Different Methods of Long-Term Electric Load Demand Forecasting; A Comprehensive Review

Size: px
Start display at page:

Download "Different Methods of Long-Term Electric Load Demand Forecasting; A Comprehensive Review"

Transcription

1 Dfferent Methods of Long-Term Electrc Load Demand Forecastng; A Comprehensve Revew L. Ghods* and M. Kalantar* Abstract: Long-term demand forecastng presents the frst step n plannng and developng future generaton, transmsson and dstrbuton facltes. One of the prmary tasks of an electrc utlty accurately predcts load demand requrements at all tmes, especally for long-term. Based on the outcome of such forecasts, utltes coordnate ther resources to meet the forecasted demand usng a least-cost plan. In general, resource plannng s performed subject to numerous uncertantes. Expert opnon ndcates that a major source of uncertanty n plannng for future capacty resource needs and operaton of exstng generaton resources s the forecasted load demand. Ths paper presents an overvew of the past and current practce n long- term demand forecastng. It ntroduces methods, whch conssts of some tradtonal methods, neural networks, genetc algorthms, fuzzy rules, support vector machnes, wavelet networks and expert systems. Keywords: Long-term, Demand Forecastng, Neural Networks, Genetc Algorthms, Fuzzy Rules. 1 Introducton1 A power system serves one functon and that s to supply customers, both large and small, wth electrcal energy as economcally and as relablty as possble. Another responsblty of power utltes s to recognze the needs of ther customers (Demand) and supply the necessary energes. Lmtatons of energy resources n addton to envronmental factors, requres the electrc energy to be used more effcently and more effcent power plants and transmsson lnes to be constructed [1]. Long-term demand forecasts span from eght years ahead up to ffteen years. They have an mportant role n the context of generaton, transmsson and dstrbuton network plannng n a power system. The objectve of power system plannng s to determne an economcal expanson of the equpment and facltes to meet the customers' future electrc demand wth an acceptable level of relablty and power qualty [2]. Accurate long-term demand forecastng plays an essental role foe electrc power system plannng. It corresponds to load demand forecastng wth lead tmes enough to plan for long-term mantenance, constructon schedulng for developng new generaton facltes, purchasng of generatng unts, developng transmsson and dstrbuton systems. The accuracy of the long-term Iranan Journal of Electrcal & Electronc Engneerng, Paper frst receved 18 Jan and n revsed form 13 Jun * The Authors are wth the Department of Electrcal Engneerng, Iran Unversty of scence and technology (IUST), Tehran, Iran. E-mals: Ladan_gh760@yahoo.com, Kalantar@ust.ac.r. load forecast has sgnfcant effect on developng future generaton and dstrbuton plannng. An expensve overestmaton of load demand wll result n substantal nvestment for the constructon of excess power facltes, whle underestmaton wll result n customer dscontentment. Unfortunately, t s dffcult to forecast load demand accurately over a plannng perod of several years. Ths fact s due to the uncertan nature of the forecastng process. There are a large number of nfluental that characterze and drectly or ndrectly affect the underlyng forecastng process; all of them uncertan and uncontrollable [3]. However, nether the accurate amount of needed power nor the preparaton for such amounts of power s as easy as t looks, because: (1) long-term load forecastng s always naccurate (2) peak demand s very much dependant on temperature (3) some of the necessary data for longterm forecastng ncludng weather condton and economc data are not avalable, (4) t s very dffcult to store electrc power wth the present technology, (5) t takes several years and requres a great amount of nvestment to construct new power generaton statons and transmsson facltes [4]. Therefore, any long-term load demand forecastng, by nature, s naccurate! Generally, long-term load demand forecastng methods can be classfed n to two broad categores: parametrc methods and artfcal ntellgence based methods. The artfcal ntellgence methods are further classfed n to neural networks [1], [2], [4], [8], [10], support vector machnes [15], genetc algorthms [14], Iranan Journal of Electrcal & Electronc Engneerng, Vol. 7, No. 4, Dec

2 wavelet networks [12] [13], fuzzy logcs [16] and expert system [17] methods. The parametrc methods are based on relatng load demand to ts affectng factors by a mathematcal model. The model parameters are estmated usng statstcal technques on hstorcal data of load and t's affectng factors. Parametrc load forecastng methods can be generally categorzed under three approaches: regresson methods, tme seres predcton methods [3]. Tradtonal statstcal load demand forecastng technques or parametrc methods have been used n practce for a long tme. These tradtonal methods can be combned usng weghted mult-model forecastng technques, showng adequate results n practcal system. However, these methods cannot properly present the complex nonlnear relatonshps that exst between the load and a seres of factors that nfluence on t [2]. In ths paper, we ntroduce a bref overvew n longterm forecastng methods. Ths paper s organzed as follows. Next secton brefly descrbes parametrc models. Secton III descrbes dfferent artfcal ntellgence based methods and secton IV s the conclusons of paper. 2 Parametrc Methods The three types of well-known parametrc methods are as, trend analyss, end-use modelng and econometrc modelng. 2.1 Trend Analyss Trend analyss extends past rates of electrcty demand n to the future, usng technques that range from hand-drawn straght lnes to complex computerproduced curves. These extensons consttute the forecast. Trend analyss focuses on past changes or movements n electrcty demand and uses them to predct future changes n electrcty demand. Usually, there s not much explanaton of why demand acts as t does, n the past or n the future. Trendng s frequently modfed by nformed judgment, wheren utlty forecasters modfy ther forecasts based on ther knowledge of future developments whch mght make future electrcty demand behave dfferently than t has n the past [5]. The advantage of trend analyss s that, t s smple, quck and nexpensve to perform [5]. The dsadvantage of a trend forecast s that t produces only one result, future electrcty demand. It does not help analyze why electrcty demand behaves the way t does, and t provdes no means to accurately measure how changes n energy prces or government poltes nfluence electrcty demand [5]. 2.2 End-Use Models The end-use approach drectly estmates energy consumpton by usng extensve nformaton on end users, such as applcatons, the customer use, ther age, szes of houses, and so on. Statstcal nformaton about customers along wth dynamcs of change s the bass for the forecast [5]. End-use models focus on the varous uses of electrcty n the resdental, commercal, and ndustral sector. These models are based on the prncple that electrcty demand s derved from customer's demand for lght, coolng, heatng, refrgeraton, etc. Thus, enduse models explan energy demand as a functon of the number of applcatons n the market [5]. Ideally, ths approach s very accurate. However, t s senstve to the amount and qualty of end-use data. For example, n ths method the dstrbuton of equpment age s mportant for partcular types of applances. End-use forecast requres less hstorcal data but more nformaton about customers and ther equpments [5]. Ths method predcts the energy consumptons. If we want to calculate the load, we have to have the load factor n each sectons and dfferent types of energy consumptons and then by load factor we can calculate the load n each secton. The system load factor s defned as follows equaton: Average - load demand LoadFactor = Peak - load demand (1) annual KWh energy = peak - load demand 8760 hours/year The dsadvantage of end-use analyss s that most end-use models assume a constant relatonshp between electrcty and end-use (electrcty per applance). Ths mght hold for over a few years, but over 10 or 20-year perod, energy savng technology or energy prces wll undoubtedly change, and the relatonshps wll not reman constant [6]. 2.3 Econometrc Models The econometrc approach combnes economc theory and statstcal technques for forecastng electrcty demand. The approach estmates the relatonshp between energy consumpton (dependent varables) and factors nfluencng consumpton. The relatonshps are estmated by the least-square method or tme seres methods. One of the optons n ths framework s to aggregate the econometrc approach, when consumpton n dfferent sectors (resdental, commercal, ndustral, etc.) s calculated as a functon of weather, economc and other varables, and then estmates are assembled usng recent hstorcal data. Integraton of the econometrc approach n to the enduse approach ntroduces behavoral components n to the end-use equatons [5]. The advantage of econometrcs are that t provdes detaled nformaton on future levels of electrcty demand, why future electrcty demand ncreases, and how electrcty demand s affected by all the varous factors [6], [7], [29]. 250 Iranan Journal of Electrcal & Electronc Engneerng, Vol. 7, No. 4, Dec. 2011

3 A dsadvantage of econometrc forecastng s that n order for an econometrc forecast to be accurate, the changes n electrcty reman the same n the forecast perod as n the past. Ths assumpton, whch s called constant elastcty, may be hard to justfy especally where very large electrcty prces changes, make customers more senstve to electrcty prces. 2.4 Dfferences Between These Tradtonal Mentoned Method As mentoned n the trend analyss, just past changes or movements n electrcty demand and uses them to predct future changes n electrcty demand, there sn't any process on why those movements happened. In ths method, end users and ther behavor aren't mportant. But n end use method, statstcal nformaton about customers along wth dynamcs of change s the bass for the forecast. In Economcal methods, the results estmate the relatonshp between dependent varables and factors nfluencng consumpton. The relatonshps are estmated by the least-square method or tme seres methods. In comparson, trend analyss can't be trustworthy; n ths method we need a wse and knowng judge to recognze unreal date and omt them from prevous nformaton. Up to ths part we descrbe the old methods for long term load forecastng. They are also useful today. But the new followng methods can use for ther accuracy and fast possessng system. Specal the new methods are used for dfferent economcal nputs n forecastng. By these new methods, we can have a model from the past data and correct ts naccurate date. After that we can predct the followng peak load. 3 Artfcal Intellgence Based Methods 3.1 Artfcal Neural Networks Artfcal neural networks (ANNs) have succeeded n several power system problems, such as plannng, control, analyss, protecton, desgn, load forecastng, securty analyss, and fault dagnoss. The last three are the most popular. The ANNs ablty n mappng complex non-lnear relatonshps s responsble for the growng number of ts applcaton to load forecastng [8], [9]. Most of the ANNs have been appled to shorttme load forecastng. Only a few studes are carres out for long-term load demand forecastng [10], [22], [24], [28]. In developng a long-term load forecast, the followng are some of the degrees of freedom whch must be terated upon wth the objectve to ncrease the potental for an accurate load forecast: (1) fracton of the database that wll be used for tranng and testng purpose, (2) transformatons to be performed on the hstorcal database, (3) ANNs archtecture specfcatons, (4) optmal stoppng pont durng ANNs tranng, and, (5) relatve weghts for use n forecast combnaton [8]. The desgn of neural network archtecture nvolves decson makng on type, sze and number of neural beng used [11]. The result of Output ANN s n (2). Y n = = 1 W X (2) where = 1, 2,..., n, X s nput, and W s weght of network and Y s one of the ANN's outputs. The frst queston to be asked s f an ANN can learn to perform the desre applcaton, and f so what would be the most sutable form of the network. In ths secton, varous aspects of ANNs are analyzed to determne a sutable model. These aspects nclude the network archtecture and method of tranng. There are three types whch can be useful for long-term load demand forecastng: Recurrent neural network (RNN) for forecastng the peak load, feed-forward back propagaton (FFBP) for forecastng the annual peak load [10] and radal bass functon network.(rbfn) for fastng tranng and better followng the peaks and valleys [4]. 1) Recurrent neural network: Recurrent neural network contans feedback connectons, whch enable them to encode temporal context nternally. Ths feedback can be external or nternal. RNN has be ablty to learn patterns from the past records and also to generalze and project the future load patterns for an unseen data [10]. We have dfferent types of RNNs, such as Jordan RNN, Elman RNN and others. Feedback connectons n these RNNs are dfferent from network to network. For nstance, Jordan RNN has feedback connectons from output to nput whle the Elman RNN has feedback connectons from ts hdden layer neurons back to ts nputs. Addtonal neurons n nput layer, whch accept these feedback connectons, are called state or context neurons. The role of context neurons n RNN s to get nputs from the upper layer, and after processng send ther outputs to the hdden layer together wth other plan unts. In long-term load demand forecastng, there s strong relatonshp between the present and next year loads. For ths type of problem, Jordan's model of RNN proved to be sutable. However, t should be noted that as the perod of target forecast loads becomes longer, the forecast errors mght ncreases relatvely [10]. Ths s why the feed-forward back propagaton s used for forecastng loads of longer than 1 year. The Jordan RNN used n most of case study s shown n Fg. 1. 2) Feed-forward back propagaton: Feed-forward back propagaton s one of s one of the most wdely used neural network paradgms, whch have been appled successfully n applcaton studes. FFBP can be appled to any problem that requres pattern mappng. Gven an nput pattern, the network produces an assocated output pattern. Its learnng and update procedure s ntutvely appealng, because t s based on Ghods & Kalantar: Dfferent Methods of Long-Term Electrc Load Demand Forecastng 251

