Columbus DPU Asset Management Program Business Case Evaluations Kevin V. Campanella, P.E. - Columbus Department of Public Utilities

Size: px
Start display at page:

Download "Columbus DPU Asset Management Program Business Case Evaluations Kevin V. Campanella, P.E. - Columbus Department of Public Utilities"

Transcription

1 Columbus DPU Asset Management Program Business Case Evaluations Kevin V. Campanella, P.E. - Columbus Department of Public Utilities Link to the on-line presentation:

2 Columbus DPU Public utility; Comprised of two divisions Sewerage and Drainage Power and Water Serve over 1 million customers with sewer / water Three WTPs, 240 MGD total capacity (900 ML/day) 3,700 miles (6,000 km) of water mains Two WWTPs, 480 MGD total capacity (1800 ML/day) 6,000 miles (9,500 km) of sewers and drains 57 booster / pump stations (W / WW) $530M Annual Operating Budget; $250M Annual Capital Impr. Budget

3 DPU s Asset Management Journey

4 The Aquamark Framework is designed to examine whole of business process capability and execution which underpin AM outcomes. The asset management aspects of the utility are subdivided into seven functions:

5 Functions divided into Processes, Sub-processes and Measures

6 Scoring approach

7 Business Case Evaluations (BCE) Project benefits must outweigh the costs: Level of Service Improvement Life-cycle Cost-reduction Risk Reduction

8 The Problem Capital decisions of the past: Conservative in nature Used multi-criteria analysis (no monetization ) for social, environmental, and even some financial factors Risk was not quantified and monetized Inconsistent application of life-cycle costing

9 Aquamark Scoring Approach

10 Extensive Process Development and Documentation

11 BCE Guidelines Manual

12 BCE Threshold Levels Graphic 5 KVC to clean up High Mid Low None Risk $ Range* > $500k $200k-$500k $50k-$200k <$50k Capital $ Range ~ Water > $5M $2M-$5M $1M-$2M < $1M ~ Sewer > $5M $2M-$5M $1M-$2M < $1M ~ Power > $1M $250k-$1M $75k-$250k < $75K ~ Storm > $3M $1.5M-$3M $500k-$1.5M < $500K Review Teams Director Administrators Administrators Assistant Administrators Directors Staff Assistant Administrators Section Managers N/A

13 BCE Process Diagram

14 Swim Lane Diagram

15 On-line Training

16 Live Staff and Consultant Training

17 TBL Cost Catalog

18 Complete Coverage and Frequency

19 Business Cases Required by Policy

20 Extraordinary Effectiveness and Results

21 The Business Case for BCE s

22 DOPW-Water Northwest Distribution System Transmission Improvements BCE

23 Problem Statement Configuration of the Columbus and Dublin water distribution systems presents a risk of not being able to provide an uninterrupted supply of safe drinking water and fire protection to customers in the northwest portion of the DOPW service area under numerous non-emergency (e.g. maximum day demand) and emergency (e.g. booster station failure) situations. Approximately 15,000 customer accounts are served in this area with a 2010 population of approximately 65,000 people (U.S. Census data). The area is primarily residential with a mix of retail and commercial uses. Dublin Methodist Hospital and numerous medical office facilities are within this area. The purpose of this BCE is to evaluate the risk posed to our customers and stakeholders and determine if there is a way to mitigate some or all the risk that provides our customers value for their money.

24 Background DOPW Service Area 2010 vs census shows significant growth Last transmission capacity increases across Scioto River to NW in 1981

25 Background Transmission System Blazer Tank is the canary in the coal mine

26 Emergency Storage (Pumping disruptions, fire fighting, etc. Equalization Storage (Normal Consumption) Problem NW System Shortage Blazer Tank Water Levels, June-August, Summer Emergency Storage Level Used emergency storage for nonemergency use 83% of time Daily Minimum

27 Problem NW System Shortage (cont.) Concerns during non-emergency (all assets operating) Not meeting demand on max days Low pressures in southern Post-North district Henderson Tanks not turning over Cleveland and Henderson Stations over-utilized

28 Problem NW System Shortage (cont.) Concerns during emergencies (unexpected demands or disruptions) Inability to fight fires Transmission main failures under Scioto River: Insufficient redundancy to avoid customer outages. Two week duration to repair during emergency. Shutdown of Henderson Booster Station Insufficient redundancy to avoid customer outages. Station in poor condition/at end of useful life Elevated likelihood of extended duration disruption days if switchgear or transformer fails catastrophically

29 Problem NW System Shortage (cont.) Concerns during emergencies (unexpected demands or disruptions) continued Loss of supply to the Fisher District No redundancy for Fisher Booster Station Transmission mains could shut down station for 48 hours 25,000 customers impacted

30 Alternatives - Griggs Originally proposed in 1999 New booster station and 10 miles of transmission main

31 Alternatives - Griggs Provides water to the NW service area Provides adequate emergency storage Adds redundancy to the river crossings Reduces reliance on Henderson and Cleveland Booster Stations Improves turnover at Henderson Tanks Additionally, provides redundant feed to the Fisher District Henderson Booster Station would be refurbished

32 Alternatives Griggs (cont.) Mid 2000 s Land was purchased and design was nearly completed Estimated to cost between $24-$26 million to construct. Project had conflicts with DOSD biofilter, issues with land acquisition, other uncertainties DOPW reevaluated to explore other options

33 Alternatives Bethel-Full Modify Bethel Booster Station and construct 5 miles of transmission mains. Abandon Henderson Booster Station

34 Alternatives Bethel-Full Bethel-Full alternative proposed in 2009 Utilizes capacity of the current Bethel Station Reconfigured to pump from either DRWP or HCWP Henderson Booster Station is at the end of its useful life Allows Henderson to be de-commissioned instead of refurbished

35 Alternatives Bethel-Full Provides water to the NW service area Provides adequate emergency storage Improves turnover at Henderson Tanks Adds redundancy to the river crossings Reduces reliance on Cleveland Booster Station Much lower capital cost than Griggs alternative Estimated at $17.1 million to construct

36 Alternatives Bethel-Full (cont.) Bethel-Full increases the criticality of the Bethel Booster Station and reduces redundancy to NW service area. Does not address lack of redundancy to Fisher District

37 Alternatives Bethel-Full (cont.) Studied extensively for 2009 Water Distribution System Master Plan functionality confirmed DOPW was ready to proceed with RFP, and then BCE process was introduced Early estimates of risk cost suggested that B/C ratio for Bethel-Full option would be less than one.

