sanitary Sewer Pipe Bursting Project: Conversion of Abandoned Gravity Sewer Main Into Upsized Sanitary Force Main South San Francisco, CA Kent Von Aspern,* Collins Orton**

More information

SECTION 33 31 00.11 GRAVITY SANITARY SEWERS

SECTION 33 31 00.11 GRAVITY SANITARY SEWERS SECTION 33 31 00.11 GRAVITY SANITARY SEWERS PART 1: GENERAL 1.01 SCOPE A. Gravity sanitary sewers and appurtenances. 1.02 SUBMITTALS A. Conform to requirements of Section 01 33 00 Submittals. B. Submit

More information

General Guidelines for Repairing Buried PE Potable Water Pressure Pipes

General Guidelines for Repairing Buried PE Potable Water Pressure Pipes 515 General Guidelines for Repairing Buried PE Potable Water Pressure Pipes Introduction Traditional piping systems have gasket-sealed bell and spigot joints every 20 feet, which can be a potential maintenance

More information

METHOD OF STATEMENT FOR STATIC LOADING TEST

METHOD OF STATEMENT FOR STATIC LOADING TEST Compression Test, METHOD OF STATEMENT FOR STATIC LOADING TEST Tension Test and Lateral Test According to the American Standards ASTM D1143 07, ASTM D3689 07, ASTM D3966 07 and Euro Codes EC7 Table of Contents

More information

The Manitoba Water Services Board SECTION 027030 Standard Construction Specifications September 2013 Page 1 of 21

The Manitoba Water Services Board SECTION 027030 Standard Construction Specifications September 2013 Page 1 of 21 September 2013 Page 1 of 21 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described herein shall consist of the construction of sewers including: the supply and installation of pipe, saddles, tees,

More information

Proposed Construction of Basement Flood Risk Assessment. 35 Edwardes Square London W8 6HH

Proposed Construction of Basement Flood Risk Assessment. 35 Edwardes Square London W8 6HH Proposed Construction of Basement Flood Risk Assessment 35 Edwardes Square London W8 6HH 1 Introduction This FRA has been carried out in accordance with the National Planning Policy Statement (NPPF), the

More information

SEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER

SEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER Village of Shorewood, Wisconsin SEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER Prepared By: Thomas A. Zoulek, P.E., LEED A.P. Vice President Mid City Plumbing & Heating

More information

Safe & Sound Bridge Terminology

Safe & Sound Bridge Terminology Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries

More information

Pipe bursting provides viable alternative for rehab work By Greg Key, U.S. Pipe

Pipe bursting provides viable alternative for rehab work By Greg Key, U.S. Pipe Pipe bursting provides viable alternative for rehab work By Greg Key, U.S. Pipe As the Environmental Protection Agency tightens groundwater quality regulations, old leaking sewers lines made of pipe clay,

More information

Measuring the Condition of Prestressed Concrete Cylinder Pipe

Measuring the Condition of Prestressed Concrete Cylinder Pipe Measuring the Condition of Prestressed Concrete Cylinder Pipe John Marshall, P.E.I, I J.W. Marshall and Associates, and Paul S. Fisk, President NDT Corporation Introduction Prestressed Concrete Cylinder

More information

Investigation of Foundation Failure. Step 1 - Data Collection. Investigation Steps

Investigation of Foundation Failure. Step 1 - Data Collection. Investigation Steps Foundations on Expansive Clay Soil Part 3 - Investigation of Failed Foundations Presented by: Eric Green, P.E. Structural Engineer Slide 1 Copyright Eric Green 2005 Investigation of Foundation Failure

More information

MS-3/2009 HDPE (High Density Polyethylene) Pipe and Fittings Specification for Buried Potable Water

MS-3/2009 HDPE (High Density Polyethylene) Pipe and Fittings Specification for Buried Potable Water MS-3/2009 HDPE (High Density Polyethylene) Pipe and Fittings Specification for Buried Potable Water 105 Decker Court, Suite 825, Irving, TX 75062 P: 469-499-1044 F: 469-499-1063 www.plasticpipe.org HDPE

More information

EXHIBIT "A. Technical Specifications for Water and Sewer Service Lines

EXHIBIT A. Technical Specifications for Water and Sewer Service Lines EXHIBIT "A Technical Specifications for Water and Sewer Service Lines Water and Sewer Line Bedding and Backfill: Drawings show cross-section of trench, pipe laid on top of 6" min. bedding material, bedding

More information

Critical factors for restoration of water supply pipelines in the Hutt City, New Zealand after a magnitude 7.5 earthquake from the Wellington fault

Critical factors for restoration of water supply pipelines in the Hutt City, New Zealand after a magnitude 7.5 earthquake from the Wellington fault The th October -7, 008, Beijing, China Critical factors for restoration of water supply pipelines in the Hutt City, New Zealand after a magnitude 7.5 earthquake from the Wellington fault John X. Zhao,

More information

System. Stability. Security. Integrity. 150 Helical Anchor

System. Stability. Security. Integrity. 150 Helical Anchor Model 150 HELICAL ANCHOR System PN #MBHAT Stability. Security. Integrity. 150 Helical Anchor System About Foundation Supportworks is a network of the most experienced and knowledgeable foundation repair

More information

SECTION 02401 - SANITARY SEWER PIPE

SECTION 02401 - SANITARY SEWER PIPE PART 1 - GENERAL 1.1 DESCRIPTION A. The WORK under this Section includes providing all labor, materials, tools and equipment necessary for furnishing and installing sanitary sewer pipe, in accordance with

More information