4 a relatvely smple concept: the network s suppled wth both a set of patterns to be learned and desred system response for each pattern. If the network gves the wrong answer, then the weghts are corrected so that the error s lessened and as a result future responses of the network are more lkely to be correct. The advantages of usng such a network center on some of ther propertes, too. Frstly, they automatcally generalze ther knowledge enablng them to recognzee patterns, whch they have had seen. Secondly, they are robust enough to recognze patterns, whch have been obscured by nose. Lastly, once they have been traned on the ntal set of patterns, ther recognton of smlar patterns s accomplshed very quckly [10]. There are two more advantages for FFBP, BP tranng s mathematcally desgned to mnmze the mean square error acrosss all tranng patterns and t has supervsed tranng technque [10]. The FFBP used n most of case study s shown n Fg. 2. 3) Redal bass functon network: A redal bass functon network (RBFN) n most general terms s any network, whch has an nternal representaton of hdden processng elements (pattern unts), whch are radcally symmetrc [ 4]. It conssts of three layers; the nput layer, hdden layer and output layer. The nodes wthn each layer are fully connected to the prevous layer, as shown n Fg. 3. For a hdden unt to be radcally symmetrc, t must have the followng three consttuents: A center, whch s a vector n the nput space and whch s typcally stored n the weght vector from the nput layer to the pattern unt A dstance measure, to determne how far an nput vector s from the center. Typcally, ths s the standard Eucldean dstance measure. A transfer functon, whch s a functon of a sngle varable, and whch determnes the output of the processng elements by mappng the outpu of the dstance functon. A common functon s a Gaussan functon, whch outputs stronger value when the dstance s small. In the other word, the output of a pattern unt s a functon of only the dstance between an nput vector and the stored center. Fg. 1 Jordan Recurrent Neural Networks. Fg. 2 Feed-forward back propagaton neural networks. Fg. 3 Redal Bass Functon Network. The key to a successful mplementaton of thesee networks s to fnd sutable centers for the Gaussan functon [10]. 3.2 Wavelet Networks Ths secton nvestgates the applcaton of wavelet packet n power load forecastng. Wavelet theory s ntroduced to power load forecastng recently and receved wde attenton. Comparng to tradtonal load forecastng methods, wavelet theory provdes powerful and flexble tool to decompose load data nto dfferent frequency components, makng t possble to analyze the characterstcs of each component and mprove forecastng accuracy. Wavelet packet analyss s the extenson of wavelet analyss and t has better frequency resoluton [12], [23]. Several papers nvestgated the applcaton of wavelet analyss n power load forecastng, and the forecastng accuracy was mproved. The wavelet network must have the followng measurements to forecast well: Select proper wavelet functon for load forecastng. The selecton of wavelet functon s mportant for wavelet applcaton, but there s no general rule tll now.generally, the most mportant thng of power load forecastng s to 252 Iranan Journal of Electrcal & Electronc Engneerng, Vol. 7, No. 4, Dec. 2011

5 mprove forecastng accuracy, so t requres less dstorton durng the wavelet decomposton and reconstructon process, whch s dfferent from other applcatons such as fault detecton. Among varous wavelet functons, the borghogonal wavelet functonn s symmetrcal and has lnear phase, so t won t brng sgnal dstorton durng the decomposton and reconstructon process. Therefore, the selecton of borghogonal wavelet for power load forecastng s sutable [12]. Avod border dstorton durng wavelet transform. Because of the lmted number of data n wavelet applcatons, border dstorton problem arsess durng the wavelet decomposton process, but users often gnore t except the method proposed n [13]. For load forecastng applcaton wth fnte number of load data, border dstorton means the wavelet coeffcents of the latest data s dstorted and the forecastng based on these coeffcents couldn t gve accurate forecastng result. It s too bad to forecast wthout the help of the latest data. To deal wth the problem, border extenson s a smple and effectve soluton, and there are several types of border extenson, such as symmetrcal extenson and zero paddng. Although t s hard to gve general gudelnes for selectng proper extenson method, symmetrcal border extensonn s sutable for borghogonal wavelet whch s symmetrcal. The structure of the wavelet network s shown n Fg. 4. Ths structure s very smlar to Mult layer neural network. The most advantage factor of wavelet network s not spanned nputs although the accuracy of model s better than mult layer neural networks. It has more advantages to apply to long-term forecast. The mult- has resoluton analyss capablty of wavelet functons much power n functon approxmaton to obtan better accuracy [13]. A new method s the fuzzy rules and wavelet neural network model for long term load forecastng. The neural call functon s bass of nonlnear wavelets. It overcomes the shortcomng of sngle tran set of fuzzy rules. It can mprove effectvely the forecast accuracy and speed [26]. Another new method s the wavelet neural network model for long term load forecastng. The neural call functon s bass of nonlnear wavelets. We overcome the shortcomng of sngle tran set of ANN. It can be seen that ths method can mprove effectvely the forecast accuracy and speed [30]. 3.3 Genetc Algorthms Managngg electrcal energy supply s a complex task. The most mportant part of electrc utlty resource plannng s forecastng of the future load demand n the regonal or natonal servce area. Ths s usually acheved by constructng models on relatvee nformaton, such as clmate and prevous load demandd data. Genetc programmng approach s proposed to forecast long term electrcal power consumpton. The emprcal results demonstrate successful load forecast wth a low error rate [19]. Genetc Algorthms (GAs) have recently receved much attenton as robust stochastc search algorthms for varous problems. Ths class of methods s based on the mechansm of natural selecton and natural genetcs, whch combnes the noton of survval of the fttest, random and yet structured, search and parallell evaluaton of the ponts n the search space. GAs have been successfully appled n varous areas such as, load flow problems, fault detecton, stablty analyss, economc dspatch, power system control and load demand forecastng [14]. Consderng the features of long term load forecastng are complcated, a generc neural network model that s able to adapt to and learn from amount of non-lnear or mprecse rules, so t s a model wth hghly robustness. For avodng the nflexblty of the generc neural network tself, many experences and opnons of experts are ntroduced durng the use, so that a comprehensve effect of dfferent factors thatt nfluence the power load can be reflected. The generc algorthm s able to search precsely at global scope, and the neural network s able to ft well at local scope, both of whch are chosen together [20]. Genetc algorthms are a numercal optmzaton technque. More specfcally, they are parameter search procedures based upon the mechancs of natural genetcs. They combne a Darwnan survval-of-the-fttestt strategy wth a random, yet structured nformatonn exchange among a populaton of artfcal chromosomes. Ths technque has ganed popularty n recent years as a robust optmzaton tool for a varety of problems n engneerng, scence, economcs, fnance, etc. GAs accommodate all the facets of soft computng, namely uncertanty, mprecson, non-lnearty, and robustness. Some of the attractve features can be summarzed as followng [14]: Fg. 4 Schematc of Wavelet Network. Ghods & Kalantar: Dfferent Methods of Long-Term Electrc Load Demand Forecastng 253

6 Learnng: GAs are the best known and wdely used global search technques wth an ablty to explore and explot a gven operatng space usng avalable performance (or learnng) measures. Generc Code Structure: GA operates on an encoded parameter strng and not drectly on the parameters. Ths enables the user to treat any aspect of the problem as an optmzable varable. Optmalty of the Solutons: In many problems, there s no guarantee of smoothness. Tradtonal search technques often fal mserably on such search spaces. GA s known to be capable of fndng near optmal solutons n complex search spaces. Advanced Operators: Ths ncludes technques such as nckng (for dscoverng multple solutons), combnatons of Neural, Fuzzy, and chaos theory, and multple-objectve optmzaton. The GAs approach presented n ths work s employed to fnd the optmum values of the state vector X that mnmzes the absolute summaton of the forecastng error r(t). In order to emphasze the best strng and speed up convergence of the teraton procedure, ftness s normalzed nto range between 0 and 1. The ftness functon (ff) adopted s [14]: 1 ff = 1 k m (3) + k = 1 r(t) where k s a scalng constant (for example, k=0.0001) Lke other stochastc methods, the GA has a number of parameters that must be selected, sze of populaton, probablty of crossover and probablty of mutaton. r (t) s the error vector assocated. GA tres to keep the r (t) n the allowed lmtaton. If the r (t) s kept n the allowed lmtaton, the ftness functon has the best value for load demand forecastng [14]. Forecastng results usng GA were found to be the best. Ths ndcates that the GA approaches s qute promsng and deserves serous attenton because of ts robustness and sutablty for parallel mplementaton [14]. Wth r (t), we can calculate the load demand forecastng by the followng equaton: n P(t) = a + = a t + r(t) (4) 0 1 where P(t) s the peak load demand at tme t, a 0, a are the regresson coeffcents relatng the load demand P(t) to the tme t. r(t) s the resdual load at year (t). 3.4 Support Vector Machne (SVM) SVM (Support Vector Machne) s a useful technque for data classfcaton. Even though people consder that t s easer to use than Neural Networks, however, users who are not famlar wth SVM often get unsatsfactory results at frst [15]. The support vector machnes (SVMs) are based on the prncple of structural rsk mnmzaton (SRM) rather than the prncple of emprcal rsk mnmzaton, whch conducted by most of tradtonal neural network models. SVMs have been extended to solve nonlnear regresson estmaton problems [16]. Recurrent neural network (RNN) s one knd of SVM whch s based on the man concept n whch every unt s consdered as an output of the network and the provson of adjusted nformaton as nput n a tranng process. RNNs are extensvely appled n long-term load tme seres forecastng and can be classfed n three types, Jordan networks, Elman networks, and Wllams and Zpser networks. Both Jordan and Elman networks use manly past nformaton to capture detaled nformaton. Wllams and Zpser networks take much more nformaton from the hdden layer and back nto themselves. Therefore, Wllams and Zpser networks are senstve when models are mplemented. Jordan and Elman networks are suted to tme seres forecastng. Tradtonally, RNNs are traned by back-propagaton algorthms. SVMs wth genetc algorthms are used to determne the weghts between nodes [16]. The basc concept of the SVM regresson s to map nonlnearly the orgnal data x nto a hgher dmensonal feature space. Hence, gven a set of data N G = {(x,a )} = 1 (where x s the nput vector, a the actual value and N s the total number of data patterns), the SVM regresson functon s: f = g(x) = w (x) ψ + b (5) where ψ (x) s the feature of nputs, and both w and b are coeffcents. The coeffcents ( w and b) are estmated by mnmzng the followng regularzed rsk functon: 1 N 1 2 r(c) = C ( a, f ) N 1 Γ ε = + 2 ω (6) where, 0 f a f ε Γε (a, f ) = (7) a f ε otherwse and C and ε are prescrbed parameters. In (6), Γε (a, f) s called the ε-nsenstve loss functon. The loss equals zero f the forecasted value s wthn the ε-tube (7). The second term, 1/2 w ², measures the flatness of the functon. Therefore, C s consdered to specfy the tradeoff between the emprcal rsk and the model flatness. Both C and ε are user-determned parameters. The archtecture of SVMs wth genetc algorthm (SVMG) s shown n Fg. 5. The superor performance of the RSVMG model has several causes. Frst, the RSVMG model has nonlnear 254 Iranan Journal of Electrcal & Electronc Engneerng, Vol. 7, No. 4, Dec. 2011