38 Pre-BCE Prior to development of the BCE process it was difficult to determine which risks were significant Projects were focused on consequence avoidance Risks were identified then lowest cost alternative to eliminate risks were explored Does the risk reduction justify the use of customers money? Risk Breakdown Status Quo Alt. 1 Alt. 2 Peak demand N Y Y Water quality N Y Y Adequate pressure N Y Y Fire fighting N Y Y River crossing redundancy N Y Y Fisher B.S. redundancy N Y N Henderson or Bethel Booster redundancy Y Y Y Henderson transmission redundancy N Y Y Financial Cost $26M $18M

39 BCE Framework BCE use of risk = likelihood x consequence and monetized triple bottom line provides structure to estimate value of proposed risk reduction. Projects now focused on Risk Management We can now show whether or not project provides customers value for their money!

40 Monetized Social Risk $4,500,000 $4,000,000 $25,000,000 $3,500,000 $20,000,000 $3,000,000 $15,000,000 $2,500,000 $10,000,000 $5,000,000 $2,000,000 $1,500,000 $0 Status Quo Griggs Bethel - Full Net costs Benefits $1,000,000 $500,000 $0 Status Quo Griggs Bethel - Full Henderson or Bethel B.S. redundancy Peak demand Fisher B.S. redundancy Adequate pressure Henderson transmission redundancy Water quality River crossing redundancy Fire fighting Determined that costs exceeded benefits for both alternatives

41 Search for Solutions that Provide $4,500,000 Value Henderson or Bethel B.S. redundancy Net costs Benefits Residual Risk $4,000,000 $3,500,000 $3,000,000 $2,500,000 $2,000,000 $1,500,000 $1,000,000 $500,000 $0 Peak demand Fisher B.S. redundancy Adequate pressure Henderson transmission redundancy Water quality River crossing redundancy Fire fighting

42 Alternatives Bethel-Partial Looked at how to reduce cost of Bethel-Full Almost all of the cost was in transmission mains Provides new capacity and redundancy across Scioto River

43 Alternatives Bethel-Partial Provides water to the NW service area Provides adequate emergency storage Adds redundancy to the river crossings Reduces reliance on Cleveland Booster Station Much lower capital cost than Griggs and Bethel- Full alternatives Estimated at $9.2 million

44 Alternatives Bethel-Partial Requires new pump at Henderson Tanks to improve turnover Required additional hydraulic modeling to verify effectiveness of filling Blazer Tank Requires refurbishment of Henderson Booster Station

45 Alternatives Operational Changes Modeling effort suggests that transmission improvements are not necessary. Utilization of Bethel Booster Station with current transmission mains can increase supply to the northwest Requires additional supply from DRWP Modifications to Bethel Booster Station would improve efficiency/effectiveness of Bethel Estimated costs are $3.4 million

46 Alternatives Operational Changes Henderson Booster Station must be refurbished Criticality of Henderson Booster Station extremely high during peak demands Requires new pump at Henderson Tanks to improve turnover May create turnover issues at Smoky Row Tanks Installation of two 24 diameter isolation valves on supply side of Smoky Row Tanks would address issue Increased discharge pressures from Bethel Booster Station may increase breaks/leaks in portions of Cleveland and Henderson Pressure Districts

47 Alternatives Operational Changes

48 Triple Bottom Line NPV $25,000,000 Financial Factors Residual Risk $20,000,000 $15,000,000 $10,000,000 $5,000,000 $0

49 Recommendations Alternative #4 - Operational Changes 1. Refurbish the Henderson Booster Station. 2. Perform a condition assessment on the 20 river crossing at Henderson Road. 3. Communicate with Dublin regarding the criticality of their 24 river crossing at S.R Evaluate during engineering design costs and benefits of jockey pump at Henderson Tanks 5. Evaluate during engineering design costs and benefits of splitting Bethel Booster Station

50 Recommendations (cont.) 6. Modify operational procedures to utilize Bethel Booster Station more frequently 7. Following other improvements, monitor turnover at Smoky Row Tanks. Install isolation valves if turnover becomes a recurring issue.

51 Thank you! Kevin Campanella Columbus Dept. of Public Utilities Assistant Director - Asset Management Phone: kvcampanella@columbus.gov

Innovative Methods to Assess Sewer Pipe Risk and Improve Replacement Planning Decisions

Innovative Methods to Assess Sewer Pipe Risk and Improve Replacement Planning Decisions Innovative Methods to Assess Sewer Pipe Risk and Improve Replacement Planning Decisions Seth Anderson, GISP Management Consultant Celine Hyer, P.E. Associate Vice President Presentation Topics The Infrastructure

More information

Real-time energy and water quality management system designed for success!

Real-time energy and water quality management system designed for success! Real-time energy and water quality management system designed for success! Texas Water 2012 San Antonio, TX April 13, 2012 Manuel Perez Energy Manager Peter Martin Vice President Brian Skeens Global Technology

More information

Columbus DPU s Asset Management Program Achieves Ground Breaking ROI

Columbus DPU s Asset Management Program Achieves Ground Breaking ROI Columbus DPU s Asset Management Program Achieves Ground Breaking ROI Kevin V. Campanella, P.E., Assistant Director - Asset Management Columbus Department of Public Utilities 910 Dublin Road, Columbus,

More information

2007 Operating Budget 2007-2016 Capital Budget 2007 Proposed Water and Wastewater Service Rate

2007 Operating Budget 2007-2016 Capital Budget 2007 Proposed Water and Wastewater Service Rate 2007 Operating Budget 2007-2016 Capital Budget 2007 Proposed Water and Wastewater Service Rate Toronto City Council February 1 5, 2007 Multi-Year Toronto Water Business Plan was approved by Council February

More information

Drinking Water Sector - Damage Assessment Report

Drinking Water Sector - Damage Assessment Report Drinking Water Sector - Damage Assessment Report The Division s Drinking Water Sector Damage Assessment Report (available on-line at the Division s Website http://www.state.nj.us/dep/watersupply ) and

More information

Fundamentals of Asset Management. Step 8. Optimize Capital Investment A Hands-On Approach

Fundamentals of Asset Management. Step 8. Optimize Capital Investment A Hands-On Approach Fundamentals of Asset Management Step 8. Optimize Capital Investment A Hands-On Approach Tom s bad day Fundamentals of Asset Management 2 Fourth of 5 core questions 4. What are my best O&M and CIP investment

More information

Design Criteria & Service Goals

Design Criteria & Service Goals 4.1 Design Life of Improvements The design life of a water system component is sometimes referred to as its useful life or service life. The selection of a design life is a matter of judgment based on

More information

DeSoto County is not a water service provider and does not operate any

DeSoto County is not a water service provider and does not operate any Water and Sewer DeSoto County is not a water service provider and does not operate any water delivery systems. There are 14 certificated, non-municipal water associations operating in the county that are

More information

Terry Biederman, PE- Director of Public Works Greg Gucwa, PE- Principal Johnson and Anderson Engineering

Terry Biederman, PE- Director of Public Works Greg Gucwa, PE- Principal Johnson and Anderson Engineering DON T JUST REHAB IT, RENEW IT! WATERFORD TOWNSHIP, MICHIGAN IMPROVEMENTS TO A 3.0 MGD SEWAGE PUMPING STATION Terry Biederman, PE- Director of Public Works Greg Gucwa, PE- Principal Johnson and Anderson

More information

Asset Management Answering the 5 Core Questions

Asset Management Answering the 5 Core Questions Asset Management Answering the 5 Core Questions by Timothy Taber, PE Barton & Loguidice Page 1 Drivers Asset Management Case Study 1. What is the current state of my assets? 2. What is my required sustainable

More information

Based on the above, it is recommended that Lift Stations #1 and #3 be abandoned and their flows be diverted to the regional Lift Station #8.

Based on the above, it is recommended that Lift Stations #1 and #3 be abandoned and their flows be diverted to the regional Lift Station #8. Lakeside; Clairmont Heights; Portion of Clairmont currently serviced to Pump Station #2; Crossroads North and Crossroads South portion of flows that are diverted to Lakeside Trunk. It is understood that

More information

White Paper. www.geodecisions.com

White Paper. www.geodecisions.com White Paper www.geodecisions.com A Geo Spatial Total Asset Management System (TAMS) To Improve Asset Management Decision Making Fall 2013 Abstract This paper describes a Geospatial Total Asset Management

More information

Leveraging Resources for Financing, Implementing, and Sustaining Climate Change Adaptation and Resiliency

Leveraging Resources for Financing, Implementing, and Sustaining Climate Change Adaptation and Resiliency Leveraging Resources for Financing, Implementing, and Sustaining Climate Change Adaptation and Resiliency August 20, 2014 California Adaptation Forum Karen Kubick, PE Sewer System Improvement Program Director

More information

Aligning Asset Management Strategy with Service Level Objectives

Aligning Asset Management Strategy with Service Level Objectives Aligning Asset Management Strategy with Service Level Objectives The successful outcome of an asset management program is the achievement of targeted service levels at the least cost and risk to the utility.

More information

High-Rate Retention Treatment Facility for CSO Control in Windsor Riverfront East

High-Rate Retention Treatment Facility for CSO Control in Windsor Riverfront East High-Rate Retention Treatment Facility for CSO Control in Windsor Riverfront East Jian Li, Ph.D., P.Eng., PE Senior Environmental Engineer Stantec Consulting Ltd. Water & Wastewater Treatment BMP Forum

More information

Inexpensive Leak Detection for Small Waterworks. Virginia Department of Heath Office of Drinking Water Catalog Number: HTO/005/2015

Inexpensive Leak Detection for Small Waterworks. Virginia Department of Heath Office of Drinking Water Catalog Number: HTO/005/2015 Inexpensive Leak Detection for Small Waterworks Virginia Department of Heath Office of Drinking Water Catalog Number: HTO/005/2015 Page 2 Virginia Department of Heath Office of Drinking Water Page 9 The

More information

Emerging Technologies in Wastewater Collection Systems

Emerging Technologies in Wastewater Collection Systems Keville Enterprises Emerging Technologies in Wastewater Collection Systems Douglas McCutchen, CCM Brian Karmasin, P.E., BCEE CMAA Annual Conference Oct 2008 San Francisco, California Today s s Presentation

More information

Triple Bottom Line (TBL) Analysis Favors Green Infrastructure Over Offline Storages to Mitigate the Upper Olentangy CSOs

Triple Bottom Line (TBL) Analysis Favors Green Infrastructure Over Offline Storages to Mitigate the Upper Olentangy CSOs Triple Bottom Line (TBL) Analysis Favors Green Infrastructure Over Offline Storages to Mitigate the Upper Olentangy CSOs Hunter Kelly, PE, Columbus DPU Kwasi Amoah, PE, Dynotec, Inc. Hazem Gheith, PhD,

More information

Ontario s s Water and Wastewater Energy Management Best Practices

Ontario s s Water and Wastewater Energy Management Best Practices Ontario s s Water and Wastewater Energy Management Best Practices Erin Cain February 27 th, 2007 AWWA/WEF Joint Management Conference February 25-28, 2007 Introduction What can I take back and apply? Energy

More information

WATER SUPPLY CONTINGENCY PLAN CITY OF LAKE WOBEGON, MINNESOTA

WATER SUPPLY CONTINGENCY PLAN CITY OF LAKE WOBEGON, MINNESOTA WATER SUPPLY CONTINGENCY PLAN CITY OF LAKE WOBEGON, MINNESOTA INDEX A. PURPOSE B. PUBLIC WATER SUPPLY CHARACTERISTICS 1. Current Supply Source 2. Treatment 3. Storage and Distribution 4. Maps and Plans