7 Fg. 6 Block dagram of the fuzzy logc system. Prevous data Load data Fg. 5 Archtecture of SVMG. Fuzzfcaton Selecton of ANN mappng capabltes and thus can more easly capture electrcty load data patterns than can the ANN and regresson models. Second, mproper determnng of these three parameters wll cause ether over-fttng or under-fttng of a SVM model. In ths secton, the Gas can determne sutable parameters to forecast electrcty load. Thrd, the RSVMG model performs structural rsk mnmzaton rather than mnmzng the tranng errors. Mnmzng the upper bound on the generalzaton error mproves the generalzaton performance compared to the ANN and regresson models. 3.5 Fuzzy Logc Model Fuzzy control systems are rule-based systems n whch a set of so-called fzzy rules represents a control decson mechansm to adjust the effects of certan stmulus. The am of fuzzy control systems s normally to replace a sklled human operator wth a fuzzy rulebased system. The fuzzy logc model provdes an algorthm, whch can convert the lngustc strategy based on expert knowledge nto an automatc strategy. Fg. 6 represents the basc confguraton of a fuzzy logc system, whch conssts of a fuzzfcaton, knowledge base, fuzzy nterface and a defuzzfcaton (IO). The fuzzy logc method s appled for scorng. The applcaton of fuzzy rules wll mprove the model accuracy by avodng arbtrarness for the purpose of the stud. The fuzzy rule base s composed of some rules generated from the analyss of the hstorcal load data [16], [21]. One of the applcatons of the fuzzy rules s to combne them wth neural network to tran ANN and have a better load demand forecastng. The tranng patterns for the ANN models were collected from the hstorcal load data. The number of tranng cycles has been determned through a tral process, to avod overtranng [16]. The beneft of the proposed hybrd structure was to utlze the advantages of both,.e., the generalzaton capablty of ANN and the ablty of fuzzy nference for handlng and formalzng the experence and knowledge of the forecasters. It has been demonstrated that the method gve relatvely accurate load forecasts for the actual data. The test results showed that ths method of Fuzzy Interface Defuzzfcaton Load forecasted Fg. 7 Structure of ANN and Fuzzy based used. Forecasted of selected load Combnaton of the results Forecasted load forecastng could provde a consderable mprovement of the forecastng accuracy. Ths ndcates that the fuzzy rules and the tranng patterns for the ANN s qute promsng and deserve serous attenton of ts robustness and sutablty for mplementaton. It can be concluded that the outcome of the study clearly ndcates that the proposed composte model can be used as an attractve and effectve means for the ndustral load forecastng. The mprovement of forecast accuracy and the adaptaton to the change of customers would fulfll the forecastng needs [16]. Fg. 7 shows the structure of ANN and Fuzzy based used n forecastng. We can also combne two dfferent methods to acheve better result. These two methods can be ANN and Fuzzy control. Long term load forecastng of power system s affected by varous uncertan factors. Usng clusterng method numerous relatve factors can be syntheszed for the forecastng model so that the accuracy of the load forecastng would be mproved sgnfcantly. A clusterng neural network consstng of logc operators s quoted, whch can be used n long term load forecastng Applyng logc operators and n the fuzzy theory, the algorthm speed of the clusterng network wll be ncreased. Although compettve learnng algorthm s used here for the network, t solves the dead unt problem and gves more room to select the ntal values of the clusterng center n the clusterng analyss of the hstory data. The proposed model consders the nfluences of both hstory and future uncertan factors [25], [27], [31], [32]. Ghods & Kalantar: Dfferent Methods of Long-Term Electrc Load Demand Forecastng 255

8 3.6 Expert System The confdence levels assocated wth classcal forecastng technques, when appled to forecastng problem n mature and stable utltes are unlkely to be smlar to those of dynamc and fast growng utltes. Ths s attrbuted to the dfferences n the nature of growth, soco-economc condtons, occurrence of specal events, extreme clmatc condtons, and the competton n generaton due to the deregulaton of the electrcty sector wth possble changes n tarff structures. Under such condtons, these forecastng technques are nsuffcent to establsh demand forecast for long-term load demand. Consequently, ths case requres separate consderaton ether by pursung the search for more mprovement n the exstng forecastng technques or establshng another approach to address the forecastng problem of such systems [17]. In ths secton, the classcal forecastng methods are frstly appled to obtan the long-term load demand forecasts, for a typcal fast growng utlty as well as normal developng system [17]. A poor performance s observed when such methods are appled to fast developng system, whereas most of these models are vald when used to produce the forecasts of the normal developng system. Consequently, an extended logstc model s developed to reflect the crtcal forecastng problem n fast growng areas. Although the developed model gves an accurate load demand forecast compared wth the classcal models, t s hardly dffcult to dependent on sngle method for producng the demand of such fast growng and dynamc system [17]. Ths s because several mportant factors related to the cyclc and dynamc events that contrbute sgnfcantly to the system load are dffcult to nvolve t nto the exstng forecastng models. Thus, there s a need to develop a computatonal tool whch allows one to store the knowledge assocated wth ths problem along wth the mathematcal models to support the choce of the most sutable load forecastng model, for long-term power system plannng. Therefore, the mplementaton of long-term forecastng strateges usng a knowledge-based expert system (ES) s then presented n ths secton. In the expert system, key system varables whch have major effects on system load are dentfed based on past planners experences. A set of decson rules relatng these varables are then establshed and stored n the knowledge base to select the recommended forecastng [17]. The man components of the proposed expert system are shown n Fg. 8. Wth the knowledge base at hand (rules and facts), an nference engne can be used to search through ths knowledge base accordng to the soluton strategy. The detaled procedures of the soluton strategy to ascertan the accuracy and credblty of selectng forecastng method. In addton to knowledge base, nference engne, soluton strategy, a user nterface s also developed n the expert system to facltate the navgaton between the expert system and the user. The varables of the formulated problem can be grouped nto Statc and Dynamc Facts as follows: Statc Facts: Ths knd of knowledge s developed before startng the plannng process. A sample of these facts s: system condtons to dentfy the current stuaton of the system,.e., mature, or under developng, solated or nterconnected wth other system, etc. Forecastng horzon to defne the load forecastng perod,.e., long-term. Load pattern to descrbe the load behavor (stable, or dynamc pattern, cyclc, or seasonal pattern, or combnaton of all, tme of system peak, load types, etc.) Hstorcal peak load to ndcate annual and seasonal growth, concdence factor, area peak, etc. Hstorcal energy to descrbe the nformaton related to number of consumers of each sector, consumpton rate, tarff rate, etc. Major factors affectng the system peak,.e., weather varables, economc varables, demographc varables, specal event, suppressed demand, bulk loads to be connected nto the network, concdence factor of the system peak, etc. Dynamc Facts: These facts are developed and automatcally updated durng the nference process to represent the plannng attrbutes needed for evaluatng a decson makng process. Samples of these facts nclude the followng: Fg. 8 Structure of expert system for long-term load forecastng. 256 Iranan Journal of Electrcal & Electronc Engneerng, Vol. 7, No. 4, Dec. 2011