More information

WATER MEASUREMENT USING TWO INCH (50 mm) DRAIN TESTS

WATER MEASUREMENT USING TWO INCH (50 mm) DRAIN TESTS GAP.14.1.2.2 A Publication of Global Asset Protection Services LLC WATER MEASUREMENT USING TWO INCH (50 mm) DRAIN TESTS INTRODUCTION A hydrant or other large-volume flow test is necessary for proper water

More information

MAP KEYS GLOSSARY FOR THE DRAINAGE AND WATER REPORT

MAP KEYS GLOSSARY FOR THE DRAINAGE AND WATER REPORT Record MAP KEYS GLOSSARY FOR THE DRAINAGE AND WATER REPORT Abandoned Gravity Private Combined Gravity Private Foul Gravity Private Surface Water Gravity Public Combined Gravity Public Foul Gravity Public

More information

The City of Atlanta: Investing in a Useable Water Utility GIS

The City of Atlanta: Investing in a Useable Water Utility GIS The City of Atlanta: Investing in a Useable Water Utility GIS Esri UC 2013 Session Title: GIS Implementation July 10, 2013 Rasheed Ahmed, PH.D, P.E. Senior Watershed Manager, Atlanta DWM Dax Flinn, GISP,

More information

Affordable Asset Management Workshop Making Use of the Data You Have An Owners Perspective

Affordable Asset Management Workshop Making Use of the Data You Have An Owners Perspective Affordable Asset Management Workshop Making Use of the Data You Have An Owners Perspective Building the Foundation for an Effective Asset Management Program Scott D. Kelly, P.E. Assistant City Administrator

More information

Asset Management Overview. Water & Wastewater Utility Operation and Management for Tribes

Asset Management Overview. Water & Wastewater Utility Operation and Management for Tribes Asset Management Overview Water & Wastewater Utility Operation and Management for Tribes Asset Management Overview What is an Asset? What is Asset Management? What are the Benefits of Implementing Asset

More information

Water supply in tall buildings: roof tanks vs. pressurised systems

Water supply in tall buildings: roof tanks vs. pressurised systems Water supply in tall buildings: roof tanks vs. pressurised s Introduction The use of roof tanks to ensure adequate water pressure in buildings, and especially tall buildings, is very common. The alternative

More information

Triple-Bottom-Line Analysis Screening of Final Alternatives

Triple-Bottom-Line Analysis Screening of Final Alternatives Appendix H Triple-Bottom-Line Analysis Screening of Final Alternatives TM 970, CSO Control Alternatives Development (October 2011) This page left blank intentionally. Appendix H.1 Triple-Bottom-Line Analysis

More information

TOWN OF SAUGEEN SHORES WATER AND SANITARY SEWER SERVICING MASTER PLAN 2014 REPORT

TOWN OF SAUGEEN SHORES WATER AND SANITARY SEWER SERVICING MASTER PLAN 2014 REPORT TOWN OF SAUGEEN SHORES WATER AND SANITARY SEWER SERVICING MASTER PLAN 2014 REPORT TOWN OF SAUGEEN SHORES WATER AND SANITARY SEWER SERVICING MASTER PLAN 2014 REPORT April 1, 2015 B. M. ROSS AND ASSOCIATES

More information

Effective Operations Performance Management

Effective Operations Performance Management Passion for Improving Performance Effective Operations Performance Management Presented by: Doug Spiers P.E., Esq. Vice President 11/17/10 Strategic Framework for Success Total Quality Management or TQM

More information

Columbus State Community College MASTER PLANNING

Columbus State Community College MASTER PLANNING Columbus State Community College MASTER PLANNING Current State Facilities and Utilities Assessment November 2011 Columbus State Community College MASTER PLANNING EXISTING UTILITIES AND FACILITIES ASSESSMENT

More information

Water Utility Financial Plan and Rates Study

Water Utility Financial Plan and Rates Study FINAL March 2015 Prepared for City of Fresno, California Water Utility Financial Plan and Rates Study Submitted by F I N A L Water Utility Financial Plan and Rates Study Prepared for City of Fresno, California

More information

Components of a Basement Flooding Protection Plan: Sewer System Improvements. November 2000

Components of a Basement Flooding Protection Plan: Sewer System Improvements. November 2000 Components of a Basement Flooding Protection Plan: Sewer System Improvements November 2000 Components of a Basement Flooding Protection Plan: Sewer System Improvements November 2000 SEMCOG 2000 Prepared

More information

EMERGENCY RESPONSE PLAN FOR AZU SMALL WATERWORKS SYSTEM

EMERGENCY RESPONSE PLAN FOR AZU SMALL WATERWORKS SYSTEM EMERGENCY RESPONSE PLAN FOR AZU SMALL WATERWORKS SYSTEM EMERGENCY RESPONSE PLAN FOR AZU SMALL WATERWORKS SYSTEM INTRODUCTION The Drinking Water Protection Act requires a water supplier to monitor and protect

More information

STEAMBOAT LAKE WATER AND SANITATION DISTRICT PETITION FOR AMENDMENT TO SERVICE PLAN TABLE OF CONTENTS. SECTION DESCRIPTION Page

STEAMBOAT LAKE WATER AND SANITATION DISTRICT PETITION FOR AMENDMENT TO SERVICE PLAN TABLE OF CONTENTS. SECTION DESCRIPTION Page STEAMBOAT LAKE WATER AND SANITATION DISTRICT PETITION FOR AMENDMENT TO SERVICE PLAN TABLE OF CONTENTS SECTION DESCRIPTION Page 1 Executive Summary / Brief History 2 2 Services Provided / Administration

More information

Development enquiry request

Development enquiry request Development enquiry request Water supply and/or drainage capacity assessment for a proposed development NOTE: Please ensure all relevant sections of the application are completed and refer to the attached

More information

Policy 10.105: Enterprise Risk Management Policy

Policy 10.105: Enterprise Risk Management Policy Name: Responsibility: Complements: Enterprise Risk Management Framework Coordinator, Enterprise Risk Management Policy 10.105: Enterprise Risk Management Policy Date: November 2006 Revision Date(s): January

More information

Addressing Declining Elevations in Lake Mead

Addressing Declining Elevations in Lake Mead Integrated Resource Planning Advisory Committee July 23, 2014 Addressing Declining Elevations in Lake Mead 1 Meeting Topics Drought update Attribute finalization Interbasin Cooperation Intake Pumping Station

More information

Risk Mitigation Applied to Decision Making. Steve Wenke 2012 Northwest Hydro Operators Forum September 26,2012

Risk Mitigation Applied to Decision Making. Steve Wenke 2012 Northwest Hydro Operators Forum September 26,2012 Risk Mitigation Applied to Decision Making Steve Wenke 2012 Northwest Hydro Operators Forum September 26,2012 Risk Based Decision Making Briefly Discuss a change in our Capital Allocation Process Briefly

More information

REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL

REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE Functional Servicing and Storm Water Management Report PUBLIC WORKS TABLE OF CONTENTS 1. INTRODUCTION...1 2.

More information

89 Avenue Road GP Ltd. Functional Servicing and Stormwater Management Report for 89 Avenue Road Re-Development City of Toronto

89 Avenue Road GP Ltd. Functional Servicing and Stormwater Management Report for 89 Avenue Road Re-Development City of Toronto 89 Avenue Road GP Ltd. Functional Servicing and Stormwater Management Report for 89 Avenue Road Re-Development City of Toronto Prepared By: R.J. Burnside & Associates Limited 6990 Creditview Road, Unit

More information

Emergency/Disaster Response Plan

Emergency/Disaster Response Plan This EXAMPLE is for a small water system and represents the minimum information required. The information required for your plan will be based on the complexity of your water system. Emergency/Disaster

More information

Water Shortage Contingency Plan

Water Shortage Contingency Plan Section 10632 of the California Water Code states that the Urban Water Management Plan shall provide an urban water shortage contingency analysis that includes information on the estimated three-year minimum

More information

LOWER WEST PEACE SUBDIVISION GROUNDWATER MITIGATION

LOWER WEST PEACE SUBDIVISION GROUNDWATER MITIGATION LOWER WEST PEACE SUBDIVISION GROUNDWATER MITIGATION Nick VanderKwaak Bob Gammer 28 October 2013 1 Groundwater Seepage Since 2008 BC Hydro has worked with the Town and residents to mitigate basement seepage

More information

SOCALGAS APROACH TO PIPELINE INTEGRITY

SOCALGAS APROACH TO PIPELINE INTEGRITY SUMMER 2011 SOCALGAS APROACH TO PIPELINE INTEGRITY Southern California Gas Company (SoCalGas ) is committed to providing clean, safe and reliable natural gas to its customers and takes important steps

More information

Climate Change and Infrastructure Planning Ahead

Climate Change and Infrastructure Planning Ahead Climate Change and Infrastructure Planning Ahead Climate Change and Infrastructure Planning Ahead Infrastructure the physical facilities that support our society, such as buildings, roads, railways, ports

More information

Repaired 24 Mainline Leaks

Repaired 24 Mainline Leaks Agenda 1. Improvements & Repairs within the last year 2. Capital Improvement Project Update 3. Status of Water Supply & the Drought 4. Website Updates 5. Questions? 1 Repaired 24 Mainline Leaks Majority

More information

Green Spaces to Improve Waterways and Communities

Green Spaces to Improve Waterways and Communities Green Spaces to Improve Waterways and Communities Thomas M. Evans, ASLA LEED AP Green Infrastructure Design Services Director Cleveland, Ohio Northern Michigan Green Infrastructure Conference June 4, 2015

More information

Sewerage Management System for Reduction of River Pollution

Sewerage Management System for Reduction of River Pollution Sewerage Management System for Reduction of River Pollution Peter Hartwig Germany Content page: 1 Introduction 1 2 Total emissions 3 3 Discharge from the wastewater treatment plants 4 4 Discharge from

More information

* 765 million tons of recoverable reserves as of 1970; W.E. Edmonds, Pennsylvania Geologic Survey

* 765 million tons of recoverable reserves as of 1970; W.E. Edmonds, Pennsylvania Geologic Survey IV. PROPOSED PLAN FOR AMD ABATEMENT GOALS AND OBJECTIVES Although the major natural resource in the Wyoming Valley is anthracite coal*, its importance to the present and future economy of the area is limited

More information

Visual Integration of Compound Events. A presentation to the Climate Compact of Southeast Florida

Visual Integration of Compound Events. A presentation to the Climate Compact of Southeast Florida Visual Integration of Compound Events A presentation to the Climate Compact of Southeast Florida What is the Compact? Agreement between Broward, Miami-Dade, Monroe, and Palm Beach County Commissions (set

More information

Maricopa Association of Governments. Technical Memorandum No. 1 INFRASTRUCTURE DEVELOPMENT COSTS. August 2001

Maricopa Association of Governments. Technical Memorandum No. 1 INFRASTRUCTURE DEVELOPMENT COSTS. August 2001 Maricopa Association of Governments Technical Memorandum No. 1 INFRASTRUCTURE DEVELOPMENT COSTS August 2001 3033 NORTH 44TH STREET, SUITE 101 PHOENIX, ARIZONA 85018 (602) 263-9500 FAX (602) 265-1422 Technical

More information

I. Introduction. 10 minutes

I. Introduction. 10 minutes I. Introduction 10 minutes Introduction (1 of 2) An uninterrupted water supply is: The primary weapon for extinguishment Essential for fire fighter safety Ensuring a dependable water supply is a critical

More information

Eidelweiss Asset Management. Project Plan. Revision 0 - Draft

Eidelweiss Asset Management. Project Plan. Revision 0 - Draft Eidelweiss Asset Management Project Plan Revision 0 - Draft Written by Larry Leonard Eidelweiss Commissioner / Team Chairperson 5/29/2014 Table of Contents Section Description 1 Overview 2 Development