9 load and energy attrbute for the estmated load and energy forecast; System losses attrbute for the estmated system losses; Error attrbute related to the forecastng model. In ths secton, a long-term load forecastng s developed and classfed accordng to the forecastng problem usng a knowledge-based expert system (ES). The proposed methodology s appled successfully to forecast yearly peak load for normal and fast developng power systems. Snce the expert system s very flexble n updatng the forecastng methods and heurstc rules, t s expected that the expert system can serve as a valuable assstant to system planners n performng ther annual load forecastng dutes. Fnally, t can be expected to serve as a valuable assstant also for tranng purposes [17]. 4 Contrastng New Forecastng Methods Recurrent neural network (RNN) has be ablty to learn patterns from the past records and also to generalze and project the future load patterns for an unseen data. In ths type, some addtonal neurons are avalable. Addtonal neurons n nput layer, whch accept these feedback connectons, are called state or context neurons. The role of context neurons n RNN s to get nputs from the upper layer, and after processng send ther outputs to the hdden layer together wth other plan unts. In the other neural network method, feed-forward back propagaton an nput pattern s gven, the network produces an assocated output pattern. Its learnng and update procedure s ntutvely appealng, because t s based on a relatvely smple concept: the network s suppled wth both a set of patterns to be learned and desred system response for each pattern. Ths method s much better than the RNN method. Because f the network gves the wrong answer, then the weghts are corrected so that the error s lessened and as a result future responses of the network are more lkely to be correct. It can have a trustworthy result. Another method for long term load forecastng s Wavelet Network. The most advantage factor of wavelet network s not spanned nputs although the accuracy of model s better than mult layer neural networks. Ths s one reason whch can be ended up n ths choce. It has more advantages to apply to long-term forecast. The mult-resoluton analyss capablty of wavelet functons has much power n functon approxmaton to obtan better accuracy. Ths accuracy can make a better result n future forecastng. For one method, we can call Genetc Algorthm for long-term load demand forecastng, Genetc algorthms are a numercal optmzaton technque. More specfcally, they are parameter search procedures based upon the mechancs of natural genetcs. Forecastng results usng GA were found to be the best. Ths ndcates that the GA approaches s qute promsng and deserves serous attenton because of ts robustness and sutablty for parallel mplementaton. Other most commonly method s SVM. Ths method s much more comparable wth ANN. Frst, the RSVMG model has nonlnear mappng capabltes and thus can more easly capture electrcty load data patterns than can the ANN and regresson models. Second, mproper determnng of these three parameters wll cause ether over-fttng or under-fttng of a SVM model. Thrd, the RSVMG model performs structural rsk mnmzaton rather than mnmzng the tranng errors. Fuzzy system as another method s normally to replace a sklled human operator wth a fuzzy rule-based system. One of the applcatons of the fuzzy rules s to combne them wth neural network to tran ANN and have a better load demand forecastng. In expert system, we can use tradtonal methods to forecast the peak load forecastng. The expert system s very flexble n updatng the forecastng methods and heurstc rules, t s expected that the expert system can serve as a valuable assstant to system planners n performng ther annual load forecastng dutes. 5 Conclusons Load forecastng plays a domnant part n the economc optmzaton and secure operaton of electrc power systems. Long-term load forecastng represents the frst step n developng future generaton, transmsson, and dstrbuton facltes. Any substantal devaton n the forecast, partcularly under the new market structure, wll result n ether overbuldng of supply facltes, or curtalment of customer demand. The confdence levels assocated wth classcal forecastng technques, when appled to forecastng problem n mature and stable utltes are unlkely to be smlar to those of dynamc and fast growng utltes. Ths s attrbuted to the dfferences n the nature of growth, soco-economc condtons, occurrence of specal events, extreme clmatc condtons, and the competton n generaton due to the deregulaton of the electrcty sector wth possble changes n tarff structures. Under such condtons, these forecastng technques are nsuffcent to establsh demand forecast for long-term power system plannng. Consequently, ths case requres separate consderaton ether by pursung the search for more mprovement n the exstng forecastng technques or establshng another approach to address the forecastng problem of such systems. Dfferent methods of long-term load demand forecastng are defned n ths paper. All of these methods can forecast the load of the power system, but the amount of prevous data and such varables whch they need to forecast, make them dfferent n accuracy from area to area. Fnally, for long-term load forecastng, we should know the power system n detals, and after that we can select the best method for the specfed power system. Ghods & Kalantar: Dfferent Methods of Long-Term Electrc Load Demand Forecastng 257

10 Sometmes we can combne dfferent methods and compare the accuracy of them together. Tradtonal methods, such as tme seres, regresson models and etc. are used n most of the countres, because of ther relable result. Neural networks can solve nonlnear problems, and because of nonlnear behavor of load, so they can be useful for long-term load forecastng. Genetc algorthm can forecast long-term load forecastng, when we have a lot amount of dfferent varables and we want to fnd the best soluton to follow the future load. Also t can be useful to estmate the support vector machne parameters. Wavelet can estmate peak and valley of load behavor better than Furous seres. It can combne wth ANN have a better forecast. References [1] Al Mamun M., and Negasaka K., Artfcal neural networks appled to long-term electrcty demand forecastng, Proceedngs of the Fourth Internatonal Conference on Hybrd Intellgent Systems (HIS'04), pp , Dec [2] Dang Khoa T. Q. and Oanh P. T., Applcaton of Elman and neural wavelet network to long-term load forecastng, ISEE Journal, track 3, sec. B, No. 20, pp. 1-6, [3] Al-Hamd H. M. and Solman S. A., Longterm/md-term electrc load forecastng based on short-term correlaton and annual growth, Electrc Power System Research (Elsever), Vol. 74, No. 3, pp , June [4] Negasaka K. and Al Mamun M., Long-term peak demand predcton of 9 Japanese power utltes usng radal bass functon networks, IEEE Power Eengneerng Socety General Meetng, Vol. 1, pp , 6-10 June [5] Engneerng and desgn hydropower proponent, Load forecastng methods, n EM , appendx B, Dec [6] Genethlou D. and Fenberg E. A., Load forecastng, Appled mathematcs for restructured electrc power system: optmzaton, control and computatonal ntellgence (J. H. Chow, F.F. Wu, and J. J. Momoh, eds.), chapter 12, pp , [7] Fu C. W. and Nguyen T. T., Models for longterm energy forecastng, IEEE Power Engneerng Socety General Meetng, Vol. 1, pp , July [8] Taradar Heque M. and Kashtban A. M., Applcaton of neural networks n power systems; A revew, Transacton of Engneerng, Computng and Technology, Vol. 6, No. 1, ISSN , pp , June [9] Atya A. F., Development of an ntellgent longterm electrc load forecastng system, Proceedngs of the Internatonal Conference, ISAP apos, pp , [10] Kermanshah B. S., and Iwamya H., Up to year 2020 load forecastng usng neural nets, Electrc Power System Research (Elsever), Vol. 24, No. 9, pp , [11] Phmphachanh S., Chamnongtha K., Kumhom P., and Sangswang A., Usng neural network for long term peak load forecastng n Ventane muncpalty, IEEE Regon 10 Conference, TENCON 2004, Vol. 3, pp , [12] Khoa T. Q. D., Phuong L. M., Bnh P. T. T. and Len N. T. H., Applcaton of wavelet and neural network to long-term load forecastng, Internatonal Conference on Power System Technology (POWERCON 2004), pp , Sngapore, November [13] Khoa T. Q. D., Phuong L. M., Bnh P. T. T., Len N. T. H., Power load forecastng algorthm based on wavelet packet analyss, Internatonal Conference on Power System Technology (POWERCON 2004), pp , Sngapore, November [14] EL_Naggar K. M. and AL-Rumah K. A., Electrc load forecastng usng genetc based algorthm, optmal flter estmator and least error square technque: Comparatve study, Transacton of Engneerng, Computng and Technology, Vol. 6, pp , ISSN , June [15] Pa P.-F., and Hong W.-C., Forecastng regonal electrcty load based on recurrent support vector machnes wth genetc algorthms, Electrc Power System Research (Elsever), Vol. 74, No. 3, pp , [16] Faraht M. A., Long-term ndustral load forecastng and plannng usng neural networks technque and fuzzy nterface method, 39th Internatonal Unverstes Power Engneerng Conference, UPEC 2004, Vol. 1, pp , [17] Kandl M. S., El-Debeky S. M. and Hasanen N. E., The mplementaton of long-term forecastng strateges usng a knowledge-based expert system: part-ii, Electrc Power System Research (Elsever), Vol. 58, No. 1, pp , [18] Carmona D., Jaramllo M. A., Gonzalez E. and Alvarez A. J., Electrc energy demand forecastng wth neural networks, IEEE, 28th Annual Conference of the Industral Electroncs Socety, Vol.3, pp , [19] Karabuluta K., Alkanb A. and Ylmaz A. S., Long term energy consumpton forecastng genetc programmng, Assocaton for Scentfc Research, Mathematcal And Computatonal Applcatons, Vol. 13. No. 2, pp , [20] Ynglng, Hongsong S., Yawe Y. and Nansheng D., Research on long term load forecastng 258 Iranan Journal of Electrcal & Electronc Engneerng, Vol. 7, No. 4, Dec. 2011

11 based on Improved Genetc Neural Network, IEEE, PCAIIA, pp , [21] Zhang Q. and Lu T., Research on the md-long term electrc load forecastng based on fuzzy rules, Informaton Management and Engneerng (ICIME), 2010 The 2nd IEEE Internatonal Conference, pp , [22] Ghanbar A., Naghav A., Ghader S. F. and Sabaghan M., Artfcal Neural Networks and regresson approaches comparson for forecastng Iran's annual electrcty load, IEEE POWER ENG. Conference, pp , [23] J Z., Zhang P. and Zhao Z., Applcaton of Wavelet Neutral Network and Rough Set Theory to Forecast Md-Long-Term Electrc Power Load, Educaton Technology and Computer Scence, ETCS '09. Frst Internatonal Workshop on, Vol. 1, pp , [24] Hobbs N. J., Km B. H. and Leee K. Y., Long- Neural Network Archtecture, Intellgent Systems Applcatons to Power Systems, ISAP Internatonal Conference on Dgtal Object Identfer, pp. 1-7, Term Load Forecastng Usng System Type [25] Yue L., Zhang Y., Xe H. and Zhong Q., The fuzzy logc clusterng neural network approach for mddle and long term load forecastng, GSIS IEEE Internatonal Conference, pp , [26] Zhang Q. and Lu T., A Fuzzy Rules and Wavelet Neural Network Method for Md-long- term Electrc Load Forecastng, ICCNT, IEEE 2010 Second Internatonal Conference, pp , [27] Ghanbaran M., Kavehna F., Askar M. R., Mohammad A. and Kevan H., Applyng Tme- Neuro-Fuzzy Technques, IEEE Conference POWER ENG., pp , [28] Shrvastava V. and Msra R. B., A Novel Approach of Input Varable Selecton for ANN Seres Regresson to Load Forecastng Usng Based Load Forecastng, IEEE Conference, ICPST, pp. 1-5, [29] Yngyng L. and Dongxao N., Applcaton of Prncpal Component Regresson Analyss n power load forecastng for medum and long term, IEEE Conference, ICACTE, pp. V V3-203, [30] Zhang Q. and Lu T.., Research on Md-long Term Load Forecastng Base on Wavelet Neural Network, IEEE Conference, ICCEA 2010, pp, , [31] Maralloo M. N., Koushk A. R., Lucas C. and Kalhor A.., Long term electrcal load forecastng va a neurofuzzy model, IEEE Conference, CSICC 2009, pp 35-40, [32] Dalvand M. M., Azam S. and Tarmorad H., Long-term load forecastng of Iranan power grd usng fuzzy and artfcal neural networks, IEEE Conference 2008, pp 1-4, [33] Ghods L. and Kalantar M., Long-Term Peak Load Demand Forecastng by Usng Radal Basss Functon Neural Networks, Iranan Journal of Electrcall & Electronc Engneerng (IJEEE), Vol. 6, No. 3, pp , Ladan Ghods was born n Tehran, Iran n She receved her B.S.. degree from Azad Unversty of Tehran. She graduated n power engneerng n M.S from Iran unversty of scence and technology (IUST) n She s nterested n neural network and ts abltes to forecast the future factors. She s also nterested n power nstallaton especally n ndustres. Mohsen Kalantar, was born on 1961 n Iran. He receved hs Ph.D. from Indan Insttute of Technology, New Delh, Inda n He s currently an Assocate Professor n the Departmentt of Electrcal Engneerng at Iran Unversty of Scence and Technology, Tehran. He s also foundng member of Center of Excellence for Power System Automaton and Operaton. He has around 30 Journal publcatons and has presented about 1000 papers at Internatonal Conferences. Hs felds of nterestt nclude wnd and solar power generatons, Dstrbuted Generatons, power system dynamcs and control, system stablty and optmzaton. Ghods & Kalantar: Dfferent Methods of Long-Term Electrc Load Demand Forecastng 259

Forecasting the Demand of Emergency Supplies: Based on the CBR Theory and BP Neural Network

Forecasting the Demand of Emergency Supplies: Based on the CBR Theory and BP Neural Network 700 Proceedngs of the 8th Internatonal Conference on Innovaton & Management Forecastng the Demand of Emergency Supples: Based on the CBR Theory and BP Neural Network Fu Deqang, Lu Yun, L Changbng School

More information

Forecasting the Direction and Strength of Stock Market Movement

Forecasting the Direction and Strength of Stock Market Movement Forecastng the Drecton and Strength of Stock Market Movement Jngwe Chen Mng Chen Nan Ye cjngwe@stanford.edu mchen5@stanford.edu nanye@stanford.edu Abstract - Stock market s one of the most complcated systems

More information

What is Candidate Sampling

What is Candidate Sampling What s Canddate Samplng Say we have a multclass or mult label problem where each tranng example ( x, T ) conssts of a context x a small (mult)set of target classes T out of a large unverse L of possble

More information

The Development of Web Log Mining Based on Improve-K-Means Clustering Analysis

The Development of Web Log Mining Based on Improve-K-Means Clustering Analysis The Development of Web Log Mnng Based on Improve-K-Means Clusterng Analyss TngZhong Wang * College of Informaton Technology, Luoyang Normal Unversty, Luoyang, 471022, Chna wangtngzhong2@sna.cn Abstract.