More information

WERF STRATEGIC ASSET MANAGEMENT CASE STUDY

WERF STRATEGIC ASSET MANAGEMENT CASE STUDY WERF STRATEGIC ASSET MANAGEMENT CASE STUDY Seattle Public Utilities Takes Aim at Critical Assets Using Risk- Based Decision Making and Strategic Asset Management Plans What does asset failure mean to your

More information

Stormwater Asset Management. Presented to SESWA By Ricardo Campos January 23, 2013

Stormwater Asset Management. Presented to SESWA By Ricardo Campos January 23, 2013 Stormwater Asset Management Presented to SESWA By Ricardo Campos January 23, 2013 Agenda I. What is Asset Management? II. Why Asset Management for Stormwater Systems? III. How to Implement a Stormwater

More information

Kansas City s Overflow Control Program

Kansas City s Overflow Control Program Kansas City s Overflow Control Program Kansas City Water Services Water Wastewater Stormwater 2 Water Services Department 1000 Positions 835 Employees 3 Utilities FY 13/14 Budget = $307 million Water Wastewater

More information

Federal Triangle Stormwater Working Group Federal Triangle Floodproofing Seminar BUILDING STRONG SM

Federal Triangle Stormwater Working Group Federal Triangle Floodproofing Seminar BUILDING STRONG SM Federal Triangle Stormwater Working Group Federal Triangle Floodproofing Seminar Initial Risk Flood Risk = Probability of Flooding x Consequences Zoning Building Codes Outreach Evacuation Planning Risk

More information

Asset Management: A Best Practice

Asset Management: A Best Practice Asset Management: A Best Practice Purpose Introduction This guide will help you understand: The definition of Asset Management. Why asset management is important to your utility. The best practices in

More information

Process and Energy Audits at Water and Wastewater Facilities. Thomas Devine, CAP, CEM, LEED AP April 25 2012

Process and Energy Audits at Water and Wastewater Facilities. Thomas Devine, CAP, CEM, LEED AP April 25 2012 Process and Energy Audits at Water and Wastewater Facilities Thomas Devine, CAP, CEM, LEED AP April 25 2012 Presentation Outline Types of Audits Benchmarking Submetering Data Collection/Information Gathering

More information

INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION. Infrastructure Flood Protection Remediation Policies

INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION. Infrastructure Flood Protection Remediation Policies INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION Infrastructure Flood Protection Remediation Policies DRAFT POOLBEG PLANNING SCHEME 196 FIGURE 9.1: UTILITIES WAYLEAVES Electricity Cables 8m Wayleave for

More information

Hardware safety integrity Guideline

Hardware safety integrity Guideline Hardware safety integrity Comments on this report are gratefully received by Johan Hedberg at SP Swedish National Testing and Research Institute mailto:johan.hedberg@sp.se Quoting of this report is allowed

More information

SANITARY SEWER OVERFLOW EVALUATION REPORT

SANITARY SEWER OVERFLOW EVALUATION REPORT SANITARY SEWER OVERFLOW EVALUATION REPORT MAY 2012 SEPT 2013 Draft for Review: November 13, 2013 Prepared by: James C. Hailey & Company City of Gallatin, Sumner County, TN Sanitary Sewer Collection Evaluation

More information

SEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER

SEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER Village of Shorewood, Wisconsin SEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER Prepared By: Thomas A. Zoulek, P.E., LEED A.P. Vice President Mid City Plumbing & Heating

More information

Township of Enniskillen. Asset Management Plan

Township of Enniskillen. Asset Management Plan Township of Enniskillen Asset Management Plan 2014 1 TABLE OF CONTENTS Page A. Introduction 3 B. State of Local Infrastructure 4 C. Desired Levels of Service 7 D. Asset Management Strategy 8 E. Financing

More information

Flood Mitigation and Management in Bangkok Metropolitan Area

Flood Mitigation and Management in Bangkok Metropolitan Area กร งเทพมหานคร Flood Mitigation and Management in Bangkok Metropolitan Area Present By Mr. Kriangkrai Phamornpol Department of Drainage and Sewerage Bangkok Metropolitan Administration 1 Flood Mitigation

More information

San Francisco s Urban Watershed Framework: A Decision Making Process to Support Multi-Benefit Wastewater and Stormwater Projects September 26, 2011

San Francisco s Urban Watershed Framework: A Decision Making Process to Support Multi-Benefit Wastewater and Stormwater Projects September 26, 2011 San Francisco s Urban Watershed Framework: A Decision Making Process to Support Multi-Benefit Wastewater and Stormwater Projects September 26, 2011 Karen Kubick, P.E., SSIP Program Director, SFPUC Randy

More information

City of Bakersfield Public Works Department Sewer System Management Plan December 2014

City of Bakersfield Public Works Department Sewer System Management Plan December 2014 City of Bakersfield Public Works Department Sewer System Management Plan December 2014 C:\Users\hmayberry\Desktop\SEWER SYSTEM MANAGEMENT PLAN 2014.doc 1 Sewer System Management Plan Index: Section 1 Goals

More information

Almonte Sanitary District Sewer System Management Plan Adopted by the ALMONTE Board of Directors on_08/28/06

Almonte Sanitary District Sewer System Management Plan Adopted by the ALMONTE Board of Directors on_08/28/06 Almonte Sanitary District Sewer System Management Plan Adopted by the ALMONTE Board of Directors on_08/28/06 1. Goals The goal of this SSMP is to provide a plan and schedule to properly manage, operate,

More information

CHAPTER 8 CIVIL DESIGN

CHAPTER 8 CIVIL DESIGN CHAPTER 8 CIVIL DESIGN A. GENERAL This Chapter includes standards and design considerations for other civil engineering design in structural, drainage and utilities. Design considerations for electrical

More information

Flood Risk Management

Flood Risk Management Flood Risk Management Value of Flood Risk Management Every year floods sweep through communities across the United States taking lives, destroying property, shutting down businesses, harming the environment

More information

Flood Risk Management

Flood Risk Management Flood Risk Management Value of Flood Risk Management Value to Individuals and Communities Every year floods sweep through communities across the United States taking lives, destroying property, shutting

More information

UTILITIES AND ENERGY MANAGEMENT

UTILITIES AND ENERGY MANAGEMENT UTILITIES AND ENERGY MANAGEMENT University of Texas at Austin increases investment in co-generation to achieve greater utility reliability and economy. ENVIRONMENTAL BENEFITS AND ENERGY SAVINGS Power plant

More information

CRM Inspection Experience & Lessons Learned

CRM Inspection Experience & Lessons Learned CRM Inspection Experience & Lessons Learned Ken Yoss, Control Center Manager Chevron Pipe Line Company (CPL) CPL s Opportunity Align with Control Center Vision Enhance pipeline safety by strengthening

More information

Action plans for hotspot locations - Ash Study

Action plans for hotspot locations - Ash Study Appendix 9 Action plans for hotspot locations - Ash Study Ash Vale North 1. Local evidence indicates the culvert could not discharge during December 2013 because the outlet was blocked on the western side

More information

Urban Environmental Management in Singapore. Jothieswaran P Chief Engineer Pollution Control Department National Environment Agency

Urban Environmental Management in Singapore. Jothieswaran P Chief Engineer Pollution Control Department National Environment Agency Urban Environmental Management in Singapore Jothieswaran P Chief Engineer Pollution Control Department National Environment Agency Introduction City state comprising a main island and some islets Land

More information

Neighbourhood Energy in Vancouver Sewage Heat Recovery within a city-wide strategy

Neighbourhood Energy in Vancouver Sewage Heat Recovery within a city-wide strategy Neighbourhood Energy in Vancouver Sewage Heat Recovery within a city-wide strategy IDEA Annual Conference, June 4, 2013 Kieran McConnell, NEU Systems Engineer SLIDE 1 1) The role of Neighbourhood Energy

More information

A Green Sector Overview

A Green Sector Overview A Green Sector Overview Micro Hydro Electric Power Ontario's Waterpower Resources: Past and Present The first hydroelectric generator in Canada was installed near Ottawa, which was the first city in North

More information

MIAMI-DADE LATERAL PILOT PROGRAM. James T. Cowgill, P.E. Rodney J. Lovett Franklin Torrealba, P.E.

MIAMI-DADE LATERAL PILOT PROGRAM. James T. Cowgill, P.E. Rodney J. Lovett Franklin Torrealba, P.E. MIAMI-DADE LATERAL PILOT PROGRAM James T. Cowgill, P.E. Rodney J. Lovett Franklin Torrealba, P.E. Hazen and Sawyer, P.C. 4000 Hollywood Boulevard Hollywood, FL 33021 ABSTRACT Since 1994 the Miami-Dade

More information

Adapting to Climate Change Through Asset Management Planning. Tiffany Batac David Rose, PhD Parsons Brinckerhoff

Adapting to Climate Change Through Asset Management Planning. Tiffany Batac David Rose, PhD Parsons Brinckerhoff Adapting to Climate Change Through Asset Management Planning Tiffany Batac David Rose, PhD Parsons Brinckerhoff 1 2 Agenda FTA Transit Climate Change Adaptation Assessment Pilots: MARTA Study Framework

More information

Genesee Advanced Water Treatment Facility

Genesee Advanced Water Treatment Facility Genesee Advanced Water Treatment Facility State Revolving Fund Loan Public Hearing April 28, 2015 Project Purpose Upgrade critical components of the District's water system Develop a more robust water

More information

NETWORK OUTPUT MEASURES METHODOLOGY Authors: National Grid, SP Transmission Limited, Scottish Hydro Electric Transmission Limited

NETWORK OUTPUT MEASURES METHODOLOGY Authors: National Grid, SP Transmission Limited, Scottish Hydro Electric Transmission Limited NETWORK OUTPUT MEASURES METHODOLOGY Authors: National Grid, SP Transmission Limited, Scottish Hydro Electric Transmission Limited TABLE OF CONTENTS 1.0 Purpose and Scope...2 1.1 Methodology Purpose...2

More information

Bridges & Culverts Condition by Quantity

Bridges & Culverts Condition by Quantity 3.4.3 What condition is it in? Approximately 93% of the municipality s bridge structures are in good to excellent condition, with the remaining 7% in fair condition. As a result, the municipality received

More information

Thames Water key Messages for London Borough of Ealing 25 th October 2005

Thames Water key Messages for London Borough of Ealing 25 th October 2005 Thames Water key Messages for London Borough of Ealing 25 th October 2005 Item 1: Drainage & ownership The area of drainage is complex. Thames Water, the Local Authority, the Environment Agency and property

More information

NETWORK OUTPUT MEASURES CONSULTATION

NETWORK OUTPUT MEASURES CONSULTATION NETWORK OUTPUT MEASURES CONSULTATION Great Britain s electricity transmission network transmits high-voltage electricity from where it is produced to where it is needed throughout the country. It broadly

More information

Fundamentals of Asset Management. Step 10. Build Asset Management Plan A Hands-On Approach

Fundamentals of Asset Management. Step 10. Build Asset Management Plan A Hands-On Approach Fundamentals of Asset Management Step 10. Build Asset Management Plan A Hands-On Approach Tom s bad day Fundamentals of Asset Management 2 AM plan 10-step process Develop Asset Registry Assess Performance,

More information

1 in 30 year 1 in 75 year 1 in 100 year 1 in 100 year plus climate change (+30%) 1 in 200 year

1 in 30 year 1 in 75 year 1 in 100 year 1 in 100 year plus climate change (+30%) 1 in 200 year Appendix C1 Surface Water Modelling 1 Overview 1.1 The Drain London modelling was designed to analyse the impact of heavy rainfall events across each London borough by assessing flow paths, velocities

More information

Preliminary Engineering Report Lake Huron Water Supply Karegnondi Water Authority

Preliminary Engineering Report Lake Huron Water Supply Karegnondi Water Authority Preliminary Engineering Report Lake Huron Water Supply Karegnondi Water Authority September 2009 Prepared by: AECOM Jones & Henry Engineers, LTD Lockwood, Andrews and Newnam, Inc. O'Malia Consulting ROWE

More information

FINAL TECHNICAL MEMORANDUM AWD-00002 FLOWS THROUGH FLOOD DAMAGE REDUCTION AREA July 16, 2012

FINAL TECHNICAL MEMORANDUM AWD-00002 FLOWS THROUGH FLOOD DAMAGE REDUCTION AREA July 16, 2012 FINAL TECHNICAL MEMORANDUM AWD-00002 FLOWS THROUGH FLOOD DAMAGE REDUCTION AREA July 16, 2012 Table of Contents TABLE OF CONTENTS Table of Contents... 1 Executive Summary... 2 1 Objective... 4 2 Study Approach...