More information

Can Auto Liability Insurance Purchases Signal Risk Attitude?

Can Auto Liability Insurance Purchases Signal Risk Attitude? Internatonal Journal of Busness and Economcs, 2011, Vol. 10, No. 2, 159-164 Can Auto Lablty Insurance Purchases Sgnal Rsk Atttude? Chu-Shu L Department of Internatonal Busness, Asa Unversty, Tawan Sheng-Chang

More information

An Alternative Way to Measure Private Equity Performance

An Alternative Way to Measure Private Equity Performance An Alternatve Way to Measure Prvate Equty Performance Peter Todd Parlux Investment Technology LLC Summary Internal Rate of Return (IRR) s probably the most common way to measure the performance of prvate

More information

NEURO-FUZZY INFERENCE SYSTEM FOR E-COMMERCE WEBSITE EVALUATION

NEURO-FUZZY INFERENCE SYSTEM FOR E-COMMERCE WEBSITE EVALUATION NEURO-FUZZY INFERENE SYSTEM FOR E-OMMERE WEBSITE EVALUATION Huan Lu, School of Software, Harbn Unversty of Scence and Technology, Harbn, hna Faculty of Appled Mathematcs and omputer Scence, Belarusan State

More information

An Evaluation of the Extended Logistic, Simple Logistic, and Gompertz Models for Forecasting Short Lifecycle Products and Services

An Evaluation of the Extended Logistic, Simple Logistic, and Gompertz Models for Forecasting Short Lifecycle Products and Services An Evaluaton of the Extended Logstc, Smple Logstc, and Gompertz Models for Forecastng Short Lfecycle Products and Servces Charles V. Trappey a,1, Hsn-yng Wu b a Professor (Management Scence), Natonal Chao

More information

On the Optimal Control of a Cascade of Hydro-Electric Power Stations

On the Optimal Control of a Cascade of Hydro-Electric Power Stations On the Optmal Control of a Cascade of Hydro-Electrc Power Statons M.C.M. Guedes a, A.F. Rbero a, G.V. Smrnov b and S. Vlela c a Department of Mathematcs, School of Scences, Unversty of Porto, Portugal;

More information

A hybrid global optimization algorithm based on parallel chaos optimization and outlook algorithm

A hybrid global optimization algorithm based on parallel chaos optimization and outlook algorithm Avalable onlne www.ocpr.com Journal of Chemcal and Pharmaceutcal Research, 2014, 6(7):1884-1889 Research Artcle ISSN : 0975-7384 CODEN(USA) : JCPRC5 A hybrd global optmzaton algorthm based on parallel

More information

Feature selection for intrusion detection. Slobodan Petrović NISlab, Gjøvik University College

Feature selection for intrusion detection. Slobodan Petrović NISlab, Gjøvik University College Feature selecton for ntruson detecton Slobodan Petrovć NISlab, Gjøvk Unversty College Contents The feature selecton problem Intruson detecton Traffc features relevant for IDS The CFS measure The mrmr measure

More information

Project Networks With Mixed-Time Constraints

Project Networks With Mixed-Time Constraints Project Networs Wth Mxed-Tme Constrants L Caccetta and B Wattananon Western Australan Centre of Excellence n Industral Optmsaton (WACEIO) Curtn Unversty of Technology GPO Box U1987 Perth Western Australa

More information

Calculating the high frequency transmission line parameters of power cables

Calculating the high frequency transmission line parameters of power cables < ' Calculatng the hgh frequency transmsson lne parameters of power cables Authors: Dr. John Dcknson, Laboratory Servces Manager, N 0 RW E B Communcatons Mr. Peter J. Ncholson, Project Assgnment Manager,

More information

Course outline. Financial Time Series Analysis. Overview. Data analysis. Predictive signal. Trading strategy

Course outline. Financial Time Series Analysis. Overview. Data analysis. Predictive signal. Trading strategy Fnancal Tme Seres Analyss Patrck McSharry patrck@mcsharry.net www.mcsharry.net Trnty Term 2014 Mathematcal Insttute Unversty of Oxford Course outlne 1. Data analyss, probablty, correlatons, vsualsaton

More information

Lecture 2: Single Layer Perceptrons Kevin Swingler

Lecture 2: Single Layer Perceptrons Kevin Swingler Lecture 2: Sngle Layer Perceptrons Kevn Sngler kms@cs.str.ac.uk Recap: McCulloch-Ptts Neuron Ths vastly smplfed model of real neurons s also knon as a Threshold Logc Unt: W 2 A Y 3 n W n. A set of synapses

More information

A DYNAMIC CRASHING METHOD FOR PROJECT MANAGEMENT USING SIMULATION-BASED OPTIMIZATION. Michael E. Kuhl Radhamés A. Tolentino-Peña

A DYNAMIC CRASHING METHOD FOR PROJECT MANAGEMENT USING SIMULATION-BASED OPTIMIZATION. Michael E. Kuhl Radhamés A. Tolentino-Peña Proceedngs of the 2008 Wnter Smulaton Conference S. J. Mason, R. R. Hll, L. Mönch, O. Rose, T. Jefferson, J. W. Fowler eds. A DYNAMIC CRASHING METHOD FOR PROJECT MANAGEMENT USING SIMULATION-BASED OPTIMIZATION

More information

On-Line Fault Detection in Wind Turbine Transmission System using Adaptive Filter and Robust Statistical Features

On-Line Fault Detection in Wind Turbine Transmission System using Adaptive Filter and Robust Statistical Features On-Lne Fault Detecton n Wnd Turbne Transmsson System usng Adaptve Flter and Robust Statstcal Features Ruoyu L Remote Dagnostcs Center SKF USA Inc. 3443 N. Sam Houston Pkwy., Houston TX 77086 Emal: ruoyu.l@skf.com

More information

Causal, Explanatory Forecasting. Analysis. Regression Analysis. Simple Linear Regression. Which is Independent? Forecasting

Causal, Explanatory Forecasting. Analysis. Regression Analysis. Simple Linear Regression. Which is Independent? Forecasting Causal, Explanatory Forecastng Assumes cause-and-effect relatonshp between system nputs and ts output Forecastng wth Regresson Analyss Rchard S. Barr Inputs System Cause + Effect Relatonshp The job of

More information

An Interest-Oriented Network Evolution Mechanism for Online Communities

An Interest-Oriented Network Evolution Mechanism for Online Communities An Interest-Orented Network Evoluton Mechansm for Onlne Communtes Cahong Sun and Xaopng Yang School of Informaton, Renmn Unversty of Chna, Bejng 100872, P.R. Chna {chsun,yang}@ruc.edu.cn Abstract. Onlne

More information

benefit is 2, paid if the policyholder dies within the year, and probability of death within the year is ).

benefit is 2, paid if the policyholder dies within the year, and probability of death within the year is ). REVIEW OF RISK MANAGEMENT CONCEPTS LOSS DISTRIBUTIONS AND INSURANCE Loss and nsurance: When someone s subject to the rsk of ncurrng a fnancal loss, the loss s generally modeled usng a random varable or

More information

Module 2 LOSSLESS IMAGE COMPRESSION SYSTEMS. Version 2 ECE IIT, Kharagpur

Module 2 LOSSLESS IMAGE COMPRESSION SYSTEMS. Version 2 ECE IIT, Kharagpur Module LOSSLESS IMAGE COMPRESSION SYSTEMS Lesson 3 Lossless Compresson: Huffman Codng Instructonal Objectves At the end of ths lesson, the students should be able to:. Defne and measure source entropy..

More information

Statistical Methods to Develop Rating Models

Statistical Methods to Develop Rating Models Statstcal Methods to Develop Ratng Models [Evelyn Hayden and Danel Porath, Österrechsche Natonalbank and Unversty of Appled Scences at Manz] Source: The Basel II Rsk Parameters Estmaton, Valdaton, and

More information

A New Task Scheduling Algorithm Based on Improved Genetic Algorithm

A New Task Scheduling Algorithm Based on Improved Genetic Algorithm A New Task Schedulng Algorthm Based on Improved Genetc Algorthm n Cloud Computng Envronment Congcong Xong, Long Feng, Lxan Chen A New Task Schedulng Algorthm Based on Improved Genetc Algorthm n Cloud Computng

More information

Credit Limit Optimization (CLO) for Credit Cards

Credit Limit Optimization (CLO) for Credit Cards Credt Lmt Optmzaton (CLO) for Credt Cards Vay S. Desa CSCC IX, Ednburgh September 8, 2005 Copyrght 2003, SAS Insttute Inc. All rghts reserved. SAS Propretary Agenda Background Tradtonal approaches to credt

More information

Fault tolerance in cloud technologies presented as a service

Fault tolerance in cloud technologies presented as a service Internatonal Scentfc Conference Computer Scence 2015 Pavel Dzhunev, PhD student Fault tolerance n cloud technologes presented as a servce INTRODUCTION Improvements n technques for vrtualzaton and performance

More information

The OC Curve of Attribute Acceptance Plans

The OC Curve of Attribute Acceptance Plans The OC Curve of Attrbute Acceptance Plans The Operatng Characterstc (OC) curve descrbes the probablty of acceptng a lot as a functon of the lot s qualty. Fgure 1 shows a typcal OC Curve. 10 8 6 4 1 3 4

More information

Development of an intelligent system for tool wear monitoring applying neural networks

Development of an intelligent system for tool wear monitoring applying neural networks of Achevements n Materals and Manufacturng Engneerng VOLUME 14 ISSUE 1-2 January-February 2006 Development of an ntellgent system for tool wear montorng applyng neural networks A. Antć a, J. Hodolč a,

More information

Robust Design of Public Storage Warehouses. Yeming (Yale) Gong EMLYON Business School

Robust Design of Public Storage Warehouses. Yeming (Yale) Gong EMLYON Business School Robust Desgn of Publc Storage Warehouses Yemng (Yale) Gong EMLYON Busness School Rene de Koster Rotterdam school of management, Erasmus Unversty Abstract We apply robust optmzaton and revenue management

More information

Optimal Choice of Random Variables in D-ITG Traffic Generating Tool using Evolutionary Algorithms

Optimal Choice of Random Variables in D-ITG Traffic Generating Tool using Evolutionary Algorithms Optmal Choce of Random Varables n D-ITG Traffc Generatng Tool usng Evolutonary Algorthms M. R. Mosav* (C.A.), F. Farab* and S. Karam* Abstract: Impressve development of computer networks has been requred

More information

A study on the ability of Support Vector Regression and Neural Networks to Forecast Basic Time Series Patterns

A study on the ability of Support Vector Regression and Neural Networks to Forecast Basic Time Series Patterns A study on the ablty of Support Vector Regresson and Neural Networks to Forecast Basc Tme Seres Patterns Sven F. Crone, Jose Guajardo 2, and Rchard Weber 2 Lancaster Unversty, Department of Management

More information

Damage detection in composite laminates using coin-tap method

Damage detection in composite laminates using coin-tap method Damage detecton n composte lamnates usng con-tap method S.J. Km Korea Aerospace Research Insttute, 45 Eoeun-Dong, Youseong-Gu, 35-333 Daejeon, Republc of Korea yaeln@kar.re.kr 45 The con-tap test has the

More information

"Research Note" APPLICATION OF CHARGE SIMULATION METHOD TO ELECTRIC FIELD CALCULATION IN THE POWER CABLES *

Research Note APPLICATION OF CHARGE SIMULATION METHOD TO ELECTRIC FIELD CALCULATION IN THE POWER CABLES * Iranan Journal of Scence & Technology, Transacton B, Engneerng, ol. 30, No. B6, 789-794 rnted n The Islamc Republc of Iran, 006 Shraz Unversty "Research Note" ALICATION OF CHARGE SIMULATION METHOD TO ELECTRIC

More information

A Secure Password-Authenticated Key Agreement Using Smart Cards

A Secure Password-Authenticated Key Agreement Using Smart Cards A Secure Password-Authentcated Key Agreement Usng Smart Cards Ka Chan 1, Wen-Chung Kuo 2 and Jn-Chou Cheng 3 1 Department of Computer and Informaton Scence, R.O.C. Mltary Academy, Kaohsung 83059, Tawan,

More information

THE APPLICATION OF DATA MINING TECHNIQUES AND MULTIPLE CLASSIFIERS TO MARKETING DECISION

THE APPLICATION OF DATA MINING TECHNIQUES AND MULTIPLE CLASSIFIERS TO MARKETING DECISION Internatonal Journal of Electronc Busness Management, Vol. 3, No. 4, pp. 30-30 (2005) 30 THE APPLICATION OF DATA MINING TECHNIQUES AND MULTIPLE CLASSIFIERS TO MARKETING DECISION Yu-Mn Chang *, Yu-Cheh

More information

Face Verification Problem. Face Recognition Problem. Application: Access Control. Biometric Authentication. Face Verification (1:1 matching)

Face Verification Problem. Face Recognition Problem. Application: Access Control. Biometric Authentication. Face Verification (1:1 matching) Face Recognton Problem Face Verfcaton Problem Face Verfcaton (1:1 matchng) Querymage face query Face Recognton (1:N matchng) database Applcaton: Access Control www.vsage.com www.vsoncs.com Bometrc Authentcaton

More information

Performance Management and Evaluation Research to University Students

Performance Management and Evaluation Research to University Students 631 A publcaton of CHEMICAL ENGINEERING TRANSACTIONS VOL. 46, 2015 Guest Edtors: Peyu Ren, Yancang L, Hupng Song Copyrght 2015, AIDIC Servz S.r.l., ISBN 978-88-95608-37-2; ISSN 2283-9216 The Italan Assocaton

More information

A Novel Methodology of Working Capital Management for Large. Public Constructions by Using Fuzzy S-curve Regression

A Novel Methodology of Working Capital Management for Large. Public Constructions by Using Fuzzy S-curve Regression Novel Methodology of Workng Captal Management for Large Publc Constructons by Usng Fuzzy S-curve Regresson Cheng-Wu Chen, Morrs H. L. Wang and Tng-Ya Hseh Department of Cvl Engneerng, Natonal Central Unversty,

More information

A GENETIC ALGORITHM-BASED METHOD FOR CREATING IMPARTIAL WORK SCHEDULES FOR NURSES

A GENETIC ALGORITHM-BASED METHOD FOR CREATING IMPARTIAL WORK SCHEDULES FOR NURSES 82 Internatonal Journal of Electronc Busness Management, Vol. 0, No. 3, pp. 82-93 (202) A GENETIC ALGORITHM-BASED METHOD FOR CREATING IMPARTIAL WORK SCHEDULES FOR NURSES Feng-Cheng Yang * and We-Tng Wu

More information

Traffic State Estimation in the Traffic Management Center of Berlin

Traffic State Estimation in the Traffic Management Center of Berlin Traffc State Estmaton n the Traffc Management Center of Berln Authors: Peter Vortsch, PTV AG, Stumpfstrasse, D-763 Karlsruhe, Germany phone ++49/72/965/35, emal peter.vortsch@ptv.de Peter Möhl, PTV AG,

More information

Multiple-Period Attribution: Residuals and Compounding

Multiple-Period Attribution: Residuals and Compounding Multple-Perod Attrbuton: Resduals and Compoundng Our revewer gave these authors full marks for dealng wth an ssue that performance measurers and vendors often regard as propretary nformaton. In 1994, Dens

More information

Research on Evaluation of Customer Experience of B2C Ecommerce Logistics Enterprises

Research on Evaluation of Customer Experience of B2C Ecommerce Logistics Enterprises 3rd Internatonal Conference on Educaton, Management, Arts, Economcs and Socal Scence (ICEMAESS 2015) Research on Evaluaton of Customer Experence of B2C Ecommerce Logstcs Enterprses Yle Pe1, a, Wanxn Xue1,

More information

L10: Linear discriminants analysis

L10: Linear discriminants analysis L0: Lnear dscrmnants analyss Lnear dscrmnant analyss, two classes Lnear dscrmnant analyss, C classes LDA vs. PCA Lmtatons of LDA Varants of LDA Other dmensonalty reducton methods CSCE 666 Pattern Analyss

More information

行 政 院 國 家 科 學 委 員 會 補 助 專 題 研 究 計 畫 成 果 報 告 期 中 進 度 報 告

行 政 院 國 家 科 學 委 員 會 補 助 專 題 研 究 計 畫 成 果 報 告 期 中 進 度 報 告 行 政 院 國 家 科 學 委 員 會 補 助 專 題 研 究 計 畫 成 果 報 告 期 中 進 度 報 告 畫 類 別 : 個 別 型 計 畫 半 導 體 產 業 大 型 廠 房 之 設 施 規 劃 計 畫 編 號 :NSC 96-2628-E-009-026-MY3 執 行 期 間 : 2007 年 8 月 1 日 至 2010 年 7 月 31 日 計 畫 主 持 人 : 巫 木 誠 共 同

More information

A DATA MINING APPLICATION IN A STUDENT DATABASE

A DATA MINING APPLICATION IN A STUDENT DATABASE JOURNAL OF AERONAUTICS AND SPACE TECHNOLOGIES JULY 005 VOLUME NUMBER (53-57) A DATA MINING APPLICATION IN A STUDENT DATABASE Şenol Zafer ERDOĞAN Maltepe Ünversty Faculty of Engneerng Büyükbakkalköy-Istanbul

More information

Abstract. 260 Business Intelligence Journal July IDENTIFICATION OF DEMAND THROUGH STATISTICAL DISTRIBUTION MODELING FOR IMPROVED DEMAND FORECASTING

Abstract. 260 Business Intelligence Journal July IDENTIFICATION OF DEMAND THROUGH STATISTICAL DISTRIBUTION MODELING FOR IMPROVED DEMAND FORECASTING 260 Busness Intellgence Journal July IDENTIFICATION OF DEMAND THROUGH STATISTICAL DISTRIBUTION MODELING FOR IMPROVED DEMAND FORECASTING Murphy Choy Mchelle L.F. Cheong School of Informaton Systems, Sngapore

More information

A Hybrid Model for Forecasting Sales in Turkish Paint Industry

A Hybrid Model for Forecasting Sales in Turkish Paint Industry Internatonal Journal of Computatonal Intellgence Systems, Vol.2, No. 3 (October, 2009), 277-287 A Hybrd Model for Forecastng Sales n Turksh Pant Industry Alp Ustundag * Department of Industral Engneerng,

More information

Gender Classification for Real-Time Audience Analysis System

Gender Classification for Real-Time Audience Analysis System Gender Classfcaton for Real-Tme Audence Analyss System Vladmr Khryashchev, Lev Shmaglt, Andrey Shemyakov, Anton Lebedev Yaroslavl State Unversty Yaroslavl, Russa vhr@yandex.ru, shmaglt_lev@yahoo.com, andrey.shemakov@gmal.com,

More information

CHOLESTEROL REFERENCE METHOD LABORATORY NETWORK. Sample Stability Protocol

CHOLESTEROL REFERENCE METHOD LABORATORY NETWORK. Sample Stability Protocol CHOLESTEROL REFERENCE METHOD LABORATORY NETWORK Sample Stablty Protocol Background The Cholesterol Reference Method Laboratory Network (CRMLN) developed certfcaton protocols for total cholesterol, HDL

More information

Power-of-Two Policies for Single- Warehouse Multi-Retailer Inventory Systems with Order Frequency Discounts

Power-of-Two Policies for Single- Warehouse Multi-Retailer Inventory Systems with Order Frequency Discounts Power-of-wo Polces for Sngle- Warehouse Mult-Retaler Inventory Systems wth Order Frequency Dscounts José A. Ventura Pennsylvana State Unversty (USA) Yale. Herer echnon Israel Insttute of echnology (Israel)

More information

Institute of Informatics, Faculty of Business and Management, Brno University of Technology,Czech Republic

Institute of Informatics, Faculty of Business and Management, Brno University of Technology,Czech Republic Lagrange Multplers as Quanttatve Indcators n Economcs Ivan Mezník Insttute of Informatcs, Faculty of Busness and Management, Brno Unversty of TechnologCzech Republc Abstract The quanttatve role of Lagrange