More information

City of Edmonton Page 1 of 5 Foundation Drain Discharge Collection System Guideline November, 2005

City of Edmonton Page 1 of 5 Foundation Drain Discharge Collection System Guideline November, 2005 City of Edmonton Page 1 of 5 This guideline will apply to all new developments involving singledetached, semi-detached or duplex houses in the City of Edmonton effective January 1, 2006. Preamble: This

More information

North San Jose Neighborhoods Planning Taskforce

North San Jose Neighborhoods Planning Taskforce North San Jose Neighborhoods Planning Taskforce Key Topics Water Supply Flooding Related Topics Storm Water Storm Sewer Sanitary Sewer Water Conservation Treatment Plant Water Background Responsible Agencies

More information

CONFIRMING WET WEATHER TREATMENT FACILITY HYDRAULIC DESIGN WITH PHYSICAL MODEL STUDY

CONFIRMING WET WEATHER TREATMENT FACILITY HYDRAULIC DESIGN WITH PHYSICAL MODEL STUDY CONFIRMING WET WEATHER TREATMENT FACILITY HYDRAULIC DESIGN WITH PHYSICAL MODEL STUDY TONY YEE, PE JARED HUTCHINS, PE METROPOLITAN SEWER DISTRICT OF GREATER CINCINNATI BLACK & VEATCH WET WEATHER TREATMENT

More information

Request for Proposals April 10, 2008 Freshwater Brook Sewer & Water Project Contract Administration & Inspection Page No. 1 TABLE OF CONTENTS

Request for Proposals April 10, 2008 Freshwater Brook Sewer & Water Project Contract Administration & Inspection Page No. 1 TABLE OF CONTENTS REQUEST FOR PROPOSAL Freshwater Brook Sewer and Water Project April 2008 Closing Date: Wednesday, April 23, 2008 Closing Time: 3:00 p.m. (Local Time) Halifax Water 200 Bluewater Road, Suite 201 P.O. Box

More information

OPERATIONS & MAINTENANCE FY 2012-2013 Adopted Budget

OPERATIONS & MAINTENANCE FY 2012-2013 Adopted Budget SERVICE DESCRIPTION To maintain all of the transferred and accepted infrastructure within the district including water, wastewater, and stormwater systems, streetlights, traffic signals, and landscaping

More information

Click to edit Master title style

Click to edit Master title style Click to edit Master title style Sewer System Improvement Program (SSIP) Karen Kubick, PE Wastewater Enterprise Capital Program Director San Francisco Public Utilities Commission Construction Managers

More information

FEDERAL GOVERNMENT OVERSIGHT OF PIPELINE SAFETY

FEDERAL GOVERNMENT OVERSIGHT OF PIPELINE SAFETY Operational Safety INTRODUCTION The Millennium Pipeline Company (Millennium) is proud of the key role it plays in New York s energy infrastructure. The Millennium Pipeline is a vital link in a system that

More information

INNOVATION AND COST EFFECTIVE APPROACH TO POTABLE WATER PIPE REPLACEMENT STRATEGICALLY FOCUSED ON DISTRIBUTION SYSTEM WATER QUALITY IMPROVEMENT By

INNOVATION AND COST EFFECTIVE APPROACH TO POTABLE WATER PIPE REPLACEMENT STRATEGICALLY FOCUSED ON DISTRIBUTION SYSTEM WATER QUALITY IMPROVEMENT By INNOVATION AND COST EFFECTIVE APPROACH TO POTABLE WATER PIPE REPLACEMENT STRATEGICALLY FOCUSED ON DISTRIBUTION SYSTEM WATER QUALITY IMPROVEMENT By ABSTRACT Migdalia Hernandez, City of Sanford P.O. Box

More information

Residential Plumbing BCN 1058

Residential Plumbing BCN 1058 Residential Plumbing BCN 1058 CHAPTER 7 Plumbing Fixtures and Sizing the Drain, Waste, and Vent System MICHAEL KNOTEK 74 Plumbing Fixtures and Sizing the Drain, Waste, and Vent System PLUMBING FIXTURES

More information

PREDICTIVE AND OPERATIONAL ANALYTICS, WHAT IS IT REALLY ALL ABOUT?

PREDICTIVE AND OPERATIONAL ANALYTICS, WHAT IS IT REALLY ALL ABOUT? PREDICTIVE AND OPERATIONAL ANALYTICS, WHAT IS IT REALLY ALL ABOUT? Derek Vogelsang 1, Alana Duncker 1, Steve McMichael 2 1. MWH Global, Adelaide, SA 2. South Australia Water Corporation, Adelaide, SA ABSTRACT

More information

PUTTING IT ALL TOGETHER: INTEGRATING MASTER PLANNING WITH ASSET MANAGEMENT

PUTTING IT ALL TOGETHER: INTEGRATING MASTER PLANNING WITH ASSET MANAGEMENT PUTTING IT ALL TOGETHER: INTEGRATING MASTER PLANNING WITH ASSET MANAGEMENT Jeffrey B. Stillman, P.E., Practice Leader (Main Author/Presenter) Kevin T. Laptos, P.E., Regional Planning Leader Kent A. Lackey,

More information