More information

Dynamic Pricing for Smart Grid with Reinforcement Learning

Dynamic Pricing for Smart Grid with Reinforcement Learning Dynamc Prcng for Smart Grd wth Renforcement Learnng Byung-Gook Km, Yu Zhang, Mhaela van der Schaar, and Jang-Won Lee Samsung Electroncs, Suwon, Korea Department of Electrcal Engneerng, UCLA, Los Angeles,

More information

PSYCHOLOGICAL RESEARCH (PYC 304-C) Lecture 12

PSYCHOLOGICAL RESEARCH (PYC 304-C) Lecture 12 14 The Ch-squared dstrbuton PSYCHOLOGICAL RESEARCH (PYC 304-C) Lecture 1 If a normal varable X, havng mean µ and varance σ, s standardsed, the new varable Z has a mean 0 and varance 1. When ths standardsed

More information

How To Understand The Results Of The German Meris Cloud And Water Vapour Product

How To Understand The Results Of The German Meris Cloud And Water Vapour Product Ttel: Project: Doc. No.: MERIS level 3 cloud and water vapour products MAPP MAPP-ATBD-ClWVL3 Issue: 1 Revson: 0 Date: 9.12.1998 Functon Name Organsaton Sgnature Date Author: Bennartz FUB Preusker FUB Schüller

More information

IMPACT ANALYSIS OF A CELLULAR PHONE

IMPACT ANALYSIS OF A CELLULAR PHONE 4 th ASA & μeta Internatonal Conference IMPACT AALYSIS OF A CELLULAR PHOE We Lu, 2 Hongy L Bejng FEAonlne Engneerng Co.,Ltd. Bejng, Chna ABSTRACT Drop test smulaton plays an mportant role n nvestgatng

More information

Study on Model of Risks Assessment of Standard Operation in Rural Power Network

Study on Model of Risks Assessment of Standard Operation in Rural Power Network Study on Model of Rsks Assessment of Standard Operaton n Rural Power Network Qngj L 1, Tao Yang 2 1 Qngj L, College of Informaton and Electrcal Engneerng, Shenyang Agrculture Unversty, Shenyang 110866,

More information

Lei Liu, Hua Yang Business School, Hunan University, Changsha, Hunan, P.R. China, 410082. Abstract

Lei Liu, Hua Yang Business School, Hunan University, Changsha, Hunan, P.R. China, 410082. Abstract , pp.377-390 http://dx.do.org/10.14257/jsa.2016.10.4.34 Research on the Enterprse Performance Management Informaton System Development and Robustness Optmzaton based on Data Regresson Analyss and Mathematcal

More information

Data Broadcast on a Multi-System Heterogeneous Overlayed Wireless Network *

Data Broadcast on a Multi-System Heterogeneous Overlayed Wireless Network * JOURNAL OF INFORMATION SCIENCE AND ENGINEERING 24, 819-840 (2008) Data Broadcast on a Mult-System Heterogeneous Overlayed Wreless Network * Department of Computer Scence Natonal Chao Tung Unversty Hsnchu,

More information

Feasibility of Using Discriminate Pricing Schemes for Energy Trading in Smart Grid

Feasibility of Using Discriminate Pricing Schemes for Energy Trading in Smart Grid Feasblty of Usng Dscrmnate Prcng Schemes for Energy Tradng n Smart Grd Wayes Tushar, Chau Yuen, Bo Cha, Davd B. Smth, and H. Vncent Poor Sngapore Unversty of Technology and Desgn, Sngapore 138682. Emal:

More information

HOUSEHOLDS DEBT BURDEN: AN ANALYSIS BASED ON MICROECONOMIC DATA*

HOUSEHOLDS DEBT BURDEN: AN ANALYSIS BASED ON MICROECONOMIC DATA* HOUSEHOLDS DEBT BURDEN: AN ANALYSIS BASED ON MICROECONOMIC DATA* Luísa Farnha** 1. INTRODUCTION The rapd growth n Portuguese households ndebtedness n the past few years ncreased the concerns that debt

More information

ANALYZING THE RELATIONSHIPS BETWEEN QUALITY, TIME, AND COST IN PROJECT MANAGEMENT DECISION MAKING

ANALYZING THE RELATIONSHIPS BETWEEN QUALITY, TIME, AND COST IN PROJECT MANAGEMENT DECISION MAKING ANALYZING THE RELATIONSHIPS BETWEEN QUALITY, TIME, AND COST IN PROJECT MANAGEMENT DECISION MAKING Matthew J. Lberatore, Department of Management and Operatons, Vllanova Unversty, Vllanova, PA 19085, 610-519-4390,

More information

INVESTIGATION OF VEHICULAR USERS FAIRNESS IN CDMA-HDR NETWORKS

INVESTIGATION OF VEHICULAR USERS FAIRNESS IN CDMA-HDR NETWORKS 21 22 September 2007, BULGARIA 119 Proceedngs of the Internatonal Conference on Informaton Technologes (InfoTech-2007) 21 st 22 nd September 2007, Bulgara vol. 2 INVESTIGATION OF VEHICULAR USERS FAIRNESS

More information

Survey on Virtual Machine Placement Techniques in Cloud Computing Environment

Survey on Virtual Machine Placement Techniques in Cloud Computing Environment Survey on Vrtual Machne Placement Technques n Cloud Computng Envronment Rajeev Kumar Gupta and R. K. Paterya Department of Computer Scence & Engneerng, MANIT, Bhopal, Inda ABSTRACT In tradtonal data center

More information

Forecasting and Modelling Electricity Demand Using Anfis Predictor

Forecasting and Modelling Electricity Demand Using Anfis Predictor Journal of Mathematcs and Statstcs 7 (4): 75-8, 0 ISSN 549-3644 0 Scence Publcatons Forecastng and Modellng Electrcty Demand Usng Anfs Predctor M. Mordjaou and B. Boudjema Department of Electrcal Engneerng,

More information

FREQUENCY OF OCCURRENCE OF CERTAIN CHEMICAL CLASSES OF GSR FROM VARIOUS AMMUNITION TYPES

FREQUENCY OF OCCURRENCE OF CERTAIN CHEMICAL CLASSES OF GSR FROM VARIOUS AMMUNITION TYPES FREQUENCY OF OCCURRENCE OF CERTAIN CHEMICAL CLASSES OF GSR FROM VARIOUS AMMUNITION TYPES Zuzanna BRO EK-MUCHA, Grzegorz ZADORA, 2 Insttute of Forensc Research, Cracow, Poland 2 Faculty of Chemstry, Jagellonan

More information

Single and multiple stage classifiers implementing logistic discrimination

Single and multiple stage classifiers implementing logistic discrimination Sngle and multple stage classfers mplementng logstc dscrmnaton Hélo Radke Bttencourt 1 Dens Alter de Olvera Moraes 2 Vctor Haertel 2 1 Pontfíca Unversdade Católca do Ro Grande do Sul - PUCRS Av. Ipranga,

More information

A COLLABORATIVE TRADING MODEL BY SUPPORT VECTOR REGRESSION AND TS FUZZY RULE FOR DAILY STOCK TURNING POINTS DETECTION

A COLLABORATIVE TRADING MODEL BY SUPPORT VECTOR REGRESSION AND TS FUZZY RULE FOR DAILY STOCK TURNING POINTS DETECTION A COLLABORATIVE TRADING MODEL BY SUPPORT VECTOR REGRESSION AND TS FUZZY RULE FOR DAILY STOCK TURNING POINTS DETECTION JHENG-LONG WU, PEI-CHANN CHANG, KAI-TING CHANG Department of Informaton Management,

More information

Preventive Maintenance and Replacement Scheduling: Models and Algorithms

Preventive Maintenance and Replacement Scheduling: Models and Algorithms Preventve Mantenance and Replacement Schedulng: Models and Algorthms By Kamran S. Moghaddam B.S. Unversty of Tehran 200 M.S. Tehran Polytechnc 2003 A Dssertaton Proposal Submtted to the Faculty of the

More information

MATHEMATICAL ENGINEERING TECHNICAL REPORTS. Sequential Optimizing Investing Strategy with Neural Networks

MATHEMATICAL ENGINEERING TECHNICAL REPORTS. Sequential Optimizing Investing Strategy with Neural Networks MATHEMATICAL ENGINEERING TECHNICAL REPORTS Sequental Optmzng Investng Strategy wth Neural Networks Ryo ADACHI and Akmch TAKEMURA METR 2010 03 February 2010 DEPARTMENT OF MATHEMATICAL INFORMATICS GRADUATE

More information

RESEARCH ON DUAL-SHAKER SINE VIBRATION CONTROL. Yaoqi FENG 1, Hanping QIU 1. China Academy of Space Technology (CAST) yaoqi.feng@yahoo.

RESEARCH ON DUAL-SHAKER SINE VIBRATION CONTROL. Yaoqi FENG 1, Hanping QIU 1. China Academy of Space Technology (CAST) yaoqi.feng@yahoo. ICSV4 Carns Australa 9- July, 007 RESEARCH ON DUAL-SHAKER SINE VIBRATION CONTROL Yaoq FENG, Hanpng QIU Dynamc Test Laboratory, BISEE Chna Academy of Space Technology (CAST) yaoq.feng@yahoo.com Abstract

More information

AN APPOINTMENT ORDER OUTPATIENT SCHEDULING SYSTEM THAT IMPROVES OUTPATIENT EXPERIENCE

AN APPOINTMENT ORDER OUTPATIENT SCHEDULING SYSTEM THAT IMPROVES OUTPATIENT EXPERIENCE AN APPOINTMENT ORDER OUTPATIENT SCHEDULING SYSTEM THAT IMPROVES OUTPATIENT EXPERIENCE Yu-L Huang Industral Engneerng Department New Mexco State Unversty Las Cruces, New Mexco 88003, U.S.A. Abstract Patent

More information

Improved SVM in Cloud Computing Information Mining

Improved SVM in Cloud Computing Information Mining Internatonal Journal of Grd Dstrbuton Computng Vol.8, No.1 (015), pp.33-40 http://dx.do.org/10.1457/jgdc.015.8.1.04 Improved n Cloud Computng Informaton Mnng Lvshuhong (ZhengDe polytechnc college JangSu

More information

A Replication-Based and Fault Tolerant Allocation Algorithm for Cloud Computing

A Replication-Based and Fault Tolerant Allocation Algorithm for Cloud Computing A Replcaton-Based and Fault Tolerant Allocaton Algorthm for Cloud Computng Tork Altameem Dept of Computer Scence, RCC, Kng Saud Unversty, PO Box: 28095 11437 Ryadh-Saud Araba Abstract The very large nfrastructure

More information

APPLICATION OF PROBE DATA COLLECTED VIA INFRARED BEACONS TO TRAFFIC MANEGEMENT

APPLICATION OF PROBE DATA COLLECTED VIA INFRARED BEACONS TO TRAFFIC MANEGEMENT APPLICATION OF PROBE DATA COLLECTED VIA INFRARED BEACONS TO TRAFFIC MANEGEMENT Toshhko Oda (1), Kochro Iwaoka (2) (1), (2) Infrastructure Systems Busness Unt, Panasonc System Networks Co., Ltd. Saedo-cho

More information

Improved Mining of Software Complexity Data on Evolutionary Filtered Training Sets

Improved Mining of Software Complexity Data on Evolutionary Filtered Training Sets Improved Mnng of Software Complexty Data on Evolutonary Fltered Tranng Sets VILI PODGORELEC Insttute of Informatcs, FERI Unversty of Marbor Smetanova ulca 17, SI-2000 Marbor SLOVENIA vl.podgorelec@un-mb.s

More information

Risk-based Fatigue Estimate of Deep Water Risers -- Course Project for EM388F: Fracture Mechanics, Spring 2008

Risk-based Fatigue Estimate of Deep Water Risers -- Course Project for EM388F: Fracture Mechanics, Spring 2008 Rsk-based Fatgue Estmate of Deep Water Rsers -- Course Project for EM388F: Fracture Mechancs, Sprng 2008 Chen Sh Department of Cvl, Archtectural, and Envronmental Engneerng The Unversty of Texas at Austn

More information

Overview of monitoring and evaluation

Overview of monitoring and evaluation 540 Toolkt to Combat Traffckng n Persons Tool 10.1 Overvew of montorng and evaluaton Overvew Ths tool brefly descrbes both montorng and evaluaton, and the dstncton between the two. What s montorng? Montorng

More information

Frequency Selective IQ Phase and IQ Amplitude Imbalance Adjustments for OFDM Direct Conversion Transmitters

Frequency Selective IQ Phase and IQ Amplitude Imbalance Adjustments for OFDM Direct Conversion Transmitters Frequency Selectve IQ Phase and IQ Ampltude Imbalance Adjustments for OFDM Drect Converson ransmtters Edmund Coersmeer, Ernst Zelnsk Noka, Meesmannstrasse 103, 44807 Bochum, Germany edmund.coersmeer@noka.com,

More information

IWFMS: An Internal Workflow Management System/Optimizer for Hadoop

IWFMS: An Internal Workflow Management System/Optimizer for Hadoop IWFMS: An Internal Workflow Management System/Optmzer for Hadoop Lan Lu, Yao Shen Department of Computer Scence and Engneerng Shangha JaoTong Unversty Shangha, Chna lustrve@gmal.com, yshen@cs.sjtu.edu.cn

More information

Methodology to Determine Relationships between Performance Factors in Hadoop Cloud Computing Applications

Methodology to Determine Relationships between Performance Factors in Hadoop Cloud Computing Applications Methodology to Determne Relatonshps between Performance Factors n Hadoop Cloud Computng Applcatons Lus Eduardo Bautsta Vllalpando 1,2, Alan Aprl 1 and Alan Abran 1 1 Department of Software Engneerng and

More information

Bayesian Network Based Causal Relationship Identification and Funding Success Prediction in P2P Lending

Bayesian Network Based Causal Relationship Identification and Funding Success Prediction in P2P Lending Proceedngs of 2012 4th Internatonal Conference on Machne Learnng and Computng IPCSIT vol. 25 (2012) (2012) IACSIT Press, Sngapore Bayesan Network Based Causal Relatonshp Identfcaton and Fundng Success

More information

How To Calculate The Accountng Perod Of Nequalty

How To Calculate The Accountng Perod Of Nequalty Inequalty and The Accountng Perod Quentn Wodon and Shlomo Ytzha World Ban and Hebrew Unversty September Abstract Income nequalty typcally declnes wth the length of tme taen nto account for measurement.

More information

J. Parallel Distrib. Comput.

J. Parallel Distrib. Comput. J. Parallel Dstrb. Comput. 71 (2011) 62 76 Contents lsts avalable at ScenceDrect J. Parallel Dstrb. Comput. journal homepage: www.elsever.com/locate/jpdc Optmzng server placement n dstrbuted systems n

More information

iavenue iavenue i i i iavenue iavenue iavenue

iavenue iavenue i i i iavenue iavenue iavenue Saratoga Systems' enterprse-wde Avenue CRM system s a comprehensve web-enabled software soluton. Ths next generaton system enables you to effectvely manage and enhance your customer relatonshps n both

More information

The Journal of Systems and Software

The Journal of Systems and Software The Journal of Systems and Software 82 (2009) 241 252 Contents lsts avalable at ScenceDrect The Journal of Systems and Software journal homepage: www. elsever. com/ locate/ jss A study of project selecton

More information

Efficient Project Portfolio as a tool for Enterprise Risk Management

Efficient Project Portfolio as a tool for Enterprise Risk Management Effcent Proect Portfolo as a tool for Enterprse Rsk Management Valentn O. Nkonov Ural State Techncal Unversty Growth Traectory Consultng Company January 5, 27 Effcent Proect Portfolo as a tool for Enterprse

More information

Sciences Shenyang, Shenyang, China.

Sciences Shenyang, Shenyang, China. Advanced Materals Research Vols. 314-316 (2011) pp 1315-1320 (2011) Trans Tech Publcatons, Swtzerland do:10.4028/www.scentfc.net/amr.314-316.1315 Solvng the Two-Obectve Shop Schedulng Problem n MTO Manufacturng

More information

Cloud-based Social Application Deployment using Local Processing and Global Distribution

Cloud-based Social Application Deployment using Local Processing and Global Distribution Cloud-based Socal Applcaton Deployment usng Local Processng and Global Dstrbuton Zh Wang *, Baochun L, Lfeng Sun *, and Shqang Yang * * Bejng Key Laboratory of Networked Multmeda Department of Computer

More information

DEFINING %COMPLETE IN MICROSOFT PROJECT

DEFINING %COMPLETE IN MICROSOFT PROJECT CelersSystems DEFINING %COMPLETE IN MICROSOFT PROJECT PREPARED BY James E Aksel, PMP, PMI-SP, MVP For Addtonal Informaton about Earned Value Management Systems and reportng, please contact: CelersSystems,

More information

Mining Multiple Large Data Sources

Mining Multiple Large Data Sources The Internatonal Arab Journal of Informaton Technology, Vol. 7, No. 3, July 2 24 Mnng Multple Large Data Sources Anmesh Adhkar, Pralhad Ramachandrarao 2, Bhanu Prasad 3, and Jhml Adhkar 4 Department of

More information

The Application of Fractional Brownian Motion in Option Pricing

The Application of Fractional Brownian Motion in Option Pricing Vol. 0, No. (05), pp. 73-8 http://dx.do.org/0.457/jmue.05.0..6 The Applcaton of Fractonal Brownan Moton n Opton Prcng Qng-xn Zhou School of Basc Scence,arbn Unversty of Commerce,arbn zhouqngxn98@6.com

More information

Logistic Regression. Lecture 4: More classifiers and classes. Logistic regression. Adaboost. Optimization. Multiple class classification

Logistic Regression. Lecture 4: More classifiers and classes. Logistic regression. Adaboost. Optimization. Multiple class classification Lecture 4: More classfers and classes C4B Machne Learnng Hlary 20 A. Zsserman Logstc regresson Loss functons revsted Adaboost Loss functons revsted Optmzaton Multple class classfcaton Logstc Regresson

More information

Application of Multi-Agents for Fault Detection and Reconfiguration of Power Distribution Systems

Application of Multi-Agents for Fault Detection and Reconfiguration of Power Distribution Systems 1 Applcaton of Mult-Agents for Fault Detecton and Reconfguraton of Power Dstrbuton Systems K. Nareshkumar, Member, IEEE, M. A. Choudhry, Senor Member, IEEE, J. La, A. Felach, Senor Member, IEEE Abstract--The

More information

Luby s Alg. for Maximal Independent Sets using Pairwise Independence

Luby s Alg. for Maximal Independent Sets using Pairwise Independence Lecture Notes for Randomzed Algorthms Luby s Alg. for Maxmal Independent Sets usng Parwse Independence Last Updated by Erc Vgoda on February, 006 8. Maxmal Independent Sets For a graph G = (V, E), an ndependent

More information

The Current Employment Statistics (CES) survey,

The Current Employment Statistics (CES) survey, Busness Brths and Deaths Impact of busness brths and deaths n the payroll survey The CES probablty-based sample redesgn accounts for most busness brth employment through the mputaton of busness deaths,

More information

Machine Learning and Software Quality Prediction: As an Expert System

Machine Learning and Software Quality Prediction: As an Expert System I.J. Informaton Engneerng and Electronc Busness, 2014, 2, 9-27 Publshed Onlne Aprl 2014 n MECS (http://www.mecs-press.org/) DOI: 10.5815/jeeb.2014.02.02 Machne Learnng and Software Qualty Predcton: As

More information

SCHEDULING OF CONSTRUCTION PROJECTS BY MEANS OF EVOLUTIONARY ALGORITHMS

SCHEDULING OF CONSTRUCTION PROJECTS BY MEANS OF EVOLUTIONARY ALGORITHMS SCHEDULING OF CONSTRUCTION PROJECTS BY MEANS OF EVOLUTIONARY ALGORITHMS Magdalena Rogalska 1, Wocech Bożeko 2,Zdzsław Heduck 3, 1 Lubln Unversty of Technology, 2- Lubln, Nadbystrzycka 4., Poland. E-mal:rogalska@akropols.pol.lubln.pl

More information

Ants Can Schedule Software Projects

Ants Can Schedule Software Projects Ants Can Schedule Software Proects Broderck Crawford 1,2, Rcardo Soto 1,3, Frankln Johnson 4, and Erc Monfroy 5 1 Pontfca Unversdad Católca de Valparaíso, Chle FrstName.Name@ucv.cl 2 Unversdad Fns Terrae,

More information

8.5 UNITARY AND HERMITIAN MATRICES. The conjugate transpose of a complex matrix A, denoted by A*, is given by

8.5 UNITARY AND HERMITIAN MATRICES. The conjugate transpose of a complex matrix A, denoted by A*, is given by 6 CHAPTER 8 COMPLEX VECTOR SPACES 5. Fnd the kernel of the lnear transformaton gven n Exercse 5. In Exercses 55 and 56, fnd the mage of v, for the ndcated composton, where and are gven by the followng

More information

Number of Levels Cumulative Annual operating Income per year construction costs costs ($) ($) ($) 1 600,000 35,000 100,000 2 2,200,000 60,000 350,000

Number of Levels Cumulative Annual operating Income per year construction costs costs ($) ($) ($) 1 600,000 35,000 100,000 2 2,200,000 60,000 350,000 Problem Set 5 Solutons 1 MIT s consderng buldng a new car park near Kendall Square. o unversty funds are avalable (overhead rates are under pressure and the new faclty would have to pay for tself from

More information

RequIn, a tool for fast web traffic inference

RequIn, a tool for fast web traffic inference RequIn, a tool for fast web traffc nference Olver aul, Jean Etenne Kba GET/INT, LOR Department 9 rue Charles Fourer 90 Evry, France Olver.aul@nt-evry.fr, Jean-Etenne.Kba@nt-evry.fr Abstract As networked

More information